Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Duvha Power Station - Emalahleni - Witbank - 1035
Organization Type
GOVERNMENT
Published
03 Sept 2026
OCDS Reference
ocds-9t57fa-168940
ESKOM is procuring civil construction services at duvha power station in mpumalanga for a period of sixty (60) months. The tender is an open invitation, submitted electronically via eskom's e-tendering system, with a non-compulsory clarification meeting scheduled for 14 september 2026. Bidders must be registered on the CIDB (if applicable) and comply with eskom's safety, health, environment and quality (sheq) requirements, as well as the ESKOM life-saving rules.
Submission: Tenders must be submitted electronically via the Eskom E-tendering system on the Tender Bulletin by 02 October 2026 at 10:00 (SAST).
Clarification meeting: A non-compulsory clarification meeting will be held on 14 September 2026 at 11:00 via MS Teams (link provided in the tender documents).
Returnable forms: Bidders must complete and submit all mandatory annexures, including Authorisation Form (Annexure A), Acknowledgement Form (Annexure B), Tenderer's Particulars (Annexure C), Integrity Declaration Form (Annexure D), CPA Requirements for Local Goods/Services (Annexure E), SBD 1 (Annexure H), SBD 6.1 Preference Points Claim (Annexure I), SBD 4 Bidders Disclosure (Annexure J), and Tax Evaluation questionnaire (Annexure K).
Eligibility: Tenderers must not be under any restriction to do business with Eskom or State-Owned Companies, must not have a conflict of interest, and must not submit more than one tender (except where the E-tendering system limit of 900MB applies).
Sub-contracting: Tenderers are not permitted to sub-contract 100% of the scope of work; any tender based on 100% sub-contracting will be disqualified.
CIDB registration: If CIDB grading is stipulated as a qualification criterion, tenderers must be registered with the Construction Industry Development Board at closing date, or be capable of being registered within 21 working days from closing; proof of registration is mandatory at closing.
Safety compliance: Bidders must provide proof of SHEQ systems, policies and capabilities, and comply with Eskom's Life-Saving Rules (zero tolerance for violations).
Tender validity: Tenders must remain valid for 12 weeks from the closing date and time.
Pricing: Rates and prices must be fixed for the duration of the contract, stated in South African Rand, and include all duties, taxes (including VAT) and levies.
Security for performance: If required, tenderers must indicate names of at least two financial institutions they will approach for the required security.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Friday, 02 October 2026 - 10:00
Venue
Ms Teams
CIDB grade 7ce or higher
Categories
Request for Bid(Open-Tender)
Duvha Power Station - Emalahleni - Witbank - 1035
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Description
Source: Tender Documents.zip03 Sept
2026
Tender Published
Tender was published
02 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Tender Documents.zip
This tender comprises Eskom's standard conditions of tender and two annexures: a supplementary SHEQ requirement (Annexure C) and general conditions of contract. The document mandates strict adherence to Eskom's Life-Saving Rules, including requirements for a valid PTW, issued within the last 24 hours for work performed on a specific date, and the documented appointment of a SHEQ Representative responsible for managing the rules on site until completion. The scope is for Civil Engineering services at a defined site. The general conditions of contract are GCC 2015 (5th edition) with page references. Standard National Treasury PPPFA and B-BBEE documentation may be required.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 11 962 300
Range
Based on 5 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Supply Chain
Management Procedure 32-1034. Any addenda to an issued Invitation to Tender will be
published or issued in the same way as the Invitation to Tender was and will form part of the
Invitation to Tender documents.
Communication 1.5 Every communication between Eskom and a tenderer shall be made to or from the Eskom
Representative only, in w
Eskom and its subsidiaries will conduct business with respect and care for people to ensure that no
operating condition or urgency of service endangers the life of anyone or causes injury or damage
to the environment. Eskom is committed to preventing all work-related injuries. In fulfilling this
commitment to protect people, the environment and property, management will provide and
maintain a safe and healthy work environment, in accordance with industry standards and in
compliance with legislative requirements.
At-risk behaviour leads to incidents. Life-saving Rules are safety rules that have been created to
enforce zero tolerance for serious at-risk behaviours. These rules have been determined in terms
of the consequences of the behaviours they describe, that is, if a particular set of behaviours or
actions has a very high probability of causing disabilities or fatalities when performed.
The Eskom Life-saving Rules complement our existing safety best practices and are safety rules to
be followed at all locations.
The Life-saving Rules apply to all Eskom employees, agents, consultants, and contractors. Visitors
to Eskom should also respect and adhere to these rules as applicable and could be instructed to
leave the Eskom premises with immediate effect should they refuse to do so.
2.1 Scope
This standard shall apply at all Eskom sites with the intention to promote a safe working
environment for all Eskom employees, agents, consultants, and contractors. Visitors to Eskom
should also respect and adhere to these rules, as applicable.
2.1.1 Purpose
This standard clarifies the five most prominent causes of serious injuries and fatalities within
Eskom, and Eskom’s intention to enforce “ZERO TOLERANCE” with respect to non-adherence to
these rules, due to the potential consequences of serious injury or fatality at the workplace.
2.1.2 Applicability
This standard shall apply throughout Eskom Holdings SOC Limited, its divisions, subsidiaries, and
entities wherein Eskom has a controlling interest and/or Eskom contractors, unless specifically
exempted by Sustainability Systems, where the business transacted may be of a completely
different nature to the core business of Eskom.
2.1.3 Effective date
This document will be effective from the date of authorisation.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] ISO 9001 Quality Management Systems
[2] 32-37: Substance Abuse Procedure
[3] 32-95: Environmental, Occupational Health and Safety Incident Management Procedure
[4] 32-136 Contractor Health and Safety Requirements
[5] 32-345 Eskom Vehicle Safety Specification
[6] 32-407 Behavioural Safety Observations
[7] 32-418: Working at Heights Standard
[8] 32-477 Safety, Health and Environment Training and Development Procedure
[9] 32-520 Occupational Health and Safety Risk Assessment Procedure
[10] 32-524 Developing a SHE Specification
[11] 36-681: Plant Safety Regulations
[12] 32-726 SHE requirements for Eskom Commercial Process
[13] 32-727: Safety, Health, Environment and Quality Policy
[14] 32-848: Operating Regulations for High Voltage Systems
[15] 32-1112: Disciplinary Code
[16] 32-1113: Disciplinary Procedure
[17] 240-44175132 Eskom Personal Protective Equipment Specification
[18] 240-62946386: Vehicle and Driver Safety Management Procedure
[19] 240-43848327: Right to Refuse Employees’ Right of Refusal to Work in an Unsafe Situation
Procedure
[20] 240-84733329: Medical Surveillance Procedure
[21] 240-100979499 Personal Protective Equipment for Working at Heights Specification
2.2.2 Informative
[22] National Road Traffic Act
[23] Occupational Health and Safety Act
[24] 34-104 Earthing Standard
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
2.3 Definitions
2.3.1 Contractor: Any person (juristic/individual) formally contracted (directly or indirectly) by
Eskom and who performs work; supplies a service, product, equipment or material for the
purposes of advancing Eskom’s business and other interests. This includes consultants,
and third party contractors i.e. vendors, suppliers, agents, joint ventures, fixed term
contractors, principal contractors and subcontractors.
2.3.2 Life-saving Rule: Rules that, if not adhered to, have the potential to cause serious harm to
people. The consequences of a person knowingly and wilfully violating this rule will result in
a disciplinary process in accordance with the Eskom Disciplinary Code and Procedure.
2.3.3 Visitors: Any person who visits an Eskom site/office during working hours to attend a
meeting or for any reason whatsoever. This could include a minor.
2.3.4 Work at height: Means any work performed above a stable work surface or where a
person puts himself/herself in a position where he/she exposes himself/herself to a fall from
or into. Work at height is, as a result, work in any place (except a staircase in a permanent
workplace ), including a place at, above or below ground level, where a person could be
injured if he/she fell from that place. Access and egress that present a risk of fall can also
be classified as work at height.
2.3.5 Zero Tolerance: The standard that provides for the imposition of severe consequences for
a proscribed offence or behaviour without making exceptions for the extenuating
circumstances.
2.4 Abbreviations
Abbreviation Explanation
OHS Occupational Health and Safety
ORHVS Operational Regulations for High Voltage Systems
PPE Personal Protective Equipment
PSR Plant Safety Regulations
PTW Permit to Work
SHEQ Safety, health, environment and quality
2.5 Roles and Responsibilities
2.5.1 Sustainability Systems Department
The sustainability Systems Department shall:
a) Compile and review the Life-saving Rules for Occupational Health and Safety;
b) Develop awareness material;
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
c) Ensure that the rules are communicated throughout the business;
d) Ensure compliance is monitored; and
e) Ensure that violations and sanctions are consolidated and communicated by Sustainability
Systems to the organisation.
2.5.2 All Groups/Divisions/Operating Units/Business Units
The management at Group/Divisional/Operating Unit/Business Unit level shall be responsible for:
a) Implementing the Eskom Life-saving Rules in their Groups/Divisions/Operating
Units/Business Units.
b) Communicating to all their employees, contractors, contractor employees and visitors the
importance of compliance with the Eskom Life-saving Rules and the consequences of non-
compliance therewith. This includes communicating Life-saving Rules to all new
employees and new contractors.
c) Ensuring that the awareness material is made available, distributed and displayed at all
units.
d) Ensuring all employees sign confirmation that the rules have been discussed with them,
that they understand the rules and the consequences of violating these rules, and retain
copies thereof.
e) Investigating any violation of a Life-saving rule and initiate the disciplinary process within
five (5) working days.
f) Ensuring consistency in the application of appropriate sanctions on employees, contractors
and contractor employees.
2.5.3 All employees (Eskom and contractors)
a) Always observe and adhere to the Life-saving Rules.
b) Avoid taking shortcuts when executing tasks. Always do the right thing even when no-one
is watching.
c) Only perform work that you are authorised to do.
d) All employees to exercise the right to refuse to perform work in an unsafe situation, or when
required to ignore a Life-saving rule.
2.6 Process for Monitoring
Groups/Divisions/Operating Units/Business units are responsible for ensuring the understanding
of, and compliance with, Life-saving Rules. Line management shall monitor compliance and report
on analysis and trending through performance reporting. The amendments to the revised standard
shall be implemented with immediate effect and may be audited after a period of six (6) months
from date of implementation.
2.7 Related/Supporting Documents
[1] 240-62196227 - Life-saving Rules – revision 5 (superseded).
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
[2] 240–63942960 - Life-saving Rule Acknowledgement Form Document Content.
Life-saving Rules are safety rules that, if not adhered to, have the potential to cause serious harm
to people. The consequences of a person knowingly and wilfully violating these rules will result in a
disciplinary process in accordance with the Eskom Disciplinary Code and Procedure.
The objective of this standard is to clarify Eskom’s intention to enforce “ZERO TOLERANCE” with
respect to behaviour resulting in serious risk to an individual at the workplace.
It must be noted that the content of this standard does not detract from the requirements for safe
behaviour for all other work-related activities or other safety requirements, but emphasises the
importance thereof.
3.1 Eskom Life-Saving Rules
3.1.1 Rule 1: open, isolate, test, earth, bond, and/or insulate before
Touch
With the aim to ensure a safe electrical work environment, no person may work/operate on, around
or near any electrical network, line or apparatus, electrically connected to the power system and/or
electrically charged and/or not electrically charged unless:
a) He/she is trained and authorised as competent for the task to be done;
b) There is a valid permit to work, where required;
c) A pre-task risk assessment to identify all risks and hazards has been conducted prior to any
work commencing;
d) He/she follows the requirements on OPEN, ISOLATE, TEST, EARTH, BOND and/or
INSULATE BEFORE TOUCH, correctly based on applicable/related standards, procedures
and outcome of risk assessment fit for the type of work or task to be performed;
e) The authorised person (team leader) has certified and physically shown all team members that
the apparatus is safe to work on;
f) He/she makes the specific electrical environment safe prior to performing the work; and
g) All the appropriate PPE (including face shield and insulated gloves for low voltage work) are
worn.
3.1.2 Rule 2: hook up at heights
Working at height is a significant part of work in Eskom Holdings and is regarded as a high-risk
activity, and as a result all precautions must be taken to prevent incidents while working at height.
Wherever reasonably practicable, preference must be given to the performance of work at ground
level as opposed to work in an elevated position. Where work in an elevated position is necessary,
the requirements in this document shall apply.
No person may work at height where there is a risk of falling unless:
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
a) He/she is medically fit to work at height;
b) A pre-task risk assessment to identify all risks and hazards has been conducted prior to
commencing any work of this nature;
c) He/she is appropriately trained as determined by the risk assessment;
d) He/she is appropriately secured during ascending and descending; and
e) He/she is using an Eskom approved fall arrest system where applicable.
3.1.3 Rule 3: buckle up
Where required, the proper wearing of seat belts for any driver, operator and passenger is
mandatory in all vehicles/equipment when driving and/or travelling for Eskom business purposes.
The driver is obligated to ensure that he/she as well as all passengers are properly seated and
wearing their seatbelts at all times while being transported in the vehicle, as per Eskom
specifications.
Note: This rule is applicable on any road or parking lot, irrespective of the speed, and when the
vehicle moves in a forward or backward direction.
3.1.4 Rule 4: be sober
No person who is under the influence or who appears to be under the influence of intoxicating
liquor or drugs will be permitted to enter, or remain on an Eskom site or conduct Eskom business
or drive/operate a vehicle/equipment for Eskom business purposes.
This includes any level of alcohol or the presence of any drugs, controlled substances, and/or
illegal substances in the body that impairs or could impair mental and physical functioning,
irrespective of when the substance was used.
3.1.5 Rule 5: ensure that you have a permit to work
Where an authorisation limitation exists, no person shall work without the required Permit to Work
(PTW), which is governed by for example the:
a) Plant Safety Regulations; or
b) Operating Regulations for High Voltage Systems (ORHVS); or
c) Any other activity where a permit is required.
No plant is to be returned to service without the cancellation of all permits on that plant in
accordance with procedure, unless permission is granted for a particular plant to be returned to
service with permits still open, like in the case of redundant systems.
NOTE: In the case of live work, a “live work declaration form” is to be completed by the authorised
person, who is the person responsible for the safe execution of work according to relevant
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
standards and procedures. Outline the key principles or rules to support the implementation of the
standard statement.
3.2 Consequences of violating a Life-Saving Rule
In terms of general health and safety in Eskom, if any of the Life-saving Rules are violated, it will
be treated as a serious misconduct, and result in a disciplinary process in accordance with the
Eskom Disciplinary Code and Procedure.
It must be highlighted that Eskom takes a ZERO TOLERANCE stance to violation of these rules.
Depending on the circumstances, Eskom reserves the right, where a contractor
manager/supervisor allows the violation of a Life-saving Rule, to suspend the contractor’s activities
while determining an appropriate sanction.
In the light of a contractor employee allegedly violating a Life-saving Rule, the contractor shall
immediately remove the employee from site and initiate the disciplinary process. The contractor
shall investigate any violation of a Life-saving Rule and initiate the disciplinary process within five
(5) working days of the violation. The contractor shall after the disciplinary process furnish Eskom
with a copy of the sanction.
This document has been seen and approved by:
Name Designation
Thava Govender Group Executive – Generation and (Acting) Risk and Sustainability
Divisions
Kerseri Pather General Manager – Sustainability Systems
Jace Naidoo Senior Manager – Sustainability Systems – OHS
Alex Stramrood Senior Manager – Sustainability Systems – OHS
Risk and Sustainability Members of the Risk and Sustainability Management Committee
Management Committee
HR Policies and Procedures Members of the HR Policies and Procedures Committee
Committee
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
Date Rev. Compiler Remarks
January 2017 6 A Stramrood Substituted the words “Disciplinary
hearing” with Disciplinary process.
Updated the Purpose and
Applicability to specify that this
Standard is applicable to
contractors. Updated Normative
and Informative References.
Updated Definition section by
removing Agent and Consultant as
these have been incorporated into
the definition of Contractor.
Updated the definition of Work at
Height and Zero Tolerance.
Reviewed and updated the Roles
and Responsibilities section and
Process for Monitoring. Added
permit requirement to Rule 1,
updated Rule 2 - Removed the
words “psychologically fit to work”
as this is no longer a requirement
in terms of the Construction
Regulations, 2014 and updated
Rule 3 – Removed the words “(for
example transporting people on
the back of trucks in a cabin)”
Updated Consequences of
violating a Life-saving Rule with
regard to contractors.
October 2015 5 A Stramrood Revision date needed to be
extended. Content still valid and
same.
May 2012 4 S Govender Amended Section 3.6
Consequences of Violating a Life-
saving Rule to align with EXCO
decision.
March 2013 3 S Govender Changed Cardinal Rules to Life-
saving Rules, and amended
content to ensure better
understanding of the intent and
requirements.
September 2010 2 K Terblanche Content of Rev 1 was incorporated
into the new Policy template.
Content was revised and updated.
December 2008 1 K Terblanche Annexure 1: Acknowledgement of
Eskom Life-saving Rules of this
document was removed. The
references made to Annexure 1 in
paragraphs 3.5.2 and 3.8 were
also removed.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
Date Rev. Compiler Remarks
August 2008 0 K Terblanche The document with reference
number 32-421 was developed
and approved.
The following people were involved in the development of this document:
Alex Stramrood
Kerseri Pather
Loraine Smit
Marc Lebea
Mike Townsend
Nosipho Noveve
Sheryl Isaacs
Sivi Govender
SN Middel
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
1.1 Scope
The Eskom Supplier Integrity Pact (Integrity Pact) is applicable to Eskom Holdings SOC Ltd (including all
wholly owned subsidiaries) and all existing and potential suppliers (as per the definition hereunder).
1.2 Purpose
The integrity pact is a pact between Eskom and its suppliers that prescribes the “ethical behaviour”. Ethical
behaviour is desirable/acceptable conduct (actions and decisions) that will bring about good/appropriate
consequences/outcomes in the interaction with others. Ethical behaviour incorporates ethical values and
considers not only what is good for oneself, but also what is good for others. Eskom considers such behaviour
of paramount importance and expects every existing/potential supplier and its own employees/directors to
always act ethically and with integrity.
Eskom commits to ensuring that it implements a procurement policy/procedure that aligns to all applicable
South African laws and regulations, as well as the constitutional principles of fairness, transparency, equity,
cost effectiveness and competitiveness.
This document supplements all other relevant Commercial and Ethics related policies/codes/procedures.
1.3 Preamble
In order to achieve this purpose, all Eskom suppliers are required to read this Integrity Pact and to complete,
sign and submit the Integrity Declaration Form whenever they participate in any Eskom procurement process.
Eskom and its suppliers commit to honouring their respective obligations herein, and agree to refrain from
any form of dishonesty, fraud, and/or corruption throughout the entire procurement process, including
tendering practices that are in bad faith, unfair and anti-competitive (e.g., under-pricing/collusion/bid rigging)
Term Definition
Conflict of Interest A conflict of interest arises when one’s personal interests, personal
financial interests or any other interests, affect, or could be perceived to
affect, or has the potential to affect one’s objectivity and discretion and/or
the objectivity and discretion of another in performing Eskom duties or
making decisions on behalf of Eskom. This means that an employee or
director is in a position to make a decision (or influences a decision) that
is not fair and objective in order to benefit personally, or to benefit related
and /or inter-related persons.
Director Means a member of the board of Eskom, or a board of its subsidiary or
an alternate director of such board and includes a person occupying the
position of a director, by whatever name designated, or a prescribed
officer, or a person who is a member of a committee of the board or of
the audit committee, irrespective of whether the person is also a member
of such board.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Supplier Integrity Pact Unique Identifier: 240-113650212
Revision: 2
Page:
Employment equity The Employment Equity Act promotes equity in the workplace,
ensures that all employees receive equal opportunities and that
employees are treated fairly by their employers. The law protects a
person from unfair treatment and any form of discrimination.
Employee (s) Also referred to as staff members. These include individuals employed
by Eskom on a permanent basis, contract labour, temporary employees,
part-time employees, casual employees, occasional employees, fixed-
term contractors, learners, and others acting on behalf of Eskom or its
subsidiaries.
Eskom Registered Vendor Means a current or potential supplier who may be a natural or juristic
person and includes any employee of such supplier acting within the
course and scope of his/her employment, or any agent or manager acting
for or on behalf of, or in the interests of the supplier registered as a vendor
on the Eskom Vendor Database.
Supplier Means any natural person or juristic person that does business with
Eskom or tenders to do business with Eskom, or is registered on Eskom’s
Vendor Database, such as consultants, contractors, sub-contractors and
providers of goods and services.
Abbreviation Explanation
DOI Declaration of Interest
ETC EXCO Tender Committee
NDA Non-disclosure agreement
RFP Request for Proposal
RFQ Request for Quotation
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Supplier Integrity Pact Unique Identifier: 240-113650212
Revision: 2
Page:
4.1 Eskom’s suppliers accept that they will at all times:
4.1.1 Maintain an impeachable standard of integrity in all their business and personal dealings and take all
reasonable measures necessary to prevent all dishonest, unfair, fraudulent, corrupt, and illegal
practices during any stage of the Eskom procurement process including the execution of contracts
and contract modifications.
4.1.2 Ensure that they are familiar with all publicly available Eskom policies/ procedures/codes that impact
the supply chain processes including, but not limited to Eskom’s Standard Conditions of Tender.
4.1.3 Reject all improper business practices (as may be prohibited by Eskom).
4.1.4 Not abuse the trust placed in them by Eskom employees, or misuse opportunities arising during their
interaction with Eskom for personal gain.
4.1.5 Seek to constantly maintain and enhance their standards of professional competence.
4.1.6 Adopt, where possible, policies and practices which align with those of Eskom (labour practices,
employment equity initiatives and human relations policies) to the highest ethical standards.
4.2 Eskom’s suppliers confirm specifically that:
4.2.1 All confidential information, to which they may have access in the course of their work, must not be
disclosed without the express consent from the authorised Eskom representative. The supplier is
required to complete a Non-Disclosure Agreement (NDA) to give effect to this.
4.2.2 They will not deliberately misrepresent information, submit false certifications or forged documents to
influence the tendering process to advantage themselves or to mislead Eskom in any way and that
Eskom has the right to request an audit of such information, and take further action against the supplier
should it be found that it has acted in a dishonest or fraudulent manner.
4.2.3 Although the establishment of long term and close relations between Eskom and its suppliers is
recognised, Suppliers are nevertheless, required to avoid relationships with Eskom
employees//directors, that may be perceived to be contrary to the constitutional principles of fairness,
equitability, transparency, competitiveness, and cost effectiveness. Suppliers are therefore required
to complete the Integrity declaration form wherein they are required to disclose any interest that they
may have with an Eskom employee/director, whether financial, personal, or private, in its business,
and/or any affiliation /relationship which affects, or may affect, or may be perceived to affect, the
decision-making during tender award. Should a supplier later become aware that its
owners/members/directors/partners/shareholders are an Eskom employee/director with respect to a
tender in which it participated, the supplier is required to disclose the interest/relationship to Eskom
and submit whatever information may be required regarding the parties involved.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Supplier Integrity Pact Unique Identifier: 240-113650212
Revision: 2
Page:
4.2.4 Although the entertainment of customers and provisions of business courtesies or gifts are generally
an accepted commercial practice, they must not in any way negatively affect Eskom’s image and
reputation. They should not exceed the R1500,00 value prescribed by Eskom and should not be of
such a nature (value or circumstances) as to be construed as placing an Eskom employee/director
under obligation to the supplier or in any way improperly influence the recipient.
4.2.5 They will avoid entering into unethical and/or fraudulent dealings with any Eskom employee/director
involved in the evaluation/adjudication/negotiation of a transaction in which it participates, involving
direct/indirect monetary or material benefits in order to be unfairly benefitted. In such circumstances,
no business courtesy, bribe, gift, fees commission or inducement may be offered to, or requested by
an Eskom employee/director involved in the evaluation/adjudication/negotiation of a transaction in
which the supplier is participating.
4.2.6 They will not enter any dishonest and/or illegal agreement or an understanding with other tenderers
involved in a tender/RFP process in which it participates. They will complete the integrity Declaration
Form which incorporates a Declaration of Fair Tendering Practices, when participating in any Eskom
tender/Request for Quotation (RFQ).
4.2.7 They understand that they may be subject to a supplier discipline process and that sanctions that
may be imposed on suppliers should they be found guilty of misconduct.
4.2.8 Should a supplier become aware of any dishonest, fraudulent or inappropriate behaviour of any Eskom
employee/director; the said supplier is required to report this behaviour to the Eskom Ethics office via
email at [email protected], or via the Eskom Forensic email at [email protected] or through
the Eskom toll free hotline 0800 11 27 22, wherein confidentiality is guaranteed.
5.1 Eskom undertakes to treat all tenderers during the tender process according to the constitutional
principles of fairness, transparency, equity, cost-effectiveness, and competitiveness.
5.2 All Eskom employees/directors are required to complete an annual Declaration of Interest (DOI),
wherein they are required to declare all interests, directorships, memberships, details of any of their
related or inter-related persons or other associates that conduct business with Eskom and all other
material personal interests, whether a conflict exists or not. During the financial year, all Eskom
employees/directors have an option of amending annual DOIs should there be changes in their
interests or what has been disclosed already. In addition to this annual declaration, employees are also
required to complete an additional DOI and NDA if involved in the procurement process.
5.3 Eskom employees will ensure that all gifts received in the normal course of business is declared,
recorded, and authorised by relevant managers. Employees/directors involved in the tender evaluation/
negotiation process, may not accept, demand, or accept a promise of any money, business courtesies,
gifts, rewards, gratuity, favours from any of the tenderers involved to benefit or as may be perceived to
benefit such tenderer. Further to this, employees and directors are prohibited from offering or accepting
loan(s) or other benefit(s) from suppliers, unless the supplier is in the business of granting such loans
or benefits and the terms and conditions of the loan that is offered to the employee/director is also
offered to the general members of the public or a section thereof.
5.4 Should Eskom become aware of any relationship/interest of any employee/director in a tender in which
it is involved in tender evaluation/negotiation process, then this employee/director will be excluded from
the said tender evaluation/negotiation process.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Supplier Integrity Pact Unique Identifier: 240-113650212
Revision: 2
Page:
5.5 Eskom will implement the Supplier Discipline Process if it becomes aware of any contravention of the
provisions of this integrity pact, any other misconduct by a supplier and/or any Eskom
employee/director who acts in bad faith to benefit themselves or a supplier. Eskom has the right, after
following a process of investigation and affording the supplier an opportunity to make representation,
to notify the supplier of the intention to suspend it from the Eskom Vendor Database, impose various
other sanctions and/or institute disciplinary actions against its employees/directors. Subsequently,
Eskom will forward the names of such suppliers including the directors of the company to National
Treasury, who will include the suppliers on the List of Restricted Suppliers on the National Database.
