Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Arnot Power Station - Arnot Power Station - RIETKUIL - 1087
Organization Type
GOVERNMENT
Published
22 Jul 2026
OCDS Reference
ocds-9t57fa-163214
This tender from ESKOM covers the provision of an outside plant mv switchgear upgrade at arnot power station in mpumalanga over a 3-year period. The accompanying document is eskom's standard listing approved electronic devices (protection relays, ieds, controllers, etc.) That must be used on power station electrical plant, and bidders must ensure their proposed equipment complies with this approved list and associated testing requirements.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Friday, 21 August 2026 - 10:00
Venue
Arnot Power Station
IT is estimated that tenderers must have a construction industry development board (CIDB) contractor grading of 8ep or 8me or higher
Categories
Request for Bid(Open-Tender)
Arnot Power Station - Arnot Power Station - RIETKUIL - 1087
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: Eskom's (SHEQ) Policy Poster (32-727) final_rev 10.pdf. You don’t need to refresh — this page will pick up the updated review automatically.
22 Jul
2026
Tender Published
Tender was published
21 Aug
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
240-56227573 Air-Insulated Withdrawable AC Metal-Enclosed Switchgear Controlgear for 1kV to 52kV.pdf
Eskom tender for the provision of Outside Plant MV Switchgear Upgrade at Arnot Power Station for 3 years. The document is a technical standard (240-56227573 Revision 2) specifying requirements for new air-insulated, withdrawable, AC metal-enclosed switchgear and controlgear for rated voltages above 1kV up to and including 52kV for indoor installations in Eskom Generation power plants.
MV Switchgear Technical Evaluation Criteria Rev 2..pdf
Eskom seeks a contractor for a 3-year project to replace obsolete and unsafe medium voltage (MV) switchgear at Arnot Power Station in Mpumalanga. The scope includes full removal of old equipment, design, supply, installation, testing, and commissioning of new, compliant MV switchgear.
MV Switchgear Outside Plant 2026.zip
The tender is for the provision of Outside Plant MV Switchgear Upgrade at Arnot Power Station over a 3-year period. The project involves replacing outdated and unsafe MV switchgear, battery chargers, and associated systems to improve safety, reliability, and maintainability. The scope includes design, manufacturing, supply, installation, testing, commissioning, and handover of new MV switchgear, DC chargers, batteries, and support structures, as well as decommissioning and removal of existing equipment. The new switchgear must comply with Eskom standards and include modern protection schemes, HVAC systems, and interfaces with existing control and instrumentation systems.
Invitation to Tender (ITT) - Switch Gear Upgrade.pdf
Eskom invites tenders for a 3-year contract to upgrade Outside Plant Medium Voltage (MV) Switchgear at Arnot Power Station. The tender is open, uses the NEC3 Engineering & Construction Contract, and requires electronic submission via Eskom's e-tendering portal by 21 August 2026.
Tender Advert Template Switchgear.pdf
Eskom invites tenders for a 3-year contract to upgrade Outside Plant MV Switchgear at Arnot Power Station. The tender requires CIDB registration, has a clarification meeting scheduled, and a closing date in August 2026.
240-56227589 list of approved electronic devices.pdf
This document is Eskom's 'List of Approved Electronic Devices to be used on Eskom Power Stations Standard' (Revision 4). It is not the tender document itself but a critical referenced technical standard. The actual tender is for the provision of Outside Plant MV Switchgear Upgrade at Arnot Power Station for 3 years. This standard defines the approved manufacturers, models, and functions of electronic devices (protective relays, IEDs, controllers, meters, etc.) that may be used in Eskom Generation projects, including the referenced tender work.
240-77471499 Annexure B (3).docx
This tender document outlines ESKOM's requirements for the provision of Outside Plant MV Switchgear Upgrade at Arnot Power Station over a 3-year period, with a strong emphasis on Occupational Health and Safety (OHS) compliance and contractor management responsibilities.
Tender Advert Template MV Switchgear upgrade.pdf
Eskom invites tenders for a 3-year contract to upgrade the Outside Plant MV Switchgear at Arnot Power Station. The tender requires CIDB registration and has a clarification meeting scheduled.
240-56357424 MV and LV Switchgear Protection Standard (Rev 2.1).pdf
This tender document comprises two primary components: 1) A memorandum from Eskom stating that the MV (Medium Voltage) protection requirements in the standard '240-56357424: MV and LV Switchgear Protection Standard' have been superseded by a new standard ('240-143485806 Generation auxiliary plant medium voltage protection standard'). The old combined standard no longer governs MV protection. 2) The detailed, now-partially-superseded standard itself, which outlines comprehensive technical requirements for the protection of MV and LV electrical plant, including protection philosophies, relay functions, setting principles, and specific requirements for switchgear, cables, transformers, and motors.
240-56356396 Earthing and Lightning Protection Standard (Rev 2)_SIGNED.pdf
This document is not the tender itself but an Eskom technical standard (Earthing and Lightning Protection Standard, Revision 2) that defines the mandatory design, installation, and testing requirements for earthing and lightning protection systems within Eskom Generation power stations. It will be a critical compliance reference for any contractor bidding on the 'Outside Plant MV Switchgear Upgrade at Arnot Power Station' tender, as the work must adhere to this standard.
240-68099512 Form A_Cat 1_ Rev 9.docx
The tender is for the provision of Outside Plant MV Switchgear Upgrade at Arnot Power Station over a 3-year period. It is issued by Eskom and requires compliance with Eskom Supplier Quality Requirements (Specification 240-105658000) and ISO 9001 standards. The tenderer must acknowledge and accept these requirements by completing and signing the provided form.
240-77471651 Annexure C 1.docx
Eskom tender for a 3-year Outside Plant MV Switchgear Upgrade at Arnot Power Station. The document is primarily an OHS (Occupational Health and Safety) evaluation checklist, indicating that safety compliance is a critical and mandatory component of the tender assessment.
Eskom's (SHEQ) Policy Poster (32-727) final_rev 10.pdf
ESKOM is seeking a contractor to provide Outside Plant MV Switchgear Upgrade services at Arnot Power Station for a 3-year period. The tender involves upgrading medium-voltage switchgear infrastructure located outside plant buildings.
ECC Outside plant MV switchgear upgrade.pdf
Eskom seeks a contractor for a 3-year Outside Plant MV Switchgear Upgrade at Arnot Power Station using NEC3 Engineering & Construction Contract Option A (priced contract with activity schedule). The contract includes design, installation, and commissioning of 11kV switchgear, with key dates for design and completion by 31 December 2030.
