Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
Delmas Road - Kriel - Mpumalanga - 2271
Organization Type
GOVERNMENT
Published
31 Jul 2026
OCDS Reference
ocds-9t57fa-164309
Refurbishment and re-steliting of valves during planned and unplanned maintenance at matla power station, on an as-and-when-required basis for a period of five years. The most consequential requirement is that bidders must implement and maintain an environmental management system consistent with iso 14001:2015 and comply with eskom's environmental operational controls.
Bidders must establish, implement and maintain an Environmental Management System consistent with ISO 14001:2015.
Bidders must comply with environmental operational controls and planning as per OMOP 4402 and OMOP 4090.
The polluter pays principle applies: the last payment is processed only after a final housekeeping check sheet is submitted and approved.
Bidders must assess the state of the environment at the designated site before work begins and submit Annexure C to the environmental department.
Any housekeeping or waste-related findings at the end of the contract period are for the supplier's account.
Bidders must provide necessary training and awareness for their employees on environmental management.
Bidders must maintain an Environmental Management System File as proof of compliance based on ISO 14001:2015.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Categories
Request for Quotation
Delmas Road - Kriel - Mpumalanga - 2271
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Documents being finalised: Annexure C.pdf, Annexure D.pdf, Annexure E.pdf and 1 more. You don’t need to refresh — this page will pick up the updated review automatically.
31 Jul
2026
Tender Published
Tender was published
31 Aug
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
SBD 6.1 - Preference Points Claims Form..pdf
ESKOM is inviting bids for the refurbishment and re-steliting of valves during planned (IR, GO, and MGO) and unplanned maintenance at Matla Power Station, on an as-and-when-required basis, for a period of five (05) years. The tender uses the 80/20 preferential procurement system, with 80 points for price and 20 points for B-BBEE status level of contribution.
Eskom - Standard Conditions of Tender.pdf
Annexure E.pdf
Annexure C.pdf
Annexure D.pdf
No 11 Designated items Local Content percentages THRESHOLDS.pdf
ESKOM is seeking contractors for the refurbishment and re-steliting of valves during planned and unplanned maintenance at Matla Power Station, on an as-and-when-required basis over a five-year period. The tender includes specific local content requirements for valves and actuators, which must be met.
Tender Technical Evaluation Strategy for Stellite Repairs on Valves at Matla Power Station - 4 January 2026.pdf
ESKOM is seeking a contractor for the refurbishment and re-stelliting of valves during planned and unplanned maintenance at Matla Power Station over a five-year period on an as-and-when-required basis. The tender requires proven experience in both off-site and in-situ stellite repair of valves, compliance with ISO 3834-2, and submission of detailed welding documents (WPS/WPQR) for material groups 1, 4, and 5. The technical evaluation threshold is 70%, with mandatory criteria that must be met for further consideration.
SDLIBI~1.PDF
This tender from Eskom seeks a contractor for the refurbishment and re-steliting of valves during planned and unplanned maintenance at Matla Power Station, on an as-and-when-required basis, over a 60-month period. The evaluation includes a preference point system for B-BBEE status, with specific goals for local procurement, subcontracting to black-owned entities, job creation, and skills development. Contractual obligations include SDL&I commitments, with penalties and retention for non-compliance.
SBD 1 - Invitation to Bid..pdf
ESKOM is inviting bids for the refurbishment and re-steliting of valves during planned (IR, GO, and MGO) and unplanned maintenance at Matla Power Station, North West, for a period of five (5) years on an as-and-when-required basis. The tender closes on 31 August 2026 at 10:00 AM (UTC). Bidders must complete the official SBD1 form and comply with all submission and compliance requirements.
Standard Bidding Document (SDB) 4_Annexure A.pdf
ESKOM is inviting bids for the refurbishment and re-steliting of valves during planned (IR, GO, and MGO) and unplanned maintenance at Matla Power Station, on an as-and-when-required basis for a period of five (05) years. The tender is located in North West province and closes on August 31, 2026. The document provided is the SBD4 Bidder's Disclosure form, which must be completed and submitted as part of the bid.
Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf
This document is a PAYE (Pay-As-You-Earn) questionnaire for service contractors bidding on an Eskom tender for the refurbishment and re-steliting of valves during planned and unplanned maintenance at Matla Power Station, over a five-year period on an as-and-when-required basis. The questionnaire is used to determine the contractor's tax classification (independent contractor, personal service provider, labour broker, or dependent contractor) for the 2026/2027 tax year, which affects how Eskom withholds employees' tax from payments.
No 5 ANNEXURE A Integrity Declaration Form (1).pdf
Eskom is seeking a contractor for the refurbishment and re-steliting of valves during planned (IR, GO, and MGO) and unplanned maintenance at Matla Power Station, on an as-and-when-required basis for a period of five (05) years. The tender is open until August 31, 2026, and requires compliance with Eskom's integrity declaration, including declarations of interest and fair tendering practices.
No 4 SBD 6.2 Local Content in terms of PPR 2017.pdf
ESKOM is seeking bids for the refurbishment and re-steliting of valves during planned (IR, GO, and MGO) and unplanned maintenance at Matla Power Station, North West, on an as-and-when-required basis for a period of five (05) years. The tender includes a mandatory local content declaration (SBD 6.2) requiring bidders to comply with the Preferential Procurement Regulations, 2017, and the SABS technical specification SATS 1286:2011, with a stipulated minimum local content threshold (to be specified in the bid).
