Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Issuing Organization
Passenger Rail Agency of South Africa (PRASA)Location
Gauteng
Closing Date
09 Oct 2026
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Gauteng Province - BRAAMFONTEIN - JOHANNESBURG - 2001
Organization Type
GOVERNMENT
Published
08 Sept 2026
OCDS Reference
ocds-9t57fa-169505
Passenger rail agency of south africa (PRASA) is appointing a service provider for the refurbishment of rails in the gauteng region over 36 months on an as-and-when required basis. Work includes field welding and grinding of rail manufactured crossings, wheel-spin burns, battered ends, removal of ultrasonic defects via exothermic welding of rail joints (48kg/m, 57kg/m, 60kg/m), and grinding of overlaps on turnouts. The key requirement is that bidders must price each item in the pricing schedule and provide a 10% performance bond if awarded.
Bidders must complete and sign Form C (Tender Form), submit the completed Annexure 5 (Pricing Schedule) with rates for all listed items (field welding and grinding of rail crossings, wheel-spin burns, battered rail ends, exothermic welds for 48kg/m, 57kg/m, 60kg/m rails, and grinding of overlaps on turnouts), and include VAT at 15% in the grand total.
Tenders must remain valid for a minimum of 90 working days from the closing date.
The successful bidder must furnish a Performance Bond of 10% of the contract price (VAT inclusive) issued by a South African registered bank.
Within 30 working days of award notification, the successful bidder must produce documentary proof of Workmen's Compensation, Securities, and Insurance coverage.
The successful bidder must sign a formal contract within 7 working days of notification that the contract documents are ready.
Bidders must provide a certified copy of a Resolution of the Board of Directors or Certificate of Partners, Members, or Participants authorising the signatory to bind the entity.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Friday, 09 October 2026 - 12:00
Venue
Cnr Leyds and Simmons, Shosholoza Meyl Junction, 6th floor boardroom Braamfontein,2001
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Categories
Request for Bid(Open-Tender)
Gauteng Province - BRAAMFONTEIN - JOHANNESBURG - 2001
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Description
Source: ANNEXURE 4 - SCOPE OF WORK (66082026-GAU-PERWAY).pdf08 Sept
2026
Tender Published
Tender was published
09 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
RFP DOCUMENT - 66.08.2026 GAU-PERWAY (002).pdf
The Passenger Rail Agency of South Africa (PRASA) seeks a service provider for the refurbishment of rails in the Metrorail Gauteng Region, including field welding and grinding of rail manufactured crossings, wheel-spin burns (skid marks), battered ends, removal of ultrasonic defects by exothermic welding of rail joints (48kg/m, 57kg/m and 60kg/m), and grinding of overlaps on turnouts, on an 'as and when' required basis for a period of 36 months.
ANNEXURE 4 - SCOPE OF WORK (66082026-GAU-PERWAY).pdf
The Passenger Rail Agency of South Africa (PRASA) is procuring a service provider for the refurbishment of rails in the Gauteng Region, including field welding and grinding of rail manufactured crossings, wheel-spin burns, battered ends, removal of ultrasonic defects via exothermic welding of rail joints (48kg/m, 57kg/m, and 60kg/m), and grinding of overlaps on turnouts. The contract is for 36 months on an as-and-when-required basis, covering mainlines and staging yards across the Gauteng Region.
ANNEXURE 2 - RFP CLARIFICATION FORM (66.08.2026-GAU-PERWAY).pdf
The Passenger Rail Agency of South Africa (PRASA) is procuring a service provider for the refurbishment of rails in the Gauteng region, including field welding and grinding of rail manufactured crossings, removal of wheel-spin burns, battered ends, and ultrasonic defects via exothermic welding of rail joints (48kg/m, 57kg/m, and 60kg/m), as well as grinding of overlaps on turnouts, on an as-and-when required basis for a period of 36 months.
66-08-2026-GAU-PERWAY CIDB ADVERD.pdf
The Passenger Rail Agency of South Africa (PRASA) invites tenders for the refurbishment of rails in the Metrorail Gauteng region, including field welding and grinding of rail manufactured crossings, removal of wheel spin burns (skid marks), battered ends, removal of ultrasonic defects by exothermic welding of rail joints (48kg/m, 57kg/m and 60kg/m), and grinding of overlaps on turnouts, on an 'as and when' required basis for a period of 36 months.
ANNEXURE 1 APPENDICES - LIST OF PRASA TENDER RETURNABLE FORMS FINAL (66082026-GAU-PERWAY.pdf
The Passenger Rail Agency of South Africa (PRASA) is seeking a service provider for the refurbishment of rails in the Gauteng region, including field welding and grinding of rail manufactured crossings, removal of wheel-spin burns and battered ends, exothermic welding of rail joints (48kg/m, 57kg/m and 60kg/m), and grinding of overlaps on turnouts. The contract is for an 'as and when' required basis over a period of 36 months.
Performance Bond Guide.pdf
Refurbishment of rails in the Metrorail Gauteng region through field welding and grinding of rail manufactured crossings, removal of wheel spin burns (skid marks) and battered ends, removal of ultrasonic defects by exothermic welding of rail joints (48kg/m, 57kg/m and 60kg/m), and grinding of overlaps on turnouts. The service is required on an 'as and when' basis for a period of 36 months.
ANNEXURE 5 - PRICING SCHEDULE (66082026-GAU-PERWAY).pdf
The Passenger Rail Agency of South Africa (PRASA) is procuring a service provider for the refurbishment of rails in the Gauteng region, including field welding and grinding of rail manufactured crossings, repair of wheel-spin burns and battered ends, removal of ultrasonic defects via exothermic welding of rail joints (48kg/m, 57kg/m, and 60kg/m), and grinding of overlaps on turnouts. The contract is for an 'as and when required' basis over a period of 36 months.
ANNEXURE 3 - DRAFT CONTRACT (66082026-GAU-PERWAY).pdf
The Passenger Rail Agency of South Africa (PRASA) is procuring a 36-month minor works agreement for the refurbishment of rails in the Metrorail Gauteng region, covering field welding and grinding of rail manufactured crossings, removal of wheel spin burns (skid marks), removal of battered ends, exothermic welding to repair ultrasonic defects (for 48 kg/m, 57 kg/m and 60 kg/m rails), and grinding of overlaps on turnouts, on an 'as and when' required basis.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
Passenger Rail Agency of South Africa (PRASA)Contact Person
Gloria Mokgobi
Phone
043-700-2331
Secure PRASA tenders with AI Matching & Recommendations, rail-infrastructure intelligence, compliance analysis, and bid support for rolling stock and station upgrades.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 7 129 102
Range
Based on 21 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
The scope of work involves track welding and related infrastructure works for PRASA in the Gauteng region. The contractor must supply rails, turnouts, and a flash butt welding machine. Work processes include performing work for PRASA Gauteng Province, ensuring final quality of track geometry, and communicating timeously on quality and production issues. All work must comply with the Occupational Health and Safety Act, National Environmental Management Act, and other relevant legislation. The contractor must not allow persons within the structure gauge when warning not operating.
Important Dates
Source: ANNEXURE 4 - SCOPE OF WORK (66082026-GAU-PERWAY).pdf (unknown){"briefingSession":"{"date":null,"time":null,"venue":"tendance register will be","is_compulsory":true}"}
Submission Guidelines
Source: ANNEXURE 4 - SCOPE OF WORK (66082026-GAU-PERWAY).pdf (unknown)Submit the completed tender documentation, including all mandatory forms and annexures, to the address and by the date and time stated in the tender. Bids must be submitted in the required format; non-compliant bids will be disqualified. Mandatory documents must be submitted with the tender; failure to do so may result in automatic disqualification, unless PRASA requests the information within three working days.
Returnable Documents
Source: ANNEXURE 4 - SCOPE OF WORK (66082026-GAU-PERWAY).pdf (unknown)Mandatory documents to submit: Completed Pricing and Delivery Schedule Form C, completed BOQ/Pricing, valid CIDB grading certificate, attendance of compulsory briefing session (Form D). Other mandatory documents: COID letter of good standing, valid SARS PIN, CSD supplier registration number, completion of all RFT documentation, joint venture/consortium/subcontract agreement. For technical evaluation: provide for each successfully completed project - copy of appointment letter on company letterhead (description, client name, client contact, project start/end dates, extension of time, contract value inclusive of VAT), completion certificate signed by client. For key staff: provide CVs and certified copies of qualifications and certificates of professional bodies, with translation if not in English, SAQA certificate for foreign qualifications, valid work permits for foreign nationals. Also required: SBD 5 for NIPP.
