Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Megawatt Park,2 Maxwell Drive, Sunninghill, Sandton - Sunninghill, Sandton - Johannesburg - 2157
Organization Type
GOVERNMENT
Published
26 Aug 2026
OCDS Reference
ocds-9t57fa-166992
ESKOM holdings soc ltd requires the supply, delivery and offloading of radio frequency (rf) cables, connectors and related accessories to its distribution sites (brackenfell rdc, polokwane rdc, new germany rdc and gauteng sites) on an as-and-when basis for a five-year period under an nec3 supply contract. The single most consequential requirement is that the bidder must be able to deliver to multiple sites nationwide to a dpu incoterms 2020 basis, including responsibility for transport, offloading, export/import formalities and compliance with eskom's additional conditions (z1–z15) covering b-bbee status changes, ethics, asbestos, nuclear liability and insurance.
Closing date: 22 September 2026 at 10:00; submission via completed NEC3 SC3 Form of Offer and Acceptance (C1.1), Contract Data Part Two (C1.2b), Pricing Data (C2.1 and C2.2) and required securities/insurance within two weeks of agreement.
Mandatory returnable documents: signed Form of Offer and Acceptance; completed Contract Data Part Two (supplier details, tendered total, price schedule reference, risk register, access restrictions, programme, overhead/profit percentage); completed Pricing Assumptions and Price Schedule; bonds, guarantees and proof of insurance per Contract Data.
Eligibility: CSD registration; valid SARS tax compliance status (tax PIN); CIPC registration; B-BBEE verification certificate (any level) with obligation to notify changes within 7 days and submit updated certificate within 30 days; joint ventures must declare joint and several liability and notify key authorised person within 2 weeks.
Pricing: Price Schedule with unit rates (R/m for cables, R/item for connectors and accessories); price adjustment (Option X1) applies after 16 months from base date (month before tender close) with 85% adjustable / 15% non-adjustable split; payment within 30 days of correct tax invoice for contracts under R50 million (excl. VAT), 60 days for R50 million and above; interest at prime rate (Standard Bank); tax invoice due within one week of payment certificate; Purchaser VAT number 4740101508 must appear on invoices.
Delay damages (Option X7): 5% per purchase order if delivery one week late; maximum 15% if two weeks late; applied per purchase order with proof of administrative efforts.
Insurance: Supplier must provide cover per Insurance Table A (goods replacement cost, liability for property damage/bodily injury, employer's liability); Purchaser provides cover per Insurance Table B (Assets All Risk, Contract Works, Environmental, Public Liability, Marine, Motor Fleet, Terrorism, Cyber, Nuclear).
Special conditions: compliance with Eskom additional conditions Z1–Z15 including confidentiality (no disclosure/images without consent), ethics (no prohibited actions), asbestos (ambient air to SA standards OEL 0.2 fibres/ml 4-hr TWA, STEL 0.6 fibres/ml 10-min TWA; right to stop work), nuclear liability indemnity (Koeberg), and arbitration under Association of Arbitrators (Southern Africa) rules in South Africa.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Tuesday, 22 September 2026 - 10:00
Venue
Ms Teams
Categories
Request for Bid(Open-Tender)
Megawatt Park,2 Maxwell Drive, Sunninghill, Sandton - Sunninghill, Sandton - Johannesburg - 2157
Recommended Certifications
Having these can improve your winning chances: SABS Product Certification, NRCS Certification
AI Document Analysis Stages
Description
Source: Cables & Connectors Specification.pdf (unknown)26 Aug
2026
Tender Published
Tender was published
22 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
SDLI Strategy Doc_ BIDDERS TEMPLATE.pdf
Analysis completed but response format was invalid
240-109253698 CQP Template Rev 3.docx
Supply and delivery of radio frequency cables and connectors for Eskom's distribution division on an as-and-when required basis for a period of five years.
E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf
Supply and delivery of radio frequency cables and connectors for Eskom's distribution division on an as-and-when required basis for five years.
E-tendering Help Manual for supplier - 27 January 2025.pdf
Supply and delivery of radio frequency cables and connectors for Eskom's distribution division on an as-and-when required basis for five years. Bids must be submitted electronically via the Eskom eTendering system.
Eskom Supplier Integrity Pact - 02 June 2023.pdf
Eskom Distribution Division seeks the supply and delivery of radio frequency cables and connectors on an “as and when” required basis for five years. Bidders must accept and comply with Eskom's Supplier Integrity Pact, including ethical conduct, conflict-of-interest disclosure, and anti-corruption commitments.
240-105658000 Supplier Quality Management Specification (3).pdf
Eskom seeks a supplier for the supply and delivery of radio frequency cables and connectors on an as-and-when required basis for five years. The contract is for the Distribution Division in Gauteng.
Cables & Connectors Specification.pdf
Eskom is procuring the supply and delivery of radio frequency cables, connectors, and associated accessories for its distribution division on an as-and-when required basis for five years. The procurement is governed by Eskom's telecommunications standard 240-64013506, which specifies technical requirements for cables, connectors, boots, tools, clamps, protectors, and other items.
Scope of Work _Cables Connectors May26.pdf
Supply and delivery of radio frequency cables, connectors, and related accessories to Eskom Distribution on an as-and-when required basis for a five-year period, supporting the RF network across all Eskom clusters.
Invitation to tender-RF cables and connectors - A.pdf
Eskom is inviting tenders for the supply and delivery of radio frequency cables and connectors for its distribution division on an as-and-when required basis for a period of five years. The contract will be governed by the NEC3 Supply Contract and evaluation will follow the 80/20 preferential procurement system.
Non-Disclosure Agreement (NDA) Vendors Template -.pdf
Eskom is procuring the supply and delivery of radio frequency cables and connectors for its distribution division, on an as-and-when required basis for five years. The tender is issued in Gauteng and closes on 22 September 2026 at 10:00 UTC.
Tender Technical Evaluation Sheet_Schedule A.xlsx
Eskom requires the supply and delivery of radio frequency cables, connectors, tools, clamps, surge protectors, and associated accessories for its Distribution Division on an 'as and when required' basis over a five-year period. The contract covers a comprehensive range of coaxial cables (RG58, RG223, RG213, RG214, RG400, LMR series, Eupen), connectors (BNC, N-type, SMA, TNC, UHF), adaptors, flyleads, clamps, grounding kits, surge protection devices, tapes, and installation tools, all specified to strict technical standards and brand requirements.
Eskom Standard Conditions of Tender.pdf
Supply and delivery of radio frequency cables and connectors for Eskom's distribution division on an as-and-when required basis for a period of five years.
Cables & Connectors Technical Evaluation Criteria_Rev 2.pdf
Supply and delivery of radio frequency cables and connectors for Eskom's distribution division on an as-and-when required basis for a period of five years. The tender is governed by a technical evaluation comprising mandatory criteria and a desktop evaluation with a 90% pass threshold.
SHE Requirements.pdf
Eskom requires the supply and delivery of radio frequency cables and connectors for its distribution division, on an as-and-when-required basis, for a period of five years. The contract is open to tenderers who can meet the occupational health and safety returnables detailed in the scope.
240-68099512 Form A Cat 3 Rev 9.pdf
Eskom is procuring the supply and delivery of radio frequency cables and connectors for its Distribution Division on an 'as and when' required basis for a five-year period.
Supplier Quality Management_Cat 3_List of Returnables Rev 7.xlsx
Eskom is procuring the supply and delivery of radio frequency cables and connectors for its distribution division on an as-and-when required basis for a five-year period. The tender is issued in Gauteng and includes a quality management evaluation based on the Supplier Quality Management scorecard.
RF Cables & Connectors NEC supply contract.pdf
Eskom is procuring the supply, delivery, and offloading of radio frequency (RF) cables, connectors, and related accessories to various Distribution sites on an as-and-when required basis for a five-year period, under an NEC3 Supply Contract (SC3).
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
R 422 698
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
This document is the Eskom technical standard (Unique Identifier 240-64013506, Revision 3) for RF cables and connectors used in telecommunications. It forms part of the enquiry documentation for establishing an Eskom Telecommunications enabling contract. The standard applies across Eskom Holdings, its divisions, subsidiaries, and controlled entities. It defines the technical requirements for materials, cables, connectors, boots, tools, adaptors, flyleads, clamps, surge protectors, and ancillary items. Normative references include ISO 9001, IEC 60529, IEC 61000-6-5, ETSI standards, and MIL-17. Informative references are Eskom document standards 32-9 and 32-644. Abbreviations cover AC, DC, MOV, PoE, RoHS. Implementation responsibility lies with relevant planning and maintenance departments.
Evaluation Criteria
Source: Cables & Connectors Specification.pdf (unknown)Technical compliance with the specification in Annex A (Schedule of technical compliance) is mandatory. Bidders must complete Schedule B for every clause, stating compliance or non-compliance and providing supporting evidence (file number, section, page, paragraph). Failure to support a clause with a reference results in non-compliance. The specification references ISO 9001 Quality Management Systems as a normative standard; bidders should be prepared to demonstrate a quality management system aligned with ISO 9001. No price/preference split, minimum functionality score, or B-BBEE threshold is stated in this document; those details will be in the full tender pack.
Technical Specifications
Source: Cables & Connectors Specification.pdf (unknown)Scope: Supply and delivery of RF cables, connectors, boots, tools, adaptors, flyleads, clamps, surge protectors, and ancillary items for Eskom Telecommunications on an 'as and when' basis for five years.
Key technical requirements:
Normative standards: ISO 9001; IEC 60529 (IP code); IEC 61000-6-5; all relevant ETSI standards; MIL-17.
Compliance schedule (Annex A) must be completed with evidence references for every clause.
Quality Management
Source: Cables & Connectors Specification.pdf (unknown)ISO 9001 Quality Management Systems is listed as a normative reference (clause 2.2.1 [1]). All parties using this document must apply the most recent edition. This implies that bidders should operate a quality management system aligned with ISO 9001. No additional quality assurance, quality control, or certification requirements are specified in this document.
Compliance Requirements
Source: Cables & Connectors Specification.pdf (unknown)Mandatory technical compliance with every clause in the specification (Annex A Schedule of technical compliance). Bidders must complete Schedule B, stating compliance/non-compliance per clause and providing supporting evidence references. No eligibility criteria (CSD, tax, B-BBEE, CIDB, CIPC, professional registrations, local content) are stated in this document; those will be in the full tender pack. Standard returnable forms (SBD 1, SBD 4, SBD 6.1, SBD 9, etc.) are not listed here but are typically required by Eskom tenders.
Health & Safety
Source: Cables & Connectors Specification.pdf (unknown)No explicit occupational health and safety, safety plan, or HSE compliance requirements are stated in this document. Material requirements specify corrosion-resistant metals (stainless steel or hot-dipped galvanized) and stainless steel mounting hardware, which relate to durability rather than safety. Surge protectors reference standards such as GR1089, NEC800.100, NEC830.100, and RoHS, which have safety implications, but no bidder safety obligations are detailed.
Section
Source: Cables & Connectors Specification.pdf (unknown)The only evaluation criterion evident in this document is technical compliance with the specification. Bidders must complete the Schedule of Technical Compliance (Annex A, Schedule B) for every clause, providing evidence references. Non-compliance or unsupported claims result in technical non-compliance. ISO 9001 Quality Management Systems is cited as a normative standard, implying quality system alignment may be assessed. No price/preference points, minimum scores, or other evaluation stages are described in this document.
Contact Information
Source: Non-Disclosure Agreement (NDA) Vendors Template -.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"................... a company incorporated under the laws of [insert"}
Evaluation Criteria
Source: Non-Disclosure Agreement (NDA) Vendors Template -.pdf (unknown)No eligibility criteria specified
Technical Specifications
Source: Non-Disclosure Agreement (NDA) Vendors Template -.pdf (unknown)provisions of this Agreement for any
purpose whatsoever other than the Project
Compliance Requirements
Source: Non-Disclosure Agreement (NDA) Vendors Template -.pdf (unknown)No specific requirements found
Description
Source: Supplier Quality Management_Cat 3_List of Returnables Rev 7.xlsx (unknown)This document is Eskom's Supplier Quality Management tender evaluation scorecard (Rev 7, effective 21/01/2022, Unique ID 240-12248652) used to assess bidder quality documentation for the supply and delivery of radio frequency cables and connectors (Tender E3423DXMWP). It defines five evaluation sections with standard weightings: Section A (QMS Requirements) 25%, Section B (QMS in Operation) 25%, Section C (Contract Quality Plan) 20%, Section D (Quality Control Plan) 20%, Section E (User-defined) 10%. The scorecard allows selection of Category 3 (implemented QMS with internal audit report, draft CQP and ITP per scope of works). Bidders are evaluated on documented evidence submitted with the tender; the scorecard is used by Eskom's PQA representatives during desktop evaluation.
Submission Guidelines
Source: Supplier Quality Management_Cat 3_List of Returnables Rev 7.xlsx (unknown)Bidders must submit the following returnable documents with their tender:
All documents must be submitted in the format required by the tender pack. Late submissions will be disqualified.
Evaluation Criteria
Source: Supplier Quality Management_Cat 3_List of Returnables Rev 7.xlsx (unknown)Tender evaluation uses a weighted quality scorecard across five sections. Bidders are scored on documented evidence submitted with the tender. Section weights (standard):
Each section score = (score obtained / maximum score) × 100% × weight. No minimum qualifying threshold is stated in the document.
Technical Specifications
Source: Supplier Quality Management_Cat 3_List of Returnables Rev 7.xlsx (unknown)Supply and delivery of radio frequency cables and connectors for Eskom Distribution Division on an "as and when" required basis for a period of five years. Quality management requirements are governed by Eskom Supplier Contract Quality Requirements Specification (document 240-105658000) and ISO 9001:2015, ISO 10005. Bidders must demonstrate QMS compliance through either valid ISO 9001:2015 certification (Option 1) or documented QMS implementation evidence (Option 2). Required deliverables include: internal audit report with nonconformity/corrective action records, draft Contract Quality Plan (ISO 10005), Inspection and Test Plan or Quality Control Plan for similar/previous work, roles/responsibilities matrix including quality function, and control of externally provided processes/products/services. Form A (supplier quality declaration) must be completed and signed.
Compliance Requirements
Source: Supplier Quality Management_Cat 3_List of Returnables Rev 7.xlsx (unknown)Mandatory compliance documents:
No CSD registration, tax clearance, B-BBEE, CIDB, or CIPC requirements are stated in this document.
Description
Source: RF Cables & Connectors NEC supply contract.pdf (unknown)Supply, Delivery and Offloading of Radio Frequency (RF) Cables, connectors and related accessories to various Eskom Distribution sites on an "as and when required" basis for a period of five (5) years. The contract is based on the NEC3 Supply Contract (April 2013) with Options X1, X2, X7 and Z1–Z15. Delivery terms follow INCOTERMS 2020 DPU (Delivered at Place Unloaded) to Eskom Distribution Brackenfell RDC, Polokwane RDC, New Germany RDC and Gauteng Eskom Distribution Various Sites as per delivery address on the Purchase Order.
Important Dates
Source: RF Cables & Connectors NEC supply contract.pdf (unknown)Closing date: 22 September 2026 at 10:00 (from tender record). No compulsory briefing, site visit, or clarification deadline is stated in the document.
Contact Information
Source: RF Cables & Connectors NEC supply contract.pdf (unknown)Purchaser: Eskom Holdings SOC Ltd, Reg No. 2002/015527/30, Registered office at Megawatt Park, Maxwell Drive, Sandton, Johannesburg. Tel: 011 800 8111. Supply Manager: to be confirmed (TBC). Adjudicator nominating body: Chairman of ICE-SA, a Division of the South African Institution of Civil Engineering (www.ice-sa.org.za). Arbitration: Association of Arbitrators (Southern Africa) or its successor body; place of arbitration: South Africa.
Submission Guidelines
Source: RF Cables & Connectors NEC supply contract.pdf (unknown)Submission is by completing and returning the NEC3 SC3 Form of Offer and Acceptance (C1.1) with the offered total price (exclusive of VAT, VAT at 15%, and inclusive of VAT). Bidders must also complete Contract Data Part Two (C1.2b) providing supplier name, address, tendered total of Prices, price schedule reference, risk register matters, access restrictions, delivery date statement, programme reference, and overhead/profit percentage. The Pricing Data (Part C2) including pricing assumptions and the price schedule must be completed. Securities, bonds, guarantees, proof of insurance and any other documentation required by the Contract Data must be delivered within two weeks of receiving a completed copy of the agreement. The contract is governed by South African law, in English, using the NEC3 Supply Contract (April 2013) with Options X1 (price adjustment), X2 (changes in law), X7 (delay damages), and Z1–Z15 (Eskom additional conditions).
Evaluation Criteria
Source: RF Cables & Connectors NEC supply contract.pdf (unknown)The document does not specify an evaluation methodology, scoring split, minimum qualifying thresholds, or preference point system (80/20 or 90/10). It contains only a reference to a quality section (4.11) without detail. No evaluation criteria specific to this tender can be recovered from the source text.
Technical Specifications
Source: RF Cables & Connectors NEC supply contract.pdf (unknown)Scope: Supply, delivery and offloading of Radio Frequency (RF) Cables, connectors and related accessories to various Eskom Distribution sites on an "as and when required" basis for a period of five (5) years. Delivery places (INCOTERMS 2020 DPU): Eskom Distribution Brackenfell RDC, Polokwane RDC, New Germany RDC, and Gauteng Eskom Distribution Various Sites as per delivery address on the Purchase Order. Supplier responsibilities: notify Supply Manager of scheduled delivery; check packing and marking before dispatch; contract for and pay transport costs; arrange access to delivery place (jointly with Purchaser); load and unload goods; undertake export and import requirements for international procurement. Information to be provided by Supplier: packing lists, copy of invoice, delivery note, test results and maintenance manuals; for international procurement: licences, authorisations, Air Waybill or Bill of Lading, Bill of Entry, customs work sheets, invoice from importation clearing agent, and other import documents required by authorised officials. Defects date: warranty period as per Manufacturer's specifications after Delivery. Defect correction period: maximum 4 weeks. Defects access period: maximum 1 week. Supplier's liability for design defects not notified before last defects date limited to replacement cost of goods for manufacturing defects; liability period 12 months after defect liability period ends. End of liability date: 12 months after Delivery of whole goods and services with support of spares.
Methodology
Source: RF Cables & Connectors NEC supply contract.pdf (unknown)Supply Requirements based on INCOTERMS 2020 DPU. Supplier obligations per Incoterms A1–A10: provision of goods in conformity with contract; licences, authorisations and formalities; contracts of carriage and insurance; delivery; transfer of risks; division of costs; notice to buyer; proof of delivery/transport document; checking-packing-marking; other obligations. Purchaser obligations per Incoterms B1–B10: payment of price; licences, authorisations and formalities; contracts of carriage and insurance; taking delivery; transfer of risks; division of costs; notice to seller; proof of delivery/transport document; inspection of goods; other obligations. Specific actions: Supplier notifies Supply Manager about scheduled delivery; Supplier checks packing and marking before dispatch; Supplier contracts for transport and pays transport costs; Supplier/Purchaser arrange access to delivery place; Supplier loads and unloads goods; for international procurement Supplier undertakes export and import requirements.
