Amasfort road - Volksrust - Volksrust - 2470
Organization Type
GOVERNMENT
Published
12 Oct 2026
OCDS Reference
ocds-9t57fa-173805
ESKOM requires a contractor to perform correlation, parallel and spot checking on emission particulate matter (pm) and gas monitors at majuba power station over a five-year term. The work includes full statutory correlation tests, stratification surveys, statutory parallel tests (qal2), and annual surveillance spot checks, with reporting required within 14 working days. The contract is an nec3 term service contract (tsc3) option a, priced on an 'as and when' required basis, with a start date of 01 november 2026 and service period ending 31 october 2031. Bidders must price per test across defined quantities (e.g., 24 correlation spot checks, 30 full statutory correlation tests) and submit a completed form of offer and acceptance with a valid CIDB registration number.
Closing date and time: 26 October 2026 at 10:00. Late submissions are disqualified.
Contract term: 5 years, starting 01 November 2026 and ending 31 October 2031.
Mandatory returnables: signed Form of Offer and Acceptance (C1.1) with tendered total and CIDB registration number; completed Contract Data Part 2 (C1.2b) with key personnel details and CVs; priced price list (C2.2) per the provided tables; Schedule of Deviations (or state none); all applicable SBD/MBD forms.
Pricing format: NEC3 TSC3 Option A (priced contract with price list). Price per test for each activity and multiply by the stated total number of tests over 5 years: 24 correlation spot checks, 30 full statutory correlation tests, 30 stratification surveys, 24 statutory parallel tests (QAL2).
Technical scope: testing on smokestacks at Majuba Power Station (stack diameter 8.5–9 m) for dust and gaseous emission monitors, per Eskom standard 240-56242363 and EPA methods (ISO 12141, EPA 3A, 6C, 7E, 10).
Reporting: submit a full report with correlation curve within 14 working days of completing each task order; calibration gas must have SANAS traceable certification.
Key personnel: provide CVs for key people; at least one Artisan with Grade 12, N4, trade test, and 2 years' experience.
Compliance: comply with Occupational Health & Safety Act and Construction Regulations 2014 (may be appointed Principal Contractor); comply with Eskom Asbestos Standard 32-303; notify Eskom within 7 days of any B-BBEE status change and submit updated verification certificate within 30 days.
Insurance: provide insurances per Insurance Table A (replacement cost or policy limits) from start date until completion or termination.
Price adjustment: Option X1 applies – 85% of preliminaries linked to STATSA CPI (Headline), 15% non-adjustable.
Payment: per task order on completion and submission of report; assessment within 14 working days; payment within 4 weeks; interest at prime rate if late.
Contact: Service Manager Rajesh Sooknanan, tel 017 799 3641, email [email protected].
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Date & Time
Monday, 26 October 2026 - 10:00
Venue
null
Request for Bid(Open-Tender)
Amasfort road - Volksrust - Volksrust - 2470
Recommended Certifications
Having these can improve your winning chances: NERSA Registration, PV GreenCard (Solar Installation)
AI Document Analysis Stages
Description
Source: NEC Correlation Testing.pdf (unknown)12 Oct
2026
Tender Published
Tender was published
26 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Supplier Development Localisation & Industrialisation Correlation, Parallel and Spot Checking on Emission PM and Gas Monitors.pdf
Analysis completed but response format was invalid
559-816058 32-726-03T High Risk Emission.docx
Eskom requires a contractor to conduct correlation, parallel and spot check testing on emission particulate matter (PM) and gas monitors at Majuba Power Station, on an as-and-when-required basis over a five-year period, in line with Eskom's statutory emissions reporting standard. The contract carries a full set of occupational health and safety obligations, including statutory appointments, risk assessments, medical surveillance, training and an OHS file.
Environmental Requirements for Contractors and Suppliers Rev 3- 06 March 2025 XY.pdf
E-tendering Help Manual for supplier - 27 January 2025 (1).pdf
Eskom requires correlation, parallel and spot checking services on emission particulate matter (PM) and gas monitors at its Mpumalanga operations. The work involves verifying the accuracy and performance of continuous emission monitoring systems through comparative and spot-check procedures.
Supplier Evaluation Pack Template for 01 March 2024 to 29 February 2025.doc
Eskom requires contractors to complete a PAYE classification questionnaire to determine whether they are independent contractors, personal service providers, labour brokers, or dependent contractors for tax withholding purposes. The questionnaire applies to companies, close corporations, trusts, and individuals providing services to Eskom and its subsidiaries.
