Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
1 MODDERFONTEIN ROAD - SANDRINGHAM - JOHANNESBURG - 2192
Organization Type
GOVERNMENT
Published
05 Nov 2026
OCDS Reference
ocds-9t57fa-177002
The national health laboratory service requires a service provider to deliver a fully managed cisco-based sd-wan solution for five years across approximately 272 sites, with link capacities from 20 mbps to 10 gbps. The scope covers solution design, last-mile access, reuse of 50 nhls-owned cisco isr routers, migration from the existing viptela deployment on sanren links, 24x7 noc operations, a private 4/5G apn for up to 5000 sim cards, and service levels of 99.9% For data centres and 99.0% Per laboratory or office. Bidders must pass a mandatory compliance stage and then score at least 85% on technical functionality before pricing is opened, so the decisive risk is an unsubstantiated or incomplete technical response rather than price.
Closing: bids must be in the NHLS bid box by 03 December 2026 at 11:00; postal or courier bids must arrive at least 36 hours earlier, and late bids are returned.
Submission format: one original, one hard copy and one USB PDF copy, signed in black ink with every page initialled, sealed in separate BID and PRICING envelopes inside a marked outer envelope; emailed, faxed or telephonic bids are rejected.
Technical threshold: bidders must score at least 85% on technical functionality to reach price evaluation; every mandatory requirement must be answered and substantiated with page references, and unanswered or unsubstantiated responses cause disqualification.
Mandatory returnables: CSD registration report, valid SARS tax clearance or tax compliance status PIN (per consortium, joint venture or subcontractor member), SBD 1, SBD 4, SBD 5, SBD 6.1 with B-BBEE certificate or sworn affidavit, signed Price Declaration Form, and proof of authority to sign.
Compliance schedules: every question from 11.2 to 11.34 and the NHLS Special Conditions from 12.2.1 to 12.2.9 must be completed in full; an incomplete bid is disqualified.
Pricing: all prices must be VAT inclusive in South African Rand, firm and fixed for the five-year contract, and costed strictly on the supplied pricing schedule; the total on the cover form prevails if amounts differ, and the offer must remain open for 180 days.
Demonstration and due diligence: a live NOC and service desk demonstration covering event detection through to SLA reporting is required during technical evaluation, and NHLS may conduct a physical NOC visit before award.
Clarification deadline: written queries must reach the named contact on or before 17 November 2026; approaching any other NHLS employee may disqualify the bid.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Date & Time
Thursday, 03 December 2026 - 11:00
Venue
MAIN CONFERENCE ROOM NATIONAL HEALTH LABORATORY SERVICE 1 MODDERFONTEIN ROAD SANDRINGHAM
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Categories
Request for Bid(Open-Tender)
1 MODDERFONTEIN ROAD - SANDRINGHAM - JOHANNESBURG - 2192
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: IITPSA Membership, ISO 27001 (Information Security Management), ISO 20000 (IT Service Management), CISSP
AI Document Analysis Stages
Description
Source: Copy of RFB157- NEW Annexure B Price Pricing schedule.xlsx05 Nov
2026
Tender Published
Tender was published
03 Dec
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
RFB157-25-26_Bid Document_Reviewed.docx
A fully managed Cisco-based SD-WAN service is required for the National Health Laboratory Service across approximately 272 sites, with link capacities from 20 Mbps to 10 Gbps, for a period of five years. The service covers solution design, last-mile access, reuse of NHLS-owned Cisco ISR routers, migration, 24x7 managed operations, a private 4/5G APN service for up to 5,000 SIM cards, and defined service levels.
