Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Kriel Power Station - Kriel - Kriel -
Organization Type
GOVERNMENT
Published
03 Jun 2026
OCDS Reference
ocds-9t57fa-158048
This tender, issued by ESKOM, requires a contractor to draw, fabricate, supply, deliver, replace, and install new pipework with fittings inside cable tunnels and pipe trenches at kriel power station in mpumalanga over a six-month period. IT is aimed at registered suppliers with proven OHS compliance and technical capability for industrial pipework projects.
Description
Source: SHE SPEC.pdfThe project involves drawing, fabricating, supplying, delivering, replacing, and installing new pipework with fittings inside the cable tunnels and pipe trenches at Kriel Power Station. The contract duration is six months. The project address is Kriel Power Station.
Categories
Request for Bid(Open-Tender)
Kriel Power Station - Kriel - Kriel -
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
SHE SPEC.pdf
Eskom's tender for the draw, fabrication, supply, delivery, replacement, and installation of new pipework with fittings inside cable tunnels and pipe trenches at Kriel Power Station over a six-month period. The project emphasizes strict compliance with Occupational Health and Safety (OHS) standards, Eskom’s SHEQ policies, and South African legislative requirements. The scope includes high-risk activities requiring adherence to Eskom’s Life-Saving Rules, statutory appointments, and comprehensive safety management.
Date & Time
Monday, 22 June 2026 - 10:00
Venue
MS Teams link in tender document
03 Jun
2026
Tender Published
Tender was published
22 Jun
2026
Closing Date
Tender closing date
Median Estimate
R 264 480
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Learn how to submit a winning bid with these related articles
Everything South African general contractors need to know about how to write a winning tender proposal without an in-house bid team in gauteng — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Everything South African general contractors need to know about complete guide to csd and bbbee compliance for general sector suppliers in south africa (2026) — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Everything South African general contractors need to know about complete guide to csd & bbbee compliance for general sector tenders in south africa — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Everything South African general contractors need to know about complete guide to csd compliance for general sector suppliers in south africa (2026) — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
💡 Want more tendering tips and strategies?
Explore Our BlogImportant Dates
Source: SHE SPEC.pdf (unknown)Closing date for submissions: 15 September 2025.
Contact Information
Source: SHE SPEC.pdf (unknown)Eskom’s Contract Manager/Project: Derrick Mahlalela.
Eskom’s OHS/SHE Manager: Gift Mamize (Acting).
Eskom’s Procurement Manager/Officer: Phumelele Mncwango.
Eskom’s OHS/SHE Officer: Sizani Shabangu.
Project Address: Kriel Power Station.
Evaluation Criteria
Source: SHE SPEC.pdf (unknown)General requirements:
Specific requirements:
Technical Specifications
Source: SHE SPEC.pdf (unknown)Scope of work:
Technical and safety requirements:
Methodology
Source: SHE SPEC.pdfThe contractor must develop and submit method statements or written safe work procedures aligned with risk assessments. These procedures must detail:
Additional requirements:
Experience & Qualifications
Source: SHE SPEC.pdfThe main contractor must:
Key personnel requirements:
Quality Management
Source: SHE SPEC.pdfThe main contractor must ensure all tools and equipment are:
Compliance Requirements
Source: SHE SPEC.pdf (unknown)Mandatory compliance with the following legislation:
Additional compliance requirements:
Health & Safety
Source: SHE SPEC.pdfEskom’s Kriel Power Station requires strict adherence to its Safety, Health, Environmental, and Quality (SHEQ) Policy and applicable legislative obligations. The main contractor must:
Key OHS requirements:
Environmental
Source: SHE SPEC.pdfThe contractor must:
Contractual Terms
Source: SHE SPEC.pdfEskom reserves the right to terminate the contract under certain conditions, including:
Submission Guidelines
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.pdf (TENDER)Submit the following returnable documents as part of your bid: Form A (completed and signed).
Returnable Documents
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.pdf (TENDER)Form A must be completed and signed as part of the tender submission.
Evaluation Criteria
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.pdf (TENDER)Evaluation is based on a total possible score of 13 points, broken down as follows: Section A (Quality Management System Requirements - ISO 9001:2015 compliance): 7 points. Required deliverables: QMS Manual or equivalent, Quality Policy (approved by top management), Quality Objectives (approved by top management), Control of documented information (Clause 7.5), Control of nonconforming outputs (Clause 8.7), Nonconformity and Corrective Action (Clause 10.2), Internal Audit (Clause 9.2). Section B (Evidence of QMS in operation): 2 points. Required deliverables: Organizational chart and responsibility matrix (Clause 5.3), Control of Externally Provided Processes, Products, and Services (Clause 8.4). Section C (Contract Quality Plan Requirements): 1 point. Required deliverable: Draft Contract Quality Plan specific to the project scope (Ref ISO 10005). Section D (Quality Control Plan Requirements): 1 point. Required deliverable: Draft/Example of an Inspection and Test Plan (ITP) or Quality Control Plan (QCP) for similar/previous work (Ref ISO 10005). Section E (User-defined additional requirements): 2 points. Required deliverables: Form A (completed and signed), Additional requirements as per scope of work/specification. Mandatory criteria: Compliance with ISO 9001:2015 (documented QMS required, certification optional), Submission of all Section A-E deliverables, Ability to perform work within 6 months at Kriel Power Station, Provision of draft CQP and QCP/ITP tailored to the project scope, Documented evidence of roles, responsibilities, and external provider controls. Preferred criteria: Prior experience in pipework fabrication/installation in power stations or similar environments, Existing ISO 9001 certification (though not mandatory).
Compliance Requirements
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.pdf (TENDER)Compliance with ISO 9001:2015 Quality Management System requirements is mandatory. Objective evidence of a documented QMS (not necessarily certified) must be provided. Additional customer-specific requirements may apply as per the scope of work or specification. Ensure all customer-specific and standard requirements are addressed.
Submission Guidelines
Source: ITT_CIDB Ann G Compulsory Enterprise Questionnaire.pdf (unknown)Returnable Documents: Not specified in the provided text.
