Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Eskom Road - Brackenfell - Cape Town - 7560
Organization Type
GOVERNMENT
Published
07 Sept 2026
OCDS Reference
ocds-9t57fa-169345
Date & Time
Wednesday, 30 September 2026 - 10:00
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Venue
MS Teams
Categories
Request for Bid(Open-Tender)
Eskom Road - Brackenfell - Cape Town - 7560
AI Document Analysis Stages
Important Dates
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)07 Sept
2026
Tender Published
Tender was published
30 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Non-Disclosure Agreement (NDA) Vendors Template.pdf
Eskom is procuring the hiring of portable toilet facilities and their servicing at various sites in the Western Cape on an as-and-when-required basis. The tender is open for a long period, with a closing date of 30 September 2026.
NEC3 TSSC - Term Services Toilet hire contract Dx Western Cape OU 30 June 2026.pdf
No summary available
Clarification meeting for Toilet Hire and applicable servicing.ics
240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdf
Eskom General Conditions of Purchase - 31 May 2024_Rev.pdf
Hiring of portable toilet facilities and applicable servicing at various sites in the Western Cape on an as and when required basis, for Eskom.
Environmental Requirements - Hiring of Toilets .xlsx
Annexure C 3 HS Tender Evaluation Template.pdf
Invitation to Tender (ITT) Toilet hire and cleaning services re-issue 07 September 2026.pdf
240-126469599_Method Statement template -Rev 3 .docx
E-tendering Help Manual for supplier - 27 January 2025.pdf
E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf
240-68099512 Form A_Cat 4_ Rev 9.pdf
Eskom is procuring the hiring and servicing of portable toilet facilities at various sites in the Western Cape, on an as-and-when-required basis. The tender includes pre- and post-contract quality requirements aligned with Eskom's specification 240-105658000 and ISO 9001, with the tenderer required to acknowledge and accept these quality conditions.
Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026 (1).pdf
Eskom is procuring the hiring and servicing of portable toilet facilities at various sites in the Western Cape on an as-and-when-required basis. The tender includes a PAYE questionnaire that bidders must complete to determine their tax classification for service contracts with Eskom.
Technical Evaluation Criteria for Hiring of Portable toilet .pdf
ESKOM is hiring portable toilet facilities and servicing at various sites in the Western Cape on an as-and-when-required basis. Bidders must meet a minimum technical threshold of 80% to proceed.
Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf
Eskom is procuring the hiring and servicing of portable toilet facilities at various sites in the Western Cape, on an as-and-when-required basis. The tender is governed by Eskom's Standard Conditions of Tender (Rev 12), which set out the procedural and compliance obligations for bidders.
240-105658000 Supplier Quality Management Specification (3).pdf
Eskom seeks to hire portable toilet facilities with servicing at various sites in the Western Cape on an as-and-when-required basis. The tender is open until 30 September 2026, and bidders must comply with Eskom's Supplier Quality Management specification (240-105658000), which requires a quality management system aligned to ISO 9001 and submission of quality documentation according to a selected category (1-4).
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 275 825
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
{"closingDate":"17 October 2021"}
Contact Information
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown){"name":null,"email":null,"phone":null,"department":"Supply Chain Management","address":null}
Evaluation Criteria
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Bidders must complete and sign Form A (Tender and Contract Quality Requirements for Supplier Quality Management Specification 240-105658000/QM 58 and ISO 9001). Bidders must have a QMS conforming to ISO 9001 (latest revision) or an applicable QMS standard. Depending on the category, bidders must submit a valid ISO 9001 certificate (Category 1) or documented evidence of a QMS (Categories 2-4). Bidders must submit the required quality documentation as per the List of Tender Returnables (240-12248652). Eskom may perform capability and capacity assessments prior to contract award. No other eligibility criteria (e.g., CSD registration, tax clearance, B-BBEE level, CIDB grading) are stated in the provided document.
Technical Specifications
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Title: Supplier Quality Management: Document Identifier: 240-105658000
Alternative Reference QM 58
Number:
Area of Applicability: Eskom Holdings SOC Ltd
Functional Area: Quality Management
Revision: 3
Total Pages: 28
Next Review Date: October 2024
Disclosure Controlled Disclosure
Classification:
Compiled by Supported by Functional Authorized by
Responsibility
SA Sambo P Dondashe L Meyer K Pather
Chief Advisor Middle Manager Acting Senior General Manager
Quality Quality Manager Quality Risk and
Management Management Management Sustainability
Date: 15/10/2021 Date: 15/10/2021 Date: 15/10/2021 Date: 17 October 2021
EDC TN Formatted 15.10.2021
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Content
. Introduction ............................................................................................................................... 3
2.1 Scope ............................................................................................................................... 3
2.1.1 Purpose ................................................................................................................. 3
2.1.2 Applicability ........................................................................................................... 3
2.1.3 Effective date ......................................................................................................... 3
2.2 Normative/Informative References ................................................................................... 3
2.2.1 Normative .............................................................................................................. 3
2.2.2 Informative............................................................................................................. 3
2.3 Definitions ........................................................................................................................ 4
2.4 Abbreviations ................................................................................................................... 5
2.5 Roles and Responsibilities ............................................................................................... 6
2.6 Process for Monitoring ...................................................................................................... 6
2.7 Related/Supporting Documents ........................................................................................ 6
3.1 Supplier and Sub-Supplier Quality Management System Requirements .......................... 7
3.2 Quality Plan ...................................................................................................................... 8
3.3 Contract Quality Plan........................................................................................................ 8
3.4 Quality Control Plan ....................................................................................................... 10
3.5 Pre-Contract Award: Quality Requirement ...................................................................... 13
3.6 Main Supplier and Sub-supplier Capability and Capacity Assessment ........................... 16
3.7 Post-Contract Award ...................................................................................................... 17
3.7.1 Contract Execution .............................................................................................. 17
3.7.2 Supplier Quality Performance Monitoring Phase ................................................. 18
3.7.3 Supplier Quality Audit .......................................................................................... 18
3.8 Standard Conditions ....................................................................................................... 19
3.8.1 Rights of Access .................................................................................................. 19
3.8.2 Eskom Rights to Information ................................................................................ 20
3.8.3 Preservation ........................................................................................................ 21
3.8.4 Quality Audits Related Conditions ....................................................................... 25
3.8.5 Management of Nonconformities and Nonconforming Outputs Identified by
Eskom ................................................................................................................. 25
3.8.6 Special Processes ............................................................................................... 26
Acceptance ............................................................................................................................. 27
Revisions ................................................................................................................................ 27
Development Team ................................................................................................................ 27
Acknowledgements ................................................................................................................ 28
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The intention of this specification is to specify and describe the minimum quality requirements for all
existing and potential Eskom suppliers and define the quality criteria for the selection, evaluation,
vendor registration, management, monitoring, assessment and auditing of suppliers. Eskom’s
position is to partner with suppliers who fully demonstrate commitment to the development,
implementation, and maintenance of a quality management system (QMS) that conforms to the
requirements of ISO 9001 standard. The priority is to encourage suppliers to continually improve
their QMS and enhance service delivery by implementing and conforming to the standard.
2.1 Scope
2.1.1 Purpose
The purpose of this specification is to outline the requirements according to which suppliers shall
develop,
implement,
maintain, and
continually improve
a quality management system (QMS) based on ISO 9001, which should form the basis for conformity
to Eskom quality requirements and continually adhere to them throughout the duration of a contract
2.1.2 Applicability
This specification shall apply throughout Eskom Holdings Limited divisions, its subsidiaries,
suppliers, and sub-suppliers and shall form part of all Eskom requests for information (RFI)/ requests
for quotation (RFQ)/ requests for proposal (RFP), including contracts for the procurement of products
and services.
2.1.3 Effective date
Date of authorisation of the specification
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] ISO 9001 Quality Management Systems – Requirements
[2] ISO 10005 Quality Management Systems – Guidelines for Quality Plans.
2.2.2 Informative
[3] ISO 9000 Quality Management Systems – Fundamentals and Vocabulary
[4] 32-727: Safety, Health, Environment, and Quality (SHEQ) Policy
[5] ISO 10006 Quality Management Systems – Guidelines for Quality Management in Projects
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
[6] ISO 9004 Quality Management – Quality of an Organisation – Guidance to Achieve Sustained
Success
[7] 32-1033: Eskom’s Procurement and Supply Chain Management Policy
[8] 32-1034: Eskom’s Procurement and Supply Chain Management Procedure
[9] PPPFA: Preferential Procurement Policy Framework Act, 2000 (Act No. )
[10] CIDB 1004: Best Practice Guideline A4: Evaluating Quality in Tender Submissions
[11] 240-12248652 Supplier Quality Management: List of Tender Returnables
[12] IAEA Safety Standard GS-R-3.1 Application of the Management System for Facilities and
Activities
[13] SANS 10845-1 Construction Procurement Part1: Processes, Methods and Procedures
2.3 Definitions
The vocabulary of ISO 9000 and the following definitions apply in the application of this specification.
2.3.1 Component: a constituent part of the product or sub-assembly of the product. The product
may comprise multiple individual components
2.3.2 Contract Quality Plan: a document of the supplier’s process for delivering the level of quality
required by the contract. It is a framework for the contractor’s process for delivering quality.
Purpose of a CQP is to outline how the results defined in the specifications will be achieved.
2.3.3 Hold Point: a predetermined stage in the quality control plan (QCP) beyond which work/
manufacturing shall not proceed without the attendance of, and written authorisation of, an
Eskom representative or Eskom inspection agency, whichever is applicable.
2.3.4 Intervention Points: those control points indicated by the various controlling bodies
concerned with the implementation of a specific QCP/ ITP. These can be in the form of
inspection, hold points, surveillances, witnesses, reviews and verifications.
2.3.5 Inspection Agency: an organisation or person appointed by Eskom for the purpose of
performing quality assurance/ quality control, monitoring, inspection and/ or expediting
services.
2.3.6 Level 1 Plant Items: equipment, whose failure has an effect on personnel safety and/ or
health, causes an environmental incident, cause a huge production loss or major equipment
damage. Equipment that are safety/ redundancy/ protective device or covered by statutory
regulations requirements.
2.3.7 Level 2 Plant Items: equipment, whose failure impacts plant availability and/or reliability,
causes significant costs or secondary damage.
2.3.8 Level 3 Plant Items: equipment that does not impact on personnel safety and/ or health,
environmental, cost, availability and/ or reliability of plant.
2.3.9 Nonconformity: a deficiency in material, composition, characteristic, or performance that
renders the quality of an item, component, or product unacceptable or indeterminate. The
term also covers a deficiency in, or deviation from/non-adherence to, the quality management
system requirements, prescribed production processes, and/or related documentation such
as procedures and instructions.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
2.3.10 Quality Plan: specification of the actions, responsibilities and associated resources to be
applied to a specific object.
2.3.11 Quality Control Plan: a document specifying the activities to be inspected throughout the
execution of the project, inclusive of test methods, procedures, and acceptance criteria (This
term is equivalent to QIP and ITP).
2.3.12 Requirement: the need or expectation that is stated, generally implied, or obligatory.
Requirements are generally specified in the purchase order and/or contract documentation,
but may not be limited to these.
2.3.13 Primary Plant (Power Plant): primary plant include High Voltage equipment situated inside
the control room (breakers, bus-bars, CT’s, VT’s and transformers).
2.3.14 Secondary Plant (Control Plant): secondary plant includes all equipment used to control
and protect the HV equipment on the primary plant side. (Protection, metering, AC/DC and
tele-control).
2.3.15 Special Process: is any production or service process which generates products or services
which cannot be measured, monitored, or verified prior to delivery and use.
2.3.16 Supplier: is a current or potential supplier, vendor, contractor, consultant, or service provider.
A supplier may be a natural or legal person and includes any employee acting within the
course and scope of his/her employment or any agent or manager acting for, or on behalf of,
or in the interests of, the person registered as supplier on the Eskom supplier database.
2.3.17 Sub-supplier: an organisation that provides a product/service to the supplier and/or that
enters into a subcontract and assumes some of the obligations of the supplier or prime
contractor.
2.3.18 Witness Point: a predetermined stage in the quality control plan where and inspection
activity will take place. Work may proceed, provided Eskom or its inspection agency has been
formally notified and confirmed that inspection is waived.
2.4 Abbreviations
Abbreviation Explanation
AIA Approved Inspection Authority
CA Corrective Action
CQP Contract Quality Plan
FIDIC Federation Internationale Des Ingenieurs- Conseils
FMECA Failure Mode, Effects and Criticality Analysis
HAZOP Hazard and Operability Study
ISO International Organisation for Standardisation
ITP Inspection and Test Plan
NC Nonconformity
NDT Non Destructive Testing
PMI Positive Material Identification
QCP Quality Control Plan
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Abbreviation Explanation
QMS Quality Management System
PQP Project Quality Plan
RFI Request for Information
RFQ Request for Quotation
RFP Request for Proposal
SHEQ Safety, Health, Environment, and Quality
SETA Skills Education Training Authorities
WPS Welding procedure specifications
WQR Welder’s Qualification Record
2.5 Roles and Responsibilities
Eskom Quality representative/ professional will select applicable requirements for existing and
potential Eskom suppliers using Form A (Tender and Contract Quality Requirements for Supplier
Quality Management: Specification 240-105658000/ QM 58 and Quality Requirements for ISO 9001
Standard).
The existing and/ or potential suppliers must complete, sign and return Form A with the other
returnable as listed in the List of Tender Returnable document (240-12248652). Other roles and
responsibilities for this standard are defined within the text of this specification.
2.6 Process for Monitoring
The application of this specification throughout Eskom shall be audited as per the management
system audit schedule.
2.7 Related/Supporting Documents
The documents superseded by this specification: all divisional and business unit supplier quality
requirements standards and/or specifications.
Forms and templates:
[1] 240-68099512 Tender and Contract Quality Requirements for Supplier Quality Management
Specification 240-105658000/ QM 58 and Quality Requirements for ISO 9001 Standard (Form
A)
[2] 240-109253698 Template for a Typical Contract Quality Plan
[3] 240-109253302 Quality Control Plan/Inspection and Test Plan
[4] 240-126469599 Method Statement Template.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The quality assessment criteria and Form A of this specification will be selected and completed by
an Eskom Quality representative/ professional who will identify the applicable supplier quality
requirements to be met.
Form A of this specification must also be completed and signed by the supplier responding to an
Eskom invitation to tender, in order to acknowledge and accept Eskom Supplier Quality requirements
as per this specification and ISO 9001 Standard or any additional quality requirements specific to
the scope of work.
3.1 Supplier and Sub-Supplier Quality Management System Requirements
3.1.1 The supplier and sub-supplier shall develop, implement, maintain and improve a formal QMS
that conforms to the latest ISO 9001 standard or any applicable standard of QMS (latest
applicable revision) and in accordance with the requirements of this specification.
3.1.2 Such a formal system shall consist of the appropriate documented information required by
ISO 9001 and may include a quality manual, quality plans, work procedures, work
instructions, method statements, work flow documentation, etc., as the case may be. This
requirement constitutes the most basic QMS requirements.
3.1.3 Unless specifically excluded from the quality list of tender returnable, as per the categories of
quality requirements (Category 1, 2, 3, or 4), such a QMS shall carry a valid ISO 9001
certificate from an accredited certification body, as indicated in the applicable Eskom
invitation (this requirement applies equally to both the supplier and any/ all manufacturing
third-party organisations mentioned above).
3.1.4 Unless specifically excluded in the quality list of tender returnable, as per the categories of
quality requirements (Category 1, 2, 3, or 4), the supplier shall have a fully developed,
documented, implemented, reviewed and maintained QMS that complies with the
requirements of ISO 9001 standard or any applicable standard of QMS. In the event that the
main supplier invariably requires the assistance of a sub-supplier in order to realise its own
supply obligations. The aforementioned requirement applies equally in all cases where any
such sub-supplier’s scope of responsibility includes the provision of any of the following
activities, namely, design and development, manufacturing, maintenance, testing, storage,
delivery, installation, commissioning, and project management, or in the cases the supplier
name changes, mergers, acquisitions and/ or cessions. Eskom Quality department must
ensure that the changed entity can still fulfil the requirements as set out in the contract
documentation.
3.1.5 Eskom reserves the right to request and perform necessary assessments at sub-supplier
facilities.
3.1.6 The main supplier shall be responsible for defining and managing the specific quality
assurance and control elements applicable to the respective sub-supplier’s scope of
work/supply and ensure that its sub-supplier(s) quality programmes support Eskom
requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.1.7 The supplier shall inform Eskom of any proposed changes to the QMS or staff that will affect
the quality system prior to implementation of these changes.
3.1.8 The main supplier shall develop and implement a performance management programme for
their sub-supplier. The programme shall include, but not limited to:
Verification of the QMS
Audits and surveillances
Regular assessment of the CQPs and reviews of QCPs.
NC and Defect Management
Inspection and test plans
Risk management
3.2 Quality Plan
The information in this section constitutes the minimum requirements for a quality plan.
3.2.1 Where specified in the Evaluation Criteria and/ or quality list of tender returnables , as per the
categories of quality requirements (Category 1, 2, 3, or 4); all individual products, services
and processes shall have a documented, implemented, reviewed and maintained contract
quality plan and/or quality control plan (inspection and test plan).
3.2.2 Where specified in the evaluation criteria and/ or quality list of tender returnables. All
production and/ or service provision shall be carried out in accordance with a documented
and agreed contract quality plan (CQP) and/ or quality control plan (QCP)/ inspection and test
plan (ITP).
3.2.3 The supplier shall plan for the required quality-related activities and interfaces within the
supplier’s quality system in order to demonstrate its ability towards both controlling and
meeting specified Eskom requirements.
Note 1: Contract Quality Plan should address the quality assurance elements related to the scope
of work and/ or technical specification.
Note 2: Quality Control Plan (QCP)/ Inspection and Test Plan (ITP) should address the quality
control elements related to the scope of work and/ or technical specification.
3.3 Contract Quality Plan
The main supplier shall require sub-suppliers to submit project quality plans (PQPs)/ contract quality
plans (CQPs) and associated documentation in accordance with the requirements of project QMS
processes applicable to the sub-supplier’s scope of work.
The supplier shall, where applicable, based on scope of work criticality, ensure that procurement
documents clearly and unambiguously require sub-supplier submission of a sub-supplier CQP for
supplier and Eskom review.
The main supplier shall ensure that sub-supplier CQPs are developed and implemented in
accordance with the ISO 10005 Quality Management System Guidelines for Quality Plans. In
addition to the elements specified in ISO 10005, the supplier’s and/ or sub-suppliers’ CQPs shall
include the following (as applicable):
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.3.1 The management of records, including material tests, positive material identification (PMI)
testing, material certification, etc.
3.3.2 The provision for free and uninhibited access by the supplier and/or personnel at the time of
inspection.
3.3.3 The proposals for submission of final documentation, the final manufacturing data book, prior
to shipment.
3.3.4 The special processes related to welding: management of the welder’s qualification record
(WQR), welding procedure specifications (WPS), and procedures qualification records (PQR)
that will be used in the performance of work for supplier review and acceptance prior to
commencing manufacture. Welders shall be qualified to the specified Codes of Construction
for the applicable procedures. The requirements for qualification shall be specified by the
supplier, and welder records shall be maintained by sub-suppliers performing the work.
3.3.5 The special installation procedures and other required fabrication or manufacturing
procedures (that is, those required for post-weld heat treatment, tube rolling, coatings, etc.)
that will be used in the performance of work shall require supplier review and acceptance
prior to commencing manufacture. The personnel carrying out special processes (for
example, NDE, welding, coating, heat treatment, etc.) where the results cannot be fully
verified by subsequent inspection and test shall be suitably qualified and, where applicable,
registered with statutory bodies as legally required, that is, as radiographic workers to conduct
radiography. The requirements for the qualification shall be specified, and personnel records
shall be maintained in accordance with the Project Quality Personnel Qualification
Specification and, where applicable, legal requirements.
3.3.6 The personnel required to perform special processes shall be certified competent through a
certificate of competency in accordance with the company’s internal training management
and competency control procedures or an external certification body (for example, NDT)
through an accredited service provider as per Skills Education Training Authorities (SETA)
requirements.
3.3.7 All personnel who perform activities that affect quality shall have their training needs identified
and documented. The required training shall be implemented in accordance with the
company’s training management and competency control procedures. All the training
certificates shall meet the SETA requirements in terms of having the unit standard completed
and the accreditation number of the service providers.
3.3.8 Instructions and requirements for equipment and materials storage, preservation, and
maintenance, including identification of materials required for preservation and maintenance,
are to be provided sufficiently prior to receipt (prior to shipment or earlier) to ensure that
appropriate resources are available at the time of delivery.
3.3.9 Specific quality monitoring and verification activities are to be undertaken on the supplier’s
sub-suppliers by Eskom or it agent.
