Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Arnot Power Station - Rietkuil - Rietkuil - 1097
Organization Type
GOVERNMENT
Published
14 Aug 2026
OCDS Reference
ocds-9t57fa-165616
The tender is for the provision of main air ejector condenser refurbishment services, including full retubing, on an 'as and when required' basis for a period of 3 years at arnot power station. The services include the refurbishment of main ejector condensers, replacement of tubes, and testing and inspection of the condensers. The tenderer must comply with the technical specifications, evaluation criteria, and compliance requirements.
The tenderer must submit a completed Form of Offer and Acceptance.
The Contractor shall provide proof of a valid ISO 3834-2 certification for the company/manufacturer that owns and runs the standard workshop where the MAE will be refurbished (re-tubed).
The scope of accreditation of the ISO 3834-2 certificate shall include the design code (AD 2000 Code) or the one that replaced AD 2000 (EN, to be used for this project).
The tenderer must comply with the technical specifications, including the refurbishment of main ejector condensers at Arnot Power Station, with a two-stage ejector design, inter and after-coolers, and a fixed tubesheet and bellow/compensator on the shell side.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Friday, 04 September 2026 - 10:00
Venue
null
Categories
Request for Bid(Open-Tender)
Arnot Power Station - Rietkuil - Rietkuil - 1097
AI Document Analysis Stages
Description
Source: Commercial.zip (RFP)14 Aug
2026
Tender Published
Tender was published
04 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Technical.zip
Analysis completed but response format was invalid
Commercial.zip
Eskom is procuring refurbishment services for the Main Air Ejector Condenser, including full retubing, on an as-and-when-required basis for a three-year period at Arnot Power Station. The tender is open to suppliers who can provide the specified services and comply with Eskom's e-tendering and integrity requirements.
SHEQ.zip
Eskom seeks a contractor for the refurbishment of Main Air Ejector Condensers, including full retubing, on an as-and-when-required basis for three years at Arnot Power Station. The tender is open nationally, with a closing date of 4 September 2026.
Finance.zip
ESKOM is procuring Main Air Ejector Condenser Refurbishment Services, including full retubing, on an 'As and When Required' basis for a period of 3 years at Arnot Power Station. The services are required to be provided by a qualified and experienced service provider. The tender is open to all qualified bidders.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 460 575
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
eTendering system is a web-based system that allows suppliers bidding for various tenders advertised on Tender Bulletin system to “upload” their tender documents.
Important Dates
Source: Commercial.zip (RFP){"closingDate":"2026-09-04T10:00:00.000Z","closingTime":"10:00:00","briefingSession":{"date":null,"time":null,"venue":"N/A","is_compulsory":false}}
Contact Information
Source: Commercial.zip (RFP){"name":null,"email":"[email protected]","phone":"013 297 9110","department":null,"address":"N/A"}
Submission Guidelines
Source: Commercial.zip (RFP)Tenders must submit their bids via the Eskom Tender Bulletin site on the Eskom E-tendering page. The tender documents should be updated in the relevant folders, Technical, Commercial and Financial as indicated on e-tendering page. Tenders must be submitted in English. Written tenders must be completed in ink and may not be completed in pencil.
Evaluation Criteria
Source: Commercial.zip (RFP)A maximum of 20 points may be awarded to a tenderer for the specific goal specified for the tender. The points scored for the specific goal will be added to the points scored for price and the total must be rounded off to the nearest two decimal places. The contract must be awarded to the tenderer scoring the highest points.
Technical Specifications
Source: Commercial.zip (RFP)The scope of work includes the provision of main air ejector condenser refurbishment services, including full retubing, on an ‘as and when required’ basis for a period of 3 years at Arnot Power Station.
Financial Requirements
Source: Commercial.zip (RFP)Payment terms as stipulated hereunder when submitting tenders and concluding contracts with Eskom: For contracts valued below R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying Suppliers within 30 days of receipt of undisputed invoices.
Compliance Requirements
Source: Commercial.zip (RFP)No specific requirements found. CSD report or as per certificate/affidavit provided. CSD number/CSD report) must be provided at the closing date and time for tender submission.