240-143485806 Gx MV Protection std.pdf
This document is not a tender solicitation but Eskom's internal technical standard (240-143485806) for Medium Voltage Protection in Generation Auxiliary Plant. It defines the protection philosophy, design principles, and technical specifications for MV protection systems across Eskom power stations, including switchgear upgrades. The referenced tender is for a 3-year Outside Plant MV Switchgear Upgrade at Arnot Power Station, and this standard would govern the technical compliance of any proposed solution.
240-56030406 RMU standard.pdf
Eskom seeks a contractor for a 3-year Outside Plant MV Switchgear Upgrade at Arnot Power Station. The tender is governed by a detailed technical specification (240-56030406, Rev 2) for Ring Main Units (RMUs) and Integrated Remote Terminal Unit (IRTU) fitted RMUs for systems with nominal voltages from 3.3 kV to 33 kV (up to 36 kV). The specification standardizes requirements for new, factory-assembled RMUs for indoor/outdoor use, including protection systems, remote control, and corrosion protection.
TENDER~3.PDF
Eskom seeks a contractor for a 3-year Outside Plant MV Switchgear Upgrade project at Arnot Power Station. The tender emphasizes compliance with preferential procurement policies, including B-BBEE scoring, local content thresholds, skills development, and subcontracting to designated groups. The evaluation uses a 90/10 scoring system (90 for price, 10 for B-BBEE status), with additional mandatory SDL&I (Supplier Development, Localisation & Industrialisation) obligations that become contractual commitments.
Life-Saving Rules (2).pdf
This document is not the tender document itself but Eskom's Life-Saving Rules Standard (Revision 7). It defines six critical safety rules with zero-tolerance enforcement for all personnel (including contractors) working on Eskom sites. It is a mandatory compliance document for any contractor bidding for or working on the 'Outside Plant MV Switchgear Upgrade at Arnot Power Station' tender.
240-56227443 Generation Requirements for Control and Power Cables for Power Stations Standard.pdf
This tender document outlines Eskom's technical requirements for control and power cables to be used in the Outside Plant MV Switchgear Upgrade at Arnot Power Station over a 3-year period. It is a controlled disclosure standard specifying cable types, specifications, installation, testing, and compliance requirements for power station applications.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 1 725 000
Range
Based on CIDB Grade 1CE limit. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Learn how to submit a winning bid with these related articles
A technical guide to municipal electrical tenders. Covers CIDB EB/EP grading, electrification projects (INEP), substation maintenance panels, and COC compliance.
How mechanical and electrical engineers, contractors, and consultants can win public sector contracts in South Africa — HVAC, plumbing, fire systems, electrical infrastructure, ECSA registration, CIDB ME designation, and tender documentation essentials.
How small electrical contractors use Joint Ventures to combine EP grading, win Eskom and municipal infrastructure projects, and compete for renewable energy installations.
How small office supplies, stationery, and general goods suppliers use Joint Ventures to win government procurement contracts by combining inventory with B-BBEE credentials.
💡 Want more tendering tips and strategies?
Explore Our BlogWe refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Description
Source: 240-56356396 Earthing and Lightning Protection Standard (Rev 2)_SIGNED.pdfThis document is the Eskom Earthing and Lightning Protection Standard (240-56356396, Revision 2). It is not a tender document but a technical standard that defines requirements for the design, supply, installation, and testing of earthing and lightning protection systems at Eskom Generation power stations.
Primary objectives:
Scope: Applies to electrical and instrumentation systems within Eskom Generation.
The document includes extensive definitions, referenced standards, design principles, material specifications, installation guidelines, and testing requirements.
Evaluation Criteria
Source: 240-56356396 Earthing and Lightning Protection Standard (Rev 2)_SIGNED.pdf (unknown)The document does not contain tender evaluation criteria. It is a technical standard. The extracted text appears to be fragmented and does not describe a scoring method for bid evaluation.
Technical Specifications
Source: 240-56356396 Earthing and Lightning Protection Standard (Rev 2)_SIGNED.pdf (unknown)This is a technical standard document, not a tender specification. It defines the design, supply, installation, and testing requirements for earthing and lightning protection systems at Eskom Generation power stations.
Key requirements for bidders to note:
Limit touch and step potentials; provide a low impedance return path for fault currents.
Target maximum earth resistance for the complete system is 10 milli-ohms, maintainable up to 45m distances.
Protect installation against lightning, surges, spikes, and other induced interferences.
Methodology
Source: 240-56356396 Earthing and Lightning Protection Standard (Rev 2)_SIGNED.pdfThe standard prescribes a detailed methodology for implementing earthing and lightning protection:
Experience & Qualifications
Source: 240-56356396 Earthing and Lightning Protection Standard (Rev 2)_SIGNED.pdfThe document does not specify bidder experience or personnel qualifications. It defines the role of an 'Earthing Contractor' as a contractor appointed to install earthing conductors on cable racking and connect electrical/mechanical equipment to earth. It implies that contractors must have the skill to execute specialized connections (brazing, exothermic welding) which are material and skill-dependent.
Quality Management
Source: 240-56356396 Earthing and Lightning Protection Standard (Rev 2)_SIGNED.pdfThe standard mandates rigorous testing, maintenance, and documentation to ensure system integrity:
Compliance Requirements
Source: 240-56356396 Earthing and Lightning Protection Standard (Rev 2)_SIGNED.pdf (unknown)The document does not list standard tender compliance requirements (CSD, tax, B-BBEE, CIDB, etc.). It is a technical standard. Compliance is required with the extensive list of referenced technical standards and Eskom specifications, including:
Safety-related compliance:
Description
Source: 240-56030406 RMU standard.pdfThis specification standardises and rationalises medium voltage Ring Main Units (RMUs) and IRTU fitted RMUs for Eskom, including remote terminal units and protection systems for free-standing indoor/outdoor applications. It covers distribution automation, IPP applications, high-risk enclosures, and 36 kV units for Generation and Distribution.
Submission Guidelines
Source: 240-56030406 RMU standard.pdf (unknown)Returnable Documents: The full Technical Schedules B (including Test Schedules and Deviation Schedules) must be completed and submitted together with Technical Schedules A for approval at the time of tender. This includes individual RMU and IRTU fitted RMU item Technical Schedules.
