Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Deneysville Road - Vereeniging - Vereeniging - 1930
Organization Type
GOVERNMENT
Published
27 Oct 2026
OCDS Reference
ocds-9t57fa-175833
ESKOM lethabo power station requires a supplier to provide monthly water proficiency testing scheme samples for its chemical services department over a five-year period. The service covers quarterly participation in three analysis groups: trace metals, nutrients, and minerals, with sample sizes and exact numbers at the supplier's discretion. Bidders must be able to supply electronic samples monthly, report z-scores monthly, and comply with iso 17043 and iso 9001 standards.
Contract period: Five years, with monthly supply and delivery of water proficiency testing scheme samples.
Analysis groups: Quarterly participation in Group 1 (trace metals, ppb), Group 2 (nutrients, ppm), and Group 3 (minerals, pH, conductivity, etc.).
Reporting: Monthly z-score reports and quality control records are mandatory.
Compliance: Must adhere to ISO 17043 (proficiency testing) and ISO 9001 (quality management) standards.
Safety: All workers must have appropriate PPE and be familiar with risk assessments and safety precautions.
Closing date: 25 November 2026 at 08:00 (UTC). Submission method and address are not specified in the provided document.
Contact: Compiled by S Mahlasela (Senior Supervisor Chemistry); approved by C Radebe (Chemical Services Manager, Acting).
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Date & Time
Wednesday, 25 November 2026 - 10:00
Venue
MS teams
None
Categories
Request for Bid(Open-Tender)
Deneysville Road - Vereeniging - Vereeniging - 1930
Recommended Certifications
Having these can improve your winning chances: SABS Product Certification, NRCS Certification
AI Document Analysis Stages
Description
27 Oct
2026
Tender Published
Tender was published
25 Nov
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Invitation to Tender (ITT) - PTS.pdf
Eskom requires the monthly supply and delivery of water proficiency testing scheme samples to Lethabo Power Station over a five-year period. The contract will be awarded under the NEC3 Supply Contract with specific options, and bidders must meet technical functionality thresholds and submit mandatory returnables.
E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf
Monthly supply and delivery of water proficiency testing scheme samples for Lethabo Power Station over a five-year period, issued by Eskom.
Water samples Profiency Testing Scheme - SOW.pdf
Supply and delivery of monthly water proficiency testing scheme (PTS) samples to Lethabo Power Station's Chemical Services Coal Laboratory for a five-year period. The service covers quarterly participation in three sample groups (trace metals, nutrients, and minerals) with analysis and monthly z-score reporting.
Eskom - Standard Conditions of Tender - 30 January 2025.pdf
Monthly supply and delivery of water proficiency testing scheme samples to Lethabo Power Station in the Free State, under a five-year contract. Eskom seeks a supplier to provide testing samples on a recurring monthly basis, with the tender process governed by Eskom's standard conditions for fairness, transparency, and cost-effectiveness.
Declaration of Shareholding or Beneficiaries Form.pdf
Monthly supply and delivery of water proficiency testing scheme samples for Lethabo Power Station over a five-year period, issued by Eskom.
Technical Specification and Technical Evaluation - Water samples proficiency testing scheme 1.pdf
Eskom Lethabo Power Station requires a contractor to supply and deliver water proficiency testing scheme samples monthly for a period of five years. The service covers three groups of water analyses (trace metals, nutrients, and minerals) with quarterly participation, and includes monthly z-score reporting.
NEC3 Supply Contract - Supply and delivery of Water proficiency Testing Scheme Samples.pdf
Eskom requires the monthly supply and delivery of water proficiency testing scheme samples to Lethabo Power Station in Vereeniging, Free State, under a five-year NEC3 Supply Contract. The contract covers three groups of water quality parameters (trace metals, nutrients, and minerals) with quarterly participation, and includes pricing schedules for annual and five-year totals.
Quality.zip
Eskom requires the monthly supply and delivery of water Proficiency Testing Scheme (PTS) samples to Lethabo Power Station over a five-year period. Bidders must meet the tender's quality management system requirements (Category 3, Option 2) by submitting documented evidence of a QMS compliant with ISO 9001, including a quality manual, quality policy, quality objectives, and procedures for document control, nonconforming outputs, corrective action, and internal audits. Additionally, bidders must provide a draft Contract Quality Plan, an example Quality Control Plan or Inspection and Test Plan, a completed Form A, and two customer reference letters from the past 24 months.
Supplier Development Localisation Industrialisation (SDLI) Strategy Water Testing.pdf
Eskom requires the monthly supply and delivery of water Proficiency Testing Scheme (PTS) samples to Lethabo Power Station in the Free State, under a sixty-month contract. The tender is evaluated on price (90 points) and specific goals (10 points) under the 90/10 preference point system, with additional SDL&I obligations.