Evaluation Criteria
Source: ANNEXURE 4 - SCOPE OF WORK (66082026-GAU-PERWAY).pdf (unknown)Bids are evaluated in two stages. Stage 1A: mandatory compliance requirements (as listed in Table 9). Stage 1B: detailed evaluation of technical and business capability. Technical evaluation: 100 points, split between organizational experience (50 points) and experience/qualifications of key staff (50 points). Organizational experience scoring: 5 or more similar projects = 50 points; fewer projects score proportionally. Key staff scoring based on CVs and technical experience. Price evaluation: preference point system (80/20 or 90/10) applies; price scoring formula: Ps = Pt/Pmin
Technical Specifications
Source: ANNEXURE 4 - SCOPE OF WORK (66082026-GAU-PERWAY).pdf (unknown)Appointment of a service provider for
The refurbishment of rails by means of field welding and
Grinding of rail manufactured crossings, wheel-spin
Burns, battered ends and removal of ultra-sonic defects
By means of exothermic welding of rail joints (48KG/M,
57KG/M and 60KG/M) and grinding of overlaps on turn outs
On an as and when required basis for 36 months in the
Gauteng region
Methodology
Source: ANNEXURE 4 - SCOPE OF WORK (66082026-GAU-PERWAY).pdf13.12. Normal protection measures in accordance with the Protection Manual shall apply.
13.13. All protection arrangements shall at all times remains under the supervision and
responsibility of a Track master or Track inspector.
13.14. The contractor shall at all times be required to supply adequate and competent
supervision. The contractor shall provide a fully qualified Track Master - with valid
Track Master certificate (as required by PRASA) to properly supervise the execution
of the work.
13.15. The contractor must supply his own flagmen with valid flagmen certificate as required
per work site for protection duties. (At least 3 flagmen per site)
13.16. The contractor shall appoint at each work site a person whose sole task shall be to be
on the lookout for approaching rail traffic. This employee shall operate an audible
warning device to timeously warn all people on the work site of approaching rail traffic.
13.17. The contractor shall not allow any persons on the work site to venture within the
structure gauge when this warning procedure is not operating effectively.
13.18. The warning device shall be such that its sound can be clearly and effectively heard
above the noise on the work site by all personnel within a radius of 100m around the
centre of each work site. The cost to the contractor of providing the lookout as well as
the warning device shall be deemed to be included in the rates tendered and no
separate payment shall be made.
13.19. The Contractor shall accept responsibility for safe custody of the material and care of
14.1. Evaluation and scoring methodology
11.1.1 The evaluation of the Bids by the evaluation committees will be conducted at various
levels.
11.1.2 The following levels will be applied in the evaluation:
Experience & Qualifications
Source: ANNEXURE 4 - SCOPE OF WORK (66082026-GAU-PERWAY).pdf2.1.3. Previous track welding experience
2.1.3.1. All contractors are required to give satisfactory evidence of previous experience
regarding on-track welding and grinding and competent and qualified welding staff,
as it will form part of the evaluation criteria during the process of awarding the
contract.
2.1.4. Contractor’s responsibilities
2.1.4.1. Provision of three (3) Welding Teams
5.1.4.1.1 Each Welding team required for work will consist of:
5.1.4.1.1.1 Two welders per team
5.1.4.1.1.1.1 Welders must be in possession of valid track welding certificates. Certified copies
of the certificates must be attached with the tender submission.
5.1.4.1.1.2 Three Flag men per team
5.1.4.1.1.2.1 All flag men must be certified.
of 23
Confidential – Specification / Scope Submission (Ver.1 2020)
purpose for which it is meant to be used as well as to reach all working areas (E.g.
Across multiple lines, Cuttings etc.)
5.1.4.2.3 The Technical Officer shall have the right at any time during the contract period to
inspect and test the plant as to its efficiency and suitability. The Technical Officer
also have the right to order the contractor to remove from site and replace any plant,
which he considers inefficient or unsuitable for the work. All costs experienced by
the contractor due to loss of productivity or repairs to machinery will be for his/her
account.
5.1.4.2.4 The contractor will not be allowed to borrow or make use of any PRASA plant. The
vehicle to transport the equipment and personnel should be roadworthy and the
driver must be in possession of a valid driver’s licence and Public Drivers Permit
(Pdp)
5.1.4.3 Material and consumables
5.1.4.3.1 The Contractor shall supply the following material and consumables in good quality
and working condition:
5.1.4.3.1.1 Exothermic portions and moulds for the welding of joints.
5.1.4.3.1.2 All oxygen, acetylene, LP gas and welding rods required for welding purposes.
5.1.4.3.1.3 Cleaning material, oil, grease, black lead, and graphite for treating contact and
sliding surfaces.
5.1.4.3.1.4 Track thermometers for measuring rail temperatures.
5.1.4.3.1.5 Shims for setting expansion gaps at rail joints.
5.1.4.3.1.6 Applicable temperature crayons.
5.1.4.3.1.7 Penetrating agent.
5.1.4.3.1.8 Number and alphabetic stencils.
5.1.4.3.1.9 Measuring equipment and templates required to measure conformance and quality
of the work
of 23
Confidential – Specification / Scope Submission (Ver.1 2020)
3.2. Details of the minimum qualifications for the technical staff
Listed on 6.1 Are outlined below.
3.2.1. Perway – track inspector/ master
3.2.1.1. The minimum qualifications for the Perway Track inspector/master are as follows:
3.2.1.1.1. Recognised Track Inspector/Master qualification;
3.2.1.1.2. Minimum of 3 years of post-qualification experience.
3.2.2. Health and safety officer
3.2.2.1. The minimum qualifications for the Health and Safety Officer are as follows:
3.2.2.1.1. National Higher Diploma in Safety Management.
3.2.2.1.2. Registration as a Health and Safety Officer (Pr registered – SACPCMP).
3.2.2.1.3. Minimum of 3 years of post-qualification experience.
3.2.3. Track welder
3.2.3.1.1. The minimum qualifications for the Track Welder are as follows:
3.2.3.1.1.1. Recognised Track Welder qualification (QCTO).
3.2.3.1.1.2. Minimum of 3 years of post-qualification experience.
3.2.4. Flagman
3.2.4.1.1. The minimum qualifications for the Flagman are as follows:
3.2.4.1.1.1. Valid Flagman certificate
NB: A minimum of three qualified flagmen shall be deployed for each occupied
section.
1 Organizational Experience 50
2 Experience and qualifications of key staff 50
Total 100
Table 11: Technical Evaluation Criteria
14.6.3. Further details of the technical/functional, weighting and scores are presented in Table
12 below.
Organizational Experience 50 Score will be based on successfully executed
components and sets compliance = 0
Experience and Qualification of key staff 50 Score will be based on the qualifications, and
Experience of key personnel (based on CVs technical experience of each key staff (Track
submitted) Inspector/Master, Track Welder and Health
and safety officer).
(N.B. Provide copies of original qualifications and less than 1 year related experience =
certificates of professional bodies. The copies must 10
be certified by commissioner of oath. The date on 2. Listed three key staff members with a
the stamp shall be six months or less old, before the minimum of 1 year but less than 2
closing date of the tender. If the qualification has years’ related experience = 20
been awarded in other language either than English, 3. Listed three key staff members with a
please provide translation in English). All foreign minimum of 2 years’ but less than 3
years related experience = 30 qualifications are to be accompanied by
minimum of 3 years’ but less than 4
national’s qualifications to be accompanied
years related experience = 40
by valid work permits 5. Listed three key staff members with 4
and more years’ related experience
= 50
Total 100
Table 12: Technical Evaluation Criteria
Note: Bidders that fail to achieve the minimum overall qualifying score of 80% on
functional/ technical requirements will not be considered for further Price and Specific
Goals (Stage 3) evaluation.
