Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Grootvlei Power Station - Grootvlei - Balfour - 2024
Organization Type
GOVERNMENT
Published
29 May 2026
OCDS Reference
ocds-9t57fa-157652
This tender invites suppliers to provide and deliver turbine control system spares for eskom’s grootvlei power station over a five-year period. IT is an open bid targeting compliant suppliers capable of meeting technical, commercial, and b-bbee requirements.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Monday, 15 June 2026 - 11:00
Venue
null
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Categories
Request for Bid(Open-Tender)
Grootvlei Power Station - Grootvlei - Balfour - 2024
Recommended Certifications
Having these can improve your winning chances: SABS Product Certification, NRCS Certification
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Documents being finalised: 240-105658000 Supplier Quality Management Specification.pdf, 240-68099512 (Rev 9) Form A Tender & Contract - Turbine Control System (TCS) instrumentation.pdf, C1 2a SC3 Data by Purchaser.docx and 22 more. You don’t need to refresh — this page will pick up the updated review automatically.
29 May
2026
Tender Published
Tender was published
15 Jun
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
C1 1 SC3 Offer Acceptance.pdf
ESKOM tender for the supply and delivery of Turbine Turbovisory equipment and field Instrumentation at Grootvlei Power Station for a 5-year period on an 'as and when required' basis. This is Part C1.1 (Form of Offer & Acceptance) of the procurement documentation, establishing the contractual framework between ESKOM Holdings SOC Ltd and the successful supplier.
Invitation to Tender (ITT) - Turbine Centreline Spares.pdf
Eskom invites tenders for the supply and delivery of turbine control system spares to Grootvlei Power Station for a five-year period. The tender is an open invitation, valued between R1m and R50m, and follows the 80/20 preferential procurement system. Submission is electronic-only via Eskom's e-tendering portal.
C3 1 SC3 Purchasers Goods Information.docx
Eskom seeks a supplier for the supply and delivery of Turbine Control System spares (Turbovisory equipment and field instrumentation) to Grootvlei Power Station on an as-and-when-required basis for a 5-year period. The contract involves 40+ specific, technically detailed items including sensors, transmitters, relays, transducers, thermocouples, and monitoring modules. Key obligations include on-demand delivery, strict compliance with technical specifications, adherence to Eskom's safety, quality, and environmental standards, and mandatory subcontracting of 5% of contract value to designated black-owned enterprises.
Annexure B.pdf
This document is Annexure B of a tender for supplying turbine control system spares to Grootvlei Power Station over five years. It focuses on Occupational Health and Safety (OHS) legal and compliance requirements that suppliers/contractors must acknowledge and adhere to when working for Eskom.
GVLF 0183 Environmental Evaluation Form (revised).docx
Eskom tender for supply and delivery of turbine control system spares at Grootvlei Power Station for a 5-year period, with mandatory environmental compliance evaluation.
C2 SC3 Pricing Data - Copy.pdf
Eskom Holdings SOC Ltd is inviting tenders for the supply and delivery of Turbine Control System Spares, specifically Turbine Turbovisory equipment and field instrumentation, for Grootvlei Power Station over a 5-year period. The contract is structured under the NEC3 Supply Contract framework, with pricing based on a detailed Price Schedule for various items, including monitors, sensors, amplifiers, transducers, thermocouples, and other instrumentation components. Payments are tied to lump-sum or rate-based pricing as per the schedule, with no adjustments unless a compensation event occurs.
C0 SC3 Contract cover pages.docx
Eskom is inviting tenders for the supply and delivery of Turbine Control System Spares (Turbovisory equipment and field instrumentation) for Grootvlei Power Station over a 5-year period. The contract follows the NEC3 Supply Contract (SC3) framework.
C1 2b SC3 Data by Supplier.pdf
ESKOM is seeking a supplier for the provision and delivery of Turbine Control System Spares, including Turbovisory equipment and field instrumentation, at Grootvlei Power Station over a five-year period. The contract is on an as-needed basis, with flexible delivery dates and a structured pricing schedule.
Annexure C2 Supplier OHS tender evaluation CI.pdf
Eskom is inviting tenders for the supply and delivery of Turbine Control System (TCS) spares at Grootvlei Power Station over a 5-year period. The tender includes strict Occupational Health and Safety (OHS) compliance requirements, with submissions evaluated based on OHS documentation and risk management plans.
240-12248652 (Rev 7) List of Tender Returnables - Turbine Control System (TCS) instrumentaton.pdf
The tender is for the supply and delivery of Turbine Control System (TCS) spares and associated proprietary subcomponents for Grootvlei Power Station over a 5-year period. Issued by Eskom, it requires compliance with ISO 9001-based Quality Management System (QMS) standards, documented evidence of operational QMS, and adherence to Eskom and national/international standards for materials and processes.
Squad Check meeting Minutes - Turbine Centreline Spares.docx
The tender is for the supply and delivery of Turbine Control System Spares at Grootvlei Power Station over a five-year period. The document outlines procedural, financial, technical, and compliance requirements, with a focus on aligning clauses with NEC standards, clarifying pricing and delivery terms, and ensuring OHS, environmental, and quality standards are met.
GVL0799 Tender Technical Evaluation Strategy for the supply of Turbovisory Equipment and Field Instrumentation.pdf
This tender, issued by Eskom, seeks the supply and delivery of Turbine Control System (TCS) spares, including Turbovisory Equipment and Field Instrumentation, for Grootvlei Power Station over a 5-year period. The goal is to ensure the availability of compatible spares (new or second-hand) to maintain system performance, addressing market constraints and supply risks for legacy modules. The evaluation process includes mandatory and qualitative technical criteria, with a minimum threshold of 70% for technical acceptance.
GVL 0651 Medium Risk Specification for Coal Stations (TCS).docx
This is an ESKOM Occupational Health and Safety (OHS) Specification document (Reference: GVL/0651, Revision 1) for the supply and delivery of Turbine Control System (TCS) spares at Grootvlei Power Station over a 5-year period. The document outlines mandatory health, safety, environmental, and quality requirements that contractors must comply with during the contract. It covers legal compliance, risk management, PPE requirements, training, incident investigation, emergency management, and Eskom's life-saving rules. The closing date is June 15, 2026 at 11:00 AM.
C0 SC3 Contract cover pages.pdf
Eskom is inviting tenders for the supply and delivery of Turbine Control System Spares, specifically Turbovisory equipment and field instrumentation, for Grootvlei Power Station over a 5-year period. The contract follows the NEC3 Supply Contract (SC3) framework and requires as-needed deliveries.
GVLF 0009 GVL 0799 Procedure Change Form for Tender Tech Eval Strategy for the Supply of Turbovisory Equipment.pdf
Eskom is inviting tenders for the supply and delivery of Turbine Control System Spares (including Turbovisory Equipment and Field Instrumentation) for Grootvlei Power Station over a 5-year period. The tender closes on June 15, 2026, and involves technical evaluation procedures as outlined in the provided documentation.