Contact Information
Source: Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdf (unknown)Ethics and reporting contacts:
Submission Guidelines
Source: Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdf (unknown)Suppliers must:
Required returnable documents:
Disqualification risks:
Reporting obligations:
Returnable Documents
Source: Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdf (unknown)Suppliers must submit the following returnable documents:
Evaluation Criteria
Source: Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdf (unknown)Evaluation is based on:
Compliance Requirements
Source: Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdf (unknown)Suppliers must comply with:
Consequences of non-compliance:
Evaluation Criteria
Source: Safety file checklist.pdf (unknown)Evaluation will focus on the following criteria:
Technical Specifications
Source: Safety file checklist.pdf (unknown)Scope: Draw, fabricate, supply, deliver, replace, and install new pipework with fittings inside cable tunnels and pipe trenches at Kriel Power Station for a 6-month period. Contract type may be full-time or as-and-when basis.
Key Requirements:
Methodology
Source: Safety file checklist.pdfMethodology Requirements:
Quality Management
Source: Safety file checklist.pdfQuality and Safety Requirements:
Compliance Requirements
Source: Safety file checklist.pdf (unknown)Mandatory Compliance:
Key Appointments (Competent Persons):
Risk Assessment and Training:
PPE and Confined Spaces:
Incident Management:
Records and Documentation:
COVID-19 Requirements:
Vehicle Safety:
Health & Safety
Source: Safety file checklist.pdfOccupational Health and Safety (OHS) Requirements:
Description
Source: 240-105658000 Supplier Quality Management Specification.pdfThe tender involves the drawing, fabrication, supply, delivery, replacement, and installation of new pipework with fittings inside cable tunnels and pipe trenches at Kriel Power Station. The project duration is six months. The scope requires compliance with Eskom’s Supplier Quality Management Specification (240-105658000/QM 58) and adherence to ISO 9001 standards for quality management.
Important Dates
Source: 240-105658000 Supplier Quality Management Specification.pdf (unknown)Closing date for submission: 22 June 2026 at 10:00 AM (UTC).
Contact Information
Source: 240-105658000 Supplier Quality Management Specification.pdf (unknown)Department: Supply Chain Management. For specific queries, refer to the tender document or Eskom’s official procurement portal.
Submission Guidelines
Source: 240-105658000 Supplier Quality Management Specification.pdf (unknown)Submit all required returnable documents as specified in the List of Tender Returnables (240-12248652) and the selected category (Category 1, 2, 3, or 4) in Form A. Ensure Form A (Tender and Contract Quality Requirements for Supplier Quality Management Specification 240-105658000/QM 58 and ISO 9001) is completed, signed, and returned with other returnables. Non-submission or incomplete submission of required documents may lead to disqualification.
Returnable Documents
Source: 240-105658000 Supplier Quality Management Specification.pdf (unknown)Suppliers must complete and sign Form A (Tender and Contract Quality Requirements for Supplier Quality Management Specification 240-105658000/QM 58 and ISO 9001). Category-specific returnable documents include: Valid ISO 9001 certificate (or equivalent). QMS manual, quality policy, and objectives. Internal and external audit reports with nonconformity and corrective action details. Draft Contract Quality Plan (CQP) and example Inspection and Test Plan (ITP)/Quality Control Plan (QCP). Documented information for control of externally provided processes, products, and services. Roles, responsibilities, and authorities related to the QMS. Records of management review meetings. Quality method statement (for Category 4). Specific requirements are selected using the List of Tender Returnables (240-12248652).
Evaluation Criteria
Source: 240-105658000 Supplier Quality Management Specification.pdf (unknown)Mandatory: Must be a registered supplier on Eskom’s database (or willing to register). Must demonstrate capacity and capability to execute the scope (fabrication, supply, installation of pipework). Must have a valid ISO 9001 certification (or equivalent) unless excluded by the tender category. Must comply with Eskom’s Supplier Quality Management Specification (240-105658000/QM 58). Must submit all required returnable documents (per the selected category and List of Tender Returnables 240-12248652). Must adhere to SHEQ policies (Safety, Health, Environment, Quality). Must have experience in similar projects (pipework fabrication/installation in power stations or industrial environments). Preferential: Compliance with PPPFA (Preferential Procurement Policy Framework Act) may apply for South African tenders. Local content and B-BBEE (Broad-Based Black Economic Empowerment) compliance may be advantageous. Prior experience with Eskom or similar utility projects is favorable.
Technical Specifications
Source: 240-105658000 Supplier Quality Management Specification.pdf (unknown)Scope: Draw, fabricate, supply, deliver, replace, and install new pipework with fittings inside cable tunnels and pipe trenches at Kriel Power Station for a period of six months. Quality Requirements: Develop, implement, maintain, and continually improve a Quality Management System (QMS) based on ISO 9001. Submit a Contract Quality Plan (CQP) and Quality Control Plan (QCP)/Inspection and Test Plan (ITP) as per ISO 10005 and Eskom’s templates. Special Processes: Welding, non-destructive testing (NDT), and other special processes must be pre-qualified, with procedures and operators tested and certified. Preservation: Implement a comprehensive preservation program for materials, equipment, and components during storage, transportation, and installation. Compliance: Adhere to Eskom’s Supplier Quality Management Specification (240-105658000/QM 58) and all applicable codes, standards, and acceptance criteria.
Methodology
Source: 240-105658000 Supplier Quality Management Specification.pdfSuppliers must submit a detailed methodology for executing the scope of work, including: Clear description of equipment, locations, and facility details. Identification of quality verification activities and stages. Reference documents, procedures, or method statements to be used. Definition of acceptance criteria. Listing of certifying or verifying documents. Identification of intervention points (hold, witness, review) for Eskom and third-party inspectors. Qualification requirements for quality control inspectors. Suppliers must use Eskom’s templates for CQP, QCP, and ITP where applicable. Method statements must align with ISO 9001 and project-specific requirements.
Experience & Qualifications
Source: 240-105658000 Supplier Quality Management Specification.pdfSuppliers must demonstrate experience in similar projects, particularly in pipework fabrication and installation in power stations or industrial environments. Key personnel must have relevant qualifications and certifications for their roles. Welders and operators for special processes must be certified and qualified in accordance with applicable codes and standards. Suppliers must submit evidence of training and competency for all personnel involved in quality-affecting activities. Sub-suppliers must also meet experience and qualification requirements for their scope of work.
Quality Management
Source: 240-105658000 Supplier Quality Management Specification.pdfSuppliers must develop, implement, maintain, and continually improve a QMS conforming to ISO 9001. The QMS must include documented information such as a quality manual, procedures, work instructions, and method statements. Suppliers must submit a Contract Quality Plan (CQP) and Quality Control Plan (QCP)/Inspection and Test Plan (ITP) for Eskom’s review and acceptance. QCPs/ITPs must cover all quality-control activities from contract review to commissioning. Suppliers must ensure sub-suppliers comply with Eskom’s quality requirements and submit their own QCPs/ITPs. Eskom will conduct audits and assessments to verify compliance. Suppliers must manage nonconformities, conduct root cause analysis, and implement corrective actions within 14 days or as specified. Suppliers must maintain records of all quality-related activities and provide access to Eskom for audits and inspections.