E-tendering Help Manual for supplier - 27 January 2025.pdf
Monthly supply and delivery of water proficiency testing scheme samples for Lethabo Power Station, under a five-year contract. The procurement is managed through Eskom's eTendering system, requiring electronic submission of tender documents.
Safety.zip
Eskom requires the monthly supply and delivery of water Proficiency Testing Scheme samples to Lethabo Power Station over a five-year period. The contract is classified as high risk, with extensive Occupational Health and Safety (OHS) obligations, including a signed OHS acknowledgement, a detailed health and safety plan, a baseline risk assessment, and compliance with Eskom's life-saving rules.
Eskom Supplier Integrity Pact - 02 June 2023.pdf
Monthly supply and delivery of water proficiency testing scheme samples for Lethabo Power Station, under a five-year contract with Eskom. The procurement is governed by Eskom's Supplier Integrity Pact, which mandates ethical conduct and integrity declarations from all suppliers.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubWe refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
The procurement is for monthly supply and delivery of water proficiency testing scheme samples for Lethabo Power Station, for a five-year period. The scope applies to Chemical Services, Eskom Lethabo Power Station, and the contractor.
Evaluation Criteria
Source: Technical Specification and Technical Evaluation - Water samples proficiency testing scheme 1.pdf (unknown)No evaluation criteria are stated in the document beyond compliance with the Procurement Strategy. The contractor is required to perform work to the highest standard, adhere to safety regulations and hold points, and notify the Eskom Supervisor or Contract Manager on completion. Monthly Z-score reports and quality control records are referenced as part of the process for monitoring.
Technical Specifications
Source: Technical Specification and Technical Evaluation - Water samples proficiency testing scheme 1.pdf (unknown)Monthly supply and delivery of water proficiency testing scheme samples for Lethabo Power Station for a period of five years.
Scope includes participation in proficiency testing schemes for three sample groups, delivered quarterly (samples per group at supplier discretion):
Contractor responsibilities:
Eskom responsibilities (Contract Manager and Technician):
Quality Management
Source: Technical Specification and Technical Evaluation - Water samples proficiency testing scheme 1.pdfInformative references include ISO 9001 and ISO 17043. The contractor must perform work to the highest standard, keep all instructions and procedures on hand, and supply record and history requirements. The contractor must notify the Eskom Supervisor or Contract Manager when work is completed. Quality control records are part of the process for monitoring.
Compliance Requirements
Source: Technical Specification and Technical Evaluation - Water samples proficiency testing scheme 1.pdf (unknown)No specific compliance requirements (CSD, tax, B-BBEE, CIDB, etc.) are stated in the document.
Section
Source: Technical Specification and Technical Evaluation - Water samples proficiency testing scheme 1.pdfThe document references monthly Z-score reports and quality control records as part of the process for monitoring. No other evaluation criteria are stated.
Important Dates
Source: Quality.zip (unknown)Nothing beyond the stated closing date was found in the tender document. The closing date is 25 November 2026 at 08:00.
Contact Information
Source: Quality.zip (unknown)Eskom representative for quality requirements:
No telephone or email addresses were provided in the document.
Submission Guidelines
Source: Quality.zip (unknown)Returnable documents — all must be completed, signed and submitted with the bid:
Disqualification risks:
Evaluation Criteria
Source: Quality.zip (unknown)Evaluation follows the Supplier Quality Management specification (240-105658000) and the List of Tender Returnables (240-12248652), Category 3, Option 2.
Scoring (per returnable, indicator = 1 point):
There is no stated minimum qualifying score, nor a price/functionality split in the provided documents. The bidder must demonstrate a developed QMS that complies with ISO 9001 (latest applicable revision); ISO 9001 certification is not explicitly required under Category 3 criteria.
Technical Specifications
Source: Quality.zip (unknown)Eskom requires monthly supply and delivery of water Proficiency Testing Scheme samples to Lethabo Power Station for a period of five (5) years.
The supplier must demonstrate a quality management system (QMS) conforming to ISO 9001 (latest applicable revision).
The bidder's QMS must cover:
Contract Quality Plan (per ISO 10005) must be submitted prior to commencement of work.
Quality Control Plan (QCP/ITP) must identify hold points, witness points, and Eskom intervention points. Eskom may appoint inspection agencies or resident inspectors, and must have access to the supplier's and sub-supplier's facilities. QCP/ITPs become addenda to the contract once signed.
Financial Requirements
Source: Quality.zip (unknown)No pricing format, bid security, bonds, guarantees, retention, payment terms, or financial capacity thresholds are stated in the document.
Compliance Requirements
Source: Quality.zip (unknown)The document specifies quality management requirements, not general compliance requirements.
Mandatory quality evidence (Category 3, Option 2):
ISO 9001 certification is not required; a documented, compliant QMS suffices.
No B-BBEE, CSD, tax, CIDB, or CIPC requirements are stated in this document.
