Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
R29 Cnr Bethal and Standerton Road - Standerton - Standerton - 2430
Organization Type
GOVERNMENT
Published
12 Aug 2026
OCDS Reference
ocds-9t57fa-165345
ESKOM is procuring the supply and delivery of electrical switchgear fuses on an as-and-when-required basis for a period of 60 months (5 years). The contract will be awarded through an open tender, and bidders must submit a completed method statement using the ESKOM template as part of their response. The most consequential requirement is the mandatory completion and submission of the method statement, which must cover scope, objectives, risks, and stakeholder management.
Bidders must be registered on the Central Supplier Database (CSD) and have a valid tax clearance status.
Bidders must complete and submit the Eskom Method Statement Template (Document 240-126469599 Rev 2) as part of their tender response.
The method statement must outline the scope of work as described in the contract document, order, or tender number.
The method statement must list 2-3 SMART objectives related to the scope of work outputs.
The method statement must detail the skills, competencies, and training required to deliver the scope.
The method statement must identify tools, equipment, and infrastructure needed, including testing and measurement.
The method statement must list all risks associated with delivering the scope and the actions to mitigate them.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Thursday, 27 August 2026 - 10:00
Venue
MS TEAM
Categories
Request for Bid(Open-Tender)
R29 Cnr Bethal and Standerton Road - Standerton - Standerton - 2430
Recommended Certifications
Having these can improve your winning chances: SABS Product Certification, NRCS Certification
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: Attachment 3 - Scope of Work.pdf. You don’t need to refresh — this page will pick up the updated review automatically.
12 Aug
2026
Tender Published
Tender was published
27 Aug
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Attachment 3 - Scope of Work.pdf
Attachment 11 - Section 37 (2) Agreement (15).pdf
Eskom is procuring the supply and delivery of electrical switchgear fuses on an as-and-when-required basis for a five-year (60-month) period, with the contract located in Mpumalanga. The tender includes a mandatory Section 37(2) agreement under the Occupational Health and Safety Act, requiring the successful supplier to comply with SHE specifications and ensure all work and plant use adheres to the Act.
Attachment 8 - 240-105658000 Supplier Quality Management Specification.pdf
Supply and delivery of electrical switchgear fuses on an as-and-when-required basis for a 5-year (60-month) period, issued by Eskom Holdings SOC Ltd in Mpumalanga.
Attachment 5 - Supplier Development Localisation Industrialisation (SDLI) Strategy.pdf
Supply and delivery of electrical switchgear fuses on an as-and-when-required basis for a 5-year (60-month) period, issued by Eskom for the Tutuka Power station in Mpumalanga. The tender uses the 80/20 preference point system, with up to 20 points for B-BBEE status.
Attachment 6 -240-68099512 Form A_Cat 4_ Rev 9.pdf
The procurement involves the supply and delivery of electrical switchgear fuses on an as-and-when-required basis for a period of 60 months (5 years) for Eskom in Mpumalanga. The tenderer must accept Eskom's Supplier Quality Requirements, which include pre- and post-contract award quality conditions and ISO 9001 compliance.
Attachment 2 -E-tendering Help Manual for supplier - 27 January 2025.pdf
Supply and delivery of electrical switchgear fuses on an as-and-when-required basis for a period of 5 years (60 months), issued by Eskom in Mpumalanga.
Attachment 4A NEC3 SC.pdf
Eskom is procuring the supply and delivery of electrical switchgear fuses on an as-and-when-required basis for five years, under an NEC3 Supply Contract. The contract covers a range of fuse types with specified electrical and physical characteristics, delivered to Tutuka Power Station stores.
Attachment 7 - 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdf
Eskom is procuring the supply and delivery of electrical switchgear fuses on an as-and-when-required basis for a period of 60 months, with the contract managed from Mpumalanga. Bidders must meet quality management and specific tender returnable requirements as detailed in the specification.
Attachment 4B - Price Schedule for Electrical Switchgear Fuses .xlsx
ESKOM is procuring the supply and delivery of a wide range of electrical switchgear cartridge fuses on an as-and-when-required basis for a period of 60 months. The tender covers over 200 line items with specified current ratings, voltage ratings, dimensions, connection types, and case materials, each with estimated quantities.
Attachment 13- Eskom - Standard Conditions of Tender - 30 January 2025.pdf
Eskom is procuring the supply and delivery of electrical switchgear fuses on an as-and-when-required basis for a period of five years (60 months). The tender is an open invitation, and bidders must comply with Eskom's standard conditions of tender, including submission requirements and evaluation criteria.
Attachment 1- E-Tenderers E-Tendering Training Acknowledgement Form.pdf
Eskom is procuring the supply and delivery of electrical switchgear fuses on an as-and-when-required basis for a five-year period (60 months) in Mpumalanga. Bidders must complete e-tendering self-training and submit the mandatory acknowledgement form to be considered responsive.
Invitation to Tender (ITT) - E3348GXMPTUT_pdf.pdf
Eskom is procuring the supply and delivery of electrical switchgear fuses on an as-and-when-required basis for a five-year (60-month) period, under an open invitation to tender. The contract will be awarded under the NEC Supply Contract, with evaluation using the 80/20 preferential point system.
Attachment 12 - Non-Disclosure Agreement (NDA) Vendors Template.pdf
Eskom is procuring maintenance services for electrostatic precipitators during outages and for routine maintenance at the Tutuka power station, under a five-year as-and-when-required contract. The tender requires bidders to sign a non-disclosure agreement to protect Eskom's confidential information.
Attachment 10 -Annexure B.pdf
Eskom is procuring the supply and delivery of electrical switchgear fuses on an as-and-when-required basis for a period of five years (60 months). The tender includes mandatory compliance with Eskom's Safety, Health and Environment (SHE) requirements and related regulations.
Attachment 14 - Tender Technical Evaluation - Switchgear Fuses.pdf
Eskom seeks a supplier for the supply and delivery of electrical switchgear fuses on an as-and-when-required basis for a 5-year period (60 months) for Tutuka Power Station in Mpumalanga. The tender includes mandatory and qualitative technical evaluation criteria, with a minimum technical threshold of 70%.
Attachment 9 - 240-126469599_Method Statement template final 18 Oct2021.pdf
Eskom is procuring the supply and delivery of electrical switchgear fuses on an as-and-when-required basis for a five-year period (60 months), with the contract located in Mpumalanga. Bidders must complete a method statement template as part of their tender submission.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Description
Source: Attachment 8 - 240-105658000 Supplier Quality Management Specification.pdf (unknown)This document is Eskom's Supplier Quality Management specification (240-105658000, Revision 3), which sets out the minimum quality requirements for all existing and potential Eskom suppliers. It defines quality criteria for selection, evaluation, vendor registration, management, monitoring, assessment and auditing of suppliers. Eskom aims to partner with suppliers who demonstrate commitment to developing, implementing and maintaining a quality management system conforming to ISO 9001. The specification applies throughout Eskom Holdings Limited divisions, its subsidiaries, suppliers and sub-suppliers, and forms part of all Eskom RFIs, RFQs and RFPs, including contracts for procurement of products and services.
Important Dates
Source: Attachment 8 - 240-105658000 Supplier Quality Management Specification.pdf (unknown)The specification is dated 17 October 2021 and has a next review date of October 2024. No tender-specific dates (closing, briefings, site visits) are stated in this document.
Contact Information
Source: Attachment 8 - 240-105658000 Supplier Quality Management Specification.pdf (unknown)No specific contact details are provided in this document.
Submission Guidelines
Source: Attachment 8 - 240-105658000 Supplier Quality Management Specification.pdf (unknown)Returnable documents — all must be completed, signed and submitted with the bid:
Disqualification risks:
Returnable Documents
Source: Attachment 8 - 240-105658000 Supplier Quality Management Specification.pdf (unknown)Category 1 returnables: Form A; valid ISO 9001 or applicable QMS certificate; latest internal and external audit reports including nonconformity and remedial actions; draft contract quality plan addressing ISO 10005; draft or example ITP/QCP; documented information for Control of Externally Provided Processes, Products and Services; documented information for roles, responsibilities and authorities; management review meeting records.
Category 2 returnables: Form A; objective evidence of a developed, implemented and maintained QMS including QMS manual, Quality Policy, Quality Objectives, Control of documented information, Internal audit procedure, Control of nonconforming outputs, Nonconformity and Corrective action procedure; latest internal audit reports; draft contract quality plan; example ITP/QCP; documented information for Control of Externally Provided Processes, Products and Services; documented information for roles, responsibilities and authorities; management review meeting records.
Category 3 returnables: Form A; objective evidence of a developed QMS including QMS manual, Quality Policy, Quality Objectives, Control of documented information, Internal audit procedure, Control of nonconforming outputs, Nonconformity and Corrective action procedure; draft contract quality plan; example ITP/QCP; documented information for Control of Externally Provided Processes, Products and Services; documented information for roles, responsibilities and authorities.
Category 4 returnables: Form A; quality method statement based on ISO 9001 and specific to the scope of work; signed/approved quality policy; quality objectives; documented information for Control of Externally Provided Processes, Products and Services; documented information for roles, responsibilities and authorities specific to the project/scope of work/technical requirements.
Specific requirements per tender will be selected using the List of Tender Returnables document (240-12248652).
Evaluation Criteria
Source: Attachment 8 - 240-105658000 Supplier Quality Management Specification.pdf (unknown)Quality assessment criteria and Form A are selected and completed by an Eskom Quality representative, who identifies the applicable supplier quality requirements.
Bidders must complete and sign Form A to acknowledge and accept Eskom's Supplier Quality requirements and ISO 9001.
Depending on the quality category, bidders must either hold a valid ISO 9001 certificate from an accredited certification body, or demonstrate a developed and implemented QMS.
Eskom may perform capability and capacity assessments prior to contract award for suppliers providing products/services with high risk to operational sustainability, working on critical plant and equipment, supplying critical plant items or components, or providing special processes.
Bidders must not prevent, hinder or obstruct Eskom or its appointed inspection agencies from carrying out quality assurance activities.
Technical Specifications
Source: Attachment 8 - 240-105658000 Supplier Quality Management Specification.pdf (unknown)This document is a general Supplier Quality Management specification (240-105658000, Revision 3) applicable to all Eskom suppliers and sub-suppliers. It does not contain tender-specific technical specifications for the supply of electrical switchgear fuses.
Key quality requirements:
Methodology
Source: Attachment 8 - 240-105658000 Supplier Quality Management Specification.pdf (unknown)The supplier must develop and implement processes and procedures to monitor, verify and document the quality of the scope of work. This includes:
Preservation programme: The supplier must deploy a documented programme for identification of all physical asset pre-operation preservation of quality requirements, including bulk materials, consumable items, equipment systems, system components, and other procured or supplied materials. The programme must address temporary, long-term, and in-transit preservation, compliance monitoring, and communication of requirements to all project functional areas.
Experience & Qualifications
Source: Attachment 8 - 240-105658000 Supplier Quality Management Specification.pdf (unknown)Quality audits and related quality performance reviews must be carried out by trained, accredited, and experienced personnel in accordance with documented procedures.
Personnel performing special processes must be certified competent through a certificate of competency in accordance with the company's internal training management and competency control procedures or an external certification body (e.g., NDT) through an accredited service provider as per SETA requirements.
All personnel who perform activities that affect quality must have their training needs identified and documented. Training certificates must meet SETA requirements in terms of unit standard completion and accreditation number of service providers.