Supplier Evaluation Pack Template for 01 March 2024 to 29 February 2025.xls
ESKOM requires correlation, parallel and spot checking services on emission particulate matter (PM) and gas monitors at its Mpumalanga facility. The work involves verifying the accuracy and compliance of emission monitoring equipment.
Eskom - Standard Conditions of Tender (August 2024).pdf
Eskom requires correlation, parallel and spot checking services on emission particulate matter (PM) and gas monitors at its Mpumalanga facilities. The tender covers the provision of testing and verification services to ensure emissions monitoring equipment operates accurately and complies with relevant standards.
Integrity Declaration Form - 31 May 2024.docx
Eskom requires correlation, parallel and spot checking services on emission particulate matter (PM) and gas monitors at its Mpumalanga facilities. Bidders must complete and submit the Integrity Declaration Form, including declarations of interest and shareholding information.
240-77471651 Annexure C 1 (1).docx
ESKOM requires correlation, parallel and spot checking on emission PM and gas monitors at its Mpumalanga operations. Bidders must submit a range of OHS tender returnables, including a signed OHS legal acknowledgement, a Health and Safety Plan, detailed OHS costing, a Baseline OHS Risk Assessment, a valid COIDA letter of good standing, an OHS policy signed by the CEO, and OHS competency evidence.
240-12248652_List of Tender Returnables_Cat 3_ Rev 7.pdf
Eskom requires correlation, parallel and spot checking on emission particulate matter (PM) and gas monitors, delivered in Mpumalanga under specification 240-105658000. Bidders submit a quality returnables pack scored across five sections, with the largest weighting on an uncertified quality management system complying with ISO 9001.
Technical Evaluation Criteria.pdf
Eskom requires correlation, parallel and spot checking services on emission particulate matter (PM) and gas monitors, delivered in Mpumalanga. Bids are assessed purely on technical criteria, with a minimum qualifying score of 70%. Accreditation status and a track record of completed correlation reports carry almost all of the weight.
E-Tenderers E-Tendering Training Acknowledgement Form.pdf
Correlation, parallel and spot checking is required on emission particulate matter (PM) and gas monitors for Eskom in Mpumalanga. Participation is run through Eskom's E-Tendering solution, and bidders must first confirm that they can operate that solution.
240-77471499 Annexure B.docx
Eskom requires correlation, parallel and spot checking services on emission particulate matter (PM) and gas monitors in Mpumalanga. Bidders must acknowledge and comply with Eskom's occupational health and safety legal and other requirements for the duration of the contract.
240-68099512 Form A_Cat 3_ Rev 9.pdf
Eskom requires correlation, parallel and spot checking services on emission particulate matter (PM) and gas monitors at its Mpumalanga operations. Bidders must accept Eskom's supplier quality requirements under specification 240-105658000 and the ISO 9001 standard, and must sign the quality requirements acknowledgement form.
Eskom Supplier Integrity Pact - 02 June 2023.pdf
Eskom requires correlation, parallel and spot checking services on emission particulate matter (PM) and gas monitors, delivered in Mpumalanga. Bidders responding to this procurement must also accept and sign Eskom's Supplier Integrity Pact, which governs ethical conduct across the tender process and the resulting contract.
NEC Correlation Testing.pdf
Eskom requires a service provider to carry out correlation, parallel and spot checking on emission particulate matter (PM) and gas monitors at Majuba Power Station in Mpumalanga. The work is let as a five-year NEC3 Term Service Contract (TSC3) on an as-and-when-required basis, priced per test against anticipated volumes.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
The tender is for correlation, parallel and spot checking on emission particulate matter (PM) and gas monitors at Majuba Power Station, Eskom. The contract is an NEC3 Term Service Contract (TSC3) Option A, on an 'as and when' required basis over 5 years. Tests include full statutory correlation tests, stratification surveys, parallel tests (QAL2), and annual spot checks. Contractor must provide full reports with correlation curves.
Important Dates
Source: NEC Correlation Testing.pdf (unknown)Closing date: 26 October 2026 at 10:00 (from tender record).
Contract start date: 01 November 2026.
Service period end: 31 October 2031 (5-year term).
Contact Information
Source: NEC Correlation Testing.pdf (unknown)Service Manager (technical): Rajesh Sooknanan
Email: [email protected]
Telephone: 017 799 3641
Address: Eskom Holdings SOC Limited, Majuba Power Station, Private Bag 9001, Volksrust, 2470
Enquiries contact: Ronewa Ramagovhodo
Email: [email protected]
Telephone: 011 223 0057
Note: Some contact details may be for a different tender (RAF), but the tender record lists the above.