Quality Management
Source: RF Cables & Connectors NEC supply contract.pdf (unknown)Defects date: warranty period as per Manufacturer's specifications after Delivery. Defect correction period: maximum 4 weeks. Defects access period: maximum 1 week. Supplier's liability for design defects not notified before last defects date limited to replacement cost of goods for manufacturing defects; liability period 12 months after defect liability period ends after Delivery. Supplier's total liability limited to latent defects identified due to manufacturing flaw. End of liability date: 12 months after Delivery of whole goods and services with support of spares. Information to be provided by Supplier includes test results and maintenance manuals.
Pricing Schedule
Source: RF Cables & Connectors NEC supply contract.pdf (unknown)Pricing assumptions: Prices are amounts stated in price column of Price Schedule; where quantity stated, Price calculated by multiplying quantity by rate. Price Schedule is the price schedule unless later changed per contract. Amount due = Price for each completed lump sum item + (quantity completed × rate) + other amounts payable to Supplier - amounts payable by or retained from Supplier. Tax required by law included in amount due. Price schedule items include cables (RG58, RG223, RG213, RG214, RG400, LMR195, LMR240, LMR400, Eupen 1/2'' and 7/8'', Coaxial 7/8'' Aluminium) priced per metre; boots (strain relief for various cable types) priced per item; tools (cable prep, stripping, crimp kit, tensioner) priced per item; adaptors (BNC, N, TNC, SMA, UHF types) priced per item; protectors (surge filters, suppressors, data line, AC, solar, DIN rail, PoE) priced per item; tape (self-vulcanizing, insulation, butyl) priced per item; saddles, crimpers, bundles, seals, kits, shrouds priced per item; clamps (Cumfy, G-clamp, Polyprop, grounding, BAND-IT, stainless steel cable ties) priced per item; fly-leads (various connector combinations and cable types/lengths) priced per item; connectors (BNC, N, SMA, TNC, UHF, bulkhead types) priced per item. Courier services priced per km (marked N/A).
Financial Requirements
Source: RF Cables & Connectors NEC supply contract.pdf (unknown)Pricing format: Price Schedule with rates per unit (R/m for cables, R/Item for connectors, fly-leads, clamps, adaptors, protectors, tools, boots, tape, saddles, crimpers, bundles, seals, kits, shrouds). Price adjustment (Option X1): CPA kicks in after 16 months from base date (month prior to tender closing date); proportions: 0.85 adjustable, 0.15 non-adjustable. Payment terms: within 30 days of receipt of a commercially and financially correct tax invoice for contracts valued under R50 million (excluding VAT); within 60 days for contracts valued at R50 million and above (excluding VAT). Interest rate: zero percent above the publicly quoted prime rate of Standard Bank of South Africa Limited. Supplier must provide a tax invoice within one week of receiving a payment certificate; late invoice extends payment period by an equal period. Supplier must comply with VAT Act and include Purchaser's VAT number 4740101508 on each invoice. Delay damages (Option X7): 5% per purchase order if delivery is one week outside agreed timelines; maximum 15% if two weeks outside timelines; applied per purchase order considering urgency and impact; Purchaser must prove everything administrable was done without success (emails and letters as source documents). Insurance: Supplier provides insurances per Insurance Table A (loss/damage to goods, liability for property damage/bodily injury, employer's liability); Purchaser provides insurances per Insurance Table B (Assets All Risk, Contract Works, Environmental Liability, General and Public Liability, Transportation/Marine, Motor Fleet and Mobile Plant, Terrorism, Cyber Liability, Nuclear Material Damage and Business Interruption).
Compliance Requirements
Source: RF Cables & Connectors NEC supply contract.pdf (unknown)Returnable documents: C1.1 Form of Offer and Acceptance (completed and signed); C1.2b Contract Data provided by the Supplier (completed); C2.1 Pricing Assumptions and C2.2 Price Schedule (completed); securities, bonds, guarantees, proof of insurance as required by Contract Data. B-BBEE: Supplier must notify Purchaser within 7 days of any change in B-BBEE status and submit updated verification certificate and supporting documentation within 30 days; decreased status may lead to renegotiation or termination; failure to notify may constitute reason for termination. Joint ventures: joint and several liability; notify Supply Manager of key person with authority to bind within 2 weeks of Contract Date; no composition change without Purchaser's written consent. Confidentiality: no disclosure of contract information without consent; images require prior written consent; subcontractors must comply. Ethics: Prohibited Actions (Coercive, Collusive, Corrupt, Fraudulent, Obstructive) not permitted; Purchaser may terminate if Prohibited Action occurs; cooperation with investigations required. Asbestos: Purchaser ensures ambient air conforms to SA standards (OEL 0.2 fibres/ml 4-hour TWA, STEL 0.6 fibres/ml 10-min TWA); Supplier personnel may stop work and leave contaminated area until declared safe; removal/disposal by registered asbestos contractor at Purchaser's expense. Nuclear liability: Purchaser indemnifies Supplier against nuclear damage liabilities except unlawful intent or unauthorised presence at Koeberg Nuclear Power Station. Standard registrations: CSD registration, valid tax compliance status (SARS tax PIN), CIPC registration implied.
B-BBEE Requirements
Source: RF Cables & Connectors NEC supply contract.pdf (unknown)Z3 Change of B-BBEE status: Where a change in Supplier's legal status, ownership or any other change to business composition or dealings results in a change to Supplier's B-BBEE status, Supplier notifies Purchaser within seven days. Supplier required to submit updated verification certificate and necessary supporting documentation confirming change in B-BBEE status to Supply Manager within thirty days of notification or as otherwise instructed. Where Supplier's B-BBEE status has decreased since Contract Date, Purchaser may either re-negotiate contract or terminate Supplier's obligation to Provide Goods and Services. Failure by Supplier to notify Purchaser of change in B-BBEE status may constitute reason for termination. If Purchaser terminates per this clause, procedures on termination are P1, P2 and P3 as stated in clause 92, and amount due is A1 and A3 as stated in clause 93.
Health & Safety
Source: RF Cables & Connectors NEC supply contract.pdf (unknown)Z6 Health, safety and environment: Supplier undertakes to take all reasonable precautions to maintain health and safety of persons in and about provision of goods and execution of services. Supplier warrants that total of Prices includes sufficient amount for proper compliance with all applicable health & safety laws, regulations, rules, guidelines and procedures. Supplier undertakes to comply with all applicable health & safety laws and regulations and ensures subcontractors, employees and others under Supplier's direction and control likewise observe and comply. Supplier complies with all applicable environmental laws and regulations and ensures subcontractors, employees and others under Supplier's direction and control likewise observe and comply. Z15 Asbestos: Purchaser ensures ambient air in area where Supplier will Provide Services conforms to SA standard for asbestos per GNR February 2002 under Occupational Health and Safety Act 1993. OEL: 0.2 regulated asbestos fibres/ml as 4-hour TWA; short term exposure limit: 0.6 fibres/ml as 10-minute TWA. Measurements by independent, competent, certified occupational hygiene inspection body (SANAS accredited and Dept of Employment and Labour approved AAIA). Supplier may perform parallel measurements at own expense. Purchaser manages asbestos and ACM per Standard 32-303. If asbestos identified during Services, risk assessment conducted; if exposure above Action Level (0.1 fibres/ml over 4 hours), immediate control measures implemented and air monitoring conducted to declare area safe. Supplier personnel entitled to stop work and leave contaminated area until declared safe by Compliance Monitoring or AAIA approved intervention. Contract dates extended by notification periods per regulations 3 and 21 of Asbestos Regulations. Removal/disposal of asbestos by registered asbestos contractor instructed by Purchaser at Purchaser's expense per SA legislation.
Environmental
Source: RF Cables & Connectors NEC supply contract.pdf (unknown)Z6.2: Supplier complies with all applicable environmental laws and regulations and rules, guidelines and procedures otherwise provided for under this contract and ensures subcontractors, employees and others under Supplier's direction and control likewise observe and comply. Z14 Nuclear Liability: Purchaser is operator of Koeberg Nuclear Power Station (KNPS), a nuclear installation designated by National Nuclear Regulator, holder of nuclear licence. Purchaser solely responsible for and indemnifies Supplier against any and all liabilities arising from nuclear damage as defined in Act, except to extent liabilities incurred due to unlawful intent of Supplier or unauthorised presence at KNPS. Purchaser waives rights of recourse except for unlawful intent or unauthorised presence. Purchaser does not waive rights under section 30(7) of Act. Protection in effect until KNPS decommissioned. Insurance Table B includes Environmental Liability insurance per insurance policy document.
Contractual Terms
Source: RF Cables & Connectors NEC supply contract.pdf (unknown)Contract based on NEC3 Supply Contract (April 2013) with Options X1 (Price adjustment for inflation), X2 (Changes in the law), X7 (Delay damages), and Z (Additional conditions of contract Z1–Z15). Law of contract: Republic of South Africa. Language: English. Period for reply: 1 week. Starting date: date of last signature on document. Delivery date: as stated in each purchase order. Supplier does not bring goods to Delivery Place more than one week before Delivery Date. Supplier submits first programme within 2 weeks of Contract Date; revised programmes at intervals no longer than 4 weeks. Defects date: warranty period as per Manufacturer's specifications after Delivery. Defect correction period: maximum 4 weeks. Defects access period: maximum 1 week. Assessment interval: after complete Delivery of each order. Currency: South African Rand. Payment period: within 30 days of receipt of commercially and financially correct tax invoice for contracts valued under R50 million; within 60 days for contracts valued at R50 million and above (excluding VAT). Interest rate: zero percent above publicly quoted prime rate of Standard Bank of South Africa Limited. Compensation events per Section 6 of NEC3 SC. Title per Section 7. Purchaser's additional risks: None. Supplier's liability for indirect/consequential loss limited to R0.00. Supplier's liability for loss/damage to Purchaser's property limited to applicable deductible. Supplier's liability for design defects not notified before defects date limited to replacement cost of goods for manufacturing defects; liability period 12 months after defect liability period ends. Supplier's total liability limited to latent defects from manufacturing flaws. End of liability date: 12 months after Delivery of whole goods and services with support of spares. Termination and dispute resolution per Section 9 of NEC3 SC. Adjudicator selected from ICE-SA Division of SAICE Panel of Adjudicators; if no agreement, appointed by Arbitration Foundation of Southern Africa (AFSA). Tribunal: arbitration per latest Rules for Conduct of Arbitrations by Association of Arbitrators (Southern Africa); place: South Africa. Arbitrator chosen by Chairman of Association of Arbitrators (Southern Africa) if parties cannot agree. Price adjustment (X1): CPA kicks in after 16 months from base date; base date: month prior to tender closing date; proportions: 0.85 adjustable, 0.15 non-adjustable. Changes in law (X2): change in South African law after Contract Date is compensation event. Delay damages (X7): 5% per purchase order if Supplier is one week outside agreed delivery timelines; maximum 15% in two weeks outside timelines; applied per purchase order considering urgency and impact; Purchaser must prove everything administrable was done without success; emails and letters used as source documents. Z1: Cession, delegation, assignment - Supplier requires Purchaser's written consent; Purchaser may cede to subsidiaries/divisions from ESI restructuring. Z2: Joint ventures - joint and several liability; notify Supply Manager of key person within 2 weeks; no composition change without Purchaser's written consent. Z3: B-BBEE status change - notify Purchaser within 7 days; submit updated verification certificate within 30 days; decreased status allows renegotiation or termination; failure to notify may constitute termination reason. Z4: Confidentiality - no disclosure without consent; exceptions for public domain and prior possession; images require prior written consent; subcontractors must comply. Z5: Waiver and estoppel - no waiver unless agreed in writing. Z6: Health, safety, environment - Supplier warrants prices include sufficient amount for H&S compliance; complies with all applicable H&S and environmental laws; ensures subcontractors/employees comply. Z7: Tax invoice - Supplier provides tax invoice within 1 week of payment certificate; late invoice extends payment period; Supplier must comply with VAT Act and include Purchaser's VAT number 4740101508. Z8: Compensation events - delete words "unless the event arises from the Supply Manager giving an instruction, changing an earlier decision or correcting an assumption" from core clause 61.3. Z9: Purchaser's limitation of liability - indirect/consequential loss limited to R0.00; indemnity liability limited. Z10: Termination - add "or had a business rescue order granted against it" to core clause 91.1. Z11: Delay damages termination - if delay damages reach limits, Purchaser may terminate using procedures for reasons R1–R15 or R18. Z12: Ethics - definitions of Prohibited Actions (Coercive, Collusive, Corrupt, Fraudulent, Obstructive); Committing Party may not take Prohibited Actions; Purchaser may terminate if Prohibited Action occurs; amounts due per core clauses 92.1 and 92.2; cooperation with investigations required. Z13: Insurance - Supplier provides insurances per Insurance Table A (loss/damage to goods, liability for property damage/bodily injury, employer's liability); Purchaser provides insurances per Insurance Table B (Assets All Risk, Contract Works, Environmental Liability, General and Public Liability, Transportation/Marine, Motor Fleet and Mobile Plant, Terrorism, Cyber Liability, Nuclear Material Damage and Business Interruption). Z14: Nuclear Liability - Purchaser is operator of Koeberg Nuclear Power Station; indemnifies Supplier against nuclear damage liabilities except unlawful intent or unauthorised presence; waives recourse except section 30(7) of Act; protection until KNPS decommissioned. Z15: Asbestos - Purchaser ensures ambient air conforms to SA standards (OEL 0.2 fibres/ml 4-hour TWA, STEL 0.6 fibres/ml 10-min TWA); certifies conditions on request via SANAS accredited AAIA; Supplier may perform parallel measurements; Purchaser manages asbestos per Standard 32-303; risk assessment and control measures if asbestos identified; Supplier personnel may stop work and leave contaminated area until declared safe; contract dates extended by notification periods per Asbestos Regulations; removal/disposal by registered asbestos contractor at Purchaser's expense.
Section
Source: RF Cables & Connectors NEC supply contract.pdf (unknown)The document contains only a reference to a quality section (4.11) without any evaluation criteria, scoring methodology, minimum thresholds, or preference point system. No tender-specific evaluation criteria can be recovered.
Important Dates
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)Closing date: 2026-09-22 at 10:00 (local time).
Contact Information
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER){"name":null,"email":"[email protected]","phone":null,"department":null,"address":"ls before they can be granted access to the eTendering system. An"}
Evaluation Criteria
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)Bidders must be registered on the Central Supplier Database (CSD) to gain access to the Eskom eTendering system. No other eligibility criteria are specified in the provided document.
Technical Specifications
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)eTendering system is a web-based system that allows suppliers bidding for various tenders advertised
on Tender Bulletin system to “upload” their tender documents. Currently the tenderers or suppliers
submit tender documents at various Eskom tender offices. eTendering system replaces the manual or
physical submission of tender documents at various Eskom tender offices. eTendering system in a
nutshell is an electronic box where tender documents can be “dropped” or “uploaded”. Suppliers will
be required to register their details before they can be granted access to the eTendering system. An
OTP (one time pin) will be sent to both their cell phone and email address.
Quick and direct access is also available by using the following links:
of the public, to view and access Eskom published tenders. eTendering hyperlink will be found
on this site. Members of the public may follow prompt instructions once they have clicked on
the eTendering link (https://eTendering.eskom.co.za). This link will allow them to upload the
required tender documentation.
members of the public, to view information about published tenders and submit their tender
documents.
eTendering system.
2 Problems
A channel of communication has been created in case users of the system experiences a problem
with the system. In a case users come across some difficulties in using Tender bulletin, eTendering
and OpenText systems they need to contact the buyer responsible for the published tender.
3 What’s New
A new functionality to “add closed tenders”. Closed tenders refers to the tenders which are not listed
on Tenderbulletin as normal tenders, but are tenders sent directly to the relevant and potential
suppliers who meet the selection and evaluation criteria to offer what the buyer needs. These
suppliers will be sent a link via email to bid privately.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
4 Getting Started
To gain access to eTendering portal
Open your web browser
Type TenderBulletin (eskom.co.za) or https://eTendering.eskom.co.za
eTendering system login page will be displayed:
Fig 1
Registration Form Steps to follow
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Plus prefix e.g +27
capture picture to validate that you
are not a robot.
click on register button
the registerer to verify the email sent to
the provided email address.
click on “Resend Verification Email”
button
on link provided on
the email.
etendering site with a login screen
displayed, now complete the login
with your verified email address and
password
Fig1.1
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig2a.
Fig2b.
Fig3.
OTP page will be displayed
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
OTP sent to the registered cellphone number and email address
Insert the otp number then click “Verify OTP” button, to resend OTP click on “Resend OTP”
button
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Landing page once OTP is verified
Select the preferred “Ref No”
A page with the preferred Tender information is displayed before tender documentation can
be submitted.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Click on “Create New Submission” button to submit required Tender documents
Landing page once clicked on “Create New Submission” button. Take note of the
mentioned disclaimers.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
To submit tender documents, click on “Add file” button
Upload required tender documents by:
Giving the file a name
Select the listed file type e.g.: Technical, commercial, finance and etc
Choose the file you need to upload
Then click on “Upload” button, Fig5.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig4.
Fig5.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Continue to submit all the required documents under the correct category ,i.e: Technical
should be selected if technical documentation is uploaded and etc. Verify all required
documents are uploaded before making ‘Final Submission’ by clicking on ‘Finalize
Submission’ button.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
all uploaded files should not exceed 900MB.
will pop-up
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
If not all documents were submitted or still wish to add or submit more documents, click on
“No, continue adding files” button.
submission and closed time and date timestamp at the bottom.
submitted tenders will be displayed.
If you want to view or verify the submitted documents, click on “View Submission” button
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
submitted documents on email,Fig6.This is the final step for the submitter or tenderer.
It is vital to save the email with the submission ID for future enquiry if need be.
--------Originalmessage--------
From:Eskom E-Tender Document Submission 28 [email protected]
Date:Tue,23Aug2022,3:42pm
Subject: Response To Submitter
Eskom E-Tender Document Submission 28
Hi Monalisa
You have finalized a new submission with submission id:14 on tender #MPKUS10086PS
closing date : 2022-11-30 10:00:00.
Have started the submission from 2022-08-23 14:28:33 and finalized at 2022-08-23
15:42:28
Tender Description:
Award for Provision of Office Cleaning and Janitorial Services at Kusile Power Station
Project
Files Submitted:
ID Original Name Title Size Type
38 Test7.pdf testingCom 33141 Commercial
40 Test1.pdf testingTech 33502 Technical
41 Test15.pdf testingFin 33141 Finance
Thanks,
Eskom E-Tender Document Submission 28 Automated Mail
© 2022 Eskom E-Tender Document Submission 28. All rights reserved.
NB: This Email and its contents are subject to the Eskom Holdings SOC Ltd EMAIL
LEGAL NOTICE which can be viewed at
http://www.eskom.co.za/Pages/Email_Legal_Spam_Disclaimer.aspx
Fig6.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
5 Edit Registration
To edit already registered information such as Name, Organization, CSD and cell phone number
select “Edit Registration” on the drop down, Fig1. New window with information that needs to be
updated pop ups,Fig2. Click on “Update” button to update registration details.
