Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
524 Cnr Stanza Bopape and Steve Biko Street - ARCADIA - Pretoria - 0083
Organization Type
GOVERNMENT
Published
06 Aug 2026
OCDS Reference
ocds-9t57fa-164809
The department of land reform and rural development seeks a firm or consortium to review and amend the spatial planning and land use management (splum) by-law for lesedi local municipality in gauteng, over a ten-month period. The review must align the 2015 by-law with recent legislation including the gauteng township economic development act 2022, the municipal fiscal powers and functions act 2024, the lesedi land use scheme 2025 and the municipal spatial development framework 2022, and must address identified gaps in definitions, processes, enforcement and transitional arrangements. The most consequential requirement is that the project leader must hold a bachelor's degree in town/urban/city and regional planning and be registered with sacplan as a professional planner, and the team must include a legal practitioner registered with the relevant authority and specialising in legislative drafting.
Project leader qualification: Must hold a recognised bachelor's degree in Town/Urban/City and Regional Planning and be registered with SACPLAN as a Professional Planner; a valid registration certificate must be attached.
Legal practitioner: The team must include a legal practitioner with proven experience and specialisation in legislative drafting (e.g. Acts, regulations, municipal by-laws), registered with the Law Society/Legal Practice Council/Bar of Advocates; a valid registration certificate must be attached.
Mandatory documents: Submit a board resolution authorising the signatory (LA 1.6 on company letterhead), a fully completed and signed SBD 3.3 pricing schedule, a fully completed key-personnel form, and all SBD forms and GCC.
Tax and CSD compliance: Submit an original valid tax clearance certificate (certified copies not accepted) or a SARS PIN/TCS/CSD number; bidders must be registered on the Central Supplier Database and attach a CSD report printout.
Functionality threshold: Bids must score at least 70 out of 100 points on functionality to proceed to the presentation and preference point stages.
Submission: Bids must be deposited in the Bid/tender box at 6th Floor, Suncardia Building, 524 Stanza Bopape Street, Arcadia, by 11:00 on 28 August 2026, in a sealed envelope; late bids will not be accepted.
Project duration and penalties: The project runs for ten months with milestone-based payments (5% inception, 20% data collection, 25% draft, 20% public consultation, 20% final, 10% close-out); financial penalties apply for delays or non-compliance, and the service provider must commence within five days of the official order and signed SLA.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Friday, 28 August 2026 - 11:00
Venue
null
Appointment of a service provider to review the spatial planning and land use management by-law for lesedi local municipality, for a period of ten (10) months, gauteng province.
Categories
Request for Quotation
524 Cnr Stanza Bopape and Steve Biko Street - ARCADIA - Pretoria - 0083
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: CA(SA) - Chartered Accountant, PMI-PMP (Project Management Professional), Prince2 Practitioner, Six Sigma Certification
AI Document Analysis Stages
Description
Source: RFQ FOR LESEDI SP AND LAND USE BY-LAW DOCUMENT.pdf06 Aug
2026
Tender Published
Tender was published
28 Aug
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
RFQ FOR LESEDI SP AND LAND USE BY-LAW DOCUMENT.pdf
The Department of Land Reform and Rural Development (DLRRD) is seeking a qualified service provider or consortium to review and amend the Spatial Planning and Land Use Management (SPLUM) By-Law for Lesedi Local Municipality (LLM) in Gauteng. The project duration is ten (10) months, with a closing date of 28 August 2026 at 11:00 AM. The review must align the By-Law with recent legislation (e.g., TEDA, MFPFA), the Lesedi Land Use Scheme 2025, and the Municipal SDF, addressing gaps in definitions, processes, enforcement, and township economy regulation. The service provider will conduct a status quo analysis, draft amendments, undertake public participation, and deliver a final reviewed By-Law with schedules, application forms, and printed booklets. Payment is milestone-based, and strict timeframes apply with financial penalties for delays.
