Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Not applicable - Not applicable - Not applicable -
Organization Type
GOVERNMENT
Published
21 Sept 2026
OCDS Reference
ocds-9t57fa-171188
ESKOM requires the supply and delivery of conveyor idlers to various coal-fired power stations over a five-year period, under a re-issued open tender. Bidders must comply with eskom's preferential procurement framework, which awards preference points based on b-bbee status and may impose local content and subcontracting conditions. The most consequential consideration is that a valid b-bbee certificate or proof of compliance is mandatory for contract award, and failure to submit IT by closing results in zero preference points.
Closing date and time: 12 October 2026 at 10:00 (submission method and address not stated in the document).
B-BBEE compliance is mandatory for contract award: a valid B-BBEE certificate (SANAS-accredited), sworn affidavit, or CIPC affidavit must be submitted; failure to submit by closing results in zero preference points but not automatic disqualification.
Preference points are allocated per B-BBEE status level: Level 1 earns 20 points (80/20 system) or 10 points (90/10 system); Level 2 earns 18 or 9; Level 3 earns 14 or 6; Level 4 earns 12 or 5; Level 5 earns 8 or 4; Level 6 earns 6 or 3; Level 7 earns 4 or 2; Level 8 earns 2 or 1; non-compliant earns 0.
If the contract value exceeds R30 million, the successful bidder must subcontract at least 30% of the contract value to qualifying EMEs/QSEs (e.g., 51% black-owned, black women-owned, youth, disabled, military veterans, or cooperatives) as a condition for award.
Bidders may not subcontract more than 25% of the contract value to entities with a lower B-BBEE status than the bidder, unless the subcontractor is an EME with the capability to execute.
Local content requirements apply if the goods are designated: only locally produced goods meeting the stipulated minimum threshold will be considered; the SBD 6.2 Declaration Certificate for Local Content and annexures C, D, and E must be completed and signed.
If the contract has imported content of USD 5 million or more, the winning bidder must enter into a NIPP obligation agreement with the dtic before signing the Eskom contract.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Monday, 12 October 2026 - 10:00
Venue
https://teams.microsoft.com/meet/328908474531294?p=BEqfGcgdlBPBtS75VW
Categories
Request for Bid(Open-Tender)
Not applicable - Not applicable - Not applicable -
Recommended Certifications
Having these can improve your winning chances: SABS Product Certification, NRCS Certification
AI Document Analysis Stages
Important Dates
Source: BEE_Affidavit-EME-Gen.pdf.pdf (unknown)21 Sept
2026
Tender Published
Tender was published
12 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
E2122GXMWPR - invitation to Tender.pdf
No summary available
Eskom - Standard Conditions of Tender - 30 January 2025 (G20 Logo).pdf
No summary available
Preferential Procurement Regulations Work Instructions (signed) BBBEE 30.01.2023 (4).pdf
Eskom is re-issuing a tender for the supply and delivery of conveyor idlers to various coal-fired power stations over a five-year period. The tender is open to national suppliers and will be evaluated under Eskom's preferential procurement regulations, which include B-BBEE scoring and local content requirements.
BEE_Affidavit-EME-Gen.pdf.pdf
Supply and delivery of conveyor idlers over a 5-year period to various coal-fired power stations, re-issued by Eskom. The contract is open to South African bidders, with B-BBEE status considered for preference points.
E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf
Supply and delivery of conveyor idlers for various coal-fired power stations over a 5-year period, re-issued by Eskom. The tender requires bidders to complete e-Tendering training and submit an acknowledgement form as a mandatory returnable.
E-tendering Help Manual for supplier - 27 January 2025.pdf
Eskom is re-issuing a tender for the supply and delivery of conveyor idlers to various coal-fired power stations over a five-year period. The tender is open to suppliers registered on Eskom's eTendering system, which requires a Central Supplier Database (CSD) number for access.
BEE_Affidavit-QSE-Gen.pdf.pdf
Supply and delivery of conveyor idlers for various coal-fired power stations over a 5-year period, issued by Eskom on a national basis.