5.6 All Eskom employees/directors are prohibited from having any direct/ indirect personal or other
beneficial interest in any contract with Eskom, whether as a supplier, an advisor or by virtue of being a
director or owner of a business, or in any other capacity. This includes third-party related transactions
with an indirect link to an Eskom contract.
6.1 This Eskom Supplier Integrity Pact is governed by and interpreted in accordance with the laws,
regulations and legislation of the Republic of South Africa.
6.2 The actions stipulated in this Integrity Pact are without prejudice to any other civil or criminal
proceedings that may arise in accordance with the provisions of the law.
6.3 This Integrity Pact shall remain valid until replaced. Should one or more provisions of this Integrity
Pact be regarded as invalid, remainder of the provisions will remain valid.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Annexure Attached (Y /
N / n/a)
1.1.1 *Authorisation Form Annexure A Y
1.1.2 *Acknowledgement form Annexure B Y
1.1.3 *Tenderer’s particulars Annexure C Y
1.1.4 *Integrity Declaration Form Annexure D Y
(refer to www.eskom.co.za for the Supplier Integrity
Pact that suppliers are required to download and read)
1.1.5 *CPA Requirements for Local Goods/Services Annexure E Y
1.1.6 *CPA(IG) for Foreign Goods/Services (if applicable) Annexure F Y
1.1.7 SBD 6.2 Declaration Certificate for Local Production Annexure G1 Y
and Local Content
(only applicable if designated materials are
included and then Tenderers will be required to
complete and submit Annexures F1 to F4 as
evidence of compliance with this requirement).
Annexure C Local Content Declaration- Summary
Schedule Annexure G2 N
Annexure D Imported Content Declaration –
Supporting Schedule to Annexure C Annexure G3 N
Annexure E Local Content Declaration- Supporting
Schedule to Annexure C Annexure G4 N
1.1.8 *SBD 1 Invitation to Bid must be filled out by all Annexure H Y
tenderers and submitted with the tender at tender
submission deadline
1.1.9 *SBD 6.1 Preference Points Claim Form in terms of Annexure I Y
Pppf
provisions of this Agreement for any
purpose whatsoever other than the Project
The Fourth Schedule to the Income Tax Act (“the Act”) requires that Employees' Tax must be
withheld from "remuneration" paid by an "Employer" to an "Employee". This tool is intended to establish
whether an Individual, Close Corporation, Company or Trust should be classified as an Independent
Contractor, Personal Service Provider, Labour Broker or a Dependent Contractor, and the tax
consequences of such classification.
This Pack is applicable ONLY to Contractors who supply Eskom Holdings SOC Ltd (“Eskom”) and its
subsidiaries with services or Individual Contractors providing Eskom with labour.
The Contractor or its duly authorised representative must declare that all questions have been answered
truthfully.
Answering the questions will direct you to your next step.
Please note:
This Pack is based on tax legislation for the 2023/2024 tax year and is subject to change.
In the questions, any references to "you" refers to the Contractor.
In the questions, the term Contractor is used interchangeably with Individual/CC/Company/Trust.
Definitions as per the Income Tax Act are included in Appendix 10.
Any reference to “Eskom” refers to Eskom Holdings SOC Ltd and its subsidiaries:
Eskom Rotek Industries SOC Ltd
Eskom Enterprises SOC (Pty) Ltd
Escap SOC (Pty) Ltd
Eskom Finance Company SOC (Pty) Ltd
Eskom Foundation NPC
National Transmission Company SA
The Pack is based on legislation and case law applicable to the 2023/2024 tax year. We therefore
recommend that, if it is used outside of this period, you should first consult with your representative in
Eskom to refer it to Eskom’s Corporate Tax Department in Megawatt Park.
When you return the completed Pack; i.e. the signed summary sheet and signed affidavits to Eskom,
please copy Group Tax on Email address: [email protected]
The Contractor or its duly Authorised Representative acknowledges and accepts that:
ease of reading.
this Pack;
Disclaimer
Applicable to the 2023/2024 Tax Years
Eskom accepts no liability whatsoever for any loss or damages whatsoever and howsoever incurred, or
suffered, resulting, or arising, from the use of this Pack.
Contractor type
Supplier category
Please complete the following questionnaire for:
Company/Close Corporation/Trusts - EVALUATION PACK A on .
Individuals - EVALUATION PACK B on .
Applicable to the 2023/2024 Tax Years
Evaluation pack a
(To determine whether a Company, Close Corporation (CC) or Trust is a Personal
Service Provider)
Fields marked with an Asterisk (*) must be completed
Contractor’s details for a company or close corporation or
Trust
Contractor’s Name* Vendor No.
Duly Authorised Representative Name Representative Surname
Capacity Representative ID No.*
Representative Passport No. (if no RSA ID) Country of Passport Issue
VAT Registration No. Income Tax Registration No.*
CO/CC/Trust Registration No.* E-Mail Address
Telephone Number* Fax Number
Contractor’s Physical Business Address*
Unit No
Complex Name
Street Number
Street Name
Suburb
City/Town
Postal Code
Contractor’s Postal Business Address*
Same as above (Mark with an X)
Address TYPE (Delete where not applicable) P O Box/Private Bag/Street Address
P O Box/Private Bag/Street NUMBER
Street Name
Suburb
Town
Postal Code
Contractor’s Bank Details*
Account Number Bank Name
Branch Name Branch Number
Name of Account Holder Account Type (Delete where not applicable)
Current/ Savings/ Transmission/Credit Card/Bond
Account
Account Holder Relationship*
i.e. own, joint or 3rd party Own/Joint/3rd Party
Applicable to the 2023/2024 Tax Years
Please answer the following questions by marking the appropriate column with an
"X".
The term “You” will refer to the Company/CC/Trust in this Questionnaire.
Question 1(i)
Are you a Resident of the Republic of South Africa in terms of the Income Tax Act?
(Refer to Appendix 10 for the definition of a resident).
If the answer is Yes, go to Question 2(i).
If the answer is No:
Eskom to refer it to Eskom Group Tax Department in Megawatt Park.
Question 2(i)
Do you employ 3 (three) or more persons (excluding shareholders or members or
beneficiaries of the Company/CC/Trust)?
If the answer is Yes, go to Question 2(ii).
If the answer is No, go to Question 3(i).
Question 2(ii)
Are these employees employed:
If the answer is Yes, go to Question 2(iii).
If the answer is No, go to Question 3(i).
Question 2(iii)
Are the above 3 employees connected to the shareholders or the members or the
beneficiaries of the Company/CC/Trust?
If the answer is Yes, go to Question 3(i).
If the answer is No:
from your payments.
from your payments.
Corporation/Trust” at the end of the Evaluation Pack.
Applicable to the 2023/2024 Tax Years
Question 3(i)
Will/are any person who is a Connected person in relation to the Company/CC/Trust
render services personally to Eskom on behalf of the Company/CC/Trust? (Refer to
Appendix 10 for the definition of a Connected person).
If the answer is Yes, go to Question 4(i).
If the answer is No:
from your payments.
from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Question 4(i)
During the current year of assessment:
received either directly or indirectly, from:
the definition of an Associated institution)
If the answer is Yes:
Corporation/Trust” at the end of the evaluation Pack.
If the answer is No:
from your payments.
Question 5(i)
Must your duties be performed /are your duties performed mainly (more than 50%) at
the premises of Eskom,
And
Will you be subject /are you subject to Eskom’s control or supervision as to the
manner in which your duties are to be performed?
If the answer is Yes to BOTH questions:
Corporation/Trust” at the end of the evaluation Pack.
If the answer is No:
from your payments.
Applicable to the 2023/2024 Tax Years
Question 6(i)
Do/will the payments by Eskom for services payable with reference to output or
certain agreed results, e.g. payment (be it a fixed fee or an hourly rate) be only due if
and when a specific deliverable has been completed?
Question 6(ii)
Does/Will Eskom have the contractual right to control the tools or equipment, staff,
raw materials, routines, patents or technology used in the provision of the services?
Question 6(iii)
Are you/will you prohibited from rendering services to any other employers/clients
during the period of service to Eskom?
Question 6(iv)
Do/will you have the right to sub-contract work?
Question 6(v)
Are you personally or will you personally be at risk for the quality of the work done or
to be done (risk for poor quality; time over-runs, project not producing income)?
Question 6(vi)
Are/will you or the person rendering the service be obliged to be present and perform
the work at Eskom regardless of whether work is available or not?
Question 6(vii)
Is Eskom’s business or will Eskom’s business be critical to your financial/economic
survival?
Question 6(viii)
Does/will your position form part of Eskom’s organisational structure?
Question 6(ix)
Does/will Eskom provide you with any of the following:
Question 6(x)
Does/will Eskom provide you with an office?
Question 6(xi)
Does/will Eskom provide you with any equipment, tools, stationery and material?
Please go to the next section to establish your tax status.
Applicable to the 2023/2024 Tax Years
To establish your tax status, you need to summarise the “Yes” and “No” as
answered on Question 6(i) to 6(xi) in the column below:
Question Yes No
6(i) Independent PSP
6(ii) PSP Independent
6(iii) PSP Independent
6(iv) Independent PSP
6(v) Independent PSP
6(vi) PSP Independent
6(vii) PSP Independent
6(viii) PSP Independent
6(ix) PSP Independent
6(x) PSP Independent
6(xi) PSP Independent
Decision
Independent
Psp
If you have answered “PSP” to any of the following questions 6 (i), 6(iii), 6(v), 6(vi),
6(ix);
or
If you have answered more than 50% “PSP” to questions 6(ii), 6(iv), 6(vii), 6(viii),
6(x), 6(xi):
and will be coded as 3601 on your IRP5 certificate.
Corporation/Trust” at the end of the evaluation Pack.
Alternatively:
If you have already signed Appendix 7 on Questions 4 or 5:
disclosed on the IRP5 for payments received.
If you have not signed Appendix 7 on Questions 4 or 5:
from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Applicable to the 2023/2024 Tax Years
Summary for ID No. Vendor No:
Company/Close Corporation/Trust Summary
Please sign
he
following
Questions Answer Appendix
(Appendices
)
1(i) Are you a Resident of the Republic of South Africa in terms of the Income
Tax Act?
2(i) Do you employ 3 (three) or more persons (excluding shareholders or
members or beneficiaries of the Company/CC/Trust and connected
persons in relation to the shareholder or member or beneficiaries)?
2(i ) Are these employees employed on a full time basis and are they engaged
in the business of the Company/CC/Trust?
2(iii) Are the above 3 employees connected to the shareholders or the members
or beneficiaries of the Company/CC/Trust?
3(i) Will/are any person who is a Connected person in relation to the
Company/CC/Trust render services personally to Eskom on behalf of the
Compa y/CC Trust?
4(i) During the current year of assessment will more than 80% of your income
or is it likely that more than 80% of your income will consist of amounts
received either directly or indirectly from any one client, or an Associated
institution in relation to that client?
5(i) Must your duties be performed / are your duties performed mainly (more
than 50%) at the premises of Eskom AND will you be /are you subject to
Eskom’s control or supervision as to the manner in which your duties are
performed or to the hours of work?
6( ) Do/will the payments by Eskom for services payable with reference to
output or certain agreed results, e.g. payment (be a fixed fee or an hourly
rate) be only due if and when a specific deliverable has been completed?
6(ii) Does/Will Eskom have the contractual right to control the tools or
equipment, staff, raw materials, routines, patents or technology used in the
provision of the services?
6(iii) Are you/will you prohibited from rendering services to any other
employers/clients during the period of service to Eskom?
6(iv) Do/will you have the right to sub-contract work?
6(v) Are you personally or will you personally be at risk for the quality of the
work done or to be done (risk for poor quality; time over-runs, project not
producing income)?
6(vi) Are/will you or the person rendering the service be obliged to be present
and perform the work at Eskom regardless of whether work is available or
not?
6(vii) Is Eskom’s business or will Eskom’s business be critical to your
financial/economic survival?
6(viii) Does/will your position form part of Eskom’s organisational structure?
6(ix) Does/will Eskom provide you with any of the following:
Pension fund / Provident fund / Retirement Annuity Fund; medical aid,
leave of any nature, salary increases, bonuses or any allowances.
6(x) Does/will Eskom provide you with an office?
6(xi) Does/will Eskom provide you with any equipment, tools, stationery and
material?
Tax Status
Particulars of person acting as representative of the company/close
Corporation/trust
I, the undersigned, confirm that the information provided above is accurate, and that the Company/CC/Trust will,
while contracted to Eskom, inform Eskom of any changes that take place pertaining to the information provided
above. Eskom shall be entitled to withhold from any payments to be made to the Company/CC/Trust, any taxes,
interest and penalties that it may be required to pay to SARS as a result of the above information being inaccurate.
Representative's Full Names Capacity Contact No.
Signature Date
Applicable to the 2023/2024 Tax Years
Evaluation pack b
(To determine whether an Individual is a Dependent Contractor)
Fields marked with an Asterisk (*) must be completed
Contractor’s details for an individual*
Trading Name* Vendor No.
First Names* Initials*
Surname* ID Number*
Passport No. (if no RSA ID) Country of Passport Issue
VAT Registration No. Income Tax Registration No.*
Date of Birth* E-Mail Address
Telephone Number* Fax Number
Contractor’s Physical Business Address*
Unit No
Complex Name
Street Number
Street Name
Suburb
City/Town
Postal Code
Contractor’s Postal Business Address*
Same as above (Mark with an X)
Address TYPE (Delete where not applicable) P O Box/Private Bag/Street Address
P O Box/Private Bag/Street NUMBER
Street Name
Suburb
Town
Postal Code
Contractor’s Bank Details*
Account Number Bank Name
Branch Name Branch Number
Name of Account Holder Account Type (Delete where not applicable)
Current/ Savings/ Transmission/Credit Card/Bond
Account
Account Holder Relationship*
i.e. own, joint or 3rd party Own/Joint/3rd Party
Applicable to the 2023/2024 Tax Years
Please answer the following questions by marking the appropriate column with an
"X".
Question 1(i)
Do/will you provide Eskom with a service or people?
If the answer is “Service”:
PAYE will be withheld from your payments.
If the answer is “People”, go to Question 2(i).
Question 2(i)
Do you provide Eskom with People and will these people be paid by you?
If the answer is Yes, go to Question 2(ii).
If the answer is No, go to Question 3(i).
Question 2(ii)
Are you in possession of an IRP30 exemption certificate which is valid for the period
under review?
If the answer is Yes:
from your payments.
provided, PAYE will be withheld from your payments until such time
the IRP30 certificate is provided.
Pack.
If the answer is No:
IRP30 certificate is provided.
Pack.
Question 3(i)
Are you a Resident of the Republic of South Africa in terms of the Income Tax Act?
(Refer to Appendix 10 for the definition of a Resident).
If the answer is Yes, go to Question 4(i).
If the answer is No:
Eskom to refer it to Eskom Group Tax Department in Megawatt.
Applicable to the 2023/2024 Tax Years
Question 4(i)
Do you employ:
If the answer is Yes, go to Question 4(ii).
If the answer is No, go to Question 5(i).
Question 4(ii)
Are these employees employed:
If the answer is Yes, go to Question 4(iii).
If the answer is No, go to Question 5(i).
Question 4(iii)
Are any of these employees Connected persons in respect of the Individual, e.g.
spouse, parent, adoptive parent, child, grandparent, cousin, etc.? (Refer to
Appendix 10 for the definition of Connected person).
If the answer is Yes, go to Question 5(i).
If the answer is No:
from your payments.
withheld from your payments.
Pack.
Question 5(i)
Must your duties be performed mainly (i.e. more than 50%) at premises of Eskom?
If the answer is Yes, go to Question 5(ii).
If the answer is No, go to Question 5(ii).
Question 5(ii)
Will you be /are you subject to Eskom’s control or supervision as to the manner in
which your duties are to be performed or as to the hours of work?
If the answers in both Questions 5(1) and 5(ii) are Yes:
If the answer is No:
from your payments.
Applicable to the 2023/2024 Tax Years
Question 6(i)
Do/will the payments by Eskom for services payable with reference to output or
certain agreed results, e.g. payment (be it a fixed fee or an hourly rate) be only due
if and when a specific deliverable has been completed?
Question 6(ii)
Does/Will Eskom have the contractual right to control the tools or equipment, staff,
raw materials, routines, patents or technology used in the provision of the services?
Question 6(iii)
Are you/will you prohibited from rendering services to any other employers/clients
during the period of service to Eskom?
Question 6(iv)
Do/will you have the right to sub-contract work?
Question 6(v)
Are you personally / will you personally be at risk for the quality of the work done or
to be done (risk for poor quality; time over-runs, project not producing income)?
Question 6(vi)
Are/will you or the person rendering the service be obliged to be present and
perform the work at Eskom regardless of whether work is available or not?
Question 6(vii)
Is Eskom’s business or will Eskom’s business be critical to your financial/economic
survival?
Question 6(viii)
Does/will your position form part of Eskom’s organisational structure?
Question 6(ix)
Does/will Eskom provide you with any of the following:
Question 6(x)
Does/will Eskom provide you with an office?
Question 6(xi)
Does/will Eskom provide you with any equipment, tools, stationery and material?
Please go to the next section to establish your tax status.
Applicable to the 2023/2024 Tax Years
To establish your tax status, you need to summarise the “Yes” and “No” as
answered on Question 6(i) to 6(xi) in the column below:
Question Yes No
6(i) Independent Employee
6(ii) Employee Independent
6(iii) Employee Independent
6(iv) Independent Employee
6(v) Independent Employee
6(vi) Employee Independent
6(vii) Employee Independent
6(viii) Employee Independent
6(ix) Employee Independent
6(x) Employee Independent
6(xi) Employee Independent
Decision
Independent
Psp
If you have answered “Employee” to any of the following questions 6 (i), 6(iii), 6(v),
6(vi), 6(ix);
or
If you have answered more than 50% “Employee” to questions 6(ii), 6(iv), 6(vii),
6(viii), 6(x), 6(xi):
Alternatively:
If you have already signed Appendix 7 on Questions 5:
disclosed on the IRP5 for payments received.
If you have not signed Appendix 7 on Questions 5:
withheld from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Applicable to the 2023/2024 Tax Years
Summary for ID No. Vendor No:
Company/Close Corporation/Trust Summary
Please si n
the following
Construction Services CONTRACT NO. _________
NEC3 Term Service
Contract Quality Plan template assist the supplier to identify and plan for meeting client's/ contract expectations/requirements for quality management
NB: The tenderer must complete and sign this form to acknowledge and accept Eskom Supplier Quality Requirements as per 240-105658000 Specification and ISO 9001 Standard.
Construction Services 5 years
Signature
of Environmental Document Comments
Training and competency
Compulsory OHS/SHE Legal Liability
Training).
Liability & OHS Supervisory training.
employees or risk based).
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorised version on
the system. No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
of 9
Template Identifier 240-43921898 Rev 5
Annexure C 1: OHS Tender Evaluation Template (High risk) Document Identifier 240-77471651 Rev 3
Effective Date May 2021
Cell A5: Designation Employer (Site Manager with OHS/SHE Legal Liability Training)
Duvha Power Station, owned and operated by Eskom is a coal-fired power station of five powergenerating units with a combined capacity of 3,000MW (excluding unit 3 which was decommissioned).
The power station is located about 13 kilometres southeast of Emalahleni in the Nkangala District
Municipality, Mpumalanga Province. The location is illustrated in Figure 1 below. The centre coordinates (WGS 84) for the power station are as follows:
25° 57’ 40.96’’ S 29° 20’ 17.06’’ E
Duvha Power Station has over 40 years in operation and civil and structures are required to be
inspected and maintained periodically for safe use as per the construction regulations. This document
contains the technical requirement for corrective and preventative maintenance works to be carried out
by an appointed contractor for a period of 5 years. The technical requirements are in line with the
maintenance strategy for Duvha Power Station civil and structures. All defective infrastructures will be
executed and prioritised in accordance with the requirements stipulated in (240-44948953 Work
Prioritisation Procedure). The maintenance works for the civil structures is for period of 5 years to
ensure compliance with construction regulations to render the civil structures and infrastructures safe
for continue use.
Figure 1: Showing a topographical location of Duvha Power Station
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
2.1 Scope
This document covers the technical requirement for the provision of a maintenance contract for Duvha
Power Station civil and structures. The service for the maintenance works is outsourced to a contractor
to execute the works on behalf of the client. This works includes but not limited to the followings works.
painting.
Structural steel works, such as repairs, fabrication and installation of steel structures.
Carpentry works such as repair, replacement, and weather protection (outdoor).
Brickworks such as repair, replacement, reinforcement, plastering and painting.
Weather proofing of structures such as waterproofing, corrosion protection, acid/chemical
resistance coating of structures and weather protection (outdoor).
compaction.
Sheeting and cladding works such as repairs, replacement, and painting.
Roadworks for surfaced/paved and unsurfaced roads such as repair, replacement, compacting,
marking and signage.
Fencing such as repair, replacement, and painting.
Material testing.
Underground scanning.
Rope access for elevated works such as roof repairs
2.1.1 Purpose
The purpose of this document is to describe in detailed the requirement for the provision of a
maintenance contract for Duvha Power Station civil and structures to comply with Construction
Regulations and the Occupational Health and Safety Act, no (OHS).
2.1.2 Applicability
This document applies to Duvha Power Station.
2.2 Normative/informative references
Parties using this document to apply the most recent edition of the documents listed in the following
paragraphs.
2.2.1 Normative
[1] 32-727 - Eskom Safety, Health, Environment and Quality (SHEQ) Policy.
[2] Occupational Health and Safety Act No. , Construction Regulations.
[3] ISO 9001 Quality Management Systems.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
[4] 240-99527377, Inspection manual for civil works at Eskom’s Power Stations.
[5] 03A-ENS0040 Rev 3 - Civil Structures Maintenance Execution Strategy.
[6] 03A-ENS0042 Rev 3 - Water Retaining Structure Outside Plant Maintenance Strategy.
[7] 240-44948953 Work Prioritisation Procedure.
[8] 240-106365693, Standard for External Corrosion Protection of Plant Equipment and
Associated Piping with Coatings.
[9] 240-75655504 Corrosion Protection Standard for New Indoor and Outdoor Eskom
Equipment.
[10] 240-106628253, Standard for Welding Requirements on Eskom Plant
[11] National Environmental Management Act, 1998 (Act )
[12] National Environmental Management Waste Act, 2008 (Act )
These documents are indispensable for the application of this document, i.e., documents to be used
together with this document.
2.2.2 Informative
[13] 474-58 (Rev1): Document and Records Management
[14] 240-53113685, Design Review Procedure
[15] 240-53114002, Engineering Change Management Procedure
[16] 240-76992014, Project/Plant Specific Technical Documents and Records Management Work
Instruction
2.3 Definitions
Definition Description
Controlled disclosure controlled disclosure to external parties (either enforced by law, or
discretionary).
Task Order A task order is a written instruction to proceed with the task as stipulated
on the task order. The task order will only be valid if a “45 number” appear
on the task order. The “45 number” will serve as the order number for the
task and need to be stated on the invoice for the work done as per task
order.
Client The owner of the Power Station at which the inspections are to be done.
Normally the Client will be represented by the Power Station or System
Engineer
Contractor Service provider appointed to supply a specific service to Eskom, Duvha
Power Station.
Employer Eskom, or Eskom Duvha Power Station or representative
Sub-contractor An individual or business which has a contract with a principal contractor
to supply some portion of the work or services on a project which the
contractor has agreed to perform
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
2.4 Abbreviations
Abbreviation Description
CCTV Closed-Circuit Television
CV Curriculum Vitae
CM Contract Manager
ECSA Engineering Council of South Africa
ESP Electrostatic Precipitator
FFP Fabric Filter Plant
ISO International Standard Organisation
MW megawatt
SANS South African National Standards
SHEQ Safety, Health, Environmental & Quality
SE System Engineer
PPE Personal protective Equipment
PSR Plant Safety Regulations
QA Quality Assurance
QC Quality Control
QCP Quality Control Plan
WGS World geodetic System
2.5 Roles and responsibilities
2.5.1 Employer
Safety, Health and Environmental
The Employer to ensure the following:
insurer as contemplated in the compensation for occupational injuries and diseases act, before
work beginning work on site.
The Employer to also ensure that a copy of the Principal Contractor's health and safety plan is
available on request to an Employee, Inspector or Contractor. Non-compliances will result in
work stoppages.
Audit periods are mutually agreed between the Client and Principal Contractor.
The Contractor is notified promptly of situations which may affect the health and safety of any
person carrying out works on site.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
Contractor, where changes are brought about.
o Conduct health and safety audits to establish the effectiveness of the Contractor’s health
and safety management systems.
o Refuse employees or agents of the Contractor access to the Power Station Site if such
persons commit unsafe acts or unsafe working practice or is found not competent or
authorised.
o Stop works should there be unsafe working practices and procedures.
General
The Employer to ensure the following:
works.
2.5.2 Appointed Principal Contractor
Safety, Health and Environmental
The Principal Contractor to ensure the following:
its regulations and all other relevant health and safety legislation to ensure the health and safety
of persons carrying out works. This to also apply to sub-contractors.
the employer. This to be applied from the date of commencement and duration of works. The
contents of the health and safety plan to also be discussed and negotiated with sub-Contractors.
The health and safety plan to be implemented and maintained on site.
site regulations.
All employees undergo safety induction training on-site.
All employees or agents, visitors of the Contractor are medically, physical, and psychologically
fit to enter the Power Station and carry out works. Employees to also have a valid medical
certificate of fitness specific to the work to be performed.
compensation insurer as contemplated in the compensation for occupational injuries and
diseases act, before work beginning work on site.
Safeguard all employees by maintaining a safe and hygiene working environment and culture.
A safety profile is kept for tracking and auditing purposes.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
danger to one's life or health are at once reported.
Contractor, where changes are brought about.
the risk assessment.
may affect the health and safety of any person carrying out works on site.
PPE to the Contractors' Employees is the responsibility of the Contractor.
that all employees are competent and aware of all requirements needed to execute works safely.
performed by a competent person appointed in writing. The risk assessment to form part of the
health and safety plan to be applied on the site and to include at least:
o The identification of the risks and hazards to which persons may be exposed to.
o The analysis and evaluation of the risks and hazards identified.
o A documented plan of safe work procedures to mitigate, reduce or control the risks and
hazards that have been identified.
o A monitoring plan; and
o A review plans.
during the execution of maintenance services. Subcontractors and others under the Contractor's
direction and control to observe and comply with the latter.
General
be included in this document and supply record and history requirements.
Contractor takes all necessary precautions that may be required to safeguard existing
infrastructure and services including protection of all surface works. These additional works are
formally documented in method statements for the Employer’s review and acceptance.
calculations by the Contract Manager in no way relieves the Contractor of his liability for the
works. The Contractor remains liable for all works conducted as per this document.
delegates, to ensure seamless integration of the various works.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
To work with and consult with the other functions/structures of the Employer.
Resources and tools required by personnel for executing works are provided by the Contractor.
To produce and submit to the Employer for approval, the number and details of personnel that
will execute the works. Qualifications and proof thereof to also be provided to the Employer.
