Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Eskom sunnilaws office park - - East London -
Organization Type
GOVERNMENT
Published
02 Sept 2026
OCDS Reference
ocds-9t57fa-168691
ESKOM requires a quality control plan (qcp) or inspection and test plan (itp) for the supply, installation, commissioning, maintenance, servicing, fault-finding, repairs, replacement, testing and technical support of security systems and integrated equipment for the cape coastal cluster in the eastern cape. The template defines intervention points, testing and inspection methods, acceptance criteria, and approval workflows involving the contractor, subcontractor, ESKOM, and approved inspection authorities where applicable.
Bidders must submit a completed QCP/ITP using the prescribed template with all intervention points defined (Hold, Witness, Document Review, Approval, Information, Surveillance, Verification).
Testing methods must specify T1 (100% testing) or T2 (sample testing) for each activity.
Inspection methods must specify A1 (100% inspection) or A2 (sample inspection) for each activity.
Acceptance criteria must cover functionality requirements, performance measures, regulatory compliance, and chemical tests where applicable.
Inspection methods must include visual, microscopy, NDT, liquid/dye penetrant, magnetic particle, and eddy current as relevant.
Approvals required from Contractor/Supplier, Subcontractor (where applicable), Eskom, and Approved Inspection Authority (AIA) where applicable.
Each activity must be categorised as Statutory (S) or Non-statutory (N) with controlling documents and acceptance criteria specified.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Friday, 09 October 2026 - 10:00
Venue
https://teams.microsoft.com/meet/339153437523973?p=vkxuQW1VEexSs09mjT
Categories
Request for Bid(Open-Tender)
Eskom sunnilaws office park - - East London -
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP)-rev 3.docx. You don’t need to refresh — this page will pick up the updated review automatically.
02 Sept
2026
Tender Published
Tender was published
09 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Technical Evaluation Criteria Scorecard - Security Technology - 19 Aug 2026 - 31 Aug 2026.xlsx
Eskom requires a service provider for the supply, installation, commissioning, maintenance, servicing, fault-finding, repairs, replacement, testing and technical support of security systems and integrated equipment for the Cape Coastal Cluster in the Eastern Cape.
240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf
Eskom requires a supplier to provide comprehensive security systems services — including supply, installation, commissioning, maintenance, servicing, fault-finding, repairs, replacement, testing, and technical support — for the Cape Coastal Cluster in the Eastern Cape. The contract is governed by Eskom's Supplier Quality Management Specification (240-105658000, Revision 4), which mandates ISO 9001-aligned quality management systems, contract quality plans, quality control plans with hold and witness points, and sub-supplier quality assurance. The tender closes on 9 October 2026 at 10:00 UTC.
240-77471499 Annexure B Eskom Acknowledgement Form for OHS Legal and Other Requirements - Rev 4.docx
Eskom requires a contractor to supply, install, commission, maintain, service, fault-find, repair, replace, test and provide technical support for security systems and integrated equipment for the Cape Coastal Cluster in the Eastern Cape.
Supplier Quality Management_Returnables Latest.pdf
Eskom requires a service provider for the supply, installation, commissioning, maintenance, servicing, fault-finding, repairs, replacement, testing and technical support of security systems and integrated equipment for the Cape Coastal Cluster in the Eastern Cape.
SHE Specification- INTELLIGENT SUBSTATION SECURITY SYSTEMs - 15 July 2026.pdf
Eskom requires a principal contractor to supply, install, commission, maintain, service, fault-find, repair, replace, test and provide technical support for intelligent substation and security systems across the Cape Coastal Cluster in the Eastern Cape. The scope covers large and small substations and includes CCTV, fibre perimeter intrusion detection, PTZ and bullet cameras, AI-based plant monitoring, alarm systems (Paradox EVO 192), UPS backup with LFP batteries, network infrastructure compliant with Eskom standards, decommissioning of legacy systems, and integration with existing telecommunications and power supplies.
240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP)-rev 3.docx
Eskom requires a contractor to supply, install, commission, maintain, service, fault-find, repair, replace, test and provide technical support for security systems and integrated equipment across the Cape Coastal Cluster in the Eastern Cape.
Environmental Tender Evaluation criteria -Security Systems.xlsx
Eskom requires a contractor to supply, install, commission, maintain, service, fault-find, repair, replace, test and provide technical support for security systems and integrated equipment across the Cape Coastal Cluster in the Eastern Cape. The environmental evaluation criteria detailed in Annexure C1 form part of the tender submission requirements.
240-68099512 Form A Rev 10 (001).pdf
Eskom is procuring a comprehensive security systems contract for the Cape Coastal Cluster in the Eastern Cape, covering supply, installation, commissioning, maintenance, servicing, fault-finding, repairs, replacement, testing, and technical support of security systems and integrated equipment.
240-77471969- Tender Evaluation Sheet Medium and Low risk.pdf
Eskom requires a service provider for the supply, installation, commissioning, maintenance, servicing, fault-finding, repairs, replacement, testing and technical support of security systems and integrated equipment for the Cape Coastal Cluster in the Eastern Cape.
NEC For Intelligent Substation and Security Systems.pdf
Eskom Holdings SOC Ltd invites tenders for the supply, installation, commissioning, maintenance, servicing, fault-finding, repairs, replacement, testing and technical support of security systems and integrated equipment for the Cape Coastal Cluster in the Eastern Cape. The contract is based on the NEC3 Term Service Contract (TSC3) with Option A (Priced contract with price list) and a Task Order process, for an initial service period of one year with a total contract duration of three years.
Supplier Quality Management_Returnables Latest.xlsx
Eskom requires a contractor to supply, install, commission, maintain, service, fault-find, repair, replace, test and provide technical support for security systems and integrated equipment across the Cape Coastal Cluster in the Eastern Cape.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubWe refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Description
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)This document (240-105658000, QM 58, Revision 4) is Eskom's Supplier Quality Management Specification. It specifies the minimum quality requirements for all existing and potential Eskom suppliers and sub-suppliers and defines the quality criteria for evaluation, selection, supplier/vendor registration, assessment, performance monitoring, and auditing. Eskom's position is to partner with suppliers who demonstrate commitment to developing, implementing, and maintaining a QMS conforming to ISO 9001. The specification applies across all Eskom divisions, subsidiaries, suppliers, and sub-suppliers and forms part of all Eskom RFIs, RFQs, RFPs, and procurement contracts. Effective date is the date of authorisation (authorised 01 July 2026). Next review date is May 2030.
Important Dates
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)Specification effective date: date of authorisation (authorised 01 July 2026). Next review date: May 2030. Closing date, briefing dates, site visits, and clarification deadlines are not in this specification; they are in the specific tender invitation.
Contact Information
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)Eskom Quality representative/professional (assigned per tender as part of a Cross Functional Team). No named individual, email, phone, or submission address is provided in this specification. Enquiries should be directed to the contact details in the specific tender invitation.
Submission Guidelines
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)Submission channel and format are not stated in this specification document. The document is a quality management specification (QM 58) that forms part of Eskom procurement processes. Bidders must complete and sign Form A (240-68099512) and return it with the other returnables listed in the List of Tender Returnables (240-12248652). The applicable quality category (1–4) will be indicated in Form A for each specific tender. Only one category applies per procurement process. Disqualification risks: failure to submit Form A signed; omission of any returnable required for the selected quality category; submission of an invalid or expired ISO 9001 certificate where Category 1 applies; failure to provide required QMS documented information, audit reports, draft Contract Quality Plan, or example ITP/QCP as specified for the category.
Evaluation Criteria
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)Evaluation uses the Supplier Quality Management: Tender Evaluation Scorecard (240-168873697) and the Guideline for QM 58 Selection Criteria (240-125473040). The assigned Eskom Quality representative selects the applicable quality category (1–4) and returnables for each tender. Preference points are claimed under the PPPFA (80/20 or 90/10 system) via a valid B-BBEE certificate or sworn affidavit. Minimum qualifying thresholds and price/functionality splits are not stated in this specification; they are defined in the specific tender invitation. Suppliers are assessed on QMS conformity to ISO 9001, completeness of returnable documentation for the selected category, and capability/capacity for high-risk scopes (Generation Level 1 & 2 plant, Transmission and Distribution Power Plant & Control Plant, Mega Projects).
