Tender Type
Request for Bid(Open-Tender)
Delivery Location
Arnot Power Station - Rietkuil - Mpumalanga - 1097
Organization Type
GOVERNMENT
Published
16 Sept 2026
OCDS Reference
ocds-9t57fa-170684
ESKOM is seeking a contractor for the dredging of high-level and low-level ash water return dams at arnot power station in mpumalanga, on an as-and-when-required basis for 36 months. The contract requires a documented iso 9001:2015-compliant quality management system, a draft contract quality plan, and a quality control plan, with evaluation points awarded across four quality sections. Bidders must complete and sign form a and provide all required quality documentation to avoid disqualification.
Closing date: 13 October 2026 at 10:00 (time stated in tender record; confirm exact time from tender documents).
Submission method: Not stated in the provided document; verify from the full tender pack.
Mandatory briefing/site visit: Not stated in the provided document; verify from the full tender pack.
Returnable documents: Form A must be completed and signed; no other submission details are stated.
Quality management system: Must provide objective evidence of a documented QMS complying with ISO 9001:2015 (not necessarily certified), including QMS manual, quality policy, quality objectives, control of documented information, control of nonconforming outputs, nonconformity and corrective action, and internal audit procedures.
Quality plans: Must submit a draft Contract Quality Plan (Ref ISO 10005) and a draft Quality Control Plan/ITP (Ref ISO 10005) as per scope of works.
Evaluation: Quality requirements scored across Sections A (7 points), B (2 points), C (1 point), D (1 point), E (1 point) — total 12 points; no minimum qualifying score stated.
Eligibility: Must be registered on the CSD (Central Supplier Database) and have a valid SARS tax clearance; B-BBEE level required for preference points (exact level not stated).
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Tuesday, 13 October 2026 - 10:00
Venue
null
Categories
Request for Bid(Open-Tender)
Arnot Power Station - Rietkuil - Mpumalanga - 1097
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Description
Source: Eskom Vehicle Safety Spec 32-345.pdf16 Sept
2026
Tender Published
Tender was published
13 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
240-12248652_List of Tender Returnables_Cat 3_ Rev 7.docx
Dredging of high level and low-level Ash Water Return Dams at Arnot Power Station on an 'as and when required' basis for a period of 36 months is required by ESKOM in Mpumalanga. Bidders must submit quality documentation as outlined in the tender requirements.
240-68099512 Form A_Cat 3_ Rev 9.docx
Eskom requires the dredging of the high-level and low-level Ash Water Return Dams at Arnot Power Station in Mpumalanga, on an as-and-when-required basis for a 36-month period. Bidders must accept Eskom's Supplier Quality Requirements as per specification 240-105658000 and the ISO 9001 standard.
Safety Health Environment and Quality SHEQ Policy.pdf
Eskom requires a contractor for the dredging of high-level and low-level Ash Water Return Dams at Arnot Power Station in Mpumalanga, on an as-and-when-required basis, for a period of 36 months (3 years).
Eskom General Conditions of Purchase.pdf
Dredging of high-level and low-level Ash Water Return Dams at Arnot Power Station on an as-and-when-required basis for a period of 36 months (3 years), for Eskom.
Eskom Supplier Integrity Pact_.pdf
Eskom requires dredging of the high-level and low-level Ash Water Return Dams at Arnot Power Station in Mpumalanga. The service will be appointed on an “as and when required basis” for 36 months (3 years).
Invitation to Tender (ITT) or Request for Proposal (RFP) E3558GXMPARN.pdf
Eskom is procuring dredging services for high-level and low-level Ash Water Return Dams at Arnot Power Station in Mpumalanga on an as-and-when-required basis for 36 months. The tender requires electronic submission via Eskom E-tendering by 13 October 2026 at 10:00 AM SAST, with a 120-working-day validity period.
Eskom Vehicle Safety Spec 32-345.pdf
Dredging of the high-level and low-level Ash Water Return Dams at Arnot Power Station in Mpumalanga is required by ESKOM. The services are required on an as and when required basis for 36 months (3 years).
Eskom life-saving rules.pdf
Dredging of high level and low-level Ash Water Return Dams at Arnot Power Station on an 'as and when required' basis for a period of 36 months (3 years). The work is for Eskom in Mpumalanga.
OSH Acknowledge form.pdf
Dredging of high-level and low-level Ash Water Return Dams at Arnot Power Station on an as-and-when-required basis for 36 months, issued by Eskom in Mpumalanga.
Eskom - Standard Conditions of Tender.pdf
Dredging of high-level and low-level Ash Water Return Dams at Arnot Power Station on an as-and-when-required basis for a period of 36 months (3 years).
