Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
19 Murray Street - Lady Grey - Lady Grey - 9755
Organization Type
GOVERNMENT
Published
29 Jul 2026
OCDS Reference
ocds-9t57fa-163794
Senqu local municipality invites bids for the facilitation of strategic planning sessions over a 36-month period. This tender is open to professional service providers, with evaluation based on price (80 points) and specific goals such as locality and empowerment (20 points).
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Tuesday, 18 August 2026 - 12:00
Venue
null
See tender document
Categories
Request for Bid(Open-Tender)
19 Murray Street - Lady Grey - Lady Grey - 9755
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: CA(SA) - Chartered Accountant, PMI-PMP (Project Management Professional), Prince2 Practitioner, Six Sigma Certification
AI Document Analysis Stages
Important Dates
Source: Tender 02 of 26-27 Strategic Planning Session Facilitator ---Final.pdf (TENDER)29 Jul
2026
Tender Published
Tender was published
18 Aug
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Advert 02_2025-2026T Strategic Planning Session Facilitator.pdf
Senqu Local Municipality invites tenders for the facilitation of Strategic Planning Sessions over a 36-month period. The tender closes on 18 August 2026 at 12:00 PM (UTC). The evaluation follows an 80/20 preference system, with 80 points for price and 20 points for specific goals (e.g., HDI status, locality). Tenders must be submitted in a sealed envelope to the municipality’s address, with no electronic submissions accepted.
Tender 02 of 26-27 Strategic Planning Session Facilitator ---Final.pdf
Senqu Local Municipality invites tenders for the facilitation of Strategic Planning Sessions over a 36-month period. The tender closes on 18 August 2026 at 12:00 UTC. The contract involves providing professional facilitation services, and the evaluation is based on a combination of price (80 points) and specific goals (20 points), including preferences for historically disadvantaged persons and locality. The tender process is governed by strict compliance, ethical, and procedural requirements, including registration on municipal and national supplier databases, tax compliance, and adherence to Broad-Based Black Economic Empowerment (B-BBEE) regulations.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Senqu tenders with AI Discovery, high-altitude mountain intelligence, and application support for Lady Grey and Barkly East projects.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
R 1 424 710
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
💡 Want more tendering tips and strategies?
Explore Our BlogWe refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
{"closingDate":"18 August 2026","closingTime":"12h00","briefingSession":"{"date":null,"time":null,"venue":"ion meetings or at any other time prior to the award of the Contract, will not be","is_compulsory":false}"}
Contact Information
Source: Tender 02 of 26-27 Strategic Planning Session Facilitator ---Final.pdf (TENDER){"name":"Ms NBB Mokhantso","email":"[email protected]","phone":"051 603 1300","department":"Supply Chain Management","address":"030019 Fax: 0516030445 e-mail: [email protected]"}
Submission Guidelines
Source: Tender 02 of 26-27 Strategic Planning Session Facilitator ---Final.pdf (TENDER)Returnable Documents: 3.2.1.1.4 Key personnel, In order to be declared responsive, the tenderer must have the following key personnel in its, acceptable. Such undertaking must be attached to the schedule titled Key Personnel., personnel listed below and the schedule titled Key Personnel must be clearly indicative of the, requirement experience durations, qualifications, professional registration details, etc, 3.2.19.2 Evidence of tax compliance, In this regard, it is the responsibility of the tenderer to provide its Tax Compliance Status PIN, Before making an award the SM must verify the bidder’s tax compliance status. Where the
Evaluation Criteria
Source: Tender 02 of 26-27 Strategic Planning Session Facilitator ---Final.pdf (TENDER)General
Experience
Key Personnel
Methodology
Locality
B-BBEE
Functionality
Technical Specifications
Source: Tender 02 of 26-27 Strategic Planning Session Facilitator ---Final.pdf (TENDER)and any drawings and documents or parts thereof, which may be incorporated by reference into the above listed
Parts.
Deviations from and amendments to the documents listed in the conditions of tender and any addenda thereto as
listed in the returnable schedules as well as any changes to the terms of the offer agreed by the tenderer and the
employer during this process of offer and acceptance, are contained in the schedule of deviations attached to and
forming part of this form of offer and acceptance. No amendments to or deviations from said documents are valid
unless contained in this schedule.
The tenderer shall within two weeks after receiving a completed copy of this agreement, including the schedule of
deviations (if any), contact the employer to arrange the delivery of any securities, bonds, guarantees, proof of
insurance and any other documents to be provided in terms of the conditions of contract as supplemented by the
special conditions of contract. Failure to fulfil any of these obligations in accordance with those terms shall constitute
a repudiation of this agreement.
Notwithstanding anything contained herein, this agreement comes into effect on the date when the parties have signed
the table below and confirms receipt from the employer of one fully completed original copy of this agreement,
including the schedule of deviations (if any). The tenderer (now contractor) shall within five working days of the
agreement coming into effect notify the employer in writing of any reason why he cannot accept the contents of this
agreement as a complete and accurate memorandum thereof, failing which the agreement presented to the contractor
shall constitute the binding contract between the parties.
Signature (s)
Name(s)
Capacity
For the Employer Date
Name and Address of the Employer
Name and signature of witness Date
P a g e | 27
Form of Offer and Acceptance
Bid -2027T
Schedule of Deviations N/A
Notes:
limited to those permitted in terms of the conditions of tender.
letter, which constitutes a deviation as aforesaid, become the subject of agreements reached during the
process of offer and acceptance, the outcome of such agreement shall be recorded here.
change to the tender documents and which it is agreed by the Parties becomes an obligation of the contract
shall also be recorded here.
also be incorporated into the final draft of the Contract.
1 Subject
Details
2 Subject
Details
3 Subject
Details
4 Subject
Details
5 Subject
Details
By the duly authorised representatives signing this agreement, the employer and the tenderer agree to and accept
the foregoing schedule of deviations as the only deviations from and amendments to the documents listed in the
conditions of tender and addenda thereto as listed in the returnable schedules, as well as any confirmation,
clarification or changes to the terms of the offer agreed by the tenderer and the employer during this process of offer
and acceptance.
It is expressly agreed that no other matter whether in writing, oral communication or implied during the period between
the issue of the tender documents and the receipt by the tenderer of a completed signed copy of this Agreement shall
have any meaning or effect in the contract between the parties arising from this agreement.
P a g e | 28
Form of Offer and Acceptance
Bid -2027T
(6) price schedule
Bid specifications may not make any reference to any particular trade mark, name, patent, design, type, specific origin or
producer, unless there is no other sufficiently precise or intelligible way of describing the characteristics of the work, in
which case such reference must be accompanied by the words “or equivalent”.
Tenderers must note that wherever this document refers to any particular trade mark,
Name, patent, design, type, specific origin or producer, such reference shall be deemed to
Be accompanied by the words ‘or equivalent”
Pricing Instructions:
Pricing Instructions mean the criteria as set out below, read together with all Parts of this contract document, which it will
be assumed in the contract, that the tenderer has taken into account when developing his prices.
6.1 State the rates and prices in Rand unless instructed otherwise in the tender conditions.
6.2 Include in the rates, prices, and the tendered total of the prices (if any) all duties, taxes (except Value Added Tax
(VAT), and other levies payable by the successful tenderer, such duties, taxes and levies being those applicable
14 days before the closing time stated in the General Tender Information.
6.3 The short descriptions given in the Activity Schedule below are brief descriptions used to identify the activities for
which prices are required. Detailed descriptions of the activities to be priced are provided in the Scope of Work.
6.4 All prices tendered must include all expenses, disbursements and costs (e.g. transport, accommodation etc.) that
may be required for the execution of the tenderer’s obligations in terms of the Contract, and shall cover the cost
of all general risks, liabilities and obligations set forth or implied in the Contract as well as overhead charges and
profit (in the event that the tender is successful). All prices tendered will be final and binding.
6.5 All prices shall be tendered in accordance with the units specified in this schedule.
6.6 Where a value is given in the Quantity column, a Rate and Price (the product of the Quantity and Rate) is required
to be inserted in the relevant columns.
6.7 The successful tenderer is required to perform all tasks listed against each item. The tenderer must therefore
tender prices/rates on all items as per the section in the Price Schedule. An item against which no rate is/are
entered, or if anything other than a rate or a nil rate (for example, a zero, a dash or the word “included”
or abbreviations thereof) is entered against an item, it will also be regarded as a nil rate having been
entered against that item, i.e. that there is no charge for that item. The Tenderer may be requested to
clarify nil rates, or items regarded as having nil rates; and the Employer may also perform a risk analysis
with regard to the reasonableness of such rates.
6.8 Provision for time-based services which fall beyond the scope of normal services as described in the Scope of
Work has been made in the Activity Schedule. This provision is for services provided on instruction from the
Employer and will be deducted in whole or part if not required. The estimated period of involvement of each
category of person must be agreed with the Employer before any work in this regard commences.
6.9 The categories of persons (A, B, C, D) in respect of time-based fee rates for professional services shall be as
defined in the relevant guideline scope(s) of services (as referenced in the Specifications).
6.10 A higher category person undertaking lower category work will be reimbursed, in respect of time-based fees, at
the lower category rate.
6.11 Tenderers are to note that only those recoverable expenses listed in the Activity Schedule will be reimbursed to
the Service Provider. No reimbursement of costs for subsistence, typing, printing/copying (other than reports
and/or tender documents), communications or computer hardware and/or software will be made and these costs
will be deemed to be included in rates, sums, and prices for normal and additional services rendered.
6.12 Items for printing/copying shall be for specified contract documents, reports, manuals and drawings, excluding
general correspondence, minor reports, progress reports, etc. which shall be deemed to be included in the
professional fees. Payment will only be made for copies of reports and drawings submitted to the Employer or
issued, as specified or requested by the Employer, and all drafts shall be for the Service Provider’s account.
