Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Bloemfontein, Welkom, Port Elizabeth and East London - various - Free State & Eastern Cape -
Organization Type
GOVERNMENT
Published
11 Sept 2026
OCDS Reference
ocds-9t57fa-170070
Supply and delivery of 1.5L Bottled water to ESKOM sites in bloemfontein, welkom, port elizabeth and east london on an as-and-when-required basis. The contract includes a contract price adjustment (cpa) mechanism that becomes active after 16 months, with a minimum 15% fixed portion. Bidders must populate the cpa breakdown or their prices will be deemed fixed and firm.
Bidders must submit a CPA breakdown aligned to NTCSA's proposed formula, or an alternative acceptable change, or prices will be deemed fixed and firm.
The CPA formula must have a minimum 15% fixed portion, and each formula must total 100%.
Only official published indices (e.g., Statistics SA CPI Table D-3, SEIFSA Table L-2(B)) may be used; no in-house indices are allowed.
CPA applies only after 16 months from the base date (one month before tender closing); the cut-off date is one month before delivery.
Rates must exclude VAT.
NTCSA will not accept rate of exchange adjustments in any CPA formula.
Separate CPA formulae are required for local and foreign components; combining them is not allowed.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Thursday, 08 October 2026 - 10:00
Venue
MS Teams
Tender documents can be uploaded on https://etendering.eskom.co.za
Categories
Request for Bid(Open-Tender)
Bloemfontein, Welkom, Port Elizabeth and East London - various - Free State & Eastern Cape -
AI Document Analysis Stages
Description
Source: BOQ.zip11 Sept
2026
Tender Published
Tender was published
08 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
NEC.zip
Supply and delivery of 1.5L bottled water to Eskom/NTCSA sites in Bloemfontein, Welkom, Port Elizabeth and East London on an as-and-when required basis, under a 36-month NEC3 Supply Contract (SC3). The contract is rate-based with prices fixed for the first 16 months, then subject to CPI-linked price adjustment.
CPA - 16 months.pdf
Supply and delivery of 1.5L bottled water to Bloemfontein, Welkom, Port Elizabeth and East London on an as-and-when-required basis, issued by ESKOM (NTCSA). The tender includes contract price adjustment (CPA) provisions for contracts exceeding 12 months.
Drinking water Standard.pdf
ESKOM is procuring the supply and delivery of 1.5L bottled water on an as-and-when-required basis to Bloemfontein, Welkom, Port Elizabeth and East London. The water must comply with SANS 241-1:2015 (Edition 2) drinking water quality standards, including physical, chemical, microbiological and aesthetic limits.
Commercial.zip
No summary available
BOQ.zip
ESKOM's National Transmission Company seeks a supplier to deliver 1.5-litre bottled water on an as-and-when-required basis to four task points: Bloemfontein, Welkom, Port Elizabeth and East London. The contract also covers transport costs for a normal LDV, with toll fees to be included in the tendered kilometre rates.
NTCSA Invitation_to_Tender_(ITT)_E3528NTCSAMWP.pdf
NTCSA seeks a supplier for the supply and delivery of 1.5L bottled drinking water on an as-and-when-required basis to four locations: Bloemfontein, Welkom, Port Elizabeth, and East London. The tender aims to appoint four suppliers, one for each CLN area, under a 3-year contract.
Safety & Environmental Requirements.zip
Eskom is procuring the supply and delivery of 1.5L bottled water on an as-and-when-required basis to Bloemfontein, Welkom, Port Elizabeth, and East London. The contract is for the Southern Grid area and will require compliance with extensive OHS and environmental requirements.
Technical Evaluation Criteria (1.5L Bottled Drinking Water).pdf
A three-year contract for the supply and delivery of 1.5L bottled drinking water on an as-and-when-required basis to Bloemfontein, Welkom, Port Elizabeth, and East London, issued by Eskom for its Southern Grid, Lines, and Servitudes operations.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 2 168 345
Range
Based on 6 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
The contract is for the supply of bottled water for lines and servitudes. The Bill of Quantities includes: 1.5 litre bottled water (quantity 1 each) and cost of transport/travelling for a normal LDV (toll fees to be allowed for in tendered km rates). Transport costs are charged as per the business office to task point; task point for this contract is Welkom.
Contact Information
Source: BOQ.zip (unknown){"name":null,"email":null,"phone":null,"department":"QUANTITY RATE AMOUNT","address":null}
Evaluation Criteria
Source: BOQ.zip (unknown)No eligibility criteria specified
Technical Specifications
Source: BOQ.zip (unknown)Supply bottled water for lines and servitudes
Item NO payment ERP short description unit quantity rate amount
REFERS Number
To
Bottled water
1.5 Liter water ea 1
Bottled water
Cost of transport/travelling for normal LDV(Toll fees to be allowed for in tendered km 1
rates)
Transport cost are charged as per the business office to task point
T
Supply bottled water for lines and servitudes
Item NO payment ERP short description unit quantity rate amount
REFERS Number
To
Bottled water
1.5 Liter water ea 1
Bottled water
Cost of transport/travelling for normal LDV(Toll fees to be allowed for in tendered km 1
rates)
Transport cost are charged as per the business office to task point
T
Supply bottled water for lines and servitudes
Item NO payment ERP short description unit quantity rate amount
REFERS Number
To
Bottled water
1.5 Liter water ea 1
Bottled water
Cost of transport/travelling for normal LDV(Toll fees to be allowed for in tendered km 1
rates)
Transport cost are charged as per the business office to task point
T
Supply bottled water for lines and servitudes
Item NO payment ERP short description unit quantity rate amount
REFERS Number
To
Bottled water
1.5 Liter water ea 1
Bottled water
Cost of transport/travelling for normal LDV(Toll fees to be allowed for in tendered km 1
rates)
Transport cost are charged as per the business office to task point
T
Compliance Requirements
Source: BOQ.zip (unknown)No specific requirements found
Description
Source: Safety & Environmental Requirements.zipThe tender is for the supply and delivery of 1.5L bottled water to four locations. The contract is with Eskom's National Transmission Company South Africa (NTCSA), which is responsible for planning, operating, and maintaining transmission assets. The contractor must comply with OHS and environmental specifications.
Important Dates
Source: Safety & Environmental Requirements.zip (unknown){"briefingSession":"{"date":null,"time":null,"venue":"ed work","is_compulsory":false}"}
Contact Information
Source: Safety & Environmental Requirements.zip (unknown){"name":null,"email":null,"phone":"27118002311","department":null,"address":null}
Submission Guidelines
Source: Safety & Environmental Requirements.zip (unknown)Submit the completed tender documentation, including all returnable forms, by the closing date and time. The submission method and address are not stated in the provided text. Ensure all required forms are signed and dated. Disqualification may occur if mandatory documents are missing or incomplete.
Evaluation Criteria
Source: Safety & Environmental Requirements.zip (unknown)The OHS specification is evaluated with a weighted scoring system. A tenderer must receive a weighted average score of 80% or above to be taken into consideration. The evaluation includes sections on OHS management, environmental management, waste management, and employer-defined additional requirements.
Technical Specifications
Source: Safety & Environmental Requirements.zip (unknown)Annexure B: Acknowledgement Form for Eskom OHS legal and other requirements
Tenderer’s / Supplier’s name: ………………………………………………. Tender Ref number: ………………………………….
maintenance of access roads, No Go fencing, vegetation clearing) 0
E.1e Human Resources (Environmental Officer) 0
E.2 Environmental Requirements Proforma
E.2a Environmental Requirements Proforma: 240-110600836 completed and signed (by the Contractor) 1
Section E Score 1 0
Contractor / service
Cell A3: Occupational Health and Safety Baseline risk assessment template
National Transmission Company South Africa (NTCSA) is a subsidiary of Eskom Group that is
mandated for the planning, operating and maintaining transmission assets throughout their
economic life, provides access to an interconnected transmission system and influences customer
demand and behaviour.
NTCSA develop optimal plans and engineering solutions for the expansion, maintenance and
refurbishment of the power transmission network as well as providing a technology and asset
management service to ensure that the integrated power system is reliable, adequate and secure.
NTCSA execute projects related to the capital expansion, strengthening and refurbishment of
transmission assets as well as construction management of transmission networks required for the
integration of new generators and loads. Ensure a reliable and sustainable transmission network
through operating, maintaining and commissioning of new assets.
Eskom’s responsibility and commitment is to ensure a safe working environment is in line with its
Safety, Health, Environmental and Quality Policy, along with legislative obligations.
This OHS specification is NTCSA’s minimum requirements which are required to be met for the
specific contract and for the duration of the contract period by contractors and where required, the
delivery organisation.
The contractor is expected to develop a OHS plan which meets these requirements as well
as all the relevant applicable legislation they conform to.
NTCSA is in no way assuming the contractor’s legal responsibilities. The contractor is and
remains accountable for the quality and the execution of his/her health and safety
programme for his/her employees and appointed contractor employees.
This OHS specification reflects minimum requirements and should not be construed as all
encompassing.
Note 1: All the requirements listed hereunder are in relation to the contract and do not supersede or
replace any organizational OHS requirements.
Where requirements listed are already in place, then the organisational requirements must be taken
in cognisance of and listed in the respective OHS plans. If there are any additional NTCSA and or
legislative requirements listed in the OHS specification, then these must be addressed.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No 2021/539129/30
of 50
File name: NTCSA Specification Guideline For Contracts and Contractor OHS Requirements for High /Medium/ & Low Risk Projects
Template ID 559-824510295(Rev 1) NTCSA Header and Footer portrait template
Supply and delivery of 1.5 litres Document
bottled water Contractor Specification 559-1624821993 Rev 1 Identifier
for Contractor OHS Requirements for
Effective Date July 2024 Low-Risk work
Review Date July 2027
2.1 Scope
This OHS specification lists the legislative and Eskom requirements and where applicable, any
requirements pertaining to Local Authorities / Municipal by-laws / Environmental legislation that must
be met by the contractor.
2.1.1 Purpose
This document provide guidance for a standardised approach to the compilation of OHS
specifications throughout NTCSA for contracts, (Other type of contracts can be used such as
NEC/FIDIC etc)
2.1.2 Applicability
This OHS specification shall be applicable to any contracting organisation who intends tendering for
the contract.
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs, but not limited to:
2.2.1 Normative
[1] Basic Conditions of Employment Act No .
[2] Occupational Health and Safety Act and Regulations No .
[3] National Environmental Management Act .
[4] National Road Traffic Act .
[5] 32-37 Eskom Substance Abuse Procedure.
[6] 240-62196227 Life- saving Rules
[7] 32-95 Environmental, Occupational Health and Safety Incident Management Procedure
[8] 32-727 SHEQ Policy
[9] 32- 418 Working at Heights Procedure
[10] 240-62946386 Vehicle and Driver Safety Management Procedure
[11] 32-520 Risk Assessment procedure
[12] Plant Safety Regulations / The Operating Regulations for High Voltage Systems (ORHVS) -
240-114967625
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No 2021/539129/30
of 50
File name: NTCSA Specification Guideline For Contracts and Contractor OHS Requirements for High /Medium/ & Low Risk Projects
Template ID 559-824510295(Rev 1) NTCSA Header and Footer portrait template
Supply and delivery of 1.5 litres Document
bottled water Contractor Specification 559-1624821993 Rev 1 Identifier
for Contractor OHS Requirements for
Effective Date July 2024 Low-Risk work
Review Date July 2027
2.2.2 Informative
[1] Tobacco Products Control Act (Updated 2011.05.19)
[2] SANS 1186 Symbolic Safety Signs
[3] Constitution of the Republic of South Africa No
[4] DMN 34-110 Operating A Vehicle Mounted Crane
[5] DMN 34-1981 Excavations.
[6] All applicable SANS
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No 2021/539129/30
of 50
File name: NTCSA Specification Guideline For Contracts and Contractor OHS Requirements for High /Medium/ & Low Risk Projects
Template ID 559-824510295(Rev 1) NTCSA Header and Footer portrait template
Supply and delivery of 1.5 litres Document
bottled water Contractor Specification 559-1624821993 Rev 1 Identifier
for Contractor OHS Requirements for
Effective Date July 2024 Low-Risk work
Review Date July 2027
2.3 Definitions
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No 2021/539129/30
of 50
File name: NTCSA Specification Guideline For Contracts and Contractor OHS Requirements for High /Medium/ & Low Risk Projects
Template ID 559-824510295(Rev 1) NTCSA Header and Footer portrait template
Supply and delivery of 1.5 litres Document
bottled water Contractor Specification 559-1624821993 Rev 1 Identifier
for Contractor OHS Requirements for
Effective Date July 2024 Low-Risk work
Review Date July 2027
Definition Explanation
Appointed contractor Means a contractor appointed by the principal contractor
Baseline risk (32-520) baseline operational risks refer to the health and safety risks
assessment associated with all standard processes and routine activities in the business
Business unit (BU) (32-296) means any defined unit within the Eskom environment, operating as
a business under a particular cost-centre number. In the context of this
document and in terms of health and safety, any reference to a BU includes a
defined unit within any Eskom division and its subsidiaries
Client (OHS Act) Eskom representative (Internal – Asset Owner), also referred to as
the contract administrator/custodian or agent or project manager (as defined
in the contract). He/she is the person responsible for ensuring that the works
or services are executed in terms of the contract, as well as adherence to
legislation pertaining to the contract.
Competent person (OHS Act) means any person having the knowledge, training, experience,
and qualifications, specific to the work or task being performed, provided that,
where appropriate, qualifications and training are registered in terms of the
South African Qualifications Authority Act, 1995 (Act No. )
Contractor (OHS Act) means an employer as defined in section 1 of the Act who
performs contracted work and includes principal contractors
Construction work Any work in connection with
a. the construction, erection, alteration, renovation, repair, demolition or
dismantling of or addition to a building or any similar structure.
b. the construction, erection, maintenance, demolition or dismantling of any
bridge, dam, canal, road, railway, runway, sewer or water reticulation
system or the moving of earth, clearing of land, the making of excavation,
piling or any similar civil engineering structure or type of work.
