Tender Type
Request for Bid(Open-Tender)
Delivery Location
Delmas Road - Kriel - Matla Power Station Kriel - 2271
Organization Type
GOVERNMENT
Published
17 Jul 2026
OCDS Reference
ocds-9t57fa-162739
This tender invites suppliers to provide and deliver fresh fruits and vegetables to eskom's matla power station in mpumalanga for a period of two years. The successful contractor must comply with strict environmental management requirements, including implementing an environmental management system aligned with iso 14001:2015 and adhering to eskom's operational controls.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Thursday, 13 August 2026 - 10:00
Venue
https://teams.microsoft.com/meet/390710681470187?p=Yf2TBd2lWXYhRkjA2G
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Categories
Request for Bid(Open-Tender)
Delmas Road - Kriel - Matla Power Station Kriel - 2271
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: HACCP Certification, ISO 22000 (Food Safety Management)
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Documents being finalised: Contractor Health and Safety.pdf, Eskom Supplier Integrity Pact.pdf. You don’t need to refresh — this page will pick up the updated review automatically.
17 Jul
2026
Tender Published
Tender was published
13 Aug
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
NEC3 Supply Contract Supply and Delivery Of Fruits and Vegetables.pdf
Eskom Holdings SOC Ltd is inviting tenders for the supply and delivery of fresh fruits and vegetables to Matla Power Station over a 24-month period on an as-and-when-required basis. The contract is governed by the NEC3 Supply Contract (SC3) framework, with specific clauses and conditions detailed for pricing, delivery, compliance, and legal obligations. The tender requires adherence to strict quality, health, safety, and ethical standards, including B-BBEE compliance and nuclear liability indemnification.
Eskom Supplier Integrity Pact.pdf
Environmental Requirements.pdf
Eskom is inviting tenders for the supply and delivery of fresh fruits and vegetables to Matla Power Station over a 2-year period. The tender includes environmental compliance requirements and contractor assessments.
Safety Requirements.pdf
Eskom is inviting tenders for the supply and delivery of fresh fruits and vegetables to Matla Power Station over a 2-year period. The tender emphasizes strict Safety, Health, Environment, and Quality (SHEQ) compliance, with mandatory documentation and a short response window for missing SHEQ submissions.
Contractor Health and Safety.pdf
Supplier Quality Management Fruits and Veges.xlsx
This tender is for the supply and delivery of fresh fruits and vegetables to Eskom Matla Power Station over a 2-year period. The evaluation focuses on quality management systems (QMS), compliance with ISO 9001:2015, and adherence to Eskom's contractual and quality requirements.
Quality Requirements.pdf
Eskom is inviting tenders for the supply and delivery of fresh fruits and vegetables to Matla Power Station over a 2-year period. The tender emphasizes compliance with Eskom's quality requirements (240-105658000) and ISO 9001 standards, including pre- and post-contract quality assessments, supplier capability evaluations, and ongoing performance monitoring.
Annexure L - Authority to submit a tender.pdf
This tender is for the supply and delivery of fresh fruits and vegetables to Eskom Matla Power Station over a 2-year period. The document provided (Annexure L) is a returnable schedule requiring the tenderer to confirm their legal authority to submit the tender, based on their organizational structure (e.g., company, close corporation, partnership, joint venture, or sole proprietor).
Non-Disclosure Agreement (NDA) Vendors -E1133GXMPMATR.pdf
The tender is for the supply and delivery of fresh fruits and vegetables to Eskom Matla Power Station for a period of 2 years. The document provided is a Non-Disclosure Agreement (NDA) outlining the confidentiality terms between Eskom Holdings SOC Ltd and potential suppliers/tenderers. The NDA governs the protection of confidential information shared during the tender process and subsequent project execution.
Environmental Contractors Assessment Form.pdf
The tender is for the supply and delivery of fresh fruits and vegetables to Eskom Matla Power Station over a 2-year period. The document includes an Environmental Contractors Assessment Form (Annexure A) outlining environmental and operational requirements for contractors.
CONTRACTORS COMMITMENT AND INDEMNITY LETTER.pdf
Tender for the supply and delivery of fresh fruits and vegetables to Eskom Matla Power Station over a 2-year period, with strict adherence to ISO 14001:2015 Environmental Management System (EMS) standards and compliance obligations.