Fig1.
Fig2.
6 Log off Button
To logout, click “Log out” on the dropdown next to your name
Fig1.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
7 Password reset
To reset a forgotten password, click “Forgot your password” Fig1. and a new screen will
pop up to enter an alternative email where the new password will be sent Fig2.Confirmation
message will be sent to the user, Fig3.
Fig1.
Fig2.
Fig3.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
An email confirming password reset will be sent to the email provided.
Click on the link or “Reset Password” button to reset the password.
Fig4.
A new window will pop up to reset and confirm the new password, Fig5.Enter new
password and confirm then click on “Reset Password” button.
Fig5.
OTP window will pop up, type in the OTP sent to either the cell phone or email address.
Fig6.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
OTP successfully goes through and lands on the below screen, password is successfully
reset.
Fig7.
8 General
This system is compatible to most web browsers however we recommend Ms Edge.
The end.
© 2023 Eskom of 19
Compliance Requirements
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)CSD number to gain access to
Description
Source: 240-109253698 CQP Template Rev 3.docx (unknown)The tender is for the supply and delivery of radio frequency cables and connectors for Eskom's distribution division on an "as and when" required basis for a period of 5 years. The document provided is a Contract Quality Plan (CQP) template that the successful bidder must complete and submit.
Technical Specifications
Source: 240-109253698 CQP Template Rev 3.docx (unknown)The tender is for the supply and delivery of radio frequency cables and connectors for Eskom's distribution division on an "as and when" required basis for a period of 5 years. The document provided is a Contract Quality Plan (CQP) template that the successful bidder must complete and submit. The CQP must cover: scope of work, communication channels with Eskom, an organogram showing QA/QC roles, an index of interfacing documents (standards, codes, specifications), a list of suppliers and sub-suppliers, monitoring of sub-suppliers, interface of sub-suppliers with the supplier's QMS, an index of items to be manufactured/refurbished/purchased, items/activities requiring a QCP/ITP, special controls governed by codes (e.g., welding, NDT), documented information to be submitted to Eskom, records control and retention, concession and non-conformance management, databook management, management of working tools and equipment, dealing with customer property, product preservation, identification and traceability, and commissioning and post-delivery activities.
Important Dates
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown){"closingDate":"27 June 2023"}
Contact Information
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)Ethics and reporting channels (for suppliers to report dishonest, fraudulent or inappropriate behaviour by Eskom employees/directors):
No SCM or technical contacts for this tender are provided in the document.
Submission Guidelines
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)Returnable documents:
Disqualification risks:
Evaluation Criteria
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)No tender-specific evaluation criteria, scoring split, minimum qualifying thresholds or preference-point system are stated in this document. The Integrity Pact sets ethical and behavioural obligations that apply to all Eskom procurement processes but does not define how bids are scored.
Technical Specifications
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)1.1 Scope
The Eskom Supplier Integrity Pact (Integrity Pact) is applicable to Eskom Holdings SOC Ltd (including all
wholly owned subsidiaries) and all existing and potential suppliers (as per the definition hereunder).
1.2 Purpose
The integrity pact is a pact between Eskom and its suppliers that prescribes the “ethical behaviour”. Ethical
behaviour is desirable/acceptable conduct (actions and decisions) that will bring about good/appropriate
consequences/outcomes in the interaction with others. Ethical behaviour incorporates ethical values and
considers not only what is good for oneself, but also what is good for others. Eskom considers such behaviour
of paramount importance and expects every existing/potential supplier and its own employees/directors to
always act ethically and with integrity.
Eskom commits to ensuring that it implements a procurement policy/procedure that aligns to all applicable
South African laws and regulations, as well as the constitutional principles of fairness, transparency, equity,
cost effectiveness and competitiveness.
This document supplements all other relevant Commercial and Ethics related policies/codes/procedures.
1.3 Preamble
In order to achieve this purpose, all Eskom suppliers are required to read this Integrity Pact and to complete,
sign and submit the Integrity Declaration Form whenever they participate in any Eskom procurement process.
Eskom and its suppliers commit to honouring their respective obligations herein, and agree to refrain from
any form of dishonesty, fraud, and/or corruption throughout the entire procurement process, including
tendering practices that are in bad faith, unfair and anti-competitive (e.g., under-pricing/collusion/bid rigging)
Term Definition
Conflict of Interest A conflict of interest arises when one’s personal interests, personal
financial interests or any other interests, affect, or could be perceived to
affect, or has the potential to affect one’s objectivity and discretion and/or
the objectivity and discretion of another in performing Eskom duties or
making decisions on behalf of Eskom. This means that an employee or
director is in a position to make a decision (or influences a decision) that
is not fair and objective in order to benefit personally, or to benefit related
and /or inter-related persons.
Director Means a member of the board of Eskom, or a board of its subsidiary or
an alternate director of such board and includes a person occupying the
position of a director, by whatever name designated, or a prescribed
officer, or a person who is a member of a committee of the board or of
the audit committee, irrespective of whether the person is also a member
of such board.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Supplier Integrity Pact Unique Identifier: 240-113650212
Revision: 2
Page:
Employment equity The Employment Equity Act promotes equity in the workplace,
ensures that all employees receive equal opportunities and that
employees are treated fairly by their employers. The law protects a
person from unfair treatment and any form of discrimination.
Employee (s) Also referred to as staff members. These include individuals employed
by Eskom on a permanent basis, contract labour, temporary employees,
part-time employees, casual employees, occasional employees, fixed-
term contractors, learners, and others acting on behalf of Eskom or its
subsidiaries.
Eskom Registered Vendor Means a current or potential supplier who may be a natural or juristic
person and includes any employee of such supplier acting within the
course and scope of his/her employment, or any agent or manager acting
for or on behalf of, or in the interests of the supplier registered as a vendor
on the Eskom Vendor Database.
Supplier Means any natural person or juristic person that does business with
Eskom or tenders to do business with Eskom, or is registered on Eskom’s
Vendor Database, such as consultants, contractors, sub-contractors and
providers of goods and services.
Abbreviation Explanation
DOI Declaration of Interest
ETC EXCO Tender Committee
NDA Non-disclosure agreement
RFP Request for Proposal
RFQ Request for Quotation
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Supplier Integrity Pact Unique Identifier: 240-113650212
Revision: 2
Page:
4.1 Eskom’s suppliers accept that they will at all times:
4.1.1 Maintain an impeachable standard of integrity in all their business and personal dealings and take all
reasonable measures necessary to prevent all dishonest, unfair, fraudulent, corrupt, and illegal
practices during any stage of the Eskom procurement process including the execution of contracts
and contract modifications.
4.1.2 Ensure that they are familiar with all publicly available Eskom policies/ procedures/codes that impact
the supply chain processes including, but not limited to Eskom’s Standard Conditions of Tender.
4.1.3 Reject all improper business practices (as may be prohibited by Eskom).
4.1.4 Not abuse the trust placed in them by Eskom employees, or misuse opportunities arising during their
interaction with Eskom for personal gain.
4.1.5 Seek to constantly maintain and enhance their standards of professional competence.
4.1.6 Adopt, where possible, policies and practices which align with those of Eskom (labour practices,
employment equity initiatives and human relations policies) to the highest ethical standards.
4.2 Eskom’s suppliers confirm specifically that:
4.2.1 All confidential information, to which they may have access in the course of their work, must not be
disclosed without the express consent from the authorised Eskom representative. The supplier is
required to complete a Non-Disclosure Agreement (NDA) to give effect to this.
4.2.2 They will not deliberately misrepresent information, submit false certifications or forged documents to
influence the tendering process to advantage themselves or to mislead Eskom in any way and that
Eskom has the right to request an audit of such information, and take further action against the supplier
should it be found that it has acted in a dishonest or fraudulent manner.
4.2.3 Although the establishment of long term and close relations between Eskom and its suppliers is
recognised, Suppliers are nevertheless, required to avoid relationships with Eskom
employees//directors, that may be perceived to be contrary to the constitutional principles of fairness,
equitability, transparency, competitiveness, and cost effectiveness. Suppliers are therefore required
to complete the Integrity declaration form wherein they are required to disclose any interest that they
may have with an Eskom employee/director, whether financial, personal, or private, in its business,
and/or any affiliation /relationship which affects, or may affect, or may be perceived to affect, the
decision-making during tender award. Should a supplier later become aware that its
owners/members/directors/partners/shareholders are an Eskom employee/director with respect to a
tender in which it participated, the supplier is required to disclose the interest/relationship to Eskom
and submit whatever information may be required regarding the parties involved.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Supplier Integrity Pact Unique Identifier: 240-113650212
Revision: 2
Page:
4.2.4 Although the entertainment of customers and provisions of business courtesies or gifts are generally
an accepted commercial practice, they must not in any way negatively affect Eskom’s image and
reputation. They should not exceed the R1500,00 value prescribed by Eskom and should not be of
such a nature (value or circumstances) as to be construed as placing an Eskom employee/director
under obligation to the supplier or in any way improperly influence the recipient.
4.2.5 They will avoid entering into unethical and/or fraudulent dealings with any Eskom employee/director
involved in the evaluation/adjudication/negotiation of a transaction in which it participates, involving
direct/indirect monetary or material benefits in order to be unfairly benefitted. In such circumstances,
no business courtesy, bribe, gift, fees commission or inducement may be offered to, or requested by
an Eskom employee/director involved in the evaluation/adjudication/negotiation of a transaction in
which the supplier is participating.
4.2.6 They will not enter any dishonest and/or illegal agreement or an understanding with other tenderers
involved in a tender/RFP process in which it participates. They will complete the integrity Declaration
Form which incorporates a Declaration of Fair Tendering Practices, when participating in any Eskom
tender/Request for Quotation (RFQ).
4.2.7 They understand that they may be subject to a supplier discipline process and that sanctions that
may be imposed on suppliers should they be found guilty of misconduct.
4.2.8 Should a supplier become aware of any dishonest, fraudulent or inappropriate behaviour of any Eskom
employee/director; the said supplier is required to report this behaviour to the Eskom Ethics office via
email at [email protected], or via the Eskom Forensic email at [email protected] or through
the Eskom toll free hotline 0800 11 27 22, wherein confidentiality is guaranteed.
5.1 Eskom undertakes to treat all tenderers during the tender process according to the constitutional
principles of fairness, transparency, equity, cost-effectiveness, and competitiveness.
5.2 All Eskom employees/directors are required to complete an annual Declaration of Interest (DOI),
wherein they are required to declare all interests, directorships, memberships, details of any of their
related or inter-related persons or other associates that conduct business with Eskom and all other
material personal interests, whether a conflict exists or not. During the financial year, all Eskom
employees/directors have an option of amending annual DOIs should there be changes in their
interests or what has been disclosed already. In addition to this annual declaration, employees are also
required to complete an additional DOI and NDA if involved in the procurement process.
5.3 Eskom employees will ensure that all gifts received in the normal course of business is declared,
recorded, and authorised by relevant managers. Employees/directors involved in the tender evaluation/
negotiation process, may not accept, demand, or accept a promise of any money, business courtesies,
gifts, rewards, gratuity, favours from any of the tenderers involved to benefit or as may be perceived to
benefit such tenderer. Further to this, employees and directors are prohibited from offering or accepting
loan(s) or other benefit(s) from suppliers, unless the supplier is in the business of granting such loans
or benefits and the terms and conditions of the loan that is offered to the employee/director is also
offered to the general members of the public or a section thereof.
5.4 Should Eskom become aware of any relationship/interest of any employee/director in a tender in which
it is involved in tender evaluation/negotiation process, then this employee/director will be excluded from
the said tender evaluation/negotiation process.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Supplier Integrity Pact Unique Identifier: 240-113650212
Revision: 2
Page:
5.5 Eskom will implement the Supplier Discipline Process if it becomes aware of any contravention of the
provisions of this integrity pact, any other misconduct by a supplier and/or any Eskom
employee/director who acts in bad faith to benefit themselves or a supplier. Eskom has the right, after
following a process of investigation and affording the supplier an opportunity to make representation,
to notify the supplier of the intention to suspend it from the Eskom Vendor Database, impose various
other sanctions and/or institute disciplinary actions against its employees/directors. Subsequently,
Eskom will forward the names of such suppliers including the directors of the company to National
Treasury, who will include the suppliers on the List of Restricted Suppliers on the National Database.
5.6 All Eskom employees/directors are prohibited from having any direct/ indirect personal or other
beneficial interest in any contract with Eskom, whether as a supplier, an advisor or by virtue of being a
director or owner of a business, or in any other capacity. This includes third-party related transactions
with an indirect link to an Eskom contract.
6.1 This Eskom Supplier Integrity Pact is governed by and interpreted in accordance with the laws,
regulations and legislation of the Republic of South Africa.
6.2 The actions stipulated in this Integrity Pact are without prejudice to any other civil or criminal
proceedings that may arise in accordance with the provisions of the law.
6.3 This Integrity Pact shall remain valid until replaced. Should one or more provisions of this Integrity
Pact be regarded as invalid, remainder of the provisions will remain valid.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Compliance Requirements
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)Mandatory compliance obligations for suppliers:
Requirements
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)Supplier obligations:
Description
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)This specification (240-105658000) defines the minimum quality requirements for all Eskom suppliers.
It outlines the quality criteria for selection, evaluation, vendor registration, management, monitoring, assessment, and auditing of suppliers.
The specification is applicable to all Eskom RFI/RFQ/RFP processes and contracts.
Contact Information
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown){"name":null,"email":null,"phone":null,"department":"Supply Chain Management","address":null}
Evaluation Criteria
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Quality evaluation follows Eskom Supplier Quality Management Specification 240-105658000.
Bidders must complete Form A (240-68099512) to acknowledge and accept the quality requirements.
The applicable quality category (1-4) will be indicated by Eskom; returnable documents per category are listed in the List of Tender Returnables (240-12248652).
At minimum, returnables may include a valid ISO 9001 certificate (category 1) or evidence of a developed QMS (categories 2-4), a draft Contract Quality Plan, example Quality Control Plan / Inspection and Test Plan, internal audit reports, documented information for management review, and control of externally provided processes.
Eskom may conduct capability and capacity assessments before contract award.
Form A, quality documentation, and any other returnables must be submitted with the tender.
Technical Specifications
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Title: Supplier Quality Management: Document Identifier: 240-105658000
Alternative Reference QM 58
Number:
Area of Applicability: Eskom Holdings SOC Ltd
Functional Area: Quality Management
Revision: 3
Total Pages: 28
Next Review Date: October 2024
Disclosure Controlled Disclosure
Classification:
Compiled by Supported by Functional Authorized by
Responsibility
SA Sambo P Dondashe L Meyer K Pather
Chief Advisor Middle Manager Acting Senior General Manager
Quality Quality Manager Quality Risk and
Management Management Management Sustainability
Date: 15/10/2021 Date: 15/10/2021 Date: 15/10/2021 Date: 17 October 2021
EDC TN Formatted 15.10.2021
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Content
. Introduction ............................................................................................................................... 3
2.1 Scope ............................................................................................................................... 3
2.1.1 Purpose ................................................................................................................. 3
2.1.2 Applicability ........................................................................................................... 3
2.1.3 Effective date ......................................................................................................... 3
2.2 Normative/Informative References ................................................................................... 3
2.2.1 Normative .............................................................................................................. 3
2.2.2 Informative............................................................................................................. 3
2.3 Definitions ........................................................................................................................ 4
2.4 Abbreviations ................................................................................................................... 5
2.5 Roles and Responsibilities ............................................................................................... 6
2.6 Process for Monitoring ...................................................................................................... 6
2.7 Related/Supporting Documents ........................................................................................ 6
3.1 Supplier and Sub-Supplier Quality Management System Requirements .......................... 7
3.2 Quality Plan ...................................................................................................................... 8
3.3 Contract Quality Plan........................................................................................................ 8
3.4 Quality Control Plan ....................................................................................................... 10
3.5 Pre-Contract Award: Quality Requirement ...................................................................... 13
3.6 Main Supplier and Sub-supplier Capability and Capacity Assessment ........................... 16
3.7 Post-Contract Award ...................................................................................................... 17
3.7.1 Contract Execution .............................................................................................. 17
3.7.2 Supplier Quality Performance Monitoring Phase ................................................. 18
3.7.3 Supplier Quality Audit .......................................................................................... 18
3.8 Standard Conditions ....................................................................................................... 19
3.8.1 Rights of Access .................................................................................................. 19
3.8.2 Eskom Rights to Information ................................................................................ 20
3.8.3 Preservation ........................................................................................................ 21
3.8.4 Quality Audits Related Conditions ....................................................................... 25
3.8.5 Management of Nonconformities and Nonconforming Outputs Identified by
Eskom ................................................................................................................. 25
3.8.6 Special Processes ............................................................................................... 26
Acceptance ............................................................................................................................. 27
Revisions ................................................................................................................................ 27
Development Team ................................................................................................................ 27
Acknowledgements ................................................................................................................ 28
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The intention of this specification is to specify and describe the minimum quality requirements for all
existing and potential Eskom suppliers and define the quality criteria for the selection, evaluation,
vendor registration, management, monitoring, assessment and auditing of suppliers. Eskom’s
position is to partner with suppliers who fully demonstrate commitment to the development,
implementation, and maintenance of a quality management system (QMS) that conforms to the
requirements of ISO 9001 standard. The priority is to encourage suppliers to continually improve
their QMS and enhance service delivery by implementing and conforming to the standard.
2.1 Scope
2.1.1 Purpose
The purpose of this specification is to outline the requirements according to which suppliers shall
develop,
implement,
maintain, and
continually improve
a quality management system (QMS) based on ISO 9001, which should form the basis for conformity
to Eskom quality requirements and continually adhere to them throughout the duration of a contract
2.1.2 Applicability
This specification shall apply throughout Eskom Holdings Limited divisions, its subsidiaries,
suppliers, and sub-suppliers and shall form part of all Eskom requests for information (RFI)/ requests
for quotation (RFQ)/ requests for proposal (RFP), including contracts for the procurement of products
and services.
2.1.3 Effective date
Date of authorisation of the specification
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] ISO 9001 Quality Management Systems – Requirements
[2] ISO 10005 Quality Management Systems – Guidelines for Quality Plans.
2.2.2 Informative
[3] ISO 9000 Quality Management Systems – Fundamentals and Vocabulary
[4] 32-727: Safety, Health, Environment, and Quality (SHEQ) Policy
[5] ISO 10006 Quality Management Systems – Guidelines for Quality Management in Projects
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
[6] ISO 9004 Quality Management – Quality of an Organisation – Guidance to Achieve Sustained
Success
[7] 32-1033: Eskom’s Procurement and Supply Chain Management Policy
[8] 32-1034: Eskom’s Procurement and Supply Chain Management Procedure
[9] PPPFA: Preferential Procurement Policy Framework Act, 2000 (Act No. )
[10] CIDB 1004: Best Practice Guideline A4: Evaluating Quality in Tender Submissions
[11] 240-12248652 Supplier Quality Management: List of Tender Returnables
[12] IAEA Safety Standard GS-R-3.1 Application of the Management System for Facilities and
Activities
[13] SANS 10845-1 Construction Procurement Part1: Processes, Methods and Procedures
2.3 Definitions
The vocabulary of ISO 9000 and the following definitions apply in the application of this specification.