Compliance Requirements
Source: 240-105658000 Supplier Quality Management Specification.pdf (unknown)Must be a registered supplier on Eskom’s database. Must comply with Eskom’s Supplier Quality Management Specification (240-105658000/QM 58). Must have a valid ISO 9001 certification (or equivalent) unless excluded by the tender category. Must adhere to SHEQ policies (Safety, Health, Environment, Quality). Must submit all required returnable documents as per the selected category and List of Tender Returnables (240-12248652). B-BBEE compliance is advantageous. PPPFA (Preferential Procurement Policy Framework Act) may apply.
Health & Safety
Source: 240-105658000 Supplier Quality Management Specification.pdfSuppliers must adhere to Eskom’s SHEQ (Safety, Health, Environment, and Quality) Policy (32-727). All activities must comply with relevant safety, health, and environmental regulations. Suppliers must ensure personnel are trained and competent in SHEQ requirements. Special processes (e.g., welding, NDT) must be performed by qualified personnel in accordance with applicable standards and codes. Suppliers must provide a safe working environment and implement measures to prevent incidents. Eskom reserves the right to participate in or lead investigations related to SHEQ incidents.
Contractual Terms
Source: 240-105658000 Supplier Quality Management Specification.pdfEskom reserves the right to review, inspect, and audit any part of the supplier’s QMS, documentation, materials, or equipment at any time or project location. Suppliers must allow Eskom access to all quality plans, procedures, and records. Eskom may appoint resident quality inspectors at the supplier’s or sub-supplier’s premises at no cost to Eskom. Suppliers must provide workspace and access for Eskom inspectors. Eskom may suspend deliveries if work does not meet specified requirements. Suppliers are liable for repair, rework, or replacement costs for nonconforming products identified by Eskom. Repeated nonconformities may lead to rescinding the supplier’s qualification status. Contractual remedies will be applied in accordance with FIDIC/NEC contract terms for failures to rectify nonconformities.
Section
Source: 240-105658000 Supplier Quality Management Specification.pdfEvaluation will be based on compliance with mandatory requirements, including QMS certification, experience, and submission of returnable documents. Preferential criteria include B-BBEE compliance, local content, and prior experience with Eskom or similar projects. Suppliers will be assessed on their ability to meet technical, quality, and SHEQ requirements. Noncompliance with mandatory criteria may result in disqualification.
Description
Source: 240-68099512 Form A_Cat 3_ Rev 9.pdfScope: Draw, fabricate, supply, deliver, replace, and install new pipework with fittings inside cable tunnels and pipe trenches at Kriel Power Station for six months. Quality category: Category 3 (as per clause 3.5-105658000) is selected. Site assessment applicability must be indicated.
Submission Guidelines
Source: 240-68099512 Form A_Cat 3_ Rev 9.pdf (unknown)Submit the completed and signed Form A (240-68099512 Rev 9) to acknowledge acceptance of Eskom Supplier Quality Requirements and ISO 9001 Standard. Only one category may be selected (Category 3 is marked as applicable in this document).
Evaluation Criteria
Source: 240-68099512 Form A_Cat 3_ Rev 9.pdf (unknown)Evaluation is based on pre-contract award quality requirements, contract execution, and supplier quality performance monitoring. Key criteria include: compliance with ISO 9001 clauses (Context of the Organisation, Leadership, Planning, Support, Operation, Performance Evaluations, Improvement), capability to perform site assessments if required, ability to meet Eskom’s technical, quality, and documentation requirements, and compliance with Eskom’s rights of access, information, and preservation conditions. Quality audits and nonconformity management are part of the evaluation.
Technical Specifications
Source: 240-68099512 Form A_Cat 3_ Rev 9.pdf (unknown)Scope: Draw, fabricate, supply, deliver, replace, and install new pipework with fittings inside cable tunnels and pipe trenches at Kriel Power Station for six months. Quality requirements: Category 3 (as per clause 3.5-105658000) is applicable. Post-contract award includes Eskom rights of access, rights to information, preservation, and management of nonconformities. Methodology must align with ISO 9001 principles: Customer focus, Leadership, Engagement of people, Process approach, Improvement, Evidence-based decision making, and Relationship Management.
Quality Management
Source: 240-68099512 Form A_Cat 3_ Rev 9.pdfPost-contract award includes contract execution and supplier quality performance monitoring (clause 3.7-105658000). Eskom retains rights of access, information, preservation, and quality audits. Management of nonconformities and nonconforming outputs is required.
Compliance Requirements
Source: 240-68099512 Form A_Cat 3_ Rev 9.pdf (unknown)ISO 9001 certification is mandatory. Compliance with Eskom Supplier Quality Requirements (240-105658000 Specification) is required. Bidders must accept clauses related to quality audits, nonconformity management, and special processes.
Section
Source: 240-68099512 Form A_Cat 3_ Rev 9.pdfEvaluation includes pre-contract award quality requirements, contract execution, and supplier quality performance monitoring. ISO 9001 clauses applicable: Context of the Organisation, Leadership, Planning, Support, Operation, Performance Evaluations, and Improvement. Quality audits and nonconformity management are part of the evaluation.
Important Dates
Source: RER0371 - Environmental Evaluation - Draw Fabricate Supply Deliver Replace and Install New Pipework with Fittings inside the Cable Tunnels and Pipe Trenches.pdf (unknown)Closing date: 12 August 2025
Review date: 12 August 2027
Returnable Documents
Source: RER0371 - Environmental Evaluation - Draw Fabricate Supply Deliver Replace and Install New Pipework with Fittings inside the Cable Tunnels and Pipe Trenches.pdf (unknown)Required returnable documents:
Evaluation Criteria
Source: RER0371 - Environmental Evaluation - Draw Fabricate Supply Deliver Replace and Install New Pipework with Fittings inside the Cable Tunnels and Pipe Trenches.pdf (unknown)Mandatory requirements:
Advantageous (non-mandatory) requirements:
Exclusion criteria:
Technical Specifications
Source: RER0371 - Environmental Evaluation - Draw Fabricate Supply Deliver Replace and Install New Pipework with Fittings inside the Cable Tunnels and Pipe Trenches.pdf (unknown)Scope: Draw, fabricate, supply, deliver, replace, and install new pipework with fittings inside cable tunnels and pipe trenches at Kriel Power Station. Duration: 6 months.