Section
Source: Commercial.zip (RFP)1.1.9 *SBD 6.1 Preference Points Claim Form in terms of Annexure I Y. PPPFA 2022 regulations. 3.13 Functionality requirements. MANDATORY TECHNICAL EVALUATION CRITERIA. Table 1: Mandatory Technical Evaluation Criteria
Description
Source: Technical.zipProvision of Main Air Ejector Condenser
Refurbishment Services
This document provides the technical specifications for the Arnot PS main air ejector condenser
refurbishment inclusive of full retube. Safely replace the tube bundle tubes (re-tube) to restore design
heat transfer and integrity, eliminate leaks, and ensure code-compliant re-commissioning.
Outcomes:
SANS 347 category).
2.1 Scope
This document covers the applicable work to be done, as well as the requirements and specifications
regarding the work.
2.1.1 Purpose
The purpose of this document is to provide the Contractor with all the relevant details required to
perform the work as defined in the scope.
2.1.2 Applicability
This document applies to the refurbishment of main ejector condensers at Arnot Power Station.
2.1.3 Effective date
This document is effective from the date of authorisation until its withdrawn.
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] ISO 9001 Quality Management Systems
[2] Pressure Equipment Regulations as defined in OHS Act (PER)
[3] SANS 347 Categorization and conformity assessment criteria for all pressure
[4] TEMA – Standards of the tubular exchanger manufacturers association
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Arnot Power Station Main Air Ejector Condenser Unique Identifier: AETP 0075
Refurbishment Technical Specification
Revision: 1
Page:
[5] PD 5500 Specification for Unfired Fusion Welded Pressure Vessels
[6] ASME II part A, B &D. Standard for ferrous and non-ferrous material specifications.
[7] ISO 3834 Quality Requirements for Fusion Welding of Metallic Material
[8] 0.41/5189 Arnot Main Air Ejector Condenser arrangement drawing
[9] ISO 3834 – Quality requirements for fusion welding of metallic materials
2.2.2 Informative
[10] 240-106628253 Standard for welding Requirements on Eskom Plant
[11] 240-83539994 Standard for Non-Destructive Testing (NDT) on Eskom Plant
[12] 240-86973501 Engineering Drawing Standard
[13] 240-145581571 Standard for the identification of contents of pipes and vessels
[14] 240-76648318 Specification for the Procurement of UNS S44660 Stainless Steel Condenser
Tubes
3.1 General requirements
exact quantity required will be provided by the commercial department.
Arnot Power Station of all items in the following sections of this document (hereafter referred to as
“the works”) according to the applicable codes and standards and the requirements in this
document.
o Water boxes shall be re-used.
o Shells shall be cleaned, inspected, tested, and repainted (refer to section 3.4).
o Shell bellows to MPI tested, if damaged this might impact on re-use of the shell.
o Tubes to be pulled and shell be inspected internally via the shell steam side and vacuum
connections. Inspections will be done visually via colour endoscope, and as far as
possible with an camera that can be entered into the shell via the vacuum nozzle. The
course of action will be determined through agreement between Eskom Engineering and
the Contractor. There are two possible outcomes: the tube bundle will be refurbished or
replaced (refer to section 3.6 and 3.7).
o The main ejector condensers shall be assembled and preserved.
o The main ejector condensers shall be delivered and offloaded on site.
refurbished, and when those are installed the next two will be made available until all 12 has been
refurbished..
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Arnot Power Station Main Air Ejector Condenser Unique Identifier: AETP 0075
Refurbishment Technical Specification
Revision: 1
Page:
South Africa. Replacement tubes maybe imported but must be declared in the tender. The
percentage value of the imported items must be stated in the tender.
3.2 Design conditions and requirements
design on water side (condensate/water inside the tubes) while steam flow is directed over the
external surfaces of the tubes.
Table 1: Main Ejector Condensers design
Tube Side Shell Side
Medium Water Steam
Design Pressure (Max) 1.35 MPa(g) 0.35 MPa(g)
Design Temperature (Max) 80oC 80oC
Test Pressure 2.7 bar(g) 0.53 bar(g)
Capacity 0.07 m3 0.345 m3
SANS 347 Hazard Category SEP III
Vessel SANS 347 Categorisation CAT III
The vessel is classified as CAT III in accordance with SANS 347 edition 3.1.
