Tender Type
Request for Information
Delivery Location
Matla Power Station - Kriel - Kriel - 2271
Organization Type
GOVERNMENT
Published
01 Sept 2026
OCDS Reference
ocds-9t57fa-167683
Date & Time
Friday, 18 September 2026 - 10:00
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Venue
null
Categories
Request for Information
Matla Power Station - Kriel - Kriel - 2271
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: IITPSA Membership, ISO 27001 (Information Security Management), ISO 20000 (IT Service Management), CISSP
AI Document Analysis Stages
Contact Information
Source: SCOPE OF WORK RFI.pdf (unknown){"name":null,"email":null,"phone":null,"department":"(Document Control)","address":null}
01 Sept
2026
Tender Published
Tender was published
18 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
SCOPE OF WORK RFI.pdf
Eskom requires a contractor to design, supply, install, commission, and support a Private 5G mobile voice communication network at Matla Power Station in Mpumalanga to replace the existing NEC/Philips iS3000 DECT system. The solution must provide equivalent or better operational capability for a minimum of 400 users across all station operational areas, including hazardous zones, with mandatory integration into the existing HiCOM 300 series PABX via SIP trunk.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 907 418
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Evaluation Criteria
Source: SCOPE OF WORK RFI.pdf (unknown)Contractor must demonstrate capability as Design Authority for Private 5G systems in industrial/hazardous environments; compliance with Generation Cyber Security Compliance Standard (240-129014618); ability to supply equipment meeting IP65, MIL-STD-810H, IEC 61000-4-2, and hazardous area certifications; valid CSD registration, SARS tax compliance, and B-BBEE certification per standard Eskom requirements (implied); competent personnel for high-risk industrial installation per OHS Act and Matla Plant Safety Regulations (240-150642762).
Technical Specifications
Source: SCOPE OF WORK RFI.pdf (unknown)Review Date October 2027
NB: Do not tamper with the template.
General
(Document Control)
Scope of work description procedure, specification, hold points, witness, responsible
/ Activity eng. Requirements / documentation reports party
1.1 Occupational Health and Safety
commences on site
Safety Regulations. (240-150642762).
Matla power station SHEQ induction must be done before access to site can be granted
The contractor should ensure that all employees have acquired the required competency for the
task they are performing.
Reference No: MEC-05970 Reference Rev No: 0 Date: 18/06/2026 of 35
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 35
File name: Scope of Work for Dect Mobile Systems Replacement ECN 27551318
Template ID: 240-43921898 (Rev 8) Header and Footer portrait template
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
Review Date October 2027
Scope of work description procedure, specification, hold points, witness, responsible
/ Activity eng. Requirements / documentation reports party
and tools to reduce worker noise exposure, contribute towards compliance to OHSA noise
exposure limits and ultimately reduce the risk of noise induced hearing loss.
1.2 Environmental Management.
. must have environmental AUTHORISATION before commencement of work.
The contractor shall comply with all applicable legal and other requirements.
The polluter pays principle will be applied.
The contractor manager shall ensure compliance with Eskom Matla Environmental procedures to
ensure the prevention of pollution (refer: OMOP 4090 and 4402).
(Annexure C: OMOP 4402) of designated area.
Reference No: MEC-05970 Reference Rev No: 0 Date: 18/06/2026 of 35
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 35
File name: Scope of Work for Dect Mobile Systems Replacement ECN 27551318
Template ID: 240-43921898 (Rev 8) Header and Footer portrait template
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
Review Date October 2027
Scope of work description procedure, specification, hold points, witness, responsible
/ Activity eng. Requirements / documentation reports party
1.3 Quality Management
this must be approved by engineering and authorised by the Quality Department before
commencing with the work.
Contractors/executioner to adhere to QM 58 and OMOP4497 requirements
Number of NCR issued can affect your next tendering process.
The QCP shall be signed progressively by the Engineer/Supervisor, Eskom QC Inspector,
Contractor QC Inspector and/or AIA.