6.13 Tenderers are to note that the planning for this contract is based on a three-year budget which is subject to
change. While the Employer has every intention to complete the full scope of works, the Employer reserves the
right to reduce or increase the scope of works according to the dictates of the budget, or to terminate this contract,
without adjustment to the agreed rates, sums or fees and without payment of any penalty or surcharge in this
regard. The Service Provider shall however be entitled to pro-rata payment for all services carried out in terms
P a g e | 29
Methodology
Source: Tender 02 of 26-27 Strategic Planning Session Facilitator ---Final.pdf1.EXPERIENCE 35
2.KEY Competences 30
3.METHODOLOGY 35
Total points 100
The minimum qualifying score for functionality is 75 out of a maximum of 100.
Methodology is fully based 35 35 points
on the responsibilities of the
document
must be attached
Non submission of facilitation 00
and include the approach
criteria on the
right (To score
points bidders
must submit a
detailed
methodology plan
)
P a g e | 11
Experience & Qualifications
Source: Tender 02 of 26-27 Strategic Planning Session Facilitator ---Final.pdfSession facilitation projectsAppointment letters
with contactable Bidder has successfully 4 Strategic Planning 30
references in completed 4 Strategic Planning Session projects
relation to the
Session facilitation projects
required services
must be attached to Bidder has successfully 5 Strategic Planning 35
claim points. completed 5 and more Session projects
Facilitation of Strategic Planning
Session projects
Bidder has submitted no no information or 0
information or inadequate inadequate
information to determine the information
scoring level
Criteria 2: key competences
KEY COMPETENCES: Lead Degree in 15 points
30 Points
Facilitat Developmental
Bidders must submit
or: Studies or Urban
detailed CV with original
and Regional
Academ
certified copies (not older
Planning or Natural
ic
than 06 months) of the
Sciences,
Qualific
required professional
Sociology or Public
ation:
qualifications. If the
Administration or
required certified copies
Law or Town
of professional
Planning or Project
are not attached no Management or
points will be allocated. Finance or
(Copy of a certified copy Accounting
will not be considered).
Diploma in 10 points
Developmental
Studies or Natural
Sciences,
Sociology or Public
Administration or
P a g e | 10
Conditions of Tender
Bid -2027T
Law or Town
Planning or Project
Management or
Finance or
Accounting
Qualifications other 0
than the above
Years of facilitation 10 Years or above 15
6 to 9 Years 10
5 years 5
Less than 5 years 0
Criteria 3 METHODOLOGY
METHODOLOGY Criterion Points
Methodology is fully based 35 35 points
on the responsibilities of the
Methodology Facilitator as stated in the
Specifications section of this criteria proposal
document
must be attached
Non submission of facilitation 00
and include the approach
criteria on the
right (To score
points bidders
must submit a
detailed
methodology plan
)
P a g e | 11
Conditions of Tender
Bid -2027T
3.2.1.1.6 Professional indemnity insurance
3.2.2 Cost of tendering
The SM will not be liable for any costs incurred in the preparation and submission of a tender
offer, including the costs of any testing necessary to demonstrate that aspects of the offer
complies with requirements.
3.2.3 Check documents
The documents issued by the SM for the purpose of a tender offer are listed in the index of this
tender document.
Before submission of any tender, the tenderer should check the number of pages, and if any are
found to be missing or duplicated, or the figures or writing is indistinct, or if the Price Schedule
contains any obvious errors, the tenderer must apply to the SM at once to have the same rectified.
3.2.4 Confidentiality and copyright of documents
Treat as confidential all matters arising in connection with the tender. Use and copy the documents
issued by the SM only for the purpose of preparing and submitting a tender offer in response to
the invitation.
3.2.5 Reference documents
Obtain, as necessary for submitting a tender offer, copies of the latest versions of standards,
specifications, Conditions of Contract and other publications, which are not attached but which
are incorporated into the tender documents by reference.
3.2.6 Acknowledge and comply with notices
Acknowledge receipt of notices to the tender documents, which the SM may issue, fully comply
with all instructions issued in the notices, and if necessary, apply for an extension of the closing
time stated on the front page of the tender document, in order to take the notices into account.
Notwithstanding any requests for confirmation of receipt of notices issued, the tenderer shall be
deemed to have received such notices if the SM can show proof of transmission thereof via
electronic mail, facsimile or registered post.
3.2.7 Clarification meeting N/A
Attend, where required, a clarification meeting at which tenderers may familiarise themselves with
aspects of the proposed work, services or supply and pose questions. Details of the meeting(s)
are stated in the General Tender Information.
Tenderers should be represented at the site visit/clarification meeting by a person who is suitably
qualified and experienced to comprehend the implications of the work involved.
3.2.8 Seek clarification
Request clarification of the tender documents, if necessary, by notifying the SM at least one week
before the closing time stated in the General Tender Information, where possible.
3.2.9 Pricing the tender offer
3.2.9.1 Comply with all pricing instructions as stated on the Price Schedule.
P a g e | 12
Conditions of Tender
Bid -2027T
3.2.10 Alterations to documents
Do not make any alterations or additions to the tender documents, except to comply with
instructions issued by the SM in writing, or necessary to correct errors made by the tenderer. All
signatories to the tender offer shall initial all such alterations.
3.2.11.2 Accept that an alternative tender offer may be based only on the criteria stated in the tender
conditions or criteria otherwise acceptable to the SM.
3.2.12 Submitting a tender offer
3.2.12.1 Submit one tender offer only on the original tender documents as issued by the SM, either as a
single tendering entity or as a member in a joint venture to provide the whole of the works, services
or supply identified in the contract conditions and described in the specifications. Only those
tenders submitted on the tender documents as issued by the SM together with all Returnable
Schedules duly completed and signed will be declared responsive.
3.2.12.2 Return the entire document to the SM after completing it in its entirety, either electronically (if they
were issued in electronic format) or by writing legibly in non-erasable ink.
3.2.12.3 Submit the parts of the tender offer communicated on paper as an original with an English
translation for any part of the tender submission not made in English.
1 (One) copy(ies) of the following elements of the bid submission must be submitted separately
bound in the same envelope where possible:
3.2.12.4 Sign the original tender offer where required in terms of the tender conditions. The tender shall
be signed by a person duly authorised to do so. Tenders submitted by joint ventures of two or
more firms shall be accompanied by the document of formation of the joint venture or any other
document signed by all parties, in which is defined precisely the conditions under which the joint
venture will function, its period of duration, the persons authorised to represent and obligate it, the
participation of the several firms forming the joint venture, and any other information necessary to
permit a full appraisal of its functioning. Signatories for tenderers proposing to contract as joint
ventures shall state which of the signatories is the lead partner.
3.2.12.5 Where a two-envelope system is required in terms of the tender conditions, place and seal the
returnable documents listed in the tender conditions in an envelope marked “financial proposal”
and place the remaining returnable documents in an envelope marked “technical proposal”. Each
envelope shall state on the outside the SM’s address and identification details stated in the
General Tender Information, as well as the tenderer's name and contact address.
3.2.12.6 Seal the original tender offer and copy packages together in an outer package that states on the
outside only the SM's address and identification details as stated in the General Tender
Information. . If it is not possible to submit the original tender and the required copies (see 3.13.3)
in a single envelope, then the tenderer must seal the original and each copy of the tender offer as
separate packages marking the packages as “ORIGINAL” and “COPY” in addition to the
aforementioned tender submission details.
3.2.12.7 Accept that the SM shall not assume any responsibility for the misplacement or premature opening
of the tender offer if the outer package is not sealed and marked as stated.
3.2.12.8 Accept that tender offers submitted by facsimile or e-mail will be rejected by the SM, unless stated
otherwise in the tender conditions.
3.2.12.9 By signing the offer part of the Form of Offer (Section 2, Part A) the tenderer warrants that all
information provided in the tender submission is true and correct.
3.2.12.10 Tenders must be properly received and deposited in the designated tender box on or before the
closing date and before the closing time (as detailed on the General Tender Information page
of this tender document)
3.2.12.12 The tenderer must record and reference all information submitted contained in other documents
for example cover letters, brochures, catalogues, etc. in the returnable schedule titled List of
Other Documents Attached by Tenderer.
P a g e | 13
Conditions of Tender
Bid -2027T
3.2.13 Information and data to be completed in all respects
Accept that tender offers, which do not provide all the data or information requested completely
and in the form required, may be regarded by the SM as non-responsive.
3.2.14 Closing time
3.2.14.1 Ensure that the SM receives the tender offer at the address specified in the General Tender
Information prior to the closing time stated on the front page of the tender document.
3.2.14.2 Accept that, if the SM extends the closing time stated on the front page of the tender document
for any reason, the requirements of these Conditions of Tender apply equally to the extended
deadline.
3.2.14.3 Accept that, the SM shall not consider tenders that are received after the closing date and time
for such a tender (late tenders).
3.2.15 Tender offer validity and withdrawal of tenders
3.2.15.1 Warrants that the tender offer(s) remains valid, irrevocable and open for acceptance by the SM
at any time for a period of 120 days after the closing date stated on the front page of the tender
document.
3.2.15.2 Notwithstanding the period stated above, bids shall remain valid for acceptance for a period of
three (3) months after the expiry of the original validity period, unless the SM is notified in writing
of anything to the contrary by the bidder.
3.2.15.3 A tenderer may request in writing, after the closing date, that the tender offer be withdrawn. Such
withdrawal will be permitted or refused at the sole discretion of the SM after consideration of the
reasons for the withdrawal, which shall be fully set out by the tenderer in such written request for
withdrawal. Should the tender offer be withdrawn in contravention hereof, the tenderer agrees
that:
a) it shall be liable to the SM for any additional expense incurred or losses suffered by the
SM in having either to accept another tender or, if new tenders have to be invited, the
additional expenses incurred or losses suffered by the invitation of new tenders and the
subsequent acceptance of any other tender;
b) the SM shall also have the right to recover such additional expenses or losses by set-off
against monies which may be due or become due to the tenderer under this or any other
tender or contract or against any guarantee or deposit that may have been furnished by
the tenderer or on its behalf for the due fulfilment of this or any other tender or contract.
Pending the ascertainment of the amount of such additional expenses or losses, the SM
shall be entitled to retain such monies, guarantee or deposit as security for any such
expenses or loss.