Any new components are to be designed and manufactured generally in accordance with PD 5500.
All NDE acceptance criteria are to be in accordance with PD 5500.
General arrangement drawings, including the bill of materials, are required for the main ejector
condensers, clearly indicating existing/re-used components as well as new components.
The drawing can be used for tender purposes, but the exact dimensions must be verified on the
main ejector condensers before refurbishment.
Contractor, only if tubesheet or shell is replaced - if just retube these don’t need to be cut, perhaps
conduct all necessary NDT’s as agreed with the employer.
3.3 Water box refurbishment
Existing water boxes shall be re-used.
Water boxes are to be cleaned.
All welds are to be surface tested.
Any indications found on the welds must be repaired. The exact repair methodology shall be
discussed and agreed upon with Eskom engineering. All Welding in accordance with ISO 3834 part
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Arnot Power Station Main Air Ejector Condenser Unique Identifier: AETP 0075
Refurbishment Technical Specification
Revision: 1
Page:
gramophone finish. If flanges need to be machined, this must be discussed with Eskom engineering
first. The contractor will have to prove that the flange is still fit for use after machining through
calculations. If the flange is not fit for use, it must be replaced.
All tapped holes are to be inspected and re-tapped if required.
Existing water box is to be pressure tested as per section 3.14.
3.4 Shell
will not be weld repaired.
covered during sandblasting activities.
(main air ejector condenser), and compared to the drawing thickness (0.41/5189 Arnot Main Air
Ejector Condenser arrangement drawing), should more than 1mm wall loss be noted, repair action
to be agreed with Employer.
discussed and agreed upon with Eskom engineering.
Ultrasonic wall thickness examination. Replace or repair bellows if damaged. Repair method to be
review and approved by client engineering, as bellow replacement will require the shell to be cut in
half, Care to be taken that shell sections are perfectly aligned before rewelding the shell, as any
misalignment will cause tube next retubing to be hampered or not be possible..
finish. If flanges need to be machined, this must first be discussed with Eskom engineering. The
contractor will have to prove that the flange is still fit for use after machining through calculation. If
the flange is not fit for use, it shall be replaced.
(See Eskom document 240-106365693).
3.5 Tube bundle inspection
MPI on tubesheet, visual for grooving, pitting, erosion; UT for thickness where needed.
not to be fit for re-use.
tolerance.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Arnot Power Station Main Air Ejector Condenser Unique Identifier: AETP 0075
Refurbishment Technical Specification
Revision: 1
Page:
section 3.6 below.
3.6 Tube bundle refurbishment
and chemicals to be used shall be submitted to Eskom engineering for acceptance before cleaning
begins.
Replace all consumables such as seals and gaskets.
Pressure test as per section 3.14.
3.7 Tube bundle replacement
The section below specifies the requirements for manufacturing and testing of retubing the bundles
3.7.1 Tube plates
plates during tube expansion will be removed).
removal of a tube for measurements of a tube and tube hole so we can specify the tubes correctly
with tolerance. If required, the relevant tables shall be interpolated.
Tolerances.
workmanlike finish. A practical test for smoothness is that cotton wool shall not attach to the surface
when wiped over it.
3.7.2 Tubes
been pulled out and analysed.
Specification for the Procurement of UNS S44660 Stainless Steel Condenser Tubes.
provided in drawing [8]. Wall thickness to be confirmed by the contractor. The contractor is
responsible for confirming the actual tube OD as well.
in correct length per stage, tube cutting from a longer length will not be permitted as this cause
the tube ends to become oval during such cutting process. A stick out of 2mm will be provided
for, this stick out will be on the waterbox side, on the interface where stage 1 and stage two meet
the tube ends will be flush with tubesheet.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Arnot Power Station Main Air Ejector Condenser Unique Identifier: AETP 0075
Refurbishment Technical Specification
Revision: 1
Page:
Specification for the Procurement of UNS S44660 Stainless Steel Condenser
Tubes
The Contractor is responsible for ensuring the tubes are manufactured with acceptable tolerances
on the OD, considering the tube plate tolerances as per standard fit criteria.