14.7. Stage 3 - pricing and specific goals
14.7.1. Include or attach detailed pricing schedule
14.7.2. Bidders should provide their price proposal in envelope 2, which should include Form C
(Financial Offer) and also provide proof of Specific Goals.
14.7.3. The following formula shall be used by the Bid Evaluation Committee to allocate scores
to the interested bidders
Figure 8: formula for allocating points
of 23
Confidential – Specification / Scope Submission (Ver.1 2020)
Quality Management
Source: ANNEXURE 4 - SCOPE OF WORK (66082026-GAU-PERWAY).pdf14.2. Evaluation process
14.2.1 Interested bidders for this project shall be evaluated in terms for their administrative
responsiveness, substantive responsiveness, technical/functional (capacity testing)
evaluation and preference points. The evaluation committee shall use the following
Evaluation Criteria depicted in table 8 below for the selection of the preferred bidder that
shall render / deliver the required works, goods and / or services.
Pricing Schedule
Source: ANNEXURE 4 - SCOPE OF WORK (66082026-GAU-PERWAY).pdf (unknown)Pricing of works: prices quoted in South African currency. Contractor advised to study SPK 7/2 requirements. Contract offer based on rates as indicated in bill of quantities. Payment certificate: on or after assessment date, Technical Officer and Supplier assess quantities of progress on each item in Bill of Quantities and complete Progress Assessment Detail form, then Progress Assessment Certificate issued. Supplier submits VAT invoice with Progress Certificate for payment. Contractor to provide banking details for electronic payments.
Financial Requirements
Source: ANNEXURE 4 - SCOPE OF WORK (66082026-GAU-PERWAY).pdf (unknown)Payment Terms: PAYMENT CERTIFICATE
5.9.1. On or after the assessment date, the Technical Officer and the Supplier will together
assess the quantities of the progress on each item in the Bill of Quantities and complete
the Progress Assessment Detail form, where after the Progress Assessment Certificate
will be issued.
5.9.2. The Supplier shall then submit a VAT invoice and a
Health & Safety
Source: ANNEXURE 4 - SCOPE OF WORK (66082026-GAU-PERWAY).pdf5.1.4.3.1.10 The required radios, flags and whistles,
5.1.4.3.1.11 All other consumables (E.g., Fuel, grinding stones, etc.) required for the proper
execution of the Works.
5.1.5 Daily workload
5.1.5.1 A daily workload (job cards) to be issued as per occupation notice.
5.1.5.2 The minimum daily workload will consist of:
5.1.5.2.1 Welding and grinding of two (2) Rail Manufactured crossings, or
5.1.5.2.2 Welding and grinding of at least fifty (50) skid marks (150mm represent one skid
mark), or
5.1.5.2.3 Cast & grind of 8 x Exothermic Welds.
5.1.5.3 PRASA Track Master to take over the site after completion of the day’s work and to
sign-off the daily log sheets.
5.1.5.4 PRASA Technical Supervisor (welding) to inspect the work done by the contractor and
to co-sign the log sheets.
5.1.5.5 Notes:
5.1.5.5.1 Should the contractor fail to achieve the workload provided, it will be recorded on
the daily log sheet, and he/she will be paid for work done only.
5.1.5.5.2 The average daily workload will be calculated over a one-month period.
2.2. Contract area
2.2.1. The contract area will be within all the corridors in the Gauteng Region.
2.2.2. PRASA will provide the Contractor with a preliminary working program. The Technical
Officer will also arrange for a planning meeting 5 days prior of contract commencement.
3.1. Professional technical staff requirements
3.1.1. The appointed contractor will be required to provide qualified and experienced
professional staff with the following key professional expertise:
3.1.1.1. Track Master
3.1.1.2. Health and Safety Officer;
3.1.1.3. Track Welder
3.1.1.4. Flagman
of 23
Confidential – Specification / Scope Submission (Ver.1 2020)
SANS 3000-1 to 2, Railway Safety Management
EN13674-1 Specification for new Railway Rails or the latest equivalent standard
UIC 860-0, UIC UIC Codes or the latest equivalent standard
8610-1
of 23
Confidential – Specification / Scope Submission (Ver.1 2020)
Specification Health and Safety Act (Act ) and Applicable Regulations;
including any subsequent amendments;
13.1. All work in this contract shall comply with the Occupational Safety Act No ,
13.2. A copy of the act as well as an approved safety file shall be kept on site for the duration of
the project.
of 23
Confidential – Specification / Scope Submission (Ver.1 2020)
13.3. The Contractor shall comply with all applicable legislation and PRASA’s safety
requirements adopted from time to time and instructed by the Technical Officer. Such
compliance shall be entirely at the contractor’s cost and shall be deemed to have been
allowed for in the rates or total prices in the contract.
13.4. The Contractor shall report all incidents in writing to the Technical Officer. Any incident
resulting in the death of or injury to any person on the works shall be reported within 15
minutes of its occurrence and any other incident shall be reported within 12 hours of its
occurrence.
13.5. All personnel employed by the Contractor shall have undergone a Health and Safety
13.6. The Contractor shall make necessary arrangements for sanitation, water, and electricity
at these relevant sites during the refurbishment of rails and turnouts.
13.7. The safety file will be approved only after all the requirements on the checklist are met.
WITS_LIB/RISK_MGT/SHE File Checklist (version 3) is attached in this regard.
13.8. All work shall always comply with the E7/2 Specification attached hereto.
13.9. Normal protection measures in accordance with the Protection Manual shall apply.
13.10. An effective safety procedure to be followed by all personnel on any work site in the case
of approaching rail traffic shall be compiled by the Contractor and implemented before
any work commences. This procedure shall be updated whenever the need arises, and
any changes shall be communicated to all employees on a works site before work
proceeds.
13.10.1. The contractor shall be responsible for the safety of personnel on site. The following
shall also form part of the safety plan:
13.10.1.1. Transportation of equipment and personnel.
13.10.1.2. Transportation, storage and handling of hazardous equipment
13.10.1.3. The site access certificate shall only be issued (to the successful bidder) after the
evaluation and approval of the safety file.
13.10.1.4. It is the requirement of this contract that the contractor should provide PRASA with
a detailed safety plan prior to being issued with a site access certificate, in
accordance with the latest version of the OHS Act and the SPK7 and the PRASA
13.10.1.5. The contractor is responsible to appoint the Safety Officer fulltime on site whose
sole responsibility will be to manage and monitor safety related issues on site.
of 23
Confidential – Specification / Scope Submission (Ver.1 2020)
Contractual Terms
Source: ANNEXURE 4 - SCOPE OF WORK (66082026-GAU-PERWAY).pdf (unknown)Penalties: if contractor fails to complete services within stipulated time, liable for 0.03% of contract price per delayed day per order, maximum 10% of contract price. Penalty does not relieve contractor of obligations. PRASA may set off or deduct penalty amounts. Additional penalties for delays to PRASA trains: R2500 per hour or part thereof, maximum R22500 per day. Damage to infrastructure materials deducted from invoice: R740 per wooden sleeper, R970 per concrete sleeper, R130 per chair, R900 per rail lubricator. Security: contractor responsible for providing security on site for equipment, small plant, consumables, and personnel for contract duration. Performance levels: contractor to perform strictly in accordance with agreement levels and accept penalties for non-performance. Increase or decrease in costs: prices fixed for duration of contract. Site physical conditions: tenderer must make provision for foreseeable and unforeseeable circumstances and obtain necessary site information to submit fixed price. Contractor responsible for safe custody of material and care of PRASA assets from handover until hand back; any loss or damage recovered on contractor's account.
Special Conditions
Source: ANNEXURE 4 - SCOPE OF WORK (66082026-GAU-PERWAY).pdf (unknown)Project specific terms and conditions: Performance levels - contractor to perform strictly in accordance with agreement levels and accept penalties for non-performance. Increase or decrease in costs - prices fixed for duration of contract. Site physical conditions - tenderer must make provision for foreseeable and unforeseeable circumstances and obtain necessary site information to submit fixed price. National Industrial Participation Programme (NIPP) applicable to all government procurement contracts with imported content; bidders required to complete SBD 5, non-completion leads to automatic disqualification.