Consultant means a person providing professional advice
Controlled disclosure controlled disclosure to external parties (either enforced by law or
discretionary)
Employee (OHS Act) means, subject to the provisions of subsection (2), any person
who is employed by or works for an employer and who receives or is entitled
to receive any remuneration or who works under the direction or supervision
of an employer or any other person
Employer (OHS Act) means, subject to the provisions of subsection (2), any person
who employs or provides work for any person and remunerates that person
or expressly or tacitly undertakes to remunerate him/her, but excludes a TES
(ex labour broker) as defined in section 1(1) of the Labour Relations Act 1956
(Act No. )
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No 2021/539129/30
of 50
File name: NTCSA Specification Guideline For Contracts and Contractor OHS Requirements for High /Medium/ & Low Risk Projects
Template ID 559-824510295(Rev 1) NTCSA Header and Footer portrait template
Supply and delivery of 1.5 litres Document
bottled water Contractor Specification 559-1624821993 Rev 1 Identifier
for Contractor OHS Requirements for
Effective Date July 2024 Low-Risk work
Review Date July 2027
Definition Explanation
Environment (32-94) means:
a. the land, water, and atmosphere of the earth;
b. micro-organisms and plant and animal life; and
c. any part or combination of (a) and (b) and the interrelationships among
and between them, and the physical, chemical, aesthetic, and cultural
properties and conditions of the foregoing that influence human health
and well-being
Environmental A detailed plan of action prepared to ensure that recommendations for
Management plan enhancing or ensuring positive impacts and limiting or preventing negative
environmental impacts are implemented during the life-cycle of a project.
This Environmental Management Plan should preferable form part of
Eskom’s Environmental Management System
Eskom requirements Eskom requirements flowing from directives, policies, standards, procedures,
specifications, work instructions, guidelines, or manuals
Fall protection plan (OHS Act) means a documented plan of all risks relating to working from an
elevated position, considering the nature of work undertaken, and setting out
the procedures and methods to be applied in order to eliminate the risk
Hazard (OHS Act) means a source of, or exposure to, danger
Hazard identification (OHS Act) means the identification and documenting of existing or expected
hazards to the health and safety of persons, which are normally associated
with the type of construction work being executed or to be executed
Health and safety file (OHS Act) means a file or other record in permanent form, containing the
information required in relation to the contract.
Health and safety plan (OHS Act) means a document plan that addresses hazards identified and
includes safe work procedures to mitigate, reduce, or control hazards
identified
Health and safety (OHS Act) means a document specification of all health and safety
specification requirements pertaining to associated to a contract, so as to ensure the
health and safety of persons.
Health and safety means comprehensive health and safety requirements for a contract, project,
requirements site, and scope of work. This specification is intended to ensure the health
and safety of persons, both workers and the public, and the duty of care to
the environment. The health and safety requirements must be specific to
each contract, project, site, and scope of work
Lifesaving Rules (240-62196227) a rule that, if not adhered to, has the potential to cause
serious harm to people
Medical Certificate of (OHS Act) means a certificate valid for one year, issued by an occupational
fitness health practitioner, issued in terms of the regulations, whom shall be
registered with the Health Professions Council of South Africa
Medical surveillance (OHS Act) means a planned programme or periodic examination (which may
include clinical examinations, biological monitoring, or medical tests) of
employees by an occupational health practitioner or, in prescribed cases, by
an occupational medicine practitioner
Method statement (OHS Act) means a written document detailing the key activities to be
performed in order to reduce, as reasonably as practicable, the hazards
identified in any risk assessment
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No 2021/539129/30
of 50
File name: NTCSA Specification Guideline For Contracts and Contractor OHS Requirements for High /Medium/ & Low Risk Projects
Template ID 559-824510295(Rev 1) NTCSA Header and Footer portrait template
Supply and delivery of 1.5 litres Document
bottled water Contractor Specification 559-1624821993 Rev 1 Identifier
for Contractor OHS Requirements for
Effective Date July 2024 Low-Risk work
Review Date July 2027
Definition Explanation
Organisation may be defined as a group of individuals (large of small) that is cooperating
under the direction of executive leadership in accomplishment of certain
common objects
Pre-job meetings (34-227) means a meeting that is held prior to the commencement of the
day’s work and that is attended by all the relevant employees associated with
the work task
Principal contractor (In the text of this document) Means an employer, as defined in section 1 of
the OHS Act, who intends to tender for or has signed a contract with Eskom
for services rendered.
Provincial director (OHS Act) means the provincial director as defined in Regulation 1 of the
General Administrative Regulations under the Act
Responsible Manager Is a Manager of a department, section or operating/business unit who has
been appointed as part of the Eskom delegation of authority process with the
aim to assist the applicable 16(2) assigned person in executing his/her duties
in terms of the Occupational Health and Safety Act
Risk assessment (OHS Act) means a programme to determine any risk associated with any
hazard at a construction site in order to identify the steps needed to be taken
to remove, reduce, or control such hazard.
Safe Work Procedure Please define it
Site (34-228) means an Eskom department, unit, complex, building, specific
project, work site, or the site where agents, clients, principal contractors,
contractors, suppliers, vendors, and service providers provide a service to
Eskom, directly or indirectly
Service provider any private person or legal entity that provides any service(s) to Eskom for
compensation
Subsidiary (32-94) an enterprise controlled by another (called the parent) through the
ownership of greater than 50% of its voting stock
Supplier (32-1034)means a natural or legal person who renders a service and may
include the following current or potential supplier vendor, contractor,
consultant
Task (34-227) a segment of work that requires a set of specific and distinct actions
for its completion
Toolbox talks (34-227) where the team leader, after conducting pre-task planning, shares
all the tasks at hand and discusses task allocation, the identified risks, and
the control measures with all his/her team members on site before
commencing a specific task and documenting the agreed strategy. (This
shall be done to ensure common understanding of the tasks, risks, and
control measures required.)
The Act (OHS Act) means the Occupational Health and Safety Act No. , as
amended, and the Regulations thereto
Visitor any person visiting a workplace with the knowledge of, or under the
supervision of, an employer.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No 2021/539129/30
of 50
File name: NTCSA Specification Guideline For Contracts and Contractor OHS Requirements for High /Medium/ & Low Risk Projects
Template ID 559-824510295(Rev 1) NTCSA Header and Footer portrait template
Supply and delivery of 1.5 litres Document
bottled water Contractor Specification 559-1624821993 Rev 1 Identifier
for Contractor OHS Requirements for
Effective Date July 2024 Low-Risk work
Review Date July 2027
2.4 Abbreviations
Abbreviation Description
AIA Approved Inspection Authority
BU Business Unit
GCE Group Chief Executive
GE Group Executive
CNC (Eskom) Customer Network Centre
CR Construction Regulations of the OHS Act
COID Act Compensation for Occupational Injuries and Diseases Act
DMR Driven Machinery Regulations
DoLE Department of Labour and Employment (Inspection and Enforcement services –
Provincial office)
EAP Employee Assistance Program
EP Emergency Preparedness
ERfW Environmental Regulations for Workplaces
GAR General Administrative Regulations
GSR General Safety Regulations
HCA Hazardous Chemical Agents
MD Managing Director
LDV Light Delivery Vehicle
LoG (COID) Letter of Good Standing
SDS Safety Data Sheets
NEMA National Environmental Management Act
OHS Act Occupational Health and Safety Act and Regulations,
SACPCMP South African Council for the Project & Construction Management Professions
SABS South African Bureau Standard
SANS South African National Standard
2.5 Related/Supporting Documents
Eskom OHS Act section 37 (2) agreement to be signed at procurement prior the signing of the NEC
contract it is the responsibility of the project manager to ensure that the 37(2) agreement is signed
and a copy be kept in the contractor file at procurement.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No 2021/539129/30
of 50
File name: NTCSA Specification Guideline For Contracts and Contractor OHS Requirements for High /Medium/ & Low Risk Projects
Template ID 559-824510295(Rev 1) NTCSA Header and Footer portrait template
Supply and delivery of 1.5 litres Document
bottled water Contractor Specification 559-1624821993 Rev 1 Identifier
for Contractor OHS Requirements for
Effective Date July 2024 Low-Risk work
Review Date July 2027
2.6 Roles and Responsibilities
2.6.1 Commitment
Visible commitment is essential to providing a safe work environment at all levels (from GCEO, GE,
GM, Senior Managers, Middle Managers, Managers, Professionals, Bargaining Unit etc) must
demonstrate their commitment by being proactively involved in the day-to-day operations, in
particular the Occupational Health and Safety aspects of any project / contract. Legislation requires
that each employee must take reasonable care of themselves and their fellow workers, from
management level down to the lowest employee level.
2.6.2 Principal contractors.
Note 1: Most of the roles and responsibilities listed apply to both principal contractors and any
appointed contractors. Where some of the listed do not apply to both, then the specific
responsibilities will be listed and titled. The contractors shall:
part of the OHS Act, Regulation 7 of the Construction Regulations, NTCSA / Eskom and
other requirements.
writing of all construction work if it falls within the scope of Regulation 4 of the Construction
Regulations (if this has not been arranged and or done by the client/agent);
appointed contractors within their working area, as contemplated by section 37(2) of the OHS
Act;
date of induction, relevant skills and licenses and be able to produce this list at the request
of the NTCSA Project Manager.
in terms of their appointment and that they advise and assist these appointees in the
execution of their duties.
with on all work sites.
participation and cooperation.
be kept for each work site.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No 2021/539129/30
of 50
File name: NTCSA Specification Guideline For Contracts and Contractor OHS Requirements for High /Medium/ & Low Risk Projects
Template ID 559-824510295(Rev 1) NTCSA Header and Footer portrait template
Supply and delivery of 1.5 litres Document
bottled water Contractor Specification 559-1624821993 Rev 1 Identifier
for Contractor OHS Requirements for
Effective Date July 2024 Low-Risk work
Review Date July 2027
files) health and safety file to the NTCSA project manager on completion of the project. This
is to include all drawings, designs, lists of materials used and other applicable information
about the completed project, as well as the list of appointed contractors, the agreement, and
the type of work completed.
and safety file to the principal contractor on completion of the project. This is to include all
drawings, designs, lists of materials used and other applicable information about the
completed project, as well as the list of appointed contractors, the agreement, and the type
of work completed.
Compensation Commissioner’s valid letter of good standing before the commencement of
work and any future renewal letters obtained during the project for record-keeping purposes.
The letter of good standing shall reflect the name of the contractor’s company. Similarly, the
principal contractor must provide the NTCSA project manager with all the valid letters of good
standing from their appointed contractors.
Compensation Commissioner’s valid letter of good standing before the commencement of
work and any future renewal letters obtained during the project for record-keeping purposes.
The letter of good standing shall reflect the name of the contractor’s company.
in the health and safety aspects relating to such work and that the employees understand
the hazards associated with all other work being carried out on the project.
adhere to such procedures. Similarly (without removing the appointed contractors’
responsibilities), ensure that their appointed contractors and their employees are conversant
with all relevant work procedures and that they adhere to such procedures.
Co-ordinate the activities of all the appointed contractors in the interests of safety and health;
Ensure that potential contractors (whom they intend appointing) submitting tenders have
made detailed provision for the cost of safety and health measures throughout the project.
with the health and safety plan or if such work poses a threat to the health and safety of
persons or a risk of degradation to the environment.
Take reasonable steps to ensure cooperation between all their appointed contractors.
Only appoint contractors to do work, if satisfied that the contractor has the necessary
competencies and resources to perform the work safely.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No 2021/539129/30
of 50
File name: NTCSA Specification Guideline For Contracts and Contractor OHS Requirements for High /Medium/ & Low Risk Projects
Template ID 559-824510295(Rev 1) NTCSA Header and Footer portrait template
Supply and delivery of 1.5 litres Document
bottled water Contractor Specification 559-1624821993 Rev 1 Identifier
for Contractor OHS Requirements for
Effective Date July 2024 Low-Risk work
Review Date July 2027
specified work throughout the contract period.
Note 2: No work may commence and or continue without the presence of the appointed project manager or
project supervisor during performance of the contracted work.
for which such supervisor has been appointed for.
Note 3: In determining the number of appointed competent supervisors, the nature and scope of work being
performed, shall be taken into consideration.
Note 4: If a sufficient number of competent employee(s) have been appointed to assist the construction
supervisor, the construction supervisor may supervise more than one site.
SACPCMP) in writing.
information or suspecting such information has been divulged, in the interests of health and
safety requirements;
employees have transgressed any of the requirements of the health and safety specification,
safety and health plans, site rules or any other requirements.
the public, and other contractors) present at work or in the vicinity of a construction site
against all risks that may arise from such site.
safety. This should be done by a competent person appointed in writing with a view to identify
hazardous and potentially hazardous work operations.
starting of any new task, irrespective of whether it is a repetitive task or not.
project activity for which they are responsible.
NTCSA’s behalf, with the relevant sections of the documented NTCSA/Eskom’s SHE
Specification.
if they meet all the requirements.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No 2021/539129/30
of 50
File name: NTCSA Specification Guideline For Contracts and Contractor OHS Requirements for High /Medium/ & Low Risk Projects
Template ID 559-824510295(Rev 1) NTCSA Header and Footer portrait template
Supply and delivery of 1.5 litres Document
bottled water Contractor Specification 559-1624821993 Rev 1 Identifier
for Contractor OHS Requirements for
Effective Date July 2024 Low-Risk work
Review Date July 2027
contract is in place and maintained.
person/man job specifications must be compiled and handed to the occupational health
practitioner.
Medical assessments must be conducted by a registered Occupational Health Practitioner.
During the pre-employment medical, where employees will be required to work at heights,
they will also be required to undergo the required employee physical and psychological
fitness examinations.
involved in the project work, as well as the appointed contractors, have received a health
and safety induction training session. Similarly, ensure that all visitors to site undergo the
site’s induction training.
employees involved in the project work, as well as the appointed contractors, have received
task-specific training.
employees, inspect such equipment regularly and ensure recipients of PPE are trained in the
proper use, care and where necessary, the maintenance of PPE;
Note 5: should the principal contractor or his/her appointed contractors entertain visitors on site, they will be
held responsible for the provision and wearing PPE.
structure as may be required. Any such structures shall be positioned and erected in
compliance with any instructions from the NTCSA project manager and the relevant site
safety and fire prevention requirements;
rehabilitate the environment.
where an Environment Management Plan is in place, then adhere to the plan.
Respect the rights of landowners/lessors and the preservation of their registered activities.
Must have a substance abuse program which must be in line with the requirements of the
OHS Act.
work sites.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No 2021/539129/30
of 50
File name: NTCSA Specification Guideline For Contracts and Contractor OHS Requirements for High /Medium/ & Low Risk Projects
Template ID 559-824510295(Rev 1) NTCSA Header and Footer portrait template
Supply and delivery of 1.5 litres Document
bottled water Contractor Specification 559-1624821993 Rev 1 Identifier
for Contractor OHS Requirements for
Effective Date July 2024 Low-Risk work
Review Date July 2027
Note 6: Eskom will not tolerate the presence of anyone who is or who appears to be under the influence of
alcohol or any other intoxicating substance whilst performing work for them or on any work site.
condition, use, care, storage, maintenance, and the management of these;
investigators.
Be involved in all of their appointed contractor’s investigations.
Establish health and safety committees, hold such committee meetings on all sites, and
ensure that appointed contractors participate in their health and safety meetings.
