Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Kusile Power Station Project - Balmoral - WITBANK - 1034
Organization Type
GOVERNMENT
Published
13 Jul 2026
OCDS Reference
ocds-9t57fa-162233
This tender seeks a service provider to support ESKOM in completing the kusile power station project by delivering advisory, construction, and commissioning services. The provider’s team will integrate with eskom’s management to ensure compliance with safety, operational, and technical standards.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Friday, 31 July 2026 - 10:00
Venue
null
Categories
Request for Bid(Open-Tender)
Kusile Power Station Project - Balmoral - WITBANK - 1034
AI Document Analysis Stages
Description
Source: BOQ - E322OGCDMPKUS.xlsx13 Jul
2026
Tender Published
Tender was published
31 Jul
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Works Information - E322OGCDMPKUS.pdf
Eskom is seeking a service provider to deliver Construction and Commissioning management services for the outstanding works at Kusile Power Station Project. The contract spans 6 months (June 2026–November 2026) and requires skilled personnel to integrate with Eskom’s team, ensuring compliance with safety, quality, and regulatory standards. The scope includes construction supervision, commissioning support, defect identification, safety compliance, and documentation management for systems like Hydrogen, FGD, Conveyors, DCS, and Compressor Plant.
Technical_Evaluation_Strategy - E322OGCDMPKUS.pdf
Eskom is seeking a service provider to support the construction and commissioning activities for the Kusile Power Station Project. The appointed provider will work under Eskom's management, ensuring compliance with safety regulations, operational standards, and project specifications. The tender evaluation focuses on mandatory technical criteria (e.g., CVs, qualifications, certifications) and qualitative criteria (e.g., resource plan, previous assignments, lead time), with a minimum technical score threshold of 75%.
BOQ - E322OGCDMPKUS.xlsx
Eskom is tendering for Construction and Commissioning Management Services at the Kusile Power Station Project. The tender requires pricing for various skilled personnel roles (e.g., Master Installation Electrician, Responsible Person, Supervisors) over a specified duration. The submission involves completing detailed price schedules in a provided Excel workbook, with a closing date of July 31, 2026.
NEC SKILLS - E322OGCDMPKUS.pdf
Eskom Holdings SOC Ltd is seeking a contractor to provide **Commissioning and Construction Management services** for outstanding projects at **Kusile Power Station**. The contract is a **NEC3 Term Service Contract (TSC3) Option E (Cost Reimbursable)** with a **8-month service period** (extendable to 12 months as per the scope). The contractor will support Eskom in completing remaining construction and commissioning activities, ensuring compliance with safety, quality, and regulatory standards. The scope includes construction supervision, commissioning support, SHEQ compliance, defect identification, and handover coordination for systems like Waste Water Treatment, BOP, Conveyors, HVAC, and more. The contract emphasizes **B-BBEE compliance**, **health/safety/environmental adherence**, and **skills transfer** to local communities.
To download these documents and access AI-powered analysis, visit the main tender page.
Eskom is South Africa's primary electricity supplier, managing generation, transmission, and distribution.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 203 136
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services: General. Unlock full pricing strategies, bid frequency, and historical win rates.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
The tender is for the provision of construction and commissioning management services at Eskom Kusile Power Station.
Evaluation Criteria
Source: BOQ - E322OGCDMPKUS.xlsx (unknown)No explicit pre-qualification criteria are stated in the provided document excerpts. Eligibility will likely be determined by the ability to meet the scope (providing the specified construction and commissioning management services) and compliance with the tender submission requirements, including accurate completion of all pricing schedules.
Technical Specifications
Source: BOQ - E322OGCDMPKUS.xlsx (unknown)The tender is for the provision of construction and commissioning management services at Eskom Kusile Power Station. The scope includes supplying personnel in roles such as Master Installation Electrician (MIE), Responsible Person (RP), Junior Supervisor (JS), Senior Skills (SS), Construction Supervisors (CS), and Lifting Machinery Inspector (LMI).
