Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Lethabo Power Station Situated ± 18 km South of Vereeniging on the Viljoensdrift-Deneysville Road, F - Vereeniging - Vereeniging - 1930
Organization Type
GOVERNMENT
Published
01 Jun 2026
OCDS Reference
ocds-9t57fa-157776
ESKOM is inviting bids for the loading of sro cip chemicals at lethabo power station in the free state. This tender requires strict compliance with eskom’s supplier quality requirements (240-105658000) and iso 9001 standards, targeting suppliers with proven technical capability in chemical handling and quality management.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Friday, 12 June 2026 - 11:00
Venue
MS TEAMS
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
CIDB 3m or higher clarification meeting: clarification meeting : loading of sro cip chemicals at lethabo power station e2782gxmpletr | meeting-join | microsoft teams
Categories
Request for Bid(Open-Tender)
Lethabo Power Station Situated ± 18 km South of Vereeniging on the Viljoensdrift-Deneysville Road, F - Vereeniging - Vereeniging - 1930
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Documents being finalised: Latest 240-105658000 Supplier Quality Management Specification (3) (1).pdf, SRO CIP NEC.pdf, Eskom Standard Conditions of Tender.pdf and 4 more. You don’t need to refresh — this page will pick up the updated review automatically.
01 Jun
2026
Tender Published
Tender was published
12 Jun
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
SRO CIP NEC.pdf
Eskom Holdings SOC Ltd is inviting tenders for the design, manufacturing, supply, installation, quality assurance, commissioning, and handover of a system for the loading of SRO (Spiral Reverse Osmosis) CIP (Cleaning in Place) chemicals at Lethabo Power Station. The project aims to reduce manual labor and enhance safety by implementing an eductor system for chemical handling. The contract is governed by the NEC3 Engineering & Construction Contract (ECC3) with specific options and secondary clauses.
E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf
The tender is for the loading of SRO CIP Chemicals at Eskom's Lethabo Power Station in Gauteng. Applicants must complete mandatory e-Tendering training and submit an acknowledgment form to confirm their ability to use the e-Tendering system. The closing date is June 12, 2026.
Form B.pdf
The tender is for the loading of SRO CIP Chemicals at Eskom's Lethabo Power Station in Gauteng. It emphasizes strict compliance with Eskom’s Occupational Health and Safety (OHS) legal and procedural requirements, including statutory acts, Eskom-specific standards, and contractor management obligations. The closing date is June 12, 2026.
Category 2 Quality.pdf
The tender is for the loading of SRO CIP Chemicals at Eskom's Lethabo Power Station in Gauteng. It requires suppliers to demonstrate compliance with stringent Quality Management System (QMS) standards, either through ISO 9001 certification or documented evidence of a QMS aligned with ISO 9001:2015. The evaluation focuses on quality management, operational evidence, contract quality plans, quality control plans, and additional user-defined requirements like project history and risk management.
Annexure C1 OHS Tender Evaluation (High risk).pdf
The tender is for the loading of SRO CIP Chemicals at Eskom's Lethabo Power Station in Gauteng. It includes a high-risk OHS (Occupational Health and Safety) evaluation template with strict compliance requirements, including OHS legal acknowledgments, risk assessments, and competency proofs.
E-tendering Help Manual for supplier - 27 January 2025.pdf
The tender titled 'Loading of SRO CIP Chemicals at Lethabo Power Station' is issued by Eskom in Gauteng, South Africa. It involves the submission of bids for the loading of SRO (Short-Range Order) CIP (Clean-In-Place) chemicals at the specified power station. The tender process is conducted through Eskom's eTendering system, a web-based platform for electronic submission of tender documents.
Form A_Cat 2_ Loading of SRO CIP Chemicals at Lethabo Power Station (1).pdf
The tender is for the loading of SRO CIP Chemicals at Eskom's Lethabo Power Station in Gauteng. It requires compliance with Eskom's Quality Requirements (240-105658000) and ISO 9001 standards, with a focus on supplier capability, contract execution, and quality performance monitoring.
Latest 240-105658000 Supplier Quality Management Specification (3) (1).pdf
The tender is for the loading of SRO CIP chemicals at Eskom's Lethabo Power Station in Gauteng. It requires suppliers to adhere to Eskom's Supplier Quality Management (SQM) Specification (240-105658000), which mandates compliance with ISO 9001 or equivalent QMS standards. The tender emphasizes quality assurance, control plans, and documentation for pre- and post-contract phases, including audits, nonconformity management, and sub-supplier oversight.
Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdf
The tender is for the loading of SRO CIP Chemicals at Eskom's Lethabo Power Station in Gauteng. It is governed by Eskom's Supplier Integrity Pact, which mandates ethical behavior, transparency, and compliance with South African laws. Suppliers must adhere to strict anti-corruption, confidentiality, and conflict-of-interest policies, and sign an Integrity Declaration Form.
Tender Technical Evaluation Strategy _29 December 2025 (003).pdf
The tender is for the design, manufacturing, installation, testing, and commissioning of a system to safely load SRO (Spherical Reverse Osmosis) CIP (Clean In Place) chemicals at Eskom's Lethabo Power Station. The project aims to upgrade the existing manual handling system to minimize risks associated with carrying hazardous chemicals up stairs. The scope includes engineering, decommissioning old equipment, welding, scaffolding, training, and providing manuals/specifications.
Supplier Evaluation Pack Template for 01 March 2023 to 29 February 2024.pdf
The tender is for the loading of SRO CIP Chemicals at Eskom's Lethabo Power Station in Gauteng. The document primarily focuses on determining the tax classification of contractors (individuals, companies, CCs, or trusts) providing services to Eskom, ensuring compliance with South African tax legislation (Income Tax Act). It includes questionnaires and affidavits to classify contractors as Independent Contractors, Personal Service Providers (PSP), Labour Brokers, or Dependent Contractors, with implications for PAYE withholding.
Eskom Standard Conditions of Tender.pdf
Invitation to Tender (ITT) SRO Project.pdf
Eskom Holdings SOC Ltd invites tenders for the **Loading of SRO CIP Chemicals at Lethabo Power Station** (Tender No: **E2782GXMPLETR**). The tender is open, with a closing date of **12 June 2026 at 10:00 AM (UTC)**. Submissions must be electronic via the **Eskom E-Tendering Portal**. The contract involves chemical loading services, with a validity period of **120 days** post-closing. A non-compulsory clarification meeting is scheduled for **03 June 2026 at 10:00 AM (MS Teams)**. The evaluation follows an **80/20 scoring system** (80 points for price, 20 for B-BBEE/preference points).