2.3.1 Component: a constituent part of the product or sub-assembly of the product. The product
may comprise multiple individual components
2.3.2 Contract Quality Plan: a document of the supplier’s process for delivering the level of quality
required by the contract. It is a framework for the contractor’s process for delivering quality.
Purpose of a CQP is to outline how the results defined in the specifications will be achieved.
2.3.3 Hold Point: a predetermined stage in the quality control plan (QCP) beyond which work/
manufacturing shall not proceed without the attendance of, and written authorisation of, an
Eskom representative or Eskom inspection agency, whichever is applicable.
2.3.4 Intervention Points: those control points indicated by the various controlling bodies
concerned with the implementation of a specific QCP/ ITP. These can be in the form of
inspection, hold points, surveillances, witnesses, reviews and verifications.
2.3.5 Inspection Agency: an organisation or person appointed by Eskom for the purpose of
performing quality assurance/ quality control, monitoring, inspection and/ or expediting
services.
2.3.6 Level 1 Plant Items: equipment, whose failure has an effect on personnel safety and/ or
health, causes an environmental incident, cause a huge production loss or major equipment
damage. Equipment that are safety/ redundancy/ protective device or covered by statutory
regulations requirements.
2.3.7 Level 2 Plant Items: equipment, whose failure impacts plant availability and/or reliability,
causes significant costs or secondary damage.
2.3.8 Level 3 Plant Items: equipment that does not impact on personnel safety and/ or health,
environmental, cost, availability and/ or reliability of plant.
2.3.9 Nonconformity: a deficiency in material, composition, characteristic, or performance that
renders the quality of an item, component, or product unacceptable or indeterminate. The
term also covers a deficiency in, or deviation from/non-adherence to, the quality management
system requirements, prescribed production processes, and/or related documentation such
as procedures and instructions.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
2.3.10 Quality Plan: specification of the actions, responsibilities and associated resources to be
applied to a specific object.
2.3.11 Quality Control Plan: a document specifying the activities to be inspected throughout the
execution of the project, inclusive of test methods, procedures, and acceptance criteria (This
term is equivalent to QIP and ITP).
2.3.12 Requirement: the need or expectation that is stated, generally implied, or obligatory.
Requirements are generally specified in the purchase order and/or contract documentation,
but may not be limited to these.
2.3.13 Primary Plant (Power Plant): primary plant include High Voltage equipment situated inside
the control room (breakers, bus-bars, CT’s, VT’s and transformers).
2.3.14 Secondary Plant (Control Plant): secondary plant includes all equipment used to control
and protect the HV equipment on the primary plant side. (Protection, metering, AC/DC and
tele-control).
2.3.15 Special Process: is any production or service process which generates products or services
which cannot be measured, monitored, or verified prior to delivery and use.
2.3.16 Supplier: is a current or potential supplier, vendor, contractor, consultant, or service provider.
A supplier may be a natural or legal person and includes any employee acting within the
course and scope of his/her employment or any agent or manager acting for, or on behalf of,
or in the interests of, the person registered as supplier on the Eskom supplier database.
2.3.17 Sub-supplier: an organisation that provides a product/service to the supplier and/or that
enters into a subcontract and assumes some of the obligations of the supplier or prime
contractor.
2.3.18 Witness Point: a predetermined stage in the quality control plan where and inspection
activity will take place. Work may proceed, provided Eskom or its inspection agency has been
formally notified and confirmed that inspection is waived.
2.4 Abbreviations
Abbreviation Explanation
AIA Approved Inspection Authority
CA Corrective Action
CQP Contract Quality Plan
FIDIC Federation Internationale Des Ingenieurs- Conseils
FMECA Failure Mode, Effects and Criticality Analysis
HAZOP Hazard and Operability Study
ISO International Organisation for Standardisation
ITP Inspection and Test Plan
NC Nonconformity
NDT Non Destructive Testing
PMI Positive Material Identification
QCP Quality Control Plan
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Abbreviation Explanation
QMS Quality Management System
PQP Project Quality Plan
RFI Request for Information
RFQ Request for Quotation
RFP Request for Proposal
SHEQ Safety, Health, Environment, and Quality
SETA Skills Education Training Authorities
WPS Welding procedure specifications
WQR Welder’s Qualification Record
2.5 Roles and Responsibilities
Eskom Quality representative/ professional will select applicable requirements for existing and
potential Eskom suppliers using Form A (Tender and Contract Quality Requirements for Supplier
Quality Management: Specification 240-105658000/ QM 58 and Quality Requirements for ISO 9001
Standard).
The existing and/ or potential suppliers must complete, sign and return Form A with the other
returnable as listed in the List of Tender Returnable document (240-12248652). Other roles and
responsibilities for this standard are defined within the text of this specification.
2.6 Process for Monitoring
The application of this specification throughout Eskom shall be audited as per the management
system audit schedule.
2.7 Related/Supporting Documents
The documents superseded by this specification: all divisional and business unit supplier quality
requirements standards and/or specifications.
Forms and templates:
[1] 240-68099512 Tender and Contract Quality Requirements for Supplier Quality Management
Specification 240-105658000/ QM 58 and Quality Requirements for ISO 9001 Standard (Form
A)
[2] 240-109253698 Template for a Typical Contract Quality Plan
[3] 240-109253302 Quality Control Plan/Inspection and Test Plan
[4] 240-126469599 Method Statement Template.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The quality assessment criteria and Form A of this specification will be selected and completed by
an Eskom Quality representative/ professional who will identify the applicable supplier quality
requirements to be met.
Form A of this specification must also be completed and signed by the supplier responding to an
Eskom invitation to tender, in order to acknowledge and accept Eskom Supplier Quality requirements
as per this specification and ISO 9001 Standard or any additional quality requirements specific to
the scope of work.
3.1 Supplier and Sub-Supplier Quality Management System Requirements
3.1.1 The supplier and sub-supplier shall develop, implement, maintain and improve a formal QMS
that conforms to the latest ISO 9001 standard or any applicable standard of QMS (latest
applicable revision) and in accordance with the requirements of this specification.
3.1.2 Such a formal system shall consist of the appropriate documented information required by
ISO 9001 and may include a quality manual, quality plans, work procedures, work
instructions, method statements, work flow documentation, etc., as the case may be. This
requirement constitutes the most basic QMS requirements.
3.1.3 Unless specifically excluded from the quality list of tender returnable, as per the categories of
quality requirements (Category 1, 2, 3, or 4), such a QMS shall carry a valid ISO 9001
certificate from an accredited certification body, as indicated in the applicable Eskom
invitation (this requirement applies equally to both the supplier and any/ all manufacturing
third-party organisations mentioned above).
3.1.4 Unless specifically excluded in the quality list of tender returnable, as per the categories of
quality requirements (Category 1, 2, 3, or 4), the supplier shall have a fully developed,
documented, implemented, reviewed and maintained QMS that complies with the
requirements of ISO 9001 standard or any applicable standard of QMS. In the event that the
main supplier invariably requires the assistance of a sub-supplier in order to realise its own
supply obligations. The aforementioned requirement applies equally in all cases where any
such sub-supplier’s scope of responsibility includes the provision of any of the following
activities, namely, design and development, manufacturing, maintenance, testing, storage,
delivery, installation, commissioning, and project management, or in the cases the supplier
name changes, mergers, acquisitions and/ or cessions. Eskom Quality department must
ensure that the changed entity can still fulfil the requirements as set out in the contract
documentation.
3.1.5 Eskom reserves the right to request and perform necessary assessments at sub-supplier
facilities.
3.1.6 The main supplier shall be responsible for defining and managing the specific quality
assurance and control elements applicable to the respective sub-supplier’s scope of
work/supply and ensure that its sub-supplier(s) quality programmes support Eskom
requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.1.7 The supplier shall inform Eskom of any proposed changes to the QMS or staff that will affect
the quality system prior to implementation of these changes.
3.1.8 The main supplier shall develop and implement a performance management programme for
their sub-supplier. The programme shall include, but not limited to:
Verification of the QMS
Audits and surveillances
Regular assessment of the CQPs and reviews of QCPs.
NC and Defect Management
Inspection and test plans
Risk management
3.2 Quality Plan
The information in this section constitutes the minimum requirements for a quality plan.
3.2.1 Where specified in the Evaluation Criteria and/ or quality list of tender returnables , as per the
categories of quality requirements (Category 1, 2, 3, or 4); all individual products, services
and processes shall have a documented, implemented, reviewed and maintained contract
quality plan and/or quality control plan (inspection and test plan).
3.2.2 Where specified in the evaluation criteria and/ or quality list of tender returnables. All
production and/ or service provision shall be carried out in accordance with a documented
and agreed contract quality plan (CQP) and/ or quality control plan (QCP)/ inspection and test
plan (ITP).
3.2.3 The supplier shall plan for the required quality-related activities and interfaces within the
supplier’s quality system in order to demonstrate its ability towards both controlling and
meeting specified Eskom requirements.
Note 1: Contract Quality Plan should address the quality assurance elements related to the scope
of work and/ or technical specification.
Note 2: Quality Control Plan (QCP)/ Inspection and Test Plan (ITP) should address the quality
control elements related to the scope of work and/ or technical specification.
3.3 Contract Quality Plan
The main supplier shall require sub-suppliers to submit project quality plans (PQPs)/ contract quality
plans (CQPs) and associated documentation in accordance with the requirements of project QMS
processes applicable to the sub-supplier’s scope of work.
The supplier shall, where applicable, based on scope of work criticality, ensure that procurement
documents clearly and unambiguously require sub-supplier submission of a sub-supplier CQP for
supplier and Eskom review.
The main supplier shall ensure that sub-supplier CQPs are developed and implemented in
accordance with the ISO 10005 Quality Management System Guidelines for Quality Plans. In
addition to the elements specified in ISO 10005, the supplier’s and/ or sub-suppliers’ CQPs shall
include the following (as applicable):
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.3.1 The management of records, including material tests, positive material identification (PMI)
testing, material certification, etc.
3.3.2 The provision for free and uninhibited access by the supplier and/or personnel at the time of
inspection.
3.3.3 The proposals for submission of final documentation, the final manufacturing data book, prior
to shipment.
3.3.4 The special processes related to welding: management of the welder’s qualification record
(WQR), welding procedure specifications (WPS), and procedures qualification records (PQR)
that will be used in the performance of work for supplier review and acceptance prior to
commencing manufacture. Welders shall be qualified to the specified Codes of Construction
for the applicable procedures. The requirements for qualification shall be specified by the
supplier, and welder records shall be maintained by sub-suppliers performing the work.
3.3.5 The special installation procedures and other required fabrication or manufacturing
procedures (that is, those required for post-weld heat treatment, tube rolling, coatings, etc.)
that will be used in the performance of work shall require supplier review and acceptance
prior to commencing manufacture. The personnel carrying out special processes (for
example, NDE, welding, coating, heat treatment, etc.) where the results cannot be fully
verified by subsequent inspection and test shall be suitably qualified and, where applicable,
registered with statutory bodies as legally required, that is, as radiographic workers to conduct
radiography. The requirements for the qualification shall be specified, and personnel records
shall be maintained in accordance with the Project Quality Personnel Qualification
Specification and, where applicable, legal requirements.
3.3.6 The personnel required to perform special processes shall be certified competent through a
certificate of competency in accordance with the company’s internal training management
and competency control procedures or an external certification body (for example, NDT)
through an accredited service provider as per Skills Education Training Authorities (SETA)
requirements.
3.3.7 All personnel who perform activities that affect quality shall have their training needs identified
and documented. The required training shall be implemented in accordance with the
company’s training management and competency control procedures. All the training
certificates shall meet the SETA requirements in terms of having the unit standard completed
and the accreditation number of the service providers.
3.3.8 Instructions and requirements for equipment and materials storage, preservation, and
maintenance, including identification of materials required for preservation and maintenance,
are to be provided sufficiently prior to receipt (prior to shipment or earlier) to ensure that
appropriate resources are available at the time of delivery.
3.3.9 Specific quality monitoring and verification activities are to be undertaken on the supplier’s
sub-suppliers by Eskom or it agent.
3.3.10 The CQP information need to include, but not limited to:
Spells out the aspects of the QMS to be applied within a specific Eskom project, and the
methods to be utilised to ensure quality.
Outline the resources, the communication channels, applicable documents and records to be
generated.
Management Authority and Responsibility from both supplier and client need to outline in the
Cqp.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
List of documents and records that will be used and submitted during the execution of the
project.
Communications channels should include contact person and contact details
Monitoring & measurement procedures for activities need to be indicated.
3.3.11 The main supplier and sub-supplier CQPs shall comply with the Eskom Quality Requirements
Specifications and shall be submitted prior to the initial scope of work kick-off or initial pre-
fabrication meeting and prior to commencement of manufacturing, whichever is earlier.
3.3.12 The Eskom template for CQP provided shall be used as guideline, where the supplier does
not have a CQP template.
3.4 Quality Control Plan
The supplier shall develop and implement processes and procedures that efficiently and effectively
monitor, verify and document the quality of the scope of work for deliverables.
The main supplier shall ensure that sub-supplier QCPs/ ITPs are prepared at a level of detail
sufficient to address all quality-control-related activities in a chronological order, from contract review
through materials verification, manufacturing, fabrication, assembly, final testing, commissioning,
hand-over documentation, and certification. In addition, the supplier shall ensure compliance with
the following requirements:
3.4.1 All stages of manufacturing, fabrication, assembly and installation shall be controlled by a
supplier’s QCP/ ITP that clearly and unambiguously identifies the quality verifications to be
performed and special attention to controls related to critical products and services.
3.4.2 QCP/ ITP shall be reviewed and accepted by Eskom, its inspection authority or agency, and
they shall allow for the insertion of Eskom specific requirements, including hold and witness
points prior to the commencement of work.
3.4.3 Subsequent changes to the Eskom accepted QCP/ ITP shall require Eskom, its inspection
authority or agency’s agreement prior to the commencement of work involving an activity
affected by such changes.
3.4.4 The ITPs should cover materials certification, fabrication works, in-process inspections, final
acceptance tests, packaging and pre- shipment/ transportation, shipping/ transportation
inspections where contracted, preservation, site acceptance tests, construction and erection
works, and pre-commissioning and commissioning tests.
3.4.5 All sub-supplier QCP/ ITP activity shall be performed using an Eskom-accepted supplier
Qcp/ itp.
3.4.6 All applicable codes, standards, and relevant acceptance criteria documents are available at
the work location, and Eskom representatives on site shall have on-going access to this
information. Workplace documentation shall be available in English and in any workforce-
appropriate language.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.4.7 Where activities subject to inspection and test procedures are to be undertaken by a sub-
supplier, the QCP/ ITP shall make reference to this fact and shall include descriptive details
of the sub-supplier’s involvement. A separate QCP/ ITP shall be required for each sub-
supplier scope of work.
3.4.8 The supplier shall be ultimately accountable and responsible for the development and proper
implementation of all sub-supplier QCPs/ ITPs, including those reviewed or developed by
sub-suppliers.
3.4.9 Eskom reserves the right to select intervention points on QCPs/ ITPs for Eskom oversight of
selected functions and to perform surveillance or audits of the work.
3.4.10 Once signed, the ITPs and QCPs become addendums to the main contract. These ITPs can
be reviewed at Eskom’s discretion based on its assessment of the supplier’s performance or
other risks.
3.4.11 A QCP/ ITP shall contain the following information:
Eskom contract number and title
The supplier’s order number
Identification of the area of works/contract
Description of the work, with components, item number, and activity date
QCP/ITP unique number
A list of the sequence of operations, including inspection and tests
The identification of the specification, drawing number, or procedure for each operation,
with reference to the relevant criticality risk rating
The acceptance criteria, with reference to the technical specification, in-house, national, or
international standard, with the relevant clause number for each operation
The inspection and test activities that the supplier has nominated for its intervention points
Provision for the inclusion of intervention points nominated by Eskom and/or its authority/
agency
Provision for intervention point acceptance by date and signature for all parties having
intervention in the plan
Inspection and test records to be generated by the supplier for each operation and an
indication of records to be provided to Eskom (as applicable)
3.4.12 The main supplier shall require sub-suppliers to submit QCPs/ ITPs and associated
documentation applicable to the sub-supplier scope of work. Any changes made to the QCP
after submission must be resubmitted to Eskom for further review. The supplier shall ensure
that all sub-supplier QCPs/ ITPs are in compliance with the Eskom Quality Requirements
Specifications, including, but not limited to, the following requirements:
Clear and unambiguous description of the equipment and location(s) at which each activity
will take place, including facility location(s)
Identification of quality verification activity and stage
The details of reference documents, procedures, or method statements to be utilised in
performance of the activity, including specific reference to actual sections and pages of
procedures, standards, instructions, specifications, etc.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Definition of acceptance criteria
Listing of certifying or verifying documents generated to provide evidence of compliance
with specified requirements; documents are to be provided using the proper Eskom
document numbering requirements
Identification of main supplier and sub-supplier (where applicable) third-party/approved
inspection authority (AIA) and Eskom inspection activities defined in terms of witness, hold,
document review, and verification monitoring points and provision for sign-off of each of the
above-mentioned parties for each intervention point
Qualification requirements for quality control inspectors, including any third-party/AIA
inspectors
Listing of all proposed test procedures
Acceptance criteria for each inspection or test in alignment with specified tolerances
A section for signed acceptance of the QC/ITP by the supplier, sub-supplier (where
applicable), and Eskom prior to commencement of work
Inspection or testing intervention points, including, but not limited to, factory acceptance test
and package acceptance test, witness, and hold points
3.4.13 A quality kick-off meeting will be held at the start of the contract and, if required, at the start
of each subsequent phase.
The supplier shall arrange coordination meetings with Eskom prior to placement of orders
for items or equipment to ensure that all technical and commercial requirements are clear
and understood. Fourteen days’ advance notice of meetings shall be given to Eskom.
Supplier inspection personnel, including inspection agency personnel, shall be competent
and qualified to perform inspection and testing assignments. Mobilisation of all such
personnel shall be in compliance with the Project Quality Personnel Qualification
Specification.
3.4.14 Where QCP/ ITP is applicable, the supplier shall ensure that sub-suppliers are provided with
comprehensive, clearly written, and unambiguous inspection and testing protocols, including
processes, procedures, and methods that shall include, but not be limited to, the following:
Requirements for inspection checklists and inspection assignments, with lists of items to be
inspected
An inspection and testing report format, report content, schedule for report processing and
distribution, and report retention requirements
Inspection and test report results response tracking (log) and resolution of nonconformity in
inspection and test processes, procedures, or methods and nonconformity identified in
inspection and test results
Associated Failure Mode, Effects and Criticality Analysis (FMECA) reports relating to the
equipment and sub-systems (if applicable)
Hazard and Operability Study (HAZOP) report, as applicable
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.4.15 The supplier shall establish processes and procedures for formal assessment of sub-supplier
inspection and testing programmes. These shall include review of sub-supplier inspection
reports and other quality control documentation. Additional formal assessment of
manufacturing, fabrication, and assembly facility operations shall be conducted by the
supplier to ensure continuing suitability, adequacy, and effectiveness of the sub-supplier’s
inspection and testing programmes. Assessment frequency shall be established in
consideration of the sub-supplier scope of work, criticality of scope of work deliverables, and
performance information. The assessment scope and schedule shall be developed in
consultation with Eskom.
