Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Status: Closed — No Longer Accepting Submissions
This tender closed on 27 February 2026. Submissions are no longer accepted. The tender lifecycle continues — check the awards section for updates.
Tender Type
RFP
Delivery Location
1 Cullinan Crescent - Kimberley - Kimberley - 8301
Organization Type
GOVERNMENT
Published
03 Feb 2026
The william humphreys art gallery (northern cape) is seeking to appoint a panel of qualified maintenance service providers for a 36‑month period. Providers will be selected for categories such as electrical, building, pest control, tree felling, air‑conditioning and plumbing, with work allocated on a quotation‑by‑quotation basis. Submissions must be emailed by 27 february 2026 and meet strict compliance, insurance and b‑bbee requirements.
AI Document Analysis Stages
RFP
1 Cullinan Crescent - Kimberley - Kimberley - 8301
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Request for Proposals - Panel of Maintenance Services Providers.pdf
Date & Time
Friday, 27 February 2026 - 23:30
Venue
null
This briefing session took place during the tender period.
The panel will cover, but is not limited to, the following categories:
Category: technical
3.1 Electrical Maintenance Services
Category: technical
• Fault finding and repairs to electrical installations
Category: technical
• Maintenance of distribution boards, wiring, plugs, switches, and lighting
Category: technical
03 Feb
2026
Tender Published
Tender was published
27 Feb
2026
Closing Date
Tender closing date
Pending
Median Estimate
R 441 448
Range
Based on 18 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
AI Document Analysis Stages
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: Request for Proposals - Panel of Maintenance Services Providers.pdf. You don’t need to refresh — this page will pick up the updated review automatically.
Important Dates
Source: Request for Proposals - Panel of Maintenance Services Providers.pdfContact Information
Source: Request for Proposals - Panel of Maintenance Services Providers.pdfContact: Mpho Matsitle
Phone: 053 831 1724
Email: [email protected]
Organisation: William Humphreys Art Gallery (WHAG)
No physical submission address is provided; proposals are to be emailed.
Submission Guidelines
Source: Request for Proposals - Panel of Maintenance Services Providers.pdfEvaluation Criteria
Source: Request for Proposals - Panel of Maintenance Services Providers.pdfTechnical Specifications
Source: Request for Proposals - Panel of Maintenance Services Providers.pdfScope of services (non‑exclusive panel, 36‑month term, work allocated per quotation):
1. Electrical Maintenance – fault finding, repairs, distribution board maintenance, compliance inspections, emergency response, preventive upgrades.
2. Building Maintenance – carpentry, masonry, glazing, painting, minor renovations, preventive and emergency repairs.
3. Fumigation & Pest Control – inspections, treatments, fumigation of galleries/offices, environmentally compliant methods, reporting.
4. Tree Felling & Grounds – tree pruning/felling, hazardous tree removal, stump disposal, municipal/environmental compliance.
5. Air‑Conditioning – installation, servicing, fault repairs, refrigerant handling, preventive schedules, emergency repairs, reporting.
6. Plumbing – water supply/drainage repairs, taps, valves, toilets, leak detection, blocked drains, geyser maintenance, emergency services, compliance with plumbing standards.
Additional requirements: compliance with Occupational Health and Safety Act, provision of service reports to Facilities Officer, minimum 6‑month warranty on all work, adherence to health & safety regulations.
Financial Requirements
Source: Request for Proposals - Panel of Maintenance Services Providers.pdfCompliance Requirements
Source: Request for Proposals - Panel of Maintenance Services Providers.pdfMandatory compliance:
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
To download these documents and access AI-powered analysis, visit the main tender page.
• Compliance inspections and Certificates of Compliance (where applicable)
Category: technical
• Emergency electrical services
Category: technical
• Preventative maintenance and upgrades
Category: technical
3.2 Building Maintenance Services
Category: technical
• General building repairs (carpentry, masonry, glazing, painting, etc.)