3.7.3 Tube Expansion
3.7.3.1 Tube Expansion Requirements
The tubes shall be attached to the tube plates by mechanical roller expansion using 3-pin rollers.
The Contractor shall provide a marked-up tube plate drawing indicating the tubes designated as
calibration holes to verify and test wall thinning during the expansion process. These tubes should
account for no less than 2% of the total tube plate holes. Under no circumstances should more than
50 tubes be expanded without a reference tube. These designated holes must be clearly marked
on the tube plate, documented on a tube plate drawing, and measured using a 3-pin bore gauge
before the tubes are loaded into the tube.
holes on each tube plate using a no-go gauge. No holes shall be larger than the maximum hole
tolerance specified in the TEMA standard. Should such holes exist the contractor to provide a
method for sleeving that particular tube hole to bring it back to standard fit. Before sleeving a method
statement will be provided to the Employer.
before any joints expansions will be done on the waterbox side tubeplate. The expanding procedure
at the fixed end tube plate shall be as follows:
side, the opposite tubeplate tubes will be flush.
of tube plate.
and values achieved in the mock-up tests.
waterbox side tube plate can be made. The expanding procedure at the expansion end tube plate
shall be as follows:
with the clusters spread out uniformly across the tube plate. This initial set of expansions
aims to prevent distortion of the tube plate, which can otherwise occur due to forces
imposed by the expansion process.
from the tube plate face is 2-3 mm on waterbox side where as the opposite tube plate
tubes will be flush with tubesheet face.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Arnot Power Station Main Air Ejector Condenser Unique Identifier: AETP 0075
Refurbishment Technical Specification
Revision: 1
Page:
tube-to-tube plate joints for every tube. As a minimum, the following checks and controls shall be
implemented:
each tube.
following shall be done:
o Clean expander.
o Rotate manually and inspect rollers, verifying free movement, and inspect
mandrill shaft for defects (score, abrasion, and pitting).
o Verify that the torque setting on the expander torque scale is correct and ensure
that the locking mechanism is securely tightened.
o Inspections shall also be conducted in the event of torque fluctuations or
evidence of damage to the tube inside surface.
o For each tube that enters the tube plate on the calibration holes, the average
tube OD shall be recorded (value “D” as detailed below). Additionally, the
Contractor shall measure the average tube ID before the tube is expanded
(Value “d” as detailed below). Alternatively, the average tube wall formula can
be used provided at least 3 measurements are taken.
for marking, recording, and controlling the expansion process to prevent accidental re-expansion.
Leaking tubes that need re-expansion must be clearly marked on a drawing included in the
databook.
3.7.3.2 Tube Expansion Measurements
backup documentation stating the expansion levels achieved. The following measurements that will
be recorded:
expansion depth/length. If average wall thickness is used, a cross comparison between
wall thickness/ID and OD will be provide.
map indicating all measured tubes precisely.
thickness shall be determined from (OD-ID)/2.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Arnot Power Station Main Air Ejector Condenser Unique Identifier: AETP 0075
Refurbishment Technical Specification
Revision: 1
Page:
(T − t) − (D − d)
Tw =
(d − t) ∗ 100
D = Diameter of tubesheet hole, mm
d = Outside diameter of tube, mm
T = Tube inside diameter after expansion, mm
t = Tube inside diameter before expansion, mm
Tw = % wall thinning
expansion data.
Description Symbol Result
Tubesheet hole size D
Tube outside diameter d
Tube inside diameter before expansion t
Tube inside diameter after rolling T
% Expansion Tw
3.7.3.3 Requirements for Tube-to-tubesheet Mock-up Test
one set of mock-up tests is required in case of multiple coolers if the following conditions are met:
a) The same tube expander drives are used on the different units.
b) The tubes are of the same heat number
c) The tubesheets hole ID is to standard fit tolerance.
achieved. AS existing tubesheet will be re-used tubes will be expanded into one of the tubesheets
to determine the required torque to achieve a wall thinning of 4-6%. The tube will then be subjected
to a push out test to prove integrity of tube joint. This will be witnessed by the Employer, tests will
be performed until the required thinning is achieved and an adequate joint strength is mutually
agreed upon by all parties.
calculated using the formular provided above.
