Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
1 Impala - Pullenshope - Pullenshope - 1096
Organization Type
GOVERNMENT
Published
07 Sept 2026
OCDS Reference
ocds-9t57fa-169279
Date & Time
Tuesday, 29 September 2026 - 10:00
Venue
MS-TEAMS
Categories
Request for Bid(Open-Tender)
1 Impala - Pullenshope - Pullenshope - 1096
AI Document Analysis Stages
Important Dates
Source: SHE Specification.pdf (unknown)07 Sept
2026
Tender Published
Tender was published
29 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Quality Form A.pdf
OHS Returnables.pdf
240-109253698 CQP Template 2021.docx
E-tendering Help Manual for supplier - 27 January 2025(1).pdf
SDL&I.pdf
Invitation to Tender (ITT)_Hydrogen Plant Maintenance_Hendrina PS.pdf
Tender Technical Evaluation Criteria.pdf
SHE Specification.pdf
SOW.pdf
Quality Tender Returnables.pdf
Annex-e_Local Content Declaration-Supporting Schedule to Annex C - Copy.pdf
Annex-c_Local content Declaration-Summary Schedule - Copy.pdf
Environmental Requirements.pdf
Annexure B- Acknowledgement Form.pdf
Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdf
QCP.pdf
Annex-d_Imports Declaration-Supporting schedule to Annex C - Copy.pdf
Eskom - Standard Conditions of Tender - 30 January 2025-1.pdf
E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025(1).pdf
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 736 920
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
{"briefingSession":"{"date":null,"time":null,"venue":"ion reports to the relevant management.","is_compulsory":false}"}
Contact Information
Source: SHE Specification.pdf (unknown){"name":null,"email":null,"phone":null,"department":"for its employees to attend","address":"nance Services at Hendrina Power"}
Evaluation Criteria
Source: SHE Specification.pdf (unknown)Section 37(2) of the OHS Act requires Eskom to sign an agreement and include it in the OHS file for evaluation
Check functionality of temperature switches
Check functionality of temperatur switches
Check functionality of level switches
Check functionality of level transmitters
Check functionality of fill up volume and dryer drain pot level switches
Check functionality of break tank level switch
Safety and quality documentation (sheq) (safety file to be submitted)
Health, Environmental, and Quality (SHEQ) Policy and applicable legislative obligations. This OHS
The contractor is and remains accountable for the quality and execution of their health and safety programme
Technical Specifications
Source: SHE Specification.pdf (unknown)Eskom’s responsibility and commitment is to ensure a safe working environment is in line with its Safety,
Health, Environmental, and Quality (SHEQ) Policy and applicable legislative obligations. This OHS
specification is Eskom Generation's minimum requirements which are required to be met for the duration of
the contract period by contractors/suppliers and, where required, the delivery organisation. The contractor is
expected to develop an OHS plan that meets these requirements as well as all the relevant applicable
legislation that they conform to. Eskom in no way assumes the contractor’s legal responsibilities and liabilities.
The contractor is and remains accountable for the quality and execution of their health and safety programme
for their employees and appointed contractor employees. This OHS specification reflects minimum
requirements and should not be construed as all-encompassing.
Note 1: All the requirements listed hereunder are in relation to the contract and do not supersede or
replace any organizational OHS requirements.
Where requirements listed are already in place, then the organizational requirements must be taken
cognisance of and listed in the respective OHS plans. If there are any additional Eskom and/or legislative
requirements listed in the OHS specification, then these must be addressed.
2.1 Scope
This OHS specification lists the legislative and Eskom requirements and, where applicable, any
requirements pertaining to local authorities, municipal by-laws, or environmental legislation that must
be met by the contractor.
2.1.1 Purpose
This document will provide a standardised approach to the compilation of OHS specifications throughout
Eskom Generation business for contracts, standards, and NEC 3.
2.1.2 Applicability
This OHS specification is applicable to any contracting organisation that intends to respond to Eskom
Generation's tender/enquiry with the intention of entering into a contract.
2.2 Normative/informative references
Parties using this document shall apply the most recent edition of the documents listed in the following
paragraphs.
2.2.1 Normative
Basic Conditions of Employment Act No .
Occupational Health and Safety Act and Regulations No .
OHS Act “Regulations on Hazardous Work by Children in South Africa”
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 35
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document
SPECIFICATION 229-T2208 Rev 1
Identifier
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
National Environmental Management Act .
National Road Traffic Act .
32-37 Eskom Substance Abuse Procedure.
32-136 Contractor Health and Safety Requirements
240-62196227 Life- saving Rules
32-95 Environmental, Occupational Health and Safety Incident Management Procedure
32-727 SHEQ Policy
32- 418 Working at Heights Procedure
240-62946386 Vehicle and Driver Safety Management Procedure
32-520 Risk Assessment procedure
Plant Safety Regulations
Iso 45001
Eskom Covid-19 policy
National Disaster Management Act
2.2.2 Informative
[1] Tobacco Products Control Act (Updated 2011.05.19)
[2] SANS 1186 Symbolic Safety Signs
[3] Constitution of the Republic of South Africa No
[4] DMN 34-110 Operating A Vehicle Mounted Crane
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 35
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document
SPECIFICATION 229-T2208 Rev 1
Identifier
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
2.3 Definitions
Definition Explanation
Appointed contractor Means a contractor appointed by the Main contractor
Baseline risk (32-520) baseline operational risks refer to the health and safety risks
assessment associated with all standard processes and routine activities in the business
Business unit (BU) (32-296) means any defined unit within the Eskom environment, operating as
a business under a particular cost-centre number. In the context of this
document and in terms of health and safety, any reference to a BU includes a
defined unit within any Eskom division and its subsidiaries
Client (OHS Act) Eskom representative (Internal – Asset Owner), also referred to as
the contract administrator/custodian or agent or project manager (as defined
in the contract). He/she is the person responsible for ensuring that the works
or services are executed in terms of the contract, as well as adherence to
legislation pertaining to the contract.
Competent person (OHS Act) means any person having the knowledge, training, experience,
and qualifications, specific to the work or task being performed, provided that,
where appropriate, qualifications and training are registered in terms of the
South African Qualifications Authority Act, 1995 (Act No. )
Contractor (OHS Act) means an employer as defined in section 1 of the Act who
performs contracted work and includes Main contractors
Contract’s Manager/End Contract’s Manager/End User
User
Consultant means a person providing professional advice
Controlled disclosure controlled disclosure to external parties (either enforced by law or
discretionary)
Duty of care to the (32-136) anybody who causes or has caused or may cause significant
environment pollution or degradation of the environment must take reasonable measures
to prevent such pollution or degradation from occurring, continuing, or
recurring. If such harm to the environment is authorised by law or cannot
reasonably be avoided or stopped, such person must minimise and rectify
such pollution or degradation of the environment
Employee (OHS Act) means, subject to the provisions of subsection (2), any person
who is employed by or works for an employer and who receives or is entitled
to receive any remuneration or who works under the direction or supervision
of an employer or any other person
Employer (OHS Act) means, subject to the provisions of subsection (2), any person
who employs or provides work for any person and remunerates that person
or expressly or tacitly undertakes to remunerate him/her, but excludes a TES
(ex labour broker) as defined in section 1(1) of the Labour Relations Act 1956
(Act No. )
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 35
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document
SPECIFICATION 229-T2208 Rev 1
Identifier
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
2.3 Definitions
Definition Explanation
Environment (32-94) means:
a) the land, water, and atmosphere of the earth;
b) micro-organisms and plant and animal life; and
c) any part or combination of (a) and (b) and the interrelationships
among and between them, and the physical, chemical, aesthetic, and
cultural properties and conditions of the foregoing that influence
human health and well-being
Eskom requirements Eskom requirements flowing from directives, policies, standards, procedures,
specifications, work instructions, guidelines, or manuals
Fall protection plan (OHS Act) means a documented plan of all risks relating to working from an
elevated position, considering the nature of work undertaken, and setting out
the procedures and methods to be applied in order to eliminate the risk
Hazard (OHS Act) means a source of, or exposure to, danger
Hazard identification (OHS Act) means the identification and documenting of existing or expected
hazards to the health and safety of persons, which are normally associated
with the type of construction work being executed or to be executed
Occupational Health (OHS Act) means a file or other record in permanent form, containing the
and safety file information required in relation to the contract.
Health and safety plan (OHS Act) means a document plan that addresses hazards identified and
includes safe work procedures to mitigate, reduce, or control hazards
identified
Occupational Health (OHS Act) means a document specification of all health and safety
and safety specification requirements pertaining to associated to a contract, so as to ensure the
health and safety of persons.
Occupational Health means comprehensive health and safety requirements for a contract, project,
and safety requirements site, and scope of work. This specification is intended to ensure the health
and safety of persons, both workers and the public, and the duty of care to
the environment. The health and safety requirements must be specific to
each contract, project, site, and scope of work
Lifesaving Rules (240-62196227) a rule that, if not adhered to, has the potential to cause
serious harm to people
Medical Certificate of (OHS Act) means a certificate valid for one year, issued by an occupational
fitness health practitioner, issued in terms of the regulations, whom shall be
registered with the Health Professions Council of South Africa
Medical surveillance (OHS Act) means a planned programme or periodic examination (which may
include clinical examinations, biological monitoring, or medical tests) of
employees by an occupational health practitioner or, in prescribed cases, by
an occupational medicine practitioner
Method statement (OHS Act) means a written document detailing the key activities to be
performed in order to reduce, as reasonably as practicable, the hazards
identified in any risk assessment
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 35
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document
SPECIFICATION 229-T2208 Rev 1
Identifier
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
2.3 Definitions
Definition Explanation
National sourcing of services providers/contractors at the divisional level and not at BU
Enquiries/contracts level thorough tendering, request for price etc
Organisation may be defined as a group of individuals (large of small) that is cooperating
under the direction of executive leadership in accomplishment of certain
common objects
Pre-job meetings (34-227) means a meeting that is held prior to the commencement of the
day’s work and that is attended by all the relevant employees associated with
the work task
Main contractor (In the text of this document) Means an employer, as defined in section 1 of
the OHS Act, who intends to tender for or has signed a contract with Eskom
for services rendered.
Provincial director (OHS Act) means the provincial director as defined in Regulation 1 of the
General Administrative Regulations under the Act
Responsible Manager Is a Manager of a department, section or operating/business unit who has
been appointed as part of the Eskom delegation of authority process with the
aim to assist the applicable 16(2) assigned person in executing his/her duties
in terms of the Occupational Health and Safety Act
Risk assessment (OHS Act) means a programme to determine any risk associated with any
hazard at a construction site in order to identify the steps needed to be taken
to remove, reduce, or control such hazard.
Site (34-228) means an Eskom department, unit, complex, building, specific
project, work site, or the site where agents, clients, Main contractors,
contractors, suppliers, vendors, and service providers provide a service to
Eskom, directly or indirectly
Service provider any private person or legal entity that provides any service(s) to Eskom for
compensation
Subsidiary (32-94) an enterprise controlled by another (called the parent) through the
ownership of greater than 50% of its voting stock
Supplier (32-1034)means a natural or legal person who renders a service and may
include the following current or potential supplier vendor, contractor,
consultant
Task (34-227) a segment of work that requires a set of specific and distinct actions
for its completion
Toolbox talks (34-227) where the team leader, after conducting pre-task planning, shares
all the tasks at hand and discusses task allocation, the identified risks, and
the control measures with all his/her team members on site before
commencing a specific task and documenting the agreed strategy. (This
shall be done to ensure common understanding of the tasks, risks, and
control measures required.)
The Act (OHS Act) means the Occupational Health and Safety Act No. , as
amended, and the Regulations thereto
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 35
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document
SPECIFICATION 229-T2208 Rev 1
Identifier
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
2.3 Definitions
Definition Explanation
Visitor any person visiting a workplace with the knowledge of, or under the
supervision of, an employer.
2.4 Abbreviations
Abbreviation Description
BU Business Unit
CE Chief Executive
COID Act Compensation for Occupational Injuries and Diseases Act
DMR Driven Machinery Regulations
DEL Department of Employment and Labour ( Inspection and Enforcement services –
Provincial office)
EP Emergency Preparedness
EAP Employee Assistance Program
ERfW Environmental Regulations for Workplaces
GAR General Administrative Regulations
GSR General Safety Regulations
HCS Hazardous Chemical Substances
LDV Light Delivery Vehicle
MSDS Material Safety Data Sheets
OHS Act Occupational Health and Safety Act and Regulations,
O&M Operating and Maintenance
LoG (COID) Letter of Good Standing
SABS South African Bureau Standard
SANS South African National Standard
2.5 Related/supporting documents
Section 37(2) of the OHS Act requires Eskom to sign an agreement and include it in the OHS file for evaluation
prior to the start of work. OHS department will issue the 37(2) agreement to the project manager/end user who
will facilitate the signing of the document by Eskom and contractor representatives.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 35
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document
SPECIFICATION 229-T2208 Rev 1
Identifier
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
3.1 Scope of work
The objective of the works is to ensure timely maintenance and the activities with all intervals as part
of the objectives are tabled below:
Monthly Service
Perform visual inspections on pressure gauges and transmitters with comparison to the HMI
readings. Perform visual inspections of the HTO with its pipework. Visual inspection on pipework.
Three Monthly Service
Calibrate OTH Sensor
Six Monthly Services
6 monthly service
Inspect and clean power and control cabinets
Recharge chiller system and clean condenser fins
Check the torque on the cell stack
Clean/replace filters in power/control panels
Calibrate the oth analyzer
Calibrate the hta detector cell
Calibrate h2 purity analyser h2 plant
Calibrate h2 purity analyser metering panel
Calibrate the hto analyser
Disassemble and clean the hto panel
Disassemble and clean the oth panel
Service hto panel regulator
Service oth pnl h2 supply regulator
Service oth pnl n2 supply regulator
Check leak tightness of system
Check electrolyser valves to user open inspect and test
Check all vent and regen valves open inspect and test
Check the concentration of the electrolyte
Check the fixings of the power rack cables incl transformer taps
Check instrument air supply
Test and calibrate the ota analyser
3.4 Yearly Services
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 35
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document
SPECIFICATION 229-T2208 Rev 1
Identifier
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
Yearly services
Check functionality of temperature switches
Check functionality of temperatur switches
Check functionality of level switches
Check functionality of level transmitters
Check functionality of fill up volume and dryer drain pot level switches
Inspect and clean break tank
Check functionality of break tank level switch
Calibrate pressure switches h2 process
Calibrate pressure transmitters
Calibrate pressure indicators
Replace the oth analyser cell
Replace thyristor cooling fans
Replace chiller and conductivity panel filters
Replace the level transmitter floats.
Replace the level switch floats.
Calibrate dew point transmitter.
Replace the hto detector sensor.
Replace the ota detector sensor.
Check the 24volts UPS batteries.
Replace the plc batteries.
Compile service data pack and submit
3.5 Three Yearly Services
3-YEARLY service
Calibration of pressure relief valves and replace if faulty
Pressure testing of h2 plant only to per 2009 regulations
Re-gas chiller unit inspect and test chiller pump and condenser unit
Exchange the electrolyte
Electrolyte 300 litres 30% composition
Hta analyzer cell (2) ttl over 5 years
Deoxo catalyst
Modification of deoxo drier vessels to enable catalyst and desiccant
Change including design calculations
3.6 Additional Scope
Additional scope
Calibration exchange program for 2 x michell is probes for 3 years
Safety and quality documentation (sheq) (safety file to be submitted)
Provision for 30 breakdown callouts.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 35
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document
SPECIFICATION 229-T2208 Rev 1
Identifier
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
Practical training sessions (at least 6 people during the duration of the
Contract)
Dew point calibrations
Perform fault analysis and repair faults on the plc.
Update plc software as a when required.
3.2 Legal compliance
3.2.1 Section 37(2) (Legal) Agreement
A section 37(2) agreement must be signed between Eskom and the main contractor at the time of submitting
the safety file. The main contractor must ensure that a section 37(2) agreement is compiled between the main
contractor and all their appointed contractors for the contract. The original copy of the section 37(2) agreement
must be retained by the contractor, and a copy must be retained by the responsible project manager/end user.
A copy of all the agreements must form part of the respective contractor’s OHS file.
3.2.2 Hazardous Work by Children (Child Labour)
The constitution of the Republic of South Africa, in the "Bill of Rights", is clear on the rights of children,
especially when it comes to:
being protected from exploitative labour practices.
not be required or permitted to perform work or provide services that
are inappropriate for a person of that child’s age; or
This places at risk the child’s well-being, education, physical or mental health, or spiritual, moral, or
social development and the Basic Conditions of Employment Act, Chapter six, Section 43,
"Prohibition of employment of children."
Before resorting to the use of child labour, due consideration must be given to the child's constitutional
rights. Where work is being performed which is not prohibited in terms of the constitution, then such work
must be conducted in terms of the OHS Act "Regulations on Hazardous Work by Children in South Africa"
with emphasis on paragraph 2: Purpose and Interpretation. Eskom does not condone the use of child labour
and, therefore, all effort must be exercised, and child labour should not be used.
3.2.3 OHS Act
The main contractor and appointed contractors shall have an up-to-date copy of the OHS Act and regulations
which will be available to all employees.
3.2.4 Legislative Compliance
All contractors will comply with all the legislation pertaining to this contract being:
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 35
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document
SPECIFICATION 229-T2208 Rev 1
Identifier
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
The Main contractor and all appointed contractors will comply with all the legislation pertaining to this project
being:
The Constitution of the Republic of South Africa (particularly Section 24 of the Bill of Rights).
Occupational Health and Safety Act 1993 (Act ) and its Regulations.
National Environmental Management Act 1998 (Act ).
Environment Conservation Act 1989 (Act ).
National Water Act 1998 (Act ).
Civil and Building Work Act.
National Road Traffic Act .
Compensation for Occupational Injures and Diseases Act.
SANS Standards –Contractor shall use the relative standards applicable to the project.
3.3 ESKOM requirements
All contractors shall, before commencement of the project ensure that all their employees are familiar with the
relevant Eskom OHS documentation that is applicable to contract services.
3.4 Sheq policy
A SHEQ policy is a statement of intent and a commitment by the organization’s CE and senior management
in relation to the relevant OHS roles and responsibilities, the achievement of their strategic objectives, and
values of integrity, customer satisfaction, excellence, and innovation. The main contractor and all appointed
contractors, if not already in place, will be required to compile an organisational SHEQ policy in line with their
OHS responsibilities. The policy must be signed by the organisation’s CE or the appointed assistant to the CE,
OHS Act Section 16(2). The policy must be displayed in a prominent place within the workplace. A copy of the
policy must be filed in the contractor's OHS files and attached as an annexure to the OHS Plan.
3.5 Covid -19 policy
Due to the current pandemic the contractors are required to submit the Covid policy signed by the most senior
person. The policy must be displayed in a prominent place within the workplace. A copy of the policy must be
filed in the contractor's OHS files and attached as an annexure to the OHS Plan.
3.5.1 Covid -19 requirements
Covid-19 costs are not for profit making purpose and Eskom reserves the right to accept and/or decline the
list of PPE which will be listed in the detailed Covid-19 costs. Due to the current pandemic the contractors
are required to provide Eskom with a Covid-19 risk assessment and a detailed plan on how to prevent the
spread of the virus and what control measures will be put in place to protect Eskom employees and
members of the public. The risk assessment must include the following but not limited to, adherence to
Covid-19 protocols in designated smoking areas. Covid-19 costs are applicable for the duration of the
pandemic and the Covid-19 costs will be ceased once the country has declared that Covid-19 is no more a
pandemic. The contractors have an obligation to comply with the National Disaster Management Act
including the appointment of the Compliance Officer.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 35
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document
SPECIFICATION 229-T2208 Rev 1
Identifier
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
3.6 Coid
The Main contractor and all his/her appointed contractors shall be registered with an appropriate employment
compensation commissioner and have available a valid letter of good standing (LoG) from such commissioner.
The obligation lies with the contractors to ensure that the LoG remain valid throughout the contract period. A
copy of the LoG must be filed in the contractor OHS files.
3.7 Costing for OHS within the project
The costing for OHS must be itemised based on the overall scope of the project (i.e.) Training, provision of
PPE, safety equipment purchases etc.
3.8 Statutory appointments
The Main contractor and all appointed contractors must appoint competent workers who will comply with the
OHS Act for the duration of the contract. Before requiring appointees to accept an appointment, the employer
must ensure that they have received appropriate training and/or information about their responsibilities. The
relevant statutory appointments must be made in compliance with the OHS Act's criteria, which include
appointing a qualified individual to the appropriate roles.
3.9 ESKOM life-saving rules
work for Eskom to do the same.
consultants, and contractors. Any Eskom employee or employee of a Main Contractor or appointed
contractor who fails to follow these rules would be deemed a serious violation. These rules are in
place to protect any employee, labour broker, or contractor working from significant injury or death.
the rules shall be obeyed by any contractor and their employees.
The rules are:
Rule description of rule
Open, isolate, test, earth, bond, and/or insulate before touch
Rule 1
( That is plant, any plant operating above 1000 V)
Hook up at heights
Rule 2 Working at height is defined as any work performed above a stable work surface or where a
person puts himself/herself in a position where he/she exposes himself/herself to a fall from or
into.
Buckle up
Rule 3 No person may drive any vehicle on Eskom business and/or on Eskom premises:
Unless the driver and all passengers are wearing seat belts.
Rule 4 BE SOBER
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 35
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document
SPECIFICATION 229-T2208 Rev 1
Identifier
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
No person is allowed to be under the influence of intoxicating liquor or drugs while on duty
Permit to work
Rule 5 Where an authorisation limitation exists, no person shall work without the required permit to
work.
Ensure safe live working
Rule 6 Ensure all live work basic principles are adhered to, as outlined in the High Voltage
Live Working Standard for the respective division
Eskom will take a zero-tolerance approach to these policies.
Noncompliance to Life-saving rules is regarded serious misconduct and will result in
serious disciplinary action, which may include dismissal.
This is to ensure that everyone who works on or visits an Eskom facility returns home to
their families safely.
3.10 Substance abuse
workplace accidents and car driving. As a result, Eskom has the right to take reasonable procedures
to identify and prohibit drunk people from entering the company.
General Safety Regulation 2A specifies the legal position on intoxication.
The allowable alcohol and drug level is 0%.
All contractors must follow Eskom's procedure 32-37 ("Substance Abuse Procedure"), taking into
account that this is an Eskom Life-saving Rule number 4: (BE SOBER"), and anyone entering the
Eskom site will be subjected to ad hoc alcohol testing if the BU has self-alcohol testing equipment.
regular basis.
Test results must be marked "Confidential" and kept in the employee's personal file.
Eskom's life-saving rules must be included in the induction process.
All employees involved in the scope of work must sign the Life-saving rule pledge before
commencement of work.
3.11 Contractor organisational structure
3.11.1 Main Contractor Organogram
The Main contractor must provide an organisational organogram on the company’s letter head related
to this contract, depicting all the levels of responsibility from the CE down to the supervisors
responsible for the contract. List the relevant positions held, names of appointees, legal appointments
and the Organogram must be signed off by the company's 16(1) or 16 (2).
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 35
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document
SPECIFICATION 229-T2208 Rev 1
Identifier
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
The Main contractor must ensure that all appointed contractors comply with this requirement. The
Main contractor is responsible for keeping copies of all the organograms’ as well as submitting them
with the OHS plan. All organograms shall be updated timeously when appointments are changed.
This diagram must be kept up to date and filed in the project OHS files.
3.11.2 Appointed Contractor/s Organogram
company’s letter head, listing the reporting structure from their CE down to their project supervisors.
The diagram must list the names, positions held, any appointments made and must be signed off by
the company's 16(1) or 16 (2).
copy filed in the relevant project OHS files.
3.12 Roles and responsibilities
Commitment
Visible commitment is essential to providing a safe work environment. Managers, supervisors and employees
at all levels must demonstrate their commitment by being proactively involved in the day to day operations, in
particular the Occupational Health and Safety aspects of any project / contract. Legislation requires that each
employee must take reasonable care of themselves and their fellow workers, from management level down to
the lowest employee level.