To download these documents and access AI-powered analysis, visit the main tender page.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
R 494 615
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Select the applicable option Tenders Good standing
If “Good standing”, please state the purpose of this application
Particulars of applicant
Name/Legal name
(Initials & Surname
or registered name)
Trading name
(if applicable)
ID/Passport no Company/Close Corp.
registered no
Income Tax ref no PAYE ref no
L VAT registration no 4 SDL ref no
Customs code UIF ref no
U
Fax
Telephone no C O D E N U M B E R C O D E no N U M B E R
E-mail address
Physical address
Postal address
Particulars of representative (Public Officer/Trustee/Partner)
Surname
First names
ID/Passport no Income Tax ref no
Fax
Telephone no C O D E N U M B E R C O D E N U M B E R no
E-mail address
Physical address
of 2
Particulars of tender (If applicable)
Tender number
Estimated Tender
amount R ,
Expected duration year(s)
of the tender
Particulars of the 3 largest contracts previously awarded
Date started Date finalised Principal Contact person Telephone number Amount
Audit
Are you currently aware of any Audit investigation against you/the company?
If “YES” provide details
Yes NO
Appointment of representative/agent (Power of Attorney)
I the undersigned confirm that I require a Tax Clearance Certificate in respect of Tenders
I hereby authorise and instruct
SARS the applicable Tax Clearance Certificate on my/our behalf. or Goodstanding.
to apply to and receive from
Signature of representative/agent
Name of
C CYY MM DDrepresentative/
agent Date
Terms of reference: for the appointment of a service provider to
Review the spatial planning and land use management by-law for
Lesedi local municipality, for a period of ten (10) months, gauteng
Province.
1.1 The Department of Land Reform and Rural Development (DLRRD) requires the
services of one (1) firm or a consortium of suitably qualified service providers to
Review the Spatial Planning and Land Use Management (SPLUM) By-Law for
Lesedi Local Municipality (LLM) in the Gauteng Province.
1.2. In terms of Sections 5(1)(c), 6 and 23(1)(b) including all other related provisions of
the Spatial Planning and Land Use Management Act, 2013 (Act ) the
municipality is mandated to establish a uniform, recognisable and comprehensive
system of spatial planning and land use management in its municipal area to
maintain economic unity, equal opportunity, equal access to government services,
to promote social and economic inclusion. Whereas municipalities are charged with
the responsibility to control and regulate the use of land within the municipal area
1.3 The present LLM SPLUM By-Law, 2015 has some shortcomings in so far as
alignment and inclusion of recently enacted legislative frameworks at national and
provincial level such as the Gauteng Township Economic Development Act of 2022
(TEDA) and the Municipal Fiscal Powers and Functions Act, 2024 (MFPFA) as well
as the Lesedi Land Use Scheme, 2025 (LUS). Thereby, affecting the alignment of
Department of Land Reform and Rural Development l Departement van Grondhervorming en Landelike Ontwikkeling l UmNyango wokuBuyiselwa kweNarha nokuThuthukisa iiNdawo 9
zemaKhaya l ISebe loBuyekezo lweMihlaba noPhuhliso lwamaPhandle l UMnyango Wezinguquko Kwezomhlaba Nokuthuthukiswa Kwezindawo Zasemaphandleni l Kgoro ya
Peakanyoleswa ya Naga le Tlhabollo ya Dinagamagae l Lefapha la Kabobotjha ya Naha le Ntshetsopele ya dibaka tsa Mahaeng l Lefapha laTokafatso ya Lefatshe le Tlhabololo yaMagae l Litiko Letingucuko Kutemhlaba Nekutfutfukiswa Kwetindzawo Tasemaphandleni l Muhasho wa Mbuyedzedzo ya Mavu na Mveledziso ya Mahayani l Ndzawulo ya Antswiso Page
wa Misava na Nhluvukiso wa Matikoxikaya.
Terms of reference: for the appointment of a service provider to review the
Spatial planning and land use management by-law for lesedi local municipality,
For a period of ten (10) months, gauteng province.
objectives and plans from a regional perspective and the implementation and
management of land use in the area.
1.4 The need therefore exists for the coordination of planning tools to achieve
compliance within the municipality and to review the existing SPLUM By-Law for
LLM to ensure harmony and coordination of these spatial planning and land use
management instruments.
2.1 LLM is a category B municipality and is one of three local municipalities that falls
within the Sedibeng District Municipality in the Gauteng Province.
Figure 1: Lesedi Local Municipality
Page
Terms of reference: for the appointment of a service provider to review the
Spatial planning and land use management by-law for lesedi local municipality,
For a period of ten (10) months, gauteng province.