C2 SC3 Pricing Data.pdf
Eskom Holdings SOC Ltd is inviting tenders for the supply and delivery of various Turbine Turbovisory equipment and field instrumentation spares for Grootvlei Power Station over a 5-year period. The contract follows the NEC3 Supply Contract (SC3) framework, with pricing based on a detailed Price Schedule for listed items, including monitors, sensors, transducers, amplifiers, thermocouples, and other instrumentation components. Payments are structured as lump sums or rate-based quantities, with no adjustments for quantity variations unless a compensation event occurs.
240-68099512 (Rev 9) Form A Tender & Contract - Turbine Control System (TCS) instrumentation.pdf
Eskom tender for the supply and delivery of Turbine Control System (TCS) instrumentation and associated proprietary subcomponents for Grootvlei Power Station over a five-year period. The tender requires ISO 9001 compliance with Category 4 quality requirements focusing on supplier capability and capacity assessment.
C1 2b SC3 Data by Supplier.docx
Eskom is inviting tenders for the supply and delivery of Turbine Control System Spares at Grootvlei Power Station over a 5-year period. The tender requires suppliers to provide detailed contract data, pricing, delivery schedules, and risk management information.
C2 SC3 Pricing Data.docx
Eskom is seeking a supplier for the provision and delivery of Turbine Control System Spares at Grootvlei Power Station over a five-year period. The contract is structured under the NEC3 Supply Contract framework, with pricing based on a detailed Price Schedule. The tender includes a list of 35 specific spares, each with technical specifications, quantities, and unit types, requiring suppliers to provide competitive pricing for these items.
240-126469599_Method Statement template Rev2.docx
This is a tender document template from ESKOM for the supply and delivery of turbine control system spares at Grootvlei Power Station over a five-year period. The document outlines a structured method statement requiring detailed responses on scope, objectives, risk management, stakeholder engagement, and supplier capabilities. It is not a completed tender but a framework for bidders to demonstrate their approach to quality management, competency, infrastructure, and process improvement.
240-105658000 Supplier Quality Management Specification.pdf
The tender is for the supply and delivery of Turbine Control System Spares at Grootvlei Power Station over a 5-year period. Eskom requires suppliers to adhere to strict Quality Management System (QMS) standards, including ISO 9001 compliance, documented quality plans, and rigorous inspection/testing protocols. Suppliers must demonstrate capability in managing sub-suppliers, quality control, and compliance with Eskom’s technical and contractual requirements.
GVLF 0183 Environmental Evaluation Form (revised).pdf
This tender, issued by Eskom, is for the supply and delivery of Turbine Control System Spares at Grootvlei Power Station over a five-year period. The evaluation focuses on the supplier’s technical capabilities, environmental compliance, and adherence to safety and legal standards, including ISO 14001:2015 and NEMA requirements.
C1 2a SC3 Data by Purchaser.docx
Eskom is seeking a supplier for the provision and delivery of Turbine Control System Spares (Turbovisory equipment and field instrumentation) for Grootvlei Power Station over a 5-year period. The contract is governed by NEC3 Supply Contract terms, with specific clauses for inflation adjustments, legal changes, delay damages, and performance penalties. The supplier must comply with strict quality, delivery, and safety standards, including B-BBEE requirements, and adhere to Eskom’s additional conditions (Z-clauses).
C1 1 SC3 Offer Acceptance.docx
ESKOM tender for the supply and delivery of Turbine Control System Spares (Turbovisory equipment and field Instrumentation) at Grootvlei Power Station for a period of five (5) years. The contract will be governed by ESKOM's standard terms with pricing to be provided exclusive of VAT at 15%. The successful tenderer must provide securities, bonds, guarantees, and proof of insurance upon contract award.
C3 1 SC3 Purchasers Goods Information - Copy.docx
ESKOM tender for the supply and delivery of Turbine Control System Spares at Grootvlei Power Station for a period of five years on an as-and-when-required basis. The contract involves supplying various Turbine Turbovisory equipment and field instrumentation including sensors, transmitters, amplifiers, monitors, thermocouples, and related assemblies. The goods are specialized industrial control equipment for turbine plant applications requiring specific technical specifications and OEM part numbers.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Important Dates
Source: 240-105658000 Supplier Quality Management Specification.pdfClosing date: 15 June 2026 at 11:00 AM (SAST).
Contact Information
Source: 240-105658000 Supplier Quality Management Specification.pdfDepartment: Supply Chain Management (Quality Management). No specific contact details provided in the document.
Submission Guidelines
Source: 240-105658000 Supplier Quality Management Specification.pdfSubmit the following returnable documents as per the tender category (1-4) specified in Form A:
Evaluation Criteria
Source: 240-105658000 Supplier Quality Management Specification.pdfMandatory criteria:
Preferred criteria:
Technical Specifications
Source: 240-105658000 Supplier Quality Management Specification.pdfScope: Supply and delivery of Turbine Control System Spares for Grootvlei Power Station over 5 years.
Key requirements:
Compliance Requirements
Source: 240-105658000 Supplier Quality Management Specification.pdfMandatory compliance requirements:
Important Dates
Source: 240-68099512 (Rev 9) Form A Tender & Contract - Turbine Control System (TCS) instrumentation.pdfDocument review date: January 2027. No other dates are specified in this document. Closing date is provided in the tender listing (2026-06-15).
Contact Information
Source: 240-68099512 (Rev 9) Form A Tender & Contract - Turbine Control System (TCS) instrumentation.pdfEskom Quality Representative: Mmaphuti Moloto (QA Officer). No email, phone, or submission address provided in this document.
Submission Guidelines
Source: 240-68099512 (Rev 9) Form A Tender & Contract - Turbine Control System (TCS) instrumentation.pdfNo submission instructions, required forms, or returnables are specified in this document. Bidders must refer to the full tender advertisement or accompanying tender documentation for submission requirements, including how and where to submit, deadlines, and disqualification risks.
Evaluation Criteria
Source: 240-68099512 (Rev 9) Form A Tender & Contract - Turbine Control System (TCS) instrumentation.pdfTenderers must: - Select only one applicable quality category (Category 4 is marked as applicable). - Demonstrate Main Supplier and Sub-supplier Capability and Capacity. - Comply with Eskom’s standard conditions, including: quality audits, rights of access, rights to information, preservation, and management of nonconformities. - Meet ISO 9001:2015 quality management system requirements.
Technical Specifications
Source: 240-68099512 (Rev 9) Form A Tender & Contract - Turbine Control System (TCS) instrumentation.pdfScope: Supply and delivery of Turbine Control System (TCS) instrumentation and associated proprietary subcomponents for Grootvlei Power Station. Contract duration: five (5) years. Requirements: - Pre-contract award assessment under Category 4. - Main Supplier and Sub-supplier Capability and Capacity Assessment. - Post-award: Contract Execution and Supplier Quality Performance Monitoring phases apply.