CONTRACTORS COMMITMENT AND INDEMNITY LETTER.pdf
ESKOM's Matla Power Station is seeking contractors for the refurbishment and re-steliting of valves during planned and unplanned maintenance over a five-year period on an as-and-when-required basis. The contractor must commit to environmental management in line with ISO 14001:2015, including compliance with Eskom's EMS requirements, pollution prevention, and housekeeping standards.
Form A -Refurbishment of Re-steliting of valves during planned (IR, GO and MGO) and unplanned Maintanance at Matla Power Station for a period of five (05) years on a as and when required basis.pdf
ESKOM is tendering for the refurbishment and re-steliting of valves during planned (IR, GO, and MGO) and unplanned maintenance at Matla Power Station, North West, on an as-and-when-required basis for a period of five years. The tender includes quality requirements aligned with ISO 9001 and Eskom's specific quality clauses.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
R 2 760 000
Range
Based on CIDB grading. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Description
Source: Tender Technical Evaluation Strategy for Stellite Repairs on Valves at Matla Power Station - 4 January 2026.pdfMatla Power Station operates boiler and turbine plants across 6 units, using various valves at different pressures and temperatures. Maintenance and planned outage work includes stripping valves and inspecting them; a major defect found is damage to the sealing faces (stellite). The tender covers re-stelliting of these valves.
Contact Information
Source: Tender Technical Evaluation Strategy for Stellite Repairs on Valves at Matla Power Station - 4 January 2026.pdf (unknown){"name":null,"email":null,"phone":null,"department":"s. These valves are of different types and operate at different pressures and temperatures. The","address":null}
Evaluation Criteria
Source: Tender Technical Evaluation Strategy for Stellite Repairs on Valves at Matla Power Station - 4 January 2026.pdf (unknown)Technical evaluation threshold: minimum weighted final score of 70% to be considered.
Mandatory criteria (non-compliance disqualifies):
Qualitative criteria scored per Tender Evaluation Procedure 240-48929482, with scores of 5 (100%), 4 (80%), 2 (40%) and 0 (0%); scores of 1 and 3 are not used.
Weightings: Company experience 20%, Quality assurance QCP 20%, Welding documents for Group 1 materials 20%, Welding documents for Group 4 materials 20%, Welding documents for Group 5 materials 20%.
Company experience: evidence of previous off-site and in-situ stellite repair of valves, with valve type, size, material group, and in-situ/off-site details; scoring based on number of projects executed (0, 40%, 80%, 100%).
QCP: example for in-situ re-stelliting on a 150NB, 15M03 gate valve, with 12 critical points; scoring based on number of critical points covered.
Welding documents: WPS and WPQR per BS EN 15608 for Groups 1, 4 and 5, butt weld joint welding procedure, qualified thickness range 3-14mm, in accordance with BS EN 15614-1, on contractor's letterhead with document number; scoring based on number of critical points listed (13 critical points).
Acceptable technical risks: minor amendments to welding documentation.
Unacceptable technical risks: inability to perform in-situ valve stelliting; insufficient stelliting experience.
Unacceptable technical exceptions/conditions: non-adherence to mandatory requirements.
Technical Specifications
Source: Tender Technical Evaluation Strategy for Stellite Repairs on Valves at Matla Power Station - 4 January 2026.pdf (unknown)Scope: re-stelliting of valves at Matla Power Station, covering boiler and turbine plant valves across all 6 units, during normal maintenance and planned outages.
Work includes stripping valves, inspections, and repair of damaged sealing faces (stellite).
Contract scope reference: MET-053765.
Valve sizes range from 80NB to 500NB for in-situ welding capability.
Valve materials fall into material groups 1, 4 and 5.
The strategy applies to Matla Power Station only.
Experience & Qualifications
Source: Tender Technical Evaluation Strategy for Stellite Repairs on Valves at Matla Power Station - 4 January 2026.pdfCompany experience: contractor must demonstrate previous projects successfully conducting off-site and in-situ stellite repair of valves, with details of valve type, valve size, valve material group, and whether in-situ or off-site.
Scoring based on number of projects executed: no submission (0%), 4-5 projects (40%), 6-7 projects (80%), 8 or more projects (100%).
Projects must involve valves of sizes between 80NB and 600NB.
Quality Management
Source: Tender Technical Evaluation Strategy for Stellite Repairs on Valves at Matla Power Station - 4 January 2026.pdfQuality assurance QCP: contractor must submit a QCP for in-situ re-stelliting on a 150NB, 15M03 gate valve, covering 12 critical intervention points.
Critical QCP intervention points: approval of QCP; approval of welding procedure; approval of welding qualifications; approval of DT procedures; material identification/PMI; removal of existing stellite; PMI post removal; welding of new stellite; machining to size; NDT on new stellite; lap and blue tests; data pack review/release.
WPS/WPQR documents must list: qualification code and standard including revision/edition; base material specification and material group number; material dimensional range; joint type; single or multi processes; welding consumables; welding positions (e.g. 2G, 5G, 6G); preheat, interpass and PWHT requirements with qualified ranges; shielding gas type and flow rate; electrode or filler material type; WPS fully approved and signed off by welding engineer and AIA; welder qualifications; record of WPQR for stated material and dimension signed by welding engineer/technologist.
Compliance Requirements
Source: Tender Technical Evaluation Strategy for Stellite Repairs on Valves at Matla Power Station - 4 January 2026.pdf (unknown)ISO 3834-2 certificate: valid and up to date, with material groups 1, 4 and 5 listed; all pages of the certificate must be submitted.
Welding governance must comply with Standard for Welding Requirements on Eskom Plant 240-106628253.
B-BBEE minimum level: 1.