No procuring of outage items without the approval of scopes by quality
All outage scopes creep and scopes addition should be approved by quality
No contractor should be in the possession of scopes for execution without the scopes approved
by quality
1.4 Inputs from other departments
Reference No: MEC-05970 Reference Rev No: 0 Date: 18/06/2026 of 35
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 35
File name: Scope of Work for Dect Mobile Systems Replacement ECN 27551318
Template ID: 240-43921898 (Rev 8) Header and Footer portrait template
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
Review Date October 2027
Scope of work description procedure, specification, hold points, witness, responsible
/ Activity eng. Requirements / documentation reports party
1.5 Commissioning reference
Reference No: MEC-05970 Reference Rev No: 0 Date: 18/06/2026 of 35
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 35
File name: Scope of Work for Dect Mobile Systems Replacement ECN 27551318
Template ID: 240-43921898 (Rev 8) Header and Footer portrait template
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
Review Date October 2027
Scope of work description / activity procedure, specification, hold points, witness, responsible party
Eng. Requirements / documentation reports
Matla C&I Engineering
deliver to site, install, test, commission, and hand design before scope
over a fully functional Private 5G mobile voice execution
communication system at Matla Power Station.
NEC/Philips iS3000 DECT system and provide a
minimum equivalent operational capability as
defined in the ROC.
detailed engineering design. Eskom C&I
Engineering will review and approve all design
submissions prior to implementation.
The Contractor shall propose the most technically
appropriate Private 5G solution to meet the
requirements defined herein.
Reference No: MEC-05970 Reference Rev No: 0 Date: 18/06/2026 of 35
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 35
File name: Scope of Work for Dect Mobile Systems Replacement ECN 27551318
Template ID: 240-43921898 (Rev 8) Header and Footer portrait template
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
Review Date October 2027
Eskom Matla C&I
Engineering The Contractor shall conduct a full site audit of Matla Power
Station to determine RF propagation characteristics,
coverage challenges, and base station placement
requirements.
The site survey shall cover all operational areas of the
station as a minimum, including but not limited to:
Main Control Room (MCR)
North and South Satellite Control Rooms
Turbine Hall - all levels and platforms
Boiler area - all levels, platforms, and burner decks
Reference No: MEC-05970 Reference Rev No: 0 Date: 18/06/2026 of 35
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 35
File name: Scope of Work for Dect Mobile Systems Replacement ECN 27551318
Template ID: 240-43921898 (Rev 8) Header and Footer portrait template
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
Review Date October 2027
Coal Bunker floor and coal handling areas
Coal Staithe and conveyor areas
Ash handling plant
Water Treatment Plant
Workshops, stores, and maintenance areas
Administration block and gatehouse
Underground cable tunnels
Unit 1-6
Outside Plant Area
Reference No: MEC-05970 Reference Rev No: 0 Date: 18/06/2026 of 35
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 35
File name: Scope of Work for Dect Mobile Systems Replacement ECN 27551318
Template ID: 240-43921898 (Rev 8) Header and Footer portrait template
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
Review Date October 2027
Control Room)
MainGate (Security Offices)
Fire Station & Technical Training
Ash Resources
Coal Plant
Admin Building
Site Canteen Building
Engineering Offices
Rotek Building & ABB Offices
Reference No: MEC-05970 Reference Rev No: 0 Date: 18/06/2026 of 35
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 35
File name: Scope of Work for Dect Mobile Systems Replacement ECN 27551318
Template ID: 240-43921898 (Rev 8) Header and Footer portrait template
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
Review Date October 2027
Simulator Building
Strategic Stores 1
Contractor Yard
The Matla Power Station drawing layout of the site is
included in the appendix
The site survey shall consider the following site-specific
challenges: heavy steel structural members and boiler
frameworks, thick concrete walls and floors,
electromagnetic interference from transformers, motor
drives, switchgear, and MV/HV equipment.