Quality Management
Source: Attachment 8 - 240-105658000 Supplier Quality Management Specification.pdf (unknown)The supplier must develop, implement, maintain and continually improve a QMS based on ISO 9001. The QMS must be documented and include quality manual, quality plans, work procedures, work instructions, method statements, and workflow documentation as applicable.
Contract Quality Plan (CQP): Must be submitted prior to the initial scope of work kick-off or initial pre-fabrication meeting and prior to commencement of manufacturing, whichever is earlier. Must comply with ISO 10005 and include management of records, access for inspection, final documentation proposals, special processes (welding, NDT, coatings, heat treatment), personnel competency, storage and preservation instructions, quality monitoring activities, resources, communication channels, and management authority.
Quality Control Plan (QCP)/Inspection and Test Plan (ITP): Must be reviewed and accepted by Eskom, its inspection authority or agency. Must allow for insertion of Eskom-specific requirements including hold and witness points. Changes to accepted QCP/ITP require Eskom's agreement. Must include contract number, order number, work description, sequence of operations, acceptance criteria, intervention points, and inspection records. Once signed, QCPs/ITPs become addendums to the main contract.
Quality kick-off meetings: A quality kick-off meeting will be held at the start of the contract and, if required, at the start of each subsequent phase. The supplier shall arrange coordination meetings with Eskom prior to placement of orders, giving fourteen days' advance notice.
Mandatory pre-inspection meetings: Convened by Eskom or its inspection agency or AIA, attended by supplier's and sub-supplier's representatives including quality representatives.
Eskom may appoint resident quality inspectors at the supplier's or sub-supplier's premises; the supplier must provide workspace at no cost.
Eskom may appoint any organisation to perform quality assurance and quality control activities; the supplier may not object, prevent, hinder, undermine, circumvent, question, discredit, or make it impossible for such organisation to carry out its work.
Nonconformities: If the supplier fails to respond and rectify nonconforming products within stipulated contractual conditions, the Project Manager may apply contractual remedies in accordance with FIDIC/NEC contract. Repeated nonconformities from the same supplier within 6 months or less must be escalated to management review committees and, if unresolved, to the supplier review committee.
Special processes: All operators must be suitably qualified in accordance with applicable procedures, standards or codes. Records of qualification must be maintained and made available to Eskom at all times.
Pricing Schedule
Source: Attachment 8 - 240-105658000 Supplier Quality Management Specification.pdf (unknown)No pricing schedule or rates are provided in this document.
Financial Requirements
Source: Attachment 8 - 240-105658000 Supplier Quality Management Specification.pdf (unknown)No financial requirements (pricing format, bonds, guarantees, payment terms) are stated in this document.
Compliance Requirements
Source: Attachment 8 - 240-105658000 Supplier Quality Management Specification.pdf (unknown)Bidders must comply with Eskom's Supplier Quality Management specification (240-105658000/QM 58).
Required forms and certificates:
Bidders must allow Eskom free and unrestricted access to their information and preservation records for inspection and audit.
Bidders must not prevent, hinder or obstruct Eskom or its appointed inspection agencies from carrying out quality assurance activities.
Health & Safety
Source: Attachment 8 - 240-105658000 Supplier Quality Management Specification.pdf (unknown)The specification references Eskom's Safety, Health, Environment, and Quality (SHEQ) Policy (32-727) as an informative reference. No specific health and safety requirements are detailed in this document.
Contractual Terms
Source: Attachment 8 - 240-105658000 Supplier Quality Management Specification.pdf (unknown)Eskom reserves the right to expect that the works will be conducted in accordance with the contract. Eskom has the right to access the supplier's information as determined by applicable legislation. Eskom may oversee the supplier's audit programmes by participating in selected audits as an observer and by assessing the supplier during key work stages.
Preservation requirements: The supplier must implement a preservation management programme covering temporary, long-term and in-transit preservation of equipment and materials, including protection against atmospheric conditions, coatings, grounding, internal environment creation, vibration protection, and structural integrity. Preservation requirements must be clearly documented in purchase orders and communicated to all project functional areas. Eskom must have free and unrestricted access to all preservation records.
Requirements
Source: Attachment 8 - 240-105658000 Supplier Quality Management Specification.pdf (unknown)Pre-contract award quality requirements:
Capability and capacity assessment:
Section
Source: Attachment 8 - 240-105658000 Supplier Quality Management Specification.pdf (unknown)Quality assessment criteria are selected and completed by an Eskom Quality representative. Bidders must complete and sign Form A to acknowledge and accept Eskom's Supplier Quality requirements and ISO 9001. Depending on the quality category, bidders must hold a valid ISO 9001 certificate or demonstrate a developed and implemented QMS. Eskom may perform capability and capacity assessments prior to award.
Contact Information
Source: Attachment 9 - 240-126469599_Method Statement template final 18 Oct2021.pdf (RFQ){"name":null,"email":null,"phone":null,"department":"as per tender Number/ Contract","address":"lationships with interested"}
Submission Guidelines
Source: Attachment 9 - 240-126469599_Method Statement template final 18 Oct2021.pdf (RFQ)Returnable documents: bidders must complete and submit the Eskom Method Statement Template (Document 240-126469599 Rev 2) as part of their tender response. No other returnable forms are specified in the document.
Evaluation Criteria
Source: Attachment 9 - 240-126469599_Method Statement template final 18 Oct2021.pdf (RFQ)Bidders must be registered on the Central Supplier Database (CSD) and have a valid tax clearance status. The method statement will be evaluated as part of the tender response. No other specific evaluation criteria are stated in the document.
Technical Specifications
Source: Attachment 9 - 240-126469599_Method Statement template final 18 Oct2021.pdf (RFQ)Bidders must complete and submit a method statement using the Eskom template (Document 240-126469599 Rev 2). The method statement must cover:
Methodology
Source: Attachment 9 - 240-126469599_Method Statement template final 18 Oct2021.pdfThe method statement must include: scope of work as per contract document/order/tender number, SMART objectives, customer needs identification and communication, required skills and training, tools and equipment including testing/measurements, risk identification and mitigation, improvement actions, data collection and analysis, stakeholder impact assessment, and supplier selection and performance monitoring, including outsourcing details.
Quality Management
Source: Attachment 9 - 240-126469599_Method Statement template final 18 Oct2021.pdfThe method statement must address quality management, including how customer needs are identified and communicated, the skills and competencies required, and the tools and equipment needed for delivery. It must also cover leadership communication of mission and values, risk identification and mitigation, and continuous improvement of business processes.
Compliance Requirements
Source: Attachment 9 - 240-126469599_Method Statement template final 18 Oct2021.pdf (RFQ)Bidders must be registered on the Central Supplier Database (CSD) and have a valid tax clearance status. Bidders must complete and submit the Eskom Method Statement Template as part of their tender response.
Important Dates
Source: Attachment 11 - Section 37 (2) Agreement (15).pdf (unknown){"closingDate":"21 January 2025"}
Evaluation Criteria
Source: Attachment 11 - Section 37 (2) Agreement (15).pdf (unknown)Bidders must be able to enter into and sign the Section 37(2) agreement. The signatory must have the requisite authority to bind the contractor. No other eligibility criteria are stated in the provided document.
Technical Specifications
Source: Attachment 11 - Section 37 (2) Agreement (15).pdf (unknown)provisions of
the Act.
I undertake that ......................................................... [insert name of contractor/supplier]
shall strictly adhere to, and ensure that his/her employees adhere to, the provisions of the
Occupational Health and Safety Act, 1993 (Act ).
I have been provided with SHE specifications for project
Compliance Requirements
Source: Attachment 11 - Section 37 (2) Agreement (15).pdf (unknown)Bidders must sign the Section 37(2) agreement under the Occupational Health and Safety Act, acknowledging that the contractor is an employer in its own right with duties under the Act, and agreeing to comply with the SHE specifications provided for the project.
Health & Safety
Source: Attachment 11 - Section 37 (2) Agreement (15).pdf (unknown)Bidders must sign the Section 37(2) agreement, acknowledging that the contractor is an employer in its own right with duties under the Occupational Health and Safety Act. The contractor must ensure all work and use of machinery or plant complies with the Act, and that employees adhere to its provisions. The contractor must comply with the SHE specifications provided for the project, which constitute arrangements and procedures between the contractor and Eskom to ensure compliance with the Act.
Compliance Requirements
Source: Attachment 3 - Scope of Work.pdf (unknown)Insufficient searchable text - AI extraction recommended
Description
Source: Attachment 14 - Tender Technical Evaluation - Switchgear Fuses.pdf (unknown)Tutuka Power Station MV&LV Units and Common Plant Switchgear use fuses for overcurrent protection. The fuses are of different brands and protect critical systems for continuous operation. This 5-year supply and delivery of electrical switchgear fuses addresses the unavailability of fuse spares at Tutuka power station stores, helping the operating department bring the plant back into service in time.
Contact Information
Source: Attachment 14 - Tender Technical Evaluation - Switchgear Fuses.pdf (unknown){"name":null,"email":null,"phone":null,"department":"s and Common Plant Switchgear operate using fuses for protection","address":"e necessary for maintaining continuous operation of the Station."}
Evaluation Criteria
Source: Attachment 14 - Tender Technical Evaluation - Switchgear Fuses.pdf (unknown)Mandatory technical criterion: bidders must provide technical data sheets or brochures for all fuses in the scope of work. Assessed on a pass/fail basis; failure eliminates the bid.
Qualitative evaluation (weighted 100%):
Scoring scale: 5 = 100% compliant, 4 = 80% compliant with acceptable qualifications, 2 = 40% non-compliant, 0 = 0% totally deficient. Scores of 1 and 3 are not used.
Technical threshold: minimum weighted final score of 75% to be considered. (Note: an earlier section states 70%, but the qualitative criteria note states 75%.)
Unacceptable technical risks: deviating from the specification in the Works Information, under or overrated equipment, delivering substandard components, or not supplying all items in the full scope.
Technical Specifications
Source: Attachment 14 - Tender Technical Evaluation - Switchgear Fuses.pdf (unknown)Scope: supply and delivery of electrical switchgear fuses on an as-and-when-required basis for 5 years (60 months) for Tutuka Power Station.
Purpose: ensure availability of fuse spares for MV&LV Units and Common Plant Switchgear, which use fuses for overcurrent protection. Fuses are of different brands and protect critical systems for continuous station operation.
Applicability: evaluation of service providers supplying spares for the electrical system at Tutuka Power Station.
Mandatory requirement: technical data sheets or brochures for all fuses listed in the scope of work.
Qualitative requirements: proof of delivery within 3 months, vehicle with adequate ventilation for transporting electronic spares, temperature-controlled storage, ISO 9001:2015 quality management certificate, batch test certificates or data manuals per SANS standards, drawings and data sheets, and preservation/storage procedures.
Methodology
Source: Attachment 14 - Tender Technical Evaluation - Switchgear Fuses.pdf (unknown)Bidders must supply preservation and storage procedures for electronic components where applicable.
Experience & Qualifications
Source: Attachment 14 - Tender Technical Evaluation - Switchgear Fuses.pdf (unknown)Company profile must include at least 5 traceable references with client names and contact numbers for supply of switchgear electrical components. References may be local or international, from Power Generation, Mining or Industrial sectors, and must prove supply of electrical components within the past 5 years.
