Tender Type
Request for Bid(Open-Tender)
Delivery Location
Cape Town International Airport Southern Office Block Building - Airport Industria - Cape Town - 8000
Organization Type
GOVERNMENT
Published
06 May 2026
OCDS Reference
ocds-9t57fa-155260
This tender seeks a contractor to replace the a3 and a4 passenger loading bridges at cape town international airport, including fabrication, removal of old structures, installation, testing, and commissioning over a 36-month period. The project requires compliance with nec3 ecc3 contract terms and includes a 12-month defects liability period.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Monday, 08 June 2026 - 14:00
Venue
Cape Town International Airport Southern Office Block Building Ground floor Reception area
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Refer to bid document
Categories
Request for Bid(Open-Tender)
Cape Town International Airport Southern Office Block Building - Airport Industria - Cape Town - 8000
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: 1. CIA RFP 7762- 2025 Bid document.pdf. You don’t need to refresh — this page will pick up the updated review automatically.
06 May
2026
Tender Published
Tender was published
08 Jun
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
2. CIA RFP 7762-2025 NEC ECC - A3 A4 Replace.pdf
The tender is for the appointment of a contractor to replace Passenger Loading Bridges A3 and A4 at Cape Town International Airport. The scope includes decommissioning, removal, disposal of old bridges, design, fabrication, construction of fixed tunnels, installation of movable bridges, testing, commissioning, and maintenance during a 36-month defects liability period. The contract follows the NEC3 Engineering and Construction Contract (ECC) framework with specific clauses and options.
1. CIA RFP 7762- 2025 Bid document.pdf
The Airports Company of South Africa (ACSA) invites tenders for the appointment of a contractor to replace A3 and A4 passenger loading bridges at Cape Town International Airport. The contract includes fabrication, removal, and commissioning over a 36-month period. The tender closes on 08 June 2026 at 14:00 UTC.
To download these documents and access AI-powered analysis, visit the main tender page.
Win ACSA tenders with AI Matching Engine, airport-infrastructure intelligence, compliance analysis, and application support for aviation operations.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
R 264 688
Range
Based on 7 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Important Dates
Source: 1. CIA RFP 7762- 2025 Bid document.pdf (RFP)Contact Information
Source: 1. CIA RFP 7762- 2025 Bid document.pdf (RFP)Submission Guidelines
Source: 1. CIA RFP 7762- 2025 Bid document.pdf (RFP)Evaluation Criteria
Source: 1. CIA RFP 7762- 2025 Bid document.pdf (RFP){
"mandatory": [
"CIDB contractor grading of 7ME or higher.",
"Attendance at compulsory briefing and site inspection (18 May 2026).",
"Tax compliance (TCS PIN or CSD registration).",
"Completion of all returnable documents (e.g., NEC Form of Offer).",
"No restrictions on doing business with ACSA."
],
"functionality": {
"minimumThreshold": 60,
"criteria": [
"Company experience: Must provide 3+ reference letters for similar projects (e.g., passenger boarding bridges, reinforced concrete/steel structures, mechanical/electrical systems in transport/aviation). Each letter must include: client letterhead, scope of work, project value, start/completion dates, and contactable references. Cumulative project value must be ≥ R15M.",
"Key personnel qualifications and experience:
All CVs must include at least 2 contactable references."
]
},
"priceAndPreference": {
"system": "90/10 for bids > R50M; 80/20 for bids ≤ R50M.",
"formula": "Ps = 90(1 - (Pt - Pmin)/Pmin) for 90/10 system.",
"specificGoals": [
"B-BBEE Status Level: Level 1 (5 pts), Level 2 (4.5 pts), Level 3 (4 pts), Level 4 (3 pts), Level 5 (2 pts), Level 6 (0.5 pts), Level 7 (0.3 pts), Level 8 (0.1 pts).",
"Black youth majority-owned entities: 5 pts.",
"Black women majority-owned entities: 5 pts.",
"Majority-owned by people with disabilities: 5 pts."