Supply contract C0 SC3 Contract cover pages (1).pdf
Supply and delivery of conveyor idlers (steel, HDPE, and impact rollers) to various Eskom coal-fired power stations over a period not exceeding five years, under an NEC3 Supply Contract (SC3). The contract is a re-issue and covers manufacture, supply, and delivery as and when required.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 1 492 125
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
{"closingDate":"27 April 1994"}
Contact Information
Source: BEE_Affidavit-EME-Gen.pdf.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"t on its behalf"}
Submission Guidelines
Source: BEE_Affidavit-EME-Gen.pdf.pdf (unknown)Returnable documents: a sworn B-BBEE affidavit for EMEs (Exempted Micro Enterprises) declaring ownership percentages and annual turnover, signed by a commissioner of oaths and valid for 12 months. The affidavit must be completed, signed, and submitted with the bid.
Evaluation Criteria
Source: BEE_Affidavit-EME-Gen.pdf.pdf (unknown)B-BBEE preference points are claimed via a sworn affidavit for EMEs. The affidavit must state the enterprise's B-BBEE level, ownership percentages (Black, Black Female, Black Designated Group), and annual turnover. The affidavit must be signed by a commissioner of oaths and is valid for 12 months from the date signed.
Compliance Requirements
Source: BEE_Affidavit-EME-Gen.pdf.pdf (unknown)B-BBEE: Bidders claiming EME status must submit a sworn affidavit (B-BBEE Exempted Micro Enterprise – General) declaring ownership percentages and annual turnover. The affidavit must be signed by a commissioner of oaths and is valid for 12 months.
Contact Information
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf (unknown)No specific contact information is provided in the extracted text. Bidders should refer to the full tender document for SCM and technical contact details.
Submission Guidelines
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf (unknown)Submission is via the Eskom E-Tendering Solution only. Bidders must complete and submit the E-Tendering Training Acknowledgement Form within the prescribed period; failure to do so renders the bid non-responsive and disqualified. The form must be fully completed and signed. Returnable forms include the Training Acknowledgement Form and the E-Tenderers E-Tendering Training Acknowledgement Form (Rev 1).
Evaluation Criteria
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf (unknown)The tender will be evaluated in two stages: 1) Mandatory compliance (including submission of the training acknowledgement form) – non-compliance results in disqualification. 2) Technical evaluation – bidders must meet the technical specifications for conveyor idlers. 3) Price and B-BBEE evaluation – the contract will be awarded based on the 90/10 preference point system (90 points for price, 10 for B-BBEE status).
Technical Specifications
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf (unknown)The tender is for the supply and delivery of conveyor idlers for various coal-fired power stations over a period of 5 years. The specific technical specifications, quantities, and delivery locations are detailed in the tender document.
Financial Requirements
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf (unknown)No specific financial requirements (e.g., bid security, guarantees, retention, payment terms) are stated in the provided text. Bidders should refer to the full tender document for any such requirements.
Evaluation Criteria
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)No evaluation criteria are stated in the document.
Technical Specifications
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)eTendering system is a web-based platform for uploading tender documents. Supports closed tenders sent directly to selected suppliers. A CSD number is required for public access.
Special Conditions
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)No special conditions are stated in the document.
Contact Information
Source: BEE_Affidavit-QSE-Gen.pdf.pdf (unknown){
"content": "Address: t on its behalf"
}
Submission Guidelines
Source: BEE_Affidavit-QSE-Gen.pdf.pdf (unknown){
"content": "Bidders must submit the completed and signed returnable documents. All forms must be completed in full and signed. Late submissions are not accepted. The sworn affidavit must be completed and commissioned."
}
Evaluation Criteria
Source: BEE_Affidavit-QSE-Gen.pdf.pdf (unknown)Content
B-BBEE Minimum Level: One. The affidavit must declare the enterprise's B-BBEE level and black ownership percentages. Definitions of 'Black People' and 'Black Designated Groups' per the B-BBEE Act and Codes of Good Practice apply.
Evaluation Criteria
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (G20 Logo).pdf (TENDER)Evaluation in two stages: 1) Functionality (if applicable) – minimum threshold may apply; 2) Price and B-BBEE (PPPFA points). Functionality and B-BBEE are not used as objective criteria. Eskom will not measure a criterion twice in different evaluations. Tenderers must meet mandatory requirements to be responsive.
Description
Source: E2122GXMWPR - invitation to Tender.pdf (RFP)Re-issue: Supply and delivery of conveyor idlers for various coal fired Power Stations over a period of 5 years. Tender number E2122GXMWPR. Issue date 18 September 2026. Closing date and time 12 October 2026. Tender validity period twelve (12) weeks / ninety (90) days from the closing date and time.