3.7.3.4 Requirements for pull-out test
derived:
greatest load-bearing joint
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Arnot Power Station Main Air Ejector Condenser Unique Identifier: AETP 0075
Refurbishment Technical Specification
Revision: 1
Page:
ensuring that all specified pull-out tests are conducted to assess the load-bearing
capabilities of the expanded joints at various tube hole diameters.
3.8 Flanges
pressure rating as the installed flanges. Orientation when refitting the flanges is of utmost
importance to ensure alignment on site. Any misalignment correction during installation will be a
negative compensation event on the contractor, not ejector will be installed by others.
Blanks shall be fitted on all flanges before delivery to site.
All tapped holes to be blanked off with suitable plugs.
3.9 Material requirements
bellows/compensators if required. Any other pressure containment part replacement will be handled
on a compensation event basis, after mutual agreement with the Employers representative.
Additionally, any consumables required, such as gaskets, bolts, and nuts shall be supplied by the
contractor.
bellows/compensators and shell shall be provided with 3.1 material certification in accordance with
Bs en 10204:2004.
follows:
only; therefore, no AIA needs to be appointed.
3.10 Welding and requirements
3.10.1 Welding Requirements
provided ISO 3834-2 certificate shall include the scope of accreditation, specifying the design code
to be used.
All welders for manual welding shall be coded to BS EN ISO 9606.
All welding procedures shall be qualified to the latest version of BS EN 15614-1.
Geometry-specific Weld Procedure Specifications (WPS) are required, supported by the relevant
Pqr.
Engineer, in accordance with current Eskom standards.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Arnot Power Station Main Air Ejector Condenser Unique Identifier: AETP 0075
Refurbishment Technical Specification
Revision: 1
Page:
240-106628253 Standard for Welding Requirements on Eskom Plant.
3.10.2 NDE Requirements
subcontractor will be and for which process they are approved / certified.
Destructive Testing (NDT) on Eskom Plant.
3.11 Quality requirements
commencement of the specific work.
Control personnel as well as Engineering. QCPs shall make provision for signatures indicating
interventions by the Contractor’s QC Representative, the Employers QC Representative, and the
employer`s engineer.
any signature to the specific individual who endorsed any activity within the QCP.
Intervention points will be signed as the work progresses, and no backdating will be allowed.
Notification for hold and witness points shall be provide in writing and at least 72 hours in advance.
The following minimum hold points shall be included for the Employer’s Quality Control
Department:
main air ejector condenser unit
3.12 Drawing requirements
relevant dimensions and full material list. Additionally, detailed information regarding the tube
bundle shall be included. These drawing will be supplied to the Employer in CAD format and also
readable PDF.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Arnot Power Station Main Air Ejector Condenser Unique Identifier: AETP 0075
Refurbishment Technical Specification
Revision: 1
Page:
Requirement (240-86973501).
3.13 Documentation requirements
documents impacting the work, are subject to Eskom’s approval. These documents must be
approved by the Employer at least 7 working days before the commencement of the Works.
Employer on the previous revision, if applicable, along with the Contractor’s response and
corrective actions taken. Changes will be documented in a revision table within each drawing or
document. Upon approval of the new revision, all prior revisions will be removed from the
production floor.
may have his own document or drawing number on the document or drawing, but where reference
is made among documents or drawings, the Employer’s number shall be used.
at a minimum, if applicable:
bill of materials, drawings, and designs (applicable only to materials requiring 3.1 certification).
pressure gauges.
3.14 Pressure test requirements
on design pressure. The test pressure shall be as specified in Table 1.
inspect for leaking tubes. After that, the waterbox pressure test shall carried out.
temperature.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Arnot Power Station Main Air Ejector Condenser Unique Identifier: AETP 0075
Refurbishment Technical Specification
Revision: 1
Page:
will be indicated on a tube plate map. If the tube still leaks after a second expansion, consultation
with the Employer will be necessary. In this case, the leaking tubes shall be replaced.