To procure or co-ordinate the supply of required consumables.
To assist the maintenance Contract Manager in planning, organizing, and managing all
maintenance related activities.
violated any of the Eskom Life Saving Rules, they may face disciplinary action.
o Open, isolate, test, earth, bond, and/or insulate before touch.
o Hook up at heights.
o Buckle up.
o Be sober.
o Ensure that you have a permit to work.
o Wear correct PPE at all times.
o Report all incidents.
2.6 Related/supporting documents
Not Applicable
3.1 Description of the works
The objective of the Employer is to appoint a Contractor for maintenance services of civil and structures
at Duvha Power Station for a period of 5 years. The works entails the following:
the works by complying with the OHS act No. and Regulations.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
3.2 Require service for contractor
3.2.1 Carpentry and Glazing
3.2.1.1 Carpentry and glazing services
drywall.
3.2.1.2 Glazing
opening made of glass.
3.2.2 Waterproofing
3.2.2.1 Waterproofing services
structures, and walls.
roads, runways, parking areas and other surfaces.
3.2.2.2 Waterproofing specifications and requirements
Damp proofing and waterproofing to comply with the Specifications and requirements given the table
below. Waterproofing materials are applied in accordance with SANS 10021. All joints in damp-proof
course on walls are lapped a minimum of 150 mm except at junctions and corners where the lap is
equal the full thickness of the wall.
Material SANS Type and/or Additional Requirements
Bituminous damp-proof course to wall,
248 Type FV/ as specified on the drawings.
sills, etc.
Polyethylene sheet in damp-proof course
952 Type B/ as specified on the drawings
to walls, sills etc.
Ditto to floors and basements 952 Type C/ as specified on the drawings
Mastic asphalt for roofing 297 -
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
Material SANS Type and/or Additional Requirements
Mastic asphalt for damp-proof coursed and
298 -
tanking
Bituminous roofing felt 92 Type 60/ as specified on the drawings
Polyethylene sheet for the waterproofing of
952 Type A/ as specified on the drawings
flat roofs
Chloroprene rubber sheet (for
580 At least 2.5 mm thick and 1200 mm wide
waterproofing)
Sealing compounds with two-component Type 2 Gun Grade/ as specified on the
polysulphide base drawings
3.2.3 Masonry works (bricklaying).
3.2.3.1 Masonry services
3.2.3.2 Masonry specifications and requirement
List of applicable standards for masonry works.
Code Description
SABS 029 Comprehensive model building regulations Chapter 8: Masonry and walling
SANS 1206 Masonry units
SANS 227 Burnt clay masonry units
SANS 285 Calcium silicate masonry units
SANS 1215 Concrete masonry units
SANS 2001 CM1 Construction works Part CM1 – Masonry walling
SANS 10073 The safe application of masonry-type facings to buildings
SANS 10145 Concrete masonry construction
SANS 10249 Masonry walling
SANS 50413 Masonry cement
SANS 50771 Specification for masonry units
SANS 50934-3 Admixtures for concrete, mortar, and grout Part 3: Admixtures for masonry
mortar – Definition, requirements, conformity, marking and labelling
Specification data associated with SANS 2001 CM1 – Masonry walling.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
Clause/No Specification Data
Essential data
4.1 Materials
4.1.1.2 Burnt Clay masonry units complies with the requirements of SANS 227 and
have the following properties:
o Dark: Country Meadow Satin
o Light: Opal Satin
o Foundation brickwork: NFX – 7.5 MPa minimum.
o Internal brickwork: NFP– 7.5 MPa minimum.
o Face Brick: FBS – 12.5 MPa
o Foundation brickwork: Normal
o Internal brickwork: Normal
o Face Brick: Special
The quality verification are as follows: See Appendix F of SANS 227
The test for efflorescence is required.
4.1.4.1 Sands that comply with the requirements of SANS 1090 are required.
4.1.6 Mortar plasticizers and set-retarder admixtures are permitted.
4.1.9.1.2 Brick forces are galvanised.
4.1.9.2.2 Rod reinforcements are galvanised
4.1.12.1 Wall ties in cavity walls are of the butterfly type.
4.1.12.1 Only galvanised steel wall ties are used.
4.1.13.2 Internal steel door frames are galvanised.
4.2 Mortar
4.2.1.2 Mortar plasticizers and set-retarder admixtures are permitted
4.6.3.1 Reference panels are required
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
Clause/No Specification Data
4.16 Roof anchors are in accordance with the requirements of SANS 10400
5 Compliance with Requirements
5.1.1 The degree of accuracy to be II
Variations
With reference to Clause 4.1.13:
Cm1. V.1
All other door and window frames are bronzed anodised aluminium.
List of applicable standards for foundations of masonry walling
Code Description
SANS 517 Light steel frame building
SANS 952-1 Polymer film for damp-proofing and waterproofing in buildings. Part 1:
Monofilament and co-extruded products
SANS 2001 Construction works Part CM2 – Strip footings, pad footings and slab on-the-
CM2 ground foundations for masonry walling
SANS 1200 F Standardized specification for civil engineering construction Section F: Piling
SANS 10100 The structural use of concrete
SANS 10120-2 F Code of practice for use with standardized specifications for civil engineering
construction and contract documents Part 2: Project specification Section F:
Piling
SANS 10120-3 F Code of practice for use with standardized specifications for civil engineering
construction and contract documents Part 3: Guidance for design Section F:
Piling
SANS 10120-5 F Code of practice for use with standardized specifications for civil engineering
construction and contract documents Part 5: Contract administration Section F:
Piling
SANS 10400 H The application of the National Building Regulations Part H: Foundations
SANS 101400 J The application of the National Building Regulations Part J: Floors
SANS 10161 The design of foundations for buildings
SANS 10088 Pile foundations
Specification data associated with SANS 2001 EM1 – Cement plaster.
Clause/No Specification Data
Essential data
4.1 Materials
4.1.6.2 This clause is deleted and replaced with the following:
“Admixtures are allowed to the mixes to improve workability or to improve the
properties of the finished plaster, provided that the data sheets for such have
been submitted to the Project Manager for review and acceptance prior to use”
4.2 Methods and procedures
4.2.3.2 Single-coat plaster: 10mm to 12mm
5.0 Compliance with the requirements
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
Clause/No Specification Data
The permissible deviations in plaster to not exceed 4mm under a 2m straight
edge
Additional clauses
EM1. A.1 All cracks, blisters and other defects are carefully cut out and made good and
the whole of the plaster work is to be left in perfect and clean condition on
completion.
3.2.4 Concrete works
from the structure, removal of dirt, etc.)
and cable trench concrete covers.
3.2.4.1 Concrete specifications and standards
List of applicable standards for concrete works
Code Description
Admixtures
240-144332407 Guideline for Eskom Power Stations Concrete Remedial Work
SANS 50934-1 Admixtures of concrete, mortar and grout, Part 1, Common requirements
SANS 50934-2 Admixtures of concrete, mortar and grout, Part 2, Concrete admixtures:
definitions, requirements, conformity, marking and labelling
SANS 50934-3 Admixtures for concrete, mortar and grout, Part 3, Admixtures for masonry
mortar - definitions, requirements, conformity and marking and labelling
SANS 50934-5 Admixtures for concrete, mortar and grout, Part 5, Admixtures for sprayed
concrete - definitions, requirements, conformity, marking and labelling
SANS 50934-6 Admixtures for concrete, mortar and grout, Part 6, Sampling, conformity
control and evaluation of conformity
Aggregates
SANS 1083 Aggregates from natural sources – Aggregates for concrete
SANS 1090 Aggregates from natural sources - Fine aggregates for plaster and mortar
Cementitious Materials
SANS 6151 Free water content of Portland cementitious materials
SANS 6152 Available alkali content of cement extenders (complying with SANS 50197-1)
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
Code Description
SANS 50197-1 Cement. Part 1, Composition, specifications, and conformity criteria for
common cements
Concrete
SANS 878 Ready-mixed concrete
SANS 5860 Concrete tests - Dimensions, tolerances, and uses of cast test specimens
SANS 5861-1 Concrete tests - Mixing fresh concrete in the laboratory
SANS 5861-2 Concrete tests -Sampling of freshly mixed concrete
SANS 5861-3 Concrete tests - Making and curing of test specimens
SANS 5862-1 Concrete tests - Consistence of freshly mixed concrete - slump test
SANS 5862-2 Concrete tests - Consistence of freshly mixed concrete - flow test
SANS 5863 Concrete tests - compressive strength of hardened concrete
SANS 5864 Concrete tests - flexural strength of hardened concrete
SANS 5865 Concrete tests - the drilling, preparation, and testing for compressive strength
of cores taken from hardened concrete
SANS 6255 Mortar tests - compressive strength of mortar
SANS 50206 Concrete – Specification, performance, production, and conformity
Construction
SANS 2001 CC1 Construction works: Part CC1: Concrete works (structural)
SANS 2001 CC2 Construction works: Part CC2: Concrete works (minor works)
SANS 10100-2 The structural use of concrete. Part 2, Materials, and execution of work
SANS 10109-1 Concrete floors. Part 1, Bases to concrete floors
SANS 10109-2 Concrete floors. Part 2, Finishes to concrete floors
SANS 10155 Accuracy in buildings
SANS 53670 Execution of concrete structures
SANS 55392 Sustainability in building construction: general principles
Reinforcement
SANS 282 Bending dimensions and scheduling of steel reinforcement for concrete
SANS 920 Steel bars for concrete reinforcement
SANS 1024 Welded steel fabric for reinforcement of concrete
Water
SANS 51008 Mixing of water for concrete – Specification for sampling, testing, and
assessing the suitability of water, including water recovered from processes in
the concrete industry, as mixing water for concrete
Concrete and Related Products
SANS 266 Gypsum plasterboard
SANS 508 Concrete retaining blocks
SANS 541 Precast concrete paving slabs
SANS 677 Concrete non-pressure pipes
SANS 685 Fibre-cement sheets (flat and profiled)
SANS 803 Fibre-cement boards
SANS 819 Fibre-cement pipes, couplings and fittings for sewerage, drainage, and low-
pressure irrigation
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
Code Description
SANS 927 Precast concrete kerbs, edgings, and channels
SANS 986 Precast reinforced concrete culverts
SANS 1058 Concrete paving blocks
SANS 1215 Concrete masonry units
SANS 1294 Precast concrete manhole sections and components
SANS 1372 Prefabricated concrete components for fences
SANS 1879 Precast concrete suspended slabs
SANS 1882 Polymer concrete surface boxes, manhole and inspection covers, gully
gratings and frames
SANS 50771-3 Specification for masonry units. Part 3, Aggregate concrete masonry unite
(dense and lightweight aggregates)
SANS 50771-4 Specification for masonry units. Part 4, Autoclaved aerated concrete masonry
units
SANS 10904 Fibre-cement corrugated sheets and fittings for roofing and cladding
Other Standards
SANS 53584 Products and systems for the protection and repair of concrete structures –
Test methods – Determination of creep in compression for repair products
SANS 1200 G Standardized specification for civil engineering construction Section G:
Concrete (structural)
Specification data associated with SANS 2001 CC1 – Concrete works (structural)
Clause/No Specification Data
Essential data
4.2 Materials
4.2.1.1 Cementitious binders are common cements that comply with SANS 50197-1 or
be blends of certain common cements and extenders1 that comply with SANS
55617-1*, SANS 50450-1** and SANS 50450-2** or SANS 53263-2***, SANS
50934-6*** and SANS 50934-2***.
4.2.2 Water complies with the requirements of SANS 51008.
4.2.3.1 2 The coarse aggregate has a nominal size of 19mm.
The nominal maximum size of coarse aggregate does not exceed:
reinforcement, the use of a nominal size of 9,5 mm or 13,2 mm should
be considered.
4.2.6 The grade of concrete is as follows:
etc.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
Clause/No Specification Data
4.2.7 The material requirements for grout are as follows:
Cement complies with SANS 50196-1.
o The grout has a minimum crushing strength of the concrete. The
sand aggregate is capable of freely passing a filter mesh of 1.5
mm.
o A grout is regarded as non-shrink if its volume is not less than the
initial volume, after hardening for 28 days. During this period, the
test specimens to have been completely protected against drying,
evaporating, carbonation and exposure to temperatures outside
the range 23 °C ± 3 °C.
The type and brand of non-shrink grout to, after approval, be indicated on the
drawings and/or specification for concrete work.
In general, one of the following types of non-shrink grout are used:
concrete.
strength of the concrete.
4.2.11.1 Joint fillers, sealants, water stops, bearings, and accessories complies with the
following requirements:
polyethylene foam and sealed against the ingress of dirt or water with a
gun grade sealant material to comply with manufacturer’s specifications.
4.3.1.5 Earth cuts may be used as forms for vertical surfaces.
4.3.1.8 Formed Concrete
The formed surfaces are as follows:
acceptable.
additional finish – Smooth finish is required.
finish is permitted.
4.3.1.8 The degree of accuracy required is II.
4.3.8.3 The false work and supporting formwork on continuously reinforced concrete
structures to be removed as follows:
-On acceptance by the Contract Manager that the false work and formwork may
be removed.
4.4 Reinforcement
4.4.1.3 Bars may not be bent hot.
4.4.2.2 Welding of bars are not permitted.
4.4.3.1 The cover is as follows:
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
Clause/No Specification Data
4.5 Holes, chases and fixing bolts
4.5.1 Fixtures to be embedded in the concrete are as per client’s specifications.
4.6 Embedded items
4.6.2.1 The type and location of water stops are as per client’s specifications.
4.7 Quality of concrete
4.7.3.2 Pumping of concrete is permitted where necessary.
4.7.4.1 Efflorescence on exposed concrete surfaces is not permitted
4.7.12.1.1 Construction joints are required.
4.7.12.1.4 Proprietary bonding compounds between old and new concrete is permitted.
4.7.14.6 Concrete is not to be placed during periods of heavy or prolonged rain.
4.7.15.1 Exposed surfaces of concrete not finished against forms have the following
surface finishes:
hand or machine sufficient only to produce a uniform surface free from
screed marks.
5 Compliance with the requirements
5.1 Testing
5.1.1.7 The test results from a ready-mix production facility, as part of its quality control
system, are used.
5.1.2.3 The test results may be assessed statistically.
5.2 Tolerances
5.2.1.1 The degree of accuracy is III for surfaces cast against earth cuts and II for other
concrete surfaces.
Variations
CC1.V.1 The uninterrupted supply of the correct volume to site is guaranteed if “ready-
mixed” concrete is used.
CC1.V.2 The space between pipes and ducts that are to be cast into reinforced concrete
and any adjacent reinforcement is not smaller than the larger of the following:
CC1.V.3 The Contract Manager may permit production of concrete at a central production
facility other than on the Site of construction and reserves the right to inspect for
acceptance of these central production facilities. The Contractor is responsible
for conducting all control testing.
CC1.V.4 Concrete may not be placed before the Contract Manager has given permission
in writing. A minimum written notice period of 24 hours prior to pouring is required
for each part of the structure.
CC1.V.5 the Contractor receives from the ready-mixed concrete Supplier, a certificate
with the following information:
compacted concrete.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
Clause/No Specification Data
Additional clauses
CC1.A.1 Cement and cement extenders are free flowing and free of lumps and are
supplied in the manufacturer's sealed unbroken bags or in bulk. Material that
has become hardened or lumpy or fails to comply with the relevant standards in
any way is removed from the Site, without delay.
CC1.A.2 The materials used in the construction of falsework and formwork are suitable
for the purpose for which they are required and is of such a quality that will
produce the standard of work specified. The Contractor submits his proposal of
the materials that is used for the construction of the falsework and formwork to
the Contract Manager two weeks prior to use for his acceptance.
CC1.A.3 The minimum blinding thickness is 75mm.
CC1.A.4 All reinforcement is hot rolled steel grade 450MPa.
CC1.A.5 All cement and cement extenders used in the works are tested by the
manufacturer or the Contractor in a laboratory. Copies of all test results so
obtained accompany each delivery of cement and cement extender to the site
and included as executed records.
The Contractor keeps full records of all data relevant to the manufacture,
delivery, testing and use of all cement and cement extenders used in the Works.
CC1.A.6 Prevention of plastic shrinkage cracks
The Contractor takes measures as necessary to prevent plastic shrinkage
cracking in the concrete. Particularly on dry windy days or hot sunny days, the
Contractor makes provision for fine spraying of the concrete surface with water
as soon as it has taken its initial set or covers the concrete with plastic sheeting.
It may be necessary to change the aggregates or the concrete mix proportions.
To deal with shrinkage cracking, it may be necessary to change the time at
which, or the way, floating is carried out.
If plastic shrinkage cracking occurs, the cracks are be closed by re-vibrating the
concrete while the concrete is still in a plastic state. Once the cracks have been
closed, the concrete is kept thoroughly wet, or covered with plastic sheeting for
at least a further three hours.
CC1.A.7 Curing of concrete
Details of the Contractor's proposals for curing concrete are submitted to the
Contract Manager for agreement before the placing of concrete commences.
Membrane curing compounds are not permitted, where the aesthetic
appearance of the finished surface is of importance and there is any danger of
the membrane becoming difficult to remove.
CC1.A.8 The average strength of the 3 cubes crushed is referred to as one test
result. The results are submitted to the Contract Manager for his acceptance.
Cc1.A.9
special precautions need be taken to protect concrete from the effects of
cold weather.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
Clause/No Specification Data
conditions are confined to ground frosts during the night, the Contractor
takes the necessary precautions to ensure that concrete is placed and
compacted at a concrete temperature of not less than 5oC and that it is
subsequently covered and protected from cold winds and frosts to
ensure that its temperature does not fall below that shown in Table
CC1.A.9 for at least the period shown in the table. Such precaution must
be presented to the Contract Manager for his approval.
Contractor ceases with placing of concrete when the air temperature falls
to 2oC and does not resume until it rises to 5oC,
Table CC1. A.9: Concrete temperature during early life
Characteristic Concrete to be maintained at not less
than temperature shown for a minimum Strength of Concrete
period of:
2oC 5oC
10 MPa 10.0 days 8.0 days
20 MPa 4.5 days 3.5 days
30 MPa and above 3.0 days 2.5 days
Notes:
a compressive strength of 5 MPa.
interpolated, but in no case to the maturing temperature fall below 2oC.
Concrete not placed within formwork or in contact with reinforcement
with a temperature which is at or below 0oC and it is not placed
against any surface bearing frost or ice.
CC1.A.10 No placing of concrete takes place if the ambient temperature exceeds or is
likely to exceed 32°C or if there are hot drying winds during the casting period,
without the acceptance of the Contract Manager.
Fresh concrete having a temperature exceeding 32oC are not placed in the
works. For pours of large volume where control of temperature rises or
temperature differential is critical, a lower maximum placing temperature, to be
agreed with the Contract Manager, may be imposed. The Contractor takes all
measures necessary to ensure that the specified maximum placing temperature
is not exceeded and that loss of moisture during transporting and placing is
reduced to the minimum. Such measures are agreed with the Contract
Manager.
Areas in which concrete is to be placed are shielded from direct sunshine and
rock or concrete surfaces are thoroughly wetted if instructed by the Contract
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
Clause/No Specification Data
Manager to reduce absorption of water from the concrete placed on or against
them.
After placing of concrete in any part of an area, the specified curing process
commences as soon as possible. If any interval occurs between completion of
placing and start of curing, the concrete is covered for this interval with polythene
sheet to prevent loss of moisture.
CC1.A.11 Particular attention will be paid to heat of hydration, especially for large pours.
CC1.A.12 Cement extenders are only used where specified - an accepted cement extender
to only be blended with a CEM1 Portland Cement. The use of Fly Ash is
preferred.
Blending of CEM1 cement with an extender may be done in the batch plant, or
at an accepted commercial blending plant.
All cement extenders used comply with SANS 1491 Parts 1, 2 or 3 as
appropriate for Ground Granulated Blast - Furnace Slag (GGBS) or Ground
Granulated Corex Slag (GGCS), Fly Ash (FA) or Condensed Silica Fume (CSF)
respectively, and to carry the SANS mark, or similar accepted.
CC1.A.13 If mixing concrete on site, the Contractor prepares trial mixes using the approved
material, and the plant used for these trials is the plant used in the works.
CC1.A.14 The Contractor submits full details of the trial mixes and test results and of the
mixes proposed for use in the works, which are based on the satisfactory results
of these preliminary tests and on the methods of mixing and placing the concrete
in the works.
CC1.A.15 Commencing of concreting:
No concreting commences in any portion of the works until the preparations
have been accepted and written permission given by the Project Manager that
concreting in such portion of the works may commence.
The Contractor provides to the Project Manager an accepted checklist for
concrete pours at least four hours before the placing of any concrete. All
relevant items are checked by the Contractor and the checklist signed off by the
Contractor’s representative as to its completeness and correctness.
The following information is recorded by the Contractor and forms part of the
data books in respect of each delivery of concrete:
The concrete is compacted and placed in its final position within 2 hours of the
introduction of cement to the aggregates. The time of such introduction is
recorded on the delivery note. When truck mixed concrete is used, water is
added under supervision either at the Site or at the central batching plant, but in
no circumstances is water added in transit.
CC1.A.16 Check Tests on Hardened Concrete
The Contractor, if directed by the Project Manager, carries out the following tests
on hardened concrete either for routine inspection, quality control or as a
verification of defects found by visual inspection or low cube strengths:
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
Clause/No Specification Data
accordance with SANS 5863, SANS 5864, and SANS 5865. Loading
tests on a completed structure or on precast elements are conducted if
there is reasonable doubt as to the adequacy of the structure.
resistance to damage by other materials.
CC1.A.17 Placing and compaction of concrete is carried out under supervision of suitably
qualified Personnel. Control procedures are established to cover all aspects of
workmanship including placing, compacting, finishing, curing, hot and cold
weather concreting, large concrete pours, etc. The concrete consistence is
appropriate to the location in which it is to be placed and suitable placing and
compacting equipment and procedures are employed to ensure that a high level
of compaction without segregation is achieved. It is particularly important that
full compaction is achieved in areas close to construction and movement joints,
embedded water bars, reinforcement and against previously placed, hardened
concrete.
The following precautions are taken by the Contractor:
built-in fittings (embedment) are not displaced and that damage is not
caused to the face of the formwork.
formwork at a rate of at least 2m per hour. Concrete is not placed directly
against vertical formwork; it flows to this surface during the compaction
process.
Manager. Concrete is not dropped freely more than 1.5 m unless
adequate precautions have been taken to prevent segregation,
displacement of reinforcing bars, tendons, and built-in fittings
(embedment’s) and damage to formwork. The design and slope of
chutes are to the acceptance of the Employer; chutes are kept clean and
in good repair.
placing, to ensure that it is homogeneous. The concrete is worked
around the reinforcing bars, tendons, and built-in fittings (embedment’s),
etc. and into corners of the formwork to form a solid void-free mass
having the required surface finish. Vibration is applied in a manner that
does not promote segregation, until all the air has been expelled.
Vibrators are only used to compact concrete; they are not used to move
concrete across the formwork. Over-vibration is avoided. When external
vibrators are used, the design of formwork and vibrator characteristics
ensure efficient compaction while avoiding surface defects.
in finishing is not permitted.
absorption is considered when deciding on the method of vibration to be
used. Extra precautions are taken to ensure full compaction of the
concrete since this cannot be checked when the formwork is removed.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
Clause/No Specification Data
in position by tremies or by pipeline from the mixer and is not allowed to
fall freely through water.
handling and placing characteristics of fresh concrete, are in accordance
with this Works Information and are used only if accepted by the Project
Manager.
more than one hour unless a construction joint is formed. The concrete
in each section between joints or corners are placed in successive pours,
working away in both directions from the centre-most panel of that
section. The minimum interval between placing adjacent panels is 3
days, unless directed otherwise.
ground, the ground surface is suitably prepared and protected against
intermixing, water suction, etc, and the concrete is placed before this
surface has deteriorated.
Once placed, the concrete is not subsequently disturbed and not vibrated or
rammed.
CC1.A.18 All vibrating is carried out under the direction of a Specialist and to a plan
accepted by the Project Manager. No workman is allowed to operate a vibrating
tool without having received instruction and training in its use. Vibrators are
immersion-type, of approved pattern, and they may be electrically or
pneumatically driven. Care is taken to avoid segregation and excessive
vibrating.
CC1.A.19 Defective Concrete
No repairing of any concrete is done without the written permission of the Project
Manager and then only in such manner as he accepts.
Concrete which does not comply with this Works Information is removed and
replaced with sound concrete. This may involve the removal and replacement
of otherwise satisfactory concrete associated with the defective material.
CC1.A.20 Formwork
Formwork with damaged edges or faces is not used. Open joint in timber forms
is sealed. Plywood surfaces and cut edges are sealed to prevent the absorption
of moisture.
Immediately before concreting, the forms and all other surfaces which are in
contact with the fresh concrete, are cleaned of loose materials and debris
including shavings, woods chips, sawdust, pieces of wire, nails, foamed plastic,
fragments of hardened concrete and mortar.
CC1.A.21 In the case of precast concrete units constructed in a factory or yard remote from
the Site, details of the concrete ingredients, mix design, and compression test
cube results are made available on delivery to Site
CC1.A.22 Corners to concrete items which are permanently exposed, are chamfered to
avoid sharp edges which are liable to be damaged
CC1.A.23 Holding Down Bolts and Embedded Fixtures
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
Clause/No Specification Data
Threads of holding down bolts are protected with “Densotape”, or similar
material accepted by the Project Manager, during delivery and storage. After
concreting, the bolt projections with attached nuts and washers, are protected
against corrosion with similar sealing tape and protected against mechanical
damage with a timber shield or as otherwise approved, until the erection of the
steel works or other Plant or fixtures commences.
Holding down bolts, embedded fixtures and recesses are in the correct position
by means of templates. These are constructed using steel sections fabricated
to 1mm tolerance, or as otherwise approved and are held rigidly in position
during concreting.
Particular attention is directed to the placing of reinforcement around bolt
assemblies and embedded fixtures.
Holding down bolts and holding down bolt assemblies are in the position shown
on the Drawings.
CC1.A.24 All reinforcement is cleaned of salt depositions, loose mill scale, rust, grease,
set mortar or other harmful matter, by power brushing or acid dipping. The
Contractor ensures that such reinforcement is protected against chemical
deposits at all stages of the work, until the concrete is poured.
Reinforcement placing is checked against the design drawings before concreting
is permitted.
Specification data associated with SANS 2001 CC2 – Concrete works (minor)
Clause/No Specification Data
Essential data
4.2 Materials
4.2.3.1 The nominal size of aggregate is 19mm unless stated otherwise by the client.
4.2.6 The concrete grade is as follows:
o Mass concrete is defined as unreinforced concrete cast for fill in voids
etc.
4.7.11.2 Exposed surfaces to have non-skid surfaces.
Test certificates
The submission of test certificates issued by an accredited, independent testing authority to confirm
that the respective materials comply with the specified requirements, or a certificate by the patent holder
or designer, certifying that the manufactured item complies in all respects with relevant product
specifications.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
Acceptance procedures for the acceptance of mix designs
The Contractor designs the mixes which he proposes to use in the works to meet the specified criteria
including the requirements for durability, hot and cold weather, and temperature control and curing of
concrete.