Important Dates
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf (unknown)Closing date: 27 January 2025. (Closing time not stated in the source.)
Submission Guidelines
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf (unknown)Returnable documents:
Evaluation Criteria
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf (unknown)Submission of the fully completed E-Tendering Training Acknowledgement Form is mandatory. Failure to submit it within the prescribed period results in disqualification.
Description
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Water Testing.pdfImportant Dates
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Water Testing.pdf (TENDER)Contact Information
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Water Testing.pdf (TENDER)Evaluation Criteria
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Water Testing.pdf (TENDER)Technical Specifications
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Water Testing.pdf (TENDER)Pricing Schedule
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Water Testing.pdfFinancial Requirements
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Water Testing.pdf (TENDER)Compliance Requirements
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Water Testing.pdf (TENDER)Health & Safety
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Water Testing.pdfSection
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Water Testing.pdfDescription
Source: Safety.zipThe scope is the monthly supply and delivery of water Proficiency Testing Scheme samples to Lethabo Power Station for a period of five (5) years.
The contract is classified as high risk for OHS purposes.
The contractor will be the 'Main contractor' and is accountable for managing any appointed contractors, including their OHS compliance.
Important Dates
Source: Safety.zip (unknown)Closing date: 25 November 2026 (time not stated in document).
No briefing session or site visit dates are stated.
Contact Information
Source: Safety.zip (unknown)OHS Officer: P. Mhlongo
OHS Advisor: T. Mofokeng
Project address:
Lethabo Power Station
Deneysville / Viljoensdrift Road
Private Bag X415
Vereeniging, 1930 SA
No email or telephone contacts stated.
Submission Guidelines
Source: Safety.zip (unknown)Returnable documents — all must be completed, signed and submitted with the bid:
Submission method and address not stated in the extracted document.
Closing time: not stated (tender closing date is 25 November 2026 per the tender record).
Evaluation Criteria
Source: Safety.zip (unknown)Evaluation is conducted in the following stages:
Scoring split and minimum qualifying score not stated.
Technical Specifications
Source: Safety.zip (unknown)The scope is the monthly supply and delivery of water Proficiency Testing Scheme samples to Lethabo Power Station for a period of five (5) years.
Delivery location: Lethabo Power Station, Deneysville / Viljoensdrift Road, Private Bag X415, Vereeniging, 1930.
The contractor is responsible for managing any appointed contractors and must ensure they have adequate resources and competencies.
The contractor must provide an organisational organogram showing the reporting structure from CEO to supervisors, signed by the 16(1) or 16(2) appointee.
A section 37(2) agreement must be signed between Eskom and the main contractor (and between the main contractor and any appointed contractors) as part of the safety file.
Financial Requirements
Source: Safety.zip (unknown)Costing for OHS must be itemised based on the overall scope of the project (training, PPE, safety equipment purchases, etc.), broken down, not provided as a lump sum.
No other financial requirements (bid security, guarantees, retention, payment terms) stated.
Compliance Requirements
Source: Safety.zip (unknown)Mandatory compliance:
Section
Source: Safety.zipOHS tender returnables (Annexure C1) are evaluated as mandatory; a bid is recommended or not recommended.
Bidders must be registered with the Compensation Commissioner and hold a valid Letter of Good Standing (COIDA).
Compliance with the OHS Act and its regulations is mandatory.
A signed Section 37(2) agreement is required.
Non-compliance with Life-Saving Rules or substance abuse policy may lead to disqualification.
B-BBEE Minimum Level: 2.
Description
Source: Water samples Profiency Testing Scheme - SOW.pdfSupply of monthly water proficiency testing scheme samples for Chemical Services at Lethabo Power Station for five years. Includes the analysis parameters in three groups (trace metals, nutrients, minerals) on a quarterly basis.
Contact Information
Source: Water samples Profiency Testing Scheme - SOW.pdf (unknown)Approved by: C Radebe, Chemical Services Manager (Acting)
Compiled by: S Mahlasela, Senior Supervisor Chemistry
Evaluation Criteria
Source: Water samples Profiency Testing Scheme - SOW.pdf (unknown)The Procurement Strategy is the normative reference for bidding and evaluation. ISO 9001 and ISO 17043 are cited as informative references. Monthly Z-score reports and quality control records are required as monitoring and performance evidence.
Technical Specifications
Source: Water samples Profiency Testing Scheme - SOW.pdf (unknown)Scope: Monthly supply and delivery of water proficiency testing scheme samples to Chemical Services at Lethabo Power Station for five years.
Delivery: Electronic samples supplied monthly; quarterly participation in three analysis groups.
Group 1 - Trace Metals (quarterly): Iron, Copper, Zinc, Lead, Boron, Barium, Strontium, Molybdenum, Silicon, Phosphorus, Chromium, Aluminium, Manganese, Cadmium, Arsenic - all as ppb.