Technical Specifications
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)Scope: minimum quality requirements for all existing and potential Eskom suppliers and sub-suppliers across all divisions and subsidiaries. Applies to all Eskom RFIs, RFQs, RFPs, and contracts for products and services. Suppliers must develop, implement, maintain, and continually improve a QMS conforming to ISO 9001 (latest revision). Normative references: ISO 9001, ISO 10005. Informative references: ISO 9000, ISO 10006, ISO 9004, Eskom SHEQ Policy (32-727), Eskom Procurement Policy (32-1033) and Procedure (32-1034), PPPFA, CIDB 1004, IAEA GS-R-3.1, SANS 10845-1. Key definitions: Hold Point (work cannot proceed without Eskom written authorisation), Witness Point (work may proceed after formal notification and confirmed waiver), Intervention Points (inspection, hold, surveillance, witness, review, verification), Level 1/2/3 Plant Items (safety/environment/production loss; availability/reliability; no significant impact), Special Processes (welding, NDT/NDE), Primary Plant (HV equipment in control room), Secondary Plant (control/protection/metering/tele-control). Supplier and sub-supplier QMS must be certified by an accredited body (Category 1) or demonstrated via documented evidence (Category 2). Main supplier responsible for sub-supplier quality assurance, performance management (verification, audits, CQP/QCP reviews, NC management, ITPs, risk management, documentation, awareness). Personnel performing special processes must be qualified, certified, and registered with statutory bodies where legally required. Training records must meet NQF/unit standard and accredited provider requirements. Preservation management programme required covering storage, transit, handling, and special precautions for valves, motors, rotating equipment, piping, instrumentation, coatings, insulation, etc. Eskom has free and unrestricted access to all preservation records.
Methodology
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)Preservation management programme methodology: scope covers initial transfer of ownership through temporary/long-term storage and transit to final delivery. Must address protection against atmospheric conditions, sunlight, temperature, soil, dust, humidity, salt spray, corrosive atmospheres, and other physical environment conditions. Detailed procedures for application, use, monitoring, and maintenance of coatings, coverings, fasteners, lines, and other components for internal and external weather protection. Preservation work plan development and execution performance evaluation for all parties providing material transportation, handling, or storage services. Oversight of material quality preservation plan preparation and execution at all work locations. Preservation programme records management process compliant with Eskom information management requirements, addressing generation, maintenance, and ready access by Eskom. Identification of all physical asset pre-operation preservation requirements (bulk materials, consumables, equipment systems, components, procured/supplied materials not yet deployed). Clear communication of pre-operation preservation requirements to sub-suppliers where project responsibility is delegated. Documented processes/procedures for monitoring compliance with programme requirements. Compliance monitoring from engineering instruction through procurement documentation until equipment/materials incorporated into operating system/structure. Compliance evaluation frequency anticipating transfer of tactical responsibility between project functional areas (procurement to logistics, logistics to fabrication, etc.) and between subcontracted service providers. Supplier engineering must ensure preservation requirements are documented and communicated to procurement, logistics, construction management, quality, security, and other functional areas via a preservation programme applicable to all systems, components, equipment, materials, customer-supplied materials, and other goods.
Quality Management
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)QMS Requirements: Supplier and sub-suppliers must develop, implement, maintain, and improve a formal QMS conforming to ISO 9001 (latest revision) with documented information (quality manual, plans, procedures, work instructions, method statements). Category 1 requires a valid ISO 9001 certificate from an accredited body; Category 2 requires objective evidence of a compliant QMS (manual, policy, objectives, document control, internal audit, nonconforming output control, corrective action procedures). Main supplier responsible for sub-supplier quality assurance and performance management (QMS verification, audits/surveillances, CQP/QCP reviews, NC/defect management, ITPs, risk management, documentation, awareness/communication). Supplier must inform Eskom of proposed QMS or staff changes affecting quality prior to implementation. Quality Plans: Where specified in evaluation criteria or returnables list, all products/services/processes require a documented Contract/Project Quality Plan (CQP) and/or Quality Control Plan (QCP)/Inspection and Test Plan (ITP) per ISO 10005. CQP Requirements: Must include record management (material tests, PMI, certification), free access for inspection, final documentation submission prior to shipment, welding special processes (WQR, WPS, PQR), special installation/fabrication procedures, qualified/certified personnel for special processes (NDE, welding, coating, heat treatment) with statutory registration where required, training records meeting NQF/accredited provider standards, storage/preservation/maintenance instructions, sub-supplier monitoring by Eskom/agent, QMS aspects applied, resources, communication channels, documents/records, management authority/responsibility, contact details, monitoring/measurement procedures. CQPs must be submitted before initial kick-off/pre-fabrication meeting or manufacturing commencement. Eskom CQP template (240-109253698) available as guideline. QCP/ITP Requirements: Must cover all quality-control activities chronologically from contract review through materials verification, manufacturing, fabrication, assembly, final testing, commissioning, hand-over, certification. Must identify quality verifications, intervention points, hold/witness points per ISO 10005. Reviewed and accepted by Eskom representative/inspection authority before work commencement. Changes require Eskom agreement. ITPs must cover materials certification, fabrication, in-process inspections, final acceptance tests, packaging/pre-shipment, shipping inspections, preservation, site acceptance tests, construction/erection, pre-commissioning/commissioning. Sub-supplier QCPs/ITPs based on Eskom-accepted supplier QCP/ITP. Workplace documentation in English and workforce-appropriate languages. Separate QCP/ITP per sub-supplier scope. Supplier ultimately accountable for all sub-supplier QCPs/ITPs. Eskom may select intervention points for oversight, surveillance, audits. Signed ITPs/QCPs become contract addendums. QCP/ITP content: contract number/title, supplier order number, work area identification, work description with components/item numbers/dates, unique QCP/ITP number, sequence of operations with inspections/tests, specification/drawing/procedure references with criticality risk ratings, acceptance criteria with standard references/clauses, supplier-nominated intervention points, provision for Eskom-nominated intervention points, sign-off by all parties, inspection/test records generated and indicated for Eskom. Mandatory quality kick-off meeting at contract start and each phase. Coordination meetings with Eskom before order placement (14 days' notice). Competent/qualified inspection personnel per Project Quality Personnel Qualification Specification. Mandatory pre-inspection meetings convened by Eskom/inspection agency/AIA with supplier/sub-supplier quality representatives. Eskom may appoint resident quality inspectors at supplier/sub-supplier premises (supplier provides workspace at no cost). Eskom may appoint any organisation as AIA/inspection agency; supplier/sub-suppliers may not object or hinder. Eskom QCP/ITP template (240-109253302) available as guideline. Sub-supplier inspection/testing protocols must include checklists, report formats/content/schedule/retention, nonconformity tracking/resolution, FMECA reports, HAZOP reports. Supplier must formally assess sub-supplier inspection/testing programmes (report reviews, facility assessments) with frequency based on scope criticality and performance, in consultation with Eskom. Purchased product compliance verification must obtain document return/review status before implementation. Post-Contract Award: Supplier must submit scope-specific CQP within 30 days (or per contract timeline) before work commencement. Monthly quality performance/management reports required with content agreed by Eskom. Quality performance monitoring phase includes quality-related aspects monitoring. Supplier quality audits conducted per specification.
Pricing Schedule
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)No pricing schedule, rates, bill of quantities, or payment schedules are provided in this specification. These are defined in the specific tender invitation and contract documents.
Financial Requirements
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)No pricing format, bonds, guarantees, payment terms, or financial capacity thresholds are stated in this specification. These are defined in the specific tender invitation and contract.
Compliance Requirements
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)Mandatory: registration on National Treasury Central Supplier Database (CSD); valid SARS tax clearance certificate or tax compliance status PIN; valid B-BBEE certificate or sworn affidavit for PPPFA preference points; completion and signature of Form A (240-68099512) acknowledging compliance with QM 58 and ISO 9001. Quality category-specific returnables (per List of Tender Returnables 240-12248652): Category 1 — valid ISO 9001 certificate from accredited body, latest internal and external audit reports with nonconformities and corrective actions, documented QMS roles/responsibilities/authorities, draft Contract Quality Plan per ISO 10005, example ITP/QCP from similar work (where applicable), documented Control of Externally Provided Processes/Products/Services, management review records. Category 2 — objective evidence of developed/implemented/maintained QMS per ISO 9001 (quality manual, policy, objectives, control of documented information, internal audit procedure, control of nonconforming outputs, nonconformity/corrective action procedure), latest internal audit reports, draft Contract Quality Plan per ISO 10005, example ITP/QCP (where applicable), Control of Externally Provided Processes/Products/Services, documented roles/responsibilities/authorities, management review records. Categories 3 and 4 requirements are not detailed in the extracted text. Sub-suppliers with scope covering design, manufacturing, maintenance, testing, storage, delivery, installation, commissioning, or project management must meet equivalent QMS requirements. CIDB grading may apply for construction-related scopes (referenced CIDB 1004).
Health & Safety
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)The specification references the Eskom SHEQ Policy (32-727) and IAEA Safety Standard GS-R-3.1 as informative references. Level 1 Plant Items are defined as equipment whose failure affects personnel safety/health, causes environmental incidents, huge production loss, or major equipment damage, or are safety/redundancy/protective devices covered by statutory regulations. No specific health and safety requirements, safety plans, or HSE compliance details are provided in this specification; these would be in the specific tender/contract documents.