Supplier Declaration of Interest Template.pdf
This tender is for the supply and delivery of fresh fruits and vegetables to Eskom Matla Power Station over a 2-year period. The document includes a Supplier Declaration of Interest, which requires applicants to disclose conflicts of interest, relationships with Eskom employees, and any business courtesies exchanged.
Invitation to Tender (ITT) for Fresh furits and vegetables for a period of Two (2)._.pdf
Eskom Holdings SOC Ltd invites tenders for the supply and delivery of fresh fruits and vegetables to Matla Power Station in Mpumalanga for a 2-year period. The tender (E1133GXMPMATR) closes on 13 August 2026 at 10:00 AM UTC. Submissions must be electronic via Eskom’s e-tendering portal, with mandatory documents including technical, commercial, and financial proposals in PDF/Excel formats. The contract requires compliance with food safety standards (e.g., ISO 22000 or equivalent) and proof of delivery capability (e.g., refrigerated transport). Evaluation is based on functionality (75% threshold), price (80 points), and B-BBEE/preferential procurement (20 points).
Eskom_Standard_Conditions_of_Tender_-_.pdf
Eskom invites tenders for the supply and delivery of fresh fruits and vegetables to Matla Power Station in Mpumalanga for a 2-year period. The tender process is governed by Eskom's Standard Conditions of Tender, with strict submission, evaluation, and compliance requirements.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 2 950 988
Range
Based on 14 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Submission Guidelines
Source: Contractor Health and Safety.pdf (unknown)Returnable Documents: Not specified in the provided text.
Description
Source: Invitation to Tender (ITT) for Fresh furits and vegetables for a period of Two (2)._.pdfImportant Dates
Source: Invitation to Tender (ITT) for Fresh furits and vegetables for a period of Two (2)._.pdf (TENDER)Contact Information
Source: Invitation to Tender (ITT) for Fresh furits and vegetables for a period of Two (2)._.pdf (TENDER)Submission Guidelines
Source: Invitation to Tender (ITT) for Fresh furits and vegetables for a period of Two (2)._.pdf (TENDER)Evaluation Criteria
Source: Invitation to Tender (ITT) for Fresh furits and vegetables for a period of Two (2)._.pdf (TENDER)Technical Specifications
Source: Invitation to Tender (ITT) for Fresh furits and vegetables for a period of Two (2)._.pdf (TENDER)Experience & Qualifications
Source: Invitation to Tender (ITT) for Fresh furits and vegetables for a period of Two (2)._.pdfPricing Schedule
Source: Invitation to Tender (ITT) for Fresh furits and vegetables for a period of Two (2)._.pdfFinancial Requirements
Source: Invitation to Tender (ITT) for Fresh furits and vegetables for a period of Two (2)._.pdf (TENDER)Compliance Requirements
Source: Invitation to Tender (ITT) for Fresh furits and vegetables for a period of Two (2)._.pdf (TENDER)Health & Safety
Source: Invitation to Tender (ITT) for Fresh furits and vegetables for a period of Two (2)._.pdfContractual Terms
Source: Invitation to Tender (ITT) for Fresh furits and vegetables for a period of Two (2)._.pdfR50M: 60 days from receipt of undisputed invoices.
Submission Guidelines
Source: Safety Requirements.pdf (unknown)Evaluation Criteria
Source: Safety Requirements.pdf (unknown)Compliance Requirements
Source: Safety Requirements.pdf (unknown)Health & Safety
Source: Safety Requirements.pdfSpecial Conditions
Source: Safety Requirements.pdf (unknown)Description
Source: Quality Requirements.pdfSupply and delivery of fresh fruits and vegetables to Eskom Matla Power Station for a period of 2 years. Category 4 of the quality requirements applies.
Important Dates
Source: Quality Requirements.pdf (unknown)Closing date: 12 December 2024. Quality Requirements document review date: January 2027. Authorisation date: January 2022.
Submission Guidelines
Source: Quality Requirements.pdf (unknown)Complete and sign the Quality Requirements form (Template Identifier 240-43921804 Rev 3) to acknowledge acceptance of Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 Standard. Select only one applicable category (Category 4 marked as applicable in the document). Indicate whether site assessment is applicable.
Evaluation Criteria
Source: Quality Requirements.pdf (unknown)Pre-Contract Award Quality Requirements, Contract Execution, and Supplier Quality Performance Monitoring Phase are applicable. Quality Audits and Management of Nonconformities are required. ISO 9001 Standard clauses (4-10) and principles (1-7) apply. Bidders must demonstrate capability and capacity as a main supplier/sub-supplier (Category 4). Must have a quality management system aligned with ISO 9001. Must agree to Eskom's quality audits, nonconformity management, and performance evaluations. Must comply with Eskom's copyright and document control policies.