Requirements
Source: Tender Technical Evaluation Strategy for Stellite Repairs on Valves at Matla Power Station - 4 January 2026.pdf (unknown)Mandatory technical criteria: valid ISO 3834-2 certificate covering material groups 1, 4 and 5; capability to perform in-situ welding for valve sizes 80NB to 500NB with evidence of previous in-situ re-stelliting repairs in tabular form. Non-compliance with either leads to disqualification.
Section
Source: Tender Technical Evaluation Strategy for Stellite Repairs on Valves at Matla Power Station - 4 January 2026.pdfTechnical evaluation threshold: minimum weighted final score of 70%.
Scoring matrix: 5 (100%) compliant, no foreseen technical risks; 4 (80%) compliant with acceptable risks/exceptions/conditions; 2 (40%) non-compliant; 0 (0%) totally deficient or non-responsive. Scores of 1 and 3 are not allowed.
Qualitative criteria: company experience (20%), QCP (20%), welding documents for Group 1 (20%), Group 4 (20%), Group 5 (20%).
Acceptable technical risks: minor amendments to welding documentation.
Unacceptable technical risks: inability to do in-situ valve stelliting; insufficient stelliting experience.
Unacceptable technical exceptions/conditions: non-adherence to mandatory requirements.
Description
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdfThe document is a PAYE questionnaire for service contracts to Eskom and its subsidiaries, applicable from 1 March 2026 to 28 February 2027. It determines whether a contractor is an independent contractor, personal service provider, labour broker, or dependent contractor for tax purposes, based on the Fourth Schedule to the Income Tax Act.
Important Dates
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)The pack applies from 1 March 2026 to 28 February 2027.
Contact Information
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)Group Tax email: [email protected]
Submission Guidelines
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)Returnable documents:
Returnable Documents
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)The bidder must complete the applicable evaluation pack (A for companies/CCs/trusts, B for individuals), sign the required appendices as directed, and sign the summary sheet and particulars sections. The completed pack must be returned to Eskom, copying Group Tax.
Evaluation Criteria
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)The questionnaire determines the bidder's tax classification (independent contractor, personal service provider, labour broker, or dependent contractor) through a series of tests: residence, number of employees exclusion, services rendered by a connected person, more than 80% of income test, place/control/supervision test, and dominant impression test. The classification determines whether PAYE is withheld and which declarations must be signed. There are no explicit financial or technical eligibility criteria in this document.
Technical Specifications
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)The document is a PAYE questionnaire for service contracts to Eskom and its subsidiaries. It applies to contractors supplying services or labour to Eskom. The questionnaire establishes whether the contractor is an independent contractor, personal service provider, labour broker, or dependent contractor for tax purposes. It includes tests on residence, employee numbers, connected persons, income concentration, place of work and control, and dominant impression. The pack is based on tax legislation for the 2026/2027 tax year.
Methodology
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)The questionnaire uses a series of tests to determine tax classification: residence, number of employees exclusion, services rendered by a connected person, more than 80% of income test, place/control/supervision test, and dominant impression test. The answers direct the bidder to the appropriate tax status and required declarations.
Pricing Schedule
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdfThe pricing schedule is not provided in this document. The financial implications relate to PAYE withholding based on the bidder's tax classification and whether a valid IRP30 certificate is held.
Financial Requirements
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)If the bidder provides a valid IRP30 certificate as a labour broker, no employees' tax is withheld and an IT3(a) certificate with code 3617 is issued. Without a valid IRP30 certificate, employees' tax is withheld at individual rates until the certificate is provided, and an IRP5 with code 3617 is issued. If classified as a dependent contractor or personal service provider, employees' tax is withheld at the prevailing rate and coded 3601 or 3616 on the IRP5.
Compliance Requirements
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)The bidder must complete the PAYE questionnaire and sign the required affidavits and declarations. Non-residents must sign Appendix 9 and submit the pack to Eskom's Group Tax Department. Failure to sign required affidavits or declarations results in PAYE being withheld from payments.
Contractual Terms
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)Eskom accepts no liability for any loss or damages arising from the use of the pack. The bidder must notify Eskom of any changes to the information provided; failure to do so may result in liability for taxes, penalties, and interest imposed by SARS. The declarations confirm the bidder's classification and the associated tax consequences, including PAYE withholding and IRP5/IT3(a) certificate issuance.
Special Conditions
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)The completed pack, including the signed summary sheet and affidavits, must be returned to Eskom, copying Group Tax at [email protected].
Requirements
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)The bidder must answer all questions truthfully and is responsible for the accuracy and completeness of the information provided. The pack will not be automatically updated with legislative changes.
Section
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdfThe evaluation is based on the bidder's tax classification determined through the questionnaire's tests. There are no additional evaluation criteria in this document.
Contact Information
Source: No 5 ANNEXURE A Integrity Declaration Form (1).pdf (RFP){"name":null,"email":null,"phone":null,"department":"y), should the resulting tender, or part thereof, be","address":"ENDERING PRACTICES"}
Evaluation Criteria
Source: No 5 ANNEXURE A Integrity Declaration Form (1).pdf (RFP)Bidders must not be listed on National Treasury's Database of Restricted Suppliers or the Register for Tender Defaulters, must not have been convicted of fraud or corruption in the past five years, and must not be prohibited from doing business with any international financial development or funding agency. Bidders must also complete and sign the integrity declaration form.
Technical Specifications
Source: No 5 ANNEXURE A Integrity Declaration Form (1).pdf (RFP)provisions above, please complete the table hereunder with all required
Annexure a – integrity declaration form)
information.