2.2 Lesedi spans an area of ±1430km2, which is largely rural, with two towns situated
within it, namely Heidelberg/Ratanda in the western part, and Devon Impumelelo
and KwaZenzele Vischkuil on its eastern edge.
2.3 The area can be described as mostly agricultural, with Heidelberg and Devon being
the primary service centres for the surrounding agricultural areas. The municipal
area of LLM encompasses both urban and rural regions, with a mix of formal and
informal settlements. This diverse composition presents a unique set of challenges
and opportunities for the local administration. The municipality must balance the
needs of the urban and rural populations, while also addressing the varied settlement
patterns within its jurisdiction. Effective management of these complexities is
essential for the sustainable development of the region.
2.4 The area within the municipal boundary is governed by the Lesedi SPLUM By-Law,
2015 which was proclaimed in the Provincial Gazette on the 26th of January 2016.
The By-Law was the first to be adopted after the implementation of SPLUMA.
3 problem statement
3.1 The Lesedi SPLUM By-Law that has been in place for some ten years now and there
is a need to review it considering the review of the Lesedi Land Use Scheme of 2025
(LUS) that has yielded some misalignment and the need for amendments.
Additionally, the By-Law also needs to be aligned to other enacted provincial and
national legislation such as TEDA and the Standard Draft By-Laws for Township
Economies, 2024, The MFPFA as well as the Municipal Spatial Development
Framework,2022 (MSDF).
3.2 Further to the above, there are other identified gaps and wording that were not
thoroughly cognisant of unforeseen urban developments that unfolded prior to the
approval and subsequent proclamation of the aforesaid documents, such as the
following misalignment but not limited to:
a) There are definitions and processes that were omitted or are vague and as a
result cause irregularities in decision making.
Page
Terms of reference: for the appointment of a service provider to review the
Spatial planning and land use management by-law for lesedi local municipality,
For a period of ten (10) months, gauteng province.
b) There is a further need for new definitions.
c) There are other categorised applications that were previously excluded in the
By-Law.
d) There is a need to relax certain requirements to simplify and unlock the land
development process within the municipality.
e) There is a need for a clearly defined objection process that also provides
guidance on how LLM will deal with petitions against objections.
f) There is a need to strengthen and make provision for the regulation of land
uses within the township economy such as spaza shops, etc.
g) The application forms and schedules must be reviewed and aligned to the
adopted LLM processes.
h) There is a need to strengthen the provisions for land use regulation and/or
enforcement.
i) There is a need to make provision for transitional arrangements where
required.
These continue to hinder the integration and sustainability of social, economic and
environmental elements. Consequently, the institutional arrangements have been
uncoordinated and weak, which results in incoherent planning procedures and
systems within the municipality.
3.2 The current situation poses significant challenges for the municipality, and it is
imperative that appropriate measures be taken to address the issue. This requires
benchmarking with like institutions and by-laws to yield a comprehensive approach
that integrates the various elements of land use management and promotes
sustainable development practices. This will require the involvement of all
stakeholders and the development of a coherent institutional framework that fosters
collaboration and coordination.
3.3 Consequently, there is a need to review the LLM SPLUM By-Law to allow an
opportunity to make the necessary amendments, enhance service delivery efficiency
and ensure that the By-Law covers all the procedural aspects of land development
Page
Terms of reference: for the appointment of a service provider to review the
Spatial planning and land use management by-law for lesedi local municipality,
For a period of ten (10) months, gauteng province.
applications within the jurisdiction, compliance and enforcement as well as further
allow the inclusion of previously disadvantaged communities.
3.4 The review of the LLM SPLUM By-Law will align with the legislative and normative
principles of the SPLUMA. (ongoing compliance)
4.1 The key objective of the project is to appoint a service provider to review and amend
the SPLUM By-Law for the LLM within a period of ten (10) months.