Contractual Terms
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)Rights of Access: Eskom shall have access at all reasonable times before, during, and after manufacture and before delivery, construction, erection, and commissioning to measure, test, and inspect products and workmanship at supplier premises and Eskom sites. Eskom may suspend pending deliveries via a cease delivery order for work not performed to specified requirements. Preservation: Supplier must maintain a preservation management programme covering initial transfer of ownership through storage, transit, and final delivery. Programme must address manufacturer recommendations, specifications, and project-specific requirements, with special precautions for valves, electrical motors, rotating equipment, piping, instrumentation, flange faces, gaskets, coatings, insulation, and periodic maintenance (shaft rotation, engine turnover, lubrication). Preservation requirements must be documented in purchase orders and work authorisations and communicated to all project functional areas. Eskom has free and unrestricted access to all preservation records. Nonconformities: Supplier must respond and rectify nonconforming products within contractual conditions. Repeated nonconformities from the same supplier within 6 months must be escalated to management review committees and, if unresolved, to the supplier review committee. Contractual remedies apply per FIDIC/NEC contract terms. Special Processes: Must be approved by an accredited body with proof of certification submitted to Eskom (e.g., Welding Management System per ISO 3834).
Requirements
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)Normative references: ISO 9001 Quality Management Systems – Requirements; ISO 10005 Quality Management Systems – Guidelines for Quality Plans. Informative references: ISO 9000 Quality Management Systems – Fundamentals and Vocabulary; 32-727: Safety, Health, Environment, and Quality (SHEQ) Policy; ISO 10006 Quality Management Systems – Guidelines for Quality Management in Projects; ISO 9004 Quality Management – Quality of an Organisation – Guidance to Achieve Sustained Success; 32-1033: Eskom's Procurement and Supply Chain Management Policy; 32-1034: Eskom's Procurement and Supply Chain Management Procedure; PPPFA: Preferential Procurement Policy Framework Act, 2000; CIDB 1004: Best Practice Guideline A4: Evaluating Quality in Tender Submissions; 240-12248652 Supplier Quality Management: List of Tender Returnable; 240-168873697 Supplier Quality Management: Tender Evaluation Scorecard; 240-125473040 Supplier Quality Management: Guideline for QM 58 Selection Criteria; IAEA Safety Standard GS-R-3.1 Application of the Management System for Facilities and Activities; SANS 10845-1 Construction Procurement Part 1: Processes, Methods and Procedures. Definitions: Component, Contract Quality Plan, Hold Point, Intervention Points, Inspection Agency, Level 1 Plant Items (safety/environmental/production loss impact), Level 2 Plant Items (availability/reliability impact), Level 3 Plant Items (no significant impact), Nonconformity, Quality Plan, Quality Control Plan (equivalent to QIP and ITP), Requirement, Primary Plant (High Voltage equipment in control room), Secondary Plant (Control Plant), Special Process (welding, non-destructive techniques), Supplier (current/potential supplier, vendor, contractor, consultant, service provider), Sub-supplier, Witness Point. Abbreviations: AIA (Approved Inspection Authority), CA (Corrective Action), CFT (Cross Functional Team), CQP (Contract Quality Plan), FIDIC, FMECA (Failure Mode, Effects and Criticality Analysis), HAZOP (Hazard and Operability Study), ISO, ITP (Inspection and Test Plan), NC (Nonconformity), NDT/NDE (Non-Destructive Testing/Examination), PMI (Positive Material Identification), QCP (Quality Control Plan), QMS (Quality Management System), PQP (Project Quality Plan), RFI, RFQ, RFP, SHEQ, WPS (Welding Procedure Specifications), WQR (Welder's Qualification Record). Roles and Responsibilities: Assigned Eskom Quality representative/professional (part of CFT) selects applicable requirements using Guideline 240-125473040 and Form A. Suppliers must complete, sign, and return Form A with other returnables per List of Tender Returnables (240-12248652). Pre-Contract Award Quality Requirements: Four quality categories (1–4), only one applicable per procurement. Category 1: Form A signed; valid ISO 9001/applicable QMS certificate; latest internal/external audit reports with nonconformities and corrective actions; documented QMS roles/responsibilities/authorities; draft Contract Quality Plan per ISO 10005; example ITP/QCP from similar work (where applicable); documented Control of Externally Provided Processes/Products/Services; management review records. Category 2: Form A signed; objective evidence of QMS per ISO 9001 (manual, policy, objectives, document control, internal audit procedure, nonconforming output control, corrective action procedure); latest internal audit reports; draft Contract Quality Plan per ISO 10005; example ITP/QCP (where applicable); Control of Externally Provided Processes/Products/Services; documented roles/responsibilities/authorities; management review records. Specific requirements per tender selected via List of Tender Returnables (240-12248652). Additional scope-specific requirements listed from Section E2 onwards. Capability and Capacity Assessment: Required for suppliers providing products/services with high risk to operational sustainability, work on critical plant/equipment, supply of critical plant items/components, special processes, commodities, specialised services. Applicable to Generation Level 1 & 2 plant, Transmission and Distribution Power Plant & Control Plant, Mega Projects.
Section
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)Evaluation is based on the Supplier Quality Management: Tender Evaluation Scorecard (240-168873697) and the Guideline for QM 58 Selection Criteria (240-125473040). The assigned Eskom Quality representative selects the applicable quality category (1–4) and returnables for each tender. Preference points are awarded under the PPPFA (80/20 or 90/10) via a valid B-BBEE certificate or sworn affidavit. Suppliers are assessed on QMS conformity to ISO 9001, completeness of category-specific returnable documentation, and capability/capacity for high-risk scopes (Generation Level 1 & 2 plant, Transmission and Distribution Power Plant & Control Plant, Mega Projects). Minimum qualifying scores and price/functionality weightings are not in this specification; they are in the specific tender invitation.
Description
Source: Environmental Tender Evaluation criteria -Security Systems.xlsx (unknown)This document is Annexure C1: Environmental Tender Evaluation & Scoring Card (Template Identifier 240-43921899 Rev 5, Document Identifier 240-167528519 Rev 1, Effective Date 2021-12-01, Review Date 2025-12-01). It sets out the environmental evaluation criteria and scoring methodology for the security systems tender for the Cape Coastal Cluster, Eastern Cape. The purpose is to assess whether tenderers have submitted the required environmental documentation and that such documentation complies with specified requirements. Enquiry number is 32-727. The evaluation is conducted by an Environmental Evaluator who will recommend or not recommend the bidder based on the assessment.
Submission Guidelines
Source: Environmental Tender Evaluation criteria -Security Systems.xlsx (unknown)Bidders must submit all environmental documentation listed in the evaluation criteria at tender stage. Each required document must be provided as evidence; failure to submit a document or submitting one that does not meet minimum requirements results in a score of 0 for that criterion. The Environmental Evaluator will assess submissions and recommend or not recommend the bidder based on the evaluation outcome.
Evaluation Criteria
Source: Environmental Tender Evaluation criteria -Security Systems.xlsx (unknown)Environmental evaluation uses a binary scoring system (0 or 1) per criterion. A score of 1 is awarded only when the submitted document satisfies the minimum requirements; a score of 0 applies if the document is not submitted or does not meet requirements. The evaluation covers 13 criteria: Environmental Policy (signed by CEO/Director, dated, version-controlled); Company Organogram showing environmental roles (Environmental Officer, Environmental Representative, Director, Hazardous Substances Handler); Environmental Aspects & Impacts Register with significance rating methodology and linked compliance obligations; Environmental Risks & Opportunities (SWOT) Register; Project/Site-Specific Environmental Management Programme (EMP) addressing significant aspects, SWOT risks, stakeholder needs, and area-specific risks (protected areas, wetlands, indigenous trees) with operational control procedures; Waste Management Plan covering waste streams, pollution prevention, separation, and minimisation (reuse, recycle, reduce); Environmental Emergency Preparedness & Response Plan listing possible emergencies, response approach, drills/exercises with timeframes, and emergency contact details; Environmental Incident Register with incident description, date, reporting details, actions taken, recommendation status, and closure date; Environmental Competency Training certificates, training matrix, schedule, and documented proof of staff training; Declaration of Environmental and Social Past Performance (signed and dated); and Additional project-specific environmental requirements where practicable. Bidders are advised to read ISO 14001:2015 for detailed EMS requirements and definitions. The Environmental Evaluator will mark the submission as Recommended or Not Recommended.
Technical Specifications
Source: Environmental Tender Evaluation criteria -Security Systems.xlsx (unknown)Scope covers supply, installation, commissioning, maintenance, servicing, fault-finding, repairs, replacement, testing, and technical support of security systems and integrated equipment for the Cape Coastal Cluster in the Eastern Cape. Environmental requirements are project/site-specific and must address activities such as changing pole-mounted transformers, excavation and compacting, storage of oil-containing equipment, application of herbicides, and transport of hazardous/dangerous goods. The Environmental Management Programme must include operational control procedures for risks unique to the area (e.g., working in protected areas, removal of indigenous trees requiring permits, working on wetlands). Emergency planning must cover chemical spillages, air pollution incidents, and encounters with bees and snakes, including drills/exercises on specified timeframes. Waste streams expected on site include batteries, paper, offcuts, and concrete waste.