Financial Requirements
Source: BOQ - E322OGCDMPKUS.xlsx (unknown)The tender price must be provided in ZAR excluding VAT. The total price must include all direct and indirect costs, overheads, profits, on costs, risks, liabilities, and obligations. Payment applications will be based on completed activities or milestones as per the Price Schedule/Bills of Quantities. The tenderer must complete the pricing schedule workbook, entering rates and totals in the designated green-shaded cells. Calculations are the tenderer's responsibility and must be thoroughly checked.
Description
Source: NEC SKILLS - E322OGCDMPKUS.pdf (unknown)Part 3: scope of work
Contact Information
Source: NEC SKILLS - E322OGCDMPKUS.pdf (unknown){"name":null,"email":null,"phone":"011 803 3008","department":null,"address":"C Ltd (reg no"}
Returnable Documents
Source: NEC SKILLS - E322OGCDMPKUS.pdf (unknown)Signature(s) Name(s) signature of Date witness Tenderer’s CIDB registration number:
Evaluation Criteria
Source: NEC SKILLS - E322OGCDMPKUS.pdf (unknown)Mandatory
Preferential
Technical Specifications
Source: NEC SKILLS - E322OGCDMPKUS.pdf (unknown)Provision of Commissioning Management services
Methodology
Source: NEC SKILLS - E322OGCDMPKUS.pdf (unknown)2 The Contractor’s main responsibilities 21.1 The Contractor submits a first plan for acceptance within 2 weeks of the Contract Date
Experience & Qualifications
Source: NEC SKILLS - E322OGCDMPKUS.pdf (unknown)24.1 The key people are: 1 Name: Job: Responsibilities: Qualifications: Experience:
Quality Management
Source: NEC SKILLS - E322OGCDMPKUS.pdfperformance is in compliance with Kusile site regulations during construction and the
capability to ensure challenges are resolved amicably as an when they occur. Tracking
compliance with the Inspection and Test Plans (ITPs) for each milestone daily and records
in Daily Diary whether activities are at risk of failing inspections is an integral part of
Ensure Contractors adhere to quality plans and submits Data Books in accordance with
the project schedule.
Track progress against the constraint logs or 2, 3 or 6 weeks look ahead plans
Monitor construction progress daily using physical quantities versus Contractor’s schedule
and Weekly work plans
If progress does not meet schedule, engage immediately with Contactor to identify root
causes or raise the issues in the relevant meetings
Write Daily Diaries detailing progress, quality, health and safety issues.
Review Application for Final Inspection (AFI) before it is submitted to Quality and identify
any additional work required before formal inspection is scheduled
Coordinate pre-safety clearance walk downs during AFI submission
Attend start-up meeting for plant safety clearance booking
Ensure that plant is safety cleared in accordance to the Commissioning procedure
Ensure submission of accurate and complete Construction Turn over (CTO) files to
Daily site-plant walk downs of all responsible areas of all the outstanding projects (Waste
Water Treatment Plant, BOP, Conveyors (Coal and Ash), Coal Offloading, (Switchgear &
HVAC), BMH Transfer Houses) to verify the status of plant is in compliant with Construction
& Operating Regulations.
Support Commissioning Department on Testing & Optimisation of newly constructed
systems.
Identify defects and coordinate remedial works
Drive completion of Construction as per project schedule
Drive the hand over process from contractor to client for safety clearance of systems and
assist with Commissioning activities
Drive safety compliance with the safety department, (attend daily contractors toolbox
talks/DSTI/ Hot work permits).
Drive Integration between Eskom and the different contractors in the work areas during
construction
Assist in coordinating Quality inspections with the Quality Department on completed
construction works as well with safety clearances and KKS certifications
Comprehensive Lifting Equipment Inspections: Examine cranes, hoists, winches, forklifts,
and all other lifting machinery to ensure safe operation and compliance with relevant
regulations
Load Testing & Certification: To oversee that equipment is tested to its rated capacity, and
detailed certification is provided to meet legal and insurance requirements.
