Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
Eskom Sunilaws Office Park - Beacon Bay - East London - 5241
Organization Type
GOVERNMENT
Published
14 Aug 2026
OCDS Reference
ocds-9t57fa-165678
Provision of mv/lv maintenance and repairs for overhead aerial bundled conductor and bare conductor lines in the cape coastal cluster – eastern cape. The tenderer must accept eskom's supplier quality requirements as per specification 240-105658000 and iso 9001, and complete and sign form a.
Tenderer must complete and sign Form A (Tender & Contract Quality Requirements, document identifier 240-68099512 Rev 9) to acknowledge and accept Eskom's Supplier Quality Requirements as per specification 240-105658000 and ISO 9001.
Category 3 is the applicable pre-contract award quality requirements category; the tenderer must indicate the applicable category and whether a site assessment is applicable.
Post-contract award, the supplier must comply with Eskom's quality requirements including contract execution, supplier quality performance monitoring, rights of access, rights to information, preservation, quality audits, management of nonconformities, and special processes.
The tenderer's quality representative must complete and sign the form.
The scope is MV/LV maintenance and repairs of overhead aerial bundled conductor and bare conductor lines in the Cape Coastal Cluster – Eastern Cape.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Monday, 07 September 2026 - 11:00
Venue
MS Teams
Categories
Request for Quotation
Eskom Sunilaws Office Park - Beacon Bay - East London - 5241
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx. You don’t need to refresh — this page will pick up the updated review automatically.
14 Aug
2026
Tender Published
Tender was published
07 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
240-109253698 CQP Template 2021.docx
Eskom is procuring services for MV/LV maintenance and repairs in the Cape Coastal Cluster, Eastern Cape. The contract includes provision for overhead aerial bundled conductor and bare conductor lines. The tender closes on September 7, 2026.
Supplier Quality Management_Returnables Latest.pdf
ESKOM is procuring services for MV/LV maintenance and repairs in the Cape Coastal Cluster, Eastern Cape. The tender requires bidders to provide documented evidence of their quality management system and contract quality plan.
Eskom - Standard Conditions of Tender (February 2022).pdf
Eskom is procuring MV/LV maintenance and repairs services in the Eastern Cape province. The tender is open to eligible bidders who meet the specified requirements.
Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf
Eskom is procuring services for MV/LV maintenance and repairs in the Cape Coastal Cluster, Eastern Cape. The tender requires bidders to complete a PAYE questionnaire to determine their tax status.
E-Tenderers E-Tendering Training Acknowledgement Form.pdf
Eskom is procuring services for MV/LV maintenance and repairs in the Cape Coastal Cluster, Eastern Cape. The tender requires provision for overhead aerial bundled conductor and bare conductor lines. The closing date is September 7, 2026.
37.2 Agreement.pdf
Eskom requires a contractor for medium voltage (MV) and low voltage (LV) maintenance and repairs on overhead aerial bundled conductor and bare conductor lines within the Cape Coastal Cluster in the Eastern Cape.
NEC ECC For Provision for MVLV Maintenance.pdf
Eskom Holdings SOC Limited is procuring provision for MV/LV maintenance and repairs in the Cape Coastal Cluster, Eastern Cape. The contract is based on the NEC3 Engineering and Construction Contract, with a priced contract and bill of quantities. The tenderer must provide a panel contract for maintenance and repairs of MV/LV lines on an as-and-when-required basis.
Invitation to Tender (ITT) for MVLV Maintenance Repairs (003).pdf
Eskom is procuring MV/LV maintenance and repair services in the Cape Coastal Cluster, Eastern Cape. The tender is open to all eligible bidders, with a closing date of 07 September 2026 at 10h00. The scope of work includes maintenance and repairs of overhead aerial bundled conductor and bare conductor lines.
240-105658000 Supplier Quality Management Specification (3).pdf
Eskom is procuring MV/LV maintenance and repairs services in the Eastern Cape. The tender requires suppliers to have a quality management system in place and to submit various documents, including a contract quality plan and inspection and test plan.
BOQ MVLV MAINTENANCE 14Aug2026.xlsx
ESKOM is procuring provision for MV/LV maintenance and repairs in the Cape Coastal Cluster, Eastern Cape. The tender requires bidders to provide materials and labour for various electrical maintenance tasks.
Supplier Quality Management_Returnables Latest.xlsx
ESKOM is procuring MV/LV maintenance and repairs services in the Cape Coastal Cluster, Eastern Cape. The tender requires bidders to provide quality management system requirements, contract quality plan requirements, and quality control plan requirements.
E-tendering Help Manual for supplier - 27 January 2025.pdf
This document is the Eskom eTendering System User Manual (Revision 3.0, dated 28 August 2023) providing instructions for suppliers on how to register, log in, and submit tender documents electronically via the Eskom eTendering portal. It does not contain the specific tender documentation, scope, or evaluation criteria for the MV/LV Maintenance & Repairs tender in the Cape Coastal Cluster.
240-68099512 Form A Rev 9.pdf
Eskom is procuring maintenance and repair services for medium voltage (MV) and low voltage (LV) overhead aerial bundled conductor and bare conductor lines in the Cape Coastal Cluster, Eastern Cape. The tender closes on 7 September 2026.
240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx
ESKOM is procuring services for MV/LV maintenance and repairs in the Cape Coastal Cluster, Eastern Cape. The scope includes overhead aerial bundled conductor and bare conductor lines. The tender closes on 7 September 2026.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
R 2 510 966
Range
Based on 16 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Important Dates
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)The closing date is 2026-09-07T11:00:00.000Z
Contact Information
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)The department requires Supply Chain Management contacts
Submission Guidelines
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001). The supplier shall submit a valid copy of ISO 9001 or any applicable certificate of a QMS (the latest applicable revision).