Concrete Test Cubes
For each class of concrete in production at each plant for use in the works, samples of concrete are
taken by the Contractor at the point of mixing or of deposition as instructed by the Contract Manager
and in the presence of a representative of the Contract Manager, all in accordance with the sampling
procedures described in SANS 5861.
Samples are taken on the basis of one for each 20 m3 of concrete placed but, in any case, not less than
one sample per day, whichever is the more frequent.
The Contractor casts from each sample, cure, and test six test cubes as set out in SANS 5863. Three
cubes are tested at 7 days and three at 28 days.
The average strength of the three cubes crushed are referred to as one test result.
Concrete is deemed to comply with the strength specified if the average strength of any four consecutive
test results exceeds the specified characteristic strength by 2 MPa and the strength of any test result is
not less than the specified characteristic strength minus 3 MPa.
The quantity of concrete represented by any group of four consecutive test results includes the batches
from which the first and last samples were taken together with all intervening batches. When a test
result fails to comply only the batch from which the sample was taken it is deemed to fail to comply.
Concrete slump
The correct slump for each mix is as accepted by the Contract Manager in accordance with the
Contractor’s mix design.
The Contractor takes slump tests from each concrete transporter before release from the batching plant
and again at the point of deposition. The slump test is carried out in accordance with SANS 5862.
Concrete of the incorrect slump is not used in the works.
The addition of cement and sand to reduce the slump is not acceptable.
Failure to comply with requirements.
The Contractor acts as instructed by the Contract Manager without any additional payment to remedy
concrete which fails to comply with the requirements stipulated in the Works Information. Such action
may include, but is not necessarily confined to, the following:
a) Adjusting the mix proportions until the concrete again complies with the Works Information.
b) Cutting test scores from the failed concrete and testing in accordance with SANS 5865.
c) Full scale load tests or sonic investigations.
d) Carrying out additional Works to overcome the effect of the failed concrete.
e) Removing the failed concrete.
f) Increasing the frequency of sampling until control is again established.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
Equipment for concrete
Before any orders are placed and equipment is delivered to Site, the Contractor submits to the Contract
Manager for acceptance, details of all equipment and arrangements he intends to provide for the
following:
Production, transport, storage, and handling of aggregates.
Transport, storage and handling of cement and cement extenders.
Batching, mixing, transporting, and placing of concrete.
Hot and cold weather concreting.
Concrete curing; and
Temperature control.
3.2.5 Structural steel works
The following services are required to be performed by the contractor
machine foundation steel bases.
latest issue of SANS 2001 – CS1.
Specification data associated with SANS 2001 CS1 – Structural steelwork.
Clause/No Specification Data
Essential data
4.1 Materials
4.1.1 “All structural steelwork is manufactured using grade S355JR steel.”
4.1.5 Structural fasteners are of the following grades and types:
“All structural bolts and holding down bolts are of class 8.8 and nuts are of class
8, unless otherwise.”
4.3 Workmanship (General)
4.3.1.1 All steel elements are marked to be traceable to a specific cast or heat of steel.
4.4 Workmanship (Welding)
4.4.4.3 Tack welds are not to be incorporated into the final welds.
4.5 Workmanship (Bolting)
4.5.1.3 The maximum protrusion beyond the nut is not less than 3mm, but not greater
than 5mm.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
Clause/No Specification Data
4.5.1.4 Washers under nuts and bolt heads on flat surfaces are required.
5.3 Non-Destructive testing of welds (Welding)
5.3.4 Ultrasonic or radiographic examination is required for all complete joint
penetration welds.
5.3.5 The requirements for non-destructive tests are as follows:
Magnetic Particle Inspection (MPI). The testing positions for DPI and MPI
are indicated by the Supervisor. All welds that fail the test are repaired. The
scope of the welds to be tested is increased to 100% of the welds for the
case where any welds fail the test.”
Ultrasonic examination.”
Variations
CS1.V.1 Clause 4.2.4.2 and 4.4.4.5:
All attachments to facilitate erection are removed and holes are closed up after
erection.
CS1.V.2 Clause 4.4.4.3:
All tack welds are removed before welding, tack welds are not to be incorporated
into the final welds.
Additional clauses
CS1.A.1 “Handling and lifting plant have sufficient capacity to ensure that steelwork is
placed in its final position without distortion or undue stressing of members.”
CS1.A.2 “Splices:
maintain the full strength of the plate.
from the Employer with regard to the location of the splice and the welding
procedure to be used.
Visual inspections of the root pass and final welds are required for splice welds.”
CS1.A.3 “Tolerances:
unless otherwise specified by the drawing.
accumulative, unless noted of the drawing.
within 3mm of the required drawing location.
dimension.
drawing dimension.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
Clause/No Specification Data
precedence.
Unless otherwise specified by the drawing, tolerances for all overall dimensions
(length, width, height, etc.) are within 3mm.”
CS1.A.4 “Structures, composite units and bolted assemblies that comprise component
parts are not subjected to excessive stresses during the assembly, fabrication, or
erection process.”
CS1.A.5 “Any necessary straightening or forming is carried out by methods that neither
weaken nor deface the material.”
CS1.A.6 “All weld joints in areas to be covered by stiffeners are to be ground flush after
welding and prior to installation of stiffeners.”
CS1.A.7 “All complete joint penetration welds have complete penetration and wherever
practicable are welded from both sides. The backs of the first run are suitably
gouged out.”
CS1.A.8 “The Contractor submits for acceptance full details of his proposed welding
procedures and the provisions of AWS apply to the acceptance thereof.
Acceptance of the welding procedures does not relieve the Contractor of his
responsibility for correct welding and for the minimising of distortion in the finished
structure.”
CS1.A.9 “Welds showing any planar defects such as cracks, lack of fusion or penetration
and excessive slag inclusions or porosity are cut out and rewelded. Under-cutting
is not permitted.”
CS1.A.10 “Weld repairs are made to the same procedure as for the original weld. All tests
are repeated after the repair has been completed and reports on radiographic and
ultrasonic tests are marked to indicate that the report refers to a repaired weld.”
CS1.A.11 “Visual examination of all welds check at minimum that:
undercutting or porosity, and
3.2.6 Earthworks
a) Excavations
excavation.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
as instructed by the Employer.
while working deep excavation.
walls protection. The design report for trench wall shoring to be submitted to the Client for
review.
b) Borrow to fill material selected material.
c) Earthworks specifications and standards
Work
Specification data associated with SANS 2001 BE1 – Earthworks
Clause/No Specification data
Essential data
4.1 Materials
4.1.5.2 Materials from excavation is disposed of as follows:
Suitable materials intended for re-use are stockpiled in an area provide the Contract
Manager
Material suitability is determined by the intended re-use of the material. Where
temporary stockpiles hold materials intended for rehabilitation of ground, stockpiles
that can deteriorate if exposed are protected against erosion and weathering.
Unsuitable materials not intended for re-use are removed from the work site and
disposed of at a location accepted by the Contract Manager. Materials are disposed
of in accordance with local and national laws and regulations.
4.2 Methods and procedures
4.2.1.1 All areas in which excavation is to take place or that are to be covered by terraces,
banks or structures is cleared in accordance with the requirements of SANS 2001-
Bs1.
4.2.1.2 Topsoil is conserved for later use in the following manner:
Vegetation intended for re-use is removed to a location provide the Contract
Manager and is neatly stacked and regularly watered and tended until required for
replanting.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
Clause/No Specification data
Topsoil intended for re-use is stock-piled and/or spread in a location provide the
Contract Manager
4.2.1.3 The overburden is stripped and removed to depth of 300mm.
4.2.3 Surplus and unsuitable material are removed from the work site and disposed of at
a location accepted by the Contract Manager. Materials are disposed of in
accordance with local and national laws and regulations.
Additional Clauses
BE1.A.1 Design of Excavations:
The Contractor is solely responsible for the design and installation of all temporary
works to ensure the stability of the excavations. The Contractor provides his
proposals to the Supervisor for acceptance before excavation work commences on
site.
The macro and micro stability of cuttings, excavation and embankment slopes and
the related soil/rock deformations is analysed in accordance with the SAICE Code
(2010).
Design of cuttings, excavation and embankment slopes includes erosion protection
of slopes, Soil deformation with respect to settlements due to consolidation,
compression of soil structure, movements required to develop shear resistance,
the consequence of sliding and squeezing, etc., are analysed.
BE1.A.2 Excavation Classification
The Contractor uses any method he chooses to excavate any class of material, but
his chosen method of excavation does not determine the classification of the
excavation. The Contractor uses guidelines for excavation classification and
methods set out by SANS 1200D Section 3.1.
BE1.A.3 The Contractor notifies the Contract Manager of his intention to excavate 3 days
prior excavation for planned works, no excavation work to commence without the
presence of the Contract Manager.
The Contractor does not excavate before a method statement, excavation permits,
and underground services scans are submitted and accepted by the Contract
Manager.
BE1.A.4 The effect of earthworks on neighbouring structures, services, etc., are analysed
(for both short and long-term effects) and detrimental effects are avoided, or
appropriate measures taken to safeguard the integrity of the item in question.
Similarly, the effects of dewatering or disturbance of the existing geohydrological
conditions because of earthworks on neighbouring structures, services, etc., are
considered.
3.2.7 Roof Sheeting, Cladding, Drainage, shade nets and Structure
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
The tender evaluation strategy is developed for the purpose of setting out the technical requirements for
evaluating tenderers to obtain a qualified and technically suitable service provider for the civil construction
services for Duvha Power Station structures, infrastructure, and buildings. The scope of work consists of
civil structures such as the coal stock yard, roads (bitumen and gravel), general buildings, substations,
chimneys, cooling towers, machine foundations, boiler house, turbine hall, cable tunnels, cladding &
sheeting, bridges, storm and wastewater drainage system, Water Treatment Plant structures, Sewage
Plant structures, etc.
The 5 years civil and structures Construction services contract for Duvha Power Station aims at addressing
the structural and architectural routine and accidental damages and all defects as they occur. It will also
improve the civil infrastructures performance and compliance with construction regulations under the
occupational health and safety act .
2.1 Scope
This document covers the technical evaluation criteria to be utilised for the process of evaluating the tender
submissions for the civil and structural construction services 5 years contract at Duvha Power Station.
2.1.1 Purpose
The purpose of this tender technical evaluation strategy is to define the Mandatory Evaluation Criteria,
Qualitative Evaluation Criteria and TET member responsibilities for tender technical evaluation. The
technical evaluation strategy serves as basis for the tender technical evaluation process.
2.1.2 Applicability
This document is applicable to Duvha Power Station
2.2 Normative/informative references
Parties using this document shall apply the most recent edition of the documents listed in the following
paragraphs.
2.2.1 Normative
[1] 240-168966153: Generation Tender Technical Evaluation Procedure
[2] 240-44682850: PCM - Provide Engineering During Project Sourcing
[3] 32-1033: Eskom Procurement and Supply Chain Management Policy
[4] [32-1034: Eskom Procurement and Supply Management Procedure
2.2.2 Informative
[1] Duvha Power Station Civil and Structures Maintenance 5 years contract scope for work
[2] TSC3 - Duvha Power Station Civil and Structures Maintenance 5 years contract at Duvha Power
Station
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Tender Technical Evaluation Strategy for Duvha Power Unique Identifier: 382-171223
Station Civil Construction Services 5 years Contract at Revision: 0
Duvha Power Station Page:
2.3 Definitions
2.3.1 Classification
Controlled Disclosure: Controlled Disclosure to external parties (either enforced by law, or discretionary).
2.4 Abbreviations
Abbreviation Description
OHS Act Occupational Health and Safety Act No
PPE Personal Protective Equipment
PS Power Station
PSR Plant Safety Regulations
QC Quality Control
QCP Quality Control Plan
QM Quality Management
SANS South African National Standards
SE System Engineer
SHEQ Safety, Health, Environment and Quality
2.5 Roles and responsibilities
As per 240-168966153 Generation Technical Tender Evaluation Procedure (Rev 1)
2.6 Process for monitoring
The primary process that shall be used for monitoring the application of this document is 240-168966153
Generation Technical Tender Evaluation Procedure (Rev 1).
2.7 Related/supporting documents
[1] 240-53716746: Tender Technical Evaluation Report Template
[2] 240-53716712: Tender Technical Evaluation Results Form Template
[3] 240-53716726: Tender Technical Evaluation Scoring Form Template
3.1 Technical evaluation threshold
A weighted score-card approach is used to evaluate the technical compliance of the tenders against the
specifications. Tenderers need to have a weighted score of 70% overall or more to technically qualify for
further evaluation.
The technical criteria and weighting are broken down as follows:
a) Technical: 100%
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Tender Technical Evaluation Strategy for Duvha Power Unique Identifier: 382-171223
Station Civil Construction Services 5 years Contract at Revision: 0
Duvha Power Station Page:
b) Safety Health Environmental and Quality (SHEQ): Objective
The SHEQ objective criteria are not included in this document as it does not form part of the technical
scope.
The evaluation of the tender submission will be based on the tenderer’s ability to meet the technical
requirements. A weighted score card approach will be used to evaluate the tender submission against
the specifications and Employer’s requirements.
Table 1: Technical Scoring Methodology
Score percentage (%) description
5 100 compliant
Important Dates
Source: Tender Documents.zip (RFP){"closingDate":"31 January 2025","closingTime":"10:00","briefingSession":"{"date":"31 January 2025","time":null,"venue":"ion meeting A non-compulsory clarification meeting with","is_compulsory":true}"}
Contact Information
Source: Tender Documents.zip (RFP){"name":"MS Teams","email":"[email protected]","phone":"0404929811","department":null,"address":"r which"}
Submission Guidelines
Source: Tender Documents.zip (RFP)Returnable Documents: C1.1 Form of Offer and Acceptance 3-5, C1.1 Form of Offer & Acceptance, This Offer may be accepted by the Employer by signing the Acceptance part of this Form of Offer
Evaluation Criteria
Source: Tender Documents.zip (RFP)Tenderers must be registered on the National Treasury Central Supplier Database (CSD). Tenderers must complete and submit Annexure A (Returnable Tender Document) and Annexure B (B-BBEE: B-BBEE affidavit or certificate; for exemptions, a sworn affidavit must be provided). Tenderers must also allow for the SDL&I (Skills Development Levy and Information) in the case of designated groups, as per Annexure B. Compliance with all applicable laws and regulations is required per the General Conditions of Contract.
Technical Specifications
Source: Tender Documents.zip (RFP)Supply Chain
Management Procedure 32-1034. Any addenda to an issued Invitation to Tender will be
published or issued in the same way as the Invitation to Tender was and will form part of the
Invitation to Tender documents.
Communication 1.5 Every communication between Eskom and a tenderer shall be made to or from the Eskom
Representative only, in w
Eskom and its subsidiaries will conduct business with respect and care for people to ensure that no
operating condition or urgency of service endangers the life of anyone or causes injury or damage
to the environment. Eskom is committed to preventing all work-related injuries. In fulfilling this
commitment to protect people, the environment and property, management will provide and
maintain a safe and healthy work environment, in accordance with industry standards and in
compliance with legislative requirements.
At-risk behaviour leads to incidents. Life-saving Rules are safety rules that have been created to
enforce zero tolerance for serious at-risk behaviours. These rules have been determined in terms
of the consequences of the behaviours they describe, that is, if a particular set of behaviours or
actions has a very high probability of causing disabilities or fatalities when performed.
The Eskom Life-saving Rules complement our existing safety best practices and are safety rules to
be followed at all locations.
The Life-saving Rules apply to all Eskom employees, agents, consultants, and contractors. Visitors
to Eskom should also respect and adhere to these rules as applicable and could be instructed to
leave the Eskom premises with immediate effect should they refuse to do so.
2.1 Scope
This standard shall apply at all Eskom sites with the intention to promote a safe working
environment for all Eskom employees, agents, consultants, and contractors. Visitors to Eskom
should also respect and adhere to these rules, as applicable.
2.1.1 Purpose
This standard clarifies the five most prominent causes of serious injuries and fatalities within
Eskom, and Eskom’s intention to enforce “ZERO TOLERANCE” with respect to non-adherence to
these rules, due to the potential consequences of serious injury or fatality at the workplace.
2.1.2 Applicability
This standard shall apply throughout Eskom Holdings SOC Limited, its divisions, subsidiaries, and
entities wherein Eskom has a controlling interest and/or Eskom contractors, unless specifically
exempted by Sustainability Systems, where the business transacted may be of a completely
different nature to the core business of Eskom.
2.1.3 Effective date
This document will be effective from the date of authorisation.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] ISO 9001 Quality Management Systems
[2] 32-37: Substance Abuse Procedure
[3] 32-95: Environmental, Occupational Health and Safety Incident Management Procedure
[4] 32-136 Contractor Health and Safety Requirements
[5] 32-345 Eskom Vehicle Safety Specification
[6] 32-407 Behavioural Safety Observations
[7] 32-418: Working at Heights Standard
[8] 32-477 Safety, Health and Environment Training and Development Procedure
[9] 32-520 Occupational Health and Safety Risk Assessment Procedure
[10] 32-524 Developing a SHE Specification
[11] 36-681: Plant Safety Regulations
[12] 32-726 SHE requirements for Eskom Commercial Process
[13] 32-727: Safety, Health, Environment and Quality Policy
[14] 32-848: Operating Regulations for High Voltage Systems
[15] 32-1112: Disciplinary Code
[16] 32-1113: Disciplinary Procedure
[17] 240-44175132 Eskom Personal Protective Equipment Specification
[18] 240-62946386: Vehicle and Driver Safety Management Procedure
[19] 240-43848327: Right to Refuse Employees’ Right of Refusal to Work in an Unsafe Situation
Procedure
[20] 240-84733329: Medical Surveillance Procedure
[21] 240-100979499 Personal Protective Equipment for Working at Heights Specification
2.2.2 Informative
[22] National Road Traffic Act
[23] Occupational Health and Safety Act
[24] 34-104 Earthing Standard
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
2.3 Definitions
2.3.1 Contractor: Any person (juristic/individual) formally contracted (directly or indirectly) by
Eskom and who performs work; supplies a service, product, equipment or material for the
purposes of advancing Eskom’s business and other interests. This includes consultants,
and third party contractors i.e. vendors, suppliers, agents, joint ventures, fixed term
contractors, principal contractors and subcontractors.
2.3.2 Life-saving Rule: Rules that, if not adhered to, have the potential to cause serious harm to
people. The consequences of a person knowingly and wilfully violating this rule will result in
a disciplinary process in accordance with the Eskom Disciplinary Code and Procedure.
2.3.3 Visitors: Any person who visits an Eskom site/office during working hours to attend a
meeting or for any reason whatsoever. This could include a minor.
2.3.4 Work at height: Means any work performed above a stable work surface or where a
person puts himself/herself in a position where he/she exposes himself/herself to a fall from
or into. Work at height is, as a result, work in any place (except a staircase in a permanent
workplace ), including a place at, above or below ground level, where a person could be
injured if he/she fell from that place. Access and egress that present a risk of fall can also
be classified as work at height.
2.3.5 Zero Tolerance: The standard that provides for the imposition of severe consequences for
a proscribed offence or behaviour without making exceptions for the extenuating
circumstances.
2.4 Abbreviations
Abbreviation Explanation
OHS Occupational Health and Safety
ORHVS Operational Regulations for High Voltage Systems
PPE Personal Protective Equipment
PSR Plant Safety Regulations
PTW Permit to Work
SHEQ Safety, health, environment and quality
2.5 Roles and Responsibilities
2.5.1 Sustainability Systems Department
The sustainability Systems Department shall:
a) Compile and review the Life-saving Rules for Occupational Health and Safety;
b) Develop awareness material;
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
c) Ensure that the rules are communicated throughout the business;
d) Ensure compliance is monitored; and
e) Ensure that violations and sanctions are consolidated and communicated by Sustainability
Systems to the organisation.
2.5.2 All Groups/Divisions/Operating Units/Business Units
The management at Group/Divisional/Operating Unit/Business Unit level shall be responsible for:
a) Implementing the Eskom Life-saving Rules in their Groups/Divisions/Operating
Units/Business Units.
b) Communicating to all their employees, contractors, contractor employees and visitors the
importance of compliance with the Eskom Life-saving Rules and the consequences of non-
compliance therewith. This includes communicating Life-saving Rules to all new
employees and new contractors.
c) Ensuring that the awareness material is made available, distributed and displayed at all
units.
d) Ensuring all employees sign confirmation that the rules have been discussed with them,
that they understand the rules and the consequences of violating these rules, and retain
copies thereof.
e) Investigating any violation of a Life-saving rule and initiate the disciplinary process within
five (5) working days.
f) Ensuring consistency in the application of appropriate sanctions on employees, contractors
and contractor employees.
2.5.3 All employees (Eskom and contractors)
a) Always observe and adhere to the Life-saving Rules.
b) Avoid taking shortcuts when executing tasks. Always do the right thing even when no-one
is watching.
c) Only perform work that you are authorised to do.
d) All employees to exercise the right to refuse to perform work in an unsafe situation, or when
required to ignore a Life-saving rule.
2.6 Process for Monitoring
Groups/Divisions/Operating Units/Business units are responsible for ensuring the understanding
of, and compliance with, Life-saving Rules. Line management shall monitor compliance and report
on analysis and trending through performance reporting. The amendments to the revised standard
shall be implemented with immediate effect and may be audited after a period of six (6) months
from date of implementation.
2.7 Related/Supporting Documents
[1] 240-62196227 - Life-saving Rules – revision 5 (superseded).
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
[2] 240–63942960 - Life-saving Rule Acknowledgement Form Document Content.
Life-saving Rules are safety rules that, if not adhered to, have the potential to cause serious harm
to people. The consequences of a person knowingly and wilfully violating these rules will result in a
disciplinary process in accordance with the Eskom Disciplinary Code and Procedure.
The objective of this standard is to clarify Eskom’s intention to enforce “ZERO TOLERANCE” with
respect to behaviour resulting in serious risk to an individual at the workplace.
It must be noted that the content of this standard does not detract from the requirements for safe
behaviour for all other work-related activities or other safety requirements, but emphasises the
importance thereof.
3.1 Eskom Life-Saving Rules
3.1.1 Rule 1: open, isolate, test, earth, bond, and/or insulate before
Touch
With the aim to ensure a safe electrical work environment, no person may work/operate on, around
or near any electrical network, line or apparatus, electrically connected to the power system and/or
electrically charged and/or not electrically charged unless:
a) He/she is trained and authorised as competent for the task to be done;
b) There is a valid permit to work, where required;
c) A pre-task risk assessment to identify all risks and hazards has been conducted prior to any
work commencing;
d) He/she follows the requirements on OPEN, ISOLATE, TEST, EARTH, BOND and/or
INSULATE BEFORE TOUCH, correctly based on applicable/related standards, procedures
and outcome of risk assessment fit for the type of work or task to be performed;
e) The authorised person (team leader) has certified and physically shown all team members that
the apparatus is safe to work on;
f) He/she makes the specific electrical environment safe prior to performing the work; and
g) All the appropriate PPE (including face shield and insulated gloves for low voltage work) are
worn.
3.1.2 Rule 2: hook up at heights
Working at height is a significant part of work in Eskom Holdings and is regarded as a high-risk
activity, and as a result all precautions must be taken to prevent incidents while working at height.
Wherever reasonably practicable, preference must be given to the performance of work at ground
level as opposed to work in an elevated position. Where work in an elevated position is necessary,
the requirements in this document shall apply.
No person may work at height where there is a risk of falling unless:
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
a) He/she is medically fit to work at height;
b) A pre-task risk assessment to identify all risks and hazards has been conducted prior to
commencing any work of this nature;
c) He/she is appropriately trained as determined by the risk assessment;
d) He/she is appropriately secured during ascending and descending; and
e) He/she is using an Eskom approved fall arrest system where applicable.
3.1.3 Rule 3: buckle up
Where required, the proper wearing of seat belts for any driver, operator and passenger is
mandatory in all vehicles/equipment when driving and/or travelling for Eskom business purposes.
The driver is obligated to ensure that he/she as well as all passengers are properly seated and
wearing their seatbelts at all times while being transported in the vehicle, as per Eskom
specifications.
Note: This rule is applicable on any road or parking lot, irrespective of the speed, and when the
vehicle moves in a forward or backward direction.
3.1.4 Rule 4: be sober
No person who is under the influence or who appears to be under the influence of intoxicating
liquor or drugs will be permitted to enter, or remain on an Eskom site or conduct Eskom business
or drive/operate a vehicle/equipment for Eskom business purposes.
This includes any level of alcohol or the presence of any drugs, controlled substances, and/or
illegal substances in the body that impairs or could impair mental and physical functioning,
irrespective of when the substance was used.
3.1.5 Rule 5: ensure that you have a permit to work
Where an authorisation limitation exists, no person shall work without the required Permit to Work
(PTW), which is governed by for example the:
a) Plant Safety Regulations; or
b) Operating Regulations for High Voltage Systems (ORHVS); or
c) Any other activity where a permit is required.
No plant is to be returned to service without the cancellation of all permits on that plant in
accordance with procedure, unless permission is granted for a particular plant to be returned to
service with permits still open, like in the case of redundant systems.
NOTE: In the case of live work, a “live work declaration form” is to be completed by the authorised
person, who is the person responsible for the safe execution of work according to relevant
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
standards and procedures. Outline the key principles or rules to support the implementation of the
standard statement.
3.2 Consequences of violating a Life-Saving Rule
In terms of general health and safety in Eskom, if any of the Life-saving Rules are violated, it will
be treated as a serious misconduct, and result in a disciplinary process in accordance with the
Eskom Disciplinary Code and Procedure.
It must be highlighted that Eskom takes a ZERO TOLERANCE stance to violation of these rules.
Depending on the circumstances, Eskom reserves the right, where a contractor
manager/supervisor allows the violation of a Life-saving Rule, to suspend the contractor’s activities
while determining an appropriate sanction.
In the light of a contractor employee allegedly violating a Life-saving Rule, the contractor shall
immediately remove the employee from site and initiate the disciplinary process. The contractor
shall investigate any violation of a Life-saving Rule and initiate the disciplinary process within five
(5) working days of the violation. The contractor shall after the disciplinary process furnish Eskom
with a copy of the sanction.
This document has been seen and approved by:
Name Designation
Thava Govender Group Executive – Generation and (Acting) Risk and Sustainability
Divisions
Kerseri Pather General Manager – Sustainability Systems
Jace Naidoo Senior Manager – Sustainability Systems – OHS
Alex Stramrood Senior Manager – Sustainability Systems – OHS
Risk and Sustainability Members of the Risk and Sustainability Management Committee
Management Committee
HR Policies and Procedures Members of the HR Policies and Procedures Committee
Committee
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
Date Rev. Compiler Remarks
January 2017 6 A Stramrood Substituted the words “Disciplinary
hearing” with Disciplinary process.