3.3.10 The CQP information need to include, but not limited to:
Spells out the aspects of the QMS to be applied within a specific Eskom project, and the
methods to be utilised to ensure quality.
Outline the resources, the communication channels, applicable documents and records to be
generated.
Management Authority and Responsibility from both supplier and client need to outline in the
Cqp.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
List of documents and records that will be used and submitted during the execution of the
project.
Communications channels should include contact person and contact details
Monitoring & measurement procedures for activities need to be indicated.
3.3.11 The main supplier and sub-supplier CQPs shall comply with the Eskom Quality Requirements
Specifications and shall be submitted prior to the initial scope of work kick-off or initial pre-
fabrication meeting and prior to commencement of manufacturing, whichever is earlier.
3.3.12 The Eskom template for CQP provided shall be used as guideline, where the supplier does
not have a CQP template.
3.4 Quality Control Plan
The supplier shall develop and implement processes and procedures that efficiently and effectively
monitor, verify and document the quality of the scope of work for deliverables.
The main supplier shall ensure that sub-supplier QCPs/ ITPs are prepared at a level of detail
sufficient to address all quality-control-related activities in a chronological order, from contract review
through materials verification, manufacturing, fabrication, assembly, final testing, commissioning,
hand-over documentation, and certification. In addition, the supplier shall ensure compliance with
the following requirements:
3.4.1 All stages of manufacturing, fabrication, assembly and installation shall be controlled by a
supplier’s QCP/ ITP that clearly and unambiguously identifies the quality verifications to be
performed and special attention to controls related to critical products and services.
3.4.2 QCP/ ITP shall be reviewed and accepted by Eskom, its inspection authority or agency, and
they shall allow for the insertion of Eskom specific requirements, including hold and witness
points prior to the commencement of work.
3.4.3 Subsequent changes to the Eskom accepted QCP/ ITP shall require Eskom, its inspection
authority or agency’s agreement prior to the commencement of work involving an activity
affected by such changes.
3.4.4 The ITPs should cover materials certification, fabrication works, in-process inspections, final
acceptance tests, packaging and pre- shipment/ transportation, shipping/ transportation
inspections where contracted, preservation, site acceptance tests, construction and erection
works, and pre-commissioning and commissioning tests.
3.4.5 All sub-supplier QCP/ ITP activity shall be performed using an Eskom-accepted supplier
Qcp/ itp.
3.4.6 All applicable codes, standards, and relevant acceptance criteria documents are available at
the work location, and Eskom representatives on site shall have on-going access to this
information. Workplace documentation shall be available in English and in any workforce-
appropriate language.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.4.7 Where activities subject to inspection and test procedures are to be undertaken by a sub-
supplier, the QCP/ ITP shall make reference to this fact and shall include descriptive details
of the sub-supplier’s involvement. A separate QCP/ ITP shall be required for each sub-
supplier scope of work.
3.4.8 The supplier shall be ultimately accountable and responsible for the development and proper
implementation of all sub-supplier QCPs/ ITPs, including those reviewed or developed by
sub-suppliers.
3.4.9 Eskom reserves the right to select intervention points on QCPs/ ITPs for Eskom oversight of
selected functions and to perform surveillance or audits of the work.
3.4.10 Once signed, the ITPs and QCPs become addendums to the main contract. These ITPs can
be reviewed at Eskom’s discretion based on its assessment of the supplier’s performance or
other risks.
3.4.11 A QCP/ ITP shall contain the following information:
Eskom contract number and title
The supplier’s order number
Identification of the area of works/contract
Description of the work, with components, item number, and activity date
QCP/ITP unique number
A list of the sequence of operations, including inspection and tests
The identification of the specification, drawing number, or procedure for each operation,
with reference to the relevant criticality risk rating
The acceptance criteria, with reference to the technical specification, in-house, national, or
international standard, with the relevant clause number for each operation
The inspection and test activities that the supplier has nominated for its intervention points
Provision for the inclusion of intervention points nominated by Eskom and/or its authority/
agency
Provision for intervention point acceptance by date and signature for all parties having
intervention in the plan
Inspection and test records to be generated by the supplier for each operation and an
indication of records to be provided to Eskom (as applicable)
3.4.12 The main supplier shall require sub-suppliers to submit QCPs/ ITPs and associated
documentation applicable to the sub-supplier scope of work. Any changes made to the QCP
after submission must be resubmitted to Eskom for further review. The supplier shall ensure
that all sub-supplier QCPs/ ITPs are in compliance with the Eskom Quality Requirements
Specifications, including, but not limited to, the following requirements:
Clear and unambiguous description of the equipment and location(s) at which each activity
will take place, including facility location(s)
Identification of quality verification activity and stage
The details of reference documents, procedures, or method statements to be utilised in
performance of the activity, including specific reference to actual sections and pages of
procedures, standards, instructions, specifications, etc.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Definition of acceptance criteria
Listing of certifying or verifying documents generated to provide evidence of compliance
with specified requirements; documents are to be provided using the proper Eskom
document numbering requirements
Identification of main supplier and sub-supplier (where applicable) third-party/approved
inspection authority (AIA) and Eskom inspection activities defined in terms of witness, hold,
document review, and verification monitoring points and provision for sign-off of each of the
above-mentioned parties for each intervention point
Qualification requirements for quality control inspectors, including any third-party/AIA
inspectors
Listing of all proposed test procedures
Acceptance criteria for each inspection or test in alignment with specified tolerances
A section for signed acceptance of the QC/ITP by the supplier, sub-supplier (where
applicable), and Eskom prior to commencement of work
Inspection or testing intervention points, including, but not limited to, factory acceptance test
and package acceptance test, witness, and hold points
3.4.13 A quality kick-off meeting will be held at the start of the contract and, if required, at the start
of each subsequent phase.
The supplier shall arrange coordination meetings with Eskom prior to placement of orders
for items or equipment to ensure that all technical and commercial requirements are clear
and understood. Fourteen days’ advance notice of meetings shall be given to Eskom.
Supplier inspection personnel, including inspection agency personnel, shall be competent
and qualified to perform inspection and testing assignments. Mobilisation of all such
personnel shall be in compliance with the Project Quality Personnel Qualification
Specification.
3.4.14 Where QCP/ ITP is applicable, the supplier shall ensure that sub-suppliers are provided with
comprehensive, clearly written, and unambiguous inspection and testing protocols, including
processes, procedures, and methods that shall include, but not be limited to, the following:
Requirements for inspection checklists and inspection assignments, with lists of items to be
inspected
An inspection and testing report format, report content, schedule for report processing and
distribution, and report retention requirements
Inspection and test report results response tracking (log) and resolution of nonconformity in
inspection and test processes, procedures, or methods and nonconformity identified in
inspection and test results
Associated Failure Mode, Effects and Criticality Analysis (FMECA) reports relating to the
equipment and sub-systems (if applicable)
Hazard and Operability Study (HAZOP) report, as applicable
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.4.15 The supplier shall establish processes and procedures for formal assessment of sub-supplier
inspection and testing programmes. These shall include review of sub-supplier inspection
reports and other quality control documentation. Additional formal assessment of
manufacturing, fabrication, and assembly facility operations shall be conducted by the
supplier to ensure continuing suitability, adequacy, and effectiveness of the sub-supplier’s
inspection and testing programmes. Assessment frequency shall be established in
consideration of the sub-supplier scope of work, criticality of scope of work deliverables, and
performance information. The assessment scope and schedule shall be developed in
consultation with Eskom.
3.4.16 Supplier processes and procedures for verification of supplier and sub-supplier purchased
product compliance with specifications shall obtain document return/review status prior to
implementation.
3.4.17 The objective is to finalise any outstanding procedural or other issues before proceeding to
deliver the works.
3.4.18 Eskom, in consultation with the supplier, develops an agenda for the meeting, and Eskom will
keep minutes of these meetings.
3.4.19 Mandatory pre-inspection meetings will be convened by Eskom or its inspection agency or
AIA to be attended by the supplier’s and sub-supplier’s representatives, including their quality
representatives who will be involved in the works, and records are to be kept.
3.4.20 Eskom reserves the right to appoint resident quality inspectors who can be based at the
supplier’s or sub-supplier’s premises and on site where the work is being performed. The
supplier is expected to provide workspace at no cost to Eskom for the inspector, as required.
3.4.21 Eskom may appoint any organisation it prefers to perform quality assurance and quality
control activities, either in the capacity as an AIA or inspection agency, on the works
contracted to the supplier, and the supplier or its sub-suppliers may not object, prevent,
hinder, undermine, circumvent, question, discredit, or in any way make it impossible for such
organisation to carry out its work on behalf of Eskom.
3.4.22 The Eskom template for QCP/ ITP provided shall be used as guideline, where the supplier
does not have a QCP/ ITP template.
3.5 Pre-Contract Award: Quality Requirement
3.5.1 Main Supplier and Sub-supplier Categories
Eskom supplier quality requirements for all existing and potential suppliers and sub-suppliers are
classified into four categories (category 1, 2, 3 and 4). Suppliers must prepare and submit quality
documentation as per the tender selected category (indicated in Form A) using the list of tender
returnables document.
NOTE: Only one (1) category must be applicable per procurement process e.g. [Eskom requests for
information (RFI)/ requests for quotation (RFQ)/ requests for proposal (RFP), including contracts for
the procurement of products and services].
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The following are the minimum returnable documentation for Categories 1 to 4:
3.5.2 Category 1: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit a valid copy of ISO 9001 or any applicable certificate of a QMS (the
latest applicable revision). The QMS should drive the supplier’s business management
processes to ensure that all of Eskom’s requirements are fully met on a consistent basis.
The supplier shall submit the latest copy of the management system internal and external
audit reports. The audit reports must include, if applicable, nonconformity identified, and the
resulting remedial actions (correction and/ or corrective action reports).
The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
Where applicable; the supplier shall submit a draft, or an example of an inspection and test
plan (ITP) or quality control plan (QCP) on similar and/ or previous work done.
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
The supplier shall submit documented information retained (records) of management review
meetings that include agenda, meeting minutes, attendance registers, reports, presentations,
etc.
Note: specific requirements per tender will be selected using the List of Tender Returnable
documents (240-12248652).
3.5.3 Category 2: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit objective evidence of a developed, implemented and maintained QMS
that complies with ISO 9001 or any applicable standard of quality management system (the latest
applicable revision). The following documents (approved/ signed copies) shall be submitted:
Quality Management System manual or a documented information that have defines and
describes the QMS and its scope
Quality Policy, aligned with the supplier’s strategic direction (documented information)
Quality Objectives (documented information)
Control of documented information (both maintain and retain documented information )
Internal audit procedure (documented information)
Control of nonconforming outputs (documented information)
Nonconformity and Corrective action procedure (documented information)
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The QMS should drive all the supplier’s business management processes to ensure that all of
Eskom’s requirements are fully met on a consistent basis.
The supplier shall submit the latest copy of the management system internal audit reports. The
audit reports must include, if applicable, nonconformity identified, and the resulting remedial
actions (correction and/ or corrective action reports).
The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
Where applicable; the supplier shall submit an example of inspection and test plan (ITP) or
quality control plan (QCP) on similar or previous work done.
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
The supplier shall submit documented information retained (records) of management review
meetings that include agenda, meeting minutes, attendance registers, reports, presentations,
etc.
Note: specific requirements per tender will be selected using the List of Tender Returnable
document (240-12248652).
3.5.4 Category 3: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit objective evidence of a developed QMS that complies with ISO 9001
(or the latest applicable revision). The following documented information (approved/ signed
copies) shall be submitted:
o Quality management system manual or a (documented information) that have
defines and describes the QMS and its scope
o Quality Policy, aligned with the supplier’s strategic direction (documented
information)
o Quality Objectives (documented information)
o Control of documented information (both maintain and retain documented
information )
o Internal audit procedure (documented information)
o Control of nonconforming outputs (documented information)
o Nonconformity and Corrective action procedure (documented information)
The QMS should drive all the supplier’s business management processes to ensure that all of
Eskom’s requirements are fully met on a consistent basis.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
Where applicable; the supplier shall submit an example inspection and test plan (ITP) or
quality control plan (QCP).
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
NB: specific requirements per tender will be selected using the List of Tender Returnables
document (240-12248652).
3.5.5 Category 4: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit a quality method statement based on ISO 9001 and specific to the
scope of work.
The quality method statement should address all the supplier’s business management
processes to ensure that all of Eskom’s requirements are fully met on a consistent basis.
The supplier shall submit a signed/ approved quality policy (aligned with the supplier’s strategic
direction). (documented information)
The supplier shall submit a copy of quality objectives. (documented information)
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of the documented information for roles, responsibilities and
authorities, specific to the project/ scope of work/ technical requirements. Examples of relevant
documented information are; organization charts, job descriptions, work instructions, duty
statements, manuals, procedures.
Note: specific requirements per tender will be selected using the List of Tender Returnables
document (240-12248652).
3.6 Main Supplier and Sub-supplier Capability and Capacity Assessment
Supplier capability and capacity assessments shall be performed prior to contract award on potential
suppliers participating in Eskom Holdings procurement process to:
provide products and services with high risk to operational sustainability
work on critical plant and equipment
supply of critical plant items or components
provide special processes
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
All sub-suppliers used by the main supplier/ contractor, performing work on Eskom critical plant
equipment, supplying commodities and providing specialised services shall be subjected to the
capability and capacity assessment.
Critical plant includes the following:
Generation Level 1 & 2 plant
Transmission and Distribution Power Plant & Control Plant
Mega Projects
All potential quality risks identified will be included in the assessment report provided for the tender
evaluation.
Note: Form A (Enquiry/ Contract/ Quality Requirements for Supplier Quality Management:
Specification 240-105658000/ QM 58 and ISO 9001) will be used to select and indicate whether
capability and capacity assessment will be conducted.
3.7 Post-Contract Award
3.7.1 Contract Execution
The supplier shall submit the following documents within 30 days or as per stated timeline after the
contract date, prior to the commencement of work, for acceptance by Eskom:
The supplier shall complete a QCP before contract award. This shall be reviewed and
signed off by Eskom within 30 days or as per stated timeline after contract award.
The supplier shall complete a quality control plan and ITP(s) for review and acceptance by
Eskom prior to the commencement of any work, inclusive of subcontracted work, within 30
days or as per stated timeline after contract award.
The sub-supplier QCP/ ITP shall be submitted for review and comment by the supplier and
by Eskom within 30 days or as per stated timeline after the award of the tender. All supplier
and Eskom comments shall be resolved prior to commencing work.
The equipment lists and an indication of pressurised components and systems.
Note: These plans are to be compiled in line with Eskom’s requirements and will have to be
discussed with, and approved by, Eskom prior to any work commencing.
Correspondence shall be directed to the project manager, and periodic quality review
meetings shall be convened by Eskom with the supplier.
The mandatory quality review meetings are to be convened by the nominated project quality
manager or his/her representative for the contract.
Monthly quality performance and management reports are to be prepared by the supplier
during contract execution. The content of these reports shall be agreed by Eskom when
submitted to Eskom on a monthly basis.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.7.2 Supplier Quality Performance Monitoring Phase
During the contract execution phase, suppliers shall be monitored by Eskom for performance on
quality-related aspects.
The outcomes of such monitoring will enable Eskom to take any appropriate actions pertaining to
the supplier.
The monitoring shall be carried out periodically by Eskom or at predetermined intervals during the
execution of a contract using agreed key performance indicators. The monitored key performance
areas include the following:
CQP and QCP /ITP
Delivery
Design
Cost
Management system
Subsequent key performance indicators associated with these areas will include the following:
Nonconformity monitoring
Audit and assessment evaluation scoring
Management system compliance and accreditation
Achievement of delivery targets as per contractual agreements
Process improvements
Correction and corrective action response and closure
3.7.3 Supplier Quality Audit
3.7.3.1 Quality audits and related quality performance reviews are intended to provide an objective
evaluation of compliance with performance expectations defined in this specification, in the
supplier contract quality plan (CQP), and in any other project scope of work specification.
3.7.3.2 Quality audits and related quality performance reviews include, but are not limited to, any
quality or other project functional area audits, assessments, verification of compliance
reviews, surveillance, inspections, or other interim or final assessments of scope of work
deliverables provided by the supplier or sub-suppliers
3.7.3.3 Quality audits and related quality performance reviews are intended to provide an objective
evaluation of compliance with performance expectations defined in this specification, in the
supplier contract quality plan (CQP), and in any other project scope of work specification.
3.7.3.4 Quality audits and related quality performance reviews include, but are not limited to, any
quality or other project functional area audits, assessments, verification of compliance
reviews, surveillance, inspections, or other interim or final assessments of scope of work
deliverables provided by the supplier or sub-suppliers.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.7.3.5 Quality audits and related quality performance reviews shall be carried out by trained,
accredited, and experienced personnel in accordance with procedures documented in the
Cqp.
3.7.3.6 The supplier shall submit, for Eskom review, documented processes for conducting project
scope of work quality audits and related quality performance reviews. Supplier quality audits
and related quality performance review processes shall be designed to address evaluation
of progress towards completion of project functional area deliverables as well as final
deliverable quality.
3.7.3.7 The supplier shall provide a schedule of anticipated quality audits covering all functional
areas and related quality performance reviews at the time of first post-contract award CQP
submission.
3.8 Standard Conditions
3.8.1 Rights of Access
Eskom:
3.8.1.1 shall be granted electronic and hard-copy access to all quality plans, procedures,
documentation, and other quality records relating to the work, including, but not limited to,
data extracts;
3.8.1.2 reserves the right to review, inspect, and audit any or all parts of the supplier’s QMS, as well
as any documentation, materials, or equipment associated with the work, at any time or
project work location; and
3.8.1.3 reserves the right to carry out assessments and audits on all new suppliers and sub-
suppliers.
The supplier:
3.8.1.4 shall support Eskom’s effort to monitor, verify, and/or witness any activities associated with
the work at any time;
3.8.1.5 shall cooperate with Eskom requests for documentation, records, and inspection and
witnessing. Eskom participation in audits, appraisals, assessment of plans, and verification
shall be conducted at no extra cost to Eskom;
3.8.1.6 shall ensure that a sub-supplier provides access to Eskom to all work procedures, records,
and supporting documentation through provision of access to view and photocopy, as
required, to support verification of scope of work requirements. Access shall include the
ability to photograph Eskom equipment, systems, system components, materials, etc.;
3.8.1.7 shall provide access to all quality-related information pertaining to activities performed by
itself or sub-suppliers, where Eskom might not have participated in the witnessing of their
quality assurance or control (this refers to inspections, audits, etc. performed by the supplier
on its own sub-suppliers);
3.8.1.8 shall allow Eskom to assess, audit, approve, or reject any sub-suppliers employed by
Eskom’s suppliers to assist with the product and/or service delivery to Eskom; and
3.8.1.9 shall ensure that the above requirements flow down to sub-suppliers.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.2 Eskom Rights to Information
3.8.2.1 To expect that the works will be conducted in accordance with the contract between the
parties.
3.8.2.2 To have access to the supplier’s information as determined by applicable legislation.
3.8.2.3 Eskom reserves the right to oversee the supplier’s audit programmes by participating in
selected audits as an observer and by assessing the supplier during key work stages.
Eskom will coordinate with the supplier to develop an oversight schedule aligned with the
supplier’s audit schedule.
3.8.2.4 To obtain access to any audit reports of audits performed by the supplier reflected in the
audit programme.
3.8.2.5 To conduct independent quality audits during all phases of the contract, and the supplier
shall provide all resources to support these activities.
3.8.2.6 Eskom shall have the right to participate in, or request that, a technical investigation be
launched and conducted at the supplier’s and sub-suppliers’ premises or other sites when
risk to Eskom products or service deliverables is identified.
3.8.2.7 To participate in, and/or lead, investigations related to incidents involving its products.
3.8.2.8 To require from suppliers to be responsible for the cost of re-inspections.
3.8.2.9 To withhold payment from suppliers as a result of outstanding nonconformities, irrespective
of the agreed payment schedule and in accordance with the conditions of contract.
3.8.2.10 Shall be granted electronic and hard-copy access to all quality plans, procedures,
documentation, and other quality records relating to the work, including, but not limited to,
data extracts.
3.8.2.11 Reserves the right to review, inspect, and audit any or all parts of the supplier’s QMS, as
well as any documentation, materials, or equipment associated with the work, at any time or
project work location.
3.8.2.12 Shall carry out assessments and audits on all new suppliers and sub-suppliers.
3.8.2.13 Reserves the right to appoint resident quality inspectors who can be based at the supplier’s
or sub-supplier’s premises and on site where the work is being performed.
3.8.2.14 Reserves the right to select intervention points within all developed supplier QCPs/ ITPs
for Eskom oversight of selected functions and to perform surveillance or audits of the work.