Submission Guidelines
Source: NEC Correlation Testing.pdf (unknown)Submission method: single offer through the Form of Offer and Acceptance (C1.1 TSC3).
Returnable documents (all must be completed, signed and submitted):
Submission must be received by the closing time. Late submissions are disqualified.
The contract is an NEC3 Term Service Contract (TSC3) Option A (priced contract with price list), 'as and when' required over 5 years.
Evaluation Criteria
Source: NEC Correlation Testing.pdf (unknown)Evaluation is in terms of the NEC3 TSC3 tender and Eskom procurement rules. The contract is a priced contract with a price list (Option A).
Preference points: 80/20 or 90/10 system per PPPFA, as applicable (not specified in the extract). B-BBEE status is a factor.
Minimum qualifying score: not stated in the document.
Evaluation stages: likely includes compliance check, functionality/technical evaluation, and price; details not fully in the extract.
Technical Specifications
Source: NEC Correlation Testing.pdf (unknown)Scope: Correlation, parallel and spot checking on emission particulate matter (PM) and gas monitors at Majuba Power Station, Eskom.
Experience & Qualifications
Source: NEC Correlation Testing.pdfMinimum requirements: 1 x Artisan with Grade 12, N4, Trade test, and 2 years experience. Key persons' CVs required, with details of job, responsibilities, qualifications, and experience.
Quality Management
Source: NEC Correlation Testing.pdfQuality requirements are referenced in the Scope of Work (C3), but specifics not fully extracted. Reporting must be done within 14 working days; calibration gas must have SANAS traceable certification; zero calibration before correlation tests. Late delivery results in delay damages of 10% of task order value.
Pricing Schedule
Source: NEC Correlation Testing.pdfPricing data (Part C2): Option A priced contract with price list. 'As and when' required basis over 5 years. Pricing tables include: Annual Safety Inductions (per year); Authorised Supervisor Training (x2); Correlation Spot Checks (24 tests); Full Statutory Correlation Tests (30 tests); Stratification Surveys (30 tests); Statutory Parallel Tests (QAL2) (24 tests). Each table has items: site establishment, labour (skilled/unskilled), travelling per km, accommodation per night, consumables per day, specific test methods (ISO 12141, EPA Method 3A/6C/7E/10), calibration gas, reporting. Prices are per test, multiplied by total anticipated tests over 5 years.
Financial Requirements
Source: NEC Correlation Testing.pdf (unknown)Contract type: Priced contract with price list (Option A). Payment per task order on completion and submission of report, assessment within 14 working days; payment period 4 weeks; interest at prime rate.
Pricing tables required for:
Each table include labour (skilled/unskilled), travelling per km, accommodation per night, consumables per day, specific test methods, calibration gas, reporting, and totals per test and for total tests.
Price adjustment for inflation (Option X1): 0.85 proportion linked to STATSA CPI (Headline), 0.15 non-adjustable.
Insurance: Contractor provides insurances per Insurance Table A (replacement cost or policy limits). Employer provides certain insurances per Insurance Table B.
Compliance Requirements
Source: NEC Correlation Testing.pdf (unknown)CSD registration: not explicitly stated in the extract, but likely required for Eskom.
Tax compliance: Tax invoice must include Employer's VAT number 4740101508.
B-BBEE: Contractor must notify Employer within 7 days of any change in B-BBEE status; must submit updated verification certificate within 30 days. Decrease in B-BBEE status may lead to re-negotiation or termination.
Health and safety: Compliance with Occupational Health & Safety Act and Construction Regulations 2014; possible appointment as Principal Contractor. Asbestos regulations (Z14): must comply with Eskom Asbestos Standard 32-303; OEL for asbestos 0.2 fibres/ml as 4-hour TWA, short-term 0.6 fibres/ml as 10-min TWA; Contractor may perform parallel measurements; asbestos removal by registered contractor at Employer's expense.
Environmental: Compliance with all applicable environmental laws.
Joint venture/consortium: If applicable, joint and several liability; notify key person within 2 weeks.
No collusion or prohibited actions (anti-corruption).
Contractor's personnel must meet minimum requirements: 1 x Artisan with Grade 12, N4, Trade test, 2 years experience.
CVs of key personnel required.
Health & Safety
Source: NEC Correlation Testing.pdfHealth and safety obligations: Contractor must take all reasonable precautions (clause Z6). Must comply with Construction Regulations 2014 and all applicable health & safety laws. Warrants that Prices include sufficient amount for compliance. May be appointed as Principal Contractor. Asbestos: Contractor's personnel may stop work and leave contaminated area if asbestos risk; Employer manages asbestos according to standard; parallel measurements at Contractor's expense; removal/disposal by registered asbestos contractor at Employer's expense.