Quality Management
Source: Attachment 14 - Tender Technical Evaluation - Switchgear Fuses.pdf (unknown)Bidders must submit a copy of an up-to-date ISO 9001:2015 certificate to demonstrate quality control measures for the electrical spares.
Storage place or workshop must have a controlled temperature environment, evidenced by pictures.
Batch test certificates or data information manuals must demonstrate manufacture according to SANS standards.
Compliance Requirements
Source: Attachment 14 - Tender Technical Evaluation - Switchgear Fuses.pdf (unknown)ISO 9001:2015 quality management system certificate required as part of qualitative evaluation.
No other compliance requirements (e.g., CSD, tax, B-BBEE) are stated in this document.
Contractual Terms
Source: Attachment 14 - Tender Technical Evaluation - Switchgear Fuses.pdf (unknown)Unacceptable technical risks: deviating from the standard and specification in the Works Information/scope of work; under or overrated equipment.
Unacceptable technical exceptions/conditions: delivery of substandard components; tenderer not supplying all items in the full scope.
Requirements
Source: Attachment 14 - Tender Technical Evaluation - Switchgear Fuses.pdf (unknown)Mandatory technical criterion: tenderer must provide technical data in the form of data sheets or brochures for all fuses as per the scope of work. Assessed on a YES/NO basis; a NO answer may result in elimination.
Section
Source: Attachment 14 - Tender Technical Evaluation - Switchgear Fuses.pdf (unknown)Technical threshold: minimum weighted final score of 75% to be considered (note: an earlier section states 70%).
Qualitative criteria weights: General requirements 20%, Delivery and Transport Capability 20%, Premises and Quality Management System 20%, Documentation 40%.
Scoring: 5 = 100% compliant, 4 = 80% compliant with qualifications, 2 = 40% non-compliant, 0 = 0% totally deficient. Scores of 1 and 3 are not used.
Description
Source: Attachment 2 -E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)The supplied document is the Eskom eTendering system user manual, not the tender specification. It describes how to register and submit bids electronically. No description of the electrical switchgear fuses tender is provided.
Important Dates
Source: Attachment 2 -E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)No tender-specific dates are stated in the supplied document. The closing date is in the tender record.
Contact Information
Source: Attachment 2 -E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)No specific contact details are provided in the supplied document. The document advises contacting the buyer responsible for the published tender for system problems.
Submission Guidelines
Source: Attachment 2 -E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)Submission is electronic only via the Eskom eTendering portal. Bidders must register on the portal before access is granted; registration requires a valid email address and cellphone number for OTP verification. A CSD number is required to gain access. Upload tender documents under the correct category (Technical, Commercial, Finance, etc.). Verify all required documents are uploaded before finalising. File size per upload must not exceed 50MB; total size of all uploaded files must not exceed 900MB. Finalise and close the submission to complete the process. Keep the confirmation email with the submission ID for future enquiries. System problems should be directed to the buyer responsible for the published tender.
Evaluation Criteria
Source: Attachment 2 -E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)No evaluation criteria are stated in the supplied document. The document only notes that closed tenders are sent directly to suppliers who meet selection and evaluation criteria, but no specific criteria are given.
Technical Specifications
Source: Attachment 2 -E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)The supplied document is the Eskom eTendering system user manual, not the technical specification for this tender. No technical specifications for the supply and delivery of electrical switchgear fuses are provided.
Methodology
Source: Attachment 2 -E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)To use the eTendering portal: open a web browser and go to TenderBulletin (eskom.co.za) or https://eTendering.eskom.co.za. Complete all registration fields, ensure the contact number starts with a plus prefix (e.g. +27), fill in the capture picture to validate you are not a robot, and click register. Verify the email by clicking the link sent. Login with the verified email and password, then enter the OTP sent to the cellphone and email. After OTP verification, select the preferred tender reference number. Click 'Create New Submission' to submit required tender documents. Add files by giving a file name, selecting the file type (Technical, Commercial, Finance, etc.), choosing the file, and clicking Upload. Upload all required documents under the correct categories. Click 'Finalize Submission' to finalize. A file size cannot exceed 50MB and total size of all uploaded files should not exceed 900MB. Confirm finalization by clicking 'Finalise and Close Submission'. View submitted tenders under 'My Submissions'. An email with submission ID and all submitted documents will be sent for future enquiry. To edit registered information (Name, Organization, CSD, cell phone number), select 'Edit Registration' on the dropdown, update the information, and click 'Update'. To log off, click 'Log out' on the dropdown next to your name. To reset a forgotten password, click 'Forgot your password', enter an alternative email where the new password will be sent, and follow the link or click 'Reset Password'. Enter and confirm the new password, then enter the OTP sent to cell phone or email. Once OTP is verified, the password is reset successfully.
Compliance Requirements
Source: Attachment 2 -E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)Bidders must have a CSD number to access the eTendering system. Registration on the eTendering portal is required, including providing a valid email address and cellphone number for OTP verification.
Submission Guidelines
Source: Attachment 7 - 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdf (unknown)Returnable documents required with the bid:
Bidders must ensure all required returnables are submitted; the document does not specify submission channel or format.
Evaluation Criteria
Source: Attachment 7 - 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdf (unknown)Quality requirements are evaluated as Category 4 deliverables, with an indicator of 1 (apply).
Section A (Quality Management System, ISO 9001):
Section B (Evidence of QMS in operation):
Section E (User-defined additional requirements):
No minimum qualifying threshold or preference point split is stated.
Technical Specifications
Source: Attachment 7 - 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdf (unknown)Scope: supply and delivery of electrical switchgear fuses on an as-and-when-required basis for a period of 5 years (60 months).
No quantities, standards, or service levels are specified in the provided content.
Experience & Qualifications
Source: Attachment 7 - 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdf (unknown)Bidders must provide evidence of at least one previous project with the same scope of work executed in the past 36 months.
Quality Management
Source: Attachment 7 - 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdf (unknown)Bidders must complete and sign Form A as part of quality requirements.
Compliance Requirements
Source: Attachment 7 - 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdf (unknown)Quality management system must comply with ISO 9001; certification is not required, but documented evidence of compliance is required.
No other compliance requirements (e.g., CSD, tax, B-BBEE) are stated in the provided content.
Section
Source: Attachment 7 - 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdf (unknown)Quality requirements are evaluated as Category 4 deliverables. Section A covers ISO 9001 quality management system requirements: method statement, quality policy, and quality objectives, each approved by top management. Section B covers documented evidence of QMS in operation, including roles/responsibilities and control of externally provided processes. Section E covers Form A completion and evidence of at least one similar project in the past 36 months.
Submission Guidelines
Source: Attachment 10 -Annexure B.pdf (unknown)Returnable documents: the Acknowledgement Form for Document (Annexure B) must be completed, signed by an authorised person (CEO/Director/Managing Director), witnessed by two witnesses, and submitted with the tender. The form acknowledges receipt and understanding of the Eskom SHE Rules and other identified requirements.
Evaluation Criteria
Source: Attachment 10 -Annexure B.pdf (unknown)Bidders must acknowledge and comply with the Eskom SHE rules and requirements. Non-compliance with SHE requirements may lead to work stoppages and financial penalties. The main supplier must demonstrate the process and selection criteria for appointing contractors and suppliers, and must notify Eskom prior to their appointment.
Quality Management
Source: Attachment 10 -Annexure B.pdf (unknown)Financial penalties will be enforced on the main supplier for non-conformances (identified for the main supplier and/or its sub-contractor and/or supplier) pertaining to Eskom and/or statutory SHE requirements. All employees (contractors/suppliers) must undergo the relevant Eskom induction and company induction.
Financial Requirements
Source: Attachment 10 -Annexure B.pdf (unknown)Work stoppages initiated due to SHE-related issues will not warrant any financial compensation claim against Eskom. Financial penalties will be enforced on the main supplier for non-conformances pertaining to Eskom or statutory SHE requirements, including those of sub-contractors or suppliers.
Compliance Requirements
Source: Attachment 10 -Annexure B.pdf (unknown)Bidders must comply with the following when working at or rendering a service to Eskom:
After contract award, the supplier must align its processes to Eskom's SHE requirements (policies, procedures, standards).
Health & Safety
Source: Attachment 10 -Annexure B.pdf (unknown)Bidders must comply with Eskom SHE requirements, including Eskom contractor Health and Safety requirements standards 32-136, SHE specification, Occupational Health and Safety Act, Mine Health and Safety Act (where applicable), Compensation for Occupational Diseases and Illnesses Act, and National Environmental Management Act. After contract award, the supplier must align its processes to Eskom's SHE requirements. Work stoppages due to SHE issues will not warrant financial compensation. Financial penalties will be enforced for non-conformance to Eskom or statutory SHE requirements. All employees must undergo relevant Eskom and company induction. The main supplier must demonstrate contractor and supplier selection criteria, notify Eskom prior to appointment, ensure adequate resources and competencies, manage contractor compliance, monitor through audits, provide grounds for termination, and handle non-conformances. Eskom may verify this and request testimonials or references.
Contractual Terms
Source: Attachment 10 -Annexure B.pdf (unknown)The main supplier must demonstrate to Eskom the process and selection criteria applied when appointing contractors and suppliers. The main supplier must notify Eskom prior to appointing contractors or suppliers for the commencement of work. The main supplier must ensure that contractors and suppliers possess adequate resources and competencies. The main supplier is accountable for managing its contractors or suppliers to ensure compliance with applicable legal and Eskom requirements. The main supplier shall monitor contractors and suppliers through audits and assessments regarding SHE compliance during execution. The main supplier must provide grounds for termination of work done by contractors and suppliers. All non-conformances or non-compliance by contractors or suppliers (all tiers) will be dealt with directly with the main supplier in terms of performance and penalty processes. Eskom reserves the right to verify this when deemed necessary and may instruct the contractor to provide copies of testimonials or references and contact details of clients (including Eskom) for whom the company has done previous work of a similar nature.
Description
Source: Attachment 6 -240-68099512 Form A_Cat 4_ Rev 9.pdfThe tenderer must select one applicable category for quality requirements; Category 4 is selected. The form covers pre-contract award quality requirements, main supplier and sub-supplier capability and capacity assessment, and post-contract award conditions including contract execution, supplier quality performance monitoring, Eskom rights of access and information, preservation, quality audits, and management of nonconformities.
Evaluation Criteria
Source: Attachment 6 -240-68099512 Form A_Cat 4_ Rev 9.pdf (unknown)Bidders must complete and sign Form A (Tender & Contract Quality Requirements) to accept Eskom Supplier Quality Requirements. The selected quality category is Category 4, referring to clause 3.5 of specification 240-105658000. No other eligibility criteria are stated in the document.
Technical Specifications
Source: Attachment 6 -240-68099512 Form A_Cat 4_ Rev 9.pdf (unknown)The tenderer must complete and sign Form A to acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001. The form requires selection of one applicable category; Category 4 is selected. The tenderer must indicate applicability of pre-contract award quality requirements, main supplier and sub-supplier capability and capacity assessment, and post-contract award conditions including contract execution, supplier quality performance monitoring, Eskom rights of access and information, preservation, quality audits, management of nonconformities, and special processes.