Preventive Maintenance Advice: Recommend maintenance schedules and procedures to
extend the lifespan of machinery and prevent costly breakdowns.
Approval and Signing off on specialised systems (Hydrogen, FGD, Conveyors, DCS,
Compressor plant) (SP)
2.2 Commissioning services will include the following:
Preparing and applying permits to work on a 24/7 basis (RP)
Providing 24 hours coverage for the running of non-commercial plant on site (Hydrogen,
FGD, Conveyors, DCS, Compressor plant) (RP/SP)
Responsible for energizing all new plant (RP)
Applying for sanction for test of all new motors (RP)
RP’s at Kusile also support the contract package teams that have plants that are not
handed over including brush gear inspections and the maintenance of lights in the units.
RPs are responsible for applying and accepting permits to work after the safety clearance
for phasing the electrical test.
Walk down and lock out system after safety clearance. (RP)
Advise and commission of specialised systems (Hydrogen, FGD, Conveyors, DCS,
Compressor plant) (SS)
Approval and Signing off on specialised systems (Hydrogen, FGD, Conveyors, DCS,
Compressor plant) (SS)
ITP’s Inspection Test Plan
Plan (PQMP) for this contract. This PQMP shall describe the project quality requirement and
shall also describe the requirement for continued compliance to the requirement of ISO 9001
Pricing Schedule
Source: NEC SKILLS - E322OGCDMPKUS.pdfContents: No of
pages
Part C1 Agreements & Contract Data 19
Part C2 Pricing Data 3
Part C3 Scope of Work 8
Part c2: pricing data c2 TSC3/E cover
ESKOM HOLDINGS SOC Ltd ENQUIRY NO. E322OGCDMPKUS
Part c1: agreements & contract data
Contents: No of
pages
C1.1 Form of Offer and Acceptance 3
C1.2a Contract Data provided by the Employer 9
C1.2b Contract Data provided by the Contractor 1
Part c2: pricing data c2 TSC3/E cover
ESKOM HOLDINGS SOC Ltd ENQUIRY NO. E322OGCDMPKUS
terms of the conditions of contract.
Part c2: pricing data c2 TSC3/E cover
ESKOM HOLDINGS SOC Ltd ENQUIRY NO. E322OGCDMPKUS
Part C1 Agreements and Contract Data, (which includes this Form of Offer and Acceptance)
Part C2 Pricing Data
Part C3 Scope of Work: Service Information
and drawings and documents (or parts thereof), which may be incorporated by reference into the above
listed Parts.
Part c2: pricing data c2 TSC3/E cover
ESKOM HOLDINGS SOC Ltd ENQUIRY NO. E322OGCDMPKUS
Part c2: pricing data c2 TSC3/E cover
ESKOM HOLDINGS SOC Ltd ENQUIRY NO. E322OGCDMPKUS
11.2(2) The Affected Property is Kusile Power Station
11.2(13) The service is Provision of Commissioning Management services
at Kusile Power Station Project
11.2(14) The following matters will be included in
the Risk Register None
11.2(15) The Service Information is in Part 3: Scope of Work and all documents and
drawings to which it makes reference.
12.2 The law of the contract is the law of the Republic of South Africa
2 Available from Engineering Contract Strategies Tel 011 803 3008 Fax 086 539 1902 www.ecs.co.za
Part c2: pricing data c2 TSC3/E cover
ESKOM HOLDINGS SOC Ltd ENQUIRY NO. E322OGCDMPKUS
Part c2: pricing data c2 TSC3/E cover
ESKOM HOLDINGS SOC Ltd ENQUIRY NO. E322OGCDMPKUS
Part c2: pricing data c2 TSC3/E cover
ESKOM HOLDINGS SOC Ltd ENQUIRY NO. E322OGCDMPKUS
are Z1 to Z11 always apply.
Z1 Cession delegation and assignment
Z1.1 The Contractor does not cede, delegate or assign any of its rights or obligations to any person
without the written consent of the Employer.