3.4.16 Supplier processes and procedures for verification of supplier and sub-supplier purchased
product compliance with specifications shall obtain document return/review status prior to
implementation.
3.4.17 The objective is to finalise any outstanding procedural or other issues before proceeding to
deliver the works.
3.4.18 Eskom, in consultation with the supplier, develops an agenda for the meeting, and Eskom will
keep minutes of these meetings.
3.4.19 Mandatory pre-inspection meetings will be convened by Eskom or its inspection agency or
AIA to be attended by the supplier’s and sub-supplier’s representatives, including their quality
representatives who will be involved in the works, and records are to be kept.
3.4.20 Eskom reserves the right to appoint resident quality inspectors who can be based at the
supplier’s or sub-supplier’s premises and on site where the work is being performed. The
supplier is expected to provide workspace at no cost to Eskom for the inspector, as required.
3.4.21 Eskom may appoint any organisation it prefers to perform quality assurance and quality
control activities, either in the capacity as an AIA or inspection agency, on the works
contracted to the supplier, and the supplier or its sub-suppliers may not object, prevent,
hinder, undermine, circumvent, question, discredit, or in any way make it impossible for such
organisation to carry out its work on behalf of Eskom.
3.4.22 The Eskom template for QCP/ ITP provided shall be used as guideline, where the supplier
does not have a QCP/ ITP template.
3.5 Pre-Contract Award: Quality Requirement
3.5.1 Main Supplier and Sub-supplier Categories
Eskom supplier quality requirements for all existing and potential suppliers and sub-suppliers are
classified into four categories (category 1, 2, 3 and 4). Suppliers must prepare and submit quality
documentation as per the tender selected category (indicated in Form A) using the list of tender
returnables document.
NOTE: Only one (1) category must be applicable per procurement process e.g. [Eskom requests for
information (RFI)/ requests for quotation (RFQ)/ requests for proposal (RFP), including contracts for
the procurement of products and services].
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The following are the minimum returnable documentation for Categories 1 to 4:
3.5.2 Category 1: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit a valid copy of ISO 9001 or any applicable certificate of a QMS (the
latest applicable revision). The QMS should drive the supplier’s business management
processes to ensure that all of Eskom’s requirements are fully met on a consistent basis.
The supplier shall submit the latest copy of the management system internal and external
audit reports. The audit reports must include, if applicable, nonconformity identified, and the
resulting remedial actions (correction and/ or corrective action reports).
The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
Where applicable; the supplier shall submit a draft, or an example of an inspection and test
plan (ITP) or quality control plan (QCP) on similar and/ or previous work done.
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
The supplier shall submit documented information retained (records) of management review
meetings that include agenda, meeting minutes, attendance registers, reports, presentations,
etc.
Note: specific requirements per tender will be selected using the List of Tender Returnable
documents (240-12248652).
3.5.3 Category 2: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit objective evidence of a developed, implemented and maintained QMS
that complies with ISO 9001 or any applicable standard of quality management system (the latest
applicable revision). The following documents (approved/ signed copies) shall be submitted:
Quality Management System manual or a documented information that have defines and
describes the QMS and its scope
Quality Policy, aligned with the supplier’s strategic direction (documented information)
Quality Objectives (documented information)
Control of documented information (both maintain and retain documented information )
Internal audit procedure (documented information)
Control of nonconforming outputs (documented information)
Nonconformity and Corrective action procedure (documented information)
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The QMS should drive all the supplier’s business management processes to ensure that all of
Eskom’s requirements are fully met on a consistent basis.
The supplier shall submit the latest copy of the management system internal audit reports. The
audit reports must include, if applicable, nonconformity identified, and the resulting remedial
actions (correction and/ or corrective action reports).
The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
Where applicable; the supplier shall submit an example of inspection and test plan (ITP) or
quality control plan (QCP) on similar or previous work done.
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
The supplier shall submit documented information retained (records) of management review
meetings that include agenda, meeting minutes, attendance registers, reports, presentations,
etc.
Note: specific requirements per tender will be selected using the List of Tender Returnable
document (240-12248652).
3.5.4 Category 3: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit objective evidence of a developed QMS that complies with ISO 9001
(or the latest applicable revision). The following documented information (approved/ signed
copies) shall be submitted:
o Quality management system manual or a (documented information) that have
defines and describes the QMS and its scope
o Quality Policy, aligned with the supplier’s strategic direction (documented
information)
o Quality Objectives (documented information)
o Control of documented information (both maintain and retain documented
information )
o Internal audit procedure (documented information)
o Control of nonconforming outputs (documented information)
o Nonconformity and Corrective action procedure (documented information)
The QMS should drive all the supplier’s business management processes to ensure that all of
Eskom’s requirements are fully met on a consistent basis.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
Where applicable; the supplier shall submit an example inspection and test plan (ITP) or
quality control plan (QCP).
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
NB: specific requirements per tender will be selected using the List of Tender Returnables
document (240-12248652).
3.5.5 Category 4: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit a quality method statement based on ISO 9001 and specific to the
scope of work.
The quality method statement should address all the supplier’s business management
processes to ensure that all of Eskom’s requirements are fully met on a consistent basis.
The supplier shall submit a signed/ approved quality policy (aligned with the supplier’s strategic
direction). (documented information)
The supplier shall submit a copy of quality objectives. (documented information)
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of the documented information for roles, responsibilities and
authorities, specific to the project/ scope of work/ technical requirements. Examples of relevant
documented information are; organization charts, job descriptions, work instructions, duty
statements, manuals, procedures.
Note: specific requirements per tender will be selected using the List of Tender Returnables
document (240-12248652).
3.6 Main Supplier and Sub-supplier Capability and Capacity Assessment
Supplier capability and capacity assessments shall be performed prior to contract award on potential
suppliers participating in Eskom Holdings procurement process to:
provide products and services with high risk to operational sustainability
work on critical plant and equipment
supply of critical plant items or components
provide special processes
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
All sub-suppliers used by the main supplier/ contractor, performing work on Eskom critical plant
equipment, supplying commodities and providing specialised services shall be subjected to the
capability and capacity assessment.
Critical plant includes the following:
Generation Level 1 & 2 plant
Transmission and Distribution Power Plant & Control Plant
Mega Projects
All potential quality risks identified will be included in the assessment report provided for the tender
evaluation.
Note: Form A (Enquiry/ Contract/ Quality Requirements for Supplier Quality Management:
Specification 240-105658000/ QM 58 and ISO 9001) will be used to select and indicate whether
capability and capacity assessment will be conducted.
3.7 Post-Contract Award
3.7.1 Contract Execution
The supplier shall submit the following documents within 30 days or as per stated timeline after the
contract date, prior to the commencement of work, for acceptance by Eskom:
The supplier shall complete a QCP before contract award. This shall be reviewed and
signed off by Eskom within 30 days or as per stated timeline after contract award.
The supplier shall complete a quality control plan and ITP(s) for review and acceptance by
Eskom prior to the commencement of any work, inclusive of subcontracted work, within 30
days or as per stated timeline after contract award.
The sub-supplier QCP/ ITP shall be submitted for review and comment by the supplier and
by Eskom within 30 days or as per stated timeline after the award of the tender. All supplier
and Eskom comments shall be resolved prior to commencing work.
The equipment lists and an indication of pressurised components and systems.
Note: These plans are to be compiled in line with Eskom’s requirements and will have to be
discussed with, and approved by, Eskom prior to any work commencing.
Correspondence shall be directed to the project manager, and periodic quality review
meetings shall be convened by Eskom with the supplier.
The mandatory quality review meetings are to be convened by the nominated project quality
manager or his/her representative for the contract.
Monthly quality performance and management reports are to be prepared by the supplier
during contract execution. The content of these reports shall be agreed by Eskom when
submitted to Eskom on a monthly basis.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.7.2 Supplier Quality Performance Monitoring Phase
During the contract execution phase, suppliers shall be monitored by Eskom for performance on
quality-related aspects.
The outcomes of such monitoring will enable Eskom to take any appropriate actions pertaining to
the supplier.
The monitoring shall be carried out periodically by Eskom or at predetermined intervals during the
execution of a contract using agreed key performance indicators. The monitored key performance
areas include the following:
CQP and QCP /ITP
Delivery
Design
Cost
Management system
Subsequent key performance indicators associated with these areas will include the following:
Nonconformity monitoring
Audit and assessment evaluation scoring
Management system compliance and accreditation
Achievement of delivery targets as per contractual agreements
Process improvements
Correction and corrective action response and closure
3.7.3 Supplier Quality Audit
3.7.3.1 Quality audits and related quality performance reviews are intended to provide an objective
evaluation of compliance with performance expectations defined in this specification, in the
supplier contract quality plan (CQP), and in any other project scope of work specification.
3.7.3.2 Quality audits and related quality performance reviews include, but are not limited to, any
quality or other project functional area audits, assessments, verification of compliance
reviews, surveillance, inspections, or other interim or final assessments of scope of work
deliverables provided by the supplier or sub-suppliers
3.7.3.3 Quality audits and related quality performance reviews are intended to provide an objective
evaluation of compliance with performance expectations defined in this specification, in the
supplier contract quality plan (CQP), and in any other project scope of work specification.
3.7.3.4 Quality audits and related quality performance reviews include, but are not limited to, any
quality or other project functional area audits, assessments, verification of compliance
reviews, surveillance, inspections, or other interim or final assessments of scope of work
deliverables provided by the supplier or sub-suppliers.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.7.3.5 Quality audits and related quality performance reviews shall be carried out by trained,
accredited, and experienced personnel in accordance with procedures documented in the
Cqp.
3.7.3.6 The supplier shall submit, for Eskom review, documented processes for conducting project
scope of work quality audits and related quality performance reviews. Supplier quality audits
and related quality performance review processes shall be designed to address evaluation
of progress towards completion of project functional area deliverables as well as final
deliverable quality.
3.7.3.7 The supplier shall provide a schedule of anticipated quality audits covering all functional
areas and related quality performance reviews at the time of first post-contract award CQP
submission.
3.8 Standard Conditions
3.8.1 Rights of Access
Eskom:
3.8.1.1 shall be granted electronic and hard-copy access to all quality plans, procedures,
documentation, and other quality records relating to the work, including, but not limited to,
data extracts;
3.8.1.2 reserves the right to review, inspect, and audit any or all parts of the supplier’s QMS, as well
as any documentation, materials, or equipment associated with the work, at any time or
project work location; and
3.8.1.3 reserves the right to carry out assessments and audits on all new suppliers and sub-
suppliers.
The supplier:
3.8.1.4 shall support Eskom’s effort to monitor, verify, and/or witness any activities associated with
the work at any time;
3.8.1.5 shall cooperate with Eskom requests for documentation, records, and inspection and
witnessing. Eskom participation in audits, appraisals, assessment of plans, and verification
shall be conducted at no extra cost to Eskom;
3.8.1.6 shall ensure that a sub-supplier provides access to Eskom to all work procedures, records,
and supporting documentation through provision of access to view and photocopy, as
required, to support verification of scope of work requirements. Access shall include the
ability to photograph Eskom equipment, systems, system components, materials, etc.;
3.8.1.7 shall provide access to all quality-related information pertaining to activities performed by
itself or sub-suppliers, where Eskom might not have participated in the witnessing of their
quality assurance or control (this refers to inspections, audits, etc. performed by the supplier
on its own sub-suppliers);
3.8.1.8 shall allow Eskom to assess, audit, approve, or reject any sub-suppliers employed by
Eskom’s suppliers to assist with the product and/or service delivery to Eskom; and
3.8.1.9 shall ensure that the above requirements flow down to sub-suppliers.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.2 Eskom Rights to Information
3.8.2.1 To expect that the works will be conducted in accordance with the contract between the
parties.
3.8.2.2 To have access to the supplier’s information as determined by applicable legislation.
3.8.2.3 Eskom reserves the right to oversee the supplier’s audit programmes by participating in
selected audits as an observer and by assessing the supplier during key work stages.
Eskom will coordinate with the supplier to develop an oversight schedule aligned with the
supplier’s audit schedule.
3.8.2.4 To obtain access to any audit reports of audits performed by the supplier reflected in the
audit programme.
3.8.2.5 To conduct independent quality audits during all phases of the contract, and the supplier
shall provide all resources to support these activities.
3.8.2.6 Eskom shall have the right to participate in, or request that, a technical investigation be
launched and conducted at the supplier’s and sub-suppliers’ premises or other sites when
risk to Eskom products or service deliverables is identified.
3.8.2.7 To participate in, and/or lead, investigations related to incidents involving its products.
3.8.2.8 To require from suppliers to be responsible for the cost of re-inspections.
3.8.2.9 To withhold payment from suppliers as a result of outstanding nonconformities, irrespective
of the agreed payment schedule and in accordance with the conditions of contract.
3.8.2.10 Shall be granted electronic and hard-copy access to all quality plans, procedures,
documentation, and other quality records relating to the work, including, but not limited to,
data extracts.
3.8.2.11 Reserves the right to review, inspect, and audit any or all parts of the supplier’s QMS, as
well as any documentation, materials, or equipment associated with the work, at any time or
project work location.
3.8.2.12 Shall carry out assessments and audits on all new suppliers and sub-suppliers.
3.8.2.13 Reserves the right to appoint resident quality inspectors who can be based at the supplier’s
or sub-supplier’s premises and on site where the work is being performed.
3.8.2.14 Reserves the right to select intervention points within all developed supplier QCPs/ ITPs
for Eskom oversight of selected functions and to perform surveillance or audits of the work.
3.8.2.15 Shall be given access at all reasonable times before, during, and after manufacture and
before delivery, construction, erection, and commissioning to measure, test, and inspect the
products and workmanship, as necessary, at the supplier’s premises and at Eskom sites.
3.8.2.16 Reserves the right to suspend any pending deliveries by the issuing of a cease delivery
order at any time and for any portion of the work that is not being performed in accordance
with the specified/agreed requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.3 Preservation
The supplier shall develop and implement a comprehensive preservation programme consisting of
plans, processes, procedures and actions undertaken for the purpose of planning for and
maintenance of material deliverables quality. The supplier preservation programme scope includes,
but is not limited to, the following:
3.8.3.1 Engagement of personnel suitably qualified for oversight of, and (as required) direct
implementation of, preservation programme requirements.
3.8.3.2 Development and implementation of preservation programme training appropriate to work
need.
3.8.3.3 Eskom may make use of its appointed service provider tasked to provide a full suite of
services encompassing an online monitoring system and asset tracking during, but not
limited to the following stages: inspections, testing, shipping, transportation, storage, and
commissioning. The supplier is to enable full access during all of these stages in order to
allow the installation of the devices on Eskom-identified products and equipment, which
include the sub-supplier’s testing facilities, processing plant, and any other processes
deemed important towards effective and efficient quality control.
3.8.3.4 Eskom seeks cooperation between the supplier’s designers and those of Eskom’s service
provider in ensuring seamless installation of the device and other associated installations.
Moreover, there is also a need to integrate data flows and systems between Eskom and the
supplier. Further details are included in the Eskom specifications and works information.
3.8.3.5 Review and tracking of compliance with Eskom and supplier engineering specification of
preservation requirements.
3.8.3.6 Review and tracking of compliance with sub-supplier provided preservation requirements
and recommendations.
3.8.3.7 Evaluation of prospective temporary and longer-term material storage sites for consistency
with preservation programme expectations.
3.8.3.8 Preservation work plan development and plan execution performance evaluation of all
parties engaged for provision of material transportation, handling, or storage services.
3.8.3.9 Oversight of material quality preservation plan preparation and plan execution performance
at all work locations.
3.8.3.10 Development of a preservation programme records management process, in compliance
with Eskom information management requirements, which comprehensively addresses
generation, maintenance, and ready access by Eskom to all preservation programme
records.
3.8.3.11 The supplier shall deploy a clearly defined documented programme providing for
identification of all physical asset pre-operation preservation of quality requirements. In this
reference, the term “physical assets” should be understood to include bulk materials,
including consumable items, equipment systems, system components, and any other
procured or supplied materials or equipment transferred to project control, but not deployed
for operational purposes.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.3.12 Where the project responsibility for equipment and materials management has been
formally delegated, the supplier’s preservation programme shall ensure clear and
unambiguous communication of pre-operation preservation of goods quality requirements
to sub-suppliers.
3.8.3.13 The supplier’s preservation programme shall clearly and unambiguously document
processes and procedures for efficient and effective monitoring of compliance with
programme requirements.
3.8.3.14 Compliance monitoring shall commence with ensuring comprehensive consideration of
preservation requirements in the engineering instruction and subsequent inclusion of said
instruction in procurement documentation and shall be applicable until such time as
equipment or materials have been incorporated in an operating or operational system or
structure.
3.8.3.15 Compliance evaluation frequency shall anticipate transfer of tactical-level responsibility for
management of preservation responsibilities between project functional areas, for example,
procurement to logistics, logistics to fabrication, fabrication to logistics, logistics to
construction, etc., and shall, in similar fashion, anticipate transfer of support for tactical-level
responsibility between various subcontracted service providers.
3.8.3.16 Supplier engineering shall ensure that preservation requirements for scope of work
systems, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented and that preservation requirements are efficiently and
effectively communicated to project procurement, logistics, construction management,
quality, security, and other project functional areas, as required, for efficient and effective
implementation of preservation requirements. This shall take the form of a preservation
programme applicable to all systems, system components, equipment, materials, customer-
supplied materials, and other goods procured or managed under the scope of work.
3.8.3.17 The supplier’s preservation management programme shall clearly and unambiguously
address temporary, long-term, and in-transit preservation requirements, including, but not
limited to:
requirements for protection against, or insulation from, atmospheric conditions,
sunlight, temperature, soil, dust, humidity, salt spray, corrosive atmospheres, or
other physical environment conditions;
detailed procedures for application, use, monitoring, and maintenance of coatings,
coverings, fasteners, lines, and other components for internal and external weather
proofing;
requirements for electrical grounding or isolation;
requirements for internal or external environment creation, for example, inert gas
charging, heating, cooling, etc., inclusive of gas storage, electric power supply, etc.;
detailed procedures for initial set-up, charging, activation, and maintenance of
internal atmosphere generation, regeneration, monitoring, and relieving systems, for
example, inert gas management systems;
requirements for protection against, or insulation from, vibration or long-period
cyclical motion in transit, for example, wave-generated movement during sea
transport;
internal and external structural integrity protection, for example, internal and external
bracing, padding, framing, chocking, etc.;
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
support structure requirements, for example, stools, pads, or other devices,
substrates, or support required to ensure in-storage and in-transit stability of
systems, system components, equipment, and material, or other discrete units or
items;
provision for physical separation and/or barriers to prevent airborne or direct
transmittal of contaminants between work areas or between work areas and storage
areas, for example, prevention of carbon steel grinding or cutting debris impact on
stainless steel elements, airborne drift of blast aggregate into vessels or machinery,
etc.;
provision for, and final disposition of, temporary and longer-term storage or transit
required supports and related binding devices, for example, stools, stands, sea
fasteners, platforms, chocks, spacers, cabling, etc.;
provision of requirements for temporary work platforms or other support structures
required to ensure provision of preservation services, for example, provision of a
self-elevating work platform for periodic access to elevated fittings, gauges, man-
ways, etc.;
requirements for protection against, or insulation from, contact with other objects, for
example, padding or other protection for external tubing, fittings, or other impact-
sensitive structures or components;
clear physical delineation of temporary and longer-term storage areas supplemented
by hard and soft barriers, as required, to maintain a protective perimeter;
documented agreements with storage facility and transportation provider
management regarding security management, including, but not limited to, facility
access and egress control and control of access to project goods and materials
within facility boundaries or aboard vehicles or vessels; and
detailed procedures for inspection and testing to verify performance of preservation
procedures and to provide for timely notice and corrective action to maintain
preservation status.