Supplier Declaration of Interest Template.docx
Eskom requires dredging services for high-level and low-level ash water return dams at Arnot Power Station in Mpumalanga on an as-and-when-required basis for a 36-month period.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
The document is Eskom's Vehicle Safety Specification (32-345, Revision 5), which standardises minimum safety requirements for all vehicles used for Eskom business, including contractor vehicles. It applies to Eskom Holdings, its divisions, subsidiaries, scheme vehicles, and any vehicle used for Eskom purposes. Only newly purchased vehicles and new contracts must comply; existing vehicles follow a phased replacement plan.
Technical Specifications
Source: Eskom Vehicle Safety Spec 32-345.pdf (unknown)The document is the Eskom Vehicle Safety Specification (32-345, Revision 5), which sets minimum safety requirements for all vehicles used for Eskom business, including contractor vehicles.
Standard minimum specifications for all vehicles:
Light delivery vehicles (LDVs, <3 500 kg):
Heavy commercial vehicles (GVM >3 500 kg, including >16 000 kg and abnormal):
Minibuses (up to 16 passengers):
Midi-buses and buses (16+ passengers):
Trailers and caravans:
Construction vehicles:
Other:
Methodology
Source: Eskom Vehicle Safety Spec 32-345.pdfExisting vehicles follow a phased replacement plan per the Fleet Services Department. Scheme and non-Eskom vehicles must comply when replaced. Newly purchased vehicles and new contracts must comply immediately.
Quality Management
Source: Eskom Vehicle Safety Spec 32-345.pdfCompliance with the specification is audited at least annually by the operating/business unit as part of internal audit. Sustainability Systems OHS may perform compliance inspections. All records are audited by the Assurance and Forensic Department (A&F) or a delegated person, at a frequency determined by A&F.
Compliance Requirements
Source: Eskom Vehicle Safety Spec 32-345.pdf (unknown)The specification applies to all Eskom vehicles and vehicles used for Eskom activities, including contractor vehicles. Only newly purchased vehicles and new contracts must comply; existing vehicles follow a phased replacement plan. Scheme and non-Eskom vehicles must comply when replaced.
Compliance is audited at least annually by the operating/business unit. Sustainability Systems OHS may perform compliance inspections. Records are audited by the Assurance and Forensic Department (A&F).
References (most recent editions apply):
Health & Safety
Source: Eskom Vehicle Safety Spec 32-345.pdfVehicle safety requirements are detailed in the technical specifications. Construction vehicles must meet OHS Act Construction Regulation 23, NRTA, Mine Health and Safety Act, and NEMA. Operator protection, signalling, acoustic warning and reversing alarms, and telescoping whips with flags are required where applicable.
Contractual Terms
Source: Eskom Vehicle Safety Spec 32-345.pdf (unknown)Changes or modifications to any Eskom-owned vehicle must be managed per the Fleet Management Policy and certified safe by the manufacturer. The Fleet section must approve any added items. Items must be supplied and installed by the dealer or at approved fitment centres.
Description
Source: 240-68099512 Form A_Cat 3_ Rev 9.docxThe tenderer must complete and sign the Supplier Quality Requirements acknowledgement form to acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 Standard.
Submission Guidelines
Source: 240-68099512 Form A_Cat 3_ Rev 9.docx (unknown)Returnable documents:
Evaluation Criteria
Source: 240-68099512 Form A_Cat 3_ Rev 9.docx (unknown)Bidders must complete and sign the Supplier Quality Requirements acknowledgement form, selecting Category 3 as the applicable pre-contract award quality category. No other eligibility criteria are stated in the provided document.
Technical Specifications
Source: 240-68099512 Form A_Cat 3_ Rev 9.docx (unknown)The tenderer must complete and sign the Supplier Quality Requirements acknowledgement form to acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 Standard.
Compliance Requirements
Source: 240-68099512 Form A_Cat 3_ Rev 9.docx (unknown)No specific requirements found
Evaluation Criteria
Source: Safety Health Environment and Quality SHEQ Policy.pdf (unknown)Bidders must comply with Eskom's SHEQ Policy (document 32-727), which requires conformance with ISO 9001, ISO 14001, and ISO 45001/OHSAS 18001 standards, as well as relevant South African legislation including the Occupational Health and Safety Act, National Environmental Management Act, and the Constitution. Contractors must demonstrate a commitment to Zero Harm (zero fatalities, injuries, ill-health, environmental incidents, and defects) and adhere to Eskom's Life-saving Rules. No specific B-BBEE level, CIDB grading, or financial thresholds are stated in the provided document.