3.12.1 Main contractors and appointed contractors
Note 1: Most of the roles and responsibilities listed apply to both Main contractors and any appointed
contractors. Where some of the listed do not apply to both, then the specific responsibilities will be listed and
titled. The contractors shall:
OHS Act and Regulation 7 of the Construction Regulations.
contractors within their working area, as contemplated by section 37(2) of the OHS Act;
induction, relevant skills and licenses and be able to produce this list at the request of the Eskom
Project Manager.
of their appointment and that they advise and assist these appointees in the execution of their duties.
all work sites.
be kept for each work site.
letter of good standing before the commencement of work and any future renewal letters obtained
during the contract for record-keeping purposes. The letter of good standing shall reflect the name of
the contractor’s company. Similarly, the Main contractor must provide the Eskom project manager with
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 35
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document
SPECIFICATION 229-T2208 Rev 1
Identifier
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
all the valid letters of good standing from their appointed contractors. This requirement applies to the
appointed contractors.
health and safety aspects relating to such work and that the employees understand the hazards
associated with all other work being carried out on the project.
such procedures. Similarly (without removing the appointed contractors’ responsibilities), ensure that
their appointed contractors and their employees are conversant with all relevant work procedures and
that they adhere to such procedures.
safety of persons or a risk of degradation to the environment.
assess the appointed contractors OHS files. Only appoint contractors who are competent to do work,
have satisfied the OHS compliance requirements and satisfied that the contractor has the necessary
competencies and resources to perform the work safely.
such supervisor has been appointed for.
or suspecting such information has been divulged, in the interests of health and safety requirements.
emerging risks. This should be done by a competent person appointed in writing with a view to identify
hazardous and potentially hazardous work operations.
of any new task, irrespective of whether it is a repetitive task or not.
in place and maintained. Prior to having pre-employment and periodic medicals fitness examinations
conducted, person/man job specifications must be compiled and handed to the occupational health
practitioner.
inspect such equipment regularly and ensure recipients of PPE are trained in the proper use, care and
where necessary, the maintenance of PPE;
Note: should the Main contractor or his/her appointed contractors entertain visitors on site, they will
be held responsible for the provision and wearing PPE.
as and aligned with 32-95 requirements.
3.12.2 Contractor site supervisor
The contractor site supervisor must be trained in the following:
HIRA, Incident investigation training, Supervisor training, authorised person & PSR, Legal liability
Must:
project requirements;
Inspect all work done by the contractors to ensure adherence to Eskom’s standards and
Conduct follow-up inspections to ensure findings are closed out and preventative action is in place.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 35
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document
SPECIFICATION 229-T2208 Rev 1
Identifier
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
instance and thereafter the Eskom project manager in the second instance relating to procedure
requirements, non-conformances identified, corrective actions, audits and inspection schedules.
instructions and safety regulations issued by Eskom:
reports.
statistics report etc
the tasks assigned.
deviate from safety requirements.
3.12.3 Contractor Health and Safety officer full/time
Part time Safety Officer
The contractor health and Safety officer must be trained in the following:
SAMTRAC, HIRA, Incident investigation training, Legal liability, Training, knowledge and
understanding of ISO 4500, Minimum work experience 2yrs, OHS Diploma (applicable to 3-5 years
contract)
3.13 Risk assessment (refer to 32-520)
It is a legal requirement in terms of Section 8 (2)(d) of the OHS Act for an employer to carry out risk
assessments, to establish which risks and hazards are attached to the health and safety of persons due
to any work which is performed, any article or substance which is, handled, stored, transported. A risk
assessment is defined as an identification of the hazards present in the activity, work, site, and an estimate
of the extent of the risks involved, considering whatever precautions are already being taken.
It is essentially a three-stage process:
identification of all hazards.
evaluation of the risks;
Measures to control the risks.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 35
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document
SPECIFICATION 229-T2208 Rev 1
Identifier
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
Risk assessments are required to be maintained. This means that significant changes to a process or
activity, or any new process or activity should be subjected to a risk assessment and that if new hazards
come to light during the work process, then these should also be subjected to risk assessments. Risk
assessments for long term processes should be periodically reviewed and updated. Method statements
or written safe work procedures are an effective method as information and record of the way jobs / tasks
must be performed. Daily or issue based or task specific or on the job risk assessments must be conducted
at the place where work is to be performed/ conducted to allow managers and employees to assess any
inherent risks that could have been overlooked during the initial risk assessment or any changes that might
have occurred in a period of absence. For example if a job / task is extended over a day or halted due to
inclement weather.
Guidelines for actual steps involved in a job/task specific risk assessment are:
Each activity is listed.
Specific hazards are identified and listed against each activity.
The magnitude of each risk is rated as Low. Medium or High.
All known documentary and supervisory controls are listed. For instance: What safe work
procedures exist for ladders.
The relevance, effectiveness and sufficiency of these controls are assessed.
In the event of insufficient or deficient controls for the particular activity, steps to be taken to rectify
this shall be recorded, and safe working procedures drawn up.
Persons responsible for implementing and supervising the task shall be identified, nominated and
duly assigned.
Persons responsible for monitoring the task and carrying out the planned job observation must be
nominated.
Completed risk assessment shall be handed to the Eskom project manager representative for
comment and approval.
The relevant section of the risk assessment shall be issued with a Transmittal Note to the Supervisor
nominated as the responsible person; and the names of workmen who have received instruction
on the work content and the sequence of the activities listed in the risk assessment shall be
recorded, and their competence established. This instruction shall be done through an interpreter
if required and recorded on the Pre-Job Brief (Daily Safe Task Instructions), with reference to
applicable Risk Assessments.
3.14 Safe work procedures / method statements
There must be written safe work procedures for all activities, the safe work procedures must be aligned with
the risk assessments. Method statements / written safe work procedure are control measures used to
prevent an incident from occurring during the execution of the project. A written safe work procedure/
method statements provide guidance how to execute the task safely. A safe working procedure should be
written when: -
a. Designing a new job or task.
b. Changing jobs or task;
c. Introducing new equipment or substances; and
The safe working procedure should identify:
d. The supervisor for the task or job and the employees who will undertake the task;
e. The tasks that are to be undertaken that pose risks;
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 35
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document
SPECIFICATION 229-T2208 Rev 1
Identifier
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
f. The equipment and substances that are used in these tasks;
g. The control measures that have been built into these tasks;
h. Any training or qualification needed to undertake the task;
i. The personal protective equipment to be worn;
J. Actions to be undertaken to address safety issues that may arise while undertaking the task.
3.15 Fire equipment and maintenance
a. Be clearly labelled
b. Conspicuously numbered
c. Entered in a register
d. Inspected monthly by a competent person
3.16 First aid and equipment
The requirements of the OHS Act GSR 3 must be observed.
First aid appointments must be made to meet the legal requirements. Appointees must be trained to
level 2 and the training service provider must be registered in accordance with section 26(1) of the
Skills Development Amendment Act, Act No. . It is good practice for all employees to be
trained to at least level 1.
performed, the distance teams are working apart and the terrain to be covered if an emergency
should arise.
employees.
familiar with the emergency numbers.
team of workers on site or part thereof, taking into account the type of work performed and the
distance between teams.
available and accessible for the immediate treatment of injured persons at the workplace.
contact details of the First Aider of such first aid box or boxes shall be erected.
for incidents occurring after working hours.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 35
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document
SPECIFICATION 229-T2208 Rev 1
Identifier
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
3.16.1 Boxes and equipment
The following is a list of minimum contents of a first aid box:
◻ Item 1: Wound cleaner/antiseptic (100ml).
◻ Item 2: Swabs for cleaning wounds.
◻ Item 3: Cotton wool for padding (100 g).
◻ Item 4: Sterile gauze (minimum quantity 10).
◻ Item 5: 1 Pair of forceps (for splinters).
◻ Item 6: 1 Pair of scissors (minimum size 100 mm).
◻ Item 7: 1 Set of safety pins.
◻ Item 8: 4 Triangular bandages.
◻ Item 9: 4 Roller bandages (75 mm X 5 m).
◻ Item 10: 4 Roller bandages (100 mm X 5 m).
◻ Item 11: 1 Roll of elastic adhesive (25 mm X 3 m).
◻ Item 12: 1 Non-allergenic adhesive strip (25 mm X 3 m).
◻ Item 13: 1 Packet of adhesive dressing strips (minimum quantity, 10 assorted sizes).
◻ Item 14: 4 First aid dressings (75 mm X 100 mm).
◻ Item 15: 4 First aid dressings (150 mm x 200 mm).
◻ Item 16: 2 Straight splints.
◻ Item 17: 2 Pairs large and 2 pairs medium disposable latex gloves.
◻ Item 18: 2 CPR mouth pieces or similar devices.
A content check list must be available with all boxes and boxes shall be checked on a regular basis, kept
clean and dust free.
3.17 OHS communication systems
how they intend to communicate OHS issues to their staff, the mediums they will employ and how
they will measure the effectiveness of their OHS communication. Below is a brief on how
communication should take place. Where project meetings are conducted on site, OHS shall be
included as a standing agenda point and minutes of these meetings shall be available on site at all
times. Minutes of meeting must be compiled and filed in the relevant OHS files. All employees shall
have access to these minutes. Attendance register shall be kept for all the health and safety
meetings.
3.17.1 Statutory Health and Safety Committees
the OHS Act. Similarly, appointed contractors shall establish their own statutory health and safety
committee.
All appointed contractors shall be members of the Main contractor’s safety committee.
The Committee shall meet to discuss OHS issues concerning the current work being performed,
training, upcoming work and OHS requirements, incidents and lessons learned specific OHS
problems, safety performance, action plans and other relevant OHS issues. Listed below is a
preferred agenda.
(Refer to Section 19 (2) (a) of the OHS Act).
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 35
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document
SPECIFICATION 229-T2208 Rev 1
Identifier
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
Representatives on that specific statutory health and safety committee. (Refer to Section 19(2)(c) of
the OHS Act)
high risk work is involved, more frequent if required), and all appointed members of the committee
shall attend the meeting.
project manager and the Inspector at DEL.
incidents and other notified serious incidents.
keep record of all recommendations made by the committee.
standards, procedures and practices.
and safety committees carry out their duties.
contractor. The appointed chairperson must be competent to chair meetings and be able to make
informed decisions.
3.17.2 Non-statutory health and safety committees
worksite to assist with the communication of health and safety related matters between the statutory
health and safety committee and the workplace.
as the statutory safety committee
3.17.2.1 Agenda
List of agenda items:
Matters arising from previous minutes
Matters arising from Contractor’s OHS meetings.
Covid-19 compliance
Audit results and feedback
Review Health and Safety Representative Inspection Reports
Review
o Incident investigation reports
o Non-Conformances
o Announcements (near miss/injury/damage)
o Follow up on recommendations made by the employer in incident investigation reports
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 35
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document
SPECIFICATION 229-T2208 Rev 1
Identifier
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
Accident Prevention – Safety Promotion
o Planned Job Observations
o OHS Training
o Protective clothing and equipment
o Incident Announcements / Recall
Forthcoming High hazard activities.
Non-conformances.
Housekeeping.
Work permits.
Work procedures.
Hazardous materials / substances.
Fire Prevention
Occupational Hygiene Assessments, Health Risks and Actions
Security
Rules, Instructions
Public Safety
Environmental Management
Emergency Preparedness
Statistics report
Closure
3.17.2.2 Minutes and action items for all health and safety committee meetings
Minutes and record of action items shall be kept of all health and safety committee meetings.
Action column with target dates and responsible person shall be clearly visible on the minutes and
shall be completed during the meeting.
the duration of the project or a minimum period of three years.
project or a minimum period of 12 months.
months.
The original copy of the minutes and record of the action items must be signed by the chairperson.
The relevant project manager and Main contractor shall endorse the relevant minutes with his/her
recommendations and return the minutes to the relevant contractors chairperson within 14 calendar
days of the meeting.
3.18 Tool box talks / daily team talks / pre job meetings
associated with the work task in attendance. The job, relevant procedures, associated hazards,
safety measures, i.e. the task risk assessments shall be discussed. Each employee who attends the
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 35
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document
SPECIFICATION 229-T2208 Rev 1
Identifier
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
briefing shall sign an attendance list of that pre-job brief form undertaking that they have an
understanding of the tasks, risks and control measures required.
then weekly tool box talks must be conducted. The toolbox talk topics will be based on OHS issues
pertaining to the project site. The topic and the contents shall be in writing. Attendance registers with
the topic listed shall be kept.
3.19 OHS training
training requirements and the costing of such requirements. Similarly, appointed contractor must
provide the same requirements when bidding with the Main contractor.
procedures. Additional to the requirements, will be that the Main contractor and appointed
contractors must have the appropriate qualifications, certificates and employees should always be
under competent supervision.
given to those appointees prior to the acceptance of those appointments.
all affected staff shall undergo the applicable refresher training.
Appropriate time must be set aside for training (induction and other) of all employees.
Records of all training and qualifications of all contractor employees must be kept on the OHS file.
3.19.1 Main Contractor Induction training
The contractor is required to make arrangements with the Business Unit for its employees to attend induction
in order to be granted permission to access site.
employees have undergone the Eskom OHS induction training prior to commencing work on site.
they have received and understood the induction training.
examination and found fit for duty. A copy of the certificate of fitness must be kept in the OHS file on
site for the duration of the project.
All employees and visitors on site shall carry the proof of induction training.
It is the contractors responsibility to keep records of induction training.
3.19.2 Appointed Contractor induction training
The Main contractor shall ensure that all his / her employees and appointed contractor employees undergo
site specific work induction with regard to the approved project OHS plan, hazards prevalent on the work site,
scope specific risk assessment, rules and regulations, and other related aspects. The induction training should
also include identification of sensitive features such as wetlands/vlei areas, red data species, graves, etc.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 35
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document
SPECIFICATION 229-T2208 Rev 1
Identifier
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
3.19.3 Visitors to site induction
induction prior to being allowed access to site.
No visitors are permitted to undertake any work onsite, of any nature.
training.
3.20 General training
The Main contractor will be required to ensure that before an employee commences work on the project/site,
the respective supervisor informs the employee of his scope of authority, the hazards associated with work as
well as the control measures to be taken. This will include man-job specifications, the discussion of any task
procedures or hazardous operational procedures to be performed by the employee. The Main Contractor is to
ensure that the supervisor has satisfied himself that the employee understands the hazards associated with
the work to be performed by conducting task/job observations.
3.21 Contractor site establishment
where contractors are providing their own facilities, the following shall apply:
manager, listing position of all buildings, amenities, storage, stacking areas and temporary electrical
installations. The appropriate colour coding and demarcation of storage and stacking areas must be
carried out.
facilities and dining area in relation to one another and away from stacking and storage areas.
Main contractor’s site facilities should be managed and kept hygienically clean.
Where the materials are stored at the work sites, proper stacking and storage shall be carried out and
maintained in good order at all times.
in the bill of quantities as per the OHS Act and its regulations and inline with the scope of work.
Where Eskom is making provision of the facilities to the contractor, the following shall
apply:
with the contractor management conduct inspections, draft and sign the service level agreement.
Main contractors shall manage and keep the allocated Eskom facility hygienically clean at all times.
It is the responsibility of the contractor to maintain and keep the facility in a good condition.
It is the contractor’s responsibility to immediately report to the Eskom contract manager/project
manager the defects incurred.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 35
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document
SPECIFICATION 229-T2208 Rev 1
Identifier
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
3.22 Vehicle management
a. Their passengers wear seat belts whilst the vehicle is in motion.
b. Comply with all traffic road rules, safety, direction and speed signs.
c. Ensure that vehicle loads are properly secured prior to moving off.
d. Ensure that vehicles are not overloaded.
No persons maybe transported at the back of the bakkie.
Drivers are required to conduct the route risk assessment prior to travelling/driving.
No drivers or operators may text, talk on cell phones or two-way radios whilst driving.
All drivers shall have a valid medical fitness certificate.
The First aid box with valid contents and fire extinguishers must be included in the vehicle, be
services annually and inspected monthly. Drivers must be trained on how to use the First aid box
and fire extinguishers.
of the vehicle.
access to site.
at all times and this is applicable to yellow plant.
(thirty) meters must be left clear between such a vehicle and such a machine.
which are not roadworthy will not be permitted to be used on site.
Precautions shall be taken to secure all loads properly. Loads projecting from vehicles shall be
securely loaded and in daytime a red flag and during darkness a red light or red reflective material
shall be attached to the extreme end of such projecting materials.
Reverse alarm / beeper
Yellow reflective tape
Mud flaps
Fire Extinguisher
2 Triangles
First Aid Box
Safety belts for every seat
No fold-up or jockey seat
Tyres
License disc
Yellow reflective tape that must be fitted at a height of between 250mm and 1.5 metres
Speed warning sigh (100km/h) at the back of the minibus
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 35
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document
SPECIFICATION 229-T2208 Rev 1
Identifier
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
Driver have a Public Driving Permit
3.23 Housekeeping and order
duration of the project/contract.
designated waste area, awaiting disposal.
injuries/fatalities.
Nails protruding through timber shall be bent over or removed so as not to cause injury.
All packaging material including boxes, pallets, crates, etc. to be removed from the work area
immediately.
materials, scrap, temporary buildings and building bases to the satisfaction of the client/agent.
cleanliness, anyone has the responsibility to bring it to the attention of the Main contractor in the first
instance and the Eskom project/contract manager in the second instance.
contractors to cease work until the area has been tidied up and made safe. Neither additional costs
nor extension of time to the contract shall be allowed as a result of such a stoppage. Failure to
comply with this requirement will result into site cleaning by another cleaning contractor company at
the cost of the Main contractor.
maintenance of satisfactory standards. The Main contractor shall document the results of each
inspection and shall maintain records for viewing.
3.24 Workplace signage and colour coding
Symbolic safety signage shall be displayed where it is required by legislation.
All symbolic safety signage shall conform to the requirements of SANS standard 1186.
Signs shall be positioned to be seen from most positions within the work sites / areas.
All signage must be clear at all times and be replaced timeously when worn out.
Contractors establishing sites must erect a company sign at their site offices to reflect the name and
contact details of the: contractor site/responsible manager; supervisors; Health and Safety
Manager/Practitioner; First Aider; Health and Safety Representative and Evacuation warden.
means of a sign.
use.
prohibited and/or where alerting and cautioning passers-by to be aware of potential dangers.
toolbox talks.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 35
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document
SPECIFICATION 229-T2208 Rev 1
Identifier
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
indicating the meaning of symbolic safety signs must be displayed.
3.25 Tools and equipment
maintained in a good condition.
inspected at least monthly or as required by legislation and risk assessments. The equipment should
be numbered or tagged so that it can be properly monitored and inspected.
documentation prior to being brought onto the project and the records shall form part of the OHS
plan. Maintenance calibration shall be undertaken in terms of the manufacturer’s requirements.
recommendations and legal requirements.
on this project.
unsuitable for the safe and satisfactory execution of the work for which it is intended, the Eskom
personnel shall advise the contractor in writing and the contractor shall forthwith remove the item
from site and replace it with a safe and adequate substitute.
Note: In such cases, the contractor shall not be entitled to extra payments or extensions of time in
respect of delay caused by Eskom’s instructions.
out of site immediately, locked away to prevent further use until such time as the tool or piece of
equipment has been repaired.
the project. Such tools and equipment’s shall be subjected to regular inspections.
3.25.1 Hand tools
the construction supervisor on a monthly basis as well as by users prior to use.
heads, to be removed at the end or beginning of shift prior to use.
Tools with sharp points in toolboxes must be protected with a cover.
All files and similar tools must be fitted with handles.
No make shift tools are permissible on the project.
3.26 Ladders
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 35
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document
SPECIFICATION 229-T2208 Rev 1
Identifier
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
or with climbing irons.
The ladder wheels, brakes and platform must be in good condition.
All metal parts to be in good condition, no cracks.
The appropriate head protection, with chin strap shall be worn by employees working from a ladder
or with climbing irons.
Non-slip devices must be in good condition and no paint to be on wooden ladders
Climbing irons are permitted to be used in place of ladders on condition that the requirements of
GSR 6 are not compromised and from an electrical point of view not damage any cabling. The
working at heights risk assessment must indicate the use of climbing irons.
climbing irons.
When using climbing irons, the appropriate rope grab fall prevention system shall be used.
The correct fall protection equipment shall be worn and used whilst climbing up, working from and
climbing down ladders.
(risk based) or with climbing irons.
time prior to climbing by employees using such ladders. The inspection check lists must be filed in
the site OHS files
3.27 Auditing
3.27.1 Approval and compliance of Main contractor OHS plan
The Contractor’s OHS Plan will be audited against compliance checklist so as to verify compliance to the
requirements of the Eskom OHS specifications. Once there is compliance only then will the Main contractors
OHS plan be approved by the project manager or an appointed Eskom contract custodian. The
implementation of the OHS Plan shall be assessed / audited by Eskom personnel on a regular basis. This
will include physical conditions evaluation.
3.27.2 Eskom OHS audits
Eskom shall evaluate all contractors’ OHS performance on an ongoing basis against the legal, Eskom
requirements, OHS specification and the contractors OHS plans.
Note: Eskom reserves the right to conduct unannounced audits on contractors
There will be monthly audits conducted by Eskom on the Main contractor/s and/or appointed contractors.
These audits shall be attended by the contractor’s site manager or his representative.
If there are any findings / non-compliance identified as serious in these audits, an activity will be stopped for
that specific Main Contractor and appointed contractor. Refer to section on “Work Stoppage” in this OHS
Specification.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 35
Template
GENERATION COAL FIRED 32-726-17T Rev 1
Identifier
Stations OHS
Document
SPECIFICATION 229-T2208 Rev 1
Identifier
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
3.27.3 Contractor audits
Main Contractors are required to conduct internal audits on both their employees and their appointed
contractors on the implementation of their OHS Plan on a monthly basis or when the scope of work changes.
A summary of the findings and the proposed corrective actions shall be submitted to Eskom project manager
within one week after completion of the audit. Where appointed contractors are audited by the Main contractor
a copy of the audit report shall be submitted to the appointed contractor within 7 days of the audit.
3.28 Smoking
The national smoking policy must be observed and smoking is permitted in designated areas only (Eskom
Smoking Procedure 32-36).
3.29 Cellular phones
The National Road Traffic Act requirements regarding the use of cellular phones must be observed, when
driving and or operating mobile equipment and or machinery. The personal use of cell phones in the plant is
prohibited unless it is an emergency or for work purpose. The use of cell phone camera in the plant must be
in line with the national key point Act and the Plant safety regulation.
3.30 Occupational health, hygiene and rehabilitation
All contractors are required to develop an Occupational Health, Hygiene and Rehabilitation program. The
program is intended to ensure that the risks to health are identified and controlled.
3.30.1 Medical Assessments
Note: Eskom will only accept medical surveillances conducted by an Occupational Health Practitioner who
holds a qualification in occupational health.
medical surveillance program whereby their employees undergo entry, periodic and exit medical
fitness examinations.
hazards that the employees will be exposed to.
specification, which must indicate the description of work, list of hazards and potential occupational
exposure limits, physical hazards and required physical attributes.
shall be maintained until completion of the contract.
have undergone pre-entry medical examination before starting work on the contract.
issued with a conditional certificate of fitness.
certificates as and when their employees leave the company.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 35
Quality Management
Source: SHE Specification.pdf (unknown)DEL Department of Employment and Labour ( Inspection and Enforcement services –
Provincial office)
readings. Perform visual inspections of the HTO with its pipework. Visual inspection on pipework.
Pressure testing of h2 plant only to per 2009 regulations
instance and thereafter the Eskom project manager in the second instance relating to procedure
requirements, non-conformances identified, corrective actions, audits and inspection schedules.
List of agenda items:
Matters arising from previous minutes
Matters arising from Contractor’s OHS meetings.
Covid-19 compliance
Audit results and feedback
Review Health and Safety Representative Inspection Reports
Review
o Incident investigation reports
o Non-Conformances
o Announcements (near miss/injury/damage)
o Follow up on recommendations made by the employer in incident investigation reports
apply:
with the contractor management conduct inspections, draft and sign the service level agreement.
at all times and this is applicable to yellow plant.
(thirty) meters must be left clear between such a vehicle and such a machine.
which are not roadworthy will not be permitted to be used on site.
maintenance of satisfactory standards. The Main contractor shall document the results of each
inspection and shall maintain records for viewing.
3.24 Workplace signage and colour coding
the project. Such tools and equipment’s shall be subjected to regular inspections.