3.8.2.15 Shall be given access at all reasonable times before, during, and after manufacture and
before delivery, construction, erection, and commissioning to measure, test, and inspect the
products and workmanship, as necessary, at the supplier’s premises and at Eskom sites.
3.8.2.16 Reserves the right to suspend any pending deliveries by the issuing of a cease delivery
order at any time and for any portion of the work that is not being performed in accordance
with the specified/agreed requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.3 Preservation
The supplier shall develop and implement a comprehensive preservation programme consisting of
plans, processes, procedures and actions undertaken for the purpose of planning for and
maintenance of material deliverables quality. The supplier preservation programme scope includes,
but is not limited to, the following:
3.8.3.1 Engagement of personnel suitably qualified for oversight of, and (as required) direct
implementation of, preservation programme requirements.
3.8.3.2 Development and implementation of preservation programme training appropriate to work
need.
3.8.3.3 Eskom may make use of its appointed service provider tasked to provide a full suite of
services encompassing an online monitoring system and asset tracking during, but not
limited to the following stages: inspections, testing, shipping, transportation, storage, and
commissioning. The supplier is to enable full access during all of these stages in order to
allow the installation of the devices on Eskom-identified products and equipment, which
include the sub-supplier’s testing facilities, processing plant, and any other processes
deemed important towards effective and efficient quality control.
3.8.3.4 Eskom seeks cooperation between the supplier’s designers and those of Eskom’s service
provider in ensuring seamless installation of the device and other associated installations.
Moreover, there is also a need to integrate data flows and systems between Eskom and the
supplier. Further details are included in the Eskom specifications and works information.
3.8.3.5 Review and tracking of compliance with Eskom and supplier engineering specification of
preservation requirements.
3.8.3.6 Review and tracking of compliance with sub-supplier provided preservation requirements
and recommendations.
3.8.3.7 Evaluation of prospective temporary and longer-term material storage sites for consistency
with preservation programme expectations.
3.8.3.8 Preservation work plan development and plan execution performance evaluation of all
parties engaged for provision of material transportation, handling, or storage services.
3.8.3.9 Oversight of material quality preservation plan preparation and plan execution performance
at all work locations.
3.8.3.10 Development of a preservation programme records management process, in compliance
with Eskom information management requirements, which comprehensively addresses
generation, maintenance, and ready access by Eskom to all preservation programme
records.
3.8.3.11 The supplier shall deploy a clearly defined documented programme providing for
identification of all physical asset pre-operation preservation of quality requirements. In this
reference, the term “physical assets” should be understood to include bulk materials,
including consumable items, equipment systems, system components, and any other
procured or supplied materials or equipment transferred to project control, but not deployed
for operational purposes.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.3.12 Where the project responsibility for equipment and materials management has been
formally delegated, the supplier’s preservation programme shall ensure clear and
unambiguous communication of pre-operation preservation of goods quality requirements
to sub-suppliers.
3.8.3.13 The supplier’s preservation programme shall clearly and unambiguously document
processes and procedures for efficient and effective monitoring of compliance with
programme requirements.
3.8.3.14 Compliance monitoring shall commence with ensuring comprehensive consideration of
preservation requirements in the engineering instruction and subsequent inclusion of said
instruction in procurement documentation and shall be applicable until such time as
equipment or materials have been incorporated in an operating or operational system or
structure.
3.8.3.15 Compliance evaluation frequency shall anticipate transfer of tactical-level responsibility for
management of preservation responsibilities between project functional areas, for example,
procurement to logistics, logistics to fabrication, fabrication to logistics, logistics to
construction, etc., and shall, in similar fashion, anticipate transfer of support for tactical-level
responsibility between various subcontracted service providers.
3.8.3.16 Supplier engineering shall ensure that preservation requirements for scope of work
systems, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented and that preservation requirements are efficiently and
effectively communicated to project procurement, logistics, construction management,
quality, security, and other project functional areas, as required, for efficient and effective
implementation of preservation requirements. This shall take the form of a preservation
programme applicable to all systems, system components, equipment, materials, customer-
supplied materials, and other goods procured or managed under the scope of work.
3.8.3.17 The supplier’s preservation management programme shall clearly and unambiguously
address temporary, long-term, and in-transit preservation requirements, including, but not
limited to:
requirements for protection against, or insulation from, atmospheric conditions,
sunlight, temperature, soil, dust, humidity, salt spray, corrosive atmospheres, or
other physical environment conditions;
detailed procedures for application, use, monitoring, and maintenance of coatings,
coverings, fasteners, lines, and other components for internal and external weather
proofing;
requirements for electrical grounding or isolation;
requirements for internal or external environment creation, for example, inert gas
charging, heating, cooling, etc., inclusive of gas storage, electric power supply, etc.;
detailed procedures for initial set-up, charging, activation, and maintenance of
internal atmosphere generation, regeneration, monitoring, and relieving systems, for
example, inert gas management systems;
requirements for protection against, or insulation from, vibration or long-period
cyclical motion in transit, for example, wave-generated movement during sea
transport;
internal and external structural integrity protection, for example, internal and external
bracing, padding, framing, chocking, etc.;
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
support structure requirements, for example, stools, pads, or other devices,
substrates, or support required to ensure in-storage and in-transit stability of
systems, system components, equipment, and material, or other discrete units or
items;
provision for physical separation and/or barriers to prevent airborne or direct
transmittal of contaminants between work areas or between work areas and storage
areas, for example, prevention of carbon steel grinding or cutting debris impact on
stainless steel elements, airborne drift of blast aggregate into vessels or machinery,
etc.;
provision for, and final disposition of, temporary and longer-term storage or transit
required supports and related binding devices, for example, stools, stands, sea
fasteners, platforms, chocks, spacers, cabling, etc.;
provision of requirements for temporary work platforms or other support structures
required to ensure provision of preservation services, for example, provision of a
self-elevating work platform for periodic access to elevated fittings, gauges, man-
ways, etc.;
requirements for protection against, or insulation from, contact with other objects, for
example, padding or other protection for external tubing, fittings, or other impact-
sensitive structures or components;
clear physical delineation of temporary and longer-term storage areas supplemented
by hard and soft barriers, as required, to maintain a protective perimeter;
documented agreements with storage facility and transportation provider
management regarding security management, including, but not limited to, facility
access and egress control and control of access to project goods and materials
within facility boundaries or aboard vehicles or vessels; and
detailed procedures for inspection and testing to verify performance of preservation
procedures and to provide for timely notice and corrective action to maintain
preservation status.
3.8.3.18 The supplier’s preservation management programme scope shall encompass
management of preservation requirements, from initial transfer of ownership or management
responsibility to project scope of responsibility, through any period of temporary or longer-
term storage and through any period of transit, including transit for final delivery at point of
active use or installation.
3.8.3.19 The supplier’s preservation management programme shall clearly and unambiguously
address processes and procedures to ensure that storage and control of materials are
accomplished in accordance with manufacturer recommendations, specifications, and
project-specific requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.3.20 The supplier’s preservation management programme shall incorporate special precautions
to address preservation and control of valves, electrical motors and components,
mechanical and rotating equipment, piping and fittings, instrumentation, flange faces,
gaskets, coatings, insulation, and other materials. Special precautions include, but are not
limited to, supplier-specified maintenance procedures related to engines, electric motors,
pumps, compressors, etc., such as periodic shaft rotation, engine turnover, lubrication, etc.
3.8.3.21 The supplier shall ensure that clear and unambiguous requirements for preservation of the
system, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented in purchase orders, work authorisations, and other
communications between the supplier and sub-suppliers.
3.8.3.22 Where sub-supplier expertise is utilised in determination of the preservation protocol,
supplier procurement processes shall ensure clear and unambiguous documentation of sub-
supplier input into preservation management programme requirements.
3.8.3.23 Supplier procurement shall ensure that preservation requirements for scope of work
systems, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented and that preservation requirements are efficiently and
effectively communicated to project logistics, construction management, quality, security,
and other project functional areas, as required, for efficient and effective implementation of
preservation requirements.
3.8.3.24 The supplier shall ensure comprehensive, clear, and unambiguous designation of sub-
supplier responsibility for execution of all preservation management programme elements,
including, but not limited to, all systems, processes, procedures, methods, ready access to
records, and provision of equipment, tools, or services essential to efficient and effective
execution of the preservation management programme.
3.8.3.25 The supplier shall ensure that preservation management programme responsibilities are
clearly and unambiguously defined within the project team and efficiently and effectively
implemented at all project scope of work locations. Inclusion of supplier and sub-supplier
scope of work in the development and implementation of a preservation management
programme shall be considered essential to efficient and effective preservation
management programme execution.
3.8.3.26 The supplier shall ensure clear and unambiguous designation of project team responsibility
for oversight and management of preservation management programme elements during
every stage of project development.
3.8.3.27 The supplier shall ensure that Eskom has free and unrestricted access to all preservation
records for inspection and audit.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.4 Quality Audits Related Conditions
3.8.4.1 The supplier shall maintain an accurate quality audit and related quality performance review
schedule and shall incorporate the current schedule as an attachment to the supplier CQP.
3.8.4.2 The supplier’s quality audit and related quality performance review schedule development
process shall be designed to incorporate consideration of information generated by
previously conducted audits and reviews, by input from project risk management evaluations
(risk register), or from Eskom or sub-supplier subject matter expertise.
3.8.4.3 Eskom reserves the right to oversee supplier audit programmes by participating in selected
audits as an observer and by assessing the supplier during key work stages. Eskom will
coordinate with the supplier to develop an oversight schedule aligned with the supplier’s
audit schedule.
3.8.4.4 Eskom will have the right to obtain access to any audit reports of audits performed by the
supplier reflected in the audit programme.
3.8.4.5 Eskom reserves the right to conduct independent quality audits, scheduled and
unscheduled, during all phases of the contract. The supplier shall provide all resources to
support these activities.
3.8.4.6 Eskom shall be given access at all reasonable times before, during, and after manufacture
and before delivery, construction, erection, and commissioning to measure, test, and inspect
the products and workmanship, as necessary, at the supplier’s premises and at Eskom sites.
3.8.4.7 The supplier shall obtain access for Eskom to measure, test, witness tests, and inspect
products that are being manufactured by any sub-supplier. This includes surveillances.
3.8.4.8 The assessments and audits shall be carried out on all new suppliers and their sub-
suppliers.
3.8.4.9 Eskom shall have the right to participate in, or request that, a technical investigation be
launched and conducted at the supplier’s and sub-suppliers’ premises or other sites when
risk to Eskom products or service deliverables is identified.
3.8.4.10 Qualification requirements for supplier and sub-supplier personnel engaged in conducting
quality audits and related quality performance reviews shall be defined in the supplier CQP
and shall be in compliance with the Project Quality Personnel Qualification Specification.
3.8.5 Management of Nonconformities and Nonconforming Outputs Identified by Eskom
3.8.5.1 Nonconformity reports raised by Eskom and issued against the supplier shall be investigated
by the supplier as a matter of urgency in order to determine the root cause, corrective action
measures, as required, with implementation time frames.
3.8.5.2 A formal response shall be prepared in respect of the defined criteria and submitted to
Eskom for its review, evaluation, and acceptance, within a maximum of 14 calendar days
from the date of issue of the nonconformity and should be aligned with the site
requirements/procedure.
3.8.5.3 Eskom may, at its discretion, request a response sooner and, in any case, before the
supplier proceeding with any pending/further intervention or corrective action, as may be
required by Eskom.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.5.4 Should Eskom or its inspection authority/agency identify any nonconforming products during
the conduct of its audits/surveillances/inspections, the supplier shall be deemed to be in
breach of contract and shall be held liable for any repair, rework, and/or associated
replacement costs. The supplier may, in such instances, also be held liable for the full costs
associated with the conducting of follow-up audits/surveillances/inspections.
3.8.5.5 The nature, magnitude, and/or frequency of nonconformity and inspection defect/rejection
reports raised by Eskom or its appointed inspection authority/agency shall form the basis of
any action to rescind/withdraw the supplier’s qualification status.
3.8.5.6 Nonconforming outputs identified by Eskom shall be documented via a NC Report and
issued to the suppliers via the contract communication protocol. The suppliers shall
investigate the matter and respond in writing to Eskom of disposition within the stated
contractual conditions.
Note: The dates for the disposition should align to contractual conditions.
3.8.5.7 Eskom shall identify repeat deficiencies as systematic failures of the supplier’s QMS and
shall notify the supplier of the trends. Eskom can initiate an internal audit to highlight the
system failures. The supplier with raise a Corrective Action Report and undertake Root
Cause Analysis. In such cases, QMS rectification and/ or update measures shall be taken
immediately.
3.8.5.8 Should the Supplier fail to respond and rectify nonconforming products within stipulated
contractual conditions. The Project Manager should apply contractual remedies in
accordance with Fidic/ NEC contract.
3.8.5.9 Repeated Nonconformities; if there are any identified repeat nonconformities from the same
supplier within a period of 6 months or less. This must then be escalated to the management
review committees of the BU/ OU/ Cluster/ or Divisions for adjudication. If not resolved, then
the matter must be escalated to the supplier review committee for recommendation.
3.8.6 Special Processes
The following requirements shall be applicable as well as additional requirements as specified in the
scope of work for the provision of the following special process services:
3.8.6.1 The supplier shall ensure that all processes which require that procedures be pre-qualified
or work methods and operators tested and qualified are controlled and all steps followed
before the work can commence.
3.8.6.2 This typically covers such activities as welding, non-destructive testing, special fabrication
techniques, coating, painting, etc.
3.8.6.3 All special processes (procedures and processes) shall be submitted for review and
acceptance by Eskom, accredited or certified agency. No work shall commence until these
are accepted.
3.8.6.4 Where applicable, a relevant Management System for the special process shall be certified
or approved by an accredited body and proof of certification shall be submitted to Eskom for
review. An example for this will be the Welding Management System based on ISO 3834.
3.8.6.5 Where samples are required for acceptance, these shall be submitted to Eskom for review
and acceptance.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.6.6 The supplier shall ensure that all operators are suitably qualified for these processes in
accordance with the procedures, processes and/ or applicable standards/ codes.
3.8.6.7 The records of qualification of procedures, processes and operators shall be maintained by
the supplier in accordance with the applicable procedure or code and these made available
to Eskom at all times.
This document has been seen and accepted by:
Name Designation
Kerseri Pather General Manager: Risk and Sustainability
Lenock Meyer Acting Senior Manager: Quality Management
Pamela Dondashe Middle Manager: Quality Assurance
Mandla Mkhwanazi Middle Manager: SHEQ Procurement and Supply Chain Management
Suzette Manthe Senior Advisor: Quality Performance and Planning
Lorna Ndlela Middle Manager: Eskom Document and Records Management
Date Rev. Compiler Remarks
October 2021 3 SA Sambo Specification was due for revision and in addition, to
align the requirements with the latest Eskom business
processes and systems.
October 2018 2 SA Sambo Specification reviewed to be aligned with the
requirements of ISO 9001:2015
March 2016 1 SA Sambo Specification was due for revision and also to
repackage the requirements and tender returnable
documents into four categories.
December 2011 0 A Hunter New document
The following people were involved in the development of this document:
Andrew Else
Bongi Tshabalala
Feziwe Mogamisi
Lesego Garegae
Patrick Thwane
Xolani Zuma
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Eskom Operational Quality Forum Members
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Section
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Supplier Quality Management: Specification Unique Identifier: 240-105658000
The intention of this specification is to specify and describe the minimum quality requirements for all
existing and potential Eskom suppliers and define the quality criteria for the selection, evaluation,
implementation, and maintenance of a quality management system (QMS) that conforms to the
a quality management system (QMS) based on ISO 9001, which should form the basis for conformity
to Eskom quality requirements and continually adhere to them throughout the duration of a contract
[1] ISO 9001 Quality Management Systems – Requirements
[2] ISO 10005 Quality Management Systems – Guidelines for Quality Plans.
[3] ISO 9000 Quality Management Systems – Fundamentals and Vocabulary
[4] 32-727: Safety, Health, Environment, and Quality (SHEQ) Policy
[5] ISO 10006 Quality Management Systems – Guidelines for Quality Management in Projects
[6] ISO 9004 Quality Management – Quality of an Organisation – Guidance to Achieve Sustained
[9] PPPFA: Preferential Procurement Policy Framework Act, 2000 (Act No. )
[10] CIDB 1004: Best Practice Guideline A4: Evaluating Quality in Tender Submissions
[11] 240-12248652 Supplier Quality Management: List of Tender Returnables
2.3.2 Contract Quality Plan: a document of the supplier’s process for delivering the level of quality
required by the contract. It is a framework for the contractor’s process for delivering quality.
2.3.3 Hold Point: a predetermined stage in the quality control plan (QCP) beyond which work/
2.3.4 Intervention Points: those control points indicated by the various controlling bodies
inspection, hold points, surveillances, witnesses, reviews and verifications.
performing quality assurance/ quality control, monitoring, inspection and/ or expediting
Title: Supplier Quality Management: Document Identifier: 240-105658000
Functional Area: Quality Management
Quality Quality Manager Quality Risk and
Important Dates
Source: Eskom General Conditions of Purchase - 31 May 2024_Rev.pdf (unknown){"closingDate":"31 May 2024"}
Contact Information
Source: Eskom General Conditions of Purchase - 31 May 2024_Rev.pdf (unknown){"name":null,"email":"[email protected]","phone":null,"department":null,"address":"note specifying the means of transport, weight, number or volume as appropriate and"}
Evaluation Criteria
Source: Eskom General Conditions of Purchase - 31 May 2024_Rev.pdf (unknown)Bidders must accept Eskom's General Conditions of Purchase. The supplier must complete Eskom's CPA (IG) form. The supplier must comply with all statutory requirements. No specific pre-qualification criteria (e.g., CSD registration, B-BBEE level, CIDB grading) are stated in the provided document.
Technical Specifications
Source: Eskom General Conditions of Purchase - 31 May 2024_Rev.pdf (unknown)supply the goods or
execute the works
Quality Management
Source: Eskom General Conditions of Purchase - 31 May 2024_Rev.pdf (unknown)240-59385009 Rev 3 Eskom General Conditions Identifier
of Purchase Effective Date 31 May 2024
Review Date May 2029
part of the goods by giving written notice to the Supplier specifying the reason for rejection and whether
replacement of goods or re-work is required.
In the case of goods delivered, Eskom may return the rejected goods to the Supplier at the Supplier's risk
and expense. Any money paid to the Supplier in respect of the goods not replaced within the time required,
together with the costs of returning rejected goods to the Supplier and obtaining replacement goods from a
third party, shall be paid by the Supplier to Eskom.
In the case of works/services, the Supplier shall correct non-conformances/defects as indicated by Eskom.
Pricing Schedule
Source: Eskom General Conditions of Purchase - 31 May 2024_Rev.pdf (unknown)for price adjustment, which is calculated in accordance with the formula stated in the agreement. The
Compliance Requirements
Source: Eskom General Conditions of Purchase - 31 May 2024_Rev.pdf (unknown)No specific requirements found
Health & Safety
Source: Eskom General Conditions of Purchase - 31 May 2024_Rev.pdf (unknown)rate shall be used to convert from this currency to South African Rand (ZAR). Payment to the Supplier in
any currency other than ZAR shall not exceed the amounts stated in the agreement. Eskom’s CPA (IG)
form must be duly completed by the Supplier. Eskom will pay for the item within 30 days after receipt of a
correct Tax invoice. Eskom’s VAT registration number (4740101508) has to appear on the tax invoice,
before any payment will be made, as from 1 June 2004.
compliance with the terms and conditions of the agreement at the point of delivery/site specified in the
agreement on or before the date stated in the agreement. Late deliveries of the goods or late completion
of the works/services may be subject to a penalty as stated in the agreement. No payment shall be made
if the Supplier does not provide the goods/services/works as stated in agreement. Where goods are to be
delivered the Supplier shall:-
clearly mark the outside of each consignment or package with the Supplier's name and full details of
the destination in accordance with the order and include a packing note stating the contents thereof;
send an advice note specifying the means of transport, weight, number or volume as appropriate and
the point and date of dispatch, to Eskom at the address for delivery of the items;
send a detailed Tax invoice to Eskom after delivery of the goods or after completion of the
works/services;
state the agreement number on all communications in respect of the agreement; and
state in his tender whether delivery cost is included in the price. If not, it will be deemed to be included.
made for containers or packing materials or their return to the Supplier.
inspect and/or test the goods/works/services as well as the workmanship at any stage of the work. Should
Contractual Terms
Source: Eskom General Conditions of Purchase - 31 May 2024_Rev.pdf (unknown)corrected by a third party at the Supplier’s costs.
and expenses arising from the negligence, infringement of intellectual or legal rights or breach of statutory
duty of the Supplier, his subcontractors, agents or servants or the rights of others, or from the Supplier's
defective design, materials or workmanship.
that the goods/works/services are fit for the purpose for which they are intended and that they will remain
free from defects for a period of one year (unless otherwise stated in the agreement) from acceptance. If
a defect/non-conformance is found with the goods/works/services within this period, the Supplier shall
rectify the defect/non-conformance within an agreed time period, free of cost to Eskom. The Supplier shall
use reasonable skill and care to provide the goods/ works/services as described in the contract.
obligations to any person without the written consent of the other or sub-contracting by the Supplier.
obligations under this agreement to any of its subsidiaries or any of its present divisions or operations
which may be converted into separate legal entities as a result of restructuring.
agreement which is governed by the law of the RSA and the parties hereby submit to the jurisdiction of
the SA courts.
and fail to rectify or remedy the default, and after receiving written notice from the non-defaulting party, the
latter shall be entitled to terminate the agreement.
has accrued or thereafter accrues to Eskom) if the Supplier defaults in due performance of the agreement,
or becomes bankrupt or otherwise is, in the opinion of Eskom, in such financial circumstances as to
prejudice the proper performance of the agreement.
our suppliers.