Full Name & Capacity/ Identity Confirm and provide Full Names & To your
Position within tenderer (e.g. Number details (including Capacity/Position of knowledge
employee/Director/member/ employee number) if Eskom employee/ is thi
Compliance Requirements
Source: No 5 ANNEXURE A Integrity Declaration Form (1).pdf (RFP)Returnable form: Annexure A – Integrity Declaration Form. This form requires bidders to declare any interest or relationship with Eskom employees, directors, or state officials, and to confirm fair tendering practices. Bidders must disclose if any employee, director, member, shareholder, or owner is currently employed by Eskom, and whether authorisation for remunerative work outside public sector employment has been obtained. Bidders must also declare if they share a controlling partner or have any relationship with other tenderers in this process. The declaration must be signed by a duly authorised representative. If bidding as a joint venture, the lead partner must sign, and a copy of the joint venture agreement confirming joint and several liability must be attached.
Contact Information
Source: Standard Bidding Document (SDB) 4_Annexure A.pdf (TENDER){"name":null,"email":null,"phone":null,"department":"SUPPLY CHAIN MANAGEMENT","address":null}
Evaluation Criteria
Source: Standard Bidding Document (SDB) 4_Annexure A.pdf (TENDER)Bidders must not be listed on the Register for Tender Defaulters or the List of Restricted Suppliers. Bidders must disclose any relationship with state employees or persons connected to the procuring institution. Bidders must certify that the bid was prepared independently, without collusion or disclosure of pricing to competitors. Suspicious bids may be reported to the Competition Commission or the National Prosecuting Authority.
Technical Specifications
Source: Standard Bidding Document (SDB) 4_Annexure A.pdf (TENDER)Supply chain management system should
This declaration prove to be false.
.................................... .....................................................
Signature Date
.................................... ......................................................
Position Name of bidder
Compliance Requirements
Source: Standard Bidding Document (SDB) 4_Annexure A.pdf (TENDER)Returnable form: SBD 4 (Bidder's Disclosure) — declares any employment by the state, relationships with procuring institution staff, and interests in related enterprises. A false declaration disqualifies the bid.
Description
Source: SBD 1 - Invitation to Bid..pdfThe successful bidder must sign a written contract form (SBD 7). Bids must be submitted on official forms, not retyped, and delivered to the correct address by the stipulated time. Late bids will not be considered. Bidders must register on the Central Supplier Database (CSD) to upload mandatory information. The bid is subject to the Preferential Procurement Policy Framework Act 2000, the Preferential Procurement Regulations 2017, and the General Conditions of Contract (GCC).
Contact Information
Source: SBD 1 - Invitation to Bid..pdf (TENDER){"name":null,"email":null,"phone":null,"department":"/ PUBLIC ENTITY)","address":"UIRED TO FILL IN AND SIGN A WRITTEN CONTRACT FORM (SBD7)."}
Submission Guidelines
Source: SBD 1 - Invitation to Bid..pdf (TENDER)Bids must be submitted on the official forms provided, not retyped, and delivered to the correct address by the stipulated time. Late bids will not be considered. Bidders must register on the Central Supplier Database (CSD) to upload mandatory information. The successful bidder must sign a written contract form (SBD 7). Returnable forms include SBD 1 (Invitation to Bid) with supplier details, tax compliance PIN or CSD number, B-BBEE certificate or sworn affidavit, and proof of authority to sign. Failure to provide any required particulars may render the bid invalid.
Evaluation Criteria
Source: SBD 1 - Invitation to Bid..pdf (TENDER)The bid is subject to the Preferential Procurement Policy Framework Act 2000 and the Preferential Procurement Regulations 2017. B-BBEE preference points require a valid B-BBEE certificate or sworn affidavit (for EMEs/QSEs).
Technical Specifications
Source: SBD 1 - Invitation to Bid..pdf (TENDER)The successful bidder will be required to fill in and sign a written contract form (sbd7).
Bid response documents may be deposited in the bid box
Situated at (street address)
Supplier information
Name of bidder
Postal address
Street address
Telephone number code number
Cellphone number
Facsimile number code number
E-mail address
VAT registration number
TCS PIN: OR CSD No:
B-BBEE STATUS LEVEL VERIFICATION Yes B-BBEE STATUS Yes
Certificate level sworn
[TICK APPLICABLE BOX] No AFFIDAVIT No
If yes, who was the certificate
Issued by?
An accounting officer as contemplated in the close corporation
An accounting officer as act (cca)
Contemplated in the close a verification agency accredited by the south african
Corporation act (cca) and name accreditation system (sanas)
The applicable in the tick box a registered auditor
Name:
[A B-BBEE STATUS LEVEL VERIFICATION CERTIFICATE/SWORN AFFIDAVIT(FOR EMEs& QSEs) MUST BE SUBMITTED IN
Order to qualify for preference points for b-bbee]
ARE YOU THE ACCREDITED Yes No ARE YOU A FOREIGN Yes No
Representative in south africa based supplier for
For the goods /services /works the goods /services [if yes answer part b:3
Offered? [If yes enclose proof] /works offered? Below ]
Signature of bidder .................................... Date
Capacity under which this bid is
SIGNED (Attach proof of authority to sign
this bid; e.g. resolution of directors, etc.)
Total bid price (all
Total number of items offered inclusive)
Bidding procedure enquiries may be directed to: technical information may be directed to:
Department/ public entity contact person
Contact person telephone number
Telephone number facsimile number
Facsimile number e-mail address
E-mail address
Sbd1
Part b
Terms and conditions for bidding
1.1. Bids must be delivered by the stipulated time to the correct address. Late bids will not be accepted for
Consideration.