3.25.1 Hand tools
the construction supervisor on a monthly basis as well as by users prior to use.
heads, to be removed at the end or beginning of shift prior to use.
time prior to climbing by employees using such ladders. The inspection check lists must be filed in
the site OHS files
3.27 Auditing
3.27.1 Approval and compliance of Main contractor OHS plan
The Contractor’s OHS Plan will be audited against compliance checklist so as to verify compliance to the
requirements of the Eskom OHS specifications. Once there is compliance only then will the Main contractors
Compliance Requirements
Source: SHE Specification.pdf (unknown)No specific requirements found
B-BBEE Minimum Level: 2
Health & Safety
Source: SHE Specification.pdf (unknown)Introduction ..................................................................................................................................... 4
Supporting clauses ....................................................................................................................... 4
2.1 Scope ............................................................................................................................................. 4
2.1.1 Purpose .................................................................................................................................... 4
2.1.2 Applicability ............................................................................................................................... 4
2.2 Normative/informative references.................................................................................. 4
2.2.1 Normative ................................................................................................................................. 4
2.2.2 Informative ................................................................................................................................ 5
2.4 Abbreviations ............................................................................................................................. 9
2.5 Related/supporting documents ........................................................................................ 9
3.1 Scope of work ......................................................................................................................... 10
3.2 Legal compliance ................................................................................................................... 10
3.2.1 Section 37(2) (Legal) Agreement ............................................................................................ 12
3.2.2 Hazardous Work by Children (Child Labour)........................................................................... 12
3.2.3 OHS Act .................................................................................................................................. 12
3.2.4 Legislative Compliance ........................................................................................................... 12
3.3 ESKOM requirements ............................................................................................................. 13
3.4 Sheq policy ............................................................................................................................... 13
3.5 Covid -19 policy ........................................................................................................................ 13
3.5.1 Covid -19 requirements........................................................................................................... 13
3.6 Coid ............................................................................................................................................... 14
3.7 Costing for OHS within the project ............................................................................... 14
3.8 Statutory appointments ..................................................................................................... 14
3.9 ESKOM life-saving rules ....................................................................................................... 14
3.10 Substance abuse ................................................................................................................... 15
3.11 Contractor organisational structure ..................................................................... 15
3.11.1 Main Contractor Organogram ............................................................................................... 15
3.11.2 Appointed Contractor/s Organogram .................................................................................... 16
3.12 Roles and responsibilities ............................................................................................... 16
Commitment .................................................................................................................................. 16
3.12.1 Main contractors and appointed contractors ......................................................................... 16
3.12.2 Contractor site supervisor ..................................................................................................... 17
The contractor site supervisor must be trained in the following ........................................................ 17
HIRA, Incident investigation training, Supervisor training, authorised person & PSR, Legal
liability ........................................................................................................................................ 17
3.12.3 Contractor Health and Safety officer full/time ........................................................................ 18
Part time Safety Officer............................................................................................................... 18
The contractor health and Safety officer must be trained in the following ................................... 18
SAMTRAC, HIRA, Incident investigation training, Legal liability, Training, knowledge and
understanding of ISO 4500, Minimum work experience 2yrs, OHS Diploma (applicable to 3-5
years contract) ............................................................................................................................ 18
3.13 Risk assessment (refer to 32-520) .................................................................................. 18
3.14 Safe work procedures / method statements .......................................................... 19
3.15 Fire equipment and maintenance .................................................................................... 20
3.16 First aid and equipment ..................................................................................................... 20
3.16.1 Boxes and equipment ........................................................................................................... 21
Effective Date April 2022 ACTIVITIES/SERVICES
3.17 OHS communication systems ............................................................................................ 21
3.17.1 Statutory Health and Safety Committees .............................................................................. 21
3.17.2 Non-statutory health and safety committees ......................................................................... 22
3.18 Tool box talks / daily team talks / pre job meetings ............................................. 23
3.19 OHS training ............................................................................................................................ 24
3.19.1 Main Contractor Induction training ........................................................................................ 24
Following shall apply ......................................................................................................... 25
3.22 Vehicle management ............................................................................................................ 26
3.23 Housekeeping and order ................................................................................................... 27
3.24 Workplace signage and colour coding ..................................................................... 27
3.25 Tools and equipment ........................................................................................................... 28
3.25.1 Hand tools ............................................................................................................................ 28
3.26 Ladders..................................................................................................................................... 28
3.27 Auditing .................................................................................................................................... 29
3.27.1 Approval and compliance of Main contractor OHS plan ........................................................ 29
3.27.2 Eskom OHS audits ............................................................................................................... 29
3.27.3 Contractor audits .................................................................................................................. 30
3.28 Smoking..................................................................................................................................... 30
3.29 Cellular phones ................................................................................................................... 30
3.30 Occupational health, hygiene and rehabilitation ................................................. 30
3.30.1 Medical Assessments ........................................................................................................... 30
3.31 Roles and responsibilities ............................................................................................... 31
3.32 Personal protective equipment requirements ...................................................... 31
3.33 Incident investigation ........................................................................................................ 31
3.34 Emergency management .................................................................................................... 32
3.35 Non-conformance and compliance ............................................................................... 32
3.36 OHS files ................................................................................................................................... 32
3.37 Work stoppage ...................................................................................................................... 33
3.38 Hours of work....................................................................................................................... 33
3.38.1 Normal work.......................................................................................................................... 33
3.38.2 Night work ............................................................................................................................. 33
3.38.3 Overtime ............................................................................................................................... 34
3.39 Omissions from safety and health requirements specification ..................... 34
3.40 Contractor performance monitoring ....................................................................... 34
3.41 Contract sign off ................................................................................................................ 34
3.42 Eskom's right to terminate the contract ................................................................. 34
Authorization ................................................................................................................................. 34
Revisions ........................................................................................................................................... 35
Effective Date April 2022 ACTIVITIES/SERVICES
Eskom’s responsibility and commitment is to ensure a safe working environment is in line with its Safety,
Health, Environmental, and Quality (SHEQ) Policy and applicable legislative obligations. This OHS
specification is Eskom Generation's minimum requirements which are required to be met for the duration of
the contract period by contractors/suppliers and, where required, the delivery organisation. The contractor is
expected to develop an OHS plan that meets these requirements as well as all the relevant applicable
legislation that they conform to. Eskom in no way assumes the contractor’s legal responsibilities and liabilities.
paragraphs.
2.2.1 Normative
Basic Conditions of Employment Act No .
Occupational Health and Safety Act and Regulations No .
OHS Act “Regulations on Hazardous Work by Children in South Africa”
Effective Date April 2022 ACTIVITIES/SERVICES
National Environmental Management Act .
National Road Traffic Act .
32-37 Eskom Substance Abuse Procedure.
32-136 Contractor Health and Safety Requirements
240-62196227 Life- saving Rules
32-95 Environmental, Occupational Health and Safety Incident Management Procedure
32-727 SHEQ Policy
32- 418 Working at Heights Procedure
240-62946386 Vehicle and Driver Safety Management Procedure
32-520 Risk Assessment procedure
Plant Safety Regulations
Iso 45001
Eskom Covid-19 policy
National Disaster Management Act
2.2.2 Informative
[1] Tobacco Products Control Act (Updated 2011.05.19)
[2] SANS 1186 Symbolic Safety Signs
[3] Constitution of the Republic of South Africa No
[4] DMN 34-110 Operating A Vehicle Mounted Crane
Baseline risk (32-520) baseline operational risks refer to the health and safety risks
assessment associated with all standard processes and routine activities in the business
Business unit (BU) (32-296) means any defined unit within the Eskom environment, operating as
a business under a particular cost-centre number. In the context of this
document and in terms of health and safety, any reference to a BU includes a
defined unit within any Eskom division and its subsidiaries
Client (OHS Act) Eskom representative (Internal – Asset Owner), also referred to as
the contract administrator/custodian or agent or project manager (as defined
in the contract). He/she is the person responsible for ensuring that the works
or services are executed in terms of the contract, as well as adherence to
legislation pertaining to the contract.
Competent person (OHS Act) means any person having the knowledge, training, experience,
and qualifications, specific to the work or task being performed, provided that,
where appropriate, qualifications and training are registered in terms of the
South African Qualifications Authority Act, 1995 (Act No. )
Contractor (OHS Act) means an employer as defined in section 1 of the Act who
performs contracted work and includes Main contractors
Contract’s Manager/End Contract’s Manager/End User
Controlled disclosure controlled disclosure to external parties (either enforced by law or
discretionary)
Duty of care to the (32-136) anybody who causes or has caused or may cause significant
environment pollution or degradation of the environment must take reasonable measures
to prevent such pollution or degradation from occurring, continuing, or
recurring. If such harm to the environment is authorised by law or cannot
reasonably be avoided or stopped, such person must minimise and rectify
such pollution or degradation of the environment
Employee (OHS Act) means, subject to the provisions of subsection (2), any person
who is employed by or works for an employer and who receives or is entitled
to receive any remuneration or who works under the direction or supervision
of an employer or any other person
Employer (OHS Act) means, subject to the provisions of subsection (2), any person
who employs or provides work for any person and remunerates that person
or expressly or tacitly undertakes to remunerate him/her, but excludes a TES
(ex labour broker) as defined in section 1(1) of the Labour Relations Act 1956
(Act No. )
specifications, work instructions, guidelines, or manuals
Fall protection plan (OHS Act) means a documented plan of all risks relating to working from an
elevated position, considering the nature of work undertaken, and setting out
the procedures and methods to be applied in order to eliminate the risk
Hazard (OHS Act) means a source of, or exposure to, danger
Hazard identification (OHS Act) means the identification and documenting of existing or expected
hazards to the health and safety of persons, which are normally associated
with the type of construction work being executed or to be executed
Occupational Health (OHS Act) means a file or other record in permanent form, containing the
and safety file information required in relation to the contract.
Health and safety plan (OHS Act) means a document plan that addresses hazards identified and
includes safe work procedures to mitigate, reduce, or control hazards
identified
Occupational Health (OHS Act) means a document specification of all health and safety
and safety specification requirements pertaining to associated to a contract, so as to ensure the
health and safety of persons.
and safety requirements site, and scope of work. This specification is intended to ensure the health
and safety of persons, both workers and the public, and the duty of care to
the environment. The health and safety requirements must be specific to
each contract, project, site, and scope of work
Lifesaving Rules (240-62196227) a rule that, if not adhered to, has the potential to cause
serious harm to people
Medical Certificate of (OHS Act) means a certificate valid for one year, issued by an occupational
fitness health practitioner, issued in terms of the regulations, whom shall be
registered with the Health Professions Council of South Africa
Medical surveillance (OHS Act) means a planned programme or periodic examination (which may
include clinical examinations, biological monitoring, or medical tests) of
employees by an occupational health practitioner or, in prescribed cases, by
an occupational medicine practitioner
Method statement (OHS Act) means a written document detailing the key activities to be
performed in order to reduce, as reasonably as practicable, the hazards
identified in any risk assessment
been appointed as part of the Eskom delegation of authority process with the
aim to assist the applicable 16(2) assigned person in executing his/her duties
in terms of the Occupational Health and Safety Act
Risk assessment (OHS Act) means a programme to determine any risk associated with any
hazard at a construction site in order to identify the steps needed to be taken
to remove, reduce, or control such hazard.
Site (34-228) means an Eskom department, unit, complex, building, specific
project, work site, or the site where agents, clients, Main contractors,
contractors, suppliers, vendors, and service providers provide a service to
Service provider any private person or legal entity that provides any service(s) to Eskom for
compensation
Subsidiary (32-94) an enterprise controlled by another (called the parent) through the
ownership of greater than 50% of its voting stock
Supplier (32-1034)means a natural or legal person who renders a service and may
include the following current or potential supplier vendor, contractor,
consultant
Task (34-227) a segment of work that requires a set of specific and distinct actions
for its completion
Toolbox talks (34-227) where the team leader, after conducting pre-task planning, shares
all the tasks at hand and discusses task allocation, the identified risks, and
the control measures with all his/her team members on site before
commencing a specific task and documenting the agreed strategy. (This
shall be done to ensure common understanding of the tasks, risks, and
control measures required.)
The Act (OHS Act) means the Occupational Health and Safety Act No. , as
amended, and the Regulations thereto
Calibration exchange program for 2 x michell is probes for 3 years
Safety and quality documentation (sheq) (safety file to be submitted)
Provision for 30 breakdown callouts.
3.2 Legal compliance
3.2.1 Section 37(2) (Legal) Agreement
A section 37(2) agreement must be signed between Eskom and the main contractor at the time of submitting
the safety file. The main contractor must ensure that a section 37(2) agreement is compiled between the main
contractor and all their appointed contractors for the contract. The original copy of the section 37(2) agreement
must be retained by the contractor, and a copy must be retained by the responsible project manager/end user.
A copy of all the agreements must form part of the respective contractor’s OHS file.
3.2.2 Hazardous Work by Children (Child Labour)
The constitution of the Republic of South Africa, in the "Bill of Rights", is clear on the rights of children,
especially when it comes to:
being protected from exploitative labour practices.
not be required or permitted to perform work or provide services that
are inappropriate for a person of that child’s age; or
This places at risk the child’s well-being, education, physical or mental health, or spiritual, moral, or
social development and the Basic Conditions of Employment Act, Chapter six, Section 43,
"Prohibition of employment of children."
rights. Where work is being performed which is not prohibited in terms of the constitution, then such work
must be conducted in terms of the OHS Act "Regulations on Hazardous Work by Children in South Africa"
with emphasis on paragraph 2: Purpose and Interpretation. Eskom does not condone the use of child labour
and, therefore, all effort must be exercised, and child labour should not be used.
3.2.3 OHS Act
being:
The Constitution of the Republic of South Africa (particularly Section 24 of the Bill of Rights).
Occupational Health and Safety Act 1993 (Act ) and its Regulations.
National Environmental Management Act 1998 (Act ).
Environment Conservation Act 1989 (Act ).
National Water Act 1998 (Act ).
Civil and Building Work Act.
National Road Traffic Act .
Compensation for Occupational Injures and Diseases Act.
SANS Standards –Contractor shall use the relative standards applicable to the project.
3.3 ESKOM requirements
relevant Eskom OHS documentation that is applicable to contract services.
3.4 Sheq policy
A SHEQ policy is a statement of intent and a commitment by the organization’s CE and senior management
in relation to the relevant OHS roles and responsibilities, the achievement of their strategic objectives, and
values of integrity, customer satisfaction, excellence, and innovation. The main contractor and all appointed
contractors, if not already in place, will be required to compile an organisational SHEQ policy in line with their
OHS responsibilities. The policy must be signed by the organisation’s CE or the appointed assistant to the CE,
OHS Act Section 16(2). The policy must be displayed in a prominent place within the workplace. A copy of the
policy must be filed in the contractor's OHS files and attached as an annexure to the OHS Plan.
3.5 Covid -19 policy
person. The policy must be displayed in a prominent place within the workplace. A copy of the policy must be
filed in the contractor's OHS files and attached as an annexure to the OHS Plan.
3.5.1 Covid -19 requirements
Covid-19 costs are not for profit making purpose and Eskom reserves the right to accept and/or decline the
list of PPE which will be listed in the detailed Covid-19 costs. Due to the current pandemic the contractors
are required to provide Eskom with a Covid-19 risk assessment and a detailed plan on how to prevent the
spread of the virus and what control measures will be put in place to protect Eskom employees and
members of the public. The risk assessment must include the following but not limited to, adherence to
Covid-19 protocols in designated smoking areas. Covid-19 costs are applicable for the duration of the
pandemic and the Covid-19 costs will be ceased once the country has declared that Covid-19 is no more a
pandemic. The contractors have an obligation to comply with the National Disaster Management Act
including the appointment of the Compliance Officer.
Rule 2 Working at height is defined as any work performed above a stable work surface or where a
person puts himself/herself in a position where he/she exposes himself/herself to a fall from or
into.
workplace accidents and car driving. As a result, Eskom has the right to take reasonable procedures
to identify and prohibit drunk people from entering the company.
General Safety Regulation 2A specifies the legal position on intoxication.
The allowable alcohol and drug level is 0%.
All contractors must follow Eskom's procedure 32-37 ("Substance Abuse Procedure"), taking into
account that this is an Eskom Life-saving Rule number 4: (BE SOBER"), and anyone entering the
at all levels must demonstrate their commitment by being proactively involved in the day to day operations, in
particular the Occupational Health and Safety aspects of any project / contract. Legislation requires that each
employee must take reasonable care of themselves and their fellow workers, from management level down to
the lowest employee level.
3.12.1 Main contractors and appointed contractors
Note 1: Most of the roles and responsibilities listed apply to both Main contractors and any appointed
contractors. Where some of the listed do not apply to both, then the specific responsibilities will be listed and
titled. The contractors shall:
OHS Act and Regulation 7 of the Construction Regulations.
all work sites.
be kept for each work site.
letter of good standing before the commencement of work and any future renewal letters obtained
during the contract for record-keeping purposes. The letter of good standing shall reflect the name of
the contractor’s company. Similarly, the Main contractor must provide the Eskom project manager with
health and safety aspects relating to such work and that the employees understand the hazards
associated with all other work being carried out on the project.
safety of persons or a risk of degradation to the environment.
such supervisor has been appointed for.
or suspecting such information has been divulged, in the interests of health and safety requirements.
emerging risks. This should be done by a competent person appointed in writing with a view to identify
hazardous and potentially hazardous work operations.
in place and maintained. Prior to having pre-employment and periodic medicals fitness examinations
conducted, person/man job specifications must be compiled and handed to the occupational health
practitioner.
inspect such equipment regularly and ensure recipients of PPE are trained in the proper use, care and
where necessary, the maintenance of PPE;
Note: should the Main contractor or his/her appointed contractors entertain visitors on site, they will
be held responsible for the provision and wearing PPE.
instructions and safety regulations issued by Eskom:
deviate from safety requirements.
3.12.3 Contractor Health and Safety officer full/time
Part time Safety Officer
The contractor health and Safety officer must be trained in the following:
SAMTRAC, HIRA, Incident investigation training, Legal liability, Training, knowledge and
understanding of ISO 4500, Minimum work experience 2yrs, OHS Diploma (applicable to 3-5 years
contract)
3.13 Risk assessment (refer to 32-520)
It is a legal requirement in terms of Section 8 (2)(d) of the OHS Act for an employer to carry out risk
assessments, to establish which risks and hazards are attached to the health and safety of persons due
to any work which is performed, any article or substance which is, handled, stored, transported. A risk
assessment is defined as an identification of the hazards present in the activity, work, site, and an estimate
of the extent of the risks involved, considering whatever precautions are already being taken.
identification of all hazards.
evaluation of the risks;
Measures to control the risks.
activity, or any new process or activity should be subjected to a risk assessment and that if new hazards
come to light during the work process, then these should also be subjected to risk assessments. Risk
assessments for long term processes should be periodically reviewed and updated. Method statements
or written safe work procedures are an effective method as information and record of the way jobs / tasks
must be performed. Daily or issue based or task specific or on the job risk assessments must be conducted
at the place where work is to be performed/ conducted to allow managers and employees to assess any
inherent risks that could have been overlooked during the initial risk assessment or any changes that might
have occurred in a period of absence. For example if a job / task is extended over a day or halted due to
inclement weather.
Each activity is listed.
Specific hazards are identified and listed against each activity.
The magnitude of each risk is rated as Low. Medium or High.
All known documentary and supervisory controls are listed. For instance: What safe work
procedures exist for ladders.
The relevance, effectiveness and sufficiency of these controls are assessed.
In the event of insufficient or deficient controls for the particular activity, steps to be taken to rectify
this shall be recorded, and safe working procedures drawn up.
Persons responsible for implementing and supervising the task shall be identified, nominated and
duly assigned.
Persons responsible for monitoring the task and carrying out the planned job observation must be
nominated.
Completed risk assessment shall be handed to the Eskom project manager representative for
comment and approval.
The relevant section of the risk assessment shall be issued with a Transmittal Note to the Supervisor
nominated as the responsible person; and the names of workmen who have received instruction
on the work content and the sequence of the activities listed in the risk assessment shall be
recorded, and their competence established. This instruction shall be done through an interpreter
if required and recorded on the Pre-Job Brief (Daily Safe Task Instructions), with reference to
applicable Risk Assessments.
3.14 Safe work procedures / method statements
the risk assessments. Method statements / written safe work procedure are control measures used to
prevent an incident from occurring during the execution of the project. A written safe work procedure/
method statements provide guidance how to execute the task safely. A safe working procedure should be
written when: -
a. Designing a new job or task.
b. Changing jobs or task;
c. Introducing new equipment or substances; and
performed, the distance teams are working apart and the terrain to be covered if an emergency
should arise.
familiar with the emergency numbers.
team of workers on site or part thereof, taking into account the type of work performed and the
distance between teams.
◻ Item 1: Wound cleaner/antiseptic (100ml).
◻ Item 2: Swabs for cleaning wounds.
◻ Item 3: Cotton wool for padding (100 g).
◻ Item 4: Sterile gauze (minimum quantity 10).
◻ Item 5: 1 Pair of forceps (for splinters).
◻ Item 6: 1 Pair of scissors (minimum size 100 mm).
◻ Item 7: 1 Set of safety pins.
◻ Item 8: 4 Triangular bandages.
◻ Item 9: 4 Roller bandages (75 mm X 5 m).
◻ Item 10: 4 Roller bandages (100 mm X 5 m).
◻ Item 11: 1 Roll of elastic adhesive (25 mm X 3 m).
◻ Item 12: 1 Non-allergenic adhesive strip (25 mm X 3 m).
◻ Item 13: 1 Packet of adhesive dressing strips (minimum quantity, 10 assorted sizes).
◻ Item 14: 4 First aid dressings (75 mm X 100 mm).
◻ Item 15: 4 First aid dressings (150 mm x 200 mm).
◻ Item 16: 2 Straight splints.
◻ Item 17: 2 Pairs large and 2 pairs medium disposable latex gloves.
◻ Item 18: 2 CPR mouth pieces or similar devices.
how they intend to communicate OHS issues to their staff, the mediums they will employ and how
they will measure the effectiveness of their OHS communication. Below is a brief on how
communication should take place. Where project meetings are conducted on site, OHS shall be
included as a standing agenda point and minutes of these meetings shall be available on site at all
times. Minutes of meeting must be compiled and filed in the relevant OHS files. All employees shall
have access to these minutes. Attendance register shall be kept for all the health and safety
meetings.
3.17.1 Statutory Health and Safety Committees
the OHS Act. Similarly, appointed contractors shall establish their own statutory health and safety
committee.
training, upcoming work and OHS requirements, incidents and lessons learned specific OHS
problems, safety performance, action plans and other relevant OHS issues. Listed below is a
preferred agenda.
Representatives on that specific statutory health and safety committee. (Refer to Section 19(2)(c) of
the OHS Act)
high risk work is involved, more frequent if required), and all appointed members of the committee
shall attend the meeting.
project manager and the Inspector at DEL.
incidents and other notified serious incidents.
and safety committees carry out their duties.
contractor. The appointed chairperson must be competent to chair meetings and be able to make
informed decisions.
3.17.2 Non-statutory health and safety committees
worksite to assist with the communication of health and safety related matters between the statutory
health and safety committee and the workplace.
as the statutory safety committee
3.17.2.1 Agenda
Effective Date April 2022 ACTIVITIES/SERVICES
Accident Prevention – Safety Promotion
o Planned Job Observations
o OHS Training
o Protective clothing and equipment
o Incident Announcements / Recall
Forthcoming High hazard activities.
Non-conformances.
Housekeeping.
Work permits.
Work procedures.
Hazardous materials / substances.
Fire Prevention
Occupational Hygiene Assessments, Health Risks and Actions
Security
Rules, Instructions
Public Safety
Environmental Management
Emergency Preparedness
Statistics report
Closure
3.17.2.2 Minutes and action items for all health and safety committee meetings
the duration of the project or a minimum period of three years.
project or a minimum period of 12 months.
months.
recommendations and return the minutes to the relevant contractors chairperson within 14 calendar
days of the meeting.
3.18 Tool box talks / daily team talks / pre job meetings
associated with the work task in attendance. The job, relevant procedures, associated hazards,
safety measures, i.e. the task risk assessments shall be discussed. Each employee who attends the
all affected staff shall undergo the applicable refresher training.
site specific work induction with regard to the approved project OHS plan, hazards prevalent on the work site,
scope specific risk assessment, rules and regulations, and other related aspects. The induction training should
also include identification of sensitive features such as wetlands/vlei areas, red data species, graves, etc.
the respective supervisor informs the employee of his scope of authority, the hazards associated with work as
well as the control measures to be taken. This will include man-job specifications, the discussion of any task
procedures or hazardous operational procedures to be performed by the employee. The Main Contractor is to
ensure that the supervisor has satisfied himself that the employee understands the hazards associated with
the work to be performed by conducting task/job observations.
3.21 Contractor site establishment
where contractors are providing their own facilities, the following shall apply:
a. Their passengers wear seat belts whilst the vehicle is in motion.
b. Comply with all traffic road rules, safety, direction and speed signs.
c. Ensure that vehicle loads are properly secured prior to moving off.
d. Ensure that vehicles are not overloaded.
services annually and inspected monthly. Drivers must be trained on how to use the First aid box
and fire extinguishers.