Evaluation Criteria
Source: 240-56030406 RMU standard.pdf (unknown)Suppliers must be conversant with and comply fully with Specification 240-56030406. They must obtain all necessary supporting documents. Suppliers must have ISO 9001 Quality Management Systems (normative reference). Any deviation constitutes non-conformance unless agreed in advance by a delegated Eskom Cable Systems Specialist based on sound engineering judgement. Proof of performance for protection systems up to the circuit-breaker's rated short-circuit breaking current is required. SPRs using external DIP switches/potentiometers for settings are not accepted. Configuration software must be provided at no extra cost and be compatible with specified Windows OS.
Technical Specifications
Source: 240-56030406 RMU standard.pdf (unknown)This specification covers Eskom’s requirements for new factory-assembled Ring Main Units (RMUs) and Integrated Remote Terminal Unit (IRTU) fitted RMUs rated for three-phase cable systems from 3.6 kV to 36 kV, for freestanding indoor or outdoor operation at 50 Hz. It distinguishes between inland and coastal applications and excludes bulk metering kiosks. Key requirements include compliance with SANS 1874 and other referenced standards, specific configurations, lightning impulse withstand levels, cable test facilities, remote tripping, fuse-link specifications, protection equipment (SPR or IED), RTU requirements, DC supply, control plant enclosure, plant status controls, wiring, LV AC power supply, MV cable termination enclosures, gas pressure indication, live circuit indication, earth fault indication, padlock protection, concrete plinths, corrosion protection, documentation, testing, and marking.
Quality Management
Source: 240-56030406 RMU standard.pdfSuppliers must comply with ISO 9001 and other referenced standards. Specific requirements include software/firmware version control, configuration management, test reports, and vendor responsibilities for setup and testing.
Compliance Requirements
Source: 240-56030406 RMU standard.pdf (unknown)All RMUs and IRTU fitted RMUs must comply with SANS 1874 and this specification, with this specification taking precedence in case of conflict. Suppliers must be conversant with and comply with all requirements; no deviations are accepted without prior agreement from Eskom. The process for monitoring uses technical evaluation criteria and technical schedules A and B as per SANS 1874.
Health & Safety
Source: 240-56030406 RMU standard.pdfSafety requirements include internal arc classification testing per SANS/IEC 62271-202 for outdoor RMUs and SANS/IEC 62271-200 for indoor units, with submission of type test reports and videos for Eskom safety review. Live circuit indication and earth fault indication are mandated.
Environmental
Source: 240-56030406 RMU standard.pdfEnvironmental considerations include corrosion protection based on inland (medium pollution) or coastal (very heavy pollution) classifications per SANS 60815-1, with specific corrosivity ratings and detailed specifications referenced.
Contractual Terms
Source: 240-56030406 RMU standard.pdfThe specification outlines technical requirements for RMUs and IRTU fitted RMUs, including configurations, testing, protection systems, wiring, power supply, enclosures, and documentation. It references Eskom standards and drawings, with no explicit contractual terms like duration or penalties provided.
Section
Source: 240-56030406 RMU standard.pdfThe evaluation includes detailed protection requirements for IRTU fitted RMUs with Protection IEDs, covering harmonic restraint, overcurrent and earth fault functions, directional power, live load blocking, negative phase sequence, frequency and voltage protection, measurement functions, event recording, configuration software, and sensor requirements. Suppliers must provide specific technical details in schedules.
Important Dates
Source: Tender Advert Template MV Switchgear upgrade.pdf (TENDER)Contact Information
Source: Tender Advert Template MV Switchgear upgrade.pdf (TENDER)Submission Guidelines
Source: Tender Advert Template MV Switchgear upgrade.pdf (TENDER)Returnable documents are required but not specified in detail.
Evaluation Criteria
Source: Tender Advert Template MV Switchgear upgrade.pdf (TENDER)Tenderers must have a CIDB contractor grading of 8EP or 8ME or higher. Joint ventures are permitted if all members are CIDB registered, the lead partner meets the grading requirement (or is one level below), and the combined grading equals or exceeds 8EP/8ME.
Technical Specifications
Source: Tender Advert Template MV Switchgear upgrade.pdf (TENDER)Compliance Requirements
Source: Tender Advert Template MV Switchgear upgrade.pdf (TENDER)Requirements
Source: Tender Advert Template MV Switchgear upgrade.pdf (TENDER)Section
Source: Tender Advert Template MV Switchgear upgrade.pdf (TENDER)Description
Source: 240-56227443 Generation Requirements for Control and Power Cables for Power Stations Standard.pdfEvaluation Criteria
Source: 240-56227443 Generation Requirements for Control and Power Cables for Power Stations Standard.pdf (unknown)Technical Specifications
Source: 240-56227443 Generation Requirements for Control and Power Cables for Power Stations Standard.pdf (unknown)Methodology
Source: 240-56227443 Generation Requirements for Control and Power Cables for Power Stations Standard.pdf (unknown)Quality Management
Source: 240-56227443 Generation Requirements for Control and Power Cables for Power Stations Standard.pdfFinancial Requirements
Source: 240-56227443 Generation Requirements for Control and Power Cables for Power Stations Standard.pdf (unknown)Compliance Requirements
Source: 240-56227443 Generation Requirements for Control and Power Cables for Power Stations Standard.pdf (unknown)Health & Safety
Source: 240-56227443 Generation Requirements for Control and Power Cables for Power Stations Standard.pdfContractual Terms
Source: 240-56227443 Generation Requirements for Control and Power Cables for Power Stations Standard.pdfRequirements
Source: 240-56227443 Generation Requirements for Control and Power Cables for Power Stations Standard.pdf (unknown)Section
Source: 240-56227443 Generation Requirements for Control and Power Cables for Power Stations Standard.pdfDescription
Source: Life-Saving Rules (2).pdfImportant Dates
Source: Life-Saving Rules (2).pdf (unknown)Evaluation Criteria
Source: Life-Saving Rules (2).pdf (unknown)Technical Specifications
Source: Life-Saving Rules (2).pdf (unknown)Compliance Requirements
Source: Life-Saving Rules (2).pdf (unknown)Health & Safety
Source: Life-Saving Rules (2).pdfImportant Dates
Source: Eskom's (SHEQ) Policy Poster (32-727) final_rev 10.pdf (unknown)14 April 2026
Submission Guidelines
Source: Eskom's (SHEQ) Policy Poster (32-727) final_rev 10.pdf (unknown)Returnable Documents: Not specified in the provided text.
Evaluation Criteria
Source: Eskom's (SHEQ) Policy Poster (32-727) final_rev 10.pdf (unknown)Bidders must be registered with relevant industry bodies (CIDB grading likely required). Must demonstrate previous experience with MV switchgear projects. Must have valid tax clearance certificate. Must comply with ESKOM's vendor registration requirements.