3.2.16 Clarification of tender offer, or additional information, after submission
Provide clarification of a tender offer, or additional information, in response to a written request to
do so from the SM during the evaluation of tender offers within the time period stated in such
request. No change in the competitive position of tenderers or substance of the tender offer is
sought, offered, or permitted.
This clause does not preclude the negotiation of the final terms of the contract with a preferred
tenderer following a competitive selection process, should the SM elect to do so.
Failure, or refusal, to provide such clarification or additional information within the time for
submission stated in the SM’s written request may render the tender non-responsive.
3.2.17 Provide other material
3.2.17.1 General:
Provide, on request by the SM, any other material that has a bearing on the tender offer, the
tenderer’s commercial position (including joint venture agreements), preferencing arrangements,
or samples of materials, considered necessary by the SM for the purpose of the evaluation of the
tender. Should the tenderer not provide the material, or a satisfactory reason as to why it cannot
P a g e | 14
Conditions of Tender
Bid -2027T
be provided, by the time for submission stated in the SM’s request, the SM may regard the tender
offer as non-responsive.
3.2.17.2 Provide, on written request by the SM, where the transaction value inclusive of VAT exceeds
R 10 million:
a) audited annual financial statement for the past 3 years, or for the period since
establishment if established during the past 3 years, if required by law to prepare annual
financial statements for auditing;
b) a certificate signed by the tenderer certifying that the tenderer has no undisputed
commitments for municipal services towards a municipality or other service provider in
respect of which payment is overdue for more than 30 days;
c) particulars of any contracts awarded to the tenderer by an organ of state during the past
five years, including particulars of any material non-compliance or dispute concerning
the execution of such contract;
d) a statement indicating whether any portion of the goods or services are expected to be
sourced from outside the Republic, and, if so, what portion and whether any portion of
payment from the municipality or municipal entity is expected to be transferred out of the
Republic.
Each party to a Consortium/Joint Venture shall submit separate certificates/statements in the
above regard.
3.2.17.3 Municipal Accounts:
In addition to the conditions stated in 3.2.1.1.2.k of these tender conditions, tenderers further
undertake to fully cooperate with the SM in the provision of appropriate and valid information and
/ or evidence to enable the SM to determine whether the entity and its directors / members /
partners has any municipal arrears greater than 90 days. The SM reserves its rights to make
additional enquiries in this regard, with the bidding entity or any municipality or municipal entity.
3.2.18 Samples, Inspections, tests and analysis
Provide access during working hours to premises for inspections, tests and analysis as provided
for in the tender conditions or specifications.
If the Specification requires the tenderer to provide samples, these shall be provided strictly in
accordance with the instructions set out in the Specification.
If such samples are not submitted as required in the bid documents or within any further time
stipulated by the SM in writing, then the bid concerned may be declared non-responsive.
The samples provided by all successful bidders will be retained by the SM for the duration of any
subsequent contract. Bidders are to note that samples are requested for testing purposes
therefore samples submitted to the SM may not in all instances be returned in the same state of
supply and in other instances may not be returned at all. Unsuccessful bidders will be advised by
the Project Manager or dedicated SM Official to collect their samples, save in the aforementioned
instances where the samples would not be returned.
3.2.19 Certificates
The tenderer must provide the SM with all certificates as stated below:
P a g e | 15
Conditions of Tender
Bid -2027T
3.2.19.1 Broad-Based Black Economic Empowerment Status Level Documentation
In order to qualify for preference points, it is the responsibility of the tenderer to submit
documentary proof, either as certificates, sworn affidavits or any other requirement prescribed in
terms of the B-BBEE Act, of its B-BBEE status level of contribution in accordance with the
applicable Codes of good practise as issued by the Department of Trade and Industry, to the SM
with the tender submission.
Consortiums/Joint Ventures will qualify for preference points, provided that the entity submits the
relevant certificate/scorecard in accordance with the applicable codes of good practise. Note that,
in the case of unincorporated entities, a verified consolidated B-BBEE scorecard must be
submitted in the form of a certificate with the tender.
Tenderers are further referred to the content of the Preference Points Claim Form for the full
terms and conditions applicable to the awarding of preference points.
The applicable code for this tender is the Amended Codes for Measuring Broad-Based Black
Economic Empowerment in the Construction Sector.
The tenderer shall indicate on the Preference Points Claim Form the Level of Contribution in
respect of the enterprise status or structure of the tendering entity (the supplier).
3.2.19.2 Evidence of tax compliance
Tenderers shall be registered with the South African Revenue Service (SARS) and their tax affairs
must be in order and they must be tax compliant subject to the requirements of clause 2.2.1.1.2.h.
In this regard, it is the responsibility of the tenderer to provide its Tax Compliance Status PIN
number on the Compulsory Enterprise Questionnaire pages of the tender submission.
Each party to a Consortium/Joint Venture shall separately submit this information.
Before making an award the SM must verify the bidder’s tax compliance status. Where the
recommended bidder is not tax compliant, the bidder should be notified of the non-compliant
status and be requested to submit to the SM, within 7 working days, written proof from SARS that
they have made arrangement to meet their outstanding tax obligations. The proof of tax
compliance submitted by the bidder must be verified by the SM via CSD or e-Filing. The SM
should reject a bid submitted by the bidder if such bidder fails to provide proof of tax compliance
within the timeframe stated herein and it status on the SARS system remains non-compliant.
Only foreign suppliers who have answered “NO” to all the questions contained in the
Questionnaire to Bidding Foreign Suppliers section on the Compulsory Enterprise
Questionnaire pages of the tender submission, are not required to register for a tax compliance
status with SARS.
3.2.20 Compliance with Occupational Health and Safety Act,
Tenderers are to note the requirements of the Occupational Health and Safety Act, .
The Tenderer shall be deemed to have read and fully understood the requirements of the above
Act and Regulations and to have allowed for all costs in compliance therewith.
In this regard the Tenderer shall submit upon written request to do so by the SM, a Health and
Safety Plan in sufficient detail to demonstrate the necessary competencies and resources to
deliver the goods or services all in accordance with the Act, Regulations and Health and Safety
Specification.
P a g e | 16
Conditions of Tender
Bid -2027T
3.2.21 Claims arising from submission of tender
The tenderer warrants that it has:
a) inspected the Specifications and read and fully understood the Conditions of Contract.
b) read and fully understood the whole text of the Specifications and Price Schedule and
thoroughly acquainted himself with the nature of the goods or services proposed and
generally of all matters which may influence the Contract.
c) visited the site(s) where delivery of the proposed goods will take place, carefully
examined existing conditions, the means of access to the site(s), the conditions under
which the delivery is to be made, and acquainted himself with any limitations or
restrictions that may be imposed by the Municipal or other Authorities in regard to access
and transport of materials, plant and equipment to and from the site(s) and made the
necessary provisions for any additional costs involved thereby.
d) requested the SM to clarify the actual requirements of anything in the Specifications and
Price Schedule, the exact meaning or interpretation of which is not clearly intelligible to
the Tenderer.
e) received any notices to the tender documents which have been issued in accordance
with the SM’s Supply Chain Management Policy.
The SM will therefore not be liable for the payment of any extra costs or claims arising from the
submission of the tender.
P a g e | 17
Conditions of Tender
Bid -2027T
3.3 The SM’s undertakings
3.3.1 Respond to requests from the tenderer
3.3.1.1 Unless otherwise stated in the Tender Conditions, respond to a request for clarification received
up to one week (where possible) before the tender closing time stated on the front page of the
tender document.
3.3.1.2 The SM’s representative for the purpose of this tender is stated on the General Tender
Information page.
3.3.2 Issue Notices
If necessary, issue addenda in writing that may amend or amplify the tender documents to each
tenderer during the period from the date the tender documents are available until one week
before the tender closing time stated in the Tender Data. The SM reserves its rights to issue
addenda less than one week before the tender closing time in exceptional circumstances If, as
a result a tenderer applies for an extension to the closing time stated on the front page of the
tender document, the SM may grant such extension and, shall then notify all tenderers who
drew documents.
Notwithstanding any requests for confirmation of receipt of notices issued, the tenderer shall be
deemed to have received such notices if the SM can show proof of transmission thereof via
electronic mail, facsimile or registered post.
3.3.3 Opening of tender submissions
3.3.3.1 Unless the two-envelope system is to be followed, open tender submissions in the presence of
tenderers’ agents who choose to attend at the time and place stated in the tender conditions.
Tenders will be opened immediately after the closing time for receipt of tenders as stated on the
front page of the tender document, or as stated in any Notice extending the closing date and at
the closing venue as stated in the General Tender Information.
3.3.3.2 Announce at the meeting held immediately after the opening of tender submissions, at the
closing venue as stated in the General Tender Information, the name of each tenderer whose
tender offer is opened and, where possible, the prices and the preferences indicated.
3.3.3.3 Make available a record of the details announced at the tender opening meeting on the SM’s
website.
3.3.4 Two-envelope system N/A
3.3.4.1 Where stated in the tender conditions that a two-envelope system is to be followed, open only
the technical proposal of tenders in the presence of tenderers’ agents who choose to attend at
the time and place stated in the tender conditions and announce the name of each tenderer
whose technical proposal is opened.
3.3.4.2 Evaluate the quality of the technical proposals offered by tenderers, then advise tenderers who
have submitted responsive technical proposals of the time and place when the financial
proposals will be opened. Open only the financial proposals of tenderers, who have submitted
responsive technical proposals in accordance with the requirements as stated in the tender
conditions and announce the total price and any preferences claimed. Return unopened
financial proposals to tenderers whose technical proposals were non responsive.
3.3.5 Non-disclosure
Not disclose to tenderers, or to any other person not officially concerned with such processes,
information relating to the evaluation and comparison of tender offers and recommendations for
the award of a contract, until after the award of the contract to the successful tenderer.
P a g e | 18
Conditions of Tender
Bid -2027T
3.3.6 Grounds for rejection and disqualification
Determine whether there has been any effort by a tenderer to influence the processing of tender
offers and instantly disqualify a tenderer (and his tender offer) if it is established that he engaged
in corrupt or fraudulent practices.
