Tender Type
Request for Bid(Open-Tender)
Delivery Location
1 LANGFORD STREET - WESTVILLE - WESTVILLE - 3610
Organization Type
GOVERNMENT
Published
04 Sept 2026
OCDS Reference
ocds-9t57fa-169196
ESKOM requires the supply and delivery of bulk water to various areas within the southern grid on an as-and-when-required basis. Bidders must achieve a weighted average score of at least 80% in the environmental management evaluation, which is a mandatory gate for consideration. The most consequential requirement is the submission of comprehensive environmental documentation, including an environmental management system, environmental management programme, waste management plan, and an environmental bill of quantity.
Bidders must achieve a weighted average score of at least 80% in the environmental management evaluation to be considered.
Bidders must submit a valid Environmental Management System (EMS) with documented information covering policy, objectives, roles, responsibilities, and authorities.
Bidders must provide a draft or example Environmental Management Programme (EMPr) or Method Statements covering hazardous chemical substances, water management, access control, landowner liaison, noise control, environmental awareness, and incident reporting.
Bidders must submit a draft or example Waste Management Plan covering waste types, legislation, segregation, handling, disposal, and reporting.
Bidders must provide a draft Aspect and Impact Register and Method Statement based on the scope of work.
Bidders must submit an Environmental Bill of Quantity with items relevant to environmental aspects as per the scope of work.
Bidders must complete and sign the Contractor Environmental Requirements Proforma (240-180100129).
The person responsible for environmental monitoring, reporting, and incident management must hold at least an N.Diploma or BSc/Bachelor Degree in Environmental Sciences, Management, Nature Conservation, or a related field.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Monday, 05 October 2026 - 10:00
Venue
MS TEAMS
Join the meeting now bulkwater clarification | meeting-join | microsoft teams meeting ID: 352 112 837 168 614 passcode: 6fz2va6k
Request for Bid(Open-Tender)
1 LANGFORD STREET - WESTVILLE - WESTVILLE - 3610
Recommended Certifications
Having these can improve your winning chances: WISA Membership, IWMSA Membership
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: OHS EVALUATION CRITERIA.pdf. You don’t need to refresh — this page will pick up the updated review automatically.
04 Sept
2026
Tender Published
Tender was published
05 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
NTCSA_E-Tenderers E-Tendering Training Acknowledgement Form.pdf
Analysis completed but response format was invalid
The supply and delivery of bulk water to various areas within the Southern Grid.pdf
Eskom (NTCSA) invites bids for the supply and delivery of bulk water to various areas within the Southern Grid, on an 'as and when required' basis over a 36-month period. The tender is subject to the 80/20 preferential procurement system, with B-BBEE points awarded. Bidders must complete and submit the required SDL&I commitments, including local production content, job creation, skills development, and B-BBEE documentation. The closing date is 5 October 2026 at 10:00.
TECHNICAL CRITERIA BULK WATER1.pdf
ESKOM seeks a supplier for the supply and delivery of bulk water to various areas within the southern grid, on an as-and-when-required basis. The tender is evaluated in two parts: mandatory criteria (100% pass required) and supplementary criteria (minimum 75% score required), with an on-site verification of evidence.
NTCSA_E-tendering Help Manual for supplier.docx
The supply and delivery of bulk water to various areas within the southern grid on an as-and-when-required basis, issued by Eskom in the Free State province.
BRA.pdf
The supply and delivery of bulk water to various areas within the southern grid on an as-and-when-required basis, for Eskom's NTCSA division in the Free State province.
Supply NEC Contract.pdf
This document is a tender for the supply and delivery of bulk water to various Eskom substations, including Grassridge, Poseidon, and Neptune. It is based on the NEC3 Supply Contract (SC3) and includes detailed contract conditions, pricing schedules, and scope of work. The tenderer must complete the pricing and provide all required documentation.
Eskom Standard Conditions of Tender on E-tendering.pdf
Eskom is procuring the supply and delivery of bulk water to various areas within the southern grid on an as-and-when-required basis. The tender is open to eligible suppliers who can deliver water in bulk to designated areas in the Free State province.
1.01_NTCSA Invitation_to_Tender_(ITT)_or_Request_for_Proposal_ eTendering Template _July 2026_ Bulk Water Review.pdf
No summary available
SHE SPECS.pdf
ESKOM is procuring the supply and delivery of bulk water, treated or naturally suitable for hygiene and household purposes, to various areas within the Southern Grid, including substations in the Eastern Cape (Grassridge, Poseidon, Neptune, Coega IDZ area, Cookhouse, East London, Gqeberha). Water must be delivered by truck in volumes of 15,000 to 25,000 litres per delivery, on an as-and-when-required basis. The contract is governed by a detailed SHE specification requiring compliance with South African occupational health, safety, environmental, and water quality standards.
ANNEXURE B ACKNOWLEDGEMENT.pdf
The supply and delivery of bulk water to various areas within the southern grid on an as and when required basis, for Eskom in the Free State province.
eTendering_ExternalUser_Guide_v4.pdf
Eskom seeks suppliers for the supply and delivery of bulk water to various areas within the southern grid, on an as-and-when-required basis. The tender is managed through Eskom's eTendering system, requiring electronic submission of documents.
ENVIRO.pdf
Eskom is procuring the supply and delivery of bulk water to various areas within the southern grid on an as-and-when-required basis. The tender includes an environmental management assessment, requiring bidders to submit documented evidence of their environmental management systems, waste management plans, and other related documentation.
BOQ Bulk Water Rev 0.xlsx
The supply and delivery of bulk water to various areas within the southern grid on an as-and-when-required basis, for the National Transmission Company of South Africa (ESKOM).
ENVIRO FORMA.pdf
The supply and delivery of bulk water to various areas within the southern grid on an as and when required basis, issued by Eskom in the Free State province. The contract requires adherence to environmental management requirements and submission of relevant documentation.
OHS EVALUATION CRITERIA.pdf
This tender from Eskom in the Free State province invites bids for the supply and delivery of bulk water to various areas within the southern grid on an as-and-when required basis. The closing date is October 5, 2026. The document outlines standard South African procurement forms and compliance requirements, including B-BBEE, tax clearance, and other regulatory declarations.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 2 254 019
Range
Based on 18 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Evaluation Criteria
Source: OHS EVALUATION CRITERIA.pdf (unknown)Eligibility is determined by compliance with the mandatory SBD forms and declarations, including no conflict of interest (SBD 4), no collusive practices (SBD 9), and a clean record regarding past supply chain management practices (SBD 8). Bidders must be registered on the CSD, have a valid tax clearance, and meet the specified B-BBEE level. For construction-related services, a valid CIDB grading may be required. The bidder must also meet any local content requirements and be a legal entity capable of entering into a contract with Eskom.
Compliance Requirements
Source: OHS EVALUATION CRITERIA.pdf (unknown)No specific requirements found
Submission Guidelines
Source: ANNEXURE B ACKNOWLEDGEMENT.pdf (unknown)Returnable documents: Annexure B Acknowledgement Form for Eskom OHS legal and other requirements, completed and signed by an authorised person (CEO/Director/Managing Director). The form confirms the bidder has obtained and understands the OHS requirements and the consequences of non-compliance.
Evaluation Criteria
Source: ANNEXURE B ACKNOWLEDGEMENT.pdf (unknown)Bidders must complete and sign Annexure B: Acknowledgement Form for Eskom OHS legal and other requirements. Compliance with the OHS requirements is mandatory; penalties will be enforced for non-conformance.
Technical Specifications
Source: ANNEXURE B ACKNOWLEDGEMENT.pdf (unknown)appointment of contractors or suppliers for the commencement
of work
Compliance Requirements
Source: ANNEXURE B ACKNOWLEDGEMENT.pdf (unknown)Bidders must comply with the following OHS documents when working at or rendering a service to Eskom: Eskom Contractor Health and Safety requirements standard 32-136, the provided OHS specification, the Occupational Health and Safety Act, and the Compensation for Occupational Diseases and Illnesses Act. All employees (contractors/suppliers) must undergo the relevant Eskom induction. The main contractor must demonstrate the process and selection criteria for appointing contractors and suppliers, notify Eskom prior to appointment, ensure adequate resources and competencies, manage contractor compliance, monitor through audits and assessments, and deal with non-conformances through performance and penalty processes. Eskom may verify references and contact details of clients for whom the company has done similar work.
Health & Safety
Source: ANNEXURE B ACKNOWLEDGEMENT.pdfBidders must comply with Eskom OHS requirements, including Eskom Contractor Health and Safety requirements standard 32-136, the provided OHS specification, the Occupational Health and Safety Act, and the Compensation for Occupational Diseases and Illnesses Act. Penalties will be enforced for non-conformance. All employees must undergo relevant Eskom induction. The main contractor must demonstrate contractor selection criteria, notify Eskom before appointing contractors, ensure adequate resources and competencies, manage contractor compliance, monitor through audits, and deal with non-conformances. Eskom may verify references.
Contractual Terms
Source: ANNEXURE B ACKNOWLEDGEMENT.pdfThe main contractor must demonstrate to Eskom the process and selection criteria applied when appointing contractors and suppliers. Notification to Eskom is required prior to appointing contractors or suppliers for commencement of work. The main contractor must ensure contractors and suppliers have adequate resources and competencies, and is accountable for their management to ensure compliance with legal and Eskom requirements. The main contractor must monitor contractors and suppliers through audits and assessments regarding OHS compliance. Grounds for termination of work by contractors/suppliers must be provided by the main contractor. Non-conformances by contractors/suppliers (all tiers) are dealt with directly with the main contractor through performance and penalty processes. Eskom reserves the right to verify this and may request copies of testimonials/references and contact details of clients (including Eskom) for whom similar work was done.
Description
Source: eTendering_ExternalUser_Guide_v4.pdfThe tender is for the supply and delivery of bulk water to various areas within the southern grid, on an as-and-when-required basis. The document provided is the Eskom eTendering System User Manual, which describes the electronic submission process. It does not contain tender-specific scope details beyond the title.
Important Dates
Source: eTendering_ExternalUser_Guide_v4.pdf (TENDER)The tender record lists the closing date as 2026-10-05 at 10:00. No other dates (briefings, site visits, clarification deadlines) are stated in the provided document.
Contact Information
Source: eTendering_ExternalUser_Guide_v4.pdf (TENDER)For system problems with Tender Bulletin, eTendering or OpenText, contact the buyer responsible for the published tender. No specific contact names, phone numbers, or addresses are provided in the document.