Environmental specifications:
Compliance Requirements
Source: RER0371 - Environmental Evaluation - Draw Fabricate Supply Deliver Replace and Install New Pipework with Fittings inside the Cable Tunnels and Pipe Trenches.pdf (unknown)Environmental compliance:
Environmental
Source: RER0371 - Environmental Evaluation - Draw Fabricate Supply Deliver Replace and Install New Pipework with Fittings inside the Cable Tunnels and Pipe Trenches.pdfEnvironmental requirements:
Description
Source: ITT_CIDB SBD9 SCM_certificate_independent_bid_determination_SBD9_.pdfGeneral Requirement:
Contact Information
Source: ITT_CIDB SBD9 SCM_certificate_independent_bid_determination_SBD9_.pdf (TENDER)Department: Supply Chain Management. No specific name, email, phone, or address provided in the document.
Submission Guidelines
Source: ITT_CIDB SBD9 SCM_certificate_independent_bid_determination_SBD9_.pdf (TENDER)Required Returnable Documents:
Disqualification Risks:
Additional Notes:
Returnable Documents
Source: ITT_CIDB SBD9 SCM_certificate_independent_bid_determination_SBD9_.pdf (TENDER)Required Bid Submission Documents:
Evaluation Criteria
Source: ITT_CIDB SBD9 SCM_certificate_independent_bid_determination_SBD9_.pdf (TENDER)General Requirements:
Exclusion Criteria:
Experience & Qualifications
Source: ITT_CIDB SBD9 SCM_certificate_independent_bid_determination_SBD9_.pdfCompetitor Definition:
Compliance Requirements
Source: ITT_CIDB SBD9 SCM_certificate_independent_bid_determination_SBD9_.pdf (TENDER)Mandatory Compliance:
Prohibited Conduct:
Contractual Terms
Source: ITT_CIDB SBD9 SCM_certificate_independent_bid_determination_SBD9_.pdfContractual Obligations:
Special Conditions
Source: ITT_CIDB SBD9 SCM_certificate_independent_bid_determination_SBD9_.pdf (TENDER)Anti-Collusion and Fraud Prevention:
Contact Information
Source: 240-109253698 CQP Template 2021.pdf (unknown)Supplier must provide Representative details and contacts (E-mails). All documentation must be submitted as per the contract agreement. Communication will include Fixed Contract Meetings, Weekly Progress Meetings, and reporting.
Returnable Documents
Source: 240-109253698 CQP Template 2021.pdf (unknown)Databook Management: If applicable, submit databooks with review and acceptance processes. Include a list of purchase orders for quality-critical items. Required documents include: QCP/ITP from Suppliers, Certificates of Compliance, Index of ITP/QCP/PQP, Data Book Index, Risk Register, Offsite and Offshore Inspection Reports, Method Statements, Safe Working Procedures, PQRs, Repair Procedures, Final Databook, Quality Manual, Quality Policy, Risk Register, Audit Findings Report and Register/Action Register, Consolidated Inspection Register, Monthly Inspection Analysis Report, Updated Procedure Registers, Register of NCs/Defects/Punch Items with analysis, Databook Status Registers.
Evaluation Criteria
Source: 240-109253698 CQP Template 2021.pdf (unknown)Evaluation will assess the following: Experience in pipework fabrication, supply, and installation for power stations or similar industrial environments. Compliance with Eskom’s quality standards (SANS 466:2005 / ISO 10005:2005) and evidence of a functional Quality Management System (QMS). Proven capacity to execute the scope within six months, including resource availability (personnel, tools, sub-suppliers). Ability to produce and submit all required technical and quality documentation (e.g., Contract Quality Plan (CQP), Inspection and Test Plans (ITP), certificates). Legal registration in South Africa with valid tax and compliance certificates. Adherence to Eskom’s safety and environmental policies, including method statements and risk assessments.
Technical Specifications
Source: 240-109253698 CQP Template 2021.pdf (unknown)Scope of Work: Draw, fabricate, supply, deliver, replace, and install new pipework with fittings inside cable tunnels and pipe trenches at Kriel Power Station for a period of six months. Activities may include: Design, Manufacturing, Supply and Delivery/Transportation, Construction/Installation/Maintenance, Commissioning, Professional Services, or Other. Full description of works must be provided as per NEC or FIDIC document standards. Sub-suppliers must integrate with the supplier’s QMS, including applicable documents, procedures, and work instructions. Submit Method Statements, Safe Working Procedures, Procedure Qualification Records (PQRs), and Repair Procedures. Maintain Audit Findings Report and Register, updated procedure registers, and a register of Non-Conformances (NCs), Defects, or Punch Items with analysis. Databook status registers must be updated monthly (milestone-based). Organogram must include scope of work/contract-related roles, responsibilities, and outputs, with QA and QC functions.
Experience & Qualifications
Source: 240-109253698 CQP Template 2021.pdfOrganogram must include scope of work/contract-related roles, responsibilities, and outputs, with QA and QC functions. Team member’s responsibilities and qualifications necessary to fulfil stated duties must be included. Work verification must specify who is responsible for carrying out a task and who is responsible for checking the work.
Quality Management
Source: 240-109253698 CQP Template 2021.pdfSub-suppliers must integrate with the supplier’s Quality Management System (QMS), including applicable documents, procedures, and work instructions. Supplier must list core processes, industry standards, specifications, and drawings applicable to the scope of work. Monitoring of suppliers and sub-suppliers must include performance evaluation, selection, and performance monitoring as per the supplier’s procedures for managing externally supplied products and services.
Compliance Requirements
Source: 240-109253698 CQP Template 2021.pdf (unknown)Post-delivery activities must include warranty period and conditions, customer satisfaction measurement, technical support, defect correction period/retention funds. Statutory, regulatory, and scope of work requirements must be considered. Method statements must describe how jobs are carried out safely, including all risks identified in risk assessments and measures to control those risks. Ensures proper planning and resourcing.
Health & Safety
Source: 240-109253698 CQP Template 2021.pdfMethod statements must describe in a logical sequence how a job is to be carried out safely, including all risks identified in risk assessments and measures to control those risks. This ensures proper planning and resourcing. Product preservation must include processes for identification, handling, contamination control, packaging, storage, and protection.