Technical Specifications
Source: Safety Health Environment and Quality SHEQ Policy.pdf (unknown)Eskom Holdings SOC Ltd, Registration Number 2002/015527/30, is South Africa's primary electricity supplier and is wholly owned by the South African Government. Eskom's key role is to assist in lowering the cost of doing business in South Africa, enabling economic growth and security of supply through providing electricity in an efficient and sustainable manner, including its generation, transmission and distribution, while ensuring that this is done within acceptable benchmark standards.
Eskom generates and distributes approximately 95% of the electricity used in South Africa and approximately 40% of the electricity used on the rest of the African continent. Approximately 90% of Eskom's production is coming from coal.
Eskom aims to comply with the legislation, policies, conditions and requirements of key government stakeholders, including spheres of government.
Eskom is currently moving away from operating as a vertically integrated company that supplies electricity to South Africa and the Southern African Development Community (SADC) region. As the main provider of generation, transmission and distribution capacity in South Africa, Eskom supplies electricity to industrial, mining, commercial, agricultural and residential customers, as well as to redistributors.
In doing so, Eskom's mission is to provide sustainable electricity solutions to grow the economy and improve the quality of life of the people in South Africa and in the region.
Eskom is committed to safety, health, the environment and quality principles to ensure that no operating condition or urgency of service justifies exposing anyone to negative risks arising out of Eskom's business, causing an incident with health, safety, environmental and quality consequences.
This Safety, Health, Environment & Quality (SHEQ) Policy governs principles and rules to fulfil Eskom's commitment to people, the environment and quality.
Eskom's operations are underpinned by the organisation's vision, mission and values.
Vision
Sustainable power for a better future
Mission
To provide sustainable electricity solutions to grow the economy and improve the quality of life of the people in South Africa and in the region
Eskom will strive to ensure that zero harm befalls its employees, contractors, the
Zero harm
public and the natural environment
Integrity Honesty of purpose, conduct and discipline in actions, and respect for people
Innovation Value-adding creativity and results oriented. Lead through excellence and innovation
Sinobuntu Caring
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30
Safety, Health, Environment, and Quality (SHEQ) Unique Identifier: 32-727
Policy Revision: 4
Page:
A commitment to meet and strive to exceed the needs of the receivers of products
Customer satisfaction
and services
Excellence Acknowledged by all for exceptional standards, performance and professionals
The SHEQ Policy and its implementation aims to ensure commitment to the Eskom vision, values
and the sustainability principles. Zero Harm means ensuring that the Eskom operational activities
do not inflict harm on Eskom's assets, its employees, contractors and members of the public affected
by its operations, and the environment in terms of compliance obligations. Zero Harm is a value,
which the organisation will strive towards by operating within its compliance obligations/legal and
other requirements, continual improvement against set intended outcomes and reduction of its
environmental footprint by avoiding incidents and minimising environmental degradation. The SHEQ
Policy also aims to achieve Zero Defects.
The implementation of this policy will be in line with the abovementioned values, which underpin the
way Eskom operates.
2.1 Policy statement
Eskom will integrate and/or incorporate safety, health, environment and quality requirements through
the plan-do-check-act (PDCA) quality cycle in its activities so that decisions made ensure the
consideration of economic development, environmental duty of care, and social equity to continually
improve performance and achieve stakeholder requirements.
Eskom's commitment to safety, health, environment, and quality management is achieved through:
14001, and ISO 45001/OHSAS 18001 requirements;
subscribes and sets to meet the intent of this policy;
health, as well as the provision of safe and healthy workplaces and activities;
stakeholders;
measuring performance against these to ensure continual improvement;
assessment, fitness for duty assessments, emergency preparedness responses, response to
emerging outbreaks, pandemic or epidemic disasters and medical surveillances) for the
opportunity for improvement within the SHEQ management systems;
conducting safety, health, environment and quality training and creating employee awareness;
engaging interested parties and stakeholders by promoting open communication and
engagement that is safety, health, environment and quality purpose-driven;
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30
Safety, Health, Environment, and Quality (SHEQ) Unique Identifier: 32-727
Policy Revision: 4
Page:
safety, health, environment and quality requirements;
management;
committees;
degradation, pursuing a low-carbon future, and prioritising energy and water efficiency and
conservation within and outside Eskom including transitioning to a cleaner energy mix;
requirements;
mitigation and adaptation, and protection of biodiversity, ecosystems and the prevention of
pollution and degradation
ensuring continual improvement in SHEQ systems to enhance Eskom's business performance;
consultation and participation of workers and worker representatives on OH&S management
systems.
2.2 Policy principles or rules
Eskom's principles and rules that underpin the way in which it approaches safety, health,
environment and quality are as follows:
preventable.
SHEQ performance is achieved through a Zero Harm culture.