3.8.3.18 The supplier’s preservation management programme scope shall encompass
management of preservation requirements, from initial transfer of ownership or management
responsibility to project scope of responsibility, through any period of temporary or longer-
term storage and through any period of transit, including transit for final delivery at point of
active use or installation.
3.8.3.19 The supplier’s preservation management programme shall clearly and unambiguously
address processes and procedures to ensure that storage and control of materials are
accomplished in accordance with manufacturer recommendations, specifications, and
project-specific requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.3.20 The supplier’s preservation management programme shall incorporate special precautions
to address preservation and control of valves, electrical motors and components,
mechanical and rotating equipment, piping and fittings, instrumentation, flange faces,
gaskets, coatings, insulation, and other materials. Special precautions include, but are not
limited to, supplier-specified maintenance procedures related to engines, electric motors,
pumps, compressors, etc., such as periodic shaft rotation, engine turnover, lubrication, etc.
3.8.3.21 The supplier shall ensure that clear and unambiguous requirements for preservation of the
system, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented in purchase orders, work authorisations, and other
communications between the supplier and sub-suppliers.
3.8.3.22 Where sub-supplier expertise is utilised in determination of the preservation protocol,
supplier procurement processes shall ensure clear and unambiguous documentation of sub-
supplier input into preservation management programme requirements.
3.8.3.23 Supplier procurement shall ensure that preservation requirements for scope of work
systems, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented and that preservation requirements are efficiently and
effectively communicated to project logistics, construction management, quality, security,
and other project functional areas, as required, for efficient and effective implementation of
preservation requirements.
3.8.3.24 The supplier shall ensure comprehensive, clear, and unambiguous designation of sub-
supplier responsibility for execution of all preservation management programme elements,
including, but not limited to, all systems, processes, procedures, methods, ready access to
records, and provision of equipment, tools, or services essential to efficient and effective
execution of the preservation management programme.
3.8.3.25 The supplier shall ensure that preservation management programme responsibilities are
clearly and unambiguously defined within the project team and efficiently and effectively
implemented at all project scope of work locations. Inclusion of supplier and sub-supplier
scope of work in the development and implementation of a preservation management
programme shall be considered essential to efficient and effective preservation
management programme execution.
3.8.3.26 The supplier shall ensure clear and unambiguous designation of project team responsibility
for oversight and management of preservation management programme elements during
every stage of project development.
3.8.3.27 The supplier shall ensure that Eskom has free and unrestricted access to all preservation
records for inspection and audit.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.4 Quality Audits Related Conditions
3.8.4.1 The supplier shall maintain an accurate quality audit and related quality performance review
schedule and shall incorporate the current schedule as an attachment to the supplier CQP.
3.8.4.2 The supplier’s quality audit and related quality performance review schedule development
process shall be designed to incorporate consideration of information generated by
previously conducted audits and reviews, by input from project risk management evaluations
(risk register), or from Eskom or sub-supplier subject matter expertise.
3.8.4.3 Eskom reserves the right to oversee supplier audit programmes by participating in selected
audits as an observer and by assessing the supplier during key work stages. Eskom will
coordinate with the supplier to develop an oversight schedule aligned with the supplier’s
audit schedule.
3.8.4.4 Eskom will have the right to obtain access to any audit reports of audits performed by the
supplier reflected in the audit programme.
3.8.4.5 Eskom reserves the right to conduct independent quality audits, scheduled and
unscheduled, during all phases of the contract. The supplier shall provide all resources to
support these activities.
3.8.4.6 Eskom shall be given access at all reasonable times before, during, and after manufacture
and before delivery, construction, erection, and commissioning to measure, test, and inspect
the products and workmanship, as necessary, at the supplier’s premises and at Eskom sites.
3.8.4.7 The supplier shall obtain access for Eskom to measure, test, witness tests, and inspect
products that are being manufactured by any sub-supplier. This includes surveillances.
3.8.4.8 The assessments and audits shall be carried out on all new suppliers and their sub-
suppliers.
3.8.4.9 Eskom shall have the right to participate in, or request that, a technical investigation be
launched and conducted at the supplier’s and sub-suppliers’ premises or other sites when
risk to Eskom products or service deliverables is identified.
3.8.4.10 Qualification requirements for supplier and sub-supplier personnel engaged in conducting
quality audits and related quality performance reviews shall be defined in the supplier CQP
and shall be in compliance with the Project Quality Personnel Qualification Specification.
3.8.5 Management of Nonconformities and Nonconforming Outputs Identified by Eskom
3.8.5.1 Nonconformity reports raised by Eskom and issued against the supplier shall be investigated
by the supplier as a matter of urgency in order to determine the root cause, corrective action
measures, as required, with implementation time frames.
3.8.5.2 A formal response shall be prepared in respect of the defined criteria and submitted to
Eskom for its review, evaluation, and acceptance, within a maximum of 14 calendar days
from the date of issue of the nonconformity and should be aligned with the site
requirements/procedure.
3.8.5.3 Eskom may, at its discretion, request a response sooner and, in any case, before the
supplier proceeding with any pending/further intervention or corrective action, as may be
required by Eskom.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.5.4 Should Eskom or its inspection authority/agency identify any nonconforming products during
the conduct of its audits/surveillances/inspections, the supplier shall be deemed to be in
breach of contract and shall be held liable for any repair, rework, and/or associated
replacement costs. The supplier may, in such instances, also be held liable for the full costs
associated with the conducting of follow-up audits/surveillances/inspections.
3.8.5.5 The nature, magnitude, and/or frequency of nonconformity and inspection defect/rejection
reports raised by Eskom or its appointed inspection authority/agency shall form the basis of
any action to rescind/withdraw the supplier’s qualification status.
3.8.5.6 Nonconforming outputs identified by Eskom shall be documented via a NC Report and
issued to the suppliers via the contract communication protocol. The suppliers shall
investigate the matter and respond in writing to Eskom of disposition within the stated
contractual conditions.
Note: The dates for the disposition should align to contractual conditions.
3.8.5.7 Eskom shall identify repeat deficiencies as systematic failures of the supplier’s QMS and
shall notify the supplier of the trends. Eskom can initiate an internal audit to highlight the
system failures. The supplier with raise a Corrective Action Report and undertake Root
Cause Analysis. In such cases, QMS rectification and/ or update measures shall be taken
immediately.
3.8.5.8 Should the Supplier fail to respond and rectify nonconforming products within stipulated
contractual conditions. The Project Manager should apply contractual remedies in
accordance with Fidic/ NEC contract.
3.8.5.9 Repeated Nonconformities; if there are any identified repeat nonconformities from the same
supplier within a period of 6 months or less. This must then be escalated to the management
review committees of the BU/ OU/ Cluster/ or Divisions for adjudication. If not resolved, then
the matter must be escalated to the supplier review committee for recommendation.
3.8.6 Special Processes
The following requirements shall be applicable as well as additional requirements as specified in the
scope of work for the provision of the following special process services:
3.8.6.1 The supplier shall ensure that all processes which require that procedures be pre-qualified
or work methods and operators tested and qualified are controlled and all steps followed
before the work can commence.
3.8.6.2 This typically covers such activities as welding, non-destructive testing, special fabrication
techniques, coating, painting, etc.
3.8.6.3 All special processes (procedures and processes) shall be submitted for review and
acceptance by Eskom, accredited or certified agency. No work shall commence until these
are accepted.
3.8.6.4 Where applicable, a relevant Management System for the special process shall be certified
or approved by an accredited body and proof of certification shall be submitted to Eskom for
review. An example for this will be the Welding Management System based on ISO 3834.
3.8.6.5 Where samples are required for acceptance, these shall be submitted to Eskom for review
and acceptance.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.6.6 The supplier shall ensure that all operators are suitably qualified for these processes in
accordance with the procedures, processes and/ or applicable standards/ codes.
3.8.6.7 The records of qualification of procedures, processes and operators shall be maintained by
the supplier in accordance with the applicable procedure or code and these made available
to Eskom at all times.
This document has been seen and accepted by:
Name Designation
Kerseri Pather General Manager: Risk and Sustainability
Lenock Meyer Acting Senior Manager: Quality Management
Pamela Dondashe Middle Manager: Quality Assurance
Mandla Mkhwanazi Middle Manager: SHEQ Procurement and Supply Chain Management
Suzette Manthe Senior Advisor: Quality Performance and Planning
Lorna Ndlela Middle Manager: Eskom Document and Records Management
Date Rev. Compiler Remarks
October 2021 3 SA Sambo Specification was due for revision and in addition, to
align the requirements with the latest Eskom business
processes and systems.
October 2018 2 SA Sambo Specification reviewed to be aligned with the
requirements of ISO 9001:2015
March 2016 1 SA Sambo Specification was due for revision and also to
repackage the requirements and tender returnable
documents into four categories.
December 2011 0 A Hunter New document
The following people were involved in the development of this document:
Andrew Else
Bongi Tshabalala
Feziwe Mogamisi
Lesego Garegae
Patrick Thwane
Xolani Zuma
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Eskom Operational Quality Forum Members
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Methodology
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)The supplier must develop a preservation management programme covering identification, tracking, and protection of physical assets.
Method statements must be submitted for preservation activities.
Quality control plans and inspection/test plans must describe the sequence of operations, acceptance criteria, and intervention points.
The Eskom template for CQP and QCP/ITP may be used as a guideline.
Experience & Qualifications
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Quality audits and performance reviews must be carried out by trained, accredited, and experienced personnel.
Personnel performing special processes (NDT, welding, etc.) must be certified competent and where applicable registered with statutory bodies.
Training records must comply with SETA requirements.
Quality Management
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)The supplier must develop, implement, maintain and continually improve a QMS based on ISO 9001.
The QMS must conform to the requirements of this specification.
The supplier must submit a draft Contract Quality Plan (per ISO 10005) and a Quality Control Plan / Inspection and Test Plan.
Sub-suppliers must also comply with these quality requirements.
Eskom reserves the right to audit and inspect the supplier's and sub-supplier's quality systems.
Hold and witness points will be specified in the QCP/ITP.
A quality kick-off meeting and pre-inspection meetings will be held.
Eskom may appoint an inspection agency or resident quality inspectors at the supplier's premises.
Management of nonconformities and corrective actions is required.
Special processes (e.g., welding, NDT) require qualified personnel and procedures.
Compliance Requirements
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)The quality specification references ISO 9001 as the basis for the QMS.
No further compliance requirements (CSD, B-BBEE, CIDB) are stated in this document.
Health & Safety
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)The specification references Eskom's Safety, Health, Environment, and Quality (SHEQ) Policy (32-727).
No further health and safety requirements are detailed in this document.
Contractual Terms
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)The supplier must implement a preservation management programme for physical assets, including special precautions for valves, electrical motors, mechanical equipment, piping, instrumentation, etc.
The preservation requirements must be documented in purchase orders and communicated to sub-suppliers.
Sub-supplier responsibilities for preservation must be clearly defined.
Eskom has unrestricted access to all preservation records for inspection and audit.
Section
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)See evaluationCriteria above. The specification defines the quality evaluation criteria for selection and assessment of suppliers. Bidders must comply with the applicable quality category as determined by Eskom.
Important Dates
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf (unknown){"closingDate":"27 January 2025"}
Contact Information
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf (unknown){"name":"__________________________________________________________","email":null,"phone":null,"department":null,"address":null}
Submission Guidelines
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf (unknown)Returnable form: the E-Tenderers' E-Tendering Training Acknowledgement Form must be fully completed, signed, and submitted. Failure to do so within the prescribed period will result in disqualification.
Evaluation Criteria
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf (unknown)Bidders must submit the mandatory E-Tendering Training Acknowledgement Form. Non-submission or incomplete submission renders the bid non-responsive.
Description
Source: Scope of Work _Cables Connectors May26.pdf (unknown)Scope: Supply and delivery of Radio Frequency (RF) cables, connectors and related accessories to Eskom Distribution on an "as and when" required basis for a period of 5 years. Background: Eskom Distribution utilises RF network for internal operations across all Eskom clusters. Materials required to support and expand the existing network, ensuring speedy purchasing and delivery to required Eskom offices.
Important Dates
Source: Scope of Work _Cables Connectors May26.pdf (unknown)Contract effective date: 21 October 2025. Contract review date: October 2028. Tender closing date (from tender record): 22 September 2026 at 10:00.
Contact Information
Source: Scope of Work _Cables Connectors May26.pdf (unknown)Compiled by: Tshepiso Moloisane, Eskom Distribution Telecoms Design Manager. Supported by: Mondli Shabalala, Eskom Distribution Telecoms Chief Engineer. Approved by: Thuli Tladi, Eskom Distribution Middle Manager DX Telecoms.
Technical Specifications
Source: Scope of Work _Cables Connectors May26.pdf (unknown)Scope: Supply and delivery of Radio Frequency (RF) cables, connectors and related accessories to Eskom Distribution on an "as and when" required basis for a period of 5 years. Background: Eskom Distribution utilises RF network for internal operations across all Eskom clusters. Materials required to support and expand the existing network, ensuring speedy purchasing and delivery to required Eskom offices. Document identifier: 559-1826396412 Rev 1.
Description
Source: Cables & Connectors Technical Evaluation Criteria_Rev 2.pdfThis document defines the technical evaluation criteria for the RF Cables and Connectors enquiry (Specification 240-64013506). It applies across Eskom Holdings Limited and its controlled entities. The evaluation uses a two-stage process: (1) Mandatory criteria — submission of Schedule A (technical compliance schedule) in English and Official Distributor letters from OEMs; failure on any mandatory item disqualifies the bidder. (2) Desktop evaluation — scoring of 171 clauses in Schedule A (0 = non-compliant/no info, 1 = partially compliant, 2 = fully compliant); maximum 342 points, pass threshold 90% (308 points). Normative references: Specification 240-64013506, ISO 9001, Eskom procedure 32-1034.
Submission Guidelines
Source: Cables & Connectors Technical Evaluation Criteria_Rev 2.pdf (unknown)Mandatory returnable documents (must be submitted with the bid):
Failure to provide any of the above mandatory documents results in immediate disqualification; the bidder will not proceed to the desktop evaluation stage.
Evaluation Criteria
Source: Cables & Connectors Technical Evaluation Criteria_Rev 2.pdf (unknown)Two-stage technical evaluation:
A "No" on any mandatory criterion disqualifies the tenderer from further evaluation.
Non-compliant or no information supplied = 0 points
Partially compliant = 1 point
Fully compliant = 2 points
Normative references applied during evaluation:
Technical Specifications
Source: Cables & Connectors Technical Evaluation Criteria_Rev 2.pdf (unknown)Scope: Supply and delivery of radio frequency (RF) cables and connectors for Eskom's Distribution Division on an "as and when" required basis for a period of five years.
Applicable specification: 240-64013506 — Telecommunications RF Cables and Connectors (Annex A contains Schedule A: Schedule of technical compliance with 171 clauses).
Normative standards:
Applicability: Throughout Eskom Holdings Limited, its divisions, subsidiaries, and entities where Eskom has a controlling interest.
Key definitions:
Disclosure classification: Controlled disclosure.
Quality Management
Source: Cables & Connectors Technical Evaluation Criteria_Rev 2.pdfQuality management requirement: ISO 9001 Quality management systems is a normative reference for this tender. Bidders' quality systems will be assessed against this standard as part of the technical evaluation. Eskom procedure 32-1034 (Procurement and supply chain management) also applies.
Financial Requirements
Source: Cables & Connectors Technical Evaluation Criteria_Rev 2.pdf (unknown)Bid Bond: performance guarantees.
The evaluation method has two main parts: Mandatory criteria evaluation and Desktop. The Technical
Evaluation tables (Table 1, 2 and 3) below will be used to evaluate RF Cables and Connectors tendered
as listed in the specification, 240-64013506 (Annex A).
3.1 Mandatory criteria evaluation
Thi
Compliance Requirements
Source: Cables & Connectors Technical Evaluation Criteria_Rev 2.pdf (unknown)Mandatory technical compliance documents (evaluated as pass/fail gate):
Quality management: Bidders must align with ISO 9001 Quality management systems (normative reference).
Procurement compliance: Subject to Eskom procedure 32-1034 (Procurement and supply chain management).
Standard Eskom returnable forms (SBD/MBD) are not detailed in this technical evaluation document; refer to the main tender pack for CSD registration, tax compliance, B-BBEE, SBD 4, SBD 8, SBD 9, and other standard returnable requirements.
Contractual Terms
Source: Cables & Connectors Technical Evaluation Criteria_Rev 2.pdfThis document is an evaluation criteria report and does not constitute a contract offer. It states explicitly that:
Section
Source: Cables & Connectors Technical Evaluation Criteria_Rev 2.pdfTwo-stage technical evaluation:
Any "No" results in disqualification; bidder does not proceed to desktop evaluation.
Normative references governing evaluation: Specification 240-64013506, ISO 9001, Eskom procedure 32-1034.
Description
Source: 240-68099512 Form A Cat 3 Rev 9.pdfSupply and delivery of radio frequency cables and connectors for Distribution Division on an "as and when" required basis for a period of 5 years. Pre-contract award quality requirements: Category 3 selected (refer to clause 3.5 of 240-105658000). Post-contract award requirements: Contract Execution (clause 3.7), Supplier Quality Performance Monitoring Phase (clause 3.7), Eskom Rights of Access (clause 3.8), Eskom Rights to Information (clause 3.8), Preservation (clause 3.8), Quality Audits Related Conditions (clause 3.8), Management of Nonconformities and Nonconforming Outputs Identified by Eskom (clause 3.8), Special Processes (clause 3.8).
Contact Information
Source: 240-68099512 Form A Cat 3 Rev 9.pdf (unknown)Eskom Quality Representative: Sipho A Sambo, Chief Quality Advisor (signed 2026/03/18).
Submission Guidelines
Source: 240-68099512 Form A Cat 3 Rev 9.pdf (unknown)The tenderer must complete and sign Form A (document identifier 240-68099512 Rev 9) to acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 Standard. The signed form must be submitted with the tender response.