Z1.2 Notwithstanding the above, the Employer may on written notice to the Contractor cede and
delegate its rights and obligations under this contract to any of its subsidiaries or any of its
present divisions or operations which may be converted into separate legal entities as a result
of the restructuring of the Electricity Supply Industry.
Part c2: pricing data c2 TSC3/E cover
ESKOM HOLDINGS SOC Ltd ENQUIRY NO. E322OGCDMPKUS
service period, requires the prior written consent of the Service Manager. All rights in and to all
such images vests exclusively in the Employer.
Z4.5 The Contractor ensures that all his subcontractors abide by the undertakings in this clause.
Part c2: pricing data c2 TSC3/E cover
ESKOM HOLDINGS SOC Ltd ENQUIRY NO. E322OGCDMPKUS
Part c2: pricing data c2 TSC3/E cover
ESKOM HOLDINGS SOC Ltd ENQUIRY NO. E322OGCDMPKUS
ensures that the Committing Party co-operates fully with an investigation.
Part c2: pricing data c2 TSC3/E cover
ESKOM HOLDINGS SOC Ltd ENQUIRY NO. E322OGCDMPKUS
11.2(12) The price list is in Document called Price list
Part c2: pricing data c2 TSC3/E cover
ESKOM HOLDINGS SOC Ltd ENQUIRY NO. E322OGCDMPKUS
Part 2: pricing data
TSC3 Option A
reference pages
C2.1 Pricing assumptions: Option A 1
C2.2 The price list
Part c2: pricing data c2 TSC3/E cover
ESKOM HOLDINGS SOC Ltd ENQUIRY NO. E322OGCDMPKUS
C2.1 Pricing assumptions: Option A
time is stated in the Unit column and the expected length of time (as a quantity of the stated units of
time) is stated in the Expected Quantity column.
Part c2: pricing data c2.1 TSC3/E pricing assumptions
Financial Requirements
Source: NEC SKILLS - E322OGCDMPKUS.pdf (unknown)Payment Terms: payment certificate from the Service Manager in terms of core
clause 51.1, the Contractor provides the Employer with a tax invoice in accordance with the
Employer's procedures stated in the Service Information, showing the amount due for payment
equal to that stated in the payment certificate.
Z7.2 If the Contractor does not provide a tax invoice in the form and
Compliance Requirements
Source: NEC SKILLS - E322OGCDMPKUS.pdf (unknown)No specific requirements found
B-BBEE Details: med to be jointly
and severally liable to the Employer for the performance of this contract.
Z2.2 Unless already notified to the Employer, the persons or organisations notify the Service
Manager within two weeks of the Contract Date of the key person who has the authority to bind
the Contractor on their behalf.
Z2.3 The Contractor does not alter the composition of the joint venture, consortium or other
unincorporated grouping of two or more persons without the consent of the Employer having
been given to the Contractor in writing.
Z3 Change of Broad Based Black Economic Empowerment (B-BBEE) status
Z3.1 Where a change in the Contractor’s legal status, ownership or any other change to his business
composition or business dealings results in a change to the Contractor’s B-BBEE status, the
Contractor notifies the Employer within seven days of the change.
Z3.2 The Contractor is required to submit an updated verification certificate and necessary
supporting documentation confirming the change in his B-BBEE status to the Service Manager
within thirty days of the notification or as otherwise instructed by the Service Manager.
Z3.3 Where, as a result, the Contractor’s B-BBEE status has decreased since the Contract Date the
Employer may either re-negotiate this contract or alternatively, terminate the Contractor’s
obligation to Provide the Service.
Z3.4 Failure by the Contractor to notify the Employer of a change in its B-BBEE status may
constitute a reason for termination. If the Employer terminates in terms of this clause, the
procedures on termination are P1, P2 and P4 as stated in clause 92, and the amount due is A1
and A3 as stated in clause 93.