Chair their own health and safety committee meetings and record such meetings.
Appoint sufficient number of health and safety representatives in terms of legislative
requirements and ensure that the appointed contractors appoint health and safety
representatives for their work sites.
his/her approval prior to them commencing work.
including date of induction, relevant skills and licenses and be able to produce this list at the
request of the NTCSA Project Manager.
2.6.3 Construction Managers / Supplier
Note 1: No work may commence and or continue without the appointed supervisor or manager during the
performance of the contracted work.
appointed to supervise;
for new staff and site visitors;
procedures, before any work commences and thereafter, at such times as may be
determined by a risk assessment;
with on all work sites;
or if such work poses a threat to the safety and health of persons or a risk of degradation to
the environment;
employees wear/use the PPE as instructed.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No 2021/539129/30
of 50
File name: NTCSA Specification Guideline For Contracts and Contractor OHS Requirements for High /Medium/ & Low Risk Projects
Template ID 559-824510295(Rev 1) NTCSA Header and Footer portrait template
Supply and delivery of 1.5 litres Document
bottled water Contractor Specification 559-1624821993 Rev 1 Identifier
for Contractor OHS Requirements for
Effective Date July 2024 Low-Risk work
Review Date July 2027
contractors on instructions of their contractor.
and that they adhere to such procedures;
assessments and ensure that appropriate mitigating measures have been considered and
implemented.
prior to the starting of any new task, irrespective of whether it is a repetitive task. Ensure that
the team are involved in the abovementioned risk assessments;
as confirming the requirements of the daily risk assessments;
the public, and other contractors) present at work or in the vicinity of a construction site
against all risks that may arise from such site.
premises / work sites and that no employee remains on site if he/she is under the influence.
Furthermore, report such instances to contract management;
respect to condition, use, care, storage, maintenance, and the management of these.
the project work, to the employees for whom they are responsible for.
information or suspecting such information has been divulged, in the interests of health and
safety requirements (reference – section 26 of the OHS Act).
is done to the environment and that where an Environment Management Plan is in place,
then the plan adhere to the plan.
accordance with the principal contractor’s and or appointed contractors health and safety
plan which poses a threat to the health and safety of persons.
2.6.4 Contractor site supervisor or Contract Supervisor
Must:
and NTCSA project requirements;
and specifications
place.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No 2021/539129/30
of 50
File name: NTCSA Specification Guideline For Contracts and Contractor OHS Requirements for High /Medium/ & Low Risk Projects
Template ID 559-824510295(Rev 1) NTCSA Header and Footer portrait template
Supply and delivery of 1.5 litres Document
bottled water Contractor Specification 559-1624821993 Rev 1 Identifier
for Contractor OHS Requirements for
Effective Date July 2024 Low-Risk work
Review Date July 2027
elimination of unsafe acts by all people whilst on the project site.
first instance and thereafter the NTCSA project manager in the second instance relating to
procedure requirements, non-conformances identified, corrective actions, audits and
inspection schedules.
Eskom requirements;
procedures, work instructions and safety regulations issued by NTCSA:
inspection reports.
perform the tasks assigned.
contractors deviate from safety requirements.
relevant documentation.
2.6.5 Employees
Must:
/ Eskom requirements;
sessions, some of which are:
a. familiarising themselves with their workplaces and safety and health procedures;
b. working in a manner that does not endanger them or cause harm to others;
c. ensuring that the work area is kept tidy;
d. reporting all incidents and near misses;
e. protecting fellow workers against injury by performing job observations;
f. reporting unsafe acts and unsafe conditions;
g. reporting any situation that may become dangerous; and
h. carrying out lawful orders and obeying safety and health rules;
immediately report this to the person concerned. If the person persists, stop that person
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No 2021/539129/30
of 50
File name: NTCSA Specification Guideline For Contracts and Contractor OHS Requirements for High /Medium/ & Low Risk Projects
Template ID 559-824510295(Rev 1) NTCSA Header and Footer portrait template
Supply and delivery of 1.5 litres Document
bottled water Contractor Specification 559-1624821993 Rev 1 Identifier
for Contractor OHS Requirements for
Effective Date July 2024 Low-Risk work
Review Date July 2027
from working, and report the matter to contractor management and/or NTCSA’s project
manager or supervisor immediately.
provided for the protection of the site or for the health and safety of persons this includes any
guarding of machinery or equipment.
Where reflective jackets/bibs are required to be worn, wear them.
health and safety site rules, NTCSA / Eskom requirements, company requirements, or
legislative requirements.
members of the public, or visitors who may be affected by their acts and/or omissions at
work.
risks and measures related to the work processes.
protection or that of others.
that there is an imminent and serious danger to their health and safety and have the duty to
inform their supervisor immediately of such danger.
instance), and/or the NTCSA project manager, any substandard acts and/or conditions that
have come to their attention and that have not been rectified or acted on by their contractor
management timeously.
working conditions, to the extent of their control, over the equipment and methods of work
adopted.
health, safety, and environmental concerns.
instructions.
2.6.6 Contractor Health and Safety officer
related matters on the sites.
providing them with a health and safety service.
submitted to any appointed contractors.
meetings.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No 2021/539129/30
of 50
File name: NTCSA Specification Guideline For Contracts and Contractor OHS Requirements for High /Medium/ & Low Risk Projects
Template ID 559-824510295(Rev 1) NTCSA Header and Footer portrait template
Supply and delivery of 1.5 litres Document
bottled water Contractor Specification 559-1624821993 Rev 1 Identifier
for Contractor OHS Requirements for
Effective Date July 2024 Low-Risk work
Review Date July 2027
accordance with the principal contractor’s and or appointed contractor’s health and safety
plan which poses a threat to the health and safety of persons.
premises / work sites and that no employee remains on site if he/she is under the influence.
Furthermore, report such instances to construction manager
processes for breathalyser and drug testing while entering and/or being on any NTCSA /
Eskom work site by NTCSA / Eskom.
contractors on instructions of their contractor;
and any appointed contractors on instructions of their contractor.
3.1 Scope of work
Supply and delivery of 1.5 litres bottled Water Contract for a period of 3 years
A copy of the scope of works must be retained by the contractor.
Note: The contractor who will be awarded this contract will be known as the “principal contractor” and any
contractor appointed by the principal contractor will be known as the “appointed contractor.
3.2 Legal Compliance
3.2.1 Section 37(2) (Legal) Agreement
A section 37(2) agreement must be signed between NTCSA / Eskom and the principal contractor
The signed section 37(2) Agreement must be retained by both parties
A copy of all the agreements must form part of the respective contractor’s OHS file.
3.2.2 Hazardous work by children (Child Labour)
The constitution of the Republic of South Africa, in the “Bill of Rights” is clear on the rights of children,
especially when it comes to:
being protected from exploitative labour practices;
not to be required or permitted to perform work or provide services that
i. are inappropriate for a person of that child’s age; or
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No 2021/539129/30
of 50
File name: NTCSA Specification Guideline For Contracts and Contractor OHS Requirements for High /Medium/ & Low Risk Projects
Template ID 559-824510295(Rev 1) NTCSA Header and Footer portrait template
Supply and delivery of 1.5 litres Document
bottled water Contractor Specification 559-1624821993 Rev 1 Identifier
for Contractor OHS Requirements for
Effective Date July 2024 Low-Risk work
Review Date July 2027
ii. place at risk the child’s well-being, education, physical or mental health or spiritual, moral or
social development;
and the Basic Conditions of Employment Act, Chapter six Section 43 “Prohibition of employment of
children”.
Before resorting to the use of child labour, due consideration must be given to the rights of the child
in terms of the constitution. Where work is being performed which is not prohibited in terms of the
constitution, then such work must be conducted in terms of the OHS Act “Regulations on Hazardous
Work by Children in South Africa” with emphasis on paragraph 2 Purpose and Interpretation.
NTCSA/ Eskom does not condone the use of child labour and therefore all effort must be exercised
and child labour should not be used.
3.2.3 OHS Act
The principal contractor and appointed contractors shall have an up to date copy of the OHS Act
and regulations which will be available to all employees.
All contractors will comply with all the legislative requirements, NTCSA/Eskom requirement, and
other requirements, pertaining to this contract being:
The principal contractor and all appointed contractors will comply with all the legislation pertaining
to this project being, but not limited to:
The Constitution of the Republic of South Africa (particularly Section 24 of the Bill of Rights).
Occupational Health and Safety Act 1993 (Act ) and its Regulations.
National Environmental Management Act 1998 (Act ).
Environment Conservation Act 1989 (Act ).
National Water Act 1998 (Act ).
Civil and Building Work Act.
National Road Traffic Act .
Compensation for Occupational Injures and Diseases Act.
SANS Standards – Contractor shall use the relative standards applicable to the project (i.e.
South African National Standard (SANS) 241 Drinking Water).
3.3 NTCSA / Eskom Requirements
All contractors shall, before commencement of the project ensure that all their employees are familiar
with the relevant NTCSA/Eskom OHS documentation that is applicable to contract services.
3.3.1 Appointment of a contractor
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No 2021/539129/30
of 50
File name: NTCSA Specification Guideline For Contracts and Contractor OHS Requirements for High /Medium/ & Low Risk Projects
Template ID 559-824510295(Rev 1) NTCSA Header and Footer portrait template
Supply and delivery of 1.5 litres Document
bottled water Contractor Specification 559-1624821993 Rev 1 Identifier
for Contractor OHS Requirements for
Effective Date July 2024 Low-Risk work
Review Date July 2027
The principal contractor will be appointed by NTCSA/ Eskom on the awarding of the contract and
will be responsible and accountable for all legislative and Eskom requirements for the duration of
the contract.
3.3.2 Appointment of sub-contractors
The principal contractor may appoint contractors to assist in the contract. All appointments shall be
done in writing and will form part of the SHE plan that is required to be submitted to Eskom. Adequate
training and instruction must be given to the appointees and the principal contractor must ensure
that all the appointed contractors understand their roles and responsibilities.
Note: Copies of contractor appointments must be kept in the respective SHE file.
3.4 SHEQ Policy
OHS Policy (SHE/SHEQ policy) is a statement of intent and a commitment by the organisation’s
GCE/CE /GM and senior management in relation to the relevant OHS roles and responsibilities, the
achievement of their strategic objectives, values of integrity, customer satisfaction, excellence, and
innovation.
The principal contractor and all appointed contractors, if already not in place, will be required to
compile an organisational SHEQ policy in line with their OHS responsibilities. The policy must be
signed by the organisation’s GCE/ CE/MD or the appointed assistant to the GCE/ CE/MD OHS Act
Section 16(2). The policy must be displayed in a prominent place within the workplace. A copy of
the policy must be filed in the contractor OHS files and attached as an annexure in the OHS Plan.
3.5 Coid
The principal contractor and all his/her appointed contractors shall be registered with an appropriate
employment compensation commissioner and have available a valid letter of good standing (LoG)
from such commissioner. The obligation lies with the contractors to ensure that the LoG remain valid
throughout the contract period. A copy of the LoG must be filed in the contractor OHS files.
3.6 Costing for SHE within the Project
The costing for OHS must be itemised based on the overall scope of the project (i.e.) Training,
provision of PPE, safety equipment purchases etc.
3.7 Statutory Appointments
For the duration of the contract, the principal contractor and all appointed contractors shall appoint
competent employees who will meet the requirements of the OHS Act. Where appointments are
made, contractors shall ensure that the appointees have been suitably trained and or informed of
their responsibilities before getting them to accept such appointment. The relevant statutory
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No 2021/539129/30
of 50
File name: NTCSA Specification Guideline For Contracts and Contractor OHS Requirements for High /Medium/ & Low Risk Projects
Template ID 559-824510295(Rev 1) NTCSA Header and Footer portrait template
Supply and delivery of 1.5 litres Document
bottled water Contractor Specification 559-1624821993 Rev 1 Identifier
for Contractor OHS Requirements for
Effective Date July 2024 Low-Risk work
Review Date July 2027
appointments shall be made in accordance with the requirements of the OHS Act which includes the
requirement of a competent person being appointed in the relevant roles. The statutory
appointments should include but not limited to the following:
OHS Act General Administrative Regulation 9(2) – Incident Investigator
OHS Act Section 16 (2) – Assign duties
OHS Act Section 19 (3) - Health and Safety Committee Member
OHS Act Section 19(6)(a) – Co-opted Health and Safety Committee member
OHS Act Construction Regulation 7(1)(c)(v) Appointment of a Contractor (if appointing
subcontractors)
3.9.1 Non-statutory appointments
3.8 Eskom Life-saving Rules
performs work for NTCSA / Eskom in NTCSA/Eskom adopt the same view.
agents, consultants, and contractors. Failure to adhere to these rules by any NTCSA
employee or employee of a Principal Contractor or appointed contractor will be considered
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No 2021/539129/30
of 50
File name: NTCSA Specification Guideline For Contracts and Contractor OHS Requirements for High /Medium/ & Low Risk Projects
Template ID 559-824510295(Rev 1) NTCSA Header and Footer portrait template
Supply and delivery of 1.5 litres Document
bottled water Contractor Specification 559-1624821993 Rev 1 Identifier
for Contractor OHS Requirements for
Effective Date July 2024 Low-Risk work
Review Date July 2027
a serious transgression. These rules are being implemented to prevent serious injury or
death of any employee, labour broker or contractor working in any area within Eskom.
product), then the rules shall be obeyed by any contractor and their employees.
The rules are:
Rule description of rule
Open, isolate, test, earth and create an equipotential zone
BEFORE TOUCH Rule 1
(That is plant, any plant operating above 1000 V)
Hook up at heights
Rule 2 Working at height is defined as any work performed above a stable work surface or
where a person puts himself/herself in a position where he/she exposes himself/herself
to a fall from or into.
Buckle up
No person may drive any vehicle on NTCSA/Eskom business and/or on NTCSA/Eskom
Rule 3
premises:
Unless the driver and all passengers are wearing seat belts.
Be sober
Rule 4 No person is allowed to be under the influence of intoxicating liquor or drugs while on
duty
Ensure that you have a permit to work
Rule 5 Where an authorisation limitation exists, no person shall work without the required
permit to work.
Rule 6 ENSURE SAFE LIVE WORKING
Eskom will take a stance of zero tolerance on these rules.
Non-compliance to a Life Saving rule will be considered serious misconduct and will lead to serious
disciplinary action, which may include dismissal.