3.3.7 Test for responsiveness
3.3.7.1 Appoint a Bid Evaluation Committee and determine after opening whether each tender offer
properly received:
a) complies with the requirements of these Conditions of Tender,
b) has been properly and fully completed and signed, and
c) is responsive to the other requirements of the tender documents.
3.3.7.2 A responsive tender is one that conforms to all the terms, conditions, and specifications of the
tender documents without material deviation or qualification. A material deviation or qualification
is one which, in the SM's opinion, would:
a) detrimentally affect the scope, quality, or performance of the goods, services or supply
identified in
b) the Specifications,
c) significantly change the SM's or the tenderer's risks and responsibilities under the
contract, or
d) affect the competitive position of other tenderers presenting responsive tenders, if it
were to be rectified.
Reject a non-responsive tender offer, and not allow it to be subsequently made responsive by
correction or withdrawal of any material deviation or qualification.
The SM reserves the right to accept a tender offer which does not, in the SM’s opinion, materially
and/or substantially deviate from the terms, conditions, and specifications of the tender
documents.
3.3.8 Arithmetical errors, omissions, discrepancies and corrections of rates
3.3.8.1 Check the highest ranked tender or tenderer with the highest number of tender evaluation points
after the evaluation of tender offers for:
a) the gross misplacement of the decimal point in any unit rate;
b) omissions made in completing the Price Schedule; or
c) arithmetic errors in:
i. line item totals resulting from the product of a unit rate and a quantity in the
Price Schedule; or
ii. the summation of the prices; or
iii. calculation of individual rates.
3.3.8.2 Notify the tenderer of all errors or omissions that are identified in the tender offer and either
confirm the tender offer as tendered or accept the corrected total of prices. Where the tenderer
elects to confirm the tender offer as tendered, correct the errors as follows:
a) If bills of quantities or pricing schedules apply and there is an error in the line item total
resulting from the product of the unit rate and the quantity, the line item total shall
govern and the rate shall be corrected. Where there is an obviously gross
misplacement of the decimal point in the unit rate, the line item total as quoted shall
govern, and the unit rate shall be corrected.
Where there is an error in the total of the prices either as a result of other corrections required
by this checking process or in the tenderer's addition of prices, the total of the prices shall govern
and the tenderer will be asked to revise selected item prices (and their rates if bills of quantities
apply) to achieve the tendered total of the prices.
P a g e | 19
Conditions of Tender
Bid -2027T
3.3.8.3 In the event of tendered rates or lump sums being declared by the SM to be unacceptable to it
because they are not priced, either excessively low or high, or not in proper balance with other
rates or lump sums, the tenderer may be required to produce evidence and advance arguments
in support of the tendered rates or lump sums objected to. If, after submission of such evidence
and any further evidence requested, the SM is still not satisfied with the tendered rates or lump
sums objected to, it may request the tenderer to amend these rates and lump sums along the
lines indicated by it.
The tenderer will then have the option to alter and/or amend the rates and lump sums objected
to and such other related amounts as are agreed on by the SM, but this shall be done without
altering the tender offer in accordance with this clause.
Should the tenderer fail to amend his tender in a manner acceptable to and within the time stated
by the SM, the SM may declare the tender as non-responsive.
3.3.9 Clarification of a tender offer
The SM may, after the closing date, request additional information or clarification from tenderers,
in writing on any matter affecting the evaluation of the tender offer or that could give rise to
ambiguity in a contract arising from the tender offer, which written request and related response
shall not change or affect their competitive position or the substance of their offer. Such request
may only be made in writing by the Bid Evaluation Committee using any means as appropriate.
3.3.10 Evaluation of tender offers
3.3.10.1 General
3.3.10.1.1 Reduce each responsive tender offer to a comparative price and evaluate them using the tender
evaluation methods and associated evaluation criteria and weightings that are specified in the
tender conditions.
3.3.10.1.2 For evaluation purposes only, the effects of the relevant contract price adjustment methods will
be considered in the determination of comparative prices as follows:
a. If the selected method is based on bidders supplying rates or percentages for outer
years, comparative prices would be determined over the entire contract period based
on such rates or percentages.
b. If the selected method is based on a formula, indices, coefficients, etc. that is the same
for all bidders during the contract period, comparative prices would be the prices as
tendered for year one.
c. If the selected method is based on a formula, indices, coefficients, etc. that varies
between bidders, comparative prices would be determined over the entire contract
period based on published indices relevant during the 12 months prior to the closing
date of tenders.
d. If the selected method includes an imported content requiring rate of exchange
variation, comparative prices would be determined based on the exchange rates
tendered for the prices as tendered for year one. The rand equivalent of the applicable
currency 14 days prior to the closing date of tender will be used (the SM will check all
quoted rates against those supplied by its own bank).
e. If the selected method is based on suppliers’ price lists, comparative prices would be
the prices as tendered for year one.
f. If the selected method is based on suppliers’ price lists and / or rate of exchange,
comparative prices would be determined as tendered for year one whilst taking into
account the tendered percentage subject to rate of exchange (see sub clause (d) for
details on the calculation of the rate of exchange).
3.3.10.1.3 Where the scoring of functionality forms part of a bid process, each member of the Bid
Evaluation Committee must individually score functionality. The individual scores must then be
interrogated and calibrated if required where there are significant discrepancies. The individual
scores must then be added together and averaged to determine the final score.
P a g e | 20
Conditions of Tender
Bid -2027T
3.3.10.2 Decimal places
Score financial offers, preferences, and functionality, as relevant, to two decimal places.
3.3.10.3 Scoring of tenders (price and preference)
3.3.10.3.1 Points for price will be allocated in accordance with the formula set out in this clause based on
the tender sum / amount as set out in the Price Schedule (Part 3).
3.3.10.3.2 Points for preference will be allocated in accordance with the provisions of Preference Points
Claim Form and the table in this clause.
3.3.10.3.3 The terms and conditions of Preference Points Claim Form as it relates to preference shall
apply in all respects to the tender evaluation process and any subsequent contract.
3.3.10.3.4 Applicable formula:
The price/preference points system as identified within the Preference Claim form attached in
this bid document will be applicable to this tender.
3.3.10.5 Risk Analysis
Notwithstanding compliance with regard to any requirements of the tender, the SM will perform
a risk analysis in respect of the following:
a) reasonableness of the financial offer
b) reasonableness of unit rates and prices
c) the tenderer’s ability to fulfil its obligations in terms of the tender document, that is, that
the tenderer can demonstrate that he/she possesses the necessary professional and
technical qualifications, professional and technical competence, financial resources,
equipment and other physical facilities, managerial capability, reliability, capacity,
experience, reputation, personnel to perform the contract, etc.; the SM reserves the right
to consider a tenderer’s existing contracts with the SM in this regard
d) any other matter relating to the submitted bid, the tendering entity, matters of
compliance, verification of submitted information and documents, etc.
The conclusions drawn from this risk analysis will be used by the SM in determining the
acceptability of the tender offer.
No tenderer will be recommended for an award unless the tenderer has demonstrated to the
satisfaction of the SM that he/she has the resources and skills required.
3.3.11 Negotiations with preferred tenderers
The SM may negotiate the final terms of a contract with tenderers identified through a
competitive tendering process as preferred tenderers provided that such negotiation:
a) does not allow any preferred tenderer a second or unfair opportunity;
b) is not to the detriment of any other tenderer; and
c) does not lead to a higher price than the tender as submitted.
If negotiations fail to result in acceptable contract terms, the Municipal Manager (or his
delegated authority) may terminate the negotiations and cancel the tender, or invite the next
ranked tenderer for negotiations. The original preferred tenderer should be informed of the
reasons for termination of the negotiations. If the decision is to invite the next highest ranked
tenderer for negotiations, the failed earlier negotiations may not be reopened by the SM.
Minutes of any such negotiations shall be kept for record purposes.
The provisions of this clause will be equally applicable to any invitation to negotiate with any
other tenderers.
In terms of the PPPFA Regulations, 2017, tenders must be cancelled in the event that
negotiations fail to achieve a market related price with any of the three highest scoring tenderers.
3.3.12 Acceptance of tender offer
Notwithstanding any other provisions contained in the tender document, the SM reserves the
right to:
P a g e | 21
Conditions of Tender
Bid -2027T
3.3.12.1 Accept a tender offer(s) which does not, in the SM’s opinion, materially and/or substantially
deviate from the terms, conditions, and specifications of the tender document.
3.3.12.2 Accept the whole tender or part of a tender or any item or part of any item or items from multiple
manufacturers, or to accept more than one tender (in the event of a number of items being
offered), and the SM is not obliged to accept the lowest or any tender.
3.3.12.3 Accept the tender offer(s), if in the opinion of the SM, it does not present any material risk and
only if the tenderer(s)::
a) is not under restrictions, has any principals who are under restrictions, or is not
currently a supplier to whom notice has been served for abuse of the supply chain
management system, preventing participation in the SM’s procurement,
b) can, as necessary and in relation to the proposed contract, demonstrate that he or she
possesses the professional and technical qualifications, professional and technical
competence, financial resources, equipment and other physical facilities, managerial
capability, reliability, experience and reputation, expertise and the personnel, to
perform the contract,
c) has the legal capacity to enter into the contract,
d) is not insolvent, in receivership, under Business Rescue as provided for in chapter 6
of the Companies Act, 2008, bankrupt or being wound up, has his affairs administered
by a court or a judicial officer, has suspended his business activities, or is subject to
legal proceedings in respect of any of the foregoing, complies with the legal
requirements, if any, stated in the tender data, and
e) is able, in the opinion of the SM, to perform the contract free of conflicts of interest.
If an award cannot be made in terms of anything contained herein, the SM reserves the right to
consider the next ranked tenderer(s).
3.3.12.4 Not to make an award, or revoke an award already made, where the implementation of the
contract may result in reputational risk or harm to the SM as a result of (inter alia):
a) reports of poor governance and/or unethical behaviour;
b) association with notorious individuals or their known family;
c) poor performance issues, known to the SM;
d) negative social media reports; and
e) adverse assurance (e.g. due diligence) report outcomes.