Copy of RFB157- NEW Annexure B Price Pricing schedule.xlsx
The National Health Laboratory Service seeks a service provider to deliver a fully managed SD-WAN solution across 272 sites and APN services for 5,000 SIM cards over a five-year contract, including implementation, project management, and ongoing managed services.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
National Health Laboratory Service (NHLS)Secure NHLS tenders with AI-Powered Matching, health-sector intelligence, compliance analysis, and application support for laboratory and diagnostics contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 3 421 969
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Scope summary
Important Dates
Source: Copy of RFB157- NEW Annexure B Price Pricing schedule.xlsx (unknown)Closing: 3 December 2026 at 09:00
Submission Guidelines
Source: Copy of RFB157- NEW Annexure B Price Pricing schedule.xlsx (unknown)Pricing submission requirements
Evaluation Criteria
Source: Copy of RFB157- NEW Annexure B Price Pricing schedule.xlsx (unknown)Mandatory pricing compliance
Technical Specifications
Source: Copy of RFB157- NEW Annexure B Price Pricing schedule.xlsx (unknown)Scope and quantities
Financial Requirements
Source: Copy of RFB157- NEW Annexure B Price Pricing schedule.xlsx (unknown)Pricing currency and tax
Description
Source: RFB157-25-26_Bid Document_Reviewed.docxLate bids: bids delivered after the stipulated closing time will not be accepted for consideration.
Important Dates
Source: RFB157-25-26_Bid Document_Reviewed.docx (unknown)Clarification queries: must be submitted in writing on or before 17 November 2026; no other NHLS employee may be approached.
Closing date and time: 03 December 2026 at 11:00.
Postal or courier delivery: must reach the office at least 36 hours before the closing date.
Submission Guidelines
Source: RFB157-25-26_Bid Document_Reviewed.docx (unknown)Submission method: hard copy delivered to the NHLS bid box; telephonic, faxed, e-mailed or oral tenders are not accepted.
Packaging: one original, one hard copy and one electronic copy on a USB flash drive in PDF format, sealed in two envelopes inside an outer envelope.
Envelope 1: marked “BID / Proposal Section” and holds all documents excluding the price schedule, price declaration and detailed supporting pricing documentation.
Envelope 2: marked “PRICING Section” and holds the pricing schedule, price declaration and detailed supporting pricing documentation.
Outer envelope: clearly marked with the RFB number, RFB description and bidder’s name.
Signing: the original copy must be signed in black ink by an authorised employee, agent or representative; every page must carry the same signatory’s initials.
Oversized bids: hand in at the reception desk during office hours 08:00–16:30 or before 11:00 on the closing date.
Postal or courier bids: must reach the office at least 36 hours before the closing date; late bids are returned and not considered.
Closing: bids must be in the bid box before or on 03 December 2026 at 11:00.
Returnable forms:
Evaluation Criteria
Source: RFB157-25-26_Bid Document_Reviewed.docx (unknown)Evaluation stages: a bidder must pass each stage to proceed to the next.
Stage 1: Administrative compliance verification — returnable documents and signatures are checked.
Stage 2: Technical mandatory requirement evaluation — full compliance with every mandatory requirement; each response must be substantiated with page references; unanswered or unsubstantiated responses result in disqualification.
Stage 3: Technical functionality requirement evaluation — scored on depth, relevance, clarity and evidence; minimum qualifying threshold is 85%; submissions below 85% are disqualified.
Stage 4: Price / Specific Goals evaluation — 80/20 or 90/10 PPPFA principle.
Public bid opening: held at the closing date and time; bidder names are announced, but prices are not disclosed.
Award: the bid with the highest combined points (Merit 1) is recommended; the NHLS Chief Executive Officer must approve the Bid Adjudication Committee recommendation; any deviation must be motivated and reported to Treasury.
Technical Specifications
Source: RFB157-25-26_Bid Document_Reviewed.docx (unknown)Scope: appointment of a service provider to deliver a fully managed Cisco-based SD-WAN solution for five (5) years, including solution design, supply and provisioning, reuse of existing routers, last-mile access, migration, managed operations, reporting and service governance.
Sites and capacity: approximately 272 NHLS sites; link capacities range from 20 Mbps to 10 Gbps; future scalability for bandwidth upgrades, additional sites, policy changes and increased application traffic must be supported.