Important Dates
Source: E2122GXMWPR - invitation to Tender.pdf (RFP){"closingDate":"21 February 2025","closingTime":"10H00"}
Briefing Session
Source: E2122GXMWPR - invitation to Tender.pdf (RFP)Non-compulsory clarification meeting on 28 September 2026, 10H00-11H00 SAST, via Microsoft Teams link https://teams.microsoft.com/meet/328908474531294?p=BEqfGcgdlBPBtS75VW. Clarification queries must be emailed to [email protected].
Contact Information
Source: E2122GXMWPR - invitation to Tender.pdf (RFP){"name":null,"email":"[email protected]","phone":"0847453129","department":null,"address":null}
Returnable Documents
Source: E2122GXMWPR - invitation to Tender.pdf (RFP)Mandatory returnables at tender closing (disqualifiable): Annexure A Authorisation Form, Annexure B Acknowledgement Form, Annexure C Tenderer's Particulars, Annexure D Integrity Pact Declaration, Annexure E CPA for local goods/services, Annexure F CPA(IG) for imported goods/services, Annexure G1-G4 SBD 6.2 and local content declarations, Annexure H SBD 1, Annexure I SBD 6.1 Preference Points Claim, Annexure J SBD 4 Bidders Disclosure. Non-disqualifiable returnables include tax clearance, tax evaluation questionnaire, employment equity compliance. Tender must be submitted electronically via Eskom E-tendering site in PDF and Excel formats (50MB per file, 900MB total).
Evaluation Criteria
Source: E2122GXMWPR - invitation to Tender.pdf (RFP)No eligibility criteria specified
Technical Specifications
Source: E2122GXMWPR - invitation to Tender.pdf (RFP)Annexure Attached (Y /
N / n/a)
1.1.1 *Authorisation Form Annexure A Y
1.1.2 *Acknowledgement form Annexure B Y
1.1.3 *Tenderer’s particulars Annexure C Y
1.1.4 *Integrity Declaration Form (Suppliers are required to Annexure D Y
download and read the Supplier Integrity Pact. It is
accessible on the Eskom Tender Bulletin via Eskom
Supplier Integrity Pact (eskom.co.za) link)
1.1.5 *CPA Requirements for Local Goods/Services Y
1.1.6 *CPA(IG) for Foreign Goods/Services (if applicable) Y
1.1.7 SBD 6.2 Declaration Certificate for Local Production Annexure G1 Y
and Local Content (only applicable if designated
materials are included and then Tenderers will be
required to complete and submit Annexures G1 to
G4 as evidence of compliance with this
requirement).
Annexure C Local Content Declaration- Summary Annexure G2
Schedule Y
Annexure D Imported Content Declaration – Supporting Annexure G3
Schedule to Annexure C Y
Annexure E Local Content Declaration- Supporting Annexure G4
Schedule to Annexure C Y
1.1.8 *SBD 1 Invitation to Bid must be filled out by all Annexure H Y
tenderers and submitted with the tender at tender
submission deadline
1.1.9 *SBD 6.1 Preference Poi
Methodology
Source: E2122GXMWPR - invitation to Tender.pdf (RFP)evaluation purposes but will be implemented when
payment is affected.
Price points will be scored out of 90/80 for price. A maximum
of 10/20 points will be allocated to the B-BBEE level
contribution. The prices and preference points will be added
together to determine the highest scoring tenderer.
3.18 Evaluation of Specific Goals The tender evaluation and the contract allocation process will
be based on the 80/20 preference point scoring methodology
as per the Preferential Procurement Regulation of 2022 (PPR
2022).
Quality Management
Source: E2122GXMWPR - invitation to Tender.pdf (RFP)Quality requirements based on Category 2 Supplier Quality Management Specification: Supplier QM specification QM58, Cat 2 quality requirements list, CQP & QCP for Section C and D, Category 2 Form A, QCP template for suppliers without own.
Pricing Schedule
Source: E2122GXMWPR - invitation to Tender.pdf (RFP)E2122GXMWPR Effective Date 21 February 2025
Review Date February 2030
Number Description Annexure Attached (Y /
N / n/a)
1.1.18 Scope of Work and technical evaluation criteria Included in technical folder
1.1.19 NEC3 Supply Contract (SC3) Included in technical folder
1.1.20 Pricing Schedule (if not contained in Contract)
returnables as at stipulated deadlines.
(Maaa.........)
requirements:
Central Supplier Database registration (CSD) number (MAAA...)