Evaluation Criteria
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Suppliers must have a valid ISO 9001 certificate or other applicable quality management system certificate, and must complete and sign Form A. Suppliers must also meet the requirements outlined in the tender document, including having a quality management system in place.
Technical Specifications
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)The intention of this specification is to specify and describe the minimum quality requirements for all existing and potential Eskom suppliers and define the quality criteria for the selection, evaluation, vendor registration, management, monitoring, assessment and auditing of suppliers.
Methodology
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)The supplier shall deploy a clearly defined documented programme providing for identification of all physical asset pre-operation preservation of quality requirements.
Experience & Qualifications
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)The supplier shall ensure that quality audits and related quality performance reviews shall be carried out by trained, accredited, and experienced personnel in accordance with procedures documented in the quality management system.
Quality Management
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)The supplier shall develop, implement, maintain and improve a formal QMS that conforms to the latest ISO 9001 standard or any applicable standard of QMS (latest applicable revision) and in accordance with the requirements of this specification.
Pricing Schedule
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)The supplier shall ensure that preservation requirements for scope of work systems, system components, equipment, materials, and other procured goods are clearly and unambiguously documented and that preservation requirements are efficiently and effectively communicated to project logistics, construction management, quality, security, and other project functional areas, as required, for efficient and effective implementation of preservation requirements.
Financial Requirements
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)The supplier shall ensure that clear and unambiguous requirements for preservation of the system, system components, equipment, materials, and other procured goods are clearly and unambiguously documented in purchase orders, work authorisations, and other communications between the supplier and sub-suppliers.
Compliance Requirements
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)The supplier shall submit a quality method statement based on ISO 9001 and specific to the scope of work. The quality method statement should address all the supplier’s business management processes to ensure that all of Eskom’s requirements are fully met on a consistent basis.
Contractual Terms
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)The supplier shall ensure that preservation management programme responsibilities are clearly and unambiguously defined within the project team and efficiently and effectively implemented at all project scope of work locations.
Description
Source: 240-109253698 CQP Template 2021.docx (unknown)Contract Quality Plan template assist the supplier to identify and plan for meeting client's/ contract expectations/requirements for quality management
Evaluation Criteria
Source: 240-109253698 CQP Template 2021.docx (unknown)Bidders must meet the requirements outlined in the Contract Quality Plan and have the necessary expertise and resources
Technical Specifications
Source: 240-109253698 CQP Template 2021.docx (unknown)Scope: MV/LV maintenance and repairs on overhead aerial bundled conductor and bare conductor lines in the Cape Coastal Cluster, Eastern Cape.
Quality management: Bidders must prepare a Contract Quality Plan (CQP) aligned with SANS 466:2005 / ISO 10005:2005 covering:
Compliance Requirements
Source: 240-109253698 CQP Template 2021.docx (unknown)No specific requirements found
Description
Source: Supplier Quality Management_Returnables Latest.xlsxProvision for MV/ LV Maintenance & Repairs MV & LV (Overhead aerial bundled conductor and bare conductor lines) in Cape Coastal Cluster – Eastern Cape.
Evaluation Criteria
Source: Supplier Quality Management_Returnables Latest.xlsx (unknown)Bidders must have a valid CSD registration, tax clearance, and B-BBEE level as required by the tender documents
Technical Specifications
Source: Supplier Quality Management_Returnables Latest.xlsx (unknown)Provision for MV/ LV Maintenance & Repairs MV & LV (Overhead aerial bundled conductor and bare conductor lines) in Cape Coastal Cluster – Eastern Cape.
Important Dates
Source: E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown){"closingDate":"2026-09-07T11:00:00.000Z"}
Contact Information
Source: E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":null}
Submission Guidelines
Source: E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)Returnable Documents: E-Tenderers’ E-Tendering Training Acknowledgement Form must be fully completed and submitted to Eskom within the prescribed period. Failure to do so will render the Tenderer non-responsive and will be disqualified from the Procurement Process.
Returnable Documents
Source: E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)E-Tenderers’ E-Tendering Training Acknowledgement Form is a Mandatory returnable document prior to E-Tendering. Failure to fully complete the form and submit it to Eskom within the prescribed period will render the Tenderer non-responsive and will be disqualified from the Procurement Process.
Evaluation Criteria
Source: E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)No eligibility criteria specified
Technical Specifications
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx (unknown)Quality Control Plan (QCP) or Inspection Test Plan (ITP) for MV/LV maintenance and repairs on overhead aerial bundled conductor and bare conductor lines in the Cape Coastal Cluster, Eastern Cape. The plan defines intervention points: Hold Point (H), Witness Point (W), Approval Point (AP), Information Only (IN), Surveillance (S), Verification (V). Inspection and test categories: 100% Testing (T1), Sample Testing (T2), 100% Inspection (A1), Sample Inspection (A2), 100% Witness (W1), Sample Witness (W2), 100% Document Review (R1), Sample Document Review (R2). Methods include visual, microscopy, NDT, liquid/dye penetrant, magnetic particle, eddy current. Acceptance criteria cover functionality requirements, performance measures, regulatory compliance, chemical tests. Records required for Supplier Inspection, Eskom Inspection, AIA/NOBO, Internal/TPI. Approvals needed from Contractor/Supplier, Subcontractor (where applicable), Eskom, and Approved Inspection Authority (AIA) where applicable.
Description
Source: Invitation to Tender (ITT) for MVLV Maintenance Repairs (003).pdfThe tender is for the provision of MV/LV maintenance and repairs on overhead aerial bundled conductor and bare conductor lines in the Cape Coastal Cluster – Eastern Cape. The contract will be awarded to up to 50 contractors to facilitate quick allocation of work. Work will be allocated on a rotational basis to compliant contractors (COIDA, TAX, B-BBEE). Each qualifying contractor receives at least one task order; subsequent allocations depend on least allocation and resource availability. Refusal of work must be confirmed in writing.