Compliance Requirements
Source: Environmental Tender Evaluation criteria -Security Systems.xlsx (unknown)Environmental documentation must comply with ISO 14001:2015 Environmental Management System requirements. Reference documentation includes Eskom documents 32-727 (SHEQ Policy) and 32-726 (SHE Requirements for Eskom Commercial Processes). Environmental compliance obligations (laws) associated with aspects and impacts must be identified and aligned. No other compliance requirements (CSD registration, tax clearance, B-BBEE, CIDB, CIPC, professional registrations, local content) are specified in this document.
Description
Source: Environmental Tender Evaluation criteria -Security Systems.xlsxCell D1: Annexure C1: Environmental Tender Evaluation & Scoring Card
Technical Specifications
Source: Environmental Tender Evaluation criteria -Security Systems.xlsx (unknown)Cell D1: Annexure C1: Environmental Tender Evaluation & Scoring Card
Compliance Requirements
Source: Environmental Tender Evaluation criteria -Security Systems.xlsx (unknown)No specific requirements found
Description
Source: 240-77471499 Annexure B Eskom Acknowledgement Form for OHS Legal and Other Requirements - Rev 4.docxAnnexure B: Eskom Acknowledgement Form for OHS Legal and Other Requirements — a mandatory returnable form requiring the bidder's authorised signatory (CEO/Director/Managing Director) to acknowledge access to and understanding of applicable OHS legislation (Occupational Health and Safety Act, 1993 and Regulations; Compensation for Occupational Injuries and Diseases Act, 1993 as amended) and Eskom OHS requirements, and to accept consequences of non-compliance. The form must be signed, dated, and witnessed. This annexure forms part of the bid submission for the provision of security systems and integrated equipment services for the Cape Coastal Cluster, Eastern Cape.
Submission Guidelines
Source: 240-77471499 Annexure B Eskom Acknowledgement Form for OHS Legal and Other Requirements - Rev 4.docx (unknown)Returnable documents:
Evaluation Criteria
Source: 240-77471499 Annexure B Eskom Acknowledgement Form for OHS Legal and Other Requirements - Rev 4.docx (unknown)Compliance with Occupational Health and Safety Act, 1993 (Act No. 85 of 1993) and its Regulations.
Compliance with Compensation for Occupational Injuries and Diseases Act, 1993 (Act No. 130 of 1993) as amended.
Demonstrated ability to align company processes to Eskom OHS requirements (policies, procedures, standards) after contract award.
Provision of documented contractor and supplier selection process incorporating competency, compliance, and OHS performance requirements.
Capacity to ensure all employees and contractors undergo relevant Eskom induction and company induction.
Accountability for management and oversight of contractors and suppliers (all tiers) for compliance with legal, regulatory, contractual, and Eskom OHS requirements.
Implementation of audit and assessment programme to verify contractor and supplier OHS compliance throughout contract execution.
Management of non-conformances and non-compliances in accordance with agreed performance and penalty mechanisms aligned to Eskom processes.
Contractual penalties enforced on the main supplier for non-compliances by the main supplier, its contractors, or suppliers to statutory or Eskom OHS requirements.
Technical Specifications
Source: 240-77471499 Annexure B Eskom Acknowledgement Form for OHS Legal and Other Requirements - Rev 4.docx (unknown)Scope covers supply, installation, commissioning, maintenance, servicing, fault-finding, repairs, replacement, testing, and technical support of security systems and integrated equipment for the Cape Coastal Cluster, Eastern Cape.
OHS legal and other requirements acknowledgement (Annexure B) forms part of the technical compliance pack.
Contractor must provide copies of testimonials/references and client contact details (including Eskom) for previous similar work upon instruction.
All applicable legislation, standards, policies, procedures, and Eskom requirements relevant to services rendered must be complied with, including but not limited to the Occupational Health and Safety Act, 1993 (Act No. 85 of 1993) and Regulations, and the Compensation for Occupational Injuries and Diseases Act, 1993 (Act No. 130 of 1993) as amended.
Main supplier/contractor must notify Eskom prior to appointment of any contractor or supplier and before commencement of work.
Main supplier must ensure contractors and suppliers have necessary resources and competencies to execute the work scope.
Main supplier must implement a programme of audits and assessments to verify contractor and supplier compliance with OHS requirements throughout execution.
All employees (contractors/suppliers) must undergo relevant Eskom induction and company induction.
Financial Requirements
Source: 240-77471499 Annexure B Eskom Acknowledgement Form for OHS Legal and Other Requirements - Rev 4.docx (unknown)Contractual penalties shall be enforced on the main supplier for non-compliances or non-conformances (identified for the main supplier and/or its contractor and/or supplier) to statutory or any other requirements, in particular Eskom OHS requirements.
Compliance Requirements
Source: 240-77471499 Annexure B Eskom Acknowledgement Form for OHS Legal and Other Requirements - Rev 4.docx (unknown)CSD registration and valid tax compliance status (implied standard requirement for Eskom tenders).
Compliance with Occupational Health and Safety Act, 1993 (Act No. 85 of 1993) and Regulations.
Compliance with Compensation for Occupational Injuries and Diseases Act, 1993 (Act No. 130 of 1993) as amended.
Alignment of company processes to Eskom OHS requirements (policies, procedures, standards) after contract award.
Documented contractor and supplier selection process incorporating competency, compliance, and OHS performance requirements.
All personnel must complete Eskom induction and company induction.
Authority of CEO/Director/Managing Director to sign Annexure B acknowledgement form.
Returnable form: Annexure B — Eskom Acknowledgement Form for OHS Legal and Other Requirements (signed by authorised person, witnessed).
Evaluation Criteria
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP)-rev 3.docx (unknown)No eligibility criteria specified
Technical Specifications
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP)-rev 3.docx (unknown)Quality Control Plan (QCP) / Inspection and Test Plan (ITP) template for security systems work. Defines intervention point categories: Hold Point (W1/W2), Witness Point (W1/W2), Document Review (R1/R2), Approval (AP), Information (IN), Surveillance (S), Verification (V). Testing methods: T1 (100% testing), T2 (sample testing). Inspection methods: A1 (100% inspection), A2 (sample inspection). Acceptance criteria include functionality requirements, performance measures, regulatory compliance, chemical tests. Inspection methods cover visual, microscopy, NDT, liquid/dye penetrant, magnetic particle, eddy current. Requires approvals from Contractor/Supplier, Subcontractor, Eskom, and Approved Inspection Authority (AIA) where applicable. Records column for documenting results. Categories: S (Statutory) or N (Non-statutory). Controlling documents and acceptance criteria to be specified per activity.
Description
Source: Supplier Quality Management_Returnables Latest.xlsx (unknown)This document is the Eskom Supplier Quality Management Returnables template (Unique ID 240-12248652, Rev 7, Effective 21/01/2022) used to evaluate quality documentation submitted with tenders. It defines five supplier categories with differing returnable requirements. The template includes a Cover sheet for category selection, a Returnables sheet listing required documents per category, and Supplier evaluation scorecards (Sheets Supplier1–Supplier6) for scoring submitted quality documentation. Reference specifications: Supplier Contract Quality Requirements Specification (240-105658000) and related standards. The tender itself (E3425DXECOU) covers security systems for the Cape Coastal Cluster, Eastern Cape.
Submission Guidelines
Source: Supplier Quality Management_Returnables Latest.xlsx (unknown)Bidders must submit quality management documentation as specified in the Supplier Quality Management Returnables template. The applicable category must be selected on the Cover tab (only one category). Required returnables per category include:
All documents must be completed, signed, saved as PDF (or signed and locked spreadsheet) and submitted with the tender. Incomplete or unsigned returnables will disqualify the bid.
Evaluation Criteria
Source: Supplier Quality Management_Returnables Latest.xlsx (unknown)Quality documentation is evaluated across five weighted sections:
Scores are calculated as (Score Obtained / Maximum Score) × 100% × Weight. No minimum qualifying threshold stated in the document.
Technical Specifications
Source: Supplier Quality Management_Returnables Latest.xlsx (unknown)Supply, installation, commissioning, maintenance, servicing, fault-finding, repairs, replacement, testing and technical support of security systems and integrated equipment for the Cape Coastal Cluster, Eastern Cape. Quality management must comply with ISO 9001:2015 and Eskom specifications (ref 240-105658000, 240-51544462, 240-109253698, 240-109253302). Contract Quality Plan per ISO 10005. Inspection and Test Plans / Quality Control Plans per Scope of Works. Bidders must demonstrate defined roles, responsibilities and authorities including quality management function. Control of externally provided processes, products and services required. Internal and external audit reports with nonconformity/corrective action records required. Management review records required.