],
"proofRequired": "Original/certified B-BBEE certificate from SANAS-accredited agency (or sworn affidavit). For JVs, a consolidated certificate is required."
},
"objectiveCriteria": "Tender awarded to highest scorer unless objective criteria justify award to another bidder. If no bidder meets objective criteria, highest scorer wins."
}
Technical Specifications
Source: 1. CIA RFP 7762- 2025 Bid document.pdf (RFP)Financial Requirements
Source: 1. CIA RFP 7762- 2025 Bid document.pdf (RFP)Compliance Requirements
Source: 1. CIA RFP 7762- 2025 Bid document.pdf (RFP)Description
Source: 2. CIA RFP 7762-2025 NEC ECC - A3 A4 Replace.pdfProject involves the appointment of a contractor for the replacement of A3 and A4 passenger loading bridges at Cape Town International Airport. Scope includes assessment, safe decommissioning/demolition, removal from site (and disposal of old components), design, fabrication, construction of fixed tunnel, installation of movable bridge, testing, and commissioning over a 36-month period. Contract is structured under NEC3 Engineering and Construction Contract (ECC3) with detailed Agreements & Contract Data (Part C1), Pricing Data (Part C2), Scope of Works (Part C3), Site Information (Part C4), and Annexures (Part C5).
Important Dates
Source: 2. CIA RFP 7762-2025 NEC ECC - A3 A4 Replace.pdf (RFP)Contract start date: 3 weeks after contract award. Submission of preliminary programme: 2 weeks after contract start date. Programme updates: at intervals no longer than 4 weeks. Completion date: 3 years after contract start date. Defects date: 52 weeks (12 months) after Completion of the whole of the works. Defect correction period: 4 weeks. Access dates for Electrical Complex, Airside, and Restricted areas: contract start date.
Contact Information
Source: 2. CIA RFP 7762-2025 NEC ECC - A3 A4 Replace.pdf (RFP)Employer: Airports Company South Africa SOC Limited, Cape Town International Airport, Administration Office, Southern Office Block, South Africa, 7525. Phone: 021 937 1200. Project Manager: To be confirmed (TBC). Supervisor: To be confirmed (TBC). Insurance Broker contacts: Buhle Mnguni, Phone: +27 (0)11 723 1400, Mobile: +27 (0)74 535 9075, Email: [email protected]; Nokulunga Masiza, Phone: +27 (0)11 723 1400, Mobile: +27 (0)79 512 0532, Email: [email protected]. Adjudicator Nominating Body: Chairman of the Johannesburg Society of Advocates.
Submission Guidelines
Source: 2. CIA RFP 7762-2025 NEC ECC - A3 A4 Replace.pdf (RFP)Submit the following returnable documents as listed in the Returnable Schedules: signed Form of Offer and Acceptance, Pricing Schedule (Part C2), Schedule of Deviations (if applicable), and all addenda. Ensure all documents are fully completed and signed by an authorised representative. Within two weeks of receiving the completed agreement, deliver all required securities, bonds, guarantees, proof of insurance, and other documentation as specified in the Contract Data. Failure to do so constitutes repudiation of the agreement.
Returnable Documents
Source: 2. CIA RFP 7762-2025 NEC ECC - A3 A4 Replace.pdf (RFP)Returnable documents include: signed Form of Offer and Acceptance, Pricing Schedule (Part C2), Schedule of Deviations (if any), and all addenda listed in the Returnable Schedules. Contractor must deliver securities, bonds, guarantees, proof of insurance, and other required documentation within two weeks of receiving the completed agreement. Failure to do so constitutes repudiation.