4.2 The By-Law review, as a spatial planning and land use management and
development regulatory tool aims to provide for the categorisation of land
development applications, to provide for processes and procedures for land
development applications, while also being compliant with the land use scheme. The
By-Law review must also make amendment to the provisions for an Appeal Authority
where applicable and provide for offences and penalties that are necessary and
relevant for land use management, land development and compliance, or incidental
thereto such as:
a) Provide for a package of plans which shall inform the social, economic,
environmental and infrastructural development in the Municipality.
b) Provide a uniform, effective, comprehensive, and interrelated framework
for spatial planning and land use management.
c) Provide for the inclusive, developmental, equitable and efficient planning
in the spirit of co-operative governance.
d) Provide a framework for co-operative and cross-border relationships with
all spheres of Government and to ensure the integration of planning
between the Municipality and neighbouring Municipalities.
e) Provide a framework for policies, principles, norms and standards for
spatial development planning and land use management.
Page
Terms of reference: for the appointment of a service provider to review the
Spatial planning and land use management by-law for lesedi local municipality,
For a period of ten (10) months, gauteng province.
f) Provide a framework for the monitoring, coordination and review of the
spatial planning and land use management system.
g) Ensure continued regulation of land development application and
decision-making procedures.
h) Ensure the continued establishment, functioning and operations of
the Tribunal.
i) Provide for the continued facilitation and enforcement of land use and
development measures.
j) Review the processes of the appeal authority, and
k) Ensure the penalties for breach of its provisions are still adequate.
4.3 The By-Law review should protect the resources and values of the municipal area
by protecting or promoting activities that employ best practice management,
maintain or enhance service delivery, and/or implement spatial and land use
planning in the jurisdiction. This is a means to sustain the benefits to the community
derived from the natural environment.
4.4 This section on By-Law amendments should identify how the proposed SPLUM By-
Law amendments achieve the planning intent for the municipality by proposing
processes and procedures that reflect the municipality’s unique circumstances and
address local challenges as well as satisfy the needs of the municipality and the
matters listed above.
4.5 The Bylaw is used to implement land development and land use applications, spatial
planning, and land use schemes within the LLM. The By-Law review should also
identify how other planning and management initiatives can contribute to achieving
the planning intent of the municipality and the management and Implementation of
strategies.
4.6 The required SPLUM By-Law review must continue to give effect to the development
principles contained in the Spatial Planning and Land Use Management Act
(SPLUMA) including: -
Page
Terms of reference: for the appointment of a service provider to review the
Spatial planning and land use management by-law for lesedi local municipality,
For a period of ten (10) months, gauteng province.
i. Spatial Justice
ii. Spatial Sustainability
iii. Efficiency
iv. Spatial Resilience, and
v. Good Administration
4.7 The SPLUM By-Law review must take cognisance of and adhere to newly enacted
national and provincial policies and legislation, including, the Municipality’s
Integrated Development Planning (IDP), MSDF and LUS.
5.1 The successful service provider would be expected to undertake the following
towards the review of the LLM SPLUM By-Law:
a) The reviewed SPLUM By-law should continue to establish a comprehensive
framework for land use planning and development. It should review the existing
provisions for development procedures and processes, timeframes, enforcement
mechanisms, engineering services and other related matters and ensure they
are still relevant and promote efficient service delivery.
b) Conduct a status quo analysis which will entail but not limited to the review of
case law and legal precedent that has been set on spatial planning and land use
management matters that may influence the proposals/amendments made to the
Lesedi SPLUM By-Law for the municipality taking into cognizance the local
circumstance, local policies, development as well as provincial and national
policies and strategies. The envisaged outcome of this exercise is the
development processes and procedures that will inform the SPLUM By-Law
review and highlight and identify visible conflicts and contradictions and how they
can be addressed, as well as necessary amendments, new inclusions, schedules
and application forms.
Page
Terms of reference: for the appointment of a service provider to review the
Spatial planning and land use management by-law for lesedi local municipality,
For a period of ten (10) months, gauteng province.
c) The reviewed By-law should provide guidance for township economic
revitalisation processes and align to relevant legislations and policies.
d) The general requirements for preparation and implementation of the MSDF and
LUS must be maintained.
e) The reviewed SPLUM By-Law must include:
o Definitions
o Relationship with other Legislation.
regulations.
o Public Participation.
amendment or review of the SPLUM By-law, SDF, LUS, Local Are
Plans/Precinct Plans and land development applications.
o Review the process for the creation, amendment, and review of the land use
scheme, which specifies permitted land uses and development regulations.