Important Dates
Source: Invitation to Tender (ITT) for MVLV Maintenance Repairs (003).pdf (RFP)Closing date and time: 07 September 2026 at 10h00 am.
Clarification meeting (non-compulsory): 25 August 2026 at 10:00 am via MS Teams. Attendance must be confirmed with the Eskom Representative via email to [email protected].
Tender validity period: 120 days from closing date and time.
Clarification queries must be submitted at least 5 working days before the tender deadline.
Contact Information
Source: Invitation to Tender (ITT) for MVLV Maintenance Repairs (003).pdf (RFP)Eskom Representative: Thembakazi Wellem
Tel: 043 703 2378
Email: [email protected]
All queries and clarifications must be addressed in writing to the Eskom Representative only.
Submission Guidelines
Source: Invitation to Tender (ITT) for MVLV Maintenance Repairs (003).pdf (RFP)Tenders must be submitted electronically via the Eskom E-tendering site before the closing time. No hard copies will be accepted. The submission must be in PDF format, with the price list also provided in Excel format. File size limits: 50MB per file, 900MB total per submission. No zip/compressed files allowed. If resubmitting, only the latest version will be accepted; previous submissions become null and void. Ensure the submission status is marked as complete.
Mandatory returnables at closing (non-compliance renders the bid non-responsive):
Other required forms (must be completed and signed):
Disqualification risks:
Evaluation Criteria
Source: Invitation to Tender (ITT) for MVLV Maintenance Repairs (003).pdf (RFP)Evaluation stages: 1) Commercial, 2) Functionality, 3) PPPFA Price & Preference, 4) Contractual requirements (SHEQ, SDL&I), 5) Financial evaluation.
Functionality (Technical) – minimum qualifying score 75%:
Price and Preference (80/20 system):
Contract award:
Post-award considerations:
Technical Specifications
Source: Invitation to Tender (ITT) for MVLV Maintenance Repairs (003).pdf (RFP)Scope: Provision of MV/LV maintenance and repairs on overhead aerial bundled conductor and bare conductor lines in the Cape Coastal Cluster – Eastern Cape.
Technical mandatory requirements:
Functional criteria – Skills/Training Resources (45%):
Functional criteria – Tools and Equipment (40%):
Functional criteria – Experience (15%):
Methodology
Source: Invitation to Tender (ITT) for MVLV Maintenance Repairs (003).pdfProposals must meet 75% functionality qualifying score to be evaluated further. A weighted scorecard approach is used for technical compliance. Authorisation prerequisites (MV Outcome 3&4 and LV Authorisations) are included in functional criteria for scoring; weight set to not close the market but influence ranking. Contractors without authorisations are given 3 months to obtain them. Work allocation: one panel of qualifying contractors; rotational basis; each contractor receives at least one task order; subsequent allocations based on least allocation and resource availability.
Experience & Qualifications
Source: Invitation to Tender (ITT) for MVLV Maintenance Repairs (003).pdfExperience (15% weight):
Skills/Training Resources (45%):
Tools and Equipment (40%):
Quality Management
Source: Invitation to Tender (ITT) for MVLV Maintenance Repairs (003).pdfQuality requirements (Category 3):
SHEQ, SDL&I and financial statements requirements will be evaluated; bidders may be given opportunity to correct shortcomings.
Pricing Schedule
Source: Invitation to Tender (ITT) for MVLV Maintenance Repairs (003).pdfPricing schedule: Completed pricing schedule must be submitted (if not already in NEC or other contract). Price list must be in PDF and Excel format. Prices evaluated inclusive of VAT, corrected for arithmetical errors, excluding contingencies, adjusted for variations. Unconditional discounts considered; conditional discounts applied at payment. Prices scored out of 80 points under the 80/20 preference system.
Financial Requirements
Source: Invitation to Tender (ITT) for MVLV Maintenance Repairs (003).pdf (RFP)Pricing format: Priced Bill of Quantities (BOQ) must be submitted; price list in PDF and Excel.
Price evaluation:
Payment terms:
Financial evaluation:
No performance security required (not applicable).
Compliance Requirements
Source: Invitation to Tender (ITT) for MVLV Maintenance Repairs (003).pdf (RFP)Eligibility:
Mandatory registrations and certificates:
Local content (SDL&I) – mandatory for contract award:
SHEQ requirements (evaluated, with opportunity to correct):
Environmental requirements:
Quality requirements (Category 3):
Health & Safety
Source: Invitation to Tender (ITT) for MVLV Maintenance Repairs (003).pdfSHE requirements:
Safety returnable at closing: COIDA original certificate of good standing or proof of application (South African tenderers only).
Environmental
Source: Invitation to Tender (ITT) for MVLV Maintenance Repairs (003).pdfEnvironmental requirements:
Local content (SDL&I): Mandatory for contract award – SBD 6.2, Annexure C, DTIC exemption if needed. Threshold: Powerline hardware – Distribution line hardware 100%.
Contractual Terms
Source: Invitation to Tender (ITT) for MVLV Maintenance Repairs (003).pdfContract conditions: NEC3 Engineering and Construction Contract (ECC3), Main Option A (priced contract with activity schedule). Dispute resolution: Option W1. Secondary options: X1 (price adjustment for inflation), X2 (changes in law), X5 (sectional completion), X7 (delay damages), X16 (retention), X18 (limitation of liability), X19 (task order), Z (additional conditions).
Payment terms: Below R50 million (incl. VAT) – 30 days; above R50 million – 60 days from receipt of undisputed invoices.