Submission Guidelines
Source: eTendering_ExternalUser_Guide_v4.pdf (TENDER)Submission is electronic only via the Eskom eTendering system at https://eTendering.eskom.co.za. Bidders must register on the system and verify their email address before submitting. An OTP is sent to the registered cellphone and email for login. Upload each document under the correct category (Technical, Commercial, Finance, etc.). Finalise the submission by clicking 'Finalize Submission' then 'Finalise and Close Submission'. Individual file size must not exceed 50MB; total upload size must not exceed 900MB. After finalisation, an email confirmation with a submission ID is sent; keep this email for future enquiries.
Evaluation Criteria
Source: eTendering_ExternalUser_Guide_v4.pdf (TENDER)No evaluation criteria are stated in the provided document. The document mentions that closed tenders are sent directly to suppliers who meet selection and evaluation criteria, but no specific criteria are given.
Technical Specifications
Source: eTendering_ExternalUser_Guide_v4.pdf (TENDER)The scope is the supply and delivery of bulk water to various areas within the southern grid on an as-and-when-required basis. No quantities, delivery schedules, water quality standards, or service levels are stated in the provided document.
Compliance Requirements
Source: eTendering_ExternalUser_Guide_v4.pdf (TENDER)CSD registration is mandatory: bidders must have a CSD number to gain access to the eTendering system. No other compliance requirements (tax status, B-BBEE, CIDB, etc.) are stated in the provided document.
Description
Source: The supply and delivery of bulk water to various areas within the Southern Grid.pdfMarket Research: Current suppliers from Eskom database; potential suppliers from CSD suppliers.
Important Dates
Source: The supply and delivery of bulk water to various areas within the Southern Grid.pdf (TENDER)Closing date: 2026-10-05 at 10:00 (from tender record). No other dates stated in the document.
Contact Information
Source: The supply and delivery of bulk water to various areas within the Southern Grid.pdf (TENDER)Buyer: Lindokuhle Chonco. Business Unit: NTCSA. No email, phone, or submission address provided in the document.
Submission Guidelines
Source: The supply and delivery of bulk water to various areas within the Southern Grid.pdf (TENDER)Returnable documents: SBD 6.2 (Declaration for Local Production and Content) and Annexure C (Local Content Declaration-Summary Schedule) are mandatory on contract award. Bidders must also submit a valid B-BBEE certificate or sworn affidavit, proof of ownership/shareholding (preferably CIPC documentation) with shareholding breakdown, certified ID copies of shareholders, and proof of disability where applicable. Tenderers failing to provide preference point documentation will not be disqualified but will score only out of 90/80 for price and 0 out of 10/20 for specific goals.
Evaluation Criteria
Source: The supply and delivery of bulk water to various areas within the Southern Grid.pdf (TENDER)Evaluation uses a preference point system with a maximum of 10/20 points for specific goals (B-BBEE status level) added to price points. Points table: Level 1: 10/20, Level 2: 9/18, Level 3: 6/14, Level 4: 5/12, Level 5: 4/8, Level 6: 3/6, Level 7: 2/4, Level 8: 1/2, Non-compliant: 0/0. Contract awarded to tenderer scoring highest total points. Objective criteria are not mandatory but are a condition for contract award; failure may lead to the second-ranked tenderer being recommended. The commodity is not a designated sector, so no local content threshold applies. CIDB compulsory training: No. National Industrial Participation Programme: N/A. Mandatory subcontracting: N/A.
Technical Specifications
Source: The supply and delivery of bulk water to various areas within the Southern Grid.pdf (TENDER)Scope: Supply and delivery of bulk water to various areas within the Southern Grid on an 'as and when' required basis. Duration: As and when required over 36 months.
Methodology
Source: The supply and delivery of bulk water to various areas within the Southern Grid.pdfSkills development: Tenderers must propose training for unemployed candidates to address Eskom's core, scarce and critical skills, as per Government Gazette 43937. Candidates must be from all provinces and representative of demographics. Tenderers bear full cost; Eskom makes no financial contribution. Tenderers may approach SETAs for grants and SARS for tax rebates.
Financial Requirements
Source: The supply and delivery of bulk water to various areas within the Southern Grid.pdf (TENDER)Pricing: Tender response must be separated into its components as per the Price Schedule included with the tender documents. Local procurement content is total spending minus the imported component; NTCSA target is 100%. SDL&I retention: NTCSA will retain 2.5% of every invoice (excluding VAT) as security for fulfilment of SDL&I obligations. Retained amounts released upon receipt of SDL&I progress reports, fulfilment of all obligations, and submission of an approved compliance report by the SDL&I Department.
Compliance Requirements
Source: The supply and delivery of bulk water to various areas within the Southern Grid.pdf (TENDER)B-BBEE: A valid B-BBEE certificate or sworn affidavit is a condition for contract award. Exempted Micro-Enterprise (annual total revenue ≤ R10 million) may submit a sworn affidavit; Qualifying Small Enterprise (revenue ≤ R50 million) must comply with QSE scorecard unless at least 51% Black owned, in which case a sworn affidavit is required; revenue above R50 million requires a valid B-BBEE certificate. B-BBEE Improvement Plan: Must be submitted within 30 days of signing the contract. Level 1 must maintain; Levels 2-3 must improve/maintain; Level 4 must achieve Level 3 by end of first year and improve one level each subsequent year; Levels 5-8 or non-compliant must achieve Level 4 by end of first year and improve one level each subsequent year. Sworn affidavits must meet validity requirements including deponent details, enterprise details, black ownership percentages, total revenue, financial year end, B-BBEE status level, empowering supplier status, and Commissioner of Oath requirements.
B-BBEE Requirements
Source: The supply and delivery of bulk water to various areas within the Southern Grid.pdf (TENDER)Jobs: Tenderers must submit proposals for the type and number of jobs created and retained in South Africa as a direct result of the contract.
Contractual Terms
Source: The supply and delivery of bulk water to various areas within the Southern Grid.pdf (TENDER)Reporting and Monitoring: Suppliers must submit quarterly SDL&I compliance reports using the Data Collection Template. NTCSA reviews reports within 30 days and notifies in writing if obligations not met. Suppliers must implement corrective measures before next report, failing which retention clauses are invoked. Each contract must include an SDL&I Implementation Schedule, completed and returned within 28 days after contract award, used for monitoring and reporting.
Requirements
Source: The supply and delivery of bulk water to various areas within the Southern Grid.pdf (TENDER)Objective criteria: Not mandatory but a condition for contract award. If not met, may lead to second-ranked tenderer being recommended. Designated sectors: The commodity is not a designated sector. SBD 6.2 Declaration Form and Annexure C (Local Content Declaration-Summary Schedule) are mandatory on contract award. CIDB skills development: No compulsory training. National Industrial Participation Programme: N/A. Mandatory subcontracting: N/A.
Section
Source: The supply and delivery of bulk water to various areas within the Southern Grid.pdfSpecific goals: A maximum of 10/20 points may be awarded for the specific goal specified for the tender. Points scored for the specific goal are added to price points. B-BBEE status level points table (90/10 and 80/20 systems): Level 1: 10/20, Level 2: 9/18, Level 3: 6/14, Level 4: 5/12, Level 5: 4/8, Level 6: 3/6, Level 7: 2/4, Level 8: 1/2, Non-compliant: 0/0. Documents required to claim preference points: valid B-BBEE certificate (SANAS accredited) or sworn affidavit/CIPS affidavit, proof of ownership/shareholding (preferably CIPC) with breakdown, certified ID copies of shareholders, proof of disability where applicable. Tenderers failing to provide documentation will not be disqualified but may only score out of 90/80 for price and 0 for specific goals.
Description
Source: BRA.pdfThe tender involves the supply and delivery of bulk water to various areas within the southern grid on an as-and-when-required basis.
Evaluation Criteria
Source: BRA.pdf (unknown)No specific eligibility criteria (e.g., CSD registration, tax clearance, B-BBEE level, CIDB grading) are stated in the provided document. Bidders must comply with Eskom's safety and driving requirements as described.
Technical Specifications
Source: BRA.pdf (unknown)The tender is for the supply and delivery of bulk water to various areas within the southern grid on an as-and-when-required basis. The document provided focuses on driving and vehicle safety requirements rather than detailed technical specifications.
Quality Management
Source: BRA.pdfBidders must conduct pre-trip vehicle inspections to ensure vehicles are roadworthy and safe for operation.
Compliance Requirements
Source: BRA.pdf (unknown)Bidders must comply with Eskom's safety and driving requirements, including:
Health & Safety
Source: BRA.pdfBidders must adhere to Eskom's road safety rules and directives, including avoiding alcohol/substance use, managing driver health and fatigue, and ensuring safe driving in unfavourable conditions (e.g., mist, fog, heavy rain, night, difficult terrain).
Description
Source: BOQ Bulk Water Rev 0.xlsxThe tender is for the supply and delivery of bulk water to various areas within the southern grid, on an as-and-when-required basis. The water must be properly treated or naturally suitable for hygiene and other household purposes.
Evaluation Criteria
Source: BOQ Bulk Water Rev 0.xlsx (unknown)No eligibility criteria specified
Technical Specifications
Source: BOQ Bulk Water Rev 0.xlsx (unknown)The bulk water supplied must be properly treated or naturally suitable for hygiene and other household purposes.
The Bill of Quantities covers transport of water by truck in 15,000 to 25,000 litre loads, charged per kilometre, and the supply of bulk water charged per litre.
Description
Source: ENVIRO FORMA.pdfThe tender is for the supply and delivery of bulk water to various areas within the southern grid on an as-and-when-required basis. The bidder must complete and sign the Contractor Environmental Requirements Proforma (document 240-110600836 Rev 2).
Contact Information
Source: ENVIRO FORMA.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"lways implement environmental best practice on site during the contract"}
Submission Guidelines
Source: ENVIRO FORMA.pdf (unknown)Returnable documents: the Contractor Environmental Requirements Proforma (document 240-110600836 Rev 2) must be completed and signed by the bidder, including organisation name, vendor number, contract number, scope of work, full name, designation, signature, date and contact number. The proforma must also be signed by the Eskom Project Manager.
Evaluation Criteria
Source: ENVIRO FORMA.pdf (unknown)The bidder must complete and sign the Contractor Environmental Requirements Proforma, acknowledging acceptance of the responsibility to comply with all environmental requirements. No other evaluation criteria are stated in the available document.
