Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Issuing Organization
Development Bank of Southern Africa (DBSA)Location
Gauteng
Closing Date
07 Oct 2026
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
1258 Lever Road - Headwayhill - Midrand - 1619
Organization Type
GOVERNMENT
Published
16 Sept 2026
OCDS Reference
ocds-9t57fa-170650
Demolition and removal of structural concrete and concrete paving blocks as part of the tzaneen dam project for the department of water and sanitation, with the development bank of southern africa acting as implementing agent. The successful bidder will execute the works under the management and supervision of the main contractor, dws construction north (pty) ltd, and must accept appointment as principal contractor under the construction regulations 2014. A performance guarantee must be provided within 14 days of the agreement taking effect, and pricing is submitted via a bill of quantities.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Wednesday, 07 October 2026 - 00:00
Venue
No. 1 Voortrekker Road, Tzaneen Dam, Construction North office- Tzaneen. Please use Deer Park Road t
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Categories
Request for Bid(Open-Tender)
1258 Lever Road - Headwayhill - Midrand - 1619
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Description
16 Sept
2026
Tender Published
Tender was published
07 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
RFP089.2026_Volume 1 Procedures.pdf
The Development Bank of Southern Africa (DBSA), on behalf of the Department of Water and Sanitation, requires a CIDB-registered contractor (Grade 7 CE or SE or higher) to demolish and remove structural concrete and concrete paving blocks at the Tzaneen Dam Construction North office in Tzaneen, Limpopo. The procurement is a single-stage open tender with a compulsory site briefing and a two-envelope electronic submission via Microsoft OneDrive. Bidders must have completed at least two demolition projects valued over R10 million each in the last 10 years, and the successful contractor must subcontract a minimum of 30% of the paving removal work to local community-based subcontractors.
Annexure C - DBSA SHEQ Policy.pdf
RFP089.2026_Volume 3 The Contract.pdf
Demolition and removal of structural concrete and concrete paving blocks at the Development Bank of Southern Africa premises in Midrand, Gauteng, under a GCC 2015 construction contract. The contractor will work under the direction of the Employer's Agent and must co-operate with the Main Contractor appointed for the Tzaneen Dam project.
Annexure B - Baseline Risk Assessment - Tzaneen Dam - DBSA.pdf
The Development Bank of Southern Africa, on behalf of the Department of Water and Sanitation, is appointing a contractor for the demolition and removal of structural concrete and concrete paving blocks as part of the Groot Letaba River Water Development Project: Raising of Tzaneen Dam. The works include demolishing approximately 4 m of concrete from the top of the existing Ogee crest, constructing a reinforced concrete labyrinth, raising embankment NOCs, and revising energy dissipation measures.
RFP089.2026_Volume 2 Returnables.pdf
Demolition and removal of structural concrete and concrete paving blocks for the Development Bank of Southern Africa in Gauteng, under tender RFP089/2026. Bidders must complete a full set of returnable forms, attend a compulsory tender brief, and submit by 7 October 2026.
Annexure A - Health & Safety Specifications - DBSA - Tzaneen Dam - Demolition Work.pdf
Demolition and removal of structural concrete and concrete paving blocks at the Tzaneen Dam site, part of the Groot Letaba River Water Development Project, for the Department of Water and Sanitation, with the Development Bank of Southern Africa as the employer. The contractor must comply with the Client Health and Safety Specifications under the Occupational Health and Safety Act and Construction Regulations 2014.
RFP089.2026 BOQ.xlsx
No summary available
To download these documents and access AI-powered analysis, visit the main tender page.
Secure DBSA tenders with AI Matching Engine, development finance intelligence, compliance analysis, and bid support for infrastructure and consulting.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubWe refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
The project is the Groot Letaba River Water Development Project (GLeWaP): Raising of Tzaneen Dam, located on the Groot Letaba River upstream of Tzaneen in Limpopo. The dam was completed in 1977 and is a concrete gravity spillway with zoned earthfill embankments. The raising involves demolishing 4 m of concrete from the Ogee crest, constructing a reinforced concrete labyrinth to a new crest elevation of RL 726.99 m (raised 3 m), raising concrete NOC tongue walls, modifying the inlet works control house, raising and strengthening embankment NOCs to RL 732.3 m, and revising energy dissipation measures. Preceding activities include stockpiling 20,000 m³ of embankment material, demolishing the top 4 m of the dam crest, and constructing an access road.