Reverse alarm / beeper
Yellow reflective tape
Mud flaps
Fire Extinguisher
2 Triangles
First Aid Box
Safety belts for every seat
No fold-up or jockey seat
Tyres
License disc
Yellow reflective tape that must be fitted at a height of between 250mm and 1.5 metres
Speed warning sigh (100km/h) at the back of the minibus
contact details of the: contractor site/responsible manager; supervisors; Health and Safety
Manager/Practitioner; First Aider; Health and Safety Representative and Evacuation warden.
means of a sign.
indicating the meaning of symbolic safety signs must be displayed.
3.25 Tools and equipment
inspected at least monthly or as required by legislation and risk assessments. The equipment should
be numbered or tagged so that it can be properly monitored and inspected.
GSR 6 are not compromised and from an electrical point of view not damage any cabling. The
working at heights risk assessment must indicate the use of climbing irons.
driving and or operating mobile equipment and or machinery. The personal use of cell phones in the plant is
prohibited unless it is an emergency or for work purpose. The use of cell phone camera in the plant must be
in line with the national key point Act and the Plant safety regulation.
3.30 Occupational health, hygiene and rehabilitation
program is intended to ensure that the risks to health are identified and controlled.
3.30.1 Medical Assessments
Note: Eskom will only accept medical surveillances conducted by an Occupational Health Practitioner who
holds a qualification in occupational health.
hazards that the employees will be exposed to.
specification, which must indicate the description of work, list of hazards and potential occupational
exposure limits, physical hazards and required physical attributes.
Environmental
Source: SHE Specification.pdf (unknown)requirements pertaining to local authorities, municipal by-laws, or environmental legislation that must
be met by the contractor.
2.1.1 Purpose
designated waste area, awaiting disposal.
injuries/fatalities.
Important Dates
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025(1).pdf (unknown){"closingDate":"27 January 2025"}
Contact Information
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025(1).pdf (unknown){"name":"__________________________________________________________","email":null,"phone":null,"department":null,"address":null}
Compliance Requirements
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025(1).pdf (unknown)No specific requirements found
Description
Source: QCP.pdf (unknown)Quality Control Plan Approvals Name Signature Intervention Point Legend (KEY)
Contractor /Supplier Hold Point AP - Document Requires T1 – 100% Testing A1 – 100% Inspection
Approval T2- Sample Testing A2- Sample Inspection
Subcontractor (where applicable) Witness Point W1 – 100% witness W2 - Sample witness
Eskom Document IN - Document Requires for R1- 100% Document Review R2- Sample Document
Review information only Review
Approved Inspection Authority (AIA) Surveillance (S)
(Where applicable) Verification (V)
Activities Intervention Point Category Inspection and Test Method Supplier Inspection Eskom Inspection Records
No Description / Requirement Date Supplier Eskom S=Statutory Method Controlling Acceptance AIA/NOBO Internal/TPI AIA/NOBO Internal/TPI
/ N= Non- document Criteria
statutory
Notes: INSPECTION AND TEST METHOD (e.g. Visual, Microscopy, NDT, Liquid/ Dye Penetrant, Magnetic Particle, EDDY, etc.); ACCEPTANCE CRITERIA ( e.g. Functionality requirement,
Performance Measures, Regulatory Compliance, Chemical test , etc.)
Abbreviations: NOBO (Notification Body); TPI (Third Party Inspection)
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorised version on
the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Evaluation Criteria
Source: QCP.pdf (unknown)Notes: INSPECTION AND TEST METHOD (e.g. Visual, Microscopy, NDT, Liquid/ Dye Penetrant, Magnetic Particle, EDDY, etc.); ACCEPTANCE CRITERIA ( e.g. Functionality requirement,
Quality Control Plan / Inspection and Test Plan (QCP/ITP)Form Document Identifier 240-109253302 Rev 2
Quality Control Plan Approvals Name Signature Intervention Point Legend (KEY)
Technical Specifications
Source: QCP.pdf (unknown)Quality Control Plan Approvals Name Signature Intervention Point Legend (KEY)
Contractor /Supplier Hold Point AP - Document Requires T1 – 100% Testing A1 – 100% Inspection
Approval T2- Sample Testing A2- Sample Inspection
Subcontractor (where applicable) Witness Point W1 – 100% witness W2 - Sample witness
Eskom Document IN - Document Requires for R1- 100% Document Review R2- Sample Document
Review information only Review
Approved Inspection Authority (AIA) Surveillance (S)
(Where applicable) Verification (V)
Activities Intervention Point Category Inspection and Test Method Supplier Inspection Eskom Inspection Records
No Description / Requirement Date Supplier Eskom S=Statutory Method Controlling Acceptance AIA/NOBO Internal/TPI AIA/NOBO Internal/TPI
/ N= Non- document Criteria
statutory
Notes: INSPECTION AND TEST METHOD (e.g. Visual, Microscopy, NDT, Liquid/ Dye Penetrant, Magnetic Particle, EDDY, etc.); ACCEPTANCE CRITERIA ( e.g. Functionality requirement,
Performance Measures, Regulatory Compliance, Chemical test , etc.)
Abbreviations: NOBO (Notification Body); TPI (Third Party Inspection)
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorised version on
the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Quality Management
Source: QCP.pdf (unknown)Description
Quality Control Plan Approvals Name Signature Intervention Point Legend (KEY)
Contractor /Supplier Hold Point AP - Document Requires T1 – 100% Testing A1 – 100% Inspection
Approval T2- Sample Testing A2- Sample Inspection
Subcontractor (where applicable) Witness Point W1 – 100% witness W2 - Sample witness
Eskom Document IN - Document Requires for R1- 100% Document Review R2- Sample Document
Approved Inspection Authority (AIA) Surveillance (S)
(Where applicable) Verification (V)
No Description / Requirement Date Supplier Eskom S=Statutory Method Controlling Acceptance AIA/NOBO Internal/TPI AIA/NOBO Internal/TPI
/ N= Non- document Criteria
statutory
Notes: INSPECTION AND TEST METHOD (e.g. Visual, Microscopy, NDT, Liquid/ Dye Penetrant, Magnetic Particle, EDDY, etc.); ACCEPTANCE CRITERIA ( e.g. Functionality requirement,
Performance Measures, Regulatory Compliance, Chemical test , etc.)
Abbreviations: NOBO (Notification Body); TPI (Third Party Inspection)
Section
Source: QCP.pdf (unknown)Notes: INSPECTION AND TEST METHOD (e.g. Visual, Microscopy, NDT, Liquid/ Dye Penetrant, Magnetic Particle, EDDY, etc.); ACCEPTANCE CRITERIA ( e.g. Functionality requirement,
Quality Control Plan / Inspection and Test Plan (QCP/ITP)Form Document Identifier 240-109253302 Rev 2
Quality Control Plan Approvals Name Signature Intervention Point Legend (KEY)
Description
Source: 240-109253698 CQP Template 2021.docxContract Quality Plan template assist the supplier to identify and plan for meeting client's/ contract expectations/requirements for quality management
Technical Specifications
Source: 240-109253698 CQP Template 2021.docx (unknown)Contract Quality Plan template assist the supplier to identify and plan for meeting client's/ contract expectations/requirements for quality management
Evaluation Criteria
Source: Quality Form A.pdf (unknown)Ard indicate with an quality iso 9001 standard indicate with an
Performance Evaluations X PRINCIPLE 6 XSECTION making
Eskom’s quality
NB: The tenderer must complete and sign this form to acknowledge and accept Eskom Supplier Quality Requirements as per 240
TENDER & CONTRACT QUALITY Document Identifier 240-68099512 Rev 9
QUALITY REQUIREMENTS FOR ISO 9001 Review Date January 2027
Pre-contract award quality requirements x
B Contract Execution (refer to clause 3.7.-105658000) X CLAUSE Supplier Quality Performance Monitoring Phase (refer to clause 3.7.-105658000) X
Quality Audits Related Conditions (refer to clause 3.8.-105658000) X
Clauses of iso iso 9001 standard indicate with an quality iso 9001 standard indicate with an
Technical Specifications
Source: Quality Form A.pdf (unknown)Indicate with an
105658000 (x) as applicable
Specification or (-) if not
Applicable
Pre-contract award quality requirements x
(*Select Only Applicable Category). NB: Not more than one category must be selected. Also indicate
whether site assessment is applicable.
Category 1 (refer to clause 3.5.-105658000) X
Category 2 (refer to clause 3.5.-105658000) -
Category 3 (refer to clause 3.5.-105658000) -
Category 4 (refer to clause 3.5.-105658000) -
Main Supplier and Sub-supplier Capability and Capacity Assessment (refer to clause 3.-105658000) -
3 post-contract award(eskom)
Methodology
Source: Quality Form A.pdfCLAUSE 4 Context of the Organisation X PRINCIPLE 1 Customer focus X
CLAUSE 5 Leadership X PRINCIPLE 2 Leadership X
CLAUSE 6 Planning X PRINCIPLE 3 Engagement of people X(ESKOM)
C CLAUSE 7 Support X PRINCIPLE 4 Process approach X
CLAUSE 8 Operation X PRINCIPLE 5 Improvement X
CLAUSE 9 Evidence based decision
Performance Evaluations X PRINCIPLE 6 XSECTION making
CLAUSE 10 Improvement X PRINCIPLE 7 Relationship Management X
Quality Management
Source: Quality Form A.pdfAuthorisation Date January 2022
240-105658000 and
QUALITY REQUIREMENTS FOR ISO 9001 Review Date January 2027
Eskom Rights of Access (refer to clause 3.8.-105658000) X
Eskom Rights to Information (refer to clause 3.8.-105658000) X
Preservation (refer to clause 3.8.-105658000) X
Quality Audits Related Conditions (refer to clause 3.8.-105658000) X
Management of Nonconformities and Nonconforming Outputs Identified by Eskom (refer to clause 3.8.-
Special processes (refer to clause 3.8.-105658000) x
Clauses of iso iso 9001 standard indicate with an quality iso 9001 standard indicate with an
9001 standard clause description (x) as applicable principles principle description (x) as applicable
Or (-) if not or (-) if not
Representativesection (tenderer)
NB: The tenderer must complete and sign this form to acknowledge and accept Eskom Supplier Quality Requirements as per 240-
105658000 Specification and ISO 9001 Standard.
Important Dates
Source: SDL&I.pdf (TENDER){"closingDate":"01 April 2023"}
Contact Information
Source: SDL&I.pdf (TENDER){"name":null,"email":null,"phone":null,"department":"Hendrina Power Station","address":"it proposals in a table below for developing the skills of unemployed"}
Evaluation Criteria
Source: SDL&I.pdf (TENDER)Section 1: Specific Goals
A maximum of 10/20 points may be awarded to a tenderer for the specific goal specified for the
tender. The points scored for the specific goal must be added to the points scored for price and the
scoring the highest points.
B-BBEE Status Level of Number of points Number of points
Contributor (90/10 system) (80/20 system)
NB: The following documents are required to claim preference points,
Tenderer failing to provide documentation for the allocation of preference points will not be
May only score point out of 90/80 for price
Scores 0 points out of 10/20 for specific goals
Technical Specifications
Source: SDL&I.pdf (TENDER)N/a
NOTE: Failure by the Contractor/Service Provider/Supplier to meet the CIDB CSDG mandatory %
will render their tender non-responsive.
Methodology
Source: SDL&I.pdfthrough their supply network. In certain cases, the SETA’s accredited training providers can be
approached to participate in developing critical and scarce skills.
Note: That these targets for skills development candidates categorically exclude Eskom
employees and registered learners. The tenderers are required to take full responsibility
user to ensure it is in line with the authorised version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
File name: 240-43921804 (Rev 6) Header and footer portrait template of 6
Document Identifier 240-148918142 Rev 4
SDL&I Strategy Setting Effective Date 01 April 2023
Template Review Date April 2026
for the total cost of developing the requisite skills, and Eskom shall not make any
financial contribution towards the fulfilment of this obligation. Tenderers also are
advised to approach their relevant SETAs to access grants, subsidies, and incentives
as well as South African Revenue Services for tax rebates that are earmarked for skills
development initiatives
Section 4: SDL&I Penalty and Performance Security
Eskom will apply a penalty of 1.3% of the invoice amount for failure to meet SDL&I obligations.
Eskom will apply a penalty of 1.3% of the Contract Value for failure to meet SDL&I obligations.
For the duration of the contract, Eskom will retain 2.5% of every invoice (excluding VAT) as security
for the fulfilment of all SDL&I Obligations. The retained amounts shall only be released to the
Pricing Schedule
Source: SDL&I.pdfuser to ensure it is in line with the authorised version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
File name: 240-43921804 (Rev 6) Header and footer portrait template of 6
Document Identifier 240-148918142 Rev 4
SDL&I Strategy Setting Effective Date 01 April 2023
Template Review Date April 2026
tender response must be separated into its components as per the Price Schedule included with
the tender documents. Local procurement content is total spending minus the imported
component.
Compliance Requirements
Source: SDL&I.pdf (TENDER)Proof of ownership / shareholding (preferably CIPC documentation) inclusive of shareholding
B-BBEE Minimum Level: 0
Points Allocation: 20 points
B-BBEE Details: Description/ Scope of Work The provision of H2 plant maintenance services at Hendrina
Power Station for a period of 5 years
Duration of the Project 5 Years
Section 1: Specific Goals
A maximum of 10/20 points may be awarded to a tenderer for the specific goal specified for the
tender. The points scored for the specific goal must be added to the points scored for price and the
total must be rounded off to the nearest two decimal places. Subject to section 2(1)(f) of the
Preferential Procurement Policy Framework Act, the contract must be awarded to the tenderer
scoring the highest points.
B-BBEE Status Level of Number of points Number of points
Contributor (90/10 system) (80/20 system)
1 10 20
2 9 18
3 6 14
4 5 12
5 4 8
6 3 6
7 2 4
8 1 2
Non-compliant contributor 0 0
NB: The following documents are required to claim preference points,
Valid B-BBEE certificate issued by a SANAS accredited verification agency / sworn affidavit /
CIPS affidavit
Proof of ownership / shareholding (preferably CIPC documentation) inclusive of shareholding
breakdown
Certified ID copies of shareholder(s)
Proof of Disability (where applicable)
In a case of a trust, consortium or joint venture (including incorporated consortia and joint
ventures),a consolidated B-BBEE status level verification certificate.
Tenderer failing to provide documentation for the allocation of preference points will not be
disqualified, but’
May only score point out of 90/80 for price
Scores 0 points out of 10/20 for specific goals
Confidential
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorised version on the system. No part of this document may be rep
Health & Safety
Source: SDL&I.pdfensure their validity:
Name/s of deponent as they appear in the identity document and the identity number.
Designation of the deponent as the director, owner or member must be indicated in order to know that person is duly
authorised to depose of an affidavit. (Mark the applicable option).
Name of enterprise as per enterprise registration documents issued by the CIPC, where applicable, and enterprise
business address.
Percentage of black ownership, black female ownership and designated group. In the case of specialised enterprises
as per Statement 004, the percentage of black beneficiaries must be reflected. (No blank spaces to be left).
Indicate total revenue for the year under review and whether it is based on audited financial statements or
management account. (Mark the applicable option).
Financial year end as per the enterprise’s registration documents, which was used to determine the total revenue.
(Financial year end to be stipulated by day/month/year).
B-BBEE Status level. An enterprise can only have one status level. (Tick applicable level)
Empowering supplier status must be indicated. For QSEs, the deponent must select the basis for the empowering
supplier status.
Date deponent signed and date of Commissioner of Oath must be the same. (The sworn affidavit must be signed in
the presence of the Commissioner of Oath. Furthermore the Commissioner must also sign and stamp)
Commissioner of Oath cannot be an employee or ex officio of the enterprise because, a person cannot by law,
commission a sworn affidavit in which they have an interest.
Compliance Requirements
Source: Annex-d_Imports Declaration-Supporting schedule to Annex C - Copy.pdf (unknown)Insufficient searchable text - AI extraction recommended
Contact Information
Source: OHS Returnables.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"knowledgement of Eskom's OHS legal and other requirements form signed and submitted by the tenderer?"}
Evaluation Criteria
Source: OHS Returnables.pdf (unknown)Annexure C 1: OHS Tender Evaluation Template (High risk) Document Identifier 240-77471651 Rev 3
Health & Safety
Source: OHS Returnables.pdfIs the acknowledgement of Eskom's OHS legal and other requirements form signed and submitted by the tenderer?
2 Health and Safety Plan (must address the project /scope of work OHS risk(s) and aligned with the health and safety
specification or requirements)
Has the tenderer submitted detailed costing for OHS (the cost should be broken down not provided as a lump sum).
The costing must be based on the overall scope of work/service to be performed.
The scope of work and the risk assessment may serve as a guideline.
4 Baseline OHS Risk Assessment (BRA)
Important Dates
Source: Invitation to Tender (ITT)_Hydrogen Plant Maintenance_Hendrina PS.pdf (RFP){"closingDate":"30 October 2025","closingTime":"10h00","briefingSession":"{"date":"05 August 2026","time":"09h00am","venue":"ion A non-compulsory clarification site visit with representatives of","is_compulsory":true}"}
Contact Information
Source: Invitation to Tender (ITT)_Hydrogen Plant Maintenance_Hendrina PS.pdf (RFP){"name":null,"email":"[email protected]","phone":"013 296 3305","department":null,"address":"r which"}
Submission Guidelines
Source: Invitation to Tender (ITT)_Hydrogen Plant Maintenance_Hendrina PS.pdf (RFP)Returnable Documents: Criteria 1: Company Experience 35 Proof of experience in maintenance Signed, contract 1.1 of Hydrogen Plant (as defined in the and/or signed scope of work). assessments of previous work of Scoring Criteria: X ≥ 5 number of completed similar scope with the following work = 5 points (35) information: 2< X ≤ 4 number of completed work = 4 points Name of company (28) where work was 35 0< X ≤ 2 number of executed, Project, completed work = 2 points Description, (14) Contract period & X = 0 number of completed Contact person. work = 0 points (0) Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 66 File name: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 27 - Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 27 Invitation to Tender/ Request Identifier for Proposal Effective Date 30 October 2025 Review Date October 2030, Note: ‘x’ is the number of completed NB!! PO number work. without the PO document will not be accepted Qualitative Technical Criteria Description Reference to Criteria Criteria Technical Weighting Sub Specification (%) Weighting / Tender (%), Criteria 2: Key Individuals Responsible for 30 Contract Work Site Manager: Copy of CV and Certified copy 2.1 Technical National Diploma of certificate (NQF 6) with experience of 5 (certified within years’. 3 to 6 months of the closing date) Scoring criteria: and CV showing years of X ≥ 5 years of experience = experience with 5 points (10) traceable 3< X ≤ 5 years of references. 10 experience = 4 points (8) 0< X ≤ 3 years of experience = 2 points (4) X = 0 years of experience = 0 points (0), Note: x’ is the number of years of
Evaluation Criteria
Source: Invitation to Tender (ITT)_Hydrogen Plant Maintenance_Hendrina PS.pdf (RFP)1.1.9 *SBD 6.1 Preference Points Claim Form in terms of Annexure I Y
PPPFA 2022 regulations
1.1.11 Tax Evaluation questionnaire to determine whether a N/A
3.13 Functionality requirements Functionality requirements are applicable
functionality criteria
Quality Control Plan 25%
Threshold 70%
Tenderers who do not meet the threshold for functionality scoring will
3.15 Evaluation of Price Prices will be evaluated as follows
evaluation parameters relating to uncertainty and risk, where
evaluation purposes but will be implemented when payment is
Prices will be scored out of 80 points
3.18 Evaluation of Specific Goals Specific goals will be scored out of 20 points in accordance with the
If a tenderer fails to submit evidence of its points claim for a Specific
Goal, it will not be disqualified. However, it will be awarded 0 points
B-BBEE Status Level (80/20 system)
the 80/20 system. Eskom will add the score from Pricing and Specific
Technical Specifications
Source: Invitation to Tender (ITT)_Hydrogen Plant Maintenance_Hendrina PS.pdf (RFP)Safety Data Sheets as per the scope of work (SDS)
Copy of approved Environmental Management
Programme
Register of waste that will be generated.
Waste Management Plan (Method statement)
Proof of training and skills of persons performing
significant activities (e.g., oil spills, application of
herbicides)
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 66
File name: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 27 -
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 27
Invitation to Tender/ Request Identifier
for Proposal Effective Date 30 October 2025
Review Date October 2030
Reference Returnable From Suppliers at at **
closing (Non- prior Award. required required closing. required Tender (disqualifiable)* Contract disqualifiable)
to Tender Returnable Returnable Returnable
Due N/A N/A N/A
Diligence/financial
analysis
Documents required under
Functionality/techinical criteria
Functionality/Technical Refer to documents labelled: √
required for evaluation
/scoring 1.SOW- The Provision of Hydrogen Plant
Maintenance Services at Hendrina Power Station on
an “As and When Required” Basis for a period of five
years
Maintenance Services at Hendrina Power Station
on an “As and When Required” Basis for a period
of five years
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 66
File name: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 27 -
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 27
Invitation to Tender/ Request Identifier
for Proposal Effective Date 30 October 2025
Review Date October 2030
Mandatory technical evaluation criteria
Category Source Evidence Reason for Requirement
Proof of certification The Hydrogen plant is classified as a Hazardous
Location and there are certain criteria to legally execute CERTIFICATION TO
any work in such areas. Any potential Contractor must be LEGALLY EXECUTE
certified to execute work on such a plant to be considered WORK ON A
for the contract. HAZARDOUS
Location
Qualitative technical criteria
Qualitative Technical Criteria Reference to Criteria Criteria
Description Technical Weighting Sub
Specification (%) Weighting
/ Tender (%)
Methodology
Source: Invitation to Tender (ITT)_Hydrogen Plant Maintenance_Hendrina PS.pdf (RFP)tenderer must select a minimum of two (2) financial institutions that it
is likely to approach from the list provided of Eskom-approved
financial institutions
3.4 Tender Opening
for Proposal Effective Date 30 October 2025
Review Date October 2030
X ≥ 3 years of experience = experience with
5 points (10) traceable
X = 2 years of experience = references.
4 points (8)
X = 1 years of experience =
2 points (4)
X = 0 years of experience =
0 points (0)
*Note: x’ is the number of years of
experience.
Artisan: Minimum N3 technical Certified copy 2.3
qualification and Trade test of certificate
including 3 years’ post trade test (certified within
experience 3 to 6 months of
the closing date)
and CV showing Scoring criteria:
years of
X ≥ 3 years of experience = experience with
5 points (10) traceable
X = 2 years of experience = references. 10
4 points (8)
X = 1 years of experience =
2 points (4)
X = 0 years of experience =
0 points (0)
*Note: x’ is the number of years of
experience.
Criteria 3: Method Statement 25
Provide detailed method statement Detailed method 3. 3.1
of the maintenance work as defined statement must
in the scope of work: include, but not
limited to
frequency,
Not submitted or related to the resources
25 scope of work = 0 points required,
Method statement is basic, estimated time,
vague, or does not cover most resource
of the scope of work = 2 points planning.
Method statements is clear, has
minimal errors, and covers
Quality Management
Source: Invitation to Tender (ITT)_Hydrogen Plant Maintenance_Hendrina PS.pdf (RFP)SECTION A: Quality Management System
Requirements ISO 9001 Valid certification of Quality
SECTION B: Evidence of QMS in operation (Tender
Quality Requirements -Ref 240-105658000)
SECTION C: Contract Quality Plan Requirements
(Ref 240-105658000 and 240-109253698). Draft
described in the tender documents (Ref ISO 10005)
SECTION D: Quality Control Plan Requirements (Ref
240-105658000 or 240-109253302) QCP /Checklist/
ITP (Quality Control Plans) as per Scope of Works
(Ref ISO 10005
SECTION E: User defined additional Requirements &
miscellaneous (Ref 240-105658000), Customer
specific requirements & other standards and required
can be listed and evaluated here
for Proposal Effective Date 30 October 2025
Review Date October 2030
Reference Returnable From Suppliers at at **
closing (Non- prior Award. required required closing. required Tender (disqualifiable)* Contract disqualifiable)
to Tender Returnable Returnable Returnable
preventative action
for Proposal Effective Date 30 October 2025
Review Date October 2030
majority of the scope of work =
4 points
Method statement is clearly
defined, detailed,
comprehensive and cover the
full scope of work = 5 points
Criteria 4: Quality Control Plan 4. 10
Quality Control Plan (QCP) Drafted QCP 4.1
maintenance activities hold points and
steps taken to
Scoring criteria: ensure that
QCP includes all necessary quality is
steps to evaluate quality controlled
and includes reference to during delivery
supporting documents and of the
10 intervention points (i.e. maintenance
hold, witness etc.) = 5 activities.