375-LET-AABB-D00138-178 Lethabo PS Loading of SRO CIP Chemicals.pdf
The tender is for the design, supply, installation, and commissioning of a system to load SRO (Spiral Reverse Osmosis) CIP (Cleaning in Place) chemicals at Eskom's Lethabo Power Station. The project aims to minimize manual handling of hazardous CIP chemicals, improving safety for operators. The scope includes chemical handling/storage, mechanical design/installation, and C&I (Control & Instrumentation) and electrical work. The contractor must comply with Eskom's technical, safety, and quality standards, including detailed design reviews, testing (FAT/SIT), and training for Eskom staff.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Important Dates
Source: Latest 240-105658000 Supplier Quality Management Specification (3) (1).pdfNo specific dates provided in the document beyond the tender closing date (refer to tender record).
Contact Information
Source: Latest 240-105658000 Supplier Quality Management Specification (3) (1).pdfDepartment: Supply Chain Management (SCM). No specific names, emails, phones, or addresses provided in the document.
Submission Guidelines
Source: Latest 240-105658000 Supplier Quality Management Specification (3) (1).pdfSubmit the following returnable documents as per the tender category (1-4) selected in Form A (240-68099512):
Evaluation Criteria
Source: Latest 240-105658000 Supplier Quality Management Specification (3) (1).pdfMandatory:
Preferred:
Technical Specifications
Source: Latest 240-105658000 Supplier Quality Management Specification (3) (1).pdfScope: Loading of SRO CIP Chemicals at Lethabo Power Station.
Requirements:
Compliance Requirements
Source: Latest 240-105658000 Supplier Quality Management Specification (3) (1).pdfMandatory compliance requirements:
Submission Guidelines
Source: Form B.pdfSubmit a signed Acknowledgement Form (Annexure B) confirming understanding of Eskom OHS requirements. Ensure all employees, including contractors/suppliers, undergo Eskom induction. Be prepared to provide copies of testimonials/references and client contact details (including Eskom) for similar past work if requested by Eskom. The main contractor/supplier must: demonstrate the process and selection criteria for appointing sub-contractors/suppliers; notify Eskom prior to sub-contractor/supplier appointment; ensure sub-contractors/suppliers have adequate resources and competencies; manage sub-contractors/suppliers to comply with legal and Eskom requirements; monitor sub-contractors/suppliers via audits/assessments for OHS compliance; provide grounds for termination of sub-contractor/supplier work; handle non-conformances directly with sub-contractors/suppliers.
Returnable Documents
Source: Form B.pdfSubmit a signed Acknowledgement Form (Annexure B) confirming understanding of Eskom OHS requirements. The form must include: Company/Supplier Name; Name of Authorised Person (CEO/Director/Managing Director); Signature; Date; Witness 1 and Witness 2 signatures.
Evaluation Criteria
Source: Form B.pdfGeneral: Must be a registered company (proof may be required). Must have prior experience in similar work (references/testimonials may be requested). Must comply with South African legal and statutory OHS requirements. Technical: Capability to handle SRO CIP Chemicals safely and in compliance with Eskom’s standards. Must have adequate resources (human, equipment) to perform the work. Must demonstrate processes for subcontractor/supplier management and OHS compliance.
Technical Specifications
Source: Form B.pdfScope: Loading of SRO CIP Chemicals at Lethabo Power Station. Main contractor/supplier must: demonstrate selection criteria for appointing sub-contractors/suppliers; notify Eskom prior to sub-contractor/supplier appointment; ensure sub-contractors/suppliers have adequate resources and competencies; manage sub-contractors/suppliers to comply with legal and Eskom requirements; monitor sub-contractors/suppliers via audits/assessments for OHS compliance; provide grounds for termination of sub-contractor/supplier work; handle non-conformances directly with sub-contractors/suppliers. Be prepared to provide testimonials/references and client contact details (including Eskom) for similar past work.
Compliance Requirements
Source: Form B.pdfMandatory compliance with: Eskom Contractor Health and Safety Requirements Standard 32-136; OHS specifications/requirements provided by Eskom; Occupational Health and Safety Act; Compensation for Occupational Diseases and Illnesses Act. Post-award: align company processes with Eskom’s OHS policies, procedures, and standards. Penalties apply for non-conformance by the main supplier or its sub-contractors/suppliers. Eskom may verify compliance and request evidence of past work. All employees (including contractors/suppliers) must undergo Eskom induction.
Important Dates
Source: Form A_Cat 2_ Loading of SRO CIP Chemicals at Lethabo Power Station (1).pdfClosing date: 04 February 2026. Quality and Audit Support Officer signature date: 04 February 2026.
Contact Information
Source: Form A_Cat 2_ Loading of SRO CIP Chemicals at Lethabo Power Station (1).pdfEskom’s Quality Representative: Risk and Assurance representative, Quality and Audit Support Officer. Tenderer must designate a Quality Representative (name, designation, date, signature required).
Submission Guidelines
Source: Form A_Cat 2_ Loading of SRO CIP Chemicals at Lethabo Power Station (1).pdfSubmit the completed and signed Form A (Template Identifier 240-43921804 Rev 3) to acknowledge acceptance of Eskom Supplier Quality Requirements (240-105658000) and ISO 9001 Standard. Include all returnable documents as per tender requirements. Failure to sign or submit Form A may result in disqualification.
Returnable Documents
Source: Form A_Cat 2_ Loading of SRO CIP Chemicals at Lethabo Power Station (1).pdfTenderer must complete and sign Form A to acknowledge acceptance of Eskom Supplier Quality Requirements (240-105658000) and ISO 9001 Standard.
Evaluation Criteria
Source: Form A_Cat 2_ Loading of SRO CIP Chemicals at Lethabo Power Station (1).pdfEvaluation includes: Compliance with ISO 9001 clauses (4-10: Context of Organisation, Leadership, Planning, Support, Operation, Performance Evaluations, Improvement). Adherence to Eskom’s specified quality requirements (240-105658000). Technical experience in handling SRO CIP Chemicals and safety/quality protocols. Main Supplier and Sub-supplier Capability and Capacity Assessment (if applicable).