Management is accountable for setting safety, health, environment and quality policy and every
employee is expected to ensure implementation and compliance within the scope of their duties.
Conducting business with respect and care for people, the environment and assets.
Eskom strives to ensure that Zero Harm befalls its employees, contractors, the public and the
environment:
o Zero fatalities
o Zero injuries, ill-health
o Zero environmental incidents
o Zero tolerance
o Zero defects
contractors and visitors:
o Open, isolate, test, earth, bond, and/or insulate before touch
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30
Safety, Health, Environment, and Quality (SHEQ) Unique Identifier: 32-727
Policy Revision: 4
Page:
o Hook up at heights
o Buckle up
o Be sober
o Permit to work
out of Eskom's business, causing an incident with health, safety, environmental and quality
consequences.
and quality intended outcomes and criteria in line with Eskom values, and promote efficiency.
3.1 Scope
This policy document sets out Eskom's approach to safety, health, environment and quality across
the Eskom Group.
3.1.1 Purpose
The purpose of this policy is to set the commitment for safety, health, environment and quality
management within Eskom and to ensure uniformity across the organisation.
3.1.2 Applicability
This policy shall apply throughout Eskom Holdings SOC Ltd divisions, subsidiaries, and entities in
which Eskom has a controlling interest or influence.
3.1.3 Effective date
Implementation of this policy shall be monitored after one month from the date of authorisation and
communication.
3.2 Normative/Informative references
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
3.2.1 Normative
[1] ISO 9001 Quality Management Systems - Requirements
[2] Constitution of the Republic of South Africa Act, No.
[3] National Environmental Management Act, No.
[4] Occupational Health and Safety Act, No.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30
Safety, Health, Environment, and Quality (SHEQ) Unique Identifier: 32-727
Policy Revision: 4
Page:
[5] Compensation for Occupational Injuries and Diseases Act, No.
[6] Mines Health and Safety Act, No.
[7] 240-62196227 Life-saving Rules standard
[8] 32-716 Internal OHS Communications Standard
[9] 240-62582234 OHS Roles and Responsibilities and Statutory Appointments
[10] ISO 14001 Environmental Management Systems – Requirements with guidance for use
[11] OHSAS 18001: Occupational Health and Safety Management Systems – Requirements
[12] ISO 45001 Occupational Health and Safety Management System Standard — Requirements
with guidance for use
3.2.2 Informative
[1] ISO 9000 Quality Management Systems – Fundamentals and Vocabulary
[2] Health and Safety Agreement between Eskom and Organised Labour
[3] 240-77569976 Eskom Climate Change Policy
[4] ISO 9004 Managing for the Sustained Success of an Organisation – A Quality Management
Approach
3.3 Definitions
3.3.1 Accident: Any unplanned event, arising out of and in the course of, an Eskom or contractor
employee's employment and resulting in personal injury, ill-health, or death of the employee,
including damage and/or environmental pollution or degradation, as well as death of, or injury
to, any member of the public.
3.3.2 Consultation: seeking views before making a decision
3.3.3 Continual improvement: Recurring activity to increase the ability to fulfil requirements.
3.3.4 Contractor: (Also referred to as mandatory as per section 1 of the OHS Act): Any employer
formally contracted (directly or indirectly) by Eskom and who performs work and supplies a
service, product, equipment or material for the purposes of advancing Eskom's business or
other interests is classified as a contractor. This includes Eskom board members, personal
contractors (that is, consultants) and third-party contractors (that is, vendors, suppliers,
agents, joint ventures, principal contractors and subcontractors).
3.3.5 Environment: The surroundings within which humans exist and that are made up of:
i. the land, water, and atmosphere of the earth;
ii. micro-organisms and plant and animal life;
iii. any part or combination of (i) and (ii) and the interrelationships among and between
them; and
iv. the physical, chemical, aesthetic, and cultural properties and conditions of the foregoing
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30
Safety, Health, Environment, and Quality (SHEQ) Unique Identifier: 32-727
Policy Revision: 4
Page:
that influence human health and well-being.
3.3.6 Eskom: Eskom Holdings SOC Ltd.
3.3.7 Incident: Any unplanned event that could or does result in harm, injury and ill-health,
damage, and/or environmental pollution or degradation or gives rise to an accident or has the
potential to lead to an accident.
3.3.8 Interested and affected party: person or organisation that can affect, be affected by, or
perceive itself to be affected by a decision or activity.
3.3.9 Occupational health and safety: Deals with the prevention of occupational injuries and
diseases as well as the protection, promotion and maintenance of the health of all employees
and other workers (including temporary workers and contractors). It includes occupational
hygiene, occupational safety, occupational medicine, occupational nursing, fire safety, public
safety and emergency preparedness.