Description
Source: Environmental Requirements - Hiring of Toilets .xlsx (unknown)Cell D1: Annexure C1: Environmental Tender Evaluation & Scoring Card
Technical Specifications
Source: Environmental Requirements - Hiring of Toilets .xlsx (unknown)Cell D1: Annexure C1: Environmental Tender Evaluation & Scoring Card
Important Dates
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf (unknown){"closingDate":"27 January 2025"}
Contact Information
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf (unknown){"name":"__________________________________________________________","email":null,"phone":null,"department":null,"address":null}
Evaluation Criteria
Source: Technical Evaluation Criteria for Hiring of Portable toilet .pdf (unknown)Bidders must achieve a minimum overall technical score of 80% to be considered further. Experience in similar work, waste transporter licence/registration, and accreditation under the National Integrated Waste Management By-law are the scored criteria.
Technical Specifications
Source: Technical Evaluation Criteria for Hiring of Portable toilet .pdf (unknown)Technical evaluation: Toilet hire 2. Waste transporter license /
Environmental
Source: Technical Evaluation Criteria for Hiring of Portable toilet .pdf (unknown)transport waste =30 points.
terms of the National body
integrated waste management
by law (PG 6756)- 20 points
Total Points Scored (Technical):
Minimum threshold for Technical:80%
Section
Source: Technical Evaluation Criteria for Hiring of Portable toilet .pdf (unknown)Technical evaluation: Toilet hire
Technical requirements Score Comments
work = 50 points, OR
scope of work = 30 points, OR
scope of work = 20 points.
transport waste =30 points.
by law (PG 6756)- 20 points
Total Points Scored (Technical)
Important Dates
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER){"closingTime":"2.2","briefingSession":"{"date":null,"time":null,"venue":"tend a site visit and/or clarification meeting that is stipulated as being","is_compulsory":true}"}
Evaluation Criteria
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)Tenderers must be eligible to do business with Eskom and not be under any restriction. They must comply with any eligibility criteria stated in the Tender Data. Tenderers must not sub-contract 100% of the scope. They must provide a valid B-BBEE certificate/affidavit or CSD number at closing date if B-BBEE is a pre-qualification criterion; otherwise, failure to provide will result in zero points under PPPFA. CIDB registration may be required if stipulated. Tenderers must submit the SDL&I Undertaking by contract award. Tenderers must complete and submit all mandatory tender returnables by the closing date; failure will lead to disqualification. Tenderers must not have misrepresented or falsified any information; fraud or fronting will lead to disqualification and reporting to the B-BBEE Commission. Tenderers must comply with the Contract Skills Development Goals (CSDG) and Contract Participation Goals (CPG) if applicable. Tenderers must attend any compulsory site visit or clarification meeting. Tenderers must provide proof of SHEQ systems. Tenderers must be registered on the National Treasury Central Supplier Database (CSD) if required by the Tender Data.
Technical Specifications
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)Supply Chain
Management Procedure 32-1034. Any addenda to an issued Invitation to Tender will be
published or issued in the same way as the Invitation to Tender was and will form part of the
Invitation to Tender documents.
Communication 1.5 Every communication between Eskom and a tenderer shall be made to or from the Eskom
Representative only, in w
Quality Management
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)of a tenderer.
Cost of tendering 2.6 Accept that Eskom will not compensate the tenderer for any costs incurred in the preparation
and submission of a tender, including the costs of any testing necessary to demonstrate that
aspects of the tender satisfy the evaluation criteria, or the negotiation of any contract.
Submitting a tender 2.7 Check the Invitation to Tender documents on receipt and notify the Eskom representative of
any discrepancy or omitted documents. The Acknowledgement Form must be completed
and submitted with the tender and must clearly state if the tender is for the whole or part of
the works, services or supply identified in the specification and/or works information by
Pricing Schedule
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)reasonable time for tenderers to make consequential adjustments to their tenders before
the closing date and time for submission.
In writing’ means hand-written, typed, type-written, printed or electronically made, and that
results in a permanent record.
Insurance 2.17 The extent (if any) of insurance provided by Eskom may not be for the full cover required in
the conditions of contract. The tenderer is advised to seek qualified advice regarding
insurance.
Pricing the tender 2.18 Include in the rates, prices, and the tendered total of the Prices all duties, taxes (including
VAT), and other levies payable by the tenderer if successful. Such duties, taxes and levies
are those applicable 14 (fourteen) days prior to the closing date and time for tender
submission.
2.19 Provide rates and Prices that are fixed for the duration of the contract and are not subject to
contract price adjustment except as provided for in the Invitation to Tender.
2.20 State the rates and Prices in South African Rand unless instructed otherwise in the Invitation
to Tender. The selected conditions of contract may provide for part payment in other
currencies. Therefore, submit Rates/Prices in Rands in accordance with the exchange rate
and base date as stipulated in the Invitation to tender.
Alterations to 2.21 May not make any alterations or additions to the tender documents, other than for purposes
documents of complying with instructions issued by the Eskom Representative or if necessary to correct
errors made by the tenderer. All such alterations shall be initialed by all signatories to the
tender. Corrections may not be made using correction fluid, correction tape or the like.
Alternative tenders 2.22 Submit alternative tenders only if a main tender is also submitted, and only if the submission
of alternative tenders is permitted by the Invitation to Tender. Accept that an alternative
tender may be based only on the criteria stated in the Tender Data.
Clarification and 2.23 Provide clarification and documents as may be required by the Eskom Representative
correction of Prices during the evaluation of tenders. However, documents identified as mandatory tender
after tender returnables that are required to be submitted at the closing date and time for tender
submission submission will not be requested and may not be submitted after the closing date and time.
phases, as this is regarded as ‘double dipping’.
Designated 3.12 Tenderers are also required to submit information on designated material and
materials and thresholds no later than contract award. If this information is not completed and
thresholds submitted as indicated in the Invitation to Tender, your tender will not be considered for
contract award
Functionality 3.13 If functionality is a criterion, tenderers will be scored against the functionality criteria and
requirements will be required meet the minimum threshold stated in the Tender Data to proceed to
further evaluation.
Financial analysis 3.14 Eskom has to determine the risk of doing business with a supplier who may pose a
(if applicable) financial risk to Eskom in the execution of the contract. During evaluation of a tenderer’s
financial statements, Eskom will attempt to identify mitigating factors or requirements for
the tenderer to meet, if such factors/requirements exist in the tender’s context. However,
should suitable mitigating factors not exist in the tender’s context or should mitigating
factors exist but be insufficient or if the risk is considered to be too high or should the
tenderer not agree with the mitigating factors, the tenderer will not be considered for
award.
Evaluation of Price 3.15 Evaluate the Price in accordance with the criteria/requirements in the Tender Data. Factors
such as CPA, FOREX, commodity exposure, unconditional discounts, technical
adjustment, PV and forecasted rates of invoicing are taken into account when determining
the evaluation Price.
Arithmetical errors 3.16 Check responsive tenders for arithmetical errors. If there is a discrepancy between an
amount in figures and the amount in words, the amount in words shall prevail.
Check the highest-ranked tenders for the following errors or omissions: -
(a) the misplacement of the decimal point in any unit rate; or
(b) omissions in completing the pricing schedule or bill of quantities, or
(c) arithmetical errors in line-item totals that are the result of the incorrect multiplication
of a unit rate and a quantity in a bill of quantities or schedule of prices; or
(d) arithmetical errors that are the result of the incorrect addition of the prices.
will request the tenderer to either confirm the prices as tendered or to accept the
corrected prices.
Where the tenderer elects to confirm the prices as tendered; Eskom will correct the error
as follows: -
(a) If a bill of quantities or pricing schedule applies and there is an error in the line-item
total that is the result of an error in multiplying the unit rate and the quantity, the line-
item total shall prevail, and the rate shall be corrected.
(b) Where there is a misplacement of the decimal point in the unit rate, the line-item total
as quoted shall prevail, and the unit rate shall be corrected.
(c) Where there is an error in the total of the prices that is the result either of other
corrections required by the checking process or in the tenderer’s addition of prices,
the total of the prices shall prevail, and the tenderer shall be asked to revise the
selected item prices (and their rates if a bill of quantities applies) to result in the
tendered total of the prices.
documentation by closing date and time of tender submission, the tenderer will not be
disqualified if otherwise evaluated as acceptable in all other criteria; however, the tenderer
will score zero points for Specific Goals within the 90/10 or 80/20 allocation of points.
Ranking of tenders 3.19 According to the PPPFA, Eskom will add the score for Pricing and the Specific Goals
together and rank the suppliers from the highest to the lowest.
Objective criteria 3.20 A contract may be awarded to a tenderer that did not score the highest points only in
accordance with Section 2(1) (f) of the Preferential Procurement Policy Framework Act,
must stipulate the Objective Criteria in the Invitation to Tender. Functionality and any
element of the B-BBEE scorecard may not be used as Objective Criteria.
Compliance Requirements
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)CSD report or as per certificate/affidavit provided
CSD number/CSD report) must be provided at the closing date and time for
CSD number or B-BBEE certificate/affidavit will need to be
B-BBEE Details: kom Representative and
Agreement to sign the contract documents.
Proof of authority 2.25 Where an agent submits a tender on behalf of a principal, an authenticated copy of the
to act as agent authority to act as an agent of the tenderer must be submitted as a tender returnable.
Compliance with 2.26 Comply with relevant legislation and regulatory instruments such as Instruction Notes issued
relevant legislation by National Treasury, CIDB Regulations for construction works; materials designated for local
(NT instructions, content and/or production by the dtic, PPPFA Regulations; Amended B-BBEE Codes, COIDA;
CIDB, PPPFA etc) OHS Act; Eskom’s requirements for Safety, Health, Environment and Quality (SHEQ) and any other
applicable legislation or regulatory instruments indicated in the Invitation to Tender.
Proof of Safety, 2.27 Tenderers are required to provide proof to the satisfaction of Eskom that safety, health,
Health, environmental and quality (SHEQ) systems, policies and capabilities are in place at the
Environment and closing date and time for tender submission stipulated in the Invitation to Tender and/or
Quality Contract Award. All costs and personnel associated with SHEQ must be reflected in the
requirements tender.
CIDB 2.28 Where the Tender Data has stipulated CIDB grading/s as a qualification criterion, tenderers
are required to be registered with the Construction Industry Development Board at the
closing date and time for submission of tenders or to be capable of being so registered
within twenty-one (21) working days from the closing date and time for submission of
tenders.
Where CIDB is applicable; proof of registration on CIDB is mandatory at the closing date
and time for tender submission. Should this not be received as stipulated
Health & Safety
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)tenderers that Eskom has identified. A sole source and a single source are regarded as a
tenderer that meets the requirements stated in the Eskom Procurement and Supply Chain
Management Procedure 32-1034. Any addenda to an issued Invitation to Tender will be
published or issued in the same way as the Invitation to Tender was and will form part of the
Proof of authority 2.25 Where an agent submits a tender on behalf of a principal, an authenticated copy of the
to act as agent authority to act as an agent of the tenderer must be submitted as a tender returnable.
Compliance with 2.26 Comply with relevant legislation and regulatory instruments such as Instruction Notes issued
relevant legislation by National Treasury, CIDB Regulations for construction works; materials designated for local
(NT instructions, content and/or production by the dtic, PPPFA Regulations; Amended B-BBEE Codes, COIDA;
CIDB, PPPFA etc) OHS Act; Eskom’s requirements for Safety, Health, Environment and Quality (SHEQ) and any other
applicable legislation or regulatory instruments indicated in the Invitation to Tender.
Proof of Safety, 2.27 Tenderers are required to provide proof to the satisfaction of Eskom that safety, health,
Health, environmental and quality (SHEQ) systems, policies and capabilities are in place at the
requirements tender.
CIDB 2.28 Where the Tender Data has stipulated CIDB grading/s as a qualification criterion, tenderers
are required to be registered with the Construction Industry Development Board at the
closing date and time for submission of tenders or to be capable of being so registered
within twenty-one (21) working days from the closing date and time for submission of
tenders.
Where CIDB is applicable; proof of registration on CIDB is mandatory at the closing date
and time for tender submission. Should this not be received as stipulated in the Invitation to
Tender; the tender will be disqualified. However, in the event that, at the closing date and
time for tender submission, only proof of application for registration on CIDB is available,
then this must be submitted by the closing date and time for tender submission, while the
actual proof of CIDB registration (printout from CIDB database) must be submitted by
contract award
Contract Skills 2.29 If the tenderer is awarded a contract, it, as Contractor, shall achieve in the performance of
Development Goal the contract the Contract Skills Development Goals (CSDG) established in the CIDB
(CSDG) Standard for Developing Skills through Infrastructure Contract (published in GN 1779,
Government Gazette No. April 2023)
that has a duration of 12 months or more, and to:
a contract of R5 million or more, in the case of a professional service or service contract
or an order issued in terms of such a contract; or
a CIDB grading designation of grade 7 or higher, in case of an engineering and
construction works, or design and build contract or an order issued in terms of such a
contract.
Contract 2.30 The Contractor shall achieve in the performance of the contract the Contract Participation
Participation Goals Goals (CPG) relating to the engagement of targeted enterprises as established in the CIDB
(CPG) standard for indirect targeting for enterprise development through Construction works
contracts (published in Government Gazette No. February 2013).
enterprises as established in the aforesaid standard applies to:
construction works contracts in the General Building (GB) and to Civil Engineering (CE)
classes of construction works;
construction works contracts of an estimated minimum project duration of 6 months; and
Respond 3.1 Respond to a request for clarification that Eskom receives before the closing date for
clarification clarification or queries. Eskom’s responses will be published to all tenderers in the same
manner the Invitation to Tender documents were issued. It is the tenderers’ responsibility
to check the Eskom Tender Bulletin and NT e-Tender Portal regularly for updated
responses to clarifications.
Issue Addenda 3.2 If necessary and prior to the closing date and time for tender submission, amend, amplify, or
add to the Invitation to Tender documents by way of Addenda published in the same
platform that the Invitation to Tender was issued. It is the tenderers’ responsibility to
check the Eskom Tender Bulletin and NT e-Tender Portal regularly for Addenda.
electronically. The Eskom Representative will publish the names of all tenderers received
on the Eskom Tender Bulletin and NT e-Tender Portal.
Tender Prices 3.5 Eskom will announce the names of the tenderers. Prices may be announced if so, stated
in the Tender Data.
Non-disclosure 3.6 Unless required by law, Eskom will not disclose information relating to the evaluation and
comparison of tenders and recommendations for the award of a contract to tenderers or to
any other person not officially concerned with the tender process until after the tender
award.
Grounds for 3.7 Reject a tender if Eskom establishes that there is proof that the tenderer influenced the
rejection processing of tenders or the awarding of the contract, the existence of collusion and/or bid
rigging, and/or that the tenderer has participated in any fraudulent/illegal activity in
connection with the Invitation to Tender.
Clarification of a 3.8 Obtain clarification from a tenderer in respect of any matter in the tender that may not be
tender clear or that could give rise to ambiguity in a contract arising from this tender if the matter
were not to be clarified. A document that the Invitation to Tender identifies as a mandatory
tender returnable that is required to be submitted at the closing date and time for tender
submission will not be requested, but Eskom may seek clarity on it.
may utilise reverse e-auction in certain Enquiries. Where reverse e-auction will be utilised,
this will be indicated in the respective Invitation to Tender and the reverse e-auction
supporting documents will be issued in the Invitation to Tender. Tenderers will be required
to submit a complete tender that does not contain Prices. If a tenderer has included prices
in its tender, the prices will not be considered.
Acceptance of 3.22 Notify Eskom's acceptance to the successful tender before the expiry of the validity period
tender or agreed additional validity period. Inform the successful and unsuccessful tenderers only
once approval has been granted by the Eskom Adjudication Authority. For open tenders,
this notification must be published on the Eskom Tender Bulletin and NT e-Tender Portal
Prepare contract 3.23 Revise the contract documents issued by Eskom in the Invitation to Tender documents to
documents take account of:
Addenda issued during the tender period;
inclusion of returnables stipulated in the Invitation to Tender;
inclusion of changes agreed in contract negotiations; and
Other revisions or documents agreed to between Eskom and the successful
tenderer during negotiations,
Sign Form of 3.24 Arrange for authorised signatories of both parties to complete and sign the original and one
Contractual Terms
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)including the Eskom Representative shall not be liable for any losses, claims or damages of
whatsoever nature or howsoever arising that may be sustained by a tenderer or any other
person as a result of its participation in the tender or from any amendment, termination or
suspension of the process set out in the Invitation to Tender or from its exclusion from
participating in the tender process at any point.
Eskom’s right to 1.7 Eskom reserves the right to enter into mandated negotiations with any, one or more selected
negotiate tenderer(s) in accordance with Eskom’s approved procurement policies and procedures.
240-62044728 Rev 12 Eskom Standard Identifier
Conditions of Tender Effective Date 01 February 2025
Review Date January 2030
Disclaimer 1.8 While Eskom takes all reasonable measures to ensure that all information contained in the
regarding accuracy tender documents is correct and complete, Eskom does not, however, make any
of tender representations or warranties, express or implied, as to the accuracy or completeness of
documents such information and Eskom expressly disclaims any, and all liability for such
representations, warranties or statements.
Tenderer’s 2. The tenderer shall comply with the following obligations when submitting a tender and shall:
Tender validity 2.12 Hold the tender(s) valid for acceptance by Eskom at any time within the validity period after
the closing date and time for tender submission. Extend the validity period for a specified
additional period if Eskom requests the tenderer to do so. A tenderer that agrees to extend
the validity of its tender will not be required or permitted to modify its tender. A tenderer that
does not agree to extend the validity of its tender will be excluded from further
consideration. Tenderers will be requested to extend the validity of their tenders until a
contract(s) have been concluded with one or more tenderers. A request that a tenderer
extend the validity of its tender is not a representation that the tender is an acceptable
tender or that Eskom will seek to negotiate or conclude a contract with the tenderer. If the
validity of tenders expires before contracts have been concluded, the procurement process
is deemed to have concluded without an award.
Confidentiality and 2. 13 Treat as confidential all matters that arise in connection with the procurement. Use and copy
copyright of the documents provided by Eskom only for the purpose of preparing and submitting a tender
documents in response to this Invitation to Tender.
Standardised 2.14 Obtain and familiarise themselves with, if required for the purposes of submitting a tender,
specifications and the latest revision of standardised specifications and/or other documents that have been
other publications incorporated by reference into the Invitation to Tender documents by reference.
Site visit and / or 2.15 Tenderers must attend a site visit and/or clarification meeting that is stipulated as being
clarification compulsory in order to familiarise themselves with the proposed work, services, supply,
meeting location or similar. Failure to attend a clarification meeting or site visit that is identified as
compulsory will result in disqualification from participation.
Details of the meeting(s) are stated in the Tender Data. Tenderers are entitled to ask
questions for clarity in the course of a site visit or clarification meeting.
correction of errors as required above.
Evaluation of 3.17 Score the B-BBEE level as stated on the CSD report or as per certificate/affidavit provided.
B-BBEE If the B-BBEE level is a pre-qualification criterion; then the proof of the B-BBEE level
(certificate/CSD number/CSD report) must be provided at the closing date and time for
tender submission; or the tender will be disqualified. If sub-contracting to designated groups
pre-qualification criteria are utilized (selected/mandatory) in terms of the PPPFA
Regulation, then Eskom will apply the PPPFA requirements for sub-contractors’ B-BBEE
status and the sub-contractors’ CSD number or B-BBEE certificate/affidavit will need to be
provided at the closing date and time for tender submission. Should the
information/documents provided indicate that the level is in dispute (fraudulent/ expired)
then the tender will be disqualified.
However, for the purposes of PPPFA point allocation: if no B-BBEE certificate/affidavit is
provided at Tender closing date and time for tender submission, or the
information/documents provided are fraudulent or have expired; then the tenderer will not
be disqualified (if otherwise deemed to be responsive and acceptable in all other aspects)
but will score zero under PPPFA point allocation.