Technical Specifications
Source: Form A_Cat 2_ Loading of SRO CIP Chemicals at Lethabo Power Station (1).pdfScope: Loading of SRO CIP Chemicals at Lethabo Power Station. Category 2 (clause 3.5-105658000) applies. Post-Contract Award requirements: Contract Execution, Supplier Quality Performance Monitoring, Eskom Rights of Access, Eskom Rights to Information, Preservation, Quality Audits, and Management of Nonconformities. ISO 9001 clauses 4-10 are applicable (Context of Organisation, Leadership, Planning, Support, Operation, Performance Evaluations, Improvement).
Quality Management
Source: Form A_Cat 2_ Loading of SRO CIP Chemicals at Lethabo Power Station (1).pdfPre-Contract Award Quality Requirements: Category 2 (clause 3.5-105658000) applies. Only one category may be selected. Site assessment applicability must be indicated. Main Supplier and Sub-supplier Capability and Capacity Assessment (clause 3-105658000) may apply. Post-Contract Award: Contract Execution and Supplier Quality Performance Monitoring Phase (clause 3.7-105658000). ISO 9001 Standard: All clauses (4-10) and principles (1-7) are applicable.
Compliance Requirements
Source: Form A_Cat 2_ Loading of SRO CIP Chemicals at Lethabo Power Station (1).pdfMandatory compliance with Eskom Supplier Quality Requirements (240-105658000) and ISO 9001 Standard. Tenderer must complete and sign Form A to confirm acceptance. Eskom retains rights to: Access, Information, Preservation, Quality Audits, and Management of Nonconformities. Special Processes (clause 3.8-105658000) apply.
Contractual Terms
Source: Form A_Cat 2_ Loading of SRO CIP Chemicals at Lethabo Power Station (1).pdfEskom retains rights to: Access, Information, Preservation, Quality Audits, and Management of Nonconformities and Nonconforming Outputs. Special Processes (clause 3.8-105658000) apply.
Section
Source: Form A_Cat 2_ Loading of SRO CIP Chemicals at Lethabo Power Station (1).pdfEskom’s Quality Representative: Risk and Assurance representative, Quality and Audit Support Officer (signature dated 04 February 2026). Tenderer must designate a Quality Representative (name, designation, date, signature required).
Important Dates
Source: SRO CIP NEC.pdfCompletion date for the whole of the works: Six months from the official start date. Defects date: 52 weeks after completion. Defect correction period: 4 hours for defects affecting system availability; 2 weeks for latent defects or non-critical defects. Assessment interval for payments: Between the 25th of each month and the date of the signed assessment. Payment due: 30 calendar days after signed assessment and valid tax invoice (60 days for contracts above R50,000,000). Starting date: To be announced (TBA). First programme submission: Within two weeks of the Contract Date. Revised programmes: Submitted at intervals no longer than one week.
Contact Information
Source: SRO CIP NEC.pdfProject Manager and Supervisor: Based at Lethabo Power Station, Deneysville Rd, Viljoensdrift. Employer: Eskom Holdings SOC Ltd, Registered office at Megawatt Park, Maxwell Drive, Sandton, Johannesburg. Submission address for signed documents: Lethabo Power Station, Deneysville Vaal Dam Road, Vereeniging, 1930.
Submission Guidelines
Source: SRO CIP NEC.pdfSubmit the following returnable documents: Form of Offer and Acceptance (C1.1), signed by a duly authorised representative of the tenderer. The Employer accepts the offer by signing the Acceptance part of the form and returning one copy, including the Schedule of Deviations (if any), to the tenderer. Ensure all deviations from tender documents are recorded in the Schedule of Deviations. Alternative tenders require a separate Form of Offer and Acceptance. Submit pricing data in Part C2 (Pricing Data).
Evaluation Criteria
Source: SRO CIP NEC.pdfGeneral requirements: Must be a registered entity (CIDB registration required). Must comply with South African company laws and Eskom’s tender conditions. Must demonstrate technical and financial capability to execute the project. Specific requirements: Experience in designing, supplying, and installing chemical handling systems (preferably for power stations or industrial facilities). Compliance with B-BBEE requirements (current verification certificate required). Ability to provide required insurances and guarantees (e.g., performance bond, parent company guarantee). Personnel must pass security clearance checks (criminal verification record required). Must adhere to Eskom’s health, safety, and environmental (HSE) policies.
Technical Specifications
Source: SRO CIP NEC.pdfScope: Design, manufacturing, supply, installation, quality assurance, commissioning, and handover of the eductor system for the Spiral Reverse Osmosis (SRO) Chemical Cleaning in Place (CIP) system at Lethabo Power Station. The eductor system aims to reduce manual labour and improve safety for chemical loading and offloading. Key deliverables: Detailed design submission and approval, procurement of materials, fabrication (including Factory Acceptance Testing - FAT), delivery to site, construction of the whole works, commissioning and testing, training and configuration management, and safety file approval. Site access and safety: Safety File approval, safety induction, and access to plant area are required as per the accepted programme. Risk Register and Site Information are provided in Part 4 of the document. Completion of sectional works: Design and approvals, material purchase and delivery, manufacturing and FAT, construction, commissioning and SAT, training and drawings submission.
Financial Requirements
Source: SRO CIP NEC.pdfPricing: Option A (Priced contract with activity schedule) under NEC3 ECC3. Submit pricing data in Part C2. Payment terms: 30 calendar days after signed assessment and valid tax invoice (60 days for contracts above R50,000,000). Interest rate: Prime rate as quoted by Standard Bank of South Africa. Retention: 10% of every payment certificate. Advance payment: As per Option X14 (if applicable). Price adjustment for inflation: Base date is one month prior to tender closing date (Option X1). Bonds/guarantees: Performance Bond (Option X13), Parent Company Guarantee (Option X4), and Advance Payment Guarantee (if applicable). Currency: South African Rand. Delay damages: 2% per day of the Sectional Purchase Order Value for late completion, capped at 15% of the Sectional Purchase Order Value.