3.3.10 Participation: involvement in decision-making.
3.3.11 Quality: The quality of something can be determined by comparing a set of inherent
characteristics with a set of requirements. If those inherent characteristics meet all
requirements, high or excellent quality is achieved. If those characteristics do not meet all
requirements, a low or poor level of quality is achieved.
3.3.12 Zero defects: Zero defects are aimed at the reduction of defects through prevention. It is
directed at motivating people to prevent mistakes by developing a constant, conscious desire
to do their job right the first time.
3.3.13 Zero Harm: The prevention of harm to people and the environment brought about through
visible and felt leadership, including the implementation of effective controls and practices.
3.4 Abbreviations
Abbreviation Explanation
EDC Eskom Documentation Centre
EXCO Executive Management Committee
ISO International Organisation for Standardisation
LTD Limited
PDCA Plan, Do, Check, Act
SHEQ Safety, health, environment, and quality
SOC State-owned Company
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30
Safety, Health, Environment, and Quality (SHEQ) Unique Identifier: 32-727
Policy Revision: 4
Page:
3.5 Roles and responsibilities
3.5.1 Eskom's Leadership is accountable for leading the practices and processes needed to control
and manage safety, health, environment and quality risks, opportunities and impacts as an
integral part of Eskom's operations.
3.5.2 Eskom's employees are responsible for understanding and incorporating safety, health,
environment and quality into daily work activities.
3.5.3 Eskom's contractors are responsible for meeting applicable safety, health, environment and
quality compliance obligations and organisational requirements.
3.6 Process for monitoring
Application of this policy throughout Eskom shall be audited as per the audit schedule.
This document has been seen and accepted by the Risk and Sustainability Management Committee
and noted by Exco.
Date Rev. Remarks
Include the word “environment” which was previously
October 2020 4
omitted under “2.1 Policy statement (11)”.
Align to the requirements of the latest ISO 9001, ISO
August 2020 3 14001 and ISO 45001 standards and new business
requirements.
Update of policy based on: revised ISO 9001 and 14001
standards; change in Eskom's registration name; changed
August 2016 2 to refer to other standards as may be applicable; aligned to
Corporate Plan; and the appointment of a new Group Chief
Executive.
Update of policy based on revision date, while taking into
August 2013 1 account Eskom's strategic imperatives, changed structure
and additional Eskom values.
This policy supersedes 32-94 and 32-7 SHE and Quality
Policies. The contents of both policies were revised and
August 2010 0 incorporated into one policy, which was reallocated the
reference number 32-727 in accordance with the Eskom
Documentation Centre (EDC) requirements.
The policy was reviewed by the Risk and Sustainability Division with inputs from the divisions across
the organisation.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30
Safety, Health, Environment, and Quality (SHEQ) Unique Identifier: 32-727
Policy Revision: 4
Page:
None.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30
Quality Management
Source: Safety Health Environment and Quality SHEQ Policy.pdfEskom's SHEQ Policy requires conformance with ISO 9001, ISO 14001, and ISO 45001/OHSAS 18001 standards. Contractors must meet applicable SHEQ obligations and contribute to a Zero Harm culture, including zero defects.
Health & Safety
Source: Safety Health Environment and Quality SHEQ Policy.pdfEskom's SHEQ Policy sets out its commitment to safety, health, environment and quality, including Zero Harm principles, Life-saving Rules, and compliance with ISO 45001/OHSAS 18001, ISO 14001, and ISO 9001. It applies to all Eskom divisions, subsidiaries, and entities where Eskom has controlling interest, and requires contractors to meet applicable SHEQ obligations.
Environmental
Source: Safety Health Environment and Quality SHEQ Policy.pdfEskom's SHEQ Policy requires conformance with ISO 14001 and the National Environmental Management Act. Contractors must support Eskom's commitment to zero environmental incidents, proactive management of environmental footprint, minimising pollution and degradation, pursuing a low-carbon future, and prioritising energy and water efficiency.
Description
Source: Eskom - Standard Conditions of Tender.pdfThe tender is for the dredging of high level and low-level Ash Water Return Dams at Arnot Power Station, on an 'as and when required' basis, for a period of 36 months (3 years). The work falls under civil engineering.
Important Dates
Source: Eskom - Standard Conditions of Tender.pdf (TENDER)Closing date: 13 October 2026 at 10:00 (SAST).
Contact Information
Source: Eskom - Standard Conditions of Tender.pdf (TENDER)Contact: Eskom Representative (name, email, telephone not stated in this document).
Submission Guidelines
Source: Eskom - Standard Conditions of Tender.pdf (TENDER)Submission method: paper tender. Submit the complete original tender plus one (1) complete hard copy of the original, as separate packages marked "ORIGINAL" and "COPY". If an electronic copy is required, package it separately and mark "ELECTRONIC COPY". Seal all packages together in an outer package marked "Confidential".