This is to ensure that every person who works on or visits an NTCSA / Eskom site returns home
safely to his or her family.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No 2021/539129/30
of 50
File name: NTCSA Specification Guideline For Contracts and Contractor OHS Requirements for High /Medium/ & Low Risk Projects
Template ID 559-824510295(Rev 1) NTCSA Header and Footer portrait template
Supply and delivery of 1.5 litres Document
bottled water Contractor Specification 559-1624821993 Rev 1 Identifier
for Contractor OHS Requirements for
Effective Date July 2024 Low-Risk work
Review Date July 2027
3.9 Substance Abuse
incidents and the driving of vehicles. NTCSA is therefore, entitled to take reasonable steps
to ensure that intoxicated persons are identified and prevented from entering NTCSA.
General Safety Regulation 2A is clear on the legal stance regarding intoxication.
The alcohol and drug permissible level is 0%.
All contractors shall comply with Eskom’s procedure 32-37 (“Substance Abuse Procedure”),
taking into account that this is an Eskom Life-saving Rule number 4: BE SOBER”), this
means anyone entering the NTCSA will be subjected to ad hoc alcohol testing.
testing of their own employees. The legislative alcohol level is deemed to be zero.
3.10 Contractor organisational Structure
3.10.1 Principal Contractor Organogram
The principal contractor must provide an organisational organogram related to this contract,
depicting all the levels of responsibility from the GCE/CE/GM down to the supervisors responsible
for the contract. List the relevant positions held, names of appointees and legal appointments.
The principal contractor must ensure that all appointed contractors comply with this requirement.
The principal contractor is responsible for keeping copies of all the organograms’ as well as
submitting them with the OHS plan. All organograms shall be updated timeously when appointments
are changed.
This diagram must be kept up to date and filed in the project OHS files.
3.10.2 Appointed Contractor/s Organogram
listing the reporting structure from their GCE/CE/GM down to their project supervisors. The
diagram must list the names, positions held and any appointments made.
contractor and a copy filed in the relevant project OHS files.
3.11 Risk assessment (refer to 32-520)
It is a legal requirement in terms of Section 8 (2)(d) of the OHS Act for an employer to carry out risk
assessments, to establish which risks and hazards are attached to the health and safety of persons
due to any work which is performed, any article or substance which is, handled, stored, transported.
A risk assessment is defined as an identification of the hazards present in an organisation and an
estimate of the extent of the risks involved, taking into account whatever precautions are already
being taken.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No 2021/539129/30
of 50
File name: NTCSA Specification Guideline For Contracts and Contractor OHS Requirements for High /Medium/ & Low Risk Projects
Template ID 559-824510295(Rev 1) NTCSA Header and Footer portrait template
Supply and delivery of 1.5 litres Document
bottled water Contractor Specification 559-1624821993 Rev 1 Identifier
for Contractor OHS Requirements for
Effective Date July 2024 Low-Risk work
Review Date July 2027
It is essentially a three stage process:
Risk assessments are required to be maintained. This means that significant changes to a process
or activity, or any new process or activity should be subjected to a risk assessment and that if new
hazards come to light during the work process, then these should also be subjected to risk
assessments. Risk assessments for long term processes should be periodically reviewed and
updated. Method statements or written safe work procedures are an effective method as information
and record of the way jobs / tasks must be performed. Daily or issue based or task specific or on the
job risk assessments must be conducted at the place where work is to be performed/ conducted to
allow managers and employees to assess any inherent risks that could have been overlooked during
the initial risk assessment or any changes that might have occurred in a period of absence. For
example if a job / task is extended over a day or halted due to inclement weather.
Guidelines for actual steps involved in a job/task specific risk assessment are:
procedures exist for ladders;
rectify this shall be recorded, and safe working procedures drawn up;
and duly assigned;
must be nominated;
for comment and approval.
The relevant section of the risk assessment shall be issued with a NTCSA Note to the Supervisor
nominated as the responsible person; and the names of workmen who have received instruction on
the work content and the sequence of the activities listed in the risk assessment shall be recorded,
and their competence established. This instruction shall be done through an interpreter if required
and recorded on the Pre-Job Brief (Daily Safe Task Instructions), with reference to applicable Risk
Assessments.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No 2021/539129/30
of 50
File name: NTCSA Specification Guideline For Contracts and Contractor OHS Requirements for High /Medium/ & Low Risk Projects
Template ID 559-824510295(Rev 1) NTCSA Header and Footer portrait template
Supply and delivery of 1.5 litres Document
bottled water Contractor Specification 559-1624821993 Rev 1 Identifier
for Contractor OHS Requirements for
Effective Date July 2024 Low-Risk work
Review Date July 2027
3.12 Safe work procedures / method statements
Method statements / written safe work procedure are control measures used to prevent an incident
from occurring during the execution of the project. A written safe work procedure/ method statements
provide guidance how to execute the task safely. A safe working procedure should be written when:-
a. Designing a new job or task;
b. Changing a job or task;
c. Introducing new equipment or substances; and
The safe working procedure should identify:
d. The supervisor for the task or job and the employees who will undertake the task;
e. The tasks that are to be undertaken that pose risks;
f. The equipment and substances that are used in these tasks;
g. The control measures that have been built into these tasks;
h. Any training or qualification needed to undertake the task;
i. The personal protective equipment to be worn;
j. Actions to be undertaken to address safety issues that may arise while undertaking the
task.
3.13 First Aid and Equipment
The requirements of the OHS Act GSR 3 must be observed.
First aid appointments must be made to meet the requirements, this includes construction
sites. Appointees must be trained to level 2. It is good practice for all employees to be trained
to at least level 1.
of work performed, the distance teams are working apart and the terrain to be covered if an
emergency should arise.
for all employees.
employees are familiar with the emergency numbers.
50 or team of workers on site or part thereof, taking into account the type of work performed
and the distance between teams.
be available and accessible for the immediate treatment of injured persons at the workplace.
and contact details of the First Aider of such first aid box or boxes shall be erected.
be made for incidents occurring after working hours.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No 2021/539129/30
of 50
File name: NTCSA Specification Guideline For Contracts and Contractor OHS Requirements for High /Medium/ & Low Risk Projects
Template ID 559-824510295(Rev 1) NTCSA Header and Footer portrait template
Supply and delivery of 1.5 litres Document
bottled water Contractor Specification 559-1624821993 Rev 1 Identifier
for Contractor OHS Requirements for
Effective Date July 2024 Low-Risk work
Review Date July 2027
3.13.1 First Aid Boxes and equipment
The following is a list of minimum contents of a first aid box:
A content check list must be available with all boxes and boxes shall be checked on a regular basis,
kept clean and dust free.
3.14 OHS Communication Systems
Principal Contractor/s and their appointed contractors must develop a communication strategy
outlining how they intend to communicate OHS issues to their staff, the mediums they will employ
and how they will measure the effectiveness of their OHS communication. Below is a brief on how
communication should take place. Where project meetings are conducted on site, OHS shall be
included as a standing agenda point and minutes of these meetings shall be available on site at all
times. Minutes of meeting must be compiled and filed in the relevant OHS files. All employees shall
have access to these minutes. Attendance register shall be kept for all the health and safety
meetings.
3.14.1 Statutory Health and Safety Committees
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No 2021/539129/30
of 50
File name: NTCSA Specification Guideline For Contracts and Contractor OHS Requirements for High /Medium/ & Low Risk Projects
Template ID 559-824510295(Rev 1) NTCSA Header and Footer portrait template
Supply and delivery of 1.5 litres Document
bottled water Contractor Specification 559-1624821993 Rev 1 Identifier
for Contractor OHS Requirements for
Effective Date July 2024 Low-Risk work
Review Date July 2027
Section 19 of the OHS Act, where two or more health and safety representatives have
been designated, Similarly, appointed contractors shall establish their own statutory health
and safety committee.
All appointed contractors shall be members of the principal contractor’s safety committee.
The Committee shall meet to discuss OHS issues concerning the current work being
performed, training, upcoming work and OHS requirements, incidents and lessons learned
specific OHS problems, safety performance, action plans and other relevant OHS issues.
Listed below is a preferred agenda.
committees (Refer to Section 19 (2) (a) of the OHS Act).
Representatives on that specific statutory health and safety committee. (Refer to Section
19(2)(c) of the OHS Act)
medium to high risk work is involved, more frequent if required), and all appointed members
of the committee shall attend the meeting.
contractor and the project manager and the Inspector at DoEL.
25 incidents and other notified serious incidents.
shall keep record of all recommendations made by the committee.
current standards, procedures and practices.
statutory health and safety committees carry out their duties.
contractor. The appointed chairperson must be competent to chair meetings and be able to
make informed decisions.
3.14.2 Non-statutory health and safety committees
within that worksite to assist with the communication of health and safety related matters
between the statutory health and safety committee and the workplace.
same as the statutory safety committee
medium to high risk work is involved, more frequent if required), and all appointed members
of the committee shall attend the meeting
3.14.3 Agenda
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No 2021/539129/30
of 50
File name: NTCSA Specification Guideline For Contracts and Contractor OHS Requirements for High /Medium/ & Low Risk Projects
Template ID 559-824510295(Rev 1) NTCSA Header and Footer portrait template
Compliance Requirements
Source: Safety & Environmental Requirements.zip (unknown)No specific requirements found
B-BBEE Minimum Level: 2
Section
Source: Safety & Environmental Requirements.zipThe OHS specification is scored across sections A to E, covering OHS management, environmental management, waste management, and employer-defined requirements. A weighted average score of 80% or above is required for consideration. The evaluation includes comments and motivation for failing to attain maximum score.
Description
Source: CPA - 16 months.pdfof Full Title of Source Base Base
Reference portions/Weightings Index Index as Publisher Month Price/Base
of each index published of Index Index
Figure
A1 85% Statistics SA Consumer Price Statistics
Index (CPI) SA
Table D - 3
A2 85% SEIFSA Table L-2(B) Statistics
Road Freight SA
Costs
A3
15% Fixed portion not subject to CPA
Total 100%
Note: Tenderers to take note that, if the NTCSA proposed CPA breakdown is not populated,
they are required to refer to the Pricing Schedule in the NEC or other Contract or standalone
Pricing Schedule for NTCSA’s proposed CPA breakdown.
NTCSA CPA Conditions/Requirements
Tenderers are required to submit CPA that is aligned to NTCSA’s proposed CPA breakdown in
this Tender; or Tenderers may submit an alternative CPA proposal from NTCSA’s CPA
proposal, and this will be considered if deemed acceptable to NTCSA;
Note that for contracts exceeding a duration of 12 months if there is no CPA catered for by the
tenderer; then prices will be deemed to be fixed and firm.
A minimum of 15% of the total agreement value is to be fixed when a CPA formula is applied,
Each CPA formula must add up to a final total of 100.
Only official pub
Important Dates
Source: CPA - 16 months.pdf (unknown)Closing date: as per the tender record. Base date: one month prior to tender closing. Cut-off date: one month prior to delivery. CPA becomes applicable after sixteen months from the base date.
Submission Guidelines
Source: CPA - 16 months.pdf (unknown)Submit the completed tender documents, including the populated CPA breakdown in the Pricing Schedule, by the closing date and time. The CPA breakdown must align with the NTCSA proposed breakdown; if not populated, refer to the Pricing Schedule in the NEC or other contract. Prices will be deemed fixed and firm if the CPA breakdown is not submitted. Returnable forms include the CPA breakdown schedule and any other forms specified in the tender document.
Evaluation Criteria
Source: CPA - 16 months.pdf (unknown)Tenderers must populate the CPA breakdown as proposed by NTCSA. If not populated, prices will be deemed fixed and firm. The CPA formula must include a minimum 15% fixed portion. Each CPA formula must add up to 100. Only official published indices are to be used.
Technical Specifications
Source: CPA - 16 months.pdf (unknown)CPA formula components and weightings:
Pricing Schedule
Source: CPA - 16 months.pdfThe application of contract price adjustment (CPA) to tender submissions
Note: This Section will not be applicable to Professional services contracts (See relevant
section hereunder for guidelines on this).
The rates exclude VAT.
CPA will kick in after sixteen (16) months from the base date.
The Base date is one (1) month prior to tender closing, and the cut-off date is One (1) month
prior to delivery.
Note that only 85% subjected to escalation and 15% is fixed.
Proportion linked to the index for Price
Failure to propose contract price adjustment, or submit a CPA formula with the tender
submission, will result in the pricing being considered fixed.
NTCSA will not accept Rate of Exchange adjustment to be included in any CPA formula.
Local indices may not be used for CPA purposes for any imported component.
There must be separate CPA formulae for local and foreign CPA. Local and foreign escalation
may not be combined into one formula.
A3
15% Fixed portion not subject to CPA
Total 100%
Note: Tenderers to take note that, if the NTCSA proposed CPA breakdown is not populated,
they are required to refer to the Pricing Schedule in the NEC or other Contract or standalone
Pricing Schedule for NTCSA’s proposed CPA breakdown.
Financial Requirements
Source: CPA - 16 months.pdf (unknown)CPA applies after sixteen months from the base date. Base date is one month prior to tender closing; cut-off date is one month prior to delivery. A minimum of 15% of the total agreement value must be fixed. Each CPA formula must total 100. Only 85% of the total is subject to CPA; the remaining 15% is fixed. The CPA breakdown must be populated; otherwise prices are deemed fixed and firm. Indices used: CPI (85%) and SEIFSA Road Freight Costs (85%). The fixed portion is 15%.
Health & Safety
Source: CPA - 16 months.pdfof each index published of Index Index
Tenderers are required to submit CPA that is aligned to NTCSA’s proposed CPA breakdown in
this Tender; or Tenderers may submit an alternative CPA proposal from NTCSA’s CPA
proposal, and this will be considered if deemed acceptable to NTCSA;
Note that for contracts exceeding a duration of 12 months if there is no CPA catered for by the
tenderer; then prices will be deemed to be fixed and firm.
A minimum of 15% of the total agreement value is to be fixed when a CPA formula is applied,
Each CPA formula must add up to a final total of 100.
Only official published CPA indices that are in the public domain must be used.
No in-house indices may be used for CPA.
There may be more than 1 CPA formula (Formula A, B, C etc) or a combination of all the cost
components into 1 Formula (depending on how the pricing is to be submitted.
If there are specific line items for Labour and Transport, individual Formulae might be used.
Note: NTCSA reserves the right to negotiate CPA terms and conditions during negotiations
held with tenderers.
In instances of indices or other references published monthly, the Base Date is to be the month
before the month in which the Enquiry closes.
In instances where the reference figures, e.g. market prices, are published daily or at intervals
more than once a month; then the average for the month before the month in which the Enquiry
closes should be used as the Base Price.
Description
Source: NTCSA Invitation_to_Tender_(ITT)_E3528NTCSAMWP.pdf (RFP)Supply and delivery of 1.5L bottled water to Bloemfontein, Welkom, Port Elizabeth and East London on an as and when required basis. Tender number E3528NTCSAMWP. Issue date 11 September 2026. Closing date and time 08 October 2026 at 10h00. Tender validity period 90 days from the closing date and time.