Compliance Requirements
Source: Supplier Quality Management_Returnables Latest.xlsx (unknown)Bidders must comply with Eskom Supplier Contract Quality Requirements Specification (ref 240-105658000). Quality Management System per ISO 9001:2015. Contract Quality Plan per ISO 10005. Inspection and Test Plans per ISO 10005 and 240-105658000. No explicit CIDB grading, B-BBEE level, local content thresholds, financial turnover, or professional registration requirements stated in the document. Standard Eskom procurement practice requires CSD registration and valid SARS tax compliance status, though not explicitly listed in this extract.
Description
Source: Technical Evaluation Criteria Scorecard - Security Technology - 19 Aug 2026 - 31 Aug 2026.xlsx (unknown)Tender for the supply, installation, commissioning, maintenance, servicing, fault-finding, repairs, replacement, testing and technical support of security systems and integrated equipment for the Cape Coastal Cluster, Eastern Cape. Failure to meet any mandatory requirement results in disqualification from further evaluation.
Important Dates
Source: Technical Evaluation Criteria Scorecard - Security Technology - 19 Aug 2026 - 31 Aug 2026.xlsx (unknown)Closing date: 2026-10-09 at 10:00 (from tender record). No compulsory briefing, site visit, or clarification deadline stated in the provided document.
Contact Information
Source: Technical Evaluation Criteria Scorecard - Security Technology - 19 Aug 2026 - 31 Aug 2026.xlsx (unknown)No SCM or technical contact details stated in the provided document. Document compiled by E du Plessis (2026-08-21).
Submission Guidelines
Source: Technical Evaluation Criteria Scorecard - Security Technology - 19 Aug 2026 - 31 Aug 2026.xlsx (unknown)Submission method and address are not stated in the provided document. All mandatory returnable documents must be submitted with the tender. Certified copies must carry date stamps not older than three months at the time of submission. Failure to meet any mandatory requirement results in disqualification from further evaluation.
Evaluation Criteria
Source: Technical Evaluation Criteria Scorecard - Security Technology - 19 Aug 2026 - 31 Aug 2026.xlsx (unknown)Two-stage evaluation:
Technical Specifications
Source: Technical Evaluation Criteria Scorecard - Security Technology - 19 Aug 2026 - 31 Aug 2026.xlsx (unknown)Scope: supply, installation, commissioning, maintenance, servicing, fault-finding, repairs, replacement, testing and technical support of security systems and integrated equipment for the Cape Coastal Cluster, Eastern Cape. Required capabilities: IP-based CCTV/VMS installation and maintenance, access control, alarm and intrusion detection, security system integration, Cathexis VMS environment integration and compatibility, electric fencing installation per SANS 10222-3. Personnel must hold relevant qualifications and certifications. Test and diagnostic equipment, spare parts/replacement components, and technical support structure with defined response times and escalation matrix must be demonstrated. All installations must be compatible with existing Cathexis environment and not compromise operation, integrity or cybersecurity. Compliance with Eskom site access, SHE, security, cybersecurity and technical requirements mandatory. On-site technical evaluation/practical demonstration may be conducted.
Financial Requirements
Source: Technical Evaluation Criteria Scorecard - Security Technology - 19 Aug 2026 - 31 Aug 2026.xlsx (unknown)Public liability insurance minimum R10 million (letters of intent not accepted). No pricing format, bonds, guarantees, payment terms or financial capacity thresholds stated in the provided document.
Compliance Requirements
Source: Technical Evaluation Criteria Scorecard - Security Technology - 19 Aug 2026 - 31 Aug 2026.xlsx (unknown)Mandatory compliance documents (certified copies, date stamps not older than 3 months at submission):
Description
Source: 240-68099512 Form A Rev 10 (001).pdf (unknown)This document (Form A, identifier 240-68099512 Rev 10) defines the tender and contract quality requirements for the Intelligent Substation and Security System in the Cape Coastal Cluster, Eastern Cape. It references Eskom specification 240-105658000 and ISO 9001:2015. Pre-contract award Category 3 is selected (clause 4.1). Post-contract award requirements include Contract Execution, Supplier Quality Performance Monitoring, and Supplier Quality Audit (clause 5). Standard conditions cover Eskom Rights of Access, Rights to Information, Preservation, Quality Audits Related Conditions, Management of Nonconformities and Nonconforming Outputs, and Special Processes (clause 6). All ISO 9001 clauses (4-10) and all seven quality principles are applicable. The tenderer must complete and sign the form acknowledging these requirements.
Contact Information
Source: 240-68099512 Form A Rev 10 (001).pdf (unknown)Eskom Quality Representative: Bulelani Flekisi, Senior Advisor Quality Assurance (signed 17/07/2026). No SCM or technical enquiry contacts, emails, phones or submission address are stated in this document.
Submission Guidelines
Source: 240-68099512 Form A Rev 10 (001).pdf (unknown)Bidders must complete and sign Form A (Tender & Contract Quality Requirements, document identifier 240-68099512 Rev 10) to acknowledge and accept Eskom Supplier Quality Requirements per specification 240-105658000 and ISO 9001 standard. The form requires the tenderer's quality representative name, designation, date and signature. No submission method, address, closing time or other returnable documents are stated in this document.
Evaluation Criteria
Source: 240-68099512 Form A Rev 10 (001).pdf (unknown)Pre-contract award: Category 3 (Main Supplier and Sub-supplier Capability and Capacity Assessment per clause 4.1 of 240-105658000) is selected and mandatory. Post-contract award requirements: Contract Execution (clause 5), Supplier Quality Performance Monitoring (clause 5), Supplier Quality Audit (clause 5). Standard conditions: Eskom Rights of Access, Rights to Information, Preservation, Quality Audits Related Conditions, Management of Nonconformities and Nonconforming Outputs, Special Processes (all clause 6). ISO 9001 clauses applicable: 4 Context of Organisation, 5 Leadership, 6 Planning, 7 Support, 8 Operation, 9 Performance Evaluation, 10 Improvement. Quality principles applicable: Customer focus, Leadership, Engagement of people, Process approach, Improvement, Evidence-based decision making, Relationship management. No pricing split, functionality thresholds or preference point system are stated in this document.
Technical Specifications
Source: 240-68099512 Form A Rev 10 (001).pdf (unknown)Scope: Intelligent Substation and Security System in the Cape Coastal Cluster, Eastern Cape. Quality requirements governed by Eskom specification 240-105658000 and ISO 9001:2015. Pre-contract award Category 3 applies (clause 4.1). Post-contract award: Contract Execution, Supplier Quality Performance Monitoring, Supplier Quality Audit (clause 5). Eskom rights: Access, Information, Preservation, Quality Audits, Management of Nonconformities, Special Processes (clause 6). Applicable ISO 9001 clauses: 4-10 inclusive. Applicable quality principles: all seven principles. No detailed technical scope, quantities, service levels or capacity requirements are stated in this document.
Methodology
Source: 240-68099512 Form A Rev 10 (001).pdf (unknown)Methodology must align with ISO 9001:2015 clauses 4-10 and the seven quality principles. Specific requirements: Context of Organisation (clause 4), Leadership (clause 5), Planning (clause 6), Support (clause 7), Operation (clause 8), Performance Evaluation (clause 9), Improvement (clause 10). Quality principles: Customer focus, Leadership, Engagement of people, Process approach, Improvement, Evidence-based decision making, Relationship management. Execution must satisfy Eskom specification 240-105658000 clauses for Contract Execution, Supplier Quality Performance Monitoring, Supplier Quality Audit (clause 5) and Standard Conditions (clause 6).
Quality Management
Source: 240-68099512 Form A Rev 10 (001).pdf (unknown)Quality requirements per Eskom specification 240-105658000 and ISO 9001:2015 standard. Pre-contract award: Category 3 selected (clause 4.1). Post-contract award: Contract Execution (clause 5), Supplier Quality Performance Monitoring (clause 5), Supplier Quality Audit (clause 5). Eskom rights: Access, Information, Preservation, Quality Audits, Management of Nonconformities, Special Processes (clause 6). ISO 9001 clauses applicable: 4 Context of Organisation, 5 Leadership, 6 Planning, 7 Support, 8 Operation, 9 Performance Evaluation, 10 Improvement. Quality principles applicable: Customer focus, Leadership, Engagement of people, Process approach, Improvement, Evidence-based decision making, Relationship management. Tenderer must complete and sign Form A acknowledging these requirements.