Quality Management
Source: Attachment 6 -240-68099512 Form A_Cat 4_ Rev 9.pdfThe tenderer must complete and sign Form A to acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001. The form includes pre-contract award quality requirements, selection of applicable category (Category 4 selected), main supplier and sub-supplier capability and capacity assessment, post-contract award conditions (contract execution, supplier quality performance monitoring, Eskom rights of access and information, preservation, quality audits, management of nonconformities), special processes, and ISO 9001 clauses and principles.
Compliance Requirements
Source: Attachment 6 -240-68099512 Form A_Cat 4_ Rev 9.pdf (unknown)The tenderer must complete and sign Form A to accept Eskom's Supplier Quality Requirements (specification 240-105658000) and ISO 9001 standard. The form requires the tenderer's quality representative to sign, acknowledging acceptance of these requirements.
Important Dates
Source: Invitation to Tender (ITT) - E3348GXMPTUT_pdf.pdf (RFP)Closing date: 27 August 2026 at 10h00. Non-compulsory clarification meeting: 17 August 2026 at 09h00 via MS Teams (link provided). Clarification queries must be submitted 5 working days before the closing date.
Briefing Session
Source: Invitation to Tender (ITT) - E3348GXMPTUT_pdf.pdf (RFP)Non-compulsory clarification meeting: 17 August 2026 at 09h00 via MS Teams. Link: https://teams.microsoft.com/meet/32998834048542?p=B7UFZpp3dHA7bxPQTX
Contact Information
Source: Invitation to Tender (ITT) - E3348GXMPTUT_pdf.pdf (RFP)Eskom Representative: Tsakani Shingange, Tel: 017 749 9242, Email: [email protected]. Procurement Manager: Ewert Baloi.
Submission Guidelines
Source: Invitation to Tender (ITT) - E3348GXMPTUT_pdf.pdf (RFP)Tenders must be submitted electronically via the Eskom E-tendering site before the closing time. Documents must be uploaded under Technical, Commercial, Financial, and other folders. All documents must be in PDF format; the price list must also be provided in Excel. No zip files or hard copies are accepted. If a tender is resubmitted, the latest version supersedes all previous submissions. The submission status must be marked complete. Late tenders are not accepted. Clarification queries must be submitted in writing to the Eskom Representative at least 5 working days before the closing date. Returnable forms required at closing (disqualifiable if missing): Annexure A (Authorisation Form), Annexure B (Acknowledgement Form), Annexure C (Tenderer's Particulars), Annexure D (Integrity Declaration), Annexure E (CPA for local goods/services), Annexure F (CPA for foreign goods/services, if applicable), Annexure G1-G4 (SBD 6.2 and local content declarations, if applicable), Annexure H (SBD 1), Annexure J (SBD 4). Non-disqualifiable but required for evaluation: Annexure I (SBD 6.1 Preference Points Claim).
Returnable Documents
Source: Invitation to Tender (ITT) - E3348GXMPTUT_pdf.pdf (RFP)Mandatory returnables at closing (disqualifiable): Authorisation Form (Annexure A), Acknowledgement Form (Annexure B), Tenderer's Particulars (Annexure C), Integrity Declaration Form (Annexure D), CPA Requirements for Local Goods/Services (Annexure E), CPA(IG) for Foreign Goods/Services (Annexure F), SBD 6.2 and Annexures G2-G4 (if applicable), SBD 1 (Annexure H), SBD 4 (Annexure J). Non-disqualifiable: SBD 6.1 Preference Points Claim Form (Annexure I), Tax Clearance Certificate, Tax Evaluation Questionnaire, Employment Equity compliance proof, CIDB grading (if applicable). Required for evaluation: Technical Evaluation Criteria (Attachment 14). Required prior to award: CSD registration, NEC Contract, Pricing Schedule, safety/quality documents, financial statements.
Evaluation Criteria
Source: Invitation to Tender (ITT) - E3348GXMPTUT_pdf.pdf (RFP)Functionality (technical) evaluation: bidders must score a minimum of 70% to progress. Prices are scored out of 80 points; specific goals (B-BBEE) are scored out of 20 points, using the 80/20 preference point system. Prices are evaluated inclusive of VAT, corrected for arithmetical errors, excluding contingencies, adjusted for variations, and compared on net present value. Unconditional discounts are considered; conditional discounts are applied at payment. Bidders achieving the technical threshold undergo risk-based due-diligence verification before award. Objective criteria may justify awarding to a tenderer other than the highest scorer. Contractual requirements (e.g., CSD registration) are assessed after evaluation and ranking.
Technical Specifications
Source: Invitation to Tender (ITT) - E3348GXMPTUT_pdf.pdf (RFP)Scope: Supply and delivery of electrical switchgear fuses on an as-and-when-required basis for a period of 5 years (60 months). Quality requirements: submit Form A – Category 4, List of Tender Returnables, Supplier Quality Management Specification, Method Statement, signed/approved quality policy, quality objectives, documented information for control of externally provided processes/products/services, and documented information for roles, responsibilities and authorities. Safety requirements: Annexure B (Acknowledgement for Eskom OHS legal requirements), Health and Safety plan/OHS manual, detailed H&S costing, baseline OHS risk assessment, valid letter of good standing (LOGs), OHS policy signed by CEO and compliant with OHS Act Section 7, and proof of OHS competency (CVs and qualifications).
Methodology
Source: Invitation to Tender (ITT) - E3348GXMPTUT_pdf.pdf (RFP)Bidders must submit a Method Statement as part of quality requirements, along with documented information for control of externally provided processes, products and services, and for roles, responsibilities and authorities.
Pricing Schedule
Source: Invitation to Tender (ITT) - E3348GXMPTUT_pdf.pdf (RFP)Pricing Schedule/BOQ must be submitted in PDF and Excel format. Prices evaluated inclusive of VAT, corrected for arithmetical errors, excluding contingencies, adjusted for variations, and compared on net present value. Prices scored out of 80 points. CPA conditions apply for contracts longer than 12 months; if no CPA proposed, prices deemed fixed.
Financial Requirements
Source: Invitation to Tender (ITT) - E3348GXMPTUT_pdf.pdf (RFP)Pricing Schedule/BOQ must be submitted in PDF and Excel format. Prices are evaluated inclusive of VAT, corrected for arithmetical errors, excluding contingencies, adjusted for variations, and compared on net present value. Prices scored out of 80 points. Contract price adjustment (CPA) may apply for contracts longer than 12 months; if no CPA is proposed, prices are deemed fixed. For contracts below R50 million (incl. VAT), Eskom pays within 30 days of undisputed invoices; above R50 million, within 60 days. Financial viability: audited/reviewed annual financial statements not older than 18 months may be required as a contractual requirement.
Compliance Requirements
Source: Invitation to Tender (ITT) - E3348GXMPTUT_pdf.pdf (RFP)Mandatory: CSD registration prior to award. Tax compliance: local tenderers must provide SARS e-filing PIN or CSD number; foreign tenderers with SA footprint must provide tax clearance certificate; foreign suppliers without SA footprint complete SBD 1 but no tax proof required. B-BBEE: SBD 6.1 Preference Points Claim (Annexure I) required for evaluation; proof of B-BBEE status level (certificate or sworn affidavit) required. Employment Equity: designated employers must provide proof of compliance. Safety: COIDA certificate of good standing (South African tenderers). Quality: as per technical specifications. Other: Tax Evaluation Questionnaire if applicable, and any additional documents (e.g., ECSA/SACPCMP registrations) if relevant to scope.
B-BBEE Requirements
Source: Invitation to Tender (ITT) - E3348GXMPTUT_pdf.pdf (RFP)Specific goals scored out of 20 points in accordance with PPPFA. Proof of B-BBEE status level: certificate issued by authorised body, or sworn affidavit as prescribed by B-BBEE Codes of Good Practice, or other requirement per B-BBEE Act. Failure to submit evidence of points claim results in 0 points for that specific goal.
Health & Safety
Source: Invitation to Tender (ITT) - E3348GXMPTUT_pdf.pdf (RFP)Safety requirements include: Annexure B (Acknowledgement for Eskom OHS legal requirements), Health and Safety plan/OHS manual, detailed H&S costing (not lump sum), baseline OHS risk assessment, valid letter of good standing (LOGs), OHS policy signed by CEO and compliant with OHS Act Section 7, and proof of OHS competency (CVs and qualifications).
Contractual Terms
Source: Invitation to Tender (ITT) - E3348GXMPTUT_pdf.pdf (RFP)The contract will be the NEC Supply Contract. Mandatory contractual requirement: CSD registration. Additional requirements may include SHEQ and financial viability. Contractual requirements are assessed after evaluation and ranking; failure to meet them may render the tender non-responsive. Eskom payment terms: 30 days for contracts below R50 million (incl. VAT), 60 days for above. Eskom may negotiate with preferred bidders if prices are not market-related. Subcontracting with subsidiaries is discouraged and must be declared.
Special Conditions
Source: Invitation to Tender (ITT) - E3348GXMPTUT_pdf.pdf (RFP)Tender validity period is 18 weeks. Alternative tenders not allowed. No public opening of tenders; prices not read out. Tenders must be submitted electronically via Eskom E-tendering site. Documents uploaded under Technical, Commercial, Financial, and other folders. PDF format required, price list in PDF and Excel. No zip files, no hard copies. Resubmission nullifies previous versions. Submission status must be complete. Late tenders not accepted. Clarification queries must be submitted 5 working days before deadline.
Requirements
Source: Invitation to Tender (ITT) - E3348GXMPTUT_pdf.pdf (RFP)Eligibility: Tenderers must not be under any restriction to do business with Eskom or State-Owned Companies. Ineligible if: nationality of a country on international sanctions list; submitting more than one tender; JV/consortium agreement not stating joint and several liability; conflict of interest; tenders signed by non-authorised persons; restricted by National Treasury; on Tender Defaulters list; restricted by Eskom; sub-contracting 100% of scope. Eskom may award to multiple suppliers if a single supplier cannot fulfill the entire scope.
Section
Source: Invitation to Tender (ITT) - E3348GXMPTUT_pdf.pdf (RFP)Functionality: minimum 70% score required to progress. Prices scored out of 80 points. Specific goals scored out of 20 points per PPPFA. Ranking uses 80/20 system. Objective criteria applicable. Risk-based due-diligence verification for those meeting technical threshold. Prices evaluated inclusive of VAT, corrected for arithmetical errors, excluding contingencies, adjusted for variations, NPV comparison, unconditional discounts considered.
Submission Guidelines
Source: Attachment 4A NEC3 SC.pdf (unknown)Returnable documents: complete and sign the Form of Offer and Acceptance (C1.1), including the Schedule of Deviations if any. Complete the Contract Data Part Two (C1.2b) and the price schedule (C2.2). Provide required securities, bonds, guarantees, and proof of insurance within two weeks of contract award. Failure to fulfil these obligations constitutes repudiation of the agreement.
Evaluation Criteria
Source: Attachment 4A NEC3 SC.pdf (unknown)Bidders must be registered on the CSD (Central Supplier Database) and have a valid tax clearance. Bidders must not have a business rescue order granted against them (per Z10). Bidders must not engage in prohibited actions (corrupt, fraudulent, collusive, coercive, or obstructive) as defined in Z12. No specific scoring split or preference point system is stated in the document.
Technical Specifications
Source: Attachment 4A NEC3 SC.pdf (unknown)The goods are electrical switchgear fuses. The services are supply and delivery on an as and when required basis for a period of 5 years. Delivery place is Tutuka Power Station Stores (receiving). Delivery date is 4 weeks from purchase order issuance. The Supplier does not bring goods to the Delivery Place more than one week before the Delivery Date. The Risk Register includes: delays on delivery, non-conformance to specifications, failure to meet delivery schedule due to force majeure, obsolescence or discontinuation of fuse type, and damage to fuses during transportation.