Existing infrastructure: expand the current in-house Cisco Viptela SD-WAN deployment over 12 SANReN Layer 2 links into a managed service model; SANReN physical links remain with TENET/SANREN and the SD-WAN overlay is in scope; internet breakout is not required as it is separately procured from TENET.
Routers: NHLS owns 50 Cisco ISR routers (13 on the existing Viptela SD-WAN and 37 Cisco ISR 4431 routers); these must be incorporated into the SD-WAN system where technically feasible, supportable and suitable for lifecycle.
Access and resilience: support diverse access technologies including fibre; provide resilient design options per site; peer with SANReN and other service providers; advertise NHLS routes into the SD-WAN network using OSPF.
Performance: jitter average 15 ms and latency average 40 ms between site and Point of Presence; guaranteed matching of last-mile bandwidth capacity within SD-WAN virtual sites.
Microsoft 365 traffic: application-aware routing for Microsoft 365 / Office 365 using Microsoft-published endpoints, URLs and IP addresses; local or regional internet breakout to optimise latency; avoid unnecessary backhauling or hairpinning through NHLS data centres.
Quality of service: implement flexible QoS from NHLS laboratories and academic sites through the bidder network to NHLS Head Office; data may use all available bandwidth when no voice or video traffic is present.
Security: safeguards against unauthorised access, tapping and sniffing; service provider network fully isolated from internet traffic; all routers SNMP-managed and exporting NetFlow; CPE patched as patches are released; IOS security audit report furnished; configurations available for audit.
IPv6: network infrastructure compatible with migration to IPv6 at no additional cost; SD-WAN links and other supplied devices must be IPv6 compliant.
Connectivity: all NHLS network segments reachable directly from any other location through the SD-WAN cloud via the shortest path without traversing NHLS data centres; coordinate relocation of SD-WAN links if NHLS shifts data centres, branches or offices.
Cisco alignment: propose, implement and support a Cisco SD-WAN solution aligned with Cisco Validated Designs and best practices, including design justification, deviations, risks and implementation by suitably qualified personnel.
Cisco DNA Center / Catalyst Center: demonstrate integration architecture, data flows, APIs or connectors, event-to-ticket workflow, service desk integration, NOC monitoring, reporting outputs, escalation workflow and security controls; NHLS may conduct a physical NOC visit and service desk demonstration before award.
Practical demonstration: live demonstration during technical evaluation or due diligence covering event detection, classification, incident creation, priority assignment, NOC acknowledgement, escalation, closure, reporting and historical audit trail.
Implementation plan: detailed plan covering discovery and assessment, solution design and validation, production rollout waves, migration of existing SANReN-connected sites, circuit installation and coordination, router onboarding and configuration, testing and acceptance, knowledge transfer and transition to operations.
Managed service: 24x7 monitoring, incident management and escalation, problem management and root-cause analysis, change control, performance management, capacity reporting, monthly service reviews, executive escalation, service desk and support contact model, and contract management and reporting.
Private APN: private 4/5G LTE APN for up to 5000 SIM cards; compatible with LTE, UMTS, HSPA, EDGE, 3G, 4G and 5G bands; dynamic IP allocation; aggregate monthly data bundle of 30 TB; enable or disable out-of-bundle charging; data bundle top-up at in-bundle rates; APN traffic passes through the firewall at the internet breakout; web portal SIM management with real-time reporting; automatic roaming on a competitor network in poor coverage areas; usage monitoring and spend control with quotas, limits and alerts; portal-based activation, deactivation and suspension of SIM cards.
Service levels: minimum monthly availability of 99.9% for Primary and Secondary Datacentres and 99.0% per laboratory and NHLS office, measured monthly per site excluding approved maintenance windows, force majeure, NHLS-controlled system outages and third-party delays outside the bidder’s responsibility; fifteen (15) minutes incident response time.
Network operations centre: fully-fledged NMC/NOC manned 24x7x365 by skilled technical personnel for centralised remote monitoring, configuration, diagnosis, troubleshooting and performance management.