Compliance Requirements
Source: 240-68099512 Form A Rev 10 (001).pdf (unknown)Bidders must have a quality management system compliant with ISO 9001:2015 and meet Eskom Supplier Quality Requirements per specification 240-105658000. Must complete and sign Form A acknowledging these requirements. No CSD registration, tax clearance, B-BBEE, CIDB, CIPC, professional registrations or local content requirements are stated in this document.
Section
Source: 240-68099512 Form A Rev 10 (001).pdf (unknown)Evaluation is based on compliance with Eskom specification 240-105658000 and ISO 9001:2015. Pre-contract award: Category 3 (Main Supplier and Sub-supplier Capability and Capacity Assessment per clause 4.1) is mandatory. Post-contract award: Contract Execution, Supplier Quality Performance Monitoring, Supplier Quality Audit (clause 5). Standard conditions: Eskom Rights of Access, Information, Preservation, Quality Audits, Management of Nonconformities, Special Processes (clause 6). ISO 9001 clauses 4-10 and all seven quality principles apply. No scoring methodology, weightings or minimum thresholds are stated.
Submission Guidelines
Source: 240-77471969- Tender Evaluation Sheet Medium and Low risk.pdf (unknown)Returnable documents required with the bid:
All documents must be submitted and satisfy minimum requirements to avoid a score of 0.
Evaluation Criteria
Source: 240-77471969- Tender Evaluation Sheet Medium and Low risk.pdf (unknown)Two-part evaluation (Part A and Part B) using a pass/fail scoring per requirement:
Part A requirements: Signed Annexure B; comprehensive SHE Plan (12 specified elements); Baseline SHE Risk Assessment with methodology; valid Letter of Good Standing (COIDA); SHE policy signed by CEO/MD per OHS Act Section 7 or OHSAS 18001.
Part B requirements: Signed Annexure B; OHSAS 18001 certificate; valid Letter of Good Standing (COIDA).
Overall result: Approved / Not Approved based on meeting all minimum requirements. Explanatory notes for SHE requirements are in document 240-77433139 Annexure A: Supplier Risk Category.
Technical Specifications
Source: 240-77471969- Tender Evaluation Sheet Medium and Low risk.pdf (unknown)Scope: Supply, installation, commissioning, maintenance, servicing, fault-finding, repairs, replacement, testing and technical support of security systems and integrated equipment for the Cape Coastal Cluster, Eastern Cape.
SHE technical requirements embedded in the evaluation:
Compliance Requirements
Source: 240-77471969- Tender Evaluation Sheet Medium and Low risk.pdf (unknown)Mandatory compliance documents:
Standard South African procurement requirements (CSD registration, tax compliance, B-BBEE, CIDB, CIPC) are not detailed in this document but are typically required for Eskom tenders.
Health & Safety
Source: 240-77471969- Tender Evaluation Sheet Medium and Low risk.pdf (unknown)SHE Plan must address the following elements:
Baseline SHE Risk Assessment (BRA): Identification, assessment and management of safety, health and environmental risks related to the scope of work. The methodology used for the risk assessment must be provided together with the BRA.
Mandatory documents:
Scoring: 0 = Document not submitted or does not satisfy minimum requirements; 1 = Document submitted and satisfies minimum requirements.
Reference for explanatory notes: 240-77433139 Annexure A: Supplier Risk Category.
Section
Source: 240-77471969- Tender Evaluation Sheet Medium and Low risk.pdf (unknown)Pass/fail scoring per requirement:
Part A evaluates: Signed Annexure B; comprehensive SHE Plan (12 elements); Baseline SHE Risk Assessment with methodology; valid Letter of Good Standing (COIDA); SHE policy signed by CEO/MD per OHS Act Section 7 or OHSAS 18001.
Part B evaluates: Signed Annexure B; OHSAS 18001 certificate; valid Letter of Good Standing (COIDA).
Overall outcome: Approved / Not Approved.
Description
Source: NEC For Intelligent Substation and Security Systems.pdf (unknown)Supply, Install, Commissioning and Maintenance of Security related equipment at various Eskom sites within the Eastern Cape Operating Unit for 3 years. The scope includes comprehensive design, supply, installation, testing, and commissioning of Intelligent Security and Substation Plant Monitoring System solutions, including server infrastructure, overview monitors, PTZ and fixed cameras, fibre perimeter intrusion detection, AI-based plant monitoring software, NVRs/servers with RAID storage, Paradox EVO 192 alarm panels, and associated hardware. The service period is one year with a task order process. The Affected Property covers various sites within the Cape Coastal cluster - Eastern Cape.
Important Dates
Source: NEC For Intelligent Substation and Security Systems.pdf (unknown)Closing date: 9 October 2026 at 10:00 (from tender record). Starting date: to be confirmed (TBC). Service period: one year. Contractor submits first plan within two weeks of Contract Date. Task Order programme due within two weeks of receipt unless otherwise agreed. 14-day soak test period after installation completion. Defects liability periods: 12 months for security software, 3 years for physical hardware, 10 years for system design from Completion of first Task Order. No mandatory briefing or site visit dates are stated in the document.
Contact Information
Source: NEC For Intelligent Substation and Security Systems.pdf (unknown)Employer: Eskom Holdings SOC Ltd (Reg No. 2002/015527/30), Registered office: Megawatt Park, Maxwell Drive, Sandton, Johannesburg. Service Manager: Elre Du Plessis, Eskom Holdings SOC Limited, Sunilaws Office Park, Beacon Bay, East London, 5205. Tel: 043 703 2675. Email: [email protected]. Adjudicator: to be appointed from ICE-SA Panel when dispute arises; nominating body is Chairman of ICE-SA or AFSA. Arbitration seat: East London, Eastern Cape, South Africa.
Submission Guidelines
Source: NEC For Intelligent Substation and Security Systems.pdf (unknown)Submission is via the NEC3 Form of Offer and Acceptance (C1.1) which must be completed, signed by a duly authorised representative, and returned with the priced Bill of Quantities (C2.2). The offer must state the total of the Prices exclusive of VAT, VAT at 15%, and the inclusive total in figures and words. A valid CIDB registration number must be provided on the Form of Offer. The tenderer must also submit a first programme for acceptance within two weeks of the Contract Date. All returnable schedules and documents listed in the Tender Data must be included. Late submissions are disqualified regardless of reason.
Evaluation Criteria
Source: NEC For Intelligent Substation and Security Systems.pdf (unknown)The contract uses NEC3 Option A (Priced contract with price list) with a rate-based Bill of Quantities. Evaluation follows Eskom's standard procurement process: mandatory compliance (CSD registration, valid SARS tax compliance status PIN, CIDB registration where applicable, B-BBEE status declaration) followed by price and preference scoring under the PPPFA (80/20 or 90/10 system, not explicitly stated in the document). B-BBEE status changes must be notified within 7 days with updated verification certificate within 30 days; a decrease may trigger renegotiation or termination. Joint ventures must notify the key authorised person within 2 weeks of Contract Date and may not alter composition without Employer consent. No minimum turnover or financial capacity thresholds are stated. Functionality/technical evaluation criteria are not detailed in the provided text.
Technical Specifications
Source: NEC For Intelligent Substation and Security Systems.pdf (unknown)Scope: Supply, installation, commissioning, maintenance, servicing, fault-finding, repairs, replacement, testing and technical support of security systems and integrated equipment compatible with the Cathexis Vision platform at various Eskom sites within the Cape Coastal Cluster, Eastern Cape. Capital Expenditure (once-off installation & commissioning) includes: Section 1 - General & P&Gs (site establishment, safety compliance ORHVS, environmental authorisations, wayleave applications, detailed site surveys, lighting measurements); Section 2 - Engineering & Design (comprehensive system design in MicroStation/DWG format, presentation to CCC Design Review Team, as-built documentation, updated substation drawings); Section 3 - Perimeter & Outdoor Security (fibre perimeter intrusion detection per meter including inner/outer fences, PTZ cameras high-definition with mounting poles and foundations, fixed/bullet cameras for entry/exit points and high-point overview); Section 4 - Control Room & Intelligent Systems (AI-based plant monitoring software and specialised hardware, NVRs/servers with RAID storage, Paradox EVO 192 alarm panels, keypads, hard-wired PIRs/magnetic contacts); Section 5 - Network & Infrastructure (industrial-grade network switches supporting RSTP/MRP, security control room displays 3x3 grid 55"+ monitors). Travel rate for Cape Coastal Cluster (per km). Materials/spares mark-up percentage. Maintenance term: 24 months post-handover with monthly fixed service fee. Payment milestones: successful 14-day soak test with zero critical failures, Electrical Certificate of Compliance (CoC) approval, as-built drawings in MicroStation format, verification of strategic spares stock at designated CNC. Defects date runs concurrently with installation works.
Methodology
Source: NEC For Intelligent Substation and Security Systems.pdf (unknown)Contractor submits first plan for acceptance within 2 weeks of Contract Date. Plan must link operations to price list items for satisfactory cash flow. Management meetings: risk register and compensation events weekly; overall contract progress monthly. Meeting records submitted to Service Manager within 5 days. Task order process utilised. Contractor submits Task Order programme within 2 weeks of receiving Task Order unless otherwise agreed.