Description
Source: 240-77471651 Annexure C 1.docxThe tenderer must provide their name and tender reference number on the returnable document. The scope of work is the provision of outside plant MV switchgear upgrade at Arnot Power Station for a period of 3 years.
Submission Guidelines
Source: 240-77471651 Annexure C 1.docx (unknown)Returnable Documents: The tenderer must submit the following OHS tender returnables:
Submission notes:
Evaluation Criteria
Source: 240-77471651 Annexure C 1.docx (unknown)Mandatory eligibility is contingent on the complete and compliant submission of all listed OHS returnables (items 1-7). Failure to submit any required document, or submission in a non-compliant format (e.g., lump-sum OHS costing), will likely result in disqualification or a 'Not Recommended' evaluation. The tenderer must operate under a valid COIDA registration or equivalent.
Compliance Requirements
Source: 240-77471651 Annexure C 1.docx (unknown)No specific requirements found
Description
Source: 240-56227573 Air-Insulated Withdrawable AC Metal-Enclosed Switchgear Controlgear for 1kV to 52kV.pdfThis document is a technical standard specifying requirements for new air-insulated withdrawable AC metal-enclosed switchgear and controlgear.
Evaluation Criteria
Source: 240-56227573 Air-Insulated Withdrawable AC Metal-Enclosed Switchgear Controlgear for 1kV to 52kV.pdf (unknown)Suppliers must demonstrate capability to meet extensive technical specifications.
Technical Specifications
Source: 240-56227573 Air-Insulated Withdrawable AC Metal-Enclosed Switchgear Controlgear for 1kV to 52kV.pdf (unknown)This is a technical standard for new air-insulated withdrawable AC metal-enclosed switchgear and controlgear for Eskom Generation Group.
Quality Management
Source: 240-56227573 Air-Insulated Withdrawable AC Metal-Enclosed Switchgear Controlgear for 1kV to 52kV.pdfQuality requirements are embedded in the technical standard.
Health & Safety
Source: 240-56227573 Air-Insulated Withdrawable AC Metal-Enclosed Switchgear Controlgear for 1kV to 52kV.pdfSafety is integral to the technical design requirements.
Environmental
Source: 240-56227573 Air-Insulated Withdrawable AC Metal-Enclosed Switchgear Controlgear for 1kV to 52kV.pdfThe standard explicitly excludes requirements for switchgear installation and use in special environmental conditions (e.g., exposure to high temperature, high pressure, earthquakes, nuclear applications). Such requirements are subject to additional project-specific specifications.
Contractual Terms
Source: 240-56227573 Air-Insulated Withdrawable AC Metal-Enclosed Switchgear Controlgear for 1kV to 52kV.pdfThe standard defines detailed technical requirements for switchgear and controlgear, but does not contain explicit contractual terms, conditions, duration, termination, or penalties. It is a technical specification document.
Requirements
Source: 240-56227573 Air-Insulated Withdrawable AC Metal-Enclosed Switchgear Controlgear for 1kV to 52kV.pdf (unknown)The document lists extensive normative references (Eskom standards, SANS standards, IEC standards, ISO standards) that form the basis for all technical requirements.
Section
Source: 240-56227573 Air-Insulated Withdrawable AC Metal-Enclosed Switchgear Controlgear for 1kV to 52kV.pdfSuppliers must submit relevant type test reports and videos for Eskom tender evaluations.
Description
Source: 240-56357424 MV and LV Switchgear Protection Standard (Rev 2.1).pdfThis is a technical standard document outlining the minimum protection requirements for medium voltage (MV) and low voltage (LV) plant at Eskom power stations.
Contact Information
Source: 240-56357424 MV and LV Switchgear Protection Standard (Rev 2.1).pdf (unknown)Phone: 016 457 5295 (Johann Jordaan, PTM – Technical Support)
Evaluation Criteria
Source: 240-56357424 MV and LV Switchgear Protection Standard (Rev 2.1).pdf (unknown)Eligibility is determined by technical capability rather than explicit commercial criteria in this document. Suppliers must demonstrate proven expertise in high-voltage electrical engineering, specifically in MV switchgear protection systems compliant with Eskom's stringent and proprietary standards. Experience working on Eskom Generation power stations is highly advantageous. Suppliers must be able to access and apply the latest controlled Eskom standards.
Technical Specifications
Source: 240-56357424 MV and LV Switchgear Protection Standard (Rev 2.1).pdf (unknown)This is a technical standard document, not a tender specification. It outlines minimum protection requirements for MV and LV plant at Eskom power stations and is intended as a standard when purchasing new protection schemes.
Compliance Requirements
Source: 240-56357424 MV and LV Switchgear Protection Standard (Rev 2.1).pdf (unknown)No specific compliance requirements (like CSD, tax, CIDB) are stated in the document. B-BBEE: A minimum Level 3 is noted, but this appears to be a placeholder or external note, not extracted from the standard itself.
Health & Safety
Source: 240-56357424 MV and LV Switchgear Protection Standard (Rev 2.1).pdfThe document is a technical standard focused on electrical protection, not a health and safety plan. However, it includes requirements that contribute to personnel and plant safety:
Description
Source: 240-68099512 Form A_Cat 1_ Rev 9.docxSubmission Guidelines
Source: 240-68099512 Form A_Cat 1_ Rev 9.docx (unknown)Returnable Documents: The tenderer must complete and sign the form to acknowledge and accept Eskom Supplier Quality Requirements as per 240-105658000 Specification and ISO 9001 Standard.