Requirements
Source: ANNEXURE 4 - SCOPE OF WORK (66082026-GAU-PERWAY).pdf (unknown)Mandatory compliance documents include: Letter of Good Standing (COID), valid SARS PIN, CSD supplier registration number, completion of ALL RFT documentation (including all forms and annexures), and Joint Venture agreement if applicable. Attendance of compulsory briefing session is mandatory; Form D must be submitted with the tender. CIDB grading: minimum Grade 7 or higher in Class of Work CE/ME. Key staff requirements: Track Master (qualification, 3 years experience), Health and Safety Officer, Track Welder, Flagman (valid certificate). A minimum of three qualified flagmen must be deployed for each occupied section. Prices quoted in South African currency, based on bill of quantities rates. Plant must be efficient, suited for purpose, and reach all working areas; contractor not allowed to use PRASA plant.
Section
Source: ANNEXURE 4 - SCOPE OF WORK (66082026-GAU-PERWAY).pdfTechnical evaluation: 100 points total. Organizational experience: 50 points (5 or more similar projects = 50 points; fewer projects score proportionally). Experience and qualifications of key staff: 50 points, based on CVs and technical experience. Related projects include national supply of rails, turnouts, and a flash butt welding machine. Price evaluation: preference point system (80/20 or 90/10) applies; price scoring formula: Ps = Pt/Pmin
Description
Source: ANNEXURE 2 - RFP CLARIFICATION FORM (66.08.2026-GAU-PERWAY).pdfRefurbishment of rails by means of field welding and grinding of rail manufactured crossings, wheel-spin burns, battered ends and removal of ultra-sonic defects by means of exothermic welding of rail joints (48kg/m, 57kg/m and 60kg/m) and grinding of overlaps on turn outs on an as and when required basis for 36 months in the Gauteng region.
Evaluation Criteria
Source: ANNEXURE 2 - RFP CLARIFICATION FORM (66.08.2026-GAU-PERWAY).pdf (RFP)No specific eligibility criteria (such as CIDB grading, B-BBEE level, or CSD registration) are stated in the provided document. Bidders must comply with standard South African tender requirements, including completing the relevant National Treasury standard forms (e.g., SBD 1, SBD 4, SBD 6.1, SBD 8, SBD 9) as applicable.
Compliance Requirements
Source: ANNEXURE 2 - RFP CLARIFICATION FORM (66.08.2026-GAU-PERWAY).pdf (RFP)No specific requirements found
Important Dates
Source: Performance Bond Guide.pdf (unknown){"closingTime":"12:00"}
Contact Information
Source: Performance Bond Guide.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"[Insert name and physical address of Beneficiary]"}
Submission Guidelines
Source: Performance Bond Guide.pdf (unknown)Returnable documents must be completed, signed and submitted with the bid. The bidder must furnish a performance guarantee as described. No other eligibility criteria are stated in the document.
Evaluation Criteria
Source: Performance Bond Guide.pdf (unknown)The bidder must be able to furnish a performance guarantee as described. No other eligibility criteria are stated in the document.
Financial Requirements
Source: Performance Bond Guide.pdf (unknown)Bid Bond: PERFORMANCE GUARANTEE
Guarantee Reference Number:
Description
Source: ANNEXURE 3 - DRAFT CONTRACT (66082026-GAU-PERWAY).pdf (unknown)Project name, works description, site description, erf no, township, local authority, street address, employer details, principal agent details.
Contact Information
Source: ANNEXURE 3 - DRAFT CONTRACT (66082026-GAU-PERWAY).pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"ACT DATA"}
Submission Guidelines
Source: ANNEXURE 3 - DRAFT CONTRACT (66082026-GAU-PERWAY).pdf (unknown)Submit the tender electronically by the closing date and time. The tender must remain valid for 30 calendar days from the closing date; failure to honour the validity period may result in liability for damages. The employer is not bound to accept the lowest or any tender and may not give reasons. Complete and submit the priced document (lump sum or bills of quantities as indicated), the JBCC Minor Works Agreement Contract Data, and all required forms. Mark any space not applicable as 'not applicable' rather than leaving it blank.
Returnable Documents
Source: ANNEXURE 3 - DRAFT CONTRACT (66082026-GAU-PERWAY).pdf (unknown)The tenderer must provide business registration number, capacity, signature, witness details, date, and location. The tender sum must be stated in figures and in words, including tax.
Evaluation Criteria
Source: ANNEXURE 3 - DRAFT CONTRACT (66082026-GAU-PERWAY).pdf (unknown)The tender will be evaluated on the basis of the tender sum (including tax) and the completion date. The employer may reject any tender that does not comply with the tender requirements. No other evaluation criteria are stated in the provided document.
Technical Specifications
Source: ANNEXURE 3 - DRAFT CONTRACT (66082026-GAU-PERWAY).pdf (unknown)9.5 Guarantee for Payment To be provided by the employer
yes/no ?
17.4 Date for Practical completion. Currency amount
Contractor’s holiday periods ?
(for consideration by the principal agent in the revision of the date for practical completion)
Contractor's annual holiday period year 1 from Contractor's until
'other' holiday period - year 1 from until
20.0 Adjustment of Preliminaries
20.0 Payment of preliminaries
20.5.3 Assessed by principal agent, an amount pro-rated as preliminaries to the contract sum, (incl tax),
excluding preliminaries and contingencies
Adjustment of preliminaries
20 5 3 The contractor shall provide a breakdown of charges (incl tax) within 15 working days of the date of acceptance of
tenderly excluding pre5iminaries and contingency amounts
Where the contractor fails to provide such information within the specified period the amount for preliminaries
shall be subdivided in the following proportions by the principal agent:
75% varied in proportion to the revised construction period compared to the initial construction
period
For a lump sum contract, where the contractor fails to identify the preliminaries amount, such amount shall be
deemed to be seven and one half percent (7.5%) of the contract sum excluding any contingency amounts and
tax
Notes
1 By submission of this tender to the employer the tenderer offers and agrees to execute and complete the works
and remedy any defects in conformity with the specification for the tender sum stated - to be paid in instalments
as work is completed
Copyright reserved JBCC Minor Works Agreement Edition 5,1- March2014 CONTRACT DATA
2 The tender shall remain in full legal force forthirty (30) calendar days from the closing date of the tender. The
tenderer accepts liability for damages that may be suffered by the employer should the tender validity period not
be honored
3 The lowest or any offer will not necessarily be accepted by the employer - nor need reasons be given for such a
decision
Annexures. Marked
Tender sum compilation
Currency
-renderer's work excluding tax
Tax . at percentage
Total TENDER SUM inclusive of tax
Tender sum in words
(Print) TENDERER Capacity who, by its SIGNATURE warrants authority thereto Date Location
WITNESS print name Capacity SIGNATURE Date Location
Tenderers details
Name
Business-eg: public company
Business registration number
Contact person
Registered street address
Postal address
Telephone
Copyright reserved JBCC Minor Works Agreement Edition 5,1- March2014 CONTRACT DATA
Pricing Schedule
Source: ANNEXURE 3 - DRAFT CONTRACT (66082026-GAU-PERWAY).pdf (unknown)Tender sum compilation: currency, works excluding tax, tax percentage, total tender sum inclusive of tax, tender sum in words.
Financial Requirements
Source: ANNEXURE 3 - DRAFT CONTRACT (66082026-GAU-PERWAY).pdf (unknown)Payment Terms: payment certificates on
date each month, or day of week
1 9.3 9 Materials and goods off site - paid subject to
Guarantee for Advance Payment provided ?
22.0 Dispute resolution
22.2 Alternative dispute resolution organisation
Changes made to JBCC@ documentation
Note: The amendments contained herein or in the single referenced Annexure constitute the only
am
Health & Safety
Source: ANNEXURE 3 - DRAFT CONTRACT (66082026-GAU-PERWAY).pdfContract data
used in conjunction with the
JBCC© Minor Works Agreement
Edition 5.1 - published March 2014
JBCC© Constituents
The Joint Building Contracts Committee@ NPC (JBCC@) is representative of building owners and developers, professional
consultants and general and specialist contractors who contribute their knowledge and experiences to the compilation of
JBCC@ documents. JBCC@ documents portray the consensus view of the constituent members and are published in the
interests of standardisation and good practice with an equitable distribution of contractual risk. The constituents are:
Clause references apply to the JBCC@ Minor Works Agreement Edition 5.1 (MWA) published March 2014
Only clauses in the MINA requiring the provision of information [CD] are quoted below
2.0 Law, regulations and notices
2.4/19.13 Law of the country applicable to the project
Contractual Terms
Source: ANNEXURE 3 - DRAFT CONTRACT (66082026-GAU-PERWAY).pdf (unknown)Contract data: law applicable, contract documents, insurances, security, practical completion, payment, dispute resolution, amendments.