Category: technical
• Minor renovations and alterations
Category: technical
• Preventative maintenance services
Category: technical
• Emergency building repairs
Category: technical
3.3 Fumigation and Pest Control Services
Category: technical
• Pest inspections and treatment (rodents, insects, termites, etc.)
Category: technical
• Fumigation of offices, storage areas, and galleries where required
MandatoryCategory: technical
• Environmentally compliant pest control methods
Category: technical
• Issuing of treatment reports and compliance documentation
Category: technical
3.4 Tree Felling and Grounds-Related Services
Category: technical
• Tree felling and pruning
Category: technical
• Removal of dead or hazardous trees
Category: technical
• Stump removal and disposal
Category: technical
• Compliance with municipal and environmental regulations
Category: technical
3.5 Air Conditioning Services
Category: technical
• Installation, servicing, and maintenance of air conditioning units
Category: technical
• Fault finding, repairs, and replacement of components
Category: technical
• Preventative maintenance and routine servicing schedules
Category: technical
• Refrigerant handling in compliance with environmental regulations
Category: technical
• Emergency air conditioning repairs
Category: technical
• Issuing of service reports and compliance documentation
Category: technical
3.6 Plumbing Maintenance Services
Category: technical
• Maintenance and repair of water supply and drainage systems
Category: technical
• Repair and replacement of taps, valves, pipes, toilets, basins, and urinals
Category: technical
• Leak detection and repair
Category: technical
• Blocked drains and sewer line maintenance
Category: technical
• Installation and maintenance of geysers and related fittings
Category: technical
• Emergency plumbing services
Category: technical
• Compliance with relevant plumbing standards and regulations
Category: technical
4. Duration of the Panel
Category: technical
The panel will be appointed for a period of thirty-six (36) months, subject to satisfactory
Category: technical
performance and continued compliance with WHAG requirements. WHAG reserves the right
Category: technical
to review, terminate, or amend the panel in accordance with SCM policies.
Category: technical
5. Nature of Appointment
Category: technical
• Appointment to the panel is non-exclusive.
Category: technical
• Work will be allocated on a quotation/request basis among panel members.
Category: technical
• WHAG reserves the right to invite one or more panel members to quote per
Category: technical
assignment.
Category: technical
• Emergency work may be allocated directly to an available panel member.
Category: technical
6. Eligibility and Compliance Requirements
Category: technical
Service providers must:
MandatoryCategory: technical
• Be tax compliant with SARS
Category: technical
• Be registered on the Central Supplier Database (CSD)
Category: technical
• Hold relevant industry registrations and certifications (where applicable)
Category: technical
• Have proven experience in the relevant service category
Category: technical
• Comply with Occupational Health and Safety Act requirements
Category: technical
• Carry appropriate insurance (public liability, workers’ compensation, etc.)
Category: technical
7. Submission Requirements
Category: technical
Interested service providers must submit:
MandatoryCategory: technical
• Completed bid documents
Category: technical
• Company profile and relevant experience
Category: technical
• Proof of CSD registration
Category: technical
• Tax compliance status
Category: technical
• Copies of professional certifications and licenses
Category: technical
• Proof of insurance
Category: technical
• Pricing structure or schedule of rates
Category: technical
8. Evaluation Criteria
Category: technical
Submissions will be evaluated based on:
Category: technical
• Compliance with mandatory requirements
MandatoryCategory: technical
• Relevant experience and capacity
Category: technical
• Technical competence
Category: technical
• Pricing and value for money
Category: technical
• Past performance and references
Category: technical
9. Contractual Arrangements
Category: technical
Successful service providers will enter into a Service Level Agreement (SLA) with WHAG. The
Category: technical
SLA will define service standards, response times, pricing mechanisms, and reporting
Category: technical
requirements. Payments will be made in accordance with WHAG’s financial policies upon
Category: technical
receipt of valid invoices and proof of work completed.