Section
Source: 240-109253698 CQP Template 2021.pdf (unknown)Communication Channels: Supplier Representative details and contacts (E-mails). Documentation submission per contract agreement. Meetings: Fixed Contract Meetings, Weekly Progress Meetings, and reporting.
Important Dates
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Closing date and time: 22 June 2026 at 10:00 SAST. Compulsory site visit and/or clarification meeting details (if applicable) are stated in the Tender Data. Tenderers must regularly check the Eskom Tender Bulletin and NT e-Tender Portal for addenda, updates, or extensions to the closing date. All times refer to South African Standard Time (SAST, GMT+2).
Contact Information
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)All communications must be directed to the Eskom Representative only, in writing (hand-written, typed, printed, or electronic). Contact details are specified in the Tender Data. For e-tendering, refer to the Eskom Tender Bulletin and NT e-Tender Portal for updates, addenda, and responses to clarifications. Eskom will publish all clarifications and responses on the same platform where the tender was advertised. No other Eskom official may be contacted for tender-related queries.
Submission Guidelines
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Submit the complete original tender and one (1) complete hard copy in paper form by the closing date and time. For e-tendering, upload and finalize the tender via the Eskom Tender Bulletin site on the Eskom E-tendering page. No late submissions are accepted. Ensure all documents are accessible, uncorrupted, and clearly marked as "ORIGINAL" and "COPY". Seal packages in an outer envelope labeled "Confidential" with the Eskom address, tender number, tenderer's name, physical address, email, and contact telephone number. For e-tendering, update documents in the Technical, Commercial, and Financial folders. Sign the original tender. Eskom employees cannot submit tenders on behalf of tenderers. Proof of posting or courier delivery does not equate to proof of delivery. Tenders must be submitted in English. Tenderers must ensure documents are not corrupt or unreadable. For e-tendering, submissions must be finalized before the closing date and time. Tenderers are responsible for checking the Eskom Tender Bulletin and NT e-Tender Portal for updates or addenda.
Evaluation Criteria
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Evaluation follows the PPPFA 90/10 or 80/20 Preference Point System. Pricing is assessed per Tender Data criteria, including CPA, FOREX, commodity exposure, unconditional discounts, technical adjustments, PV, and forecasted invoicing rates. Functionality (if applicable) requires meeting the minimum threshold to proceed to further evaluation. B-BBEE level is scored per CSD report or certificate/affidavit; failure to submit valid proof at closing results in disqualification if B-BBEE is a pre-qualification criterion, or zero PPPFA points. Specific Goals are scored based on supporting documentation; failure to meet these results in zero points for Specific Goals. Arithmetical errors are corrected per Eskom’s rules: amounts in words prevail over figures, line-item totals prevail over unit rates, and corrected totals are binding. Reverse e-auction may be used for competitive pricing where indicated in the Tender Data. Tenders are ranked by combining Price and Specific Goals scores. Objective Criteria (if applied) must be stipulated in the Invitation to Tender and cannot include Functionality or B-BBEE elements.
Technical Specifications
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Scope: Draw, fabricate, supply, deliver, replace, and install new pipework with fittings inside cable tunnels and pipe trenches at Kriel Power Station for six months. Work must comply with Eskom’s standardised specifications and any additional requirements in the Tender Data. Tenderers must attend compulsory site visits and/or clarification meetings (if stipulated) to familiarise themselves with the work; failure to attend results in disqualification. Sub-contracting 100% of the scope is prohibited and will result in disqualification. All materials and workmanship must meet Eskom’s SHEQ and technical standards.
Quality Management
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdfAll submitted documents must be complete, accurate, and accessible for evaluation. The Acknowledgement Form must be completed and submitted with the tender, clearly stating if the bid is for the whole or part of the scope. Eskom will not compensate for costs incurred in tender preparation or submission. Tenderers must obtain and familiarise themselves with Eskom’s standardised specifications and any other documents incorporated by reference.
Financial Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Pricing must include all duties, taxes (including VAT), and levies applicable 14 days prior to the closing date. Rates and prices must be fixed for the contract duration, stated in South African Rand, and aligned with the exchange rate and base date in the Tender Data. Submit a complete pricing schedule or bill of quantities. Arithmetical errors are corrected per Eskom’s rules, with the amount in words prevailing. Alternative tenders are only permitted if a main tender is submitted and allowed by the Tender Data. Provide names of at least two financial institutions for performance security if required. Eskom may request clarification of prices during evaluation but will not accept late submissions of mandatory financial returnables. Costs of tendering are not reimbursable.
Compliance Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Comply with all relevant legislation: National Treasury Instruction Notes, CIDB Regulations, PPPFA Regulations, Amended B-BBEE Codes, COIDA, OHS Act, and Eskom’s SHEQ requirements. Submit proof of SHEQ systems, policies, and capabilities by the closing date; all SHEQ costs and personnel must be included in the tender. CIDB registration (or proof of application) is mandatory if stipulated in the Tender Data; actual CIDB registration must be submitted by contract award. B-BBEE certificate/affidavit or CSD report must be provided at closing if B-BBEE is a pre-qualification criterion; failure results in disqualification or zero PPPFA points. Sub-contractors’ B-BBEE status must comply with PPPFA requirements. Submit the SDL&I Undertaking by contract award. Contract Skills Development Goals (CSDG) and Contract Participation Goals (CPG) apply as per CIDB standards for contracts of R5M+ or CIDB grade 7+ or duration of 12+ months. Misrepresentation or falsification of information (e.g., B-BBEE certificates) will result in disqualification and reporting to the B-BBEE Commission.
Health & Safety
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdfComply with the OHS Act and Eskom’s SHEQ requirements. Provide proof of SHEQ systems, policies, and capabilities by the closing date. All SHEQ costs and personnel must be included in the tender. Failure to meet SHEQ requirements may result in disqualification. Tenderers must ensure all safety, health, environmental, and quality measures are in place for the duration of the contract.
Contractual Terms
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdfEskom reserves the right to accept or reject any tender, negotiate with selected tenderers, or cancel the tender at any time before contract conclusion. Tender validity must be maintained for the specified period and may be extended upon request; refusal to extend results in exclusion. Contracts are revised to include addenda, returnables, and negotiated changes. Both parties must sign the Form of Agreement. Eskom is not liable for any losses, claims, or damages arising from tender participation or process amendments. Confidentiality must be maintained for all procurement-related matters. Eskom will not disclose evaluation details until after contract award unless required by law.