Group 2 - Nutrients (quarterly): Total phosphate, Ammonia, Nitrate, Nitrites, Orthophosphate, Oxygen absorbed, Chemical Oxygen Demand, Total Organic Carbon, Suspended Solids - as ppm where indicated.
Group 3 - Minerals (quarterly): pH @25°C, Conductivity @25°C (mS/m), Dissolved solids @180°C, Calcium, Magnesium, Sodium, Potassium, Chlorides, Sulphate, Total alkalinity, Fluoride (ppm), Turbidity (NTU).
Sample sizes and exact number of samples are at supplier discretion.
Quality Management
Source: Water samples Profiency Testing Scheme - SOW.pdfThe scope references ISO 9001 and ISO 17043 as informative standards. Quality control records must be maintained.
Compliance Requirements
Source: Water samples Profiency Testing Scheme - SOW.pdf (unknown)All workers must have appropriate PPE and be familiar with the risk assessment, safety precautions and hazards. Work must be carried out by authorised or competent persons.
Health & Safety
Source: Water samples Profiency Testing Scheme - SOW.pdfContractor obligations: all workers must have appropriate PPE, be familiar with risk assessments and safety precautions, and work must be carried out by authorised or competent people.
Section
Source: Water samples Profiency Testing Scheme - SOW.pdfPerformance monitored through monthly z-score reports and quality control records.
Important Dates
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Closing date: 25 November 2026 at 08:00.
Compulsory briefing/site visit: Details, if applicable, will be stated in the Tender Data. Attendance at a compulsory clarification meeting or site visit is mandatory; failure to attend results in disqualification.
Contact Information
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)All communication must be directed to the Eskom Representative identified in the Invitation to Tender. Contact details are not provided in this document. Queries must be made in writing.
Submission Guidelines
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Submission must be made via the Eskom Tender Bulletin site on the Eskom E-tendering page. Tenders must be uploaded and finalized no later than the closing date and time. Submit the tender in English, with all documents completed. The original tender must be signed. No late tenders will be accepted. The tender must be submitted with all mandatory returnables and the Acknowledgement Form. Proof of posting or courier delivery does not constitute proof of delivery. Eskom is not responsible for non-receipt or delays.
Returnable forms (must be completed and submitted):
Disqualification risks:
Evaluation Criteria
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Evaluation proceeds in stages: basic compliance, mandatory returnables, pre-qualification criteria (if applicable), functionality (if applicable), financial analysis (if applicable), price evaluation, and PPPFA preference points.
Scoring:
Technical Specifications
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)The tender is for the monthly supply and delivery of water Proficiency Testing Scheme samples for Lethabo Power Station, for a period of five (5) years. Specific quantities, delivery schedules, and sample volumes are not detailed in this document. The scope includes all associated duties, taxes (including VAT), and levies in the pricing.
Quality Management
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdfBidders must demonstrate that safety, health, environment, and quality (SHEQ) systems, policies, and capabilities are in place by the closing date. All costs for SHEQ compliance must be included in the tender. Compliance with Eskom's SHEQ requirements and applicable legislation is mandatory.
Pricing Schedule
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdfPricing must include all duties, taxes (including VAT), and other levies. Rates and prices are fixed for the contract duration. Prices are to be submitted in South African Rand. Arithmetical errors will be corrected as per Eskom's rules: amounts in words prevail; prices may be corrected with tenderer's concurrence; failure to accept corrections leads to rejection. All costs for safety, health, environment, and quality must be included.
Financial Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Pricing:
Financial analysis may be conducted to assess risk; if mitigating factors are insufficient, the tenderer may not be considered for award.
Insurance: Eskom-provided insurance may not cover full requirements; advise seeking professional advice.
Compliance Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Eligibility:
Mandatory compliance:
Health & Safety
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdfBidders must comply with the OHS Act and Eskom's requirements for Safety, Health, Environment and Quality (SHEQ). Provide proof of SHEQ systems, policies, and capabilities by the closing date. All SHEQ-related costs and personnel must be reflected in the tender. Additionally, if CIDB contract skills development goals (CSDG) apply (for contracts of R5 million or more, or certain grading), the contractor must achieve those goals. Contract Participation Goals (CPG) apply to construction works contracts meeting specific criteria (e.g., GB and CE classes, minimum duration 6 months, at least 25% subcontracting).
Section
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdfEvaluation stages: basic compliance, mandatory returnables, pre-qualification criteria, functionality (if applicable), financial analysis, price evaluation, and PPPFA points. Price and Specific Goals are scored under 90/10 or 80/20 system. No double-dipping across phases. Functionality, if applicable, requires meeting minimum threshold. Award may go to a non-highest scorer only under objective criteria per PPPFA Section 2(1)(f), if stipulated. Reverse e-auction may be used in some tenders; if used, prices must not be included in the tender.