Evaluation of 3.18 Score the Specific Goals with reference to the supporting documentation in the tender. If a
Section
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)are submitted and accessible for downloading/evaluation without any challenges as well as
It must be noted that Eskom will not measure a criterion twice in the different evaluation
Functionality 3.13 If functionality is a criterion, tenderers will be scored against the functionality criteria and
further evaluation.
(if applicable) financial risk to Eskom in the execution of the contract. During evaluation of a tenderer’s
Evaluation of Price 3.15 Evaluate the Price in accordance with the criteria/requirements in the Tender Data. Factors
the evaluation Price.
but will score zero under PPPFA point allocation.
Evaluation of 3.18 Score the Specific Goals with reference to the supporting documentation in the tender. If a
Specific Goals tenderer fails to meet Specific Goals and/or to submit the required proof/supporting
will score zero points for Specific Goals within the 90/10 or 80/20 allocation of points.
Ranking of tenders 3.19 According to the PPPFA, Eskom will add the score for Pricing and the Specific Goals
Objective criteria 3.20 A contract may be awarded to a tenderer that did not score the highest points only in
must stipulate the Objective Criteria in the Invitation to Tender. Functionality and any
element of the B-BBEE scorecard may not be used as Objective Criteria.
Reverse e-Auction 3.21 Reverse e-auction is an electronic system that utilises the 90/10 and 80/20 Price and
Preference point systems, and which is intended to achieve competitive pricing. Eskom
(NT instructions, content and/or production by the dtic, PPPFA Regulations; Amended B-BBEE Codes, COIDA;
CIDB, PPPFA etc) OHS Act; Eskom’s requirements for Safety, Health, Environment and Quality (SHEQ) and any other
Health, environmental and quality (SHEQ) systems, policies and capabilities are in place at the
Quality Contract Award. All costs and personnel associated with SHEQ must be reflected in the
However, for the purposes of PPPFA point allocation: if no B-BBEE certificate/affidavit is
Description
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdfB.2 Documented information for Control of Externally Provided Processes, Products and Services - Must include criteria for evaluation, selection,
Evaluation Criteria
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdf (unknown)A.3 Quality Objectives Approved by top management. 1
Section A Score Option 2 3
SECTION B : Evidence of QMS in operation (Tender Quality Requirements -Ref 240-105658000)
not limited to quality management function/role) 1
B.2 Documented information for Control of Externally Provided Processes, Products and Services - Must include criteria for evaluation, selection,
monitoring of performance, and re-evaluation of external providers (Clause 8.4 of ISO 9001:2015)
Section B Score 2
Section E Score 2
Supplier Quality Management: Revision 7
Category 4 : Quality Requirements Deliverables to be evaluated indicator = 1
SECTION A : Quality Management System Requirements ISO 9001
A.1 Quality Method statement based on scope.(Method Statement Template-Ref 240-126469599) 1
A.2 Quality Policy Approved by top management. 1
Section
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdfA.3 Quality Objectives Approved by top management. 1
Section A Score Option 2 3
SECTION B : Evidence of QMS in operation (Tender Quality Requirements -Ref 240-105658000)
not limited to quality management function/role) 1
B.2 Documented information for Control of Externally Provided Processes, Products and Services - Must include criteria for evaluation, selection,
monitoring of performance, and re-evaluation of external providers (Clause 8.4 of ISO 9001:2015)
Section B Score 2
Section E Score 2
Supplier Quality Management: Revision 7
Category 4 : Quality Requirements Deliverables to be evaluated indicator = 1
SECTION A : Quality Management System Requirements ISO 9001
A.1 Quality Method statement based on scope.(Method Statement Template-Ref 240-126469599) 1
A.2 Quality Policy Approved by top management. 1
Evaluation Criteria
Source: Annexure C 3 HS Tender Evaluation Template.pdf (unknown)Annexure C 3: OHS Tender Evaluation Template
Methodology
Source: Annexure C 3 HS Tender Evaluation Template.pdfto the scope of work. The methodology used for the risk
assessment must be provided together with the BRA
4 Valid Letter of Good Standing (COIDA or equivalent)
Health & Safety
Source: Annexure C 3 HS Tender Evaluation Template.pdf(Must address the project /scope of work OHS risk(s) and aligned
with the health and safety specification or requirements)
3 Baseline OHS Risk Assessment (BRA)
Important Dates
Source: Invitation to Tender (ITT) Toilet hire and cleaning services re-issue 07 September 2026.pdf (TENDER){"closingDate":"07 April 2026","closingTime":"10:00","briefingSession":"{"date":"17 September 2026","time":"10:00","venue":"ion A non-compulsory clarification meeting with representatives of","is_compulsory":true}"}
Contact Information
Source: Invitation to Tender (ITT) Toilet hire and cleaning services re-issue 07 September 2026.pdf (TENDER){"name":"MS Teams","email":"[email protected]","phone":null,"department":null,"address":"r which"}
Evaluation Criteria
Source: Invitation to Tender (ITT) Toilet hire and cleaning services re-issue 07 September 2026.pdf (TENDER)1.1.9 *SBD 6.1 Preference Points Claim Form in terms of Annexure I Y
PPPFA 2022 regulations
1.1.11 Tax Evaluation questionnaire to determine whether a
3.13 Functionality requirements Functionality requirements are applicable.
A weighted score-card approach is used to evaluate the technical
have an overall weighted score of 80% or more to technically qualify
for further evaluation.
functionality criteria
Technical Score Comments
5 or more years 50 points
points, OR
waste =30 points.
Total Points Scored 100%
3.15 Evaluation of Price Prices will be evaluated as follows
or this evaluation.
preference points will not be disqualified but may only score points
out of 80 for price and score 0 points out of 20 for B-BBEE.
If a tenderer fails to submit evidence of its points claim for a Specific
Goal, it will not be disqualified. However, it will be awarded 0 points
B-BEEE Status Level of Number of Points (80/20
Allocation of BBBEE Points, (80/20): Tenderers must submit
The following documents are required to claim preference points
preference points will not be disqualified, but;
Technical Specifications
Source: Invitation to Tender (ITT) Toilet hire and cleaning services re-issue 07 September 2026.pdf (TENDER)Annexure Attached (Y /
N / n/a)
1.1.1 *Authorisation Form Annexure A Y
1.1.2 *Acknowledgement form Annexure B Y
1.1.3 *Tenderer’s particulars Annexure C Y
1.1.4 *Integrity Declaration Form (Suppliers are required to Annexure D Y
download and read the Supplier Integrity Pact. It is
accessible on the Eskom Tender Bulletin via Eskom
Supplier Integrity Pact (eskom.co.za) link)
1.1.5 *CPA Requirements for Local Goods/Services Annexure E Y
1.1.6 *CPA(IG) for Foreign Goods/Services (if applicable) Annexure F Y
1.1.7 SBD 6.2 Declaration Certificate for Local Production Annexure G1 Y
and Local Content (only applicable if designated
materials are included and then Tenderers will be
required to complete and submit Annexures G1 to
G4 as evidence of compliance with this
requirement).
Annexure C Local Content Declaration- Summary Annexure G2 Y
Schedule
Annexure D Imported Content Declaration – Supporting Annexure G3 Y
Schedule to Annexure C
Annexure E Local Content Declaration- Supporting Annexure G4 Y
Schedule to Annexure C
1.1.8 *SBD 1 Invitation to Bid must be filled out by all Annexure H Y
tenderers and submitted with the tender at tender
submission deadline
1.1.9 *
Methodology
Source: Invitation to Tender (ITT) Toilet hire and cleaning services re-issue 07 September 2026.pdffor stability for the prevention of falling over
Section A: Quality Management System Requirements ISO-9001
A.1 Quality method statement based on the scope.
A.2 Quality policy approved by top management.
A.3 Quality objectives approved by top management.
Section B: Evidence of QMS in operation
B.1 Documented information for defined roles, responsibilities and
authorities - organisation chart and responsibility matrix (must
include but not limited to quality management function / role).
B.2 Documented information for control of externally provided
processes, products and services - must include criteria for
evaluation, selection, monitoring of performance, and re-evaluation
of external providers.
Section E: User defined additional requirements & miscellaneous.
E.1 Form A is complete and signed.
Pricing Schedule
Source: Invitation to Tender (ITT) Toilet hire and cleaning services re-issue 07 September 2026.pdf1.1.20 Pricing Schedule/BOQ (if not contained in Contract) Refer to NEC Y
proposed attendee.
2.16 Seeking clarification The tenderer will notify Eskom of any clarifications required before the
closing time for clarification queries, which is [5] working days before
the deadline for tender submission.
2.22 Alternative tenders Alternative tenders are not allowed.
2.33 Cataloguing The successful tenderer may be required to provide the cataloguing
information per item after contract award and will need to ensure that
all materials delivered to Eskom are labelled in line with Eskom’s
labelling specifications as may be stipulated by Eskom. Where
cataloguing is a requirement, the Pricing Schedule must also include
a line item for cataloguing, which tenderers are required to quote for.
awarded to the successful tenderer.
In the event that there’s no successful contractor, the tender will be
reissued.
3.18 Evaluation of Specific Goals Specific goals are not applicable in this instance.
3.19 Ranking of tenders Tenderers will be ranked by applying the preferential point scoring for
the 80/20 system. Eskom will add the score from Pricing and Specific
Pricing schedule Completed pricing schedule (if not already submitted √
in the NEC or other Contract).
Financial Requirements
Source: Invitation to Tender (ITT) Toilet hire and cleaning services re-issue 07 September 2026.pdf (TENDER)Payment Terms: payment terms as stipulated hereunder when
submitting tenders and concluding contracts with Eskom:
For contracts valued below R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
Suppliers within 30 days of receipt of undisputed invoices.
For contracts valued above R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed
Compliance Requirements
Source: Invitation to Tender (ITT) Toilet hire and cleaning services re-issue 07 September 2026.pdf (TENDER)ADDITIONAL CONTRACTUAL REQUIREMENTS SUPPORTING EVIDENCE Safety COIDA - Original certificate of good standing or proof √ of application issued by the Compensation Fund (COID) or a licensed compensation insurer (South African tenderers only) Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 66 File name: Invitation to Tender (ITT) Toilet hire and cleaning services 07 September 2026 Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 28 Invitation to Tender/ Request Identifier for Proposal Effective Date 07 April 2026 Review Date April 2031 Reference Returnable From Suppliers at at ** closing (Non- prior Award. required required closing. required Tender (disqualifiable)* Contract disqualifiable) to Tender Returnable Returnable Returnable Please refer to section 3.22 above as well as the Health and Safety folder on the Eskom Tender Bulletin for further details. Quality Please refer to section 3.22 above as well as the √ Quality folder on the Eskom Tender Bulletin for further details. Other safety/quality √ documents as required per scope of works Environmental Please refer to section 3.22 above as well as the √ Environmental folder on the Eskom Tender Bulletin for further details. Due
A signed copy of the public interest score (only applicable to South African entities that are not audited) o Giving the actual score o Indicating whether the company is owner managed or not Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 66 File name: Invitation to Tender (ITT) Toilet hire and cleaning services 07 September 2026 Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 28 Invitation to Tender/ Request Identifier for Proposal Effective Date 07 April 2026 Review Date April 2031 Reference Returnable From Suppliers at at ** closing (Non- prior Award. required required closing. required Tender (disqualifiable)* Contract disqualifiable) to Tender Returnable Returnable Returnable o Confirming whether the annual financial statements were externally prepared or not.
Copies of the ITA34C for the current & previous years of assessment (only applicable to South African entities that are not audited)
For unincorporated JV or a SPV, each partner in the JV or a SPV must submit its annual financial statements including all items listed above. DOCUMENTS REQUIRED UNDER FUNCTIONALITY/TECHINICAL CRITERIA Functionality/Technical Please refer to section 3.13 above as well as the √ Technical folder on the Eskom Tender Bulletin for further details. Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 66 File name: Invitation to Tender (ITT) Toilet hire and cleaning services 07 September 2026 Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 28 Invitation to Tender/ Request Identifier for Proposal Effective Date 07 April 2026 Review Date April 2031 ANNEXURE A AUTHORISATION FORM Indicate the status of the tenderer by ticking the appropriate box below. A B C D E F COMPANY CLOSE PARTNERSHIP JOINT SOLE TRUST CORPORATION VENTURE PROPRIETOR The tenderer must complete the appropriate certificate set out below for its category of organisation. If the tenderer is a company, close corporation, joint venture, or trust the tenderer must attach a certified copy the document that is proof of the contents of the certificate (resolution of the board of directors of a company, members’ resolution of a close corporation, power of attorney in the case of a joint venture, or resolution of the board of trustees of a trust). Note further that, in addition to completing the relevant certificate for category of organisation, the authorised representative of the tenderer is also required to complete and sign the table at the end of this Authorisation Form.
Certificate for company I,_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ , in my capacity as _ _ _ _ _ _ _ _ _ _ _ of the board of directors of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, hereby confirm that by resolution of the board taken on _ _ _ __ _ _ _ _ (date), Mr/Ms _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , acting in his/her capacity of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, is authorised to submit this tender on behalf of the company, and to sign all documents in connection with this tender and any contract that may result from it on behalf of the company. A certified copy of the resolution of the board is annexed to this Form. Signed: Date: Name: Position: Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 66 File name: Invitation to Tender (ITT) Toilet hire and cleaning services 07 September 2026 Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 28 Invitation to Tender/ Request Identifier for Proposal Effective Date 07 April 2026 Review Date April 2031
Certificate for close corporation I,_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ , in my capacity as member of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, hereby confirm that by majority vote of the members taken on _ _ _ __ _ _ _ _ (date), Mr/Ms _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , acting in his/her capacity of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, is authorised to submit this tender on behalf of the close corporation, and to sign all documents in connection with this tender and any contract that may result from it on behalf of the close corporation. A certified copy of the members’ resolution is annexed to this Form. Signed: Date: Name: Position
Certificate for partnership We, the undersigned, being the key partners in the business trading as _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ hereby authorise Mr/Ms _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, acting in his/her capacity of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, to submit this tender on behalf of the partnership, and to sign all documents in connection with the tender and any contract that may result from it on behalf of the partnership. Name Address Signature Date NOTE: This certificate is required to be completed and signed by the full number of Partners necessary to commit the Partnership. Attach additional pages if more space is required. Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 66 File name: Invitation to Tender (ITT) Toilet hire and cleaning services 07 September 2026 Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 28 Invitation to Tender/ Request Identifier for Proposal Effective Date 07 April 2026 Review Date April 2031
Certificate for Joint Venture We, the undersigned, are submitting this tender offer in Joint Venture and hereby authorise Mr/Ms _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, an authorised signatory of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , being the lead member in the Joint Venture, to sign all documents in connection with the tender and any contract that may result from it on behalf of all the members in the Joint Venture. This authorisation is evidenced by the attached power of attorney signed by the legally authorised signatories of all the members in the Joint Venture. We attach to this Form a certified copy of the Joint Venture Agreement which incorporates a statement that all members in the Joint Venture are liable jointly and severally for the execution of the contract, a term that indicates which member will be the lead member, and terms that indicate the ratios according to which work and payment will be divided amongst the members. Name of JV member Address Authorised signature, name and capacity Lead member Member Member Member NOTE: This certificate is required to be completed and signed by all members of the joint venture. Attach additional pages if more space is required.
Certificate for sole proprietor I, _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, hereby confirm that I am the sole proprietor of the business trading as _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Signed: Date: Name: Position:(Sole Proprietor) Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 66 File name: Invitation to Tender (ITT) Toilet hire and cleaning services 07 September 2026 Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 28 Invitation to Tender/ Request Identifier for Proposal Effective Date 07 April 2026 Review Date April 2031
Certificate for trust I,_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ , in my capacity as _ _ _ _ _ _ _ _ _ _ _ of the board of trustees of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, hereby confirm that by resolution of the board of trustees taken on _ _ _ __ _ _ _ _ (date), Mr/Ms _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , acting in his/her capacity of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, is authorised to submit this tender on behalf of the trust and to sign all documents in connection with this tender and any contract that may result from it on behalf of the trust. A certified copy of the resolution of the board of trustees is annexed to this Form. Signed: Date: Name: Position: NOTE: The table below must also be fully completed by all tenderers in addition to the certificate that was selected and completed above. Name of tenderer: Full names of authorised signatory: Designation and capacity: Signature of authorised signatory Date of signature: Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 66 File name: Invitation to Tender (ITT) Toilet hire and cleaning services 07 September 2026 Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 28 Invitation to Tender/ Request Identifier for Proposal Effective Date 07 April 2026 Review Date April 2031 ANNEXURE B ACKNOWLEDGEMENT FORM We are in receipt of the Invitation to Tender/Proposal from Eskom Holdings SOC Ltd and the following addenda issued by Eskom: We confirm that the documentation received by us is: (Indicate by ticking the box) Correct as stated in the Invitation to Tender / RFP Content List, and that each document is complete. Or: Incorrect or incomplete for the following reasons: Cataloguing Acknowledgement: Please select the relevant statement by ticking the appropriate box below
We agree to provide the cataloguing information as described in the Invitation to Tender
We have already supplied Eskom with the cataloguing information pertaining to this Invitation to Tender in a previous contract/order [insert previous contract/order number] __________
We do not intend to provide the required cataloguing information for the reasons stated hereunder:
We are a Distributor/Importer/Agent and our Principal, being the Original Equipment Manufacturer (OEM), is or is not [delete whichever is not applicable] in the position to supply cataloguing information for items. We attach the letter from the OEM confirming its position. Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 66 File name: Invitation to Tender (ITT) Toilet hire and cleaning services 07 September 2026 Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 28 Invitation to Tender/ Request Identifier for Proposal Effective Date 07 April 2026 Review Date April 2031 Invitation to Tender/Request for Proposal No: ____________________ Name of Tenderer: ___________ _ _ Country of registration: _______________________________________ Full names of contact person: __________________________________ Contact details: Tel (landline): Cell phone: e-mail address: Name of tenderer: Full names of authorised signatory
B-BBEE Minimum Level: 0
Points Allocation: 0 points
B-BBEE Details: ght Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 66
File name: Invitation to Tender (ITT) Toilet hire and cleaning services 07 September 2026
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 28
Invitation to Tender/ Request Identifier
for Proposal Effective Date 07 April 2026
Review Date April 2031
Clause Number from Standard
Tender Data
Conditions of Tender
evaluation purposes but will be implemented when payment is
effected.
Prices will be scored out of 80 points
B-BBEE status will be score out of 20 points in accordance with
PPR2022. Tenderers are required to submit valid B-BBEE Certificate
/ fully completed Sworn affidavit for this evaluation.
Tender failing to provide documentation for the allocation of
preference points will not be disqualified but may only score points
out of 80 for price and score 0 points out of 20 for B-BBEE.
Proof of B-BBEE status level of contributor for main
contractor/supplier to be submitted prior to contract award.
If a tenderer fails to submit evidence of its points claim for a Specific
Goal, it will not be disqualified. However, it will be awarded 0 points
for that Specific Goal.
B-BEEE Status Level of Number of Points (80/20
Contributor system)
1 20
2 18
3 14
4 12
5 8
6 6
7 4
8 2
Non-compliant contributor 0
All tenderers must at a minimum maintain their BBBEE status
throughout the contract period.
Allocation of BBBEE Points, (80/20): Tenderers must submit:
The following documents are required to claim preference points:
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management sy
Health & Safety
Source: Invitation to Tender (ITT) Toilet hire and cleaning services re-issue 07 September 2026.pdfrequirements (in Annexure B) must be signed and submitted
by the tenderer.
and management of OHS risks related to the scope of work.
provided together with the BRA).
to OHS Act Section 7)
and aligned with the health and safety specification or
requirements)
occur e.g. chemical spillages, air pollution incidents and
encounters with bees and snakes.
emergency situations. This shall include exercises or drills to
prepare and test emergency response on specified
timeframes
stakeholders in case of an emergency.
following; Description of the incident (EG: bees & snakes)
The recommended supplier shall submit all the documentation (Form
A2 Baseline Training Plan, Form A3 Project Interim Report, Form A4
Supervisor Agreement, Form A5 Project Completion Report) that may
be required as returnables after contract award as stipulated by
Clause 4 of the Contract Skills Development Goals Standard
published in GGN 36760 of March 2020 – Not applicable
(Annexure A-Targeted Enterprise Declaration Affidavit; Project Interim
Report, Project Completion Report and Declaration) that may be
required as returnables after contract award and as stipulated by
Clause 3.3 of the Standard for Indirect Targeting for Enterprise
Development through Construction Works Contract (published in GN
1779, Government Gazette No. April 2023) – Not
applicable.
Safety COIDA - Original certificate of good standing or proof √
of application issued by the Compensation Fund
(COID) or a licensed compensation insurer (South
African tenderers only)
details.