No cyclic testing is required.
3.15 Configuration management and document management
include the Contractor’s drawing/document number, revision number, and title for each drawing or
document attached.
3.16 Coating requirements
Pipelines and Vessels and Eskom standard 240-145581571 Standard for the identification of
contents of pipes and vessels.
3.17 Dry and preservation
These procedures shall be approved by the Employer and the Employer’s quality representative
prior to pressure testing.
dried out. The contractor shall demonstrate that the main air ejector condenser is completely dry on
both the shell side and the tube side.
blanking off shall not be carried out without the approval of the Employer and the Inspection Agency.
under a fixed roof to avoid exposure to direct sunlight and high ambient temperatures.
3.18 Dry and preservation
The Contractor shall supply per cooler a set of 10 tube plugs to be kept by the Employer.
Contractor will also provide a tube plugging procedure.
The submission of the returnables stated in section 4 . 1 is mandatory. Failure to submit any of
these returnables will result in disqualification of the tender.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Arnot Power Station Main Air Ejector Condenser Unique Identifier: AETP 0075
Refurbishment Technical Specification
Revision: 1
Page:
4.1 Mandatory tender returnables
that owns and operates the workshop where the heaters will be refurbished. The scope of
accreditation of the ISO 3834-2 certificate shall include the design code to be used for this project.
the last 5 years is required. A minimum of 5 references is required.
4.2 Qualitative tender returnables for evaluation purposes
refurbished or built by the Contractor in the past is required.
exclusions or qualifications, a specific statement to that effect is required.
vessel manufactured previously, meeting the requirements of the works information, is required.
Table 2: Tool List to be completed
Minimum Quantity available
Description, Type or Make required at Contractors Tool / Equipment Description
where applicable quantity workshop
2 Tube expander drive
4 3 Pin roller expanders
N/A Lubricant for expansion
2 Tube facing tools
5 sets Tube facing tool replacement blades
1 Calibrated 3-Prong internal
micrometer, min accuracy 0.01 mm
1 Calibrated external tube vernier, min
accuracy 0.01 mm
1 Calibrated Torque analyser
This document has been seen and accepted by:
Name Designation
Lindokuhle Sibeko System Engineer: Condensate
Donald Ndhlovu System Engineer: Condensate
Musawenkosi Ngwenyama Senior Advisor Maintenance and Operation
Mduduzi Ngwane Turbine Maintenance Manager
Siyabonga Makasi Senior Supervisor Maintenance Technical
Dikeledi Molotia Senior Technician Maintenance
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Arnot Power Station Main Air Ejector Condenser Unique Identifier: AETP 0075
Refurbishment Technical Specification
Revision: 1
Page:
Date Rev. Compiler Remarks
March 2026 1 A.K. Tshabalala First issue and Unique Identifier
Number
January 2026 1.1 A.K. Tshabalala First Issue
January 2026 0.1 A.K. Tshabalala Updating as per recommendations
November 2025 0 A.K. Tshabalala First Issue for review
The following people were involved in the development of this document:
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
This document provides the tender technical evaluation criteria for the refurbishment of Arnot Main
Ejector Condenser.
2.1 Scope
The document covers the Tender Technical Evaluation Strategy for the Main Ejector Condenser
refurbishment.
2.1.1 Purpose
The purpose of this tender technical evaluation strategy is to define the Mandatory Evaluation
Criteria, Qualitative Evaluation Criteria and TET member responsibilities for tender technical
evaluation. The technical evaluation strategy serves as basis for the tender technical evaluation
process.
2.1.2 Applicability
This document applies to Group Technology and all other relevant stakeholders that have an
affiliation to this specific project including Arnot Power Station.
2.1.3 Effective date
This document is effective from the date of authorisation until its withdrawn.