Submission Guidelines
Source: Declaration of Shareholding or Beneficiaries Form.pdf (unknown)Returnable document: Tender Schedule T2.2a No 8 (Declaration of Shareholding or Beneficiaries). Must be completed, signed and submitted with the bid.
Compliance Requirements
Source: Declaration of Shareholding or Beneficiaries Form.pdf (unknown)Mandatory declaration: bidders must disclose all shareholders or beneficiaries of the company or trust, including names, registration numbers and shareholding percentages. Bidders must state whether any shareholder or beneficiary is employed by, or a close family member of an employee of, Eskom Holdings or its subsidiaries, and provide details of the role or relationship.
Description
Source: NEC3 Supply Contract - Supply and delivery of Water proficiency Testing Scheme Samples.pdfEskom seeks the monthly supply and delivery of water proficiency testing scheme samples to Lethabo Power Station for a five-year period under an NEC3 Supply Contract. The contract is structured in three parts: C1 Agreements and Contract Data, C2 Pricing Data, and C3 Scope of Work.
Contact Information
Source: NEC3 Supply Contract - Supply and delivery of Water proficiency Testing Scheme Samples.pdf (unknown)SCM / Supply Manager
Submission Guidelines
Source: NEC3 Supply Contract - Supply and delivery of Water proficiency Testing Scheme Samples.pdf (unknown)Returnable documents: the completed Form of Offer and Acceptance (C1.1) including the price schedule (C2.2) and Schedule of Deviations. Only deviations listed in the Schedule of Deviations are valid; a covering letter will not be included in the final contract.
The signed Offer must state the offered total prices, excluding VAT, VAT at 15%, and the inclusive total.
The supplier must, within two weeks of receiving the signed contract, deliver any required securities, bonds, guarantees, proof of insurance and other documentation as specified in the Contract Data; failure amounts to repudiation of the agreement.
Submission channel and closing time are not stated in the document.
Evaluation Criteria
Source: NEC3 Supply Contract - Supply and delivery of Water proficiency Testing Scheme Samples.pdf (unknown)The document does not state a scoring system, minimum qualifying score, or evaluation stages. The contract is a priced NEC3 Supply Contract (SC3); prices are evaluated for award unless otherwise specified in the Tender Data.
Technical Specifications
Source: NEC3 Supply Contract - Supply and delivery of Water proficiency Testing Scheme Samples.pdf (unknown)Monthly supply and delivery of water Proficiency Testing Scheme (PTS) samples to Lethabo Power Station for a five-year period.
The service provider must be ISO 17043 accredited for water proficiency testing schemes.
Laboratory performance must meet ISO 17025:2017 guidelines and ISO 9001 good laboratory practices.
The service provider must provide method statements and a fully detailed Quality Control Plan (QCP) for acceptance within three (3) weeks of the Contract Date.
Pricing and participation: three analytical groups are priced quarterly:
The supplier determines sample size per group.
Delivery place: Lethabo Power Station, Deneysville Vaaldam Road, Vereeniging, 1930.
Transport and packaging must be safe, well-stacked and preserved.
Quality Management
Source: NEC3 Supply Contract - Supply and delivery of Water proficiency Testing Scheme Samples.pdfService provider must be ISO 17043 accredited for the water proficiency testing scheme.
Laboratory performance must align with ISO 17025:2017 and ISO 9001 good practices.
Submit method statements and a fully detailed Quality Control Plan (QCP) for acceptance within three weeks of the Contract Date.
Supplier must conform to Purchaser's Goods Information and quality requirements.
Goods must be delivered in a safe, well-stacked and preserved condition.
Defects: defect date 52 weeks after delivery; defect correction period two weeks; defect access period five days.
Pricing Schedule
Source: NEC3 Supply Contract - Supply and delivery of Water proficiency Testing Scheme Samples.pdfPricing uses a Price Schedule (C2.2) with lump sum or rate-times-quantity items.
The supplier must include in prices the cost of correcting defects, spread costs of items not separately listed, and not allow for compensation events.
Prices are fixed and firm for the first year; thereafter price adjustment based on 85% labour (SEIFSA Table C3) and 15% fixed.
No adjustment to lump sum prices if quantities differ; changes only via compensation events.
Supplier completes the pricing data in Part 2 of Contract Data, including tendered total prices, price schedule reference, overheads and profit percentage.
The offered total of the Prices (excl. VAT), VAT at 15%, and inclusive total must be stated in the Form of Offer.
Financial Requirements
Source: NEC3 Supply Contract - Supply and delivery of Water proficiency Testing Scheme Samples.pdf (unknown)Currency: South African Rand.
Payment: Amounts due are assessed per task order; payment is due 30 days after delivery of the task order.
Interest on late payments: prime rate (365-day year) at Standard Bank of South Africa, or LIBOR for other currencies.