Compliance Requirements
Source: 240-68099512 (Rev 9) Form A Tender & Contract - Turbine Control System (TCS) instrumentation.pdfMandatory compliance: - ISO 9001:2015 quality management system. - Quality Audits conditions. - Preservation requirements. - Management of Nonconformities and Nonconforming Outputs identified by Eskom. - Special processes requirements. - Eskom Rights of Access and Rights to Information conditions.
Important Dates
Source: C1 2a SC3 Data by Purchaser.docxClosing date: 2026-06-15 at 11:00 (from tender record). Delivery dates: As stipulated on Purchase Order or per agreed program. Emergency deliveries: Immediately. Defects date: 12 months after delivery. Defect correction period: 2 weeks. Defects access period: 5 days. No briefing, site visit, or clarification deadlines are stated in this document.
Contact Information
Source: C1 2a SC3 Data by Purchaser.docxPurchaser: Eskom Holdings SOC Ltd (reg no: 2002/015527/30), Registered office: Megawatt Park, Maxwell Drive, Sandton, Johannesburg. Supply Manager contact details (name, address, telephone, fax, email) are not provided in this document. Adjudicator: Selected from ICE-SA Division of the South African Institution of Civil Engineering Panel of Adjudicators (www.ice-sa.org.za) or appointed by AFSA. Arbitration: Association of Arbitrators (Southern Africa), Johannesburg. Bidders must obtain full contact details from the bid invitation document.
Submission Guidelines
Source: C1 2a SC3 Data by Purchaser.docxThis document is the NEC3 Contract Data (Part 1) and does not contain bid submission instructions. Key points: (1) Obtain the separate bid documentation package for submission requirements, forms, and disqualification criteria. (2) Delivery terms are D-group (DAT, DAP, DDP) under INCOTERMS 2010. (3) Delivery place: Grootvlei Power Station Main Stores. (4) Supplier must not arrive on site without prior arrangement with Eskom. (5) All goods must meet Eskom’s quality standards; non-compliant goods may be refused.
Evaluation Criteria
Source: C1 2a SC3 Data by Purchaser.docxEvaluation is not explicitly detailed in this document, but the following criteria are implied or required: (1) Legal capacity: Must be a registered entity capable of entering into a binding contract. (2) B-BBEE: Valid verification certificate required; notify Eskom within 7 days of any status change and submit updated certificate within 30 days. Failure to maintain or disclose may lead to termination or renegotiation. (3) Financial: Demonstrate capacity for a 5-year supply contract; provide proof of insurance as per Insurance Table A (e.g., loss/damage to goods, liability, employee injuries). (4) Technical: Proven experience in supplying Turbine Control System Spares (Turbovisory equipment and field instrumentation); ability to meet Eskom’s quality standards and emergency delivery requirements. (5) Compliance: Adherence to South African laws (OHS Act, VAT Act, environmental regulations); no history of prohibited actions (corruption, fraud, etc.).
Technical Specifications
Source: C1 2a SC3 Data by Purchaser.docxScope: Supply and delivery of Turbine Turbovisory equipment and field instrumentation for Grootvlei Power Station over 5 years (as and when required). Contract framework: NEC3 Supply Contract (April 2013). INCOTERMS 2010: D-group terms (DAT, DAP, DDP) with delivery to Grootvlei Power Station Main Stores. Supplier obligations: (1) Provide goods in conformity with contract and manufacturer standards. (2) Obtain export licences (if applicable). (3) Contract for and pay transport costs. (4) Provide packing lists, invoices, delivery notes, test results, and maintenance manuals. (5) No sub-supplier engagement without Eskom’s prior written approval. (6) Goods must be packaged and transported securely. (7) Purchaser may refuse non-compliant goods. Quality: 12-month defects period; 2-week defect correction period; 5-day defects access period.
Financial Requirements
Source: C1 2a SC3 Data by Purchaser.docxCurrency: South African Rand. Payment terms: 4 weeks after invoice submission. Tax invoice: Must be provided within 1 week of receiving a payment certificate; include Eskom’s VAT number (4740101508). Interest on late payment: Standard Bank prime rate (365-day year) for Rand; LIBOR 6-month rate for foreign currency. Penalties: (1) Delay damages: 2.5% of the specific PO line item per day, capped at 10% of that line item’s value. (2) Low performance damages: 5% penalty for premature failure within 2 weeks of installation; 10% penalty for failure within 1 week. Supplier must replace defective goods at their own cost. Liability cap: Supplier’s total liability limited to the replacement value of the purchase order.
Compliance Requirements
Source: C1 2a SC3 Data by Purchaser.docxB-BBEE: Valid verification certificate required. Notify Eskom within 7 days of any B-BBEE status change; submit updated certificate within 30 days. Failure to notify or maintain status may result in termination or renegotiation. Health and Safety: Comply with all applicable laws; prices must include sufficient funds for compliance. Environment: Comply with all applicable environmental laws and regulations. Insurance (Supplier): (1) Loss/damage to goods (replacement cost or Purchaser’s policy deductible). (2) Liability for property damage and bodily injury (replacement cost or Purchaser’s deductible). (3) Employee liability per applicable law. Insurance (Purchaser): Covers Assets All Risk, Contract Works, Environmental Liability, General and Public Liability, Transportation (Marine), Motor Fleet, Terrorism, Cyber Liability, Nuclear Material Damage, and Business Interruption. Ethics: Zero tolerance for prohibited actions (coercive, collusive, corrupt, fraudulent, obstructive). Termination for ethics violations does not require a court finding. Nuclear Liability: Special provisions apply for Koeberg Nuclear Power Station. Asbestos: Ambient air must conform to South African standards (OEL 0.2 fibres/ml as 4-hour TWA). Supplier personnel may stop work in contaminated areas until declared safe.
Contact Information
Source: C1 1 SC3 Offer Acceptance.pdfPurchaser’s agent details are in the Contract Data. Submission address: Eskom Holdings SOC Ltd, Megawatt Park, Maxwell Drive, Sandton, Johannesburg, 2199.
Submission Guidelines
Source: C1 1 SC3 Offer Acceptance.pdfSubmit a signed Form of Offer and Acceptance (C1.1 SC3), including the Schedule of Deviations if applicable. Examine all documents listed in the Tender Data and addenda, as referenced in the Returnable Schedules. Return one signed copy to the Purchaser before the validity period ends. Within two weeks of receiving the signed agreement, provide securities, bonds, guarantees, proof of insurance, and other required documentation. Failure to comply may result in disqualification.
Technical Specifications
Source: C1 1 SC3 Offer Acceptance.pdfSupply and deliver Turbine Turbovisory equipment and field instrumentation as per the scope of work at Grootvlei Power Station. Deliveries are on an as-and-when-required basis over 5 years. Detailed specifications are in Part C3 (Scope of Work: Goods Information including Supply Requirements).
Financial Requirements
Source: C1 1 SC3 Offer Acceptance.pdfSubmit pricing in Part C2 (Pricing Data). Include: total offered price (exclusive of VAT), VAT at 15%, and total amount inclusive of VAT (in words and figures). The total is for budgeting purposes only; actual amounts will be assessed per contract conditions.