Contact Information
Source: Annexure B - Baseline Risk Assessment - Tzaneen Dam - DBSA.pdf (unknown)Contact: Cobus Nienaber
Role: Project Manager (DBSA)
Email: [email protected]
Contact: Cindie Venter
Role: SHEQ Specialist (DBSA)
Email: [email protected]
Contact: Jacob Tshiwilowilo
Role: Construction Project Manager (DBSA)
Email: [email protected]
Contact: Henry-John Wright
Role: Designer (ARQ (Pty) Ltd)
Email: [email protected]
Contact: Francois du Toit
Role: Pr. CHSA (SHE Group)
Email: [email protected]
Contact: Ernie Pieterse
Role: Can. CHSA (SHE Group)
Email: [email protected]
Technical Specifications
Source: Annexure B - Baseline Risk Assessment - Tzaneen Dam - DBSA.pdf (unknown)Project: Raising of Tzaneen Dam, part of Groot Letaba River Water Development Project (GLeWaP).
Location: Groot Letaba River, upstream of Tzaneen, Limpopo.
Existing dam: Completed 1977, concrete gravity spillway with zoned earthfill embankments, crest length 1,140 m, height 47 m above riverbed, max height 55 m above lowest foundation. Category III (Large, High Hazard).
Proposed works: Raise dam 3 m to increase gross storage from 157.3 to 193 million m³.
Preceding activities (already completed or to be done):
Refer to Design Report, Bill of Quantities, and Technical Specifications for full scope.
Methodology
Source: Annexure B - Baseline Risk Assessment - Tzaneen Dam - DBSA.pdf (unknown)Risk analysis method: description of task/system under analysis, evaluation of each risk by determining probability of recurrence and severity, evaluation of current and planned controls. Risk levels attributed as low (1-6), medium (7-15), high (16-25). Ranking uses consequence (1-5) and probability (1-5).
Experience & Qualifications
Source: Annexure B - Baseline Risk Assessment - Tzaneen Dam - DBSA.pdf (unknown)Assessment team includes F du Toit (Pr. CHSA), EF Pieterse (Risk Assessor), and Dr Quentin Shaw (ARQ Dams - Designers).
Quality Management
Source: Annexure B - Baseline Risk Assessment - Tzaneen Dam - DBSA.pdfHigh standards of housekeeping maintained. Stacking and storage supervisor appointed in writing. Monthly inspections of stacking and storage. Equipment inspected monthly; deviations recorded and reported. Pre-start inspections conducted. Windscreens kept clean. Speed limits adhered to. Proper supervision at all times. Use of registers and checklists.
Compliance Requirements
Source: Annexure B - Baseline Risk Assessment - Tzaneen Dam - DBSA.pdf (unknown)Key compliance and safety requirements:
Health & Safety
Source: Annexure B - Baseline Risk Assessment - Tzaneen Dam - DBSA.pdfDetailed risk assessment covers 22 activity groups: project mobilisation, site establishment, clearing and grubbing, traffic management, fire risk prevention, vehicle/plant operation, material delivery, earthworks, trenching/excavation, lifting operations, temporary works, rotary core drilling, steel fixing, concreting, pipework, scaffold work, working at heights, hazardous chemical agents, stacking/storage, hot work, electrical works, working near water, brickwork/plastering, dam demolition, tower crane operation, noise/vibration, manual handling, and housekeeping. Each activity lists hazards, risks, risk rankings, and control measures such as training, PPE, permits, inspections, supervision, and safety procedures.
Environmental
Source: Annexure B - Baseline Risk Assessment - Tzaneen Dam - DBSA.pdfRisk analysis includes environmental impact as a consequence category. Environmental impact considered alongside injury and illness.