Updated the Purpose and
Applicability to specify that this
Standard is applicable to
contractors. Updated Normative
and Informative References.
Updated Definition section by
removing Agent and Consultant as
these have been incorporated into
the definition of Contractor.
Updated the definition of Work at
Height and Zero Tolerance.
Reviewed and updated the Roles
and Responsibilities section and
Process for Monitoring. Added
permit requirement to Rule 1,
updated Rule 2 - Removed the
words “psychologically fit to work”
as this is no longer a requirement
in terms of the Construction
Regulations, 2014 and updated
Rule 3 – Removed the words “(for
example transporting people on
the back of trucks in a cabin)”
Updated Consequences of
violating a Life-saving Rule with
regard to contractors.
October 2015 5 A Stramrood Revision date needed to be
extended. Content still valid and
same.
May 2012 4 S Govender Amended Section 3.6
Consequences of Violating a Life-
saving Rule to align with EXCO
decision.
March 2013 3 S Govender Changed Cardinal Rules to Life-
saving Rules, and amended
content to ensure better
understanding of the intent and
requirements.
September 2010 2 K Terblanche Content of Rev 1 was incorporated
into the new Policy template.
Content was revised and updated.
December 2008 1 K Terblanche Annexure 1: Acknowledgement of
Eskom Life-saving Rules of this
document was removed. The
references made to Annexure 1 in
paragraphs 3.5.2 and 3.8 were
also removed.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
Date Rev. Compiler Remarks
August 2008 0 K Terblanche The document with reference
number 32-421 was developed
and approved.
The following people were involved in the development of this document:
Alex Stramrood
Kerseri Pather
Loraine Smit
Marc Lebea
Mike Townsend
Nosipho Noveve
Sheryl Isaacs
Sivi Govender
SN Middel
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
1.1 Scope
The Eskom Supplier Integrity Pact (Integrity Pact) is applicable to Eskom Holdings SOC Ltd (including all
wholly owned subsidiaries) and all existing and potential suppliers (as per the definition hereunder).
1.2 Purpose
The integrity pact is a pact between Eskom and its suppliers that prescribes the “ethical behaviour”. Ethical
behaviour is desirable/acceptable conduct (actions and decisions) that will bring about good/appropriate
consequences/outcomes in the interaction with others. Ethical behaviour incorporates ethical values and
considers not only what is good for oneself, but also what is good for others. Eskom considers such behaviour
of paramount importance and expects every existing/potential supplier and its own employees/directors to
always act ethically and with integrity.
Eskom commits to ensuring that it implements a procurement policy/procedure that aligns to all applicable
South African laws and regulations, as well as the constitutional principles of fairness, transparency, equity,
cost effectiveness and competitiveness.
This document supplements all other relevant Commercial and Ethics related policies/codes/procedures.
1.3 Preamble
In order to achieve this purpose, all Eskom suppliers are required to read this Integrity Pact and to complete,
sign and submit the Integrity Declaration Form whenever they participate in any Eskom procurement process.
Eskom and its suppliers commit to honouring their respective obligations herein, and agree to refrain from
any form of dishonesty, fraud, and/or corruption throughout the entire procurement process, including
tendering practices that are in bad faith, unfair and anti-competitive (e.g., under-pricing/collusion/bid rigging)
Term Definition
Conflict of Interest A conflict of interest arises when one’s personal interests, personal
financial interests or any other interests, affect, or could be perceived to
affect, or has the potential to affect one’s objectivity and discretion and/or
the objectivity and discretion of another in performing Eskom duties or
making decisions on behalf of Eskom. This means that an employee or
director is in a position to make a decision (or influences a decision) that
is not fair and objective in order to benefit personally, or to benefit related
and /or inter-related persons.
Director Means a member of the board of Eskom, or a board of its subsidiary or
an alternate director of such board and includes a person occupying the
position of a director, by whatever name designated, or a prescribed
officer, or a person who is a member of a committee of the board or of
the audit committee, irrespective of whether the person is also a member
of such board.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Supplier Integrity Pact Unique Identifier: 240-113650212
Revision: 2
Page:
Employment equity The Employment Equity Act promotes equity in the workplace,
ensures that all employees receive equal opportunities and that
employees are treated fairly by their employers. The law protects a
person from unfair treatment and any form of discrimination.
Employee (s) Also referred to as staff members. These include individuals employed
by Eskom on a permanent basis, contract labour, temporary employees,
part-time employees, casual employees, occasional employees, fixed-
term contractors, learners, and others acting on behalf of Eskom or its
subsidiaries.
Eskom Registered Vendor Means a current or potential supplier who may be a natural or juristic
person and includes any employee of such supplier acting within the
course and scope of his/her employment, or any agent or manager acting
for or on behalf of, or in the interests of the supplier registered as a vendor
on the Eskom Vendor Database.
Supplier Means any natural person or juristic person that does business with
Eskom or tenders to do business with Eskom, or is registered on Eskom’s
Vendor Database, such as consultants, contractors, sub-contractors and
providers of goods and services.
Abbreviation Explanation
DOI Declaration of Interest
ETC EXCO Tender Committee
NDA Non-disclosure agreement
RFP Request for Proposal
RFQ Request for Quotation
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Supplier Integrity Pact Unique Identifier: 240-113650212
Revision: 2
Page:
4.1 Eskom’s suppliers accept that they will at all times:
4.1.1 Maintain an impeachable standard of integrity in all their business and personal dealings and take all
reasonable measures necessary to prevent all dishonest, unfair, fraudulent, corrupt, and illegal
practices during any stage of the Eskom procurement process including the execution of contracts
and contract modifications.
4.1.2 Ensure that they are familiar with all publicly available Eskom policies/ procedures/codes that impact
the supply chain processes including, but not limited to Eskom’s Standard Conditions of Tender.
4.1.3 Reject all improper business practices (as may be prohibited by Eskom).
4.1.4 Not abuse the trust placed in them by Eskom employees, or misuse opportunities arising during their
interaction with Eskom for personal gain.
4.1.5 Seek to constantly maintain and enhance their standards of professional competence.
4.1.6 Adopt, where possible, policies and practices which align with those of Eskom (labour practices,
employment equity initiatives and human relations policies) to the highest ethical standards.
4.2 Eskom’s suppliers confirm specifically that:
4.2.1 All confidential information, to which they may have access in the course of their work, must not be
disclosed without the express consent from the authorised Eskom representative. The supplier is
required to complete a Non-Disclosure Agreement (NDA) to give effect to this.
4.2.2 They will not deliberately misrepresent information, submit false certifications or forged documents to
influence the tendering process to advantage themselves or to mislead Eskom in any way and that
Eskom has the right to request an audit of such information, and take further action against the supplier
should it be found that it has acted in a dishonest or fraudulent manner.
4.2.3 Although the establishment of long term and close relations between Eskom and its suppliers is
recognised, Suppliers are nevertheless, required to avoid relationships with Eskom
employees//directors, that may be perceived to be contrary to the constitutional principles of fairness,
equitability, transparency, competitiveness, and cost effectiveness. Suppliers are therefore required
to complete the Integrity declaration form wherein they are required to disclose any interest that they
may have with an Eskom employee/director, whether financial, personal, or private, in its business,
and/or any affiliation /relationship which affects, or may affect, or may be perceived to affect, the
decision-making during tender award. Should a supplier later become aware that its
owners/members/directors/partners/shareholders are an Eskom employee/director with respect to a
tender in which it participated, the supplier is required to disclose the interest/relationship to Eskom
and submit whatever information may be required regarding the parties involved.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Supplier Integrity Pact Unique Identifier: 240-113650212
Revision: 2
Page:
4.2.4 Although the entertainment of customers and provisions of business courtesies or gifts are generally
an accepted commercial practice, they must not in any way negatively affect Eskom’s image and
reputation. They should not exceed the R1500,00 value prescribed by Eskom and should not be of
such a nature (value or circumstances) as to be construed as placing an Eskom employee/director
under obligation to the supplier or in any way improperly influence the recipient.
4.2.5 They will avoid entering into unethical and/or fraudulent dealings with any Eskom employee/director
involved in the evaluation/adjudication/negotiation of a transaction in which it participates, involving
direct/indirect monetary or material benefits in order to be unfairly benefitted. In such circumstances,
no business courtesy, bribe, gift, fees commission or inducement may be offered to, or requested by
an Eskom employee/director involved in the evaluation/adjudication/negotiation of a transaction in
which the supplier is participating.
4.2.6 They will not enter any dishonest and/or illegal agreement or an understanding with other tenderers
involved in a tender/RFP process in which it participates. They will complete the integrity Declaration
Form which incorporates a Declaration of Fair Tendering Practices, when participating in any Eskom
tender/Request for Quotation (RFQ).
4.2.7 They understand that they may be subject to a supplier discipline process and that sanctions that
may be imposed on suppliers should they be found guilty of misconduct.
4.2.8 Should a supplier become aware of any dishonest, fraudulent or inappropriate behaviour of any Eskom
employee/director; the said supplier is required to report this behaviour to the Eskom Ethics office via
email at [email protected], or via the Eskom Forensic email at [email protected] or through
the Eskom toll free hotline 0800 11 27 22, wherein confidentiality is guaranteed.
5.1 Eskom undertakes to treat all tenderers during the tender process according to the constitutional
principles of fairness, transparency, equity, cost-effectiveness, and competitiveness.
5.2 All Eskom employees/directors are required to complete an annual Declaration of Interest (DOI),
wherein they are required to declare all interests, directorships, memberships, details of any of their
related or inter-related persons or other associates that conduct business with Eskom and all other
material personal interests, whether a conflict exists or not. During the financial year, all Eskom
employees/directors have an option of amending annual DOIs should there be changes in their
interests or what has been disclosed already. In addition to this annual declaration, employees are also
required to complete an additional DOI and NDA if involved in the procurement process.
5.3 Eskom employees will ensure that all gifts received in the normal course of business is declared,
recorded, and authorised by relevant managers. Employees/directors involved in the tender evaluation/
negotiation process, may not accept, demand, or accept a promise of any money, business courtesies,
gifts, rewards, gratuity, favours from any of the tenderers involved to benefit or as may be perceived to
benefit such tenderer. Further to this, employees and directors are prohibited from offering or accepting
loan(s) or other benefit(s) from suppliers, unless the supplier is in the business of granting such loans
or benefits and the terms and conditions of the loan that is offered to the employee/director is also
offered to the general members of the public or a section thereof.
5.4 Should Eskom become aware of any relationship/interest of any employee/director in a tender in which
it is involved in tender evaluation/negotiation process, then this employee/director will be excluded from
the said tender evaluation/negotiation process.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Supplier Integrity Pact Unique Identifier: 240-113650212
Revision: 2
Page:
5.5 Eskom will implement the Supplier Discipline Process if it becomes aware of any contravention of the
provisions of this integrity pact, any other misconduct by a supplier and/or any Eskom
employee/director who acts in bad faith to benefit themselves or a supplier. Eskom has the right, after
following a process of investigation and affording the supplier an opportunity to make representation,
to notify the supplier of the intention to suspend it from the Eskom Vendor Database, impose various
other sanctions and/or institute disciplinary actions against its employees/directors. Subsequently,
Eskom will forward the names of such suppliers including the directors of the company to National
Treasury, who will include the suppliers on the List of Restricted Suppliers on the National Database.
5.6 All Eskom employees/directors are prohibited from having any direct/ indirect personal or other
beneficial interest in any contract with Eskom, whether as a supplier, an advisor or by virtue of being a
director or owner of a business, or in any other capacity. This includes third-party related transactions
with an indirect link to an Eskom contract.
6.1 This Eskom Supplier Integrity Pact is governed by and interpreted in accordance with the laws,
regulations and legislation of the Republic of South Africa.
6.2 The actions stipulated in this Integrity Pact are without prejudice to any other civil or criminal
proceedings that may arise in accordance with the provisions of the law.
6.3 This Integrity Pact shall remain valid until replaced. Should one or more provisions of this Integrity
Pact be regarded as invalid, remainder of the provisions will remain valid.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Annexure Attached (Y /
N / n/a)
1.1.1 *Authorisation Form Annexure A Y
1.1.2 *Acknowledgement form Annexure B Y
1.1.3 *Tenderer’s particulars Annexure C Y
1.1.4 *Integrity Declaration Form Annexure D Y
(refer to www.eskom.co.za for the Supplier Integrity
Pact that suppliers are required to download and read)
1.1.5 *CPA Requirements for Local Goods/Services Annexure E Y
1.1.6 *CPA(IG) for Foreign Goods/Services (if applicable) Annexure F Y
1.1.7 SBD 6.2 Declaration Certificate for Local Production Annexure G1 Y
and Local Content
(only applicable if designated materials are
included and then Tenderers will be required to
complete and submit Annexures F1 to F4 as
evidence of compliance with this requirement).
Annexure C Local Content Declaration- Summary
Schedule Annexure G2 N
Annexure D Imported Content Declaration –
Supporting Schedule to Annexure C Annexure G3 N
Annexure E Local Content Declaration- Supporting
Schedule to Annexure C Annexure G4 N
1.1.8 *SBD 1 Invitation to Bid must be filled out by all Annexure H Y
tenderers and submitted with the tender at tender
submission deadline
1.1.9 *SBD 6.1 Preference Points Claim Form in terms of Annexure I Y
Pppf
provisions of this Agreement for any
purpose whatsoever other than the Project
The Fourth Schedule to the Income Tax Act (“the Act”) requires that Employees' Tax must be
withheld from "remuneration" paid by an "Employer" to an "Employee". This tool is intended to establish
whether an Individual, Close Corporation, Company or Trust should be classified as an Independent
Contractor, Personal Service Provider, Labour Broker or a Dependent Contractor, and the tax
consequences of such classification.
This Pack is applicable ONLY to Contractors who supply Eskom Holdings SOC Ltd (“Eskom”) and its
subsidiaries with services or Individual Contractors providing Eskom with labour.
The Contractor or its duly authorised representative must declare that all questions have been answered
truthfully.
Answering the questions will direct you to your next step.
Please note:
This Pack is based on tax legislation for the 2023/2024 tax year and is subject to change.
In the questions, any references to "you" refers to the Contractor.
In the questions, the term Contractor is used interchangeably with Individual/CC/Company/Trust.
Definitions as per the Income Tax Act are included in Appendix 10.
Any reference to “Eskom” refers to Eskom Holdings SOC Ltd and its subsidiaries:
Eskom Rotek Industries SOC Ltd
Eskom Enterprises SOC (Pty) Ltd
Escap SOC (Pty) Ltd
Eskom Finance Company SOC (Pty) Ltd
Eskom Foundation NPC
National Transmission Company SA
The Pack is based on legislation and case law applicable to the 2023/2024 tax year. We therefore
recommend that, if it is used outside of this period, you should first consult with your representative in
Eskom to refer it to Eskom’s Corporate Tax Department in Megawatt Park.
When you return the completed Pack; i.e. the signed summary sheet and signed affidavits to Eskom,
please copy Group Tax on Email address: [email protected]
The Contractor or its duly Authorised Representative acknowledges and accepts that:
ease of reading.
this Pack;
Disclaimer
Applicable to the 2023/2024 Tax Years
Eskom accepts no liability whatsoever for any loss or damages whatsoever and howsoever incurred, or
suffered, resulting, or arising, from the use of this Pack.
Contractor type
Supplier category
Please complete the following questionnaire for:
Company/Close Corporation/Trusts - EVALUATION PACK A on .
Individuals - EVALUATION PACK B on .
Applicable to the 2023/2024 Tax Years
Evaluation pack a
(To determine whether a Company, Close Corporation (CC) or Trust is a Personal
Service Provider)
Fields marked with an Asterisk (*) must be completed
Contractor’s details for a company or close corporation or
Trust
Contractor’s Name* Vendor No.
Duly Authorised Representative Name Representative Surname
Capacity Representative ID No.*
Representative Passport No. (if no RSA ID) Country of Passport Issue
VAT Registration No. Income Tax Registration No.*
CO/CC/Trust Registration No.* E-Mail Address
Telephone Number* Fax Number
Contractor’s Physical Business Address*
Unit No
Complex Name
Street Number
Street Name
Suburb
City/Town
Postal Code
Contractor’s Postal Business Address*
Same as above (Mark with an X)
Address TYPE (Delete where not applicable) P O Box/Private Bag/Street Address
P O Box/Private Bag/Street NUMBER
Street Name
Suburb
Town
Postal Code
Contractor’s Bank Details*
Account Number Bank Name
Branch Name Branch Number
Name of Account Holder Account Type (Delete where not applicable)
Current/ Savings/ Transmission/Credit Card/Bond
Account
Account Holder Relationship*
i.e. own, joint or 3rd party Own/Joint/3rd Party
Applicable to the 2023/2024 Tax Years
Please answer the following questions by marking the appropriate column with an
"X".
The term “You” will refer to the Company/CC/Trust in this Questionnaire.
Question 1(i)
Are you a Resident of the Republic of South Africa in terms of the Income Tax Act?
(Refer to Appendix 10 for the definition of a resident).
If the answer is Yes, go to Question 2(i).
If the answer is No:
Eskom to refer it to Eskom Group Tax Department in Megawatt Park.
Question 2(i)
Do you employ 3 (three) or more persons (excluding shareholders or members or
beneficiaries of the Company/CC/Trust)?
If the answer is Yes, go to Question 2(ii).
If the answer is No, go to Question 3(i).
Question 2(ii)
Are these employees employed:
If the answer is Yes, go to Question 2(iii).
If the answer is No, go to Question 3(i).
Question 2(iii)
Are the above 3 employees connected to the shareholders or the members or the
beneficiaries of the Company/CC/Trust?
If the answer is Yes, go to Question 3(i).
If the answer is No:
from your payments.
from your payments.
Corporation/Trust” at the end of the Evaluation Pack.
Applicable to the 2023/2024 Tax Years
Question 3(i)
Will/are any person who is a Connected person in relation to the Company/CC/Trust
render services personally to Eskom on behalf of the Company/CC/Trust? (Refer to
Appendix 10 for the definition of a Connected person).
If the answer is Yes, go to Question 4(i).
If the answer is No:
from your payments.
from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Question 4(i)
During the current year of assessment:
received either directly or indirectly, from:
the definition of an Associated institution)
If the answer is Yes:
Corporation/Trust” at the end of the evaluation Pack.
If the answer is No:
from your payments.
Question 5(i)
Must your duties be performed /are your duties performed mainly (more than 50%) at
the premises of Eskom,
And
Will you be subject /are you subject to Eskom’s control or supervision as to the
manner in which your duties are to be performed?
If the answer is Yes to BOTH questions:
Corporation/Trust” at the end of the evaluation Pack.
If the answer is No:
from your payments.
Applicable to the 2023/2024 Tax Years
Question 6(i)
Do/will the payments by Eskom for services payable with reference to output or
certain agreed results, e.g. payment (be it a fixed fee or an hourly rate) be only due if
and when a specific deliverable has been completed?
Question 6(ii)
Does/Will Eskom have the contractual right to control the tools or equipment, staff,
raw materials, routines, patents or technology used in the provision of the services?
Question 6(iii)
Are you/will you prohibited from rendering services to any other employers/clients
during the period of service to Eskom?
Question 6(iv)
Do/will you have the right to sub-contract work?
Question 6(v)
Are you personally or will you personally be at risk for the quality of the work done or
to be done (risk for poor quality; time over-runs, project not producing income)?
Question 6(vi)
Are/will you or the person rendering the service be obliged to be present and perform
the work at Eskom regardless of whether work is available or not?
Question 6(vii)
Is Eskom’s business or will Eskom’s business be critical to your financial/economic
survival?
Question 6(viii)
Does/will your position form part of Eskom’s organisational structure?
Question 6(ix)
Does/will Eskom provide you with any of the following:
Question 6(x)
Does/will Eskom provide you with an office?
Question 6(xi)
Does/will Eskom provide you with any equipment, tools, stationery and material?
Please go to the next section to establish your tax status.
Applicable to the 2023/2024 Tax Years
To establish your tax status, you need to summarise the “Yes” and “No” as
answered on Question 6(i) to 6(xi) in the column below:
Question Yes No
6(i) Independent PSP
6(ii) PSP Independent
6(iii) PSP Independent
6(iv) Independent PSP
6(v) Independent PSP
6(vi) PSP Independent
6(vii) PSP Independent
6(viii) PSP Independent
6(ix) PSP Independent
6(x) PSP Independent
6(xi) PSP Independent
Decision
Independent
Psp
If you have answered “PSP” to any of the following questions 6 (i), 6(iii), 6(v), 6(vi),
6(ix);
or
If you have answered more than 50% “PSP” to questions 6(ii), 6(iv), 6(vii), 6(viii),
6(x), 6(xi):
and will be coded as 3601 on your IRP5 certificate.
Corporation/Trust” at the end of the evaluation Pack.
Alternatively:
If you have already signed Appendix 7 on Questions 4 or 5:
disclosed on the IRP5 for payments received.
If you have not signed Appendix 7 on Questions 4 or 5:
from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Applicable to the 2023/2024 Tax Years
Summary for ID No. Vendor No:
Company/Close Corporation/Trust Summary
Please sign
he
following
Questions Answer Appendix
(Appendices
)
1(i) Are you a Resident of the Republic of South Africa in terms of the Income
Tax Act?
2(i) Do you employ 3 (three) or more persons (excluding shareholders or
members or beneficiaries of the Company/CC/Trust and connected
persons in relation to the shareholder or member or beneficiaries)?
2(i ) Are these employees employed on a full time basis and are they engaged
in the business of the Company/CC/Trust?
2(iii) Are the above 3 employees connected to the shareholders or the members
or beneficiaries of the Company/CC/Trust?
3(i) Will/are any person who is a Connected person in relation to the
Company/CC/Trust render services personally to Eskom on behalf of the
Compa y/CC Trust?
4(i) During the current year of assessment will more than 80% of your income
or is it likely that more than 80% of your income will consist of amounts
received either directly or indirectly from any one client, or an Associated
institution in relation to that client?
5(i) Must your duties be performed / are your duties performed mainly (more
than 50%) at the premises of Eskom AND will you be /are you subject to
Eskom’s control or supervision as to the manner in which your duties are
performed or to the hours of work?
6( ) Do/will the payments by Eskom for services payable with reference to
output or certain agreed results, e.g. payment (be a fixed fee or an hourly
rate) be only due if and when a specific deliverable has been completed?
6(ii) Does/Will Eskom have the contractual right to control the tools or
equipment, staff, raw materials, routines, patents or technology used in the
provision of the services?
6(iii) Are you/will you prohibited from rendering services to any other
employers/clients during the period of service to Eskom?
6(iv) Do/will you have the right to sub-contract work?
6(v) Are you personally or will you personally be at risk for the quality of the
work done or to be done (risk for poor quality; time over-runs, project not
producing income)?
6(vi) Are/will you or the person rendering the service be obliged to be present
and perform the work at Eskom regardless of whether work is available or
not?
6(vii) Is Eskom’s business or will Eskom’s business be critical to your
financial/economic survival?
6(viii) Does/will your position form part of Eskom’s organisational structure?
6(ix) Does/will Eskom provide you with any of the following:
Pension fund / Provident fund / Retirement Annuity Fund; medical aid,
leave of any nature, salary increases, bonuses or any allowances.
6(x) Does/will Eskom provide you with an office?
6(xi) Does/will Eskom provide you with any equipment, tools, stationery and
material?
Tax Status
Particulars of person acting as representative of the company/close
Corporation/trust
I, the undersigned, confirm that the information provided above is accurate, and that the Company/CC/Trust will,
while contracted to Eskom, inform Eskom of any changes that take place pertaining to the information provided
above. Eskom shall be entitled to withhold from any payments to be made to the Company/CC/Trust, any taxes,
interest and penalties that it may be required to pay to SARS as a result of the above information being inaccurate.
Representative's Full Names Capacity Contact No.
Signature Date
Applicable to the 2023/2024 Tax Years
Evaluation pack b
(To determine whether an Individual is a Dependent Contractor)
Fields marked with an Asterisk (*) must be completed
Contractor’s details for an individual*
Trading Name* Vendor No.
First Names* Initials*
Surname* ID Number*
Passport No. (if no RSA ID) Country of Passport Issue
VAT Registration No. Income Tax Registration No.*
Date of Birth* E-Mail Address
Telephone Number* Fax Number
Contractor’s Physical Business Address*
Unit No
Complex Name
Street Number
Street Name
Suburb
City/Town
Postal Code
Contractor’s Postal Business Address*
Same as above (Mark with an X)
Address TYPE (Delete where not applicable) P O Box/Private Bag/Street Address
P O Box/Private Bag/Street NUMBER
Street Name
Suburb
Town
Postal Code
Contractor’s Bank Details*
Account Number Bank Name
Branch Name Branch Number
Name of Account Holder Account Type (Delete where not applicable)
Current/ Savings/ Transmission/Credit Card/Bond
Account
Account Holder Relationship*
i.e. own, joint or 3rd party Own/Joint/3rd Party
Applicable to the 2023/2024 Tax Years
Please answer the following questions by marking the appropriate column with an
"X".
Question 1(i)
Do/will you provide Eskom with a service or people?
If the answer is “Service”:
PAYE will be withheld from your payments.
If the answer is “People”, go to Question 2(i).
Question 2(i)
Do you provide Eskom with People and will these people be paid by you?
If the answer is Yes, go to Question 2(ii).
If the answer is No, go to Question 3(i).
Question 2(ii)
Are you in possession of an IRP30 exemption certificate which is valid for the period
under review?
If the answer is Yes:
from your payments.
provided, PAYE will be withheld from your payments until such time
the IRP30 certificate is provided.
Pack.
If the answer is No:
IRP30 certificate is provided.
Pack.
Question 3(i)
Are you a Resident of the Republic of South Africa in terms of the Income Tax Act?
(Refer to Appendix 10 for the definition of a Resident).
If the answer is Yes, go to Question 4(i).
If the answer is No:
Eskom to refer it to Eskom Group Tax Department in Megawatt.
Applicable to the 2023/2024 Tax Years
Question 4(i)
Do you employ:
If the answer is Yes, go to Question 4(ii).
If the answer is No, go to Question 5(i).
Question 4(ii)
Are these employees employed:
If the answer is Yes, go to Question 4(iii).
If the answer is No, go to Question 5(i).
Question 4(iii)
Are any of these employees Connected persons in respect of the Individual, e.g.
spouse, parent, adoptive parent, child, grandparent, cousin, etc.? (Refer to
Appendix 10 for the definition of Connected person).
If the answer is Yes, go to Question 5(i).
If the answer is No:
from your payments.
withheld from your payments.
Pack.
Question 5(i)
Must your duties be performed mainly (i.e. more than 50%) at premises of Eskom?
If the answer is Yes, go to Question 5(ii).
If the answer is No, go to Question 5(ii).
Question 5(ii)
Will you be /are you subject to Eskom’s control or supervision as to the manner in
which your duties are to be performed or as to the hours of work?