QCP is generic (does not
include all steps) = 3 Points
QCP is not submitted, or
documents submitted does
not qualify as QCP = 0
Points (0)
Pricing Schedule
Source: Invitation to Tender (ITT)_Hydrogen Plant Maintenance_Hendrina PS.pdf (RFP)Construction Industry Development Board (CIDB)
contractor grading of 4ME
1.1.17 Contract Participation Goals (CPG) N/A
(if applicable)
1.1.18 Scope of Work Annexure M Y
1.1.19 NEC or other Contract Annexure N Y
1.1.20 Pricing Schedule/BOQ (if not contained in Contract) Annexure O Y
option clauses, acceptable to Eskom as the Employer, selected
from the NEC Term Services Contract.
2.33 Cataloguing The successful tenderer may be required to provide the cataloguing
information per item after contract award and will need to ensure that
all materials delivered to Eskom are labelled in line with Eskom’s
labelling specifications as may be stipulated by Eskom. Where
cataloguing is a requirement, the Pricing Schedule must also include
a line item for cataloguing, which tenderers are required to quote for.
contributor
3.19 Ranking of tenders Tenderers will be ranked by applying the preferential point scoring for
the 80/20 system. Eskom will add the score from Pricing and Specific
Pricing schedule Completed pricing schedule (if not already submitted √
in the NEC or other Contract).
Financial Requirements
Source: Invitation to Tender (ITT)_Hydrogen Plant Maintenance_Hendrina PS.pdf (RFP)Payment Terms: payment terms as stipulated hereunder when
submitting tenders and concluding contracts with Eskom:
For contracts valued below R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
Suppliers within 30 days of receipt of undisputed invoices.
For contracts valued above R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed
Health & Safety
Source: Invitation to Tender (ITT)_Hydrogen Plant Maintenance_Hendrina PS.pdf (RFP)applicable:
SHEQ requirements; and/or
Environmental requirements
Financial viability (submission of financial statements); and/or
Any other as may be stipulated.
Sdl&i
for Proposal Effective Date 30 October 2025
Review Date October 2030
Reference Returnable From Suppliers at at **
closing (Non- prior Award. required required closing. required Tender (disqualifiable)* Contract disqualifiable)
to Tender Returnable Returnable Returnable
Safety COIDA - Original certificate of good standing or proof √
of application issued by the Compensation Fund
(COID) or a licensed compensation insurer (South
African tenderers only)
(must address the project /scope of work OHS risk(s)
and aligned with the health and safety specifications
or requirements)
(the cost should be broken down not provided as a
lump sum).
scope of work/service to be performed.
may serve as a guideline.
Baseline OHS Risk Assessment (BRA)
risks related to the scope of work. The methodology
used for risk assessment must be provided together
with the BRA
documents as
required per scope
of works
Environmental EMS File (ISO14001:2015) √
related emergencies)
compliance
Emergency Preparedness Plans (e.g., oil / chemical
spill, disasters, etc.) The contractor must provide
protocols to be followed, and contingencies to be put
in place for any potential incidents.
scope of work
Safety Data Sheets as per the scope of work (SDS)
any work in such areas. Any potential Contractor must be LEGALLY EXECUTE
certified to execute work on such a plant to be considered WORK ON A
for the contract. HAZARDOUS
Environmental
Source: Invitation to Tender (ITT)_Hydrogen Plant Maintenance_Hendrina PS.pdf (RFP)ISO 14001 EMS Certificate (if company is certified)
A detailed signed Contractor’s Environmental
Management Plan (EMP) pertaining to site specific
activities
e.g., waste transporter, waste sites license etc.
Waste Management Plan (Method statement)
Contractual Terms
Source: Invitation to Tender (ITT)_Hydrogen Plant Maintenance_Hendrina PS.pdf (RFP)sanctions list. A tenderer shall be found to have the nationality
of a country if the tenderer is a national or is constituted,
incorporated, or registered and operates in conformity with the
provisions of the laws of that country. This criterion shall also
apply to the determination of the nationality of proposed
subcontractors or suppliers for any part of the Contract including
related services.
individually or as a partner in a joint venture (JV) or consortium,
except on an E-Tendering system where there is a limit size
A1: Priced contract with activity schedule
W1: Dispute resolution procedure
X1: Price adjustment for inflation
X2: Changes in the law
X17: Low service damages
X18: Limitation of liability
X19: Task Order
X20: Key performance indicators
Z: Additional conditions of contract
2.28 CIDB Requirements (where CIDB Requirements are not applicable
applicable for Engineering and
Construction Works Contracts)
submitting tenders and concluding contracts with Eskom:
For contracts valued below R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
Suppliers within 30 days of receipt of undisputed invoices.
For contracts valued above R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
suppliers within 60 days of receipt of undisputed invoices.
Contact Information
Source: Tender Technical Evaluation Criteria.pdf (unknown){"name":null,"email":null,"phone":null,"department":"Supply Chain Management","address":null}
Evaluation Criteria
Source: Tender Technical Evaluation Criteria.pdf (unknown)Tender Technical Evaluation Strategy for The Provision of
Tender Technical Evaluation Title: Unique Identifier
most of the scope of work = 2 points
covers majority of the scope of work = 4 points
Criteria 4: Quality Control Plan 4. 10
Quality Control Plan (QCP) Showing all the points Drafted QCP indicating all 4.1
for maintenance activities hold points and steps taken
to ensure that quality is
quality and includes reference to supporting 10
documents and intervention points (i.e. hold,
witness etc.) = 5 Points
does not qualify as QCP = 0 Points (0)
Technical Specifications
Source: Tender Technical Evaluation Criteria.pdf (unknown)The Hydrogen Generating Plant at Hendrina has no redundancy and it is vital to ensure that the plant is
always available and reliable. This plant must be maintained via a servicing contract by a trained and
authorized representer.
2.1 Scope
To execute six monthly, yearly as well as the three-yearly services on the Hydrogen Plant at Hendrina for
five years.
2.1.1 Purpose
The purpose of this tender technical evaluation strategy is to define the Technical Evaluation Criteria, and
TET member responsibilities for tender technical evaluation. The technical evaluation strategy serves as
basis for the tender technical evaluation process.
2.1.2 Applicability
This document is applicable to Hendrina Power Station Hydrogen Plant five years’ service contract.
2.2 Normative/informative references
Parties using this document shall apply the most recent edition of the documents listed in the following
paragraphs.
2.2.1 Normative
[1] 240-48929482: Tender Technical Evaluation Procedure
[2] 32-1034 Eskom Procurement and Supply Chain Management Procedure
2.2.2 Informative
N/a
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Tender Technical Evaluation Strategy for The Provision of
Hydrogen Plant Maintenance Services at Hendrina Power Station Unique Identifier: SAP No
on an “As and When Required” Basis for the Period 60 Months
Revision: 0
Page:
2.3 Definitions
2.3.1 Classification
Controlled Disclosure: Controlled Disclosure to external parties (either enforced by law, or discretionary)
2.4 Abbreviations
Abbreviation Description
H2 Hydrogen
TET Technical Evaluation Team
2.5 Roles and responsibilities
Engineering Manager: All Engineering Managers throughout Eskom shall ensure that all staff, in their
respective areas understand and adhere to this procedure.
Engineering Design Work Lead (EDWL): The EDWL is responsible to manage the execution and
adherence to this procedure. Typically, on New Build projects the EDWL role is fulfilled by the Lead
Discipline Engineer (LDE) and on existing asset projects the EDWL role is fulfilled by the relevant System
Engineer / Plant Engineer.
Technical Evaluation Team (TET) member: The delegated engineers / technical specialists who are
responsible to review and evaluate technical aspects of the tender documentation as per the Tender
Technical Evaluation Strategy.
2.6 Process for monitoring
240-48929482: Tender Technical Evaluation Procedure
2.7 Related/supporting documents
N/a
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Tender Technical Evaluation Strategy for The Provision of
Hydrogen Plant Maintenance Services at Hendrina Power Station Unique Identifier: SAP No
on an “As and When Required” Basis for the Period 60 Months
Revision: 0
Page:
3.1 Technical evaluation threshold
The minimum weighted final score (threshold) required for a tender to be considered from a technical
perspective is 70%.
Table 1: Qualitative Evaluation Criteria Scoring Table
Score (%) Definition
Compliant
5 100 Meet technical requirement(s) AND.
No foreseen technical risk(s) in meeting technical requirements.
Compliant with associated qualifications
Meet technical requirement(s) with.
4 80 Acceptable technical risk(s) AND/OR.
Acceptable exceptions AND/OR.
Acceptable conditions.
Non-compliant
Does not meet technical requirement(s) AND/OR.
2 40 Unacceptable technical risk(s) AND/OR.
Unacceptable exceptions AND/OR.
Unacceptable conditions.
0 0 totally deficient or non-responsive
Note 1: The scoring table does not allow for scoring of 1 and 3.
Note 2: Foreseen acceptable and unacceptable risk(s), exceptions and conditions shall be unambiguously defined
in the relevant Tender Technical Evaluation Strategy.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Tender Technical Evaluation Strategy for The Provision of
Hydrogen Plant Maintenance Services at Hendrina Power Station Unique Identifier: SAP No
on an “As and When Required” Basis for the Period 60 Months
Revision: 0
Page:
3.2 Manadatory technical evaluation criteria
Table 2: Mandatory Technical Evaluation Criteria
Category Source Evidence Reason for Requirement
Proof of certification The Hydrogen plant is classified as a Hazardous Location and there are certain
Certification to
criteria to legally execute any work in such areas. Any potential Contractor must
Legally execute work
be certified to execute work on such a plant to be considered for the contract.
On a hazardous
Location
Tender Technical Evaluation Strategy for The Provision of
Hydrogen Plant Maintenance Services at Hendrina Power Station Unique Identifier: SAP No
on an “As and When Required” Basis for the Period 60 Months
Revision: 0
Page:
3.3 Qualitative technical evaluation criteria
Table 3: Qualitative Technical Evaluation Criteria
Qualitative Technical Criteria Description Reference to Technical Criteria Criteria
Specification Weightin Sub
/ Tender Returnable g Weighti
(%) ng
(%)
Proof of experience in maintenance of Hydrogen Signed, contract and/or 1.1
Plant (as defined in the scope of work). signed assessments of
previous work of similar Scoring Criteria:
scope with the following X ≥ 5 number of completed work = 5 points (35)
information: 2< X ≤ 4 number of completed work = 4 points
(28) Name of company where
0< X ≤ 2 number of completed work = 2 points work was executed, Project,
(14) 35
X = 0 number of completed work = 0 points (0) Description, Contract period
& Contact person.
*Note: ‘x’ is the number of completed work.
NB!! PO number without the PO
document will not be accepted
Tender Technical Evaluation Strategy for The Provision of
Hydrogen Plant Maintenance Services at Hendrina Power Station Unique Identifier: SAP No
on an “As and When Required” Basis for the Period 60 Months
Revision: 0
Page:
Qualitative Technical Criteria Description Reference to Technical Criteria Criteria
Specification Weightin Sub
/ Tender Returnable g Weightin
(%) g
(%)
Site Manager: Copy of CV and Technical National Certified copy of 2.1
Diploma (NQF 6) with experience of 5 years’. certificate (certified within
3 to 6 months of the
Scoring criteria: closing date) and CV
showing years of X ≥ 5 years of experience = 5 points (10)
experience with traceable 10 3< X ≤ 5 years of experience = 4 points (8)
references. 0< X ≤ 3 years of experience = 2 points (4)
X = 0 years of experience = 0 points (0)
*Note: x’ is the number of years of experience
Supervisor: Minimum N3 technical qualification Certified copy of 2.2
and Trade test including 3 years’ post trade test certificate (certified within
experience 3 to 6 months of the
closing date) and CV
showing years of Scoring criteria:
experience with traceable
X ≥ 3 years of experience = 5 points (10) references. 10
X = 2 years of experience = 4 points (8)
X = 1 years of experience = 2 points (4)
X = 0 years of experience = 0 points (0)
*Note: x’ is the number of years of experience.
Artisan: Minimum N3 technical qualification and Certified copy of 2.3
Trade test including 3 years’ post trade test certificate (certified within
experience 3 to 6 months of the 10
closing date) and CV
showing years of Scoring criteria:
Tender Technical Evaluation Strategy for The Provision of
Hydrogen Plant Maintenance Services at Hendrina Power Station Unique Identifier: SAP No
on an “As and When Required” Basis for the Period 60 Months
Revision: 0
Page:
X ≥ 3 years of experience = 5 points (10) experience with traceable
X = 2 years of experience = 4 points (8) references.
X = 1 years of experience = 2 points (4)
X = 0 years of experience = 0 points (0)
*Note: x’ is the number of years of experience.
Criteria 3: Method Statement 25
maintenance work as defined in the scope of must include, but not limited
to frequency, resources
work: required, estimated time,
resource planning.
Not submitted or related to the scope of work = 0
points
Method statement is basic, vague, or does not cover 25
most of the scope of work = 2 points
Method statements is clear, has minimal errors, and
covers majority of the scope of work = 4 points
Method statement is clearly defined, detailed,
comprehensive and cover the full scope of work = 5
points
Criteria 4: Quality Control Plan 4. 10
Quality Control Plan (QCP) Showing all the points Drafted QCP indicating all 4.1
for maintenance activities hold points and steps taken
to ensure that quality is
Scoring criteria: controlled during delivery of
QCP includes all necessary steps to evaluate the maintenance activities.
quality and includes reference to supporting 10
documents and intervention points (i.e. hold,
witness etc.) = 5 Points
QCP is generic (does not include all steps) = 3
Points
QCP is not submitted, or documents submitted
does not qualify as QCP = 0 Points (0)
Tender Technical Evaluation Strategy for The Provision of
Hydrogen Plant Maintenance Services at Hendrina Power Station Unique Identifier: SAP No
on an “As and When Required” Basis for the Period 60 Months
Revision: 0
Page:
3.3.1.1 Exceptions / Conditions
Table 4: Acceptable Technical Exceptions / Conditions
Risk Description
consideration, provided that they submit all required proof.
will be taken into consideration, provided that they submit all required proof.
Table 5: Unacceptable Technical/Mandatory Exceptions / Conditions
Risk Description
to work on a Hydrogen plant (High explosion risk).
Experience & Qualifications
Source: Tender Technical Evaluation Criteria.pdf (unknown)Hydrogen Plant Maintenance Services at Hendrina Power Station Unique Identifier: SAP No
on an “As and When Required” Basis for the Period 60 Months
Revision: 0
Page:
Contents . Introduction ...................................................................................................................................................... 3
2.1 Scope .............................................................................................................................................................. 3
2.1.1 Purpose ..................................................................................................................................................... 3
2.1.2 Applicability................................................................................................................................................ 3
2.2 Normative/informative references .................................................................................................. 3
2.2.1 Normative .................................................................................................................................................. 3
2.2.2 Informative ................................................................................................................................................. 3
2.3 Definitions .................................................................................................................................................... 4
2.3.1 Classification ............................................................................................................................................. 4
2.4 Abbreviations .............................................................................................................................................. 4
2.5 Roles and responsibilities .................................................................................................................... 4
2.6 Process for monitoring ........................................................................................................................ 4
2.7 Related/supporting documents ......................................................................................................... 4
3.1 Technical evaluation threshold ....................................................................................................... 5
3.2 Tet members ................................................................................... Error! Bookmark not defined.
3.3 Manadatory technical evaluation criteria .................................................................................. 6
3.4 Qualitative technical evaluation criteria .................................................................................... 7
3.5 Tet member responsibilities ................................................... Error! Bookmark not defined.
3.6 Foreseen acceptable / unacceptable qualifications. Error! Bookmark not defined.
3.6.1 Risks .......................................................................................................... Error! Bookmark not defined.
3.6.1.1 Acceptable Technical Risks .............................................................. Error! Bookmark not defined.
3.6.1.2 Unacceptable Technical Risks .......................................................... Error! Bookmark not defined.
3.6.1.3 Exceptions / Conditions ................................................................................................................... 10
Authorisation ......................................................................................... Error! Bookmark not defined.
Revisions ................................................................................................... Error! Bookmark not defined.
Development team ................................................................................ Error! Bookmark not defined.
Acknowledgements ............................................................................. Error! Bookmark not defined.
/ Tender Returnable g Weighti
(%) ng
(%)
Proof of experience in maintenance of Hydrogen Signed, contract and/or 1.1
Plant (as defined in the scope of work). signed assessments of
previous work of similar Scoring Criteria:
scope with the following X ≥ 5 number of completed work = 5 points (35)
information: 2< X ≤ 4 number of completed work = 4 points
(28) Name of company where
0< X ≤ 2 number of completed work = 2 points work was executed, Project,
(14) 35
X = 0 number of completed work = 0 points (0) Description, Contract period
& Contact person.
*Note: ‘x’ is the number of completed work.
NB!! PO number without the PO
document will not be accepted
/ Tender Returnable g Weightin
(%) g
(%)
Site Manager: Copy of CV and Technical National Certified copy of 2.1
Diploma (NQF 6) with experience of 5 years’. certificate (certified within
3 to 6 months of the
Scoring criteria: closing date) and CV
showing years of X ≥ 5 years of experience = 5 points (10)
experience with traceable 10 3< X ≤ 5 years of experience = 4 points (8)
references. 0< X ≤ 3 years of experience = 2 points (4)
X = 0 years of experience = 0 points (0)
*Note: x’ is the number of years of experience
Supervisor: Minimum N3 technical qualification Certified copy of 2.2
and Trade test including 3 years’ post trade test certificate (certified within
experience 3 to 6 months of the
closing date) and CV
showing years of Scoring criteria:
experience with traceable
X ≥ 3 years of experience = 5 points (10) references. 10
X = 2 years of experience = 4 points (8)
X = 1 years of experience = 2 points (4)
X = 0 years of experience = 0 points (0)
*Note: x’ is the number of years of experience.
Artisan: Minimum N3 technical qualification and Certified copy of 2.3
Trade test including 3 years’ post trade test certificate (certified within
experience 3 to 6 months of the 10
closing date) and CV
showing years of Scoring criteria:
Description
Source: E-tendering Help Manual for supplier - 27 January 2025(1).pdf (TENDER)eTendering system is a web-based system that allows suppliers bidding for various tenders advertised
on Tender Bulletin system to “upload” their tender documents. Currently the tenderers or suppliers
submit tender documents at various Eskom tender offices. eTendering system replaces the manual or
physical submission of tender documents at various Eskom tender offices. eTendering system in a
nutshell is an electronic box where tender documents can be “dropped” or “uploaded”. Suppliers will
be required to register their details before they can be granted access to the eTendering system. An
OTP (one time pin) will be sent to both their cell phone and email address.
Quick and direct access is also available by using the following links:
of the public, to view and access Eskom published tenders. eTendering hyperlink will be found
on this site. Members of the public may follow prompt instructions once they have clicked on
the eTendering link (https://eTendering.eskom.co.za). This link will allow them to upload the
required tender documentation.
members of the public, to view information about published tenders and submit their tender
documents.
eTendering system.
2 Problems
A channel of communication has been created in case users of the system experiences a problem
with the system. In a case users come across some difficulties in using Tender bulletin, eTendering
and OpenText systems they need to contact the buyer responsible for the published tender.
3 What’s New
A new functionality to “add closed tenders”. Closed tenders refers to the tenders which are not listed
on Tenderbulletin as normal tenders, but are tenders sent directly to the relevant and potential
suppliers who meet the selection and evaluation criteria to offer what the buyer needs. These
suppliers will be sent a link via email to bid privately.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
4 Getting Started
To gain access to eTendering portal
Open your web browser
Type TenderBulletin (eskom.co.za) or https://eTendering.eskom.co.za
eTendering system login page will be displayed:
Fig 1
Registration Form Steps to follow
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Plus prefix e.g +27
capture picture to validate that you
are not a robot.
click on register button
the registerer to verify the email sent to
the provided email address.
click on “Resend Verification Email”
button
on link provided on
the email.
etendering site with a login screen
displayed, now complete the login
with your verified email address and
password
Fig1.1
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig2a.
Fig2b.
Fig3.
OTP page will be displayed
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
OTP sent to the registered cellphone number and email address
Insert the otp number then click “Verify OTP” button, to resend OTP click on “Resend OTP”
button
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Landing page once OTP is verified
Select the preferred “Ref No”
A page with the preferred Tender information is displayed before tender documentation can
be submitted.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Click on “Create New Submission” button to submit required Tender documents
Landing page once clicked on “Create New Submission” button. Take note of the
mentioned disclaimers.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
To submit tender documents, click on “Add file” button
Upload required tender documents by:
Giving the file a name
Select the listed file type e.g.: Technical, commercial, finance and etc
Choose the file you need to upload
Then click on “Upload” button, Fig5.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig4.
Fig5.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Continue to submit all the required documents under the correct category ,i.e: Technical
should be selected if technical documentation is uploaded and etc. Verify all required
documents are uploaded before making ‘Final Submission’ by clicking on ‘Finalize
Submission’ button.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
all uploaded files should not exceed 900MB.
will pop-up
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
If not all documents were submitted or still wish to add or submit more documents, click on
“No, continue adding files” button.
submission and closed time and date timestamp at the bottom.
submitted tenders will be displayed.
If you want to view or verify the submitted documents, click on “View Submission” button
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
submitted documents on email,Fig6.This is the final step for the submitter or tenderer.
It is vital to save the email with the submission ID for future enquiry if need be.
--------Originalmessage--------
From:Eskom E-Tender Document Submission 28 [email protected]
Date:Tue,23Aug2022,3:42pm
Subject: Response To Submitter
Eskom E-Tender Document Submission 28
Hi Monalisa
You have finalized a new submission with submission id:14 on tender #MPKUS10086PS
closing date : 2022-11-30 10:00:00.
Have started the submission from 2022-08-23 14:28:33 and finalized at 2022-08-23
15:42:28
Tender Description:
Award for Provision of Office Cleaning and Janitorial Services at Kusile Power Station
Project
Files Submitted:
ID Original Name Title Size Type
38 Test7.pdf testingCom 33141 Commercial
40 Test1.pdf testingTech 33502 Technical
41 Test15.pdf testingFin 33141 Finance
Thanks,
Eskom E-Tender Document Submission 28 Automated Mail
© 2022 Eskom E-Tender Document Submission 28. All rights reserved.
NB: This Email and its contents are subject to the Eskom Holdings SOC Ltd EMAIL
LEGAL NOTICE which can be viewed at
http://www.eskom.co.za/Pages/Email_Legal_Spam_Disclaimer.aspx
Fig6.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
5 Edit Registration
To edit already registered information such as Name, Organization, CSD and cell phone number
select “Edit Registration” on the drop down, Fig1. New window with information that needs to be
updated pop ups,Fig2. Click on “Update” button to update registration details.
Fig1.
Fig2.
6 Log off Button
To logout, click “Log out” on the dropdown next to your name
Fig1.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
7 Password reset
To reset a forgotten password, click “Forgot your password” Fig1. and a new screen will
pop up to enter an alternative email where the new password will be sent Fig2.Confirmation
message will be sent to the user, Fig3.
Fig1.
Fig2.
Fig3.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
An email confirming password reset will be sent to the email provided.
Click on the link or “Reset Password” button to reset the password.
Fig4.
A new window will pop up to reset and confirm the new password, Fig5.Enter new
password and confirm then click on “Reset Password” button.
Fig5.
OTP window will pop up, type in the OTP sent to either the cell phone or email address.
Fig6.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
OTP successfully goes through and lands on the below screen, password is successfully
reset.
Fig7.
8 General
This system is compatible to most web browsers however we recommend Ms Edge.
The end.
© 2023 Eskom of 19
Important Dates
Source: E-tendering Help Manual for supplier - 27 January 2025(1).pdf (TENDER){"closingDate":"23Aug2022","closingTime":"3:42pm"}
Contact Information
Source: E-tendering Help Manual for supplier - 27 January 2025(1).pdf (TENDER){"name":null,"email":"[email protected]","phone":null,"department":null,"address":"ls before they can be granted access to the eTendering system. An"}
Evaluation Criteria
Source: E-tendering Help Manual for supplier - 27 January 2025(1).pdf (TENDER)A new functionality to “add closed tenders”. Closed tenders refers to the tenders which are not listed
suppliers who meet the selection and evaluation criteria to offer what the buyer needs. These
Technical Specifications
Source: E-tendering Help Manual for supplier - 27 January 2025(1).pdf (TENDER)eTendering system is a web-based system that allows suppliers bidding for various tenders advertised
on Tender Bulletin system to “upload” their tender documents. Currently the tenderers or suppliers
submit tender documents at various Eskom tender offices. eTendering system replaces the manual or
physical submission of tender documents at various Eskom tender offices. eTendering system in a
nutshell is an electronic box where tender documents can be “dropped” or “uploaded”. Suppliers will
be required to register their details before they can be granted access to the eTendering system. An
OTP (one time pin) will be sent to both their cell phone and email address.