Evaluation Criteria
Source: 240-68099512 Form A Cat 3 Rev 9.pdf (unknown)Pre-contract award: Category 3 supplier assessment applies (refer to clause 3.5 of 240-105658000). Post-contract award requirements include: Contract Execution (clause 3.7), Supplier Quality Performance Monitoring Phase (clause 3.7), Eskom Rights of Access (clause 3.8), Eskom Rights to Information (clause 3.8), Preservation (clause 3.8), Quality Audits Related Conditions (clause 3.8), Management of Nonconformities and Nonconforming Outputs (clause 3.8), and Special Processes (clause 3.8). ISO 9001 clauses applicable: Clause 4 Context of the Organisation, Clause 5 Leadership, Clause 6 Planning, Clause 7 Support, Clause 8 Operation, Clause 9 Performance Evaluations, Clause 10 Improvement. No CIDB grading required (goods supply).
Technical Specifications
Source: 240-68099512 Form A Cat 3 Rev 9.pdf (unknown)Supply and delivery of radio frequency cables and connectors for Distribution Division on an "as and when" required basis for a period of 5 years. Supplier Category 3 applies per clause 3.5 of 240-105658000. Special Processes per clause 3.8 of 240-105658000 are applicable.
Methodology
Source: 240-68099512 Form A Cat 3 Rev 9.pdfISO 9001 quality management principles applicable: Customer focus, Leadership, Engagement of people, Process approach, Improvement, Evidence-based decision making, Relationship Management. Corresponding ISO 9001 standard clauses: Clause 4 Context of the Organisation, Clause 5 Leadership, Clause 6 Planning, Clause 7 Support, Clause 8 Operation, Clause 9 Performance Evaluations, Clause 10 Improvement.
Quality Management
Source: 240-68099512 Form A Cat 3 Rev 9.pdfPre-contract award quality requirements: Category 3 selected (refer to clause 3.5 of 240-105658000). Post-contract award requirements: Contract Execution (clause 3.7), Supplier Quality Performance Monitoring Phase (clause 3.7), Eskom Rights of Access (clause 3.8), Eskom Rights to Information (clause 3.8), Preservation (clause 3.8), Quality Audits Related Conditions (clause 3.8), Management of Nonconformities and Nonconforming Outputs Identified by Eskom (clause 3.8), Special Processes (clause 3.8). ISO 9001 standard clauses applicable: Clause 4 Context of the Organisation, Clause 5 Leadership, Clause 6 Planning, Clause 7 Support, Clause 8 Operation, Clause 9 Performance Evaluations, Clause 10 Improvement.
Compliance Requirements
Source: 240-68099512 Form A Cat 3 Rev 9.pdf (unknown)Must be registered on the National Treasury Central Supplier Database (CSD). Must have valid SARS tax clearance (TCS pin). Must meet B-BBEE requirements per applicable preference point system (80/20 or 90/10). Must demonstrate capability and capacity per Category 3 supplier assessment criteria in 240-105658000 clause 3.5. Must accept all post-contract quality obligations including audits, access rights, and nonconformity management. No CIDB grading required (goods supply).
Description
Source: Invitation to tender-RF cables and connectors - A.pdf (TENDER)Supply and delivery of radio frequency cables and connectors for Eskom Distribution Division on an "as and when" required basis for a period of 5 years. Tender number E3423DXMWP. Open invitation to tender. Contract form: NEC3 Supply Contract (SC3). Tender documents issued free of charge. Eskom Standard Conditions of Tender apply (accessible at www.eskom.co.za); Tender Data takes precedence. All queries must be directed in writing to the Eskom Representative (Bridget Seroka).
Important Dates
Source: Invitation to tender-RF cables and connectors - A.pdf (TENDER)Issue date: 26 August 2026
Clarification meeting (non-compulsory): 09 September 2026 at 09:00 via Microsoft Teams (Meeting ID: 322 391 923 934 492, Passcode: cJ3Av6Ls). Attendance confirmation required to Eskom Representative with attendee details.
Clarification queries deadline: 5 working days before tender closing (by 15 September 2026).
Tender closing: 22 September 2026 at 10:00
Tender validity period: 120 days from closing date and time
Contact Information
Source: Invitation to tender-RF cables and connectors - A.pdf (TENDER)Eskom Representative: Bridget Seroka
Telephone: 011 800 6223
Email: [email protected]
Fraud/corruption reporting: 0800 11 2722 / [email protected]
Submission address: Eskom E-tendering portal https://eTendering.eskom.co.za
Procurement Manager: Pumezile Makeba (Head Office)
Submission Guidelines
Source: Invitation to tender-RF cables and connectors - A.pdf (TENDER)Submission method: Electronic only via Eskom E-tendering portal (https://eTendering.eskom.co.za). No hard copies or zip files accepted.
Closing date and time: 22 September 2026 at 10:00. Late tenders will not be accepted.
Documents must be uploaded in PDF format (price list also in Excel). Upload limit: 500 MB per document, 4 GB total.
Folders: Technical, Commercial, Financial, and Other.
Resubmission: Only the latest version is accepted; previous submissions become void.
Submission status must show as complete.
Disqualification risks: Missing or unsigned disqualifiable returnables; late submission; incomplete tender (commercial, financial, technical); failure to meet eligibility criteria.
Mandatory returnables at closing (disqualifiable):
Non-disqualifiable returnables at closing (5 working days to remedy if missing):
Returnables for evaluation (zero score if missing):
Returnables prior to contract award:
Evaluation Criteria
Source: Invitation to tender-RF cables and connectors - A.pdf (TENDER)Eligibility (pass/fail): No sanctions-list nationality; no duplicate tenders; JV agreement must provide joint and several liability; no conflict of interest; not restricted by National Treasury, Tender Defaulters list, or Eskom; no 100% subcontracting; authorised signatory only.
Basic compliance (pass/fail): Meet eligibility; submit complete technical, commercial, financial information; submit all mandatory commercial returnables.
Mandatory technical criteria (pass/fail): Submission of Technical Schedule A (spec 240-64013506) in English; Official distributor letters from OEMs. Failure on any = disqualification from further evaluation.
Functionality (threshold 90%): Compliance with Schedule A technical specification (240-64013506). Scoring: 171 items × 2 points = 342 max. Minimum 308 points (90%) to pass. Below threshold = disqualified.
Price evaluation (80 points): Prices inclusive of VAT; corrected for arithmetic errors; contingencies excluded; adjusted for variations/deviations/alternatives; Net Present Value comparison using tendered programme, price adjustment factors, exchange fluctuations, risk parameters. Unconditional discounts considered; conditional discounts excluded from scoring but applied at payment.
Specific goals (20 points): B-BBEE status level per 80/20 PPPFA 2022:
Level 1 = 20, Level 2 = 18, Level 3 = 14, Level 4 = 12, Level 5 = 8, Level 6 = 6, Level 7 = 4, Level 8 = 2, Non-compliant = 0.
Required for points: Valid SANAS-accredited B-BBEE certificate / sworn affidavit / CIPC affidavit; proof of ownership/shareholding (CIPC) with breakdown; certified ID copies of shareholders; proof of disability (if applicable).
Failure to submit specific-goal documents: not disqualified, but scores 0/20 for specific goals and only 80/80 for price.
Ranking: Total points (price + specific goals) highest to lowest. Tie-break: highest specific-goal points; then drawing of lots.
Objective criteria: Not mandatory at closing but condition for contract award; failure may lead to second-ranked tenderer being recommended.
Reverse e-auction: Not applicable.
CIDB, CSDG, CPG: Not applicable.
Technical Specifications
Source: Invitation to tender-RF cables and connectors - A.pdf (TENDER)Scope: Supply and delivery of radio frequency cables and connectors for Distribution Division on an "as and when" required basis for 5 years.
Contract form: NEC3 Supply Contract (SC3).
Technical compliance: Schedule A in technical specification 240-64013506 (171 compliance items, each scored 0/2). Full compliance = 342 points.
Mandatory technical returnables at closing: Completed Technical Schedule A (in English); Official distributor letters from OEMs.
Quality management requirements (applicable):
Cataloguing: Successful tenderer may be required to provide cataloguing information per item after award; materials must be labelled per Eskom specifications. Pricing schedule must include a line item for cataloguing (Eskom pays).
Local content: SBD 6.2 and Annexures G1–G4 required if designated materials included.
CPA for Local Goods/Services (Annexure E) required.
CPA(IG) for Foreign Goods/Services (Annexure F) not applicable.
Reverse e-auction: Not applicable.
CIDB, CSDG, CPG: Not applicable.
Quality Management
Source: Invitation to tender-RF cables and connectors - A.pdf (TENDER)Quality management documents required (applicable to this tender):
These documents will be sent with the tender enquiry and form part of the returnables.
Pricing Schedule
Source: Invitation to tender-RF cables and connectors - A.pdf (TENDER)Pricing schedule / BOQ attached in the tender documents (PDF and Excel copy). Must be submitted with NEC3 Supply Contract (SC3) completed and signed.
Submission format: PDF and Excel via E-tendering (500 MB per document, 4 GB total).
Price evaluation: Inclusive of VAT; corrected for arithmetic errors; contingencies excluded; adjusted for variations/deviations/alternatives; Net Present Value comparison using tendered programme, price adjustment factors, exchange fluctuations, risk parameters. Unconditional discounts included in evaluation; conditional discounts excluded from evaluation but implemented at payment.
Cataloguing: If required, pricing schedule must include a line item for cataloguing (Eskom pays).
Reverse e-auction: Not applicable.
Payment terms: ≤ R50 million (incl. VAT) = 30 days; > R50 million (incl. VAT) = 60 days from receipt of undisputed invoice.
Financial due diligence prior to award: Full approved annual financial statements (no drafts/management accounts), public interest score and ITA34C if not audited, JV partner statements if applicable.
Financial Requirements
Source: Invitation to tender-RF cables and connectors - A.pdf (TENDER)Pricing format: Completed pricing schedule (BOQ) in PDF and Excel, submitted with NEC3 contract. Prices inclusive of VAT.
Price evaluation adjustments: Arithmetic error correction; contingencies excluded; variations/deviations/alternatives adjusted; Net Present Value comparison using tendered programme, price adjustment factors, exchange fluctuations, risk parameters. Unconditional discounts included in evaluation; conditional discounts excluded from evaluation but honoured at payment.
Payment terms: Contracts ≤ R50 million (incl. VAT): 30 days from receipt of undisputed invoice. Contracts > R50 million (incl. VAT): 60 days from receipt of undisputed invoice.
Performance security: Not applicable.
Financial due diligence (prior to award): Latest approved annual financial statements (full set: background, signed director's report, signed auditor/reviewer/compiler/accounting officer report, statement of financial position, comprehensive income, changes in equity, cash flows, notes). No draft or management accounts accepted.
If not audited: Public interest score (actual score, owner-managed status, external preparation confirmation); ITA34C for current and previous tax years.
JV/SPV: Each partner must submit full financial statements.
Eskom reserves right to negotiate with preferred bidders if prices not market-related.
Compliance Requirements
Source: Invitation to tender-RF cables and connectors - A.pdf (TENDER)Mandatory at tender closing (disqualifiable if missing/unsigned):
Mandatory at tender closing (non-disqualifiable, 5 working days to remedy):
Mandatory prior to contract award:
Eligibility: Not on sanctions list; not restricted by National Treasury, Tender Defaulters list, or Eskom; no conflict of interest; authorised signatory; no 100% subcontracting; JV agreement with joint and several liability.
Local content: SBD 6.2 and Annexures G1–G4 required if designated materials included.
CIDB: Not applicable.
CSDG, CPG: Not applicable.
Foreign suppliers: SBD 1 required; tax compliance proof required only if footprint in SA and not on CSD / no SARS PIN provided. No footprint in SA = no tax compliance proof required.
Health & Safety
Source: Invitation to tender-RF cables and connectors - A.pdf (TENDER)Safety requirements (additional contractual requirement):
Quality requirements (additional contractual requirement):
Other additional contractual requirements (may be included if applicable):
Contractual requirements are assessed after evaluation and ranking; proof must be submitted prior to contract award. Failure to meet by stipulated deadlines may render tenderer non-responsive and ineligible for award.
Contractual Terms
Source: Invitation to tender-RF cables and connectors - A.pdf (TENDER)Contract form: NEC3 Supply Contract (SC3).
Contract duration: 5 years.
Payment terms: ≤ R50 million (incl. VAT) = 30 days from undisputed invoice; > R50 million (incl. VAT) = 60 days from undisputed invoice.
Performance security: Not applicable.
Cataloguing: Successful tenderer may be required to provide cataloguing information per item after award; materials must comply with Eskom labelling specifications. Pricing schedule must include cataloguing line item (Eskom pays).
Subcontracting: Main contractors discouraged from subcontracting with subsidiaries (may be seen as fronting). If subcontracting with subsidiary, must declare in tender documents. Potential sub-contractors list available via www.csd.gov.za.
Price negotiation: Eskom reserves right to negotiate with preferred bidders if prices not market-related.
Sanctions: Tenderers from sanctioned countries ineligible (applies to subcontractors/suppliers).
JV/consortium: Agreement must state joint and several liability; single designated bank account; profit-sharing ratios; operate as single incorporated entity.
Objective criteria: Condition for contract award; non-compliance may lead to second-ranked tenderer recommendation.
Standard Conditions of Tender: Available at www.eskom.co.za; Tender Data takes precedence.
Section
Source: Invitation to tender-RF cables and connectors - A.pdf (TENDER)Eligibility (pass/fail): No sanctions-list nationality; no duplicate tenders; JV agreement must provide joint and several liability; no conflict of interest (common controlling partner, information access/influence); not restricted by National Treasury, Tender Defaulters list, or Eskom; no 100% subcontracting; authorised signatory only.
Basic compliance (pass/fail): Meet eligibility; submit complete technical, commercial, financial information; submit all mandatory commercial returnables.
Mandatory technical criteria (pass/fail): Technical Schedule A (spec 240-64013506) in English; Official distributor letters from OEMs. Failure = disqualification from further evaluation.
Functionality (threshold 90%): Schedule A technical compliance (171 items × 2 = 342 max). Minimum 308 points (90%) to pass. Below threshold = disqualified.
Price (80 points): Inclusive of VAT; arithmetic correction; contingencies excluded; adjusted for variations/deviations/alternatives; NPV comparison with price adjustment factors, exchange fluctuations, risk parameters. Unconditional discounts counted; conditional discounts excluded from scoring but applied at payment.
Specific goals (20 points): B-BBEE level per 80/20 PPPFA 2022 (Level 1=20, 2=18, 3=14, 4=12, 5=8, 6=6, 7=4, 8=2, Non-compliant=0). Required documents: SANAS B-BBEE certificate/sworn affidavit/CIPC affidavit; CIPC ownership/shareholding breakdown; certified shareholder IDs; disability proof (if applicable). Non-submission = 0/20 specific goals, price only out of 80.
Ranking: Total points highest to lowest. Tie-break: highest specific-goal points; then drawing of lots.
Objective criteria: Condition for contract award (not at closing); failure may elevate second-ranked tenderer.
Reverse e-auction: Not applicable.
Contact Information
Source: SHE Requirements.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"edgement of Eskom's OHS legal and other requirements form"}
Submission Guidelines
Source: SHE Requirements.pdf (unknown)OHS tender returnable documents must be submitted with the bid:
Returnable Documents
Source: SHE Requirements.pdf (unknown)Valid Letter of Good Standing: Certificate (COIDA or equivalent).
Evaluation Criteria
Source: SHE Requirements.pdf (unknown)Submission of all listed OHS tender returnables is required. No other eligibility criteria (e.g., CSD registration, B-BBEE level, CIDB grading) are mentioned in the provided document.
Financial Requirements
Source: SHE Requirements.pdf (unknown)Detailed costing for Health and Safety management must be submitted, broken down (not a lump sum) and based on the overall scope of work/service to be performed.
Compliance Requirements
Source: SHE Requirements.pdf (unknown)Mandatory OHS compliance documents:
Health & Safety
Source: SHE Requirements.pdfOHS policy signed by CEO must comply with OHS Act Section 7.
Description
Source: Tender Technical Evaluation Sheet_Schedule A.xlsxSupply and delivery of radio frequency cables, connectors, boots, tools, adaptors, flyleads, clamps, surge protectors, tapes, saddles, crimpers, bundled coaxial kits, grounding kits, and weatherproofing accessories for Eskom Distribution Division on an "as and when" required basis for a period of five years. All items must meet the detailed technical specifications in Schedule A (spec 240-64013506) and be sourced from approved OEMs with official distributor letters provided.
Submission Guidelines
Source: Tender Technical Evaluation Sheet_Schedule A.xlsx (unknown)Mandatory returnable documents:
Disqualification: A "No" response to either mandatory criterion eliminates the bid from further evaluation.
Evaluation Criteria
Source: Tender Technical Evaluation Sheet_Schedule A.xlsx (unknown)Two-stage evaluation:
Failure on either criterion results in immediate disqualification; the bid does not proceed to desktop evaluation.
No price/preference split, minimum qualifying score, or B-BBEE points are described in the provided document.
Technical Specifications
Source: Tender Technical Evaluation Sheet_Schedule A.xlsx (unknown)Scope: Supply and delivery of radio frequency cables, connectors, boots, tools, adaptors, flyleads, clamps, surge protectors, tapes, saddles, crimpers, bundled coaxial kits, grounding kits, and weatherproofing accessories for Eskom Distribution Division on an "as and when" basis for five years.
Key technical requirements (each must be evidenced):
Compliance Requirements
Source: Tender Technical Evaluation Sheet_Schedule A.xlsx (unknown)Mandatory compliance documents:
No CSD registration, tax clearance, B-BBEE certificate, CIDB grading, CIPC registration, professional body registration, or local content thresholds are mentioned in the provided document.
Description
Source: SDLI Strategy Doc_ BIDDERS TEMPLATE.pdf (unknown)Supply and delivery of radio frequency (RF) cables and connectors for the Distribution Division on an as-and-when-required basis. Contract duration: 5 years.
Important Dates
Source: SDLI Strategy Doc_ BIDDERS TEMPLATE.pdf (unknown)Closing date and time: 22 September 2026 at 10:00 (from tender record). Document effective date: 17 September 2024. Bidders review date: September 2027. No compulsory briefing or site visit is mentioned.
Contact Information
Source: SDLI Strategy Doc_ BIDDERS TEMPLATE.pdf (unknown)DTIC contacts for local content exemption applications: Ms Cathrine Matidza ([email protected], 012 394 5598 / 066 471 8982); Mr Raphael Kitiaka ([email protected], 012 394 3500 / 073 497 2051); Ms Mamosai Seleka ([email protected], 012 394 1213 / 060 705 0677); Ms Rendani Raluthaga ([email protected], 012 394 1412 / 060 705 1690); Ms Miyelani Masinga ([email protected], 012 394 1664); Ms Girlly Mahlambi ([email protected], 012 394 1394). No Eskom SCM or technical contacts are provided in the document.
Submission Guidelines
Source: SDLI Strategy Doc_ BIDDERS TEMPLATE.pdf (unknown)Submission method and address are not stated in the document. Returnable documents required with the bid: Valid B-BBEE certificate issued by a SANAS-accredited verification agency, sworn affidavit, or CIPC affidavit (for preference points claim); SBD 6.2 Declaration Form and Annex C (Local Content Declaration – Summary Schedule) (mandatory for contract award). Post-award: B-BBEE Improvement Plan within 30 days of contract signing; DTIC exemption letter if local content threshold cannot be met. Disqualification risks: omission of mandatory returnable forms; failure to meet local content thresholds without DTIC exemption.