Contact Information
Source: C1 1 SC3 Offer Acceptance.docxEskom Holdings SOC Ltd, Megawatt Park, Maxwell Drive, Sandton, Johannesburg, 2199. Purchaser’s agent details are provided in the Contract Data (Part C1).
Submission Guidelines
Source: C1 1 SC3 Offer Acceptance.docxSubmit a signed Form of Offer and Acceptance (C1.1) with: pricing (total exclusive of VAT, VAT at 15%, and total inclusive of VAT in numeric and written form), and Schedule of Deviations (if applicable). Examine and accept all documents listed in the Tender Data and addenda (Returnable Schedules). Use a separate Form of Offer and Acceptance for alternative tenders. Contract takes effect upon receipt of a fully signed original copy, including Schedule of Deviations. Within two weeks of receiving the signed agreement, contact Eskom’s agent (details in Contract Data) to arrange delivery of securities, bonds, guarantees, proof of insurance, and other required documentation. Failure to comply constitutes repudiation of the agreement.
Evaluation Criteria
Source: C1 1 SC3 Offer Acceptance.docxTenderers must: be duly authorized to sign and enter into the contract; demonstrate capacity to perform all obligations and liabilities under the contract; comply with all terms and conditions as per their true intent; submit all required returnable schedules and documentation; and be willing to provide securities, bonds, guarantees, and proof of insurance as stipulated in the Contract Data. Deviations or amendments must be explicitly documented in the Schedule of Deviations.
Technical Specifications
Source: C1 1 SC3 Offer Acceptance.docxSupply and delivery of various Turbine Turbovisory equipment and field instrumentation as per the Scope of Work (Part C3) at Grootvlei Power Station. Delivery is on an as-and-when-required basis over a 5-year period. Contract terms are defined in: Part C1 (Agreements and Contract Data), Part C2 (Pricing Data), and Part C3 (Scope of Work: Goods Information including Supply Requirements). All deviations or amendments must be documented in the Schedule of Deviations.
Financial Requirements
Source: C1 1 SC3 Offer Acceptance.docxPricing must include: total exclusive of VAT, VAT at 15%, and total inclusive of VAT (both numeric and written form). Payment terms and conditions are as per the Contract Data. Securities, bonds, guarantees, and proof of insurance must be provided within two weeks of contract award. Failure to deliver these documents constitutes repudiation.
Submission Guidelines
Source: C3 1 SC3 Purchasers Goods Information.docxSubmit bids via Eskom’s standard procurement process. Deliver goods to Grootvlei Power Station only during: Monday–Thursday: 08H00–16H00, Friday: 08H00–11H30. No deliveries on weekends or public holidays. Arrange security access with Purchaser prior to delivery. Purchaser provides offloading assistance (forklift/overhead crane available). Goods must arrive in good condition and match detailed specifications. Payment occurs only after delivery and inspection. Submit tax invoices within 7 days of receiving a payment certificate from the Supply Manager. Invoices must include: Supplier and Purchaser names/addresses, contract number/title, VAT numbers (Supplier and Purchaser), itemized description of goods/services, and total amounts (excl. VAT, VAT, and incl. VAT).
Evaluation Criteria
Source: C3 1 SC3 Purchasers Goods Information.docxMandatory compliance with all technical specifications, Eskom policies, and delivery constraints. Tenderers must commit to subcontracting a minimum 5% of the contract value to an EME or QSE that is 51% owned by black people living in rural/underdeveloped areas or townships. Mandatory returnables: Letter of intent to subcontract 5% from the main contractor. Preferred subcontracting scope: Transportation. Non-compliance with subcontracting or technical requirements may disqualify the bid.
Technical Specifications
Source: C3 1 SC3 Purchasers Goods Information.docxSupply and deliver Turbine Turbovisory equipment and field instrumentation to Grootvlei Power Station on an as-needed basis over 5 years. Key deliverables: Turbine Turbovisory equipment, field instrumentation, and testing/calibration certification. Goods must comply with detailed specifications, including but not limited to: sensors (e.g., speed sensor INT-SSR-250-750BW), transmitters (e.g., temperature transmitter TMT 121-A1KCB-5, pressure transmitters Cerebar S PMC71), push buttons (e.g., emergency stop SZT-42-92130-00023), amplifiers, relays, transducers, thermocouples (SS GR 316, various lengths), and assemblies (e.g., positioner/displacement assemblies for turbine shafts). Supplier must adhere to Eskom’s delivery agreement period (24-56361435) and quality standards (ISO 9001, Eskom Supplier Contract Quality Requirements Specification 240-105658000). Quarterly progress meetings required at Grootvlei Power Station, attended by Supply Manager (or representative), Service Provider, and End User. Supplier must comply with Eskom’s SHE rules, including OHS Act 95 of 1993 or ISO 45001, Lifesaving Rules, and Grootvlei High-Risk SHE Specifications (240-73418055). Environmental compliance: Documented environmental management system (e.g., ISO 14001), adherence to Eskom Grootvlei environmental policies, National Environmental Management Act 107 of 2008 (Duty of Care), and Eskom Environmental Incident Management Procedure (240-133087117).
Financial Requirements
Source: C3 1 SC3 Purchasers Goods Information.docxInvoicing: Submit tax invoices within 7 days of receiving a payment certificate from the Supply Manager. Invoices must include Supplier/Purchaser names and addresses, contract number/title, VAT registration numbers (Supplier and Purchaser), itemized description of goods/services per Price Schedule, and total amounts (excl. VAT, VAT, and incl. VAT). Payment terms: Per Eskom’s standard process, after delivery and inspection. No additional insurance required beyond contract data. Supplier must maintain records of defined costs, payments, and compensation events for future reference.
Compliance Requirements
Source: C3 1 SC3 Purchasers Goods Information.docxQuality: Implement and maintain a quality system compliant with ISO 9001 and Eskom Supplier Contract Quality Requirements Specification (240-105658000). Safety: Comply with OHS Act 95 of 1993 or ISO 45001, Eskom SHE rules, Lifesaving Rules, and Grootvlei High-Risk SHE Specifications (240-73418055). Submit a safety plan (including PPE, safe work procedures, risk assessments) for Employer approval prior to work commencement. Environmental: Maintain a documented environmental management system (e.g., ISO 14001), comply with Eskom Grootvlei environmental policies/standards, National Environmental Management Act 107 of 2008 (Section 28 Duty of Care), and Eskom Environmental Incident Management Procedure (240-133087117). Polluter pays principle applies. Subcontracting: Mandatory 5% subcontracting to an EME or QSE (51% black-owned in rural/underdeveloped areas/townships). Submit letter of intent to subcontract 5%. Local content target: 100%.