The RF propagation study shall include coverage simulation
maps, proposed base station locations with justification, and
Reference No: MEC-05970 Reference Rev No: 0 Date: 18/06/2026 of 35
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 35
File name: Scope of Work for Dect Mobile Systems Replacement ECN 27551318
Template ID: 240-43921898 (Rev 8) Header and Footer portrait template
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
Review Date October 2027
minimum received signal strength (RSRP) targets per
operational area.
The site survey report shall be submitted to Eskom C&I
Engineering for review and approval before network design is
finalised.
Reference No: MEC-05970 Reference Rev No: 0 Date: 18/06/2026 of 35
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 35
File name: Scope of Work for Dect Mobile Systems Replacement ECN 27551318
Template ID: 240-43921898 (Rev 8) Header and Footer portrait template
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
Review Date October 2027
Eskom Matla C&I
Engineering
and configure a Private 5G core network to support
station-wide mobile voice communication.
The core network shall include as a minimum:
5G Standalone (SA) or Non-Standalone (NSA) core
network, Contractor to recommend based on site
Review Date October 2027
(PTT) and standard voice calls
SIP gateway/trunk for PABX integration
Network management system with local monitoring
dashboard
system capacity, current system supports 400+
handsets)
infrastructure
design
communications room at Matla Power Station.
Reference No: MEC-05970 Reference Rev No: 0 Date: 18/06/2026 of 35
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 35
File name: Scope of Work for Dect Mobile Systems Replacement ECN 27551318
Template ID: 240-43921898 (Rev 8) Header and Footer portrait template
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
Review Date October 2027
Eskom to confirm final room location during site
survey.
of ≥99.99% per annum in line with ROC
requirements.
Eskom Matla C&I
Engineering
and configure the Radio Access Network including
all base stations, antennas, and supporting
infrastructure across all operational areas of the
station.
Reference No: MEC-05970 Reference Rev No: 0 Date: 18/06/2026 of 35
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 35
File name: Scope of Work for Dect Mobile Systems Replacement ECN 27551318
Template ID: 240-43921898 (Rev 8) Header and Footer portrait template
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
Review Date October 2027
the approved site survey and network design.
power station environment, IP65 minimum ingress
protection, operating temperature range -20°C to
+60°C minimum, EMC compliance to IEC 61000-4-
2 (ESD), and rated for continuous 24/7 operation.
adjacent to hazardous areas as classified under
OHSA and applicable IEC standards, equipment
shall meet the applicable hazardous area
certification requirements. The Contractor shall
confirm area classification with Eskom prior to
equipment selection.
Reference No: MEC-05970 Reference Rev No: 0 Date: 18/06/2026 of 35
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 35
File name: Scope of Work for Dect Mobile Systems Replacement ECN 27551318
Template ID: 240-43921898 (Rev 8) Header and Footer portrait template
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
Review Date October 2027
base station locations shall be routed through
existing or new cable containment in accordance
with the approved cable routing drawings and SANS
10142-1.
(mast foundations, wall brackets, cable
containment supports) shall be coordinated with
the Civil LDE.
Matla C&I Engineering
The Contractor shall configure the interface between the
Private 5G voice application server and the existing Matla
Power Station PABX (HiCOM 300 series) via SIP trunk.
Reference No: MEC-05970 Reference Rev No: 0 Date: 18/06/2026 of 35
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 35
File name: Scope of Work for Dect Mobile Systems Replacement ECN 27551318
Template ID: 240-43921898 (Rev 8) Header and Footer portrait template
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
Review Date October 2027
The integration shall enable as a minimum:
extensions
networks
(MTN, Vodacom, Telkom)
missed)
Reference No: MEC-05970 Reference Rev No: 0 Date: 18/06/2026 of 35
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 35
File name: Scope of Work for Dect Mobile Systems Replacement ECN 27551318
Template ID: 240-43921898 (Rev 8) Header and Footer portrait template
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
Review Date October 2027
SIP interface with a future SIP-based PABX
replacement in line with ROC requirement.
coordination with Eskom Telecoms / NTCSA. No
modifications to the existing PABX configuration shall
be made without prior written approval from Eskom
C&I Engineering.
acceptance testing covering all call types listed
above.