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] 240-48929482 Tender Technical Evaluation Procedure
[2] AETP 0075 Arnot Power Station Main Air Ejector Condenser Refurbishment Technical
Specification (Rev 1)
2.2.2 Informative
N/a
2.3 Definitions
N/a
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Arnot Power Station Main Air Ejector Condenser Unique Identifier: AETP 0076
Refurbishment Technical Specification
Revision: 1
Page:
2.3.1 Classification
Controlled Disclosure: Controlled Disclosure to external parties (either enforced by law, or
discretionary).
2.4 Abbreviations
Abbreviation Explanation
MAE Main Air Ejector Condenser
2.5 Roles and Responsibilities
As per 240-48929482: Tender Technical Evaluation Procedure.
2.6 Process for Monitoring
N/a
2.7 Related/Supporting Documents
None.
3.1 Technical evaluation threshold
The minimum weighted final score (threshold) required for a tender to be considered from a technical
perspective is 70%.
The contractor/vendor must comply with ALL of the following criteria. Non‐compliance with any
mandatory requirement shall result in technical disqualification.
3.2 Tet members
Insert text here.
Table 1: TET Members
TET TET Member Name Designation
number
TET 1 Herman van Niekerk Senior Consultant - Feedheating
TET 2 Khehla Tshabalala Senior Engineering Technologist
TET 3 Donald Ndhlovu System Engineer: Condensate
TET 4 Siyabonga Makasi Senior Supervisor Technical Maintenance Turbine
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Arnot Power Station Main Air Ejector Condenser Unique Identifier: AETP 0076
Refurbishment Technical Specification
Revision: 1
Page:
3.3 Manadatory technical evaluation criteria
Table 2: Mandatory Technical Evaluation Criteria
Mandatory Technical Criteria Description Reference to Technical Motivation for use of Criteria
Specification / Tender
Important Dates
Source: Technical.zip (unknown){"closingDate":"2026-09-04T10:00:00.000Z","briefingSession":{"date":null,"time":null,"venue":"Arnot Power Station","is_compulsory":false}}
Contact Information
Source: Technical.zip (unknown){"name":"TBA","email":"TBA","phone":"TBA","department":"Arnot Power Station","address":"Private Bag X2, RIETKUIL, 1097"}
Submission Guidelines
Source: Technical.zip (unknown)The tenderer must submit a completed Form of Offer and Acceptance. The Contractor shall provide proof of a valid ISO 3834-2 certification for the company/manufacturer that owns and runs the standard workshop where the MAE will be refurbished (re-tubed). The scope of accreditation of the ISO 3834-2 certificate shall include the design code (AD 2000 Code) or the one that replaced AD 2000 (EN, to be used for this project.
Evaluation Criteria
Source: Technical.zip (unknown)The evaluation criteria include the Qualitative Technical Evaluation Criteria, which assess the contractor's methodology, workmanship, and compliance with specifications. The criteria also include the evaluation of the contractor's experience, key personnel, and equipment.
Technical Specifications
Source: Technical.zip (unknown)The technical specifications include the refurbishment of main ejector condensers at Arnot Power Station, with a two-stage ejector design, inter and after-coolers, and a fixed tubesheet and bellow/compensator on the shell side. The contractor must provide new tubes installed to design spec and code, and all NDT, pressure tests, and performance checks must be passed.
Financial Requirements
Source: Technical.zip (unknown)The payment terms include the provision of a tax invoice in accordance with the Employer's procedures stated in the Service Information, showing the amount due for payment. The Contractor must also provide a tax invoice within one week of receiving a payment certificate from the Service Manager.
Compliance Requirements
Source: Technical.zip (unknown)The compliance requirements include the submission of an updated verification certificate and necessary supporting documentation confirming the change in the Contractor's B-BBEE status, within thirty days of the notification or as otherwise instructed by the Service Manager. The Contractor must also comply with the Construction Regulations and all applicable health and safety laws and regulations.