Supplier’s liability for indirect or consequential loss (including loss of profit, revenue, goodwill) is limited to R0.00.
Supplier’s total liability for all matters, other than excluded matters, is limited to the total of the prices.
End of liability date: one year after delivery of the whole of the goods and services.
Prices are fixed and firm for the first year; thereafter price adjustment applies with a proportion of 85% labour (SEIFSA Table C3) and 15% fixed.
Performance bond: only required if the financial analysis recommends it.
Insurance: Supplier must provide insurances per Insurance Table A (loss/damage to goods, property liability, bodily injury, employer's liability). Eskom provides insurances per Insurance Table B.
Tax invoicing: Within one week of receiving a payment certificate, the supplier must provide a tax invoice; late submission extends the payment period accordingly. Include Eskom VAT number 4740101508.
Compliance Requirements
Source: NEC3 Supply Contract - Supply and delivery of Water proficiency Testing Scheme Samples.pdf (unknown)Supplier must be ISO 17043 accredited (mandatory for the water testing scheme).
ISO 17025:2017 and ISO 9001 compliance for laboratory good practices.
B-BBEE: A change in the supplier’s B-BBEE status must be notified to the Purchaser within seven days; an updated verification certificate must be submitted within thirty days. A decrease in status may lead to renegotiation or termination.
Joint ventures: all members are jointly and severally liable; notify the Supply Manager of the key person within two weeks of Contract Date; change of composition requires written consent.
Confidentiality obligations apply to all information arising from the contract; images of goods require prior written consent.
No cession, delegation or assignment without written consent of the Purchaser.
No collusive, corrupt, fraudulent, coercive or obstructive actions; breach may lead to termination.
The supplier must comply with the NEC3 Supply Contract (April 2013) and Eskom Z-clauses Z1 to Z15.
Health & Safety
Source: NEC3 Supply Contract - Supply and delivery of Water proficiency Testing Scheme Samples.pdfSupplier must take reasonable precautions for health and safety of persons, and comply with applicable health & safety laws and Eskom's rules. The total price must include sufficient amount for health & safety compliance.
Asbestos provisions apply: permissible exposure limits of 0.2 fibres/ml (OEL) and short-term limit of 0.6 fibres/ml; Supplier may stop work if asbestos concentration exceeds action level; asbestos removal must be by a registered asbestos contractor at Purchaser's expense.
Environmental
Source: NEC3 Supply Contract - Supply and delivery of Water proficiency Testing Scheme Samples.pdfSupplier must comply with all applicable environmental laws and regulations, and ensure subcontractors and employees comply. Asbestos waste removal and disposal must be by a registered asbestos contractor at Purchaser's expense, in line with South African legislation.
Contractual Terms
Source: NEC3 Supply Contract - Supply and delivery of Water proficiency Testing Scheme Samples.pdfContract formed under NEC3 Supply Contract (April 2013) with Eskom Z-clauses Z1 to Z15.
Supplier’s liability limited: indirect/consequential loss to R0.00; property liability to applicable deductible; total liability to total of prices. End of liability: one year after delivery.
Delay damages: 2% per day up to maximum 15% per task order.
Law of contract: Republic of South Africa. Language: English. Reply period: two working days.
Contract start date, delivery dates, and programme details are to be provided by the supplier.
Section
Source: NEC3 Supply Contract - Supply and delivery of Water proficiency Testing Scheme Samples.pdfNo evaluation detail provided beyond the requirement to complete the Form of Offer and Acceptance and the Schedule of Deviations.
Description
Source: E-tendering Help Manual for supplier - 27 January 2025.pdfThe procurement is conducted through Eskom's eTendering system, an online platform replacing physical document submission. Bidders must upload their tender documents electronically. Access requires prior registration and a valid CSD number. The system allows bidders to view published tenders and submit documents, with email confirmation of completed submissions.
Important Dates
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)Closing date and time are not stated in the provided document.
Contact Information
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)Contact: Eskom E-Tender Document Submission 28
Email: [email protected]
For system problems, contact the buyer responsible for the published tender.
Submission Guidelines
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)Submissions must be made electronically through the Eskom eTendering system at https://eTendering.eskom.co.za. Bidders must register on the system before submitting; registration requires a valid email address, cell phone number, and a CSD number. Documents must be uploaded under the correct category (technical, commercial, finance, etc.). Individual file size cannot exceed 50MB and total upload size cannot exceed 900MB. Finalise the submission by clicking 'Finalize Submission' and then 'Finalise and Close Submission'; the submission remains open for adding files until closed. After finalisation, an email confirming the submission is sent; keep the submission ID for enquiries.
Evaluation Criteria
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)No specific evaluation criteria are stated in the provided document. Bidders must be registered on eTendering and have a valid CSD number to access the system. The document mentions that some tenders may be sent directly to selected suppliers meeting criteria, but no scoring or thresholds are detailed.