Technical Specifications
Source: ENVIRO FORMA.pdf (unknown)The scope is the supply and delivery of bulk water to various areas within the southern grid on an as-and-when-required basis. The bidder must adhere to the project Environmental Management Plan/Programme and/or Environmental Authorisation, comply with all applicable environmental legal and other requirements, comply with environmental standards, policies and procedures, be aware of and comply with environmental transgressions fine systems, inform staff of their role in managing environmental impacts, report incidents within 24 hours, implement environmental best practice, address non-conformances promptly, and maintain and submit required environmental documentation/registers (e.g., approved project-specific Environmental File, incident/complaint register, herbicide and pesticide register, hazardous substance registers) to the Eskom Project Manager on completion of the project.
Compliance Requirements
Source: ENVIRO FORMA.pdf (unknown)The bidder must complete and sign the Contractor Environmental Requirements Proforma (document 240-110600836 Rev 2), which includes an environmental management declaration. No other compliance requirements are stated in the available document.
Important Dates
Source: Eskom Standard Conditions of Tender on E-tendering.pdf (TENDER)Closing date and time: 2026-10-05T10:00:00.000Z (SAST). A compulsory site visit and/or clarification meeting is cited in the Tender Data; attendance is mandatory and failure to attend disqualifies the tender. The date, time, and venue of the meeting are not stated in the available document. Clarification requests must be submitted before the closing time for clarification of queries, as stated in the Tender Data.
Contact Information
Source: Eskom Standard Conditions of Tender on E-tendering.pdf (TENDER)No specific contact names, emails, or phone numbers are stated in the available document. All communication must be directed to the Eskom Representative in writing. The department is Supply Chain Management.
Submission Guidelines
Source: Eskom Standard Conditions of Tender on E-tendering.pdf (TENDER)Submission is electronic only, via the Eskom Tender Bulletin site on the Eskom E-tendering page. No tender box deposits. Upload and finalize by the closing deadline (SAST, GMT+2). Late tenders are not accepted; the system locks at closing time. Eskom is not responsible for network issues or upload delays. Tenders must be submitted in English. The electronic tender must be signed by a person duly authorised to bind the bidder. Documents must be placed in the correct folders (technical, commercial, financial) on the e-tendering page. The Acknowledgement Form must be completed and submitted, stating whether the tender covers the whole or part of the works/services/supply. Mandatory tender returnables must be submitted by the closing deadline; other returnables required for contract award must be provided before award. Where an agent submits on behalf of a principal, an authenticated copy of the authority to act must be included. Tenderers must check the enquiry documents on receipt and notify the Eskom Representative of any discrepancies or omissions. No alterations or additions to tender documents are allowed except to comply with instructions or correct errors; all alterations must be initialled by all signatories, and correction fluid or tape is prohibited. Alternative tenders are only allowed if a main tender is also submitted and only if permitted by the Invitation to Tender. Tenderers must hold their tenders valid for the stated validity period and extend if requested without modifying the tender. All communication with Eskom must be in writing, in English, and directed to the Eskom Representative. Tenderers must treat all tender-related matters as confidential and use Eskom documents only for preparing the tender.
Returnable Documents
Source: Eskom Standard Conditions of Tender on E-tendering.pdf (TENDER)Mandatory tender returnables: A tender that does not include mandatory documents or information as stipulated and by required deadlines will be deemed non-responsive.
Evaluation Criteria
Source: Eskom Standard Conditions of Tender on E-tendering.pdf (TENDER)Evaluation follows a staged process: basic compliance, mandatory returnables, pre-qualification criteria (if any), functionality (if applicable), then price and B-BBEE scoring under the PPPFA. Tenderers must meet the minimum functionality threshold stated in the Tender Data to be evaluated further. Price is evaluated per the Tender Data, considering factors such as CPA, FOREX, commodity increases, discounts, NPV, and forecasted invoicing rates. B-BBEE level is scored from the CSD report or certificate/affidavit; if B-BBEE is a pre-qualification criterion, proof must be provided at submission or the tender is disqualified. For PPPFA point allocation, a missing, expired, or fraudulent B-BBEE certificate results in zero points but not disqualification (if otherwise responsive). Price and B-BBEE scores are added and tenders ranked highest to lowest. Eskom may apply objective criteria under Section 2(1)(f) of the PPPFA only if stipulated; functionality and B-BBEE scorecard elements cannot be used as objective criteria. Eskom may conduct a reverse e-auction if indicated; in that case, tenders must be submitted without prices and any included prices are disregarded. Eskom will check responsive tenders for arithmetical errors; the amount in words governs. Eskom may disqualify a tender for collusion, bid rigging, fraud, or influencing the process. Tenderers must not sub-contract 100% of the scope of work; such tenders are ineligible. Eskom may reject a tender if financial risk is deemed too high after financial analysis. Tenderers must not misrepresent or falsify information; fraudulent B-BBEE certificates or fronting will be reported and may lead to suspension from business with state-owned companies for up to 10 years.
Technical Specifications
Source: Eskom Standard Conditions of Tender on E-tendering.pdf (TENDER)The scope is the supply and delivery of bulk water to various areas within the southern grid, on an as-and-when-required basis. The tender covers the supply identified in the specification and/or works information. No further technical details, quantities, or service levels are stated in the available document.
Quality Management
Source: Eskom Standard Conditions of Tender on E-tendering.pdfTenderers must provide reasonable proof that safety, health, environmental and quality (SHEQ) systems, policies and capabilities are in place at contract award. All costs and personnel associated with SHEQ should be reflected in the tender for Eskom's assessment. Tenderers must comply with Eskom's SHEQ requirements and relevant legislation such as COIDA and the OHS Act.
Pricing Schedule
Source: Eskom Standard Conditions of Tender on E-tendering.pdfRates and prices must include all duties, taxes (including VAT), and levies applicable 14 days prior to the tender submission deadline. Rates and prices are fixed for the contract duration and are not subject to price adjustment except as provided in the Enquiry. Prices must be stated in South African Rand unless instructed otherwise, and submitted in accordance with the exchange rate and base date stipulated in the Invitation to Tender. Eskom will check responsive tenders for arithmetical errors; the amount in words governs. Eskom will notify the tenderer of errors and may correct them as specified; rejection is possible if the tenderer does not correct or accept corrections. Tenderers must not make alterations or additions to tender documents except to comply with instructions or correct errors; all alterations must be initialled by all signatories, and correction fluid or tape is prohibited. Alternative tenders are only allowed if a main tender is also submitted and only if permitted by the Invitation to Tender. Eskom may request clarification, including a breakdown of rates, but no changes to prices or substance except to correct arithmetical errors; the corrected total of prices is binding on the tenderer.
Financial Requirements
Source: Eskom Standard Conditions of Tender on E-tendering.pdf (TENDER)Rates and prices must include all duties, taxes (including VAT), and levies applicable 14 days prior to the tender submission deadline. Rates and prices are fixed for the contract duration and are not subject to price adjustment except as provided in the Enquiry. Prices must be stated in South African Rand unless instructed otherwise, and submitted in accordance with the exchange rate and base date stipulated in the Invitation to Tender. If security for performance is required, the tenderer must name at least two financial institutions it is likely to approach; Eskom may reject an unsuitable institution. Eskom will not compensate tenderers for any costs incurred in preparing or submitting the tender.
Compliance Requirements
Source: Eskom Standard Conditions of Tender on E-tendering.pdf (TENDER)Tenderers must comply with the eligibility criteria in the Tender Data and must not be under any restriction to do business with Eskom or state-owned companies. Proof of CSD registration is required per National Treasury instructions. Where CIDB is applicable, proof of CIDB registration is mandatory at the tender closing deadline; if only proof of application is available, that must be submitted by closing and the actual registration printout by contract award. Tenderers must comply with PPPFA regulations, Amended B-BBEE Codes, COIDA, OHS Act, and Eskom's SHEQ requirements. Tenderers must provide reasonable proof that SHEQ systems, policies, and capabilities are in place at contract award; all SHEQ costs and personnel must be reflected in the tender. The SD&L (Supplier Development & Localisation) Undertaking must be completed and submitted by contract award; failure to do so means the tender will not be considered for award. Where designated materials apply, a specified percentage (gatekeeper) must be bought from local companies; failure to meet the gatekeeper renders the tender non-responsive. Tenderers must not misrepresent or falsify any information; fraudulent B-BBEE certificates or fronting will be reported to the B-BBEE Commissioner and may lead to suspension from business with state-owned companies for up to 10 years.
B-BBEE Requirements
Source: Eskom Standard Conditions of Tender on E-tendering.pdf (TENDER)B-BBEE level is scored from the CSD report or certificate/affidavit. If B-BBEE is a pre-qualification criterion, proof must be provided at tender submission deadline or the tender is disqualified. If sub-contracting to designated groups is a pre-qualification criterion, the sub-contractors' B-BBEE status and CSD number or certificate/affidavit must be provided at tender submission deadline. If the information provided is fraudulent or expired, the tender is disqualified. For PPPFA point allocation, if no B-BBEE certificate/affidavit is provided at closing, or it is fraudulent or expired, the tenderer is not disqualified (if otherwise responsive) but scores zero under PPPFA. Tenderers must not misrepresent or falsify information; fraudulent B-BBEE certificates or fronting will be reported to the B-BBEE Commissioner and may lead to suspension from business with state-owned companies for up to 10 years. Certain materials are designated by dti and a specified percentage (gatekeeper) must be bought from local companies; failure to meet gatekeepers renders the tender non-responsive.