Quick and direct access is also available by using the following links:
of the public, to view and access Eskom published tenders. eTendering hyperlink will be found
on this site. Members of the public may follow prompt instructions once they have clicked on
the eTendering link (https://eTendering.eskom.co.za). This link will allow them to upload the
required tender documentation.
members of the public, to view information about published tenders and submit their tender
documents.
eTendering system.
2 Problems
A channel of communication has been created in case users of the system experiences a problem
with the system. In a case users come across some difficulties in using Tender bulletin, eTendering
and OpenText systems they need to contact the buyer responsible for the published tender.
3 What’s New
A new functionality to “add closed tenders”. Closed tenders refers to the tenders which are not listed
on Tenderbulletin as normal tenders, but are tenders sent directly to the relevant and potential
suppliers who meet the selection and evaluation criteria to offer what the buyer needs. These
suppliers will be sent a link via email to bid privately.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
4 Getting Started
To gain access to eTendering portal
Open your web browser
Type TenderBulletin (eskom.co.za) or https://eTendering.eskom.co.za
eTendering system login page will be displayed:
Fig 1
Registration Form Steps to follow
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Plus prefix e.g +27
capture picture to validate that you
are not a robot.
click on register button
the registerer to verify the email sent to
the provided email address.
click on “Resend Verification Email”
button
on link provided on
the email.
etendering site with a login screen
displayed, now complete the login
with your verified email address and
password
Fig1.1
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig2a.
Fig2b.
Fig3.
OTP page will be displayed
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
OTP sent to the registered cellphone number and email address
Insert the otp number then click “Verify OTP” button, to resend OTP click on “Resend OTP”
button
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Landing page once OTP is verified
Select the preferred “Ref No”
A page with the preferred Tender information is displayed before tender documentation can
be submitted.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Click on “Create New Submission” button to submit required Tender documents
Landing page once clicked on “Create New Submission” button. Take note of the
mentioned disclaimers.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
To submit tender documents, click on “Add file” button
Upload required tender documents by:
Giving the file a name
Select the listed file type e.g.: Technical, commercial, finance and etc
Choose the file you need to upload
Then click on “Upload” button, Fig5.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig4.
Fig5.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Continue to submit all the required documents under the correct category ,i.e: Technical
should be selected if technical documentation is uploaded and etc. Verify all required
documents are uploaded before making ‘Final Submission’ by clicking on ‘Finalize
Submission’ button.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
all uploaded files should not exceed 900MB.
will pop-up
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
If not all documents were submitted or still wish to add or submit more documents, click on
“No, continue adding files” button.
submission and closed time and date timestamp at the bottom.
submitted tenders will be displayed.
If you want to view or verify the submitted documents, click on “View Submission” button
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
submitted documents on email,Fig6.This is the final step for the submitter or tenderer.
It is vital to save the email with the submission ID for future enquiry if need be.
--------Originalmessage--------
From:Eskom E-Tender Document Submission 28 [email protected]
Date:Tue,23Aug2022,3:42pm
Subject: Response To Submitter
Eskom E-Tender Document Submission 28
Hi Monalisa
You have finalized a new submission with submission id:14 on tender #MPKUS10086PS
closing date : 2022-11-30 10:00:00.
Have started the submission from 2022-08-23 14:28:33 and finalized at 2022-08-23
15:42:28
Tender Description:
Award for Provision of Office Cleaning and Janitorial Services at Kusile Power Station
Project
Files Submitted:
ID Original Name Title Size Type
38 Test7.pdf testingCom 33141 Commercial
40 Test1.pdf testingTech 33502 Technical
41 Test15.pdf testingFin 33141 Finance
Thanks,
Eskom E-Tender Document Submission 28 Automated Mail
© 2022 Eskom E-Tender Document Submission 28. All rights reserved.
NB: This Email and its contents are subject to the Eskom Holdings SOC Ltd EMAIL
LEGAL NOTICE which can be viewed at
http://www.eskom.co.za/Pages/Email_Legal_Spam_Disclaimer.aspx
Fig6.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
5 Edit Registration
To edit already registered information such as Name, Organization, CSD and cell phone number
select “Edit Registration” on the drop down, Fig1. New window with information that needs to be
updated pop ups,Fig2. Click on “Update” button to update registration details.
Fig1.
Fig2.
6 Log off Button
To logout, click “Log out” on the dropdown next to your name
Fig1.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
7 Password reset
To reset a forgotten password, click “Forgot your password” Fig1. and a new screen will
pop up to enter an alternative email where the new password will be sent Fig2.Confirmation
message will be sent to the user, Fig3.
Fig1.
Fig2.
Fig3.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
An email confirming password reset will be sent to the email provided.
Click on the link or “Reset Password” button to reset the password.
Fig4.
A new window will pop up to reset and confirm the new password, Fig5.Enter new
password and confirm then click on “Reset Password” button.
Fig5.
OTP window will pop up, type in the OTP sent to either the cell phone or email address.
Fig6.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
OTP successfully goes through and lands on the below screen, password is successfully
reset.
Fig7.
8 General
This system is compatible to most web browsers however we recommend Ms Edge.
The end.
© 2023 Eskom of 19
Quality Management
Source: E-tendering Help Manual for supplier - 27 January 2025(1).pdf (TENDER)38 Test7.pdf testingCom 33141 Commercial
40 Test1.pdf testingTech 33502 Technical
41 Test15.pdf testingFin 33141 Finance
Compliance Requirements
Source: E-tendering Help Manual for supplier - 27 January 2025(1).pdf (TENDER)CSD number to gain access to
Health & Safety
Source: E-tendering Help Manual for supplier - 27 January 2025(1).pdf (TENDER)1 Background
eTendering system is a web-based system that allows suppliers bidding for various tenders advertised
on Tender Bulletin system to “upload” their tender documents. Currently the tenderers or suppliers
submit tender documents at various Eskom tender offices. eTendering system replaces the manual or
physical submission of tender documents at various Eskom tender offices. eTendering system in a
nutshell is an electronic box where tender documents can be “dropped” or “uploaded”. Suppliers will
be required to register their details before they can be granted access to the eTendering system. An
OTP (one time pin) will be sent to both their cell phone and email address.
of the public, to view and access Eskom published tenders. eTendering hyperlink will be found
on this site. Members of the public may follow prompt instructions once they have clicked on
the eTendering link (https://eTendering.eskom.co.za). This link will allow them to upload the
required tender documentation.
members of the public, to view information about published tenders and submit their tender
documents.
eTendering system.
with the system. In a case users come across some difficulties in using Tender bulletin, eTendering
and OpenText systems they need to contact the buyer responsible for the published tender.
3 What’s New
A new functionality to “add closed tenders”. Closed tenders refers to the tenders which are not listed
on Tenderbulletin as normal tenders, but are tenders sent directly to the relevant and potential
suppliers who meet the selection and evaluation criteria to offer what the buyer needs. These
suppliers will be sent a link via email to bid privately.
© 2023 Eskom of 19
Section
Source: E-tendering Help Manual for supplier - 27 January 2025(1).pdf (TENDER)A new functionality to “add closed tenders”. Closed tenders refers to the tenders which are not listed
suppliers who meet the selection and evaluation criteria to offer what the buyer needs. These
Description
Source: Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdf (unknown)1.1 Scope
The Eskom Supplier Integrity Pact (Integrity Pact) is applicable to Eskom Holdings SOC Ltd (including all
wholly owned subsidiaries) and all existing and potential suppliers (as per the definition hereunder).
1.2 Purpose
The integrity pact is a pact between Eskom and its suppliers that prescribes the “ethical behaviour”. Ethical
behaviour is desirable/acceptable conduct (actions and decisions) that will bring about good/appropriate
consequences/outcomes in the interaction with others. Ethical behaviour incorporates ethical values and
considers not only what is good for oneself, but also what is good for others. Eskom considers such behaviour
of paramount importance and expects every existing/potential supplier and its own employees/directors to
always act ethically and with integrity.
Eskom commits to ensuring that it implements a procurement policy/procedure that aligns to all applicable
South African laws and regulations, as well as the constitutional principles of fairness, transparency, equity,
cost effectiveness and competitiveness.
This document supplements all other relevant Commercial and Ethics related policies/codes/procedures.
1.3 Preamble
In order to achieve this purpose, all Eskom suppliers are required to read this Integrity Pact and to complete,
sign and submit the Integrity Declaration Form whenever they participate in any Eskom procurement process.
Eskom and its suppliers commit to honouring their respective obligations herein, and agree to refrain from
any form of dishonesty, fraud, and/or corruption throughout the entire procurement process, including
tendering practices that are in bad faith, unfair and anti-competitive (e.g., under-pricing/collusion/bid rigging)
Term Definition
Conflict of Interest A conflict of interest arises when one’s personal interests, personal
financial interests or any other interests, affect, or could be perceived to
affect, or has the potential to affect one’s objectivity and discretion and/or
the objectivity and discretion of another in performing Eskom duties or
making decisions on behalf of Eskom. This means that an employee or
director is in a position to make a decision (or influences a decision) that
is not fair and objective in order to benefit personally, or to benefit related
and /or inter-related persons.
Director Means a member of the board of Eskom, or a board of its subsidiary or
an alternate director of such board and includes a person occupying the
position of a director, by whatever name designated, or a prescribed
officer, or a person who is a member of a committee of the board or of
the audit committee, irrespective of whether the person is also a member
of such board.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Supplier Integrity Pact Unique Identifier: 240-113650212
Revision: 2
Page:
Employment equity The Employment Equity Act promotes equity in the workplace,
ensures that all employees receive equal opportunities and that
employees are treated fairly by their employers. The law protects a
person from unfair treatment and any form of discrimination.
Employee (s) Also referred to as staff members. These include individuals employed
by Eskom on a permanent basis, contract labour, temporary employees,
part-time employees, casual employees, occasional employees, fixed-
term contractors, learners, and others acting on behalf of Eskom or its
subsidiaries.
Eskom Registered Vendor Means a current or potential supplier who may be a natural or juristic
person and includes any employee of such supplier acting within the
course and scope of his/her employment, or any agent or manager acting
for or on behalf of, or in the interests of the supplier registered as a vendor
on the Eskom Vendor Database.
Supplier Means any natural person or juristic person that does business with
Eskom or tenders to do business with Eskom, or is registered on Eskom’s
Vendor Database, such as consultants, contractors, sub-contractors and
providers of goods and services.
Abbreviation Explanation
DOI Declaration of Interest
ETC EXCO Tender Committee
NDA Non-disclosure agreement
RFP Request for Proposal
RFQ Request for Quotation
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Supplier Integrity Pact Unique Identifier: 240-113650212
Revision: 2
Page:
4.1 Eskom’s suppliers accept that they will at all times:
4.1.1 Maintain an impeachable standard of integrity in all their business and personal dealings and take all
reasonable measures necessary to prevent all dishonest, unfair, fraudulent, corrupt, and illegal
practices during any stage of the Eskom procurement process including the execution of contracts
and contract modifications.
4.1.2 Ensure that they are familiar with all publicly available Eskom policies/ procedures/codes that impact
the supply chain processes including, but not limited to Eskom’s Standard Conditions of Tender.
4.1.3 Reject all improper business practices (as may be prohibited by Eskom).
4.1.4 Not abuse the trust placed in them by Eskom employees, or misuse opportunities arising during their
interaction with Eskom for personal gain.
4.1.5 Seek to constantly maintain and enhance their standards of professional competence.
4.1.6 Adopt, where possible, policies and practices which align with those of Eskom (labour practices,
employment equity initiatives and human relations policies) to the highest ethical standards.
4.2 Eskom’s suppliers confirm specifically that:
4.2.1 All confidential information, to which they may have access in the course of their work, must not be
disclosed without the express consent from the authorised Eskom representative. The supplier is
required to complete a Non-Disclosure Agreement (NDA) to give effect to this.
4.2.2 They will not deliberately misrepresent information, submit false certifications or forged documents to
influence the tendering process to advantage themselves or to mislead Eskom in any way and that
Eskom has the right to request an audit of such information, and take further action against the supplier
should it be found that it has acted in a dishonest or fraudulent manner.
4.2.3 Although the establishment of long term and close relations between Eskom and its suppliers is
recognised, Suppliers are nevertheless, required to avoid relationships with Eskom
employees//directors, that may be perceived to be contrary to the constitutional principles of fairness,
equitability, transparency, competitiveness, and cost effectiveness. Suppliers are therefore required
to complete the Integrity declaration form wherein they are required to disclose any interest that they
may have with an Eskom employee/director, whether financial, personal, or private, in its business,
and/or any affiliation /relationship which affects, or may affect, or may be perceived to affect, the
decision-making during tender award. Should a supplier later become aware that its
owners/members/directors/partners/shareholders are an Eskom employee/director with respect to a
tender in which it participated, the supplier is required to disclose the interest/relationship to Eskom
and submit whatever information may be required regarding the parties involved.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Supplier Integrity Pact Unique Identifier: 240-113650212
Revision: 2
Page:
4.2.4 Although the entertainment of customers and provisions of business courtesies or gifts are generally
an accepted commercial practice, they must not in any way negatively affect Eskom’s image and
reputation. They should not exceed the R1500,00 value prescribed by Eskom and should not be of
such a nature (value or circumstances) as to be construed as placing an Eskom employee/director
under obligation to the supplier or in any way improperly influence the recipient.
4.2.5 They will avoid entering into unethical and/or fraudulent dealings with any Eskom employee/director
involved in the evaluation/adjudication/negotiation of a transaction in which it participates, involving
direct/indirect monetary or material benefits in order to be unfairly benefitted. In such circumstances,
no business courtesy, bribe, gift, fees commission or inducement may be offered to, or requested by
an Eskom employee/director involved in the evaluation/adjudication/negotiation of a transaction in
which the supplier is participating.
4.2.6 They will not enter any dishonest and/or illegal agreement or an understanding with other tenderers
involved in a tender/RFP process in which it participates. They will complete the integrity Declaration
Form which incorporates a Declaration of Fair Tendering Practices, when participating in any Eskom
tender/Request for Quotation (RFQ).
4.2.7 They understand that they may be subject to a supplier discipline process and that sanctions that
may be imposed on suppliers should they be found guilty of misconduct.
4.2.8 Should a supplier become aware of any dishonest, fraudulent or inappropriate behaviour of any Eskom
employee/director; the said supplier is required to report this behaviour to the Eskom Ethics office via
email at [email protected], or via the Eskom Forensic email at [email protected] or through
the Eskom toll free hotline 0800 11 27 22, wherein confidentiality is guaranteed.
5.1 Eskom undertakes to treat all tenderers during the tender process according to the constitutional
principles of fairness, transparency, equity, cost-effectiveness, and competitiveness.
5.2 All Eskom employees/directors are required to complete an annual Declaration of Interest (DOI),
wherein they are required to declare all interests, directorships, memberships, details of any of their
related or inter-related persons or other associates that conduct business with Eskom and all other
material personal interests, whether a conflict exists or not. During the financial year, all Eskom
employees/directors have an option of amending annual DOIs should there be changes in their
interests or what has been disclosed already. In addition to this annual declaration, employees are also
required to complete an additional DOI and NDA if involved in the procurement process.
5.3 Eskom employees will ensure that all gifts received in the normal course of business is declared,
recorded, and authorised by relevant managers. Employees/directors involved in the tender evaluation/
negotiation process, may not accept, demand, or accept a promise of any money, business courtesies,
gifts, rewards, gratuity, favours from any of the tenderers involved to benefit or as may be perceived to
benefit such tenderer. Further to this, employees and directors are prohibited from offering or accepting
loan(s) or other benefit(s) from suppliers, unless the supplier is in the business of granting such loans
or benefits and the terms and conditions of the loan that is offered to the employee/director is also
offered to the general members of the public or a section thereof.
5.4 Should Eskom become aware of any relationship/interest of any employee/director in a tender in which
it is involved in tender evaluation/negotiation process, then this employee/director will be excluded from
the said tender evaluation/negotiation process.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Supplier Integrity Pact Unique Identifier: 240-113650212
Revision: 2
Page:
5.5 Eskom will implement the Supplier Discipline Process if it becomes aware of any contravention of the
provisions of this integrity pact, any other misconduct by a supplier and/or any Eskom
employee/director who acts in bad faith to benefit themselves or a supplier. Eskom has the right, after
following a process of investigation and affording the supplier an opportunity to make representation,
to notify the supplier of the intention to suspend it from the Eskom Vendor Database, impose various
other sanctions and/or institute disciplinary actions against its employees/directors. Subsequently,
Eskom will forward the names of such suppliers including the directors of the company to National
Treasury, who will include the suppliers on the List of Restricted Suppliers on the National Database.
5.6 All Eskom employees/directors are prohibited from having any direct/ indirect personal or other
beneficial interest in any contract with Eskom, whether as a supplier, an advisor or by virtue of being a
director or owner of a business, or in any other capacity. This includes third-party related transactions
with an indirect link to an Eskom contract.
6.1 This Eskom Supplier Integrity Pact is governed by and interpreted in accordance with the laws,
regulations and legislation of the Republic of South Africa.
6.2 The actions stipulated in this Integrity Pact are without prejudice to any other civil or criminal
proceedings that may arise in accordance with the provisions of the law.
6.3 This Integrity Pact shall remain valid until replaced. Should one or more provisions of this Integrity
Pact be regarded as invalid, remainder of the provisions will remain valid.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Important Dates
Source: Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdf (unknown){"closingDate":"27 June 2023"}
Contact Information
Source: Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdf (unknown){"name":null,"email":null,"phone":null,"department":"ies and that","address":null}
Evaluation Criteria
Source: Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdf (unknown)involved in the evaluation/adjudication/negotiation of a transaction in which it participates, involving
an Eskom employee/director involved in the evaluation/adjudication/negotiation of a transaction in
Technical Specifications
Source: Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdf (unknown)1.1 Scope
The Eskom Supplier Integrity Pact (Integrity Pact) is applicable to Eskom Holdings SOC Ltd (including all
wholly owned subsidiaries) and all existing and potential suppliers (as per the definition hereunder).
1.2 Purpose
The integrity pact is a pact between Eskom and its suppliers that prescribes the “ethical behaviour”. Ethical
behaviour is desirable/acceptable conduct (actions and decisions) that will bring about good/appropriate
consequences/outcomes in the interaction with others. Ethical behaviour incorporates ethical values and
considers not only what is good for oneself, but also what is good for others. Eskom considers such behaviour
of paramount importance and expects every existing/potential supplier and its own employees/directors to
always act ethically and with integrity.
Eskom commits to ensuring that it implements a procurement policy/procedure that aligns to all applicable
South African laws and regulations, as well as the constitutional principles of fairness, transparency, equity,
cost effectiveness and competitiveness.
This document supplements all other relevant Commercial and Ethics related policies/codes/procedures.
1.3 Preamble
In order to achieve this purpose, all Eskom suppliers are required to read this Integrity Pact and to complete,
sign and submit the Integrity Declaration Form whenever they participate in any Eskom procurement process.
Eskom and its suppliers commit to honouring their respective obligations herein, and agree to refrain from
any form of dishonesty, fraud, and/or corruption throughout the entire procurement process, including
tendering practices that are in bad faith, unfair and anti-competitive (e.g., under-pricing/collusion/bid rigging)
Term Definition
Conflict of Interest A conflict of interest arises when one’s personal interests, personal
financial interests or any other interests, affect, or could be perceived to
affect, or has the potential to affect one’s objectivity and discretion and/or
the objectivity and discretion of another in performing Eskom duties or
making decisions on behalf of Eskom. This means that an employee or
director is in a position to make a decision (or influences a decision) that
is not fair and objective in order to benefit personally, or to benefit related
and /or inter-related persons.
Director Means a member of the board of Eskom, or a board of its subsidiary or
an alternate director of such board and includes a person occupying the
position of a director, by whatever name designated, or a prescribed
officer, or a person who is a member of a committee of the board or of
the audit committee, irrespective of whether the person is also a member
of such board.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Supplier Integrity Pact Unique Identifier: 240-113650212
Revision: 2
Page:
Employment equity The Employment Equity Act promotes equity in the workplace,
ensures that all employees receive equal opportunities and that
employees are treated fairly by their employers. The law protects a
person from unfair treatment and any form of discrimination.
Employee (s) Also referred to as staff members. These include individuals employed
by Eskom on a permanent basis, contract labour, temporary employees,
part-time employees, casual employees, occasional employees, fixed-
term contractors, learners, and others acting on behalf of Eskom or its
subsidiaries.
Eskom Registered Vendor Means a current or potential supplier who may be a natural or juristic
person and includes any employee of such supplier acting within the
course and scope of his/her employment, or any agent or manager acting
for or on behalf of, or in the interests of the supplier registered as a vendor
on the Eskom Vendor Database.
Supplier Means any natural person or juristic person that does business with
Eskom or tenders to do business with Eskom, or is registered on Eskom’s
Vendor Database, such as consultants, contractors, sub-contractors and
providers of goods and services.
Abbreviation Explanation
DOI Declaration of Interest
ETC EXCO Tender Committee
NDA Non-disclosure agreement
RFP Request for Proposal
RFQ Request for Quotation
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Supplier Integrity Pact Unique Identifier: 240-113650212
Revision: 2
Page:
4.1 Eskom’s suppliers accept that they will at all times:
4.1.1 Maintain an impeachable standard of integrity in all their business and personal dealings and take all
reasonable measures necessary to prevent all dishonest, unfair, fraudulent, corrupt, and illegal
practices during any stage of the Eskom procurement process including the execution of contracts
and contract modifications.
4.1.2 Ensure that they are familiar with all publicly available Eskom policies/ procedures/codes that impact
the supply chain processes including, but not limited to Eskom’s Standard Conditions of Tender.
4.1.3 Reject all improper business practices (as may be prohibited by Eskom).
4.1.4 Not abuse the trust placed in them by Eskom employees, or misuse opportunities arising during their
interaction with Eskom for personal gain.
4.1.5 Seek to constantly maintain and enhance their standards of professional competence.
4.1.6 Adopt, where possible, policies and practices which align with those of Eskom (labour practices,
employment equity initiatives and human relations policies) to the highest ethical standards.
4.2 Eskom’s suppliers confirm specifically that:
4.2.1 All confidential information, to which they may have access in the course of their work, must not be
disclosed without the express consent from the authorised Eskom representative. The supplier is
required to complete a Non-Disclosure Agreement (NDA) to give effect to this.
4.2.2 They will not deliberately misrepresent information, submit false certifications or forged documents to
influence the tendering process to advantage themselves or to mislead Eskom in any way and that
Eskom has the right to request an audit of such information, and take further action against the supplier
should it be found that it has acted in a dishonest or fraudulent manner.
4.2.3 Although the establishment of long term and close relations between Eskom and its suppliers is
recognised, Suppliers are nevertheless, required to avoid relationships with Eskom
employees//directors, that may be perceived to be contrary to the constitutional principles of fairness,
equitability, transparency, competitiveness, and cost effectiveness. Suppliers are therefore required
to complete the Integrity declaration form wherein they are required to disclose any interest that they
may have with an Eskom employee/director, whether financial, personal, or private, in its business,
and/or any affiliation /relationship which affects, or may affect, or may be perceived to affect, the
decision-making during tender award. Should a supplier later become aware that its
owners/members/directors/partners/shareholders are an Eskom employee/director with respect to a
tender in which it participated, the supplier is required to disclose the interest/relationship to Eskom
and submit whatever information may be required regarding the parties involved.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Supplier Integrity Pact Unique Identifier: 240-113650212
Revision: 2
Page:
4.2.4 Although the entertainment of customers and provisions of business courtesies or gifts are generally
an accepted commercial practice, they must not in any way negatively affect Eskom’s image and
reputation. They should not exceed the R1500,00 value prescribed by Eskom and should not be of
such a nature (value or circumstances) as to be construed as placing an Eskom employee/director
under obligation to the supplier or in any way improperly influence the recipient.
4.2.5 They will avoid entering into unethical and/or fraudulent dealings with any Eskom employee/director
involved in the evaluation/adjudication/negotiation of a transaction in which it participates, involving
direct/indirect monetary or material benefits in order to be unfairly benefitted. In such circumstances,
no business courtesy, bribe, gift, fees commission or inducement may be offered to, or requested by
an Eskom employee/director involved in the evaluation/adjudication/negotiation of a transaction in
which the supplier is participating.
4.2.6 They will not enter any dishonest and/or illegal agreement or an understanding with other tenderers
involved in a tender/RFP process in which it participates. They will complete the integrity Declaration
Form which incorporates a Declaration of Fair Tendering Practices, when participating in any Eskom
tender/Request for Quotation (RFQ).
4.2.7 They understand that they may be subject to a supplier discipline process and that sanctions that
may be imposed on suppliers should they be found guilty of misconduct.