o Review the processes and procedures for Land Development Applications.
including the necessary documents, timelines, and review processes.
proposals and amendments.
o Review Building Line procedure and Regulations.
buildings on a property in relation to the street or property line as
referred in title deeds.
o Penalties for Breach, and
o Transitional arrangements where applicable.
f) The reviewed SPLUM By-Law must align the process for regulating the
enforcement and compliance with the LUS and propose amendments where
necessary, relating to:
Page
Terms of reference: for the appointment of a service provider to review the
Spatial planning and land use management by-law for lesedi local municipality,
For a period of ten (10) months, gauteng province.
i. Enforcement Mechanisms
ii. Municipal Planning Tribunal establishment, functions and operation and
dispute resolutions relating to land development, including further
provisions that need to be made.
iii. Review the Appeal Authority procedures relating to appeals lodged for
decisions on land development applications.
iv. Review the processes for ensuring compliance with the by-law and for
resolving disputes related to land use and development.
g) Procedures for monitoring the implementation of the by-law, coordinating with
other government agencies, and reviewing the by-law periodically to ensure its
effectiveness.
h) Planning or preparatory report that documents case law and judgements that
have been issued on SPLUMA related matters and procedures. The report
presents the results of technical analysis of data that addresses the matters set
out in this ToR.
i) Community consultation undertaken during the review of the By-Law must
demonstrate consistency of the current By-Law with the MSDF and the LUS:
i. Benchmarking with the municipalities that have reviewed SPLUM By-
Laws to gauge best practice.
ii. Use the best-available information held by all organs of state, research
organisations and other relevant stakeholders.
iii. Provides adequate analysis and rationale to support the objectives of the
SPLUM By-Law or its amendments, and
iv. Includes a summary of consultation activities, submissions and
responses.
Page
Terms of reference: for the appointment of a service provider to review the
Spatial planning and land use management by-law for lesedi local municipality,
For a period of ten (10) months, gauteng province.
j) The By-Law should provide for a regular review and amendment process for the
SPLUM bylaws to ensure that they remain relevant and effective.
k) Develop a stakeholder engagement plan for the various consultation processes
with various stakeholders, including government, private sector and any other
stakeholders throughout the lifespan of the project. The service provider should
cater for additional unplanned meetings that may be required for the duration of
the project.
l) The service provider will also be required to assist the municipality in finalizing
any documents for the presentation of the Reviewed SPLUM By-Law in various
committees towards/and for the adoption by Council.
m) The service provider is financially responsible to ensure that the final gazette
notice is placed once the LLM reviewed SPLUM By-Law is approved and adopted
by Council.
6.1 A final reviewed SPLUM By-Law with related schedules and application forms
submitted in digital format (Word and PDF).
6.2 The service provider must supply 3 design concepts to the municipality for
consideration and do the design and layout on the approved booklet cover concept.
6.3 The final reviewed SPLUM By-Law textual document including schedules and
application forms in both hardcopy (printed) and softcopy (electronic as MS Word
document) must also be supplemented by:
Item Description Quantity
Booklets Final Reviewed SPLUM By-Law Document X50
Page
Terms of reference: for the appointment of a service provider to review the
Spatial planning and land use management by-law for lesedi local municipality,
For a period of ten (10) months, gauteng province.
Cover: 280 gsm stock, matt varnish, one side only.
Inside pages: 130 gsm stock, matt
Full Colour throughout
PUR binding
USB Soft copies of all the above must be provided X50
(Print ready artwork of final Reviewed SPLUM By-Law,
schedules and application forms)
Table 1: Document requirements
7.1. Companies with individuals with qualifications and extensive experience will be
required as detailed in Table 2 and sections 7.1 and 8, respectively.
Table 2: MINIMUM QUALIFICATIONS REQUIRED BY THE DLRRD
No. Minimum Qualification Key Skill Set Registration
Important Dates
Source: RFQ FOR LESEDI SP AND LAND USE BY-LAW DOCUMENT.pdf (RFQ)Closing date: 28 August 2026 at 11:00.
No compulsory briefing session. Prospective bidders may direct written questions to the technical contacts on or before the closing date.