Eskom reserves the right to negotiate with preferred bidders if prices are not market-related.
Subcontracting with subsidiaries discouraged; must be declared if done.
Contract Skills Development Goals (CSDG) and Contract Participation Goals (CPG) determined at task order level.
Section
Source: Invitation to Tender (ITT) for MVLV Maintenance Repairs (003).pdfEvaluation stages: Commercial, Functionality, PPPFA Price & Preference, Contractual requirements (SHEQ, SDL&I), Financial evaluation.
Functionality: Minimum 75% qualifying score. Weighted sections: Skills/Training 45%, Tools & Equipment 40%, Experience 15%. Mandatory criteria are gatekeepers (Yes/No). Site verification of tools/equipment for bidders passing technical evaluation.
Price & Preference: 80/20 system. Price scored out of 80, Specific Goals (B-BBEE) out of 20. Total out of 100. Tie-breakers: higher Specific Goals, then drawing of lots.
Contract award: Up to 50 contractors appointed. If fewer qualify, Eskom awards to those meeting requirements and re-issues for outstanding number.
Description
Source: BOQ MVLV MAINTENANCE 14Aug2026.xlsx (unknown)The tender is for the provision of MV/LV maintenance and repairs for overhead aerial bundled conductor and bare conductor lines in the Cape Coastal Cluster, Eastern Cape.
Important Dates
Source: BOQ MVLV MAINTENANCE 14Aug2026.xlsx (unknown)The closing date for this tender is 2026-09-07T11:00:00.000Z. There are no specified briefing or site visit dates.
Contact Information
Source: BOQ MVLV MAINTENANCE 14Aug2026.xlsx (unknown)The contact information for this tender is not specified in the provided document.
Submission Guidelines
Source: BOQ MVLV MAINTENANCE 14Aug2026.xlsx (unknown)Bidders must submit their quotations in the format specified in the tender document. The submission must include all the required returnable forms, which are SBD 1, SBD 3.1, SBD 4, SBD 6.1, and SBD 9. The bidder must ensure that all forms are completed, signed, and submitted with the quotation.
Evaluation Criteria
Source: BOQ MVLV MAINTENANCE 14Aug2026.xlsx (unknown)The evaluation criteria for this tender include the bidder's CIDB grading, CSD registration, and B-BBEE level. The bidder must also comply with the eligibility criteria outlined in the tender document, which includes being registered with the relevant professional bodies.
Technical Specifications
Source: BOQ MVLV MAINTENANCE 14Aug2026.xlsx (unknown)The technical specifications for this tender include the provision of MV/LV maintenance and repairs for overhead aerial bundled conductor and bare conductor lines in the Cape Coastal Cluster, Eastern Cape. The specifications exclude the 'big 5' items, which are conductor, transformers, poles, and wooden X-arms, and metering kiosks.
Financial Requirements
Source: BOQ MVLV MAINTENANCE 14Aug2026.xlsx (unknown)The financial requirements for this tender are not specified in the provided document.
Compliance Requirements
Source: BOQ MVLV MAINTENANCE 14Aug2026.xlsx (unknown)The compliance requirements for this tender include being registered with the relevant professional bodies, having the necessary CIDB grading, CSD registration, and B-BBEE level. The bidder must also comply with the eligibility criteria outlined in the tender document.
Description
Source: Eskom - Standard Conditions of Tender (February 2022).pdfSupply Chain
Management Procedure 32-1034. Any addenda to an issued Invitation to Tender will be
published or issued in the same way as the Invitation to Tender was and will form part of the
Invitation to Tender documents.
Communication 1.5 Every communication between Eskom and a tenderer shall be made to or from the Eskom
Representative only, in w
Important Dates
Source: Eskom - Standard Conditions of Tender (February 2022).pdf (TENDER){"closingTime":"11:00:00.000Z","briefingSession":{"date":null,"time":null,"venue":"tend a site visit and/or clarification meeting that is stipulated as being compulsory in order to familiarise themselves with the proposed work, services, supply, meeting location or similar","is_compulsory":true}}
Contact Information
Source: Eskom - Standard Conditions of Tender (February 2022).pdf (TENDER){"name":null,"email":null,"phone":null,"department":"Supply Chain Management","address":"The address for submission of tenders is specified in the Tender Data"}
Submission Guidelines
Source: Eskom - Standard Conditions of Tender (February 2022).pdf (TENDER)The tenderer must submit a complete original tender and one complete copy of the original tender at the address and in the tender box or e-mail address specified in the Tender Data by no later than the closing date and time for tender submission. Proof of posting or of courier delivery does not equate to proof of delivery. For E-tendering, the tenderer must upload and finalize the tender via Eskom Tender bulletin site on the Eskom E-tendering page by no later than the closing date and time for tender submission.
Evaluation Criteria
Source: Eskom - Standard Conditions of Tender (February 2022).pdf (TENDER)The evaluation criteria include functionality, price, and B-BBEE level. The tenderer must meet the minimum threshold stated in the Tender Data to proceed to further evaluation. The evaluation of price will take into account factors such as CPA, FOREX, commodity exposure, unconditional discounts, technical adjustment, PV, and forecasted rates of invoicing.
Technical Specifications
Source: Eskom - Standard Conditions of Tender (February 2022).pdf (TENDER)The scope of work includes MV/LV maintenance and repairs in the Cape Coastal Cluster - Eastern Cape. Tenderers must comply with the specifications and requirements stated in the Invitation to Tender.
Quality Management
Source: Eskom - Standard Conditions of Tender (February 2022).pdfThe tenderer must provide proof of quality management systems, policies, and capabilities in place at the closing date and time for tender submission. The tenderer must also comply with Eskom's requirements for Safety, Health, Environment, and Quality (SHEQ).