If the answers in both Questions 5(1) and 5(ii) are Yes:
If the answer is No:
from your payments.
Applicable to the 2023/2024 Tax Years
Question 6(i)
Do/will the payments by Eskom for services payable with reference to output or
certain agreed results, e.g. payment (be it a fixed fee or an hourly rate) be only due
if and when a specific deliverable has been completed?
Question 6(ii)
Does/Will Eskom have the contractual right to control the tools or equipment, staff,
raw materials, routines, patents or technology used in the provision of the services?
Question 6(iii)
Are you/will you prohibited from rendering services to any other employers/clients
during the period of service to Eskom?
Question 6(iv)
Do/will you have the right to sub-contract work?
Question 6(v)
Are you personally / will you personally be at risk for the quality of the work done or
to be done (risk for poor quality; time over-runs, project not producing income)?
Question 6(vi)
Are/will you or the person rendering the service be obliged to be present and
perform the work at Eskom regardless of whether work is available or not?
Question 6(vii)
Is Eskom’s business or will Eskom’s business be critical to your financial/economic
survival?
Question 6(viii)
Does/will your position form part of Eskom’s organisational structure?
Question 6(ix)
Does/will Eskom provide you with any of the following:
Question 6(x)
Does/will Eskom provide you with an office?
Question 6(xi)
Does/will Eskom provide you with any equipment, tools, stationery and material?
Please go to the next section to establish your tax status.
Applicable to the 2023/2024 Tax Years
To establish your tax status, you need to summarise the “Yes” and “No” as
answered on Question 6(i) to 6(xi) in the column below:
Question Yes No
6(i) Independent Employee
6(ii) Employee Independent
6(iii) Employee Independent
6(iv) Independent Employee
6(v) Independent Employee
6(vi) Employee Independent
6(vii) Employee Independent
6(viii) Employee Independent
6(ix) Employee Independent
6(x) Employee Independent
6(xi) Employee Independent
Decision
Independent
Psp
If you have answered “Employee” to any of the following questions 6 (i), 6(iii), 6(v),
6(vi), 6(ix);
or
If you have answered more than 50% “Employee” to questions 6(ii), 6(iv), 6(vii),
6(viii), 6(x), 6(xi):
Alternatively:
If you have already signed Appendix 7 on Questions 5:
disclosed on the IRP5 for payments received.
If you have not signed Appendix 7 on Questions 5:
withheld from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Applicable to the 2023/2024 Tax Years
Summary for ID No. Vendor No:
Company/Close Corporation/Trust Summary
Please si n
the following
Construction Services CONTRACT NO. _________
NEC3 Term Service
Contract Quality Plan template assist the supplier to identify and plan for meeting client's/ contract expectations/requirements for quality management
NB: The tenderer must complete and sign this form to acknowledge and accept Eskom Supplier Quality Requirements as per 240-105658000 Specification and ISO 9001 Standard.
Construction Services 5 years
Signature
of Environmental Document Comments
Training and competency
Compulsory OHS/SHE Legal Liability
Training).
Liability & OHS Supervisory training.
employees or risk based).
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorised version on
the system. No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
of 9
Template Identifier 240-43921898 Rev 5
Annexure C 1: OHS Tender Evaluation Template (High risk) Document Identifier 240-77471651 Rev 3
Effective Date May 2021
Cell A5: Designation Employer (Site Manager with OHS/SHE Legal Liability Training)
Duvha Power Station, owned and operated by Eskom is a coal-fired power station of five powergenerating units with a combined capacity of 3,000MW (excluding unit 3 which was decommissioned).
The power station is located about 13 kilometres southeast of Emalahleni in the Nkangala District
Municipality, Mpumalanga Province. The location is illustrated in Figure 1 below. The centre coordinates (WGS 84) for the power station are as follows:
25° 57’ 40.96’’ S 29° 20’ 17.06’’ E
Duvha Power Station has over 40 years in operation and civil and structures are required to be
inspected and maintained periodically for safe use as per the construction regulations. This document
contains the technical requirement for corrective and preventative maintenance works to be carried out
by an appointed contractor for a period of 5 years. The technical requirements are in line with the
maintenance strategy for Duvha Power Station civil and structures. All defective infrastructures will be
executed and prioritised in accordance with the requirements stipulated in (240-44948953 Work
Prioritisation Procedure). The maintenance works for the civil structures is for period of 5 years to
ensure compliance with construction regulations to render the civil structures and infrastructures safe
for continue use.
Figure 1: Showing a topographical location of Duvha Power Station
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
2.1 Scope
This document covers the technical requirement for the provision of a maintenance contract for Duvha
Power Station civil and structures. The service for the maintenance works is outsourced to a contractor
to execute the works on behalf of the client. This works includes but not limited to the followings works.
painting.
Structural steel works, such as repairs, fabrication and installation of steel structures.
Carpentry works such as repair, replacement, and weather protection (outdoor).
Brickworks such as repair, replacement, reinforcement, plastering and painting.
Weather proofing of structures such as waterproofing, corrosion protection, acid/chemical
resistance coating of structures and weather protection (outdoor).
compaction.
Sheeting and cladding works such as repairs, replacement, and painting.
Roadworks for surfaced/paved and unsurfaced roads such as repair, replacement, compacting,
marking and signage.
Fencing such as repair, replacement, and painting.
Material testing.
Underground scanning.
Rope access for elevated works such as roof repairs
2.1.1 Purpose
The purpose of this document is to describe in detailed the requirement for the provision of a
maintenance contract for Duvha Power Station civil and structures to comply with Construction
Regulations and the Occupational Health and Safety Act, no (OHS).
2.1.2 Applicability
This document applies to Duvha Power Station.
2.2 Normative/informative references
Parties using this document to apply the most recent edition of the documents listed in the following
paragraphs.
2.2.1 Normative
[1] 32-727 - Eskom Safety, Health, Environment and Quality (SHEQ) Policy.
[2] Occupational Health and Safety Act No. , Construction Regulations.
[3] ISO 9001 Quality Management Systems.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
[4] 240-99527377, Inspection manual for civil works at Eskom’s Power Stations.
[5] 03A-ENS0040 Rev 3 - Civil Structures Maintenance Execution Strategy.
[6] 03A-ENS0042 Rev 3 - Water Retaining Structure Outside Plant Maintenance Strategy.
[7] 240-44948953 Work Prioritisation Procedure.
[8] 240-106365693, Standard for External Corrosion Protection of Plant Equipment and
Associated Piping with Coatings.
[9] 240-75655504 Corrosion Protection Standard for New Indoor and Outdoor Eskom
Equipment.
[10] 240-106628253, Standard for Welding Requirements on Eskom Plant
[11] National Environmental Management Act, 1998 (Act )
[12] National Environmental Management Waste Act, 2008 (Act )
These documents are indispensable for the application of this document, i.e., documents to be used
together with this document.
2.2.2 Informative
[13] 474-58 (Rev1): Document and Records Management
[14] 240-53113685, Design Review Procedure
[15] 240-53114002, Engineering Change Management Procedure
[16] 240-76992014, Project/Plant Specific Technical Documents and Records Management Work
Instruction
2.3 Definitions
Definition Description
Controlled disclosure controlled disclosure to external parties (either enforced by law, or
discretionary).
Task Order A task order is a written instruction to proceed with the task as stipulated
on the task order. The task order will only be valid if a “45 number” appear
on the task order. The “45 number” will serve as the order number for the
task and need to be stated on the invoice for the work done as per task
order.
Client The owner of the Power Station at which the inspections are to be done.
Normally the Client will be represented by the Power Station or System
Engineer
Contractor Service provider appointed to supply a specific service to Eskom, Duvha
Power Station.
Employer Eskom, or Eskom Duvha Power Station or representative
Sub-contractor An individual or business which has a contract with a principal contractor
to supply some portion of the work or services on a project which the
contractor has agreed to perform
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
2.4 Abbreviations
Abbreviation Description
CCTV Closed-Circuit Television
CV Curriculum Vitae
CM Contract Manager
ECSA Engineering Council of South Africa
ESP Electrostatic Precipitator
FFP Fabric Filter Plant
ISO International Standard Organisation
MW megawatt
SANS South African National Standards
SHEQ Safety, Health, Environmental & Quality
SE System Engineer
PPE Personal protective Equipment
PSR Plant Safety Regulations
QA Quality Assurance
QC Quality Control
QCP Quality Control Plan
WGS World geodetic System
2.5 Roles and responsibilities
2.5.1 Employer
Safety, Health and Environmental
The Employer to ensure the following:
insurer as contemplated in the compensation for occupational injuries and diseases act, before
work beginning work on site.
The Employer to also ensure that a copy of the Principal Contractor's health and safety plan is
available on request to an Employee, Inspector or Contractor. Non-compliances will result in
work stoppages.
Audit periods are mutually agreed between the Client and Principal Contractor.
The Contractor is notified promptly of situations which may affect the health and safety of any
person carrying out works on site.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
Contractor, where changes are brought about.
o Conduct health and safety audits to establish the effectiveness of the Contractor’s health
and safety management systems.
o Refuse employees or agents of the Contractor access to the Power Station Site if such
persons commit unsafe acts or unsafe working practice or is found not competent or
authorised.
o Stop works should there be unsafe working practices and procedures.
General
The Employer to ensure the following:
works.
2.5.2 Appointed Principal Contractor
Safety, Health and Environmental
The Principal Contractor to ensure the following:
its regulations and all other relevant health and safety legislation to ensure the health and safety
of persons carrying out works. This to also apply to sub-contractors.
the employer. This to be applied from the date of commencement and duration of works. The
contents of the health and safety plan to also be discussed and negotiated with sub-Contractors.
The health and safety plan to be implemented and maintained on site.
site regulations.
All employees undergo safety induction training on-site.
All employees or agents, visitors of the Contractor are medically, physical, and psychologically
fit to enter the Power Station and carry out works. Employees to also have a valid medical
certificate of fitness specific to the work to be performed.
compensation insurer as contemplated in the compensation for occupational injuries and
diseases act, before work beginning work on site.
Safeguard all employees by maintaining a safe and hygiene working environment and culture.
A safety profile is kept for tracking and auditing purposes.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
danger to one's life or health are at once reported.
Contractor, where changes are brought about.
the risk assessment.
may affect the health and safety of any person carrying out works on site.
PPE to the Contractors' Employees is the responsibility of the Contractor.
that all employees are competent and aware of all requirements needed to execute works safely.
performed by a competent person appointed in writing. The risk assessment to form part of the
health and safety plan to be applied on the site and to include at least:
o The identification of the risks and hazards to which persons may be exposed to.
o The analysis and evaluation of the risks and hazards identified.
o A documented plan of safe work procedures to mitigate, reduce or control the risks and
hazards that have been identified.
o A monitoring plan; and
o A review plans.
during the execution of maintenance services. Subcontractors and others under the Contractor's
direction and control to observe and comply with the latter.
General
be included in this document and supply record and history requirements.
Contractor takes all necessary precautions that may be required to safeguard existing
infrastructure and services including protection of all surface works. These additional works are
formally documented in method statements for the Employer’s review and acceptance.
calculations by the Contract Manager in no way relieves the Contractor of his liability for the
works. The Contractor remains liable for all works conducted as per this document.
delegates, to ensure seamless integration of the various works.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
To work with and consult with the other functions/structures of the Employer.
Resources and tools required by personnel for executing works are provided by the Contractor.
To produce and submit to the Employer for approval, the number and details of personnel that
will execute the works. Qualifications and proof thereof to also be provided to the Employer.
To procure or co-ordinate the supply of required consumables.
To assist the maintenance Contract Manager in planning, organizing, and managing all
maintenance related activities.
violated any of the Eskom Life Saving Rules, they may face disciplinary action.
o Open, isolate, test, earth, bond, and/or insulate before touch.
o Hook up at heights.
o Buckle up.
o Be sober.
o Ensure that you have a permit to work.
o Wear correct PPE at all times.
o Report all incidents.
2.6 Related/supporting documents
Not Applicable
3.1 Description of the works
The objective of the Employer is to appoint a Contractor for maintenance services of civil and structures
at Duvha Power Station for a period of 5 years. The works entails the following:
the works by complying with the OHS act No. and Regulations.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
3.2 Require service for contractor
3.2.1 Carpentry and Glazing
3.2.1.1 Carpentry and glazing services
drywall.
3.2.1.2 Glazing
opening made of glass.
3.2.2 Waterproofing
3.2.2.1 Waterproofing services
structures, and walls.
roads, runways, parking areas and other surfaces.
3.2.2.2 Waterproofing specifications and requirements
Damp proofing and waterproofing to comply with the Specifications and requirements given the table
below. Waterproofing materials are applied in accordance with SANS 10021. All joints in damp-proof
course on walls are lapped a minimum of 150 mm except at junctions and corners where the lap is
equal the full thickness of the wall.
Material SANS Type and/or Additional Requirements
Bituminous damp-proof course to wall,
248 Type FV/ as specified on the drawings.
sills, etc.
Polyethylene sheet in damp-proof course
952 Type B/ as specified on the drawings
to walls, sills etc.
Ditto to floors and basements 952 Type C/ as specified on the drawings
Mastic asphalt for roofing 297 -
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
Material SANS Type and/or Additional Requirements
Mastic asphalt for damp-proof coursed and
298 -
tanking
Bituminous roofing felt 92 Type 60/ as specified on the drawings
Polyethylene sheet for the waterproofing of
952 Type A/ as specified on the drawings
flat roofs
Chloroprene rubber sheet (for
580 At least 2.5 mm thick and 1200 mm wide
waterproofing)
Sealing compounds with two-component Type 2 Gun Grade/ as specified on the
polysulphide base drawings
3.2.3 Masonry works (bricklaying).
3.2.3.1 Masonry services
3.2.3.2 Masonry specifications and requirement
List of applicable standards for masonry works.
Code Description
SABS 029 Comprehensive model building regulations Chapter 8: Masonry and walling
SANS 1206 Masonry units
SANS 227 Burnt clay masonry units
SANS 285 Calcium silicate masonry units
SANS 1215 Concrete masonry units
SANS 2001 CM1 Construction works Part CM1 – Masonry walling
SANS 10073 The safe application of masonry-type facings to buildings
SANS 10145 Concrete masonry construction
SANS 10249 Masonry walling
SANS 50413 Masonry cement
SANS 50771 Specification for masonry units
SANS 50934-3 Admixtures for concrete, mortar, and grout Part 3: Admixtures for masonry
mortar – Definition, requirements, conformity, marking and labelling
Specification data associated with SANS 2001 CM1 – Masonry walling.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
Clause/No Specification Data
Essential data
4.1 Materials
4.1.1.2 Burnt Clay masonry units complies with the requirements of SANS 227 and
have the following properties:
o Dark: Country Meadow Satin
o Light: Opal Satin
o Foundation brickwork: NFX – 7.5 MPa minimum.
o Internal brickwork: NFP– 7.5 MPa minimum.
o Face Brick: FBS – 12.5 MPa
o Foundation brickwork: Normal
o Internal brickwork: Normal
o Face Brick: Special
The quality verification are as follows: See Appendix F of SANS 227
The test for efflorescence is required.
4.1.4.1 Sands that comply with the requirements of SANS 1090 are required.
4.1.6 Mortar plasticizers and set-retarder admixtures are permitted.
4.1.9.1.2 Brick forces are galvanised.
4.1.9.2.2 Rod reinforcements are galvanised
4.1.12.1 Wall ties in cavity walls are of the butterfly type.
4.1.12.1 Only galvanised steel wall ties are used.
4.1.13.2 Internal steel door frames are galvanised.
4.2 Mortar
4.2.1.2 Mortar plasticizers and set-retarder admixtures are permitted
4.6.3.1 Reference panels are required
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
Clause/No Specification Data
4.16 Roof anchors are in accordance with the requirements of SANS 10400
5 Compliance with Requirements
5.1.1 The degree of accuracy to be II
Variations
With reference to Clause 4.1.13:
Cm1. V.1
All other door and window frames are bronzed anodised aluminium.
List of applicable standards for foundations of masonry walling
Code Description
SANS 517 Light steel frame building
SANS 952-1 Polymer film for damp-proofing and waterproofing in buildings. Part 1:
Monofilament and co-extruded products
SANS 2001 Construction works Part CM2 – Strip footings, pad footings and slab on-the-
CM2 ground foundations for masonry walling
SANS 1200 F Standardized specification for civil engineering construction Section F: Piling
SANS 10100 The structural use of concrete
SANS 10120-2 F Code of practice for use with standardized specifications for civil engineering
construction and contract documents Part 2: Project specification Section F:
Piling
SANS 10120-3 F Code of practice for use with standardized specifications for civil engineering
construction and contract documents Part 3: Guidance for design Section F:
Piling
SANS 10120-5 F Code of practice for use with standardized specifications for civil engineering
construction and contract documents Part 5: Contract administration Section F:
Piling
SANS 10400 H The application of the National Building Regulations Part H: Foundations
SANS 101400 J The application of the National Building Regulations Part J: Floors
SANS 10161 The design of foundations for buildings
SANS 10088 Pile foundations
Specification data associated with SANS 2001 EM1 – Cement plaster.
Clause/No Specification Data
Essential data
4.1 Materials
4.1.6.2 This clause is deleted and replaced with the following:
“Admixtures are allowed to the mixes to improve workability or to improve the
properties of the finished plaster, provided that the data sheets for such have
been submitted to the Project Manager for review and acceptance prior to use”
4.2 Methods and procedures
4.2.3.2 Single-coat plaster: 10mm to 12mm
5.0 Compliance with the requirements
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
Clause/No Specification Data
The permissible deviations in plaster to not exceed 4mm under a 2m straight
edge
Additional clauses
EM1. A.1 All cracks, blisters and other defects are carefully cut out and made good and
the whole of the plaster work is to be left in perfect and clean condition on
completion.
3.2.4 Concrete works
from the structure, removal of dirt, etc.)
and cable trench concrete covers.
3.2.4.1 Concrete specifications and standards
List of applicable standards for concrete works
Code Description
Admixtures
240-144332407 Guideline for Eskom Power Stations Concrete Remedial Work
SANS 50934-1 Admixtures of concrete, mortar and grout, Part 1, Common requirements
SANS 50934-2 Admixtures of concrete, mortar and grout, Part 2, Concrete admixtures:
definitions, requirements, conformity, marking and labelling
SANS 50934-3 Admixtures for concrete, mortar and grout, Part 3, Admixtures for masonry
mortar - definitions, requirements, conformity and marking and labelling
SANS 50934-5 Admixtures for concrete, mortar and grout, Part 5, Admixtures for sprayed
concrete - definitions, requirements, conformity, marking and labelling
SANS 50934-6 Admixtures for concrete, mortar and grout, Part 6, Sampling, conformity
control and evaluation of conformity
Aggregates
SANS 1083 Aggregates from natural sources – Aggregates for concrete
SANS 1090 Aggregates from natural sources - Fine aggregates for plaster and mortar
Cementitious Materials
SANS 6151 Free water content of Portland cementitious materials
SANS 6152 Available alkali content of cement extenders (complying with SANS 50197-1)
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
Code Description
SANS 50197-1 Cement. Part 1, Composition, specifications, and conformity criteria for
common cements
Concrete
SANS 878 Ready-mixed concrete
SANS 5860 Concrete tests - Dimensions, tolerances, and uses of cast test specimens
SANS 5861-1 Concrete tests - Mixing fresh concrete in the laboratory
SANS 5861-2 Concrete tests -Sampling of freshly mixed concrete
SANS 5861-3 Concrete tests - Making and curing of test specimens
SANS 5862-1 Concrete tests - Consistence of freshly mixed concrete - slump test
SANS 5862-2 Concrete tests - Consistence of freshly mixed concrete - flow test
SANS 5863 Concrete tests - compressive strength of hardened concrete
SANS 5864 Concrete tests - flexural strength of hardened concrete
SANS 5865 Concrete tests - the drilling, preparation, and testing for compressive strength
of cores taken from hardened concrete
SANS 6255 Mortar tests - compressive strength of mortar
SANS 50206 Concrete – Specification, performance, production, and conformity
Construction
SANS 2001 CC1 Construction works: Part CC1: Concrete works (structural)
SANS 2001 CC2 Construction works: Part CC2: Concrete works (minor works)
SANS 10100-2 The structural use of concrete. Part 2, Materials, and execution of work
SANS 10109-1 Concrete floors. Part 1, Bases to concrete floors
SANS 10109-2 Concrete floors. Part 2, Finishes to concrete floors
SANS 10155 Accuracy in buildings
SANS 53670 Execution of concrete structures
SANS 55392 Sustainability in building construction: general principles
Reinforcement
SANS 282 Bending dimensions and scheduling of steel reinforcement for concrete
SANS 920 Steel bars for concrete reinforcement
SANS 1024 Welded steel fabric for reinforcement of concrete
Water
SANS 51008 Mixing of water for concrete – Specification for sampling, testing, and
assessing the suitability of water, including water recovered from processes in
the concrete industry, as mixing water for concrete
Concrete and Related Products
SANS 266 Gypsum plasterboard
SANS 508 Concrete retaining blocks
SANS 541 Precast concrete paving slabs
SANS 677 Concrete non-pressure pipes
SANS 685 Fibre-cement sheets (flat and profiled)
SANS 803 Fibre-cement boards
SANS 819 Fibre-cement pipes, couplings and fittings for sewerage, drainage, and low-
pressure irrigation
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
Code Description
SANS 927 Precast concrete kerbs, edgings, and channels
SANS 986 Precast reinforced concrete culverts
SANS 1058 Concrete paving blocks
SANS 1215 Concrete masonry units
SANS 1294 Precast concrete manhole sections and components
SANS 1372 Prefabricated concrete components for fences
SANS 1879 Precast concrete suspended slabs
SANS 1882 Polymer concrete surface boxes, manhole and inspection covers, gully
gratings and frames
SANS 50771-3 Specification for masonry units. Part 3, Aggregate concrete masonry unite
(dense and lightweight aggregates)
SANS 50771-4 Specification for masonry units. Part 4, Autoclaved aerated concrete masonry
units
SANS 10904 Fibre-cement corrugated sheets and fittings for roofing and cladding
Other Standards
SANS 53584 Products and systems for the protection and repair of concrete structures –
Test methods – Determination of creep in compression for repair products
SANS 1200 G Standardized specification for civil engineering construction Section G:
Concrete (structural)
Specification data associated with SANS 2001 CC1 – Concrete works (structural)
Clause/No Specification Data
Essential data
4.2 Materials
4.2.1.1 Cementitious binders are common cements that comply with SANS 50197-1 or
be blends of certain common cements and extenders1 that comply with SANS
55617-1*, SANS 50450-1** and SANS 50450-2** or SANS 53263-2***, SANS
50934-6*** and SANS 50934-2***.
4.2.2 Water complies with the requirements of SANS 51008.
4.2.3.1 2 The coarse aggregate has a nominal size of 19mm.
The nominal maximum size of coarse aggregate does not exceed:
reinforcement, the use of a nominal size of 9,5 mm or 13,2 mm should
be considered.
4.2.6 The grade of concrete is as follows:
etc.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
Clause/No Specification Data
4.2.7 The material requirements for grout are as follows:
Cement complies with SANS 50196-1.
o The grout has a minimum crushing strength of the concrete. The
sand aggregate is capable of freely passing a filter mesh of 1.5
mm.
o A grout is regarded as non-shrink if its volume is not less than the
initial volume, after hardening for 28 days. During this period, the
test specimens to have been completely protected against drying,
evaporating, carbonation and exposure to temperatures outside
the range 23 °C ± 3 °C.
The type and brand of non-shrink grout to, after approval, be indicated on the
drawings and/or specification for concrete work.
In general, one of the following types of non-shrink grout are used:
concrete.
strength of the concrete.
4.2.11.1 Joint fillers, sealants, water stops, bearings, and accessories complies with the
following requirements:
polyethylene foam and sealed against the ingress of dirt or water with a
gun grade sealant material to comply with manufacturer’s specifications.
4.3.1.5 Earth cuts may be used as forms for vertical surfaces.
4.3.1.8 Formed Concrete
The formed surfaces are as follows:
acceptable.
additional finish – Smooth finish is required.
finish is permitted.
4.3.1.8 The degree of accuracy required is II.
4.3.8.3 The false work and supporting formwork on continuously reinforced concrete
structures to be removed as follows:
-On acceptance by the Contract Manager that the false work and formwork may
be removed.
4.4 Reinforcement
4.4.1.3 Bars may not be bent hot.
4.4.2.2 Welding of bars are not permitted.
4.4.3.1 The cover is as follows:
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
Clause/No Specification Data
4.5 Holes, chases and fixing bolts
4.5.1 Fixtures to be embedded in the concrete are as per client’s specifications.
4.6 Embedded items
4.6.2.1 The type and location of water stops are as per client’s specifications.
4.7 Quality of concrete
4.7.3.2 Pumping of concrete is permitted where necessary.
4.7.4.1 Efflorescence on exposed concrete surfaces is not permitted
4.7.12.1.1 Construction joints are required.
4.7.12.1.4 Proprietary bonding compounds between old and new concrete is permitted.
4.7.14.6 Concrete is not to be placed during periods of heavy or prolonged rain.
4.7.15.1 Exposed surfaces of concrete not finished against forms have the following
surface finishes:
hand or machine sufficient only to produce a uniform surface free from
screed marks.
5 Compliance with the requirements
5.1 Testing
5.1.1.7 The test results from a ready-mix production facility, as part of its quality control
system, are used.
5.1.2.3 The test results may be assessed statistically.
5.2 Tolerances
5.2.1.1 The degree of accuracy is III for surfaces cast against earth cuts and II for other
concrete surfaces.
Variations
CC1.V.1 The uninterrupted supply of the correct volume to site is guaranteed if “ready-
mixed” concrete is used.
CC1.V.2 The space between pipes and ducts that are to be cast into reinforced concrete
and any adjacent reinforcement is not smaller than the larger of the following:
CC1.V.3 The Contract Manager may permit production of concrete at a central production
facility other than on the Site of construction and reserves the right to inspect for
acceptance of these central production facilities. The Contractor is responsible
for conducting all control testing.
CC1.V.4 Concrete may not be placed before the Contract Manager has given permission
in writing. A minimum written notice period of 24 hours prior to pouring is required
for each part of the structure.
CC1.V.5 the Contractor receives from the ready-mixed concrete Supplier, a certificate
with the following information:
compacted concrete.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
Clause/No Specification Data
Additional clauses
CC1.A.1 Cement and cement extenders are free flowing and free of lumps and are
supplied in the manufacturer's sealed unbroken bags or in bulk. Material that
has become hardened or lumpy or fails to comply with the relevant standards in
any way is removed from the Site, without delay.
CC1.A.2 The materials used in the construction of falsework and formwork are suitable
for the purpose for which they are required and is of such a quality that will
produce the standard of work specified. The Contractor submits his proposal of
the materials that is used for the construction of the falsework and formwork to
the Contract Manager two weeks prior to use for his acceptance.
CC1.A.3 The minimum blinding thickness is 75mm.