Compliance Requirements
Source: SRO CIP NEC.pdfB-BBEE: Contractor must notify Eskom within 7 days of any change in B-BBEE status and submit an updated verification certificate within 30 days. Failure to notify may result in contract termination or renegotiation. CIDB registration: Required (tenderer’s CIDB registration number must be provided in the Form of Offer). Joint ventures: Must notify Eskom of the key person authorised to bind the contractor and cannot alter the composition without Eskom’s written consent. Health and Safety: Contractor may be appointed as Principal Contractor under Construction Regulations 2014. Must comply with all applicable health, safety, and environmental laws. Insurance: Contractor must provide insurance as per Insurance Table A (e.g., loss of/damage to works, equipment, liability for bodily injury/death). Security Clearance: Criminal verification record security clearance certificates required for all personnel accessing Eskom sites (valid for 26-52 weeks, issued by SAPS-accredited providers). POPIA Compliance: Both parties must comply with the Protection of Personal Information Act (POPIA) for shared personal information. Asbestos: Employer ensures ambient air meets asbestos safety standards; contractor may stop work if unsafe conditions are identified. Ethics: Prohibited actions (coercive, collusive, corrupt, fraudulent, obstructive) are not allowed. Contractor must cooperate with investigations into alleged prohibited actions.
Submission Guidelines
Source: Eskom Standard Conditions of Tender.pdfReturnable Documents: Not specified in the provided text.
Submission Guidelines
Source: 375-LET-AABB-D00138-178 Lethabo PS Loading of SRO CIP Chemicals.pdfSubmit the following returnable documents with your bid: Quality Control Plan (QCP), method statement, project schedule, and all design/technical documentation as per Vendor Document Submittal Schedule (VDSS). Ensure QCP is approved by Employer 14 days before work commencement. Include intervention points for Employer during manufacturing, installation, and commissioning. Provide transmittal letters with each document submittal, including document/drawing number, revision number, and title. QCP must include: approval signatures from Employer’s Engineering, Employer’s QC, and Contractor’s representative; hold/witness points for Employer’s QC (e.g., QCP approval, consumables review, commissioning assistance, final sign-off, data book review); and proof that permits are established before work starts.
Evaluation Criteria
Source: 375-LET-AABB-D00138-178 Lethabo PS Loading of SRO CIP Chemicals.pdfGeneral criteria: Contractor must have experience in power station projects, particularly with chemical handling systems. Compliance with South African legislation (OHSACT, SANS) and Eskom’s internal standards is mandatory. Ability to provide professional engineering certification for designs. Demonstrated capacity for quality management (ISO 9001 alignment preferred). Financial and technical capability to execute the project within the specified timeline. Specific criteria: Proven track record in mechanical, C&I, electrical, and civil works for industrial/utility projects. Experience with hazardous chemical handling and safety protocols. Ability to work in a controlled disclosure environment (Eskom’s EDMS). Willingness to appoint an Authorised Supervisor (AS) for on-site work.
Technical Specifications
Source: 375-LET-AABB-D00138-178 Lethabo PS Loading of SRO CIP Chemicals.pdfScope: Design, manufacture, supply, install, commission, and handover a chemical loading system for SRO CIP Chemicals at Lethabo Power Station to minimize manual handling and improve safety. Key deliverables: (1) Chemical handling and storage system with eductor for dry/wet chemicals (max 625 kg/hr dry, 420L/hr wet). (2) Mechanical: Pumping/piping (150NB, PN16, EN 13480), valves (butterfly/non-return/ball), eductor (PN10, 500kPa, 162m³/hr motive water), bunded area (SANS 10089/310). (3) C&I: Local pressure gauges, Siemens S7-300 PLC integration, Wonderware InTouch SCADA. (4) Electrical: Compliance with Eskom standards (240-56227443, 240-56356396). (5) Civil: Foundations, structural design (240-56364545). Standards: OHSACT, SANS (10108, 10142, 347, 10227), Eskom standards (e.g., 240-89147446, 240-56355754). Testing: Factory Acceptance Test (FAT) for pumps, Site Integration Test (SIT), commissioning. Training: On-site for 8 operators, 6 maintenance (2 electrical, 2 C&I, 2 mechanical), 6 engineering (2 electrical, 2 C&I, 2 mechanical), 6 chemistry staff. Documentation: As-built drawings, data books, maintenance/operating manuals, cable schedules, earthing test results. Additional requirements: Contractor must provide method statement and project schedule with tender submission. Contractor must appoint its own Authorised Supervisor (AS) to execute project scope. All flanged connections must use non-asbestos gaskets (MSDS required) and bolts torqued to 60% yield strength in a star sequence.
Compliance Requirements
Source: 375-LET-AABB-D00138-178 Lethabo PS Loading of SRO CIP Chemicals.pdfCompliance with OHSACT 1993, SANS standards (10108, 10142, 347, 10227), Eskom Generation Plant Safety Regulations, and site-specific procedures. Provide Material Safety Data Sheets (MSDS) for all chemicals and gaskets. Non-asbestos gaskets required. Waste management must align with Lethabo Power Station’s procedures (LBE22004, LBA00174) and Eskom Waste Standard (32-245). Quality Control Plan (QCP) must be approved by Employer’s QC and Engineering. All permits must be established before work commencement. Professional engineering certification required for civil works (ECSA registered engineer for design sign-off). Contractor must comply with Eskom SHEQ Policy and environmental standards (240-56031741, 240-56031742).
Contact Information
Source: Annexure C1 OHS Tender Evaluation (High risk).pdfEskom OHS Representative (Designation, Signature, Date). Development Team contact: Diane Maunatlala.
Submission Guidelines
Source: Annexure C1 OHS Tender Evaluation (High risk).pdfSubmit the following returnable documents: 1) Signed acknowledgement of Eskom's OHS legal and other requirements (Annexure B). 2) Health and Safety Plan addressing project/scope OHS risks, aligned with Eskom’s health and safety specifications. 3) Detailed OHS costing (broken down, not lump sum), based on the scope of work and risk assessment. 4) Baseline OHS Risk Assessment (BRA) with methodology. 5) Valid Letter of Good Standing (COIDA or equivalent). 6) OHS policy signed by CEO, compliant with OHS Act Section 7. 7) Proof of OHS competency (CVs, qualifications/certificates) relevant to scope, risks, and OHS plan.
Returnable Documents
Source: Annexure C1 OHS Tender Evaluation (High risk).pdfAdditional OHS tender returnables may be required based on the scope of work. These must be evaluated prior to contract award. If not applicable, this section is to be deleted.