Experience & Qualifications
Source: NEC For Intelligent Substation and Security Systems.pdf (unknown)Key people required with name, job, responsibilities, qualifications, experience, and CVs. Contractor must have CIDB registration. Compatibility and integrability with existing Cathexis Vision platform required.
Quality Management
Source: NEC For Intelligent Substation and Security Systems.pdf (unknown)As-built documentation in MicroStation format. Updated substation drawings. Presentation to CCC Design Review Team (DRT). 14-day soak test with zero critical failures. Electrical Certificate of Compliance (CoC). Verification of strategic spares stock. Compliance monitoring for asbestos per HSG248/HSG173/OESSM. AAIA-approved asbestos work plan.
Pricing Schedule
Source: NEC For Intelligent Substation and Security Systems.pdf (unknown)Option A: Priced contract with price list. Price list in C2.2 (Bill of Quantities). Tendered total of Prices is rate-based contract. Capital Expenditure (once-off installation & commissioning) includes: Section 1 - General & P&Gs (site establishment, safety compliance, environmental authorisations, wayleaves, site surveys, lighting measurements); Section 2 - Engineering & Design (system design in MicroStation/DWG, CCC Design Review Team presentation, as-built documentation); Section 3 - Perimeter & Outdoor Security (fibre perimeter intrusion detection per meter, PTZ cameras with poles/foundations, fixed/bullet cameras); Section 4 - Control Room & Intelligent Systems (AI-based plant monitoring software/hardware, NVRs/servers with RAID storage, Paradox EVO 192 alarm panels, keypads, hard-wired PIRs/magnetic contacts). Travel rate for Cape Coastal Cluster (per km). Materials/spares mark-up percentage. Payment milestones: successful 14-day soak test with zero critical failures, Electrical Certificate of Compliance (CoC) approval, as-built drawings in MicroStation format, verification of strategic spares stock at designated CNC. Defects date runs concurrently with installation works.
Financial Requirements
Source: NEC For Intelligent Substation and Security Systems.pdf (unknown)Pricing: NEC3 Option A (Priced contract with price list) using a rate-based Bill of Quantities (C2.2). Currency: South African Rand. Payment terms: 30 days for contracts valued below R50 million including VAT; 60 days for contracts valued above R50 million including VAT, from receipt of undisputed invoices. Contractor must submit tax invoice within one week of payment certificate, showing Eskom VAT number 4740101508. Interest on late payment: prime rate (Standard Bank) for ZAR, LIBOR for other currencies. Insurance: Contractor provides insurances per Insurance Table A (replacement cost for Employer's property, Plant and Materials, Equipment; Employer's policy deductible; third-party property damage replacement cost; bodily injury/death per applicable law; employee injury/death per applicable law). Employer provides insurances per Insurance Table B (Assets All Risk, Contract Works, Environmental Liability, General and Public Liability, Transportation/Marine, Motor Fleet and Mobile Plant, Terrorism, Cyber Liability, Nuclear Material Damage and Business Interruption, Nuclear Material Damage Terrorism) per policy documents. Limitation of liability: Contractor's indirect/consequential loss limited to Value of Task Order; loss/damage to Employer's property limited to insurance deductibles; design defects limited to greater of total Prices at Contract Date or insurance exclusions plus deductibles; total liability limited to total Prices except excluded matters (design defects, off-site manufacture/fabrication, third-party property damage, death/injury, IP infringement). Employer's indirect/consequential liability limited to R0.00. No performance bond or guarantee percentage explicitly stated.
Compliance Requirements
Source: NEC For Intelligent Substation and Security Systems.pdf (unknown)Mandatory: CSD registration, valid SARS tax compliance status PIN, CIDB registration (contractor's CIDB number required on Form of Offer), B-BBEE status declaration with verification certificate. B-BBEE changes: notify within 7 days, submit updated certificate within 30 days; decrease may lead to renegotiation or termination. Joint ventures: jointly and severally liable; notify key authorised person within 2 weeks of Contract Date; no composition changes without Employer written consent. Insurance: Contractor must provide certificates confirming Insurance Table A cover from starting date. Health & safety: Contractor accepts appointment as Principal Contractor under Construction Regulations 2014 (OHS Act); warrants pricing includes compliance costs; must comply with Construction Regulations and all applicable health & safety laws; ensure subcontractors/employees comply. Environmental: comply with all applicable environmental laws, regulations, rules, guidelines. Asbestos: work in areas conforming to SA standards (OEL 0.2 fibres/ml 4-hour TWA, STEL 0.6 fibres/ml 10-min TWA per HSG248/HSG173/OESSM); measurements by SANAS-accredited AAIA; risk assessment and control measures if asbestos identified; personnel may stop work until area declared safe; asbestos removal by registered contractor at Employer's expense. Confidentiality: no disclosure of contract information; images of Affected Property require prior written consent; rights vest in Employer; subcontractors bound. Ethics: prohibited actions (coercive, collusive, corrupt, fraudulent, obstructive) grounds for termination. Nuclear liability: Employer indemnifies Contractor for Koeberg NPS nuclear damage except unlawful intent or unauthorised presence. Tax: VAT Act compliance, include Eskom VAT number 4740101508 on invoices. Compensation events: notify within 8 weeks of awareness. Termination includes business rescue orders.
B-BBEE Requirements
Source: NEC For Intelligent Substation and Security Systems.pdf (unknown)Contractor must notify Employer within 7 days of any change in B-BBEE status due to legal status, ownership, or business composition changes. Updated verification certificate and supporting documentation required within 30 days. If B-BBEE status decreases, Employer may renegotiate or terminate. Failure to notify may constitute grounds for termination.
Health & Safety
Source: NEC For Intelligent Substation and Security Systems.pdf (unknown)Contractor accepts appointment as Principal Contractor under Construction Regulations 2014 (OHS Act). Warrants pricing includes sufficient amount for compliance with Construction Regulations, all applicable health & safety laws, and contract health & safety rules. Must comply with Construction Regulations and ensure subcontractors/employees comply. Environmental compliance with all applicable laws and regulations. Asbestos management: Employer ensures ambient air conforms to SA standards (OEL 0.2 fibres/ml 4-hour TWA, STEL 0.6 fibres/ml 10-min TWA per HSG248/HSG173/OESSM). Measurements by SANAS-accredited AAIA. Contractor may perform parallel measurements at own expense. If asbestos identified, risk assessment conducted, control measures implemented, air monitoring performed. Contractor personnel may stop work and leave contaminated area until declared safe by compliance monitoring or AAIA intervention. Contract dates extended by regulatory notification periods. Asbestos removal/disposal by registered asbestos contractor at Employer's expense per SA legislation.
Environmental
Source: NEC For Intelligent Substation and Security Systems.pdf (unknown)Environmental authorisations and wayleave applications required. Contractor complies with all applicable environmental laws, regulations, rules, guidelines and procedures. Environmental liability insurance per Employer's policy. Asbestos management per Employer Standard 32-303 and Asbestos Regulations 2002. Risk register includes typical risks from Safety, Health and Environmental Specification.
Contractual Terms
Source: NEC For Intelligent Substation and Security Systems.pdf (unknown)NEC3 Term Service Contract (TSC3) April 2013 with main Option A: Priced contract with price list, dispute resolution Option W1, and secondary Options X2 (Changes in the law), X17 (Low service damages), X18 (Limitation of liability), X19 (Task Order), and Z (Additional conditions of contract Z1-Z14). Law of contract: Republic of South Africa. Language: English. Period for reply: One week. Starting date: TBC. Service period: One year. Assessment interval: Period agreed by Service Manager and Contractor. Currency: South African Rand. Payment terms: 30 days for contracts below R50M, 60 days for contracts above R50M. Interest rate: Prime rate (Standard Bank) for ZAR, LIBOR for other currencies. Adjudicator from ICE-SA Panel, nominated by ICE-SA Chairman or AFSA. Tribunal: Arbitration under Association of Arbitrators (Southern Africa) rules, seat East London. Contractor's liability for indirect/consequential loss limited to Value of Task Order. Liability for loss/damage to Employer's property limited to insurance deductibles. Liability for design defects limited to greater of total Prices at Contract Date or insurance exclusions plus deductibles. Total liability limited to total Prices except for excluded matters (design defects, manufacture/fabrication off-site, third-party property damage, death/injury, IP infringement). End of liability: 12 months for security software, 3 years for physical hardware, 10 years for system design from Completion of first Task Order. Contractor submits Task Order programme within 2 weeks. Employer's liability for indirect/consequential loss limited to R0.00. Contractor provides tax invoice within one week of payment certificate. VAT number 4740101508 required on invoices. Compensation events must be notified within 8 weeks. Termination includes business rescue orders. Ethics clause prohibits coercive, collusive, corrupt, fraudulent, obstructive actions with termination rights. Insurance requirements per Tables A and B. Nuclear liability indemnity for Koeberg NPS. Asbestos management per Asbestos Regulations 2002 and Employer Standard 32-303.