Fully completed pricing schedule embedded in the NEC3 Supply Contract document
NB: Please note that it is mandatory for suppliers to register on National Treasury’s Central Supplier
“Local Procurement Content” refers to value added in South Africa by South African resources. Where
a single contract involves a combination of local and imported goods and/or services, the tender
response must be separated into its components as per the Price Schedule included with the tender
documents. Local procurement content is total spending minus the imported component.
achieved in one of the following ways: -
by multiplying 150 against the total estimated contract value
in the relevant BOQ/Pricing schedule to derive the relevant
hours required in terms of this CSDG; or
by main contractor devolving its obligations required in
terms of the CSDG to respective sub-contractor; or
by providing structured workplace learning opportunities for
Employer’s seconded employees as included in the relevant
scope of work.
[Please note:
Financial Requirements
Source: E2122GXMWPR - invitation to Tender.pdf (RFP)Payment Terms: payment terms as stipulated hereunder
when submitting tenders and concluding contracts with Eskom:
For contracts valued below R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to
paying Suppliers within 30 days of receipt of undisputed invoices.
For contracts valued above R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed
Compliance Requirements
Source: E2122GXMWPR - invitation to Tender.pdf (RFP)Central Supplier Database registration (CSD) number (MAAA...) Fully completed pricing schedule embedded in the NEC3 Supply Contract document NB: Please note that it is mandatory for suppliers to register on National Treasury’s Central Supplier Database, for any suppliers intended to do work with any State department or State-owned entity/company. Eskom requires all tenderers to comply with the Eskom’s specifications. Tenderers who do not meet Eskom's specification will result in the tenderer not being evaluated further. Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 76 File name: E2122GXMWPR - invitation to Tender (ITT) Conveyor idlers Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 24 Invitation to Tender Identifier E2122GXMWPR Effective Date 21 February 2025 Review Date February 2030 Clause Number from Standard Tender Data Conditions of Tender Step 2 – Mandatory Requirements Technical) The tenderer must submit the non – negotiable returnable set out in mandatory technical requirements as part of its tender at the stipulated tender submission deadline. Mandatory requirement are stated in the table below. Step 3 – Functionality Qualitative Technical Evaluation Criteria and scoring. Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 76 File name: E2122GXMWPR - invitation to Tender (ITT) Conveyor idlers Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 24 Invitation to Tender Identifier E2122GXMWPR Effective Date 21 February 2025 Review Date February 2030 Clause Number from Standard Tender Data Conditions of Tender Qualitative Evaluation Criteria Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 76 File name: E2122GXMWPR - invitation to Tender (ITT) Conveyor idlers Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 24 Invitation to Tender Identifier E2122GXMWPR Effective Date 21 February 2025 Review Date February 2030 Clause Number from Standard Tender Data Conditions of Tender Step 4 - Price and Preference (90/10) Price points will be calculated out of 90 /80 or price. A maximum of 10 / 20 points will be allocated to the B-BBEE level contribution. The prices and preference points will be added together to determine the highest scoring tenderer. 90 / 80 Price 10 / 20 BBBEE Price and Preference Analysis
Calculate price – 90 points.
Apply preference points according to B-BBEE level contribution - 10 points
Add price points and preference points
Select tender with highest points (Price Points + Preference Points) Step 5 – Contractual Requirements 5.1 Financial Analysis
An analysis of the tenderers latest valid financial statements will be conducted for the purposes of establishing the tenderers financial viability and ability to meet all of its contractual obligations for the duration of the contract, should the tenderer be recommended for contract award.
The outcome of a financial analysis of the supplier’s financial statements is an objective criterion that must be conducted as a due diligence and risk mitigation step as a pre- requisite to contract award. This is required to determine if the supplier is financially stable enough to execute a contract/order of the magnitude to be awarded.