Section
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdfEvaluation uses the PPPFA 90/10 or 80/20 Preference Point System. Pricing is assessed per Tender Data criteria, including CPA, FOREX, commodity exposure, discounts, technical adjustments, PV, and invoicing rates. Functionality (if applicable) requires meeting the minimum threshold to proceed. B-BBEE level is scored per CSD report or certificate; failure to submit valid proof results in disqualification or zero PPPFA points. Specific Goals are scored based on supporting documentation; failure to meet these results in zero points. Arithmetical errors are corrected per Eskom’s rules. Reverse e-auction may be used for competitive pricing where indicated.
Submission Guidelines
Source: Annexure B.pdf (unknown)Submit the signed Acknowledgement Form (Annexure B) as a returnable document. Required details: company/supplier name, name of authorised person (CEO/Director/Managing Director), signature, date, and two witness signatures.
Returnable Documents
Source: Annexure B.pdf (unknown)Signed Acknowledgement Form (Annexure B) required. Must include: company/supplier name, name of authorised person (CEO/Director/Managing Director), signature, date, and two witness signatures.
Evaluation Criteria
Source: Annexure B.pdf (unknown)General: Must be a registered legal entity (company/supplier). Must have experience in similar projects (pipework fabrication/installation in industrial/power station environments). Must demonstrate capacity to manage subcontractors/suppliers in line with Eskom’s requirements. OHS: Must acknowledge and comply with all listed Eskom OHS documents and statutory regulations. Must ensure all personnel (including subcontractors) are trained per Eskom’s induction requirements. Must have processes for monitoring and enforcing OHS compliance among subcontractors. Legal: Must agree to penalties for non-compliance and potential termination for breaches. Must provide valid references/testimonials upon request.
Technical Specifications
Source: Annexure B.pdf (unknown)Main contractor/supplier must: Demonstrate selection criteria for appointing subcontractors/suppliers. Notify Eskom prior to appointing subcontractors/suppliers. Ensure subcontractors/suppliers have adequate resources and competencies. Be accountable for subcontractor/supplier compliance with legal and Eskom requirements. Monitor subcontractors/suppliers via audits/assessments for OHS compliance. Provide grounds for termination of subcontractor/supplier work. Non-conformances by subcontractors/suppliers (all tiers) are addressed directly with the main contractor/supplier via performance and penalty processes. Eskom reserves the right to verify compliance and may request copies of testimonials/references and client contact details (including Eskom) for similar past work.
Compliance Requirements
Source: Annexure B.pdf (unknown)Mandatory compliance with Eskom and statutory OHS requirements. Required documents/standards: Eskom contractor Health and Safety requirements (standard 32-136), OHS specifications provided, Occupational Health and Safety Act, Compensation for Occupational Diseases and Illnesses Act, SHEQ Policy (32-727), National Road Traffic Act, Eskom Substance Abuse Procedure (32-37), Life-Saving Rules (240-62196227), Vehicle and Driver Safety Management (240-62946386), OH&S Incident Management Procedure (32-95), Contract and Contractor OHS Management (32-726). After contract award, full alignment of company processes to Eskom’s OHS policies, procedures, and standards is required. All employees (including subcontractors/suppliers) must undergo Eskom induction. Penalties apply for non-compliance by the main supplier or its subcontractors.
Health & Safety
Source: Annexure B.pdfMandatory OHS compliance includes: Eskom contractor Health and Safety requirements (standard 32-136), OHS specifications, Occupational Health and Safety Act, Compensation for Occupational Diseases and Illnesses Act, SHEQ Policy (32-727), National Road Traffic Act, Eskom Substance Abuse Procedure (32-37), Life-Saving Rules (240-62196227), Vehicle and Driver Safety Management (240-62946386), OH&S Incident Management Procedure (32-95), Contract and Contractor OHS Management (32-726). All employees (including subcontractors/suppliers) must undergo Eskom induction. Penalties apply for non-compliance.
Contractual Terms
Source: Annexure B.pdfMain contractor/supplier responsibilities: Demonstrate selection criteria for appointing subcontractors/suppliers. Notify Eskom prior to appointing subcontractors/suppliers. Ensure subcontractors/suppliers have adequate resources and competencies. Accountable for subcontractor/supplier compliance with legal and Eskom requirements. Monitor subcontractors/suppliers via audits/assessments for OHS compliance. Provide grounds for termination of subcontractor/supplier work. Penalties apply for non-conformance by the main supplier or its subcontractors.
Description
Source: Draw Fabricate Supply Deliver Replace and Install New Pipework with Fittings_Technical Evaluation Strategy.pdfProject scope: Draw, fabricate, supply, deliver, replace, and install new pipework with fittings inside cable tunnels and pipe trenches at Kriel Power Station for six months.
Objective: Address excessive leaks in cable tunnels and trenches, which are causing increased terrace dam levels and station water consumption.
Applicability: Kriel Power Station Generation.
Supporting documents: Scope of Work (referenced as [7]).
Submission Guidelines
Source: Draw Fabricate Supply Deliver Replace and Install New Pipework with Fittings_Technical Evaluation Strategy.pdf (unknown)Acceptable Technical Exceptions/Conditions: Only ISO 3834-2 welding certification is valid. Parts 1, 3, and 4 will not be considered. Unacceptable Technical Exceptions/Conditions: None specified.
Evaluation Criteria
Source: Draw Fabricate Supply Deliver Replace and Install New Pipework with Fittings_Technical Evaluation Strategy.pdf (unknown)Technical evaluation threshold: Minimum weighted final score of 70% required to pass.
Scoring breakdown:
Technical Specifications
Source: Draw Fabricate Supply Deliver Replace and Install New Pipework with Fittings_Technical Evaluation Strategy.pdf (unknown)Scope: Draw, fabricate, supply, deliver, replace, and install new pipework with fittings inside cable tunnels and pipe trenches at Kriel Power Station for a period of six months.
Purpose: Address excessive leaks in cable tunnels and trenches causing increased terrace dam levels and station water consumption.
Applicability: Kriel Power Station Generation.
Key deliverables:
Standards/references:
Experience & Qualifications
Source: Draw Fabricate Supply Deliver Replace and Install New Pipework with Fittings_Technical Evaluation Strategy.pdfCompetence and Certifications (20% of total evaluation):
Capacity (35% of total evaluation):
Quality Management
Source: Draw Fabricate Supply Deliver Replace and Install New Pipework with Fittings_Technical Evaluation Strategy.pdfQuality requirements:
Scoring:
Submission Guidelines
Source: SHE Requirement (1).pdf (unknown)Submit the following returnable documents: Signed acknowledgement of Eskom's OHS legal and other requirements form (Annexure B).