Returnable Documents
Source: SDLI Strategy Doc_ BIDDERS TEMPLATE.pdf (unknown)Mandatory returnable documents with bid: Valid B-BBEE certificate (SANAS-accredited) / sworn affidavit / CIPC affidavit (for preference points); SBD 6.2 Declaration Form and Annex C (Local Content Declaration – Summary Schedule) (for contract award). Post-award: B-BBEE Improvement Plan within 30 days of signing; DTIC exemption letter if applicable; quarterly SDL&I performance reports per Data Collection Template.
Evaluation Criteria
Source: SDLI Strategy Doc_ BIDDERS TEMPLATE.pdf (unknown)Preference point system: 80/20 (price 80 points, specific goals 20 points). Specific goals points awarded for B-BBEE status level: Level 1 = 20, Level 2 = 18, Level 3 = 14, Level 4 = 12, Level 5 = 8, Level 6 = 6, Level 7 = 4, Level 8 = 2, Non-compliant = 0. Tenderers without valid B-BBEE documentation are not disqualified but score 0 out of 20 for specific goals and may only compete on the 80 price points. Total points rounded to two decimal places; highest total wins. No minimum functionality or technical qualifying score is stated.
Technical Specifications
Source: SDLI Strategy Doc_ BIDDERS TEMPLATE.pdf (unknown)Supply and delivery of radio frequency (RF) cables and connectors for the Distribution Division on an as-and-when-required basis. Contract period: 5 years. Designated sector local content thresholds: Steel 100%; Telecommunication Copper Cables 90%; Electrical and Telecoms Cables 90%. SBD 6.2 and Annex C are mandatory returnables for contract award. If thresholds cannot be met due to raw material shortages or local unavailability, written exemption from the DTIC is required and the exemption letter becomes mandatory for award.
Methodology
Source: SDLI Strategy Doc_ BIDDERS TEMPLATE.pdf (unknown)SDL&I objectives aligned with RDP goals: (1) B-BBEE Improvement/Retention Plan with annual migration milestones; (2) 90% local procurement content target; (3) designated group procurement spend targets; (4) job creation and retention proposals; (5) skills development programme — one candidate per R3m spend, unemployed graduates from universities/TVETs, nationally representative, tenderer-funded, SETA/SARS incentives encouraged. Quarterly reporting per Data Collection Template; 60-day review cycle; corrective action before next reporting period.
Experience & Qualifications
Source: SDLI Strategy Doc_ BIDDERS TEMPLATE.pdf (unknown)Skills development obligation: successful tenderer must skill one candidate for every R3 million cumulative spend. Candidates must be currently unemployed graduates from South African universities or TVET colleges, nationally representative across provinces and demographics. Proof of appointment (letter of competence, proof of attendance, service contract, or certificate of compliance) required within one month of reaching the spend threshold. Full cost borne by tenderer; SETA grants and SARS tax rebates may be utilised.
Pricing Schedule
Source: SDLI Strategy Doc_ BIDDERS TEMPLATE.pdf (unknown)Pricing must be separated into local and imported components as per the Price Schedule included with the tender documents. Local procurement content target is 90% of total spend. No further pricing format details (firm/non-firm, schedule of rates, bill of quantities) are provided in this document.
Financial Requirements
Source: SDLI Strategy Doc_ BIDDERS TEMPLATE.pdf (unknown)Pricing must be separated into local and imported components as per the Price Schedule included with the tender documents. Local procurement content target: 90% of total spend. Retention security: 2.5% of each invoice amount (excluding VAT) held for failure to submit quarterly SDL&I performance reports or failure to meet SDL&I obligations. Retained funds released upon positive compliance assessment. No bid bond, performance guarantee, or advance payment terms are stated.
Compliance Requirements
Source: SDLI Strategy Doc_ BIDDERS TEMPLATE.pdf (unknown)Mandatory: CSD registration (implied for all Eskom tenders); valid tax compliance status (SARS PIN); valid B-BBEE certificate (SANAS-accredited) or sworn affidavit (EME ≤ R10m turnover) or CIPC affidavit (QSE ≤ R50m turnover, unless ≥51% black-owned then sworn affidavit) — required for contract award and preference points. Local content: Steel 100%, Telecommunication Copper Cables 90%, Electrical and Telecoms Cables 90% — SBD 6.2 and Annex C mandatory returnables. DTIC exemption letter required if thresholds not met. Post-award: B-BBEE Improvement Plan within 30 days of signing; quarterly SDL&I performance reports per Data Collection Template; skills development: one candidate per R3m cumulative spend, candidates from unemployed graduates (universities/TVETs), nationally representative demographics, full cost borne by tenderer; procurement spend targets on designated groups (as % of local procurement content): Black Owned 4.0%, Black Women Owned 3.0%, Black Youth Owned 2.0%, Black Persons with Disability 1.0%; job creation and retention proposals required. CIDB not applicable. NIPP not applicable. Mandatory subcontracting not applicable.
B-BBEE Requirements
Source: SDLI Strategy Doc_ BIDDERS TEMPLATE.pdf (unknown)B-BBEE Improvement/Retention Plan required within 30 days of contract signing. Migration milestones: Level 1 maintain; Level 2-3 improve/maintain; Level 4 achieve Level 3 by end of Year 1 then improve one level per year; Level 5-8 or non-compliant achieve Level 4 by end of Year 1 then improve at least one level per year from Year 2. Valid B-BBEE certificate (SANAS-accredited) or sworn affidavit (EME ≤ R10m turnover) or CIPC affidavit (QSE ≤ R50m turnover, unless ≥51% black-owned then sworn affidavit) is a condition for contract award. Preference points: 80/20 system with B-BBEE level scoring as above.
Contractual Terms
Source: SDLI Strategy Doc_ BIDDERS TEMPLATE.pdf (unknown)Contract period: 5 years. SDL&I obligations form contractual commitments. B-BBEE Improvement Plan due within 30 days of contract signing. Local procurement content target: 90%. Procurement spend targets on designated groups (as % of local procurement content): Black Owned 4.0%, Black Women Owned 3.0%, Black Youth Owned 2.0%, Black Persons with Disability 1.0%. Job creation and retention proposals required. Skills development: one candidate per R3m cumulative spend; candidates from unemployed graduates (universities/TVETs), nationally representative demographics; tenderer bears full cost; proof of appointment required within one month of threshold reached; SETA grants and SARS tax rebates may be accessed. Retention: 2.5% of invoice amount (excl. VAT) for non-submission of quarterly SDL&I reports or failure to meet SDL&I obligations. Quarterly reports per Data Collection Template; Eskom reviews within 60 days; written notification of non-compliance; corrective measures required before next report or retention invoked. Valid B-BBEE certificate or sworn affidavit is a condition for contract award.
Requirements
Source: SDLI Strategy Doc_ BIDDERS TEMPLATE.pdf (unknown)Designated sector local content thresholds: Steel 100%; Telecommunication Copper Cables 90%; Electrical and Telecoms Cables 90%. SBD 6.2 Declaration Form and Annex C (Local Content Declaration – Summary Schedule) mandatory for contract award. DTIC exemption required if thresholds cannot be met due to raw material shortages or local unavailability; exemption letter mandatory for award. DTIC contact details provided for exemption applications. Post-award: B-BBEE Improvement Plan within 30 days; quarterly SDL&I reports; skills development (1 candidate per R3m spend); designated group procurement targets; job creation/retention proposals.
Section
Source: SDLI Strategy Doc_ BIDDERS TEMPLATE.pdf (unknown)Preference point system: 80/20 (price 80, specific goals 20). Specific goals points for B-BBEE status level: Level 1 = 20, Level 2 = 18, Level 3 = 14, Level 4 = 12, Level 5 = 8, Level 6 = 6, Level 7 = 4, Level 8 = 2, Non-compliant = 0. No B-BBEE documentation = 0 specific goal points, only price points considered. Highest total points wins; total rounded to two decimals.
Description
Source: Eskom Standard Conditions of Tender.pdf (TENDER)Supply and delivery of radio frequency cables and connectors for the Distribution Division on an "as and when" required basis for a period of five years. Detailed scope, specifications, and works information are contained in the specification and/or works information referenced in the Tender Data.
Important Dates
Source: Eskom Standard Conditions of Tender.pdf (TENDER)Closing date and time: 22 September 2026 at 10:00 SAST (per tender record). All references to time mean South African Standard Time (GMT+2); closing time determined by Telkom time signal. Compulsory site visit and/or clarification meeting: details (date, venue) stated in the Tender Data; failure to attend results in disqualification. Clarification queries must be submitted to the Eskom Representative before the closing time for clarification queries (date not specified in this document). Tender validity period: as stated in the Tender Data; may be extended by Eskom request. Addenda may be issued and will be published on the Eskom Tender Bulletin and NT e-Tender Portal.
Contact Information
Source: Eskom Standard Conditions of Tender.pdf (TENDER)All communication must be in writing (hand-written, typed, printed or electronic) and in English, directed to the Eskom Representative only. The Eskom Representative's name, e-mail, phone, and address are specified in the Tender Data (not provided in this document). Open tenders are advertised on the Eskom Tender Bulletin and National Treasury e-Tender Portal; closed tenders are sent directly to known tenderers. Addenda and clarification responses are published via the same channels.
Submission Guidelines
Source: Eskom Standard Conditions of Tender.pdf (TENDER)Submission method: one complete original tender plus one complete hard copy of the original tender, each sealed in separate packages marked "ORIGINAL" and "COPY". Both packages placed together in an outer package marked "CONFIDENTIAL" showing only the Eskom address and the Invitation to Tender number. Eskom may also require one additional complete soft copy in electronic format. Tenders must be in English, completed in ink (not pencil), and signed by the duly authorised signatory. Delivery must be to the address, tender box, facsimile number or e-mail address stated in the Tender Data by the closing deadline. Proof of posting or courier delivery is not accepted as proof of delivery. Late tenders will not be accepted. Mandatory returnables must be submitted by the tender submission deadline; other returnables required for contract award must be submitted before contract award. Acknowledgement Form must be completed and submitted with the tender, stating whether the tender covers the whole or part of the works, services or supply. Where an agent submits on behalf of a principal, an authenticated copy of the authority to act must be submitted as a tender returnable.
Evaluation Criteria
Source: Eskom Standard Conditions of Tender.pdf (TENDER)Evaluation follows a multi-stage process: (1) Basic compliance check — tenders must meet all mandatory requirements and include one complete hard copy; failure renders the tender non-responsive and disqualified. (2) Functionality (if a criterion) — tenderers scored against technical criteria and must meet the minimum threshold stated in the Tender Data; only those meeting the threshold proceed. (3) Financial analysis — Eskom assesses financial risk from financial statements; may disqualify if risk is deemed too high or mitigating factors insufficient. (4) Price evaluation — according to criteria in the Tender Data, considering CPA, FOREX, commodity increases, discounts, NPV, forecasted invoicing rates. (5) Specific Goals (B-BBEE) — scored per PPPFA 80/20 or 90/10; failure to meet Specific Goals or submit supporting documentation by closing deadline results in zero points for Specific Goals (80/90 points for Price only), but does not disqualify if otherwise responsive. (6) Ranking — Price and Specific Goals scores added and ranked highest to lowest. (7) Objective criteria may be applied per PPPFA Section 2(1)(f) if stipulated in the tender documents. Arithmetical errors are corrected per defined rules: line item total governs over unit rate; total of prices governs over summation errors. Designated materials (dtic) — failure to meet local content thresholds renders the tender non-responsive. Reverse e-auction may be used if indicated in the specific enquiry; in that case prices submitted with the tender are disregarded.
Technical Specifications
Source: Eskom Standard Conditions of Tender.pdf (TENDER)Scope: supply and delivery of radio frequency cables and connectors for the Distribution Division on an "as and when" required basis for a period of five years (per tender record). Detailed technical specifications, quantities, standards, service levels, and works information are contained in the specification and/or works information referenced in the Tender Data (not provided in this document). Tenderers must check enquiry documents on receipt and notify the Eskom Representative of any discrepancies or omissions. Tenderers may not sub-contract 100% of the scope of work; such tenders will be deemed ineligible and disqualified. Standardised specifications referenced in the enquiry documents must be obtained at the latest revision if required for tender preparation.
Quality Management
Source: Eskom Standard Conditions of Tender.pdf (TENDER)Tenderers must provide reasonable proof of SHEQ (Safety, Health, Environment, Quality) systems, policies, and capabilities at time of contract award. All costs and personnel associated with SHEQ must be reflected in the tender for Eskom's assessment. Testing costs necessary to demonstrate tender compliance with evaluation criteria are borne by the tenderer. Standardised specifications referenced in enquiry documents must be obtained at the latest revision. Acknowledgement Form must be completed and submitted with the tender, stating whether the tender covers the whole or part of the works, services, or supply.
Pricing Schedule
Source: Eskom Standard Conditions of Tender.pdf (TENDER)Pricing: fixed rates and prices for contract duration (no adjustment except per Enquiry). All duties, taxes (VAT), levies included; rates applicable 14 days before closing. Prices in ZAR unless otherwise stated; foreign currency per exchange rate and base date in Invitation to Tender. Insurance cover by Eskom may be incomplete; tenderer to seek qualified advice. Security for performance: if required, name minimum two financial institutions for security; Eskom may reject unsuitable institutions. Arithmetical error correction: line item total governs over unit rate; total of prices governs over summation errors. Reverse e-auction may be used if indicated; prices submitted with tender then disregarded. Alternative tenders only if main tender submitted and permitted in Invitation to Tender. Clarification of prices may be requested during evaluation but mandatory returnables cannot be submitted after deadline.
Financial Requirements
Source: Eskom Standard Conditions of Tender.pdf (TENDER)Pricing: rates and prices must be fixed for the contract duration and not subject to contract price adjustment except as provided for in the Enquiry. All duties, taxes (including VAT), and other levies payable by the successful tenderer must be included in rates, prices, and the tendered total; such duties, taxes, and levies are those applicable 14 days prior to the tender submission deadline. Prices must be stated in South African Rand unless otherwise instructed in the Invitation to Tender; exchange rate and base date for any foreign currency component are stipulated in the Invitation to Tender. Insurance: Eskom's insurance cover (if any) may not be full cover required under the conditions of contract; tenderers are advised to seek qualified advice. Security for performance: if required, the tenderer must indicate the names of a minimum of two (2) financial institutions likely to be approached for the required security; Eskom reserves the right to reject unsuitable institutions. Financial statements will be evaluated for financial risk; Eskom may disqualify if risk is deemed too high. Arithmetical error correction rules apply: line item total governs over unit rate; total of prices governs over summation errors. Reverse e-auction may be used if indicated; prices submitted with tender then disregarded. Alternative tenders only if main tender submitted and permitted in Invitation to Tender. Clarification of prices may be requested during evaluation but mandatory returnables cannot be submitted after deadline.
Compliance Requirements
Source: Eskom Standard Conditions of Tender.pdf (TENDER)Mandatory compliance: CSD registration (National Treasury instructions), valid tax compliance status (SARS), compliance with PPPFA and Amended B-BBEE Codes, COIDA, OHS Act, and Eskom SHEQ requirements. CIDB registration: where applicable, proof of registration is mandatory at tender closing deadline; if only proof of application is available at closing, actual CIDB registration printout must be submitted by contract award — failure to provide either results in disqualification. SHEQ: tenderers must provide reasonable proof of safety, health, environmental, and quality systems, policies, and capabilities at time of contract award; all associated costs and personnel must be reflected in the tender. Contract Skills Development Goal (CSDG): applicable to contracts exceeding R60 million with duration 12 months or more, or professional services exceeding R5 million with duration 12 months or more. Contract Participation Goals (CPG): applicable to Grade 7-9 General Building and Civil Engineering contracts of 6 months or more where at least 25% of the main contract could be sub-contracted; minimum 5% contract participation goal for targeted enterprises. Designated materials (dtic): specified local content percentages must be met; failure renders the tender non-responsive. Fraudulent B-BBEE certificates or fronting will be reported to the B-BBEE Commissioner. Proof of authority to act as agent (if applicable). Acknowledgement Form. Mandatory tender returnables as stipulated in the Invitation to Tender must be submitted by the required deadlines.
Health & Safety
Source: Eskom Standard Conditions of Tender.pdf (TENDER)Compliance with OHS Act, COIDA, and Eskom SHEQ requirements is mandatory. Tenderers must provide reasonable proof of SHEQ systems, policies, and capabilities at contract award; all associated costs and personnel must be reflected in the tender. CIDB registration mandatory where applicable (proof at closing or proof of application at closing with registration printout by award). Contract Skills Development Goal (CSDG) applies to contracts >R60 million and 12+ months duration, or professional services >R5 million and 12+ months. Contract Participation Goals (CPG) apply to Grade 7-9 GB/CE contracts of 6+ months where 25%+ could be sub-contracted; minimum 5% participation for targeted enterprises in CE, EB, GB, ME classes. Fraudulent B-BBEE certificates or fronting reported to B-BBEE Commissioner.
Contractual Terms
Source: Eskom Standard Conditions of Tender.pdf (TENDER)Contract formation: Eskom may accept or reject any variation, deviation, or alternative tender; may accept whole or part of a tender. Eskom may cancel the tender process at any time before contract formation with written reasons. No liability for losses from participation, amendment, termination, or suspension of the process. Mandated negotiations may be conducted with selected tenderers per approved policies. Tender validity period as per Tender Data; may be extended on request without tender modification. Confidentiality: all tender matters treated as confidential; documents used only for tender preparation. Standardised specifications referenced must be obtained at latest revision. Successful tenderer must check final draft contract and sign Form of Agreement. Contract documents revised to include addenda, agreed returnables, negotiated changes, and other agreed revisions. Authorised signatories of both parties sign original and one copy of Form of Agreement. Eskom's rights to accept/reject, cancel, negotiate, and disclaim liability for document accuracy are reserved.
Section
Source: Eskom Standard Conditions of Tender.pdf (TENDER)Evaluation stages: (1) Basic compliance — mandatory documents and one complete hard copy required; non-compliance leads to disqualification. (2) Functionality (if applicable) — scored against technical criteria with minimum threshold per Tender Data. (3) Financial risk analysis — financial statements assessed; high risk may lead to disqualification. (4) Price evaluation — per Tender Data criteria, including CPA, FOREX, commodity, discounts, NPV, invoicing rates. (5) Specific Goals (B-BBEE) — PPPFA 80/20 or 90/10; zero points for Specific Goals if not met or documentation missing by closing, but tender not disqualified if otherwise responsive. (6) Ranking — combined Price and Specific Goals scores, highest to lowest. (7) Objective criteria per PPPFA Section 2(1)(f) if stipulated. Arithmetical error correction rules apply. Designated materials local content thresholds mandatory. Reverse e-auction may apply if indicated in specific enquiry.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 46 of 2000
Relevant where professional engineering services or regulated engineering work may be required.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Address
Megawatt Park,2 Maxwell Drive, Sunninghill, Sandton - Sunninghill, Sandton - Johannesburg - 2157
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
17
Last checked
26 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Supplies: Electrical Equipment. Unlock full pricing strategies, bid frequency, and historical win rates.