Technical Specifications
Source: Quality Requirements.pdf (unknown)Supply and delivery of fresh fruits and vegetables to Eskom Matla Power Station for a period of 2 years. Category 4 applies for quality requirements. Main supplier and sub-supplier capability and capacity assessment is required. Eskom retains rights of access, information, preservation, and quality audits. Nonconformities and nonconforming outputs must be managed as per clause 3.8.-105658000. Supplier Quality Performance Monitoring Phase must comply with clause 3.7.-105658000. Bidder must align with ISO 9001 principles: Customer focus, Leadership, Engagement of people, Process approach, Improvement, Evidence-based decision making, and Relationship Management.
Compliance Requirements
Source: Quality Requirements.pdf (unknown)Compliance with Eskom Supplier Quality Requirements (specification 240-105658000) and ISO 9001 Standard is mandatory. Bidders must demonstrate adherence to applicable clauses and principles.
Description
Source: CONTRACTORS COMMITMENT AND INDEMNITY LETTER.pdfSupply and delivery of fresh fruits and vegetables to Eskom Matla Power Station for a 2-year period. Contractor must comply with Matla Power Station's ISO 14001:2015 certified Environmental Management System (EMS) requirements.
Returnable Documents
Source: CONTRACTORS COMMITMENT AND INDEMNITY LETTER.pdf (unknown)Signed Contractor Commitment and Indemnity Letter (Annexure D).
Completed housekeeping check sheet (Annexure C) submitted to the environmental department before commencement and at the end of the contract.
Evaluation Criteria
Source: CONTRACTORS COMMITMENT AND INDEMNITY LETTER.pdf (unknown)General: Open to contractors capable of supplying fresh fruits and vegetables nationally.
Environmental compliance: Must demonstrate ability to comply with ISO 14001:2015 and Eskom's EMS requirements.
Legal compliance: Must adhere to all applicable environmental laws, regulations, and Eskom's operational controls.
Documentation: Must be able to provide and maintain required EMS documentation and check sheets.
Technical Specifications
Source: CONTRACTORS COMMITMENT AND INDEMNITY LETTER.pdf (unknown)Scope: Supply and delivery of fresh fruits and vegetables to Eskom Matla Power Station for a 2-year period.
Environmental Management System (EMS) requirements apply as per Matla Power Station's ISO 14001:2015 certification.
Contractor must:
Compliance Requirements
Source: CONTRACTORS COMMITMENT AND INDEMNITY LETTER.pdf (unknown)Contractor must:
Environmental
Source: CONTRACTORS COMMITMENT AND INDEMNITY LETTER.pdfMatla Power Station (MPS) is ISO 14001 certified and committed to maintaining an Environmental Management System (EMS) to manage environmental aspects, prevent pollution, and minimize degradation. Contractor must:
Description
Source: NEC3 Supply Contract Supply and Delivery Of Fruits and Vegetables.pdfSupply and delivery of fresh fruits and vegetables to Eskom Matla Power Station for a period of 24 months on an as-and-when-required basis. The scope includes adherence to the Goods Information in Part 3: Scope of Work and all referenced documents.
Contact Information
Source: NEC3 Supply Contract Supply and Delivery Of Fruits and Vegetables.pdf (unknown)Supply Manager: Zodwa Gumbi, Email: [email protected], Address: Matla Power Station, Private Bag X5012, Kriel, 2271. General Manager: Mr Bob Phahle, Address: Eskom Holdings SOC Ltd, Megawatt Park, Maxwell Drive, Sandton, Johannesburg, 2199. For contract-related queries, contact the Supply Manager. For additional support, refer to Engineering Contract Strategies: Tel 011 803 3008, Fax 086 539 1902, www.ecs.co.za.