Returnable Documents
Source: SHE Requirement (1).pdf (unknown)Returnable documents include: Signed acknowledgement of Eskom's OHS legal and other requirements form (Annexure B).
Evaluation Criteria
Source: SHE Requirement (1).pdf (unknown)Evaluation uses the OHS Tender Evaluation Template (High Risk, Document Identifier 240-77471651 Rev 3). Criteria include: signed acknowledgement of OHS requirements, Health and Safety Plan, detailed OHS costing, Baseline OHS Risk Assessment (BRA), valid COIDA Letter of Good Standing, OHS policy compliance, and OHS competency evidence. Scoring covers legal, technical, financial, and administrative compliance.
Technical Specifications
Source: SHE Requirement (1).pdf (unknown)Bidder must provide CVs and qualifications/certificates demonstrating OHS competency. Competencies must align with the scope of work, risks, and OHS plan.
Pricing Schedule
Source: SHE Requirement (1).pdf (unknown)OHS costing must be detailed and broken down, not provided as a lump sum. Costing must be based on the overall scope of work/service to be performed.
Financial Requirements
Source: SHE Requirement (1).pdf (unknown)OHS costing must be detailed and broken down, not provided as a lump sum. Costing must align with the overall scope of work/service to be performed.
Compliance Requirements
Source: SHE Requirement (1).pdf (unknown)Submit the following: Valid Letter of Good Standing (COIDA or equivalent). OHS policy signed by the CEO and compliant with OHS Act Section 7. Signed acknowledgement of Eskom's OHS legal and other requirements form (Annexure B). Health and Safety Plan addressing project OHS risks and aligned with health and safety specifications. Baseline OHS Risk Assessment (BRA) including identification, assessment, and management of OHS risks, with methodology provided.
Health & Safety
Source: SHE Requirement (1).pdfRequirements: Health and Safety Plan must address project OHS risks and align with health and safety specifications. Baseline OHS Risk Assessment (BRA) must include identification, assessment, and management of OHS risks, with methodology provided. Valid Letter of Good Standing (COIDA or equivalent) required. OHS policy must be signed by CEO and comply with OHS Act Section 7.
Special Conditions
Source: SHE Requirement (1).pdf (unknown)No part of this document may be reproduced without the expressed consent of Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Submission Guidelines
Source: ITT_CIDB SBD4 SCM_declaration_interest_SBD4_.pdf (TENDER)Submit the following returnable documents with your bid:
Note: The bid may be rejected or action taken against the bidder if the Declaration of Interest (SBD 4) is found to be false, per Paragraph 23 of the General Conditions of Contract.
Returnable Documents
Source: ITT_CIDB SBD4 SCM_declaration_interest_SBD4_.pdf (TENDER)Required returnable documents:
Evaluation Criteria
Source: ITT_CIDB SBD4 SCM_declaration_interest_SBD4_.pdf (TENDER)Evaluation criteria and risks:
Specific requirements:
Disqualification risks:
Compliance Requirements
Source: ITT_CIDB SBD4 SCM_declaration_interest_SBD4_.pdf (TENDER)Compliance requirements for bidders:
Definitions:
Description
Source: Draw Fabricate Supply Deliver Replace and Install New Pipework with Fittings_Scope of work.pdfThe project involves urgent maintenance works to address excessive leaks in the Cable Tunnels and Pipe Trenches at Kriel Power Station. The leaks are causing increased terrace dam levels and high station water consumption. The goal is to restore the plant to a good state of repair by replacing defective pipework and fittings. The total scope includes 600 m of pipework for each of the Fire Hydrant and Emulsifier Protection Systems (1,200 m combined).
Contact Information
Source: Draw Fabricate Supply Deliver Replace and Install New Pipework with Fittings_Scope of work.pdf (unknown)The appointed Contractor must provide the following contact details to the Contracts Manager and Maintenance Supervisor:
Submission Guidelines
Source: Draw Fabricate Supply Deliver Replace and Install New Pipework with Fittings_Scope of work.pdf (unknown)Submit the following returnable documents as part of your bid or execution:
Evaluation Criteria
Source: Draw Fabricate Supply Deliver Replace and Install New Pipework with Fittings_Scope of work.pdf (unknown)Evaluation will consider the following:
General:
Technical:
Quality:
Safety:
Technical Specifications
Source: Draw Fabricate Supply Deliver Replace and Install New Pipework with Fittings_Scope of work.pdf (unknown)Scope of Work:
Affected Areas:
Affected Systems:
Site Conditions:
Standards & Codes:
Exclusions:
Methodology
Source: Draw Fabricate Supply Deliver Replace and Install New Pipework with Fittings_Scope of work.pdf (unknown)Execution methodology:
Quality Management
Source: Draw Fabricate Supply Deliver Replace and Install New Pipework with Fittings_Scope of work.pdfQuality requirements include:
Pricing Schedule
Source: Draw Fabricate Supply Deliver Replace and Install New Pipework with Fittings_Scope of work.pdf (unknown)Pricing must be structured as per the Bill of Quantities (BOQ) provided:
Financial Requirements
Source: Draw Fabricate Supply Deliver Replace and Install New Pipework with Fittings_Scope of work.pdf (unknown)Pricing must be provided for the following items in the Bill of Quantities (BOQ):
Preliminary & General:
Personnel (hourly rates):
Works:
Materials:
Note: All pricing must be provided in Rand (R) and exclude VAT. Total cost must be calculated and provided.
Compliance Requirements
Source: Draw Fabricate Supply Deliver Replace and Install New Pipework with Fittings_Scope of work.pdf (unknown)Compliance with the following is mandatory:
Health & Safety
Source: Draw Fabricate Supply Deliver Replace and Install New Pipework with Fittings_Scope of work.pdfHealth and safety requirements:
Section
Source: Draw Fabricate Supply Deliver Replace and Install New Pipework with Fittings_Scope of work.pdfQuality and safety compliance codes referenced include:
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Eskom - Standard Conditions of Tender - 30 January 2025.pdf
Eskom is inviting tenders for the drawing, fabrication, supply, delivery, replacement, and installation of new pipework with fittings inside cable tunnels and pipe trenches at Kriel Power Station. The contract duration is six months, and the tender closes on 22 June 2026. The process is governed by Eskom's Standard Conditions of Tender (Rev 12), emphasizing fairness, transparency, and compliance with legal and regulatory frameworks.