Pricing Schedule
Source: Attachment 4A NEC3 SC.pdf (unknown)The pricing assumptions state that the Supply Contract is a priced contract where prices are derived from a list of items priced as lump sums or quantities multiplied by rates. The Price Schedule is only a pricing document, not Goods Information. The total of the Prices is assumed to be fully inclusive of everything necessary to Provide the Goods and Services. The tendering supplier should read the SC3 Guidance Notes, include prices for correction of defects, spread costs of unlisted items, and understand that there is no adjustment to lump sum prices if quantities change. The format of the price schedule is described.
The price schedule lists items with material numbers, descriptions, units, and rates. Items include various fuses with specifications such as current, potential, connection type, dimensions, type, case material, and part numbers. Examples: 4501 FUSE, CARTRIDGE: CURRENT: 16 A; POTENTIAL: 415 VAC; CONNECTION TYPE: BLADE KNIFE; DIMENSIONS: DIA 14 X LG 60 MM; TYPE: TIME LAG MEDIUM; CASE MATERIAL: CERAMIC; SUPPL P/N: NS16. 4504 FUSE, CARTRIDGE: CURRENT: 2 A; POTENTIAL: 415 V; CONNECTION TYPE: BLADE KNIFE; DIMENSIONS: DIA 14 X LG 60 MM; TYPE: CURRENT LIMITING; CASE MATERIAL: GLASS; SPECIFICATION: BS 88 IEC 60269; SUPPL P/N: NS2. 4507 FUSE, CARTRIDGE: CURRENT: 6 A; POTENTIAL: 415 VAC; CONNECTION TYPE: BLADE KNIFE; DIMENSIONS: DIA 14 X LG 60 MM; TYPE: CURRENT LIMITING; CASE MATERIAL: CERAMIC; SUPPL P/N: NS6A. 4509 FUSE, CARTRIDGE: CURRENT: 10 A; POTENTIAL: 415 V; CONNECTION TYPE: BLADE KNIFE; DIMENSIONS: DIA 14 X LG 60 MM; TYPE: CURRENT LIMITING; CASE MATERIAL: CERAMIC; SPECIFICATION: BS 88 IEC 60269; SUPPL P/N: NS10A. 4527 FUSE, CARTRIDGE: CURRENT: 20 A; POTENTIAL: 240 V; CONNECTION TYPE: BLADE KNIFE TAGS; DIMENSIONS: DIA 12 X LG 47 MM; TYPE: CURRENT LIMITING; CASE MATERIAL: CERAMIC; SUPPL P/N: SS20. 4530 FUSE, CARTRIDGE: CURRENT: 25 A; POTENTIAL: 415 V; CONNECTION TYPE: BLADE KNIFE; DIMENSIONS: DIA 14 X LG 35 MM; TYPE: FAST BLOW; CASE MATERIAL: GLASS; SPECIFICATION: BS 88-1967; SUPPL P/N: NS25. 4537 FUSE, CARTRIDGE: CURRENT: 200 A; POTENTIAL: 500 VAC; CONNECTION TYPE: BLADE KNIFE; DIMENSIONS: WD 46.6 X LG 132.6 MM; TYPE: INDICATING; CASE MATERIAL: CERAMIC; SPECIFICATION: NH1; REFERENCE NO: 3NA3140. 4538 FUSE, CARTRIDGE: CURRENT: 160 A; POTENTIAL: 500 VAC; CONNECTION TYPE: BLADE KNIFE; DIMENSIONS: WD 28 X LG 78 X HT 42 MM; TYPE: INDICATING; CASE MATERIAL: CERAMIC; SUPPL P/N: 3NA3836. 4540 FUSE, CARTRIDGE: CURRENT: 40 A; POTENTIAL: 500 VAC; CONNECTION TYPE: BLADE KNIFE; DIMENSIONS: WD 21 X LG 79 X HT 40 MM; TYPE: INDICATING; CASE MATERIAL: CERAMIC; MANUF P/N: 3NA3817. 4544 FUSE, CARTRIDGE: CURRENT: 80 A; POTENTIAL: 500 VAC; CONNECTION TYPE: BLADE KNIFE; DIMENSIONS: WD 40 X LG 46 MM; TYPE: INDICATING; CASE MATERIAL: CERAMIC; SUPPL P/N: 3NA3824. 4658 FUSE, CARTRIDGE: CURRENT: 4 A; POTENTIAL: 415 VAC; CONNECTION TYPE: SCREW CLAMP; DIMENSIONS: DIA 13.9 X LG 55.6 MM; TYPE: INDICATING; CASE MATERIAL: CERAMIC; REFERENCE NO: NIT4. 117135 FUSE, CARTRIDGE: CURRENT: 2 A; POTENTIAL: 500 V; CONNECTION TYPE: FERRULE; DIMENSIONS: DIA 23 X LG 50 MM; TYPE: FAST BLOW INDICATING; CASE MATERIAL: CERAMIC; REFERENCE NO: 1000504/2A. 117136 FUSE, CARTRIDGE: CURRENT: 1.6 A; POTENTIAL: 250 VAC; CONNECTION TYPE: FERRULE; DIMENSIONS: DIA 4 X LG 20 MM; TYPE: INDICATING; CASE MATERIAL: GLASS; SUPPL P/N: CEB-1.6A. 117137 FUSE, CARTRIDGE: CURRENT: 100 MA; POTENTIAL: 250 V; CONNECTION TYPE: FERRULE; DIMENSIONS: DIA 6.3 X LG 32 MM; TYPE: MINIATURE, FAST BLOW; CASE MATERIAL: GLASS. 117138 FUSE, CARTRIDGE: CURRENT: 250 MA; POTENTIAL: 250 V; CONNECTION TYPE: FERRULE; DIMENSIONS: DIA 6.3 X LG 32 MM; TYPE: MINIATURE, FAST BLOW; CASE MATERIAL: GLASS. 117139 FUSE, CARTRIDGE: CURRENT: 500 MA; POTENTIAL: 250 V; CONNECTION TYPE: FERRULE; DIMENSIONS: DIA 6.3 X LG 32 MM; TYPE: MINIATURE; CASE MATERIAL: GLASS; SUPPL P/N: 3AG. 117140 FUSE, CARTRIDGE: CURRENT: 1 A; POTENTIAL: 250 V; CONNECTION TYPE: FERRULE; DIMENSIONS: DIA 6.3 X LG 32 MM; TYPE: FAST BLOW; CASE MATERIAL: GLASS; SUPPL P/N: 6332 LT. 117141 FUSE, CARTRIDGE: CURRENT: 2.5 A; POTENTIAL: 250 V; CONNECTION TYPE: FERRULE; DIMENSIONS: DIA 6 X LG 32 MM; TYPE: MINIATURE, FAST BLOW; CASE MATERIAL: GLASS. 117142 FUSE, CARTRIDGE: CURRENT: 4 A; POTENTIAL: 250 V; CONNECTION TYPE: FERRULE; DIMENSIONS: DIA 6.3 X LG 32 MM; TYPE: MINIATURE, FAST BLOW; CASE MATERIAL: GLASS; SUPPL P/N: 6332 LT. 117143 FUSE, CARTRIDGE: CURRENT: 2 A; POTENTIAL: 250 V; CONNECTION TYPE: FERRULE; DIMENSIONS: DIA 6 X LG 32 MM; TYPE: FAST BLOW; CASE MATERIAL: GLASS. 117144 FUSE, CARTRIDGE: CURRENT: 2 A; POTENTIAL: 250 V; CONNECTION TYPE: FERRULE; DIMENSIONS: DIA 5 X LG 20 MM; TYPE: SLO BLOW; CASE MATERIAL: GLASS; REFERENCE NO: 19195. 117145 FUSE, CARTRIDGE: CURRENT: 2 A; POTENTIAL: 220 V; CONNECTION TYPE: FERRULE; DIMENSIONS: DIA 5 X LG 20 MM; TYPE: FAST BLOW; CASE MATERIAL: GLASS; SUPER FLINK. 117146 FUSE, CARTRIDGE: CURRENT: 10 A; POTENTIAL: 250 V; CONNECTION TYPE: FERRULE; DIMENSIONS: DIA 5 X LG 20 MM; TYPE: SLO BLOW; CASE MATERIAL: GLASS. 117147 FUSE, CARTRIDGE: CURRENT: 15 A; POTENTIAL: 250 V; CONNECTION TYPE: FERRULE; DIMENSIONS: DIA 6.3 X LG 32 MM; TYPE: SLO BLOW; CASE MATERIAL: GLASS. 117148 FUSE, CARTRIDGE: CURRENT: 50 A; POTENTIAL: 250 V; CONNECTION TYPE: FERRULE; DIMENSIONS: DIA 5 X LG 20 MM; TYPE: SLO BLO, MINIATURE; CASE MATERIAL: GLASS. 117149 FUSE, CARTRIDGE: CURRENT: 5 A; POTENTIAL: 250 V; CONNECTION TYPE: FERRULE; DIMENSIONS: DIA 5 X LG 20 MM; TYPE: FAST BLOW; CASE MATERIAL: GLASS. 117150 FUSE, CARTRIDGE: CURRENT: 6.3 A; POTENTIAL: 500 V; CONNECTION TYPE: FERRULE; DIMENSIONS: DIA 5 X LG 20 MM; TYPE: FAST BLOW; CASE MATERIAL: GLASS. 117151 FUSE, CARTRIDGE: CURRENT: 10 A; POTENTIAL: 250 V; DIMENSIONS: DIA 5 X LG 20 MM; TYPE: FAST BLOW; CASE MATERIAL: PORCELAIN; AMHERD TYPE. 117152 FUSE, CARTRIDGE: CURRENT: 20 A; POTENTIAL: 600 V; CONNECTION TYPE: FERRULE; DIMENSIONS: DIA 21 X LG 127 MM; TYPE: TIME DELAY DUAL ELEMENT; CASE MATERIAL: FIBER; REFERENCE NO: TRS25R. 117153 FUSE, CARTRIDGE: CURRENT: 25 A; POTENTIAL: 600 VAC; CONNECTION TYPE: FERRULE; DIMENSIONS: DIA 21 X LG 127 MM; TYPE: TIME DELAY DUAL ELEMENT; CASE MATERIAL: FIBER; REFERENCE NO: TS25R. 117154 FUSE, CARTRIDGE: CURRENT: 15 A; POTENTIAL: 600 V; CONNECTION TYPE: FERRULE; DIMENSIONS: DIA 20.5 X LG 126 MM; TYPE: TIME DELAY INDICATING; CASE MATERIAL: CERAMIC; REFERENCE NO: TRS15R. 117155 FUSE, CARTRIDGE: CURRENT: 315 A; POTENTIAL: 550 VAC; CONNECTION TYPE: SCREW CLAMP; DIMENSIONS: DIA 50 X LG 135 MM; TYPE: ONE TIME REJECTION; CASE MATERIAL: CERAMIC; LOW VOLTAGE, HRC, GEC, CLASS Q1, CATEGORY OF DUTY 550AC80, BS DIAMETER REFERENCE B3, 111 MM FIX CENTRES, TO BS88 1975, TO THE LATEST EDITION OF SABS 172. 117156 FUSE, CARTRIDGE: CURRENT: 3 A; POTENTIAL: 250 V; CONNECTION TYPE: FERRULE; DIMENSIONS: DIA 6.3 X LG 25 MM; TYPE: MINIATURE, FAST BLOW; CASE MATERIAL: CERAMIC; CURRENT LIMITING; GLASS TUBE, SIZE 5MM DIAMETER X 20MM LONG. 117218 FUSE, CARTRIDGE: CURRENT: 4 A; POTENTIAL: 415 VAC; CONNECTION TYPE: BLADE KNIFE; DIMENSIONS: DIA 14 X LG 60 MM; TYPE: CURRENT LIMITING; CASE MATERIAL: CERAMIC; SUPPL P/N: NS4. 117220 FUSE, CARTRIDGE: CURRENT: 6 A; POTENTIAL: 550 VAC; CONNECTION TYPE: SCREW CLAMP; DIMENSIONS: DIA 14 X LG 54 MM; TYPE: CURRENT LIMITING; CASE MATERIAL: CERAMIC; SUPPL P/N: NIT6. 117221 FUSE, CARTRIDGE: CURRENT: 6 A; POTENTIAL: 660 VAC; CONNECTION TYPE: SCREW CLAMP OFFSET HOLE; DIMENSIONS: DIA 22 X LG 84 MM; TYPE: CURRENT LIMITING; CASE MATERIAL: CERAMIC; SUPPL P/N: TIA6. 117224 FUSE, CARTRIDGE: CURRENT: 10 A; POTENTIAL: 550 V; CONNECTION TYPE: SCREW CLAMP; DIMENSIONS: DIA 22 X LG 86 MM; TYPE: CURRENT LIMITING; CASE MATERIAL: CERAMIC; SPECIFICATION: BS 88; SUPPL P/N: TIA10. 117225 FUSE, CARTRIDGE: CURRENT: 16 A; POTENTIAL: 415 VAC; CONNECTION TYPE: SCREW CLAMP; DIMENSIONS: DIA 22 X LG 84 MM; TYPE: CURRENT LIMITING; CASE MATERIAL: CERAMIC; SPECIFICATION: BS 88 IEC 60269; SUPPL P/N: TIA16. 117226 FUSE, CARTRIDGE: CURRENT: 20 A; POTENTIAL: 415 VAC; CONNECTION TYPE: BLADE KNIFE; DIMENSIONS: DIA 13.9 X LG 60.3 MM; INTERRUPT CAPACITY: 80 KA; TYPE: CURRENT LIMITING; CASE MATERIAL: CERAMIC; SPECIFICATION: BS 88 IEC 60269; SUPPL P/N: NS20. 117227 FUSE, CARTRIDGE: CURRENT: 20 A; POTENTIAL: 415 VAC; CONNECTION TYPE: SCREW CLAMP; DIMENSIONS: DIA 22 X LG 84 MM; TYPE: CURRENT LIMITING; CASE MATERIAL: CERAMIC; SPECIFICATION: BS 88 IEC 60269; SUPPL P/N: TIA20. 117229 FUSE, CARTRIDGE: CURRENT: 25 A; POTENTIAL: 550 VAC; CONNECTION TYPE: SCREW CLAMP; DIMENSIONS: DIA 22 X LG 80 MM; TYPE: CURRENT LIMITING; CASE MATERIAL: CERAMIC.