1.2. All bids must be submitted on the official forms provided–(not to be re-typed) or online
1.3. Bidders must register on the central supplier database (csd) to upload mandatory information namely: (
Business registration/ directorship/ membership/identity numbers; tax compliance status; and banking
Information for verification purposes). B-bbee certificate or sworn affidavit for b-bbee must be submitted
To bidding institution.
1.4. Where a bidder is not registered on the csd, mandatory information namely: (business registration/
Directorship/ membership/identity numbers; tax compliance status may not be submitted with the bid
Documentation. B-bbee certificate or sworn affidavit for b-bbee must be submitted to bidding institution.
1.5. This bid is subject to the preferential procurement policy framework act 2000 and the preferential
Procurement regulations, 2017, the general conditions of contract (gcc) and, if applicable, any other
Legislation or special conditions of contract.
2.1 Bidders must ensure compliance with their tax obligations.
2.2 Bidders are required to submit their unique personal identification number (pin) issued by SARS to enable the
Organ of state to view the taxpayer’s profile and tax status.
2.3 Application for tax compliance status (tcs) or pin may also be made via e-filing. In order to use this provision,
Taxpayers will need to register with SARS as e-filers through the website www.SARS.GOV.ZA.
2.4 Bidders may also submit a printed tcs together with the bid.
2.5 In bids where consortia / joint ventures / sub-contractors are involved, each party must submit a separate
Proof of tcs / pin / csd number.
2.6 Where NO tcs is available but the bidder is registered on the central supplier database (csd), a csd number
Must be provided.
3.1. Is the bidder a resident of the republic of south africa (RSA)? yes NO
3.2. Does the bidder have a branch in the RSA? yes NO
3.3. Does the bidder have a permanent establishment in the RSA? yes NO
3.4. Does the bidder have any source of income in the RSA? yes NO
If the answer is “NO” to all of the above, then, IT is not a requirement to obtain a tax compliance status / tax
Compliance system pin code from the south african revenue service (SARS) and if not register as per 2.3 Above.
Nb: failure to provide any of the above particulars may render the bid invalid.
Compliance Requirements
Source: SBD 1 - Invitation to Bid..pdf (TENDER)CSD registration: Bidders must be registered on the Central Supplier Database to upload business registration, directorships, tax compliance status, and banking information.
Tax compliance: Bidders must submit a SARS-issued tax compliance PIN or CSD number. A printed tax compliance status may be submitted. Consortia, joint ventures, and sub-contractors must each provide separate proof of tax compliance.
B-BBEE: A valid B-BBEE certificate or sworn affidavit (for EMEs/QSEs) must be submitted to qualify for preference points.
Foreign suppliers: Must answer the questionnaire in Part B:3 regarding residency, branch, permanent establishment, or source of income in South Africa to determine tax compliance obligations.
Contact Information
Source: SBD 6.1 - Preference Points Claims Form..pdf (TENDER){"name":null,"email":null,"phone":null,"department":null,"address":".................................."}
Submission Guidelines
Source: SBD 6.1 - Preference Points Claims Form..pdf (TENDER)Returnable form: SBD 6.1 (Preference Points Claim Form) must be completed, signed, and submitted with the bid. Bidders claiming B-BBEE points must provide valid proof of B-BBEE status level of contributor; failure to do so means no preference points are claimed. The purchaser may require substantiation of any preference claims at any time.
Evaluation Criteria
Source: SBD 6.1 - Preference Points Claims Form..pdf (TENDER)The 80/20 preference point system applies. Price is scored out of 80 points using the formula Ps = 80(1 - (Pt - Pmin)/Pmin), where Pt is the bid price and Pmin is the lowest acceptable bid price. B-BBEE status level contributes up to 20 points: Level 1 = 20, Level 2 = 18, Level 3 = 14, Level 4 = 12, Level 5 = 8, Level 6 = 6, Level 7 = 4, Level 8 = 2, Non-compliant = 0. Total points for price and B-BBEE must not exceed 100.
Technical Specifications
Source: SBD 6.1 - Preference Points Claims Form..pdf (TENDER)The scope is the refurbishment and re-steliting of valves during planned (IR, GO and MGO) and unplanned maintenance at Matla Power Station, on an as-and-when-required basis for a period of five (05) years.
Compliance Requirements
Source: SBD 6.1 - Preference Points Claims Form..pdf (TENDER)B-BBEE: Bidders must submit proof of B-BBEE status level of contributor (certificate, sworn affidavit, or other prescribed proof) to claim preference points. Subcontracting: If any portion of the contract is subcontracted, bidders must disclose the percentage, the subcontractor's name, the subcontractor's B-BBEE status level, and whether the subcontractor is an EME or QSE. The form also requires company details: name, VAT registration number, company registration number, type of company, principal business activities, company classification, and years in business.
B-BBEE Requirements
Source: SBD 6.1 - Preference Points Claims Form..pdf (TENDER)The 80/20 system applies. Points are awarded for price (80) and B-BBEE status level (20). Failure to submit proof of B-BBEE status means no preference points are claimed. The purchaser may require substantiation of claims. B-BBEE status level points: Level 1 = 20, Level 2 = 18, Level 3 = 14, Level 4 = 12, Level 5 = 8, Level 6 = 6, Level 7 = 4, Level 8 = 2, Non-compliant = 0. Bidders claiming points must complete the declaration and provide proof. Subcontracting details, including percentage, subcontractor name, B-BBEE status, and whether the subcontractor is an EME or QSE, must be disclosed.