Z4 Confidentiality
Z4.1 The Contractor does not disclose or make any information arising from or in c
Health & Safety
Source: NEC SKILLS - E322OGCDMPKUS.pdfsignature of Date
witness
Note: If a tenderer wishes to submit alternative tenders, use another copy of this Form of Offer and
Z5 Waiver and estoppel: Add to core clause 12.3:
Z5.1 Any extension, concession, waiver or relaxation of any action stated in this contract by the
not give rise to an estoppel unless the Parties agree otherwise and confirm such agreement in
writing.
Z6 Health, safety and the environment: Add to core clause 27.4
Z6.1 The Contractor undertakes to take all reasonable precautions to maintain the health and safety
of persons in and about the execution of the service. Without limitation the Contractor:
accepts that the Employer may appoint him as the “Principal Contractor” (as defined and
provided for under the Construction Regulations 2014 (promulgated under the Occupational
Health & Safety Act ) (“the Construction Regulations”) for the Affected Property;
warrants that the total of the Prices as at the Contract Date includes a sufficient amount for
proper compliance with the Construction Regulations, all applicable health & safety laws
and regulations and the health and safety rules, guidelines and procedures provided for in
this contract and generally for the proper maintenance of health & safety in and about the
execution of the service; and
undertakes, in and about the execution of the service, to comply with the Construction
b) Ensure compliance with Plant Safety Regulations (PSR), Fossil Fuel Fire Regulation
(FFFR), Operating Regulations for High Voltage System (ORHVS), OHS Act, and
Master Installation Electrician (MIE).
As part of the Safety, Health, Environment and Quality (SHEQ) system, the Construction
To ensure that pre walk downs are carried out prior to the installation to advice accordingly
(guidance) in terms of material to be used and on how the installation should be executed
(supervision) in accordance with the health and safety standards (MIE).
Populate equipment register/component list for hazardous locations with the contractors’
input and making sure it is updated before hand over to the Client (MIE)
Monitor Contractors’ construction power (DB’s) as per OHS Act requirements and ensure
the valid certificate of compliance is issued (MIE)
Ensure that the Contractors comply with the Electrical Installation Regulations and issuing
of Hazardous COC’s as per the OHS Act (MIE)
Ensure that no repairs are affected on any piece of electrical equipment unless is rendered
dead (MIE)
Ensure that under any normal working conditions where there is a possibility of static
electricity formation, necessary measures are taken to prevent the formation of electric
sparks (MIE)
Verify that the equipment is correctly installed as per the IA certifications, serial numbers
and Ex ratings and ensure that the equipment is in the correct zone as per the Area
Classification drawings (MIE)
Follow up on the electrical machinery installed in hazardous location to ensure that they are
visually inspected and tested periodically at intervals not exceeding two (2) years (MIE)
Flush various systems in preparation for commissioning (Waste -Water treatment and
Compressor plant) (JS)
Install temporary piping and strainers for system flushing (JS)
Install “jumpers” for system flushing (JS)
Field operators support for all BOP plant under commissioning (JS)
Operating of valves and equipment during commissioning, under the supervision of Eskom
Commissioning personnel (JS)
Perform plant condition monitoring (e.g.: Check for pump / motor vibrations and bearing
temperature for plant under commissioning) (JS)
Prepare plant standby for commissioning activities (JS)
Housekeeping duties on all BOP commissioned plant (JS)
Routine checks on plant in-service under commissioning (JS)
General support as labourers for Commissioning BOP (JS)
Completes daily, weekly, and monthly checklists on the commissioning plant equipment
maintenance procedures and maintains records of scheduled maintenance procedures (JS)
Maintenance of document management systems through the management of
documentation throughout the information lifecycle (JS)
Daily Diaries as per the Kusile Power Station Project prescribed template
Weekly and monthly reports as prescribed
Monthly Timesheets
2.4 Abbreviations
claimed expenses to be reimbursed at cost. In addition the following must be done:
The timesheets must be signed by the relevant assigned manager in the relevant
project.
6.1 Invoicing and payment
provider for the purpose stated in the Scope. Such material will amongst other things be used
by the Employer for strategic planning.