Evaluation Criteria
Source: Eskom - Standard Conditions of Tender.pdf (TENDER)Evaluation stages (in order):
Technical Specifications
Source: Eskom - Standard Conditions of Tender.pdf (TENDER)Scope: Dredging of high level and low-level Ash Water Return Dams at Arnot Power Station, on an 'as and when required' basis, for a period of 36 months (3 years).
Quality Management
Source: Eskom - Standard Conditions of Tender.pdfQuality management:
Pricing Schedule
Source: Eskom - Standard Conditions of Tender.pdfPricing schedule:
Financial Requirements
Source: Eskom - Standard Conditions of Tender.pdf (TENDER)Pricing:
Compliance Requirements
Source: Eskom - Standard Conditions of Tender.pdf (TENDER)Eligibility:
Health & Safety
Source: Eskom - Standard Conditions of Tender.pdfHealth and safety:
Contractual Terms
Source: Eskom - Standard Conditions of Tender.pdfContract terms:
Section
Source: Eskom - Standard Conditions of Tender.pdfAdditional evaluation criteria:
Description
Source: Eskom Supplier Integrity Pact_.pdfThe Eskom Supplier Integrity Pact applies to Eskom Holdings SOC Ltd and all existing and potential suppliers. It prescribes ethical behaviour and requires suppliers to complete, sign and submit the Integrity Declaration Form whenever participating in an Eskom procurement process. Suppliers must maintain integrity, avoid conflicts of interest, not disclose confidential information without consent, not misrepresent information, avoid relationships with Eskom employees that may affect objectivity, comply with gift limits (R1500), not engage in unethical dealings with evaluators, not collude with other tenderers, and report misconduct. Eskom commits to fair, transparent, equitable, cost-effective and competitive tender processes, requires employees to declare interests, prohibits employees from accepting gifts from tenderers, and may suspend suppliers and refer them to National Treasury for restricted listing. The pact is governed by South African law and remains valid until replaced.
Important Dates
Source: Eskom Supplier Integrity Pact_.pdf (unknown)No tender-specific dates are stated in this document. The document is the Eskom Supplier Integrity Pact, which does not contain closing dates, briefings, or site visits.
Contact Information
Source: Eskom Supplier Integrity Pact_.pdf (unknown)Reporting misconduct:
Submission Guidelines
Source: Eskom Supplier Integrity Pact_.pdf (unknown)Returnable documents:
Disqualification risks:
Evaluation Criteria
Source: Eskom Supplier Integrity Pact_.pdf (unknown)No tender-specific evaluation criteria are stated in this document. The document is the Eskom Supplier Integrity Pact, which sets ethical obligations for suppliers rather than scoring or evaluation methods.
Technical Specifications
Source: Eskom Supplier Integrity Pact_.pdf (unknown)No technical specifications are stated in this document. The document is the Eskom Supplier Integrity Pact, which sets ethical obligations rather than scope of work or deliverables.
Financial Requirements
Source: Eskom Supplier Integrity Pact_.pdf (unknown)No financial requirements are stated in this document. The document is the Eskom Supplier Integrity Pact, which does not contain pricing, bid security, or payment terms.
Compliance Requirements
Source: Eskom Supplier Integrity Pact_.pdf (unknown)No specific compliance requirements are stated in this document. The document is the Eskom Supplier Integrity Pact, which sets ethical obligations rather than eligibility or compliance thresholds.
Contractual Terms
Source: Eskom Supplier Integrity Pact_.pdfThe Eskom Supplier Integrity Pact is a pact between Eskom and its suppliers prescribing ethical behaviour. It applies to Eskom Holdings SOC Ltd and all existing and potential suppliers. Suppliers must complete, sign and submit the Integrity Declaration Form when participating in Eskom procurement processes. Suppliers must maintain integrity, avoid conflicts of interest, not disclose confidential information without consent, not misrepresent information, avoid relationships with Eskom employees that may affect objectivity, comply with gift limits (R1500), not engage in unethical dealings with evaluators, not collude with other tenderers, and report misconduct. Eskom commits to fair, transparent, equitable, cost-effective and competitive tender processes, requires employees to declare interests, prohibits employees from accepting gifts from tenderers, and may suspend suppliers and refer them to National Treasury for restricted listing. The pact is governed by South African law and remains valid until replaced.
Evaluation Criteria
Source: Supplier Declaration of Interest Template.docx (unknown)Bidders must disclose any conflicts of interest with Eskom employees or directors involved in this procurement. This includes declaring any Eskom employment, close family or associate relationships with Eskom personnel participating in the tender process, and any business courtesies exchanged with Eskom employees or directors in the past 12 months. Failure to disclose accurately may result in action against the supplier or the signatory.