Submission Guidelines
Source: NEC3 Supply Contract Supply and Delivery Of Fruits and Vegetables.pdf (unknown)Submit the following returnable documents: Form of Offer and Acceptance (C1.1), Contract Data provided by the Supplier (C1.2b), and Proforma Guarantees (C1.3). The offer must be signed by a duly authorised representative of the tenderer. Eskom may accept the offer by signing the Acceptance part of the Form of Offer and Acceptance and returning one copy, including the Schedule of Deviations (if any), to the tenderer. The contract comes into effect when the tenderer receives a fully signed original copy of the document. Alternative tenders require a separate copy of the Form of Offer and Acceptance. Failure to deliver securities, bonds, guarantees, proof of insurance, or other required documentation within two weeks of contract award constitutes a repudiation of the agreement.
Returnable Documents
Source: NEC3 Supply Contract Supply and Delivery Of Fruits and Vegetables.pdf (unknown)The following returnable documents are required: Form of Offer and Acceptance (C1.1), Contract Data provided by the Supplier (C1.2b), and Proforma Guarantees (C1.3). The offer must be signed by a duly authorised representative. Alternative tenders require a separate copy of the Form of Offer and Acceptance.
Evaluation Criteria
Source: NEC3 Supply Contract Supply and Delivery Of Fruits and Vegetables.pdf (unknown)Quality of deliverables is a primary evaluation criterion. Key Performance Indicators (KPIs) are outlined in Annexure A of the Contract Data, with performance reports submitted at intervals specified in the contract. The Risk Register includes delay damages, price increases due to inflation, and quality of deliverables, with additional risks to be identified during a risk register meeting. Legal: Supplier must be a registered legal entity in South Africa (registration number required). Financial: Supplier must demonstrate financial capability to fulfill the contract (proforma guarantees may be required). B-BBEE: Supplier must have a valid B-BBEE verification certificate and maintain or improve B-BBEE status during the contract period. Technical: Supplier must have experience in supplying fresh fruits and vegetables to large organizations or institutions and have the capacity to meet delivery requirements on an as-and-when-required basis. Ethical: Supplier must commit to Eskom’s ethics policy (Z12), prohibiting corrupt, fraudulent, or collusive actions, and cooperate with any investigations.
Technical Specifications
Source: NEC3 Supply Contract Supply and Delivery Of Fruits and Vegetables.pdf (unknown)Supply and delivery of fresh fruits and vegetables to Matla Power Station for 24 months on an as-and-when-required basis. Goods must conform to the Goods Information specified in Part 3: Scope of Work and all referenced documents. Delivery must adhere to the quantities indicated in the contract or purchase order. The Supplier must submit a programme for acceptance within one week of the Contract Date and provide revised programmes at intervals no longer than two weeks. Defects must be corrected within 24 hours of written notification, with a defects access period of 60 days. Proof of delivery, transport documents, packing lists, invoices, and delivery notes are required. INCOTERMS 2010 apply, with obligations for both parties detailed in the Supply Requirements.
Methodology
Source: NEC3 Supply Contract Supply and Delivery Of Fruits and Vegetables.pdfThe Supplier must submit a programme for acceptance within one week of the Contract Date and provide revised programmes every two weeks. Delivery must align with quantities specified in the contract or purchase order. The Supplier is responsible for contracting and paying for transport, loading, and unloading goods. For international procurement, the Supplier must handle export requirements, while the Purchaser manages import requirements.
Quality Management
Source: NEC3 Supply Contract Supply and Delivery Of Fruits and Vegetables.pdfThe Supplier must provide proof of delivery, transport documents, and ensure goods are checked, packed, and marked before dispatch. The Purchaser is responsible for inspecting goods upon receipt. All deliverables must meet the quality standards specified in the Goods Information and Contract Data.
Pricing Schedule
Source: NEC3 Supply Contract Supply and Delivery Of Fruits and Vegetables.pdfPricing is based on a Price Schedule (C2.2) where items are priced as lump sums or quantities multiplied by rates. The total of the Prices must be fully inclusive of all costs to provide the goods and services. The Supplier may add items to the Price Schedule as necessary. Example items include: Apples (various types, 18-20kg boxes), Bananas (large, 500kg or 3000kg), Grapefruit (20kg boxes), Grapes (Black/White, 500kg or 700kg boxes). VAT at 15% must be included. Price adjustments for inflation are calculated using specified indices (55% STATS SA PPI, 10% SEIFSA Road Freight, 20% SEIFSA Labour, 15% non-adjustable).