To the extent that such risks are identified as part of the analysis of the financial statements, a risk mitigation strategy must be included as part of the recommendation. If the risks cannot be mitigated to ensure performance against the contract, the contract may have to be awarded to another supplier, which may not be the highest ranked. List of Requirements to perform a financial analysis – local companies
Approved annual financial statements (not older than 18 months from year-end period), including: o Background to the company o A signed director’s report o A signed auditor’s/reviewer’s/compiler’s/accounting officer’s report o Statement of financial position o Statement of comprehensive income Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 76 File name: E2122GXMWPR - invitation to Tender (ITT) Conveyor idlers Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 24 Invitation to Tender Identifier E2122GXMWPR Effective Date 21 February 2025 Review Date February 2030 Clause Number from Standard Tender Data Conditions of Tender o Statement of changes in equity o Statement of cash flows o Notes to the financial statements
A signed copy of the public interest score (corresponding to company’s year-end) o Giving the actual score o Indicating whether the company is owner managed or not o Confirming whether the annual financial statements were externally prepared or not
Copies of the ITA34C for the current & previous years of assessment. Safety requirements, returnables and evaluation scores: Occupational Health and safety falls under contractual requirements which means the suppliers will submit the tender returnable during the tender close-out. The evaluation will take place once the mandatory and Functionality evaluation have been completed. Only the shortlisted suppliers who passed mandatory and functionality evaluation threshold will be evaluated. The suppliers will be given an opportunity to submit the outstanding documents within 7 working days after the first evaluation. Failure to submit the outstanding documents within the stipulated time; may result in the tenderer being regarded as non-responsive and ineligible for contract award. Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 76 File name: E2122GXMWPR - invitation to Tender (ITT) Conveyor idlers Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 24 Invitation to Tender Identifier E2122GXMWPR Effective Date 21 February 2025 Review Date February 2030 Clause Number from Standard Tender Data Conditions of Tender Quality Requirements, returnables and evaluation scores: The contractual quality requirements for this tender are based on category 2 Supplier Quality Management Specification applicable for contract duration and are listed below
Supplier QM specification, QM58.
Cat 2 quality requirements- list of items to be submitted.
CQP & QCP for Section C and Section D.
Category 2 Form A for Section
QCP template for supplier who do not have their own 20250921__Cat 20250921_ Conveyor 240-109253698 CQP 240-109253302 _ 240-105658000 2-Conveyor idlers MoIdlers -Form A_Cat 2_ Template 2021.docx Quality Control Plan oSupplier Quality Mana Environmental requirements and returnables
The contractor shall identify all environmental aspects related to the works and develop a comprehensive Environmental Management Plan (EMP) to mitigate all potential environmental risks.
The Environmental Management Plan must be submitted to the employer for approval before the contract is signed with the successful tenderer.
Undertakes execution of scope in accordance with specifications and EMP requirements.
The Contractor shall further identify and comply with all South African national and provincial environmental legislation as amended, including associated regulations and all local by-laws relevant to the project. 5.5 Supplier Development, Localisation& Industrialisation (SDL&I) Section 1: Specific Goals A maximum of 10/20 points may be awarded to a tenderer for the specific goal specified for the tender. The points scored for the specific goal must be added to the points scored for price and the total must be rounded off to the nearest two decimal places. Subject to section 2(1)(f) of the referential Procurement Policy Framework Act, the contract must be awarded to the tenderer scoring the highest points. Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 76 File name: E2122GXMWPR - invitation to Tender (ITT) Conveyor idlers Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 24 Invitation to Tender Identifier E2122GXMWPR Effective Date 21 February 2025 Review Date February 2030 Clause Number from Standard Tender Data Conditions of Tender B-BBEE Status Level of Number of points Number of points Contributor (90/10 system) (80/20 system) 1 10 20 2 9 18 3 6 14 4 5 12 5 4 8 6 3 6 7 2 4 8 1 2 Non-compliant contributor 0 0 Section 2: Objective criteria The inclusion of objective criteria is not mandatory but a condition for contract award. If the tenderer does not meet objective criteria; it may lead to the second-ranked tenderer being recommended for award. 2.1 Designated Sectors When applicable the following stipulated minimum threshold for Local Production and Content must be achieved in full by the tenderer YES NO
Is this Commodity or part of it a Designated ☐ Sector? Please indicate below Designated Components Commodity Components Local Content Threshold Conveyor Idlers Idlers 70% NOTE: SBD 6.2 Declaration Form and Annex C (Local Content Declaration-Summary Schedule) are therefore mandatory and must be tender Returnables if applicable. Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 76 File name: E2122GXMWPR - invitation to Tender (ITT) Conveyor idlers Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 24 Invitation to Tender Identifier E2122GXMWPR Effective Date 21 February 2025 Review Date February 2030 Clause Number from Standard Tender Data Conditions of Tender Section 3: SDL&I Objectives in line with Reconstruction and Development Programme (RDP) Goals Tenderers who complete and submit the objectives as required, but who do not meet Eskom’s targets, will not be disqualified. SDL&I objectives do not form part of scoring, but commitments will form part of