Submission Guidelines
Source: C3 1 SC3 Purchasers Goods Information - Copy.docxSubmit bids via Eskom’s standard procurement process. Deliver goods to Grootvlei Power Station only during: Monday–Thursday: 08H00–16H00, Friday: 08H00–11H30. No deliveries on weekends or public holidays. Arrange security access with Purchaser in advance. Purchaser provides offloading assistance and material handling equipment (e.g., forklift, overhead crane). Goods must arrive in good condition, per detailed specifications, and pass inspection before payment. Quarterly progress meetings required at Grootvlei Power Station, attended by Supply Manager (or representative), Service Provider, and End User. Meeting minutes must be recorded and circulated within five days of the meeting.
Evaluation Criteria
Source: C3 1 SC3 Purchasers Goods Information - Copy.docxMandatory subcontracting: Minimum 5% of contract value must be subcontracted to an EME or QSE which is 51% owned by black people living in rural or underdeveloped areas or townships. Mandatory returnable: Letter of intent to subcontract 5% from main contractor. Local procurement content target: 100%.
Technical Specifications
Source: C3 1 SC3 Purchasers Goods Information - Copy.docxSupply and deliver Turbine Turbovisory equipment and field instrumentation to Grootvlei Power Station on an as-needed basis over 5 years. Goods must comply with detailed specifications, including: sensors (e.g., speed, pressure, temperature), transmitters, amplifiers, relays, transducers, switches, thermocouples, converters, modules, monitors, and assemblies. Examples: Speed sensor (5 VDC, pulse output, 0-6 ms range), temperature transmitter (24 VDC, 4-20 mA output, DIN rail), emergency stop push button (plastic, red), pressure transmitters (0-600 kPa, 0-350 kPa, 0-160/250 kPa, 4-20 mA output), inductive displacement transducers (24 VDC), eddy current proximity switches (24 VDC), thermocouples (SS GR 316, various lengths), and displacement/expansion assemblies (stainless steel). All goods must meet Eskom’s quality, safety, and environmental standards. Supplier must adhere to Eskom’s delivery agreement period (24-56361435) and policies. Testing/calibration certification required for all delivered goods.
Financial Requirements
Source: C3 1 SC3 Purchasers Goods Information - Copy.docxInvoice within one week of receiving a payment certificate from the Supply Manager. Tax invoices must include: Supplier and Supply Manager’s name and address, contract number and title, Supplier’s VAT registration number, Purchaser’s VAT registration number, description of goods/services per Price Schedule, total amount (excluding VAT), VAT amount, and total inclusive of VAT. Payment terms as per Eskom’s standard contract conditions.
Compliance Requirements
Source: C3 1 SC3 Purchasers Goods Information - Copy.docxComply with OHS Act 85 of 1993 or ISO 45001, Eskom’s SHE rules, and Grootvlei Power Station’s High-Risk SHE Specifications (240-73418055). Implement a safety plan (PPE, safe work procedures, job-specific risk assessments, safety meetings) approved by Employer prior to work commencement. Report incidents/accidents to Grootvlei Power Station within 24 hours or end of shift. Comply with National Environmental Management Act 107 of 2008 (Duty of Care, Section 28). Maintain an environmental management system (policy, operational procedures, aspects/impacts register). Adhere to Eskom’s Environmental Incident Management Procedure (240-133087117) and Station Waste Management Procedure. Implement a quality system compliant with ISO 9001 and Eskom Supplier Contract Quality Requirements Specification (240-105658000). Subcontract a minimum of 5% of contract value to an EME or QSE 51% owned by black people in rural/underdeveloped areas or townships. Submit a letter of intent to subcontract 5%. Preferred subcontracting scope: transportation.
Important Dates
Source: Invitation to Tender (ITT) - Turbine Centreline Spares.pdfClosing date: 15 June 2026 at 10h00. Non-compulsory clarification meeting: 08 June 2026 at 14h00 via Microsoft Teams (Join: https://teams.microsoft.com/meet/395821968750524?p=B00f981a5AitrJQKJb; Meeting ID: 395 821 968 750 524; Passcode: 9zC7i6cG). Confirm attendance with Eskom Representative (Manala Mabhena) by providing attendee names, positions, and contact details. Clarification queries deadline: 5 working days before closing date (10 June 2026). Tender validity period: 180 days from closing date.
Contact Information
Source: Invitation to Tender (ITT) - Turbine Centreline Spares.pdfEskom Representative: Manala Mabhena. Email: [email protected]. Phone: 017 779 8789. All queries must be directed to this contact in writing. Eskom Standard Conditions of Tender available at www.eskom.co.za. Submission portal: https://etendering.eskom.co.za/.
Submission Guidelines
Source: Invitation to Tender (ITT) - Turbine Centreline Spares.pdfSubmit electronically via https://etendering.eskom.co.za/ by 15 June 2026 at 10h00. No hard copies or zipped files accepted. Upload documents in PDF format (max 500MB per file, total submission max 4GB). Price lists must be in both PDF and Excel. Organize files under folders: Technical, Commercial, Financial, and Other. Ensure submission status is marked as 'complete'. Late submissions are disqualified. Resubmissions replace all prior versions. Mandatory returnables: Authorisation Form (Annexure A), Acknowledgement Form (Annexure B), Tenderer’s Particulars (Annexure C), Integrity Declaration Form (Annexure D), CPA Requirements (Annexure E or F), SBD 6.2 (Annexures G1-G4 if applicable), SBD 1 (Annexure H), SBD 6.1 (Annexure I), SBD 4 (Annexure J), and E-tendering Help Manual acknowledgement (Annexure 1.1.14).
Evaluation Criteria
Source: Invitation to Tender (ITT) - Turbine Centreline Spares.pdfEligibility: Tenderers must not be from sanctioned countries, submit only one tender, have no conflict of interest, not be restricted by National Treasury, not be on the Tender Defaulters list, and not subcontract 100% of the scope. Joint ventures must have joint and several liability. Non-compliance with eligibility criteria results in disqualification. Functionality: Minimum threshold of 70% required for technical evaluation. Tenderers scoring below 70% are disqualified. Price: Scored out of 80 points (inclusive of VAT, corrected for errors, excluding contingencies, adjusted for deviations). Unconditional discounts are considered; conditional discounts are not. Specific Goals: Scored out of 20 points under PPPFA (B-BBEE status levels 1-8). Points for price and specific goals are summed and rounded to two decimal places. Highest total score wins. Alternative tenders are not allowed.
Technical Specifications
Source: Invitation to Tender (ITT) - Turbine Centreline Spares.pdfSupply and delivery of Turbine Control System Spares for Grootvlei Power Station over 5 years. Scope of Work and Pricing Schedule/BOQ are provided in PDF and Excel. Cataloguing may be required post-award; include a line item for this in the Pricing Schedule if applicable. Eskom will pay for cataloguing. Alternative tenders are not allowed. Contract conditions: NEC SC3.
Financial Requirements
Source: Invitation to Tender (ITT) - Turbine Centreline Spares.pdfPricing must be inclusive of VAT, submitted in PDF and Excel. Evaluation includes correction of arithmetical errors, exclusion of contingencies, and adjustment for deviations. Net Present Value comparison is used. Unconditional discounts are considered for evaluation; conditional discounts are applied at payment. Payment terms and performance security details are not specified.
