Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Standerton - Standerton - Standerton -
Organization Type
GOVERNMENT
Published
27 Oct 2026
OCDS Reference
ocds-9t57fa-175934
ESKOM requires the supply and delivery of a 50% drain valve (DN200/DN250 wedge gate valve) to tutuka power station in mpumalanga as a once-off order. Bidders must demonstrate stockholding capability and commit to a delivery lead time, with a 70% local content threshold for valves. The most consequential consideration is the functionality threshold: bidders must score at least 70% on stockholding evidence and delivery commitment or be disqualified.
Closing: 03 November 2026 at 10h00, submitted electronically via the Eskom E-Tendering site only; no hard copies, no zipped files, PDF format, price list in PDF and Excel, max 500 MB per document, 4 GB total.
Functionality threshold: minimum 70% score required; 60% weight for clear colour photographs confirming stockholding of DN200/DN250 wedge gate valves (0 pts no valve, 2 pts one valve, 5 pts two or more) plus a site visit to confirm; 40% weight for delivery lead time commitment (0 pts no submission, 2 pts within 4 weeks, 4 pts within 2 weeks, 5 pts within 7 days).
Mandatory disqualifiable returnables at closing: Annexure A (Authorisation), B (Acknowledgement), C (Tenderer's Particulars), D (Integrity Pact), E (CPA local goods), F (CPA imported goods if applicable), G1-G4 (SBD 6.2 and local content declarations), H (SBD 1), J (SBD 4). Missing any disqualifies.
Local content: valves must have at least 70% local production and content; SBD 6.2 and Annexures G2-G4 must be submitted.
B-BBEE: preference points claimed via SBD 6.1 (Annexure I) – if not submitted, scores zero for specific goals but not disqualified; proof required (certificate, sworn affidavit, or QSE affidavit depending on revenue).
CSD registration is a mandatory contractual requirement – proof (CSD number/report) required prior to contract award.
No clarification meeting or site visit is scheduled; clarification queries must be submitted in writing to the Eskom Representative at least 5 working days before closing.
Date & Time
Tuesday, 03 November 2026 - 10:00
Venue
null
Tenders are to be submitted electronically via ESKOM e- tendering site by the stipulated closing date and time.
Categories
Request for Bid(Open-Tender)
Standerton - Standerton - Standerton -
27 Oct
2026
Tender Published
Tender was published
03 Nov
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
ITT Supply and delivery of 50% valve.pdf
Supply and delivery of 50% drain valves (DN200/DN250 wedge gate valves) to Tutuka Power Station in Mpumalanga, as a once-off order under an open invitation to tender by Eskom Holdings SOC Ltd.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Median Estimate
R 720 068
Range
Based on 10 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Recommended Certifications
Having these can improve your winning chances: SABS Product Certification, NRCS Certification
AI Document Analysis Stages
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Description
Source: ITT Supply and delivery of 50% valve.pdfSupply and delivery of a 50% drain valve at Tutuka Power Station, once-off order. Tender is open to all.
Important Dates
Source: ITT Supply and delivery of 50% valve.pdf (TENDER)Contact Information
Source: ITT Supply and delivery of 50% valve.pdf (TENDER)Submission Guidelines
Source: ITT Supply and delivery of 50% valve.pdf (TENDER)Submit via the Eskom E-Tendering site (Eskom Tender Bulletin).
Returnable forms (disqualifiable at closing if missing):
Non-disqualifiable returnables (if missing, will be requested, but failure leads to disqualification):
Required before award:
Evaluation Criteria
Source: ITT Supply and delivery of 50% valve.pdf (TENDER)Evaluation is in two stages: functionality (technical) then price and specific goals.
Functionality (pass/fail, minimum 70%):
Tenderers scoring below 70% are disqualified.
Price and specific goals:
Specific goals (B-BBEE status points under 80/20):
Objective criteria:
Technical Specifications
Source: ITT Supply and delivery of 50% valve.pdf (TENDER)Supply and delivery of a 50% drain valve (DN200/DN250 wedge gate valve) at Tutuka Power Station, as a once-off order.
Pricing Schedule
Source: ITT Supply and delivery of 50% valve.pdfPricing schedule/BOQ must be completed and submitted in PDF and Excel. Price list in PDF and Excel. Prices evaluated inclusive of VAT, corrected for arithmetic errors. Unconditional discounts considered. Conditional discounts not considered in evaluation. Cataloguing line item may be required if cataloguing needed.
Financial Requirements
Source: ITT Supply and delivery of 50% valve.pdf (TENDER)Pricing schedule/BOQ must be completed and submitted in PDF and Excel. Price list must be in PDF and Excel.
Compliance Requirements
Source: ITT Supply and delivery of 50% valve.pdf (TENDER)Mandatory eligibility: no restriction to do business with Eskom or state-owned companies; not on sanctions lists; no more than one tender (unless JV with joint and several liability); no conflict of interest; not restricted by National Treasury or on Tender Defaulters list; not restricted by Eskom; must not subcontract 100% of scope.
Mandatory contractual requirement (prior to award): CSD registration.
Additional contractual requirements (may apply): SHEQ requirements and financial viability (annual financial statements).
Health & Safety
Source: ITT Supply and delivery of 50% valve.pdfSHEQ requirements may apply as contractual requirements. COIDA certificate of good standing or proof of application required from South African tenderers. Other safety documents as per scope: Annexure B, SHE Policy, Risk Assessment, Letter of good standing.
Contractual Terms
Source: ITT Supply and delivery of 50% valve.pdfContract conditions are the NEC SC. Security for performance may be required; if so, bidder must select two minimum financial institutions from Eskom's approved list. Payment terms: 30 days for contracts below R50m, 60 days for above. Subcontracting with subsidiary companies is discouraged and must be declared; may be interpreted as fronting. Main contractors must not subcontract 100% of scope. Tender validity is 120 days.
Section
Source: ITT Supply and delivery of 50% valve.pdfAdditional details: functionality threshold 70%, price scored out of 80/90, specific goals out of 20/10. Objective criteria apply – SDL&I. B-BBEE points per status level. Local content 70% for valves. NIPP applies for imported content ≥ USD 5 million.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
EskomContact Person
Thami Ngele
Phone
013-690-0514
[email protected]
Address
Standerton - Standerton - Standerton -
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
1
Last checked
27 Oct 2026
AI status
Enhanced
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Data conflicts
None detected
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Supplies: General. Unlock full pricing strategies, bid frequency, and historical win rates.