Health & Safety
Source: Eskom Standard Conditions of Tender on E-tendering.pdfTenderers must provide reasonable proof that safety, health, environmental and quality (SHEQ) systems, policies and capabilities are in place at contract award. All costs and personnel associated with SHEQ should be reflected in the tender for Eskom's assessment. Tenderers must comply with relevant legislation including COIDA, the OHS Act, and Eskom's SHEQ requirements. Where CIDB is applicable, proof of CIDB registration is mandatory at tender closing deadline; if only proof of application is available, that must be submitted by closing and the actual registration printout by contract award. The Contractor shall achieve the Contract Skills Development Goal (CSDG) per the CIDB Standard for Developing Skills through Infrastructure Contracts, applicable to works exceeding R60 million with contract duration 12+ months, or professional services exceeding R5 million with duration 12+ months. The Contractor shall achieve Contract Participation Goals (CPG) relating to engagement of targeted enterprises per the CIDB standard, applicable to Grade 7-9 GB and CE contracts with duration 6+ months; at least 5% CPG must be achieved. Tenderers must comply with relevant legislation such as NT instructions (CSD), CIDB regulations, PPPFA regulations, Amended B-BBEE Codes, COIDA, OHS Act, and Eskom's SHEQ requirements. Tenderers must not misrepresent or falsify information; fraudulent B-BBEE certificates or fronting will be reported and may lead to suspension from business with state-owned companies for up to 10 years. Tenderers must complete and submit the SD&L Undertaking by contract award; failure to do so means the tender will not be considered for award. Tenderers must respond to clarification requests before the closing time for clarification; responses are published to all tenderers. Tenders are opened in the presence of tenderers' representatives who choose to attend; names are announced, and prices may be announced if stated in the Tender Data. Eskom will not disclose evaluation information until after contract award unless required by law. Eskom may reject a tender after the Supplier Reconsideration Committee establishes proof of influence, collusion, bid rigging, or fraud. Eskom may obtain clarification of any unclear or ambiguous matter; mandatory documents will not be requested but clarity may be required. Eskom will determine basic compliance before detailed evaluation; failure to comply renders the tender non-responsive. A tender that does not include mandatory documents or information by the required deadlines is deemed non-responsive.
Contractual Terms
Source: Eskom Standard Conditions of Tender on E-tendering.pdfCommunication with Eskom must be in writing, in English, and directed to the Eskom Representative only. Eskom may accept or reject any variation, deviation, or alternative tender, and may accept the whole or any part of the tender. Eskom may cancel the tender process at any time before contract formation and will give written reasons upon written request. Eskom is not liable for any losses or damages arising from participation in the tender process. Eskom reserves the right to enter into mandated negotiations with selected tenderers. Eskom does not warrant the accuracy or completeness of the tender documents and disclaims liability for such information. Tenderers must hold their tenders valid for the stated validity period and extend if requested without modifying the tender. If the validity period lapses without extension, tenders are deemed invalid and a new procurement process is required. All tender-related matters are confidential; Eskom documents may only be used for preparing and submitting the tender. Tenderers must obtain the latest revisions of standardised specifications referenced in the enquiry. Tenderers must attend any compulsory site visit or clarification meeting; failure to attend disqualifies the tender. Clarification requests must be submitted before the closing time for clarification. Eskom's insurance (if any) may not cover the full extent required; tenderers should seek qualified advice. Tenderers must check the final draft of the contract and sign the contract documents. Where security for performance is required, the tenderer must name at least two financial institutions it is likely to approach; Eskom may reject an unsuitable institution. Eskom may issue addenda that amend, amplify, or add to the enquiry documents; an extension to the deadline may be granted to allow tenderers to take addenda into account. Tenderers must comply with relevant legislation including NT instructions (CSD), CIDB regulations, PPPFA regulations, Amended B-BBEE Codes, COIDA, OHS Act, and Eskom's SHEQ requirements. Tenderers must provide reasonable proof that SHEQ systems, policies, and capabilities are in place at contract award; all SHEQ costs and personnel must be reflected in the tender. Where CIDB is applicable, proof of CIDB registration is mandatory at tender closing deadline; if only proof of application is available, that must be submitted by closing and the actual registration printout by contract award. The Contractor shall achieve the Contract Skills Development Goal (CSDG) per the CIDB Standard for Developing Skills through Infrastructure Contracts, applicable to works exceeding R60 million with contract duration 12+ months, or professional services exceeding R5 million with duration 12+ months. The Contractor shall achieve Contract Participation Goals (CPG) relating to engagement of targeted enterprises per the CIDB standard, applicable to Grade 7-9 GB and CE contracts with duration 6+ months; at least 5% CPG must be achieved. Tenderers must complete and submit the SD&L Undertaking by contract award; failure to do so means the tender will not be considered for award. Eskom may disqualify a tender for misrepresentation or falsification of information; fraudulent B-BBEE certificates or fronting will be reported and may lead to suspension from business with state-owned companies for up to 10 years. Tenderers must respond to clarification requests before the closing time for clarification; responses are published to all tenderers. Tenders are opened in the presence of tenderers' representatives who choose to attend; names are announced, and prices may be announced if stated in the Tender Data. Eskom will not disclose evaluation information until after contract award unless required by law. Eskom may reject a tender after the Supplier Reconsideration Committee establishes proof of influence, collusion, bid rigging, or fraud. Eskom may obtain clarification of any unclear or ambiguous matter; mandatory documents will not be requested but clarity may be required. Eskom will determine basic compliance before detailed evaluation; failure to comply renders the tender non-responsive. A tender that does not include mandatory documents or information by the required deadlines is deemed non-responsive. Tenderers who comply with basic compliance and mandatory returnables must comply with pre-qualification criteria if stipulated; Eskom will not measure a criterion twice in different evaluation phases. Certain materials are designated by dti and a specified percentage (gatekeeper) must be bought from local companies; failure to meet gatekeepers renders the tender non-responsive. If functionality is a criterion, tenderers must meet the minimum threshold stated in the Tender Data to be evaluated further. Eskom will determine the risk of doing business with a supplier during financial analysis; if the risk is too high, Eskom may disqualify. Price is evaluated according to criteria in the Tender Data, considering factors such as CPA, FOREX, commodity increases, discounts, NPV, and forecasted invoicing rates. Eskom will check responsive tenders for arithmetical errors; the amount in words governs. Eskom will notify the tenderer of errors and may correct them as specified; rejection is possible if the tenderer does not correct or accept corrections. B-BBEE level is scored from the CSD report or certificate/affidavit; if B-BBEE is a pre-qualification criterion, proof must be provided at submission or the tender is disqualified. For PPPFA point allocation, a missing, expired, or fraudulent B-BBEE certificate results in zero points but not disqualification (if otherwise responsive). Price and B-BBEE scores are added and tenders ranked highest to lowest. A contract may be awarded to a tenderer that did not score the highest points only in accordance with Section 2(1)(f) of the PPPFA; functionality and B-BBEE scorecard elements cannot be used as objective criteria. Eskom may conduct a reverse e-auction if indicated; in that case, tenders must be submitted without prices and any included prices are disregarded. Eskom will notify the successful tenderer before expiry of the validity period, and will inform successful and unsuccessful tenderers only after approval by the Eskom Adjudication Authority; for open tenders, notification is published on the Eskom Tender Bulletin and NT e-Tender Portal. Contract documents will be revised to take account of addenda, inclusion of tender returnables, changes agreed during negotiations, and other revisions agreed. Authorised signatories of both parties must complete and sign the original and one copy of the Form of Agreement.
Requirements
Source: Eskom Standard Conditions of Tender on E-tendering.pdf (TENDER)Tenderers must comply with the eligibility criteria in the Tender Data and must not be under any restriction to do business with Eskom or state-owned companies. Tenderers are not permitted to sub-contract 100% of the scope of work; such tenders are deemed ineligible and disqualified. Where an agent submits on behalf of a principal, an authenticated copy of the authority to act must be submitted as a tender returnable. Tenderers must comply with relevant legislation including NT instructions (CSD), CIDB regulations, PPPFA regulations, Amended B-BBEE Codes, COIDA, OHS Act, and Eskom's SHEQ requirements. Where CIDB is applicable, proof of CIDB registration is mandatory at tender closing deadline; if only proof of application is available, that must be submitted by closing and the actual registration printout by contract award. Tenderers must complete and submit the SD&L Undertaking by contract award; failure to do so means the tender will not be considered for award. Tenderers must provide reasonable proof that SHEQ systems, policies, and capabilities are in place at contract award; all SHEQ costs and personnel must be reflected in the tender. Tenderers must not misrepresent or falsify information; fraudulent B-BBEE certificates or fronting will be reported and may lead to suspension from business with state-owned companies for up to 10 years.
Description
Source: ENVIRO.pdfThe tender is for the supply and delivery of bulk water to various areas within the southern grid on an as-and-when-required basis. The document provided focuses on environmental management requirements for contractors and suppliers, assessing whether the required environmental documentation is submitted and complies with specified requirements.
Evaluation Criteria
Source: ENVIRO.pdf (unknown)Bidders must achieve a weighted average score of at least 80% in the environmental management evaluation to be considered. The evaluation is based on the submission of required environmental documentation as specified in the enquiry. No other eligibility criteria are stated in the document.
Technical Specifications
Source: ENVIRO.pdf (unknown)The tender requires the supply and delivery of bulk water to various areas within the southern grid on an as-and-when-required basis. The document provided focuses on environmental management requirements for contractors and suppliers. Bidders must provide objective evidence of documented information for the following, where applicable:
Compliance Requirements
Source: ENVIRO.pdf (unknown)Bidders must submit the required environmental documentation as specified in the enquiry. The document does not state specific compliance requirements beyond the environmental management evaluation.
Contact Information
Source: NTCSA_E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown){"name":"__________________________________________________________","email":null,"phone":null,"department":null,"address":null}
Submission Guidelines
Source: NTCSA_E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)The E-Tenderers' E-Tendering Training Acknowledgement Form is a mandatory returnable document. It must be fully completed and submitted to NTCSA within the prescribed period. Failure to do so will render the tenderer non-responsive and disqualified from the procurement process.
Returnable Documents
Source: NTCSA_E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)The E-Tenderers' E-Tendering Training Acknowledgement Form is a mandatory returnable document. It must be fully completed and submitted to NTCSA within the prescribed period; failure to do so will render the tenderer non-responsive and disqualified from the procurement process.
Evaluation Criteria
Source: NTCSA_E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)Unable to extract eligibility criteria
Compliance Requirements
Source: NTCSA_E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)Mandatory returnable: E-Tenderers' E-Tendering Training Acknowledgement Form, fully completed and submitted within the prescribed period.
Description
Source: Supply NEC Contract.pdf (unknown)The supply and delivery of bulk water to various areas within the Southern Grid on an 'as and when' required basis. The goods are bulk water to various areas within the Southern Grid, delivered to locations including Grassridge, Poseidon, Neptune, and Leander substations.