Pricing Schedule
Source: Eskom - Standard Conditions of Tender (February 2022).pdfThe tenderer must submit a pricing schedule that includes all duties, taxes (including VAT), and other levies payable by the tenderer if successful. The rates and prices must be fixed for the duration of the contract and not subject to contract price adjustment except as provided for in the Invitation to Tender.
Financial Requirements
Source: Eskom - Standard Conditions of Tender (February 2022).pdf (TENDER)The tenderer must include in the rates, prices, and the tendered total of the prices all duties, taxes (including VAT), and other levies payable by the tenderer if successful. The rates and prices must be fixed for the duration of the contract and not subject to contract price adjustment except as provided for in the Invitation to Tender.
Compliance Requirements
Source: Eskom - Standard Conditions of Tender (February 2022).pdf (TENDER)The tenderer must comply with relevant legislation and regulatory instruments such as Instruction Notes issued by National Treasury, CIDB Regulations for construction works, and PPPFA Regulations. The tenderer must also provide proof of registration with the Construction Industry Development Board (CIDB) if CIDB grading is a qualification criterion.
Health & Safety
Source: Eskom - Standard Conditions of Tender (February 2022).pdfThe tenderer must provide proof of safety, health, and environmental systems, policies, and capabilities in place at the closing date and time for tender submission. The tenderer must also comply with the Occupational Health and Safety Act and Eskom's requirements for SHEQ.
Contractual Terms
Source: Eskom - Standard Conditions of Tender (February 2022).pdfThe tenderer must hold the tender valid for acceptance by Eskom at any time within the validity period after the closing date and time for tender submission. The tenderer must also comply with the contractual terms and conditions stated in the Invitation to Tender.
Requirements
Source: Eskom - Standard Conditions of Tender (February 2022).pdf (TENDER)The tenderer must comply with the eligibility criteria stated in the Tender Data and must not be under any restriction to do business with Eskom or State-Owned Companies. The tenderer must also provide proof of registration with the CIDB if CIDB grading is a qualification criterion.
Section
Source: Eskom - Standard Conditions of Tender (February 2022).pdfare submitted and accessible for downloading/evaluation without any challenges as well as
It must be noted that Eskom will not measure a criterion twice in the different evaluation
Functionality 3.13 If functionality is a criterion, tenderers will be scored against the functionality criteria and
further evaluation.
(if applicable) financial risk to Eskom in the execution of the contract. During evaluation of a tenderer’s
Evaluation of Price 3.15 Evaluate the Price in accordance with the criteria/requirements in the Tender Data. Factors
the evaluation Price.
but will score zero under PPPFA point allocation.
Evaluation of 3.18 Score the Specific Goals with reference to the supporting documentation in the tender. If a
Specific Goals tenderer fails to meet Specific Goals and/or to submit the required proof/supporting
will score zero points for Specific Goals within the 90/10 or 80/20 allocation of points.
Ranking of tenders 3.19 According to the PPPFA, Eskom will add the score for Pricing and the Specific Goals
Objective criteria 3.20 A contract may be awarded to a tenderer that did not score the highest points only in
must stipulate the Objective Criteria in the Invitation to Tender. Functionality and any
element of the B-BBEE scorecard may not be used as Objective Criteria.
Reverse e-Auction 3.21 Reverse e-auction is an electronic system that utilises the 90/10 and 80/20 Price and
Preference point systems, and which is intended to achieve competitive pricing. Eskom
(NT instructions, content and/or production by the dtic, PPPFA Regulations; Amended B-BBEE Codes, COIDA;
CIDB, PPPFA etc) OHS Act; Eskom’s requirements for Safety, Health, Environment and Quality (SHEQ) and any other
Health, environmental and quality (SHEQ) systems, policies and capabilities are in place at the
Quality Contract Award. All costs and personnel associated with SHEQ must be reflected in the
However, for the purposes of PPPFA point allocation: if no B-BBEE certificate/affidavit is
Submission Guidelines
Source: Supplier Quality Management_Returnables Latest.pdf (TENDER)Returnable forms must be completed and submitted with the quotation. The bidder must comply with the submission guidelines as stated in the tender document.
Evaluation Criteria
Source: Supplier Quality Management_Returnables Latest.pdf (TENDER)Bidders must have a valid tax clearance certificate and be registered on the Central Supplier Database (CSD). They must also comply with the Broad-Based Black Economic Empowerment (B-BBEE) Act and have a valid CIDB grading (if applicable). The evaluation criteria include Section A Score Option 2 7, Section B Score 2, Section C Score 1, and Section D Score 1.
Technical Specifications
Source: Supplier Quality Management_Returnables Latest.pdf (TENDER)The technical specifications include documented information for Control of Externally Provided Processes, Products and Services, and criteria for evaluation, selection, monitoring of performance, and re-evaluation of external providers.
Quality Management
Source: Supplier Quality Management_Returnables Latest.pdf (TENDER)The quality management requirements include Apply (Yes=1), E.1 Form A is completed and signed, and E.2 Add other requirements, as well as the documented information for Control of Externally Provided Processes, Products and Services.
Compliance Requirements
Source: Supplier Quality Management_Returnables Latest.pdf (TENDER)The compliance requirements include a valid tax clearance certificate, registration on the Central Supplier Database (CSD), compliance with the Broad-Based Black Economic Empowerment (B-BBEE) Act, and a valid CIDB grading (if applicable).
Submission Guidelines
Source: 37.2 Agreement.pdf (unknown)Returnable forms must be completed and submitted with the quotation. The contractor/supplier must sign the Section 37(2) agreement on behalf of the company.