3.3.12.5 The SM reserves the right to nominate an alternative bidder at the time when an award is made
and in the event that a contract is terminated during the execution thereof, the SM may consider
the award of the contract, or non-award, to the alternative bidder in terms of the procedures
included its SCM Policy.
3.3.13 Prepare contract documents
3.3.13.1 If necessary, revise documents that shall form part of the contract and that were issued by the
SM as part of the tender documents to take account of:
a) notices issued during the tender period,
b) inclusion of some of the returnable documents, and
c) other revisions agreed between the SM and the successful tenderer.
3.3.13.2 Complete the schedule of deviations attached to the form of offer and acceptance, if any.
3.3.14 Notice to successful and unsuccessful tenderers
3.3.14.1 Before accepting the tender of the successful tenderer the SM shall notify the successful
tenderer in writing of the decision of the SM’s Bid Adjudication Committee to award the tender
to the successful tenderer. No rights shall accrue to the successful tenderer in terms of this
notice
3.3.14.2 The SM shall, at the same time as notifying the successful tenderer of the Bid Adjudication
Committee’s decision to award the tender to the successful tenderer, also give written notice to
the other tenderers informing them that they have been unsuccessful.
P a g e | 22
Conditions of Tender
Bid -2027T
3.3.15 Provide written reasons for actions taken
Provide upon request written reasons to tenderers for any action that is taken in applying these
Conditions of Tender, but withhold information which is not in the public interest to be divulged,
which is considered to prejudice the legitimate commercial interests of tenderers or might
prejudice fair competition between tenderers.
P a g e | 23
Conditions of Tender
Bid -2027T
(4) compulsory enterprise questionnaire
The following particulars must be furnished. In the case of a joint venture, separate enterprise questionnaires
in respect of each partner must be completed and submitted.
Section 1a: Name of enterprise:
Section 1b: Trading as (if different
from above)
Section 1c: Type of Entity (please Individual / Sole Proprietor
select an option)
Closed Corporation
Company
Partnership / Joint Venture
Trust
Other:
Section 1d: Postal address
Section 1e: Physical address
(Chosen as domicillium citandi et
executandi)
Section 1f: Details of authorised Title: Full Name:
representative of tenderer Tel no: Fax no:
Cellular no:
Email address:
Section 2: VAT registration number, if any:
Section 2a: National Treasury Central Supplier Database registration no.:
Section 2b: SARS Tax Compliance Status PIN :
Section 2c: Senqu Municipality Supplier Database registration no. :
Section 3: cidb registration no (if applicable):
Section 4: Particulars of sole proprietors and partners in partnerships
Section 5: Particulars of companies and close corporations
Company registration number
Close corporation number
Tax reference number
P a g e | 24
Compulsory Enterprise Questionaire
Bid -2027T
Section 6: Foreign Bidding Suppliers
Is tenderer the accredited representative in South Africa Yes No
for the Goods / Services / Works offered? If yes, enclose proof
Is tenderer a foreign based supplier for the Goods /
Services / Works offered? Yes No
If yes, answer the Questionnaire to Bidding Foreign
Questionnaire to Bidding Foreign Suppliers
a) Is the tenderer a resident of the Republic of South
Africa or an entity registered in South Africa? Yes No
b) Is the tenderer a resident of the Republic of South
Africa or an entity registered in South Africa? Yes No
c) Does the tenderer have a permanent establishment in
the Republic of South Africa? Yes No
d) Does the tenderer have any source of income in the
Republic of South Africa? Yes No
e) Is the tenderer liable in the Republic of South Africa for
any form of taxation? Yes No
The undersigned, who warrants that he / she is duly authorised to do so on behalf of the enterprise:
i) authorizes the Employer to obtain a tax clearance certificate from the South African Revenue Services
that my / our tax matters are in order;
ii) confirms that the neither the name of the enterprise or the name of any partner, manager, director or
other person, who wholly or partly exercises, or may exercise, control over the enterprise appears
on the Register of Tender Defaulters established in terms of the Prevention and Combating of Corrupt
Activities Act of 2004 or Database of Restricted Suppliers;
iii) confirms that no partner, member, director or other person, who wholly or partly exercises, or
may exercise, control over the enterprise appears, has within the last five years been convicted of
fraud or corruption;
iv) confirms that I / we are not associated, linked or involved with any other tendering entities submitting
tender offers and have no other relationship with any of the tenderers or those responsible for compiling
the scope of work that could cause or be interpreted as a conflict of interest; and
v) confirms that the contents of this questionnaire are within my personal knowledge and are to the best
of my belief both true and correct.
Signed Date
Name Position
Enterprise name
P a g e | 25
Compulsory Enterprise Questionaire
Bid -2027T
(5) form of offer and acceptance
Offer
The SM, identified in the acceptance signature block, has solicited offers to enter into a contract for the procurement
of:
Contract NO . -2025
The tenderer, identified in the offer signature block, has examined the documents listed in the conditions of tender
and addenda thereto as listed in the returnable schedules, and by submitting this offer has accepted the conditions
of tender.
By the representative of the tenderer, deemed to be duly authorized, signing this part of this form of offer and
acceptance, the tenderer offers to perform all the obligations and liabilities of the contractor under the contract
including compliance with all its terms and conditions according to their true intent and meaning for an amount to be
determined in accordance with the conditions of contract identified herein.
By signing this Form of Offer and Acceptance the tenderer offers to supply all or any of the goods and/or render all
or any of the services described in the tender document to the SM in accordance with the:
1.1 terms and conditions stipulated in this tender document;
1.2 specifications stipulated in this tender document; and
1.3 at the prices as set out in the Price Schedule.
This offer may be accepted by the SM by signing the acceptance part of this form of offer and acceptance and
returning one copy of this document to the tenderer before the end of the period of validity stated in the conditions
of tender, whereupon the tenderer becomes the party named as the supplier in the conditions of contract.
Signature (s)
Name(s)
Capacity
For the Tenderer Date
Name and Address of the Tenderer
Name and signature of witness Date
For official use.
Initials of municipal officials at
Tender opening
P a g e | 26
Form of Offer and Acceptance
Bid -2027T
Acceptance
By signing this part of this form of offer and acceptance, the employer identified below accepts the tenderer’s offer. In
consideration thereof, the employer shall pay the supplier the amount due in accordance with the conditions of
contract.. Acceptance of the tenderer’s offer shall form an agreement between the employer and the tenderer upon
the terms and conditions contained in this agreement and in the contract that is the subject of this agreement.
The terms of the contract are contained in:
Special and General Conditions of Tender
Bid -2027T
3.2.1.1.4 Key personnel
permanent employment at the close of tender. Alternatively, a signed undertaking from a
specialist consultant/firm having the required personnel, stating that they will undertake the
necessary work on behalf of the tenderer in terms of a sub-consultant agreement, will be
acceptable. Such undertaking must be attached to the schedule titled Key Personnel.
personnel listed below and the schedule titled Key Personnel must be clearly indicative of the
requirement experience durations, qualifications, professional registration details, etc
3.2.1.1.5 Minimum score for functionality
offers, and Service providers must ensure that they submit all information and required evidence
to be evaluated in terms of functionality on the criteria mentioned in table 1 below:
Criteria 1:. Experience
EXPERIENCE Bidder has successfully 2 Strategic 10
completed 2 Strategic Planning Session 35 Points
Bid -2027T
NB: Proof of Bidder has successfully 3 Strategic Planning 20
professional completed 3 Strategic Planning Session projects
experience:
ation:
qualifications. If the
Qualifications other 0
than the above
Years of facilitation 10 Years or above 15
experience
6 to 9 Years 10
5 years 5
Less than 5 years 0
Criteria 3 METHODOLOGY
qualified and experienced to comprehend the implications of the work involved.
3.2.8 Seek clarification
a risk analysis in respect of the following:
a) reasonableness of the financial offer
b) reasonableness of unit rates and prices
c) the tenderer’s ability to fulfil its obligations in terms of the tender document, that is, that
the tenderer can demonstrate that he/she possesses the necessary professional and
technical qualifications, professional and technical competence, financial resources,
equipment and other physical facilities, managerial capability, reliability, capacity,
experience, reputation, personnel to perform the contract, etc.; the SM reserves the right
to consider a tenderer’s existing contracts with the SM in this regard
d) any other matter relating to the submitted bid, the tendering entity, matters of
compliance, verification of submitted information and documents, etc.
Bid -2027T
3.3.12.1 Accept a tender offer(s) which does not, in the SM’s opinion, materially and/or substantially
deviate from the terms, conditions, and specifications of the tender document.
3.3.12.2 Accept the whole tender or part of a tender or any item or part of any item or items from multiple
manufacturers, or to accept more than one tender (in the event of a number of items being
offered), and the SM is not obliged to accept the lowest or any tender.
3.3.12.3 Accept the tender offer(s), if in the opinion of the SM, it does not present any material risk and
only if the tenderer(s)::
a) is not under restrictions, has any principals who are under restrictions, or is not
currently a supplier to whom notice has been served for abuse of the supply chain
management system, preventing participation in the SM’s procurement,
b) can, as necessary and in relation to the proposed contract, demonstrate that he or she
possesses the professional and technical qualifications, professional and technical
competence, financial resources, equipment and other physical facilities, managerial
capability, reliability, experience and reputation, expertise and the personnel, to
perform the contract,
c) has the legal capacity to enter into the contract,
d) is not insolvent, in receivership, under Business Rescue as provided for in chapter 6
of the Companies Act, 2008, bankrupt or being wound up, has his affairs administered
by a court or a judicial officer, has suspended his business activities, or is subject to
legal proceedings in respect of any of the foregoing, complies with the legal
requirements, if any, stated in the tender data, and
e) is able, in the opinion of the SM, to perform the contract free of conflicts of interest.
Quality Management
Source: Tender 02 of 26-27 Strategic Planning Session Facilitator ---Final.pdf051 0032795
TENDER VALIDITY PERIOD 120 days
Preferential points 80/20 points
Price 80
Specific goals 20
Points for historically disadvantaged persons by 10
unfair discrimination based on race, gender, or
disability
Points for Locality (domiciled in the Senqu 10
Local Municipality)
Points for Locality (domiciled in the Joe Gqabi 05
District Municipality)
Points for Locality (domiciled in the Eastern 02
Cape District Municipality)
Points for Locality (domiciled outside the 00
Eastern Cape)
Total points for Price and Specific Goals 100
must not exceed
offer, including the costs of any testing necessary to demonstrate that aspects of the offer
complies with requirements.