Contact Information
Source: Supply NEC Contract.pdf (unknown){"name":null,"email":"[email protected]","phone":"031 710 5334","department":null,"address":"n the conditions of contract identified in"}
Submission Guidelines
Source: Supply NEC Contract.pdf (unknown)Returnable Documents: C1.1 Form of Offer and Acceptance [●], C1.1 Form of Offer & Acceptance, By the representative of the tenderer, deemed to be duly authorised, signing this part of this Form of Offer, This Offer may be accepted by the Purchaser by signing the Acceptance part of this Form of Offer and
Evaluation Criteria
Source: Supply NEC Contract.pdf (unknown)The tenderer must be a registered entity, have the necessary capacity to supply and deliver bulk water, and comply with all legal and regulatory requirements. The tenderer must also meet the B-BBEE requirements as specified in the tender document.
Technical Specifications
Source: Supply NEC Contract.pdf (unknown)supply and delivery of bulk water to various areas within the Southern Grid on
an “and as” when required basis
NEC3 Supply Contract (SC3)
Between NTCSA SOC Ltd
(Reg No. 2021/539129/30)
and [Insert at award stage]
(Reg No. ___________ )
for The supply and delivery of bulk water to various
areas within the Southern Grid on an “and as” when
required basis
Contents: No of
pages
Part C1 Agreements & Contract Data [●]
Part C2 Pricing Data [●]
Part C3 Scope of Work
Quality Management
Source: Supply NEC Contract.pdf2.1 Purchaser’s design ............................................................................................................................ ix
2.2 Procedure for submission and acceptance of Supplier’s design ....................................................... ix
2.3 Other requirements of the Supplier’s design ..................................................................................... ix
2.4 Use of Supplier’s design .................................................................................................................... ix
2.5 Manufacture & fabrication .................................................................................................................. ix
2.6 Factory acceptance testing (FAT) ..................................................................................................... ix
2.7 Other tests and inspections and commissioning in place of use ....................................................... ix
2.8 Operating manuals and maintenance schedules .............................................................................. ix
Factory acceptance testing (FAT)
Pricing Schedule
Source: Supply NEC Contract.pdf(Reg No. 2021/539129/30)
and [Insert at award stage]
(Reg No. ___________ )
for The supply and delivery of bulk water to various
areas within the Southern Grid on an “and as” when
required basis
Contents: No of
pages
Part C1 Agreements & Contract Data [●]
Part C2 Pricing Data [●]
Part C3 Scope of Work [●]
CONTRACT No. [Insert at award stage]
Part c2: pricing data c2 sc3 cover
NTCSA SOC Ltd ENQUIRY NO. _________
an “and as” when required basis
Part c1: agreements & contract data
Contents: No of
pages
C1.1 Form of Offer and Acceptance [●]
[to be inserted from Returnable Documents at award
stage]
C1.2a Contract Data provided by the Purchaser [●]
C1.2b Contract Data provided by the Supplier [●]
[to be inserted from Returnable Documents at award
stage]
Part c2: pricing data c2 sc3 cover
NTCSA SOC Ltd ENQUIRY NO. _________
Value Added Tax @ 15% is Rates Based
The offered total of the amount due inclusive of VAT is1 Rates Based
in terms of the conditions of contract.
Part c2: pricing data c2 sc3 cover
NTCSA SOC Ltd ENQUIRY NO. _________
Part C1 Agreements and Contract Data, (which includes this Form of Offer and Acceptance)
Part C2 Pricing Data
Part C3 Scope of Work: Goods Information including Supply Requirements
and drawings and documents (or parts thereof), which may be incorporated by reference into the above
listed Parts.
Part c2: pricing data c2 sc3 cover
NTCSA SOC Ltd ENQUIRY NO. _________
Part c2: pricing data c2 sc3 cover
NTCSA SOC Ltd ENQUIRY NO. _________
10.1 The Supply Manager is (name): Lungile Mathetha
Address 120 Henry Street, Bloemfontein
Tel 031 710 5334
e-mail [email protected]
11.2(13) The goods are The supply and delivery of bulk water to
various areas within the Southern Grid on an
“and as” when required basis
11.2(13) The goods are Bulk water to various areas within the
Southern Grid on an “and as” when required
basis
11.2(14) The following matters will be included in Strikes
the Risk Register Personnel injury
2 Available from Engineering Contract Strategies Tel 011 803 3008 Fax 086 539 1902, www.ecs.co.za.
Part c2: pricing data c2 sc3 cover
NTCSA SOC Ltd ENQUIRY NO. _________
an “and as” when required basis
amounts due in other currencies. LIBOR is the
6 month London Interbank Offered Rate quoted
under the caption “Money Rates” in The Wall
resolution
94.1 The Adjudicator is the person selected from the ICE-SA Division
Part c2: pricing data c2 sc3 cover
NTCSA SOC Ltd ENQUIRY NO. _________
X7 Delay damages R500.00 per day.
X17 Low performance damages
Part c2: pricing data c2 sc3 cover
NTCSA SOC Ltd ENQUIRY NO. _________
Part c2: pricing data c2 sc3 cover
NTCSA SOC Ltd ENQUIRY NO. _________
Part c2: pricing data c2 sc3 cover
NTCSA SOC Ltd ENQUIRY NO. _________
Part c2: pricing data c2 sc3 cover
NTCSA SOC Ltd ENQUIRY NO. _________
Part c2: pricing data c2 sc3 cover
NTCSA SOC Ltd ENQUIRY NO. _________
11.2(8) The Goods Information for the Supplier’s
design is in:
11.2(11) The tendered total of the Prices is R ,
(in words)
11.2(12) The price schedule is in:
11.2(14) The following matters will be included in
the Risk Register
25.2 The restrictions to access for the Supply
for this contract are
30.1 The delivery date of the goods and
services is: goods and services delivery date
1 [●] [●]
2 [●] [●]
3 [●] [●]
3 Either April 2013 or December 2009 Edition as stated by Purchaser in Contract Data part 1.
4 Available from Engineering Contract Strategies Tel 011 803 3008, Fax 086 539 1902, or www.ecs.co.za
Part c2: pricing data c2 sc3 cover
NTCSA SOC Ltd ENQUIRY NO. _________
63.2 The percentage for overheads and profit
added to the Defined Cost is %
Part c2: pricing data c2 sc3 cover
NTCSA SOC Ltd ENQUIRY NO. _________
an “and as” when required basis
Part 2: pricing data
NEC3 Supply Contract
reference pages
C2.1 Pricing assumptions 2
C2.2 The price schedule [●]
Part c2: pricing data c2 sc3 cover
NTCSA SOC Ltd ENQUIRY NO. _________
an “and as” when required basis
C2.1 Pricing assumptions
(12) The Price Schedule is the price schedule unless later changed in
accordance with this contract.
Assessing the 50.2 The amount due is
amount due
has completed,
calculated by multiplying the quantity which the Supplier has completed by
the rate,
Clause 53.1 states: “Information in the Price Schedule is not Goods Information”. This confirms that
instructions to do work or how it is to be done are not included in the Price Schedule but in the Goods
Information. This is further confirmed by Clause 20.1 which states, “The Supplier Provides the Goods and
Services in accordance with the Goods Information”. Hence the Supplier does not Provide the Goods and
schedule;
compensation event for this unless the Defect is due to a Supplier’s risk;
across other Prices and rates in order to fulfil the obligation to Provide the Goods and Services for
the tendered total of the Prices;
Part c2: pricing data c2.1 Sc3 pricing assumptions
NTCSA SOC Ltd ENQUIRY NO. _________
an “and as” when required basis
quantity, of work within that lump sum item later turns out to be different to that which the Supplier
estimated at time of tender. The only basis for a change to the Prices is as a result of a
compensation event per clause 60.1;
arise as a result of a compensation event.
Entries in the first four columns in the price schedule in section C2.2 are made either by the Purchaser or the
tendering supplier.
services are provided, a unit of time is stated in the Unit column and the length of time (as a quantity of the
stated units of time) is stated in the Quantity column.
Part c2: pricing data c2.1 Sc3 pricing assumptions
NTCSA SOC Ltd ENQUIRY NUMBER _____________
an “and as” when required basis
C2.2 the price schedule
7.1 Drawings issued by the Purchaser .................................................................................................. xiv
C3.2 Supplier’s Goods Information Error! Bookmark not defined.
DOCUMENT C2.1 PAGE viii PRICING DATA
NTCSA SOC Ltd ENQUIRY NUMBER _________
Financial Requirements
Source: Supply NEC Contract.pdf (unknown)Payment Terms: payment certificate from the Supply Manager in terms of core
clause 51.1, the Supplier provides the Purchaser with a tax invoice in accordance with the
Purchaser's procedures stated in the Goods Information, showing the amount due for payment
equal to that stated in the payment certificate.
Z7.2 If the Supplier does not provide a tax invoice in the form and by t
Health & Safety
Source: Supply NEC Contract.pdfsignature of Date
witness
Note: If a tenderer wishes to submit alternative tenders, use another copy of this Form of Offer and
no rate is quoted for the currency in question
then the rate for United States Dollars, and if
no such rate appears in The Wall Street
not give rise to an estoppel unless the Parties agree otherwise and confirm such agreement in
writing.
Z6 Health, safety and the environment: Add to core clause 25.4
Z6.1 The Supplier undertakes to take all reasonable precautions to maintain the health and safety of
persons in and about the provision of the goods and execution of the services.
proper compliance with all applicable health & safety laws and regulations and the health
and safety rules, guidelines and procedures provided for in this contract and generally for
the proper maintenance of health & safety in and about the execution of supply and
safety laws and regulations and rules, guidelines and procedures otherwise provided for
under this contract and ensures that his Subcontractors, employees and others under the
Supplier’s direction and control, likewise observe and comply with the foregoing.
Z6.2 The Supplier, in and about the execution of the supply, complies with all applicable
environmental laws and regulations and rules, guidelines and procedures otherwise provided
for under this contract and ensures that his Subcontractors, employees and others under the
Supplier’s direction and control, likewise observe and comply with the foregoing.
Part c2: pricing data c2 sc3 cover
NTCSA SOC Ltd ENQUIRY NO. _________
the regulations published in GNR February 2002, under the Occupational Health
and Safety Act, 1993 (Act ) (“Asbestos Regulations”). The OEL for asbestos is 0.2
regulated asbestos fibres per millilitre of air as a 4-hour TWA, averaged over any continuous
period of four hours, and the short term exposure limit of 0.6 regulated asbestos fibres per
millilitre of air as a 10-minute TWA, averaged over any 10 minutes, measured in accordance
with HSG248 and monitored according to HSG173 and OESSM.