Evaluation Criteria
Source: 240-68099512 Form A_Cat 1_ Rev 9.docx (unknown)General
Technical
Description
Source: MV Switchgear Outside Plant 2026.zipEvaluation Criteria
Source: MV Switchgear Outside Plant 2026.zip (unknown)General
Technical
Technical Specifications
Source: MV Switchgear Outside Plant 2026.zip (unknown)Compliance Requirements
Source: MV Switchgear Outside Plant 2026.zip (unknown)Section
Source: MV Switchgear Outside Plant 2026.zipImportant Dates
Source: ECC Outside plant MV switchgear upgrade.pdf (unknown)Contact Information
Source: ECC Outside plant MV switchgear upgrade.pdf (unknown)Submission Guidelines
Source: ECC Outside plant MV switchgear upgrade.pdf (unknown)Returnable Documents
Source: ECC Outside plant MV switchgear upgrade.pdf (unknown)Evaluation Criteria
Source: ECC Outside plant MV switchgear upgrade.pdf (unknown)Technical Specifications
Source: ECC Outside plant MV switchgear upgrade.pdf (unknown)Experience & Qualifications
Source: ECC Outside plant MV switchgear upgrade.pdfQuality Management
Source: ECC Outside plant MV switchgear upgrade.pdfPricing Schedule
Source: ECC Outside plant MV switchgear upgrade.pdfFinancial Requirements
Source: ECC Outside plant MV switchgear upgrade.pdf (unknown)Compliance Requirements
Source: ECC Outside plant MV switchgear upgrade.pdf (unknown)Health & Safety
Source: ECC Outside plant MV switchgear upgrade.pdfEnvironmental
Source: ECC Outside plant MV switchgear upgrade.pdfContractual Terms
Source: ECC Outside plant MV switchgear upgrade.pdfDescription
Source: 240-77471499 Annexure B (3).docxThe tender is for the provision of Outside Plant MV Switchgear Upgrade at Arnot Power Station for a 3-year period. A critical component is compliance with Eskom's OHS legal and other requirements, as detailed in Annexure B (Acknowledgement Form).
Evaluation Criteria
Source: 240-77471499 Annexure B (3).docx (unknown)The document indicates that bidders will be evaluated on the following aspects:
Technical Specifications
Source: 240-77471499 Annexure B (3).docx (unknown)The tender requires compliance with Eskom's Occupational Health and Safety (OHS) legal and other requirements. Key points include:
Compliance Requirements
Source: 240-77471499 Annexure B (3).docx (unknown)Compliance with Eskom's OHS legal requirements is mandatory. This includes adherence to:
Important Dates
Source: Tender Advert Template Switchgear.pdf (TENDER)Briefing Session
Source: Tender Advert Template Switchgear.pdf (TENDER)Evaluation Criteria
Source: Tender Advert Template Switchgear.pdf (TENDER)Compliance Requirements
Source: Tender Advert Template Switchgear.pdf (TENDER)Requirements
Source: Tender Advert Template Switchgear.pdf (TENDER)Section
Source: Tender Advert Template Switchgear.pdf (TENDER)Description
Source: 240-143485806 Gx MV Protection std.pdfThis document is an Eskom Generation standard for Medium Voltage Protection of auxiliary plant. It provides:
Evaluation Criteria
Source: 240-143485806 Gx MV Protection std.pdf (unknown)While not explicitly stated in this standard, eligibility for the related tender would implicitly require:
Technical Specifications
Source: 240-143485806 Gx MV Protection std.pdf (unknown)This document is a technical standard for Medium Voltage Protection in Eskom Generation power stations. It outlines the protection philosophy, requirements, and design principles for electrical protection systems on medium voltage (MV) reticulation. Key points for bidders:
Methodology
Source: 240-143485806 Gx MV Protection std.pdfThe document outlines the methodology for MV protection design and implementation:
Quality Management
Source: 240-143485806 Gx MV Protection std.pdfThe document specifies requirements for supervision and testing to ensure protection quality and reliability:
Compliance Requirements
Source: 240-143485806 Gx MV Protection std.pdf (unknown)The document references several normative standards and procedures that must be applied. Bidders must ensure compliance with:
Health & Safety
Source: 240-143485806 Gx MV Protection std.pdfThe document includes safety-related requirements for protection and control systems:
Contractual Terms
Source: 240-143485806 Gx MV Protection std.pdfThe document references normative standards and procedures that form part of the contractual framework. Bidders must apply:
Important Dates
Source: Invitation to Tender (ITT) - Switch Gear Upgrade.pdf (TENDER)Briefing Session
Source: Invitation to Tender (ITT) - Switch Gear Upgrade.pdf (TENDER)Contact Information
Source: Invitation to Tender (ITT) - Switch Gear Upgrade.pdf (TENDER)Submission Guidelines
Source: Invitation to Tender (ITT) - Switch Gear Upgrade.pdf (TENDER)Evaluation Criteria
Source: Invitation to Tender (ITT) - Switch Gear Upgrade.pdf (TENDER)Experience & Qualifications
Source: Invitation to Tender (ITT) - Switch Gear Upgrade.pdfQuality Management
Source: Invitation to Tender (ITT) - Switch Gear Upgrade.pdfPricing Schedule
Source: Invitation to Tender (ITT) - Switch Gear Upgrade.pdfFinancial Requirements
Source: Invitation to Tender (ITT) - Switch Gear Upgrade.pdf (TENDER)Compliance Requirements
Source: Invitation to Tender (ITT) - Switch Gear Upgrade.pdf (TENDER)Health & Safety
Source: Invitation to Tender (ITT) - Switch Gear Upgrade.pdfEnvironmental
Source: Invitation to Tender (ITT) - Switch Gear Upgrade.pdfContractual Terms
Source: Invitation to Tender (ITT) - Switch Gear Upgrade.pdfDescription
Source: TENDER~3.PDFImportant Dates
Source: TENDER~3.PDF (TENDER)Contact Information
Source: TENDER~3.PDF (TENDER)Submission Guidelines
Source: TENDER~3.PDF (TENDER)Evaluation Criteria
Source: TENDER~3.PDF (TENDER)All tenderers eligible, but scoring and award depend on B-BBEE status and price. Tenderers without valid B-BBEE docs can only score out of 80 for price (lose all 10 B-BBEE points). Non-compliance with CIDB CSDG or local content documentation (SBD 6.2, Annex C) renders tender non-responsive. Must meet designated sector local content threshold (90% for electrical cables).