Section
Source: SBD 6.1 - Preference Points Claims Form..pdfThe 80/20 preference point system is used. Points for price are calculated using the formula: Ps = 80(1 - (Pt - Pmin)/Pmin), where Ps = points scored for price, Pt = price of bid under consideration, Pmin = price of lowest acceptable bid. Maximum points: 80 for price, 20 for B-BBEE status level, total not to exceed 100.
Contact Information
Source: No 11 Designated items Local Content percentages THRESHOLDS.pdf (unknown){"name":null,"email":null,"phone":null,"department":" 100%","address":"Minimum threshold for local"}
Evaluation Criteria
Source: No 11 Designated items Local Content percentages THRESHOLDS.pdf (unknown)Bidders must meet the local content threshold of 70% for valves products and actuators, as specified in the designated items list. Eligibility is likely restricted to companies with relevant experience in valve maintenance and refurbishment, particularly in power generation or heavy industrial settings. Bidders must be registered on Eskom's supplier database and comply with all South African procurement regulations, including B-BBEE requirements, although not explicitly stated in the excerpt.
Technical Specifications
Source: No 11 Designated items Local Content percentages THRESHOLDS.pdf (unknown)The tender covers the refurbishment and re-steliting of valves during planned (IR, GO and MGO) and unplanned maintenance at Matla Power Station, on an as-and-when-required basis for a period of five years. The local content threshold for valves products and actuators is 70%.
Compliance Requirements
Source: No 11 Designated items Local Content percentages THRESHOLDS.pdf (unknown)Bidders must meet the local content threshold of 70% for valves products and actuators, as per the designated items list. Bidders must be registered on Eskom's supplier database and comply with all South African procurement regulations, including B-BBEE requirements, although not explicitly stated in the excerpt.
B-BBEE Requirements
Source: No 11 Designated items Local Content percentages THRESHOLDS.pdf (unknown)The designated items list specifies a minimum local content threshold of 70% for valves products and actuators. Bidders must comply with this threshold.
Submission Guidelines
Source: No 4 SBD 6.2 Local Content in terms of PPR 2017.pdf (TENDER)Returnable documents:
Disqualification risks:
Evaluation Criteria
Source: No 4 SBD 6.2 Local Content in terms of PPR 2017.pdf (TENDER)This is a designated sector tender under the Preferential Procurement Regulations, 2017. Only locally produced or manufactured goods with a stipulated minimum threshold for local production and content will be considered.
A two-stage bidding process may be followed: the first stage assesses the minimum local content threshold, and the second stage evaluates price and B-BBEE.
The local content percentage is calculated using the formula LC = [1 - x/y] x 100, where x is imported content in Rand and y is the bid price excluding VAT. Imported content is converted to Rand using the SARB exchange rate at 12:00 on the date of advertisement.
The successful bidder may not subcontract in a way that reduces the local content of the overall contract below the stipulated minimum threshold.
Technical Specifications
Source: No 4 SBD 6.2 Local Content in terms of PPR 2017.pdf (TENDER)The tender covers the refurbishment and re-steliting of valves during planned (IR, GO and MGO) and unplanned maintenance at Matla Power Station, for a period of five years on an as-and-when-required basis.
The stipulated minimum threshold(s) for local production and content are not stated in the available document — bidders must refer to Annex A of SATS 1286:2011.
Bidders must indicate whether any portion of the goods or services offered has imported content, and if so, provide the applicable SARB exchange rates for the relevant currencies.
Pricing Schedule
Source: No 4 SBD 6.2 Local Content in terms of PPR 2017.pdfThe pricing schedule must include the bid price excluding VAT (y) and the imported content (x) as calculated in terms of SATS 1286:2011.
The local content percentage is calculated using the formula LC = [1 - x/y] x 100.
Exchange rates used must be the SARB rates published at 12:00 on the date of advertisement of the bid, and proof of these rates must be submitted.
If the bid covers multiple products, the local content percentage for each product must be provided.
Financial Requirements
Source: No 4 SBD 6.2 Local Content in terms of PPR 2017.pdf (TENDER)The local content declaration requires the bidder to state:
If the bid covers more than one product, the local content percentage for each product must be provided.
Exchange rates used must be the SARB rates published at 12:00 on the date of advertisement of the bid.
Compliance Requirements
Source: No 4 SBD 6.2 Local Content in terms of PPR 2017.pdf (TENDER)Bidders must comply with the Preferential Procurement Regulations, 2017, and the local content requirements for designated sectors.
SBD 6.2 (Declaration Certificate for Local Production and Content) must be completed and signed by a legally responsible person. The declaration certifies that the goods/services comply with the minimum local content requirements as measured in terms of SATS 1286:2011.
Bidders must complete Annex C (Local Content Declaration: Summary Schedule) and submit it with the bid. Annexes D and E must be kept for verification purposes for at least five years, and the successful bidder must continuously update these with actual values for the duration of the contract.
The procuring authority has the right to verify the local content in terms of SATS 1286:2011. Submission of incorrect or unverifiable data may result in remedies under Regulation 14 of the Preferential Procurement Regulations, 2017.
Contractual Terms
Source: No 4 SBD 6.2 Local Content in terms of PPR 2017.pdfThe contract is for a period of five years, on an as-and-when-required basis.
The successful bidder may not subcontract in a manner that reduces the local production and content of the overall contract value below the stipulated minimum threshold.
If challenges are experienced in meeting the minimum local content threshold after award, the dti must be informed so it can verify and, in consultation with the accounting officer/authority, provide directives.
Section
Source: No 4 SBD 6.2 Local Content in terms of PPR 2017.pdfA two-stage bidding process may be followed: the first stage involves a minimum threshold for local production and content, and the second stage evaluates price and B-BBEE.