Environmental
Source: NEC Correlation Testing.pdfContractor must comply with all applicable environmental laws, regulations, and guidelines (clause Z6.2).
Contractual Terms
Source: NEC Correlation Testing.pdfContract is NEC3 Term Service Contract (TSC3) April 2013, with main Option A (priced contract with price list). Dispute resolution Option W1; secondary options X1 (price adjustment for inflation), X2 (changes in law), X17 (low service damages), X18 (limitation of liability), X19 (Task Order); additional conditions Z1-Z14.
Section
Source: NEC Correlation Testing.pdfEvaluation criteria not fully extracted. The contract is a priced contract; evaluation likely includes price and B-BBEE points. No minimum qualifying score stated.
Important Dates
Source: Supplier Evaluation Pack Template for 01 March 2024 to 29 February 2025.doc (unknown)Pack validity
Contact Information
Source: Supplier Evaluation Pack Template for 01 March 2024 to 29 February 2025.doc (unknown)Group Tax
Submission Guidelines
Source: Supplier Evaluation Pack Template for 01 March 2024 to 29 February 2025.doc (unknown)Returning the pack
Financial Requirements
Source: Supplier Evaluation Pack Template for 01 March 2024 to 29 February 2025.doc (unknown)PAYE withholding
Compliance Requirements
Source: Supplier Evaluation Pack Template for 01 March 2024 to 29 February 2025.doc (unknown)Tax classification pack for Eskom service contracts
Pack A tests (company, CC or trust)
Pack B tests (individual)
Appendices
Description
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.pdfThe returnables list covers the quality requirements for the tender for correlation, parallel and spot checking on emission PM and gas monitors, issued under Specification 240-105658000.
Important Dates
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.pdf (TENDER)Returnables list issued: 06 August 2026
Contact Information
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.pdf (TENDER)Eskom representative
Submission Guidelines
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.pdf (TENDER)Returnable quality documents — submit with the bid (Category 3, Specification 240-105658000):
Each listed deliverable carries an evaluation indicator of 1.
Evaluation Criteria
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.pdf (TENDER)Quality returnables are scored per section (Category 3, Specification 240-105658000):
Each deliverable is marked with an evaluation indicator of 1 where it applies.
Technical Specifications
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.pdf (TENDER)Scope: correlation, parallel and spot checking on emission particulate matter (PM) and gas monitors.
Referenced specifications: 240-105658000 (tender quality requirements); 240-109253698 (contract quality plan); 240-109253302 (quality control plan).
Quality deliverables: a documented QMS aligned to ISO 9001:2015, plus a draft contract quality plan and a quality control plan or inspection and test plan prepared to ISO 10005.
Quality Management
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.pdf (TENDER)Form A must be completed and signed. Any further customer-specific requirements, standards or items required by the scope of work or specification must be added under Section E.
Compliance Requirements
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.pdf (TENDER)Quality management system
Documented information required
Section
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.pdfScoring of the quality returnables (Category 3, Specification 240-105658000):
Every deliverable is flagged with an evaluation indicator of 1 where it applies.
Contact Information
Source: Technical Evaluation Criteria.pdf (unknown)Technical evaluation criteria compiled and verified by
No email address or telephone number is provided for either.
Submission Guidelines
Source: Technical Evaluation Criteria.pdf (unknown)Returnable evidence for the technical evaluation
Evidence rules
Evaluation Criteria
Source: Technical Evaluation Criteria.pdf (unknown)Technical evaluation
Scored criteria and weights
Total technical score: 100%; qualifying threshold: 70%.
Technical Specifications
Source: Technical Evaluation Criteria.pdf (unknown)Service: correlation, parallel and spot checking on emission particulate matter (PM) and gas monitors.
Quality Management
Source: Technical Evaluation Criteria.pdfQuality and accreditation requirements
Compliance Requirements
Source: Technical Evaluation Criteria.pdf (unknown)Mandatory accreditations and qualifications
Evidence rules
Section
Source: Technical Evaluation Criteria.pdfTechnical evaluation criteria and weights (10% impact on the overall evaluation criteria)
Total threshold: 70%.
Description
Source: 240-68099512 Form A_Cat 3_ Rev 9.pdfThe selected quality category is Category 3, which triggers pre-contract award quality requirements. The tenderer must acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 standard.
Important Dates
Source: 240-68099512 Form A_Cat 3_ Rev 9.pdf (unknown)Closing date: 06 August 2026 at 10:00 (from tender record).