7.2 Safety and Health Management
Employer’s standard document, ‘Eskom Safety, Health, Environment and Quality Policy 32-
727”, for all the Employer Health and Safety requirements.
the attached checklist for this contract. The Project Health and Safety file shall comply with the
requirements of the OSH Act.
shall describe the project health and safety requirement and shall also describe the
requirement for continued compliance to the requirement of the OSH Act.
7.3 Working on the Employer’s property
Employer’s entry and security control, permits, and site regulations
The Service provider shall comply to the Employer’s entry and security control, permits, and
site regulations
All employees working on the Eskom Power Station Site must complete induction before
work can start.
Personal Protective Equipment (PPE) must be worn at all-times except in the PPE free
zones.
All employees must comply to Eskom Life Saving Rules:
o Open, isolate, test, earth, bond and/or insulate before touch.
o Hook up on heights
o Buckle Up
o Permit to work
o Be sober.
Environmental
Source: NEC SKILLS - E322OGCDMPKUS.pdfguidelines and procedures otherwise provided for under this contract and ensures that his
Subcontractors, employees and others under the Contractor’s direction and control,
likewise observe and comply with the foregoing.
Z6.2 The Contractor, in and about the execution of the service, complies with all applicable
environmental laws and regulations and rules, guidelines and procedures otherwise provided
for under this contract and ensures that his Subcontractors, employees and others under the
Contractor’s direction and control, likewise observe and comply with the foregoing.
Z7 Provision of a Tax Invoice and interest. Add to core clause 51
Z7.1 Within one week of receiving a payment certificate from the Service Manager in terms of core
clause 51.1, the Contractor provides the Employer with a tax invoice in accordance with the
Contractual Terms
Source: NEC SKILLS - E322OGCDMPKUS.pdf (unknown)NEC3 Term Service Contract (TSC3) Between ESKOM HOLDINGS SOC Ltd (Reg No. 2002/015527/30) and _____________________ (Reg No. ______________ for Skills for outstanding project support at Kusile Power Station Project
Special Conditions
Source: NEC SKILLS - E322OGCDMPKUS.pdf (unknown)13.3 The period for reply is 2 weeks
Section
Source: NEC SKILLS - E322OGCDMPKUS.pdfQMS Quality Management System
TET Technical Evaluation Team
PQMP Project Quality Management System and Plan
SHEQ Safety Health Environment and Quality
As part of the Safety, Health, Environment and Quality (SHEQ) system, the Construction
Ensure Contractors adhere to quality plans and submits Data Books in accordance with
Write Daily Diaries detailing progress, quality, health and safety issues.
Review Application for Final Inspection (AFI) before it is submitted to Quality and identify
Description
Source: Works Information - E322OGCDMPKUS.pdfContact Information
Source: Works Information - E322OGCDMPKUS.pdf (unknown)Returnable Documents
Source: Works Information - E322OGCDMPKUS.pdf (unknown)Evaluation Criteria
Source: Works Information - E322OGCDMPKUS.pdf (unknown)General
Compliance
Experience
Technical Specifications
Source: Works Information - E322OGCDMPKUS.pdf (unknown)Quality Management
Source: Works Information - E322OGCDMPKUS.pdfPricing Schedule
Source: Works Information - E322OGCDMPKUS.pdf (unknown)Financial Requirements
Source: Works Information - E322OGCDMPKUS.pdf (unknown)Compliance Requirements
Source: Works Information - E322OGCDMPKUS.pdf (unknown)Health & Safety
Source: Works Information - E322OGCDMPKUS.pdfContractual Terms
Source: Works Information - E322OGCDMPKUS.pdf (unknown)Special Conditions
Source: Works Information - E322OGCDMPKUS.pdf (unknown)Requirements
Source: Works Information - E322OGCDMPKUS.pdf (unknown)Section
Source: Works Information - E322OGCDMPKUS.pdfDescription
Source: Technical_Evaluation_Strategy - E322OGCDMPKUS.pdfThe tender is for a construction and commissioning service team to support plant commissioning at Kusile Power Station. The provider will: Support Eskom in managing remaining construction and commissioning activities. Provide advisory and support services for execution. Monitor daily progress using physical quantities versus the Contractor’s schedule and weekly work plans. Ensure compliance with PSR, OHRVS, OHS, and MIE standards. Resources will integrate with Eskom’s team and follow Eskom’s systems and procedures.