Contact Information
Source: RFQ FOR LESEDI SP AND LAND USE BY-LAW DOCUMENT.pdf (RFQ)Technical enquiries:
Bids/Supply Chain enquiries:
Submission address: 6th Floor, Suncardia Building, 524 Stanza Bopape Street, cnr Stanza Bopape and Steve Biko Streets, Arcadia, Pretoria.
Submission Guidelines
Source: RFQ FOR LESEDI SP AND LAND USE BY-LAW DOCUMENT.pdf (RFQ)Bids must be submitted on the official forms, not retyped, and deposited in the Bid/tender box at the 6th Floor, Suncardia Building, 524 Stanza Bopape Street, cnr Stanza Bopape and Steve Biko Streets, Arcadia, before the closing time. The bid box is open Monday to Friday 07:00 to 19:00 and closes at 11:00 on the closing date. Bids must be in a sealed envelope. Late bids will not be accepted.
Returnable documents that must be completed and signed:
Disqualification risks:
Evaluation Criteria
Source: RFQ FOR LESEDI SP AND LAND USE BY-LAW DOCUMENT.pdf (RFQ)Evaluation proceeds in four stages:
Mandatory criteria include:
Additional mandatory documents (not for elimination):
Technical Specifications
Source: RFQ FOR LESEDI SP AND LAND USE BY-LAW DOCUMENT.pdf (RFQ)Scope of work – the service provider must:
Deliverables:
Methodology
Source: RFQ FOR LESEDI SP AND LAND USE BY-LAW DOCUMENT.pdfPhase 1: Inception and
Experience & Qualifications
Source: RFQ FOR LESEDI SP AND LAND USE BY-LAW DOCUMENT.pdf7.1. Companies with individuals with qualifications and extensive experience will be
required as detailed in Table 2 and sections 7.1 and 8, respectively.
Table 2: MINIMUM QUALIFICATIONS REQUIRED BY THE DLRRD
Report writing
Project Management
equivalent qualification at NQF e.g. drafting of Acts the relevant
level 8 in Law and regulations and authority (Law
municipal By-laws society or Bar of
Advocates)
Table 2: Minimum Qualifications
For a period of ten (10) months, gauteng province.
9.6 All-inclusive costing model and a project plan.
9.7 The following technical information must be submitted with the bid proposal:
a) Organogram outlining the project team members with a clear indication of the
project leader and support team.
b) Relevant professional experience of the team leader and core supporting
experts.
c) Organisational, managerial and technical ability.
d) Full CVs of all proposed team members.
e) Minimum 3 contactable current and previous client references from 3 different
clients.
f) Associations and Professional Affiliations of companies and individuals.
Pricing Schedule
Source: RFQ FOR LESEDI SP AND LAND USE BY-LAW DOCUMENT.pdfFor a period of ten (10) months, gauteng province.
11.11 Financial penalties will be imposed if the outputs produced do not meet the agreed
upon deliverables criteria as stipulated in the General Conditions of Contract.
11.12 Original invoices to substantiate all costs must be provided. The invoices should
include the DLRRD order number that will be provided to the selected service
provider upon acceptance of the proposal.
11.13 When DLRRD accepts the final product, the appointed service provider will be liable
to correct errors and fill gaps that may be discovered in the data/project, at no charge
to DLRRD. This condition will apply for a period of one month from the day the project
was completed and submitted to DLRRD.
11.14 The DLRRD reserves the right not to appoint anyone.
11.15 No material or information derived from the provision of the services under the
contract may be used for any other purposed except for those of the DLRRD, except
where duly authorized to do so in writing by the DLRRD.
11.16 Copyright in respect of all documents and data prepared or developed for the
purpose of the project by the Service Provider shall be vested in Lesedi LM
11.17 The successful Service Provider agrees to keep confidential all records and
information of or related to the project and not disclose such records or information
to any third party without the prior written consent of Lesedi LM.
11.18 All works relating to spatial information remains the property of the state and shall
be disseminated in line with the policy on pricing of spatial information products and
services.