Section
Source: Annexure B - Baseline Risk Assessment - Tzaneen Dam - DBSA.pdf (unknown)Project Manager: Cobus Nienaber ([email protected]), SHEQ Specialist: Cindie Venter ([email protected]), Construction Project Manager: Jacob Tshiwilowilo ([email protected]), Designers: Henry-John Wright ([email protected]), Pr. CHSA: Francois du Toit ([email protected]), Can. CHSA: Ernie Pieterse ([email protected]).
Description
Source: RFP089.2026_Volume 1 Procedures.pdfThe tender is for the appointment of a contractor to carry out demolition and removal of structural concrete and concrete paving blocks. The client is the Department of Water and Sanitation, with the Development Bank of Southern Africa acting as implementing agent. The project is located in the Tzaneen Dam area, Gauteng.
Important Dates
Source: RFP089.2026_Volume 1 Procedures.pdf (RFP)Tender closing: 7 October 2026 at 23:55 (Telkom Time).
Compulsory site briefing: 28 September 2026 at 11:00 (physical only).
Venue: No. 1 Voortrekker Road, Tzaneen Dam, Construction North office, Tzaneen. Use Deer Park Road to access.
Deadline for written queries: 1 October 2026 at 12:00.
Deadline for query response from DBSA: 5 October 2026 at 16:30.
Deadline to request tender submission link: 5 October 2026 at 16:30 (email to [email protected]).
Tender offer validity period: 120 calendar days from closing time.
Contact Information
Source: RFP089.2026_Volume 1 Procedures.pdf (RFP)Procurement enquiries:
Technical enquiries: Refer to T1.1 (likely same contact as above).
Employer: Development Bank of Southern Africa Limited
Submission link request and bid submission: Email to [email protected] (to request link); submission via Microsoft OneDrive link as issued.
Submission Guidelines
Source: RFP089.2026_Volume 1 Procedures.pdf (RFP)Submission method: Online via Microsoft OneDrive. A submission link must be requested by email to [email protected] by 5 October 2026 at 16:30. Bids must be submitted on official forms only; deviations, qualifications or alternatives will not be accepted. Bids received after the closing time or not submitted via the designated link will be disqualified.
Submission format:
Returnable documents (all must be completed and signed):
Disqualification risks:
Evaluation Criteria
Source: RFP089.2026_Volume 1 Procedures.pdf (RFP)Evaluation follows a 3-stage process under the 80/20 preference point system (80 points for price, 20 points for B-BBEE).
Stage 1: Responsiveness (Pre-qualifiers)
Responsiveness checks (48-hour clarification time):
Stage 2: Financial Offer and Preference
Stage 3: Objective Criteria & Risk Analysis
Additional conditions:
Minimum qualifying score: Not explicitly stated (functionality section marked N/A).
Technical Specifications
Source: RFP089.2026_Volume 1 Procedures.pdf (RFP)Scope: Appointment of a contractor for the demolition and removal of structural concrete and concrete paving blocks.
Client: Department of Water and Sanitation.
Implementing Agent: Development Bank of Southern Africa Limited.
Project location: Tzaneen Dam area (based on site briefing venue).
Nature: Construction works – demolition and concrete removal.
No specific quantities or technical standards detailed in the tendering procedures volume.
Financial Requirements
Source: RFP089.2026_Volume 1 Procedures.pdf (RFP)Pricing: Fixed rates for the duration of the contract (no adjustment).
Bid security: Not explicitly required (no bid bond mentioned).
Performance guarantee: 10% of contract sum – letter of intent from an approved insurer/financial institution to be submitted with tender.
Public liability insurance: Minimum R5 million per claim, with no limit on number of claims. Must provide letter of intent with tender.
Lateral support insurance: Required – letter of intent with tender.
Payment terms: Not specified.
Financial capacity: Recent audited/accountant-signed financial statements required. DBSA may assess financial health (ratios: accounts receivable/payable turnover, liquidity, solvency).
Cumulative order book limit: R60 million for CIDB level 6, R120 million for level 7.
Maximum active awards: 5 awards with outstanding value (if 10% or less remaining, considered near completion).