Evaluation Criteria
Source: Annexure C1 OHS Tender Evaluation (High risk).pdfMandatory requirements: Submission of all OHS tender returnables (Annexure C1), compliance with Eskom’s OHS legal requirements, valid COIDA registration, proven OHS competency for high-risk chemical handling, signed OHS policy from the applicant’s CEO. Evaluation basis: Completeness and accuracy of OHS documentation, alignment of Health and Safety Plan with scope risks, adequacy of OHS costing breakdown, validity and relevance of BRA methodology, authenticity of competency proofs. Recommendation: Bidders will be marked as Recommended or Not Recommended based on compliance.
Technical Specifications
Source: Annexure C1 OHS Tender Evaluation (High risk).pdfScope: Loading of SRO CIP Chemicals at Lethabo Power Station. Technical requirements: 1) Health and Safety Plan must address project-specific OHS risks. 2) Baseline OHS Risk Assessment (BRA) must identify, assess, and manage OHS risks for the scope, including methodology. 3) OHS competency must align with scope, risks, and OHS plan. 4) All OHS documentation must comply with Eskom’s specifications and OHS Act Section 7.
Experience & Qualifications
Source: Annexure C1 OHS Tender Evaluation (High risk).pdfOHS competency requirements: Submit CVs and qualifications/certificates demonstrating competency for the scope of work, risks, and OHS plan. Competencies must align with high-risk chemical handling at Lethabo Power Station.
Financial Requirements
Source: Annexure C1 OHS Tender Evaluation (High risk).pdfSubmit detailed costing for OHS management, broken down (not lump sum). Costing must be based on the overall scope of work and risk assessment. Use the scope of work and risk assessment as a guideline for the cost breakdown.
Compliance Requirements
Source: Annexure C1 OHS Tender Evaluation (High risk).pdfHealth & Safety
Source: Annexure C1 OHS Tender Evaluation (High risk).pdfAdditional OHS requirements: For explanatory notes, refer to Annexure A: Supplier Risk Category (Document 240-77433139).
Section
Source: Annexure C1 OHS Tender Evaluation (High risk).pdfEvaluation outcome: Bidders will be marked as Recommended or Not Recommended based on compliance with OHS tender returnables, OHS legal requirements, COIDA registration, OHS competency, and signed OHS policy.
Description
Source: E-tendering Help Manual for supplier - 27 January 2025.pdfEskom eTendering system is a web-based platform for uploading tender documents. It replaces manual submissions at Eskom tender offices. Suppliers must register (CSD number required) and verify via OTP sent to email and phone. Closed tenders are sent directly to pre-selected suppliers via email.
Important Dates
Source: E-tendering Help Manual for supplier - 27 January 2025.pdfClosing date: 12 June 2026 at 11:00. No other dates (e.g., briefings, site visits, clarification deadlines) specified.
Contact Information
Source: E-tendering Help Manual for supplier - 27 January 2025.pdfFor system issues: Contact the buyer responsible for the published tender. Automated submission confirmations sent from: [email protected]. No direct SCM/technical contact details provided.
Submission Guidelines
Source: E-tendering Help Manual for supplier - 27 January 2025.pdfSubmit via Eskom eTendering portal (https://eTendering.eskom.co.za). Steps: 1) Register on the portal (CSD number required). 2) Verify email and OTP sent to phone/email. 3) Select tender reference number (E2782GXMPLETR). 4) Click 'Create New Submission'. 5) Upload documents under correct categories (Technical, Commercial, Finance, etc.), naming each file and selecting its type. 6) Ensure individual files ≤50MB and total submission ≤900MB. 7) Click 'Finalize Submission' and confirm. 8) Save the submission confirmation email (includes submission ID and timestamp) for records. Disqualification risk: Incomplete or incorrectly categorized submissions.
Returnable Documents
Source: E-tendering Help Manual for supplier - 27 January 2025.pdfUpload required tender documents by: 1) Naming the file. 2) Selecting the file type (e.g., Technical, Commercial, Finance). 3) Choosing the file to upload. 4) Clicking 'Upload'. Verify all documents are uploaded under the correct category before finalizing. Individual files ≤50MB; total submission ≤900MB. Save the confirmation email with submission ID for records.
Evaluation Criteria
Source: E-tendering Help Manual for supplier - 27 January 2025.pdfEvaluation criteria not explicitly stated. Access requires: 1) Registration on Eskom’s eTendering system with a valid CSD number. 2) Verified email and South African cellphone number for OTP authentication. For closed tenders, only pre-selected suppliers meeting Eskom’s criteria receive direct invitations via email.
Technical Specifications
Source: E-tendering Help Manual for supplier - 27 January 2025.pdfScope: Loading of SRO CIP Chemicals at Lethabo Power Station. Submission is electronic only via eTendering portal. No additional technical deliverables, standards, or service levels specified.
Compliance Requirements
Source: E-tendering Help Manual for supplier - 27 January 2025.pdfCSD (Central Supplier Database) number is mandatory to access the eTendering system. No other compliance requirements (e.g., B-BBEE, CIDB, tax clearance) explicitly stated.
Section
Source: E-tendering Help Manual for supplier - 27 January 2025.pdfTo reset a forgotten password: 1) Click 'Forgot your password'. 2) Enter an alternative email for the new password. 3) Click the reset link in the confirmation email. 4) Enter and confirm the new password. 5) Verify via OTP sent to phone/email.
Important Dates
Source: Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdfIntegrity Pact-related submissions: 27 June 2023. Tender closing date: 12 June 2026 at 11:00.
Contact Information
Source: Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdfEthics office: [email protected]. Forensic office: [email protected]. Hotline: 0800 11 27 22 (confidential reporting).
Submission Guidelines
Source: Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdfSubmit the following for every Eskom procurement process: 1. Completed, signed Integrity Declaration Form. 2. Non-Disclosure Agreement (NDA) if accessing confidential information. Disqualification risks: 1. Deliberate misrepresentation of information or submission of false certifications/forged documents. 2. Failure to disclose conflicts of interest or relationships with Eskom employees/directors. 3. Engagement in collusion, bid-rigging, or anti-competitive practices. 4. Offering or accepting bribes, gifts, or inducements to influence tender outcomes (gifts must not exceed R1500). 5. Any dishonest, fraudulent, or corrupt practices during procurement or contract execution. Note: Eskom reserves the right to audit submitted information and impose sanctions, including suspension from the Vendor Database.