4.2.8 Should a supplier become aware of any dishonest, fraudulent or inappropriate behaviour of any Eskom
employee/director; the said supplier is required to report this behaviour to the Eskom Ethics office via
email at [email protected], or via the Eskom Forensic email at [email protected] or through
the Eskom toll free hotline 0800 11 27 22, wherein confidentiality is guaranteed.
5.1 Eskom undertakes to treat all tenderers during the tender process according to the constitutional
principles of fairness, transparency, equity, cost-effectiveness, and competitiveness.
5.2 All Eskom employees/directors are required to complete an annual Declaration of Interest (DOI),
wherein they are required to declare all interests, directorships, memberships, details of any of their
related or inter-related persons or other associates that conduct business with Eskom and all other
material personal interests, whether a conflict exists or not. During the financial year, all Eskom
employees/directors have an option of amending annual DOIs should there be changes in their
interests or what has been disclosed already. In addition to this annual declaration, employees are also
required to complete an additional DOI and NDA if involved in the procurement process.
5.3 Eskom employees will ensure that all gifts received in the normal course of business is declared,
recorded, and authorised by relevant managers. Employees/directors involved in the tender evaluation/
negotiation process, may not accept, demand, or accept a promise of any money, business courtesies,
gifts, rewards, gratuity, favours from any of the tenderers involved to benefit or as may be perceived to
benefit such tenderer. Further to this, employees and directors are prohibited from offering or accepting
loan(s) or other benefit(s) from suppliers, unless the supplier is in the business of granting such loans
or benefits and the terms and conditions of the loan that is offered to the employee/director is also
offered to the general members of the public or a section thereof.
5.4 Should Eskom become aware of any relationship/interest of any employee/director in a tender in which
it is involved in tender evaluation/negotiation process, then this employee/director will be excluded from
the said tender evaluation/negotiation process.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Supplier Integrity Pact Unique Identifier: 240-113650212
Revision: 2
Page:
5.5 Eskom will implement the Supplier Discipline Process if it becomes aware of any contravention of the
provisions of this integrity pact, any other misconduct by a supplier and/or any Eskom
employee/director who acts in bad faith to benefit themselves or a supplier. Eskom has the right, after
following a process of investigation and affording the supplier an opportunity to make representation,
to notify the supplier of the intention to suspend it from the Eskom Vendor Database, impose various
other sanctions and/or institute disciplinary actions against its employees/directors. Subsequently,
Eskom will forward the names of such suppliers including the directors of the company to National
Treasury, who will include the suppliers on the List of Restricted Suppliers on the National Database.
5.6 All Eskom employees/directors are prohibited from having any direct/ indirect personal or other
beneficial interest in any contract with Eskom, whether as a supplier, an advisor or by virtue of being a
director or owner of a business, or in any other capacity. This includes third-party related transactions
with an indirect link to an Eskom contract.
6.1 This Eskom Supplier Integrity Pact is governed by and interpreted in accordance with the laws,
regulations and legislation of the Republic of South Africa.
6.2 The actions stipulated in this Integrity Pact are without prejudice to any other civil or criminal
proceedings that may arise in accordance with the provisions of the law.
6.3 This Integrity Pact shall remain valid until replaced. Should one or more provisions of this Integrity
Pact be regarded as invalid, remainder of the provisions will remain valid.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Pricing Schedule
Source: Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdf (unknown)ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Supplier Integrity Pact Unique Identifier: 240-113650212
Revision: 2
Page:
1.1 Scope
The Eskom Supplier Integrity Pact (Integrity Pact) is applicable to Eskom Holdings SOC Ltd (including all
wholly owned subsidiaries) and all existing and potential suppliers (as per the definition hereunder).
1.2 Purpose
The integrity pact is a pact between Eskom and its suppliers that prescribes the “ethical behaviour”. Ethical
behaviour is desirable/acceptable conduct (actions and decisions) that will bring about good/appropriate
consequences/outcomes in the interaction with others. Ethical behaviour incorporates ethical values and
considers not only what is good for oneself, but also what is good for others. Eskom considers such behaviour
of paramount importance and expects every existing/potential supplier and its own employees/directors to
always act ethically and with integrity.
any form of dishonesty, fraud, and/or corruption throughout the entire procurement process, including
tendering practices that are in bad faith, unfair and anti-competitive (e.g., under-pricing/collusion/bid rigging)
Contractual Terms
Source: Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdf (unknown)tender/Request for Quotation (RFQ).
4.2.7 They understand that they may be subject to a supplier discipline process and that sanctions that
may be imposed on suppliers should they be found guilty of misconduct.
4.2.8 Should a supplier become aware of any dishonest, fraudulent or inappropriate behaviour of any Eskom
employee/director; the said supplier is required to report this behaviour to the Eskom Ethics office via
email at [email protected], or via the Eskom Forensic email at [email protected] or through
the Eskom toll free hotline 0800 11 27 22, wherein confidentiality is guaranteed.
5.1 Eskom undertakes to treat all tenderers during the tender process according to the constitutional
principles of fairness, transparency, equity, cost-effectiveness, and competitiveness.
5.2 All Eskom employees/directors are required to complete an annual Declaration of Interest (DOI),
wherein they are required to declare all interests, directorships, memberships, details of any of their
related or inter-related persons or other associates that conduct business with Eskom and all other
material personal interests, whether a conflict exists or not. During the financial year, all Eskom
employees/directors have an option of amending annual DOIs should there be changes in their
interests or what has been disclosed already. In addition to this annual declaration, employees are also
required to complete an additional DOI and NDA if involved in the procurement process.
5.3 Eskom employees will ensure that all gifts received in the normal course of business is declared,
recorded, and authorised by relevant managers. Employees/directors involved in the tender evaluation/
negotiation process, may not accept, demand, or accept a promise of any money, business courtesies,
gifts, rewards, gratuity, favours from any of the tenderers involved to benefit or as may be perceived to
benefit such tenderer. Further to this, employees and directors are prohibited from offering or accepting
loan(s) or other benefit(s) from suppliers, unless the supplier is in the business of granting such loans
or benefits and the terms and conditions of the loan that is offered to the employee/director is also
offered to the general members of the public or a section thereof.
5.4 Should Eskom become aware of any relationship/interest of any employee/director in a tender in which
it is involved in tender evaluation/negotiation process, then this employee/director will be excluded from
the said tender evaluation/negotiation process.
Section
Source: Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdf (unknown)involved in the evaluation/adjudication/negotiation of a transaction in which it participates, involving
an Eskom employee/director involved in the evaluation/adjudication/negotiation of a transaction in
Technical Specifications
Source: SOW.pdf (unknown)Hydrogen is used for cooling at Hendrina Power Station, mainly in the generators. To ensure a
continuous and reliable supply of hydrogen, a preventative maintenance strategy as prescribed by
the Original Equipment Manufacturer (OEM), must be followed. This is a five-year Service Contract
for maintaining the Hydrogen Production Plant.
This scope includes six monthly, yearly as well as a three-year services. The scope includes all
consumables and spares required for the five years and will be closely monitored by the Employer
during each intervention.
Only trained and qualified personnel with certification from the OEM will be allowed to perform
maintenance on the Hydrogen Production Plant.
2.1 Scope
The document covers the scope is limited to the hydrogen plant at Hendrina Power Station for the
next five years.
2.1.1 Purpose
The purpose of this scope of works is to ensure timely maintenance and that activities are carried
out as per the set intervals.
2.1.2 Integrated Business Improvement objectives
N/a
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] The HySTAT manual indoor revision 9
[2] ISO 9001 Quality Management Systems
[3] EST 32-124 Eskom Fire Risk Management
2.2.2 Informative
[1] Occupational Health and Safety Act
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorised version on the system.
Title: Scope of Work for The Provision of Hydrogen Plant Document No: 380-137509
Maintenance Services at Hendrina Power Station on an “As
Revision: 0
and When Required” Basis for a period of five years.
Page:
2.3 Definitions
Maintenance Plan: A structured set of tasks, which include the activities and time scales required to carry out
maintenance on equipment. This could be a combination of corrective, preventive or predictive maintenance
tasks and forms the basis of all Task Lists found in SAP for that particular plant system. SAP for that plant
system.
Maintenance Strategy: Management method used to achieve the maintenance objectives. Furthermore, it
is the choice of routine maintenance tasks and the timing of those tasks, designed to ensure that an item of
equipment continues to fulfil its intended functions.
2.4 Abbreviations
Abbreviation Explanation
HTA Hydrogen Transmitter in Atmosphere
HTO Hydrogen Transmitter in Oxygen
OEM Original Equipment Manufacturer
OTA Oxygen Transmitter in Atmosphere
OTH Oxygen Transmitter in Hydrogen
PLC Programable Logic Controller
UPS Uninterruptable Power Supply
2.5 Roles and Responsibilities
Role Responsibility
Auxiliary Compilation of the maintenance scope of work required to ensure optimal
Engineering performance and reliability of the system.
Auxiliary Managing and expediting the Hydrogen Plant maintenance contract.
Maintenance Ensuring that the scope of work is being executed by the Contractor.
Ensuring that the works management process is followed during contract
duration.
Maintenance Executing the tasks as per the maintenance contract and scope of work.
Contractor
Contract Manager Ensure that the contractor executes the works as defined in the scope of
work
2.6 Process for Monitoring
N/a
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorised version on the system.
Title: Scope of Work for The Provision of Hydrogen Plant Document No: 380-137509
Maintenance Services at Hendrina Power Station on an “As
Revision: 0
and When Required” Basis for a period of five years.
Page:
2.7 Related/Supporting Documents
N/a
The objective of the works is to ensure timely maintenance and the activities with all intervals as part of the
objectives are tabled below:
3.1 Monthly Service
Perform visual inspections on pressure gauges and transmitters with comparison to the HMI readings.
Perform visual inspections of the HTO with its pipework.
Visual inspection on pipework.
3.2 Three Monthly Service
Calibrate OTH Sensor
3.3 Six Monthly Services
6 monthly service
Inspect and clean power and control cabinets
Recharge chiller system and clean condenser fins
Check the torque on the cell stack
Clean/replace filters in power/control panels
Calibrate the oth analyzer
Calibrate the hta detector cell
Calibrate h2 purity analyser h2 plant
Calibrate h2 purity analyser metering panel
Calibrate the hto analyser
Disassemble and clean the hto panel
Disassemble and clean the oth panel
Service hto panel regulator
Service oth pnl h2 supply regulator
Service oth pnl n2 supply regulator
Check leak tightness of system
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorised version on the system.
Title: Scope of Work for The Provision of Hydrogen Plant Document No: 380-137509
Maintenance Services at Hendrina Power Station on an “As
Revision: 0
and When Required” Basis for a period of five years.
Page:
Check electrolyser valves to user open inspect and test
Check all vent and regen valves open inspect and test
Check the concentration of the electrolyte
Check the fixings of the power rack cables incl transformer taps
Check instrument air supply
Test and calibrate the ota analyser
3.4 Yearly Services
Yearly services
Check functionality of temperature switches
Check functionality of temperatur switches
Check functionality of level switches
Check functionality of level transmitters
Check functionality of fill up volume and dryer drain pot level switches
Inspect and clean break tank
Check functionality of break tank level switch
Calibrate pressure switches h2 process
Calibrate pressure transmitters
Calibrate pressure indicators
Replace the oth analyser cell
Replace thyristor cooling fans
Replace chiller and conductivity panel filters
Replace the level transmitter floats.
Replace the level switch floats.
Calibrate dew point transmitter.
Replace the hto detector sensor.
Replace the ota detector sensor.
Check the 24volts UPS batteries.
Replace the plc batteries.
Compile service data pack and submit
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorised version on the system.
Title: Scope of Work for The Provision of Hydrogen Plant Document No: 380-137509
Maintenance Services at Hendrina Power Station on an “As
Revision: 0
and When Required” Basis for a period of five years.
Page:
3.5 Three Yearly Services
3-YEARLY service
Calibration of pressure relief valves and replace if faulty
Pressure testing of h2 plant only to per 2009 regulations
Re-gas chiller unit inspect and test chiller pump and condenser unit
Exchange the electrolyte
Electrolyte 300 litres 30% composition
Hta analyzer cell (2) ttl over 5 years
Deoxo catalyst
Modification of deoxo drier vessels to enable catalyst and desiccant
Change including design calculations
3.6 Additional Scope
Additional scope
Calibration exchange program for 2 x michell is probes for 3 years
Safety and quality documentation (sheq) (safety file to be submitted)
Provision for 30 breakdown callouts.
Dew point calibrations
3.7 Training
In depth training covering all aspects of the plant including but not limited to operation, maintenance
and troubleshooting/fault finding techniques is to be offered to the station’s personnel as part of skills
transfer. A provision is made for ten (10) employees to be trained in a twelve-month window (one
financial year) for the duration of the contract period. Competency certificates are to be issued at the
end of the training.
SHEQR requirements that cover the total holistic approach to all potential risks includes the
following legal obligation:
S = All possible Safety risks associated with the applicable activity is identified and
captured in a risk assessment format which include compliance to the Occupational Health
and Safety Act and regulations -
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorised version on the system.
Title: Scope of Work for The Provision of Hydrogen Plant Document No: 380-137509
Maintenance Services at Hendrina Power Station on an “As
Revision: 0
and When Required” Basis for a period of five years.
Page:
In terms of describing the actions required for the routine to be executed, the safety
aspects below need to be reviewed in liaison with the Safety officer and addressed
accordingly:
requirements?
equipment requirements to be stipulated.
uncertainty, it may be prudent to request assistance from the Medical station or the
Safety Officer
limited access areas such as equipment rooms, etc. It is important that the
requirements for access, as well as contact persons regarding such be stipulated
clearly.
of the routine and the type of fire control that needs to be exercised.
In respect of hazardous locations, certain tools, equipment and personal protective
equipment needs to be specified. The following quick reference to be used to define
the risk and establish the relevant safety measures, and control measures initiated in
liaison with the Electrical system engineer responsible for hazardous locations:
process in the area (Hydrogen generating plant, Generators, Battery rooms,
Sewage plant, Paint spray booths)?
of the process in the area (Oil burner workshop, Fuel off loading and filling stations,
Coal plant, Carpenter workshop)?
process in the area (Chlorine dosing)
H = All possible Health risk exposures to employees are to be identified in liaison with the
Occupational Hygienist in respect of the following aspects when defining measures to
ensure the health of personnel is not compromised in the execution of the activities
described by the document:
E = All Environmental aspects and impacts are identified to mitigate any
potential environmental impact and ensure compliance with ISO 14001:2004. Use the
questions below to guide you on what may lead to environmental impacts and liaise with the
Environmental Management Department in order to capture these impacts on the EMS
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorised version on the system.
Title: Scope of Work for The Provision of Hydrogen Plant Document No: 380-137509
Maintenance Services at Hendrina Power Station on an “As
Revision: 0
and When Required” Basis for a period of five years.
Page:
database, reference to the legal register and include suitable processes to manage the
aspects:
being carried out?
overflow of the Maturation Pond into the farmer’s dam.
changing of fabric filter bags.
activity under normal as well as abnormal conditions?
Note: An environmental aspect is the element of an organisation’s activities or products
or services that can interact with the environment, i.e. during the maintenance of a motor,
the environmental aspect in this activity would be oil, degreasers, solids, rags, etc. These
aspects create a negative impact through pollution when they interact with the
environment.
Q = All Contract Quality Plans, Quality Inspections plans, and compliance to
ISO 9001:2015 to be included in the document and adhered to.
Quality requirements to be specified in the form of a Quality Inspection Plan (QIP):
A QIP contains a list of all activities contained in the process, and refers back to the
document for all detailed information, as would be contained in the document annexures.
It is also attached to the document as an annexure.
Hold and/or witness points are indicated for each activity listed, in order to define the type
of quality control activity required.
Master QIP’s need to be approved per process but can be compiled for a group of
components. However, before work on any component commences, a QIP must be
approved for that component specifically.
R = All Business risks applicable to the specific activity are identified and
captured to mitigate business risk impacts. This is done in accordance with the Risk
assessment procedure (HSPPA/036) and is to include all other risk disciplines, i.e. Protective
Services.
The Integrated Risk Management philosophy is to be applied when compiling the risk
assessment.
All aspects identified in respect of Safety, Health, Environmental, Quality, Finance,
Commercial, Legal and Security requirements need to be listed and ranked, and
mitigating strategies identified.
Responsible persons to be listed by designation, and time frames for mitigation to be
included.
The risk assessment included in the document will basically serve the purpose of a
baseline risk assessment, with a detailed risk assessment being compiled whenever
there is a need, based on the system status at the time of the activity taking place.
All maintenance related documents.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorised version on the system.
Title: Scope of Work for The Provision of Hydrogen Plant Document No: 380-137509
Maintenance Services at Hendrina Power Station on an “As
Revision: 0
and When Required” Basis for a period of five years.
Page:
N/a
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorised version on the system.
Health & Safety
Source: SOW.pdf (unknown). Introduction .................................................................................................................................................. 3
2.1 Scope ................................................................................................................................................. 3
2.1.1 Purpose .................................................................................................................................. 3
2.1.2 Integrated Business Improvement objectives ......................................................................... 3
2.2 Normative/Informative References ..................................................................................................... 3
2.2.1 Normative ............................................................................................................................... 3
2.2.2 Informative .............................................................................................................................. 3
2.3 Definitions ........................................................................................................................................... 4
2.4 Abbreviations ...................................................................................................................................... 4
2.5 Roles and Responsibilities .................................................................................................................. 4
2.6 Process for Monitoring ........................................................................................................................ 4
2.7 Related/Supporting Documents .......................................................................................................... 5
3.1 Monthly Service .................................................................................................................................. 5
3.2 Three Monthly Service ........................................................................................................................ 5
3.3 Six Monthly Services .......................................................................................................................... 5
SHEQR requirements .................................................................................................................................. 7
Records to be kept ....................................................................................................................................... 9
Notes / Forms / Appendices / Annexures ................................................................................................... 10
Acceptance ................................................................................................................................................ 10
Revisions ................................................................................................................................................... 10
Development Team .................................................................................................................................... 10
Acknowledgements .................................................................................................................................... 10
following paragraphs.
2.2.1 Normative
[1] The HySTAT manual indoor revision 9
[2] ISO 9001 Quality Management Systems
[3] EST 32-124 Eskom Fire Risk Management
2.2.2 Informative
[1] Occupational Health and Safety Act
Calibration exchange program for 2 x michell is probes for 3 years
Safety and quality documentation (sheq) (safety file to be submitted)
Provision for 30 breakdown callouts.
following legal obligation:
S = All possible Safety risks associated with the applicable activity is identified and
captured in a risk assessment format which include compliance to the Occupational Health
and Safety Act and regulations -
user to ensure it is in line with the authorised version on the system.
Title: Scope of Work for The Provision of Hydrogen Plant Document No: 380-137509
Maintenance Services at Hendrina Power Station on an “As
Revision: 0
and When Required” Basis for a period of five years.
Page:
In terms of describing the actions required for the routine to be executed, the safety
aspects below need to be reviewed in liaison with the Safety officer and addressed
accordingly:
requirements?
equipment requirements to be stipulated.
uncertainty, it may be prudent to request assistance from the Medical station or the
limited access areas such as equipment rooms, etc. It is important that the
requirements for access, as well as contact persons regarding such be stipulated
clearly.
of the routine and the type of fire control that needs to be exercised.
In respect of hazardous locations, certain tools, equipment and personal protective
equipment needs to be specified. The following quick reference to be used to define
the risk and establish the relevant safety measures, and control measures initiated in
liaison with the Electrical system engineer responsible for hazardous locations:
process in the area (Hydrogen generating plant, Generators, Battery rooms,
Sewage plant, Paint spray booths)?
of the process in the area (Oil burner workshop, Fuel off loading and filling stations,
Coal plant, Carpenter workshop)?
process in the area (Chlorine dosing)
H = All possible Health risk exposures to employees are to be identified in liaison with the
ensure the health of personnel is not compromised in the execution of the activities
described by the document:
E = All Environmental aspects and impacts are identified to mitigate any
potential environmental impact and ensure compliance with ISO 14001:2004. Use the
questions below to guide you on what may lead to environmental impacts and liaise with the
The Integrated Risk Management philosophy is to be applied when compiling the risk
assessment.
All aspects identified in respect of Safety, Health, Environmental, Quality, Finance,
mitigating strategies identified.
Responsible persons to be listed by designation, and time frames for mitigation to be
included.
The risk assessment included in the document will basically serve the purpose of a
baseline risk assessment, with a detailed risk assessment being compiled whenever
there is a need, based on the system status at the time of the activity taking place.
Important Dates
Source: Eskom - Standard Conditions of Tender - 30 January 2025-1.pdf (TENDER){"closingTime":"2.2","briefingSession":"{"date":null,"time":null,"venue":"tend a site visit and/or clarification meeting that is stipulated as being","is_compulsory":true}"}
Evaluation Criteria
Source: Eskom - Standard Conditions of Tender - 30 January 2025-1.pdf (TENDER)are submitted and accessible for downloading/evaluation without any challenges as well as
It must be noted that Eskom will not measure a criterion twice in the different evaluation
Functionality 3.13 If functionality is a criterion, tenderers will be scored against the functionality criteria and
further evaluation.
(if applicable) financial risk to Eskom in the execution of the contract. During evaluation of a tenderer’s
Evaluation of Price 3.15 Evaluate the Price in accordance with the criteria/requirements in the Tender Data. Factors
the evaluation Price.
but will score zero under PPPFA point allocation.
Evaluation of 3.18 Score the Specific Goals with reference to the supporting documentation in the tender. If a
Specific Goals tenderer fails to meet Specific Goals and/or to submit the required proof/supporting
will score zero points for Specific Goals within the 90/10 or 80/20 allocation of points.
Ranking of tenders 3.19 According to the PPPFA, Eskom will add the score for Pricing and the Specific Goals
Objective criteria 3.20 A contract may be awarded to a tenderer that did not score the highest points only in
must stipulate the Objective Criteria in the Invitation to Tender. Functionality and any
element of the B-BBEE scorecard may not be used as Objective Criteria.
Reverse e-Auction 3.21 Reverse e-auction is an electronic system that utilises the 90/10 and 80/20 Price and
Preference point systems, and which is intended to achieve competitive pricing. Eskom
(NT instructions, content and/or production by the dtic, PPPFA Regulations; Amended B-BBEE Codes, COIDA;
CIDB, PPPFA etc) OHS Act; Eskom’s requirements for Safety, Health, Environment and Quality (SHEQ) and any other
Health, environmental and quality (SHEQ) systems, policies and capabilities are in place at the
Quality Contract Award. All costs and personnel associated with SHEQ must be reflected in the
However, for the purposes of PPPFA point allocation: if no B-BBEE certificate/affidavit is
Technical Specifications
Source: Eskom - Standard Conditions of Tender - 30 January 2025-1.pdf (TENDER)Supply Chain
Management Procedure 32-1034. Any addenda to an issued Invitation to Tender will be
published or issued in the same way as the Invitation to Tender was and will form part of the
Invitation to Tender documents.
Communication 1.5 Every communication between Eskom and a tenderer shall be made to or from the Eskom
Representative only, in w
Quality Management
Source: Eskom - Standard Conditions of Tender - 30 January 2025-1.pdf (TENDER)of a tenderer.
Cost of tendering 2.6 Accept that Eskom will not compensate the tenderer for any costs incurred in the preparation
and submission of a tender, including the costs of any testing necessary to demonstrate that
aspects of the tender satisfy the evaluation criteria, or the negotiation of any contract.
Submitting a tender 2.7 Check the Invitation to Tender documents on receipt and notify the Eskom representative of
any discrepancy or omitted documents. The Acknowledgement Form must be completed
and submitted with the tender and must clearly state if the tender is for the whole or part of
the works, services or supply identified in the specification and/or works information by
Pricing Schedule
Source: Eskom - Standard Conditions of Tender - 30 January 2025-1.pdf (TENDER)reasonable time for tenderers to make consequential adjustments to their tenders before
the closing date and time for submission.
In writing’ means hand-written, typed, type-written, printed or electronically made, and that
results in a permanent record.
Insurance 2.17 The extent (if any) of insurance provided by Eskom may not be for the full cover required in
the conditions of contract. The tenderer is advised to seek qualified advice regarding
insurance.
Pricing the tender 2.18 Include in the rates, prices, and the tendered total of the Prices all duties, taxes (including
VAT), and other levies payable by the tenderer if successful. Such duties, taxes and levies
are those applicable 14 (fourteen) days prior to the closing date and time for tender
submission.
2.19 Provide rates and Prices that are fixed for the duration of the contract and are not subject to
contract price adjustment except as provided for in the Invitation to Tender.