Compliance Requirements
Source: Supplier Declaration of Interest Template.docx (unknown)Bidders must complete and submit the Supplier Declaration of Interest Template (Rev 3) as a returnable document. This declaration requires the signatory to certify under oath that the information provided is true and correct, and acknowledges that Eskom may take action if the declaration is false.
Submission Guidelines
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.docx (unknown)Returnable documents: Form A must be completed and signed. No other submission details are stated in the provided document.
Evaluation Criteria
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.docx (unknown)Quality requirements are evaluated in categories with a total possible score of 12 points. Each deliverable is scored as 1 point if the required evidence is provided. Categories: Section A (QMS documentation, 7 points), Section B (QMS in operation, 2 points), Section C (Contract Quality Plan, 1 point), Section D (Quality Control Plan/ITP, 1 point), Section E (Form A and miscellaneous, 1 point). No minimum qualifying score is stated.
Technical Specifications
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.docx (unknown)The tender is for dredging of high-level and low-level Ash Water Return Dams at Arnot Power Station, on an 'as and when required' basis, for a period of 36 months (3 years). The scope includes quality management system requirements, a contract quality plan, and quality control plans/inspection and test plans.
Compliance Requirements
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.docx (unknown)Quality management system requirements: The bidder must provide objective evidence of a documented QMS that complies with ISO 9001:2015, including a QMS manual, quality policy, quality objectives, control of documented information, control of nonconforming outputs, nonconformity and corrective action, and internal audit procedures. Evidence of QMS in operation must include an organization chart and responsibility matrix, and control of externally provided processes. A draft Contract Quality Plan and a draft Quality Control Plan/ITP for similar work are required. Form A must be completed and signed.
Quality Management
Source: Eskom General Conditions of Purchase.pdfEskom may inspect and test the goods, works, or services at any stage. If the supplier fails to comply with obligations, Eskom may reject any part by written notice, specifying the reason and whether replacement or re-work is required. For goods, rejected items may be returned at the supplier's risk and expense; the supplier must refund any money paid for goods not replaced within the required time, plus costs of return and obtaining replacements from a third party. For works/services, the supplier must correct non-conformances or defects as indicated by Eskom; if the supplier delays, Eskom may have the work corrected by a third party at the supplier's cost.
Pricing Schedule
Source: Eskom General Conditions of Purchase.pdfPrices or rates may include a price adjustment amount calculated according to a formula stated in the agreement. Payment may be made in any currency, with one exchange rate used to convert to South African Rand; payments in foreign currency shall not exceed the amounts stated in the agreement. Eskom's CPA (IG) form must be completed by the supplier. Payment is made within 30 days after receipt of a correct tax invoice, which must include Eskom's VAT registration number 4740101508.
Contractual Terms
Source: Eskom General Conditions of Purchase.pdfEskom's General Conditions of Purchase (Rev 3, effective 31 May 2024) govern the contract. Key obligations: the supplier must complete Eskom's CPA (IG) form; payment is made within 30 days of a correct tax invoice, which must show Eskom's VAT number 4740101508; the supplier must not cede or delegate rights or obligations without Eskom's written consent; Eskom may terminate if the supplier defaults, becomes bankrupt, or is in financial circumstances that prejudice performance; the supplier must adhere to all statutory requirements and South African law; the supplier must act ethically. The supplier warrants goods/works/services are fit for purpose and free from defects for one year from acceptance, unless otherwise stated, and must rectify defects at no cost to Eskom within an agreed time. Eskom may reject non-conforming goods or works and have defects corrected at the supplier's cost if the supplier delays. The supplier indemnifies Eskom against claims arising from the supplier's negligence, infringement, or breach of statutory duty.
Description
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) E3558GXMPARN.pdfDredging of high-level and low-level Ash Water Return Dams at Arnot Power Station on an 'as and when required' basis for 36 months. Tender number E3558GXMPARN.
Important Dates
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) E3558GXMPARN.pdf (RFP)Closing date: 13 October 2026 at 10:00 (SAST)
Clarification queries deadline: 10 working days before closing (i.e., by 29 September 2026)
Site visit / clarification meeting: Not applicable
Tender validity period: 120 working days from closing date
Contact Information
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) E3558GXMPARN.pdf (RFP)Eskom Representative:
Fraud and corruption reporting:
Procurement Manager (signatory):
Submission: via Eskom E-tendering site (TenderBulletin(eskom.co.za))
Submission Guidelines
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) E3558GXMPARN.pdf (RFP)Submission method: electronic only via the Eskom E-tendering site (Eskom Tender Bulletin). No hard copies accepted.