Important Dates
Source: NTCSA Invitation_to_Tender_(ITT)_E3528NTCSAMWP.pdf (RFP){"closingDate":"11 September 2026","closingTime":"10h00"}
Briefing Session
Source: NTCSA Invitation_to_Tender_(ITT)_E3528NTCSAMWP.pdf (RFP)Clarification meeting on 23 September 2026 at 10h00 via MS Teams. Join link: https://teams.microsoft.com/meet/322575241059894?p=aiXtP16oy5rvLsVnxN, Meeting ID: 322 575 241 059 894, Passcode: h2F6dm2w. Dial-in: +27 21 834 0825,,149088503# (Cape Town), Phone conference ID: 149 088 503#.
Contact Information
Source: NTCSA Invitation_to_Tender_(ITT)_E3528NTCSAMWP.pdf (RFP){"name":"MS Teams","email":null,"phone":"+27 21 834 0825","department":null,"address":"itions of Tender which may be accessed at www.ntcsa.co.za."}
Submission Guidelines
Source: NTCSA Invitation_to_Tender_(ITT)_E3528NTCSAMWP.pdf (RFP)Returnable Documents: The five-working-day period stated above does not apply to proof of CIDB contractor grading., Where CIDB registration and grading are applicable, proof must be submitted by the tender closing
Returnable Documents
Source: NTCSA Invitation_to_Tender_(ITT)_E3528NTCSAMWP.pdf (RFP)Returnable documents include: Basic Compliance (electronic copy in PDF, price list in PDF and Excel); Authorisation Form (Annexure A); Acknowledgement form (Annexure B); Tenderer's particulars (Annexure C); Integrity Declaration Form (Annexure D); CPA Requirements for Local Goods/Services (Annexure E); CPA(IG) for Foreign Goods/Services (Annexure F, if applicable); SBD 6.2 Declaration Certificate for Local Production and Local Content (Annexure G1); SBD 1 Invitation to Bid (Annexure H); Tax Clearance Certificates (for foreign tenderers with SA footprint not on CSD, and local tenderers not providing SARS PIN); Tax Evaluation questionnaire; SBD 6.1 Preference Points Claim Form (Annexure I); Specific Goals; Compliance with Employment Equity Act (for designated employers); SBD 4 – Bidders Disclosure (Annexure J); JV documents (letter of intent, JV agreement, single business entity confirmation, single bank account); E-tendering Help Manual acknowledgement; Standard Terms and Conditions; Supplier Non-Disclosure Agreement; Mandatory Contractual Requirements: proof of CSD registration; Safety: COIDA certificate of good standing or proof of application; Health and safety plan, costing, Baseline OHS Risk Management, valid letter of good standing, OHS competency; Environmental: Environmental management system requirements, environmental management programme, waste management plan, aspect and impact register; Functionality/Technical criteria documents (refer to Technical Evaluation Criteria).
Evaluation Criteria
Source: NTCSA Invitation_to_Tender_(ITT)_E3528NTCSAMWP.pdf (RFP)Tenderers must be registered on the Central Supplier Database (CSD) and provide a CSD number/CSD report. Tenderers listed on the National Treasury Restricted Suppliers list, the Tender Defaulters list, or flagged as ineligible due to findings from the Zondo Report, SIU, or other credible sources of misconduct are ineligible. Tenderers with a conflict of interest are disqualified. A tenderer must not submit more than one tender. Tenderers must complete and submit mandatory returnables including Annexure A (Authorisation Form), Annexure B (Acknowledgement Form), Annexure C (Tenderer's Particulars), Annexure D (Integrity Declaration Form), Annexure E (CPA Requirements for Local Goods/Services), Annexure H (SBD 1 Invitation to Bid), Annexure I (SBD 6.1 Preference Points Claim Form), tax clearance certificate, and a B-BBEE status level certificate or sworn affidavit. For Joint Ventures, a letter of intent or valid JV agreement and a separate confirmation of a single designated bank account are required.
Technical Specifications
Source: NTCSA Invitation_to_Tender_(ITT)_E3528NTCSAMWP.pdf (RFP)Annexure Attac Returnable Returnable Returnable
hed (Y required at required at required
/ N / Tender Tender prior to
N/A) closing closing. Contract
(disqualifiab (Non- Award.
le)* disqualifiabl
e) **
1.1.1 Basic Compliance √
Electronic copy of
the tender in a
PDF format. The
price list needs to
be submitted in
PDF. (The upload
size per document
is 500 megabytes
and total
submission is
restricted to 4
gigabytes)
1.1.2 *Authorisation Annexure A Y √
Form
1.1.3 *Acknowledgeme Annexure B Y √
nt form
1.1.4 *Tenderer’s Annexure C Y √
particulars
1.1.5 *Integrity Annexure D Y √
Declaration Form
1.1.6 *CPA Annexure E Y √
Requirements for
Local
Goods/Services
1.1.7 *CPA(IG) for Annexure F N
Foreign
Goods/Services
(if applicable)
1.1.8 SBD 6.2 Annexure G1 N
Declaration
Certificate for
Local Production
and Local
Content
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA S
Methodology
Source: NTCSA Invitation_to_Tender_(ITT)_E3528NTCSAMWP.pdfGoal, it will not be disqualified. However, it will be awarded 0 points
for that Specific Goal.
3.19 Ranking of tenders Supplier Appointment Methodology
NTCSA intends to appoint four (04) suppliers, with one supplier
allocated to each CLN area. Bidders may submit offers for one,
multiple, or all CLN areas.
Experience & Qualifications
Source: NTCSA Invitation_to_Tender_(ITT)_E3528NTCSAMWP.pdfPhone conference ID: 783 038 408#
For organizers: Meeting options | Reset dial-in PIN
2.16 Seeking clarification The tenderer will notify NTCSA of any clarifications required before
closing time for clarification queries, which is 10 working days before
the deadline for tender submission. This includes the requests for
extension for tender closing date.
Any addenda or clarifications to the Invitation to Tender (ITT) will be
posted on the e-tender portal and the Tender Bulletin. Tenderers must
review these platforms for updates before finalizing their bid
submissions. NTCSA will not be responsible for any disadvantages or
disqualifications resulting from Tenderers not accessing the latest ITT
information.
2.22 Alternative tenders Alternative tenders are not allowed.
2.33 Cataloguing The successful tenderer may be required to provide the cataloguing
information per item after contract award, and in that instance, will
need will to ensure that all materials delivered to NTCSA are labelled
in line with NTCSA’s labelling specifications as may be stipulated.
warehousing facilities and location.
supplying Bottled Task Orders / Payment certificates No 0%
etc.)
Quality Management
Source: NTCSA Invitation_to_Tender_(ITT)_E3528NTCSAMWP.pdfSection D: Quality
Control Plan
Requirements.
Section E: User
defined additional
requirements and
miscellaneous
1.1.38 Safety: Y √
Annexure A
Requirements
Iso 9001
Section D: Quality
Pricing Schedule
Source: NTCSA Invitation_to_Tender_(ITT)_E3528NTCSAMWP.pdfan as and when
required basis
1.1.27 Nec y √
1.1.28 Pricing Y √
Schedule/BOQ (if
not contained in
Contract)
1.1.29 Additional N
documents
required (ECSA/
the 80/20 system. NTCSA will add the score from Pricing and Specific
Financial Requirements
Source: NTCSA Invitation_to_Tender_(ITT)_E3528NTCSAMWP.pdf (RFP)Payment Terms: Payment certificates No 0%
etc.)
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NT
Compliance Requirements
Source: NTCSA Invitation_to_Tender_(ITT)_E3528NTCSAMWP.pdf (RFP)A certified copy of a tax clearance certificate is required from foreign tenderers (with a footprint in South Africa but that are not registered on CSD and have not provided a SARS pin number) and local tenderers (that have not provided their SARS e- filing PIN number for verification by NTCSA and/or their CSD profile / CSD number). Foreign suppliers with no footprint in South Africa must complete the SBD1 document; however, no proof of tax compliance is required. 1.1.11 Tax Evaluation Y √ questionnaire to determine whether a company, close corporation (CC) or Trust is a personal service provider for Controlled Disclosure When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA SOC Ltd, Reg No 2021/539129/30 of 66 File name: 559-235050781 NTCSA Invitation_to_Tender_(ITT)or_Request_for_Proposal eTendering_Water contract Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 559-235050781 Rev 4 Identifier Invitation to Tender Effective Date July 2024 Review Date July 2027 purposes of PAYE 1.1.12 *SBD 6.1 Annexure I Y √ Proof of valid and current CSD Registration (CSD Controlled Disclosure When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA SOC Ltd, Reg No 2021/539129/30 of 66 File name: 559-235050781 NTCSA Invitation_to_Tender_(ITT)or_Request_for_Proposal eTendering_Water contract Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 559-235050781 Rev 4 Identifier Invitation to Tender Effective Date July 2024 Review Date July 2027 number/CSD Report) [applicable to all tenderers of local origin and foreign tenderers with local footprint] ADDITIONAL CONTRACTUAL REQUIREMENTS SUPPORTING EVIDENCE 1.1.36 Safety Y √ COIDA - Original certificate of good standing or proof of application issued by the Compensation Fund (COID) or a licensed compensation insurer (South African tenderers only) 1.1.37 Quality: N Section A: Quality Management System
B-BBEE Details: Claim Form in
terms of PPPFA
2022 regulations
1.1.13 # Specific Goals Y √
A tenderer’s
failure to submit
proof that it meets
the specific goals
will not result in
its
disqualification.
The tenderer will,
however, be
scored zero for
Specific Goals for
purposes of
PPPFA scoring
and ranking.
1.1.14 Compliance with
Employment
Equity Act
To the extent that
the tenderer falls
within the
definition of a
“designated
Employer” as
contemplated in
the Employment
Equity Act , the
tenderer is
required to
furnish the
Employer with
proof of
compliance with
the Employment
Equity Act,
including proof of
submission of the
Employment
Equity report to
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 66
File name: 559-235050781 NTCSA Invitation_to_Tender_(ITT)or_Request_for_Proposal eTendering_Water contract
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 4
Identifier
Invitation to Tender
Effective Date July 2024
Review Date July 2027
the Department of
Labour. (South
African tenderers
only)
1.1.15 **SBD 4 – Annexure J Y √
Bidders
Disclosure
1.1.16 Additional Documents required in event of JV:-
1.1.16 Letter of intent to √
.1 form a
JV/consortium or
Valid joint venture
agreement
confirming the
rights and
obligations of
each of the joint
venture partners
and their profit-
sharing ratios.
1.1.16 Separate written √
.2 confirma
Health & Safety
Source: NTCSA Invitation_to_Tender_(ITT)_E3528NTCSAMWP.pdfplan
Costing for health
and safety
management.
Baseline OHS
Risk
Management
(Bra)
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 66
File name: 559-235050781 NTCSA Invitation_to_Tender_(ITT)or_Request_for_Proposal eTendering_Water contract
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 4
Identifier
Invitation to Tender
Effective Date July 2024
Review Date July 2027
Valid letter of
good standing
OHS competency
1.1.39 Environmental Y √
Section A:
Section E: User
defined additional
requirements and
miscellaneous
1.1.38 Safety: Y √
Health and safety
plan
and safety
management.
sheet. Suppliers should 25% provided Yes 100%
provide data sheets for all No 0%
items as per the Bottled Data sheets to be item specific and
specification data sheets are submitted.
reflect the company’s name where
required will be accepted.
certificates (e.g. SANS, relevant approved bureau No 0%
EN, CE ANSI) and test standards for each item in the
certificates for (where specification.
applicable) for the
relevant products with Failure to provide the certificates,
certificate of compliance no score will be allocated.
that is SANBWA
approved as per PPE Only original or certified copies that
specification reflect the company’s name where
required will be accepted.
manufacturer / supplier manufacturer / supplier No 0%
for all designated
products No score will be allocated if there is
no letter of support.
warehousing facilities proof for warehousing No 0%
applicable:
SHEQ requirements; and/or
Environmental
Source: NTCSA Invitation_to_Tender_(ITT)_E3528NTCSAMWP.pdfsystem
requirements.
Section B:
programme and
environmental
authorization.
Section C:
Plan
Section D:
Aspect and
impact register
Section E:
Employer defined
additional
requirements and
miscellaneous
1.1.40 Due N
Diligence/financia
l analysis
Audited
Financial
Statements of the
tenderer for the
previous 18
months, or to the
extent that such
statements are
not available, for
the last year.
Start-up
enterprises
formed within the
last 12 months
are not required
to submit audited
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 66
File name: 559-235050781 NTCSA Invitation_to_Tender_(ITT)or_Request_for_Proposal eTendering_Water contract
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 4
Identifier
Invitation to Tender
Effective Date July 2024
Review Date July 2027
financial
statements, but if
successful in this
enquiry; will be
required to
furnish
statements for the
first year once
available.
Documents required under functionality/techinical criteria
1.1.41 Functionality/Tec Refer to: Y √
hnical Technical
1.1.39 Environmental Y √
Environmental
management
system
requirements.
Environmental
management
programme and
environmental
authorization.
Contractual Terms
Source: NTCSA Invitation_to_Tender_(ITT)_E3528NTCSAMWP.pdfsanctions list. A tenderer shall be found to have the nationality of
a country if the tenderer is a national or is constituted,
incorporated, or registered and operates in conformity with the
provisions of the laws of that country. This criterion shall also
apply to the determination of the nationality of proposed
measures against these suppliers; and
b) Other suppliers implicated in serious misconduct and a breach of
the Eskom Supplier Integrity Pact by a forensic report or other
source of credible information, such as the SAPS, the NPA, the
payment terms as stipulated hereunder when submitting
tenders and concluding contracts with NTCSA:
For contracts valued below R50 000 000 (Fifty Million Rand)
including VAT, NTCSA is committed to paying Suppliers within 30
days of receipt of undisputed invoices.
For contracts valued above R50 000 000 (Fifty Million Rand)
including VAT, NTCSA is committed to paying suppliers within 60
days of receipt of undisputed invoices.
2.29-2.30 Contract Skills The conditions of contract will be the NEC.
Development Goal (CSDG) and
Contract Participation Goals (CPG)
2.28 CIDB Requirements (where CIDB Requirements are not applicable.
applicable for Engineering and
Construction Works Contracts)
3.24 Sign Form of Agreement Arrange for authorised signatories of both parties to complete and
sign the original and one copy of the Form of Agreement.
when submitting tenders and concluding contracts with NTCSA:
For contracts valued below R50 000 000 (Fifty Million Rand) including VAT, NTCSA is committed
to paying Suppliers within 30 days of receipt of undisputed invoices.