Evaluation Criteria
Source: Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdfSuppliers will be evaluated on: 1. Mandatory registration on Eskom’s Vendor Database. 2. Clean record: No prior convictions for fraud, corruption, or unethical business practices (non-compliance risks suspension). 3. Transparency: Willingness to disclose all required information (e.g., conflicts of interest, financial records). 4. Compliance: Alignment with Eskom’s policies on employment equity, labour practices, and ethical standards. 5. Technical capability: Demonstrated ability to handle SRO CIP Chemicals safely and in compliance with industry standards.
Compliance Requirements
Source: Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdfSuppliers must: 1. Read and understand the Eskom Supplier Integrity Pact. 2. Complete, sign, and submit the Integrity Declaration Form for every Eskom procurement process. 3. Complete a Non-Disclosure Agreement (NDA) if accessing confidential information. 4. Disclose any financial, personal, or private interest with Eskom employees/directors via the Integrity Declaration Form. 5. Declare any gifts or business courtesies exceeding R1500. 6. Avoid conflicts of interest, collusion, bid-rigging, or anti-competitive practices. 7. Report unethical behavior via [email protected], [email protected], or the hotline 0800 11 27 22.
Section
Source: Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdfReport unethical behavior to: Ethics office: [email protected]. Forensic office: [email protected]. Hotline: 0800 11 27 22 (confidential).
Description
Source: Tender Technical Evaluation Strategy _29 December 2025 (003).pdfProject involves the design, manufacture, installation, testing, and commissioning of a new CIP chemical loading system at Lethabo Power Station. The system aims to eliminate manual handling of hazardous chemicals, currently requiring operators to carry dry chemical bags up stairs to the CIP tank. The desalination plant at Lethabo uses UF and RO processes, with the CIP system cleaning membranes to restore performance. The new system must improve operator safety and minimize manual handling.
Submission Guidelines
Source: Tender Technical Evaluation Strategy _29 December 2025 (003).pdfMandatory returnable: Proof of ECSA registration (certificate + registration number) for the project lead discipline engineer (mechanical, Pr. Eng or Pr. Tech). Failure to submit this will result in immediate technical disqualification. All mandatory technical criteria are assessed on a yes/no basis—non-compliance with any criterion disqualifies the tender.
Evaluation Criteria
Source: Tender Technical Evaluation Strategy _29 December 2025 (003).pdfEvaluation is split into mandatory and qualitative criteria. Mandatory criteria: Must meet all 'must meet' criteria (e.g., ECSA registration for lead mechanical engineer, valid welding certifications, structural/electrical/instrumentation personnel qualifications). Non-compliance with any mandatory criterion results in disqualification. Qualitative criteria: Weighted scorecard approach with a minimum threshold of 70% required to pass. Key qualitative areas: Process requirements (20%): Basic process flow diagram (PFD), programme of works (manufacturing/installation time ≤35 days), training plan with proof of competent trainers. Mechanical/Equipment (30%): High-level construction method statement, welding certifications (ISO 3834-2 or HDPE standard), lead mechanical engineer CV with piping design experience. Civil/Structural (10%): Method statement for design/construction (plinth/foundation, corrosion protection, bund wall), lead structural engineer CV (≥5 years experience, ECSA registration). Electrical (20%): Methodology compliance, load list/cable sizes, electrical technician (trade test + ≥4 years experience). C&I (20%): Datasheets for pressure gauges/chemical seals, instrument technician CV (≥5 years experience).
Technical Specifications
Source: Tender Technical Evaluation Strategy _29 December 2025 (003).pdfScope: Design, manufacture, install, test, and commission a new CIP (Clean In Place) chemical loading system at Lethabo Power Station to eliminate manual handling of hazardous chemicals. Current process requires operators to carry dry chemical bags up stairs to the CIP tank, creating safety risks. Key deliverables: Detailed design and engineering of the system. Manufacturing of all components. Decommissioning/removal of existing equipment where applicable. Installation: Welding of sampling lines, valves, and probes; provision of scaffolding; installation of C&I and electrical equipment. Testing and commissioning of the installed system. Supply of manuals and specifications for the new system. Training: Theoretical and practical training for Chemical Services, Maintenance, and Operating staff. Context: Lethabo Power Station (Free State) operates a desalination plant (500 m³/h capacity) using ultrafiltration (UF) and reverse osmosis (RO) processes. The CIP system cleans membranes to restore performance. The new system must minimize manual handling and improve operator safety.
Compliance Requirements
Source: Tender Technical Evaluation Strategy _29 December 2025 (003).pdfMandatory compliance: Project lead discipline engineer (mechanical) must be professionally registered with ECSA (Pr. Eng or Pr. Tech). Proof of registration (certificate + number) must be submitted. Failure to comply results in technical disqualification. Structural: Lead Structural Design Engineer/Technologist must have ≥5 years relevant design experience and be ECSA-registered as Professional Engineer or Technologist. If subcontracted, a signed letter of intent specifying roles/responsibilities is required. Welding: ISO 3834-2 certification required for steel piping. For HDPE piping, the fusion welding standard to be used must be explicitly stated. Electrical: Electrical Technician must possess a trade test and have ≥4 years of experience. C&I: Instrument Technician must have ≥1 year of relevant experience (scoring increases with experience: 1-2 years = partial, ≥5 years = full).
Important Dates
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdfClosing date for submission of the E-Tendering Training Acknowledgement Form: 27 January 2025.
Submission Guidelines
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdfMandatory returnable: Submit a fully completed E-Tendering Training Acknowledgement Form (Template ID: 240-9722574 Rev 1) to Eskom. Required fields: Enquiry number, business name/JV, contact person, landline, cellphone, email, tenderer’s name, acknowledgment of self-training (via E-Tendering Noddy Guide, video, or clarification meeting), authorized signature, designation, and date. Failure to submit this form fully completed within the prescribed period will disqualify the bidder.
Returnable Documents
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdfMandatory returnable document: E-Tendering Training Acknowledgement Form (Template ID: 240-9722574 Rev 1). Required fields: Enquiry number, business name/JV, contact person, landline, cellphone, email, tenderer’s name, acknowledgment of self-training (via E-Tendering Noddy Guide, video, or clarification meeting), authorized signature, designation, and date. Failure to fully complete and submit this form within the prescribed period will disqualify the bidder.