Matla C&I Engineering
provisioning, configuration, testing and commissioning of
user equipment, including handsets/devices and SIM
Reference No: MEC-05970 Reference Rev No: 0 Date: 18/06/2026 of 35
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 35
File name: Scope of Work for Dect Mobile Systems Replacement ECN 27551318
Template ID: 240-43921898 (Rev 8) Header and Footer portrait template
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
Review Date October 2027
cards required for the operational use of the deployed 5G
communication system.
The Contractor shall:
power station environment, in line with ROC
Document 559-792846344.
station environment, including minimum IP rating,
operating temperature range, MIL-STD-810H or
equivalent certification, Push-to-Talk capability,
MCX/MCPTT support, and battery life requirements.
for the full complement of handsets.
Reference No: MEC-05970 Reference Rev No: 0 Date: 18/06/2026 of 35
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 35
File name: Scope of Work for Dect Mobile Systems Replacement ECN 27551318
Template ID: 240-43921898 (Rev 8) Header and Footer portrait template
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
Review Date October 2027
for acceptance testing purposes prior to full
deployment.
the deployed 5G network during acceptance testing.
provisioning procedure for Eskom to follow when
onboarding, replacing, or reassigning handsets and
SIM cards.
and provisioning configurations are fully integrated
with the deployed 5G network and MCPTT/PTT
services.
Reference No: MEC-05970 Reference Rev No: 0 Date: 18/06/2026 of 35
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 35
File name: Scope of Work for Dect Mobile Systems Replacement ECN 27551318
Template ID: 240-43921898 (Rev 8) Header and Footer portrait template
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
Review Date October 2027
Note for costing: The Contractor’s pricing shall include the
full cost of all required handsets, SIM cards, SIM provisioning
infrastructure, configuration, testing and commissioning.
Handsets shall not be excluded from the Contractor’s scope.
Matla C&I Engineering
Response Work Instruction
implemented as a dedicated, isolated
communication platform. No direct IP routing
between the 5G core network and any Eskom OT
network (DCS, SCADA, historian, protection systems)
is permitted.
Reference No: MEC-05970 Reference Rev No: 0 Date: 18/06/2026 of 35
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 35
File name: Scope of Work for Dect Mobile Systems Replacement ECN 27551318
Template ID: 240-43921898 (Rev 8) Header and Footer portrait template
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
Review Date October 2027
architecture document as a deliverable, detailing:
firewall zones between 5G core and OT/IT networks
user equipment must authenticate via SIM before
network access is granted
encrypted end-to-end
access to the 5G core or management platform
how security events and anomalies will be logged and
reported
Reference No: MEC-05970 Reference Rev No: 0 Date: 18/06/2026 of 35
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 35
File name: Scope of Work for Dect Mobile Systems Replacement ECN 27551318
Template ID: 240-43921898 (Rev 8) Header and Footer portrait template
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
Review Date October 2027
reviewed and approved by the Eskom Station
Cybersecurity Representative prior to installation.
Generation Cyber Security Compliance Standard
throughout design, installation, and commissioning.
Matla C&I Engineering
The existing NEC/Philips iS3000 DECT system shall remain
fully operational throughout the entire installation and
commissioning phase of the new Private 5G system.
The Contractor shall not disconnect, modify, or interfere with
the existing DECT system at any point during installation
Reference No: MEC-05970 Reference Rev No: 0 Date: 18/06/2026 of 35
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 35
File name: Scope of Work for Dect Mobile Systems Replacement ECN 27551318
Template ID: 240-43921898 (Rev 8) Header and Footer portrait template
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
Review Date October 2027
without prior written authorisation from Eskom C&I
Engineering.