Compliance Requirements
Source: RFP089.2026_Volume 1 Procedures.pdf (RFP)Mandatory registrations and certifications:
Pre-qualification criteria:
Local content: Marked as not applicable to this tender (SBD6.2 still required but not scored).
Subcontracting: Minimum 30% of paving removal work to be subcontracted to local community-based subcontractors from the project area.
Description
Source: Annexure A - Health & Safety Specifications - DBSA - Tzaneen Dam - Demolition Work.pdfThis document is the Client Health and Safety Specification as per Construction Regulation 5(1)(b) of the Occupational Health and Safety Act. It covers the health and safety requirements for the demolition and removal of structural concrete in preparation for the construction of Tzaneen Dam, part of the Groot Letaba River Water Development project in Limpopo.
Contact Information
Source: Annexure A - Health & Safety Specifications - DBSA - Tzaneen Dam - Demolition Work.pdf (unknown)Technical Specifications
Source: Annexure A - Health & Safety Specifications - DBSA - Tzaneen Dam - Demolition Work.pdf (unknown)Project: Groot Letaba River Water Development (GLeWaP) – Raising of Tzaneen Dam.
Scope: Demolition and removal of structural concrete in preparation for construction of the dam.
Location: near Tzaneen, Limpopo Province.
Detailed scope in Part C3 of the tender document, the Design Report, Bill of Quantities and Technical Specifications.
Experience & Qualifications
Source: Annexure A - Health & Safety Specifications - DBSA - Tzaneen Dam - Demolition Work.pdfCrane operators must be trained and annually certified by authorized agencies. Operator's experience, skill, and knowledge of the particular crane must be considered.
Quality Management
Source: Annexure A - Health & Safety Specifications - DBSA - Tzaneen Dam - Demolition Work.pdfMonthly audits by Client; corrective action plan within 7 days. Non-conformances subject to fines of R250 to R5,000 per finding. Audit template must be approved by Client's representative.
Compliance Requirements
Source: Annexure A - Health & Safety Specifications - DBSA - Tzaneen Dam - Demolition Work.pdf (unknown)Health & Safety
Source: Annexure A - Health & Safety Specifications - DBSA - Tzaneen Dam - Demolition Work.pdfConstruction Work Permit LP-TZN-316/05/2023 issued. Contractor must maintain DIFR < 1 and report monthly.
Develop risk assessments, SWPs, and method statements for all activities.
Monthly audits by Client; corrective action plan within 7 days.
Site-specific OH&S rules and security rules required.
Training: general induction, site-specific induction, operator competency, working at heights, first aid.
Investigate all accidents/incidents; keep records.
Designate OH&S representatives; conduct monthly inspections.
All employees need valid medical certificate of fitness (Annexure 3).
Appoint contractors under Section 37(2) with Letter of Good Standing and site-specific H&S Plan.
Specific activities requiring risk assessments: site establishment, working at heights, cranes/lifting, construction vehicles/mobile plant, electrical installations, demolition, etc.
Working at heights: Fall Protection Plan, training, medical surveillance, scaffolding per SANS 10085.
Cranes: operator training and annual certification, critical lift plan (lifts >75% rated load), pre-lift meeting, register, no lift above 90% rated load.
Construction vehicles/mobile plant: driver licenses, training register, medical fitness, maintenance register, safe operation rules.
First aid: equipment, notice board, incident reporting within 24 hours.
Fire precautions: equipment and training.
Welfare facilities: provided.
Fines for repeated non-conformances: R250 minimum, R5,000 maximum per finding.
Environmental
Source: Annexure A - Health & Safety Specifications - DBSA - Tzaneen Dam - Demolition Work.pdfMust store materials neatly and safely to prevent injury. Dispose of non-usable waste material in an orderly manner.
Contractual Terms
Source: Annexure A - Health & Safety Specifications - DBSA - Tzaneen Dam - Demolition Work.pdfContractor is solely responsible for eliminating conditions that could cause injury or property damage. Must continuously inspect work, materials, and equipment.