Special Conditions
Source: NEC For Intelligent Substation and Security Systems.pdf (unknown)Z1: No cession/delegation/assignment without Employer's written consent; Employer may cede to subsidiaries/divisions upon restructuring. Z2: Joint ventures jointly and severally liable; must notify key person with binding authority within 2 weeks; no composition changes without Employer consent. Z4: Confidentiality - no disclosure of contract information; images of Affected Property require prior written consent; rights vest in Employer; subcontractors bound. Z5: Waiver/estoppel requires written agreement. Z6: Health, safety, environment obligations. Z7: Tax invoice and VAT requirements. Z8: Compensation event notification within 8 weeks. Z9: Employer's limitation of liability. Z10: Termination includes business rescue. Z11: Ethics/prohibited actions. Z12: Insurance requirements (Tables A and B). Z13: Nuclear liability indemnity for Koeberg. Z14: Asbestos management per regulations and Employer Standard 32-303.
Description
Source: Supplier Quality Management_Returnables Latest.pdf (TENDER)Quality management returnables for the Intelligent Substation and Security System tender in the Cape Coastal Cluster, Eastern Cape. Bidders must provide documented evidence of a Quality Management System complying with ISO 9001:2015 (Option 2, non-certified), evidence of QMS in operation, a draft Contract Quality Plan per ISO 10005, a draft/example Inspection and Test Plan or Quality Control Plan for similar work, and a completed and signed Form A.
Contact Information
Source: Supplier Quality Management_Returnables Latest.pdf (TENDER)Eskom Representative: Bulelani Flekisi. Document issued 17/07/2026.
Submission Guidelines
Source: Supplier Quality Management_Returnables Latest.pdf (TENDER)Returnable documents required for quality evaluation:
Returnable Documents
Source: Supplier Quality Management_Returnables Latest.pdf (TENDER)Mandatory quality returnables:
Evaluation Criteria
Source: Supplier Quality Management_Returnables Latest.pdf (TENDER)Quality management evaluation uses a scored deliverables approach (Category 3, indicator = 1). Total score across five sections:
No price/functionality split, preference point system, or minimum qualifying thresholds are stated in this document.
Technical Specifications
Source: Supplier Quality Management_Returnables Latest.pdf (TENDER)Scope: Intelligent Substation and Security System in the Cape Coastal Cluster, Eastern Cape.
Quality requirements aligned to ISO 9001:2015 and ISO 10005:
Compliance Requirements
Source: Supplier Quality Management_Returnables Latest.pdf (TENDER)Quality management compliance per ISO 9001:2015 (Option 2: documented QMS complying with the standard, certification not mandatory).
No CSD registration, tax clearance, B-BBEE level, CIDB grading, professional registrations, or local content percentages stated in this document.
Section
Source: Supplier Quality Management_Returnables Latest.pdf (TENDER)Scored quality evaluation across five sections (Category 3, indicator = 1):
Total: 12 points. No minimum qualifying score stated.
Description
Source: SHE Specification- INTELLIGENT SUBSTATION SECURITY SYSTEMs - 15 July 2026.pdf (unknown)This document is the SHE Specification for Intelligent Substation & Security Systems (Unique Identifier: 559-155379501, Revision 1, compiled 07 May 2026). It applies to all contractors performing security work across the Cape Coastal Cluster in the Eastern Cape. The specification sets minimum Safety, Health and Environment (SHE) requirements that form an integral part of the contract. Principal contractors must flow these requirements down to their subcontractors. The document includes abbreviations, definitions, project scope details, client/agent and principal contractor accountabilities, Section 37(2) agreement requirements, COIDA compliance, organogram requirements, compliance and non-conformance management, legal compliance, SHE policy, appointments and competencies, training, hazard and risk management (HIRA), standard operating procedures, high-risk activities, occupational health/rehabilitation/hygiene, emergency preparedness and response, housekeeping, PPE, fire safety (including Eskom fire safety guidelines), work stoppage procedures, SHE audits, incident management, monthly statistical reporting, contractor SHE plan requirements, omissions clause, SHE file maintenance, principal contractor accountability for subcontractors, and hours of work.
Important Dates
Source: SHE Specification- INTELLIGENT SUBSTATION SECURITY SYSTEMs - 15 July 2026.pdf (unknown)Closing date and time are not stated in this document. The only dates mentioned are the SHE specification compilation date (07 May 2026) and the Security Manager signature date (15 July 2026). No mandatory briefing, site visit, or clarification deadlines are provided.
Contact Information
Source: SHE Specification- INTELLIGENT SUBSTATION SECURITY SYSTEMs - 15 July 2026.pdf (unknown)No SCM or technical contact names, emails, phone numbers, or submission addresses are given in this document. The only named individuals are the Security Manager (Elre Du Plessis) and the SHE Practitioner (Nathen Felkers) who signed the specification.
Submission Guidelines
Source: SHE Specification- INTELLIGENT SUBSTATION SECURITY SYSTEMs - 15 July 2026.pdf (unknown)Submission method and address are not stated in the provided document. The document is a SHE specification and scope of work for Intelligent Substation & Security Systems; it does not contain tender submission instructions, returnable forms list, or disqualification criteria. Bidders must obtain the formal tender pack for submission details.
Evaluation Criteria
Source: SHE Specification- INTELLIGENT SUBSTATION SECURITY SYSTEMs - 15 July 2026.pdf (unknown)The document does not specify an evaluation methodology, price/preference split (80/20 or 90/10), minimum functionality scores, or evaluation stages. It states only that the SHE plan must be submitted at least one month before commencement of work and that Eskom will evaluate it within 5 days. No further scoring criteria are provided.
Technical Specifications
Source: SHE Specification- INTELLIGENT SUBSTATION SECURITY SYSTEMs - 15 July 2026.pdf (unknown)Scope: Supply, installation, commissioning, maintenance, servicing, fault-finding, repairs, replacement, testing and technical support of Intelligent Substation & Security Systems across various Eskom sites in the Cape Coastal Cluster, Eastern Cape.
Key technical requirements:
Methodology
Source: SHE Specification- INTELLIGENT SUBSTATION SECURITY SYSTEMs - 15 July 2026.pdf (unknown)Methodology requirements:
Quality Management
Source: SHE Specification- INTELLIGENT SUBSTATION SECURITY SYSTEMs - 15 July 2026.pdf (unknown)Quality management requirements:
Pricing Schedule
Source: SHE Specification- INTELLIGENT SUBSTATION SECURITY SYSTEMs - 15 July 2026.pdf (unknown)No pricing schedule, bill of quantities, or payment terms are provided in this document. The tendered cost must include all necessary provisions for identified lighting upgrades. Full details of software and hardware licensing terms (validity periods, renewal conditions, associated costs) must be included in the proposal.
Financial Requirements
Source: SHE Specification- INTELLIGENT SUBSTATION SECURITY SYSTEMs - 15 July 2026.pdf (unknown)No pricing format, bond, guarantee, insurance, payment terms, or financial capacity thresholds are stated in this document. The tendered cost must include provisions for any required lighting upgrades. Licensing terms for software and hardware (validity periods, renewal conditions, associated costs) must be included in the proposal.
Compliance Requirements
Source: SHE Specification- INTELLIGENT SUBSTATION SECURITY SYSTEMs - 15 July 2026.pdf (unknown)Mandatory compliance requirements stated in the document:
Health & Safety
Source: SHE Specification- INTELLIGENT SUBSTATION SECURITY SYSTEMs - 15 July 2026.pdf (unknown)Health and safety requirements (SHE Specification):
Environmental
Source: SHE Specification- INTELLIGENT SUBSTATION SECURITY SYSTEMs - 15 July 2026.pdf (unknown)Environmental requirements:
Contractual Terms
Source: SHE Specification- INTELLIGENT SUBSTATION SECURITY SYSTEMs - 15 July 2026.pdf (unknown)Contractual terms derived from the scope of work and SHE specification:
Section
Source: SHE Specification- INTELLIGENT SUBSTATION SECURITY SYSTEMs - 15 July 2026.pdf (unknown)The only evaluation-related requirement in this document is that the contractor's SHE plan must be submitted at least one month prior to commencement of work, and Eskom will evaluate it within 5 days. No further evaluation criteria, scoring, or stages are defined in this specification.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Eskom sunnilaws office park - - East London -
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
11
Last checked
03 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Median Estimate
R 187 340
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Learn how to submit a winning bid with these related articles
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Other personal service activities. Unlock full pricing strategies, bid frequency, and historical win rates.