3.2.3 Check documents
above regard.
3.2.17.3 Municipal Accounts:
In addition to the conditions stated in 3.2.1.1.2.k of these tender conditions, tenderers further
undertake to fully cooperate with the SM in the provision of appropriate and valid information and
/ or evidence to enable the SM to determine whether the entity and its directors / members /
partners has any municipal arrears greater than 90 days. The SM reserves its rights to make
additional enquiries in this regard, with the bidding entity or any municipality or municipal entity.
3.2.18 Samples, Inspections, tests and analysis
subsequent contract. Bidders are to note that samples are requested for testing purposes
therefore samples submitted to the SM may not in all instances be returned in the same state of
supply and in other instances may not be returned at all. Unsuccessful bidders will be advised by
the Project Manager or dedicated SM Official to collect their samples, save in the aforementioned
instances where the samples would not be returned.
3.2.19 Certificates
Pricing Schedule
Source: Tender 02 of 26-27 Strategic Planning Session Facilitator ---Final.pdfBid -2027T
of any adjustment to the Scope of Work or, in the case of termination, remuneration and/or reimbursement as
described in Clause 8.4.4 of the Standard Professional Services contract as amended by the Contract Data.
6.14 All charges in respect of attendance at meetings and the provision of secretarial services, shall be included in the
tendered basic fee for normal services.
Rate based tender
DESCRIPTION Rate YEAR 1 YEAR 2 YEAR 3
(Excl VAT) excl VAT) excl VAT)
meeting
includes workplan and
analysis of the Municipal
tone and business model
two)
the draft report
of the Final Report Rate
session training on
implementation of the plan
VAT
Total including VAT
Total
Note well:
➢ Transport costs will be paid per Kilometre based on the Department of Trasport Rate
for a vehicle not exceeding 2 litre engine capacity. For flights, the Municipality will pay
for economy class upon submission of proof of payment.
➢ Accommodation will be provided by the Municipality based on the National Treasury
Guidelines (Rate) or paid upon submission of proof payment
➢ Omitting to fill in any part of the pricing schedule will lead to disqualification of the
tenderer.
NB: Evaluation will be done in rates.
Facilitator must ensure that all other costs are covered in the Rate quoted to
Facilitate the Strategic Planning Sessions.
For official use.
Signature of municipal officials
At tender opening
P a g e | 30
Bid -2027T
requested; or
(b) funds are no longer available to cover the total envisaged expenditure; or
(c) no acceptable tenders are received; or
(d) there is a material irregularity in the tender process; or
(e) the parties are unable to negotiate market related pricing.
Bid -2027T
3.2 Tenderer’s obligations
3.2.1 Eligibility Criteria
3.2.1.1 Tenderers are obligated to submit a tender offer that complies in all aspects to the
conditions as detailed in this tender document. Only those tenders that comply in all
aspects with the tender conditions, specifications, pricing instructions and contract
conditions will be declared to be responsive.
3.2.1.1.1 Submit a tender offer
before the closing time stated in the General Tender Information, where possible.
3.2.9 Pricing the tender offer
3.2.9.1 Comply with all pricing instructions as stated on the Price Schedule.
P a g e | 12
a) inspected the Specifications and read and fully understood the Conditions of Contract.
b) read and fully understood the whole text of the Specifications and Price Schedule and
thoroughly acquainted himself with the nature of the goods or services proposed and
generally of all matters which may influence the Contract.
c) visited the site(s) where delivery of the proposed goods will take place, carefully
examined existing conditions, the means of access to the site(s), the conditions under
which the delivery is to be made, and acquainted himself with any limitations or
restrictions that may be imposed by the Municipal or other Authorities in regard to access
and transport of materials, plant and equipment to and from the site(s) and made the
necessary provisions for any additional costs involved thereby.
d) requested the SM to clarify the actual requirements of anything in the Specifications and
correction or withdrawal of any material deviation or qualification.
The SM reserves the right to accept a tender offer which does not, in the SM’s opinion, materially
and/or substantially deviate from the terms, conditions, and specifications of the tender
documents.
3.3.8 Arithmetical errors, omissions, discrepancies and corrections of rates
3.3.8.1 Check the highest ranked tender or tenderer with the highest number of tender evaluation points
after the evaluation of tender offers for:
a) the gross misplacement of the decimal point in any unit rate;
b) omissions made in completing the Price Schedule; or
c) arithmetic errors in:
i. line item totals resulting from the product of a unit rate and a quantity in the
Price Schedule; or
ii. the summation of the prices; or
iii. calculation of individual rates.
3.3.8.2 Notify the tenderer of all errors or omissions that are identified in the tender offer and either
confirm the tender offer as tendered or accept the corrected total of prices. Where the tenderer
elects to confirm the tender offer as tendered, correct the errors as follows:
a) If bills of quantities or pricing schedules apply and there is an error in the line item total
resulting from the product of the unit rate and the quantity, the line item total shall
govern and the rate shall be corrected. Where there is an obviously gross
misplacement of the decimal point in the unit rate, the line item total as quoted shall
govern, and the unit rate shall be corrected.
by this checking process or in the tenderer's addition of prices, the total of the prices shall govern
and the tenderer will be asked to revise selected item prices (and their rates if bills of quantities
apply) to achieve the tendered total of the prices.
P a g e | 19
Bid -2027T
3.3.8.3 In the event of tendered rates or lump sums being declared by the SM to be unacceptable to it
because they are not priced, either excessively low or high, or not in proper balance with other
rates or lump sums, the tenderer may be required to produce evidence and advance arguments
in support of the tendered rates or lump sums objected to. If, after submission of such evidence
and any further evidence requested, the SM is still not satisfied with the tendered rates or lump
sums objected to, it may request the tenderer to amend these rates and lump sums along the
lines indicated by it.
3.3.10.3 Scoring of tenders (price and preference)
3.3.10.3.1 Points for price will be allocated in accordance with the formula set out in this clause based on
the tender sum / amount as set out in the Price Schedule (Part 3).
3.3.10.3.2 Points for preference will be allocated in accordance with the provisions of Preference Points
or any of the services described in the tender document to the SM in accordance with the:
1.1 terms and conditions stipulated in this tender document;
1.2 specifications stipulated in this tender document; and
1.3 at the prices as set out in the Price Schedule.
Price schedule
Specifications
and any drawings and documents or parts thereof, which may be incorporated by reference into the above listed
Bid -2027T
(6) price schedule
be assumed in the contract, that the tenderer has taken into account when developing his prices.
6.1 State the rates and prices in Rand unless instructed otherwise in the tender conditions.
6.2 Include in the rates, prices, and the tendered total of the prices (if any) all duties, taxes (except Value Added Tax
(VAT), and other levies payable by the successful tenderer, such duties, taxes and levies being those applicable
14 days before the closing time stated in the General Tender Information.
6.3 The short descriptions given in the Activity Schedule below are brief descriptions used to identify the activities for
which prices are required. Detailed descriptions of the activities to be priced are provided in the Scope of Work.
6.4 All prices tendered must include all expenses, disbursements and costs (e.g. transport, accommodation etc.) that
may be required for the execution of the tenderer’s obligations in terms of the Contract, and shall cover the cost
of all general risks, liabilities and obligations set forth or implied in the Contract as well as overhead charges and
profit (in the event that the tender is successful). All prices tendered will be final and binding.
6.5 All prices shall be tendered in accordance with the units specified in this schedule.
6.6 Where a value is given in the Quantity column, a Rate and Price (the product of the Quantity and Rate) is required
to be inserted in the relevant columns.
6.7 The successful tenderer is required to perform all tasks listed against each item. The tenderer must therefore
tender prices/rates on all items as per the section in the Price Schedule. An item against which no rate is/are
entered, or if anything other than a rate or a nil rate (for example, a zero, a dash or the word “included”
or abbreviations thereof) is entered against an item, it will also be regarded as a nil rate having been
entered against that item, i.e. that there is no charge for that item. The Tenderer may be requested to
clarify nil rates, or items regarded as having nil rates; and the Employer may also perform a risk analysis
with regard to the reasonableness of such rates.
6.8 Provision for time-based services which fall beyond the scope of normal services as described in the Scope of
category of person must be agreed with the Employer before any work in this regard commences.
6.9 The categories of persons (A, B, C, D) in respect of time-based fee rates for professional services shall be as
defined in the relevant guideline scope(s) of services (as referenced in the Specifications).
6.10 A higher category person undertaking lower category work will be reimbursed, in respect of time-based fees, at
the lower category rate.
6.11 Tenderers are to note that only those recoverable expenses listed in the Activity Schedule will be reimbursed to
the Service Provider. No reimbursement of costs for subsistence, typing, printing/copying (other than reports
and/or tender documents), communications or computer hardware and/or software will be made and these costs
will be deemed to be included in rates, sums, and prices for normal and additional services rendered.
6.12 Items for printing/copying shall be for specified contract documents, reports, manuals and drawings, excluding
general correspondence, minor reports, progress reports, etc. which shall be deemed to be included in the
professional fees. Payment will only be made for copies of reports and drawings submitted to the Employer or
issued, as specified or requested by the Employer, and all drafts shall be for the Service Provider’s account.
6.13 Tenderers are to note that the planning for this contract is based on a three-year budget which is subject to
change. While the Employer has every intention to complete the full scope of works, the Employer reserves the
right to reduce or increase the scope of works according to the dictates of the budget, or to terminate this contract,
without adjustment to the agreed rates, sums or fees and without payment of any penalty or surcharge in this
regard. The Service Provider shall however be entitled to pro-rata payment for all services carried out in terms
P a g e | 29
Price Schedule
Bid -2027T
of any adjustment to the Scope of Work or, in the case of termination, remuneration and/or reimbursement as
described in Clause 8.4.4 of the Standard Professional Services contract as amended by the Contract Data.