Other safety/quality √
documents as
required per scope
of works
Environmental Please refer to section 3.22 above as well as the √
Contractual Terms
Source: Invitation to Tender (ITT) Toilet hire and cleaning services re-issue 07 September 2026.pdfsanctions list. A tenderer shall be found to have the nationality
of a country if the tenderer is a national or is constituted,
incorporated, or registered and operates in conformity with the
provisions of the laws of that country. This criterion shall also
apply to the determination of the nationality of proposed
subcontractors or suppliers for any part of the Contract including
related services.
individually or as a partner in a joint venture (JV) or consortium,
except on an E-Tendering system where there is a limit size
(The upload size per document is 500 megabytes and total
submission is restricted to 4 gigabytes).
performance bond or a demand guarantee is a requirement, the
tenderer must select a minimum of two (2) financial institutions that it
is likely to approach from the list provided of Eskom-approved
financial institutions.
submitting tenders and concluding contracts with Eskom:
For contracts valued below R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
Suppliers within 30 days of receipt of undisputed invoices.
For contracts valued above R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
suppliers within 60 days of receipt of undisputed invoices.
Contact Information
Source: NEC3 TSSC - Term Services Toilet hire contract Dx Western Cape OU 30 June 2026.pdf (unknown){"name":null,"email":"[email protected]","phone":"+27 21 980 3375","department":"(AD HOC)","address":"as the Contractor in the conditions of contract identified in the Contract Data."}
Submission Guidelines
Source: NEC3 TSSC - Term Services Toilet hire contract Dx Western Cape OU 30 June 2026.pdf (unknown)Returnable Documents: 7. The Eskom VAT registration number: 4740 101 508 must appear on the invoice.
Evaluation Criteria
Source: NEC3 TSSC - Term Services Toilet hire contract Dx Western Cape OU 30 June 2026.pdf (unknown)No eligibility criteria specified
Technical Specifications
Source: NEC3 TSSC - Term Services Toilet hire contract Dx Western Cape OU 30 June 2026.pdf (unknown)6.1 It is required that a portable facility be provided at predetermined Major Engineering Work sites together
with applicable servicing of the facility.
6.2 It is the Supplier’s responsibility to deliver the portable toilets to various sites as described in C2.2 Price
List parameters for Western Cape Operating Unit.
6.3 On collection/ servicing of the toilet units, the Supplier should make use of the nearest registered
dumping site (situated closest to the specific Construction site).
6.4 The Price list makes provision for travelling rate per kilometre. The distance will be measured from the
Supplier’s offices (situated nearest to branch office from the site) to the specific construction site and from
the specific construction site to the nearest registered dumping site.
6.5 Every Task Order which is issued, it is the duty & responsibility of the Contractor to provide the
Employer’s Representative with a service/ maintenance report of all maintained; serviced toilets and basins.
6.6 Service reports to be provided to the Employer’s Representative on a monthly basis, but no later than the
seventh day of the following month.
The Delivery note should contain the following info:
Name of Contractor’s Rep
Purchase Order number
Date of service
Type of service Rendered
Indicate status after each visit and recommend (where applicable)
Signatories (both Eskom Representative & Contractor responsible person)
The Contractor will further provide the Employer with an approved waste disposal certificate attained from an
authorized waste disposal dumping site.
Claiming for services rendered, the Contractor is required to provide the Employer with the following
documents for each respective Task Order:
Pro-forma invoice
Service/ Maintenance report
Waste disposal certificate
NB: Service/ Maintenance Reports should be signed by an Eskom employee (Major Engineering Work) on
site and co-signed by the Contractor.
No Security Guard on site may sign off a Service/ Maintenance report document.
All chemicals utilised should be in accordance with acceptable environmentally friendly Statutory
requirements.
Part c3: scope of work c3.1 Tssc3 service information
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
Hiring of portable toilet facilities and applicable serivicing at various sites in the western
Cape on an as and when required basis for a period of three (3) years.
General Specifications:
Health and Safety requirements
Pricing Schedule
Source: NEC3 TSSC - Term Services Toilet hire contract Dx Western Cape OU 30 June 2026.pdf (unknown)(Reg No. 2002/015527/30)
and
for Hiring of portable toilet facilities and applicable
servicing at various sites in the Western Cape on an
as & when required basis for three years
Contents: Compiled in accordance with CIDB Standard for Uniformity in Page No.
Construction Procurement (May 2010 amendments)
Part C1 Agreements & Contract Data
C1.1 Form of Offer and Acceptance [●]
C1.2 Contract Data provided by the Employer [●]
C1.2 Contract Data provided by the Contractor [●]
Part C2 Pricing Data
C2.1 Pricing assumptions [●]
C2.2 Price List [●]
Part C3 Scope of Work
C3.1 Service Information [●]
Part 1 Agreements and Contract Data, (which includes this Form of Offer and Acceptance)
Part 2 Pricing Data
Part 3 Scope of Work: Service Information
and drawings and documents (or parts thereof), which may be incorporated by reference into the above
listed Parts.
Cape on an as and when required basis for a period of three (3) years.
C2 Pricing Data
C2.1 Pricing assumptions
The Price List is in two parts. Part 1 is for work described in the Service Information not requiring the
Employer to issue a Task Order. Part 2 is for work to be carried out within a stated period of time on a taskby-Task basis and instructed by Task Order. The service may comprise work under Part 1 only or Part 2
only or a mix of both.
Entries in the first four columns of Part 1 of the Price List are made either by the Employer or the tenderer.
Entries in the first four columns of Part 2 of the Price List would normally be made by the Employer as the
Total of the Prices for Part 1 As per rates
4.1 The base date for indices are 1 month prior tender closing date. The Rates will be fixed and firm for the
first year of the contract.
4.2 On the anniversary of the contract SEIFSA will be applied from month12 till end duration of the contract.
Part c3: scope of work c3.1 Tssc3 service information
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
cumulative quantities, and monthly claimed quantities.
submitted by the Contractor, to the Employer on the assessment day.
has been agreed upon between both parties.
Financial Requirements
Source: NEC3 TSSC - Term Services Toilet hire contract Dx Western Cape OU 30 June 2026.pdf (unknown)Payment Terms: payment terms and not as per NEC Conditions of Contract. The
Contractor should familiarise himself with the payment terms as noted by the Eskom Finance
Department.
Contractors are required to follow the correct process to ensure that payment is effected in
accordance with contractual payment terms:
Compliance Requirements
Source: NEC3 TSSC - Term Services Toilet hire contract Dx Western Cape OU 30 June 2026.pdf (unknown)B-BBEE Details: ys apply:
Z1 Cession delegation and assignment
Z1.1 The Contractor does not cede, delegate or assign any of its rights or obligations to any person
without the written consent of the Employer.
Z1.2 Notwithstanding the above, the Employer may on written notice to the Contractor cede and
delegate its rights and obligations under this contract to any of its subsidiaries or any of its
present divisions or operations which may be converted into separate legal entities as a result
of the restructuring of the Electricity Supply Industry.
Z2 Change of Broad Based Black Economic Empowerment (B-BBEE) status
Z2.1 Where a change in the Contractor’s legal status, ownership or any other change to his business
composition or business dealings results in a change to the Contractor’s B-BBEE status, the
Contractor notifies the Employer within seven days of the change.
Z2.2 The Contractor is required to submit an updated verification certificate and necessary
supporting documentation confirming the change in his B-BBEE status to the Employer within
thirty days of the notification or as otherwise instructed by the Employer.
Z2.3 Where, as a result, the Contractor’s B-BBEE status has decreased since the starting date the
Employer may either re-negotiate this contract or alternatively, terminate the Contractor’s
obligation to Provide the Service.
Z2.4 Failure by the Contractor to notify the Employer of a change in its B-BBEE status may
constitute a reason for termination. If the Employer terminates in terms of this clause, the
procedures on termination are those stated in Clause 91.1 and the amount due on termination
includes amounts listed in Clause 92.1 less a deduction of the forecast additional cost to the
Employer of completing the service.
1 If the previous
Health & Safety
Source: NEC3 TSSC - Term Services Toilet hire contract Dx Western Cape OU 30 June 2026.pdf (unknown)signature of Date
witness
Note: If a tenderer wishes to submit alternative tender offers, further copies of this document may be used for that purpose, duly
endorsed, ‘Alternative Tender No. _____ ‘
Part c1: agreements and contract data c1.1 Tssc3 form of offer & acceptance
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
give rise to an estoppel unless the Parties agree otherwise and confirm such agreement in
Part c1: agreements and contract data c1.2 Tssc3 contract data part 2
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
Cape on an as and when required basis for a period of three (3) years.
writing.
Z6 Health, safety and the environment
Z6.1 The Contractor undertakes to take all reasonable precautions to maintain the health and safety
of persons in and about the execution of the service. Without limitation the Contractor:
for proper compliance with the Construction Regulations, all applicable health & safety
laws and regulations and the health and safety rules, guidelines and procedures
provided for in this contract and generally for the proper maintenance of health & safety
in and about the execution of service; and
invoices will be accepted
The service will be provided predominantly at project sites.
The Contractor to ensure that he becomes fully aware of site conditions as well as access conditions
such as soil/subsurface conditions prior to submitting a tender.
during the Contract Period.
of the works.
to contractors account.
Part c3: scope of work c3.1 Tssc3 service information
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
expertise are maintained in the business to safely and efficiently conduct operations in terms of the
specification;
for the duration of the service is to establish a local office to ensure the effective management of
resources and liaison with Eskom;
Eskom customers and Land Owners;
legal and safety documentation including test certificates of equipment, and training records of
employees;
Part c3: scope of work c3.1 Tssc3 service information
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
environmental standards, procedures, specifications and any other related documentation;
environmental induction and for its SHE file to first be inspected and approved before any services
may be performed;
when required by the Employer;
a duly authorised employee from the Employer has made the area safe and indicated the safe areas
within which the Contractor can work;
a duly authorised employee from the Employer and only move and work in the areas indicated by
this Employee;
Part c3: scope of work c3.1 Tssc3 service information
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
Contractual Terms
Source: NEC3 TSSC - Term Services Toilet hire contract Dx Western Cape OU 30 June 2026.pdf (unknown)of Deviations (if any), contact the Employer’s agent (whose details are given in the Contract Data) to arrange
the delivery of any securities, bonds, guarantees, proof of insurance and any other documentation to be
provided in terms of the conditions of contract identified in the Contract Data at, or just after, the date this
Employer’s property in excess of event described in the “Format TSSC3”
insurance policy available on
http://www.eskom.co.za/Tenders/InsurancePolicie
sProcedures/Pages/EIMS_Policies_
From_1_April_2014_To_31_March_2015.aspx
82.1 The Employer provides this insurance as stated for “Format TSSC3” available on
http://www.eskom.co.za/Tenders/InsurancePolicie
sProcedures/Pages/EIMS_Policies_
From_1_April_2014_To_31_March_2015.aspx
(See Annexure A for basic guidance)
82.1 The minimum amount of cover for the first
insurance stated in the Insurance Table is: the amount of the deductibles relevant to the
event described in the “Format TSSC3”
insurance policy available on
http://www.eskom.co.za/Tenders/InsurancePolicie
sProcedures/Pages/EIMS_Policies_
From_1_April_2014_To_31_March_2015.aspx
82.1 The minimum amount of cover for the third
insurance stated in the Insurance Table is: whatever the Contractor deems necessary in
addition to that provided by the Employer.
82.1 The minimum amount of cover for the
fourth insurance stated in the Insurance
Table is: As prescribed by the Compensation for
Occupational Injuries and Diseases Act No. and the Contractor’s common law
liability for people falling outside the scope of
the Act with a limit of Indemnity of not less
than R500 000 (Five hundred thousand Rands)
dispute to him. (see www.ice-sa.org.za). If the
Z2.2 The Contractor is required to submit an updated verification certificate and necessary
supporting documentation confirming the change in his B-BBEE status to the Employer within
thirty days of the notification or as otherwise instructed by the Employer.
Z2.3 Where, as a result, the Contractor’s B-BBEE status has decreased since the starting date the
Employer may either re-negotiate this contract or alternatively, terminate the Contractor’s
obligation to Provide the Service.
Z2.4 Failure by the Contractor to notify the Employer of a change in its B-BBEE status may
constitute a reason for termination. If the Employer terminates in terms of this clause, the
procedures on termination are those stated in Clause 91.1 and the amount due on termination
includes amounts listed in Clause 92.1 less a deduction of the forecast additional cost to the
otherwise, whether in connection with any procurement process or contract with the Employer
or other people or organisations and including in circumstances where the Contractor or any
such member is removed from the an approved vendor data base of the Employer as a
consequence of such practice.
Z3.3 If the Employer terminates in terms of this clause, the procedures on termination are those
stated in Clause 91.1 and the amount due on termination includes amounts listed in Clause
92.1 less a deduction of the forecast additional cost to the Employer of completing the service.
Z4 Confidentiality
Z4.1 The Contractor does not disclose or make any information arising from or in connection with
this contract available to others except where required by this contract. This undertaking does
not, however, apply to information which at the time of disclosure or thereafter, without default
on the part of the Contractor, enters the public domain or to information which was already in
the possession of the Contractor at the time of disclosure (evidenced by written records in
existence at that time). Should the Contractor disclose information to others where required by
this contract the Contractor ensures that the provisions of this clause are complied with by the
recipient.
Z4.2 If the Contractor is uncertain about whether any such information is confidential, it is to be
regarded as such until notified otherwise by the Employer.
Z4.3 In the event that the Contractor is, at any time, required by law to disclose any such information
which is required to be kept confidential, the Contractor, to the extent permitted by law prior to
disclosure, notifies the Employer so that an appropriate protection order and/or any other action
can be taken if possible, prior to any disclosure. In the event that such protective order is not,
or cannot, be obtained, then the Contractor may disclose that portion of the information which it
is required to be disclosed by law and uses reasonable efforts to obtain assurances that
confidential treatment will be afforded to the information so disclosed.
Z4.4 The taking of images (whether photographs, video footage or otherwise) of the Employer’s
property or any portion thereof, in the course of Providing the Service and after the end of the
service period, requires the prior written consent of the Employer. All rights in and to all such
images vests exclusively in the Employer.
Z4.5 The Contractor ensures that all his subcontractors abide by the undertakings in this clause.
Z5 Waiver and estoppel: Add to clause 12.2:
Z5.1 Any extension, concession, waiver or relaxation of any action stated in this contract by the
guidelines and procedures otherwise provided for under this contract and ensures that
his Subcontractors, employees and others under the Contractor’s direction and control,
likewise observe and comply with the foregoing.
Z6.2 The Contractor, in and about the execution of the service, complies with all applicable
environmental laws and regulations and rules, guidelines and procedures otherwise provided
for under this contract and ensures that his subcontractors, employees and others under the
Contractor’s direction and control, likewise observe and comply with the foregoing.
Z7 Provision of a Tax Invoice and interest. Add to clause 50
Z7.1 The Contractor provides the Employer with a tax invoice in accordance with the Employer's
procedures stated in the Service Information, showing the correctly assessed amount due for
payment.
Z7.2 If the Contractor does not provide a tax invoice in the form and by the time required by this
contract, the time by when the Employer is to make a payment is extended by a period equal in
time to the delayed submission of the correct tax invoice. Interest due by the Employer in terms
of clause 51.2 is then calculated from the delayed date by when payment is to be made.
Z7.3 The Contractor is required to comply with the requirements of the Value Added Tax Act, no (as amended) and to include the Employer’s VAT number 4740101508 on each invoice
he submits for payment.
Z8 Notifying compensation events
Z8.1 Delete from the last sentence in clause 61.1, “unless the event arises from an instruction of the
Employer.”
Z9 Employer’s limitation of liability; Add to clause 80.2
Z9.1 The Employer’s liability to the Contractor for the Contractor’s indirect or consequential loss is
limited to R0.00 (zero Rand).
Z10 Termination: Add to clause 90.2, after the words "or its equivalent":
Z10.1 or had a business rescue order granted against it.
Part c1: agreements and contract data c1.2 Tssc3 contract data part 2
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
Z11.2 If the Employer terminates in terms of this clause, the procedures on termination are those
stated in Clause 91.1 and the amount due on termination includes amounts listed in Clause
92.1 less a deduction of the forecast additional cost to the Employer of completing the service.
Annexure A: Insurance provided by the Employer
provided by the Employer. The Contractor must obtain its own advice. Details of the insurance itself are
available from the internet web link given below.
well as a continuous maintenance or operational service activity. If an event occurs which causes loss
or damage, a claim could be made either against the Employer’s “works” policy which may be in place
for the Employer’s portion of the property affected by the service or against the Employer’s “assets”
policy which may be in place for the Employer’s portion of the property affected by the service, or both.
policy. Each policy has a range of applicable deductibles depending on the location of the property
affected by the service and the nature of the insurable event.
the insurance provided by the Employer. This can be provided from the Contractor’s own resources on a
‘self insured’ basis or obtained by him from his own insurers. In order to assess the extent of this cover,
tendering contractors and their brokers should consult the internet web link given below and scroll to
‘Format TSSC3’ to establish both the cover and the deductibles in relation to the service provided in
terms of this contract.
on the internet web link listed below and may not be the cover required by the tendering contractor to
cover his risks as intended by each of the listed insurances in the left hand column of the Insurance
Table in clause 82.1. In terms of clause 82.1 “the Contractor provides .... the insurances stated in the
stated in the Contract Data”. Hence the Contractor provides insurance which the Employer does not
provide and in cases where the Employer does provide insurance the Contractor insures for the
difference between what the Insurance Table requires and what the Employer provides.
insurance which he has allowed for in his Prices, given the foregoing guidance, either as a separate
priced item or
obtained from:
http://www.eskom.co.za/Tenders/InsurancePoliciesProcedures/Pages/EIMS_Policies_
From_1_April_2014_To_31_March_2015.aspx
Part c1: agreements and contract data c1.2 Tssc3 contract data part 2
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
Important Dates
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026 (1).pdf (unknown){"closingDate":"1 March 2025"}
Evaluation Criteria
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026 (1).pdf (unknown)Bidders must be residents of South Africa (or complete Appendix 9 if non-resident). Companies/CCs/trusts must answer questions regarding number of employees, connected persons, income concentration, place of work, and control/supervision. Individuals must answer questions regarding service vs people provision, residence, employees, and place/control. Bidders must sign the applicable appendices (e.g., Appendix 1, 2, 3, 4, 5, 6, 7, 8, 9) as directed by the questionnaire to avoid PAYE withholding. Labour brokers must provide a valid IRP30 exemption certificate to avoid PAYE withholding.
Technical Specifications
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026 (1).pdf (unknown)The Fourth Schedule to the Income Tax Act (“the Act”) requires that Employees' Tax must be
withheld from "remuneration" paid by an "Employer" to an "Employee". This tool is intended to establish
whether an Individual, Close Corporation, Company or Trust should be classified as an Independent
Contractor, Personal Service Provider, Labour Broker or a Dependent Contractor, and the tax
consequences of such classification.
This Pack is applicable ONLY to Contractors who supply Eskom Holdings SOC Ltd (“Eskom”) and its
subsidiaries with services or Individual Contractors providing Eskom with labour.
The Contractor or its duly authorised representative must declare that all questions have been answered
truthfully.
Answering the questions will direct you to your next step.
Please note:
This Pack is based on tax legislation for the 2025/2026 tax year and is subject to change.
In the questions, any references to "you" refers to the Contractor.
In the questions, the term Contractor is used interchangeably with Individual/CC/Company/Trust.
Definitions as per the Income Tax Act are included in Appendix 10.
Any reference to “Eskom” refers to Eskom Holdings SOC Ltd and its subsidiaries:
Eskom Rotek Industries SOC Ltd
Eskom Enterprises SOC (Pty) Ltd
Escap SOC (Pty) Ltd
Eskom Finance Company SOC (Pty) Ltd
Eskom Foundation NPC
Eskom National Transmission Company SA
The Pack is based on legislation and case law applicable to the 2025/2026 tax year. We therefore
recommend that, if it is used outside of this period, you should first consult with your representative in
Eskom to refer it to Eskom’s Corporate Tax Department in Megawatt Park.
When you return the completed Pack; i.e. the signed summary sheet and signed affidavits to Eskom,
please copy Group Tax on Email address: [email protected]
The Contractor or its duly Authorised Representative acknowledges and accepts that:
ease of reading.
this Pack;
Disclaimer
Applicable to the 2025/2026 Tax Years
Eskom accepts no liability whatsoever for any loss or damages whatsoever and howsoever incurred, or
suffered, resulting, or arising, from the use of this Pack.
Contractor type
Supplier category
Please complete the following questionnaire for:
Company/Close Corporation/Trusts - EVALUATION PACK A on .
Individuals - EVALUATION PACK B on .