Submission Guidelines
Source: Technical_Evaluation_Strategy - E322OGCDMPKUS.pdf (unknown)Submit the following returnable documents for all service resources: CVs, proof of qualifications, and certifications (including MIE and applicable Plant authorisations: RP). These must align with the Technical Tender Returnable and Employer’s Service Information to meet service requirements. Failure to provide these will result in technical disqualification.
Returnable Documents
Source: Technical_Evaluation_Strategy - E322OGCDMPKUS.pdf (unknown)Required returnable documents: CVs, proof of qualifications, and certifications for all service resources. These must be submitted as per the Technical Tender Returnable and Employer’s Service Information. Each document will be evaluated by a minimum of 2 TET members per criterion.
Evaluation Criteria
Source: Technical_Evaluation_Strategy - E322OGCDMPKUS.pdf (unknown)General
Disqualification
Technical Specifications
Source: Technical_Evaluation_Strategy - E322OGCDMPKUS.pdf (unknown)The service provider must support Eskom in completing the Kusile Power Station Project by: Providing advisory and support services for construction and commissioning activities. Monitoring daily construction progress using physical quantities versus the Contractor’s schedule and weekly work plans. Ensuring compliance with Plant Safety Regulations (PSR), Operating Regulations for High Voltage System (OHRVS), OHS, and Master Installation Electrician (MIE) standards. Resources will work under Eskom’s Construction and Commissioning Management, forming part of an integrated team using Eskom’s systems and procedures.
Experience & Qualifications
Source: Technical_Evaluation_Strategy - E322OGCDMPKUS.pdfForeseen acceptable qualifications: CVs, proof of qualifications, and certifications (including MIE and applicable Plant authorisations: RP) must be provided. Qualitative thresholds: Resource Plan (50%), Previous Assignments (40%), Lead Time (10%). Minimum 75% score required to pass.
Compliance Requirements
Source: Technical_Evaluation_Strategy - E322OGCDMPKUS.pdf (unknown)Mandatory compliance: Submit CVs, proof of qualifications, and certifications (including MIE and applicable Plant authorisations: RP) for all service resources. Qualitative compliance: Meet the 75% threshold for Resource Plan, Previous Assignments, and Lead Time criteria. Ensure all personnel have valid certifications and authorisations as specified in the tender documentation.
Health & Safety
Source: Technical_Evaluation_Strategy - E322OGCDMPKUS.pdfCompliance with the following is mandatory: Plant Safety Regulations (PSR). Operating Regulations for High Voltage System (OHRVS). Occupational Health and Safety (OHS) standards. Master Installation Electrician (MIE) requirements. All personnel must adhere to these regulations during construction and commissioning activities.
Requirements
Source: Technical_Evaluation_Strategy - E322OGCDMPKUS.pdf (unknown)Mandatory returnable documents: CVs, proof of qualifications, and certifications for all service resources. These must reference the Technical Tender Returnable and Employer’s Service Information. Failure to submit these will result in technical disqualification.
Section
Source: Technical_Evaluation_Strategy - E322OGCDMPKUS.pdfTechnical evaluation threshold: Minimum 75% weighted score required. Criteria: Resource Plan (50%): CVs and qualifications (20%), proposal scope compliance (30%). Previous Assignments (40%): Relevant work experience (30%), reference list (10%). Lead Time (10%): Mobilisation speed. Scoring scale: 0 (Non-compliance), 2 (Does not meet requirements), 4 (Meets with acceptable risks), 5 (Meets with no foreseen risks).
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Kusile Power Station Project - Balmoral - WITBANK - 1034
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
4
Last checked
14 Jul 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries