Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Eskom Megawatt Park (MWP) -Maxwell Dr, Sunninghill, Sandton, 2157 - Sunninghill - Sandton - 2157
Organization Type
GOVERNMENT
Published
02 Nov 2026
OCDS Reference
ocds-9t57fa-176719
ESKOM requires bidders to provide a contract quality plan (cqp) for the installation and infrastructure upgrade of an anti-climb perimeter security fence at megawatt park, covering an 11-month construction period followed by 36 months of maintenance and support. The cqp must be prepared in line with SANS 466:2005 / iso 10005:2005 and detail how the supplier will meet all quality management expectations, including scope, communication, sub-supplier control, inspection, records, and post-delivery support. The most consequential consideration is that the cqp must be comprehensive and compliant with the template, as IT forms the basis for quality assurance throughout the contract.
Contract Quality Plan (CQP): Bidders must prepare a CQP following SANS 466:2005 Edition 1 / ISO 10005:2005 Edition 2, covering all 20 sections listed in the template, including scope, communication, organogram, interfacing documents, sub-suppliers, monitoring, special controls, records, non-conformance, databook, tools, customer property, preservation, traceability, and commissioning.
CQP Approval: The CQP must be compiled by a tenderer representative (Rev 0 during evaluation, Rev 1 after award) and approved by the owner of the organisation; Eskom will review and accept it after award.
Documentation Submission: Bidders must list and submit all documented information to Eskom prior to commencement and during/at completion, including method statements, QCP/ITP, inspection reports, certificates, and databooks.
Quality Management System: The supplier must demonstrate a QMS that controls documented information, manages non-conformances, and ensures traceability, with records retained per the template's requirements.
Scope of Work: The CQP must include the full works description as per the NEC or FIDIC document, and identify any activities requiring special controls such as welding or NDT/NDE.
Sub-supplier Management: Bidders must list all sub-suppliers and sub-contractors, describe selection criteria, and explain how their performance will be monitored and how their QMS interfaces with the supplier's.
Post-delivery Obligations: The CQP must address commissioning and post-delivery activities, including warranty conditions, technical support, defect correction period, and retention funds.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tenderβs issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Date & Time
Wednesday, 02 December 2026 - 10:00
Venue
Eskom Megawatt Park (MWP) - Newtons 1 and 2
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Categories
Request for Bid(Open-Tender)
Eskom Megawatt Park (MWP) -Maxwell Dr, Sunninghill, Sandton, 2157 - Sunninghill - Sandton - 2157
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Description
02 Nov
2026
Tender Published
Tender was published
02 Dec
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
20261015_Spec_GFD_ERE_MWP_Anti Climb Security Parimeter Fence Refurbment Project SHE Spec_Rev01.do.pdf
Eskom requires the installation and infrastructure upgrade of an anti-climb perimeter security fence at Megawatt Park, 1 Maxwell Drive, Sunninghill, Sandton 2157, delivered over 47 months comprising 11 months construction and 36 months maintenance and support. The works cover the outer barrier, a new electric fence, future inner barrier provision, new lighting and camera systems, main, western and emergency (bus) gate upgrades, and patrol road refurbishment. The specification sets the minimum safety, health and environmental requirements the appointed contractor must meet.
Technical Specification Rev 7.pdf
Eskom requires the installation and infrastructure upgrade of an anti-climb perimeter security fence at its Megawatt Park campus in Gauteng, covering a 4.2 km perimeter with three gates (Main, Western and Emergency/Bus). The contract runs for 47 months: eleven months construction followed by thirty-six months maintenance and support.
BOQ_.xlsx
Provision of installation and infrastructure upgrade for an anti-climb perimeter security fence at Eskom Megawatt Park, comprising 11 months construction and 36 months maintenance and support over a 47-month period. The works cover perimeter barriers, electric fence, lighting, CCTV, gates, patrol road, stormwater, vegetation control and MV/LV electrical infrastructure.
Technical Evaluation Criteria.pdf
Eskom requires the installation and infrastructure upgrade of an anti-climb perimeter security fence at Megawatt Park, covering electrical and civil/structural design, construction, testing and commissioning, followed by maintenance and support. The contract runs 47 months β eleven months construction and thirty-six months maintenance and support. Bidders are screened on mandatory technical gatekeepers and then scored on weighted qualitative criteria against a 70% minimum technical threshold.
NEC -contract.pdf
Eskom requires the installation and infrastructure upgrade of an anti-climb perimeter security fence at Megawatt Park, Sandton, together with 36 months of maintenance and support, under an NEC3 Engineering & Construction Contract (April 2013). The contract runs 47 months in total: 11 months construction and 36 months maintenance and support.
20260313_ Form A Cat3_ ERE _ MWP Perimeter Security Fence Upgrade .pdf
Eskom requires the installation and infrastructure upgrade of an anti-climb perimeter security fence at Megawatt Park (MWP), comprising an eleven-month construction phase followed by thirty-six months of maintenance and support, a total contract period of forty-seven months. This quality requirements form sets the ISO 9001-based quality obligations the successful bidder must meet before and after contract award.
20261015_Report_GFD_ERE_SHEQ Evaluation Criteria_Anti Climb Security Parimeter Fence.Rev01.pdf
Installation and infrastructure upgrade of an anti-climb perimeter security fence at Eskom's Megawatt Park (MWP) site in Gauteng, contracted for 47 months: 11 months construction followed by 36 months of maintenance and support. Bids are screened against an OHS tender evaluation template, and the outcome of that screening is a recommendation to proceed or not proceed.
20260313_Cat3- Quality Req _ERE _ MWP Perimeter Security Fence Upgrade .pdf
Eskom requires the installation and infrastructure upgrade of an anti-climb perimeter security fence at Megawatt Park (MWP), Gauteng, over a 47-month period comprising 11 months of construction followed by 36 months of maintenance and support. Bidders must submit a quality management returnable pack covering ISO 9001-aligned QMS documentation, operational quality evidence, a draft contract quality plan, a quality control plan or inspection and test plan, and a signed Form A.
Invitation to Tender (ITT).pdf
Installation and infrastructure upgrade of an anti-climb perimeter security fence at Eskom's Megawatt Park site in Sunninghill, Sandton, covering electrical and civil scope, followed by maintenance and support. The contract runs forty-seven months β eleven months construction and thirty-six months maintenance and support β under the NEC3 Engineering and Construction Contract.
240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx
Provision of installation and infrastructure upgrade of an anti-climb perimeter security fence at Eskom Megawatt Park in Gauteng, structured as an eleven-month construction phase followed by thirty-six months of maintenance and support. Bidders must submit a Quality Control Plan setting out inspection and test activities, intervention points and acceptance criteria for the works.
240-105658000 Supplier Quality Management Specification (3).pdf
Eskom requires the installation and infrastructure upgrade of an anti-climb perimeter security fence at Megawatt Park, comprising an eleven-month construction phase followed by thirty-six months of maintenance and support. Suppliers must meet Eskom's Supplier Quality Management specification, based on ISO 9001, throughout the contract.
20261015_GFD_ERE_Annexure B_Acknowledgement Form for Eskom SHE Rules and other Requirements (5).pdf
Installation and infrastructure upgrade of an anti-climb perimeter security fence at Eskom's Megawatt Park (MWP) in Gauteng, under a 47-month contract made up of 11 months of construction followed by 36 months of maintenance and support.
20261014_GFD_ERE_MWP- Anti Climb Security Parimeter Fence Refurb OHS Baseline risk assessment template - rev. 6.xlsx
Eskom requires the installation and infrastructure upgrade of an anti-climb perimeter security fence at Megawatt Park, covering an eleven-month construction phase followed by thirty-six months of maintenance and support. The works are governed by an Occupational Health and Safety Baseline Risk Assessment (document 240-70044602) prepared for the Group Finance Division, Eskom Real Estate.
20261015_Report_GFD_ERE_SHEQ Evaluation Criteria_Anti Climb Security Parimeter Fence.Rev01.pdf
Eskom requires the installation and infrastructure upgrade of an anti-climb perimeter security fence at Megawatt Park (MWP), together with maintenance and support, over a total period of 47 months β 11 months construction and 36 months maintenance and support. Bids close on 2 December 2026 at 10:00.
240-109253698 Contract Quality Plan (CQP) Template.docx
Installation and infrastructure upgrade of an anti-climb perimeter security fence at Eskom Megawatt Park (MWP), Gauteng, comprising eleven months of construction followed by thirty-six months of maintenance and support, for a total contract period of forty-seven months. Bidders must submit a Contract Quality Plan compiled against the supplied template, which is aligned to SANS 466:2005 Edition 1 and ISO 10005:2005 Edition 2.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
EskomWin Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
RΒ 3Β 155Β 171
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically β no action required from you.
Purpose
Document control
Submission Guidelines
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Returnable quality documents
Evaluation Criteria
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Quality requirement selection
Category 1 returnables
Category 2 returnables
Category 3 returnables
Category 4 returnables
Technical Specifications
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Applicable standards
Supplier obligations
Methodology
Source: 240-105658000 Supplier Quality Management Specification (3).pdfPreservation method
Experience & Qualifications
Source: 240-105658000 Supplier Quality Management Specification (3).pdfPersonnel
Quality Management
Source: 240-105658000 Supplier Quality Management Specification (3).pdfQuality planning
Compliance Requirements
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Quality management
Contractual Terms
Source: 240-105658000 Supplier Quality Management Specification (3).pdfPreservation management
Section
Source: 240-105658000 Supplier Quality Management Specification (3).pdfQuality requirement selection
Description
Source: 20260313_Cat3- Quality Req _ERE _ MWP Perimeter Security Fence Upgrade .pdfCategory 3 quality requirements for the Eskom Megawatt Park perimeter security fence upgrade. Specification 240-105658000, unique identifier 240-12248652, revision 7, issued 13 March 2026.
Contact Information
Source: 20260313_Cat3- Quality Req _ERE _ MWP Perimeter Security Fence Upgrade .pdf (TENDER)Quality requirements
Submission Guidelines
Source: 20260313_Cat3- Quality Req _ERE _ MWP Perimeter Security Fence Upgrade .pdf (TENDER)Returnable quality documents β all must be submitted with the bid:
Evaluation Criteria
Source: 20260313_Cat3- Quality Req _ERE _ MWP Perimeter Security Fence Upgrade .pdf (TENDER)Quality requirements are assessed as Category 3 deliverables; every listed item carries an 'apply' indicator of 1 and the sections are scored:
Total available: 12 points.
ISO 9001 certification is not required; objective evidence of a documented QMS that complies with ISO 9001 is accepted.
Technical Specifications
Source: 20260313_Cat3- Quality Req _ERE _ MWP Perimeter Security Fence Upgrade .pdf (TENDER)Scope
Quality deliverables
Compliance Requirements
Source: 20260313_Cat3- Quality Req _ERE _ MWP Perimeter Security Fence Upgrade .pdf (TENDER)Quality management system
Section
Source: 20260313_Cat3- Quality Req _ERE _ MWP Perimeter Security Fence Upgrade .pdfCategory 3 quality requirements, scored by section; each deliverable carries an 'apply' indicator of 1.
Total available: 12 points.
Compliance Requirements
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx (unknown)Quality Control Plan / Inspection Test Plan (QCP/ITP)
Description
Source: 20261015_GFD_ERE_Annexure B_Acknowledgement Form for Eskom SHE Rules and other Requirements (5).pdfThe main supplier must notify Eskom prior to appointing contractors or suppliers for the commencement of work.
Submission Guidelines
Source: 20261015_GFD_ERE_Annexure B_Acknowledgement Form for Eskom SHE Rules and other Requirements (5).pdf (unknown)Returnable documents
Submission method, address and closing time are not stated in the provided document.
Evaluation Criteria
Source: 20261015_GFD_ERE_Annexure B_Acknowledgement Form for Eskom SHE Rules and other Requirements (5).pdf (unknown)Annexure B (acknowledgement of Eskom OHS legal and other requirements) must be signed by the bidder's CEO, director or managing director and witnessed by two witnesses. No other evaluation criteria are stated in the provided document.
Technical Specifications
Source: 20261015_GFD_ERE_Annexure B_Acknowledgement Form for Eskom SHE Rules and other Requirements (5).pdf (unknown)The scope of work is the provision of installation and infrastructure upgrade for an anti-climb perimeter security fence at Eskom Megawatt Park (MWP) for 11 months of construction, followed by 36 months of maintenance and support. The provided document does not give quantities, locations, or technical standards for the fence work.
Quality Management
Source: 20261015_GFD_ERE_Annexure B_Acknowledgement Form for Eskom SHE Rules and other Requirements (5).pdfQuality requirements are limited to OHS-related standards and procedures:
After contract award, the bidder must align its company processes with these Eskom requirements. Penalties apply for non-conformance, and all employees (including contractors and suppliers) must undergo the relevant Eskom induction.
Compliance Requirements
Source: 20261015_GFD_ERE_Annexure B_Acknowledgement Form for Eskom SHE Rules and other Requirements (5).pdf (unknown)OHS compliance
Health & Safety
Source: 20261015_GFD_ERE_Annexure B_Acknowledgement Form for Eskom SHE Rules and other Requirements (5).pdfThe bidder must acknowledge (via Annexure B) that it understands and will comply with the Eskom OHS legal and other requirements listed in the form. Compliance with these requirements is mandatory when working at or rendering services to Eskom.
Contractual Terms
Source: 20261015_GFD_ERE_Annexure B_Acknowledgement Form for Eskom SHE Rules and other Requirements (5).pdfContractor management obligations for the main supplier:
Section
Source: 20261015_GFD_ERE_Annexure B_Acknowledgement Form for Eskom SHE Rules and other Requirements (5).pdfThe bidder must acknowledge receipt and understanding of the Eskom Safety, Health, Environment and Quality Policy 32-727 as part of the OHS requirements. No scoring information is provided.
Description
Source: Invitation to Tender (ITT).pdfProvision of installation and infrastructure upgrade for an anti-climb perimeter security fence at Eskom Megawatt Park (MWP), Sunninghill, Sandton, for a period of 47 months - 11 months construction followed by 36 months maintenance and support. The contract is the NEC3 Engineering & Construction Contract (ECC). The tender is an open Invitation to Tender issued by Eskom Holdings SOC Ltd, and the tender documents are supplied free of charge.
Important Dates
Source: Invitation to Tender (ITT).pdf (RFP)Closing
Compulsory clarification meeting
Clarification queries
Other
Contact Information
Source: Invitation to Tender (ITT).pdf (RFP)Eskom Representative
Procurement
Fraud and corruption reporting
Submission channel
Clarification meeting venue
Eskom Megawatt Park (MWP) - Newtons 1 and 2
Maxwell Dr
Sunninghill
Sandton, 2157
Submission Guidelines
Source: Invitation to Tender (ITT).pdf (RFP)Submission method
Format and size limits
Returnable documents (must be completed, signed and submitted by the closing date and time; omission or an unsigned form disqualifies)
Additional documents required
Scored, not disqualifying
Disqualification risks
Evaluation Criteria
Source: Invitation to Tender (ITT).pdf (RFP)Evaluation stages
Scoring split
Price evaluation
Specific goals
Other
Technical Specifications
Source: Invitation to Tender (ITT).pdf (RFP)Scope
Contract
Cataloguing
Scope of work
Quality Management
Source: Invitation to Tender (ITT).pdfCategory 3 quality requirements
Pricing Schedule
Source: Invitation to Tender (ITT).pdfPricing
Cataloguing
Other
Financial Requirements
Source: Invitation to Tender (ITT).pdf (RFP)Payment terms
Performance security
Pricing
Financial due diligence (assessed before award)
Other
Compliance Requirements
Source: Invitation to Tender (ITT).pdf (RFP)Registration and eligibility
Tax
B-bbee
Employment equity
Safety
Quality
Professional registrations
Local content
Joint ventures
Subcontracting
Health & Safety
Source: Invitation to Tender (ITT).pdfSafety
Occupational health and safety
Other
Contractual Terms
Source: Invitation to Tender (ITT).pdfContract
Performance security
Payment terms
Other
Section
Source: Invitation to Tender (ITT).pdfFunctionality
Price and specific goals (PPPFA 80/20)
Price evaluation
Contractual requirements
Description
Source: BOQ_.xlsxThe project involves upgrading the perimeter security at Eskom Megawatt Park, including a new anti-climb fence, electric fence, lighting, CCTV, gates, patrol road and electrical infrastructure, followed by 36 months of maintenance and support.
Submission Guidelines
Source: BOQ_.xlsx (unknown)Returnable documents: none specified beyond the completed Bill of Quantities cover page and pricing schedules. The cover page must show the enquiry number, tenderer's name, total price excluding VAT, date, signature and designation. All pricing schedules must be completed; unpriced items are deemed included in other rates. Bill 12 (Short Schedule of Cost Components) requires a rate against every item, but no amount is carried to the summary. Submission method and address: not stated in the provided document.
Evaluation Criteria
Source: BOQ_.xlsx (unknown)Design must be undertaken by ECSA-registered Professional Engineers forming part of the Contractor's supervision team. No other evaluation criteria (scoring split, minimum qualifying score, preference points system) are stated in the provided document.
Technical Specifications
Source: BOQ_.xlsx (unknown)Scope: installation and infrastructure upgrade of an anti-climb perimeter security fence at Eskom Megawatt Park (MWP), including construction (11 months) and 36 months of maintenance and support.
Key quantities and works:
Financial Requirements
Source: BOQ_.xlsx (unknown)Pricing format: Bill of Quantities with 12 bills. Total tender price excluding VAT is carried to the cover page; VAT at 15% is added. Bill 12 (Short Schedule of Cost Components) contains rates only, not included in the total. Rates are hourly and apply at all times including after hours, weekends and public holidays. People rates include wages, overheads, profit, transport, tools and PPE; plant rates include operator and fuel. Security (performance bond or guarantee) is a priced item in Bill 1, if required by the Contract Data. No amounts, percentages or payment terms are stated in the provided document.
Compliance Requirements
Source: BOQ_.xlsx (unknown)Design must be undertaken by ECSA-registered Professional Engineers. Health and safety measures required by Eskom must be provided for in the Bill of Quantities. A full-time Health and Safety Officer is a priced item for the 11-month construction period. Temporary works must be designed by a competent Temporary Works Designer and inspected by a Temporary Works Inspector in terms of the Construction Regulations. No other compliance requirements (CSD, tax, B-BBEE, CIDB) are stated in the provided document.
Description
Source: NEC -contract.pdfInstallation and infrastructure upgrade of the anti-climb perimeter security fence at Eskom Megawatt Park (MWP), for a period of 47 months β 11 months construction plus 36 months maintenance and support. The contract is between Eskom Holdings SOC Ltd (Reg No. 2002/015527/30) and the successful bidder.
Contact Information
Source: NEC -contract.pdf (unknown)Employer
Eskom Holdings SOC Ltd (Reg No. 2002/015527/30)
Megawatt Park
Maxwell Drive
Sandton
Johannesburg
Registered office
1 Maxwell Drive
Sunninghill
Sandton, 2157
Submission Guidelines
Source: NEC -contract.pdf (unknown)Returnable documents
Deviations
Technical Specifications
Source: NEC -contract.pdf (unknown)Scope
Site and security conditions
Key dates and conditions (as per the approved schedule)
Working areas
Experience & Qualifications
Source: NEC -contract.pdfKey personnel
Quality Management
Source: NEC -contract.pdfQuality and performance
Pricing Schedule
Source: NEC -contract.pdfPricing
Financial Requirements
Source: NEC -contract.pdf (unknown)Pricing
Payment
Price adjustment (Option X1)
Damages and retention
Liability and security
Compliance Requirements
Source: NEC -contract.pdf (unknown)Contract framework
Registration and status
Contracting structure
Health, safety and environment
Ethics and confidentiality
Health & Safety
Source: NEC -contract.pdfHealth and safety
Environmental
Source: NEC -contract.pdfEnvironmental requirements
Contractual Terms
Source: NEC -contract.pdfContract form
Time
Payment
Risk and liability
Dispute resolution
Additional conditions (Z1βZ15)
Description
Source: 20261015_Spec_GFD_ERE_MWP_Anti Climb Security Parimeter Fence Refurbment Project SHE Spec_Rev01.do.pdfPurpose
Contractor obligations
Applicability
Technical Specifications
Source: 20261015_Spec_GFD_ERE_MWP_Anti Climb Security Parimeter Fence Refurbment Project SHE Spec_Rev01.do.pdf (unknown)Scope of work β Eskom Megawatt Park, 1 Maxwell Drive, Sunninghill, Sandton 2157:
Contract period: 47 months β 11 months construction, followed by 36 months maintenance and support.
SHE Plan
Applicability
Quality Management
Source: 20261015_Spec_GFD_ERE_MWP_Anti Climb Security Parimeter Fence Refurbment Project SHE Spec_Rev01.do.pdfQuality and SHE records
Compliance Requirements
Source: 20261015_Spec_GFD_ERE_MWP_Anti Climb Security Parimeter Fence Refurbment Project SHE Spec_Rev01.do.pdf (unknown)B-bbee
Registration and statutory status
Legislation and standards
Health & Safety
Source: 20261015_Spec_GFD_ERE_MWP_Anti Climb Security Parimeter Fence Refurbment Project SHE Spec_Rev01.do.pdfHealth and safety requirements
Environmental
Source: 20261015_Spec_GFD_ERE_MWP_Anti Climb Security Parimeter Fence Refurbment Project SHE Spec_Rev01.do.pdfEnvironmental requirements
Description
Source: Technical Specification Rev 7.pdfProject: Upgrade perimeter security at Eskom Megawatt Park (MWP) campus. The existing security fence is non-functional. Scope includes replacement of outer barrier, new non-lethal electric fence, new lighting, new cameras, upgrading main/western gates, new emergency gate, refurbishment of patrol roads, and electrical infrastructure upgrades. Contract period: 47 months (11 months construction, 36 months maintenance and support).
Evaluation Criteria
Source: Technical Specification Rev 7.pdf (unknown)Quality management system must be ISO 9001:2015 certified or compliant. Compliance with Construction Regulations 2014, Occupational Health and Safety Act, Electrical Machinery Regulations 2011, and Eskom SHEQ Policy (32-727). On request, bidder must prove ability to perform the scope, organisational/logistics/support resources, and experience in comparable projects. Professional personnel must remain members of their professional society and be available until project conclusion. Eskom may assess and interview key staff. Quality requirements must flow into subcontracts. No CSD, tax clearance, B-BBEE level, CIDB grading, or local content threshold stated in this specification.
Technical Specifications
Source: Technical Specification Rev 7.pdf (unknown)Scope: Upgrade perimeter security at Eskom Megawatt Park (MWP) campus.
Methodology
Source: Technical Specification Rev 7.pdfMethod statements required for construction. Design of kiosks for electrical protection components and POEs per Contractor design, in accordance with Eskom NLEPDS specification (240-78980848). Provide 10 energisers for 20 zones perimeter fence.
Quality Management
Source: Technical Specification Rev 7.pdfQuality requirements: ISO 9001:2015 certified or compliant. Submit Contract Quality Plan (CQP), Quality Control Plan (QCP)/Inspection and Test Plan (ITP) before contract award; QCP/ITP to be signed off by Employer within 30 days after award. Method statements and QCP/ITP for construction to be accepted before construction. Non-compliance may result in NCR, rejection of works, withholding of payment. Maintain records for at least 3 years after termination. Eskom may survey/surveillance facilities. Defects remedied at no extra cost. Professional personnel must be members of professional society. Comply with QM 58.
Pricing Schedule
Source: Technical Specification Rev 7.pdfPricing based on Price List. Invoices itemised per Price List. Payment per payment certificate. No detailed pricing schedule in this specification.
Financial Requirements
Source: Technical Specification Rev 7.pdf (unknown)Payment: Contractor submits tax invoice within one week of receiving payment certificate from Project Manager (core clause 51.1). Invoice addressed to Eskom Holdings SOC Ltd, must include contract number/title, VAT numbers (Employer VAT 4740101508), itemised description based on Price List, totals excluding/including VAT.
Bonds/guarantees: Form per Part 1 Agreements and Contract Data, document C1.3 (Sureties). Eskom may withhold payment until bond/guarantee received and accepted.
Insurance: Contractor to familiarise with Eskom Insurance Format A in Contract Data and make provision for liable items.
Compliance Requirements
Source: Technical Specification Rev 7.pdf (unknown)B-BBEE: Minimum Level 6 rating required after contract award.
ASGI-SA: Contractor must comply with Accelerated and Shared Growth Initiative β South Africa obligations per compliance schedule; failure constitutes substantial breach.
Quality: ISO 9001:2015 certified or compliant.
Health & Safety: Comply with Construction Regulations 2014, OHS Act, Eskom SHEQ Policy.
Electrical: Comply with Electrical Machinery Regulations 2011, SANS 10222, SANS 10142.
Key personnel: Electrical resources must have Electrical Trade Test Certificate, at least one Electrical Artisan with NQF Level 4, all with minimum 10 years relevant experience.
Electric Fence Installer must be accredited (EFSI).
Subcontractors: Must be approved by Project Manager, cannot subcontract further, must have statutory accreditations and submit CVs.
Health & Safety
Source: Technical Specification Rev 7.pdfComply with health and safety requirements in Annexure to Works Information. Comply with Construction Regulations 2014, OHS Act, Eskom SHEQ Policy (32-727). Full-time Safety and Health Officer on site. Workers not transported on back of vans/bakkies. Workers restricted to activity area. Recruit general labour from immediate District Municipality.
Contractual Terms
Source: Technical Specification Rev 7.pdfContract based on NEC conditions. Employer may instruct changes to scope at any time, in writing. Non-conformance to programme liable for delay damages. Deviations in time/cost subject to Eskom approval. Contractor to provide integrated programme in MS Project format, updated weekly. Records of defined cost, payments, compensation events: N/A.
Section
Source: Technical Specification Rev 7.pdfQuality evaluation: Eskom may assess qualifications, capability, competence of key staff and interview contractors. Quality of service/product must meet professional standards. Contractor must execute works per Eskom QM 58 Supplier Contract Quality Requirements Specification.
Description
Source: 240-109253698 Contract Quality Plan (CQP) Template.docxThe tender is for the provision of installation and infrastructure upgrade for an anti-climb perimeter security fence at Eskom Megawatt Park (MWP), for a period of forty-seven (47) months, comprising eleven (11) months of construction and thirty-six (36) months of maintenance and support.
Technical Specifications
Source: 240-109253698 Contract Quality Plan (CQP) Template.docx (unknown)The supplier must prepare a Contract Quality Plan (CQP) that identifies and plans how to meet the client's and contract's quality management expectations and requirements. The CQP must follow the guidelines of SANS 466:2005 Edition 1 / ISO 10005:2005 Edition 2. The plan must cover the following elements:
Compliance Requirements
Source: 240-109253698 Contract Quality Plan (CQP) Template.docx (unknown)The supplier must comply with the quality management requirements as per the Contract Quality Plan template. The CQP must be compiled by a representative of the tenderer (Rev 0 during tender evaluation, changing to Rev 1 after contract signing) and approved by the owner of the organisation. The CQP must be reviewed and accepted by Eskom after award. The supplier must submit all documented information as listed in the CQP to Eskom prior to commencement and during/at completion of the contract.
Description
Source: Technical Evaluation Criteria.pdfThe project involves upgrading the compromised security fence at Eskom Megawatt Park (MWP). The existing system is non-functional. The work includes installation of a new security electric fence, with both electrical and civil/structural components. The contract period is 47 months (11 months construction, 36 months maintenance and support). The client is Eskom, represented by Eskom Properties.
Important Dates
Source: Technical Evaluation Criteria.pdf (unknown)Closing date: 2 December 2026 at 08:00 (from tender record).
No other dates (briefings, site visits, clarification deadlines) are stated in the document.
Submission Guidelines
Source: Technical Evaluation Criteria.pdf (unknown)Returnable documents (all must be submitted in both hardcopy and softcopy, adequately referenced):
Disqualification risks:
Evaluation Criteria
Source: Technical Evaluation Criteria.pdf (unknown)Evaluation stages:
Mandatory criteria (gatekeepers):
Qualitative criteria weighting:
Scoring scale:
Unacceptable risks (disqualifying):
Technical Specifications
Source: Technical Evaluation Criteria.pdf (unknown)Scope:
Key technical requirements:
Methodology
Source: Technical Evaluation Criteria.pdfMethod statements are required for both electrical and civil scopes.
Experience & Qualifications
Source: Technical Evaluation Criteria.pdfKey personnel requirements:
Reference projects:
Compliance Requirements
Source: Technical Evaluation Criteria.pdf (unknown)Mandatory registrations and certifications:
Standards compliance (mandatory):
B-BBEE: Minimum Level 3 (stated in document).
Health & Safety
Source: Technical Evaluation Criteria.pdfCompliance with the Occupational Health and Safety Act, 1993 (Act 85 of 1993) and its Electrical Installation Regulations is mandatory. Non-compliance with these regulations is an unacceptable technical risk and will disqualify the bidder.
Section
Source: Technical Evaluation Criteria.pdfAdditional evaluation details:
Description
Source: 20260313_ Form A Cat3_ ERE _ MWP Perimeter Security Fence Upgrade .pdfThe scope covers installation and infrastructure upgrade of an anti-climb perimeter security fence at Eskom Megawatt Park (MWP), over 47 months: 11 months construction and 36 months maintenance and support. Form A (Tender & Contract Quality Identifier, 240-68099512 Rev 9) records which clauses of specification 240-105658000 and which ISO 9001 clauses apply to the tenderer's quality obligations.
Evaluation Criteria
Source: 20260313_ Form A Cat3_ ERE _ MWP Perimeter Security Fence Upgrade .pdf (unknown)Quality gate
Technical Specifications
Source: 20260313_ Form A Cat3_ ERE _ MWP Perimeter Security Fence Upgrade .pdf (unknown)Scope
Quality requirements
Post-contract award (Eskom)
Methodology
Source: 20260313_ Form A Cat3_ ERE _ MWP Perimeter Security Fence Upgrade .pdfThe tenderer's quality management system must address every ISO 9001 clause from 4 to 10: context of the organisation, leadership, planning, support, operation, performance evaluation, and improvement. All seven ISO 9001 quality principles are marked applicable: customer focus, leadership, engagement of people, process approach, improvement, evidence-based decision making, and relationship management.
Quality Management
Source: 20260313_ Form A Cat3_ ERE _ MWP Perimeter Security Fence Upgrade .pdfApplicable specification clauses (240-105658000)
ISO 9001 coverage required
Form administration
Compliance Requirements
Source: 20260313_ Form A Cat3_ ERE _ MWP Perimeter Security Fence Upgrade .pdf (unknown)Quality management
Section
Source: 20260313_ Form A Cat3_ ERE _ MWP Perimeter Security Fence Upgrade .pdfPre-contract award quality requirements apply under Category 3 of clause 3.5 of specification 240-105658000; only one category may be selected on Form A. The tenderer's quality management system must address ISO 9001 clauses 4 to 10. The Main Supplier and Sub-supplier Capability and Capacity Assessment is not applicable. Post-contract award, Eskom applies contract execution and supplier quality performance monitoring, quality audits, rights of access and information, preservation, management of nonconformities and special processes.
Description
Source: 20261015_Report_GFD_ERE_SHEQ Evaluation Criteria_Anti Climb Security Parimeter Fence.Rev01.pdfInstallation and infrastructure upgrade of an anti-climb perimeter security fence at Eskom Megawatt Park (MWP). Project document identifier 240-77471969 Rev 3.
Submission Guidelines
Source: 20261015_Report_GFD_ERE_SHEQ Evaluation Criteria_Anti Climb Security Parimeter Fence.Rev01.pdf (unknown)Returnable OHS documents β all must be completed and submitted with the bid:
A bid that omits any of these returnables is recorded as Not Recommended.
Evaluation Criteria
Source: 20261015_Report_GFD_ERE_SHEQ Evaluation Criteria_Anti Climb Security Parimeter Fence.Rev01.pdf (unknown)OHS compliance screening β OHS Tender Evaluation Template, identifier 240-43921898 Rev 5
Technical Specifications
Source: 20261015_Report_GFD_ERE_SHEQ Evaluation Criteria_Anti Climb Security Parimeter Fence.Rev01.pdf (unknown)Scope: installation and infrastructure upgrade of an anti-climb perimeter security fence at Eskom Megawatt Park (MWP).
Contract period: 47 months β 11 months construction, followed by 36 months maintenance and support.
Project document identifier: 240-77471969 Rev 3.
Compliance Requirements
Source: 20261015_Report_GFD_ERE_SHEQ Evaluation Criteria_Anti Climb Security Parimeter Fence.Rev01.pdf (unknown)OHS compliance
Health & Safety
Source: 20261015_Report_GFD_ERE_SHEQ Evaluation Criteria_Anti Climb Security Parimeter Fence.Rev01.pdfOHS plan must address the OHS risks of the project scope and align with the health and safety specification.
SHE management costs must be itemised against the full scope of work, not presented as a lump sum.
A Baseline OHS Risk Assessment must identify, assess and manage safety, health and environmental risks, and must set out the methodology used.
Section
Source: 20261015_Report_GFD_ERE_SHEQ Evaluation Criteria_Anti Climb Security Parimeter Fence.Rev01.pdfOHS Tender Evaluation Template, identifier 240-43921898 Rev 5, used to screen the six OHS returnables; the assessor records the bidder as Recommended or Not Recommended.
Description
Source: 20261015_Report_GFD_ERE_SHEQ Evaluation Criteria_Anti Climb Security Parimeter Fence.Rev01.pdfThe project involves the installation and infrastructure upgrade of an anti-climb perimeter security fence at Eskom Megawatt Park (MWP). The contract runs for 47 months: 11 months for construction and 36 months for maintenance and support.
Submission Guidelines
Source: 20261015_Report_GFD_ERE_SHEQ Evaluation Criteria_Anti Climb Security Parimeter Fence.Rev01.pdf (unknown)Returnable OHS documents, each to be signed and submitted with the bid:
Evaluation Criteria
Source: 20261015_Report_GFD_ERE_SHEQ Evaluation Criteria_Anti Climb Security Parimeter Fence.Rev01.pdf (unknown)OHS evaluation is pass/fail. The tenderer is assessed on submission of the required OHS documents. The outcome is recorded as Recommended or Not Recommended by Eskom's OHS representative. No scoring split or minimum score is stated.
Technical Specifications
Source: 20261015_Report_GFD_ERE_SHEQ Evaluation Criteria_Anti Climb Security Parimeter Fence.Rev01.pdf (unknown)Scope: installation and infrastructure upgrade of an anti-climb perimeter security fence at Eskom Megawatt Park (MWP). Contract period: 47 months total β 11 months construction and 36 months maintenance and support.
Compliance Requirements
Source: 20261015_Report_GFD_ERE_SHEQ Evaluation Criteria_Anti Climb Security Parimeter Fence.Rev01.pdf (unknown)OHS compliance requirements:
Health & Safety
Source: 20261015_Report_GFD_ERE_SHEQ Evaluation Criteria_Anti Climb Security Parimeter Fence.Rev01.pdfOHS requirements for the tender:
Section
Source: 20261015_Report_GFD_ERE_SHEQ Evaluation Criteria_Anti Climb Security Parimeter Fence.Rev01.pdfThe OHS evaluation template (identifier 240-43921898 Rev 5) is used to assess the tenderer's compliance with OHS requirements. The outcome is a recommendation of Recommended or Not Recommended.
Description
Source: 20261014_GFD_ERE_MWP- Anti Climb Security Parimeter Fence Refurb OHS Baseline risk assessment template - rev. 6.xlsxThe project involves installation and infrastructure upgrade of an anti-climb perimeter security fence at Eskom Megawatt Park. The contract runs 47 months: 11 months construction and 36 months maintenance and support. The work is managed by Eskom Real Estate under the Group Finance Division.
Compliance Requirements
Source: 20261014_GFD_ERE_MWP- Anti Climb Security Parimeter Fence Refurb OHS Baseline risk assessment template - rev. 6.xlsx (unknown)No specific compliance requirements stated in the provided document.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Address
Eskom Megawatt Park (MWP) -Maxwell Dr, Sunninghill, Sandton, 2157 - Sunninghill - Sandton - 2157
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
15
Last checked
04 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
Everything South African construction contractors need to know about how procurement officers verify cidb grades: what gauteng contractors must ensure is correct β april 2026 update β covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
How established construction firms use Joint Ventures with EMEs and QSEs to meet B-BBEE preferential procurement targets and access set-aside contracts.
Everything South African construction contractors need to know about cidb grading system explained: what every gauteng contractor must know in 2026 β april 2026 update β covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Everything South African construction contractors need to know about cidb vs nhbrc: understanding dual registration requirements for residential projects in gauteng β april 2026 update β covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
π‘ Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Construction. Unlock full pricing strategies, bid frequency, and historical win rates.