Special Conditions
Source: ANNEXURE 3 - DRAFT CONTRACT (66082026-GAU-PERWAY).pdf (unknown)Tender validity period of 30 calendar days; tenderer accepts liability for damages if validity not honored; lowest or any offer not necessarily accepted.
Description
Source: RFP DOCUMENT - 66.08.2026 GAU-PERWAY (002).pdfPRASA seeks to appoint a capable service provider to provide consumables, machinery, equipment, and labour that meet the stated technical and skill requirements for the refurbishment of rails by means of field welding and grinding of rail manufactured crossings, wheel-spin burns (skid marks), battered ends, removal of ultrasonic defects by means of exothermic welding of rail joints (48 kg/m, 57 kg/m, 60 kg/m) and grinding of overlaps on turnouts in the Metrorail Gauteng Region on an 'as and when' basis for 36 months.
Important Dates
Source: RFP DOCUMENT - 66.08.2026 GAU-PERWAY (002).pdf (RFP)Bid issue date: 8 September 2026. Compulsory briefing session: 18 September 2026 at 10H00, 6th Floor, Shosholoza Meyl Junction, Cnr Leyds and Simmonds Street, Braamfontein, 2001 (bidders provide own transport and accommodation). Closing date for questions: 23 September 2026 at 16H00. Closing date for responses to clarifications: 28 September 2026 at 16H00. Closing date and time for bid submission: 9 October 2026 at 12H00. Validity period: 90 working days from closing date. Evaluation, appointment, contract negotiations, signing, and commencement dates: to be advised.
Briefing Session
Source: RFP DOCUMENT - 66.08.2026 GAU-PERWAY (002).pdf (RFP)Compulsory briefing session: 18 September 2026 at 10H00, 6th Floor, Shosholoza Meyl Junction, Cnr Leyds and Simmonds Street, Braamfontein, 2001. Bidders must provide own transportation and accommodation. Certificate of Attendance (Form D) must be completed and submitted with proposal as proof of attendance. Bidders must also appear on the Compulsory Briefing Session Register. Bidders failing to attend may be disqualified. Briefing minutes/notes and clarification responses issued 28 September 2026.
Contact Information
Source: RFP DOCUMENT - 66.08.2026 GAU-PERWAY (002).pdf (RFP)SCM/Technical contact: Gloria Mokgobi. Email for clarifications: [email protected] (submit RFP Clarification Form, Annexure 2, before 23 September 2026 at 16H00). Post-closing communication: Bid Secretariat, telephone (011) 013 0343, email [email protected]. Complaints: [email protected] (include bid description, reference number, closing date, supplier name, contact details, detailed complaint). Submission address: Ground Floor, Shosholoza Meyl Junction, Cnr Leyds and Simmonds Street, Braamfontein, 2001.
Submission Guidelines
Source: RFP DOCUMENT - 66.08.2026 GAU-PERWAY (002).pdf (RFP)Submission method: Two sealed envelopes/boxes. Envelope 1 (Volume 1) contains Part A: Mandatory Requirements Response and Part B: Technical/Functional Response. Envelope 2 (Volume 2) contains Part C: Financial Proposal and Specific Goals. Envelope 2 must be submitted separately. One original response required; copies and an electronic version on memory card/external hard drive clearly marked with bidder's name are permitted. Responses must be in English, A4 format (graphics may be A3), neatly bound, consecutively numbered, and signed by a duly authorised person (authorisation must be included). Copies of original documents must be certified as true copies by a Commissioner of Oaths. Bidders must review the Draft Contract (Annexure 3) and may amend/delete parts using track changes; the marked-up contract will form part of negotiations. Delivery address: Ground Floor, Shosholoza Meyl Junction, Cnr Leyds and Simmonds Street, Braamfontein, 2001. Bids must be deposited in the PRASA tender box at the main entrance. Late bids will not be accepted.
Evaluation Criteria
Source: RFP DOCUMENT - 66.08.2026 GAU-PERWAY (002).pdf (RFP)Three-stage evaluation. Stage 1: Compliance. Stage 1A (Mandatory) — automatic disqualification if missing: completed Form C (Pricing and Delivery Schedule) and BOQ/Pricing (Annexure 5) in Envelope 2; valid CIDB grading of 7CE or 7ME or higher; attendance at compulsory briefing (Form D). Stage 1B (Basic Compliance) — must be available within 3 days of award: Letter of Good Standing (COID), valid SARS Tax Compliance Status PIN, CSD supplier registration number, completion of all RFP documentation, Joint Venture/Consortium/Partnering/Subcontract agreement signed by all parties (if applicable). Stage 2: Technical/Functionality — minimum threshold 80%. Criteria: Organisational Experience (50 points) — track record on Perway maintenance projects (replacement/installation of rails, turnouts, sleepers, fastenings, ballast, rail lubricators, track welding); scoring: 0 (no info), 10 (1 project), 20 (2), 30 (3), 40 (4), 50 (5+). Evidence: appointment letter on company letterhead with project description, client name, contact, dates, extensions, contract value inclusive of VAT; completion certificate signed by client. Experience and Qualification of Key Staff (50 points) — Track Inspector/Master Track Welder and Health and Safety Officer; CVs with certified copies of qualifications (certification stamp ≤6 months old before closing); scoring per three key staff: 0 (no submission), 10 (<1 year), 20 (1 year), 30 (2 years), 40 (3 years), 50 (4+ years). Stage 3: Price (80 points) and Specific Goals (20 points) — PPPFA 80/20 system. Bidders scoring below 80% in Stage 2 do not proceed to Stage 3.
Technical Specifications
Source: RFP DOCUMENT - 66.08.2026 GAU-PERWAY (002).pdf (RFP)Scope: Refurbishment of rails by means of field welding and grinding of rail manufactured crossings, wheel-spin burns (skid marks), battered ends, removal of ultrasonic defects by exothermic welding of rail joints (48 kg/m, 57 kg/m, 60 kg/m), and grinding of overlaps on turnouts. Work is on an 'as and when' required basis for a period of 36 months in the Metrorail Gauteng Region. Service provider must supply consumables, machinery, equipment, and labour meeting stated technical and skill requirements. Detailed scope of work is in Annexure 4. Key personnel required: Track Inspector/Master Track Welder and Health and Safety Officer (qualifications and experience evaluated). Organisational experience required in Perway maintenance: replacement/installation of rails, turnouts, sleepers, fastenings, ballast, rail lubricators, and railway track welding activities.
Methodology
Source: RFP DOCUMENT - 66.08.2026 GAU-PERWAY (002).pdfWork methodology: field welding and grinding of rail manufactured crossings, wheel-spin burns (skid marks), battered ends; removal of ultrasonic defects by exothermic welding of rail joints (48 kg/m, 57 kg/m, 60 kg/m); grinding of overlaps on turnouts. Execution on an 'as and when' required basis for 36 months in the Metrorail Gauteng Region. Detailed scope in Annexure 4. Bidders must provide technical/functional response (Part B) addressing scope of work.
Experience & Qualifications
Source: RFP DOCUMENT - 66.08.2026 GAU-PERWAY (002).pdfOrganisational Experience: Bidders must provide for each successfully completed Perway project: copy of appointment letter on company letterhead with project description, client name, client contact (email and office number), project start and end dates, extensions of time, contract value inclusive of VAT; completion certificate signed by client indicating value and type of work performed. Projects must cover: replacement/installation of rails, turnouts, sleepers, fastenings, ballast, rail lubricators, railway track welding activities. Key Personnel: Track Inspector/Master Track Welder and Health and Safety Officer. Provide CVs and certified copies of original qualifications and professional body certificates (certification stamp ≤6 months old before closing). If qualification in language other than English, provide English translation; if foreign, provide SAQA accreditation. Scoring based on qualifications and related experience of each key staff member.