Formal cutover from the existing DECT system to the new
Private 5G system shall only take place after:
confirming the new system meets all acceptance
criteria
has been completed with both systems running
simultaneously
Reference No: MEC-05970 Reference Rev No: 0 Date: 18/06/2026 of 35
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 35
File name: Scope of Work for Dect Mobile Systems Replacement ECN 27551318
Template ID: 240-43921898 (Rev 8) Header and Footer portrait template
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
Review Date October 2027
The decommissioning of the existing DECT system (removal
of repeaters, handsets, and core equipment) is excluded
from this scope and will be managed separately by Eskom.
Matla C&I Engineering
The Contractor shall conduct a Factory Acceptance Test
(FAT) on the 5G core network equipment prior to delivery to
site.
The FAT shall demonstrate as a minimum:
registration of test devices
Reference No: MEC-05970 Reference Rev No: 0 Date: 18/06/2026 of 35
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 35
File name: Scope of Work for Dect Mobile Systems Replacement ECN 27551318
Template ID: 240-43921898 (Rev 8) Header and Footer portrait template
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
Review Date October 2027
defined recovery time
calls
PABX SIP interface functionality
Network management system, alarm generation,
logging, and monitoring functions
A final FAT report shall be prepared by the Contractor and
submitted to Eskom C&I Engineering for acceptance. The FAT
report shall include test procedures used, test results,
discrepancies identified, retests conducted, and FAT
certificate.
Reference No: MEC-05970 Reference Rev No: 0 Date: 18/06/2026 of 35
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 35
File name: Scope of Work for Dect Mobile Systems Replacement ECN 27551318
Template ID: 240-43921898 (Rev 8) Header and Footer portrait template
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
Review Date October 2027
Eskom C&I Engineering representative shall be invited to
witness the FAT. Travel costs for Eskom representative to
attend FAT at Contractor premises (if off-site) are for Eskom's
account.
Matla C&I Engineering
The Contractor shall conduct a Site Integration and
Acceptance Test (SIT/SAT) after installation and
commissioning is complete.
The SIT/SAT shall include as a minimum the following tests:
signal strength (RSRP) at defined test points across all
operational areas. Minimum RSRP target to be defined
Reference No: MEC-05970 Reference Rev No: 0 Date: 18/06/2026 of 35
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 35
File name: Scope of Work for Dect Mobile Systems Replacement ECN 27551318
Template ID: 240-43921898 (Rev 8) Header and Footer portrait template
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
Review Date October 2027
in the network design and agreed with Eskom prior to
Review Date October 2027
continuity verification
segmentation and firewall rules verification
continuous operation monitoring prior to acceptance
The Contractor shall prepare a SIT/SAT test procedure and
submit it to Eskom C&I Engineering for approval at least 10
working days before testing commences.
A final SIT/SAT report shall be submitted to Eskom C&I
Engineering. Acceptance will be issued by Eskom after all
test results are confirmed as satisfactory.
Reference No: MEC-05970 Reference Rev No: 0 Date: 18/06/2026 of 35
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 35
File name: Scope of Work for Dect Mobile Systems Replacement ECN 27551318
Template ID: 240-43921898 (Rev 8) Header and Footer portrait template
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
Review Date October 2027
List of procedures
The following procedures needs to be adhered at Matla
Reference No: MEC-05970 Reference Rev No: 0 Date: 18/06/2026 of 35
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 35
File name: Scope of Work for Dect Mobile Systems Replacement ECN 27551318
Template ID: 240-43921898 (Rev 8) Header and Footer portrait template
Quality Management
Source: SCOPE OF WORK RFI.pdf10 test points across the station including worst-case
coverage areas
calls to fixed extensions, calls to external Eskom
network, calls to public network
item 2.7
between base station coverage zones
Reference No: MEC-05970 Reference Rev No: 0 Date: 18/06/2026 of 35
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 35
File name: Scope of Work for Dect Mobile Systems Replacement ECN 27551318
Template ID: 240-43921898 (Rev 8) Header and Footer portrait template
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
(Document Control)
/ Activity eng. Requirements / documentation reports party
1.3 Quality Management
this must be approved by engineering and authorised by the Quality Department before
commencing with the work.
