Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
R511+- 8KM NORTH OF FOURWAYS - Diepsloot - Johannesburg - 2107
Organization Type
GOVERNMENT
Published
14 Jul 2026
OCDS Reference
ocds-9t57fa-162325
Johannesburg water invites quotations for the verification and calibration of existing flow meters at northern wastewater treatment works. The RFQ requires in situ verification/calibration of various flow meter types to within 5% error tolerance, provision of tolerance reports and certificates, and submission of sanas calibration certificates for the equipment used. A compulsory site briefing is scheduled for 20 july 2026, and submissions must be made via the e-tender portal by 27 july 2026 at 16:00.
Date & Time
Monday, 27 July 2026 - 16:00
Venue
null
Categories
Request for Quotation
R511+- 8KM NORTH OF FOURWAYS - Diepsloot - Johannesburg - 2107
14 Jul
2026
Tender Published
Tender was published
27 Jul
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
RFQJW029NS26-27(VERIFICATION AND CALIBRATION OF EXISTING FLOW METERS AT NORTHERN WORKS (COMPUTER BASED WORK)14-29 JULY.pdf
Johannesburg Water invites bids for the verification and calibration of existing flow meters at Northern Works, a computer-based project requiring in-situ work and certification. The tender uses an 80/20 preferential scoring system and mandates electronic submission via the eTender portal.
Median Estimate
R 1 725 000
Range
Based on CIDB grading. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Learn how to submit a winning bid with these related articles
A technical guide to municipal electrical tenders. Covers CIDB EB grading, electrification projects (INEP), and maintenance of substations and mini-subs.
How mechanical and electrical engineers, contractors, and consultants can win public sector contracts in South Africa — HVAC, plumbing, fire systems, electrical infrastructure, ECSA registration, CIDB ME designation, and tender documentation essentials.
How small electrical contractors use Joint Ventures to combine EP grading, win Eskom and municipal infrastructure projects, and compete for renewable energy installations.
How small office supplies, stationery, and general goods suppliers use Joint Ventures to win government procurement contracts by combining inventory with B-BBEE credentials.
💡 Want more tendering tips and strategies?
Explore Our BlogAI Document Analysis Stages
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Description
Source: RFQJW029NS26-27(VERIFICATION AND CALIBRATION OF EXISTING FLOW METERS AT NORTHERN WORKS (COMPUTER BASED WORK)14-29 JULY.pdfThe bidder is required to verify and/or calibrate existing flow meters at Northern Works. Scope includes: in situ verification/calibration of process flow meters, ensuring accuracy within 5% error tolerance, providing a report on allowable tolerances for each flow meter type, and issuing verification/calibration certificates for each flow meter. Successful bidder must submit valid SANAS calibration certificates for clamp-on ultrasonic flow meters (closed conduits) and level gauges/meters (open channels) before starting work.
Important Dates
Source: RFQJW029NS26-27(VERIFICATION AND CALIBRATION OF EXISTING FLOW METERS AT NORTHERN WORKS (COMPUTER BASED WORK)14-29 JULY.pdf (RFQ)Closing date: 27 July 2026 at 16:00. Compulsory briefing session: 20 July 2026, 09:00-10:00 at Northern Wastewater Treatment Works (Diepsloot). RFQ validity period: 60 days from closing date.
Contact Information
Source: RFQJW029NS26-27(VERIFICATION AND CALIBRATION OF EXISTING FLOW METERS AT NORTHERN WORKS (COMPUTER BASED WORK)14-29 JULY.pdf (RFQ)Supply Chain Management: Thabiso Thabeng ([email protected], +27 79 575 4431) and Phakamani Dube ([email protected], +27 82 326 6068). Johannesburg Water address: Turbine Hall, 65 Ntemi Piliso Street, Newtown, Marshalltown, Johannesburg, 2107. Tel: +27(0) 11 688 1400, Fax: +27(0) 11 688 1528. Website: www.johannesburgwater.co.za.
Submission Guidelines
Source: RFQJW029NS26-27(VERIFICATION AND CALIBRATION OF EXISTING FLOW METERS AT NORTHERN WORKS (COMPUTER BASED WORK)14-29 JULY.pdf (RFQ)Submission must be made via the e-Tender Portal (https://www.etenders.gov.za/). Steps: 1. Search for Johannesburg Water or the RFQ reference number. 2. Expand the RFQ information. 3. Start the e-submission process. 4. Log in using CSD credentials. 5. Select supplier. 6. Check the submission checklist and attach all compulsory documents. 7. Confirm and proceed. For portal issues, contact eTenders Contact Centre: +27(0)12 406 9222 / 012 406-9229 / 012 312-5000 or [email protected]. Quotations must be on company letterhead, in PDF format (Word/Excel/pictures not allowed), and include all applicable taxes. Late submissions will not be accepted. Quotations without required brand names will be disqualified. All MBD forms must be duly completed and signed.
Evaluation Criteria
Source: RFQJW029NS26-27(VERIFICATION AND CALIBRATION OF EXISTING FLOW METERS AT NORTHERN WORKS (COMPUTER BASED WORK)14-29 JULY.pdf (RFQ)Bidders must: 1) Be registered on the Central Supplier Database (CSD). 2) Not be in the service of the state or blacklisted by National Treasury. 3) Submit a valid BBBEE certificate or compliant sworn affidavit. 4) Submit all compulsory returnable documents (Tax Clearance Certificate, MBD forms 4, 8, 9, 6.1, company registration documents, proof of municipal account/lease). 5) Submit the bid on company letterhead, in PDF format only. 6) Quote on all items in the Bill of Quantities.