Evaluation Criteria
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdfEvaluation is based on responsiveness. Mandatory criteria: 1) Applicant must undergo and acknowledge self-training for the e-Tendering system. 2) The acknowledgment form must be fully completed and submitted within the prescribed period. Non-compliance with either criterion results in disqualification.
Compliance Requirements
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdfMandatory compliance: Fully complete and submit the E-Tendering Training Acknowledgement Form to Eskom within the prescribed period. Non-compliance will render the tenderer non-responsive and result in disqualification from the procurement process.
Important Dates
Source: Invitation to Tender (ITT) SRO Project.pdfClosing date: 12 June 2026 at 10:00 AM. Non-compulsory clarification meeting: 03 June 2026 at 10:00 AM via Microsoft Teams (link: Clarification Meeting : Loading of SRO CIP Chemicals at Lethabo Power Station E2782GXMPLETR | Meeting-Join | Microsoft Teams). Confirm attendance by email to [email protected] by 02 June 2026 at 15:00. Clarification queries deadline: 5 working days before closing (05 June 2026). Tender validity period: 120 days from closing date.
Contact Information
Source: Invitation to Tender (ITT) SRO Project.pdfEskom Representative: Carron Mashilwane. Tel: 016 457 5514. Email: [email protected]. Secondary contact: Simon Ndlakuse, Email: [email protected]. Submission portal: Eskom E-Tendering (Eskom Tender Bulletin). Fraud/corruption reporting: 0800 11 2722 or [email protected].
Submission Guidelines
Source: Invitation to Tender (ITT) SRO Project.pdfSubmit electronically via Eskom E-Tendering portal (Eskom Tender Bulletin) by 12 June 2026 at 10:00 AM. No hard copies or zipped files accepted. Upload documents under folders: Technical, Commercial, Financial, and Other. All documents must be in PDF format (max 500MB per file, total submission ≤4GB). Price list must be submitted in both PDF and Excel. Latest submission overrides previous versions. Ensure submission status is marked as 'complete'. Mandatory disqualifiable returnables at closing: Authorisation Form (Annexure A), Acknowledgement Form (Annexure B), Tenderer’s Particulars (Annexure C), Integrity Declaration (Annexure D), SBD 6.2 (Annexures G1-G4), SBD 1 (Annexure H), SBD 6.1 (Annexure I), SBD 4 (Annexure J), Tax Evaluation Questionnaire, CIDB proof (3ME or higher), ECSA registration certificate for lead engineer (Pr. Eng/Pr. Tech), and pricing schedule. Non-submission of these by deadline = disqualification. Non-disqualifiable returnables: If incomplete or missing, Eskom may request resubmission within 5 working days; failure to comply = disqualification. No public tender opening; tenders downloaded electronically.
Evaluation Criteria
Source: Invitation to Tender (ITT) SRO Project.pdfEligibility: Must not be on Tender Defaulters List, National Treasury restrictions, or Eskom restrictions. No 100% subcontracting of scope. No conflict of interest (e.g., shared majority shareholders, access to competitor info). Tenderers from sanctioned countries are ineligible. Only one tender per entity (except e-tendering size limits). Documentation: Valid CIDB 3ME+ grading (main contractor/JV/subcontractor). Signed JV agreement (if applicable) with joint liability. Proof of ECSA registration for lead engineer. Valid B-BBEE certificate/affidavit (as per revenue thresholds). Tax clearance certificate (or SARS PIN for verification). COIDA certificate (Safety compliance). Scoring: Functionality criteria (70% qualitative threshold; failure to meet = disqualification). Price evaluated out of 80 points (inclusive of VAT, corrected for errors, excluding contingencies). Specific Goals (PPPFA) scored out of 20 points (B-BBEE status levels: 1=20, 2=18, 3=14, 4=12, 5=8, 6=6, 7=4, 8=2, non-compliant=0). Total score = Price + Specific Goals, rounded to two decimal places. Objective criteria may justify awarding to a non-highest scorer. Local content: Designated components require 100% local content (e.g., joining components, wire products, fasteners, structural steel, cement, reinforcing bars, HDPE/steel pipes).
Technical Specifications
Source: Invitation to Tender (ITT) SRO Project.pdfScope: Loading of SRO CIP Chemicals at Lethabo Power Station. Mandatory technical requirement: Project lead discipline (Tender Engineer Mechanical) must be professionally registered with ECSA (Pr. Eng or Pr. Tech). Proof of registration (certificate + number) must be submitted. Functionality criteria apply (70% qualitative threshold; failure to meet = disqualification). Designated local content components (if applicable) include: Joining/connecting components (100%), wire products (100%), fasteners (100%), fabricated structural steel (100%), cement (100%), reinforcing bars (100%), HDPE pipes (100%), steel pipes ≥150mm (100%). Local procurement content target: 100%. Subcontracting: 15% of scope must be allocated to EME/QSE with ≥51% black ownership (non-subsidiary, preferably local to site). Job creation/retainment proposals required. Cataloguing information may be required post-award (Eskom pays for this).
Financial Requirements
Source: Invitation to Tender (ITT) SRO Project.pdfPricing must be inclusive of VAT, exclude contingencies, and allow for arithmetical error corrections. Unconditional discounts are considered in evaluation; conditional discounts applied at payment. Payment terms: ≤R50M contracts: 30 days from undisputed invoice receipt. >R50M contracts: 60 days from undisputed invoice receipt. Pricing schedule must be submitted in PDF + Excel. SDL&I penalty: 1% of contract value for non-compliance. Eskom retains 1% of each invoice (excluding VAT) as security for SDL&I obligations; released upon fulfilment. Quarterly SDL&I compliance reports required. SDL&I Implementation Schedule due 28 days post-award.
Compliance Requirements
Source: Invitation to Tender (ITT) SRO Project.pdfMandatory: CSD registration (CSD number/report), CIDB grading 3ME or higher (valid proof required at closing), COIDA certificate of good standing (South African tenderers only), tax clearance certificate (local tenderers without SARS PIN/CSD profile; foreign tenderers with SA footprint without CSD/SARS PIN), Employment Equity compliance proof (if designated employer), ECSA registration for lead engineer, SBD forms (1, 4, 6.1, 6.2), Integrity Pact Declaration, and valid B-BBEE certificate/sworn affidavit (EME: ≤R10M revenue; QSE: ≤R50M revenue, unless ≥51% black-owned; >R50M: SANAS certificate). Joint ventures: All members must be CIDB-registered; lead partner must have ≥3ME or one level below; combined grading must meet tender value. Additional: SHEQ requirements (see SHEQ folder), financial statements (audited/management accounts, no drafts), public interest score (if not audited), ITA34C for current/previous years (if not audited). B-BBEE Improvement Plan required within 30 days of contract award (milestones: Level 4→3 in Year 1; Level 5-8→4 in Year 1, then improve one level annually).