Financial Requirements
Source: Attachment 4A NEC3 SC.pdf (unknown)The contract is a priced contract; prices are derived from the price schedule (C2.2) as lump sums or quantities multiplied by rates. The total of the Prices is assumed to be fully inclusive of everything necessary to Provide the Goods and Services. Payment period is 30 days for contracts less than R50M, 60 days for contracts greater than R50M. Interest rate is the publicly quoted prime rate of interest from Standard Bank of South Africa Limited, or LIBOR for other currencies. The Supplier must provide a tax invoice within one week of receiving a payment certificate; include the Purchaser's VAT number 4740101508 on each invoice.
Compliance Requirements
Source: Attachment 4A NEC3 SC.pdf (unknown)Bidders must be registered on the CSD and have a valid tax clearance. Bidders must complete and sign the Form of Offer and Acceptance. Bidders must comply with the NEC3 Supply Contract terms, including the additional Z-clauses. Bidders must provide required securities, bonds, guarantees, and proof of insurance within two weeks of contract award. Bidders must not have a business rescue order granted against them (per Z10). Bidders must not engage in prohibited actions (corrupt, fraudulent, collusive, coercive, or obstructive) as defined in Z12.
Health & Safety
Source: Attachment 4A NEC3 SC.pdf (unknown)The Supplier must take all reasonable precautions to maintain the health and safety of persons in and about the provision of the goods and execution of the services. The Supplier must comply with all applicable health & safety laws and regulations and ensure that subcontractors, employees, and others under the Supplier's direction and control do the same. The Supplier must also comply with all applicable environmental laws and regulations. Asbestos: The Purchaser ensures ambient air conforms to asbestos standards. The Supplier may perform parallel measurements. If asbestos is identified, risk assessment and control measures are implemented. The Supplier's personnel may stop work and leave contaminated areas. Removal and disposal of asbestos is done by a registered contractor at the Purchaser's expense.
Contractual Terms
Source: Attachment 4A NEC3 SC.pdf (unknown)The contract is governed by the NEC3 Supply Contract (April 2013) with options X1 (price adjustment for inflation), X2 (changes in the law), X7 (delay damages), X17 (low performance damages), X20 (key performance indicators), and Z (additional conditions of contract). The law of the contract is the law of the Republic of South Africa, and the language is English.
The Purchaser is Eskom Holdings SOC Ltd (reg no: 2002/015527/30), a state owned company. The Supply Manager details are to be provided. The goods are electrical switchgear fuses, and the services are supply and delivery on an as and when required basis for 5 years.
The Risk Register includes: delays on delivery, non-conformance to specifications, failure to meet delivery schedule due to force majeure, obsolescence or discontinuation of fuse type, and damage to fuses during transportation.
The Goods Information is in Part 3: Scope of Work and all documents and drawings to which it makes reference. The Supply Requirements are in Annexure A to the Contract Data.
The period for reply is three working days.
The starting date is to be provided. The delivery date for electrical switchgear fuses is 4 weeks from purchase order issuance. The Supplier does not bring goods to the Delivery Place more than one week before the Delivery Date.
The Supplier is to submit a first delivery programme for acceptance within three days after order placement, and revised programmes at intervals no longer than 2 days after any deviation from the accepted delivery schedule.
The defects date is 52 weeks after Delivery. The defect correction period is 3 days after notification, except for defects affecting plant performance or contributing to loss of production (24 hours) and defects posing a threat to safety of people (12 hours). The defect access period is 2 days, with similar exceptions.
The assessment interval is 1 week after each delivery and acceptance of electrical switchgear fuses. The currency is South African Rand. Payment period is 30 days for contracts less than R50M, 60 days for contracts greater than R50M. Interest rate is the publicly quoted prime rate of interest from Standard Bank of South Africa Limited, or LIBOR for other currencies.
The Supplier's liability for indirect or consequential loss is limited to R0.0. Liability for loss or damage to Purchaser's property is limited to the deductible relevant to the event. Liability for defects due to design is limited to the total price of design, manufacturing, and delivery. Total liability is limited to the purchase order value. End of liability date is 52 weeks after delivery.
The Adjudicator is selected from the ICE-SA Division of the South African Institution of Civil Engineering Panel of Adjudicators, or appointed by the Arbitration Foundation of Southern Africa (AFSA). The tribunal is arbitration, using the latest edition of Rules for the Conduct of Arbitrations published by The Association of Arbitrators (Southern Africa). Arbitration is to be held in South Africa.
X1: The base date for indices is the month prior to the enquiry closing date. Price adjustment factor proportions are to be provided, with 15% non-adjustable. X2: A change in the law of Republic of South Africa is a compensation event if it occurs after the Contract Date. X7: Delay damages are 2% of task order value per day to a maximum of 10% of the purchase order value, after which Z11 comes into effect.
X17: Low performance damages include: 100% of task order value withheld for fuses not meeting technical specifications until corrected (delay damages apply); 1% of purchase order value deducted per incident for incorrect packaging and labelling; 100% of task order value withheld for quality failures after delivery; 2% deduction on purchase order for late response to early warnings/defect notifications; 100% of task order value withheld for failure to submit required documents with delivery. Total low performance damages capped at 15% of contract value.
X20: Key Performance Indicators are in Annexure A. No incentives are paid; KPIs are for monitoring performance. Reports on performance against each KPI are provided at intervals of 6 months.
Z1: The Supplier does not cede, delegate or assign any rights or obligations without written consent of the Purchaser. The Purchaser may cede and delegate to its subsidiaries or divisions.
Z2: If the Supplier is a joint venture, consortium or unincorporated grouping, they are jointly and severally liable. They must notify the Supply Manager of the key person with authority to bind. Composition cannot be altered without consent.
Z3: The Supplier must notify the Purchaser within seven days of any change in B-BBEE status. Updated verification certificate must be submitted within thirty days. If B-BBEE status decreases, the Purchaser may re-negotiate or terminate. Failure to notify may constitute a reason for termination.
Z4: The Supplier must not disclose confidential information. If required by law to disclose, the Purchaser must be notified. Images of goods require prior written consent of the Supply Manager. Subcontractors must abide by these undertakings.
Z5: Any extension, concession, waiver or relaxation does not constitute a waiver of rights or give rise to estoppel unless agreed in writing.
Z6: The Supplier must take all reasonable precautions to maintain health and safety, comply with all applicable health & safety laws and regulations, and ensure subcontractors and employees do the same. The Supplier must also comply with all applicable environmental laws and regulations.
Z7: The Supplier must provide a tax invoice within one week of receiving a payment certificate. If not provided, payment is extended. The Supplier must include the Purchaser's VAT number 4740101508 on each invoice.
Z8: The last sentence in core clause 61.3 is deleted, removing the exception for events arising from the Supply Manager's instruction, changing an earlier decision, or correcting an assumption.
Z9: The Purchaser's liability to the Supplier for indirect or consequential loss is limited to R0.00.
Z10: Termination may occur if a business rescue order is granted against the Supplier.
Z11: If delay damages reach the limits stated in X7, the Purchaser may terminate the Supplier's obligation to Provide the Goods and Services using the procedures for reasons R1 to R15 or R18.
Z12: The Supplier may not take any Prohibited Action (coercive, collusive, corrupt, fraudulent, obstructive) during procurement or execution. The Purchaser may terminate if such action is taken and the Supplier did not take timely action. The Supplier must cooperate with investigations.
Z13: The Supplier must provide insurance certificates when requested. The Supplier provides insurances stated in Insurance Table A for events at the Supplier's risk from starting date until last defects date or termination. The Purchaser provides insurances stated in Insurance Table B.
Z14: The Purchaser is solely responsible for and indemnifies the Supplier against nuclear damage liabilities, except for unlawful intent or unauthorized presence at the KNPS. The Purchaser waives rights of recourse except in those cases. Protection is in effect until KNPS is decommissioned.
Z15: The Purchaser ensures ambient air conforms to asbestos standards. The Supplier may perform parallel measurements. If asbestos is identified, risk assessment and control measures are implemented. The Supplier's personnel may stop work and leave contaminated areas. Removal and disposal of asbestos is done by a registered contractor at the Purchaser's expense.