Financial Requirements
Source: NEC3 Supply Contract Supply and Delivery Of Fruits and Vegetables.pdf (unknown)Pricing is based on a Price Schedule (C2.2) where the total of the Prices is the sum of lump sums or quantities multiplied by rates. The offered total must include VAT at 15%. The total provided is for budgeting purposes only; actual amounts will be assessed per the contract conditions. Payment terms: assessment occurs every 15 days, with payments made within 4 weeks. Interest on late payments is calculated at the Standard Bank of South Africa’s prime rate (365-day year) for Rand amounts or LIBOR for other currencies. The Supplier must provide a tax invoice within one week of receiving a payment certificate, including Eskom’s VAT number (4740101508). Price adjustments for inflation are calculated using: 55% STATS SA PPI for Fruits and Vegetables, 10% SEIFSA Table L2-(b) for Road Freight, 20% SEIFSA Table C3(a) for Labour, and 15% non-adjustable. Delay damages for late delivery are R500 per day per delivery date. Overheads and profit percentage is to be specified in the Price Schedule.
Compliance Requirements
Source: NEC3 Supply Contract Supply and Delivery Of Fruits and Vegetables.pdf (unknown)B-BBEE compliance is mandatory. The Supplier must notify Eskom within 7 days of any change in B-BBEE status and submit an updated verification certificate within 30 days. Failure to notify may result in contract termination. Joint ventures or consortia must notify Eskom of the key person authorised to bind the Supplier within two weeks of the Contract Date. The Supplier must comply with all applicable health, safety, and environmental laws, including the Occupational Health and Safety Act, 1993, and Eskom’s Asbestos Standard 32-303. The Supplier must also comply with the Value Added Tax Act and include Eskom’s VAT number on all invoices. Insurance requirements include coverage for loss or damage to goods, liability for property damage, and bodily injury, as detailed in Insurance Table A. The Supplier must provide certificates of insurance when requested.
B-BBEE Requirements
Source: NEC3 Supply Contract Supply and Delivery Of Fruits and Vegetables.pdf (unknown)The Supplier must maintain B-BBEE compliance throughout the contract. Any change in B-BBEE status (due to legal status, ownership, or business composition changes) must be notified to Eskom within 7 days. An updated verification certificate and supporting documentation must be submitted within 30 days. If the Supplier’s B-BBEE status decreases, Eskom may renegotiate or terminate the contract. Failure to notify Eskom of a B-BBEE status change may result in termination.
Health & Safety
Source: NEC3 Supply Contract Supply and Delivery Of Fruits and Vegetables.pdfThe Supplier must take all reasonable precautions to maintain health and safety during the provision of goods and services. This includes compliance with all applicable health and safety laws, regulations, and Eskom’s rules and procedures. The Supplier must ensure subcontractors, employees, and others under their control also comply. Specific asbestos management requirements apply: the Purchaser ensures ambient air meets South African standards (OEL: 0.2 fibres/ml as a 4-hour TWA). If asbestos is identified, a risk assessment is conducted, and immediate control measures are implemented. The Supplier’s personnel may stop work and leave contaminated areas until declared safe. Removal and disposal of asbestos are handled by a registered contractor at Eskom’s expense.
Environmental
Source: NEC3 Supply Contract Supply and Delivery Of Fruits and Vegetables.pdfThe Supplier must comply with all applicable environmental laws, regulations, and contract-specific rules, guidelines, and procedures. This includes ensuring subcontractors, employees, and others under their control adhere to these requirements.
Contractual Terms
Source: NEC3 Supply Contract Supply and Delivery Of Fruits and Vegetables.pdfThe contract is governed by the NEC3 Supply Contract (SC3) with core clauses and options including W1 (Dispute Resolution for South Africa), X1 (Price Adjustment for Inflation), X2 (Changes in the Law), X17 (Low Performance Damages), X18 (Limitation of Liability), and X19 (Task Order). Additional conditions (Z1-Z15) apply, including cession and assignment restrictions, joint venture liability, B-BBEE status change notifications, confidentiality, health and safety, tax invoice provisions, and ethics. The contract duration is 24 months, with a 12-month end of liability date post-delivery. Dispute resolution is via adjudication (ICE-SA or AFSA) followed by arbitration under the Association of Arbitrators (Southern Africa) rules. Termination may occur for business rescue, delay damages exceeding limits, or prohibited actions (e.g., corruption, fraud).