2.20 State the rates and Prices in South African Rand unless instructed otherwise in the Invitation
to Tender. The selected conditions of contract may provide for part payment in other
currencies. Therefore, submit Rates/Prices in Rands in accordance with the exchange rate
and base date as stipulated in the Invitation to tender.
Alterations to 2.21 May not make any alterations or additions to the tender documents, other than for purposes
documents of complying with instructions issued by the Eskom Representative or if necessary to correct
errors made by the tenderer. All such alterations shall be initialed by all signatories to the
tender. Corrections may not be made using correction fluid, correction tape or the like.
Alternative tenders 2.22 Submit alternative tenders only if a main tender is also submitted, and only if the submission
of alternative tenders is permitted by the Invitation to Tender. Accept that an alternative
tender may be based only on the criteria stated in the Tender Data.
Clarification and 2.23 Provide clarification and documents as may be required by the Eskom Representative
correction of Prices during the evaluation of tenders. However, documents identified as mandatory tender
after tender returnables that are required to be submitted at the closing date and time for tender
submission submission will not be requested and may not be submitted after the closing date and time.
phases, as this is regarded as ‘double dipping’.
Designated 3.12 Tenderers are also required to submit information on designated material and
materials and thresholds no later than contract award. If this information is not completed and
thresholds submitted as indicated in the Invitation to Tender, your tender will not be considered for
contract award
Functionality 3.13 If functionality is a criterion, tenderers will be scored against the functionality criteria and
requirements will be required meet the minimum threshold stated in the Tender Data to proceed to
further evaluation.
Financial analysis 3.14 Eskom has to determine the risk of doing business with a supplier who may pose a
(if applicable) financial risk to Eskom in the execution of the contract. During evaluation of a tenderer’s
financial statements, Eskom will attempt to identify mitigating factors or requirements for
the tenderer to meet, if such factors/requirements exist in the tender’s context. However,
should suitable mitigating factors not exist in the tender’s context or should mitigating
factors exist but be insufficient or if the risk is considered to be too high or should the
tenderer not agree with the mitigating factors, the tenderer will not be considered for
award.
Evaluation of Price 3.15 Evaluate the Price in accordance with the criteria/requirements in the Tender Data. Factors
such as CPA, FOREX, commodity exposure, unconditional discounts, technical
adjustment, PV and forecasted rates of invoicing are taken into account when determining
the evaluation Price.
Arithmetical errors 3.16 Check responsive tenders for arithmetical errors. If there is a discrepancy between an
amount in figures and the amount in words, the amount in words shall prevail.
Check the highest-ranked tenders for the following errors or omissions: -
(a) the misplacement of the decimal point in any unit rate; or
(b) omissions in completing the pricing schedule or bill of quantities, or
(c) arithmetical errors in line-item totals that are the result of the incorrect multiplication
of a unit rate and a quantity in a bill of quantities or schedule of prices; or
(d) arithmetical errors that are the result of the incorrect addition of the prices.
will request the tenderer to either confirm the prices as tendered or to accept the
corrected prices.
Where the tenderer elects to confirm the prices as tendered; Eskom will correct the error
as follows: -
(a) If a bill of quantities or pricing schedule applies and there is an error in the line-item
total that is the result of an error in multiplying the unit rate and the quantity, the line-
item total shall prevail, and the rate shall be corrected.
(b) Where there is a misplacement of the decimal point in the unit rate, the line-item total
as quoted shall prevail, and the unit rate shall be corrected.
(c) Where there is an error in the total of the prices that is the result either of other
corrections required by the checking process or in the tenderer’s addition of prices,
the total of the prices shall prevail, and the tenderer shall be asked to revise the
selected item prices (and their rates if a bill of quantities applies) to result in the
tendered total of the prices.
documentation by closing date and time of tender submission, the tenderer will not be
disqualified if otherwise evaluated as acceptable in all other criteria; however, the tenderer
will score zero points for Specific Goals within the 90/10 or 80/20 allocation of points.
Ranking of tenders 3.19 According to the PPPFA, Eskom will add the score for Pricing and the Specific Goals
together and rank the suppliers from the highest to the lowest.
Objective criteria 3.20 A contract may be awarded to a tenderer that did not score the highest points only in
accordance with Section 2(1) (f) of the Preferential Procurement Policy Framework Act,
must stipulate the Objective Criteria in the Invitation to Tender. Functionality and any
element of the B-BBEE scorecard may not be used as Objective Criteria.
Compliance Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025-1.pdf (TENDER)CSD report or as per certificate/affidavit provided
CSD number/CSD report) must be provided at the closing date and time for
CSD number or B-BBEE certificate/affidavit will need to be
B-BBEE Details: kom Representative and
Agreement to sign the contract documents.
Proof of authority 2.25 Where an agent submits a tender on behalf of a principal, an authenticated copy of the
to act as agent authority to act as an agent of the tenderer must be submitted as a tender returnable.
Compliance with 2.26 Comply with relevant legislation and regulatory instruments such as Instruction Notes issued
relevant legislation by National Treasury, CIDB Regulations for construction works; materials designated for local
(NT instructions, content and/or production by the dtic, PPPFA Regulations; Amended B-BBEE Codes, COIDA;
CIDB, PPPFA etc) OHS Act; Eskom’s requirements for Safety, Health, Environment and Quality (SHEQ) and any other
applicable legislation or regulatory instruments indicated in the Invitation to Tender.
Proof of Safety, 2.27 Tenderers are required to provide proof to the satisfaction of Eskom that safety, health,
Health, environmental and quality (SHEQ) systems, policies and capabilities are in place at the
Environment and closing date and time for tender submission stipulated in the Invitation to Tender and/or
Quality Contract Award. All costs and personnel associated with SHEQ must be reflected in the
requirements tender.
CIDB 2.28 Where the Tender Data has stipulated CIDB grading/s as a qualification criterion, tenderers
are required to be registered with the Construction Industry Development Board at the
closing date and time for submission of tenders or to be capable of being so registered
within twenty-one (21) working days from the closing date and time for submission of
tenders.
Where CIDB is applicable; proof of registration on CIDB is mandatory at the closing date
and time for tender submission. Should this not be received as stipulated
Health & Safety
Source: Eskom - Standard Conditions of Tender - 30 January 2025-1.pdf (TENDER)tenderers that Eskom has identified. A sole source and a single source are regarded as a
tenderer that meets the requirements stated in the Eskom Procurement and Supply Chain
Management Procedure 32-1034. Any addenda to an issued Invitation to Tender will be
published or issued in the same way as the Invitation to Tender was and will form part of the
Proof of authority 2.25 Where an agent submits a tender on behalf of a principal, an authenticated copy of the
to act as agent authority to act as an agent of the tenderer must be submitted as a tender returnable.
Compliance with 2.26 Comply with relevant legislation and regulatory instruments such as Instruction Notes issued
relevant legislation by National Treasury, CIDB Regulations for construction works; materials designated for local
(NT instructions, content and/or production by the dtic, PPPFA Regulations; Amended B-BBEE Codes, COIDA;
CIDB, PPPFA etc) OHS Act; Eskom’s requirements for Safety, Health, Environment and Quality (SHEQ) and any other
applicable legislation or regulatory instruments indicated in the Invitation to Tender.
Proof of Safety, 2.27 Tenderers are required to provide proof to the satisfaction of Eskom that safety, health,
Health, environmental and quality (SHEQ) systems, policies and capabilities are in place at the
requirements tender.
CIDB 2.28 Where the Tender Data has stipulated CIDB grading/s as a qualification criterion, tenderers
are required to be registered with the Construction Industry Development Board at the
closing date and time for submission of tenders or to be capable of being so registered
within twenty-one (21) working days from the closing date and time for submission of
tenders.
Where CIDB is applicable; proof of registration on CIDB is mandatory at the closing date
and time for tender submission. Should this not be received as stipulated in the Invitation to
Tender; the tender will be disqualified. However, in the event that, at the closing date and
time for tender submission, only proof of application for registration on CIDB is available,
then this must be submitted by the closing date and time for tender submission, while the
actual proof of CIDB registration (printout from CIDB database) must be submitted by
contract award
Contract Skills 2.29 If the tenderer is awarded a contract, it, as Contractor, shall achieve in the performance of
Development Goal the contract the Contract Skills Development Goals (CSDG) established in the CIDB
(CSDG) Standard for Developing Skills through Infrastructure Contract (published in GN 1779,
Government Gazette No. April 2023)
that has a duration of 12 months or more, and to:
a contract of R5 million or more, in the case of a professional service or service contract
or an order issued in terms of such a contract; or
a CIDB grading designation of grade 7 or higher, in case of an engineering and
construction works, or design and build contract or an order issued in terms of such a
contract.
Contract 2.30 The Contractor shall achieve in the performance of the contract the Contract Participation
Participation Goals Goals (CPG) relating to the engagement of targeted enterprises as established in the CIDB
(CPG) standard for indirect targeting for enterprise development through Construction works
contracts (published in Government Gazette No. February 2013).
enterprises as established in the aforesaid standard applies to:
construction works contracts in the General Building (GB) and to Civil Engineering (CE)
classes of construction works;
construction works contracts of an estimated minimum project duration of 6 months; and
construction works contracts in which at least 25% of the main contract could reasonably
be expected to be subcontracted out in one or more of the following CIDB classes of
construction works:
Civil Engineering (CE)
Electrical Engineering Work (EB)
) General Building Works (GB)
) Mechanical Engineering (ME)
2.31 Eskom may disqualify a tender if it is found that the tenderer has misrepresented or
falsified any information, certificate, affidavit or document. Eskom will report any fraud
in relation to a tenderer’s B-BBEE certificate/affidavit, or evidence of ‘fronting’ as
defined in the B-BBEE Act , as amended, to the B-BBEE Commission. The
tenderer will be suspended from business with any State-Owned Company for up to 10
years and may even be sentenced to jail.
2.32 Tenderers are also required to complete fully and submit the SDL&I Undertaking
(annexure to the Invitation to Tender) by no later than contract award. If the SDL&I
Respond 3.1 Respond to a request for clarification that Eskom receives before the closing date for
clarification clarification or queries. Eskom’s responses will be published to all tenderers in the same
manner the Invitation to Tender documents were issued. It is the tenderers’ responsibility
to check the Eskom Tender Bulletin and NT e-Tender Portal regularly for updated
responses to clarifications.
Issue Addenda 3.2 If necessary and prior to the closing date and time for tender submission, amend, amplify, or
add to the Invitation to Tender documents by way of Addenda published in the same
platform that the Invitation to Tender was issued. It is the tenderers’ responsibility to
check the Eskom Tender Bulletin and NT e-Tender Portal regularly for Addenda.
electronically. The Eskom Representative will publish the names of all tenderers received
on the Eskom Tender Bulletin and NT e-Tender Portal.
Tender Prices 3.5 Eskom will announce the names of the tenderers. Prices may be announced if so, stated
in the Tender Data.
Non-disclosure 3.6 Unless required by law, Eskom will not disclose information relating to the evaluation and
comparison of tenders and recommendations for the award of a contract to tenderers or to
any other person not officially concerned with the tender process until after the tender
award.
Grounds for 3.7 Reject a tender if Eskom establishes that there is proof that the tenderer influenced the
rejection processing of tenders or the awarding of the contract, the existence of collusion and/or bid
rigging, and/or that the tenderer has participated in any fraudulent/illegal activity in
connection with the Invitation to Tender.
Clarification of a 3.8 Obtain clarification from a tenderer in respect of any matter in the tender that may not be
tender clear or that could give rise to ambiguity in a contract arising from this tender if the matter
were not to be clarified. A document that the Invitation to Tender identifies as a mandatory
tender returnable that is required to be submitted at the closing date and time for tender
submission will not be requested, but Eskom may seek clarity on it.
may utilise reverse e-auction in certain Enquiries. Where reverse e-auction will be utilised,
this will be indicated in the respective Invitation to Tender and the reverse e-auction
supporting documents will be issued in the Invitation to Tender. Tenderers will be required
to submit a complete tender that does not contain Prices. If a tenderer has included prices
in its tender, the prices will not be considered.
Acceptance of 3.22 Notify Eskom's acceptance to the successful tender before the expiry of the validity period
tender or agreed additional validity period. Inform the successful and unsuccessful tenderers only
once approval has been granted by the Eskom Adjudication Authority. For open tenders,
this notification must be published on the Eskom Tender Bulletin and NT e-Tender Portal
Prepare contract 3.23 Revise the contract documents issued by Eskom in the Invitation to Tender documents to
documents take account of:
Addenda issued during the tender period;
inclusion of returnables stipulated in the Invitation to Tender;
inclusion of changes agreed in contract negotiations; and
Other revisions or documents agreed to between Eskom and the successful
tenderer during negotiations,
Sign Form of 3.24 Arrange for authorised signatories of both parties to complete and sign the original and one
Contractual Terms
Source: Eskom - Standard Conditions of Tender - 30 January 2025-1.pdf (TENDER)including the Eskom Representative shall not be liable for any losses, claims or damages of
whatsoever nature or howsoever arising that may be sustained by a tenderer or any other
person as a result of its participation in the tender or from any amendment, termination or
suspension of the process set out in the Invitation to Tender or from its exclusion from
participating in the tender process at any point.
Eskom’s right to 1.7 Eskom reserves the right to enter into mandated negotiations with any, one or more selected
negotiate tenderer(s) in accordance with Eskom’s approved procurement policies and procedures.
240-62044728 Rev 12 Eskom Standard Identifier
Conditions of Tender Effective Date 01 February 2025
Review Date January 2030
Disclaimer 1.8 While Eskom takes all reasonable measures to ensure that all information contained in the
regarding accuracy tender documents is correct and complete, Eskom does not, however, make any
of tender representations or warranties, express or implied, as to the accuracy or completeness of
documents such information and Eskom expressly disclaims any, and all liability for such
representations, warranties or statements.
Tenderer’s 2. The tenderer shall comply with the following obligations when submitting a tender and shall:
Tender validity 2.12 Hold the tender(s) valid for acceptance by Eskom at any time within the validity period after
the closing date and time for tender submission. Extend the validity period for a specified
additional period if Eskom requests the tenderer to do so. A tenderer that agrees to extend
the validity of its tender will not be required or permitted to modify its tender. A tenderer that
does not agree to extend the validity of its tender will be excluded from further
consideration. Tenderers will be requested to extend the validity of their tenders until a
contract(s) have been concluded with one or more tenderers. A request that a tenderer
extend the validity of its tender is not a representation that the tender is an acceptable
tender or that Eskom will seek to negotiate or conclude a contract with the tenderer. If the
validity of tenders expires before contracts have been concluded, the procurement process
is deemed to have concluded without an award.
Confidentiality and 2. 13 Treat as confidential all matters that arise in connection with the procurement. Use and copy
copyright of the documents provided by Eskom only for the purpose of preparing and submitting a tender
documents in response to this Invitation to Tender.
Standardised 2.14 Obtain and familiarise themselves with, if required for the purposes of submitting a tender,
specifications and the latest revision of standardised specifications and/or other documents that have been
other publications incorporated by reference into the Invitation to Tender documents by reference.
Site visit and / or 2.15 Tenderers must attend a site visit and/or clarification meeting that is stipulated as being
clarification compulsory in order to familiarise themselves with the proposed work, services, supply,
meeting location or similar. Failure to attend a clarification meeting or site visit that is identified as
compulsory will result in disqualification from participation.
Details of the meeting(s) are stated in the Tender Data. Tenderers are entitled to ask
correction of errors as required above.
Evaluation of 3.17 Score the B-BBEE level as stated on the CSD report or as per certificate/affidavit provided.
B-BBEE If the B-BBEE level is a pre-qualification criterion; then the proof of the B-BBEE level
(certificate/CSD number/CSD report) must be provided at the closing date and time for
tender submission; or the tender will be disqualified. If sub-contracting to designated groups
pre-qualification criteria are utilized (selected/mandatory) in terms of the PPPFA
Regulation, then Eskom will apply the PPPFA requirements for sub-contractors’ B-BBEE
status and the sub-contractors’ CSD number or B-BBEE certificate/affidavit will need to be
provided at the closing date and time for tender submission. Should the
information/documents provided indicate that the level is in dispute (fraudulent/ expired)
then the tender will be disqualified.
However, for the purposes of PPPFA point allocation: if no B-BBEE certificate/affidavit is
provided at Tender closing date and time for tender submission, or the
information/documents provided are fraudulent or have expired; then the tenderer will not
be disqualified (if otherwise deemed to be responsive and acceptable in all other aspects)
but will score zero under PPPFA point allocation.
Evaluation of 3.18 Score the Specific Goals with reference to the supporting documentation in the tender. If a
Description
Source: Quality Tender Returnables.pdf (TENDER)B.2 Documented information for Control of Externally Provided Processes, Products and Services - Must include criteria for evaluation, selection,
Evaluation Criteria
Source: Quality Tender Returnables.pdf (TENDER)Section A Score Option 1 4
SECTION B : Evidence of QMS in operation (Tender Quality Requirements -Ref 240-105658000)
not limited to quality management function/role) 1
B.2 Documented information for Control of Externally Provided Processes, Products and Services - Must include criteria for evaluation, selection,
monitoring of performance, and re-evaluation of external providers (Clause 8.4 of ISO 9001:2015)
Section B Score 5
SECTION C: Contract Quality Plan Requirements (Ref 240-105658000 and 240-109253698).
Draft Contract Quality Plan specific to the scope of work as described in the tender documents (Ref ISO 10005)
NB! Draft Contract/Project Quality Plan has important QA deliverables 1
Section C Score 1
SECTION D: Quality Control Plan Requirements (Ref 240-105658000 or 240-109253302)
QCP /Checklist/ ITP (Quality Control Plans) as per Scope of Works (Ref ISO 10005)
NB! Draft/ Example of an Inspection and Test Plan (ITP) or Quality Control Plan (QCP) on similar and/ or previous work done 1
Section D Score 1
Section E Score 2
Supplier Quality Management: Revision 7
Category 1 : Quality Requirements Deliverables to be evaluated indicator = 1
SECTION A : Quality Management System Requirements ISO 9001
(Option 1) Valid certification of Quality Management System by an ISO accredited body
QCP /Checklist/ ITP (Quality Control Plans) as per Scope of Wo
Section
Source: Quality Tender Returnables.pdf (TENDER)Section A Score Option 1 4
SECTION B : Evidence of QMS in operation (Tender Quality Requirements -Ref 240-105658000)
not limited to quality management function/role) 1
B.2 Documented information for Control of Externally Provided Processes, Products and Services - Must include criteria for evaluation, selection,
monitoring of performance, and re-evaluation of external providers (Clause 8.4 of ISO 9001:2015)
Section B Score 5
SECTION C: Contract Quality Plan Requirements (Ref 240-105658000 and 240-109253698).
Draft Contract Quality Plan specific to the scope of work as described in the tender documents (Ref ISO 10005)
NB! Draft Contract/Project Quality Plan has important QA deliverables 1
Section C Score 1
SECTION D: Quality Control Plan Requirements (Ref 240-105658000 or 240-109253302)
QCP /Checklist/ ITP (Quality Control Plans) as per Scope of Works (Ref ISO 10005)
NB! Draft/ Example of an Inspection and Test Plan (ITP) or Quality Control Plan (QCP) on similar and/ or previous work done 1
Section D Score 1
Section E Score 2
Supplier Quality Management: Revision 7
Category 1 : Quality Requirements Deliverables to be evaluated indicator = 1
SECTION A : Quality Management System Requirements ISO 9001
(Option 1) Valid certification of Quality Management System by an ISO accredited body
QCP /Checklist/ ITP (Quality Control Plans) as per Scope of Wo
Evaluation Criteria
Source: Environmental Requirements.pdf (unknown)Environmental Evaluation Checklist
Points points
Monitoring, Measurement, and evaluation of
Technical Specifications
Source: Environmental Requirements.pdf (unknown)Safety Data Sheets as per the scope of work (SDS) 1
Copy of approved Environmental Management 1
Programme
Waste Management Plan (Method statement)
significant activities (e.g., oil spills, application of
herbicides)
When downloaded, this document is uncontrolled and the responsibility
rests with the user to ensure it is in line with the authorised version on the database. of 5
Document Reference No.: F/ESK108 Rev 3
Hendrina Power Station
Effective Date September 2022
Environmental Evaluation Checklist
Next Review Date September 2025
Page No
The following procedures will be given to the contractor that is awarded the contract:
Waste Management Procedure- ENV/GEN/WI/12
Oil-Spill Cleanup and rehabilitation procedure- RA/ENV/110 and Oil spill assessment form
Hendrina Environmental statement of Intent- ENV/STMT/01
Eskom SHEQ Policy (32-727)
Environmental Incident Management Procedure- 240-133087117
When downloaded, this document is uncontrolled and the responsibility
rests with the user to ensure it is in line with the authorised version on the database. of 5
Quality Management
Source: Environmental Requirements.pdf (unknown) Environmental Policy
Objectives and targets
Roles and responsibilities
Communication
Internal Audits
Emergency Preparedness (Environmental
related emergencies)
Monitoring, Measurement, and evaluation of
compliance
Non-Conformance, Corrective and
preventative action
Management review
Environmental Aspects and Impacts Register 1
Management Plan (EMP) pertaining to site specific
activities
Compliance Requirements
Source: Environmental Requirements.pdf (unknown) Non-Conformance, Corrective and preventative action Management review Environmental Aspects and Impacts Register 1
ISO 14001 EMS Certificate (if company is certified) 1
A detailed signed Contractor’s Environmental 1 Management Plan (EMP) pertaining to site specific activities
Certified copies of relevant Environmental 1 Authorisations, Permits, and Licences as required e.g., waste transporter, waste sites licence etc.
A detailed signed Site Environmental Representative 1 Appointment Letter When downloaded, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorised version on the database. of 5 Document Reference No.: F/ESK108 Rev 3 Hendrina Power Station Effective Date September 2022 Environmental Evaluation Checklist Next Review Date September 2025 Page No
Method statements for specific activities as per 1 contract
Copies of procedures and work instructions. 1
Copies of approved NEC/ PR/ Order contract 1
Emergency Preparedness Plans (e.g., oil / chemical 1 spill, disasters, etc.) The contractor must provide protocols to be followed, and contingencies to be put in place for any potential incidents.
Register of all hazardous substances as per the 1
Health & Safety
Source: Environmental Requirements.pdf (unknown)contract
Copies of procedures and work instructions. 1
Copies of approved NEC/ PR/ Order contract 1
Emergency Preparedness Plans (e.g., oil / chemical 1
spill, disasters, etc.) The contractor must provide
protocols to be followed, and contingencies to be put
in place for any potential incidents.
scope of work
Safety Data Sheets as per the scope of work (SDS) 1
Copy of approved Environmental Management 1
Environmental
Source: Environmental Requirements.pdf (unknown)e.g., waste transporter, waste sites licence etc.
A detailed signed Site Environmental Representative 1
Register of waste that will be generated. 1
Waste Management Plan (Method statement)
significant activities (e.g., oil spills, application of
herbicides)
Waste Management Procedure- ENV/GEN/WI/12
Oil-Spill Cleanup and rehabilitation procedure- RA/ENV/110 and Oil spill assessment form
Hendrina Environmental statement of Intent- ENV/STMT/01
Eskom SHEQ Policy (32-727)
Environmental Incident Management Procedure- 240-133087117
Technical Specifications
Source: Annexure B- Acknowledgement Form.pdf (unknown)appointment of contractors or suppliers for the commencement
of work
Health & Safety
Source: Annexure B- Acknowledgement Form.pdf (unknown)requirements Effective Date May 2021
Annexure B: Acknowledgement Form for Eskom OHS legal and other
requirements
NOTE: the supplier/contractor/tenderer has to ensure that he/she understands the OHS
requirements listed hereunder.
a service to Eskom but not limited to the following:
a. Eskom contractor Health and Safety requirements standards 32-136
b. OHS specification/requirements provided
c. Occupational Health and Safety Act
d. Compensation for Occupational Diseases and Illnesses Act
Note: Please note that after contract award, it is your responsibility to fully align the company’s processes
to Eskom’s OHS requirements (policies, procedures, standards etc).
its contractor and/or supplier) pertaining to Eskom and/or Statutory OHS requirement/s.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
1 Impala - Pullenshope - Pullenshope - 1096
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
19
Last checked
11 Sept 2026
AI status
Not enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
Win consulting, legal, accounting, and engineering service contracts with government. Learn registration requirements and proposal strategies.
Win government insurance, banking, actuarial, and financial consulting contracts. FSCA licensing requirements and tender strategies for financial service providers.
Master the art of the consulting bid. How to structure your methodology, price your services competitively, and score maximum evaluation points.
A professional guide for law firms to join the provincial and municipal legal panels in Gauteng, covering compliance, specialization, and bidding.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Other service activities. Unlock full pricing strategies, bid frequency, and historical win rates.