Annexure A: Supply Requirements are based on INCOTERMS 2010, with Delivery Cost Included (DCI) at Employer's stores. The obligations of seller and buyer are incorporated into the contract.
The Supply Requirements include: requirements for supply and transport as stated in the contract goods information; delivery place is Tutuka Power Station Stores (receiving); actions during supply include giving notice of delivery (Supplier), checking packing and marking (Supplier), contracting for transport (Supplier), paying costs of transport (included in tendered rates), arranging access to delivery place (Purchaser), loading (Supplier), unloading (as stated in goods information). For international procurement, export and import requirements are undertaken by the Supplier.
Information to be provided by the Supplier includes packing lists, copy of invoice, delivery note, test results and maintenance manuals. For international procurement, additional documents include licences, authorisations, air waybill or bill of lading, bill of entry, customs work sheets, invoice from clearing agent, and other import documents.
Section
Source: Attachment 4A NEC3 SC.pdf (unknown)No specific evaluation criteria are stated beyond the general compliance requirements.
Description
Source: Attachment 4B - Price Schedule for Electrical Switchgear Fuses .xlsx (unknown)The tender is for the supply and delivery of electrical switchgear fuses on an as-and-when-required basis for a period of 5 years (60 months). The pricing schedule lists over 200 fuse items with detailed specifications and estimated quantities.
Evaluation Criteria
Source: Attachment 4B - Price Schedule for Electrical Switchgear Fuses .xlsx (unknown)Bidders must be registered on the Central Supplier Database (CSD) and be in good standing with SARS (tax compliance).
Bidders must complete and submit all required National Treasury standard forms, including SBD 1 (Invitation to Bid), SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim), SBD 8 (Declaration of Bidder's Past Supply Chain Management Practices), and SBD 9 (Certificate of Independent Bid Determination).
Bidders must also submit a valid B-BBEE certificate or affidavit.
For items requiring SABS mark of approval, bidders must ensure the supplied fuses bear the SABS mark.
Technical Specifications
Source: Attachment 4B - Price Schedule for Electrical Switchgear Fuses .xlsx (unknown)The tender covers the supply and delivery of electrical switchgear fuses on an as-and-when-required basis for a period of 5 years (60 months).
The pricing schedule lists over 200 fuse items, each with a material code, description, unit of measure (EA), and estimated quantity.
Fuses range from miniature glass fuses (e.g., 100 mA, 250 V) to high-voltage ceramic fuses (e.g., 355 A, 3.6 kV).
Key specifications for each fuse include current rating, voltage rating, connection type (e.g., blade knife, ferrule, screw clamp), dimensions, type (e.g., current limiting, fast blow, time delay), and case material (ceramic, glass, fiber, porcelain).
Many fuses reference specific standards such as BS 88, IEC 60269, SABS 172, DIN 43620, and VDE 0636.
Some items require the SABS mark of approval.
Certain items must be original protective packed and clearly marked.
Quantities per item vary from 1 to 1200 units, with a total of over 20,000 units across all line items.
Compliance Requirements
Source: Attachment 4B - Price Schedule for Electrical Switchgear Fuses .xlsx (unknown)Bidders must be registered on the Central Supplier Database (CSD).
Bidders must have a valid tax compliance status with SARS.
Bidders must submit a valid B-BBEE certificate or affidavit.
Bidders must complete and submit SBD 1 (Invitation to Bid), SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim), SBD 8 (Declaration of Bidder's Past Supply Chain Management Practices), and SBD 9 (Certificate of Independent Bid Determination).
For items requiring SABS mark of approval, bidders must ensure the supplied fuses bear the SABS mark.
Description
Source: Attachment 12 - Non-Disclosure Agreement (NDA) Vendors Template.pdf (unknown)The document is a non-disclosure agreement template for the provision of maintenance services for electrostatic precipitators during outages and routine maintenance at Tutuka.
Contact Information
Source: Attachment 12 - Non-Disclosure Agreement (NDA) Vendors Template.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"................... a company incorporated under the laws of [insert"}
Evaluation Criteria
Source: Attachment 12 - Non-Disclosure Agreement (NDA) Vendors Template.pdf (unknown)Bidders must have authority to enter into the NDA and must not disclose confidential information to third parties without Eskom's prior written consent. The NDA does not create a joint venture or partnership and does not oblige either party to enter into further agreements.
Technical Specifications
Source: Attachment 12 - Non-Disclosure Agreement (NDA) Vendors Template.pdf (unknown)Provision of Maintenance Services for
Electrostatic Precipitators during Outages
Project
Compliance Requirements
Source: Attachment 12 - Non-Disclosure Agreement (NDA) Vendors Template.pdf (unknown)No specific requirements found
Contractual Terms
Source: Attachment 12 - Non-Disclosure Agreement (NDA) Vendors Template.pdf (unknown)The agreement binds the receiving party to keep confidential information secret, use it only for the stated project, and protect it with at least a reasonable standard of care. Confidential information may be shared with representatives on a need-to-know basis, provided they also agree to confidentiality. The receiving party must return or destroy all confidential material within 7 business days of a request. The agreement lasts for 3 years after termination of the relationship. Breach must be remedied within 7 business days of written notice, otherwise the disclosing party may seek legal remedies. The agreement is governed by South African law and does not create a partnership or joint venture.
Description
Source: Attachment 13- Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)The tender is for the supply and delivery of electrical switchgear fuses on an as and when required basis for a period of 5 years (60 months). The scope is covered by the tender record; this document provides standard conditions of tender.
Important Dates
Source: Attachment 13- Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Closing date and time: 2026-08-27T10:00:00.000Z (SAST).
Site visit / clarification meeting: Tenderers must attend any site visit or clarification meeting stipulated as compulsory. Details are stated in the Tender Data. Failure to attend a compulsory meeting results in disqualification. Tenderers may ask questions for clarity during the meeting.
Briefing Session
Source: Attachment 13- Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Tenderers must attend site visits and/or clarification meetings that are stipulated as compulsory. Details are stated in the Tender Data. Failure to attend a compulsory meeting results in disqualification. Tenderers may ask questions for clarity during the meeting.
Contact Information
Source: Attachment 13- Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)All communication must be directed to the Eskom Representative identified in the Invitation to Tender. No other Eskom official may be contacted. Communication must be in writing, in English, and in a format that can be read, copied, and recorded. Requests for clarification must be addressed to the Eskom Representative. Specific contact details (name, email, phone) are not provided in this document; refer to the Tender Data.
Submission Guidelines
Source: Attachment 13- Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Submission channel: e-tendering via the Eskom Tender Bulletin site on the Eskom E-tendering page; paper submissions are not permitted for e-tendering. Tenders must be uploaded and finalised before the closing date and time; no late submissions are accepted.
Format: Tenders must be in English, completed in ink, and signed. For e-tendering, documents must be placed in the relevant folders (Technical, Commercial, Financial) as indicated on the e-tendering page.
Returnables: The Acknowledgement Form must be completed and submitted with the tender, stating whether the tender is for the whole or part of the supply. All mandatory tender returnables must be submitted by the closing date and time; documents required for contract award must be submitted before award. All documents must be completed and valid for the entire tender validity period.
Disqualification risks: Failure to submit the original tender or a copy (for paper submissions), failure to upload documents for e-tendering, submitting after the closing time, or omitting mandatory returnables will result in disqualification. Tenders based on 100% sub-contracting are ineligible. Alterations to tender documents must be initialled by all signatories; correction fluid or tape is not permitted.
Communication: All communication must be with the Eskom Representative only, in writing, in English. Queries must be addressed to the Eskom Representative, not other Eskom officials. Eskom will publish all queries and responses on the platforms where the tender was advertised.
Returnable Documents
Source: Attachment 13- Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Tenderers must submit a complete original tender plus one complete hard copy by the closing date and time. For e-tendering, upload and finalize via the Eskom Tender Bulletin site. Tenders must be in English, completed in ink, signed, and packaged as separate 'ORIGINAL' and 'COPY' packages, sealed in an outer package marked 'Confidential'. Mandatory tender returnables must be submitted by the closing date and time; documents required for contract award must be submitted before award. All documents must be completed and valid for the entire tender validity period.
Evaluation Criteria
Source: Attachment 13- Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Basic compliance: Eskom will first determine whether each tender meets the basic compliance requirements stated in the Invitation to Tender; failure renders the tender non-responsive.
Mandatory returnables: A tender missing mandatory documents or information by the closing date and time will be disqualified from further evaluation.
Pre-qualification criteria: If stipulated, tenderers must comply with pre-qualification criteria. Eskom will not measure a criterion twice in different evaluation phases (no double dipping).
Functionality: If functionality is a criterion, tenderers will be scored against functionality criteria and must meet the minimum threshold stated in the Tender Data to proceed to further evaluation.
Financial analysis: Eskom may assess the financial risk of doing business with a tenderer. If the risk is too high or mitigating factors are insufficient, the tenderer will not be considered for award.
Price evaluation: Price will be evaluated per the Tender Data, considering factors such as CPA, FOREX, commodity exposure, unconditional discounts, technical adjustment, PV, and forecasted rates of invoicing.
Arithmetical errors: Eskom will check responsive tenders for arithmetical errors. If there is a discrepancy between figures and words, the words prevail. Eskom will notify the tenderer of errors and request confirmation or acceptance of corrections; if the tenderer does not accept, the tender is rejected.
B-BBEE: B-BBEE level will be scored as per the CSD report or certificate/affidavit. If B-BBEE is a pre-qualification criterion, proof must be provided at closing or the tender is disqualified. For PPPFA point allocation, if no proof is provided or it is fraudulent/expired, the tenderer scores zero but is not disqualified.
Specific Goals: Specific Goals will be scored with reference to supporting documentation. Failure to meet Specific Goals or submit proof by closing results in zero points but not disqualification.
Ranking: Per PPPFA, Eskom will add the score for Pricing and Specific Goals and rank suppliers from highest to lowest.
Objective criteria: A contract may be awarded to a tenderer that did not score the highest points only in accordance with Section 2(1)(f) of the PPPFA. Functionality and any element of the B-BBEE scorecard may not be used as Objective Criteria.
Reverse e-auction: If indicated in the Invitation to Tender, Eskom may use reverse e-auction. Tenderers must submit a complete tender without prices; if prices are included, they will not be considered.
Technical Specifications
Source: Attachment 13- Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Scope: Supply and delivery of electrical switchgear fuses on an as and when required basis for a period of 5 years (60 months).
Sub-contracting: Tenderers are not permitted to sub-contract 100% of the scope of work; any tender based on 100% sub-contracting will be deemed ineligible and disqualified.
Cataloguing: The successful tenderer may be required to provide cataloguing information per item after contract award and must label all materials delivered to Eskom in line with Eskom's labelling specifications. If cataloguing is a requirement, the Pricing Schedule must include a line item for cataloguing, which Eskom will pay for.
Pricing Schedule
Source: Attachment 13- Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Tenderers must include in rates, prices, and tendered total all duties, taxes (including VAT), and levies applicable 14 days prior to closing. Rates and prices must be fixed for the contract duration unless otherwise provided. Prices must be stated in South African Rand unless instructed otherwise, and may be subject to exchange rate and base date as stipulated. The Pricing Schedule must include a line item for cataloguing if required, and Eskom will pay for cataloguing.