Evaluation Criteria
Source: Environmental Contractors Assessment Form.pdf (unknown)General:
Environmental:
Legal:
Technical Specifications
Source: Environmental Contractors Assessment Form.pdf (unknown)Scope:
Duration:
Hazardous substances:
Waste generation:
Storage:
Workshop:
Permits:
Waste transport:
Compliance:
Quality Management
Source: Environmental Contractors Assessment Form.pdfHazardous substances:
Waste management:
Storage:
Workshop:
Permits:
Waste transport:
Compliance:
Important Dates
Source: Eskom_Standard_Conditions_of_Tender_-_.pdf (TENDER)Contact Information
Source: Eskom_Standard_Conditions_of_Tender_-_.pdf (TENDER)Submission Guidelines
Source: Eskom_Standard_Conditions_of_Tender_-_.pdf (TENDER)Returnable Documents
Source: Eskom_Standard_Conditions_of_Tender_-_.pdf (TENDER)Evaluation Criteria
Source: Eskom_Standard_Conditions_of_Tender_-_.pdf (TENDER)Technical Specifications
Source: Eskom_Standard_Conditions_of_Tender_-_.pdf (TENDER)Pricing Schedule
Source: Eskom_Standard_Conditions_of_Tender_-_.pdfFinancial Requirements
Source: Eskom_Standard_Conditions_of_Tender_-_.pdf (TENDER)Compliance Requirements
Source: Eskom_Standard_Conditions_of_Tender_-_.pdf (TENDER)B-BBEE Requirements
Source: Eskom_Standard_Conditions_of_Tender_-_.pdf (TENDER)Health & Safety
Source: Eskom_Standard_Conditions_of_Tender_-_.pdfContractual Terms
Source: Eskom_Standard_Conditions_of_Tender_-_.pdfContact Information
Source: Non-Disclosure Agreement (NDA) Vendors -E1133GXMPMATR.pdf (unknown)Returnable Documents
Source: Non-Disclosure Agreement (NDA) Vendors -E1133GXMPMATR.pdf (unknown)Evaluation Criteria
Source: Non-Disclosure Agreement (NDA) Vendors -E1133GXMPMATR.pdf (unknown)Technical Specifications
Source: Non-Disclosure Agreement (NDA) Vendors -E1133GXMPMATR.pdf (unknown)Compliance Requirements
Source: Non-Disclosure Agreement (NDA) Vendors -E1133GXMPMATR.pdf (unknown)Submission Guidelines
Source: Supplier Declaration of Interest Template.pdf (unknown)Submit the completed Supplier Declaration of Interest form as a returnable with your tender, enquiry, or negotiation attendance. The form requires disclosure of:
Failure to disclose or false declarations may result in disqualification or legal action by Eskom.
Returnable Documents
Source: Supplier Declaration of Interest Template.pdf (unknown)The Supplier Declaration of Interest form must be submitted as a returnable with your tender, enquiry, or negotiation attendance. Delete inapplicable options (e.g., YES/NO).
Evaluation Criteria
Source: Supplier Declaration of Interest Template.pdf (unknown)Suppliers must certify no conflicts of interest with Eskom employees/directors involved in the procurement process. Full disclosure of any prior or existing business relationships with Eskom or its affiliates is required. No financial benefit to Eskom employees/directors from the procurement is permitted.
Compliance Requirements
Source: Supplier Declaration of Interest Template.pdf (unknown)Mandatory compliance requirements:
Non-compliance or false declarations may lead to disqualification or legal consequences.
Requirements
Source: Supplier Declaration of Interest Template.pdf (unknown)Consultants must disclose all other services currently provided to:
A consultant is defined as a supplier providing advice or contracted deliverables linked to Eskom’s strategic direction or requiring registered professionals (e.g., attorneys, auditors, engineers).
Submission Guidelines
Source: Supplier Quality Management Fruits and Veges.xlsx (unknown)The tender document is an Excel-based Supplier Quality Management template. Bidders must:
Evaluation Criteria
Source: Supplier Quality Management Fruits and Veges.xlsx (unknown)The evaluation is based on a weighted quality scorecard with five sections (A to E). Standard weights are: Section A (Quality Management System Requirements) = 25%, Section B (Evidence of QMS in operation) = 25%, Section C (Contract Quality Plan) = 20%, Section D (Quality Control Plan) = 20%, Section E (User defined additional requirements) = 10%. The document indicates that weights may be modified (e.g., revised weights shown as 40%, 40%, 0%, 0%, 20% in one instance), but the standard weights are the default unless altered. Scoring is based on the submission of specific deliverables as listed in each section. Section A offers two options: Option 1 (valid ISO 9001 certification) or Option 2 (evidence of QMS in operation via QMS manual, quality policy, quality objectives, etc.). Bidders must choose only one option for Section A. Each section is scored based on the presence and adequacy of the required documents. The final score is calculated as a percentage of the maximum score multiplied by the section weight. Mandatory requirements include compliance with ISO 9001:2015 (or equivalent documented QMS), submission of all required deliverables per Sections A-E, ability to supply fresh fruits and vegetables consistently for 2 years to Eskom Matla Power Station, and valid business registration and tax compliance (implied for Eskom tenders). Preferred criteria include experience in similar supply contracts, evidence of successful past audits, and implementation of additional quality standards (e.g., HACCP for food safety).