CC1.A.4 All reinforcement is hot rolled steel grade 450MPa.
CC1.A.5 All cement and cement extenders used in the works are tested by the
manufacturer or the Contractor in a laboratory. Copies of all test results so
obtained accompany each delivery of cement and cement extender to the site
and included as executed records.
The Contractor keeps full records of all data relevant to the manufacture,
delivery, testing and use of all cement and cement extenders used in the Works.
CC1.A.6 Prevention of plastic shrinkage cracks
The Contractor takes measures as necessary to prevent plastic shrinkage
cracking in the concrete. Particularly on dry windy days or hot sunny days, the
Contractor makes provision for fine spraying of the concrete surface with water
as soon as it has taken its initial set or covers the concrete with plastic sheeting.
It may be necessary to change the aggregates or the concrete mix proportions.
To deal with shrinkage cracking, it may be necessary to change the time at
which, or the way, floating is carried out.
If plastic shrinkage cracking occurs, the cracks are be closed by re-vibrating the
concrete while the concrete is still in a plastic state. Once the cracks have been
closed, the concrete is kept thoroughly wet, or covered with plastic sheeting for
at least a further three hours.
CC1.A.7 Curing of concrete
Details of the Contractor's proposals for curing concrete are submitted to the
Contract Manager for agreement before the placing of concrete commences.
Membrane curing compounds are not permitted, where the aesthetic
appearance of the finished surface is of importance and there is any danger of
the membrane becoming difficult to remove.
CC1.A.8 The average strength of the 3 cubes crushed is referred to as one test
result. The results are submitted to the Contract Manager for his acceptance.
Cc1.A.9
special precautions need be taken to protect concrete from the effects of
cold weather.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
Clause/No Specification Data
conditions are confined to ground frosts during the night, the Contractor
takes the necessary precautions to ensure that concrete is placed and
compacted at a concrete temperature of not less than 5oC and that it is
subsequently covered and protected from cold winds and frosts to
ensure that its temperature does not fall below that shown in Table
CC1.A.9 for at least the period shown in the table. Such precaution must
be presented to the Contract Manager for his approval.
Contractor ceases with placing of concrete when the air temperature falls
to 2oC and does not resume until it rises to 5oC,
Table CC1. A.9: Concrete temperature during early life
Characteristic Concrete to be maintained at not less
than temperature shown for a minimum Strength of Concrete
period of:
2oC 5oC
10 MPa 10.0 days 8.0 days
20 MPa 4.5 days 3.5 days
30 MPa and above 3.0 days 2.5 days
Notes:
a compressive strength of 5 MPa.
interpolated, but in no case to the maturing temperature fall below 2oC.
Concrete not placed within formwork or in contact with reinforcement
with a temperature which is at or below 0oC and it is not placed
against any surface bearing frost or ice.
CC1.A.10 No placing of concrete takes place if the ambient temperature exceeds or is
likely to exceed 32°C or if there are hot drying winds during the casting period,
without the acceptance of the Contract Manager.
Fresh concrete having a temperature exceeding 32oC are not placed in the
works. For pours of large volume where control of temperature rises or
temperature differential is critical, a lower maximum placing temperature, to be
agreed with the Contract Manager, may be imposed. The Contractor takes all
measures necessary to ensure that the specified maximum placing temperature
is not exceeded and that loss of moisture during transporting and placing is
reduced to the minimum. Such measures are agreed with the Contract
Manager.
Areas in which concrete is to be placed are shielded from direct sunshine and
rock or concrete surfaces are thoroughly wetted if instructed by the Contract
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
Clause/No Specification Data
Manager to reduce absorption of water from the concrete placed on or against
them.
After placing of concrete in any part of an area, the specified curing process
commences as soon as possible. If any interval occurs between completion of
placing and start of curing, the concrete is covered for this interval with polythene
sheet to prevent loss of moisture.
CC1.A.11 Particular attention will be paid to heat of hydration, especially for large pours.
CC1.A.12 Cement extenders are only used where specified - an accepted cement extender
to only be blended with a CEM1 Portland Cement. The use of Fly Ash is
preferred.
Blending of CEM1 cement with an extender may be done in the batch plant, or
at an accepted commercial blending plant.
All cement extenders used comply with SANS 1491 Parts 1, 2 or 3 as
appropriate for Ground Granulated Blast - Furnace Slag (GGBS) or Ground
Granulated Corex Slag (GGCS), Fly Ash (FA) or Condensed Silica Fume (CSF)
respectively, and to carry the SANS mark, or similar accepted.
CC1.A.13 If mixing concrete on site, the Contractor prepares trial mixes using the approved
material, and the plant used for these trials is the plant used in the works.
CC1.A.14 The Contractor submits full details of the trial mixes and test results and of the
mixes proposed for use in the works, which are based on the satisfactory results
of these preliminary tests and on the methods of mixing and placing the concrete
in the works.
CC1.A.15 Commencing of concreting:
No concreting commences in any portion of the works until the preparations
have been accepted and written permission given by the Project Manager that
concreting in such portion of the works may commence.
The Contractor provides to the Project Manager an accepted checklist for
concrete pours at least four hours before the placing of any concrete. All
relevant items are checked by the Contractor and the checklist signed off by the
Contractor’s representative as to its completeness and correctness.
The following information is recorded by the Contractor and forms part of the
data books in respect of each delivery of concrete:
The concrete is compacted and placed in its final position within 2 hours of the
introduction of cement to the aggregates. The time of such introduction is
recorded on the delivery note. When truck mixed concrete is used, water is
added under supervision either at the Site or at the central batching plant, but in
no circumstances is water added in transit.
CC1.A.16 Check Tests on Hardened Concrete
The Contractor, if directed by the Project Manager, carries out the following tests
on hardened concrete either for routine inspection, quality control or as a
verification of defects found by visual inspection or low cube strengths:
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
Clause/No Specification Data
accordance with SANS 5863, SANS 5864, and SANS 5865. Loading
tests on a completed structure or on precast elements are conducted if
there is reasonable doubt as to the adequacy of the structure.
resistance to damage by other materials.
CC1.A.17 Placing and compaction of concrete is carried out under supervision of suitably
qualified Personnel. Control procedures are established to cover all aspects of
workmanship including placing, compacting, finishing, curing, hot and cold
weather concreting, large concrete pours, etc. The concrete consistence is
appropriate to the location in which it is to be placed and suitable placing and
compacting equipment and procedures are employed to ensure that a high level
of compaction without segregation is achieved. It is particularly important that
full compaction is achieved in areas close to construction and movement joints,
embedded water bars, reinforcement and against previously placed, hardened
concrete.
The following precautions are taken by the Contractor:
built-in fittings (embedment) are not displaced and that damage is not
caused to the face of the formwork.
formwork at a rate of at least 2m per hour. Concrete is not placed directly
against vertical formwork; it flows to this surface during the compaction
process.
Manager. Concrete is not dropped freely more than 1.5 m unless
adequate precautions have been taken to prevent segregation,
displacement of reinforcing bars, tendons, and built-in fittings
(embedment’s) and damage to formwork. The design and slope of
chutes are to the acceptance of the Employer; chutes are kept clean and
in good repair.
placing, to ensure that it is homogeneous. The concrete is worked
around the reinforcing bars, tendons, and built-in fittings (embedment’s),
etc. and into corners of the formwork to form a solid void-free mass
having the required surface finish. Vibration is applied in a manner that
does not promote segregation, until all the air has been expelled.
Vibrators are only used to compact concrete; they are not used to move
concrete across the formwork. Over-vibration is avoided. When external
vibrators are used, the design of formwork and vibrator characteristics
ensure efficient compaction while avoiding surface defects.
in finishing is not permitted.
absorption is considered when deciding on the method of vibration to be
used. Extra precautions are taken to ensure full compaction of the
concrete since this cannot be checked when the formwork is removed.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
Clause/No Specification Data
in position by tremies or by pipeline from the mixer and is not allowed to
fall freely through water.
handling and placing characteristics of fresh concrete, are in accordance
with this Works Information and are used only if accepted by the Project
Manager.
more than one hour unless a construction joint is formed. The concrete
in each section between joints or corners are placed in successive pours,
working away in both directions from the centre-most panel of that
section. The minimum interval between placing adjacent panels is 3
days, unless directed otherwise.
ground, the ground surface is suitably prepared and protected against
intermixing, water suction, etc, and the concrete is placed before this
surface has deteriorated.
Once placed, the concrete is not subsequently disturbed and not vibrated or
rammed.
CC1.A.18 All vibrating is carried out under the direction of a Specialist and to a plan
accepted by the Project Manager. No workman is allowed to operate a vibrating
tool without having received instruction and training in its use. Vibrators are
immersion-type, of approved pattern, and they may be electrically or
pneumatically driven. Care is taken to avoid segregation and excessive
vibrating.
CC1.A.19 Defective Concrete
No repairing of any concrete is done without the written permission of the Project
Manager and then only in such manner as he accepts.
Concrete which does not comply with this Works Information is removed and
replaced with sound concrete. This may involve the removal and replacement
of otherwise satisfactory concrete associated with the defective material.
CC1.A.20 Formwork
Formwork with damaged edges or faces is not used. Open joint in timber forms
is sealed. Plywood surfaces and cut edges are sealed to prevent the absorption
of moisture.
Immediately before concreting, the forms and all other surfaces which are in
contact with the fresh concrete, are cleaned of loose materials and debris
including shavings, woods chips, sawdust, pieces of wire, nails, foamed plastic,
fragments of hardened concrete and mortar.
CC1.A.21 In the case of precast concrete units constructed in a factory or yard remote from
the Site, details of the concrete ingredients, mix design, and compression test
cube results are made available on delivery to Site
CC1.A.22 Corners to concrete items which are permanently exposed, are chamfered to
avoid sharp edges which are liable to be damaged
CC1.A.23 Holding Down Bolts and Embedded Fixtures
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
Clause/No Specification Data
Threads of holding down bolts are protected with “Densotape”, or similar
material accepted by the Project Manager, during delivery and storage. After
concreting, the bolt projections with attached nuts and washers, are protected
against corrosion with similar sealing tape and protected against mechanical
damage with a timber shield or as otherwise approved, until the erection of the
steel works or other Plant or fixtures commences.
Holding down bolts, embedded fixtures and recesses are in the correct position
by means of templates. These are constructed using steel sections fabricated
to 1mm tolerance, or as otherwise approved and are held rigidly in position
during concreting.
Particular attention is directed to the placing of reinforcement around bolt
assemblies and embedded fixtures.
Holding down bolts and holding down bolt assemblies are in the position shown
on the Drawings.
CC1.A.24 All reinforcement is cleaned of salt depositions, loose mill scale, rust, grease,
set mortar or other harmful matter, by power brushing or acid dipping. The
Contractor ensures that such reinforcement is protected against chemical
deposits at all stages of the work, until the concrete is poured.
Reinforcement placing is checked against the design drawings before concreting
is permitted.
Specification data associated with SANS 2001 CC2 – Concrete works (minor)
Clause/No Specification Data
Essential data
4.2 Materials
4.2.3.1 The nominal size of aggregate is 19mm unless stated otherwise by the client.
4.2.6 The concrete grade is as follows:
o Mass concrete is defined as unreinforced concrete cast for fill in voids
etc.
4.7.11.2 Exposed surfaces to have non-skid surfaces.
Test certificates
The submission of test certificates issued by an accredited, independent testing authority to confirm
that the respective materials comply with the specified requirements, or a certificate by the patent holder
or designer, certifying that the manufactured item complies in all respects with relevant product
specifications.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
Acceptance procedures for the acceptance of mix designs
The Contractor designs the mixes which he proposes to use in the works to meet the specified criteria
including the requirements for durability, hot and cold weather, and temperature control and curing of
concrete.
Concrete Test Cubes
For each class of concrete in production at each plant for use in the works, samples of concrete are
taken by the Contractor at the point of mixing or of deposition as instructed by the Contract Manager
and in the presence of a representative of the Contract Manager, all in accordance with the sampling
procedures described in SANS 5861.
Samples are taken on the basis of one for each 20 m3 of concrete placed but, in any case, not less than
one sample per day, whichever is the more frequent.
The Contractor casts from each sample, cure, and test six test cubes as set out in SANS 5863. Three
cubes are tested at 7 days and three at 28 days.
The average strength of the three cubes crushed are referred to as one test result.
Concrete is deemed to comply with the strength specified if the average strength of any four consecutive
test results exceeds the specified characteristic strength by 2 MPa and the strength of any test result is
not less than the specified characteristic strength minus 3 MPa.
The quantity of concrete represented by any group of four consecutive test results includes the batches
from which the first and last samples were taken together with all intervening batches. When a test
result fails to comply only the batch from which the sample was taken it is deemed to fail to comply.
Concrete slump
The correct slump for each mix is as accepted by the Contract Manager in accordance with the
Contractor’s mix design.
The Contractor takes slump tests from each concrete transporter before release from the batching plant
and again at the point of deposition. The slump test is carried out in accordance with SANS 5862.
Concrete of the incorrect slump is not used in the works.
The addition of cement and sand to reduce the slump is not acceptable.
Failure to comply with requirements.
The Contractor acts as instructed by the Contract Manager without any additional payment to remedy
concrete which fails to comply with the requirements stipulated in the Works Information. Such action
may include, but is not necessarily confined to, the following:
a) Adjusting the mix proportions until the concrete again complies with the Works Information.
b) Cutting test scores from the failed concrete and testing in accordance with SANS 5865.
c) Full scale load tests or sonic investigations.
d) Carrying out additional Works to overcome the effect of the failed concrete.
e) Removing the failed concrete.
f) Increasing the frequency of sampling until control is again established.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
Equipment for concrete
Before any orders are placed and equipment is delivered to Site, the Contractor submits to the Contract
Manager for acceptance, details of all equipment and arrangements he intends to provide for the
following:
Production, transport, storage, and handling of aggregates.
Transport, storage and handling of cement and cement extenders.
Batching, mixing, transporting, and placing of concrete.
Hot and cold weather concreting.
Concrete curing; and
Temperature control.
3.2.5 Structural steel works
The following services are required to be performed by the contractor
machine foundation steel bases.
latest issue of SANS 2001 – CS1.
Specification data associated with SANS 2001 CS1 – Structural steelwork.
Clause/No Specification Data
Essential data
4.1 Materials
4.1.1 “All structural steelwork is manufactured using grade S355JR steel.”
4.1.5 Structural fasteners are of the following grades and types:
“All structural bolts and holding down bolts are of class 8.8 and nuts are of class
8, unless otherwise.”
4.3 Workmanship (General)
4.3.1.1 All steel elements are marked to be traceable to a specific cast or heat of steel.
4.4 Workmanship (Welding)
4.4.4.3 Tack welds are not to be incorporated into the final welds.
4.5 Workmanship (Bolting)
4.5.1.3 The maximum protrusion beyond the nut is not less than 3mm, but not greater
than 5mm.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
Clause/No Specification Data
4.5.1.4 Washers under nuts and bolt heads on flat surfaces are required.
5.3 Non-Destructive testing of welds (Welding)
5.3.4 Ultrasonic or radiographic examination is required for all complete joint
penetration welds.
5.3.5 The requirements for non-destructive tests are as follows:
Magnetic Particle Inspection (MPI). The testing positions for DPI and MPI
are indicated by the Supervisor. All welds that fail the test are repaired. The
scope of the welds to be tested is increased to 100% of the welds for the
case where any welds fail the test.”
Ultrasonic examination.”
Variations
CS1.V.1 Clause 4.2.4.2 and 4.4.4.5:
All attachments to facilitate erection are removed and holes are closed up after
erection.
CS1.V.2 Clause 4.4.4.3:
All tack welds are removed before welding, tack welds are not to be incorporated
into the final welds.
Additional clauses
CS1.A.1 “Handling and lifting plant have sufficient capacity to ensure that steelwork is
placed in its final position without distortion or undue stressing of members.”
CS1.A.2 “Splices:
maintain the full strength of the plate.
from the Employer with regard to the location of the splice and the welding
procedure to be used.
Visual inspections of the root pass and final welds are required for splice welds.”
CS1.A.3 “Tolerances:
unless otherwise specified by the drawing.
accumulative, unless noted of the drawing.
within 3mm of the required drawing location.
dimension.
drawing dimension.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
Clause/No Specification Data
precedence.
Unless otherwise specified by the drawing, tolerances for all overall dimensions
(length, width, height, etc.) are within 3mm.”
CS1.A.4 “Structures, composite units and bolted assemblies that comprise component
parts are not subjected to excessive stresses during the assembly, fabrication, or
erection process.”
CS1.A.5 “Any necessary straightening or forming is carried out by methods that neither
weaken nor deface the material.”
CS1.A.6 “All weld joints in areas to be covered by stiffeners are to be ground flush after
welding and prior to installation of stiffeners.”
CS1.A.7 “All complete joint penetration welds have complete penetration and wherever
practicable are welded from both sides. The backs of the first run are suitably
gouged out.”
CS1.A.8 “The Contractor submits for acceptance full details of his proposed welding
procedures and the provisions of AWS apply to the acceptance thereof.
Acceptance of the welding procedures does not relieve the Contractor of his
responsibility for correct welding and for the minimising of distortion in the finished
structure.”
CS1.A.9 “Welds showing any planar defects such as cracks, lack of fusion or penetration
and excessive slag inclusions or porosity are cut out and rewelded. Under-cutting
is not permitted.”
CS1.A.10 “Weld repairs are made to the same procedure as for the original weld. All tests
are repeated after the repair has been completed and reports on radiographic and
ultrasonic tests are marked to indicate that the report refers to a repaired weld.”
CS1.A.11 “Visual examination of all welds check at minimum that:
undercutting or porosity, and
3.2.6 Earthworks
a) Excavations
excavation.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
as instructed by the Employer.
while working deep excavation.
walls protection. The design report for trench wall shoring to be submitted to the Client for
review.
b) Borrow to fill material selected material.
c) Earthworks specifications and standards
Work
Specification data associated with SANS 2001 BE1 – Earthworks
Clause/No Specification data
Essential data
4.1 Materials
4.1.5.2 Materials from excavation is disposed of as follows:
Suitable materials intended for re-use are stockpiled in an area provide the Contract
Manager
Material suitability is determined by the intended re-use of the material. Where
temporary stockpiles hold materials intended for rehabilitation of ground, stockpiles
that can deteriorate if exposed are protected against erosion and weathering.
Unsuitable materials not intended for re-use are removed from the work site and
disposed of at a location accepted by the Contract Manager. Materials are disposed
of in accordance with local and national laws and regulations.
4.2 Methods and procedures
4.2.1.1 All areas in which excavation is to take place or that are to be covered by terraces,
banks or structures is cleared in accordance with the requirements of SANS 2001-
Bs1.
4.2.1.2 Topsoil is conserved for later use in the following manner:
Vegetation intended for re-use is removed to a location provide the Contract
Manager and is neatly stacked and regularly watered and tended until required for
replanting.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Duvha Power Station Civil Construction Services 5 years Unique Identifier: 382-171222
Contract scope for work Revision: 0.1
Page:
Clause/No Specification data
Topsoil intended for re-use is stock-piled and/or spread in a location provide the
Contract Manager
4.2.1.3 The overburden is stripped and removed to depth of 300mm.
4.2.3 Surplus and unsuitable material are removed from the work site and disposed of at
a location accepted by the Contract Manager. Materials are disposed of in
accordance with local and national laws and regulations.
Additional Clauses
BE1.A.1 Design of Excavations:
The Contractor is solely responsible for the design and installation of all temporary
works to ensure the stability of the excavations. The Contractor provides his
proposals to the Supervisor for acceptance before excavation work commences on
site.
The macro and micro stability of cuttings, excavation and embankment slopes and
the related soil/rock deformations is analysed in accordance with the SAICE Code
(2010).
Design of cuttings, excavation and embankment slopes includes erosion protection
of slopes, Soil deformation with respect to settlements due to consolidation,
compression of soil structure, movements required to develop shear resistance,
the consequence of sliding and squeezing, etc., are analysed.
BE1.A.2 Excavation Classification
The Contractor uses any method he chooses to excavate any class of material, but
his chosen method of excavation does not determine the classification of the
excavation. The Contractor uses guidelines for excavation classification and
methods set out by SANS 1200D Section 3.1.
BE1.A.3 The Contractor notifies the Contract Manager of his intention to excavate 3 days
prior excavation for planned works, no excavation work to commence without the
presence of the Contract Manager.
The Contractor does not excavate before a method statement, excavation permits,
and underground services scans are submitted and accepted by the Contract
Manager.
BE1.A.4 The effect of earthworks on neighbouring structures, services, etc., are analysed
(for both short and long-term effects) and detrimental effects are avoided, or
appropriate measures taken to safeguard the integrity of the item in question.
Similarly, the effects of dewatering or disturbance of the existing geohydrological
conditions because of earthworks on neighbouring structures, services, etc., are
considered.
3.2.7 Roof Sheeting, Cladding, Drainage, shade nets and Structure
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
The tender evaluation strategy is developed for the purpose of setting out the technical requirements for
evaluating tenderers to obtain a qualified and technically suitable service provider for the civil construction
services for Duvha Power Station structures, infrastructure, and buildings. The scope of work consists of
civil structures such as the coal stock yard, roads (bitumen and gravel), general buildings, substations,
chimneys, cooling towers, machine foundations, boiler house, turbine hall, cable tunnels, cladding &
sheeting, bridges, storm and wastewater drainage system, Water Treatment Plant structures, Sewage
Plant structures, etc.
The 5 years civil and structures Construction services contract for Duvha Power Station aims at addressing
the structural and architectural routine and accidental damages and all defects as they occur. It will also
improve the civil infrastructures performance and compliance with construction regulations under the
occupational health and safety act .
2.1 Scope
This document covers the technical evaluation criteria to be utilised for the process of evaluating the tender
submissions for the civil and structural construction services 5 years contract at Duvha Power Station.
2.1.1 Purpose
The purpose of this tender technical evaluation strategy is to define the Mandatory Evaluation Criteria,
Qualitative Evaluation Criteria and TET member responsibilities for tender technical evaluation. The
technical evaluation strategy serves as basis for the tender technical evaluation process.
2.1.2 Applicability
This document is applicable to Duvha Power Station
2.2 Normative/informative references
Parties using this document shall apply the most recent edition of the documents listed in the following
paragraphs.
2.2.1 Normative
[1] 240-168966153: Generation Tender Technical Evaluation Procedure
[2] 240-44682850: PCM - Provide Engineering During Project Sourcing
[3] 32-1033: Eskom Procurement and Supply Chain Management Policy
[4] [32-1034: Eskom Procurement and Supply Management Procedure
2.2.2 Informative
[1] Duvha Power Station Civil and Structures Maintenance 5 years contract scope for work
[2] TSC3 - Duvha Power Station Civil and Structures Maintenance 5 years contract at Duvha Power
Station
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Tender Technical Evaluation Strategy for Duvha Power Unique Identifier: 382-171223
Station Civil Construction Services 5 years Contract at Revision: 0
Duvha Power Station Page:
2.3 Definitions
2.3.1 Classification
Controlled Disclosure: Controlled Disclosure to external parties (either enforced by law, or discretionary).
2.4 Abbreviations
Abbreviation Description
OHS Act Occupational Health and Safety Act No
PPE Personal Protective Equipment
PS Power Station
PSR Plant Safety Regulations
QC Quality Control
QCP Quality Control Plan
QM Quality Management
SANS South African National Standards
SE System Engineer
SHEQ Safety, Health, Environment and Quality
2.5 Roles and responsibilities
As per 240-168966153 Generation Technical Tender Evaluation Procedure (Rev 1)
2.6 Process for monitoring
The primary process that shall be used for monitoring the application of this document is 240-168966153
Generation Technical Tender Evaluation Procedure (Rev 1).
2.7 Related/supporting documents
[1] 240-53716746: Tender Technical Evaluation Report Template
[2] 240-53716712: Tender Technical Evaluation Results Form Template
[3] 240-53716726: Tender Technical Evaluation Scoring Form Template
3.1 Technical evaluation threshold
A weighted score-card approach is used to evaluate the technical compliance of the tenders against the
specifications. Tenderers need to have a weighted score of 70% overall or more to technically qualify for
further evaluation.
The technical criteria and weighting are broken down as follows:
a) Technical: 100%
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Tender Technical Evaluation Strategy for Duvha Power Unique Identifier: 382-171223
Station Civil Construction Services 5 years Contract at Revision: 0
Duvha Power Station Page:
b) Safety Health Environmental and Quality (SHEQ): Objective
The SHEQ objective criteria are not included in this document as it does not form part of the technical
scope.
The evaluation of the tender submission will be based on the tenderer’s ability to meet the technical
requirements. A weighted score card approach will be used to evaluate the tender submission against
the specifications and Employer’s requirements.
Table 1: Technical Scoring Methodology
Score percentage (%) description
5 100 compliant
Financial Requirements
Source: Tender Documents.zip (RFP)Payment Terms: payment terms as stipulated hereunder when
submitting tenders and concluding contracts with Eskom:
For contracts valued below R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
Suppliers within 30 days of receipt of undisputed invoices.
For contracts valued above R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed
Compliance Requirements
Source: Tender Documents.zip (RFP)No specific requirements found
CSD report or as per certificate/affidavit provided
CSD number/CSD report) must be provided at the closing date and time for
CSD number or B-BBEE certificate/affidavit will need to be
Insufficient searchable text - AI extraction recommended
ADDITIONAL CONTRACTUAL REQUIREMENTS SUPPORTING EVIDENCE Safety √
Health and Safety Plan
Costing for Health and Safety Management
Baseline OHS Risk Assessment (BRA)
Valid Letter of Good Standing (COIDA or equivalent)
OHS policy signed by CEO
OHS Competency SHE costing table added below. Quality Please see tables below: √ Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 68 Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 22 Identifier Invitation to Tender Effective Date 31 January 2025 Review Date January 2030 Reference Returnable From Suppliers required closing required closing. required Contract to Tender (disqualifiable)* Tender prior at at Returnable Returnable (Non-disqualifiable) Returnable Environmental √
The contractor shall attach an Environmental policy signed by company’s top management to comply with ISO 14001:2015 Environmental Management System.
The contractor shall acquaint themselves and work in compliance with the conditions of the attached Duvha Waste management procedure ENVP0005. Please note that the station will monitor the contractor’s activities with compliance to the waste procedure.
The contractor shall acquaint themselves and work in compliance with the conditions of the attached Duvha Hydrocarbon procedure ENVP0030. Please note that the station will monitor the contractor’s activities with compliance to the Hydrocarbon Procedure.