Applicable to the 2025/2026 Tax Years
Evaluation pack a
(To determine whether a Company, Close Corporation (CC) or Trust is a Personal
Service Provider)
Fields marked with an Asterisk (*) must be completed
Contractor’s details for a company or close corporation or
Trust
Contractor’s Name* Vendor No.
Duly Authorised Representative Name Representative Surname
Capacity Representative ID No.*
Representative Passport No. (if no RSA ID) Country of Passport Issue
VAT Registration No. Income Tax Registration No.*
CO/CC/Trust Registration No.* E-Mail Address
Telephone Number* Fax Number
Contractor’s Physical Business Address*
Unit No
Complex Name
Street Number
Street Name
Suburb
City/Town
Postal Code
Contractor’s Postal Business Address*
Same as above (Mark with an X)
Address TYPE (Delete where not applicable) P O Box/Private Bag/Street Address
P O Box/Private Bag/Street NUMBER
Street Name
Suburb
Town
Postal Code
Contractor’s Bank Details*
Account Number Bank Name
Branch Name Branch Number
Name of Account Holder Account Type (Delete where not applicable)
Current/ Savings/ Transmission/Credit Card/Bond
Account
Account Holder Relationship*
i.e. own, joint or 3rd party Own/Joint/3rd Party
Applicable to the 2025/2026 Tax Years
Please answer the following questions by marking the appropriate column with an
"X".
The term “You” will refer to the Company/CC/Trust in this Questionnaire.
Question 1(i)
Are you a Resident of the Republic of South Africa in terms of the Income Tax Act?
(Refer to Appendix 10 for the definition of a resident).
If the answer is Yes, go to Question 2(i).
If the answer is No:
Eskom to refer it to Eskom Group Tax Department in Megawatt Park.
Question 2(i)
Do you employ 3 (three) or more persons (excluding shareholders or members or
beneficiaries of the Company/CC/Trust)?
If the answer is Yes, go to Question 2(ii).
If the answer is No, go to Question 3(i).
Question 2(ii)
Are these employees employed:
If the answer is Yes, go to Question 2(iii).
If the answer is No, go to Question 3(i).
Question 2(iii)
Are the above 3 employees connected to the shareholders or the members or the
beneficiaries of the Company/CC/Trust?
If the answer is Yes, go to Question 3(i).
If the answer is No:
from your payments.
from your payments.
Corporation/Trust” at the end of the Evaluation Pack.
Applicable to the 2025/2026 Tax Years
Question 3(i)
Will/are any person who is a Connected person in relation to the Company/CC/Trust
render services personally to Eskom on behalf of the Company/CC/Trust? (Refer to
Appendix 10 for the definition of a Connected person).
If the answer is Yes, go to Question 4(i).
If the answer is No:
from your payments.
from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Question 4(i)
During the current year of assessment:
received either directly or indirectly, from:
the definition of an Associated institution)
If the answer is Yes:
Corporation/Trust” at the end of the evaluation Pack.
If the answer is No:
from your payments.
Question 5(i)
Must your duties be performed /are your duties performed mainly (more than 50%) at
the premises of Eskom,
And
Will you be subject /are you subject to Eskom’s control or supervision as to the
manner in which your duties are to be performed?
If the answer is Yes to BOTH questions:
Corporation/Trust” at the end of the evaluation Pack.
If the answer is No:
from your payments.
Applicable to the 2025/2026 Tax Years
Question 6(i)
Do/will the payments by Eskom for services payable with reference to output or
certain agreed results, e.g. payment (be it a fixed fee or an hourly rate) be only due if
and when a specific deliverable has been completed?
Question 6(ii)
Does/Will Eskom have the contractual right to control the tools or equipment, staff,
raw materials, routines, patents or technology used in the provision of the services?
Question 6(iii)
Are you/will you prohibited from rendering services to any other employers/clients
during the period of service to Eskom?
Question 6(iv)
Do/will you have the right to sub-contract work?
Question 6(v)
Are you personally or will you personally be at risk for the quality of the work done or
to be done (risk for poor quality; time over-runs, project not producing income)?
Question 6(vi)
Are/will you or the person rendering the service be obliged to be present and perform
the work at Eskom regardless of whether work is available or not?
Question 6(vii)
Is Eskom’s business or will Eskom’s business be critical to your financial/economic
survival?
Question 6(viii)
Does/will your position form part of Eskom’s organisational structure?
Question 6(ix)
Does/will Eskom provide you with any of the following:
Question 6(x)
Does/will Eskom provide you with an office?
Question 6(xi)
Does/will Eskom provide you with any equipment, tools, stationery and material?
Please go to the next section to establish your tax status.
Applicable to the 2025/2026 Tax Years
To establish your tax status, you need to summarise the “Yes” and “No” as
answered on Question 6(i) to 6(xi) in the column below:
Question Yes No
6(i) Independent PSP
6(ii) PSP Independent
6(iii) PSP Independent
6(iv) Independent PSP
6(v) Independent PSP
6(vi) PSP Independent
6(vii) PSP Independent
6(viii) PSP Independent
6(ix) PSP Independent
6(x) PSP Independent
6(xi) PSP Independent
Decision
Independent
Psp
If you have answered “PSP” to any of the following questions 6 (i), 6(iii), 6(v), 6(vi),
6(ix);
or
If you have answered more than 50% “PSP” to questions 6(ii), 6(iv), 6(vii), 6(viii),
6(x), 6(xi):
and will be coded as 3601 on your IRP5 certificate.
Corporation/Trust” at the end of the evaluation Pack.
Alternatively:
If you have already signed Appendix 7 on Questions 4 or 5:
disclosed on the IRP5 for payments received.
If you have not signed Appendix 7 on Questions 4 or 5:
from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Applicable to the 2025/2026 Tax Years
Summary for ID No. Vendor No:
Company/Close Corporation/Trust Summary
Please sign
he following
Pricing Schedule
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026 (1).pdf (unknown)the non-deduction is 07.
until such time that a valid IRP30 certificate is provided to Eskom.
Health & Safety
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026 (1).pdf (unknown)Company/close corporation/trust ..................................................................... 11
Evaluation pack b....................................................................................................................... 13
Contractor’s details for an individual* ..................................................................... 13
Question 1(i) .............................................................................................................................. 14
Question 2(i) .............................................................................................................................. 14
Question 2(ii) ............................................................................................................................. 14
Question 3(i) .............................................................................................................................. 14
Question 4(i) .............................................................................................................................. 15
Question 4(ii) ............................................................................................................................. 15
Question 4(iii) ............................................................................................................................ 15
Question 5(i) .............................................................................................................................. 15
Question 5(ii) ............................................................................................................................. 15
Question 6(i) .............................................................................................................................. 16
Question 6(ii) ............................................................................................................................. 16
Question 6(iii) ............................................................................................................................ 16
Question 6(iv) ............................................................................................................................ 16
Question 6(v) ............................................................................................................................. 16
Question 6(vi) ............................................................................................................................ 16
Question 6(vii) ........................................................................................................................... 16
Question 6(viii)........................................................................................................................... 16
Question 6(ix) ............................................................................................................................ 16
Question 6(x) ............................................................................................................................. 16
Question 6(xi) ............................................................................................................................ 16
Particulars of individual .............................................................................................. 18
Applicable to the 2025/2026 Tax Years
Appendix 1 ....................................................................................................................................... 19
Three or more full - time employees who are not connected persons . 19
Appendix 2 ....................................................................................................................................... 20
ESKOM ...................................................................................................................................... 20
Appendix 3 ....................................................................................................................................... 21
And/or shall not be controlled or supervised by ESKOM ............................. 21
Appendix 4 ....................................................................................................................................... 22
Affidavit confirming that not more than eighty percent (80 %) of income
Is or is likely to be received from any one client ............................................. 22
Appendix 5 ....................................................................................................................................... 23
Opposed to people ........................................................................................................... 23
Appendix 6 ....................................................................................................................................... 24
Declaration by ........................................................................................................................ 24
That the contractor is a labour broker ................................................................... 24
Appendix 7 ....................................................................................................................................... 25
Declaration by ........................................................................................................................ 25
Provider ................................................................................................................................ 25
Appendix 8 ....................................................................................................................................... 26
Declaration by ........................................................................................................................ 26
That the contractor is an independent supplier or contractor .................. 26
Appendix 9 ....................................................................................................................................... 27
Declaration by ........................................................................................................................ 27
That the contractor is a non-resident of the republic of south africa .... 27
Appendix 10 ..................................................................................................................................... 28
Definitions as per the income tax act, NO. , as amended. ................... 28
“Connected Person” .................................................................................................................. 28
"Associated Institution", in relation to any single employer, ...................................................... 29
"Labour Broker" ......................................................................................................................... 29
"Personal Service Provider” ...................................................................................................... 29
"Remuneration" ......................................................................................................................... 29
“Resident” .................................................................................................................................. 30
Applicable to the 2025/2026 Tax Years
Introduction
The Fourth Schedule to the Income Tax Act (“the Act”) requires that Employees' Tax must be
withheld from "remuneration" paid by an "Employer" to an "Employee". This tool is intended to establish
whether an Individual, Close Corporation, Company or Trust should be classified as an Independent
Definitions as per the Income Tax Act are included in Appendix 10.
Any reference to “Eskom” refers to Eskom Holdings SOC Ltd and its subsidiaries:
Eskom Rotek Industries SOC Ltd
Eskom Enterprises SOC (Pty) Ltd
Escap SOC (Pty) Ltd
Eskom Finance Company SOC (Pty) Ltd
Eskom Foundation NPC
Eskom National Transmission Company SA
The Pack is based on legislation and case law applicable to the 2025/2026 tax year. We therefore
recommend that, if it is used outside of this period, you should first consult with your representative in
Eskom to refer it to Eskom’s Corporate Tax Department in Megawatt Park.
When you return the completed Pack; i.e. the signed summary sheet and signed affidavits to Eskom,
please copy Group Tax on Email address: [email protected]
ease of reading.
this Pack;
Question 1(i)
Are you a Resident of the Republic of South Africa in terms of the Income Tax Act?
(Refer to Appendix 10 for the definition of a resident).
If the answer is Yes, go to Question 2(i).
Sign Appendix 9. Submit The Pack to your contractor representative in
Sign Appendix 1. If the Affidavit is not signed, PAYE will be withheld
from your payments.
from your payments.
Corporation/Trust” at the end of the Evaluation Pack.
Applicable to the 2025/2026 Tax Years
render services personally to Eskom on behalf of the Company/CC/Trust? (Refer to
Appendix 10 for the definition of a Connected person).
If the answer is Yes, go to Question 4(i).
from your payments.
from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Question 4(i)
Corporation/Trust” at the end of the evaluation Pack.
from your payments.
Go to Question 5(i).
Sign Appendix 7. PAYE will be withheld from your payments.
Go to Question 6(i) to determine the correct disclosure code on the IRP5.
Sign “Particulars of person acting as representative of the Company/Close
Corporation/Trust” at the end of the evaluation Pack.
from your payments.
Applicable to the 2025/2026 Tax Years
Psp
If you have answered “PSP” to any of the following questions 6 (i), 6(iii), 6(v), 6(vi),
6(ix);
or
If you have answered more than 50% “PSP” to questions 6(ii), 6(iv), 6(vii), 6(viii),
6(x), 6(xi):
and will be coded as 3601 on your IRP5 certificate.
Corporation/Trust” at the end of the evaluation Pack.
If you have already signed Appendix 7 on Questions 4 or 5:
disclosed on the IRP5 for payments received.
If you have not signed Appendix 7 on Questions 4 or 5:
from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Applicable to the 2025/2026 Tax Years
Questions Answer (Appendices
)
1(i) Are you a Resident of the Republic of South Africa in terms of the
Question 1(i)
Do/will you provide Eskom with a service or people?
If the answer is “Service”:
Complete and sign Appendix 5 Affidavit. If the Affidavit is not signed,
Sign Appendix 6. If the Agreement is not signed, PAYE will be withheld
from your payments.
provided, PAYE will be withheld from your payments until such time
the IRP30 certificate is provided.
No further questions must be answered.
Sign the “Particulars of Individual” Section at the end of the Evaluation
Sign Appendix 6. PAYE will be withheld from your payments.
PAYE will be withheld from your payments until such time the valid
IRP30 certificate is provided.
Question 3(i)
Are you a Resident of the Republic of South Africa in terms of the Income Tax Act?
(Refer to Appendix 10 for the definition of a Resident).
If the answer is Yes, go to Question 4(i).
spouse, parent, adoptive parent, child, grandparent, cousin, etc.? (Refer to
Appendix 10 for the definition of Connected person).
If the answer is Yes, go to Question 5(i).
from your payments.
withheld from your payments.
Question 5(i)
Must your duties be performed mainly (i.e. more than 50%) at premises of Eskom?
If the answer is Yes, go to Question 5(ii).
If the answer is No, go to Question 5(ii).
Question 5(ii)
Will you be /are you subject to Eskom’s control or supervision as to the manner in
which your duties are to be performed or as to the hours of work?
If the answers in both Questions 5(1) and 5(ii) are Yes:
Sign Appendix 7. PAYE will be withheld from your payments.
Go to Question 6(i) to determine the correct disclosure code on the IRP5.
Sign the “Particulars of Individual” at the end of the Evaluation Pack.
Sign Appendix 3. If the Affidavit is not signed, PAYE will be withheld
from your payments.
Applicable to the 2025/2026 Tax Years
Psp
If you have answered “Employee” to any of the following questions 6 (i), 6(iii), 6(v),
6(vi), 6(ix);
or
If you have answered more than 50% “Employee” to questions 6(ii), 6(iv), 6(vii),
6(viii), 6(x), 6(xi):
If you have already signed Appendix 7 on Questions 5:
disclosed on the IRP5 for payments received.
If you have not signed Appendix 7 on Questions 5:
withheld from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Applicable to the 2025/2026 Tax Years
Appendices)
1(i) Do/will you provide Eskom with a service or people?
2(i) Do you provide Eskom with people and will these people be paid by you?
2 Are you in a possession of an IRP30 exemption certificate which is valid for
ii) the period under review?
3(i) Are you a Resident of the Republic of South Africa in terms of the Income
Tax Act?
4(i) Do you employ 3 (three) or more persons throughout the year?
4(ii) Are these employees employed on a full time basis and are they engaged
in the business of the Individual?
4(iii) Are any of these employees Connected in respect of the individuals, e.g.
spouse, parent, adoptive parent, child, grandparent, cousin, etc.?
5(i) Must your duties be performed / are your duties performed mainly (more
than 50%) at the premises of Eskom?
5(ii) Will you be /are you subject to Eskom’s control or supervision as to the
manner in which your duties are performed or to the hours of work?
6(i) Do/will the payments by Eskom for services payable with reference to
output or certain agreed results, e.g. payment (be a fixed fee or an hourly
rate) be only due if and when a specific deliverable has been completed?
6(ii) Does/Will Eskom have the contractual right to control the tools or
equipment, staff, raw materials, routines, patents or technology used in the
provision of the services?
6(iii) Are you/
ill you prohibited from rendering services to any other employers/clients
during the period of service to Eskom?
6(iv) Do/will you have the right to sub-contract work?
6(v)
re you personally or will you personally be at risk for the quality of the work
done or to be done (risk for poor quality; time over-runs, project not
producing income)?
6(vi) Are/will you or the person rendering t
e service be obliged to be present and perform the work at Eskom
regardless of whether work is available or not?
6(vii) Is Eskom’s business or will Eskom’s business be critical to your
financial/economic survival?
6(viii) Does/will your position form part of Eskom’s organisational structure?
6(ix) Does/will Eskom provide you with any of the following:
Pension fund / Provident fund / Retirement Annuity Fund; medical aid,
leave of any nature, salary increases, bonuses or any allowances.
6(x) Does/will Eskom provide you with an office?
6(xi) Does/will Eskom provide you with any equipment, tools, stationery and
material?
Applicable to the 2025/2026 Tax Years
Appendix 1
Thus signed and sworn to before me at ______________on this day
Of __________20.
Thus signed and sworn to before me at ______________on this day
Of __________20.
Applicable to the 2025/2026 Tax Years
Appendix 3
Thus signed and sworn to before me at ______________on this day
Of __________20.
Applicable to the 2025/2026 Tax Years
Appendix 4
Affidavit confirming that not more than eighty percent (80 %) of
Thus signed and sworn to before me at ______________on this day
Of __________20.
Applicable to the 2025/2026 Tax Years
Appendix 5
Thus signed and sworn to before me at ______________on this day
Of __________20.
Applicable to the 2025/2026 Tax Years
Appendix 6
Applicable to the 2025/2026 Tax Years
Appendix 7
Applicable to the 2025/2026 Tax Years
Appendix 8
Applicable to the 2025/2026 Tax Years
Appendix 9
Applicable to the 2025/2026 Tax Years
Appendix 10
rendering any such service, other than any employee who is a shareholder or member of the
company or trust or is a connected person in relation to such person;
"Remuneration"
means -
any amount of income which is paid or is payable to any person by way of any salary, leave pay, wage,
overtime pay, bonus, gratuity, commission, fee, emolument pension, superannuation allowance, retiring
allowance or stipend, whether in cash or otherwise and whether or not in respect of services rendered,
including-
a) any amount referred to in paragraph (a), (c), (cA),(d), (e), (eA) or (f) of the definition of "gross
income" in section one of this Act;
any amount required to be included in such person's gross income under paragraph (i) of that definition;
Applicable to the 2025/2026 Tax Years
bA) ...
but not including-
ii) any amount paid or payable in respect of services rendered or to be rendered by any person
(other than a person who is not a resident or an employee contemplated in paragraph (b), (c),
(d) (e) or (f)of the definition of "employee") in the course of any trade carried on by him
independently of the person by whom such amount is paid or payable and of the person to
whom such services have been or are to be rendered: Provided that for the purposes of this
paragraph a person shall not be deemed to carry on a trade independently as aforesaid if the
services are required to be performed mainly at the premises of the person by whom such
amount is paid or payable or of the person to whom such services were or are to be rendered
and the person who rendered or will render the services is subject to the control or supervision
of any other person as to the manner in which his or her duties are performed or to be
performed or as to his hours of work. Provided further that a person will be deemed to be
carrying on a trade independently as aforesaid if he throughout the year of assessment employs
three or more employees who are on a full time basis engaged in the business of such person
of rendering any such service, other than any employee who is a connected person in relation to
such person;
iii) ...
“Resident”
means any-
(a) natural person who is-
(i) ordinarily resident in the Republic; or
(ii) not at any time during the relevant year of assessment ordinarily resident in the Republic, if that
person was physically present in the Republic-
a) for a period or periods exceeding 91 days in aggregate during the relevant year of
assessment, as well as for a period or periods exceeding 91 days in aggregate during each
of the five years of assessment preceding such year of assessment; and
b) for a period or periods exceeding 915 days in aggregate during those five preceding years
of assessment,
in which case that person will be a resident with effect from the first day of that relevant year of
assessment: Provided that-
(A) a day shall include a part of a day, but shall not include any day that a person is in transit
through the Republic between two places outside the Republic and that person does not
formally enter the Republic through a “port of entry” as contemplated in section 9 (1) of the
Immigration Act, 2002 (Act No. ), or at any other place as may be permitted by
the Director General of the Department of Home Affairs or the Minister of Home Affairs in
terms of that Act; and
(B) where a person who is a resident in terms of this subparagraph is physically outside the
Republic for a continuous period of at least 330 full days immediately after the day on
which such person ceases to be physically present in the Republic, such person shall be
deemed not to have been a resident from the day on which such person so ceased to be
physically present in the Republic; or
(b) person (other than a natural person) which is incorporated, established or formed in the Republic or
which has its place of effective management in the Republic,
but does not include any person who is deemed to be exclusively a resident of another country for
purposes of the application of any agreement entered into between the governments of the Republic
and that other country for the avoidance of double taxation;
Applicable to the 2025/2026 Tax Years
Section
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026 (1).pdf (unknown)Evaluation pack a......................................................................................................................... 6
Are you personally or will you personally be at risk for the quality of the work done or
to be done (risk for poor quality; time over-runs, project not producing income)?
Corporation/Trust” at the end of the evaluation Pack.
Evaluation Criteria
Source: 240-68099512 Form A_Cat 4_ Rev 9.pdf (unknown)No specific eligibility criteria (e.g., CSD registration, tax clearance, B-BBEE level, CIDB grading) are stated in the provided document. The only stated precondition is the completion and signing of Form A to accept Eskom's quality requirements.
Technical Specifications
Source: 240-68099512 Form A_Cat 4_ Rev 9.pdf (unknown)Indicate with an
105658000 (x) as applicable
Specification or (-) if not
Applicable
Pre-contract award quality requirements x
(*Select Only Applicable Category). NB: Not more than one category must be selected. Also indicate
whether site assessment is applicable.