Description
Source: RFP089.2026 BOQ.xlsxThe work includes establishment on site to include all necessary storages, as per the Bill of Quantities.
Technical Specifications
Source: RFP089.2026 BOQ.xlsx (unknown)Demolition and removal of structural concrete at a dam site, including:
Financial Requirements
Source: RFP089.2026 BOQ.xlsx (unknown)Pricing is based on a Bill of Quantities (BOQ) with items in Sum, Months, m³, and m² units. Rates are to be inserted against each item. The BOQ includes:
A contingency of 5% is applied to the subtotal. VAT at 15% is added. The grand total (incl. VAT) is carried to the Form of Offer. The priced BOX indicates an estimated total of approximately R 37,541,704.07 incl. VAT.
Description
Source: RFP089.2026_Volume 2 Returnables.pdfThe tender is for the appointment of a contractor for the demolition and removal of structural concrete and concrete paving blocks, as stated in the tender title.
Important Dates
Source: RFP089.2026_Volume 2 Returnables.pdf (RFP)Closing date: 7 October 2026 (closing time not specified in this volume).
Tender brief: attendance is compulsory. The brief is online (Microsoft Teams link to be provided) or physical (location specified in Volume 1, Part T1.1). Attendees must register to prove attendance; failure may result in disqualification. Date and time of the brief are not stated in this volume.
Briefing Session
Source: RFP089.2026_Volume 2 Returnables.pdf (RFP)Attendance at the tender brief is compulsory. The brief may be held online (via Microsoft Teams) or physically at the location specified in Volume 1, T1.1. Bidders must register attendance (provide company name, email, contact number, and attendee name in the chat for online brief, or sign the attendance register for physical brief). Failure to comply may result in disqualification from further evaluation.
Submission Guidelines
Source: RFP089.2026_Volume 2 Returnables.pdf (RFP)All returnable forms listed in the document must be completed, signed, and submitted. The following are required:
Forms must not be altered; attachments should be in a separate indexed file. Any form left unsigned or omitted may lead to disqualification. Joint ventures must attach a formal agreement; failure renders the bid non-responsive.
Returnable Documents
Source: RFP089.2026_Volume 2 Returnables.pdf (RFP)Required returnable documents include the Subcontracting Schedule (ticked as applicable) and Method Statement and Organogram (ticked as applicable). All applicable forms must be completed and signed. SBD6.2 (Local Production and Content) is marked as not applicable.
Evaluation Criteria
Source: RFP089.2026_Volume 2 Returnables.pdf (RFP)Eligibility stages include:
Scoring split and minimum qualifying scores are not provided in this volume. The tender is subject to the PPPFA; the applicable preference point system (80/20 or 90/10) is not stated.
Technical Specifications
Source: RFP089.2026_Volume 2 Returnables.pdf (RFP)Scope of work: demolition and removal of structural concrete and concrete paving blocks. No quantities, locations, or further technical details are provided in this volume.
Methodology
Source: RFP089.2026_Volume 2 Returnables.pdfA Method Statement and Organogram (T2.1.20) must be submitted as part of the returnable documents.
Financial Requirements
Source: RFP089.2026_Volume 2 Returnables.pdf (RFP)No specific pricing format, bid security, bonds, guarantees, retention, or payment terms are stated in this volume. The only reference is to performance guarantees in the joint venture context. Bidders must provide a financial standing/bank rating (form T2.1.16).
Compliance Requirements
Source: RFP089.2026_Volume 2 Returnables.pdf (RFP)Mandatory registrations (proof required):
Additionally, bidders must declare any defaults or terminations with DBSA in the last 5 years (T2.1.5). Bidders must not be listed on the Register of Tender Defaulters or the List of Restricted Suppliers. Joint ventures must provide a formal agreement detailing ownership, control, and responsibilities.
Requirements
Source: RFP089.2026_Volume 2 Returnables.pdf (RFP)Bidders must declare all project defaults and terminations with DBSA within the last 5 years using form T2.1.5. False declarations lead to disqualification.
Section
Source: RFP089.2026_Volume 2 Returnables.pdfProof of attendance at the tender brief is a mandatory requirement for further evaluation. Bidders who fail to register may be disqualified.