Quality Management
Source: RFP DOCUMENT - 66.08.2026 GAU-PERWAY (002).pdfQuality requirements embedded in technical scope: removal of ultrasonic defects by exothermic welding of rail joints; field welding and grinding of rail manufactured crossings, wheel-spin burns, battered ends; grinding of overlaps on turnouts. Service provider must supply consumables, machinery, equipment, and labour meeting stated technical and skill requirements. Condition assessment conducted with ultrasonic measuring machine and patrol teams identified faults. No separate quality management system standard (e.g., ISO 9001) explicitly stated in extracted text.
Pricing Schedule
Source: RFP DOCUMENT - 66.08.2026 GAU-PERWAY (002).pdfPricing submitted in Envelope 2: Form C (Financial Offer) and proof of Specific Goals. Pricing schedule and Bill of Quantities (BOQ) in Annexure 5. PRASA may notify bidders of arithmetic errors or omissions in BOQ for clarification. Price weight: 80 points (PPPFA 80/20). Specific Goals weight: 20 points. No further pricing structure details (e.g., rates, payment schedules) in extracted text.
Financial Requirements
Source: RFP DOCUMENT - 66.08.2026 GAU-PERWAY (002).pdf (RFP)Pricing: Bidders must submit price proposal in Envelope 2, including Form C (Financial Offer) and proof of Specific Goals. Pricing schedule and Bill of Quantities (BOQ) are in Annexure 5. PRASA may notify bidders of arithmetic errors or omissions in the BOQ for clarification. Price evaluated at 80 points (PPPFA 80/20). Performance and bid bonds: referenced in RFP (Annexure 6: Draft Performance Bond) but specific bond/guarantee percentages not stated in extracted text. Financial stability: PRASA may request annual financial statements prepared and signed off by a professional accountant for due diligence. Validity of returnable documents: 90 working days from closing date; bidders may be requested to extend validity at same terms and conditions.
Compliance Requirements
Source: RFP DOCUMENT - 66.08.2026 GAU-PERWAY (002).pdf (RFP)Mandatory (Stage 1A): Completed Form C and BOQ/Pricing (Annexure 5) in Envelope 2; valid CIDB grading 7CE or 7ME or higher; attendance at compulsory briefing (Form D). Basic compliance (Stage 1B, within 3 days of award): Letter of Good Standing (COID); valid SARS Tax Compliance Status PIN; CSD supplier registration number; completion of all RFP documentation (all forms and annexures); Joint Venture/Consortium/Partnering/Subcontract agreement signed by all parties (if applicable). All bidders (including JV partners and subcontractors) must be registered on National Treasury's Central Supplier Database (CSD) and be tax compliant (SARS TCS PIN). Returnable forms (compress to one line each): Invitation to Bid (Form A); Terms and Conditions for Bidding (Form B); Tender Form/Pricing Schedule (Form C); Site Inspection Certificate/Pre-Tender Briefing Session (Form D); Statement of Work Successfully Carried Out (Form E); Security Screening Form (Form F); Acknowledgement (Form G); SBD 4 (Bidder's Disclosure); SBD 5 (National Industrial Participation Programme); SBD 6.1 (Preference Points Claim Form). Annexures: Annexure 1 (List of PRASA Tender Returnable Forms), Annexure 2 (RFP Clarification Form), Annexure 3 (Draft Contract), Annexure 4 (Scope of Work/Specification), Annexure 5 (Pricing and Form C and BOQ), Annexure 6 (Draft Performance Bond). B-BBEE: Joint Ventures/Consortiums with B-BBEE entities must state intention and submit signed agreement with percentage split and responsibilities; award only after signed agreement submitted.
Health & Safety
Source: RFP DOCUMENT - 66.08.2026 GAU-PERWAY (002).pdfHealth and Safety Officer required as key personnel (evaluated in technical criteria). No explicit OHS plan, safety file, or specific health and safety standards detailed in extracted text beyond the requirement for a qualified Health and Safety Officer. Compliance with applicable laws and regulations (including OHS Act) implied by legal compliance clause.
Contractual Terms
Source: RFP DOCUMENT - 66.08.2026 GAU-PERWAY (002).pdfContract duration: 36 months. PRASA reserves the right to: modify the RFP and request re-bids; withdraw or amend the RFP without notice; reject non-conforming proposals; disqualify late submissions; call for additional documents; withdraw the RFP on good cause; award at any time after closing; make no award; validate information submitted (bidders grant irrevocable consent); request annual financial statements for due diligence; not accept changes to bid rates after closing unless contract provides for it. If contract awarded on incorrect information, PRASA may cancel contract and place bidder on Restricted Suppliers list. PRASA may negotiate market-related price with highest scoring bidder, then second, then third, or cancel the bid. PRASA may negotiate Best and Final Offer (BAFO) with selected bidders if no proposal meets requirements, is affordable, and demonstrates value for money. Bidders bear all proposal preparation costs. Draft Contract (Annexure 3) to be reviewed; bidders may amend/delete parts using track changes; marked-up contract forms part of negotiations. Confidentiality: all RFP information treated as confidential; bidders must certify acquaintance with Non-Disclosure Agreement; written approval required to divulge information related to PRASA's business. Personal data processed per POPIA; PRASA may disclose information per legal obligations.
Special Conditions
Source: RFP DOCUMENT - 66.08.2026 GAU-PERWAY (002).pdf (RFP)Two-envelope submission: Envelope 1 (technical/compliance), Envelope 2 (financial/B-BBEE). One original plus copies and electronic version on memory card/external hard drive. Responses in English, A4 format, signed by authorised person, certified copies. Bidders must review Draft Contract (Annexure 3) and may amend using track changes; marked-up contract forms part of negotiations. Compulsory briefing attendance required (Form D). JV/Consortium with B-BBEE entities: must state intention, submit signed agreement with percentage split and responsibilities; award only after signed agreement. PRASA may request extension of bid validity (90 working days). PRASA not liable for bid preparation costs. Confidentiality obligations apply. No canvassing or collusion permitted.
Requirements
Source: RFP DOCUMENT - 66.08.2026 GAU-PERWAY (002).pdf (RFP)Mandatory (Stage 1A): Completed Form C and BOQ/Pricing (Annexure 5) in Envelope 2; valid CIDB grading 7CE or 7ME or higher; attendance at compulsory briefing (Form D). Basic compliance (Stage 1B, within 3 days of award): Letter of Good Standing (COID); valid SARS Tax Compliance Status PIN; CSD supplier registration number; completion of all RFP documentation; Joint Venture/Consortium/Partnering/Subcontract agreement signed by all parties (if applicable). All parties must be CSD registered and tax compliant. Returnable forms: Form A, Form B, Form C, Form D, Form E, Form F, Form G, SBD 4, SBD 5, SBD 6.1. Annexures 1-6 as listed.
Section
Source: RFP DOCUMENT - 66.08.2026 GAU-PERWAY (002).pdfThree-stage evaluation. Stage 1: Compliance (1A Mandatory, 1B Basic). Stage 2: Technical/Functionality — minimum 80% threshold. Criteria: Organisational Experience (50 points) — Perway maintenance projects (rails, turnouts, sleepers, fastenings, ballast, rail lubricators, track welding); scoring 0-50 based on number of similar projects (1=10, 2=20, 3=30, 4=40, 5+=50). Experience and Qualification of Key Staff (50 points) — Track Inspector/Master Track Welder and Health and Safety Officer; scoring per three key staff: 0 (no submission), 10 (<1 yr), 20 (1 yr), 30 (2 yr), 40 (3 yr), 50 (4+ yr). Stage 3: Price (80 points) and Specific Goals (20 points) — PPPFA 80/20. Bidders below 80% in Stage 2 do not proceed.
Description
Source: ANNEXURE 1 APPENDICES - LIST OF PRASA TENDER RETURNABLE FORMS FINAL (66082026-GAU-PERWAY.pdfThe tender covers the refurbishment of rails through field welding and grinding, specifically rail manufactured crossings, wheel-spin (60kg/m), and grinding of overlaps on turn outs. The work is required on an as-and-when-required basis for a period of 36 months in the Gauteng Region.