Evaluation Criteria
Source: 37.2 Agreement.pdf (unknown)The contractor/supplier must be an employer in their own right with duties as prescribed in the Occupational Health and Safety Act No. 85 of 1993, as amended. The contractor/supplier must have authority to sign the Section 37(2) agreement on behalf of the company.
Technical Specifications
Source: 37.2 Agreement.pdf (unknown)The contractor/supplier must comply with the provisions of the Occupational Health and Safety Act, 1993 (Act). The contractor/supplier must adhere to the SHE specifications for the project/service.
Compliance Requirements
Source: 37.2 Agreement.pdf (unknown)The contractor/supplier must acknowledge that they are an employer in their own right, with duties as prescribed in the Occupational Health and Safety Act, and agree to ensure that all work will be performed and/or machinery or plant used in accordance with the provisions of the Act.
Health & Safety
Source: 37.2 Agreement.pdfThe contractor/supplier acknowledges that they are an employer in their own right, with duties as prescribed in the Occupational Health and Safety Act, and agrees to ensure that all work will be performed and/or machinery or plant used in accordance with the provisions of the Act.
Description
Source: E-tendering Help Manual for supplier - 27 January 2025.pdfThe eTendering system is a web-based platform that replaces manual submission of tender documents at Eskom offices. Suppliers must register and verify their details via OTP before they can access the system. Access is available through the TenderBulletin public website (https://tenderbulletin.eskom.co.za) and the eTendering website (https://eTendering.eskom.co.za). A CSD number is required for access.
Important Dates
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)Closing date: 2026-09-07 at 11:00:00 (as per tender record). No other dates (briefings, site visits, clarification deadlines) are stated in the document.
Contact Information
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)For system problems or difficulties using Tender Bulletin, eTendering, or OpenText systems, contact the buyer responsible for the published tender. No specific contact names, emails, or phone numbers are provided in the document.
Submission Guidelines
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)Bids must be submitted electronically via the Eskom eTendering system at https://eTendering.eskom.co.za. Registration on the system is required before access is granted; an OTP is sent to the registered cellphone and email for verification. Documents must be uploaded under the correct category (e.g., Technical, Commercial, Finance). A single file cannot exceed 50MB, and the total size of all uploaded files must not exceed 900MB. After uploading all required documents, the bidder must click 'Finalize Submission' and then 'Finalise and Close Submission' to complete the submission. A confirmation email with the submission ID is sent; this email should be saved for future reference. Bids received after the closing time will not be accepted.
Evaluation Criteria
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)Closed tenders are sent directly to suppliers who meet the selection and evaluation criteria. No specific scoring split or minimum thresholds are stated in the available document.
Technical Specifications
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)The tender is for the provision of MV/LV maintenance and repairs of overhead aerial bundled conductor and bare conductor lines in the Cape Coastal Cluster – Eastern Cape. No further technical details (quantities, standards, service levels) are provided in the available document.
Methodology
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)To submit a bid via the eTendering system: register and verify your email and OTP, log in, select the tender reference number, click 'Create New Submission', upload documents under the correct category (Technical, Commercial, Finance, etc.), verify all documents are uploaded, then click 'Finalize Submission' and 'Finalise and Close Submission'. File size limits: 50MB per file, 900MB total. After finalisation, a confirmation email with the submission ID is sent; save it for future reference.
Compliance Requirements
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)Bidders must have a CSD (Central Supplier Database) number to gain access to the eTendering system. No other compliance requirements (tax clearance, B-BBEE, CIDB) are stated in the available document.
Special Conditions
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)Closed tenders are not listed on TenderBulletin as normal tenders; they are sent directly to selected suppliers via email link. To edit registration details (Name, Organization, CSD, cell phone), use 'Edit Registration'. To log out, click 'Log out'. To reset a forgotten password, use 'Forgot your password' and follow the OTP verification process. The system is compatible with most web browsers; Microsoft Edge is recommended.
Section
Source: E-tendering Help Manual for supplier - 27 January 2025.pdfClosed tenders are sent directly to suppliers who meet the selection and evaluation criteria. No further evaluation criteria are specified in the available document.
Description
Source: NEC ECC For Provision for MVLV Maintenance.pdfThe contract is a panel contract for the maintenance and repairs of MV and LV lines (overhead aerial bundled conductor, bare conductor lines, and underground cable reticulation) in the Cape Coastal Cluster – Eastern Cape, on an as-and-when-required basis. The contract is based on the NEC3 Engineering and Construction Contract (April 2013).
Contact Information
Source: NEC ECC For Provision for MVLV Maintenance.pdf (unknown)No specific contact details are provided in the document. The Project Manager and Supervisor details are to be inserted in the Contract Data.
Submission Guidelines
Source: NEC ECC For Provision for MVLV Maintenance.pdf (unknown)Returnable documents include the Form of Offer and Acceptance (C1.1), which must be signed by a duly authorised representative. The tenderer must also complete the Contract Data Part Two (C1.2b) and the Pricing Data (Part C2). Any deviations from the tender documents must be recorded in the Schedule of Deviations. The tenderer must submit a first programme within one week of the Contract Date. Failure to provide required securities, bonds, guarantees, or proof of insurance within two weeks of receiving the signed agreement constitutes repudiation.
Evaluation Criteria
Source: NEC ECC For Provision for MVLV Maintenance.pdf (unknown)The tender is a Request for Quotation under the NEC3 Engineering and Construction Contract, main Option B (Priced contract with bill of quantities). The evaluation will consider the tendered total of the Prices (excluding VAT) and compliance with the Conditions of Tender. B-BBEE status is relevant; changes in B-BBEE status after award may lead to renegotiation or termination. No specific scoring split or minimum qualifying thresholds are stated in the provided document.