Authorisation date of quality specification: January 2022; review date January 2027.
Submission Guidelines
Source: 240-68099512 Form A_Cat 3_ Rev 9.pdf (unknown)Returnable documents:
Submission is via the Eskom tender process; follow the instructions in the main tender invitation document for the submission channel and address.
Evaluation Criteria
Source: 240-68099512 Form A_Cat 3_ Rev 9.pdf (unknown)Pre-contract award quality requirements apply under Category 3 of specification 240-105658000. The tenderer must operate to ISO 9001 standard, with all clauses (4–10) and all seven quality principles applicable. The tenderer must select the applicable quality category (Category 3 is selected) and indicate whether a site assessment is applicable. The signed acknowledgement form is a returnable requirement.
Technical Specifications
Source: 240-68099512 Form A_Cat 3_ Rev 9.pdf (unknown)The work involves correlation, parallel and spot checking on emission PM (particulate matter) and gas monitors. The tenderer must comply with Eskom Supplier Quality Requirements specification 240-105658000 and ISO 9001 quality management standard. Selected quality category is Category 3, which triggers pre-contract award quality requirements and post-contract award obligations under clauses 3.7 and 3.8 of the specification.
Methodology
Source: 240-68099512 Form A_Cat 3_ Rev 9.pdfThe ISO 9001 standard clauses (4 to 10) and all seven quality principles are applicable, as marked on the quality acknowledgement form. The tenderer must operate to these requirements throughout the contract.
Quality Management
Source: 240-68099512 Form A_Cat 3_ Rev 9.pdfThe tenderer must select the applicable quality category (Category 3 is selected) and indicate whether a site assessment is applicable, per Eskom Supplier Quality Requirements 240-105658000. The tenderer must also indicate applicability of Main Supplier and Sub-supplier Capability and Capacity Assessment.
Post-contract award quality requirements include Contract Execution, Supplier Quality Performance Monitoring, Eskom Rights of Access, Eskom Rights to Information, Preservation, Quality Audits Related Conditions, Management of Nonconformities and Nonconforming Outputs Identified by Eskom, and Special Processes, per clauses 3.7 and 3.8 of the specification.
Compliance Requirements
Source: 240-68099512 Form A_Cat 3_ Rev 9.pdf (unknown)The tenderer must complete and sign the quality requirements acknowledgement form (Form A, Cat 3) to accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 standard.
The tenderer must indicate applicability of Main Supplier and Sub-supplier Capability and Capacity Assessment.
The tenderer must indicate whether a site assessment is applicable (per clause 3.5 of the specification).
Section
Source: 240-68099512 Form A_Cat 3_ Rev 9.pdfPre-contract award quality requirements apply under Category 3 of specification 240-105658000. The tenderer must indicate applicability of Main Supplier and Sub-supplier Capability and Capacity Assessment and indicate whether a site assessment is applicable.
Description
Source: E-tendering Help Manual for supplier - 27 January 2025 (1).pdfClosed tenders are not advertised on Tender Bulletin. They are sent directly to suppliers who meet the buyer's selection and evaluation criteria, and those suppliers receive an email link to bid privately.
Contact Information
Source: E-tendering Help Manual for supplier - 27 January 2025 (1).pdf (TENDER)Enquiries
Submission Guidelines
Source: E-tendering Help Manual for supplier - 27 January 2025 (1).pdf (TENDER)Submission channel
Access requirements
Upload process
File limits
After submission
System problems
Browser
Methodology
Source: E-tendering Help Manual for supplier - 27 January 2025 (1).pdf (TENDER)Password reset
Compliance Requirements
Source: E-tendering Help Manual for supplier - 27 January 2025 (1).pdf (TENDER)CSD registration
Special Conditions
Source: E-tendering Help Manual for supplier - 27 January 2025 (1).pdf (TENDER)The system works with most web browsers; Microsoft Edge is recommended.