Technical Specifications
Source: TENDER~3.PDF (TENDER)Methodology
Source: TENDER~3.PDFPricing Schedule
Source: TENDER~3.PDFFinancial Requirements
Source: TENDER~3.PDF (TENDER)Compliance Requirements
Source: TENDER~3.PDF (TENDER)B-BBEE Requirements
Source: TENDER~3.PDF (TENDER)Contractual Terms
Source: TENDER~3.PDF (TENDER)Special Conditions
Source: TENDER~3.PDF (TENDER)Requirements
Source: TENDER~3.PDF (TENDER)Section
Source: TENDER~3.PDFDescription
Source: MV Switchgear Technical Evaluation Criteria Rev 2..pdfSubmission Guidelines
Source: MV Switchgear Technical Evaluation Criteria Rev 2..pdf (unknown)Returnable Documents
Source: MV Switchgear Technical Evaluation Criteria Rev 2..pdf (unknown)Evaluation Criteria
Source: MV Switchgear Technical Evaluation Criteria Rev 2..pdf (unknown)Technical Specifications
Source: MV Switchgear Technical Evaluation Criteria Rev 2..pdf (unknown)Methodology
Source: MV Switchgear Technical Evaluation Criteria Rev 2..pdf (unknown)Experience & Qualifications
Source: MV Switchgear Technical Evaluation Criteria Rev 2..pdfQuality Management
Source: MV Switchgear Technical Evaluation Criteria Rev 2..pdfCompliance Requirements
Source: MV Switchgear Technical Evaluation Criteria Rev 2..pdf (unknown)Health & Safety
Source: MV Switchgear Technical Evaluation Criteria Rev 2..pdfContractual Terms
Source: MV Switchgear Technical Evaluation Criteria Rev 2..pdfRequirements
Source: MV Switchgear Technical Evaluation Criteria Rev 2..pdf (unknown)Section
Source: MV Switchgear Technical Evaluation Criteria Rev 2..pdfDescription
Source: 240-56227589 list of approved electronic devices.pdfThis document is Eskom's 'List of Approved Electronic Devices to be used on Eskom Power Stations' (Standard 36-726).
Evaluation Criteria
Source: 240-56227589 list of approved electronic devices.pdf (unknown)Suppliers must demonstrate the ability to supply and support equipment from the approved manufacturers listed in the standard's appendices. Technical proposals must align with the device functions and communication protocols specified for each application. Suppliers are responsible for ensuring any proposed device firmware/hardware versions are compatible with the approved versions listed, as per notes in section 3.2.
Technical Specifications
Source: 240-56227589 list of approved electronic devices.pdf (unknown)This document is Eskom's standard list of approved electronic devices for power station electrical plant.
Experience & Qualifications
Source: 240-56227589 list of approved electronic devices.pdf (unknown)The document lists the development team and revision history, but does not specify bidder experience or key personnel qualifications. The content is administrative and not relevant to bidder qualification.
Quality Management
Source: 240-56227589 list of approved electronic devices.pdfThe document defines quality assurance processes for electronic devices.
Compliance Requirements
Source: 240-56227589 list of approved electronic devices.pdf (unknown)The document specifies technical compliance requirements for electronic devices used on Eskom power stations.
Environmental
Source: 240-56227589 list of approved electronic devices.pdfThe document specifies environmental testing requirements for electronic devices.
Requirements
Source: 240-56227589 list of approved electronic devices.pdf (unknown)The document lists ANSI function codes (e.g., 27/51 voltage controlled overcurrent, 40 loss of excitation, 50P instantaneous overcurrent, 50/27 inadvertent energising, 50BF breaker failure, 50N/G instantaneous overcurrent neutral/ground, 51BF breaker failure IDMT, 51NBF breaker failure neutral, 64R rotor ground injection, 64S stator ground injection, 86 lockout master trip) that define the protection functions devices must support. Bidders must ensure proposed devices cover the required ANSI functions for the specific application.
Section
Source: 240-56227589 list of approved electronic devices.pdf (unknown)21, 24, 25, 27, 27g, 32rou, 40, 46, 50p,
ABB GPU2000 50G, 50IE, 51GPV, 59, 59G, 60, 64F, 67, Pass Y Generator
67N, 81ou, 87
SPA or IEC 60870-5-
21, 24, 27, 32, 40, 46, 49, 49S, 49R, 50, 103, LON or MVB
ABB REG316 51, 51/27, 59, 60, 64R, 64S, 67, 78, 81, Pass Y (part of IEC 61375), Product
87G, 87T MVB (part of IEC
List of Approved Electronic Devices to be used on Eskom Unique Identifier: 240-56227589
Power Stations Standard Revision: 4
Page:
MANUFACTURER TYPE FUNCTIONS PASS / FAIL Y2K Communication COMMENTS
SPA or IEC 60870-5-
103, LON or MVB
21, 24, 32, 40, 46, 49, 50, 51, 51/27, 59,
ABB REG216 Pass Y (part of IEC 61375), System
60, 64, 78, 81, 87t, 87g
MVB (part of IEC
21P/C, 24, 25, 27, 32, 40, 46, 49, 50PGQ, Switch Protocol
SEL 300G 5ON, 51G, 51N, 51V/C, 52, 59PGQ, 60, Pass Y (LMD), SEL Fast Generator
64G,81OU, 87, 87N Meter, SEL
Modbus® RTU
87(Not P342), 50/51/67, 50N/51N,
K-Bus, IEC-60870-5-
Micom 67N/67W, 64, 51V, 21, 59V, 27/59, 81,
Areva Pass Y 103, MODBUS or Generator
P34x 32, 40, 46T, 46OC, 47, 49, 24, 78,
Dnp3.0, Iec 874-10.
27TN/59TN, 50/27,50bf, 64s(p345)
21P, 24, 25, 27p, 27tn, 27x, 32, 40,
MMS/UCA2, dnp
46G, 50/27, 5odd, 50p, 50g, 50n, 51p,
GE G60 Pass Y 3.0, Modbus RTU / Generator
51G, 51n, 59n, 59p, 59x, 59_2, 64tn,
Tcp
67P, 67n, 68, 78, 81u, 81o, 87s
12, 21, 24, 27, 50/27, 32, 38, 39, 40, 40q,
GE SR489 46, 47, 49, 50, 50BF, 50/51GN, 51V, 59, Pass Y
3.0 Management
59GN/27TN, 60fl, 67, 76, 81,86, 87g
24, 27, 32, 40, 46, 50, 50/27, 50bf, 51n,
Beckwith M-3420 Pass Y Modbus, BECO 2200 Generator
50N, 51v, 59, 59n, 60fl, 81, 87, 87gd
Siemens 7VH60 87T, 87N Pass Y
ABB SPAD346C 50, 50BF, 50N, 51,51N,87G,87T Pass N/A SPA-Bus Transformer
Spa, lon, iec 60870-
21, 24, 27, 46, 47, 49, 50, 51, 59, 60fl, 5-103, dnp
ABB RET54* Pass Y 3.0,Modbus Transformer 67N, 81, 87G, 87T
SEL 387 50PGQ, 51PGQ, 52, 67G, 87 Pass Y Fast Messaging, Diff and O/C
or ASCII protocol
24, 27x, 50/87, 50p, 50g, 50n, 51p,
GE T60 51G, 51N, 59N, 59P, 59X, 67P, 67N, Pass Y MMS/UCA2, DNP 3.0, Transformer
81U, 81O, 87T,87G Modbus RTU / TCP
24, 27, 46, 50, 50bf, 50g, 51, 51g, 51n,
BECKWITH M-3310 Pass Y Modbus, BECO 2200 Transformer 59G, 81U, 87, 87GD
List of Approved Electronic Devices to be used on Eskom Unique Identifier: 240-56227589
Power Stations Standard Revision: 4
Page:
MANUFACTURER TYPE FUNCTIONS PASS/FAIL Y2K Communication Comments
24, 27, 46, 49, 50, 50bf, 50g, 50n, 51,
BECKWITH M-3311 Pass Y Modbus, BECO 2200 Transformer 51G, 51N, 59G, 81O/U, 87, 87GD
21, 24, 25, 27, 46, 50, 50n, 50bf, 51/67, IEC61850-8-1,
ABB RET67* 51N/67N, 52PD, 59, 59N, 59THD, 67N, Pass Y IEC60870-5-103, Transformer
81, 87t, 87, 87g, 87n, 94 dnp3.0, Lon, spa
50/51PQN, 67, 50/27, 85, 79, 25, 67N, IEC 60870-5-103, IEC processor boards
Micom P632
Areva 37/48/49/49LR/50S/66, 49, 46, Pass Y 60870-5-101, DNP 3.0, P9651428 index G
and P633
27/59PQW, 81,32, 50BF/62, 30/70 and P9651472
approved.