Local Procurement Content “Local Procurement Content” refers to value added in South Africa by South African resources. Where a single contract involves a combination of local and imported goods and/or services, the tender response must be separated into its components as per the Price Schedule included with the tender documents. Local procurement content is total spending minus the imported component. Tenderers are required to submit their proposals in the table below. Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 76 File name: E2122GXMWPR - invitation to Tender (ITT) Conveyor idlers Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 24 Invitation to Tender Identifier E2122GXMWPR Effective Date 21 February 2025 Review Date February 2030 Clause Number from Standard Tender Data Conditions of Tender
Undertaking Subcontracting not Mandatory Tenderers shall subcontract a minimum of 5% of the contract value to the following designated groups if feasible: an EME or QSE which is 51% owned by black people living in rural or underdeveloped area or townships. NOTE 1: Tenderers shall submit the following mandatory returnable for Subcontracting: o Letter of intent to subcontract. Potential scope to be subcontracted and/or outsourced but not limited to
Other scope to be specified by supplier
Jobs: if applicable Tenderers are required to submit proposals for the type and number of jobs that will be created and retained in South Africa as a direct result of being awarded a contract. Type of Jobs to be created Number of Jobs to be created Type of Jobs to be retained Number of Jobs to be retained Section 3: SDL&I Penalty and Performance Security Eskom will apply a penalty of 2.5% of the Contract Value for failure to meet SDL&I obligations. For the duration of the contract, Eskom will retain 2.5% of every invoice (excluding VAT) as security for the fulfilment of all SDL&I Obligations. The retained amounts shall only be released to the Contractor upon fulfilment of all SDL&I obligations by the contractor. Section 4: Reporting and Monitoring
The suppliers shall on a quarterly basis submit a report to Eskom in accordance with Data Collection Template on their compliance with the SDL&I obligations described above.
Eskom shall review the SDL&I reports submitted by the suppliers within 30 (thirty) days of receipt of the reports and notify the suppliers in writing if their SDL&I obligations have not been met. Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 76 File name: E2122GXMWPR - invitation to Tender (ITT) Conveyor idlers Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 24 Invitation to Tender Identifier E2122GXMWPR Effective Date 21 February 2025 Review Date February 2030 Clause Number from Standard Tender Data Conditions of Tender
Upon notification by Eskom that the suppliers have not met their SDL&I obligations, the suppliers shall be required to implement corrective measures to meet those SDL&I obligations before the commencement of the following report, failing which Retention clauses shall be invoked.
Every contract shall be accompanied by the SDL&I Implementation Schedule, which must be completed by the suppliers and returned to SDL&I representative for acceptance 28 days after contract award. This will be used as a reference document for monitoring, measuring and reporting on the supplier’s progress in delivering on their stated SDL&I commitments Section 5: General Information on Validity of Sworn Affidavits The following must be considered when it comes to validity of Affidavits Tenderers submitting B-BBEE Sworn Affidavits must ensure that the affidavits meet the following key pointers to ensure their validity
Name/s of deponent as they appear in the identity document and the identity number.
Points Allocation: 0 points
B-BBEE Details:
verification agency / affidavit / CIPS affidavit
documentation) inclusive of shareholding breakdown
Tenderer failing to provide documentation for the
allocation of preference points will not be disqualified,
but’
3.19 Ranking of tenders Tenderers will be ranked by applying the preferential point
scoring for the 80/20 or 90/10 system.
Eskom will add the score from Pricing and Specific Goals
together and rank the suppliers from the highest to the lowest.
3.20 Objective Criteria (if applicable) Objective criteria will not apply
3.21 Reverse e-auction (if applicable) Reverse e-auction is not applicable
Contractual Requirements Contractual Requirements will apply
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 76
File name: E2122GXMWPR - invitation to Tender (ITT) Conveyor idlers
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 24
Invitation to Tender Identifier
E2122GXMWPR Effective Date 21 February 2025
Review Date February 2030
Clause Number from Standard
Tender Data
Condi
B-BBEE Requirements
Source: E2122GXMWPR - invitation to Tender.pdf (RFP)B-BBEE points table: Level 1 = 10/20, Level 2 = 9/18, Level 3 = 6/14, Level 4 = 5/12, Level 5 = 4/8, Level 6 = 3/6, Level 7 = 2/4, Level 8 = 1/2, Non-compliant = 0. Documents required to claim preference points: valid B-BBEE certificate or sworn affidavit, proof of ownership/shareholding, certified ID copies, proof of disability. Designated sector: Conveyor Idlers with 70% local content threshold. SBD 6.2 and Annex C mandatory.