The contractor shall attach a safe work procedure that identifies environmental impacts associated with all the activities and how to mitigate these impacts including but not limited to dust and waste handling during demolishing works, chemical handling during weatherproofing and coating works and stormwater contamination prevention from concrete mixing and other concrete works etc. Due Audited Financial Statements of the tenderer for the √ Diligence/financial previous 18 months, or to the extent that such analysis statements are not available, for the last year. In the case of a joint venture or special purpose vehicle (SPV) specially formed for this tender, audited financial Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 68 Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 22 Identifier Invitation to Tender Effective Date 31 January 2025 Review Date January 2030 Reference Returnable From Suppliers required closing required closing. required Contract to Tender (disqualifiable)* Tender prior at at Returnable Returnable (Non-disqualifiable) Returnable statements for each participant in the JV / SPV must be submitted. Start-up enterprises formed within the last 12 months are not required to submit audited financial statements, but if successful in this Invitation to Tender; will be required to furnish statements for the first year once available. DOCUMENTS REQUIRED UNDER FUNCTIONALITY/TECHINICAL CRITERIA Functionality/Technical Please refer to table below: √
C1.1 Form of Offer and Acceptance 3-5
C1.1 Form of Offer & Acceptance
Appointment Letter & Legal
4 80 compliant with associated qualifications
Meet the technical requirement(s) with,
Acceptable technical risks AND/OR;
Acceptable exceptions AND/OR;
Acceptable conditions 2 40 NON-COMPLIANT
Does not meet the technical requirement(s) AND/OR Unacceptable technical risk(s) AND/OR;
Unacceptable exceptions AND/OR;
Unacceptable conditions 0 0 TOTALLY DEFICIENT/NON-RESPONSIVE 3.2 TET MEMBERS Table 2: TET Members The full-time core technical evaluation team will consist of the following team members (in-line with the Generation Technical Tender Evaluation Procedure, 240-168966153) The part time/support team member shall be required to fill in a technical evaluation form, if their names are marked as mandatory (X), next to a criterion. The part time/ support team member may not be required to fill in a technical evaluation form if their names are marked as optional (O) next to a criterion but shall assist the main members where necessary. TET number TET Member Name Designation CONTROLLED DISCLOSURE When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorised version on the system. Tender Technical Evaluation Strategy for Duvha Power Unique Identifier: 382-171223 Station Civil Construction Services 5 years Contract at Revision: 0 Duvha Power Station Page: TET 1 Thulani Zondo Snr Supervisor Tech Maintenance Civil TET 2 Vusi Chirwa System Engineer: Civil and Structures TET 3 Thilivhali Muthakhi System Engineer: Civil and Structures TET 4 Lamlile Mthimunye Manager: Auxiliary Maintenance CONTROLLED DISCLOSURE When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorised version on the system. Tender Technical Evaluation Strategy for Duvha Power Unique Identifier: 382-171223 Station Civil Construction Services 5 years Contract at Revision: 0 Duvha Power Station Page: 3.3 MANADATORY TECHNICAL EVALUATION CRITERIA N/A 3.4 QUALITATIVE TECHNICAL EVALUATION CRITERIA Table 3: Qualitative Technical Evaluation Criteria Qualitative Technical Criteria Description Reference to Technical Criteria Criteria Sub Specification / Tender Weighting Weighting Returnable (%) (%)
Company Experience 25% Completed Similar Works Copies of Completion 1.1 100% certificates This covers the experience of the company. The company must have completed at least five (5) projects or contracts of similar civil and structural construction or repair scope that includes (concrete works, steel structural, brickwork, earthworks, Roadworks, roofing works, weatherproofing/chemical resistant coating, etc. as stipulated in this contract scope of work). Signed (by the client) completion certificates or Letters must be submitted, each certificate or letter shall consist of the following information
Client name,
Project description, (details scope of work if description not clear)
Project cost,
Project start & end date.
Project location
Name, designation and contact number of references person In an event where the completion certificate does not have all the above details in bullet points, the tenderer shall attach supporting document(s) that contain the information to support the completion certificate or letter (e.g. signed contract, PO). Tender Technical Evaluation Strategy for Duvha Power Unique Identifier: 382-171223 Station Civil Construction Services 5 years Contract at Revision: 0 Duvha Power Station Page
Key Personnel 75% Certified copy of 30% 2.1 Construction Manager or Construction Project Manager accreditation certificate, Proof of registration as a Professional Construction Manager (Pr. qualification and a CV. CM) or Professional Construction Project Manager (Pr. CPM). A CV and qualification (National diploma, National higher diploma, B-tech or Honours degree) in the Built Environment field of study of the construction manager or project manager shall be also submitted. The CV shall reflect knowledge and experience of construction or contract management of at least 3 years in construction or project managerial position. Copies of Civil Technicians 2.2 Civil Maintenance Technicians 25% CVs and Qualifications. The contractor shall provide at least 2 CVs of civil Maintenance technicians and copies of qualifications (national diploma in civil engineering). Each technician’s CV shall reflect at least 3 years of relevant experience within construction industry as a civil technician or site agent. The working experience shall reflect start and end months and years including references contact person per working period. Copies of Construction 2.3 Construction Supervisors 15% Supervisors CVs and The contractor shall provide at least 2 CVs of construction Qualifications. supervisors with at least National Certificate: Supervision of Construction Processes (NQF Level 04) or construction related qualification of a NQF Level 04 as minimum and valid OHS Act/Legal/HIRA safety training course as minimum requirements. Each supervisor must have 3 years work experience in civil engineering or maintenance related construction work. The working experience shall reflect start and end months and years including references contact person per working period. Copies of Trade/ 2.4 Skilled Personnel/Artisans with Trade certificate 15% Competency certificates The contractor shall provide trade certificates and CVs reflecting at and CVs. least 3 years of relevant experience within their field (indicating start Tender Technical Evaluation Strategy for Duvha Power Unique Identifier: 382-171223 Station Civil Construction Services 5 years Contract at Revision: 0 Duvha Power Station Page: and end month of employment) of relevant in their field of work for the following artisan
Boilermaker
Carpenter The working experience shall reflect start and end months and years including references contact person per working period. 2.5 Civil Construction Skills 10% The contractor shall provide CVs reflecting at least 5 years’ experience within their specific fields (indicating start and end month of employment) of relevant in their field of work for the following skills
Construction: Steelwork – Reinforcement steel fixer
Construction – Concrete hander
Waterproofing - Water proofer The working experience shall reflect start and end months and years including references contact person per working period. 2.6 Rope Access Technicians 5% The contractor shall provide rope access qualification or training certificates and CVs reflecting at least 3 years of working experience within the built environment or construction (indicating start and end month of employment) of relevant in their field of work for the following skills
Rope access Technician Level 2
Rope access Technician Level 3 The working experience shall reflect start and end months and years including references contact person per working period. TOTAL: 100 Tender Technical Evaluation Strategy for Duvha Power Unique Identifier: 382-171223 Station Civil Construction Services 5 years Contract at Revision: 0 Duvha Power Station Page: Qualitative Technical Evaluation Score Scoring Criteria Criteria [0,2,4,5] 1.Work Experience 5 = 5 or more verifiable similar completed projects submitted1.1. Company works experience 4 = 3 verifiable similar completed projects submitted 2 = 2 verifiable similar completed projects submitted 0 = No verifiable similar completed projects submitted
B-BBEE Minimum Level: one
Points Allocation: 10 points
B-BBEE Details: t 240-114238630 Rev 22
Identifier
Invitation to Tender
Effective Date 31 January 2025
Review Date January 2030
Clause Number from Standard
Tender Data
Conditions of Tender
A maximum of 10/20 points may be awarded to a tenderer for
the specific goal specified for the tender. The points scored
for the specific goal must be added to the points scored for
price and the total must be rounded off to the nearest two
decimal places. Subject to section 2(1)(f) of the Preferential
Procurement Policy Framework Act, the contract must be
awarded to the tenderer scoring the highest points.
B-BBEE Status Number of Number of
Level of points points
Contributor (80/20 system) (90/10 system)
1 20 10
2 18 09
3 14 06
4 12 05
5 8 04
6 6 03
7 4 02
8 2 01
Non-compliant 0 0
contributor
NB: The following documents are required to claim
preference points,
accredited verification agency / sworn affidavit / CIPS
affidavit
documentation) inclusive of shareholding breakdown
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 68
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 22
Identifier
Section
Source: Tender Documents.zipSHE Costing:
Costing for she
Description Quantity Rate Total
Training and competency
First Aider (1)
Designation Employer (Site Manager with OHS/SHE Legal Liability
Training)
Supervisor (SHE Training)- Legal Liability & OHS Supervisory
OHS Representatives (more than 20 employees or risk based)
Incident Investigator (X1)
Mobile Plant Operators (LDV and YELLOW PLANT)
Stacking and Storage
Fire fighting level one( X1)/ After appointment on site all employees
to attend Fire Demo (provided by the Client)
Rope access supervisor and rescuer
Rope access operators
Fall Protection planner (x1) & All employees to work at heights must
be trained by an Accredited facility.
Risk Assessor (1X)
sub-total
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 68
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 22
Identifier
Invitation to Tender
Effective Date 31 January 2025
Review Date January 2030
PERSONAL PROTECTIVE CLOTHING (For each employee per annum/ month); SABS &CI APPROVED
Safety Boots, shoes and gumboots(x1 pair)
Two or one piece Overalls (x2) chemical proof type
Reflective vest (x2)
Hard hat with a chin strip with a company logo (x1)
Safety gloves (applicable for the type of duty) (x2 pair) per Month
Safety Goggles/ glasses (applicable for the type of duty) (x2)
Disposable Dust musk FFP2 Type (each to be replaced after
contamination)
Welding aprons/ 3M Welding respiratory mask
Arc flash suits for RP'S
Hearing protection (x1)sans approved (Earmuffs/earplugs)
Sun beam hats
Safety Harness
Winter coats/jackets
Rain coats (If applicable)(x1)
Other contents
First Aid Box (Including all relevant required items) (x1)
Fire extinguisher (x1 for the vehicle & x1 for the offices x1 for when
conducting Hot work activities)
Medical Surveillance (For all employees on site) including labour
broker (valadility of 12 months) / Vaccinations when exposed
Biological Agents
Site Establishment (portable flushing ablution & Kitchen
facilities/offices/workshop/stores/parking areas/safety and directive
signs/taps etc)
sub-total
Occupational hygiene requirements
Costing for Health and Safety management
Has the tenderer submitted detailed costing for OHS (the cost should
be broken down not provided as a lump sum).
· The costing must be based on the overall scope of work/service to
be performed;
· The scope of work and the risk assessment may serve as a
guideline.
· List of Occupational Hygiene surveys/ risk assessment:
· Exposure risk assessment- addressing all relevant stressors
· Ergonomics Risk Assessment
· Physical Agents Risk Assessment
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 68
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 22
Identifier
Invitation to Tender
Effective Date 31 January 2025
Review Date January 2030
· Noise Risk Assessment
· Monitoring surveys: Hazardous Chemical Agents, Hazardous
Biological Agents, Heat stress, Cold stress, Non-ionising radiation,
Indoor air quality, Illumination.
Quality Requirements
240-12248652
Supplier Quality Management:
7 List of Tender Returnables Documents 2022/01/26
240-105658000
Deliverables to be
Category 2 : Quality Requirements
evaluated indicator = 1
SECTION A : Quality Management System Requirements ISO 9001
(Option 1) Valid certification of Quality Management System by an ISO accredited body
Apply =1
A.1 Product / Service Scoping on ISO 9001 certificate is defined and relevant 1
A.2 Certificate by Approved and Authorized certification authority 1
A.3 Certification Authority has Recognized International Accreditation 1
A.4 Validity (expiry date) of certificate 1
Section A Score Option 1 4
SECTION A : Quality Management System Requirements ISO 9001
Objective evidence of documented QMS that is not
(Option 2) certified but complies with ISO 9001
Apply =1
A.1 QMS Manual or a document that defines and describes the QMS and its scope 1
A.2 Quality Policy Approved by top management. 1
A.3 Quality Objectives Approved by top management. 1
A.4 Control of documented information (i.e. document and record control)
Clause 7.5 of ISO 9001:2015
A.5 Documented information for Control of nonconforming outputs
Clause 8.7 of ISO 9001:2015
A.6 Documented information for Nonconformity and Corrective action
Clause 10.2 of ISO 9001:2015
A.7 Documented information for Internal audit
Clause 9.2 of ISO 9001:2015
Section A Score Option 2 7
SECTION B : Evidence of QMS in operation (Tender Quality Requirements -Ref 240-105658000)
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 68
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 22
Identifier
Invitation to Tender
Effective Date 31 January 2025
Review Date January 2030
Apply =1
B.1 Documented information for defined roles, responsibilities and authorities -
Organization chart and Responsibility matrix (must include but not limited to quality
management function/role)
(Clause 5.3 of ISO 9001:2015)
B.2 Documented information for Control of Externally Provided Processes, Products
and Services - Must include criteria for evaluation, selection, monitoring of 1
performance, and re-evaluation of external providers (Clause 8.4 of ISO 9001:2015)
B.3 Latest copy of an internal management system audit report (with
Nonconformity, Correction and/ or Corrective Action Reports) - Report must include
but not limited to Objective, Scope, Criteria and outcomes of the audit.
(Clause 9.2 of ISO 9001:2015)
B.4 Latest copy of a certification management system audit report not older than 12
months (with Nonconformity, Correction and/ or Corrective Action Reports)
B.5 Records of Management Review meetings (minutes, attendance registers e.t.c) 1
Section B Score 4
SECTION C: Contract Quality Plan Requirements (Ref 240-105658000 and 240-109253698).
Draft Contract Quality Plan specific to the scope of work as described in the tender documents (Ref ISO
Apply (Yes=1)
NB! Draft Contract/Project Quality Plan has important QA deliverables 1
Section C Score 1
SECTION D: Quality Control Plan Requirements (Ref 240-105658000 or 240-109253302)
QCP /Checklist/ ITP (Quality Control Plans) as per Scope of Works (Ref ISO 10005)
Apply = 1
NB! Draft/ Example of an Inspection and Test Plan (ITP) or Quality Control Plan (QCP)
on similar and/ or previous work done
Section D Score 1
SECTION E: User defined additional Requirements & miscellaneous (Ref 240-105658000)
Customer specific requirements & other standards and required can be listed and evaluated here
Apply (Yes=1)
E.1 Form A is completed and signed. 1
Section E Score 1
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 68
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 22
Identifier
Invitation to Tender
Effective Date 31 January 2025
Review Date January 2030
Enquiry/
A CONTRACT No:
Enquiry/
Contract
Description section (tenderer)
Clauses of 240- clause description indicate with an
105658000 (x) as applicable
Specification or (-) if not
Applicable
Pre-contract award quality requirements x
(*Select Only Applicable Category). NB: Not more than one category must be selected. Also
indicate whether site assessment is applicable.
Category 1 (refer to clause 3.5.-105658000) -
Category 2 (refer to clause 3.5.-105658000) -
Category 3 (refer to clause 3.5.-105658000) X
Category 4 (refer to clause 3.5.-105658000) -
Main Supplier and Sub-supplier Capability and Capacity Assessment (refer to clause 3.- -
3 post-contract award (ESKOM)
B Contract Execution (refer to clause 3.7.-105658000) X CLAUSE Supplier Quality Performance Monitoring Phase (refer to clause 3.7.-105658000) X
Standard conditions section
Eskom Rights of Access (refer to clause 3.8.-105658000) X
Eskom Rights to Information (refer to clause 3.8.-105658000) X
Preservation (refer to clause 3.8.-105658000) X
Quality Audits Related Conditions (refer to clause 3.8.-105658000) X
Management of Nonconformities and Nonconforming Outputs Identified by Eskom (refer to clause
3.8.-105658000) x
Special processes (refer to clause 3.8.-105658000) x
Clauses of iso 9001 standard indicate with an quality iso 9001 indicate with an
Iso 9001 clause description (x) as applicable principles standard (x) as applicable
Standard or (-) if not principle or (-) if not
Applicable description applicable
CLAUSE 4 Context of the Organisation X PRINCIPLE 1 Customer focus X
CLAUSE 5 Leadership X PRINCIPLE 2 Leadership X
CLAUSE 6 Planning X PRINCIPLE 3 Engagement of X
people (ESKOM) Process X C CLAUSE 7 Support X PRINCIPLE 4 approach
CLAUSE 8 Operation X PRINCIPLE 5 Improvement X
CLAUSE 9 Evidence based
Performance Evaluations X PRINCIPLE 6 X SECTION decision making
CLAUSE 10 Relationship Improvement X PRINCIPLE 7 X
Management
D eskom’s name designation date signature
Quality
Representativ
E section (ESKOM)
Name designation date signature
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 68
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 22
Identifier
Invitation to Tender
Effective Date 31 January 2025
Review Date January 2030
Tenderer’s
E
Representativ
N rer) e sectio quality (tende
Technical Evaluation Criteria:
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 68
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 22
Identifier
Invitation to Tender
Effective Date 31 January 2025
Review Date January 2030
SDL&I Requirements:
2.1 Designated Sectors
When applicable the following stipulated minimum threshold for Local Production and Content must be
achieved in full by the tenderer
Yes NO
a) Is this Commodity or part of it a Designated ☐
Sector?
Please indicate below Designated Components
Commodity Components Local Content Threshold
Cement
construction as
appropriate
Steel Products and 100%
steel Construction
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 68
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 22
Identifier
Invitation to Tender
Effective Date 31 January 2025
Review Date January 2030
NOTE: SBD 6.2 Declaration Form and Annex C (Local Content Declaration-Summary Schedule) are
therefore mandatory and must be tender returnables if applicable.
2.1 CIDB Skills Development
Continuation of Mandatory Requirements
Yes NO
a) Is there CIDB compulsory training? ☐
If Yes, what is the% of the Construction Skills Development
Goal % (CSDG)
If the answer above is Yes, it will then be mandatory for the supplier to match Eskom’s targets
Criteria Eskom Target Tenderer Commitment
Civil Engineering (CE) 0.25%
General Building (GB) 0.5%
NOTE: Failure by the Contractor/Service Provider/Supplier to meet the CIDB CSDG mandatory %
will render their tender non-responsive.
Section 3: SDL&I Objectives in line with Reconstruction and Development Programme (RDP)
Goals
Tenderers who complete and submit the objectives as required, but who do not meet Eskom’s
targets, will not be disqualified. SDL&I objectives do not form part of scoring but commitments will
form part of contractual obligations
Transformation remains an area of focus, where Eskom continuously strives to align itself with
national transformation imperatives to unlock growth, drive industrialization, create employment and
contribute to skills development.
Eskom encourages its suppliers to constantly strive to improve their B-BBEE rating. Whereas
Tenderer/s will be allocated points in terms of a preference point system based on specific goals,
Eskom also requests that tenderer/s submits their B-BBEE improvement or retention plan within 30
days of signing the contract.
Tenderer/s are therefore requested to indicate the extent to which they will maintain (only if the
respondent is a Level 1) or may improve/maintain their B-BBEE status over the contract period if
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 68
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 22
Identifier
Invitation to Tender
Effective Date 31 January 2025
Review Date January 2030
their B-BBEE status is level 2 or 3. Tenderer/s with a B-BBEE status level 4 at the time of contract
award, shall migrate and achieve as a non-negotiable a milestone of B-BBEE Level 3 by the end of
the first year of the contract and thereafter improve their B-BBEE status level or migrate by one level
higher.
Tenderer/s with a B-BBEE recognition status of Level 5 to Level 8 or non-compliant at the time of
contract award, shall migrate and achieve as a non-negotiable a milestone of Level 4 by the end of
the first year of the contract and thereafter improve at least one B-BBEE Level higher of each year
from the second year of the contract.
Tenderer/s are requested to submit their B-BBEE Improvement Plan as an essential document within
30 days of signing the contract.
NB: A valid B-BBEE certificate or Sworn Affidavit is a condition for contract award, if your company’s
annual Total Revenue is R10 Million or less you qualify as an Exempted Micro Enterprise therefore
you can submit Sworn Affidavit. If your annual Total Revenue is R50 Million or less, you qualify as
Qualifying Small Enterprise and must comply with all of the elements of QSE score card relevant to
your sector unless an entity is at least 51% Black owned you are required to obtain a Sworn affidavit.
If your Annual Total Revenue is above R50m you need to submit a Valid B-BBEE certificate
“Local Procurement Content” refers to value added in South Africa by South African resources.
Where a single contract involves a combination of local and imported goods and/or services, the
tender response must be separated into its components as per the Price Schedule included with
the tender documents. Local procurement content is total spending minus the imported
component.
Tenderers are required to submit their proposals in the table below.
Local Procurement Eskom target Tenderer Proposal
Content
100%
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 68
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 22
Identifier
Invitation to Tender
Effective Date 31 January 2025
Review Date January 2030
created and retained in South Africa as a direct result of being awarded a contract.
Type of Jobs to be created Number of Jobs to be created
Type of Jobs to be retained Number of Jobs to be retained
Tenderers are required to submit proposals in a table below for developing the skills of unemployed
candidates in the country. Skills development is intended to address Eskom’s core, scarce and critical
skills and the scarce and critical skills. These skills are also included in a 2020 list of occupations in
high demand as stipulated in the Government Gazette 43937. Candidates shall be from all provinces
in the country, and their composition shall be representative of the population demographics of South
Africa
Skill type / Eskom Entry Exit Proposed Number of
Occupation target Candidates
Boiler
maker,
3 N3 or Welder,
Equivalent Mechanical
fitter,
Technical skills electrician
Matric or N6 or
N3 National
2 Technical students Diploma
The process of developing these skills shall involve the participation by tenderers directly and
through their supply network. In certain cases, the SETA’s accredited training providers can be
approached to participate in developing critical and scarce skills.
Note: That these targets for skills development candidates categorically exclude Eskom
employees and registered learners. The tenderers are required to take full responsibility
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 68
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 22
Identifier
Invitation to Tender
Effective Date 31 January 2025
Review Date January 2030
for the total cost of developing the requisite skills, and Eskom shall not make any
financial contribution towards the fulfilment of this obligation. Tenderers also are
advised to approach their relevant SETAs to access grants, subsidies, and incentives
as well as South African Revenue Services for tax rebates that are earmarked for skills
development initiatives.
Tenderers shall subcontract a minimum of 5% of the contract value to the following designated
groups:
or townships.
NOTE 2: Tenderers shall submit the following mandatory returnable for Subcontracting:
documents (CK and B-BBEE certificate or sworn affidavit) or
the sub-contractors, stating the intent to sub-contract. The Tenderer should sign both
documents and the Sub-contractor(s) earmarked.
Potential scope to be subcontracted and/or outsourced:
Section 4: SDL&I Penalty and Performance Security
Eskom will apply a penalty of 1,5% of the invoice amount for failure to meet SDL&I obligations.
Eskom will apply a penalty of 1,5% of the Contract Value for failure to meet SDL&I obligations.
For the duration of the contract, Eskom will retain 1,5% of every invoice (excluding VAT) as security
for the fulfilment of all SDL&I Obligations. The retained amounts shall only be released to the
Contractor upon:
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 68
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 22
Identifier
Invitation to Tender
Effective Date 31 January 2025
Review Date January 2030
Section 5: Reporting and Monitoring
Collection Template on their compliance with the SDL&I obligations described above.
of the reports and notify the suppliers in writing if their SDL&I obligations have not been met.
shall be required to implement corrective measures to meet those SDL&I obligations before the
commencement of the following report, failing which Retention clauses shall be invoked.
completed by the suppliers and returned to SDL&I representative for acceptance 28 days after
contract award. This will be used as a reference document for monitoring, measuring and
reporting on the supplier’s progress in delivering on their stated SDL&I commitments
Section 5: Market Research
The following information demonstrates market analysis and assisted in arriving at the targets above.
Current Suppliers Providing the Services Potential Suppliers:
Section 6: General Information on Validity of Sworn Affidavits
The following must be considered when it comes to validity of Affidavits;
Tenderers submitting B-BBEE Sworn Affidavits must ensure that the affidavits meet the following key pointers to
ensure their validity:
authorised to depose of an affidavit. (Mark the applicable option).
business address.
as per Statement 004, the percentage of black beneficiaries must be reflected. (No blank spaces to be left).
management account. (Mark the applicable option).
(Financial year end to be stipulated by day/month/year).
supplier status.
the presence of the Commissioner of Oath. Furthermore the Commissioner must also sign and stamp)
commission a sworn affidavit in which they have an interest.
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 68
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 22
Identifier
Invitation to Tender
Effective Date 31 January 2025
Review Date January 2030
Annexure a
Authorisation form
Indicate the status of the tenderer by ticking the appropriate box below.
A b c d e f
Company close partnership joint sole trust
Corporation venture proprietor
The tenderer must complete the appropriate certificate set out below for its category of organisation.
If the tenderer is a company, close corporation, joint venture, or trust the tenderer must attach a
certified copy the document that is proof of the contents of the certificate (resolution of the board of
directors of a company, members’ resolution of a close corporation, power of attorney in the case of
a joint venture, or resolution of the board of trustees of a trust).
Note further that, in addition to completing the relevant certificate for category of organisation, the
authorised representative of the tenderer is also required to complete and sign the table at the end
of this Authorisation Form.
A. Certificate for company
I,_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ , in my capacity as _ _ _ _ _ _ _ _ _ _ _ of the
board of directors of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, hereby
confirm that by resolution of the board taken on _ _ _ __ _ _ _ _ (date), Mr/Ms _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ , acting in his/her capacity of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, is
authorised to submit this tender on behalf of the company, and to sign all documents in connection
with this tender and any contract that may result from it on behalf of the company. A certified copy of
the resolution of the board is annexed to this Form.
Signed: Date:
Name: Position:
B. Certificate for close corporation
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 68
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 22
Identifier
Invitation to Tender
Effective Date 31 January 2025
Review Date January 2030
I,_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ , in my capacity as member of _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, hereby confirm that by majority vote of the
members taken on _ _ _ __ _ _ _ _ (date), Mr/Ms _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , acting
in his/her capacity of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, is authorised to submit this tender
on behalf of the close corporation, and to sign all documents in connection with this tender and any
contract that may result from it on behalf of the close corporation. A certified copy of the members’
resolution is annexed to this Form.
Signed: Date:
Name: Position:
C. Certificate for partnership
We, the undersigned, being the key partners in the business trading as _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ hereby authorise Mr/Ms _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, acting in his/her
capacity of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, to submit this tender on behalf of the partnership,
and to sign all documents in connection with the tender and any contract that may result from it on
behalf of the partnership.
Name Address Signature Date
NOTE: This certificate is required to be completed and signed by the full number of Partners
necessary to commit the Partnership. Attach additional pages if more space is required.
D. Certificate for Joint Venture
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 68
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Address
Duvha Power Station - Emalahleni - Witbank - 1035
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
1
Last checked
08 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
A practical guide for small and medium building contractors on winning government tenders for schools, clinics, housing, and municipal buildings in South Africa.
How established construction firms use Joint Ventures with EMEs and QSEs to meet B-BBEE preferential procurement targets and access set-aside contracts.
Everything South African construction contractors need to know about how procurement officers verify cidb grades: what gauteng contractors must ensure is correct — april 2026 update — covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
How small and medium construction contractors use Joint Ventures to combine CIDB grades, win larger infrastructure projects, and grow beyond their current grading ceiling.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Construction of buildings. Unlock full pricing strategies, bid frequency, and historical win rates.