Web portal: real-time login portal showing link health, uptime, downtime, capacity, utilisation, traffic analysis and QoS graphs.
Support and reporting: maintenance downtime and advance warning procedures; scheduled incident and performance reporting; technical support personnel located within each region; monthly SLA and operations meetings.
Root cause analysis: formal root cause analysis within five days of every performance or availability problem, with an action plan to prevent recurrence.
Cost optimisation: five-year cost optimisation plan and annual service optimisation reviews, underpinned by a baseline cost assessment methodology covering connectivity, bandwidth, carrier costs, cloud connectivity, operational support, outage costs and application traffic; measurable, auditable projected savings with defined assumptions.
Chronic failure: a site failing the availability target in two consecutive months or three months within any rolling six-month period is a Chronic Failure Site; root cause analysis within five business days, corrective action plan, executive service review if requested, and an additional 5% service credit for each continuing month of non-compliance.
Financial Requirements
Source: RFB157-25-26_Bid Document_Reviewed.docx (unknown)Pricing format: prices must be VAT inclusive of all applicable taxes and quoted in South African Rand (ZAR); prices must be firm and fixed from the tender closing date for the duration of the contract.
Total bid price: must be indicated in the pricing schedule and in a separate envelope marked with the RFB number, RFB description and bidder’s name; if amounts differ, the amount on the cover form is the correct price.
Costing: all bidders must cost according to the pricing schedule provided; failure to do so leads to disqualification.
Offer validity: the offer must remain open for acceptance for 180 days from the date of submission.
Costs: the bidder bears all costs of preparing and submitting the tender; NHLS will incur no additional costs over and above the total tendered contract sum.
Licences: all licences required for complete implementation and future expansion must be fully described and disclosed.
Financial capacity: a solvency statement signed by a qualified independent auditor must confirm that the company’s financial position is sound and that it can mobilise financial resources to deliver the project.
Consortium or joint venture: each partner must submit a complete set of the latest audited financial statements.
National Industrial Participation Programme: SBD 5 applies to contracts with imported content; contracts in excess of R10 million must be reported to the Department of Trade and Industry after award.
Compliance Requirements
Source: RFB157-25-26_Bid Document_Reviewed.docx (unknown)Mandatory returnable documents:
Compliance questions: bidders must mark “Comply/Accept” or “Do not comply/Do not accept” for every question from 11.2 to 11.34 and complete the NHLS Special Conditions of Contract (12.2.1 to 12.2.9) in full; an incomplete bid is disqualified.
Security clearances: employees and subcontractors of the successful bidder may require valid security clearances at a level determined by the State Security Agency or NHLS, at the bidder’s cost; a personnel list with clearance status must be maintained and non-disclosure agreements signed.
Compensation for Occupational Injuries and Diseases Act 13 of 1993: all employees, including subcontractor employees, must be covered for the duration of the bid and any subsequent agreement; NHLS may request proof of registration and good standing with the Compensation Fund.
Language: bids must be submitted in English.
B-BBEE: NHLS applies the Preferential Procurement Policy Framework Act and requires a completed preference certificate; bidders are assessed on B-BBEE commitment in ownership, skills transfer, employment equity and procurement practices.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
1 MODDERFONTEIN ROAD - SANDRINGHAM - JOHANNESBURG - 2192
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
2
Last checked
06 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
Win government telecom contracts including fiber rollout, network infrastructure, mobile services, and broadband projects. ICASA licensing and compliance.
South Africa is bridging the digital divide. Explore the provincial and municipal broadband rollout projects and the technical requirements for bidding.
Avoid disqualification with our technical compliance checklist for IT bids. From OEM authorizations to POPIA and ISO standards.
Master the process of winning government IT tenders in South Africa. Learn about SITA registration, compliance requirements, and strategies for success.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Information and communication. Unlock full pricing strategies, bid frequency, and historical win rates.