Important Dates
Source: ANNEXURE 1 APPENDICES - LIST OF PRASA TENDER RETURNABLE FORMS FINAL (66082026-GAU-PERWAY.pdf (RFP){"closingTime":"12H00","briefingSession":"{"date":null,"time":null,"venue":"EMENT OF WORKS SUCCESSFULLY CARRIED OUT BY BIDDER 7","is_compulsory":true}"}
Briefing Session
Source: ANNEXURE 1 APPENDICES - LIST OF PRASA TENDER RETURNABLE FORMS FINAL (66082026-GAU-PERWAY.pdf (RFP)A compulsory tender briefing meeting with representatives of the Employer will take place at PRASA, Shosholoza Junction, 6th Floor, cnr Leyds and Simmonds, Braamfontein, Johannesburg, 2001, at 10:00 on 18 September 2026. Bidders failing to attend the compulsory tender briefing session will be disqualified. Arrangements can be made to make bids available before closing date provided that the prospective bidder has attended the compulsory briefing meeting.
Contact Information
Source: ANNEXURE 1 APPENDICES - LIST OF PRASA TENDER RETURNABLE FORMS FINAL (66082026-GAU-PERWAY.pdf (RFP){"name":null,"email":null,"phone":null,"department":"/ PUBLIC ENTITY)","address":"UIRED TO FILL IN AND SIGN A WRITTEN CONTRACT FORM (SBD7)."}
Returnable Documents
Source: ANNEXURE 1 APPENDICES - LIST OF PRASA TENDER RETURNABLE FORMS FINAL (66082026-GAU-PERWAY.pdf (RFP)The following forms must be completed and submitted with the bid: Form A (Invitation to Bid), Form B (Terms and Conditions for Bidding), Form D (Site Inspection / Pre-Tender Briefing Session – Compulsory), Form E (Statement of Works Successfully Carried Out by Bidder), Form F (Security Screening Form), Form G (Acknowledgment), SBD 4 (Declaration of Interest), SBD 5 (National Industrial Participation Programme), and SBD 6.1 (Preference Points Claim Form).
Evaluation Criteria
Source: ANNEXURE 1 APPENDICES - LIST OF PRASA TENDER RETURNABLE FORMS FINAL (66082026-GAU-PERWAY.pdf (RFP)Bidders must attend the compulsory tender briefing session on 18 September 2026; failure to attend will result in disqualification. Bidders must be registered on the Central Supplier Database (CSD) and provide a SARS Tax Compliance Status (TCS) PIN or CSD number. Bidders must complete and submit all mandatory forms, including Form A, Form B, Form D, Form E, Form F, Form G, SBD 4, SBD 5, and SBD 6.1. Bidders must declare any interest or relationship with state employees or the procuring institution (SBD 4). Bidders must not be listed on the Register for Tender Defaulters or the List of Restricted Suppliers. Bidders must provide proof of authority to sign the bid (e.g., resolution of directors).
Experience & Qualifications
Source: ANNEXURE 1 APPENDICES - LIST OF PRASA TENDER RETURNABLE FORMS FINAL (66082026-GAU-PERWAY.pdf (RFP)Bidders must state particulars of works successfully carried out, including client, nature of works, contract/project period, value of works for which the bidder was directly responsible, and telephone number. If space is insufficient, furnish information separately.
Quality Management
Source: ANNEXURE 1 APPENDICES - LIST OF PRASA TENDER RETURNABLE FORMS FINAL (66082026-GAU-PERWAY.pdfForm a: invitation to bid 2
Form b: terms and conditions for bidding 4
Form d: site inspection / pre-tender briefing session(compulsory) 6
Form e: statement of works successfully carried out by bidder 7
Form f: security screening form 8
Form- g: acknowledgment 10
Sbd 4: declaration of interest 10
Sbd 5: the national industrial participation programme 14
Sbd 6.1: Preference points claim form in terms of the preferential
Procurement regulations 2022 16
1 | P a g e
Request for proposal – appointment of a service provider for the
Site inspection / pre-tender briefing session (compulsory)
Request number: 66/08/2026/GAU-(PERWAY)
This is to certify that _____________________________________ has / have today attended the site
inspection / tender briefing session to which this enquiry relates.
THUS DONE and SIGNED at ________________________________________________ on this
_________________ day of ___________________________
for / on behalf of PRASA Designation
Financial Requirements
Source: ANNEXURE 1 APPENDICES - LIST OF PRASA TENDER RETURNABLE FORMS FINAL (66082026-GAU-PERWAY.pdf (RFP)Bid Bond: performance guarantee to the DTI;
d. the contractor will submit a business concept for consideration and approval by
the DTI;
e. upon approval of the business concept by the DTI, the contractor will submit
detailed business plans outlining the business concepts;
f. the contractor will implement the business plans
Compliance Requirements
Source: ANNEXURE 1 APPENDICES - LIST OF PRASA TENDER RETURNABLE FORMS FINAL (66082026-GAU-PERWAY.pdf (RFP)Tax compliance status
Tax compliance
Tax compliance requirements
Tax compliance status (tcs) or pin may also be made via e-filing
Tax compliance status / tax compliance system pin code from the south african revenue
TCS PIN: OR CSD No
Csd number
Csd number must be provided
Central supplier database (csd) to upload mandatory
Central supplier database (csd), a csd number must be provided
1.3. Bidders must register on the central supplier database (csd) to upload mandatory
Numbers; tax compliance status; and banking information for verification
1.4. Where a bidder is not registered on the csd, mandatory information namely
(Business registration/ directorship/ membership/identity numbers; tax compliance
2.3 Application for tax compliance status (tcs) or pin may also be made via e-filing. In
Must submit a separate proof of tcs / pin / csd number.
Must submit a separate proof of tcs / pin / csd num
Points Allocation: 90 points
B-BBEE Details: S OF FIELD WELDING AND GRINDING OF RAIL
Manufactured crossings, wheel-spin burns, battered ends and removal of
Ultra-sonic defects by means of exothermic welding of rail joints (48KG/M,
57KG/M and 60KG/M) and grinding of overlaps on turn outs on an as and when
Required basis for 36 months in the gauteng region
Rft number: 66/08/2026/gau-(perway)
Sbd 6.1
Preference points claim form in terms of the preferential procurement
Regulations 2022
This preference form must form part of all tenders invited. It contains general information and
serves as a claim form for preference points for specific goals.
Nb: before completing this form, tenderers must study the general
Conditions, definitions and directives applicable in respect of the
Tender and preferential procurement regulations, 2022
1.1 The following preference point systems are applicable to invitations to tender:
applicable taxes included); and
applicable taxes included).
1.2 To be completed by the organ of state
(delete whichever is not applicable for this tender).
a) The applicable preference point system for this tender is the 90/10 preference point
system.
b) The applicable preference point system for this tender is the 80/20 preference point
system.
c) Either the 90/10 or 80/20 preference point system will be applicable in this tender. The
lowest/ highest acceptable tender will be used to determine the accurate system once
tenders are received.
1.3 Points for this tender (even in the case of a tender for income-generating contracts) shall
be awarded for:
(a) Price; and
(b) Specific Goals.
1.4 To be
B-BBEE Requirements
Source: ANNEXURE 1 APPENDICES - LIST OF PRASA TENDER RETURNABLE FORMS FINAL (66082026-GAU-PERWAY.pdf (RFP)Preference points may be claimed for specific goals under the Preferential Procurement Regulations 2022. The specific goals and points are: Black Women owned (4 points, certified copy of ID), Black Youth owned (4 points, certified copy of ID), Owned by black persons with disabilities (4 points, certified copy of ID and doctor's note), EME or QSE 51% Black Owned (4 points, audited annual financial/B-BBEE certificate/affidavit), Black people living in rural areas (4 points, municipal/Eskom bill or letter from Induna/Chief confirming residential address not older than 3 months).
Health & Safety
Source: ANNEXURE 1 APPENDICES - LIST OF PRASA TENDER RETURNABLE FORMS FINAL (66082026-GAU-PERWAY.pdf*If the company has more than five directors/principals a list of all shareholders must be
appended as Annexure “A”
8 | P a g e
Request for proposal – appointment of a service provider for the
I CERTIFY THAT THE INFORMATION FURNISHED IN PARAGRAPHS 1, 2 and 3
4.1 Once the successful bidder (contractor) has made contact with and furnished the
Contractual Terms
Source: ANNEXURE 1 APPENDICES - LIST OF PRASA TENDER RETURNABLE FORMS FINAL (66082026-GAU-PERWAY.pdf (RFP)The successful bidder will be required to fill in and sign a written contract form (SBD7).