Submission Guidelines
Source: Integrity Declaration Form - 31 May 2024.docx (unknown)Returnable document
Disqualification risks
Compliance Requirements
Source: Integrity Declaration Form - 31 May 2024.docx (unknown)Integrity Declaration Form (returnable)
Submission Guidelines
Source: E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)Mandatory returnable form
Evaluation Criteria
Source: E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)Responsiveness screening
Contact Information
Source: 240-77471651 Annexure C 1 (1).docx (unknown)Development team
Submission Guidelines
Source: 240-77471651 Annexure C 1 (1).docx (unknown)OHS returnables pack
Evaluation Criteria
Source: 240-77471651 Annexure C 1 (1).docx (unknown)OHS returnables evaluation
Financial Requirements
Source: 240-77471651 Annexure C 1 (1).docx (unknown)OHS costing
Compliance Requirements
Source: 240-77471651 Annexure C 1 (1).docx (unknown)OHS tender returnables — all must be completed and submitted for evaluation before contract award:
Important Dates
Source: Eskom - Standard Conditions of Tender (August 2024).pdf (TENDER)Closing
Compulsory briefing
Briefing Session
Source: Eskom - Standard Conditions of Tender (August 2024).pdf (TENDER)Compulsory meeting
Contact Information
Source: Eskom - Standard Conditions of Tender (August 2024).pdf (TENDER)Enquiries
Submission Guidelines
Source: Eskom - Standard Conditions of Tender (August 2024).pdf (TENDER)Submission method
Copies and packaging
Returnables
Disqualification risks
Returnable Documents
Source: Eskom - Standard Conditions of Tender (August 2024).pdf (TENDER)Deadlines
Format and copies
Packaging
Other returnables
Evaluation Criteria
Source: Eskom - Standard Conditions of Tender (August 2024).pdf (TENDER)Evaluation stages
Preference points
Arithmetical errors
Other
Quality Management
Source: Eskom - Standard Conditions of Tender (August 2024).pdfQuality
Pricing Schedule
Source: Eskom - Standard Conditions of Tender (August 2024).pdfPricing basis
Document discipline
Arithmetical corrections
Scoring
Financial Requirements
Source: Eskom - Standard Conditions of Tender (August 2024).pdf (TENDER)Pricing
Security and insurance
Costs and corrections
Compliance Requirements
Source: Eskom - Standard Conditions of Tender (August 2024).pdf (TENDER)Eligibility
Statutory and regulatory compliance
CIDB
Skills and participation goals
Sheq
Integrity
Health & Safety
Source: Eskom - Standard Conditions of Tender (August 2024).pdfSafety, health, environment and quality (SHEQ)
Communication and process
Construction-related obligations
Integrity and labelling
Contractual Terms
Source: Eskom - Standard Conditions of Tender (August 2024).pdfTender process
Tender validity
Confidentiality
Contract conclusion
Insurance and security
Special Conditions
Source: Eskom - Standard Conditions of Tender (August 2024).pdf (TENDER)Process conditions
Tender validity
Confidentiality and document control
Requirements
Source: Eskom - Standard Conditions of Tender (August 2024).pdf (TENDER)Eligibility
Regulatory compliance
CIDB and development goals
Integrity
Section
Source: Eskom - Standard Conditions of Tender (August 2024).pdfEvaluation order
Description
Source: Supplier Development Localisation & Industrialisation Correlation, Parallel and Spot Checking on Emission PM and Gas Monitors.pdfBusiness unit: Eskom Majuba Power Station.
Scope of work: correlation, parallel and spot checking on emission PM and gas monitors.
Contract duration: 60 months.
SDL&I objectives (RDP goals): bidders who submit the required objectives but do not meet Eskom's targets are not disqualified. The objectives are not scored, but the commitments become contractual obligations.
Submission Guidelines
Source: Supplier Development Localisation & Industrialisation Correlation, Parallel and Spot Checking on Emission PM and Gas Monitors.pdf (unknown)Returnable documents for claiming preference points:
If this documentation is not submitted, the bid is not disqualified but scores no specific goal points and is limited to the price points (90 or 80).
Evaluation Criteria
Source: Supplier Development Localisation & Industrialisation Correlation, Parallel and Spot Checking on Emission PM and Gas Monitors.pdf (unknown)Preference point system: 80/20 or 90/10, based on specific goals.
B-BBEE status level points (90/10 system / 80/20 system):
Bidders who do not submit the preference point documentation score 0 for specific goals and are limited to the price points (90 or 80).
Technical Specifications
Source: Supplier Development Localisation & Industrialisation Correlation, Parallel and Spot Checking on Emission PM and Gas Monitors.pdf (unknown)Scope of work: correlation, parallel and spot checking on emission particulate matter (PM) and gas monitors.
Site: Eskom Majuba Power Station.
Contract duration: 60 months.