Technical Specifications
Source: RFQJW029NS26-27(VERIFICATION AND CALIBRATION OF EXISTING FLOW METERS AT NORTHERN WORKS (COMPUTER BASED WORK)14-29 JULY.pdf (RFQ)Scope: In situ verification and/or calibration of existing flow meters at Northern Works. Key deliverables: 1. Verify/calibrate process flow meters to ensure accuracy within 5% error tolerance. 2. Provide a report specifying allowable tolerances for each flow meter type. 3. Provide verification/calibration certificates for each flow meter. Equipment requirements: Successful bidder must submit valid SANAS calibration certificates for: - Clamp-on ultrasonic flow meter(s) for closed conduits. - Level gauge/meter for open channels. Site briefing PPE: Reflector vests, safety boots (steel tip), overalls, goggles, and hard hats are mandatory. List of flow meters includes units across Northern Works (e.g., Unit 3 Balancing Tank, Module feeds, final effluents, and others).
Pricing Schedule
Source: RFQJW029NS26-27(VERIFICATION AND CALIBRATION OF EXISTING FLOW METERS AT NORTHERN WORKS (COMPUTER BASED WORK)14-29 JULY.pdfSubmit a completed Bill of Quantities (BOQ) with firm prices only. Non-firm prices will not be considered. Pricing must include all applicable taxes and delivery costs. Each item in the BOQ must specify: scope of work, quantity, unit of measure, unit price, and total price. Example items: Unit 3 Balancing Tank Inlet (N3 BT IN), Unit 3 Module feeds (MOD 1-3), Unit 4/5 flow meters, and dewatering meters. Grand total must be in RSA currency with all taxes included.
Financial Requirements
Source: RFQJW029NS26-27(VERIFICATION AND CALIBRATION OF EXISTING FLOW METERS AT NORTHERN WORKS (COMPUTER BASED WORK)14-29 JULY.pdf (RFQ)Pricing must be firm and inclusive of all applicable taxes (VAT, PAYE, income tax, UIF, skills development levies). Non-firm prices or those subject to exchange rate variations will not be considered. Offer must be valid for 60 days from the closing date. Submit a completed Bill of Quantities (BOQ) with unit prices and total prices for each item. All delivery costs must be included in the bid price. Payment terms and bonds/guarantees are not explicitly specified in the document.
Compliance Requirements
Source: RFQJW029NS26-27(VERIFICATION AND CALIBRATION OF EXISTING FLOW METERS AT NORTHERN WORKS (COMPUTER BASED WORK)14-29 JULY.pdf (RFQ)Compulsory documents: 1. Valid Tax Clearance Certificate or SARS PIN. 2. Certified/original/valid B-BBEE certificate or compliant sworn affidavit (non-compliant affidavits score zero). 3. Municipal rates and taxes clearance (not older than 90 days in arrears). 4. Signed Declaration of Interest form (MBD 4). 5. Declaration of Bidder’s past SCM practices (MBD 8). 6. Certificate of Independent Proposal Determination (MBD 9). 7. Proof of CSD registration/MAAA Supplier Number. 8. Preference points claim form (MBD 6.1). 9. Company registration documents with ID copies of directors/shareholders. Additional requirements: Quotations must be on company letterhead. No bids from persons in the service of the state or blacklisted entities. Joint Venture Agreements (if applicable) must be signed by all parties.
Health & Safety
Source: RFQJW029NS26-27(VERIFICATION AND CALIBRATION OF EXISTING FLOW METERS AT NORTHERN WORKS (COMPUTER BASED WORK)14-29 JULY.pdfAll bidders attending the site briefing must wear proper basic PPE: reflector vests, safety boots (steel tip), overalls, goggles, and hard hats. Entry to the plant will be denied without full PPE compliance.
Contractual Terms
Source: RFQJW029NS26-27(VERIFICATION AND CALIBRATION OF EXISTING FLOW METERS AT NORTHERN WORKS (COMPUTER BASED WORK)14-29 JULY.pdfOffer must be valid for 60 days from the closing date. All delivery costs must be included in the bid price. Contract is subject to the Preferential Procurement Policy Framework Act of 2000 and PPPFA Regulations 2022, General Conditions of Contract (GCC), and any special conditions of contract. All applicable taxes (VAT, PAYE, income tax, UIF, skills development levies) must be included in the quotation.
Section
Source: RFQJW029NS26-27(VERIFICATION AND CALIBRATION OF EXISTING FLOW METERS AT NORTHERN WORKS (COMPUTER BASED WORK)14-29 JULY.pdfEvaluation uses the 80/20 point system: 80 points for price, 20 points for specific goals (PPPFA 2022). Mandatory criteria: 1. Attendance of compulsory briefing session. 2. Proof of one completed flow meter calibration project (completion certificate or reference letter on client’s letterhead). 3. Certified copy of Metrologist Mert Cert certificate in liquid flow metrology. Non-compliant or false documentation will result in disqualification or zero points.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 85 of 1993
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
Johannesburg WaterContact Person
Nompumezo Sobhekwa
Phone
011-688-1574
[email protected]
Address
R511+- 8KM NORTH OF FOURWAYS - Diepsloot - Johannesburg - 2107
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
1
Last checked
14 Jul 2026
AI status
Enhanced
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubSets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 46 of 2000
Relevant where professional engineering services or regulated engineering work may be required.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Data conflicts
None detected
Get deep intelligence on Services: Electrical. Unlock full pricing strategies, bid frequency, and historical win rates.