Z15.2 Upon written request by the Supplier, the Purchaser certifies that these conditions prevail. All
measurements and reporting are effected by an independent, competent, and certified
occupational hygiene inspection body, i.e. a SANAS accredited and Department of
and related control measures at the Supplier’s expense. For the purposes of compliance the
results generated from Parallel Measurements are evaluated only against South African
statutory limits as detailed in clause Z15.1. Control measures conform to the requirements
stipulated in the AAIA-approved asbestos work plan.
Z15.3 The Purchaser manages asbestos and ACM according to the Standard.
Z15.4 In the event that any asbestos is identified while Providing the Services, a risk assessment is
conducted and if so required, with reference to possible exposure to an airborne concentration
of above the AL for asbestos, immediate control measures are implemented and relevant air
monitoring conducted in order to declare the area safe.
Z15.5 The Supplier’s personnel are entitled to stop working and leave the contaminated area
forthwith until such time that the area of concern is declared safe by either Compliance
emergency asbestos work plan, if applicable.
Z15.6 The Supplier continues to Provide the Services, without additional control measures
presented, on presentation of Safe Levels. The contractually agreed dates to Provide the
statement however other clauses may also use the same data
selected. Click on the form field once and type in the data. Otherwise complete by hand and in ink.
Environmental
Source: Supply NEC Contract.pdfZ15.7 Any removal and disposal of asbestos, asbestos containing materials and waste, is done by a
registered asbestos contractor, instructed by the Purchaser at the Purchaser’s expense, and
conducted in line with South African legislation.
Contractual Terms
Source: Supply NEC Contract.pdfof Deviations (if any), contact the Purchaser’s agent (whose details are given in the Contract Data) to
arrange the delivery of any securities, bonds, guarantees, proof of insurance and any other documentation to
be provided in terms of the conditions of contract identified in the Contract Data at, or just after, the date this
agreement comes into effect. Failure to fulfil any of these obligations in accordance with those terms shall
constitute a repudiation of this agreement.
50.1 The assessment interval is between the 25th day of each successive
month.
51.1 The currency of this contract is the South African Rand
51.2 The period within which payments are
made is 4 weeks.
51.4 The interest rate is the publicly quoted prime rate of interest
(calculated on a 365-day year) charged from
time to time by the Standard Bank of South
Africa Limited (as certified, in the event of any
dispute, by any manager of such bank, whose
appointment it shall not be necessary to prove)
for amounts due in Rands and
(ii) the LIBOR rate applicable at the time for
Part c2: pricing data c2 sc3 cover
NTCSA SOC Ltd ENQUIRY NO. _________
Monitor Money Rates Service (or such service
as may replace the Reuters Monitor Money
Rates Service) on the due date for the payment
in question, adjusted mutatis mutandis every 6
months thereafter and as certified, in the event
of any dispute, by any manager employed in
the foreign exchange department of The
insurance
80.1 These are additional Purchaser’s risks 1. [●]
[●]
[●]
88.1 The Supplier’s liability to the Purchaser for
indirect or consequential loss, including
loss of profit, revenue and goodwill is
limited to R0.0 (zero Rand)
88.2 For any one event, the Supplier’s liability (1) for the Purchaser’s existing and
to the Purchaser for loss of or damage to surrounding property in the care, custody and
the Purchaser’s property is limited to control of the Supplier the amount of the
deductible (first amount payable) relevant to
the event
and
(2) for all other existing Purchaser’s property,
the applicable deductible as at contract date
dispute to him. (see www.ice-sa.org.za). If the
Z3.2 The Supplier is required to submit an updated verification certificate and necessary supporting
documentation confirming the change in his B-BBEE status to the Supply Manager within thirty
days of the notification or as otherwise instructed by the Supply Manager.
Z3.3 Where, as a result, the Supplier’s B-BBEE status has decreased since the Contract Date the
Purchaser may either re-negotiate this contract or alternatively, terminate the Supplier’s
obligation to Provide the Goods and Services.
Z3.4 Failure by the Supplier to notify the Purchaser of a change in its B-BBEE status may constitute
a reason for termination. If the Purchaser terminates in terms of this clause, the procedures on
termination are P1, P2 and P3 as stated in clause 92, and the amount due is A1 and A3 as
stated in clause 93.
Part c2: pricing data c2 sc3 cover
NTCSA SOC Ltd ENQUIRY NO. _________
an “and as” when required basis
Z4 Confidentiality
Z4.1 The Supplier does not disclose or make any information arising from or in connection with this
contract available to Others. This undertaking does not, however, apply to information which at
the time of disclosure or thereafter, without default on the part of the Supplier, enters the public
domain or to information which was already in the possession of the Supplier at the time of
disclosure (evidenced by written records in existence at that time). Should the Supplier
disclose information to Others in terms of clause 23.1, the Supplier ensures that the provisions
of this clause are complied with by the recipient.
Z4.2 If the Supplier is uncertain about whether any such information is confidential, it is to be
regarded as such until notified otherwise by the Supply Manager.
Z4.3 In the event that the Supplier is, at any time, required by law to disclose any such information
which is required to be kept confidential, the Supplier, to the extent permitted by law prior to
disclosure, notifies the Purchaser so that an appropriate protection order and/or any other
action can be taken if possible, prior to any disclosure. In the event that such protective order is
not, or cannot, be obtained, then the Supplier may disclose that portion of the information which
it is required to be disclosed by law and uses reasonable efforts to obtain assurances that
confidential treatment will be afforded to the information so disclosed.
Z4.4 The taking of images (whether photographs, video footage or otherwise) of the goods or any
portion thereof, in the course of Providing the Goods and Services and after Delivery, requires
the prior written consent of the Supply Manager. All rights in and to all such images vests
exclusively in the Purchaser.
Z4.5 The Supplier ensures that all his subcontractors abide by the undertakings in this clause.
Z5 Waiver and estoppel: Add to core clause 12.3:
Z5.1 Any extension, concession, waiver or relaxation of any action stated in this contract by the
assumption”.
Z9 Purchaser’s limitation of liability
Z9.1 The Purchaser’s liability to the Supplier for the Supplier’s indirect or consequential loss is
limited to R0.00 (zero Rand)
Z9.2 The Supplier’s entitlement under the indemnity in 83.1 is provided for in 60.1(12) and the
Purchaser’s liability under the indemnity is limited.
Termination: Add to core clause 91.1, at the second main bullet point, fourth sub-bullet
Z10
point, after the words "against it":
Z10.1 or had a business rescue order granted against it.
Z11 Addition to secondary Option X7 Delay damages (if applicable in this contract)
Z11.1 If the amount due for the Supplier’s payment of delay damages reaches the limits stated in this
Contract Data for Option X7, the Purchaser may terminate the Supplier’s obligation to Provide
the Goods and Services using the same procedures and payment on termination as those
applied for reasons R1 to R15 or R18 stated in the Termination Table.
Z12 Ethics
court or in any other similar process, of such Prohibited Action before the Purchaser can
terminate the Supplier’s obligation to Provide the Services for this reason.
Z12.3 If the Purchaser terminates the Supplier’s obligation to Provide the Services for this reason,
the amounts due on termination are those intended in core clauses 92.1 and 92.2.
Z12.4 A Committing Party co-operates fully with any investigation pursuant to alleged Prohibited
Z13 Insurance
Z __13.1 Replace core clause 84 with the following:
Insurance cover 84
84.1 When requested by a Party, the other Party provides certificates from
his insurer or broker stating that the insurances required by this
contract are in force.
84.2 The Supplier provides the insurances stated in the Insurance Table A
for events which are at the Supplier’s risk from the starting date until
the last defects date or a termination certificate has been issued.
Part c2: pricing data c2 sc3 cover
NTCSA SOC Ltd ENQUIRY NO. _________
goods, plant and materials Purchaser’s insurance.
The Purchaser’s policy deductible as at
Purchaser’s insurance.
damage to property Purchaser’s property
(except the goods, plant The replacement cost where not covered by the
and materials and Purchaser’s insurance.
equipment) and liability for
bodily injury to or death of The Purchaser’s policy deductible as at
a person (not an employee Contract Date, where covered by the
of the Supplier) caused by Purchaser’s insurance.
activity in connection with
this contract Other property
bodily injury to employees
of the Supplier arising out
of and in the course of
their employment in
connection with this
contract
Z _13.2 Replace core clause 87 with the following:
Insurance by 87
the Purchaser
87.1 The Purchaser provides the insurances stated in the Insurance Table B
Transportation (Marine) Per the insurance policy document
Z14 Nuclear Liability
Z14.1 The Purchaser is the operator of the Koeberg Nuclear Power Station (KNPS), a nuclear
installation, as designated by the National Nuclear Regulator of the Republic of South Africa,
and is the holder of a nuclear licence in respect of the KNPS.
Z14.2 The Purchaser is solely responsible for and indemnifies the Supplier or any other person
against any and all liabilities which the Supplier or any person may incur arising out of or
resulting from nuclear damage, as defined in Act , save to the extent that any
liabilities are incurred due to the unlawful intent of the Supplier or any other person or the
presence of the Supplier or that person or any property of the Supplier or such person at or in
the KNPS or on the KNPS site, without the permission of the Purchaser or of a person acting
on behalf of the Purchaser.
Z14.3 Subject to clause Z14.4 below, the Purchaser waives all rights of recourse, arising from the
aforesaid, save to the extent that any claims arise or liability is incurred due or attributable to
the unlawful intent of the Supplier or any other person, or the presence of the Supplier or that
person or any property of the Supplier or such person at or in the KNPS or on the KNPS site,
without the permission of the Purchaser or of a person acting on behalf of the Purchaser.
Z14.4 The Purchaser does not waive its rights provided for in section 30 (7) of Act , or any
replacement section dealing with the same subject matter.
Z14.5 The protection afforded by the provisions hereof shall be in effect until the KNPS is
decommissioned.