27, 46, 49T, 50/51P&N, 51P&NBF, 59, Transformer with
Abb ret63*
87N&T Pass Y DNP3.0, IEC61850 differential
16, 24, 25, 27, 32, 46, 49, 50/51P&N, 59, Transformer with
Sel 487e
67, 81, 85, 87 Pass Y IEC61850 differential
M.S.P. MSP 3-2 Pass N/A
Siemens 3UN21 Pass N/A Thermistor type
FANOX F20 Pass N/A
FANOX G17 Pass N/A
Siemens Pass N/A RS232 + Profibus
Dp
Powertronics M400 Pass N/A Version 5.5 only
Powertronics M500 Pass N/A
14, 37, 46, 48, 49, 49R, 49S, 50, 50N, Incl Trip CCt
Siemens 7SJ6112 Pass Y
50BF, 51, 51N, 74TC, 79, 86, 87N Superv and CB Fail
VAMP VAMP150 14, 37, 46, 49, 50, 50BF, 51, 66, 74TC Pass Y Arc Sensor input
14, 26, 37, 46, 48, 49, 27/49, 50, 51lr,
Areva Micom P241 50N, 51N, 53, 59N, 61N, 32N/64N, 66, Pass Y
81U
Schweitzer Eng SEL-701 27/59, 37, 46, 47, 49, 50, 55, 66, 81 Pass Y
14, 27, 37, 38, 46, 47, 49, 50P/G/N, 55,
Schweitzer Eng SEL- 710 Pass Y Motor
59, 66, 81O/U, 87
14, 27, 37, 38, 46, 47, 49, 50P/G/N, 55,
Schweitzer Eng SEL- 749M Pass Y Motor
59, 66, 81O/U
ABB MCX913 Pass N/A
ABB SPAM150 14, 37, 46, 46R, 49M, 50, 51, 66 NPS and power N/A Motor
supply problems.
Siemens 7SJ551 Pass N/A
Strike Technologies FP2000 Pass N/A
Cutler Hammer MP3000 Pass N/A
14, 21, 24, 27, 27/34, 32f, 32r, 40, 46,
IEC60870-5-103,
48, 49, 49S, 50, 50N, 50BF, 51, 51N, Generator and
Siemens 7UM61 Pass Y Profibus DP, Modbus
51V, 59, 59N, 59GN, 64R, 67, 67N, 67G, Motor
Rtu, dnp 3.0
74Tc, 81, 81r, 86,
List of Approved Electronic Devices to be used on Eskom Unique Identifier: 240-56227589
Power Stations Standard Revision: 4
Page:
MANUFACTURER TYPE FUNCTIONS PASS / FAIL Y2K Communication COMMENTS
14, 21, 24, 27, 27/34, 32, 32f, 32r, 37,
40, 46, 48, 47, 49, 49s, 50, 50n, 50bf, IEC60870-5-103,
Siemens 7UM62 51GN, 51, 51N, 51V, 59, 59N, 59GN, 64, Pass Y Profibus DP, Modbus
64R, 67, 67n, 67g, 68, 74tc, 78, 81, rtu, dnp 3.0
81R, 86,87g,87t, 87m, 87n
46, 48, 49, 49R, 49S, 50,50N, 51, 51N, Motor and
Siemens 7SJ600 Pass Y IEC60870-5-103
74TC, 79 Generator
IEC60870-5-
14, 21fl, 27, 37, 46, 47, 48, 49, 49r, 103/IEC61850,
Siemens 7SJ62 49S, 50, 50N, 50BF, 51, 51N, 59, 59N/ Pass Y Profibus-FMS/-DP,
64, 66, 67, 67N, 74TC, 79, 81, 86, 87N DNP 3.0, Modbus
Rtu
IEC60870-5-
14, 21fl, 25, 27/59, 32, 37, 38, 46,47, 48,
103/IEC61850,
49, 49R, 49S, 50, 50N, 50BF, 51, 51N, Motor and
Siemens 7SJ642 Pass Y Profibus-FMS/-DP,
55, 59N/64, 67, 67N, 74TC, 79M, 81, 86, Generator
DNP 3.0, Modbus
Iec 60870-5-103,
50/51PQN, 67, 50/27, 85, 79, 25, 67n,
Micom P632 IEC 60870-5-101, Generator and
Areva 37/48/49/49LR/50S/66, 49, 46, Pass Y
and P633 DNP 3.0, Motor
27/59PQW, 81,32, 50BF/62, 30/70
DNP3.0, IEC61850, Protection and
ABB RE*6** Model dependant Pass Y
IEC60870-103 Control
Iec61850, ieee
1588, RSTP, PRP, Protection and
Arcteq AQ M2** Model dependant Pass Y PTP, Modbus TCP, Control
Dnp 3.0, Ftp,
RSA fp2000
Schneider SEPAM 2000 Pass Y With Thermal
ABB REJ525 46, 50, 50N, 51, 51N, 62BF Pass Y
27, 27/47/59, 46, 50, 51, 50n, 51n, 59,
ABB REF54* Pass Y
59N, 67, 79, 81U/81O
ABB RXIDK2H 50, 51 Pass N/a 40 – 2000 Hz
Thytronics SCC-P72 Pass Y
Areva Micom P12X 37, 46, 49, 50, 50N, 50BF, 51, 51N, 79 Pass Y
IDMT blocks when I>>
ABB SPAJ14* 50, 50N, 51, 51N , 50BF Pass N/A
pick-up
Siemens 7SJ511 Pass N/A
Basler BE1-50/51M Pass N/A Single phase
Basler BE1-50/51B Pass N/A Three phase
CEE ITG7366 Pass N/A Three phase
ABB SPAJ11* 50N, 51N Pass N/A Earth fault
Iec 60870-5-103,
49, 50, 50n, 50bf, 51, 51n, 74tc, 79,
Siemens 7SD61 Pass Y Profibus-DP, DNP- Feeder
85, 86, 87t, 87l
3.0
25, 27, 32, 32 QVI, 50PGQ, 50N, Directional O/C and
SEL 351 Pass Y Fast Messaging,
51PGQ, 51N, 52, 59, 67PGQ, 67N, 79 Reclosing
or ASCII protocol
List of Approved Electronic Devices to be used on Eskom Unique Identifier: 240-56227589