Affidavit Example (1).pdf
ITT_CIDB Ann G Compulsory Enterprise Questionnaire.pdf
ITT_CIDB Standard Conditions of Tender Ann.pdf
ITT_CIDB SBD9 SCM_certificate_independent_bid_determination_SBD9_.pdf
The tender involves the drawing, fabrication, supply, delivery, replacement, and installation of new pipework with fittings inside cable tunnels and pipe trenches at Eskom's Kriel Power Station over a six-month period. The bid process requires strict adherence to anti-collusion regulations, as outlined in the SBD 9 Certificate of Independent Bid Determination.
Draw Fabricate Supply Deliver Replace and Install New Pipework with Fittings_Scope of work.pdf
Eskom is inviting tenders for the urgent replacement, fabrication, supply, delivery, and installation of new pipework (600m of 200NB and 250NB) with fittings inside cable tunnels and pipe trenches at Kriel Power Station. The project aims to address excessive leaks in fire protection and water/air supply systems, with a strict 45-day execution period. The scope includes hot tapping, pipe replacement, valve installation, and compliance with stringent safety, quality, and technical standards (e.g., ISO 3834, SANS 1123, NFPA). All work must adhere to Eskom’s quality control processes (QCPs) and be overseen by designated stakeholders.
ITT_CIDB SBD4 SCM_declaration_interest_SBD4_.pdf
The tender invites bids for the drawing, fabrication, supply, delivery, replacement, and installation of new pipework with fittings inside cable tunnels and pipe trenches at Eskom's Kriel Power Station over a six-month period. The focus is on ensuring transparency and avoiding conflicts of interest, particularly regarding state employees or their associates.
SHE Requirement (1).pdf
Eskom is inviting tenders for the drawing, fabrication, supply, delivery, replacement, and installation of new pipework with fittings inside cable tunnels and pipe trenches at Kriel Power Station over a six-month period. The tender emphasizes strict Occupational Health and Safety (OHS) compliance, with a detailed evaluation template provided for high-risk work.
RER0371 - Environmental Evaluation - Draw Fabricate Supply Deliver Replace and Install New Pipework with Fittings inside the Cable Tunnels and Pipe Trenches.pdf
Eskom is inviting tenders for the drawing, fabrication, supply, delivery, replacement, and installation of new pipework with fittings inside cable tunnels and pipe trenches at Kriel Power Station over a six-month period. The tender emphasizes strict environmental compliance, including ISO 14001:2015 certification, Environmental Management System (EMS) documentation, and adherence to waste management and dangerous goods transportation regulations.
240-109253698 CQP Template 2021.pdf
The tender is for the drawing, fabrication, supply, delivery, replacement, and installation of new pipework with fittings inside cable tunnels and pipe trenches at Eskom's Kriel Power Station over a six-month period. The tender emphasizes a structured Contract Quality Plan (CQP) aligned with SANS 466:2005 / ISO 10005:2005 standards to ensure quality management, documentation, and compliance throughout the project lifecycle.
Annexure B.pdf
The tender involves drawing, fabricating, supplying, delivering, replacing, and installing new pipework with fittings inside cable tunnels and pipe trenches at Eskom's Kriel Power Station over a six-month period. The project emphasizes strict compliance with Eskom's Occupational Health and Safety (OHS) legal and procedural requirements.
240-68099512 Form A_Cat 3_ Rev 9.pdf
Eskom is inviting tenders for the drawing, fabrication, supply, delivery, replacement, and installation of new pipework with fittings inside cable tunnels and pipe trenches at Kriel Power Station over a six-month period. The tender emphasizes compliance with ISO 9001 quality standards and Eskom's specific quality requirements, including pre- and post-contract assessments, supplier capability evaluations, and adherence to standard conditions like preservation, audits, and nonconformity management.
Draw Fabricate Supply Deliver Replace and Install New Pipework with Fittings_Technical Evaluation Strategy.pdf
The tender is for the drawing, fabrication, supply, delivery, replacement, and installation of new pipework with fittings inside the cable tunnels and pipe trenches at Eskom's Kriel Power Station. The project aims to address excessive leaks causing increased water consumption and terrace dam levels. The tender evaluation is based on technical criteria, with a minimum threshold of 70% required for consideration. The work must be completed within six months.
Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdf
The tender involves the drawing, fabrication, supply, delivery, replacement, and installation of new pipework with fittings inside cable tunnels and pipe trenches at Kriel Power Station over a six-month period. The tender is governed by Eskom's Supplier Integrity Pact, which mandates ethical behavior, transparency, and compliance with South African laws and Eskom's procurement policies.
Safety file checklist.pdf
The tender involves the drawing, fabrication, supply, delivery, replacement, and installation of new pipework with fittings inside cable tunnels and pipe trenches at Eskom's Kriel Power Station over a six-month period. The document outlines extensive Occupational Health and Safety (OHS) compliance requirements, contractor evaluation criteria, and site-specific safety protocols.
240-105658000 Supplier Quality Management Specification.pdf
Eskom is inviting tenders for the drawing, fabrication, supply, delivery, replacement, and installation of new pipework with fittings inside cable tunnels and pipe trenches at Kriel Power Station over a six-month period. The tender emphasizes strict adherence to Eskom's Supplier Quality Management Specification (240-105658000/QM 58), which mandates compliance with ISO 9001 standards, comprehensive quality plans, and rigorous monitoring of supplier and sub-supplier performance.
240-12248652_List of Tender Returnables_Cat 3_ Rev 7.pdf
Eskom is inviting tenders for the drawing, fabrication, supply, delivery, replacement, and installation of new pipework with fittings inside cable tunnels and pipe trenches at Kriel Power Station over a six-month period. The tender emphasizes compliance with ISO 9001 Quality Management System (QMS) standards and requires detailed documentation to prove operational QMS, a Contract Quality Plan, and a Quality Control Plan.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
EskomContact Person
Phumelele Mncwango
Phone
017-799-2302
[email protected]
Website
www.eskom.co.za/
Address
Maxwell Dr, Sunninghill, Sandton, 2157, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
18
Last checked
03 Jun 2026
AI status
Enhanced
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Eskom is South Africa's primary electricity supplier, managing generation, transmission, and distribution.