Category 1 (refer to clause 3.5.-105658000) -
Category 2 (refer to clause 3.5.-105658000) -
Category 3 (refer to clause 3.5.-105658000) -
Category 4 (refer to clause 3.5.-105658000) X
Main Supplier and Sub-supplier Capability and Capacity Assessment (refer to clause 3.-105658000) -
3 post-contract award(eskom)
Methodology
Source: 240-68099512 Form A_Cat 4_ Rev 9.pdf (unknown)CLAUSE 5 Leadership - PRINCIPLE 2 Leadership X
CLAUSE 6 Planning - PRINCIPLE 3 Engagement of people X(ESKOM)
C CLAUSE 7 Support - PRINCIPLE 4 Process approach X
CLAUSE 8 Operation - PRINCIPLE 5 Improvement X
CLAUSE 9 - Evidence based decision
Performance Evaluations PRINCIPLE 6 XSECTION making
CLAUSE 10 - Improvement PRINCIPLE 7 Relationship Management X
Quality Management
Source: 240-68099512 Form A_Cat 4_ Rev 9.pdf (unknown)Authorisation Date January 2022
240-105658000 and
QUALITY REQUIREMENTS FOR ISO 9001 Review Date January 2027
Eskom Rights of Access (refer to clause 3.8.-105658000) X
Eskom Rights to Information (refer to clause 3.8.-105658000) X
Preservation (refer to clause 3.8.-105658000) X
Quality Audits Related Conditions (refer to clause 3.8.-105658000) X
Management of Nonconformities and Nonconforming Outputs Identified by Eskom (refer to clause 3.8.-
Special processes (refer to clause 3.8.-105658000) x
Clauses of iso iso 9001 standard indicate with an quality iso 9001 standard indicate with an
9001 standard clause description (x) as applicable principles principle description (x) as applicable
Or (-) if not or (-) if not
ESKOM’S QUALITY Xola Klaas Snr Advisor Quality Assurance 29/06/2026
Representativesection (tenderer)
NB: The tenderer must complete and sign this form to acknowledge and accept Eskom Supplier Quality Requirements as per 240-
105658000 Specification and ISO 9001 Standard.
Section
Source: 240-68099512 Form A_Cat 4_ Rev 9.pdf (unknown)Ard indicate with an quality iso 9001 standard indicate with an
Performance Evaluations PRINCIPLE 6 XSECTION making
ESKOM’S QUALITY Xola Klaas Snr Advisor Quality Assurance 29/06/2026
NB: The tenderer must complete and sign this form to acknowledge and accept Eskom Supplier Quality Requirements as per 240
TENDER & CONTRACT QUALITY Document Identifier 240-68099512 Rev 9
QUALITY REQUIREMENTS FOR ISO 9001 Review Date January 2027
Pre-contract award quality requirements x
B Contract Execution (refer to clause 3.7.-105658000) X CLAUSE Supplier Quality Performance Monitoring Phase (refer to clause 3.7.-105658000) X
Quality Audits Related Conditions (refer to clause 3.8.-105658000) X
Clauses of iso iso 9001 standard indicate with an quality iso 9001 standard indicate with an
Description
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)eTendering system is a web-based system that allows suppliers bidding for various tenders advertised
on Tender Bulletin system to “upload” their tender documents. Currently the tenderers or suppliers
submit tender documents at various Eskom tender offices. eTendering system replaces the manual or
physical submission of tender documents at various Eskom tender offices. eTendering system in a
nutshell is an electronic box where tender documents can be “dropped” or “uploaded”. Suppliers will
be required to register their details before they can be granted access to the eTendering system. An
OTP (one time pin) will be sent to both their cell phone and email address.
Quick and direct access is also available by using the following links:
of the public, to view and access Eskom published tenders. eTendering hyperlink will be found
on this site. Members of the public may follow prompt instructions once they have clicked on
the eTendering link (https://eTendering.eskom.co.za). This link will allow them to upload the
required tender documentation.
members of the public, to view information about published tenders and submit their tender
documents.
eTendering system.
2 Problems
A channel of communication has been created in case users of the system experiences a problem
with the system. In a case users come across some difficulties in using Tender bulletin, eTendering
and OpenText systems they need to contact the buyer responsible for the published tender.
3 What’s New
A new functionality to “add closed tenders”. Closed tenders refers to the tenders which are not listed
on Tenderbulletin as normal tenders, but are tenders sent directly to the relevant and potential
suppliers who meet the selection and evaluation criteria to offer what the buyer needs. These
suppliers will be sent a link via email to bid privately.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
4 Getting Started
To gain access to eTendering portal
Open your web browser
Type TenderBulletin (eskom.co.za) or https://eTendering.eskom.co.za
eTendering system login page will be displayed:
Fig 1
Registration Form Steps to follow
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Plus prefix e.g +27
capture picture to validate that you
are not a robot.
click on register button
the registerer to verify the email sent to
the provided email address.
click on “Resend Verification Email”
button
on link provided on
the email.
etendering site with a login screen
displayed, now complete the login
with your verified email address and
password
Fig1.1
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig2a.
Fig2b.
Fig3.
OTP page will be displayed
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
OTP sent to the registered cellphone number and email address
Insert the otp number then click “Verify OTP” button, to resend OTP click on “Resend OTP”
button
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Landing page once OTP is verified
Select the preferred “Ref No”
A page with the preferred Tender information is displayed before tender documentation can
be submitted.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Click on “Create New Submission” button to submit required Tender documents
Landing page once clicked on “Create New Submission” button. Take note of the
mentioned disclaimers.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
To submit tender documents, click on “Add file” button
Upload required tender documents by:
Giving the file a name
Select the listed file type e.g.: Technical, commercial, finance and etc
Choose the file you need to upload
Then click on “Upload” button, Fig5.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig4.
Fig5.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Continue to submit all the required documents under the correct category ,i.e: Technical
should be selected if technical documentation is uploaded and etc. Verify all required
documents are uploaded before making ‘Final Submission’ by clicking on ‘Finalize
Submission’ button.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
all uploaded files should not exceed 900MB.
will pop-up
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
If not all documents were submitted or still wish to add or submit more documents, click on
“No, continue adding files” button.
submission and closed time and date timestamp at the bottom.
submitted tenders will be displayed.
If you want to view or verify the submitted documents, click on “View Submission” button
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
submitted documents on email,Fig6.This is the final step for the submitter or tenderer.
It is vital to save the email with the submission ID for future enquiry if need be.
--------Originalmessage--------
From:Eskom E-Tender Document Submission 28 [email protected]
Date:Tue,23Aug2022,3:42pm
Subject: Response To Submitter
Eskom E-Tender Document Submission 28
Hi Monalisa
You have finalized a new submission with submission id:14 on tender #MPKUS10086PS
closing date : 2022-11-30 10:00:00.
Have started the submission from 2022-08-23 14:28:33 and finalized at 2022-08-23
15:42:28
Tender Description:
Award for Provision of Office Cleaning and Janitorial Services at Kusile Power Station
Project
Files Submitted:
ID Original Name Title Size Type
38 Test7.pdf testingCom 33141 Commercial
40 Test1.pdf testingTech 33502 Technical
41 Test15.pdf testingFin 33141 Finance
Thanks,
Eskom E-Tender Document Submission 28 Automated Mail
© 2022 Eskom E-Tender Document Submission 28. All rights reserved.
NB: This Email and its contents are subject to the Eskom Holdings SOC Ltd EMAIL
LEGAL NOTICE which can be viewed at
http://www.eskom.co.za/Pages/Email_Legal_Spam_Disclaimer.aspx
Fig6.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
5 Edit Registration
To edit already registered information such as Name, Organization, CSD and cell phone number
select “Edit Registration” on the drop down, Fig1. New window with information that needs to be
updated pop ups,Fig2. Click on “Update” button to update registration details.
Fig1.
Fig2.
6 Log off Button
To logout, click “Log out” on the dropdown next to your name
Fig1.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
7 Password reset
To reset a forgotten password, click “Forgot your password” Fig1. and a new screen will
pop up to enter an alternative email where the new password will be sent Fig2.Confirmation
message will be sent to the user, Fig3.
Fig1.
Fig2.
Fig3.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
An email confirming password reset will be sent to the email provided.
Click on the link or “Reset Password” button to reset the password.
Fig4.
A new window will pop up to reset and confirm the new password, Fig5.Enter new
password and confirm then click on “Reset Password” button.
Fig5.
OTP window will pop up, type in the OTP sent to either the cell phone or email address.
Fig6.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
OTP successfully goes through and lands on the below screen, password is successfully
reset.
Fig7.
8 General
This system is compatible to most web browsers however we recommend Ms Edge.
The end.
© 2023 Eskom of 19
Important Dates
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER){"closingDate":"23Aug2022","closingTime":"3:42pm"}
Contact Information
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER){"name":null,"email":"[email protected]","phone":null,"department":null,"address":"ls before they can be granted access to the eTendering system. An"}
Evaluation Criteria
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)A new functionality to “add closed tenders”. Closed tenders refers to the tenders which are not listed
suppliers who meet the selection and evaluation criteria to offer what the buyer needs. These
Technical Specifications
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)eTendering system is a web-based system that allows suppliers bidding for various tenders advertised
on Tender Bulletin system to “upload” their tender documents. Currently the tenderers or suppliers
submit tender documents at various Eskom tender offices. eTendering system replaces the manual or
physical submission of tender documents at various Eskom tender offices. eTendering system in a
nutshell is an electronic box where tender documents can be “dropped” or “uploaded”. Suppliers will
be required to register their details before they can be granted access to the eTendering system. An
OTP (one time pin) will be sent to both their cell phone and email address.
Quick and direct access is also available by using the following links:
of the public, to view and access Eskom published tenders. eTendering hyperlink will be found
on this site. Members of the public may follow prompt instructions once they have clicked on
the eTendering link (https://eTendering.eskom.co.za). This link will allow them to upload the
required tender documentation.
members of the public, to view information about published tenders and submit their tender
documents.
eTendering system.
2 Problems
A channel of communication has been created in case users of the system experiences a problem
with the system. In a case users come across some difficulties in using Tender bulletin, eTendering
and OpenText systems they need to contact the buyer responsible for the published tender.
3 What’s New
A new functionality to “add closed tenders”. Closed tenders refers to the tenders which are not listed
on Tenderbulletin as normal tenders, but are tenders sent directly to the relevant and potential
suppliers who meet the selection and evaluation criteria to offer what the buyer needs. These
suppliers will be sent a link via email to bid privately.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
4 Getting Started
To gain access to eTendering portal
Open your web browser
Type TenderBulletin (eskom.co.za) or https://eTendering.eskom.co.za
eTendering system login page will be displayed:
Fig 1
Registration Form Steps to follow
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Plus prefix e.g +27
capture picture to validate that you
are not a robot.
click on register button
the registerer to verify the email sent to
the provided email address.
click on “Resend Verification Email”
button
on link provided on
the email.
etendering site with a login screen
displayed, now complete the login
with your verified email address and
password
Fig1.1
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig2a.
Fig2b.
Fig3.
OTP page will be displayed
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
OTP sent to the registered cellphone number and email address
Insert the otp number then click “Verify OTP” button, to resend OTP click on “Resend OTP”
button
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Landing page once OTP is verified
Select the preferred “Ref No”
A page with the preferred Tender information is displayed before tender documentation can
be submitted.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Click on “Create New Submission” button to submit required Tender documents
Landing page once clicked on “Create New Submission” button. Take note of the
mentioned disclaimers.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
To submit tender documents, click on “Add file” button
Upload required tender documents by:
Giving the file a name
Select the listed file type e.g.: Technical, commercial, finance and etc
Choose the file you need to upload
Then click on “Upload” button, Fig5.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig4.
Fig5.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Continue to submit all the required documents under the correct category ,i.e: Technical
should be selected if technical documentation is uploaded and etc. Verify all required
documents are uploaded before making ‘Final Submission’ by clicking on ‘Finalize
Submission’ button.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
all uploaded files should not exceed 900MB.
will pop-up
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
If not all documents were submitted or still wish to add or submit more documents, click on
“No, continue adding files” button.
submission and closed time and date timestamp at the bottom.
submitted tenders will be displayed.
If you want to view or verify the submitted documents, click on “View Submission” button
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
submitted documents on email,Fig6.This is the final step for the submitter or tenderer.
It is vital to save the email with the submission ID for future enquiry if need be.
--------Originalmessage--------
From:Eskom E-Tender Document Submission 28 [email protected]
Date:Tue,23Aug2022,3:42pm
Subject: Response To Submitter
Eskom E-Tender Document Submission 28
Hi Monalisa
You have finalized a new submission with submission id:14 on tender #MPKUS10086PS
closing date : 2022-11-30 10:00:00.
Have started the submission from 2022-08-23 14:28:33 and finalized at 2022-08-23
15:42:28
Tender Description:
Award for Provision of Office Cleaning and Janitorial Services at Kusile Power Station
Project
Files Submitted:
ID Original Name Title Size Type
38 Test7.pdf testingCom 33141 Commercial
40 Test1.pdf testingTech 33502 Technical
41 Test15.pdf testingFin 33141 Finance
Thanks,
Eskom E-Tender Document Submission 28 Automated Mail
© 2022 Eskom E-Tender Document Submission 28. All rights reserved.
NB: This Email and its contents are subject to the Eskom Holdings SOC Ltd EMAIL
LEGAL NOTICE which can be viewed at
http://www.eskom.co.za/Pages/Email_Legal_Spam_Disclaimer.aspx
Fig6.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
5 Edit Registration
To edit already registered information such as Name, Organization, CSD and cell phone number
select “Edit Registration” on the drop down, Fig1. New window with information that needs to be
updated pop ups,Fig2. Click on “Update” button to update registration details.
Fig1.
Fig2.
6 Log off Button
To logout, click “Log out” on the dropdown next to your name
Fig1.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
7 Password reset
To reset a forgotten password, click “Forgot your password” Fig1. and a new screen will
pop up to enter an alternative email where the new password will be sent Fig2.Confirmation
message will be sent to the user, Fig3.
Fig1.
Fig2.
Fig3.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
An email confirming password reset will be sent to the email provided.
Click on the link or “Reset Password” button to reset the password.
Fig4.
A new window will pop up to reset and confirm the new password, Fig5.Enter new
password and confirm then click on “Reset Password” button.
Fig5.
OTP window will pop up, type in the OTP sent to either the cell phone or email address.
Fig6.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
OTP successfully goes through and lands on the below screen, password is successfully
reset.
Fig7.
8 General
This system is compatible to most web browsers however we recommend Ms Edge.
The end.
© 2023 Eskom of 19
Quality Management
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)38 Test7.pdf testingCom 33141 Commercial
40 Test1.pdf testingTech 33502 Technical
41 Test15.pdf testingFin 33141 Finance
Compliance Requirements
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)CSD number to gain access to
Health & Safety
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)1 Background
eTendering system is a web-based system that allows suppliers bidding for various tenders advertised
on Tender Bulletin system to “upload” their tender documents. Currently the tenderers or suppliers
submit tender documents at various Eskom tender offices. eTendering system replaces the manual or
physical submission of tender documents at various Eskom tender offices. eTendering system in a
nutshell is an electronic box where tender documents can be “dropped” or “uploaded”. Suppliers will
be required to register their details before they can be granted access to the eTendering system. An
OTP (one time pin) will be sent to both their cell phone and email address.
of the public, to view and access Eskom published tenders. eTendering hyperlink will be found
on this site. Members of the public may follow prompt instructions once they have clicked on
the eTendering link (https://eTendering.eskom.co.za). This link will allow them to upload the
required tender documentation.
members of the public, to view information about published tenders and submit their tender
documents.
eTendering system.
with the system. In a case users come across some difficulties in using Tender bulletin, eTendering
and OpenText systems they need to contact the buyer responsible for the published tender.
3 What’s New
A new functionality to “add closed tenders”. Closed tenders refers to the tenders which are not listed
on Tenderbulletin as normal tenders, but are tenders sent directly to the relevant and potential
suppliers who meet the selection and evaluation criteria to offer what the buyer needs. These
suppliers will be sent a link via email to bid privately.
© 2023 Eskom of 19
Section
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)A new functionality to “add closed tenders”. Closed tenders refers to the tenders which are not listed
suppliers who meet the selection and evaluation criteria to offer what the buyer needs. These
Contact Information
Source: Non-Disclosure Agreement (NDA) Vendors Template.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"................... a company incorporated under the laws of [insert"}
Evaluation Criteria
Source: Non-Disclosure Agreement (NDA) Vendors Template.pdf (unknown)Bidders must sign and return the Non-Disclosure Agreement (NDA) as provided. No other eligibility criteria are stated in the document.
Technical Specifications
Source: Non-Disclosure Agreement (NDA) Vendors Template.pdf (unknown)provisions of this Agreement for any
purpose whatsoever other than the Project
Contractual Terms
Source: Non-Disclosure Agreement (NDA) Vendors Template.pdf (unknown)third parties. For purposes of this clause, the Receiving Party’s Representatives shall
be deemed to be acting, in the event of a breach, as the Receiving Party’s duly
authorised agents.
3.6 Accordingly, the Receiving Party agrees to indemnify, defend and hold the Disclosing
shall not apply to any Confidential Information that:
8.1 is known to, or in the possession of the Receiving Party prior to disclosure thereof by
the Disclosing Party;
8.2 is or becomes publicly known, otherwise than as a result of a breach of this Agreement
by the Receiving Party;
8.3 is developed independently of the Disclosing Party by the Receiving Party in
circumstances that do not amount to a breach of the provisions of this Agreement;
8.4 is disclosed by the Receiving Party to satisfy an order of a court of competent
jurisdiction or to comply with the provisions of any law or regulation in force from time
to time; provided that in these circumstances, the Receiving Party shall advise the
required to disclose and the Receiving Party will use its reasonable endeavours to
protect the confidentiality of such Confidential Information to the greatest extent
possible in the circumstances;
8.5 is disclosed to a third party pursuant to the prior written authorisation and Ltd to the
extent of such approval of the Disclosing Party;
8.6 is received from a third party in circumstances that do not result in a breach of the
provisions of this Agreement.
shall endure for a period of 3 (three) years after the date of termination of the
relationship between the parties or at a date specified in any subsequent agreement(s)
between the Parties in pursuance of the Project referred to herein.
Agreement and fail to remedy such breach within seven (7) business days from date
of a written notice to do so, then the Disclosing Party shall be entitled to invoke all
remedies available to it in law including, but not Ltd to, the institution of urgent
proceedings as well as any other way of relief appropriate under the circumstances, in
any court of competent jurisdiction, in the event of breach or threatened breach of the
14.2.1 will not result in a breach of any other Agreement to which it is a party; and
14.2.2 will not, to the best of its knowledge and belief, infringe the rights of any third party;
and the Disclosing Party hereby indemnifies and holds the Receiving Party harmless
against any liability for third party claims on such a basis.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Eskom Road - Brackenfell - Cape Town - 7560
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
16
Last checked
11 Sept 2026
AI status
Not enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
Your meticulously crafted General sector tender submission can be disqualified for a single, seemingly minor compliance oversight. The reality for South African contractors is that technical competence is no longer sufficient; it is underpinned by a non-negotiable framework of documentary compliance. This regulatory guide: mastering CSD and BBBEE compliance for general sector tenders in south africa provides a comprehensive, step-by-step breakdown of the mandatory registrations and certificates you must secure and present. We detail the precise requirements for CSD, BBBEE, SARS TCS, CIPC, and COIDA, explaining their function within the procurement ecosystem governed by the PFMA and PPPFA. Learn the actionable steps to prepare your business, avoid the most common disqualifying errors, and leverage technology to streamline your compliance process for successful bidding in 2026 and beyond.
Everything South African general contractors need to know about how to write a winning tender proposal without an in-house bid team in gauteng — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
This definitive guide provides General sector contractors with the precise, actionable steps required to achieve and maintain CSD and BBBEE compliance for South African public tenders in 2026. Authored by Dr. Sarah Mokwena, a Legal Compliance Specialist, it meticulously walks through the regulatory framework, mandatory registrations, and the critical documentation needed to avoid disqualification. We dissect the common, costly errors made during submission and provide a clear checklist to ensure your bid is responsive and competitive. Learn how to navigate the Central Supplier Database, validate your BBBEE status, and integrate compliance into your tender preparation process.
A meticulous legal compliance guide for South African SMEs and General contractors navigating the 2026 procurement landscape. This case study-driven analysis provides a regulatory intelligence deep dive into the mandatory frameworks of CSD (Central Supplier Database), BBBEE (Broad-Based Black Economic Empowerment), SARS Tax Compliance, CIPC registration, and COIDA. It outlines the precise, actionable steps contractors must take to achieve compliance, highlights common disqualification pitfalls in tender submissions, and explains how integrated tools like Tenders-SA.org can streamline the process. The guide serves as an essential evergreen resource for any business seeking to compete effectively for public sector contracts in the General sector.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services: General. Unlock full pricing strategies, bid frequency, and historical win rates.