SDL&I commitments form part of the contract:
Methodology
Source: Supplier Development Localisation & Industrialisation Correlation, Parallel and Spot Checking on Emission PM and Gas Monitors.pdfSkills development delivery:
Pricing Schedule
Source: Supplier Development Localisation & Industrialisation Correlation, Parallel and Spot Checking on Emission PM and Gas Monitors.pdfLocal procurement content:
Financial Requirements
Source: Supplier Development Localisation & Industrialisation Correlation, Parallel and Spot Checking on Emission PM and Gas Monitors.pdf (unknown)SDL&I penalties:
Performance security:
Pricing:
Compliance Requirements
Source: Supplier Development Localisation & Industrialisation Correlation, Parallel and Spot Checking on Emission PM and Gas Monitors.pdf (unknown)B-bbee:
Local content:
B-BBEE Requirements
Source: Supplier Development Localisation & Industrialisation Correlation, Parallel and Spot Checking on Emission PM and Gas Monitors.pdf (unknown)Preference points: a maximum of 20 points (80/20) or 10 points (90/10) for the specific goal, added to price points and rounded to two decimals; awarded to the highest scorer under the PPPFA.
B-BBEE status level points (90/10 / 80/20): Level 1 = 10/20; Level 2 = 9/18; Level 3 = 6/14; Level 4 = 5/12; Level 5 = 4/8; Level 6 = 3/6; Level 7 = 2/4; Level 8 = 1/2; non-compliant = 0.
Evidence to claim preference points: valid B-BBEE certificate from a SANAS-accredited agency, sworn affidavit or CIPS affidavit; proof of ownership/shareholding (preferably CIPC) with a breakdown; certified ID copies of shareholders; proof of disability where applicable; consolidated B-BBEE certificate for a trust, consortium or joint venture.
Certificate thresholds: EME (revenue up to R10 million) may submit a sworn affidavit; QSE (revenue up to R50 million) must comply with the QSE scorecard unless at least 51% black-owned; revenue above R50 million requires a valid B-BBEE certificate.
B-BBEE improvement or retention plan: submit within 30 days of signing the contract. Level 1 maintains; Levels 2-3 maintain or improve; Level 4 reaches Level 3 by the end of year 1; Levels 5-8 or non-compliant reach Level 4 by the end of year 1 and improve at least one level each year from year 2.
SDL&I commitments (contractual, not scored): local procurement content target of 100%; jobs created and retained in South Africa; skills development for unemployed candidates sourced from Dr. Pixley Ka Isaka Seme Local Municipality.
Contractual Terms
Source: Supplier Development Localisation & Industrialisation Correlation, Parallel and Spot Checking on Emission PM and Gas Monitors.pdfB-BBEE improvement or retention plan: must be submitted within 30 days of signing the contract.
Local procurement content: target 100%; local and imported components must be separated in the price schedule; local content is total spending minus the imported component.
Jobs: bidders must propose the type and number of jobs created and retained in South Africa as a direct result of the contract.
Skills development: bidders must propose development of unemployed candidates; candidates are sourced from Dr. Pixley Ka Isaka Seme Local Municipality; the recommended supplier must provide a skills development plan and report progress monthly; bursaries must cover tuition and a stipend; the target is TVET Electrical Engineering (C&I) bursaries at entry level Matric/N3, with a trade test certificate as the outcome; bidders bear the full cost and Eskom makes no financial contribution; bidders may approach SETAs for grants and SARS for tax rebates.
Penalties and security:
Reporting and monitoring:
Section
Source: Supplier Development Localisation & Industrialisation Correlation, Parallel and Spot Checking on Emission PM and Gas Monitors.pdfSpecific goals: a maximum of 20 points (80/20 system) or 10 points (90/10 system) is awarded for the specific goal. These points are added to price points and the total is rounded to two decimal places. The contract is awarded to the highest scorer under section 2(1)(f) of the PPPFA.
B-BBEE status level points (90/10 / 80/20): Level 1 = 10/20; Level 2 = 9/18; Level 3 = 6/14; Level 4 = 5/12; Level 5 = 4/8; Level 6 = 3/6; Level 7 = 2/4; Level 8 = 1/2; non-compliant = 0.
Bidders who do not submit the preference point documentation are not disqualified but score 0 for specific goals and only the price points (90 or 80).
Description
Source: 240-77471499 Annexure B.docxAnnexure B is the acknowledgement form covering Eskom's OHS legal and other requirements. By signing it the supplier confirms it holds copies of the listed OHS documents, understands them, and accepts the consequences of failing to comply with them while working for or rendering services to Eskom.
Submission Guidelines
Source: 240-77471499 Annexure B.docx (unknown)Returnable document
Compliance Requirements
Source: 240-77471499 Annexure B.docx (unknown)Occupational health and safety
Management of contractors and suppliers
Returnable form
Submission Guidelines
Source: 559-816058 32-726-03T High Risk Emission.docx (unknown)Returnable documents are not specified in the document. Bidders must submit an OHS plan, a risk assessment, and required safety file documents as part of the tender. The method and address for submission are not stated in the document.