Special Conditions
Source: ANNEXURE 1 APPENDICES - LIST OF PRASA TENDER RETURNABLE FORMS FINAL (66082026-GAU-PERWAY.pdf (RFP)This bid is subject to the Preferential Procurement Policy Framework Act 2000 and the Preferential Procurement Regulations 2022, the General Conditions of Contract (GCC), and, if applicable, any other legislation or special conditions of contract.
Requirements
Source: ANNEXURE 1 APPENDICES - LIST OF PRASA TENDER RETURNABLE FORMS FINAL (66082026-GAU-PERWAY.pdf (RFP)Bidders must attend the compulsory tender briefing session; failure to attend will result in disqualification. Bids must be submitted on the official forms provided (not re-typed) or online. Each party in a consortium, joint venture, or sub-contractor arrangement must submit separate proof of TCS/PIN/CSD number. If no TCS is available, a CSD number must be provided. Foreign suppliers must complete a questionnaire regarding residency, branch, permanent establishment, and source of income in South Africa. Bidders must provide particulars of successfully completed works, including client, nature of works, contract period, value, and contact details. The successful bidder will be required to sign a written contract form (SBD7).
Section
Source: ANNEXURE 1 APPENDICES - LIST OF PRASA TENDER RETURNABLE FORMS FINAL (66082026-GAU-PERWAY.pdfThe applicable preference point system is either the 90/10 or 80/20 system. Points will be awarded for specific criteria, and the lowest/highest acceptable tender will be used to determine the accurate system once tenders are received. Bidders must indicate how they claim points for each preference point system.
Description
Source: 66-08-2026-GAU-PERWAY CIDB ADVERD.pdfRefurbishment of rails by means of field welding and grinding of rail manufactured crossings, wheel spin burns (skid marks), battered ends removal of ultrasonic defects by means of exothermic welding of rail joint (48kg/m, 57kg/m and 60kg/m) and grinding of overlaps on turnouts on 'as and when' required basis for a period of 36 months in the Metrorail Gauteng Region. Employer Tender Number: 66/08/2026-GAU-PERWAY, cidb Reference Number: 100121605.
Important Dates
Source: 66-08-2026-GAU-PERWAY CIDB ADVERD.pdf (RFP)Compulsory clarification meeting: 18 September 2026 at 10h00 at Shoshoza Meyl Junction, 6th floor boardroom, Leyds and Simmonds Street, Braamfontein. Closing time: 12h00 on Friday, 9 October 2026.
Contact Information
Source: 66-08-2026-GAU-PERWAY CIDB ADVERD.pdf (RFP)Queries relating to the issue of documents: Gloria Mokgobi, Tel 011 013 0343, Email [email protected].
Submission Guidelines
Source: 66-08-2026-GAU-PERWAY CIDB ADVERD.pdf (RFP)Tenders must be submitted on the official tender documentation issued. Emailed and late tenders will not be accepted. Requirements for sealing, addressing, delivering, opening and assessment of tenders are stated in the Tender Data. Documents may be downloaded from the E-Tender Portal.
Evaluation Criteria
Source: 66-08-2026-GAU-PERWAY CIDB ADVERD.pdf (RFP)Eligibility: cidb contractor grading of 7CE or 7ME or higher. Compulsory clarification meeting attendance required. Tenders must be submitted on official tender documentation. Emailed and late tenders will not be accepted.
Technical Specifications
Source: 66-08-2026-GAU-PERWAY CIDB ADVERD.pdf (RFP)Scope: Refurbishment of rails by field welding and grinding of rail manufactured crossings, wheel spin burns (skid marks), battered ends removal of ultrasonic defects by exothermic welding of rail joints (48kg/m, 57kg/m, 60kg/m) and grinding of overlaps on turnouts, on an 'as and when' required basis for 36 months in the Metrorail Gauteng Region.
Compliance Requirements
Source: 66-08-2026-GAU-PERWAY CIDB ADVERD.pdf (RFP)Eligibility: Only tenderers with a cidb contractor grading of 7CE or 7ME or higher are eligible to submit tenders.
Section
Source: 66-08-2026-GAU-PERWAY CIDB ADVERD.pdf (RFP)Queries relating to the issues of these documents may be addressed to Gloria Mokgobi, Tel No. 011 013 0343, E-mail: [email protected].
Important Dates
Source: ANNEXURE 5 - PRICING SCHEDULE (66082026-GAU-PERWAY).pdf (TENDER)Closing date: 66/08/2026 (as per tender number) — the exact closing date and time are not stated in the provided text. No briefing or site visit dates are mentioned.
Contact Information
Source: ANNEXURE 5 - PRICING SCHEDULE (66082026-GAU-PERWAY).pdf (TENDER){"name":null,"email":null,"phone":null,"department":"rate will be","address":"RN OUTS ON AN AS AND WHEN REQUIRED BASIS"}
Submission Guidelines
Source: ANNEXURE 5 - PRICING SCHEDULE (66082026-GAU-PERWAY).pdf (TENDER)Submit the completed tender documents, including the signed Form C (Tender Form), Annexure 5 (Pricing Schedule), and all other required annexures, to PRASA by the closing date and time. The tender must remain valid for a minimum of 90 working days from the closing date. If awarded, the successful bidder must provide documentary proof of Workmen's Compensation, Securities, and Insurance coverage within 30 working days of award notification, and sign a formal contract within 7 working days of notification that contract documents are ready. A Performance Bond of 10% of the contract price (VAT inclusive), issued by a South African registered bank, must be deposited as security for due completion of the works. The pricing schedule must be completed in full, with all items priced, VAT at 15% added, and the grand total stated. Failure to comply with any of these requirements may lead to disqualification.
Evaluation Criteria
Source: ANNEXURE 5 - PRICING SCHEDULE (66082026-GAU-PERWAY).pdf (TENDER)Bidders must be duly authorised to submit the tender, with a certified copy of a Resolution of the Board of Directors or Certificate of Partners/Members/Participants. The document does not specify additional eligibility criteria such as CSD registration, tax clearance, B-BBEE level, or CIDB grading.
Pricing Schedule
Source: ANNEXURE 5 - PRICING SCHEDULE (66082026-GAU-PERWAY).pdfPricing schedule items (Annexure 5):
1.1 Field welding & grinding of rail manufactured crossings (Each)
1.2 Wheel-spin burns (Skid marks) (mm)
1.3 Welding and grinding of battered rail ends (mm)
1.4 Exothermic welds (48kg/m) (Each)
1.5 Exothermic welds (57kg/m) (Each)
1.6 Exothermic welds (60kg/m) (Each)
1.7 Grinding of overlaps on turnouts (m)
All items must be priced, VAT at 15% added, and grand total value stated.
Compliance Requirements
Source: ANNEXURE 5 - PRICING SCHEDULE (66082026-GAU-PERWAY).pdf (TENDER)I / We undertake to produce acceptable documentary proof of the necessary coverage for Workmen’s
Compensation, Securities and Insurance within 30 (thirty) working days of notification of awarding of
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Gauteng Province - BRAAMFONTEIN - JOHANNESBURG - 2001
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
8
Last checked
13 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Learn how to submit a winning bid with these related articles
How consulting engineers, engineering firms, and multidisciplinary practices can win public sector infrastructure contracts in South Africa — from ECSA registration and CESA membership to fee proposals, QBS scoring, and building a winning tender response.
A comprehensive guide to civil engineering infrastructure tenders in South Africa. Covers CIDB requirements, major buyers, the tender pipeline, and how civil engineering firms win government work in roads, dams, water, and sanitation.
How mechanical and electrical engineers, contractors, and consultants can win public sector contracts in South Africa — HVAC, plumbing, fire systems, electrical infrastructure, ECSA registration, CIDB ME designation, and tender documentation essentials.
A professional guide for consulting engineers on bidding for government infrastructure projects. Understanding percentage-based fees, discounting ECSA guidelines, and managing professional indemnity risk.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Civil engineering. Unlock full pricing strategies, bid frequency, and historical win rates.