Evaluation Criteria
Source: 2. CIA RFP 7762-2025 NEC ECC - A3 A4 Replace.pdf (RFP)General criteria: Must be a registered legal entity with a valid registration number. Demonstrated experience in large-scale infrastructure projects, particularly in airport environments. Financial and technical capacity to undertake a 36-month project with a multi-million Rand budget. Compliance with all South African legal and regulatory requirements, including tax and labour laws. Specific criteria: Proven track record in the design, fabrication, installation, and commissioning of passenger loading bridges. Experience working in live operational environments (e.g., airports) with minimal disruption. Ability to secure necessary permits, approvals, and clearances (e.g., police clearance for restricted areas). Capacity to manage risks identified in the Risk Register (e.g., weather, statutory approvals, site constraints, constructability, night works). Willingness to provide performance bonds, guarantees, and insurance as specified. Exclusionary criteria: No history of corruption, bribery, or unethical practices (compliance with Prevention and Combating of Corrupt Activities Act). No ongoing or unresolved legal disputes that could impact project delivery. No conflicts of interest with ACSA or its affiliates.
Technical Specifications
Source: 2. CIA RFP 7762-2025 NEC ECC - A3 A4 Replace.pdf (RFP)Scope: Assessment, safe decommissioning/demolition, removal from site (and disposal of old loading bridge and tunnel components), design, construction of fixed tunnel, installation of movable bridge, testing, and commissioning of new passenger loading bridges at Cape Town International Airport. During the 12-month defects liability period post-completion, the Contractor is responsible for all maintenance, servicing, and inspections. Site boundaries: Airside, Restricted areas, Landside (Electrical Complex, Terminal Building, and nearby operational bridges). Risk Register must address: unknown services, as-built information accuracy, site access (approvals, permits, police clearance), tie-in with existing infrastructure, security/guarantee approvals, live operational environment, weather conditions, statutory approvals, site constraints, constructability, method statement, compensation events, ACSA approvals, budget limitations, payment delays, procurement of materials/sub-contractors, and night works. Quality Management: Contractor must implement and maintain a quality management system as per Works Information. Submit a quality plan within two weeks of contract start date for Project Manager acceptance. Plan must enable the Contractor to Provide the Works. Any changes to the quality plan require Project Manager approval. Project Manager may instruct corrections for non-compliance; such instructions are not compensation events.
Methodology
Source: 2. CIA RFP 7762-2025 NEC ECC - A3 A4 Replace.pdf (RFP)Contractor must submit a preliminary programme within 2 weeks of contract start date and revised programmes every 4 weeks. Programme must include key dates: Start Date (3 weeks after contract award), Submission of Programme (2 weeks after start date). Access dates for Electrical Complex, Airside, and Restricted areas: contract start date. Employer is not willing to take over works before Completion Date. Contractor must notify compensation events within 4 weeks; only events affecting the critical path qualify for changes to Prices, Completion Date, or Key Dates.
Quality Management
Source: 2. CIA RFP 7762-2025 NEC ECC - A3 A4 Replace.pdfContractor must implement and maintain a quality management system as per Works Information. Submit a quality plan within two weeks of contract start date for Project Manager acceptance. Plan must allow Contractor to Provide the Works. Project Manager may instruct corrections for non-compliance; such instructions are not compensation events. Defects date is 52 weeks post-completion; defect correction period is 4 weeks. Contractor is responsible for all maintenance, servicing, and inspections during the defects liability period.
Pricing Schedule
Source: 2. CIA RFP 7762-2025 NEC ECC - A3 A4 Replace.pdfPricing is based on a Priced Contract with Bill of Quantities (Option B). Contractor must submit pricing as per Part C2 Pricing Data. Assessment interval is between the 15th and 22nd of each month. Payments are made within 4 weeks. Interest rate is Nedbank prime lending rate. Contractor must prepare forecasts of final total prices at intervals no longer than 4 weeks. Currency is South African Rand. Price adjustment for inflation uses the contract start date as the base date.