Description
Source: RFP089.2026_Volume 3 The Contract.pdfThis tender is for the appointment of a contractor to carry out demolition and removal of structural concrete and concrete paving blocks. The work is part of the Tzaneen Dam project, with the Employer being the Development Bank of Southern Africa acting as implementing agent for the Department of Water and Sanitation. The Contractor will work under the Main Contractor, DWS Construction North (Pty) Ltd.
Submission Guidelines
Source: RFP089.2026_Volume 3 The Contract.pdf (RFP)Returnable documents from Volume 3 - The Contract:
All forms must be completed in black ink and submitted as a whole. Any cover letter must be referenced in the Schedule of Deviations to be valid.
Technical Specifications
Source: RFP089.2026_Volume 3 The Contract.pdf (RFP)Scope of work (Part C3) covers demolition and removal of structural concrete and concrete paving blocks. The Contractor must execute the Works under the management and supervision of the Main Contractor (DWS Construction North (Pty) Ltd) for the Tzaneen Dam project. The Works are part of a larger project by the Client (Department of Water and Sanitation). The Contractor must cooperate with and comply with the Main Contractor's instructions. Detailed project specifications and drawings are referenced in Parts C3.1, C3.2, and C3.3 but not provided in this volume.
Pricing Schedule
Source: RFP089.2026_Volume 3 The Contract.pdfPricing is handled in Part C2: Pricing Data. This includes Pricing Instructions (C2.1), Bill of Quantities (C2.2), and Amendments, Qualifications & Alternatives (C2.3). The offered total price inclusive of VAT must be stated in the Form of Offer and Acceptance. The rates and prices are deemed to cover all obligations for proper completion. Contract may be re-measurable or lump sum as per Bill of Quantities. Adjustments for changes in legislation after tender submission are excluded.
Financial Requirements
Source: RFP089.2026_Volume 3 The Contract.pdf (RFP)Pricing format: re-measurable or lump sum as per the Bill of Quantities (Part C2.2).
Bid security: Performance guarantee required under clause 6.2 of GCC 2015.
Performance guarantee: must be provided within 14 days of the agreement coming into effect. It reduces by half at Practical Completion and lapses at Final Approval.
Payment: by electronic transfer into the Contractor's designated account. Payment certificates may be suspended if the Contractor fails to submit a detailed programme.
Interest: Prime Rate from Standard Bank of South Africa.
Contract Price includes all costs for compliance with health and safety and other obligations.
Variations require prior written approval from the Employer if they exceed the Contract Sum or contingency.
Compliance Requirements
Source: RFP089.2026_Volume 3 The Contract.pdf (RFP)The Contractor must be registered on the CSD (not explicitly stated but implied as a state entity requirement).
Tax compliance: not explicitly stated but likely required.
B-BBEE: not mentioned in this volume.
CIDB: not mentioned.
The Contractor must accept appointment as Principal Contractor under the Construction Regulations 2014 and comply with the Occupational Health and Safety Act.
The Contractor must have the capability to act under the supervision of the Main Contractor and provide a detailed programme.
Insurance: must be maintained or the Employer may cancel the contract.
Health & Safety
Source: RFP089.2026_Volume 3 The Contract.pdfThe Contractor is appointed as the Principal Contractor under the Construction Regulations 2014. The Contractor must:
Contractual Terms
Source: RFP089.2026_Volume 3 The Contract.pdfContract governed by GCC 2015 (SAICE) with Special Conditions of Contract.
Key terms:
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Address
1258 Lever Rd, Headway Hill, Midrand, 1685, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
7
Last checked
22 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Contact
011-313-3814[email protected]www.dbsa.org1258 Lever Rd, Headway Hill, Midrand, 1685, South Africa
Key Personnel
Median Estimate
R 1 983 750
Range
Based on 21 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Get deep intelligence on Construction. Unlock full pricing strategies, bid frequency, and historical win rates.
Learn how to submit a winning bid with these related articles
💡 Want more tendering tips and strategies?
Explore Our Blog