Compliance Requirements
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)CSD number required for access to the eTendering system. No other compliance requirements stated.
Description
Source: Invitation to Tender (ITT) - PTS.pdfSupply and delivery of water proficiency testing scheme samples to Lethabo Power Station, monthly for five years. Open tender. Tender validity 120 days.
Important Dates
Source: Invitation to Tender (ITT) - PTS.pdf (TENDER)Closing date and time: 25 November 2026 at 10:00
Clarification meeting (non-compulsory): 09 November 2026 at 13:30 via Microsoft Teams
Meeting link: https://teams.microsoft.com/meet/3937268394092887?p=eLQ9HoLqamxmosSCmT
Meeting ID: 393 726 839 409 288 7
Passcode: Qf9Ab28Z
Tender validity: 120 days from closing date
Contact Information
Source: Invitation to Tender (ITT) - PTS.pdf (TENDER)Eskom Representative (all queries must be directed here in writing):
Fraud/corruption reporting:
Submission Guidelines
Source: Invitation to Tender (ITT) - PTS.pdf (TENDER)Submission method: electronic via Eskom E-tendering site (Eskom Tender Bulletin).
Submission deadline: 25 November 2026 at 10:00.
No hard copies or zip files accepted. Upload limit 500 MB per document, 4 GB total.
Tender validity period: 120 days from closing date and time.
Returnable forms at closing (disqualifiable if not submitted, completed and signed):
Returnable required at closing for evaluation (non-disqualifiable but scores zero if omitted):
Other returnables at closing (disqualifiable if not submitted):
Returnables at closing (non-disqualifiable but must be provided within 5 working days if requested):
Returnables required prior to contract award:
Disqualification risks:
Evaluation Criteria
Source: Invitation to Tender (ITT) - PTS.pdf (TENDER)Evaluation system: 80/20 preference points system.
Price scoring: out of 80 points.
Specific Goals (PPPAF): out of 20 points.
Ranking: price + specific goals total, ranked highest to lowest.
Minimum functionality threshold: 70% weighted final score required to be considered.
Functionality criteria (weighted):
Scoring methodology for referral letters: 0 referrals = 0 points, 1 = 10, 2 = 20, 3 or more = 30.
ISO 17043: certificate provided = 40 points, not provided = 0.
Scheme participants: 0 = 0 points, 5-10 = 10, 10-15 = 20, 15-20 = 30, 20+ = 30 (as per scoring table).
Technical Specifications
Source: Invitation to Tender (ITT) - PTS.pdf (TENDER)Supply and delivery of water proficiency testing scheme samples to Lethabo Power Station.
Contract period: five (5) years, with monthly deliveries.
Service delivery location: Lethabo Power Station (Free State).
Quality Management
Source: Invitation to Tender (ITT) - PTS.pdfISO 17043 accreditation required: valid certificate for the water testing scheme (weighted 40% in functionality evaluation).
Quality requirements: Category 3 Quality Requirements as per attached document must be submitted prior to award.
Quality management system required as part of safety/quality documents.
Pricing Schedule
Source: Invitation to Tender (ITT) - PTS.pdfCompleted pricing schedule/BOQ to be submitted with tender, in PDF and Excel copy. Prices evaluated inclusive of VAT, corrected for arithmetic errors, excluding contingencies, and adjusted for variations. Unconditional discounts considered for evaluation; conditional discounts applied at payment.
Cataloguing line item may be required post-award.
Financial Requirements
Source: Invitation to Tender (ITT) - PTS.pdf (TENDER)Payment terms:
Pricing: completed pricing schedule / BOQ, submitted in PDF and Excel copy. Prices evaluated inclusive of VAT, corrected for arithmetical errors, excluding contingencies, and compared on net present value basis.
Security for performance: not applicable.
Cataloguing may be required post-award; pricing schedule must include a line item for cataloguing if applicable.
Compliance Requirements
Source: Invitation to Tender (ITT) - PTS.pdf (TENDER)Mandatory contractual requirements (assessed before award):
Additional safety, quality and environmental requirements (prior to award):
Eligibility criteria (disqualifying):
B-BBEE: proof of status level via certificate, sworn affidavit, or other requirements per B-BBEE Act. Specific goals are part of scoring.
Tax compliance: tax clearance certificate required if not CSD-registered or no SARS PIN provided; foreign suppliers with no SA footprint only complete SBD 1.
Employment Equity Act: designated employers must provide proof of compliance.
Health & Safety
Source: Invitation to Tender (ITT) - PTS.pdfSafety requirements (prior to award):
Contractual Terms
Source: Invitation to Tender (ITT) - PTS.pdfContract: NEC3 Supply Contract with options X1 (Price Adjustment for inflation), X2 (Changes in the law), X7 (Delay damages), and Z (Additional conditions of contract).