For contracts valued above R50 000 000 (Fifty Million Rand) including VAT, NTCSA is committed
to paying suppliers within 60 days of receipt of undisputed invoices.
Requirements
Source: NTCSA Invitation_to_Tender_(ITT)_E3528NTCSAMWP.pdf (RFP)Eligibility criteria: Tenderers must not be under any restriction to do business with NTCSA or State-Owned Companies. Ineligible if: nationality of a country on international sanctions list; submitting more than one tender (except e-tendering size limits); JV/consortium agreement not stating joint and several liability; conflict of interest; tenders signed by non-authorized persons; restricted by National Treasury; on Tender Defaulters list; sub-contracting 100% of scope; flagged suppliers (implicated in serious misconduct per Zondo Report, SIU, or other credible sources). NTCSA will disqualify tenderers not meeting eligibility criteria.
Section
Source: NTCSA Invitation_to_Tender_(ITT)_E3528NTCSAMWP.pdfEvaluation uses the 80/20 preferential procurement system. The score from pricing and specific goals (likely B-BBEE) will be added to determine the final ranking.
Important Dates
Source: Commercial.zip (TENDER){"closingDate":"23Aug2022","closingTime":"3:42pm","briefingSession":"{"date":null,"time":null,"venue":"tend a site visit and/or clarification meeting that is stipulated as being","is_compulsory":true}"}
Contact Information
Source: Commercial.zip (TENDER){"name":null,"email":null,"phone":null,"department":"Supply Chain Management","address":"g 2.2 Ensure that NTCSA has received the complete original tender and one (1) complete"}
Technical Specifications
Source: Commercial.zip (TENDER)Supply and delivery of SF6 Gas handling plant
Project
supply identified in the specification and/or works
supplying entity AND their company registration
number] ......................................................................., certify under oath that, to the best of my
knowledge, the information furnished herein is true and correct. I accept that NTCSA reserves its right to act
against the supplier named above or me personally in terms hereof, should this declaration prove to be false.
NTCSA employees and directors that engage in private work
eTendering system is a web-based system that allows suppliers bidding for various tenders advertised
on Tender Bulletin system to “upload” their tender documents. Currently the tenderers or suppliers
submit tender documents at various Eskom tender offices. eTendering system replaces the manual or
physical submission of tender documents at various Eskom tender offices. eTendering system in a
nutshell is an electronic box where tender documents can be “dropped” or “uploaded”. Suppliers will
be required to register their details before they can be granted access to the eTendering system. An
OTP (one time pin) will be sent to both their cell phone and email address.
Quick and direct access is also available by using the following links:
of the public, to view and access NTCSA published tenders. eTendering hyperlink will be found
on this site. Members of the public may follow prompt instructions once they have clicked on
the eTendering link (https://eTendering.eskom.co.za). This link will allow them to upload the
required tender documentation.
members of the public, to view information about published tenders and submit their tender
documents.
eTendering system.
2 Problems
A channel of communication has been created in case users of the system experiences a problem
with the system. In a case users come across some difficulties in using Tender bulletin, eTendering
and OpenText systems they need to contact the buyer responsible for the published tender.
3 What’s New
A new functionality to “add closed tenders”. Closed tenders refers to the tenders which are not listed
on Tenderbulletin as normal tenders, but are tenders sent directly to the relevant and potential
suppliers who meet the selection and evaluation criteria to offer what the buyer needs. These
suppliers will be sent a link via email to bid privately.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
4 Getting Started
To gain access to eTendering portal
Open your web browser
Type TenderBulletin (eskom.co.za) or https://eTendering.eskom.co.za
eTendering system login page will be displayed:
Fig 1
Registration Form Steps to follow
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Plus prefix e.g +27
capture picture to validate that you
are not a robot.
click on register button
the registerer to verify the email sent to
the provided email address.
click on “Resend Verification Email”
button
on link provided on
the email.
etendering site with a login screen
displayed, now complete the login
with your verified email address and
password
Fig1.1
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig2a.
Fig2b.
Fig3.
OTP page will be displayed
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
OTP sent to the registered cellphone number and email address
Insert the otp number then click “Verify OTP” button, to resend OTP click on “Resend OTP”
button
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Landing page once OTP is verified
Select the preferred “Ref No”
A page with the preferred Tender information is displayed before tender documentation can
be submitted.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Click on “Create New Submission” button to submit required Tender documents
Landing page once clicked on “Create New Submission” button. Take note of the
mentioned disclaimers.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
To submit tender documents, click on “Add file” button
Upload required tender documents by:
Giving the file a name
Select the listed file type e.g.: Technical, commercial, finance and etc
Choose the file you need to upload
Then click on “Upload” button, Fig5.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig4.
Fig5.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Continue to submit all the required documents under the correct category ,i.e: Technical
should be selected if technical documentation is uploaded and etc. Verify all required
documents are uploaded before making ‘Final Submission’ by clicking on ‘Finalize
Submission’ button.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
all uploaded files should not exceed 900MB.
will pop-up
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
If not all documents were submitted or still wish to add or submit more documents, click on
“No, continue adding files” button.
submission and closed time and date timestamp at the bottom.
submitted tenders will be displayed.
If you want to view or verify the submitted documents, click on “View Submission” button
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
submitted documents on email,Fig6.This is the final step for the submitter or tenderer.
It is vital to save the email with the submission ID for future enquiry if need be.
--------Originalmessage--------
From:Eskom E-Tender Document Submission 28 [email protected]
Date:Tue,23Aug2022,3:42pm
Subject: Response To Submitter
Eskom E-Tender Document Submission 28
Hi Monalisa
You have finalized a new submission with submission id:14 on tender #MPKUS10086PS
closing date : 2022-11-30 10:00:00.
Have started the submission from 2022-08-23 14:28:33 and finalized at 2022-08-23
15:42:28
Tender Description:
Award for Provision of Office Cleaning and Janitorial Services at Kusile Power Station
Project
Files Submitted:
ID Original Name Title Size Type
38 Test7.pdf testingCom 33141 Commercial
40 Test1.pdf testingTech 33502 Technical
41 Test15.pdf testingFin 33141 Finance
Thanks,
Eskom E-Tender Document Submission 28 Automated Mail
© 2022 Eskom E-Tender Document Submission 28. All rights reserved.
NB: This Email and its contents are subject to the Eskom Holdings SOC Ltd EMAIL
LEGAL NOTICE which can be viewed at
http://www.eskom.co.za/Pages/Email_Legal_Spam_Disclaimer.aspx
Fig6.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
5 Edit Registration
To edit already registered information such as Name, Organization, CSD and cell phone number
select “Edit Registration” on the drop down, Fig1. New window with information that needs to be
updated pop ups,Fig2. Click on “Update” button to update registration details.
Fig1.
Fig2.
6 Log off Button
To logout, click “Log out” on the dropdown next to your name
Fig1.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
7 Password reset
To reset a forgotten password, click “Forgot your password” Fig1. and a new screen will
pop up to enter an alternative email where the new password will be sent Fig2.Confirmation
message will be sent to the user, Fig3.
Fig1.
Fig2.
Fig3.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
An email confirming password reset will be sent to the email provided.
Click on the link or “Reset Password” button to reset the password.
Fig4.
A new window will pop up to reset and confirm the new password, Fig5.Enter new
password and confirm then click on “Reset Password” button.
Fig5.
OTP window will pop up, type in the OTP sent to either the cell phone or email address.
Fig6.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
OTP successfully goes through and lands on the below screen, password is successfully
reset.
Fig7.
8 General
This system is compatible to most web browsers however we recommend Ms Edge.
The end.
© 2023 Eskom of 19
The Fourth Schedule to the Income Tax Act (“the Act”) requires that Employees' Tax must be
withheld from "remuneration" paid by an "Employer" to an "Employee". This tool is intended to establish
whether an Individual, Close Corporation, Company or Trust should be classified as an Independent
Contractor, Personal Service Provider, Labour Broker or a Dependent Contractor, and the tax
consequences of such classification.
This Pack is applicable ONLY to Contractors who supply Eskom Holdings SOC Ltd (“Eskom”) and its
subsidiaries with services or Individual Contractors providing Eskom with labour.
The Contractor or its duly authorised representative must declare that all questions have been answered
truthfully.
Answering the questions will direct you to your next step.
Please note:
This Pack is based on tax legislation for the 2025/2026 tax year and is subject to change.
In the questions, any references to "you" refers to the Contractor.
In the questions, the term Contractor is used interchangeably with Individual/CC/Company/Trust.
Definitions as per the Income Tax Act are included in Appendix 10.
Any reference to “Eskom” refers to Eskom Holdings SOC Ltd and its subsidiaries:
Eskom Rotek Industries SOC Ltd
Eskom Enterprises SOC (Pty) Ltd
Escap SOC (Pty) Ltd
Eskom Finance Company SOC (Pty) Ltd
Eskom Foundation NPC
Eskom National Transmission Company SA
The Pack is based on legislation and case law applicable to the 2025/2026 tax year. We therefore
recommend that, if it is used outside of this period, you should first consult with your representative in
Eskom to refer it to Eskom’s Corporate Tax Department in Megawatt Park.
When you return the completed Pack; i.e. the signed summary sheet and signed affidavits to Eskom,
please copy Group Tax on Email address: [email protected]
The Contractor or its duly Authorised Representative acknowledges and accepts that:
Definitions as per the Income Tax Act, No , as amended, are listed in Appendix 10 for
ease of reading.
It is responsible for accuracy and completeness of all information, which is provided in completing
this Pack;
The Pack will not be automatically updated with any changes in legislation.
Disclaimer
Applicable to the 2025/2026 Tax Years
Eskom accepts no liability whatsoever for any loss or damages whatsoever and howsoever incurred, or
suffered, resulting, or arising, from the use of this Pack.
Contractor type
Supplier category
Please complete the following questionnaire for:
Company/Close Corporation/Trusts - EVALUATION PACK A on .
Individuals - EVALUATION PACK B on .
Applicable to the 2025/2026 Tax Years
Evaluation pack a
(To determine whether a Company, Close Corporation (CC) or Trust is a Personal
Service Provider)
Fields marked with an Asterisk (*) must be completed
Contractor’s details for a company or close corporation or
Trust
Contractor’s Name* Vendor No.
Duly Authorised Representative Name Representative Surname
Capacity Representative ID No.*
Representative Passport No. (if no RSA ID) Country of Passport Issue
VAT Registration No. Income Tax Registration No.*
CO/CC/Trust Registration No.* E-Mail Address
Telephone Number* Fax Number
Contractor’s Physical Business Address*
Unit No
Complex Name
Street Number
Street Name
Suburb
City/Town
Postal Code
Contractor’s Postal Business Address*
Same as above (Mark with an X)
Address TYPE (Delete where not applicable) P O Box/Private Bag/Street Address
P O Box/Private Bag/Street NUMBER
Street Name
Suburb
Town
Postal Code
Contractor’s Bank Details*
Account Number Bank Name
Branch Name Branch Number
Name of Account Holder Account Type (Delete where not applicable)
Current/ Savings/ Transmission/Credit Card/Bond
Account
Account Holder Relationship*
i.e. own, joint or 3rd party Own/Joint/3rd Party
Applicable to the 2025/2026 Tax Years
Please answer the following questions by marking the appropriate column with an
"X".
The term “You” will refer to the Company/CC/Trust in this Questionnaire.
Question 1(i)
Are you a Resident of the Republic of South Africa in terms of the Income Tax Act?
(Refer to Appendix 10 for the definition of a resident).
If the answer is Yes, go to Question 2(i).
If the answer is No:
Sign Appendix 9. Submit The Pack to your contractor representative in
Eskom to refer it to Eskom Group Tax Department in Megawatt Park.
No further questions must be answered.
Question 2(i)
Do you employ 3 (three) or more persons (excluding shareholders or members or
beneficiaries of the Company/CC/Trust)?
If the answer is Yes, go to Question 2(ii).
If the answer is No, go to Question 3(i).
Question 2(ii)
Are these employees employed:
On a full time basis; and
Are they engaged in the business of the Company/CC/Trust?
If the answer is Yes, go to Question 2(iii).
If the answer is No, go to Question 3(i).
Question 2(iii)
Are the above 3 employees connected to the shareholders or the members or the
beneficiaries of the Company/CC/Trust?
If the answer is Yes, go to Question 3(i).
If the answer is No:
Sign Appendix 1. If the Affidavit is not signed, PAYE will be withheld
from your payments.
Sign Appendix 8. If the Declaration is not signed, PAYE will be withheld
from your payments.
No further questions must be answered.
Sign “Particulars of person acting as representative of the Company/Close
Corporation/Trust” at the end of the Evaluation Pack.
Applicable to the 2025/2026 Tax Years
Question 3(i)
Will/are any person who is a Connected person in relation to the Company/CC/Trust
render services personally to Eskom on behalf of the Company/CC/Trust? (Refer to
Appendix 10 for the definition of a Connected person).
If the answer is Yes, go to Question 4(i).
If the answer is No:
Sign Appendix 2. If the Affidavit is not signed, PAYE will be withheld
from your payments.
Sign Appendix 8. If the Declaration is not signed, PAYE will be withheld
from your payments.
No further questions must be answered.
Sign “Particulars of person acting as representative of the Company/Close
Corporation/Trust” at the end of the evaluation Pack.
Question 4(i)
During the current year of assessment:
Will more than 80% of your income; or
Is it likely that more than 80% of your income will consist of amounts
received either directly or indirectly, from:
any one client, or
an Associated institution in relation to that client? (Refer to Annexure 9 for
the definition of an Associated institution)
If the answer is Yes:
Sign Appendix 7. PAYE will be withheld from your payments.
Go to Question 6(i) to determine the correct disclosure code on the IRP5.
Sign “Particulars of person acting as representative of the Company/Close
Corporation/Trust” at the end of the evaluation Pack.
If the answer is No:
Sign Appendix 4. If the Affidavit is not signed, PAYE will be withheld
from your payments.
Go to Question 5(i).
Question 5(i)
Must your duties be performed /are your duties performed mainly (more than 50%) at
the premises of Eskom,
And
Will you be subject /are you subject to Eskom’s control or supervision as to the
manner in which your duties are to be performed?
If the answer is Yes to BOTH questions:
Sign Appendix 7. PAYE will be withheld from your payments.
Go to Question 6(i) to determine the correct disclosure code on the IRP5.
Sign “Particulars of person acting as representative of the Company/Close
Corporation/Trust” at the end of the evaluation Pack.
If the answer is No:
Sign Appendix 3. If the Affidavit is not signed, PAYE will be withheld
from your payments.
Go to Question 6(i).
Applicable to the 2025/2026 Tax Years
Question 6(i)
Do/will the payments by Eskom for services payable with reference to output or
certain agreed results, e.g. payment (be it a fixed fee or an hourly rate) be only due if
and when a specific deliverable has been completed?