Power Stations Standard Revision: 4
Page:
MANUFACTURER TYPE FUNCTIONS PASS / FAIL Y2K Communication COMMENTS
SEL 501 49, 50PGQ, 51PGQ, 52, 62, 66 Pass Y Fast Messaging, Dual Universal O/C
or ASCII protocol
SEL 551 50PQG, 50N, 51PGQ, 51N, 52, 79 Pass Y Fast Messaging, O/C and Reclosing
or ASCII protocol
SEL 387 50PGQ, 51PGQ, 52, 67G, 87 Pass Y Fast Messaging, Diff and O/C
or ASCII protocol
Iec 60870-5-103,
Iec 60870-5-101,
Areva Micom P13* 24, 27/59, 49, 50, 51, 87, 87G Pass Y Feeder
DNP 3.0, Modbus
and Courier
21G&p, 25, 27p, 27x, 32n, 50bf,
5Odd, 50p, 50g, 50n, 50p, 50_2, dnp 3.0, Iec60870-
GE L90 Pass Y Line differential
51P, 51g, 51n, 51_2, 52, 59n, 59p, 5-104
59X, 67p, 67n, 67_2, 68, 78, 79, 87l
27P, 27X, 50G, 50N, 50P, 51G, 51N, DNP 3.0 or
GE F35 Pass Y Multiple Feeder in one
51P, 52, 59n, 59x, 79, 81 IEC60870-5-104
GE MIF II 49, 50P, 50G, 51G, 51P, 79 Pass Y Modbus TCP/IP Distribution Feeder
Dnp3.0, Iec61850-
ABB RE*6** Model dependant Pass Y (Functions model
8-1 (goose)
dependant)
27, 46, 49m, 50P/N, 50bf, 51P/N, 59, dnp3.0, Iec61850.
VAMP VAMP25* Pass Y Protection and Control
79, 81, AFD Modbus
Iec61850, dnp3.0,
SEL 451 27, 59, 50, 50BF, 51, 52, 59, 67, 79 Pass Y automation, bay
control
IEC61850, Modbus, Feeder protection with
SEL 751 25, 27, 32, 50, 51, 59, AFD, 79 Pass Y
DNP3.0 ARC flash
Iec61850, ieee
1588, rstp, prp,
Arcteq AQ F2** Model dependant Pass Y PTP, Modbus TCP, Protection and Control
Dnp 3.0, Ftp,
24, 25, 27, 27p, 27x, 32, 46, 49,
GE 350 50/51P&N, 50BF, 59, 60, 67, 79 ,81, Pass Y IEC61850, DNP 3.0, LV Incomers
List of Approved Electronic Devices to be used on Eskom Unique Identifier: 240-56227589
Power Stations Standard Revision: 4
Page:
IEC60870-5-
103&104, prp &
SPAU140 ABB-Stromberg Pass N/A
MIC 1000 General Electric Spa. Pass N/A Alt. To TC32
BE3-25 Basler Pass N/A
BE1-25 Basler Pass N/A
ABB SPAD330 87 Pass N/A 3
ABB RADSB 87 Pass N/A 5
ABB DT92 87 Pass N/A 7 8 Transformer
Basler BE1-87G 87 Pass N/A 9 10 Generator
Basler BE1-87T 87 Pass N/A 11 12 Transformer
Siemens 7VH83 87 Pass N/A 13 14 Bus Zone
ABB-Stromberg SPAE010 87 Pass N/A High Impedance
ABB-Stromberg SPAJ115C 87, 87Gnd Pass N/A + Res. E/F High impedance
Modbus, DNP3 &
Iec 60870-103.
46, 46PD, 49F, 50P/51P, 51BF, 51NBF, Line differential
ABB RED615 Pass N/A IEC61850 via
51N, 67N, 68, 79, 86, 87L and bay control
SPAJ111C ABB-Stromberg OY Pass N/A
Siemens 7RW6000 24, 27, 59, 81 Pass Y IEC60870-5-103
Micom IEC60870-5-103, Voltage and
Areva 27, 47, 59, 81 Pass Y
P92* Modbus (RTU), DNP3 Frequency
IEC61850, IEC60870- Voltage and Control
ABB RE*6** 27, 47, 59, 62, 86 Pass Y 103, Modbus, Profibus, 9Functions model
DNP3.0, SPA, LON dependant
Iec61850, ieee 1588,
Arcteq AQ V2** 27, 59, 81 Pass Y
Modbus TCP, DNP 3.0, Control
H3CA OMRON Pass N/A
H3BA OMRON Pass N/A
T3D/S Electro Fail N/A
RES010 ABB-Energi Pass N/A
M-0193B Beckwith Electric Inc Pass N/A Dated Technology
M-0194 Beckwith Electric Inc. Pass N/A Dated Technology
7VE63 Siemens Pass Y Recommended
7VE61 Siemens Pass Y
Synchrotact 4 ABB-Drives Pass N/A Not recommended
7VE512 Siemens Pass N/A
BE1-25A Basler Electric Pass N/A D/Gen only
BE3-25A Basler Electric Pass N/A D/Gen only
SYN3000 VA-Tech Pass N/A S/w Syn-Win version 2.2
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 46 of 2000
Relevant where professional engineering services or regulated engineering work may be required.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Address
Arnot Power Station - Arnot Power Station - RIETKUIL - 1087
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
19
Last checked
04 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Financial
Get deep intelligence on Services: Electrical. Unlock full pricing strategies, bid frequency, and historical win rates.