Important Dates
Source: Supplier Evaluation Pack Template for 01 March 2023 to 29 February 2024.pdfClosing date: 12 June 2026 at 11:00. Pack is valid for the 2023/2024 tax year (1 March 2023 to 28 February 2024).
Contact Information
Source: Supplier Evaluation Pack Template for 01 March 2023 to 29 February 2024.pdfFor submissions or queries, contact your Eskom contractor representative. Copy Group Tax at: [email protected]. For tax-related clarifications, consult Eskom’s Corporate Tax Department in Megawatt Park.
Submission Guidelines
Source: Supplier Evaluation Pack Template for 01 March 2023 to 29 February 2024.pdfSubmit the completed Pack (signed summary sheet and signed affidavits) to your Eskom contractor representative. Copy Group Tax via email: [email protected]. Failure to sign required affidavits (e.g., Appendix 1, 2, 3, 4, 7, or 8) will result in PAYE being withheld from payments.
Evaluation Criteria
Source: Supplier Evaluation Pack Template for 01 March 2023 to 29 February 2024.pdfGeneral: Must be a registered entity (company, CC, trust) or individual in South Africa (or non-resident with Appendix 9). Must comply with South African tax laws and Eskom’s PAYE requirements. For Companies/CCs/Trusts: Must employ 3+ full-time employees (non-connected to shareholders/members/beneficiaries) OR pass other independence tests (e.g., <80% income from Eskom, no control/supervision by Eskom). Must not have connected persons rendering services to Eskom unless declared. Must sign Appendix 8 if classified as an Independent Contractor. For Individuals: Must provide a service (not people) to Eskom OR be a Labour Broker with a valid IRP30 certificate. Must pass Residence Test, Employees Exclusion Test, Place/Control Test, or Dominant Impression Test to avoid PAYE withholding. Must sign Appendix 5 if providing a service (not people). Exclusions: Contractors failing to meet independence criteria (e.g., >80% income from Eskom, services controlled by Eskom) will have PAYE withheld (Appendix 7). Labour Brokers without an IRP30 certificate will have PAYE withheld.
Technical Specifications
Source: Supplier Evaluation Pack Template for 01 March 2023 to 29 February 2024.pdfScope: Loading of SRO CIP Chemicals at Lethabo Power Station. The document is a PAYE Questionnaire for Eskom service contracts, designed to determine tax classification (Independent Contractor, PSP, Labour Broker, or Dependent Contractor) based on the Income Tax Act. It does not specify technical deliverables for the chemical loading service.
Compliance Requirements
Source: Supplier Evaluation Pack Template for 01 March 2023 to 29 February 2024.pdfTax compliance: Must complete and sign the PAYE Questionnaire (Evaluation Pack A for Companies/CCs/Trusts or Pack B for Individuals) to determine tax status. Required affidavits/declarations (Appendices 1-9) must be signed to avoid PAYE withholding. Non-residents must sign Appendix 9. Labour Brokers must provide a valid IRP30 exemption certificate (Appendix 6) to avoid PAYE withholding. Contractors must notify Eskom of any changes in their status or information provided.
Submission Guidelines
Source: Category 2 Quality.pdfSubmit the following returnable documents by the closing date: Form A (completed and signed), Draft Contract Quality Plan (specific to the scope of work, per ISO 10005), Quality Control Plan/Checklist/Inspection and Test Plan (ITP) aligned with the scope of work (include an example from similar or previous work), Product/Service Risk Register (excluding Safety Baseline Risk Assessment), and verifiable proof of successful execution of a similar-sized project in an industrial environment (not older than 2 years) including lessons learned.
Evaluation Criteria
Source: Category 2 Quality.pdfMandatory: Compliance with ISO 9001 (certified by an accredited body OR documented QMS compliant with ISO 9001:2015), submission of all tender returnable documents, evidence of technical capability (e.g., similar project history), and valid legal/operational documentation. Preferred: Experience in chemical loading projects (especially in power stations or industrial settings) and accredited certifications from recognized bodies. Scoring: Section A (Quality Management System) max 4 points (Option 1) or 2 points (Option 2), Section B (QMS in operation) max 3 points, Section C (Contract Quality Plan) 1 point, Section D (Quality Control Plan) 1 point, Section E (Additional Requirements) max 3 points.
Technical Specifications
Source: Category 2 Quality.pdfScope: Loading of SRO CIP Chemicals at Lethabo Power Station. Deliverables: Operational plan for provision of services (per ISO 9001:2015 Clauses 6, 7, 8), documented control of nonconforming outputs and customer complaints (per Clause 8.7), Draft Contract Quality Plan (per ISO 10005), Quality Control Plan/Checklist/ITP (aligned with scope of work), Product/Service Risk Register (excluding Safety Baseline Risk Assessment), and verifiable proof of similar project execution in an industrial environment (≤2 years old) with lessons learned.
Compliance Requirements
Source: Category 2 Quality.pdfISO 9001 certification (Option 1): Valid certificate from an accredited body, with product/service scoping defined and relevant, issued by an approved and authorized certification authority with recognized international accreditation, and not expired. OR ISO 9001 compliance (Option 2): Documented QMS compliant with ISO 9001:2015 (Clauses 6, 7, 8 for operational plan, Clause 8.7 for nonconforming outputs). Must demonstrate capability to deliver the Loading of SRO CIP Chemicals scope. Additional: Form A must be completed and signed.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Lethabo Power Station Situated ± 18 km South of Vereeniging on the Viljoensdrift-Deneysville Road, F - Vereeniging - Vereeniging - 1930
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
14
Last checked
12 Jul 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
💡 Want more tendering tips and strategies?
Explore Our BlogMedian Estimate
R 240 120
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Get deep intelligence on Services: General. Unlock full pricing strategies, bid frequency, and historical win rates.