Z15 Asbestos
5.1 Programming constraints ................................................................................................................... xi
5.2 Work to be done by the Delivery Date ............................................................................................... xi
5.3 Marking the goods ............................................................................................................................. xi
5.4 Constraints at the delivery place and place of use ............................................................................ xi
5.5 Cooperating with Others .................................................................................................................... xi
5.6 Services & other things to be provided by the Purchaser or Supplier ............................................... xi
5.7 Management meetings ...................................................................................................................... xi
5.8 Documentation control ...................................................................................................................... xii
5.9 Health and safety risk management ................................................................................................. xii
5.10 Environmental constraints and management ................................................................................... xii
5.11 Quality ............................................................................................................................................... xii
5.12 Invoicing and payment ...................................................................................................................... xii
5.13 Insurance provided by the Purchaser .............................................................................................. xiii
5.14 Contract change management .......................................................... Error! Bookmark not defined.
5.15 Provision of bonds and guarantees ................................................................................................. xiii
5.16 Records of Defined Cost, payments & assessments of compensation events to be kept by the
Section
Source: Supply NEC Contract.pdf5.11 Quality ............................................................................................................................................... xii
Description
Source: TECHNICAL CRITERIA BULK WATER1.pdfThe tenderer must confirm, via the Tenderer's Declaration, that it will supply bulk water as listed in the Goods Information and deliver it to the various sites within the required time period.
Contact Information
Source: TECHNICAL CRITERIA BULK WATER1.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"om 3 different companies referencing the tenderer's service."}
Submission Guidelines
Source: TECHNICAL CRITERIA BULK WATER1.pdf (unknown)Returnable documents: the completed and signed technical evaluation returnable template, including the Tenderer's Declaration confirming the supply of bulk water to the listed sites within the required time period. Only information on this template is used to score the relevant criteria; incomplete or unclear information is not considered. Proof of bulk water quality (lab test results) must be submitted. Written references from three companies and certified copies of vehicle registration or rental agreements must be provided. Bids failing Part A or Part B thresholds are disqualified.
Returnable Documents
Source: TECHNICAL CRITERIA BULK WATER1.pdf (unknown)The technical evaluation returnable template must be filled in with the relevant information and submitted as a tender returnable. Only information on this template is used to score the relevant criteria; incomplete or unclear information is not considered. The Tenderer's Declaration must be signed and confirm the supply of bulk water to the listed sites within the required time period.
Evaluation Criteria
Source: TECHNICAL CRITERIA BULK WATER1.pdf (unknown)Technical evaluation has two parts. Part A (mandatory): bidders must score 100% on the Tenderer's Declaration (fully completed, no exclusions or amendments) and provide lab test results proving bulk water quality. Failure in Part A renders the bid non-responsive and disqualified. Part B (supplementary): bidders must achieve a minimum threshold of 75%. Failure to meet this threshold renders the bid non-responsive and disqualified. An on-site verification will be conducted; if evidence is not available during the on-site evaluation, points are reduced accordingly. Part B scoring: experience (35% weight) – more than 2 years (10 points), more than 1 year (5 points), 0 years or not meeting requirements (0 points); written references (35% weight) – 3 references (10 points), 2 references (7.5 points), 1 reference (5 points), 0 references (0 points); delivery vehicles (30% weight) – proof of 2 vehicles (10 points), proof of 1 vehicle (5 points), no proof (0 points).
Technical Specifications
Source: TECHNICAL CRITERIA BULK WATER1.pdf (unknown)Scope: supply and delivery of bulk water to various areas within the southern grid on an as-and-when-required basis. The water must be properly treated or naturally suitable for hygiene and household purposes. Bidders must confirm, via the Tenderer's Declaration, their ability to supply bulk water to the various sites within the required time period. Delivery vehicles must be designed and suitable for delivery of bulk water or similar type.
Methodology
Source: TECHNICAL CRITERIA BULK WATER1.pdf (unknown)Bidders must provide certified copies of certificates of registration for trucks in the bidder's name, or current rental agreements for trucks hired in the bidder's name from a bona fide vehicle rental company. The truck must be designed and suitable for delivery of bulk water or similar type. Scoring: proof of 2 vehicles (10 points), proof of 1 vehicle (5 points), no proof (0 points).
Experience & Qualifications
Source: TECHNICAL CRITERIA BULK WATER1.pdfBidders must provide written references from three different companies referencing their service. Each reference must include a telephone or cell number, email address, name of the referee and relevant signature. The referenced scope must be the supply and delivery of non-durable household goods (consumables) such as packaged food or beverages of a similar type as per the Goods Information. References with negative feedback are not used. Scoring: 3 references (10 points), 2 references (7.5 points), 1 reference (5 points), 0 references (0 points).
Quality Management
Source: TECHNICAL CRITERIA BULK WATER1.pdf (unknown)Bidders must provide proof of the quality of the bulk water, such as lab test results showing the water meets the requirements. No evidence supplied means no points awarded for this criterion.
Compliance Requirements
Source: TECHNICAL CRITERIA BULK WATER1.pdf (unknown)Minimum qualifying score for Part B: 75%. Part A mandatory criteria must be met at 100%. Bidders must provide proof of bulk water quality via lab test results. Bidders must provide written references from three different companies, each including a telephone or cell number, email address, name of the referee and relevant signature. Bidders must provide certified copies of certificates of registration for trucks in the bidder's name, or current rental agreements for trucks hired in the bidder's name from a bona fide vehicle rental company.
Description
Source: NTCSA_E-tendering Help Manual for supplier.docxThe tender is for the supply and delivery of bulk water to various areas within the southern grid on an as-and-when-required basis. The supplied document is a user manual for the eTendering system, not the tender specification.
Contact Information
Source: NTCSA_E-tendering Help Manual for supplier.docx (unknown)For problems with the Tender Bulletin, eTendering or OpenText systems, contact the buyer responsible for the published tender. No direct contact details are provided.
Submission Guidelines
Source: NTCSA_E-tendering Help Manual for supplier.docx (unknown)Submission is electronic only via the eTendering system at https://eTendering.eskom.co.za. Bidders must register on the system and have a CSD number to gain access. Upload each document under the correct category (technical, commercial, finance, etc.). A single file cannot exceed 50MB and the total of all files cannot exceed 900MB. After uploading all documents, click 'Finalize Submission' and then 'Finalise and Close Submission' to complete the bid. Once finalised, the submission cannot be changed. Keep the confirmation email with the submission ID for future enquiries.
Evaluation Criteria
Source: NTCSA_E-tendering Help Manual for supplier.docx (unknown)No evaluation criteria are stated in the supplied document. Bidders must have a CSD number to access the eTendering system.
Technical Specifications
Source: NTCSA_E-tendering Help Manual for supplier.docx (unknown)The tender is for the supply and delivery of bulk water to various areas within the southern grid on an as-and-when-required basis. No further technical specifications are provided in the supplied document.
Compliance Requirements
Source: NTCSA_E-tendering Help Manual for supplier.docx (unknown)Bidders must have a CSD number to access the eTendering system. Registration on the system is required, including providing contact details with a plus prefix (e.g., +27) and completing a captcha to verify they are not a robot.
Contact Information
Source: SHE SPECS.pdf (unknown)Senior Advisor: Lungile Mathetha (signature date 08/10/2025), Zelna Alexander (signature date 29/09/2025). Manager: Ayanda Velani (signature date 30/09/2025), Khunjulwa Dlulane (signature date 29/09/2025).
Evaluation Criteria
Source: SHE SPECS.pdf (unknown)Bidders must comply with the Occupational Health and Safety Act and Regulations, the Basic Conditions of Employment Act, the National Environmental Management Act, the National Road Traffic Act, and the Foodstuffs, Cosmetics and Disinfectants Act. Bidders must be registered with the Compensation Commissioner and provide a valid Letter of Good Standing. Bidders must sign a Section 37(2) agreement with Eskom. Bidders must not use child labour. Bidders must have an up-to-date copy of the OHS Act available to employees. Bidders must comply with SANS 241 for drinking water quality.
Technical Specifications
Source: SHE SPECS.pdf (unknown)Scope: Supply and delivery of bulk water that has been properly treated or is naturally suitable for hygiene and other household purposes. Truck water: 15,000 to 25,000 litres. Delivery points: Grassridge Substation (Coega IDZ area, Gqeberha), Poseidon Substation (Patryshoogte Road, Cookhouse), Neptune Substation (DR 1933 N6 Road, Nahoon, East London).
Experience & Qualifications
Source: SHE SPECS.pdfCompetent person (OHS Act) means any person having the knowledge, training, experience, and qualifications specific to the work or task being performed, provided that, where appropriate, qualifications and training are registered in terms of the South African Qualifications Authority Act, 1995.
Quality Management
Source: SHE SPECS.pdfPrincipal contractors must implement a non-conformance procedure for issuing to contractors for transgressions. Appointed contractors must also implement a non-conformance procedure. Contract management must close out non-conformances. Where non-conformances are issued by Eskom, the offender must be called by the contractor responsible manager to explain the non-conformance and intended corrective actions.
Description
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_or_Request_for_Proposal_ eTendering Template _July 2026_ Bulk Water Review.pdfSupply and delivery of bulk water to various areas within the Southern Grid on an as-and-when-required basis. Open tender. Tender validity 90 days from closing (per the invitation cover) or 12 weeks (per Tender Data); the Tender Data takes precedence.
Important Dates
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_or_Request_for_Proposal_ eTendering Template _July 2026_ Bulk Water Review.pdf (TENDER)Closing: 05 October 2026 at 10h00 (electronic submission).
Clarification meeting (non-compulsory): 17 September 2026 at 12h00, virtual via MS Teams. Meeting ID: 352 112 837 168 614, Passcode: 6Fz2va6k. Tenderers must confirm attendance with the NTCSA Representative (Lindokuhle Chonco) by email, stating the name, position and contact details of each attendee.
Clarification queries deadline: 5 working days before the tender submission deadline.
Tender validity: 12 weeks from closing date.
Briefing Session
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_or_Request_for_Proposal_ eTendering Template _July 2026_ Bulk Water Review.pdf (TENDER)Non-compulsory clarification meeting: 17 September 2026 at 12h00, virtual via MS Teams. Meeting ID: 352 112 837 168 614, Passcode: 6Fz2va6k. Confirm attendance with Lindokuhle Chonco by email, stating attendee names, positions and contact details.
Contact Information
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_or_Request_for_Proposal_ eTendering Template _July 2026_ Bulk Water Review.pdf (TENDER)NTCSA Representative (first point of contact): Lindokuhle Chonco, Tel 016 457 5541, Email [email protected].
1st escalation: Procurement Manager Ayanda Velani, Email [email protected].
2nd escalation: Middle Manager Esther Seshabela, Email [email protected].
All queries must be in writing to the NTCSA Representative. Tenderers must not contact any other NTCSA employee about the tender.