Question 6(ii)
Does/Will Eskom have the contractual right to control the tools or equipment, staff,
raw materials, routines, patents or technology used in the provision of the services?
Question 6(iii)
Are you/will you prohibited from rendering services to any other employers/clients
during the period of service to Eskom?
Question 6(iv)
Do/will you have the right to sub-contract work?
Question 6(v)
Are you personally or will you personally be at risk for the quality of the work done or
to be done (risk for poor quality; time over-runs, project not producing income)?
Question 6(vi)
Are/will you or the person rendering the service be obliged to be present and perform
the work at Eskom regardless of whether work is available or not?
Question 6(vii)
Is Eskom’s business or will Eskom’s business be critical to your financial/economic
survival?
Question 6(viii)
Does/will your position form part of Eskom’s organisational structure?
Question 6(ix)
Does/will Eskom provide you with any of the following:
Pension fund / Provident fund / Retirement Annuity Fund;
Medical Aid;
Leave of any nature;
Salary increases;
Bonuses;
Any allowances.
Question 6(x)
Does/will Eskom provide you with an office?
Question 6(xi)
Does/will Eskom provide you with any equipment, tools, stationery and material?
Please go to the next section to establish your tax status.
Applicable to the 2025/2026 Tax Years
To establish your tax status, you need to summarise the “Yes” and “No” as
answered on Question 6(i) to 6(xi) in the column below:
Question Yes No
6(i) Independent PSP
6(ii) PSP Independent
6(iii) PSP Independent
6(iv) Independent PSP
6(v) Independent PSP
6(vi) PSP Independent
6(vii) PSP Independent
6(viii) PSP Independent
6(ix) PSP Independent
6(x) PSP Independent
6(xi) PSP Independent
Decision
Independent
Psp
If you have answered “PSP” to any of the following questions 6 (i), 6(iii), 6(v), 6(vi),
6(ix);
or
If you have answered more than 50% “PSP” to questions 6(ii), 6(iv), 6(vii), 6(viii),
6(x), 6(xi):
Complete and sign Appendix 7. PAYE will be withheld from your payments
and will be coded as 3601 on your IRP5 certificate.
No further questions must be answered.
Sign “Particulars of person acting as representative of the Company/Close
Corporation/Trust” at the end of the evaluation Pack.
Alternatively:
If you have already signed Appendix 7 on Questions 4 or 5:
Code 3616 must be marked on Appendix 7 as the applicable code to be
disclosed on the IRP5 for payments received.
If you have not signed Appendix 7 on Questions 4 or 5:
Sign Appendix 8. If the Declaration is not signed, PAYE will be withheld
from your payments.
No further questions must be answered.
Sign “Particulars of person acting as representative of the Company/Close
Corporation/Trust” at the end of the evaluation Pack.
Applicable to the 2025/2026 Tax Years
Summary for ID No. Vendor No:
Company/Close Corporation/Trust Summary
Please sign
he following
Compliance Requirements
Source: Commercial.zip (TENDER)No specific requirements found
Public When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA SOC Ltd, Reg No 2021/539129/30 of 9 File name: 559-1105062830 NTCSA Standard Conditions of Tender - 01 July 2024 (1) Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 559-1105062830 Rev 1 NTCSA Standard Identifier Conditions of Tender Effective Date 01 July 2024 Review Date July 2027 CIDB 2.28 Where the Tender Data has stipulated CIDB grading/s as a qualification criterion, tenderers are required to be registered with the Construction Industry Development Board at the closing date and time for submission of tenders or to be capable of being so registered within twenty-one (21) working days from the closing date and time for submission of tenders. Contract Skills 2.29 If the tenderer is awarded a contract, it, as Contractor, shall achieve in the Development performance of the contract the Contract Skills Development Goals (CSDG) Goal (CSDG) established in the CIDB Standard for Developing Skills through Infrastructure Contract (published in GN 1779, Government Gazette No. April 2023) CSDG is applicable to a contract or an order issued in terms of a framework agreement that has a duration of 12 months or more, and to
a contract of R5 million or more, in the case of a professional service or service contract or an order issued in terms of such a contract; or
a cidb grading designation of grade 7 or higher, in case of an engineering and construction works, or design and build contract or an order issued in terms of such a contract. Contract 2.30 The Contractor shall achieve in the performance of the contract the Contract Participation Participation Goals (CPG) relating to the engagement of targeted enterprises as Goals (CPG) established in the CIDB standard for indirect targeting for enterprise development through Construction works contracts (published in Government Gazette No. February 2013). The requirements of a contract participation goal relating to the engagement of targeted enterprises as established in the aforesaid standard applies to: (a) construction works contracts in the General Building (GB) and to Civil Engineering (CE) classes of construction works; (b) construction works contracts of an estimated minimum project duration of 6 months; and (c) construction works contracts in which at least 25% of the main contract could reasonably be expected to be subcontracted out in one or more of the following CIDB classes of construction works
Civil Engineering (CE) ii) Electrical Engineering Work (EB) iii) General Building Works (GB) iv) Mechanical Engineering (ME) 2.31 NTCSA may disqualify a tender if it is found that the tenderer has misrepresented or falsified any information, certificate, affidavit or document. NTCSA will report any fraud in relation to a tenderer’s B-BBEE certificate/affidavit, or evidence of ‘fronting’ as defined in the B-BBEE Act , as amended, to the B-BBEE Commission. Cataloguing 2.32 The successful tenderer may be required to provide the cataloguing information per item after contract award, and in that instance, will need will to ensure that all materials delivered to NTCSA are labelled in line with NTCSA’s labelling specifications as may be stipulated. Where cataloguing is a requirement, the Pricing Schedule must also include a line item for cataloguing, which tenderers are required to quote for. NTCSA will pay for the cataloguing. Public When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA SOC Ltd, Reg No 2021/539129/30 of 9 File name: 559-1105062830 NTCSA Standard Conditions of Tender - 01 July 2024 (1) Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 559-1105062830 Rev 1 NTCSA Standard Identifier Conditions of Tender Effective Date 01 July 2024 Review Date July 2027 Provision of 2.33 If the provision of security for performance in the form of a performance bond or a Security for demand guarantee is a requirement, the tenderer must select a minimum of two (2) Performance financial institutions that it is likely to approach from the list provided of NTCSA- approved financial institutions. NTCSA’s 3. NTCSA shall comply with the following obligations: - Obligations Respond to 3.1 Respond to a request for clarification that NTCSA receives before the closing date for requests for clarification or queries. NTCSA’s responses will be published to all tenderers in the clarification same manner the enquiry documents were issued. It is the tenderers’ responsibility to check the NTCSA Tender Bulletin and NT e-Tender Portal regularly for updated responses to clarifications. Issue Addenda 3.2 If necessary and prior to the closing date and time for tender submission, amend, amplify, or add to the Enquiry documents by way of Addenda published in the same media that the Enquiry was issued. It is the tenderers’ responsibility to check the NTCSA Tender Bulletin and NT e-Tender Portal regularly for Addenda. If a tenderer applies for an extension to the closing date and time for tender submission in order to take account of the Addenda in preparing its tender, NTCSA may grant such an extension and shall publish the extension. Return late 3.3 Return tenders received after the closing date and time for tender submission tenders unopened to the tenderer. Tenders will be deemed to be late if they are not received in the designated tender box or at the designated facsimile machine at the date and time stipulated as the closing date and time for tender submission Tender opening 3.4 Open the tenders in the presence of the tenderers’ representatives who choose to attend the tenders’ opening at the time and place stated in the Tender Data. Tenders for which a notice of withdrawal has been submitted will not be opened. 3.5 At tender opening, NTCSA will announce the names of the tenderers. Prices may be announced if so, stated in the Tender Data. Non-disclosure 3.6 Unless required by law, NTCSA will not disclose information relating to the evaluation and comparison of tenders and recommendations for the award of a contract to tenderers or to any other person not officially concerned with the tender process until after the award. Grounds for 3.7 Reject a tender if NTCSA establishes that there is proof that the tenderer influenced the rejection processing of tenders or the awarding of the contract, the existence of collusion and/or bid rigging, and/or that the tenderer has participated in any fraudulent activity in connection with the enquiry. Clarification of a 3.8 Obtain clarification from a tenderer in respect of any matter in the tender that may not tender be clear or that could give rise to ambiguity in a contract arising from this tender if the matter were not to be clarified. A document that the Enquiry identifies as a mandatory tender returnable that is required to be submitted at the closing date and time for tender submission will not be requested, but NTCSA may seek clarity on it. Public When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA SOC Ltd, Reg No 2021/539129/30 of 9 File name: 559-1105062830 NTCSA Standard Conditions of Tender - 01 July 2024 (1) Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 559-1105062830 Rev 1 NTCSA Standard Identifier Conditions of Tender Effective Date 01 July 2024 Review Date July 2027 Basic 3.9 Determine before detailed evaluation, whether each tender received meets the basic Compliance compliance requirements stated in the Enquiry. A tenderer’s failure to comply with the basic compliance requirements will render the tender non-responsive. A tenderer’s failure to have submitted an original tender in paper form or to have submitted a copy of the original, also in paper form, will result in its disqualification from further evaluation. Tenderers will not be permitted to provide a copy of the original tender after the closing date and time for tender submission. Mandatory 3.10 A tender that does not contain the mandatory documents or information stipulated in tender the Invitation to Tender by the required deadlines will be disqualified from further returnables evaluation. Designated 3.11 A tender’s failure to meet an Enquiry’ s stipulated requirement for designated materials and materials will result in its disqualification from further evaluation. thresholds Functionality 3.12 If functionality is a criterion, tenderers will be scored against the functionality criteria requirements and will be required meet the minimum threshold stated in the Tender Data to proceed to further evaluation. Financial 3.13 NTCSA has to determine the risk of doing business with a supplier who may pose a analysis financial risk to NTCSA in the execution of the contract. During evaluation of a tenderer’s (if applicable) financial statements, NTCSA will attempt to identify mitigating factors or requirements for the tenderer to meet, if such factors/requirements exist in the tender’s context. However, should suitable mitigating factors not exist in the tender’s context or should mitigating factors exist but be insufficient or if the risk is considered to be too high or should the tenderer not agree with the mitigating factors, the tenderer will not be considered for award. Evaluation of 3.14 Evaluate the Price in accordance with the criteria/requirements in the Tender Data. Price Factors such as CPA, FOREX, commodity increases, discounts, NPV and forecasted rates of invoicing are taken into account when determining the tendered Price. Arithmetical 3.15 Check responsive tenders for arithmetical errors. If there is a discrepancy between errors an amount in figures and the amount in words, the amount in words shall prevail. Check the highest-ranked tender for the following errors or omissions
the misplacement of the decimal point in any unit rate; or
omissions in completing the pricing schedule or bill of quantities, or
arithmetical errors in line item totals that are the result of the incorrect multiplication of a unit rate and a quantity in a bill of quantities or schedule of prices; or
arithmetical errors that are the result of the incorrect addition of the prices. NTCSA will notify the tenderer of all arithmetical errors or omissions it has identified and will request the tenderer to either confirm the prices as tendered or to accept the corrected prices. Where the tenderer elects to confirm the prices as tendered; NTCSA will correct the error as follows
If a bill of quantities or pricing schedule applies and there is an error in the line-item total that is the result of an error in multiplying the unit rate and the quantity, the line Public When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA SOC Ltd, Reg No 2021/539129/30 of 9 File name: 559-1105062830 NTCSA Standard Conditions of Tender - 01 July 2024 (1) Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 559-1105062830 Rev 1 NTCSA Standard Identifier Conditions of Tender Effective Date 01 July 2024 Review Date July 2027 item total shall prevail, and the rate shall be corrected.
Where there is a misplacement of the decimal point in the unit rate, the line-item total as quoted shall prevail, and the unit rate shall be corrected.
Where there is an error in the total of the prices that is the result either of other corrections required by the checking process or in the tenderer’s addition of prices, the total of the prices shall prevail, and the tenderer shall be asked to revise the selected item prices (and their rates if a bill of quantities applies) to result in the tendered total of the prices. NTCSA will reject the tender if the tenderer does not correct and/or does not accept the correction of errors as required above. Evaluation of 3.16 Score the Specific Goals with reference to the supporting documentation in the tender. Specific Goals If a tenderer fails to meet Specific Goals and/or to submit the required proof/supporting documentation by closing date and time of tender submission, the tenderer will not be disqualified if otherwise evaluated as acceptable in all other criteria; however, the tenderer will score zero points for Specific Goals within the 90/10 or 80/20 allocation of points. Ranking of 3.17 NTCSA will add the score for Pricing and Specific Goals together and rank the tenders tenderers from the highest to the lowest. Objective criteria 3.18 A contract may be awarded to a tenderer that did not score the highest points only in accordance with Section 2(1) (f) of the Preferential Procurement Policy Framework Act,
If NTCSA intends to apply Objective Criteria envisaged in section 2(1)(f), NTCSA must stipulate the Objective Criteria in the Enquiry. Functionality and any element of the B-BBEE scorecard may not be used as Objective Criteria. Reverse e- 3.19 Reverse e-auction is an electronic system that utilises the 90/10 and 80/20 Price and Auction Preference point systems, and which is intended to achieve competitive pricing. NTCSA may utilise reverse e-auction in certain Enquiries. Where reverse e-auction will be utilised, this will be indicated in the Enquiry and the reverse e-auction supporting documents will be issued in the Enquiry. Tenderers will be required to submit a complete tender that does not contain Prices. If a tenderer has included prices in its tender, the prices will not be considered. Acceptance of 3.20 Notify NTCSA's acceptance to the successful tenderer before the expiry of the tender tender validity period. For open tenders, publish notification of award on the platforms on which the Enquiry was issued/advertised. Prepare contract 3.21 Revise the contract documents issued by NTCSA in the Enquiry documents to take documents account of
Addenda issued during the tender period;
inclusion of returnables stipulated in the Enquiry;
inclusion of changes agreed in contract negotiations; and
other revisions or documents agreed in contract negotiations. Sign Form of 3.22 Arrange for authorised signatories of both parties to complete and sign the original Agreement and one copy of the Form of Agreement. Public When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA SOC Ltd, Reg No 2021/539129/30 of 9 File name: 559-1105062830 NTCSA Standard Conditions of Tender - 01 July 2024 (1) Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
CSD number to gain access to
B-BBEE Details: A
Agreement Representative and to sign the contract documents.
Proof of 2.25 Where an agent submits a tender on behalf of a principal, an authenticated copy of
authority to act the authority to act as an agent of the tenderer must be submitted as a tender
as agent returnable.