Health & Safety
Source: E2122GXMWPR - invitation to Tender.pdf (RFP)the contract the CSDG established in the CIDB
Infrastructure contracts published in GN 1779,
Government Gazette No. April 2023].
1.1.17 Contract Participation Goals (CPG) N/A
(if applicable)
[Note that the requirements of a contract
participation goal relating to the engagement of
targeted enterprises as established in the aforesaid
standard applies to:
(a) construction works contracts in the General
Building (GB) and to Civil Engineering (CE) classes
of construction works;
(b) construction works contracts of an estimated
minimum project duration of 6 months; and
(c) construction works contracts in which at least
25% of the main contract could reasonably be
expected to be subcontracted out in one or more of
the following CIDB classes of construction works:
i) Civil Engineering (CE)
ii) Electrical Engineering Work (EB)
iii) General Building Works (GB)
iv) Mechanical Engineering (ME)
bulletin site on the Eskom E- tendering page. The documents
need to be uploaded under the folders as loaded in tender
bulletin:
▪ Commercial
▪ Technical
▪ Safety
▪ Quality
▪ Sdl&i
▪ Financial analysis
limited to:
for financial analysis
Industrialization (SDL&I)
following key pointers to ensure their validity:
person is duly authorised to depose of an affidavit. (Mark the applicable option).
where applicable, and enterprise business address.
specialised enterprises as per Statement 004, the percentage of black beneficiaries must be
reflected. (No blank spaces to be left).
statements or management account. (Mark the applicable option).
determine the total revenue. (Financial year end to be stipulated by day/month/year).
the empowering supplier status.
must be signed in the presence of the Commissioner of Oath. Furthermore the
Commissioner must also sign and stamp)
cannot by law, commission a sworn affidavit in which they have an interest.
3.24 Sign form of Agreement/ Contractual The conditions of the contract will be the NEC 3 Supply
Conditions Contract (SC3)
Main Clause – N/A
contract the CSDG established in the CIDB Standard for
(published in GN 1779, Government Gazette No. April 2023)
2.30 Contract Participation Goals is not [Please note:
applicable Contractor shall achieve in the performance of the
contract the Contract Participation Goals (CPG)
relating to the engagement of targeted enterprises as
established in the CIDB Standard for Indirect
Construction Works Contract (published in
Government Gazette No. February 2013)
relating to the engagement of targeted enterprises as
established in the aforesaid standard applies to:
a) construction works contracts in the General
Building (GB) and to Civil Engineering (CE)
classes of construction works;
b) construction works contracts of an estimated
minimum project duration of 6 months; and
c) construction works contracts in which at least
25% of the main contract could reasonably be
expected to be sub-contracted out in one or more
of the following CIDB classes of construction
works:
Environmental
Source: E2122GXMWPR - invitation to Tender.pdf (RFP)Contractor shall identify environmental aspects and develop an Environmental Management Plan (EMP) to mitigate risks. EMP must be submitted for approval before contract signing. Must comply with all South African national and provincial environmental legislation and local by-laws.
Contractual Terms
Source: E2122GXMWPR - invitation to Tender.pdf (RFP)Transformation remains an area of focus, where Eskom continuously strives to align itself with national
transformation imperatives to unlock growth, drive industrialization, create employment and contribute to
skills development.
Eskom encourages its suppliers to constantly strive to improve their B-BBEE rating. Whereas Tenderer/s
will be allocated points in terms of a preference point system based on specific goals, Eskom also requests
that tenderer/s submits their B-BBEE improvement or retention plan within 30 days of signing the contract.
Tenderer/s are therefore requested to indicate the extent to which they will maintain (only if the respondent
is a Level 1) or may improve/maintain their B-BBEE status over the contract period if their B-BBEE status
is level 2 or 3. Tenderer/s with a B-BBEE status level 4 at the time of contract award, shall migrate and
achieve as a non-negotiable a milestone of B-BBEE Level 3 by the end of the first year of the contract and
thereafter improve their B-BBEE status level or migrate by one level higher.
Tenderer/s with a B-BBEE recognition status of Level 5 to Level 8 or non-compliant at the time of contract
award, shall migrate and achieve as a non-negotiable a milestone of Level 4 by the end of the first year of
the contract and thereafter improve at least one B-BBEE Level higher of each year from the second year
of the contract.
Tenderer/s are requested to submit their B-BBEE Improvement Plan as an essential document within 30
days of signing the contract.