Financial Requirements
Source: 2. CIA RFP 7762-2025 NEC ECC - A3 A4 Replace.pdf (RFP)Contract currency: South African Rand. Pricing: Priced Contract with Bill of Quantities (Option B). Submit pricing as per Part C2 Pricing Data. Assessment interval: between the 15th and 22nd day of each month. Payments made within 4 weeks. Interest rate: Nedbank prime lending rate. Performance bond: 10% of contract value, unconditional and on-demand, valid until end of contract period. Contractor must extend bond validity if expiry does not align with contract end date. Retention: 5% of contract value (2.5% released at Completion, 2.5% after Defects Period). Delay damages: 0.05% per day up to a maximum of 10% of contract value. Price adjustment for inflation: base date is contract start date. Contractor must prepare forecasts of final total prices at intervals no longer than 4 weeks. Subcontracting: Contractor must provide proof of payment to subcontractors within 5 days of Project Manager request; failure may result in direct payment to subcontractors by Employer. Insurance: Contractor must maintain insurances for construction plant/equipment, common law liability/workmen’s compensation, motor vehicle liability, and professional indemnity. Employer provides Contract Works, Public Liability, SASRIA, Aviation Liability, and Design & Construct Professional Indemnity insurances.
Compliance Requirements
Source: 2. CIA RFP 7762-2025 NEC ECC - A3 A4 Replace.pdf (RFP)Contract governed by NEC3 Engineering and Construction Contract (ECC3) with secondary Options: X2 (Changes in Law), X7 (Delay Damages), X15 (Limitation of Liability for Design), X16 (Retention), X18 (Limitation of Liability). Additional conditions (Z Clauses Z1-Z24) include: Contractor warrants Works fit for intended purpose; must correct setting-out errors at own cost; must provide proof of subcontractor payments within 5 days of request. Employer may terminate if Contractor fails to extend performance bond validity. Contractor must maintain equipment free of liens and waive liens vis-à-vis Employer. Intellectual property rights remain with originator; Contractor grants Employer a royalty-free licence for Works-related use. Confidentiality applies to all contract information; images require Project Manager consent. Contractor must comply with anti-corruption laws (Prevention and Combating of Corrupt Activities Act); breach may lead to termination. Force Majeure conditions require Contractor to engage with riot/strike leaders, obtain proof, report to SAPS, seek court interdicts, and enforce orders. Contractor must provide securities, bonds, guarantees, and proof of insurance as per Contract Data. Insurance deductibles apply as per Annexure C1.D.
Environmental
Source: 2. CIA RFP 7762-2025 NEC ECC - A3 A4 Replace.pdf (RFP)Weather measurements are recorded at the Construction Site Office in a clearly marked file. Compensation events may be notified if weather conditions exceed assumed 10-year return values (e.g., cumulative rainfall, days with rain >10mm, days with min air temp <0°C, days with snow). Assumed values are provided in Annexure C1.A. South African Weather Service provides historical data. Typical values are provided for tendering, but actual data will be shared if received before query close or upon award. Only the difference between recorded and assumed values is considered for compensation events.
Contractual Terms
Source: 2. CIA RFP 7762-2025 NEC ECC - A3 A4 Replace.pdfContract is governed by NEC3 ECC3 with additional Z Clauses (Z1-Z24). Key amendments: Contractor warrants Works fit for intended purpose and must correct setting-out errors at own cost. Contractor must provide proof of subcontractor payments within 5 days of Project Manager request; failure may result in direct payment to subcontractors by Employer. Employer may terminate if Contractor fails to extend performance bond validity. Contractor must maintain equipment free of liens and waive liens vis-à-vis Employer. Intellectual property rights remain with originator; Contractor grants Employer a royalty-free licence for Works-related use. Confidentiality applies to all contract information; images require Project Manager consent. Contractor must comply with anti-corruption laws; breach may lead to termination. Time is of the essence for all obligations.
Section
Source: 2. CIA RFP 7762-2025 NEC ECC - A3 A4 Replace.pdfContractor must submit a quality plan within two weeks of the contract start date for Project Manager acceptance. The plan must comply with Works Information and enable the Contractor to Provide the Works. Any changes to the quality plan require Project Manager approval. Dispute resolution: Adjudicator selected from the ACSA Panel of Adjudicators. Arbitration follows the latest Association of Arbitrators (Southern Africa) rules, with the tribunal located in George, South Africa.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Cape Town International Airport Southern Office Block Building - Airport Industria - Cape Town - 8000
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
2
Last checked
19 Jun 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services: General. Unlock full pricing strategies, bid frequency, and historical win rates.