Compliance with 2.26 Comply with relevant legislation and regulatory instruments such as Instruction Notes
relevant issued by National Treasury, CIDB Regulations for construction works; materials
legislation (NT designated for local content and/or production by the dtic, PPPFA Regulations; Amended
instructions, B-BBEE Codes, COIDA; OHS Act; NTCSA’s requirements for Safety, Health, Environment
CIDB, PPPFA and Quality (SHEQ) and any other applicable legislation or regulatory instruments indicated in
etc) the Invitation to Tender.
Proof of Safety, 2.27 Tenderers are required to provide proof to the satisfaction of NTCSA that safety,
Health, health, environmental and quality (SHEQ) systems, policies and capabilities are in
Environment and place at the deadline stipulated in the Enquiry. All costs and personnel associated with
Quality SHEQ must be reflected in the tender.
requirements
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA SOC Ltd, Reg No 2021/539129/30
of 9
File name: 559-1105062830 NTCSA Standard Conditions of Tender - 01 July 2024 (1)
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document
559-1105062830 Rev 1 NTCSA Standard Identifier
Conditions
Section
Source: Commercial.zipdemonstrate that aspects of the tender satisfy the evaluation criteria, or the negotiation
2.8 Return the mandatory tender returnables to NTCSA for evaluation purposes by tender
returnables evaluation.
materials and materials will result in its disqualification from further evaluation.
Functionality 3.12 If functionality is a criterion, tenderers will be scored against the functionality criteria
to further evaluation.
analysis financial risk to NTCSA in the execution of the contract. During evaluation of a tenderer’s
Evaluation of 3.14 Evaluate the Price in accordance with the criteria/requirements in the Tender Data.
Evaluation of 3.16 Score the Specific Goals with reference to the supporting documentation in the tender.
Specific Goals If a tenderer fails to meet Specific Goals and/or to submit the required proof/supporting
tenderer will score zero points for Specific Goals within the 90/10 or 80/20 allocation
of points.
Ranking of 3.17 NTCSA will add the score for Pricing and Specific Goals together and rank the
Objective criteria 3.18 A contract may be awarded to a tenderer that did not score the highest points only in
must stipulate the Objective Criteria in the Enquiry. Functionality and any element of the
B-BBEE scorecard may not be used as Objective Criteria.
Reverse e- 3.19 Reverse e-auction is an electronic system that utilises the 90/10 and 80/20 Price and
Auction Preference point systems, and which is intended to achieve competitive pricing.
legislation (NT designated for local content and/or production by the dtic, PPPFA Regulations; Amended
CIDB, PPPFA and Quality (SHEQ) and any other applicable legislation or regulatory instruments indicated in
Health, health, environmental and quality (SHEQ) systems, policies and capabilities are in
Quality SHEQ must be reflected in the tender.
Quality Management
Source: Drinking water Standard.pdf (unknown)The document specifies SANS 241-1:2015 Edition 2 drinking water quality standards, including risk categories (Acute Health, Aesthetic, Chronic Health, Operational) and standard limits for physical, aesthetic, chemical, and microbiological determinands. It lists parameters such as colour, conductivity, total dissolved solids, turbidity, pH, free chlorine, nitrate, nitrite, sulphate, fluoride, ammonia, chloride, sodium, zinc, lead, manganese, mercury, nickel, selenium, uranium, aluminium, total organic carbon, trihalomethanes, microcystin, phenols, E.coli, protozoan parasites, total coliforms, heterotrophic plate count, and somatic coliphages, with associated limits and notes.
Health & Safety
Source: Drinking water Standard.pdfAntimony (μg/l as Sb) Chronic Health
Arsenic (μg/l as As) Chronic Health
Barium (μg/l as Ba) Chronic Health 700
Boron (μg/l as B) Chronic Health 2400
Cadmium (μg/l as Cd) Chronic Health
Total Chromium (μg/l as Cr) Chronic Health
Copper (μg/l as Cu) Chronic Health
Cyanide (recoverable) (μg/l as CN-) Acute Health
Description
Source: Technical Evaluation Criteria (1.5L Bottled Drinking Water).pdfThe scope is the supply and delivery of 1.5L bottled drinking water to Southern Grid, Lines and Servitudes, covering the locations of Bloemfontein, Welkom, Port Elizabeth, and East London, on an as-and-when-required basis.
Evaluation Criteria
Source: Technical Evaluation Criteria (1.5L Bottled Drinking Water).pdf (unknown)Bidders must score at least 85% in the technical evaluation to be considered technically acceptable. Failure to provide any required data sheets, compliance certificates, letter of support, warehousing proof, or experience evidence will result in a zero score for that sub-factor, potentially leading to disqualification. Only original or certified copies reflecting the company's name will be accepted.
Technical Specifications
Source: Technical Evaluation Criteria (1.5L Bottled Drinking Water).pdf (unknown)Supply and Delivery Contract of 1.5L Bottled
Water for Southern Grid, Lines and Servitudes.
Functionality Maximum number of Tenderers will be expected to score at least the
Criteria points percentages minimum threshold per functional area to proceed
to the next step
The minimum threshold is 85%.
Technical 100%
Factor Weight Sub-factor / Returnab
Experience & Qualifications
Source: Technical Evaluation Criteria (1.5L Bottled Drinking Water).pdfBidders must have previous experience supplying bottled drinking water, evidenced by completion certificates, task orders, payment certificates, or reference letters with valid contact details. This is part of the technical evaluation (10%).
Financial Requirements
Source: Technical Evaluation Criteria (1.5L Bottled Drinking Water).pdf (unknown)Payment Terms: Payment certificates No 0%
Drinking Water to etc.)
Companies or
Reference letter with valid contact
details will be accepted.
Total Score 100%
The threshold on the technical evaluation criteria is 85%. Suppliers/Distributers would be deemed
technically unacceptable if they score less and will thus be disqualified.
All certified documents should not be older
Compliance Requirements
Source: Technical Evaluation Criteria (1.5L Bottled Drinking Water).pdf (unknown)Completion Certificate / Yes 100%
Section
Source: Technical Evaluation Criteria (1.5L Bottled Drinking Water).pdfTechnical evaluation criteria: 1) Product technical data sheets (25%) – item-specific data sheets required, no score if not all submitted; 2) Standard compliance certificates (45%) – e.g., SANS, EN, CE, ANSI, SANBWA approved, original or certified copies not older than three months; 3) Warehousing facilities (10%) – proof of warehousing facilities and location; 4) Previous experience supplying bottled drinking water (10%) – completion certificates, task orders, payment certificates, or reference letters with valid contact details. Bidders must score at least 85% to be technically acceptable.
Description
Source: NEC.zipThe tender is for the supply and delivery of bottled water to Welkom CLN within the Southern Grid on an 'as and when' required basis. The contract is governed by the NEC3 Supply Contract (SC3) and its Contract Data. The scope of work includes the Purchaser's Goods Information (C3.1) and the Supplier's Goods Information (C3.2). The supplier must deliver the goods to the delivery place as specified in the Contract Data. The supplier must not deliver the goods more than one week before the delivery date unless otherwise agreed. The supplier must submit a first programme for acceptance within the time stated in the Contract Data. The supplier must provide operating manuals and maintenance schedules as required. The contract includes provisions for risk register, late deliveries, and other matters as specified in the Contract Data.
Contact Information
Source: NEC.zip (unknown){"name":null,"email":null,"phone":"011 803 3008","department":null,"address":"n the conditions of contract identified in"}
Submission Guidelines
Source: NEC.zip (unknown)Returnable Documents: C1.1 Form of Offer and Acceptance 03, C1.1 Form of Offer & Acceptance, By the representative of the tenderer, deemed to be duly authorised, signing this part of this Form of Offer, This Offer may be accepted by the Purchaser by signing the Acceptance part of this Form of Offer and, This Offer may be accepted by the Purchaser by signing the Acceptance part of this Form of Offer
Evaluation Criteria
Source: NEC.zip (unknown)Bidders must complete the Form of Offer and Acceptance and provide Contract Data Part 2 (Supplier's data). Must comply with B-BBEE requirements; a change in B-BBEE status must be notified within 7 days, and a decrease may lead to renegotiation or termination. Must provide a tax invoice with the Purchaser's VAT number 4710303126. Must not cede, delegate or assign rights without written consent. Must comply with ethics clauses (no corrupt, fraudulent, collusive, coercive or obstructive actions). Must provide insurance certificates as required.
Technical Specifications
Source: NEC.zip (unknown)Supply and delivery of bottled water to bloemfontein cln within the southern grid, on an ‘as and
When’ required basis
NEC3 Supply Contract (SC3)
Between NTCSA SOC Ltd
(Reg No. 2021/539129/30)
and [Insert at award stage]
(Reg No. ___________ )
for SUPPLY AND DELIVERY OF BOTTLED WATER TO
Bloemfontein cln within the southern
Grid, on an ‘as and when’ required basis
Contents: No of
pages
Part C1 Agreements & Contract Data 01
Part C2 Pricing Data 18
Part C3 Scope of Work
Supply and delivery of bottled water to east london cln within the southern grid, on an ‘as and when’
Required basis
NEC3 Supply Contract (SC3)
Between NTCSA SOC Ltd
(Reg No. 2021/539129/30)
and [Insert at award stage]
(Reg No. ___________ )
for SUPPLY AND DELIVERY OF BOTTLED WATER TO
East london cln within the southern grid,
On an ‘as and when’ required basis
Contents: No of
pages
Part C1 Agreements & Contract Data 01
Part C2 Pricing Data 18
Part C3 Scope of Work
Supply and delivery of bottled water to port elizabeth cln within the southern grid, on an ‘as and
When’ required basis
NEC3 Supply Contract (SC3)
Between NTCSA SOC Ltd
(Reg No. 2021/539129/30)
and [Insert at award stage]
(Reg No. ___________ )
for SUPPLY AND DELIVERY OF BOTTLED WATER TO
Port elizabeth cln within the southern
Grid, on an ‘as and when’ required basis
Contents: No of
pages
Part C1 Agreements & Contract Data 01
Part C2 Pricing Data 18
Part C3 Scope of Work
Supply and delivery of bottled water to welkom cln within the southern grid, on an ‘as and when’
Required basis
NEC3 Supply Contract (SC3)
Between NTCSA SOC Ltd
(Reg No. 2021/539129/30)
and [Insert at award stage]
(Reg No. ___________ )
for SUPPLY AND DELIVERY OF BOTTLED WATER TO
Welkom cln within the southern grid, on
An ‘as and when’ required basis
Contents: No of
pages
Part C1 Agreements & Contract Data 01
Part C2 Pricing Data 18
Part C3 Scope of Work
Financial Requirements
Source: NEC.zip (unknown)Payment Terms: payment certificate from the Supply Manager in terms of core
clause 51.1, the Supplier provides the Purchaser with a tax invoice in accordance with the
Purchaser's procedures stated in the Goods Information, showing the amount due for payment
Part c2: pricing data c2.1 Sc3 pricing assumptions
NTCSA SOC Ltd CONTRACT NO. _________
Supply and delivery of bottled wa
Compliance Requirements
Source: NEC.zip (unknown)C1.1 Form of Offer and Acceptance 03
C1.1 Form of Offer & Acceptance
By the representative of the tenderer, deemed to be duly authorised, signing this part of this Form of Offer
B-BBEE Details: 31.1 The Supplier is to submit a first
programme for acceptance within Not Applicable
32.2 The Supplier submits revised programmes
at intervals no longer than Not Applicable
4 Testing and defects
42 The defects date is As agreed by both parties
43.2 The defect correction period is As soon as one becomes aware
42.2 The defects access period is As soon as one becomes aware
5 Payment
50.1 The assessment interval is Three working days after receipt of Goods
51.1 The currency of this contract is the South African Rand
51.2 The period within which payments are
made is Dependent on the B-BBEE status of the
supplier
51.4 The interest rate is the publicly quoted prime rate of interest
(calculated on a 365 day year) charged from
time to time by the Standard Bank of South
Part c2: pricing data c2.1 Sc3 pricing assumptions
NTCSA SOC Ltd CONTRACT NO. _________
Supply and delivery of bottled water to bloemfontein cln within the southern grid, on an ‘as and
When’ required basis
Africa Limited (as certified, in the event of any
dispute, by any manager of such bank, whose
appointment it shall not be necessary to prove)
for amounts due in Rands and
6 Compensation events There is no reference to Contract Data in this
section of the core clauses and terms in italics
used in this section are identified elsewhere in
this Contract Data.
7 Title There is no reference to Contract Data in this
section of the core clauses and terms in italics
used in this section are identified elsewhere in
this Contract Data.
8 Risks, liabilities, indemnities and
insurance
80.1 These are additional Purchaser’s risks None
88.1 The Supplier’s liability to the Purchaser for
indirect or consequential loss, including
loss of profit, revenue and goodwill is
limited to R0.0 (zer
Section
Source: NEC.zipThe evaluation criteria are not explicitly stated in the extracted text. The tender will be evaluated based on the completeness of the tender documents, compliance with the contract conditions, and the B-BBEE status of the supplier. The Purchaser may renegotiate or terminate the contract if the supplier's B-BBEE status decreases after the contract date. The contract includes provisions for price adjustment for inflation based on the base date and cut-off date.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Bloemfontein, Welkom, Port Elizabeth and East London - various - Free State & Eastern Cape -
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
8
Last checked
12 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
Everything South African general contractors need to know about how to write a winning tender proposal without an in-house bid team in gauteng — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Your meticulously crafted General sector tender submission can be disqualified for a single, seemingly minor compliance oversight. The reality for South African contractors is that technical competence is no longer sufficient; it is underpinned by a non-negotiable framework of documentary compliance. This regulatory guide: mastering CSD and BBBEE compliance for general sector tenders in south africa provides a comprehensive, step-by-step breakdown of the mandatory registrations and certificates you must secure and present. We detail the precise requirements for CSD, BBBEE, SARS TCS, CIPC, and COIDA, explaining their function within the procurement ecosystem governed by the PFMA and PPPFA. Learn the actionable steps to prepare your business, avoid the most common disqualifying errors, and leverage technology to streamline your compliance process for successful bidding in 2026 and beyond.
For South African General contractors, the path to government procurement is paved with non-negotiable regulatory requirements. The most common barrier to entry is not a lack of capability, but a failure to master the foundational compliance frameworks that govern every bid. This complete regulatory guide to CSD and BBBEE compliance for General sector tender suppliers in South Africa demystifies the process. It provides a meticulous, step-by-step field manual for ensuring your company is fully compliant and audit-ready, enabling you to confidently access the R billions in opportunities across infrastructure maintenance, facilities management, and service delivery within the General sector.
Everything South African general contractors need to know about the complete guide to csd and bbbee compliance for general sector suppliers in south africa — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services: General. Unlock full pricing strategies, bid frequency, and historical win rates.