NB: A valid B-BBEE certificate or Sworn Affidavit is a condition for contract award, if your company’s
annual Total Revenue is R10 Million or less you qualify as an Exempted Micro Enterprise therefore you
can submit Sworn Affidavit. If your annual Total Revenue is R50 Million or less, you qualify as Qualifying
Small Enterprise and must comply with all of the elements of QSE score card relevant to your sector unless
an entity is at least 51% Black owned you are required to obtain a Sworn affidavit. If your Annual Total
Revenue is above R50m you need to submit a Valid B-BBEE certificate
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 76
File name: E2122GXMWPR - invitation to Tender (ITT) Conveyor idlers
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 24
Invitation to Tender Identifier
E2122GXMWPR Effective Date 21 February 2025
Review Date February 2030
Clause Number from Standard
Tender Data
Conditions of Tender
Skills Development
Skills development is designed to benefit the currently unemployed graduates from school: further
education and training campuses and universities.
The composition of these candidates must be representative of the population demographics of South
Africa. Note that these targets for skills development candidates categorically exclude Eskom employees
and registered learners. This is how the skills development will be applied:
Successful tenderer will be obligated to skill one candidate for every R15 Million spend cumulatively through
purchase orders/instructions awarded to the supplier; The supplier will be required to implement this
requirement a month after the threshold is reached.
✓This obligation will be for the duration of the contract however supplier needs to demonstrate positive
progress on monthly basis.
✓Candidates shall be sourced from previously disadvantage groups in South Africa, particularly at the
site where the services will be taking place.
Skills Type Intake Outcome Weight
Bursaries Matric N6 50%
Lift, Hoist and Matric Lift, Hoist and Crane 50%
Crane Operator Operator Certificate /
national or is constituted, incorporated, or registered
and operates in conformity with the provisions of the
laws of that country. This criterion shall also apply to
the determination of the nationality of proposed
subcontractors or suppliers for any part of the Contract
including related services.
either individually or as a partner in a joint venture (JV)
or consortium, except on an E-Tendering system where
there is a limit size (900MB) for submission and the
tenderers may submit more than one submission with
the same tender number.
when submitting tenders and concluding contracts with Eskom:
For contracts valued below R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to
paying Suppliers within 30 days of receipt of undisputed invoices.
For contracts valued above R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to
paying suppliers within 60 days of receipt of undisputed invoices.
Requirements
Source: E2122GXMWPR - invitation to Tender.pdf (RFP)Eligibility criteria: Tenderers must not be under any restriction to do business with Eskom or State-Owned Companies. Ineligible if: nationality of a country on international sanctions list; submitting more than one tender (except e-tendering limit); JV/consortium without joint and several liability; conflict of interest; signed by non-authorised persons; restricted by National Treasury; on Tender Defaulters list; subcontracting 100% of scope. Basic compliance requires meeting eligibility, complete tender, mandatory returnables, CSD number, and fully completed pricing schedule.
Section
Source: E2122GXMWPR - invitation to Tender.pdf (RFP)Step 1: Mandatory requirements (technical) – non-negotiable returnables must be submitted. Step 2: Mandatory technical requirements – must comply. Step 3: Financial analysis – annual financial statements required. Step 4: Price and preference – 90/10 system; price points out of 90/80, preference points out of 20/10. B-BBEE improvement plan required; must improve one level per year from second year. SDL&I penalty 2.5% of contract value for non-compliance. Ranking by total points.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 46 of 2000
Relevant where professional engineering services or regulated engineering work may be required.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Address
Not applicable - Not applicable - Not applicable -
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
8
Last checked
21 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
A technical guide to municipal electrical tenders. Covers CIDB EB/EP grading, electrification projects (INEP), substation maintenance panels, and COC compliance.
A strategic guide for medical equipment suppliers, maintenance companies, and healthcare technology providers bidding for tenders across South Africa's nine provincial health departments. Covers SAHPRA registration, OEM authorisation, service level agreements, and technical evaluation criteria.
How mechanical and electrical engineers, contractors, and consultants can win public sector contracts in South Africa — HVAC, plumbing, fire systems, electrical infrastructure, ECSA registration, CIDB ME designation, and tender documentation essentials.
A comprehensive guide to securing medical equipment maintenance tenders in South African public hospitals. Learn about SLA management, OEM certifications, and clinical engineering requirements.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Supplies: Electrical Equipment. Unlock full pricing strategies, bid frequency, and historical win rates.