11.19 The successful Service Provider agrees to maintain the level of technical capacity
as indicated in the bidding document submitted, throughout the duration of the
project and any change to their team shall not compromise the technical capacity of
the Service Provider or impact negatively on the pace and quality of the project
outcome.
b. Bidders must complete and sign the pricing schedule in full (SDB 3.3) by and
authorised person. (No other pricing template will be accepted for SBD3.3
other than the one department has provided.)
c. The Project leader must hold a bachelor’s degree in Town / Urban / City and
Financial Requirements
Source: RFQ FOR LESEDI SP AND LAND USE BY-LAW DOCUMENT.pdf (RFQ)Pricing must be submitted on the department's SBD 3.3 pricing schedule – no other template accepted. The pricing schedule must be completed in full and signed by an authorised person.
Payment is milestone-based, as per Table 3:
Total 100% over 10 months.
Payments are made only on work completed and upon satisfaction of good and quality product. Original invoices with supporting documents and the DLRRD order number must be submitted; copies will not be processed.
Financial penalties apply for delays or non-compliance with time and quality requirements. The service provider is liable to correct errors or fill gaps discovered after acceptance, at no charge, for one month from completion.
Compliance Requirements
Source: RFQ FOR LESEDI SP AND LAND USE BY-LAW DOCUMENT.pdf (RFQ)Mandatory compliance requirements:
Environmental
Source: RFQ FOR LESEDI SP AND LAND USE BY-LAW DOCUMENT.pdfenvironmental elements. Consequently, the institutional arrangements have been
uncoordinated and weak, which results in incoherent planning procedures and
systems within the municipality.
3.2 The current situation poses significant challenges for the municipality, and it is
imperative that appropriate measures be taken to address the issue. This requires
benchmarking with like institutions and by-laws to yield a comprehensive approach
that integrates the various elements of land use management and promotes
sustainable development practices. This will require the involvement of all
stakeholders and the development of a coherent institutional framework that fosters
collaboration and coordination.
3.3 Consequently, there is a need to review the LLM SPLUM By-Law to allow an
opportunity to make the necessary amendments, enhance service delivery efficiency
and ensure that the By-Law covers all the procedural aspects of land development
where applicable and provide for offences and penalties that are necessary and
relevant for land use management, land development and compliance, or incidental
thereto such as:
a) Provide for a package of plans which shall inform the social, economic,
environmental and infrastructural development in the Municipality.
b) Provide a uniform, effective, comprehensive, and interrelated framework
for spatial planning and land use management.
c) Provide for the inclusive, developmental, equitable and efficient planning
in the spirit of co-operative governance.
d) Provide a framework for co-operative and cross-border relationships with
all spheres of Government and to ensure the integration of planning
between the Municipality and neighbouring Municipalities.
e) Provide a framework for policies, principles, norms and standards for
spatial development planning and land use management.
also be required to manage the different specialists and coordinate the work being
undertaken.
7.4. Proven experience and a thorough understanding of the following are also required:
a) Spatial planning and land use management policies and legislation.
b) Urban and rural development and land reform.
c) Previous experience in the SPLUM By-Law and LUS development/review
d) Previous experience with policy and/or planning work at a Local, Regional
and Provincial Level.
e) Understanding of the interrelationship amongst the following: social,
economic, land use, transport and environmental issues.
f) Stakeholder engagement and Project Management.
g) Research, analytical writing and communication skills, and
h) Experience in developing similar tools/instruments will be an added
advantage.
Contractual Terms
Source: RFQ FOR LESEDI SP AND LAND USE BY-LAW DOCUMENT.pdfFor a period of ten (10) months, gauteng province.
f) Provide a framework for the monitoring, coordination and review of the
spatial planning and land use management system.
g) Ensure continued regulation of land development application and
decision-making procedures.
h) Ensure the continued establishment, functioning and operations of
the Tribunal.
i) Provide for the continued facilitation and enforcement of land use and
development measures.
j) Review the processes of the appeal authority, and
k) Ensure the penalties for breach of its provisions are still adequate.
4.3 The By-Law review should protect the resources and values of the municipal area
by protecting or promoting activities that employ best practice management,
maintain or enhance service delivery, and/or implement spatial and land use
planning in the jurisdiction. This is a means to sustain the benefits to the community
derived from the natural environment.