Technical Specifications
Source: NEC ECC For Provision for MVLV Maintenance.pdf (unknown)The scope is a panel contract for the maintenance and repairs of MV and LV lines, including overhead aerial bundled conductor, bare conductor lines, and underground cable reticulation, in the Cape Coastal Cluster – Eastern Cape, on an as-and-when-required basis. The works include tasks such as stay assemblies, strut assemblies, rock anchors, and various MV SWER line configurations. The bill of quantities covers materials and labour for these items. The contract is a re-measurement contract (Option B) where payment is based on quantities measured and rates in the bill of quantities.
Methodology
Source: NEC ECC For Provision for MVLV Maintenance.pdfThe contractor must submit a first programme within one week of the Contract Date. The programme must be accepted by the Project Manager. The contractor must provide the works in accordance with the Works Information. The bill of quantities is only a pricing document; the Works Information defines the scope.
Experience & Qualifications
Source: NEC ECC For Provision for MVLV Maintenance.pdfThe contractor must provide details of key persons, including their names, jobs, responsibilities, qualifications, and experience. CVs of key persons must be appended to the tender schedule. The contractor must also provide data for the Shorter Schedule of Cost Components, including percentages for people overheads, equipment rates, and hourly rates for design work.
Quality Management
Source: NEC ECC For Provision for MVLV Maintenance.pdfThe contract includes provisions for defects and liability. The defects date is 52 weeks after completion of the whole of the works. The defect correction period is within 1 week upon notification of a defect. The contractor's liability for defects due to design is limited as specified in the contract data.
Pricing Schedule
Source: NEC ECC For Provision for MVLV Maintenance.pdfThe pricing is based on a bill of quantities (Option B). The bill includes items for materials and labour, such as stay assemblies, strut assemblies, rock anchors, and MV SWER line configurations. Prices are entered as rates per unit or lump sums. The tendered total of the Prices (excluding VAT) must be stated. The contract is a re-measurement contract; payment is based on measured quantities. The bill of quantities is not Works Information; the Works Information defines the scope. The contractor must include all costs, risks, overheads, and profit in the rates. Quantities may not be final and may be adjusted.
Financial Requirements
Source: NEC ECC For Provision for MVLV Maintenance.pdf (unknown)Pricing is based on a bill of quantities (Option B). The contract is a rate-based contract; the offered total of the Prices is exclusive of VAT (15% VAT applies). Prices are fixed and firm for the first 12 months, then escalated: material rates at cost plus 5% (with three quotations required), labour rates adjusted per SEIFSA Table C3 (65% of pricing data), transport rates per SEIFSA Table L1 (20%), and a fixed portion of 15%. Retention is 5% on all task orders plus 2.5% SDL&I performance retention. Delay damages are 5% of the Task Order value per day, limited to the total value of the Task Order. Payment assessments occur on the 25th of each month or as agreed. The contractor must provide a tax invoice within one week of receiving a payment certificate.
Compliance Requirements
Source: NEC ECC For Provision for MVLV Maintenance.pdf (unknown)The tenderer must be registered with the relevant authorities and comply with B-BBEE requirements. The contractor must notify the Employer of any change in B-BBEE status within seven days and submit an updated verification certificate within thirty days. The contractor must comply with the Construction Regulations 2014 under the Occupational Health & Safety Act, and may be appointed as Principal Contractor. The contractor must comply with all applicable environmental laws. The contractor must include the Employer's VAT number (4740101508) on invoices. The contractor must provide proof of insurance as per the Insurance Tables. The tenderer must complete the Contract Data Part Two, including key persons and their qualifications.
Health & Safety
Source: NEC ECC For Provision for MVLV Maintenance.pdfThe contractor must take all reasonable precautions to maintain health and safety. The Employer may appoint the contractor as Principal Contractor under the Construction Regulations 2014. The contractor must comply with all applicable health and safety laws, including the Occupational Health & Safety Act. The risk register includes live underground cables, work in live chambers, live overhead conductors, close proximity to live equipment, operating cranes, static electricity, chainsaws, materials handling, vehicle risks, work in open trenches, biological/health risks, weather-related risks, environmental risks, ergonomic risks, work on rusted/rotten poles, fire risks, public safety risks, work close to public roads, and work in environmentally sensitive areas. Asbestos regulations apply: the OEL for asbestos is 0.2 fibres/ml (4-hour TWA) and short-term exposure limit of 0.6 fibres/ml (10-minute TWA). The contractor's personnel may stop work if asbestos is identified until the area is declared safe.
Environmental
Source: NEC ECC For Provision for MVLV Maintenance.pdfThe contractor must comply with all applicable environmental laws and regulations, and ensure that subcontractors and employees do the same. The risk register includes environmental risks and working in environmentally sensitive areas.
Contractual Terms
Source: NEC ECC For Provision for MVLV Maintenance.pdfThe contract uses NEC3 ECC3 with main Option B (Priced contract with bill of quantities) and dispute resolution Option W1 (adjudication, with arbitration as the tribunal). Secondary options include X1 (price adjustment for inflation), X2 (changes in law), X5 (sectional completion), X7 (delay damages), X16 (retention), and X18 (limitation of liability). Additional conditions Z1 to Z15 apply, covering cession, joint ventures, B-BBEE status changes, confidentiality, health and safety, tax invoices, ethics, insurance, nuclear liability, and asbestos. The law of the contract is South African law, and the language is English. The period for reply is 2 working days. The defects date is 52 weeks after completion, and the defect correction period is within 1 week of notification. The contractor's liability for indirect or consequential loss is limited to R0.00. The end of liability date is seven years after the defects date for latent defects, or as prescribed by law.