Payment terms as per financial requirements.
Eskom reserved the right to negotiate prices with preferred bidders if tendered prices are not market-related.
Main contractors discouraged from subcontracting with subsidiaries; must declare if doing so.
Section
Source: Invitation to Tender (ITT) - PTS.pdfFunctionality threshold: minimum 70% weighted final score required. Functionality criteria and scoring as detailed in standard evaluation criteria section.
Description
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdfThe Eskom Supplier Integrity Pact is a binding code of ethical conduct between Eskom and all suppliers. It requires suppliers to act with integrity, avoid conflicts of interest, and refrain from fraud, corruption, or unfair tendering practices. Suppliers must comply with all applicable South African laws and Eskom's policies that affect supply chain processes.
Important Dates
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)No specific dates beyond the tender record are stated in the document.
Contact Information
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)Enquiries and reporting misconduct:
Submission Guidelines
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)Returnable documents – each must be completed, signed and submitted:
Disqualification risks:
Evaluation Criteria
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)Supplier must be registered on the Eskom Vendor Database.
Supplier must have no current conflict of interest with Eskom staff or directors.
Supplier must not be subject to Eskom's Supplier Discipline Process for prior misconduct.
Supplier must not be listed on the National Treasury List of Restricted Suppliers.
Compliance with all applicable South African laws, including employment equity, is required.
Technical Specifications
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)This document is the Eskom Supplier Integrity Pact, applicable to all Eskom Holdings SOC Ltd and wholly owned subsidiaries, and applies to every existing or potential supplier. It is not the scope of the water proficiency testing sample supply tender itself.
Financial Requirements
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)No specific financial requirements are stated in this document.
Compliance Requirements
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)Registration on the Eskom Vendor Database is mandatory.
A signed Integrity Declaration Form must be submitted with every Eskom tender or RFQ.
Any interest or relationship with an Eskom employee or director must be disclosed; a later discovery of such a relationship must be reported.
Business courtesies or gifts to Eskom staff must not exceed R1500 and must not influence decisions.
Suppliers must not engage in collusive tendering or bid rigging.
Breaches may lead to suspension from the vendor database and referral to National Treasury for inclusion on the restricted suppliers list.
Contractual Terms
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdfThe pact is governed by South African law and remains valid until replaced. Breaches may trigger Eskom's Supplier Discipline Process, which can lead to suspension from the vendor database, other sanctions, and referral to National Treasury for inclusion on the restricted suppliers list. Eskom employees involved in tender evaluation or negotiation are prohibited from accepting gifts or benefits and must declare any conflicts of interest.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Deneysville Road - Vereeniging - Vereeniging - 1930
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
12
Last checked
27 Oct 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Median Estimate
R 435 990
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Get deep intelligence on Supplies: General. Unlock full pricing strategies, bid frequency, and historical win rates.
Learn how to submit a winning bid with these related articles
Everything South African general contractors need to know about how to write a winning tender proposal without an in-house bid team in gauteng — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Your meticulously crafted General sector tender submission can be disqualified for a single, seemingly minor compliance oversight. The reality for South African contractors is that technical competence is no longer sufficient; it is underpinned by a non-negotiable framework of documentary compliance. This regulatory guide: mastering CSD and BBBEE compliance for general sector tenders in south africa provides a comprehensive, step-by-step breakdown of the mandatory registrations and certificates you must secure and present. We detail the precise requirements for CSD, BBBEE, SARS TCS, CIPC, and COIDA, explaining their function within the procurement ecosystem governed by the PFMA and PPPFA. Learn the actionable steps to prepare your business, avoid the most common disqualifying errors, and leverage technology to streamline your compliance process for successful bidding in 2026 and beyond.
For South African General contractors, the path to government procurement is paved with non-negotiable regulatory requirements. The most common barrier to entry is not a lack of capability, but a failure to master the foundational compliance frameworks that govern every bid. This complete regulatory guide to CSD and BBBEE compliance for General sector tender suppliers in South Africa demystifies the process. It provides a meticulous, step-by-step field manual for ensuring your company is fully compliant and audit-ready, enabling you to confidently access the R billions in opportunities across infrastructure maintenance, facilities management, and service delivery within the General sector.
This definitive guide provides General sector contractors with the precise, actionable steps required to achieve and maintain CSD and BBBEE compliance for South African public tenders in 2026. Authored by Dr. Sarah Mokwena, a Legal Compliance Specialist, it meticulously walks through the regulatory framework, mandatory registrations, and the critical documentation needed to avoid disqualification. We dissect the common, costly errors made during submission and provide a clear checklist to ensure your bid is responsive and competitive. Learn how to navigate the Central Supplier Database, validate your BBBEE status, and integrate compliance into your tender preparation process.
💡 Want more tendering tips and strategies?
Explore Our Blog