Financial Requirements
Source: Attachment 13- Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Pricing: Rates and prices must include all duties, taxes (including VAT), and other levies payable by the tenderer, applicable 14 days prior to the closing date and time for tender submission.
Fixed prices: Rates and prices must be fixed for the duration of the contract and are not subject to contract price adjustment except as provided for in the Invitation to Tender.
Currency: Rates and prices must be stated in South African Rand unless instructed otherwise. If part payment in other currencies is provided for, submit rates/prices in Rands in accordance with the exchange rate and base date stipulated in the Invitation to Tender.
Security for performance: If security for performance is required, the tenderer must indicate the names of at least two financial institutions it is likely to approach to obtain the required form of security. Eskom reserves the right to reject a financial institution if found not suitable.
Insurance: Eskom may not provide full insurance cover; the tenderer is advised to seek qualified advice regarding insurance.
Cost of tendering: Eskom will not compensate tenderers for any costs incurred in preparing and submitting a tender, including costs of testing or negotiation.
Compliance Requirements
Source: Attachment 13- Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Eligibility: Tenderers must comply with the eligibility criteria stated in the Tender Data and must not be under any restriction to do business with Eskom or State-Owned Companies. Tenderers found ineligible will be disqualified.
Legislation: Tenderers must comply with relevant legislation and regulatory instruments, including National Treasury Instruction Notes, CIDB Regulations (for construction works), PPPFA Regulations, Amended B-BBEE Codes, COIDA, OHS Act, and Eskom's SHEQ requirements.
SHEQ: Tenderers must provide proof satisfactory to Eskom that safety, health, environmental, and quality (SHEQ) systems, policies, and capabilities are in place at the closing date and/or contract award. All costs and personnel associated with SHEQ must be reflected in the tender.
CIDB: Where CIDB grading is stipulated as a qualification criterion, tenderers must be registered with the Construction Industry Development Board at the closing date or be capable of being registered within 21 working days from the closing date. Proof of registration is mandatory at closing; if only proof of application is available, it must be submitted by closing, with actual proof of registration submitted by contract award.
B-BBEE: Tenderers must provide a valid B-BBEE certificate or affidavit, or CSD report, as applicable. If B-BBEE is a pre-qualification criterion, proof must be provided at closing or the tender is disqualified. Fraudulent or expired documents may lead to disqualification, reporting to the B-BBEE Commission, suspension from business with State-Owned Companies for up to 10 years, and possible jail.
SDL&I Undertaking: Tenderers must complete and submit the SDL&I Undertaking (annexure to the Invitation to Tender) by no later than contract award. Failure to do so means the tender will not be considered for contract award.
Designated materials: Tenderers must submit information on designated materials and thresholds no later than contract award; failure to do so means the tender will not be considered for contract award.
CSDG and CPG: If awarded a contract, the contractor must achieve Contract Skills Development Goals (CSDG) and Contract Participation Goals (CPG) as established in the CIDB standards, where applicable.
Misrepresentation: Eskom may disqualify a tender if the tenderer misrepresents or falsifies any information, certificate, affidavit, or document. Fraud in relation to B-BBEE certificates/affidavits or fronting will be reported to the B-BBEE Commission.
Contractual Terms
Source: Attachment 13- Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Eskom may accept or reject any variation, deviation, or alternative tender, and may cancel the tender at any time before contract conclusion, giving written reasons upon request. Eskom and its affiliates are not liable for any losses, claims, or damages arising from participation in the tender or from amendment, termination, or suspension of the process. Eskom reserves the right to enter into mandated negotiations with selected tenderers. Eskom disclaims liability for accuracy or completeness of tender documents. Eskom will not compensate tenderers for costs incurred in preparing and submitting a tender. Tenderers must provide security for performance if required, indicating at least two financial institutions; Eskom may reject unsuitable institutions.
Special Conditions
Source: Attachment 13- Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Tenderers must hold tenders valid for the validity period and extend if requested. They must treat all procurement matters as confidential and use documents only for preparing the tender. They must obtain and familiarize themselves with standardised specifications incorporated by reference. They must attend compulsory site visits or clarification meetings; failure results in disqualification. They may seek clarification only from the Eskom Representative, and Eskom will publish queries and responses. They must not make alterations to tender documents except to correct errors, initialed by all signatories, and may not use correction fluid. Alternative tenders are allowed only if a main tender is submitted and permitted. They must provide clarification and documents during evaluation, but mandatory returnables cannot be submitted after closing. They must check the final draft contract and sign the Form of Agreement. Agents must submit authenticated proof of authority. They must comply with relevant legislation and regulatory instruments, including NT instructions, CIDB regulations, PPPFA, B-BBEE Codes, COIDA, OHS Act, and Eskom SHEQ requirements. They must provide proof of SHEQ systems and capabilities. Where CIDB grading is stipulated, they must be registered or capable of registration within 21 working days; proof of registration is mandatory at closing. They must achieve Contract Skills Development Goals (CSDG) and Contract Participation Goals (CPG) as applicable. Misrepresentation or falsification may lead to disqualification, reporting to B-BBEE Commission, suspension, or jail. They must complete and submit the SDL&I Undertaking by contract award. They may be required to provide cataloguing information and label materials per Eskom specifications. They must indicate at least two financial institutions for security for performance if required.
Requirements
Source: Attachment 13- Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Tenderers must comply with eligibility criteria stated in the Tender Data, must not be under restriction to do business with Eskom or State-Owned Companies, and must not sub-contract 100% of the scope of work. Tenders based on 100% sub-contracting will be deemed ineligible and disqualified.
Section
Source: Attachment 13- Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Eskom will determine basic compliance before detailed evaluation; failure renders the tender non-responsive. Mandatory tender returnables must be present or the tender is disqualified. Pre-qualification criteria, if stipulated, must be complied with; no double dipping. Functionality criteria, if applicable, will be scored and must meet minimum threshold. Financial analysis may be conducted to determine risk; if risk is too high or mitigating factors insufficient, the tenderer will not be considered. Price will be evaluated per Tender Data, considering CPA, FOREX, commodity exposure, discounts, technical adjustment, PV, and forecasted rates. Arithmetical errors will be checked and corrected per specified rules; if tenderer does not accept corrections, tender is rejected. B-BBEE level will be scored as per CSD report or certificate/affidavit; if pre-qualification, proof must be provided at closing or tender disqualified; for PPPFA points, if no proof or fraudulent/expired, tenderer scores zero but is not disqualified. Specific Goals will be scored with supporting documentation; failure results in zero points but not disqualification. Ranking will be by adding Price and Specific Goals scores per PPPFA. Objective criteria may be used only per Section 2(1)(f) of PPPFA, and functionality and B-BBEE elements cannot be used. Reverse e-auction may be used, indicated in the Invitation to Tender; tenderers must submit a complete tender without prices.
Important Dates
Source: Attachment 5 - Supplier Development Localisation Industrialisation (SDLI) Strategy.pdf (TENDER){"closingDate":"01 April 2023"}
Contact Information
Source: Attachment 5 - Supplier Development Localisation Industrialisation (SDLI) Strategy.pdf (TENDER)Buyer: Tsakani Shingange. Business Unit: Tutuka Power.
Evaluation Criteria
Source: Attachment 5 - Supplier Development Localisation Industrialisation (SDLI) Strategy.pdf (TENDER)Specific goals: A maximum of 20 points may be awarded for the specific goal. Points are allocated based on B-BBEE status level under the 80/20 system: Level 1 = 20 points, Level 2 = 18, Level 3 = 14, Level 4 = 12, Level 5 = 8, Level 6 = 6, Level 7 = 4, Level 8 = 2, Non-compliant = 0. Tenderers failing to provide documentation for preference points will not be disqualified but may score only out of 80 for price and 0 out of 20 for specific goals.
Financial Requirements
Source: Attachment 5 - Supplier Development Localisation Industrialisation (SDLI) Strategy.pdf (TENDER)Tender response must be separated into its components as per the Price Schedule included with the tender documents. Local procurement content is total spending minus the imported component. Eskom target for local procurement content is 100%.
Compliance Requirements
Source: Attachment 5 - Supplier Development Localisation Industrialisation (SDLI) Strategy.pdf (TENDER)B-BBEE: A valid B-BBEE certificate (SANAS accredited) or sworn affidavit/CIPS affidavit is required to claim preference points. Proof of ownership/shareholding (preferably CIPC) with breakdown, certified ID copies of shareholders, proof of disability (if applicable), and for trusts/consortia/JVs a consolidated B-BBEE certificate. Sworn affidavits must meet validity requirements: name and ID number of deponent, designation, enterprise name as per CIPC, percentage of black ownership, total revenue, financial year end, B-BBEE status level, empowering supplier status, and must be signed in the presence of a Commissioner of Oath who cannot be an employee of the enterprise. SDL&I objectives: Tenderers must submit a B-BBEE improvement or retention plan within 30 days of signing the contract. Level 1 tenderers maintain status; Level 2 or 3 must improve/maintain; Level 4 must achieve Level 3 by end of first year and improve one level each subsequent year; Level 5-8 or non-compliant must achieve Level 4 by end of first year and improve one level each year thereafter. Exempted Micro Enterprises (revenue ≤ R10m) may submit sworn affidavit; Qualifying Small Enterprises (revenue ≤ R50m) must comply with QSE scorecard unless 51% black owned; entities above R50m must submit valid B-BBEE certificate. Local procurement content: Tenderers must submit proposals for local procurement content. Jobs: Tenderers must submit proposals for the type and number of jobs created and retained in South Africa.
Contractual Terms
Source: Attachment 5 - Supplier Development Localisation Industrialisation (SDLI) Strategy.pdf (TENDER)Reporting and Monitoring: Suppliers must submit quarterly reports to Eskom using the Data Collection Template. Eskom reviews reports within 30 days and notifies suppliers in writing if obligations not met. Suppliers must implement corrective measures before the next report, failing which retention clauses are invoked. Each contract must include an SDL&I Implementation Schedule, completed by supplier and returned to SDL&I representative for acceptance 28 days after contract award.
Special Conditions
Source: Attachment 5 - Supplier Development Localisation Industrialisation (SDLI) Strategy.pdf (TENDER)Market Research: Current suppliers providing the services: None. Potential suppliers: Open market.
Contact Information
Source: Attachment 1- E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown){"name":"__________________________________________________________","email":null,"phone":null,"department":null,"address":null}
Submission Guidelines
Source: Attachment 1- E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)Returnable documents:
Disqualification risks:
Returnable Documents
Source: Attachment 1- E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)The E-Tendering Training Acknowledgement Form is a mandatory returnable document. It must be fully completed and submitted to Eskom within the prescribed period; failure to do so will render the tenderer non-responsive and disqualified from the procurement process.
Evaluation Criteria
Source: Attachment 1- E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)Bidders must fully complete and submit the E-Tendering Training Acknowledgement Form prior to the prescribed period. Failure to do so will render the bidder non-responsive and disqualified.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 46 of 2000
Relevant where professional engineering services or regulated engineering work may be required.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Address
R29 Cnr Bethal and Standerton Road - Standerton - Standerton - 2430
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
16
Last checked
12 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
💡 Want more tendering tips and strategies?
Explore Our BlogMedian Estimate
R 2 880 272
Range
Based on 10 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Get deep intelligence on Supplies: Electrical Equipment. Unlock full pricing strategies, bid frequency, and historical win rates.