Compliance Requirements
Source: Invitation to Tender (ITT) - Turbine Centreline Spares.pdfMandatory: Proof of CSD registration. Preference points: Valid B-BBEE certificate (SANAS-accredited) or sworn affidavit (for EMEs/QSEs), CIPC shareholding proof with breakdown, certified ID copies of shareholders, disability proof (if applicable), and consolidated B-BBEE certificate for JVs/consortia. SHEQ: OHS policy (OHS Act Section 7), OHS plan, Baseline Risk Assessment (BRA), Letter of Good Standing (COIDA), ISO 45001 certificate (or equivalent), and appointment of a qualified SHE Officer with CV and qualifications. Environmental: SHE Policy (ISO 14001:2015), Waste Management Plan, Emergency Preparedness/Response Plan, Site-Specific Environmental Management Plan, and legal protection guarantees for employees/refusing hazardous work. SDL&I: Quarterly reports, B-BBEE improvement/retention plan within 30 days of contract signing, and SDL&I Implementation Schedule within 28 days of award. 3% of invoice value retained as security for SDL&I obligations; 3% penalty of contract value for non-compliance. CIDB requirements are not applicable.
Evaluation Criteria
Source: C2 SC3 Pricing Data.pdfGeneral: Must be a registered supplier capable of meeting Eskom’s procurement and compliance requirements. Experience in supplying turbine control system spares and field instrumentation for power stations. Ability to adhere to NEC3 SC3 contractual terms, including pricing, defect liability, and compensation events. Technical: Proven track record of supplying high-precision instrumentation (e.g., vibration monitors, pressure transmitters, thermocouples). Compliance with South African regulatory standards (e.g., safety, electrical, and quality certifications). Capacity to maintain stock and ensure timely delivery over the 5-year period. Financial: Financial stability to fulfill a long-term contract (5 years). Pricing must be competitive and fully inclusive of all obligations (no hidden costs).
Technical Specifications
Source: C2 SC3 Pricing Data.pdfScope: Supply and delivery of Turbine Turbovisory equipment and field instrumentation for Grootvlei Power Station on an as-and-when-required basis for 5 years. Key deliverables: 35 line items including monitors (bearing vibration, shaft displacement, shaft vibration, amplifier measuring, key phaser module), converters (eddy current signal converters with associated sensors), sensors (eddy current displacement, speed sensors), amplifiers (pulse signal, 3-way isolating), transducers (electro-dynamic absolute vibration, inductive displacement), transmitters (pressure, temperature, process), switches (position for barring gear), thermocouples (various types for bearings and turbine casing measurements), networking equipment (Hirschmann power supply and media module), and other components (emergency stop push button, coupling relay). All items have a quantity of 10 units, except speed sensors (15 units). Suppliers must ensure compliance with correct drawing revision numbers where applicable.
Financial Requirements
Source: C2 SC3 Pricing Data.pdfContract Type: NEC3 Supply Contract (SC3) - priced contract. Pricing Format: Lump sum items: enter amount in Price column only (Unit, Quantity, Rate left blank). Quantity-based items: enter rate multiplied by quantity to produce Price. Time-based items: unit of time stated in Unit column with length in Quantity column. Payment Terms: Amount due includes Price for completed lump sum items, plus amounts calculated from completed quantities multiplied by rates, plus other amounts due to Supplier, less amounts due to Purchaser. Any tax required by law to be paid by Purchaser is included in amount due. Pricing Assumptions: Total Prices are fully inclusive of everything necessary to provide goods and services. Prices include correction of Defects (no compensation event unless due to Supplier's risk). Costs for unlisted items should be spread across other prices. Lump sum prices are not adjusted if actual work differs from estimates. Price changes only permitted through compensation events per clause 60.1.
Evaluation Criteria
Source: GVL 0651 Medium Risk Specification for Coal Stations (TCS).docxTo be eligible, contractors must: (1) Be legally registered with Compensation for Occupational Injuries and Diseases (COID), (2) Hold valid Letter of Good Standing from COID Commissioner, (3) Have competent staff with appropriate qualifications and training, (4) Submit OHS Plan demonstrating compliance with Eskom specifications, (5) Comply with Section 37(2) of OHS Act requirements, (6) Have pre-employment medical examination capability for employees, (7) Demonstrate ability to meet all legislative and Eskom OHS requirements for the 5-year contract duration
Technical Specifications
Source: GVL 0651 Medium Risk Specification for Coal Stations (TCS).docxScope of Work: Supply and delivery of Turbine Control System (TCS) spares, including Turbovisory equipment and field instrumentation, at Grootvlei Power Station for a 5-year period on an as-and-when-required basis.
Key Requirements:
Compliance Requirements
Source: GVL 0651 Medium Risk Specification for Coal Stations (TCS).docxLegal and Regulatory Compliance:
Eskom-Specific Compliance:
B-BBEE and Local Content:
Submission Guidelines
Source: Annexure B.pdfReturnable Documents: Submit a completed, signed Annexure B (Acknowledgement Form for Eskom OHS legal and other requirements). Required fields: Company/Supplier Name, Name and signature of authorised person (CEO/Director/Managing Director), Date, and Witness signatures. Non-submission or incomplete forms may result in disqualification.
Evaluation Criteria
Source: Annexure B.pdfEvaluation will assess: 1. Demonstrated understanding and commitment to Eskom’s OHS requirements. 2. Process and criteria for selecting and managing subcontractors/suppliers. 3. Evidence of adequate resources and competencies. 4. Willingness to undergo Eskom verification, including provision of testimonials/references for similar past work.
Technical Specifications
Source: Annexure B.pdfScope: Supply and delivery of turbine control system spares. Bidder must: 1. Demonstrate process and selection criteria for appointing contractors/suppliers. 2. Notify Eskom prior to appointing any subcontractors. 3. Ensure subcontractors/suppliers have adequate resources and competencies. 4. Manage subcontractor compliance with legal and Eskom OHS requirements. 5. Conduct OHS audits/assessments of subcontractors during execution. 6. Provide termination grounds for subcontractor work if required. 7. Handle subcontractor non-conformances and penalties directly. 8. Be prepared for Eskom verification of past performance (testimonials/references for similar work).
Compliance Requirements
Source: Annexure B.pdfMandatory Compliance: 1. Align with Eskom OHS requirements post-award (policies, procedures, standards). 2. Comply with: Eskom contractor Health and Safety standard 32-136, OHS specifications/requirements, Occupational Health and Safety Act, Compensation for Occupational Diseases and Illnesses Act. 3. Ensure all employees (including contractors/suppliers) complete Eskom induction. 4. Submit signed Annexure B acknowledging understanding of OHS requirements. 5. Penalties apply for non-conformance by the main supplier or its subcontractors/suppliers.