Mandatory returnables at closing (disqualifiable if missing or unsigned):
Non-disqualifiable returnables (must be submitted at closing; if missing, Eskom will request within 5 working days):
Disqualification risks:
Returnable Documents
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) E3558GXMPARN.pdf (RFP)Mandatory returnables at tender closing: Annexure E (CPA for local goods/services), Annexure F (CPA for imported goods/services if applicable), Annexure G1-G4 (SBD 6.2 Declaration for Local Production and Content), Annexure I (SBD 6.1 Preference Points Claim Form), completed pricing schedule (PDF and copy for e-tendering), proof of CSD registration, signed Annexure B acknowledging procedures, Health and Safety Plan/OHS Manual, and other required documents. Missing mandatory returnables may lead to disqualification or submission within 5 working days if non-disqualifiable.
Evaluation Criteria
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) E3558GXMPARN.pdf (RFP)Evaluation stages:
Functionality criteria (Technical 100%, threshold 80%):
Minimum qualifying score: 80% for functionality.
Technical Specifications
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) E3558GXMPARN.pdf (RFP)Scope: Dredging of high-level and low-level Ash Water Return Dams at Arnot Power Station on an 'as and when required' basis for 36 months.
Key technical requirements:
Methodology
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) E3558GXMPARN.pdfTechnical Proposal/Method Statement required as part of mandatory technical evaluation criteria, weighted 30%.
Experience & Qualifications
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) E3558GXMPARN.pdfAnnual financial statements including background to company, signed director's report, and public interest score (for South African entities not audited) required as part of tender submission.
Quality Management
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) E3558GXMPARN.pdfQuality requirements:
Pricing Schedule
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) E3558GXMPARN.pdfCompleted pricing schedule must be submitted; for e-tendering, pricing schedule must be in PDF and a copy in editable format; failure to price all items leads to disqualification.
Financial Requirements
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) E3558GXMPARN.pdf (RFP)Payment terms:
Pricing:
Financial viability:
No bid security or performance guarantee required (N/A).
Compliance Requirements
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) E3558GXMPARN.pdf (RFP)Mandatory eligibility:
Mandatory contractual requirements (assessed after evaluation, prior to award):
Additional contractual requirements:
B-bbee:
Tax compliance:
Health & Safety
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) E3558GXMPARN.pdfCompliance with Eskom Health and Safety policy and OHS requirements; Health and Safety Plan/OHS Manual must be scope or project specific; acknowledgement of Annexure B procedures.
Environmental
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) E3558GXMPARN.pdfCompliance with National Environmental Management Act section 28; National Environmental Management: Biodiversity Act; National Environmental Management: Waste Act and Regulations; Occupational Health and Safety Act; ISO 14001:2015 Environmental Management System; project-specific Environmental Management Plan (EMP) and Waste Management Plan.
Contractual Terms
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) E3558GXMPARN.pdfContract will be NEC Term service contract; Eskom standard payment terms apply; mandatory and additional contractual requirements must be included; contractual requirements are not evaluation criteria but must be met prior to contract award.
Special Conditions
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) E3558GXMPARN.pdf (RFP)Tender validity period is 120 working days from closing date; clarification queries must be submitted 10 working days before closing; site visit and clarification meeting not applicable; tenders must be submitted electronically via Eskom E-tendering site; prices will not be read out; failure to price all items on pricing schedule leads to disqualification.
Requirements
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) E3558GXMPARN.pdf (RFP)Mandatory requirements: valid CSD registration (CSD number/report); Health and Safety Plan/OHS Manual scope-specific; compliance with Eskom Health and Safety policy and OHS requirements; acknowledgement of Annexure B procedures; environmental compliance per NEMA section 28 and related acts; ISO 14001:2015 Environmental Management System; project-specific Environmental Management Plan (EMP) and Waste Management Plan; annual financial statements including background, signed director's report, public interest score (for South African entities not audited).
Section
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) E3558GXMPARN.pdfFunctionality requirements applicable; mandatory technical evaluation criteria include Technical Proposal/Method Statement weighted 30%; tenderers not meeting functionality threshold (80%) will be disqualified; prices scored out of 80 or 90 points; B-BBEE points per 90/10 or 80/20 system (e.g., B-BBEE Status Level 1 = 10 points under 90/10, 20 points under 80/20).
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Arnot Power Station - Rietkuil - Mpumalanga - 1097
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
11
Last checked
24 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
💡 Want more tendering tips and strategies?
Explore Our BlogMedian Estimate
R 4 508 447
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Get deep intelligence on Civil engineering. Unlock full pricing strategies, bid frequency, and historical win rates.