Technical Specifications
Source: Supplier Quality Management Fruits and Veges.xlsx (unknown)The scope is the supply and delivery of fresh fruits and vegetables to Eskom Matla Power Station for a period of 2 years. The document focuses on quality management requirements rather than detailed product specifications. Bidders must demonstrate a quality management system (QMS) that ensures consistent supply. Key technical/quality requirements include:
Compliance Requirements
Source: Supplier Quality Management Fruits and Veges.xlsx (unknown)The document does not explicitly list standard compliance requirements such as CSD, tax, B-BBEE, CIDB, or CIPC. However, it mandates compliance with ISO 9001:2015 (or equivalent documented QMS) as a core quality requirement. Bidders must submit Form A (completed and signed) as part of Section E. The document implies that bidders must be registered and tax compliant for Eskom tenders, but this is not explicitly stated in the extracted text. Bidders should ensure they meet all standard Eskom supplier requirements (e.g., CSD registration, tax clearance) as per Eskom's general tender conditions, though these are not detailed in this specific document.
Submission Guidelines
Source: Annexure L - Authority to submit a tender.pdf (unknown)Submit a completed 'Authority to Submit a Tender' form (Annexure L) as a returnable schedule. Bidders must:
Returnable Documents
Source: Annexure L - Authority to submit a tender.pdf (unknown)Required returnable documents:
Evaluation Criteria
Source: Annexure L - Authority to submit a tender.pdf (unknown)No explicit evaluation criteria are stated in the available document. The only requirement is that bidders must be a legally registered entity in South Africa and have a duly authorised representative to sign tender documents and contracts. Valid, certified proof of authority (or completed Annexure L) must be submitted.
Compliance Requirements
Source: Annexure L - Authority to submit a tender.pdf (unknown)For Joint Ventures:
For all bidders:
Contractual Terms
Source: Annexure L - Authority to submit a tender.pdf (unknown)Joint Venture contractual terms:
Description
Source: Environmental Requirements.pdfSupply and delivery of fresh fruits and vegetables to Eskom Matla Power Station. Activities must not cause potential harm to the environment as per the scope of work.
Submission Guidelines
Source: Environmental Requirements.pdf (unknown)Evaluation Criteria
Source: Environmental Requirements.pdf (unknown)Technical Specifications
Source: Environmental Requirements.pdf (unknown)Compliance Requirements
Source: Environmental Requirements.pdf (unknown)Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 54 of 1972
Relevant to food safety, catering, canteens, food handling and nutrition-programme procurement.
Relevant because this tender appears to involve food supply, catering, canteens, nutrition programmes, or food handling.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve food supply, catering, canteens, nutrition programmes, or food handling.
Act 40 of 2000
Relevant where meat products, meat handling or abattoir certification may apply.
Relevant because this tender appears to involve food supply, catering, canteens, nutrition programmes, or food handling.
Address
Delmas Road - Kriel - Matla Power Station Kriel - 2271
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
14
Last checked
03 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Get deep intelligence on Food and beverage service activities. Unlock full pricing strategies, bid frequency, and historical win rates.
Learn how to submit a winning bid with these related articles
Win consulting, legal, accounting, and engineering service contracts with government. Learn registration requirements and proposal strategies.
Win government insurance, banking, actuarial, and financial consulting contracts. FSCA licensing requirements and tender strategies for financial service providers.
A guide for catering companies. Winning hospital, prison, and school feeding scheme tenders. R638 compliance, Certificates of Acceptability (COA), and menu planning.
Master the art of the consulting bid. How to structure your methodology, price your services competitively, and score maximum evaluation points.
💡 Want more tendering tips and strategies?
Explore Our Blog