4.4 This section on By-Law amendments should identify how the proposed SPLUM By-
o Review the process for the creation, amendment, and review of the land use
scheme, which specifies permitted land uses and development regulations.
o Review the processes and procedures for Land Development Applications.
including the necessary documents, timelines, and review processes.
proposals and amendments.
o Review Building Line procedure and Regulations.
buildings on a property in relation to the street or property line as
referred in title deeds.
o Penalties for Breach, and
o Transitional arrangements where applicable.
f) The reviewed SPLUM By-Law must align the process for regulating the
enforcement and compliance with the LUS and propose amendments where
necessary, relating to:
For a period of ten (10) months, gauteng province.
i. Enforcement Mechanisms
ii. Municipal Planning Tribunal establishment, functions and operation and
dispute resolutions relating to land development, including further
provisions that need to be made.
iii. Review the Appeal Authority procedures relating to appeals lodged for
decisions on land development applications.
iv. Review the processes for ensuring compliance with the by-law and for
resolving disputes related to land use and development.
g) Procedures for monitoring the implementation of the by-law, coordinating with
other government agencies, and reviewing the by-law periodically to ensure its
effectiveness.
h) Planning or preparatory report that documents case law and judgements that
have been issued on SPLUMA related matters and procedures. The report
presents the results of technical analysis of data that addresses the matters set
out in this ToR.
i) Community consultation undertaken during the review of the By-Law must
demonstrate consistency of the current By-Law with the MSDF and the LUS:
i. Benchmarking with the municipalities that have reviewed SPLUM By-
8.1. The Project will commence after the letter of appointment has been issued and the
Service Level Agreement has been signed, which will expire in Ten (10) months
thereafter and is subject to addition, extension or early termination, depending on the
need and performance assessment of the service provider.
Tribunal establishment, 2
functions and operation (if Months 25%
necessary). and 2
weeks
procedures
compliance with the by-law and
for resolving disputes.
internal and external
stakeholders.
Phase 4: Public
covering the aspects listed below as well as responding to the terms of reference.
9.1 An executive summary of the key issues.
9.2 A company profile and profile of each employee forming part of Project Team with
clear references to similar and related work undertaken in the past with clear
evidence where a person/member participated in or managed certain projects in the
past which bears relevance to the work at hand. Clear indication of actual roles and
responsibilities must be presented with verifiable proof.
9.3 General methodology for undertaking work of this nature. The methodology should
also indicate the project milestones that will be used to measure the project progress,
as well as the cost break down.
9.4 Certified copies of all certificates, references, professional registration and related
certification for all members of the proposed team must be attached.
9.5 Any other information relevant to the determination of the suitability of the interested
bidder for this project should be listed.
11.1 Awarding of the bid will be subject to the Service Provider’s express acceptance of
the DLRRD Supply Chain Management general contract conditions.
11.2 The DLRRD and successful Service Provider(s) will sign a Service Level Agreement
upon appointment. Such a Service Level Agreement will include the following:
a) Period of agreement
b) Project objectives, milestones and scope.
c) Staffing
d) Project plan and project plan management.
e) Budget
f) Cost and fee payment
g) Method of communication
h) Reporting relationship
i) Deliverables and conditions and terms of deliverables.
j) Form and formats of working papers.
k) Reviews
l) Uncompleted work
m) Confidentiality
n) Disputes, and
For a period of ten (10) months, gauteng province.
o) Financial penalties and termination of contract.
11.3 The service provider should submit an acceptance letter and be available to
commence with the project within five (5) days after receiving official order and the
service level agreement being signed.
11.4 During the execution of the project, the service provider is required to give reports
on the progress of the project. It is the responsibility of the service provider to
organise the progress report meetings and have one of their representatives
assigned to taking minutes and circulating them to the steering committee members.
11.5 Project team members must be available for the duration of the project. The service
provider is not allowed to change the composition without prior consent of the
Section
Source: RFQ FOR LESEDI SP AND LAND USE BY-LAW DOCUMENT.pdfthe Service Provider or impact negatively on the pace and quality of the project
Tenders will be evaluated in terms of the evaluation criteria stipulated below
12.1 Evaluation of mandatory criteria
impact negatively on the pace and quality of the project
will be imposed for delay or non-compliance with time and quality requirements.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
524 Cnr Stanza Bopape and Steve Biko Street - ARCADIA - Pretoria - 0083
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
1
Last checked
07 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services: Professional. Unlock full pricing strategies, bid frequency, and historical win rates.