Important Dates
Source: C0 SC3 Contract cover pages.pdfSubmission Guidelines
Source: C0 SC3 Contract cover pages.pdfEvaluation Criteria
Source: C0 SC3 Contract cover pages.pdfTechnical Specifications
Source: C0 SC3 Contract cover pages.pdfFinancial Requirements
Source: C0 SC3 Contract cover pages.pdfCompliance Requirements
Source: C0 SC3 Contract cover pages.pdfSubmission Guidelines
Source: GVLF 0009 GVL 0799 Procedure Change Form for Tender Tech Eval Strategy for the Supply of Turbovisory Equipment.pdfSubmit all required tender forms and supporting documents as per Eskom’s standard procurement procedures. No returnable documents are explicitly specified in the provided text.
Evaluation Criteria
Source: GVLF 0009 GVL 0799 Procedure Change Form for Tender Tech Eval Strategy for the Supply of Turbovisory Equipment.pdfGeneral: Must be a registered Eskom supplier, demonstrate experience in supplying turbine control systems for power stations, comply with South African regulatory and safety standards, and ensure supply chain continuity for 5 years. Technical: Requires a proven track record with Turbovisory Equipment or equivalent systems, capacity to provide field instrumentation meeting Eskom specifications, and quality assurance systems for critical components. Legal: Valid tax clearance certificate, B-BBEE compliance (likely Level 4 or better), and no conflicts of interest with Eskom or its employees.
Technical Specifications
Source: GVLF 0009 GVL 0799 Procedure Change Form for Tender Tech Eval Strategy for the Supply of Turbovisory Equipment.pdfSupply and delivery of Turbovisory Equipment and Field Instrumentation for Grootvlei Power Station. Technical evaluation strategy applies to this scope. Originator: Dumisani Chauke (C&I Engineering).
Contact Information
Source: 240-12248652 (Rev 7) List of Tender Returnables - Turbine Control System (TCS) instrumentaton.pdfEskom Representative: Mmaphuti Moloto. Issued on: 2025/10/31.
Submission Guidelines
Source: 240-12248652 (Rev 7) List of Tender Returnables - Turbine Control System (TCS) instrumentaton.pdfSubmit the following returnable documents to avoid disqualification: - Quality Method Statement based on scope (use template Ref 240-126469599). - Quality Policy approved by top management. - Quality Objectives approved by top management. - Organizational chart and responsibility matrix (must include quality management function/role). - Documented criteria for evaluation, selection, monitoring, and re-evaluation of external providers (Clause 8.4 of ISO 9001:2015). - Valid materials/product test/compliance certificates for all materials/products (e.g., factory databooks). - Proof of warehousing/facility compliant with relevant standards for preservation of goods (identification, handling, contamination control, packaging, storage, transportation, protection). - Project risk register and action plan (exclude OHS risk assessments). - Completed and signed Form A.
Evaluation Criteria
Source: 240-12248652 (Rev 7) List of Tender Returnables - Turbine Control System (TCS) instrumentaton.pdfEvaluation is based on the following sections and scoring: - Section A (Quality Management System Requirements - ISO 9001): Must provide objective evidence of a documented QMS (certification not required). Includes Quality Method Statement, Quality Policy, and Quality Objectives. Maximum score: 3. - Section B (Evidence of QMS in operation): Must submit documented information for roles/responsibilities, control of externally provided processes, material compliance certificates, preservation of goods, and project risks/opportunities. Maximum score: 5. - Section E (User-defined additional requirements): Form A must be completed and signed. Maximum score: 1. Total maximum score: 9. Compliance with Eskom and national/international standards is mandatory for materials/equipment.
Technical Specifications
Source: 240-12248652 (Rev 7) List of Tender Returnables - Turbine Control System (TCS) instrumentaton.pdfScope: Supply and delivery of Turbine Control System (TCS) instrumentation and associated proprietary subcomponents for Grootvlei Power Station. Duration: 5 years. Deliverables must meet Eskom and relevant national/international standards.
Compliance Requirements
Source: 240-12248652 (Rev 7) List of Tender Returnables - Turbine Control System (TCS) instrumentaton.pdfQuality Management System (QMS) compliance with ISO 9001:2015 is required (certification not mandatory, but documented evidence is). No explicit B-BBEE, tax, CIDB, or CIPC requirements stated in the document.
Submission Guidelines
Source: GVL0799 Tender Technical Evaluation Strategy for the supply of Turbovisory Equipment and Field Instrumentation.pdfThis document is a Tender Technical Evaluation Strategy (GVL/0799) and does not contain submission guidelines. Bidders must refer to the official tender invitation for: submission method (electronic/physical), submission address, required returnable documents, deadline, and disqualification risks.
Evaluation Criteria
Source: GVL0799 Tender Technical Evaluation Strategy for the supply of Turbovisory Equipment and Field Instrumentation.pdfEVALUATION STRUCTURE: Two-stage process — Mandatory Technical Evaluation followed by Qualitative Technical Evaluation. Bidders must pass Mandatory criteria to proceed to Qualitative evaluation.
MANDATORY TECHNICAL CRITERIA (Pass/Fail):
QUALITATIVE TECHNICAL CRITERIA (Weighted Scoring, Minimum Threshold: 70%):
Acceptable qualifications/risks:
Unacceptable qualifications/risks:
EVALUATION TEAM: Technical Evaluation Team (TET) consists of 4 members (Xolani Mkhwanazi, Wenzile Dube, Dumisani Chauke, Nonhle Shibe). All mandatory and qualitative criteria evaluated by all TET members.
Technical Specifications
Source: GVL0799 Tender Technical Evaluation Strategy for the supply of Turbovisory Equipment and Field Instrumentation.pdfSCOPE: Supply and delivery of Turbine Control and Protection spares (new and/or second-hand) for Grootvlei Power Station, including Turbovisory Equipment and Field Instrumentation, over a 5-year period.
Key context:
Mandatory technical requirements:
Standards and compliance:
Acceptable conditions:
Unacceptable conditions:
Compliance Requirements
Source: GVL0799 Tender Technical Evaluation Strategy for the supply of Turbovisory Equipment and Field Instrumentation.pdfIMPLIED REQUIREMENTS (from evaluation strategy and standard Eskom practices):
Document-specific compliance:
NOTE: This document does not explicitly state CIDB, CIPC, professional registration, or local content requirements. Bidders must confirm these from the official tender invitation.
Evaluation Criteria
Source: GVLF 0183 Environmental Evaluation Form (revised).pdfEvaluation is based on a mandatory checklist with a total score of 100%. Key criteria and weighting:
Disqualification: Failure to submit any mandatory document or submission of non-compliant documents.