Section
Source: Technical.zip1.2.11 Quality requirements...................................................................................................... 13
Description
Source: SHEQ.zip (unknown)Eskom Holdings SOC Ltd, Registration Number 2002/015527/30, is South Africa’s primary electricity supplier and is wholly owned by the South African Government. Eskom’s key role is to assist in lowering the cost of doing business in South Africa, enabling economic growth and security of supply through providing electricity in an efficient and sustainable manner, including its generation, transmission and distribution, while ensuring that this is done within acceptable benchmark standards. Eskom generates and distributes approximately 95% of the electricity used in South Africa and approximately 40% of the electricity used on the rest of the African continent. Approximately 90% of Eskom’s production is coming from coal. Eskom aims to comply with the legislation, policies, conditions and requirements of key government stakeholders, including spheres of government. Eskom is currently moving away from operating as a vertically integrated company that supplies electricity to South Africa and the Southern African Development Community (SADC) region. As the main provider of generation, transmission and distribution capacity in South Africa, Eskom supplies electricity to industrial, mining, commercial, agricultural and residential customers, as well as to redistributors. In doing so, Eskom’s mission is to provide sustainable electricity solutions to grow the economy and improve the quality of life of the people in South Africa and in the region. Eskom is committed to safety, health, the environment and quality principles to ensure that no operating condition or urgency of service justifies exposing anyone to negative risks arising out of Eskom’s business, causing an incident with health, safety, environmental and quality consequences.
Contact Information
Source: SHEQ.zip (unknown){"name":null,"email":null,"phone":null,"department":"y (SADC) region. As the","address":"the prevention of work-related injury and ill"}
Evaluation Criteria
Source: SHEQ.zip (unknown)Occupational hygiene is the identification, evaluation and control of those environmental factors, exposure to its operations, which is in line with its Safety, Health, Environmental and Quality to achieve specific goals. A project is a temporary endeavour with a defined beginning and end while honouring the preconceived constraints. The primary constraints are scope, time, quality and plant) within cost, quality and time.
Technical Specifications
Source: SHEQ.zip (unknown)Eskom Holdings SOC Ltd, Registration Number 2002/015527/30, is South Africa’s primary electricity supplier and is wholly owned by the South African Government. Eskom’s key role is to assist in lowering the cost of doing business in South Africa, enabling economic growth and security of supply through providing electricity in an efficient and sustainable manner, including its generation, transmission and distribution, while ensuring that this is done within acceptable benchmark standards.
Compliance Requirements
Source: SHEQ.zip (unknown)No specific requirements found. NOTE: the supplier/contractor/tenderer has to ensure that he/she understands the OHS requirements listed hereunder. The supplier/contractor/tenderer is expected to comply to the following documents when working at/rendering a service to Eskom but not limited to the following: Eskom contractor Health and Safety requirements standards 32-136, OHS specification/requirements provided, Occupational Health and Safety Act, Compensation for Occupational Diseases and Illnesses Act
Section
Source: SHEQ.zip (unknown)Occupational hygiene is the identification, evaluation and control of those environmental factors, exposure to its operations, which is in line with its Safety, Health, Environmental and Quality to achieve specific goals. A project is a temporary endeavour with a defined beginning and end while honouring the preconceived constraints. The primary constraints are scope, time, quality and plant) within cost, quality and time.
Submission Guidelines
Source: Finance.zip (unknown)Returnable documents — all must be submitted with the tender:
Returnable Documents
Source: Finance.zip (unknown)The tendering company must submit its latest, approved annual financial statements, including background to the company, signed director's report, signed auditor's/reviewer's/compiler's/accounting officer's report, statement of financial position, statement of comprehensive income, statement of changes in equity, statement of cash flows, and notes to the financial statements. Additionally, a signed copy of the public interest score and copies of the ITA34C for the current and previous years of assessment must be submitted. For unincorporated JV or a SPV, each partner must submit its annual financial statements.
Evaluation Criteria
Source: Finance.zip (unknown)Bidders must meet the eligibility criteria outlined in the tender document, including submitting approved annual financial statements and a valid public interest score (if applicable). Required forms include annual financial statements, public interest score, and ITA34C.
Financial Requirements
Source: Finance.zip (unknown)Financial returnables required with the tender:
Compliance Requirements
Source: Finance.zip (unknown)No specific requirements found
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Arnot Power Station - Rietkuil - Rietkuil - 1097
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
4
Last checked
14 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services: General. Unlock full pricing strategies, bid frequency, and historical win rates.