Contractors/executioner to adhere to QM 58 and OMOP4497 requirements
Number of NCR issued can affect your next tendering process.
The QCP shall be signed progressively by the Engineer/Supervisor, Eskom QC Inspector,
A call routing test shall be conducted as part of
acceptance testing covering all call types listed
above.
provisioning, configuration, testing and commissioning of
user equipment, including handsets/devices and SIM
Reference No: MEC-05970 Reference Rev No: 0 Date: 18/06/2026 of 35
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 35
File name: Scope of Work for Dect Mobile Systems Replacement ECN 27551318
Template ID: 240-43921898 (Rev 8) Header and Footer portrait template
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
Scope of work
Review Date October 2027
for acceptance testing purposes prior to full
deployment.
the deployed 5G network during acceptance testing.
provisioning procedure for Eskom to follow when
onboarding, replacing, or reassigning handsets and
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 35
File name: Scope of Work for Dect Mobile Systems Replacement ECN 27551318
Template ID: 240-43921898 (Rev 8) Header and Footer portrait template
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
Scope of work
Review Date October 2027
Note for costing: The Contractor’s pricing shall include the
full cost of all required handsets, SIM cards, SIM provisioning
infrastructure, configuration, testing and commissioning.
Handsets shall not be excluded from the Contractor’s scope.
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 35
File name: Scope of Work for Dect Mobile Systems Replacement ECN 27551318
Template ID: 240-43921898 (Rev 8) Header and Footer portrait template
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
Scope of work
Review Date October 2027
The decommissioning of the existing DECT system (removal
of repeaters, handsets, and core equipment) is excluded
from this scope and will be managed separately by Eskom.
witness the FAT. Travel costs for Eskom representative to
attend FAT at Contractor premises (if off-site) are for Eskom's
account.
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 35
File name: Scope of Work for Dect Mobile Systems Replacement ECN 27551318
Template ID: 240-43921898 (Rev 8) Header and Footer portrait template
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
Scope of work
Review Date October 2027
in the network design and agreed with Eskom prior to
testing
10 test points across the station including worst-case
coverage areas
calls to fixed extensions, calls to external Eskom
network, calls to public network
item 2.7
between base station coverage zones
Reference No: MEC-05970 Reference Rev No: 0 Date: 18/06/2026 of 35
submit it to Eskom C&I Engineering for approval at least 10
working days before testing commences.
Reference No: MEC-05970 Reference Rev No: 0 Date: 18/06/2026 of 35
Compliance Requirements
Source: SCOPE OF WORK RFI.pdf (unknown)Active/standby redundancy (1+1) on core network infrastructure
Session Management Function (SMF), Access and Mobility Management Function (AMF), and associated core network elements Reference No: MEC-05970 Reference Rev No: 0 Date: 18/06/2026 of 35 Controlled Disclosure When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 35 File name: Scope of Work for Dect Mobile Systems Replacement ECN 27551318 Template ID: 240-43921898 (Rev 8) Header and Footer portrait template MATLA POWER STATION Document Identifier 14593 Rev 7 Effective Date October 2024
Section
Source: SCOPE OF WORK RFI.pdfReference No: MEC-05970 Reference Rev No: 0 Date: 18/06/2026 of 35
Scope of work description procedure, specification, hold points, witness, responsible
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Matla Power Station - Kriel - Kriel - 2271
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
1
Last checked
01 Sept 2026
AI status
Not enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
Win government telecom contracts including fiber rollout, network infrastructure, mobile services, and broadband projects. ICASA licensing and compliance.
South Africa is bridging the digital divide. Explore the provincial and municipal broadband rollout projects and the technical requirements for bidding.
Avoid disqualification with our technical compliance checklist for IT bids. From OEM authorizations to POPIA and ISO standards.
Master the process of winning government IT tenders in South Africa. Learn about SITA registration, compliance requirements, and strategies for success.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Information and communication. Unlock full pricing strategies, bid frequency, and historical win rates.