Evaluation Criteria
Source: 559-816058 32-726-03T High Risk Emission.docx (unknown)The evaluation criteria are not detailed in this OHS specification document. However, bidders must comply with the OHS requirements, including the Section 37(2) agreement, COID registration, and submission of a valid letter of good standing before work commences.
Technical Specifications
Source: 559-816058 32-726-03T High Risk Emission.docx (unknown)Scope of work: Correlation, parallel and spot checking on emission PM (particulate matter) and gas monitors at Majuba Power Station, as per Eskom's statutory emissions reporting standard, on an as-and-when-required basis over a period of 5 years.
Key OHS requirements include:
Compliance Requirements
Source: 559-816058 32-726-03T High Risk Emission.docx (unknown)Mandatory compliance:
Description
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdfThe document is Eskom's Supplier Integrity Pact, a standard integrity agreement between Eskom and its suppliers. It applies to all existing and potential suppliers and sets out ethical conduct obligations. The pact requires suppliers to complete, sign and submit the Integrity Declaration Form whenever participating in any Eskom procurement process. Eskom commits to fair, transparent, equitable, cost-effective and competitive procurement aligned with South African law and constitutional principles. The pact supplements all other Eskom commercial and ethics policies.
Important Dates
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)Closing date: 27 June 2023 (time not stated in document).
Contact Information
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)Ethics reporting
(Confidentiality guaranteed when reporting dishonest, fraudulent or inappropriate behaviour.)
Submission Guidelines
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)Returnable documents
Disqualification risks
Evaluation Criteria
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)Evaluation is based on the constitutional principles of fairness, transparency, equity, cost-effectiveness and competitiveness.
No detailed scoring split, minimum qualifying score, or preference point system (80/20 or 90/10) is stated in the document.
Suppliers are subject to a supplier discipline process if found guilty of misconduct, which may include suspension from the Eskom Vendor Database and referral to National Treasury for inclusion on the List of Restricted Suppliers.
Technical Specifications
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)General scope
Financial Requirements
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)No tender-specific financial requirements (e.g., pricing format, bid security, bonds, guarantees, retention, payment terms, turnover) are stated in the document.
Compliance Requirements
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)Compliance forms
Conduct requirements
Contractual Terms
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdfThe pact is governed by South African law. Its provisions remain valid until replaced; if any provision is found invalid, the remainder stays in force. Eskom may impose a supplier discipline process, including suspension from the Vendor Database and referral to National Treasury, if a supplier is found guilty of misconduct. The pact does not preclude civil or criminal proceedings. Suppliers must report any dishonest, fraudulent or inappropriate behaviour by Eskom employees/directors to the Eskom Ethics office ([email protected]), Forensic office ([email protected]), or toll-free hotline 0800 11 27 22.
Special Conditions
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)Eskom Supplier Integrity Pact: Suppliers must maintain an impeachable standard of integrity and avoid conflicts of interest. They must not engage in fraud, corruption, collusion or bid rigging. They must disclose any interests or relationships with Eskom employees/directors that may affect tender decisions. Gifts to Eskom employees/directors must not exceed R1,500 and must not improperly influence. Suppliers must report unethical behaviour through the specified channels. Eskom may implement a Supplier Discipline Process, including suspension and referral to National Treasury.
Section
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdfEskom is obliged to treat all tenderers according to constitutional principles of fairness, transparency, equity, cost-effectiveness and competitiveness. There is no stated scoring methodology or preference point system in this document.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 4 of 2006
Relevant to electricity, generation, transmission, distribution and energy-service procurement.
Relevant because this tender appears to involve electricity, power supply, energy infrastructure, generators, or energy maintenance. Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve electricity, power supply, energy infrastructure, generators, or energy maintenance. Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve electricity, power supply, energy infrastructure, generators, or energy maintenance. Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
Act 28 of 2002
Relevant to mineral resources, mining rights, prospecting and mining-related procurement.
Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
Act 40 of 2004
Relevant to regulated electricity, piped-gas and petroleum-pipeline activities.
Relevant because this tender appears to involve electricity, power supply, energy infrastructure, generators, or energy maintenance.
Address
Amasfort road - Volksrust - Volksrust - 2470
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
16
Last checked
12 Oct 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
💡 Want more tendering tips and strategies?
Explore Our BlogMedian Estimate
R 3 761 189
Range
Based on 15 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Get deep intelligence on Electricity, gas, steam and air conditioning. Unlock full pricing strategies, bid frequency, and historical win rates.