Submission Guidelines
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_or_Request_for_Proposal_ eTendering Template _July 2026_ Bulk Water Review.pdf (TENDER)Submission channel: electronic only, via the Eskom E-tendering site (https://eTendering.eskom.co.za). No hard copies accepted. Upload documents under the folders Technical, Commercial, Financial, and other (SHEQ). All documents in PDF format; the price list must be in PDF and a copy in Excel. Per-document upload limit 500 MB; total submission limit 4 GB. No zip or compressed files. If resubmitting, only the latest version is accepted; earlier versions are void. Submission status must be marked complete. Tenders not uploaded by the closing time are disqualified. Tender validity period is 12 weeks; NTCSA may extend it, and a tenderer that modifies its tender after agreeing to an extension is disqualified.
Returnable documents (disqualifiable if missing or incomplete at closing):
Returnable documents (non-disqualifiable at closing, but must be provided within 5 working days if requested):
Returnable documents required at closing for evaluation (score zero if not submitted):
Joint venture (JV) additional documents:
Disqualification risks:
Returnable Documents
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_or_Request_for_Proposal_ eTendering Template _July 2026_ Bulk Water Review.pdf (TENDER)Returnable documents required: Basic compliance (electronic copy in PDF, price list in PDF and Excel); Authorisation Form (Annexure A); Acknowledgement Form (Annexure B); Tenderer's Particulars (Annexure C); Integrity Declaration Form (Annexure D); CPA Requirements for Local Goods/Services (Annexure E); CPA(IG) for Foreign Goods/Services (Annexure F, if applicable); SBD 6.2 Declaration Certificate for Local Production and Local Content (Annexure G1); SBD 1 Invitation to Bid (Annexure H); Tax Clearance Certificates; Tax Evaluation questionnaire; SBD 6.1 Preference Points Claim Form (Annexure I); Specific Goals proof; Compliance with Employment Equity Act; SBD 4 – Bidders Disclosure (Annexure J); JV documents (letter of intent, single business entity confirmation, single bank account); Reverse e-auction forms (if applicable); E-tendering Help Manual acknowledgement; CIDB registration and contractor grading (where applicable); CIDB Contract Skills Development Goals (if applicable); Engineering and Construction Works CSDG (if applicable); CIDB Indirect Targeting for Enterprise Development (if applicable); Contract Participation Goals (if applicable); Scope of Work; NEC or other Contract; Pricing Schedule/BOQ; Additional technical documents (ECSA/SACPCMP/CVs/permits/licenses); Standard Terms and Conditions; Supplier Non-Disclosure Agreement; SD&L Undertaking; Insurance Deductibles; List of Acceptable Guarantors; Mandatory Contractual Requirements: proof of valid CSD registration; Additional Contractual Requirements: COIDA certificate, quality, safety, environmental documents; Due Diligence/financial analysis: Audited Financial Statements; Functionality/Technical documents.
Evaluation Criteria
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_or_Request_for_Proposal_ eTendering Template _July 2026_ Bulk Water Review.pdf (TENDER)Evaluation stages: eligibility/compliance check, then functionality, then price and specific goals.
Functionality: applicable, with a minimum threshold of 75%. Tenderers below the threshold are disqualified. Functionality/technical documents are submitted under the Technical folder.
Price: scored out of 80 points. Prices are evaluated inclusive of VAT, corrected for arithmetical errors, excluding contingencies, adjusted for acceptable variations, and compared on a Net Present Value basis. Unconditional discounts count for evaluation; conditional discounts are applied only at payment.
Specific Goals: scored out of 20 points under the PPPFA. Failure to submit proof for a specific goal results in 0 points for that goal, not disqualification.
Ranking: 80/20 preferential point system — price score plus specific goals score, ranked highest to lowest.
Objective criteria: not applicable. Reverse e-auction: not applicable.
Contractual requirements (CSD registration, SHEQ) are not evaluation criteria; they are assessed after ranking, before award.
Technical Specifications
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_or_Request_for_Proposal_ eTendering Template _July 2026_ Bulk Water Review.pdf (TENDER)Scope: supply and delivery of bulk water to various areas within the Southern Grid, on an as-and-when-required basis. The tender is for the whole contract; no partial bids.
Pricing schedule/BOQ: every line item must be priced; if a price is included in another item, write R0.00 on that line.
Cataloguing: the successful tenderer may be required to provide cataloguing information per item after award; materials must be labelled per NTCSA specifications. If cataloguing is required, the pricing schedule must include a line item for it (NTCSA pays).
Additional technical documents required (under Technical folder): ECSA/SACPCMP registrations, CVs, permits/licenses, and any other documents per the scope of works.
Experience & Qualifications
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_or_Request_for_Proposal_ eTendering Template _July 2026_ Bulk Water Review.pdfAdditional technical documents required (under Technical folder): ECSA/SACPCMP registrations, CVs, permits/licenses, and other documents per scope of works. Specific experience or qualification thresholds are not stated in the available text.
Pricing Schedule
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_or_Request_for_Proposal_ eTendering Template _July 2026_ Bulk Water Review.pdfPricing Schedule/BOQ attached under Finance folder. Tender is for the whole contract; no item may be left unpriced — write R0.00 if included elsewhere. Cataloguing line item required if applicable. Prices evaluated inclusive of VAT, scored out of 80 points.
Financial Requirements
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_or_Request_for_Proposal_ eTendering Template _July 2026_ Bulk Water Review.pdf (TENDER)Pricing format: Pricing Schedule/BOQ (attached under Finance folder). Prices inclusive of VAT; evaluated inclusive of VAT.
Payment terms: NTCSA pays within 30 days of receipt of undisputed invoices for contracts below R50 million (incl. VAT); within 60 days for contracts above R50 million.
Security for performance: not applicable.
Financial capacity: audited financial statements required for due diligence/financial analysis.
NTCSA reserves the right to negotiate with preferred bidders if tendered prices are not market-related.
Compliance Requirements
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_or_Request_for_Proposal_ eTendering Template _July 2026_ Bulk Water Review.pdf (TENDER)CSD registration: proof of valid and current CSD registration (CSD number/report) is a mandatory contractual requirement.
Tax compliance: tax clearance certificate required unless the bidder provides a SARS e-filing PIN for verification or has a CSD profile. Foreign suppliers with no SA footprint must complete SBD 1 but no tax proof is required.
Tax Evaluation questionnaire: required to determine if the entity is a personal service provider for PAYE.
B-BBEE: SBD 6.1 Preference Points Claim Form (Annexure I) under PPPFA 2022 regulations. Proof of B-BBEE status level must be a certificate, sworn affidavit, or other requirement per the B-BBEE Act.
Employment Equity: designated employers must provide proof of compliance, including submission of the EE report to the Department of Labour (South African tenderers only).
CIDB: not applicable for this tender.
COIDA: original certificate of good standing or proof of application from the Compensation Fund or licensed insurer (South African tenderers only).
SHEQ: quality, safety and environmental documents required per scope of works (under SHEQ folder).
Supplier Integrity Pact: must be downloaded and read from www.ntcsa.co.za; Annexure D (Integrity Declaration) commits the bidder to it.
Health & Safety
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_or_Request_for_Proposal_ eTendering Template _July 2026_ Bulk Water Review.pdfSafety requirements: COIDA certificate of good standing or proof of application (South African tenderers only). Other safety/quality documents as required per scope of works, submitted under the SHEQ folder.
Contractual Terms
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_or_Request_for_Proposal_ eTendering Template _July 2026_ Bulk Water Review.pdfConditions of contract: NEC TSC3. CIDB requirements not applicable. Payment terms: 30 days for contracts below R50 million (incl. VAT), 60 days for contracts above R50 million. NTCSA may negotiate with preferred bidders if prices are not market-related. Main contractors are discouraged from subcontracting with subsidiaries; if they do, it must be declared. Proof of B-BBEE status level must be a certificate, sworn affidavit, or other requirement per the B-BBEE Act.
Requirements
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_or_Request_for_Proposal_ eTendering Template _July 2026_ Bulk Water Review.pdf (TENDER)Eligibility: tenderers must not be under any restriction to do business with NTCSA or State-Owned Companies. Ineligible if: nationality of a country on international sanctions list; submitting more than one tender; JV/consortium agreement does not state joint and several liability; conflict of interest; signed by non-authorised persons; restricted by National Treasury; on Tender Defaulters list; sub-contracting 100% of scope; flagged suppliers (implicated in serious misconduct per Zondo Report, SIU, forensic reports, or listed on PRECCA restricted suppliers list).
Section
Source: 1.01_NTCSA Invitation_to_Tender_(ITT)_or_Request_for_Proposal_ eTendering Template _July 2026_ Bulk Water Review.pdfFunctionality threshold 75%. Prices scored out of 80 points; Specific Goals scored out of 20 points. Ranking by 80/20 system. Objective criteria not applicable. Reverse e-auction not applicable. Contractual requirements (CSD registration, SHEQ) assessed after evaluation and ranking.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve water, sanitation, wastewater, bulk water, or related infrastructure.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve waste collection, refuse, recycling, hazardous waste, or disposal services. Relevant because this tender appears to involve water, sanitation, wastewater, bulk water, or related infrastructure.
Act 59 of 2008
Relevant to waste handling, transport, disposal, recycling and waste-management licences.
Relevant because this tender appears to involve waste collection, refuse, recycling, hazardous waste, or disposal services.
Act 36 of 1998
Relevant to water use, sanitation, bulk water infrastructure and DWS authorisations.
Relevant because this tender appears to involve water, sanitation, wastewater, bulk water, or related infrastructure.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve waste collection, refuse, recycling, hazardous waste, or disposal services. Relevant because this tender appears to involve water, sanitation, wastewater, bulk water, or related infrastructure.
Address
1 LANGFORD STREET - WESTVILLE - WESTVILLE - 3610
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
15
Last checked
08 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
A guide to waste management tenders in South Africa, covering waste licences, landfill operations, refuse removal contracts, and the shift towards recycling and diversion in municipal procurement.
Water is life, and in South Africa, it's a massive procurement priority. Explore the vast opportunities for SMMEs in water treatment, reticulation maintenance, and drought-resilience infrastructure.
A guide to environmental remediation tenders in South Africa, covering soil rehabilitation, spill response, historical pollution cleanup, and the NEMA compliance obligations that shape these contracts.
A technical guide for water engineers and contractors. Winning municipal tenders for wastewater treatment works (WWTW), chemical supply, and pipe infrastructure.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Water supply; sewerage, waste management and remediation activities. Unlock full pricing strategies, bid frequency, and historical win rates.