6.14 All charges in respect of attendance at meetings and the provision of secretarial services, shall be included in the
tendered basic fee for normal services.
Pricing Schedule
DESCRIPTION Rate YEAR 1 YEAR 2 YEAR 3
(Excl VAT) excl VAT) excl VAT)
➢ Transport costs will be paid per Kilometre based on the Department of Trasport Rate
for a vehicle not exceeding 2 litre engine capacity. For flights, the Municipality will pay
for economy class upon submission of proof of payment.
➢ Accommodation will be provided by the Municipality based on the National Treasury
Guidelines (Rate) or paid upon submission of proof payment
➢ Omitting to fill in any part of the pricing schedule will lead to disqualification of the
tenderer.
NB: Evaluation will be done in rates.
P a g e | 30
Price Schedule
Compliance Requirements
Source: Tender 02 of 26-27 Strategic Planning Session Facilitator ---Final.pdf (TENDER)tax compliance with SARS
tax compliance
Tax Compliance Status PIN
tax compliance status
tax compliance submitted by the bidder must be verified by the SM via CSD or e-Filing
Central Supplier Database (CSD) Registration
Central Supplier Database (CSD) as a service provider
Central Supplier Database
Central Supplier Database (CSD) updated
Central Supplier Database registration no
joint venture agreements), preferencing arrangements,
Appointment letters
who wish to register on the National Treasury Web Based Central Supplier Database
(CSD) may do so via the web address https://secure.csd.gov.za.
Central Supplier Database (CSD) updated.
b) A completed Certificate of Independent Bid Determination to be provided and which
e) A completed Declaration – Conflict of Interest and Declaration of Bidder
3.3.6 Grounds for rejection and disqualification
tender documents without material deviation or qualification. A material deviation or qualification
correction or withdrawal of any material deviation or qualification.
3.2.19.2 Evidence of tax compliance
In this regard, it is the responsibility of the tenderer to provide its Tax Compliance Status PIN
Session facilitation projectsAppointment letters
d the SM must verify the bidder’s tax compliance status. Where the
compliance submitted by the bidder must be verified by the SM via CSD or e-Filing. The SM
should reject a bid submitted by the bidder if such bidder fails to provide proof of tax compliance
Questionnaire pages of the tender submission, are not required to register for a tax compliance
detailed CV with original
qualifications. If the
Qualifications other 0
Points Allocation: 20 points
B-BBEE Details: ill be advised by
the Project Manager or dedicated SM Official to collect their samples, save in the aforementioned
instances where the samples would not be returned.
3.2.19 Certificates
The tenderer must provide the SM with all certificates as stated below:
P a g e | 15
Conditions of Tender
Bid -2027T
3.2.19.1 Broad-Based Black Economic Empowerment Status Level Documentation
In order to qualify for preference points, it is the responsibility of the tenderer to submit
documentary proof, either as certificates, sworn affidavits or any other requirement prescribed in
terms of the B-BBEE Act, of its B-BBEE status level of contribution in accordance with the
applicable Codes of good practise as issued by the Department of Trade and Industry, to the SM
with the tender submission.
Consortiums/Joint Ventures will qualify for preference points, provided that the entity submits the
relevant certificate/scorecard in accordance with the applicable codes of good practise. Note that,
in the case of unincorporated entities, a verified consolidated B-BBEE scorecard must be
submitted in the form of a certificate with the tender.
Tenderers are further referred to the content of the Preference Points Claim Form for the full
terms and conditions applicable to the awarding of preference points.
The applicable code for this tender is the Amended Codes for Measuring Broad-Based Black
Economic Empowerment in the Construction Sector.
The tenderer shall indicate on the Preference Points Claim Form the Level of Contribution in
respect of the enterprise status or structure of the tendering entity (the supplier).
3.2.19.2 Evidence of tax compliance
Tenderers shall be registered with the South African Revenue Service (SARS) and their tax affairs
must be in order a
Health & Safety
Source: Tender 02 of 26-27 Strategic Planning Session Facilitator ---Final.pdfi. Must be in writing
ii. It must set out the reasons for the appeal
iii. It must state in which way the Appellant’s rights were affected by the decision;
iv. It must state the remedy sought; and
v. It must be accompanied with a copy of the notification advising the person of the decision
or revoke the decision that has been appealed, but no such revocation of a decision may detract
from any rights that may have accrued as a result of the decision.
3.1.6.3 Right to approach the courts and rights in terms of Promotion of Administrative Justice Act,
and Promotion of Access to Information Act,
The sub- clauses above do not influence any affected person’s rights to approach the High Court
at any time or its rights in terms of the Promotion of Administrative Justice Act (PAJA) and Promotion
of Access to Information Act (PAIA).
P a g e | 6
status with SARS.
3.2.20 Compliance with Occupational Health and Safety Act,
deliver the goods or services all in accordance with the Act, Regulations and Health and Safety
offers and instantly disqualify a tenderer (and his tender offer) if it is established that he engaged
in corrupt or fraudulent practices.
3.3.7 Test for responsiveness
3.3.7.1 Appoint a Bid Evaluation Committee and determine after opening whether each tender offer
properly received:
a) complies with the requirements of these Conditions of Tender,
b) has been properly and fully completed and signed, and
c) is responsive to the other requirements of the tender documents.
3.3.7.2 A responsive tender is one that conforms to all the terms, conditions, and specifications of the
tender documents without material deviation or qualification. A material deviation or qualification
is one which, in the SM's opinion, would:
a) detrimentally affect the scope, quality, or performance of the goods, services or supply
identified in
b) the Specifications,
c) significantly change the SM's or the tenderer's risks and responsibilities under the
contract, or
d) affect the competitive position of other tenderers presenting responsive tenders, if it
were to be rectified.
satisfaction of the SM that he/she has the resources and skills required.
3.3.11 Negotiations with preferred tenderers
i) authorizes the Employer to obtain a tax clearance certificate from the South African Revenue Services
that my / our tax matters are in order;
ii) confirms that the neither the name of the enterprise or the name of any partner, manager, director or
other person, who wholly or partly exercises, or may exercise, control over the enterprise appears
on the Register of Tender Defaulters established in terms of the Prevention and Combating of Corrupt
Activities Act of 2004 or Database of Restricted Suppliers;
iii) confirms that no partner, member, director or other person, who wholly or partly exercises, or
may exercise, control over the enterprise appears, has within the last five years been convicted of
fraud or corruption;
iv) confirms that I / we are not associated, linked or involved with any other tendering entities submitting
tender offers and have no other relationship with any of the tenderers or those responsible for compiling
the scope of work that could cause or be interpreted as a conflict of interest; and
v) confirms that the contents of this questionnaire are within my personal knowledge and are to the best
of my belief both true and correct.
Contractual Terms
Source: Tender 02 of 26-27 Strategic Planning Session Facilitator ---Final.pdf(1) general tender information ............................................................................................................... 2
(2) tender notice and invitation to tender ........................................................................................... 4
(3) conditions of tender ............................................................................................................................ 5
(4) compulsory enterprise questionnaire ............................................................................................ 24
(5) form of offer and acceptance .......................................................................................................... 26
(6) price schedule ....................................................................................................................................... 29
(7) supporting schedules ......................................................................................................................... 31
Schedule 1: certificate of independent tender determination ......................................................... 31
Schedule 2: certificate of authority for joint ventures / partnerships / consortia ................... 33
Schedule 3: declaration of tenderer’s past supply chain management practices (mbd 8) ......... 34
Schedule 4: declaration of interest – state employees (mbd 4 amended) ........................................... 35
Schedule 5: preference points claim form in terms of the preferential procurement
Regulations 2022 (mbd 6.1 Amended) ........................................................................................................... 37
Schedule 9: municipal accounts’ and residence status ...................................................................... 41
Schedule 15: record of addenda to tender documents ...................................................................... 42
Schedule 16: information to be provided with the tender ................................................................ 43
Schedule 16a: work experience of bidder ............................................................................................... 44
Schedule 16b: key personnel ...................................................................................................................... 45
Schedule 16c: professional indemnity insurance ................................................................................. 47
(11) insurance broker’s warranty (pro forma) .................................................................................. 65
(12) specification(s) ................................................................................................................................... 66
P a g e | 3
for award should the contract be terminated for any reason whatsoever. In the event that a contract
is terminated during the execution thereof, the SM may consider the award of the contract, or non-
award, to the alternative bidder in terms of the procedures included its SCM Policy.
3.1.6 Objections, complaints, queries and disputes/ Appeals in terms of Section 62 of the Systems
3.1.6.1 Disputes, objections, complaints and queries
In terms of Regulations 49 and 50 of the Local Government: Municipal Finance Management Act,
Municipal Supply Chain Management Regulations (Board Notice ):
management system, may lodge within 14 days of the decision or action, a written objection or
complaint or query or dispute against the decision or action.
3.1.6.2 Appeals
In terms of Section 62 of the Local Government: Municipal Systems Act, a person whose
rights are affected by a decision taken by the SM, may appeal against that decision by giving written
notice of the appeal and reasons to the Municipal Manager within 21 days of the date of the
notification of the decision.
a) A completed Compulsory Enterprise Questionnaire to be provided (applicable schedule
to be completed);
b) A completed Certificate of Independent Bid Determination to be provided and which
does not indicate any non-compliance with the requirements of the schedule (applicable
schedule to be completed);
c) A completed Certificate of Authority for Partnerships/ Joint Ventures/ Consortiums to
be provided authorising the tender to be made and the signatory to sign the tender on the
partnership /joint venture/consortium’s (applicable schedule to be completed);
d) A copy of the partnership / joint venture / consortium agreement to be provided.
e) A completed Declaration – Conflict of Interest and Declaration of Bidders’ past Supply
Bid -2027T
3.2.1.1.6 Professional indemnity insurance
3.2.2 Cost of tendering
found to be missing or duplicated, or the figures or writing is indistinct, or if the Price Schedule
contains any obvious errors, the tenderer must apply to the SM at once to have the same rectified.