Category: technical
10. Performance Management
Category: technical
WHAG will monitor performance throughout the panel period. Poor performance, non-
Category: technical
compliance, or breach of contract may result in suspension or removal from the panel.
Category: technical
11. Confidentiality and Ethics
Category: technical
Service providers must maintain confidentiality of all WHAG information and adhere to ethical
MandatoryCategory: technical
business practices, including avoidance of conflicts of interest.
Category: technical
12. Rights Reserved
Category: technical
WHAG reserves the right to:
Category: technical
• Accept or reject any or all submissions
Category: technical
• Appoint one or more service providers per category
Category: technical
• Cancel the process at any stage without incurring liability
Category: technical
13. Health and Safety
Category: technical
The contractor shall comply with all health and safety regulations and guidelines set forth by
Category: technical
local and national authorities. The contractor shall ensure that all equipment and tools used in
Category: technical
the project are in good working condition and are regularly maintained to prevent accidents or
Category: technical
injuries.
Category: technical
14. Reporting
Category: technical
The contractor shall provide a detailed report of all maintenance tasks performed, including
Category: technical
any repairs or replacements made, to the Facilities Officer. The report should be submitted at
Category: technical
the end of installation, servicing, and maintenance, and should include any recommendations
Category: technical
for future maintenance or repairs.
Category: technical
15. Warranty
Category: technical
The contractor shall provide a warranty for all maintenance work performed for a period of at
Category: technical
least six months from the date of completion. The warranty should cover any defects or issues
Category: technical
that arise because of the maintenance work performed.
Category: technical
16. Technical Mandatory Requirements
MandatoryCategory: technical
The proposal must indicate which of the following service categories the service provider is
MandatoryCategory: technical
competent in and provide proof of expertise and experience thereof.
Category: technical
1. Electrical Maintenance Services
Category: technical
2. Building Maintenance Services
Category: technical
3. Fumigation and Pest Control Services
Category: technical
4. Tree Felling and Grounds-Related Services
Category: technical
5. Air Conditioning Services
Category: technical
6. Plumbing Maintenance Services
Category: technical
The Technical Mandatory Requirements are listed below, failure to submit all the
MandatoryCategory: technical
documentation requested below will lead to disqualification and bid will not be evaluated
Category: technical
further.
Category: technical
Mandatory Description Proof Required Criteria
MandatoryCategory: technical
Company The service provider must have a Company profile indicating at
MandatoryCategory: technical
Profile minimum of one year of experience in least one year of rendering
Category: technical
maintenance services. maintenance services.
Category: technical
Company The service provider must provide At least one reference letter
MandatoryCategory: technical
Experience evidence of successful completion of at for each applicable category
Category: technical
least one similar project per applicable
Category: technical
category.
Category: technical
Qualifications All staff working on the project must CVs of project leaders and
MandatoryCategory: technical
and Expertise have experience, and any applicable technicians.
Category: technical
academic qualifications and trade
Category: technical
certificates in the relevant category.
Category: technical
No specific requirements found
MandatoryCategory: compliance
B-BBEE Minimum Level: 1
MandatoryCategory: compliance
Awaiting Award of Contract
This tender has not yet been awarded. The contracting authority is expected to publish the award notice in due course.
27 Feb
2026
Submissions Closed
No further submissions were accepted after this date.
Organization
William Humphreys Art GalleryContact Person
Mpho Matsitle
Phone
+27 53 831 1724
[email protected]
Website
www.whag.co.za/
Address
1 Cullinan Cres, Civic Centre, Kimberley, 8300, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
1
Last checked
05 Jun 2026
AI status
Enhanced
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Learn how to submit a winning bid with these related articles
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Data conflicts
None detected
1 Cullinan Cres, Civic Centre, Kimberley, 8300, South Africa
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services to buildings and landscape activities. Unlock full pricing strategies, bid frequency, and historical win rates.