Contact Information
Source: CONTRACTORS COMMITMENT AND INDEMNITY LETTER.pdf (unknown){"name":null,"email":null,"phone":null,"department":"ies, setting and reviewing environmental objectives and targets","address":null}
Evaluation Criteria
Source: CONTRACTORS COMMITMENT AND INDEMNITY LETTER.pdf (unknown)Bidders must be capable of implementing an ISO 14001:2015 Environmental Management System and complying with Eskom's environmental requirements at Matla Power Station. No explicit financial or technical qualification thresholds are stated in the available document.
Technical Specifications
Source: CONTRACTORS COMMITMENT AND INDEMNITY LETTER.pdf (unknown)The work involves refurbishment and re-steliting of valves during planned and unplanned maintenance at Matla Power Station, on an as-and-when-required basis for a period of five years. Contractors must manage environmental aspects of their activities, products and services within the station's defined scope, and comply with environmental operational controls and planning as per OMOP 4402 and OMOP 4090.
Financial Requirements
Source: CONTRACTORS COMMITMENT AND INDEMNITY LETTER.pdf (unknown)The polluter pays principle applies: the contract manager will process the last payment in conjunction with the last housekeeping check sheet. The supplier and contractor manager must assess the state of the environment at the designated site and submit the check sheet (Annexure C) to the environmental department before commencement of work. At the end of the contract period, a final assessment is conducted; any housekeeping or waste-related findings are for the supplier's account.
Compliance Requirements
Source: CONTRACTORS COMMITMENT AND INDEMNITY LETTER.pdf (unknown)Contractors must commit to and maintain an Environmental Management System consistent with ISO 14001:2015, including fulfilling compliance obligations, setting performance indicators, identifying environmental risks and opportunities, providing training, allocating resources, and maintaining an EMS file as proof of compliance. The station is ISO 14001 certified, so contractors must align with its environmental management system.
Environmental
Source: CONTRACTORS COMMITMENT AND INDEMNITY LETTER.pdfContractors must establish, implement and maintain an Environmental Management System consistent with ISO 14001:2015, fulfil compliance obligations, set performance indicators, identify environmental risks and opportunities, provide training, allocate resources, comply with operational controls, adhere to the polluter pays principle, and maintain an EMS file as proof of compliance.
Description
Source: Form A -Refurbishment of Re-steliting of valves during planned (IR, GO and MGO) and unplanned Maintanance at Matla Power Station for a period of five (05) years on a as and when required basis.pdfRefurbishment of re-steliting of valves during planned (IR, GO and MGO) and unplanned maintenance at Matla Power Station for a period of five (05) years on an as and when required basis.
Important Dates
Source: Form A -Refurbishment of Re-steliting of valves during planned (IR, GO and MGO) and unplanned Maintanance at Matla Power Station for a period of five (05) years on a as and when required basis.pdf (unknown)Closing date: 29 July 2026.
Evaluation Criteria
Source: Form A -Refurbishment of Re-steliting of valves during planned (IR, GO and MGO) and unplanned Maintanance at Matla Power Station for a period of five (05) years on a as and when required basis.pdf (unknown)Bidders must demonstrate capability in valve refurbishment and re-steliting work at a power station. A quality management system aligned with ISO 9001 is required, and bidders must meet Eskom's quality requirements. Form A must be completed and signed, including the tenderer's quality representative section. The tender is open to suppliers meeting the technical and quality standards; no explicit financial or legal eligibility criteria are stated.
Methodology
Source: Form A -Refurbishment of Re-steliting of valves during planned (IR, GO and MGO) and unplanned Maintanance at Matla Power Station for a period of five (05) years on a as and when required basis.pdfBidders must align with ISO 9001 clauses covering context of the organisation, leadership, planning, support, operation, performance evaluation, and improvement, as well as quality principles including customer focus, leadership, engagement of people, process approach, improvement, evidence-based decision making, and relationship management.
Quality Management
Source: Form A -Refurbishment of Re-steliting of valves during planned (IR, GO and MGO) and unplanned Maintanance at Matla Power Station for a period of five (05) years on a as and when required basis.pdfBidders must comply with Eskom's quality requirements for ISO 9001, including pre-contract award quality requirements (select one category) and post-contract award conditions: contract execution, supplier quality performance monitoring, Eskom rights of access and information, preservation, quality audits, management of nonconformities, and special processes.
Compliance Requirements
Source: Form A -Refurbishment of Re-steliting of valves during planned (IR, GO and MGO) and unplanned Maintanance at Matla Power Station for a period of five (05) years on a as and when required basis.pdf (unknown)Bidders must complete and submit Form A, including the tenderer's quality representative signature. No other specific compliance requirements are stated.
Section
Source: Form A -Refurbishment of Re-steliting of valves during planned (IR, GO and MGO) and unplanned Maintanance at Matla Power Station for a period of five (05) years on a as and when required basis.pdfBidders must meet pre-contract award quality requirements and be subject to supplier quality performance monitoring. Quality audits related conditions apply.
Technical Specifications
Source: Annexure C.pdf (unknown)The scope covers refurbishment and re-steliting of valves during planned (IR, GO and MGO) and unplanned maintenance at Matla Power Station. The work is required on an as-and-when-required basis for a period of five (05) years.
Compliance Requirements
Source: Annexure C.pdf (unknown)Insufficient searchable text - AI extraction recommended
Important Dates
Source: SDLIBI~1.PDF (unknown){"closingDate":"01 April 2023"}
Evaluation Criteria
Source: SDLIBI~1.PDF (unknown)Specific goals: a maximum of 10/20 points may be awarded for the specific goal, added to price points and rounded to two decimal places. The contract goes to the highest total score.