Section
Source: NEC ECC For Provision for MVLV Maintenance.pdfThe Schedule of Deviations is part of the Form of Offer and Acceptance. Only deviations recorded in this schedule are valid; any other deviations are not part of the contract. The tenderer's covering letter must not be included in the final contract document.
Description
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdfThis document is the PAYE Questionnaire for Service Contracts to Eskom Group of Companies, applicable from 1 March 2026 to 28 February 2027. It is used to determine the tax classification of contractors supplying services or labour to Eskom.
Important Dates
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)The pack applies from 1 March 2026 to 28 February 2027. No specific closing date for submission is stated in the document.
Contact Information
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)Group Tax email: [email protected]. For non-resident contractors, the pack must be submitted to the Eskom contractor representative for referral to the Group Tax Department in Megawatt Park.
Submission Guidelines
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)Returnable documents: the completed PAYE questionnaire (Evaluation Pack A for companies/CCs/trusts, Evaluation Pack B for individuals), including the signed summary sheet and all applicable affidavits and declarations. The completed pack must be returned to Eskom, with a copy to [email protected]. Failure to sign required affidavits or declarations will result in PAYE being withheld from payments.
Evaluation Criteria
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)The questionnaire determines the contractor's tax classification (Independent Contractor, Personal Service Provider, Labour Broker, or Dependent Contractor) based on tests including residence, number of employees, services rendered by connected persons, more than 80% income test, place/control/supervision test, and dominant impression test. The classification affects PAYE withholding and IRP5/IT3(a) coding.
Technical Specifications
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)The pack applies to contractors supplying services or labour to Eskom Holdings SOC Ltd and its subsidiaries, including Eskom Rotek Industries, Eskom Enterprises, Escap, Eskom Finance Company, Eskom Foundation, and Eskom National Transmission Company. It establishes the contractor's tax status for PAYE purposes.
Pricing Schedule
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdfThe pricing schedule is not provided in this document. The PAYE questionnaire includes bank details and payment information, but no specific pricing format is stated.
Financial Requirements
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)If the contractor is classified as a Labour Broker and provides a valid IRP30 certificate, no employees' tax will be withheld and an IT3(a) with code 3617 will be issued. Without a valid IRP30, employees' tax will be withheld at individual rates until the certificate is provided, and an IRP5 with code 3617 will be issued. If classified as a Dependent Contractor or Personal Service Provider, employees' tax will be withheld at the prevailing rate and coded as 3601 or 3616.
Compliance Requirements
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)Contractors must be registered with SARS and have a valid tax clearance certificate. The PAYE questionnaire must be completed truthfully; false information may result in Eskom withholding taxes, interest, and penalties. Non-resident contractors must sign Appendix 9 and submit the pack for referral to Eskom Group Tax.
B-BBEE Requirements
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)The document includes definitions related to B-BBEE, such as Connected Person, Associated Institution, Labour Broker, and Personal Service Provider, but does not specify B-BBEE requirements for this tender.
Requirements
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)Contractors must complete the questionnaire truthfully and sign all required affidavits and declarations. The questionnaire determines whether the contractor is an Independent Contractor, Personal Service Provider, Labour Broker, or Dependent Contractor.
Section
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdfThe evaluation criteria are based on the tax classification tests in the PAYE questionnaire, including residence, number of employees, services rendered by connected persons, more than 80% income test, place/control/supervision test, and dominant impression test.
Contact Information
Source: 240-68099512 Form A Rev 9.pdf (unknown)Eskom Quality Representative: Bulelani Flekisi, Snr Advisor Quality Assurance, dated 11/02/2026.
Submission Guidelines
Source: 240-68099512 Form A Rev 9.pdf (unknown)Returnable documents: the completed and signed Form A (Tender & Contract Quality Requirements, document identifier 240-68099512 Rev 9), acknowledging and accepting Eskom's Supplier Quality Requirements as per specification 240-105658000 and ISO 9001. The tenderer's quality representative must complete and sign the form.
Evaluation Criteria
Source: 240-68099512 Form A Rev 9.pdf (unknown)The tenderer must select the applicable category for pre-contract award quality requirements. Category 3 is indicated as applicable. A supplier capability and capacity assessment may be required. Post-contract award, the supplier must comply with Eskom's quality requirements including contract execution, supplier quality performance monitoring, rights of access, rights to information, preservation, quality audits, management of nonconformities, and special processes.
Technical Specifications
Source: 240-68099512 Form A Rev 9.pdf (unknown)The tender is for MV/LV maintenance and repairs of overhead aerial bundled conductor and bare conductor lines in the Cape Coastal Cluster – Eastern Cape. The tenderer must comply with Eskom's quality requirements as per specification 240-105658000 and ISO 9001 standard. The applicable category for pre-contract award quality requirements is Category 3.
Methodology
Source: 240-68099512 Form A Rev 9.pdfThe tenderer must comply with ISO 9001 standard clauses including Context of the Organisation, Leadership, Planning, Support, Operation, Performance Evaluation, and Improvement.
Quality Management
Source: 240-68099512 Form A Rev 9.pdfThe tenderer must acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 standard. This includes pre-contract award quality requirements (Category 3 selected), post-contract award clauses (Contract Execution, Supplier Quality Performance Monitoring, Eskom Rights of Access and Information, Preservation, Quality Audits, Management of Nonconformities, Special Processes), and clauses from the ISO 9001 standard (Context, Leadership, Planning, Support, Operation, Performance Evaluation, Improvement).
Compliance Requirements
Source: 240-68099512 Form A Rev 9.pdf (unknown)The tenderer must complete and sign Form A to acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 standard.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Address
Eskom Sunilaws Office Park - Beacon Bay - East London - 5241
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
14
Last checked
14 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Construction. Unlock full pricing strategies, bid frequency, and historical win rates.