3.2.4 Confidentiality and copyright of documents
additional expenses incurred or losses suffered by the invitation of new tenders and the
subsequent acceptance of any other tender;
b) the SM shall also have the right to recover such additional expenses or losses by set-off
against monies which may be due or become due to the tenderer under this or any other
tender or contract or against any guarantee or deposit that may have been furnished by
the tenderer or on its behalf for the due fulfilment of this or any other tender or contract.
shall be entitled to retain such monies, guarantee or deposit as security for any such
expenses or loss.
3.2.16 Clarification of tender offer, or additional information, after submission
Bid -2027T
be provided, by the time for submission stated in the SM’s request, the SM may regard the tender
offer as non-responsive.
3.2.17.2 Provide, on written request by the SM, where the transaction value inclusive of VAT exceeds
R 10 million:
a) audited annual financial statement for the past 3 years, or for the period since
establishment if established during the past 3 years, if required by law to prepare annual
financial statements for auditing;
b) a certificate signed by the tenderer certifying that the tenderer has no undisputed
commitments for municipal services towards a municipality or other service provider in
respect of which payment is overdue for more than 30 days;
c) particulars of any contracts awarded to the tenderer by an organ of state during the past
five years, including particulars of any material non-compliance or dispute concerning
the execution of such contract;
d) a statement indicating whether any portion of the goods or services are expected to be
sourced from outside the Republic, and, if so, what portion and whether any portion of
payment from the municipality or municipal entity is expected to be transferred out of the
in writing on any matter affecting the evaluation of the tender offer or that could give rise to
ambiguity in a contract arising from the tender offer, which written request and related response
shall not change or affect their competitive position or the substance of their offer. Such request
may only be made in writing by the Bid Evaluation Committee using any means as appropriate.
3.3.10 Evaluation of tender offers
3.3.10.1 General
3.3.10.1.1 Reduce each responsive tender offer to a comparative price and evaluate them using the tender
evaluation methods and associated evaluation criteria and weightings that are specified in the
tender conditions.
3.3.10.1.2 For evaluation purposes only, the effects of the relevant contract price adjustment methods will
be considered in the determination of comparative prices as follows:
a. If the selected method is based on bidders supplying rates or percentages for outer
years, comparative prices would be determined over the entire contract period based
on such rates or percentages.
b. If the selected method is based on a formula, indices, coefficients, etc. that is the same
for all bidders during the contract period, comparative prices would be the prices as
tendered for year one.
c. If the selected method is based on a formula, indices, coefficients, etc. that varies
between bidders, comparative prices would be determined over the entire contract
period based on published indices relevant during the 12 months prior to the closing
date of tenders.
d. If the selected method includes an imported content requiring rate of exchange
variation, comparative prices would be determined based on the exchange rates
tendered for the prices as tendered for year one. The rand equivalent of the applicable
currency 14 days prior to the closing date of tender will be used (the SM will check all
quoted rates against those supplied by its own bank).
e. If the selected method is based on suppliers’ price lists, comparative prices would be
the prices as tendered for year one.
f. If the selected method is based on suppliers’ price lists and / or rate of exchange,
comparative prices would be determined as tendered for year one whilst taking into
account the tendered percentage subject to rate of exchange (see sub clause (d) for
details on the calculation of the rate of exchange).
3.3.10.1.3 Where the scoring of functionality forms part of a bid process, each member of the Bid
competitive tendering process as preferred tenderers provided that such negotiation:
a) does not allow any preferred tenderer a second or unfair opportunity;
b) is not to the detriment of any other tenderer; and
c) does not lead to a higher price than the tender as submitted.
If negotiations fail to result in acceptable contract terms, the Municipal Manager (or his
delegated authority) may terminate the negotiations and cancel the tender, or invite the next
ranked tenderer for negotiations. The original preferred tenderer should be informed of the
reasons for termination of the negotiations. If the decision is to invite the next highest ranked
tenderer for negotiations, the failed earlier negotiations may not be reopened by the SM.
deviations (if any), contact the employer to arrange the delivery of any securities, bonds, guarantees, proof of
insurance and any other documents to be provided in terms of the conditions of contract as supplemented by the
special conditions of contract. Failure to fulfil any of these obligations in accordance with those terms shall constitute
a repudiation of this agreement.
Section
Source: Tender 02 of 26-27 Strategic Planning Session Facilitator ---Final.pdfThe parties agree that this tender, its evaluation and acceptance and any resulting contract
3.1.2.2 These Conditions of Tender and returnable schedules which are required for tender evaluation
3.2.1.1.5 Minimum score for functionality
Only those tenders submitted by tenderers who achieve the minimum score for functionality as
The description of the functionality criteria and the maximum possible score for each is shown in
the table below. The score achieved for functionality will be the sum of the scores achieved, in the
evaluation process, for the individual criteria.
Criteria maximum points
Total points 100
The minimum qualifying score for functionality is 75 out of a maximum of 100.
the prescribed format to ensure optimal scoring of functionality points for each Evaluation Criteria.
A more detailed explanation of the functionality criteria is given below
The following criteria will be used to calculate points for functionality of Service providers tender
to be evaluated in terms of functionality on the criteria mentioned in table 1 below
completed 2 Strategic Planning Session 35 Points
Preferential points 80/20 points
Specific goals 20
Points for historically disadvantaged persons by 10
Points for Locality (domiciled in the Senqu 10
Points for Locality (domiciled in the Joe Gqabi 05
Points for Locality (domiciled in the Eastern 02
Points for Locality (domiciled outside the 00
Total points for Price and Specific Goals 100
and specific goals as stated in the tender document. Tenderers’ attention is drawn to the registration
Schedule 5: preference points claim form in terms of the preferential procurement
Description
Source: Advert 02_2025-2026T Strategic Planning Session Facilitator.pdfFacilitation of Strategic Planning Sessions for a 36-month contract period.
Important Dates
Source: Advert 02_2025-2026T Strategic Planning Session Facilitator.pdf (TENDER)Closing date: 18 August 2026 at 12h00. Tender validity period: 120 days from closing date.
Contact Information
Source: Advert 02_2025-2026T Strategic Planning Session Facilitator.pdf (TENDER)Technical enquiries: Ms. NBB Mokhantso, email: [email protected], phone: 051 003 2755. SCM enquiries: Mr. Nkosinathi Ngwenya, email: [email protected], phone: 051 003 2794. Submission address: Senqu Municipality, 19 Murray Street, Lady Grey. Tender documents available at: http://senqu.gov.za
Submission Guidelines
Source: Advert 02_2025-2026T Strategic Planning Session Facilitator.pdf (TENDER)Submit the completed original tender document and all supporting documentation in a single sealed envelope. Clearly mark the envelope with: the tenderer’s name and address, the tender number (02_2026-2027T), the tender title, and the closing date. Deposit the envelope in the tender box at Senqu Municipality, 19 Murray Street, Lady Grey, by 12h00 on 18 August 2026. No faxed or emailed submissions will be accepted. Tenders will be opened in public shortly after the closing time. The municipality reserves the right to accept the lowest or any tender, in whole or in part.
Returnable Documents
Source: Advert 02_2025-2026T Strategic Planning Session Facilitator.pdf (TENDER)Submit the original completed tender document and all supporting documentation in a single sealed envelope. Mark the envelope with the tenderer’s name, address, tender number, title, and closing date. Deposit in the tender box at Senqu Municipality, 19 Murray Street, Lady Grey, by the deadline. No faxed or emailed submissions are accepted.
Evaluation Criteria
Source: Advert 02_2025-2026T Strategic Planning Session Facilitator.pdf (TENDER)Preferential Points
Price
80
Specific Goals
Historically Disadvantaged Persons
10
Locality
Senqu Local Municipality
10
Joe Gqabi District Municipality
5
Technical Specifications
Source: Advert 02_2025-2026T Strategic Planning Session Facilitator.pdf (TENDER)Facilitation of Strategic Planning Sessions for a 36-month period. Bidders must use the bid documentation provided by the municipality. Only locally produced or manufactured goods meeting the minimum threshold for local production and content will be considered, if applicable.
Compliance Requirements
Source: Advert 02_2025-2026T Strategic Planning Session Facilitator.pdf (TENDER)Bidders must comply with all bid requirements stated in the tender document. Registration is required on the municipal supplier database and the Central Suppliers’ Database. If applicable, registration with the Construction Industry Development Board (CIDB) is also required. Compliance with the Preferential Procurement Regulations, 2022, is mandatory, including price and preference criteria. Local content and production thresholds apply where relevant.
B-BBEE Requirements
Source: Advert 02_2025-2026T Strategic Planning Session Facilitator.pdf (TENDER)Compliance with the Preferential Procurement Regulations, 2022, is required, including price and preference criteria. Only locally produced or manufactured goods meeting the minimum threshold for local production and content will be considered, if applicable.
Special Conditions
Source: Advert 02_2025-2026T Strategic Planning Session Facilitator.pdf (TENDER)The municipality reserves the right to accept the lowest or any tender, in whole or in part. Tenders will be opened in public shortly after the closing time.
Requirements
Source: Advert 02_2025-2026T Strategic Planning Session Facilitator.pdf (TENDER)Bidders must register on the municipal supplier database and the Central Suppliers’ Database. CIDB registration is required if applicable.
Section
Source: Advert 02_2025-2026T Strategic Planning Session Facilitator.pdfEvaluation uses the 80/20 Preferential Procurement Regulations, 2022. Price accounts for 80 points. Specific Goals account for 20 points: 10 for historically disadvantaged persons (race, gender, or disability), 10 for locality in Senqu Local Municipality, 5 for Joe Gqabi District Municipality, 2 for Eastern Cape District Municipality, and 0 for outside the Eastern Cape. Total must not exceed 100 points.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
19 Murray Street - Lady Grey - Lady Grey - 9755
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
2
Last checked
29 Jul 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Eastern Cape District
2
Outside Eastern Cape
0
Locality
Points awarded based on the bidder's domicile (Senqu Local Municipality, Joe Gqabi District, Eastern Cape, or outside).
HDIStatus
Points for historically disadvantaged persons (race, gender, or disability).
Get deep intelligence on Services: Professional. Unlock full pricing strategies, bid frequency, and historical win rates.