Technical Specifications
Source: GVLF 0183 Environmental Evaluation Form (revised).pdfThe tender requires an objective evaluation of the supplier’s/contractor’s:
Compliance Requirements
Source: GVLF 0183 Environmental Evaluation Form (revised).pdfMandatory compliance documents:
Evaluation Criteria
Source: C2 SC3 Pricing Data - Copy.pdfGeneral:
Technical:
Legal:
Technical Specifications
Source: C2 SC3 Pricing Data - Copy.pdfScope:
Deliverables:
Specifications:
Standards:
Financial Requirements
Source: C2 SC3 Pricing Data - Copy.pdfPricing Model:
Key Financial Terms:
Price Schedule Format:
Evaluation Criteria
Source: 240-126469599_Method Statement template Rev2.docxEvaluation will assess bidders on: proven capability in supplying turbine control system spares; robustness of quality management systems; competency of personnel and training frameworks; adequacy of infrastructure, tools, and PPE; effectiveness of risk management processes; and strength of stakeholder/supplier management. Compliance with all ESKOM requirements in the full tender/RFQ is mandatory.
Technical Specifications
Source: 240-126469599_Method Statement template Rev2.docxScope: Supply and delivery of Turbine Control System Spares for Grootvlei Power Station over 5 years. Method Statement must include: title matching tender/RFQ; supplier representative details (name, designation, contact); client division/unit; tender/RFQ number; detailed activity description per Works Information/NEC document; reference document number (if available); relevant discipline. Objectives: 2-3 SMART goals tied to scope outputs. Quality: Explain how customer needs are identified and communicated. Competency: List required skills, training, and human resources. Infrastructure: Specify all PPE, tools, equipment, and testing/measurement requirements. Leadership: Describe communication of mission, vision, values, policies, and processes. Risk: Identify all risks and mitigation actions. Improvement: Explain process gap identification for meeting/exceeding requirements. Data: Define data to be collected and analysis methods for future decisions. Stakeholders: Identify affected parties, impact levels, and actions to address concerns. Outsourcing: If applicable, detail supplier selection, evaluation, and performance monitoring.
Evaluation Criteria
Source: C2 SC3 Pricing Data.docxGeneral:
Technical:
Financial:
Compliance:
Technical Specifications
Source: C2 SC3 Pricing Data.docxScope: Supply and delivery of turbine control system spares for Grootvlei Power Station over 5 years.
Key Deliverables:
Standards/Requirements:
Financial Requirements
Source: C2 SC3 Pricing Data.docxPricing Structure:
Pricing Rules:
Price Schedule Preparation:
Format:
Important Dates
Source: Squad Check meeting Minutes - Turbine Centreline Spares.docxMeeting held on 19 May 2026 (11:50–13:50). Next meeting to be held on MS Teams (date not specified).
Contact Information
Source: Squad Check meeting Minutes - Turbine Centreline Spares.docxChairperson: Nomsa Vilakazi.
End-user contact for SDL&I: Mr. Maluta Mukwevho.
Additional attendees: Emily Manenzhe, Mofihli Khanye, Solly Mkhonto, Bukelwa Mvimbi, Mmaphuti Moloto, Sephakabatho Molatjane, Phomolo Thibela, Mathuhlwe Malebana.
Evaluation Criteria
Source: Squad Check meeting Minutes - Turbine Centreline Spares.docxGeneral Requirements:
Specific Requirements:
Technical Evaluation:
Technical Specifications
Source: Squad Check meeting Minutes - Turbine Centreline Spares.docxScope of Work (SOW) is fully signed and must be adhered to.
Financial Requirements
Source: Squad Check meeting Minutes - Turbine Centreline Spares.docxPricing Data:
NEC Employer Information:
Contact Information
Source: Annexure C2 Supplier OHS tender evaluation CI.pdfSubmission Guidelines
Source: Annexure C2 Supplier OHS tender evaluation CI.pdfEvaluation Criteria
Source: Annexure C2 Supplier OHS tender evaluation CI.pdfTechnical Specifications
Source: Annexure C2 Supplier OHS tender evaluation CI.pdfCompliance Requirements
Source: Annexure C2 Supplier OHS tender evaluation CI.pdfEvaluation Criteria
Source: C0 SC3 Contract cover pages.docxEvaluation will be based on the following criteria:
Technical Specifications
Source: C0 SC3 Contract cover pages.docxScope and contract structure for the supply and delivery of turbine control system spares:
Evaluation Criteria
Source: GVLF 0183 Environmental Evaluation Form (revised).docxEvaluation is based on a mandatory environmental management checklist with a 100% total score. Key criteria and weightings: SHE Policy (15%) - must be signed per ISO14001:2015, addressing environmental management commitment, pollution prevention, and degradation. Environmental Management Strategy (25%) - must include waste management plan, emergency preparedness/response plan, and site/work-specific environmental management plan. Legal Protection (20%) - requires a letter from top management guaranteeing worker protection per NEMA 107 of 1998, Section 29. Environmental Training and Competency (15%) - proof of training and skills for significant activities (e.g., oil spills, herbicides, asbestos). Appointment of SHE Officer (25%) - requires a qualified SHE Officer with CV and qualifications. Scoring: Yes (document submitted and meets requirements), No (document not submitted or fails requirements), with comments allowed.
Technical Specifications
Source: GVLF 0183 Environmental Evaluation Form (revised).docxThe tender requires an objective technical evaluation of the supplier’s/contractor’s capabilities, expertise, experience, capacity, processes, facilities, and equipment. The goal is to confirm the supplier’s ability to provide the required turbine control system spares and related services to Grootvlei Power Station over a five-year period.
Contact Information
Source: C1 2b SC3 Data by Supplier.pdfSubmission Guidelines
Source: C1 2b SC3 Data by Supplier.pdfEvaluation Criteria
Source: C1 2b SC3 Data by Supplier.pdfTechnical Specifications
Source: C1 2b SC3 Data by Supplier.pdfFinancial Requirements
Source: C1 2b SC3 Data by Supplier.pdfEvaluation Criteria
Source: C1 2b SC3 Data by Supplier.docxEvaluation is open to suppliers capable of providing Turbine Control System Spares and meeting Eskom’s operational and technical requirements. Criteria include: Legal registration as a valid entity with complete business and contact details; Demonstrated technical capacity to supply and deliver spares within specified timeframes and quality standards; Financial ability to provide competitive, transparent pricing with cost breakdowns, overheads, and profit percentages.
Technical Specifications
Source: C1 2b SC3 Data by Supplier.docxSupply and delivery of Turbine Control System Spares for Grootvlei Power Station over a 5-year period. Supplier must provide: Full contract data (name, address, contact details); Goods information for the supplier’s design; Complete price schedule; Delivery dates for goods and services; Risk register entries; Programme details; Percentage for overheads and profit added to Defined Cost.
Financial Requirements
Source: C1 2b SC3 Data by Supplier.docxSubmit total tendered price in Rands (numeric and in words). Include a detailed price schedule. Specify the percentage for overheads and profit added to the Defined Cost.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Grootvlei Power Station - Grootvlei - Balfour - 2024
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
25
Last checked
12 Jul 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
💡 Want more tendering tips and strategies?
Explore Our BlogMedian Estimate
R 164 119
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Get deep intelligence on Supplies: General. Unlock full pricing strategies, bid frequency, and historical win rates.