B-BBEE preference points table (90/10 and 80/20 systems): Level 1: 10/20, Level 2: 9/18, Level 3: 6/14, Level 4: 5/12, Level 5: 4/8, Level 6: 3/6, Level 7: 2/4, Level 8: 1/2, Non-compliant: 0/0.
Documents required to claim preference points: valid B-BBEE certificate from a SANAS accredited agency, sworn affidavit or CIPS affidavit; proof of ownership/shareholding (preferably CIPC) with breakdown; certified ID copies of shareholders; proof of disability where applicable; for trusts/consortia/JVs, a consolidated B-BBEE verification certificate. Electronic signatures not accepted.
Tenderers failing to provide preference point documentation are not disqualified but may only score out of 90/80 for price and 0 for specific goals.
Technical Specifications
Source: SDLIBI~1.PDF (unknown)Scope: stellite repairs on valves at Matla Power Station.
Duration: 60 months, on an as-and-when-required basis.
Market research: no current suppliers; open market for potential suppliers.
Methodology
Source: SDLIBI~1.PDFSkills development: tenderers must submit proposals for developing skills of unemployed candidates, addressing Eskom's core, scarce and critical skills, including occupations in high demand per Government Gazette 43937. Candidates from all provinces, representative of demographics. Targets: Safety Officer (3, entry N3/Grade 12 or equivalent, registration with professional body), Welders (4, Grade 12 or equivalent, trade test), QC Inspectors (3, Grade 12 or equivalent, Level 1 & 2 certificate). Tenderers encouraged to source from Kriel/Matla feeder areas. Development involves tenderers directly and through supply network, possibly with SETA accredited training providers. Targets exclude Eskom employees and registered learners. Tenderers bear full cost; Eskom makes no financial contribution. Tenderers advised to approach SETAs for grants and SARS for tax rebates.
SDL&I penalty and security: a penalty of 3% of contract value applies for failure to meet SDL&I obligations. Eskom retains 3% of every invoice (excluding VAT) as security for SDL&I obligations; retained amounts are released only upon full fulfilment.
Quality Management
Source: SDLIBI~1.PDFSkills development targets include QC Inspectors: 3 candidates, entry Grade 12 or equivalent, with Level 1 & 2 certificate.
Pricing Schedule
Source: SDLIBI~1.PDFTender responses must separate local and imported components per the price schedule. Local procurement content is total spending minus the imported component. Eskom target is 100% local procurement content.
Financial Requirements
Source: SDLIBI~1.PDF (unknown)Local procurement content: tender responses must separate local and imported components per the price schedule. Local content is total spending minus the imported component. Eskom target is 100% local procurement content.
SDL&I penalty and security: a penalty of 3% of contract value applies for failure to meet SDL&I obligations. Eskom retains 3% of every invoice (excluding VAT) as security for SDL&I obligations; retained amounts are released only upon full fulfilment.
Compliance Requirements
Source: SDLIBI~1.PDF (unknown)B-BBEE: a valid B-BBEE certificate or sworn affidavit is a condition for contract award. Revenue thresholds: EME (≤R10m) may submit a sworn affidavit; QSE (≤R50m) must comply with the QSE scorecard unless at least 51% black owned, in which case a sworn affidavit is required; revenue above R50m requires a valid B-BBEE certificate.
B-BBEE improvement or retention plan: must be submitted within 30 days of contract signing. Level 1 must maintain; Levels 2-3 must improve/maintain; Level 4 must achieve Level 3 by end of first year and improve one level each subsequent year; Levels 5-8 or non-compliant must achieve Level 4 by end of first year and improve one level each year from the second year.
Sworn affidavit validity: affidavit must include deponent name as per ID and ID number, designation (director, owner, member), enterprise name as per CIPC and business address, percentage of black ownership/black female ownership/designated group (or black beneficiaries for specialised enterprises), total revenue and basis (audited or management accounts), financial year end, B-BBEE status level (only one), empowering supplier status, same date signed by deponent and Commissioner of Oath, and the Commissioner of Oath cannot be an employee or ex officio of the enterprise.
Health & Safety
Source: SDLIBI~1.PDFSkills development targets include Safety Officers: 3 candidates, entry N3/Grade 12 or equivalent, with registration with a professional body.
Sworn affidavit validity requirements: deponent name as per ID and ID number, designation (director, owner, member), enterprise name as per CIPC and business address, percentage of black ownership/black female ownership/designated group (or black beneficiaries for specialised enterprises), total revenue and basis (audited or management accounts), financial year end, B-BBEE status level (only one), empowering supplier status, same date signed by deponent and Commissioner of Oath, and the Commissioner of Oath cannot be an employee or ex officio of the enterprise.
Contractual Terms
Source: SDLIBI~1.PDF (unknown)Reporting and monitoring: suppliers must submit quarterly reports to Eskom per the Data Collection Template on SDL&I compliance. Eskom reviews reports within 30 days and notifies in writing if obligations not met. Suppliers must implement corrective measures before the next report, failing which retention clauses are invoked. Every contract is accompanied by an SDL&I Implementation Schedule, completed and returned to the SDL&I representative for acceptance 28 days after contract award, used for monitoring and reporting.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 46 of 2000
Relevant where professional engineering services or regulated engineering work may be required.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Address
Delmas Road - Kriel - Mpumalanga - 2271
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
15
Last checked
07 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services: Electrical. Unlock full pricing strategies, bid frequency, and historical win rates.