Issuing Organization
Airports Company of South Africa LimitedLocation
Free State
Closing Date
29 Oct 2026
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Thabe Nchu Road, Bram Fischer International Airport - Bloemfontein - Bloemfontein - 9300
Organization Type
GOVERNMENT
Published
09 Sept 2026
OCDS Reference
ocds-9t57fa-169715
Engineering professional services for the refurbishment of the terminal building at bram fischer international airport over a 22‑month period are being procured by the airports company south africa. Bidders must achieve a minimum functionality score of 95 out of 100 points to be eligible for price and preference evaluation.
Email submission: Bidders must submit their bid via email to [email protected], splitting the submission into at least four attachments of 4 MB each, with no CC or BCC to any ACSA employee, and must sign or stamp every page of the bid documents.
Closing date and time: Bids must be received no later than 14 October 2026 at 12:00 PM; late bids will not be accepted.
CSD and tax compliance: Bidders must be registered on the Central Supplier Database and provide a valid SARS Tax Compliance Status PIN (or CSD number if no PIN) for each consortium/joint‑venture party.
Mandatory returnable documents: Bidders must submit a fully completed SBD 3.3 pricing schedule, Declaration of Interest and Politically Exposed Persons form, SBD 4, SBD 6.1 preference points claim, confidentiality agreement, B‑BBEE certificate or QSE/EME affidavit, verifiable medical certificate if claiming disability preference, certificate of incorporation showing ownership split, CSD report, VAT questionnaire and ACSA terms and conditions.
Functionality threshold: To proceed to price evaluation bidders must obtain at least 95 functionality points out of 100, which requires demonstrating three or more completed building‑construction projects each valued at R10 million or more (including VAT) and holding professional registration with ECSA (Pr Eng/Pr Tech) for the Principal Agent, Resident Engineer and Structural Engineer, and with SACQSP (Pr QS) for the Quantity Surveyor.
Validity period: Bidders must agree to a validity period of 120 business/working days during which quoted prices must remain firm and valid.
Security vetting: As ACSA is a National Key Point, bidders may be subjected to security vetting and will not be contracted if found non‑compliant.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Wednesday, 14 October 2026 - 12:00
Venue
Virtual Briefing Session on Microsoft Teams
Categories
Request for Bid(Open-Tender)
Thabe Nchu Road, Bram Fischer International Airport - Bloemfontein - Bloemfontein - 9300
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: CA(SA) - Chartered Accountant, PMI-PMP (Project Management Professional), Prince2 Practitioner, Six Sigma Certification
AI Document Analysis Stages
Description
Source: Tender document for Services 8590 - 09 Sep.pdf09 Sept
2026
Tender Published
Tender was published
29 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
NEC 3 PSC - Terminal Building Refurbishment.pdf
No summary available
Tender document for Services 8590 - 09 Sep.pdf
Engineering professional services for the refurbishment of the terminal building at Bram Fischer International Airport, for a period of 22 months, issued by Airports Company South Africa (ACSA). The scope covers design, tender documentation, contract administration and site monitoring, with a mandatory 95-point functionality threshold before price and preference evaluation.
To download these documents and access AI-powered analysis, visit the main tender page.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 594 297
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Request for Quotation for Engineering Professional Services for the refurbishment of the terminal building at Bram Fischer International Airport for a 22-month period. Bid Number: 8590 (re-issue). Issue Date: 9 September 2026. Queries close: 23 September 2026 at 16:00. Non-compulsory briefing: 16 September 2026 at 11:00 via Microsoft Teams. Bid closes: 14 October 2026 at 12:00 PM. Submissions by email only to [email protected] in ≥4 attachments of 4 MB each.
Important Dates
Source: Tender document for Services 8590 - 09 Sep.pdf (RFQ)Issue Date: 9 September 2026. Query/Clarification Closing Date: 23 September 2026 at 16:00. Non-compulsory Briefing Session: 16 September 2026 at 11:00 via Microsoft Teams (Meeting ID: 395 055 427 188 122, Passcode: a4bs3dK7, Dial-in: +27 21 834 0841,,692848795#). Bid Closing Date and Time: 14 October 2026 at 12:00 PM. Site Inspection: Not applicable (N/A).
Briefing Session
Source: Tender document for Services 8590 - 09 Sep.pdf (RFQ)Non-compulsory briefing session: 16 September 2026 at 11:00 via Microsoft Teams. Meeting link: https://teams.microsoft.com/meet/395055427188122?p=FY4SnZaXbbmqypfY9n. Meeting ID: 395 055 427 188 122. Passcode: a4bs3dK7. Dial-in: +27 21 834 0841,,692848795# (South Africa, Cape Town). Phone conference ID: 692 848 795#. Site inspection: Not applicable (N/A).
Contact Information
Source: Tender document for Services 8590 - 09 Sep.pdf (RFQ)SCM / Bidding Procedure Enquiries: Lerato Phalo (Buyer), Tel: 010 207 2000, Email: [email protected]. Technical Enquiries: Same contact (Lerato Phalo). Clarification requests must be submitted by 23 September 2026 at 16:00. Bidders may not contact any other ACSA employee regarding this bid. ACSA Head Office: Western Precinct, Aviation Park, O.R. Tambo International Airport, 1 Jones Road, Kempton Park, Gauteng, 1632. Postal: PO Box 75480, Gardenview, Gauteng, 2047.
Submission Guidelines
Source: Tender document for Services 8590 - 09 Sep.pdf (RFQ)Submission method: Email only to [email protected]. No physical bid box. Submissions must be split into at least four attachments of 4 MB each. Do not CC or BCC any ACSA employee. Closing date and time: 14 October 2026 at 12:00 PM. Late bids will not be accepted. Each page of the bid documents must be signed or stamped at the bottom as proof of reading. The bid must be completed on the official forms provided (not re-typed) and signed by a person authorised to act on behalf of the bidder (proof of authority, e.g. board resolution, must be submitted). Validity period: 120 business/working days from closing date. Mandatory returnable documents (all must be completed, signed and submitted with the quotation): SBD 3.3 (Priced Offer), Declaration of Interest and Politically Exposed Persons Form, SBD 4 (Bidder's Disclosure), SBD 6.1 (Preference Points Claim), Confidentiality and Non-Disclosure Agreement, B-BBEE Certificate/Scorecard or QSE/EME Affidavit, Verifiable medical certificate for disability (if claiming preference points), SARS Tax PIN (or CSD number if no PIN), Certificate of Incorporation showing ownership split, Central Supplier Database (CSD) Report, VAT Questionnaire, ACSA Terms and Conditions. Disqualification risks: any mandatory form omitted or unsigned; submission after closing time; bid document altered; bidder has an interest in another competing bidder/joint venture/consortium; failure to provide proof of authority to sign.
Returnable Documents
Source: Tender document for Services 8590 - 09 Sep.pdf (RFQ)Mandatory Returnable Documents: SBD 3.3 Priced offer, Declaration of Interest Form and Politically Exposed Persons, SBD 4 Bidder's Disclosure Form, SBD 6.1 Preference Points Claim Form, Confidentiality and Non-Disclosure Agreement, BEE Certificate and Scorecard or BBBEE QSE/EME Affidavit, Verifiable medical certificate of report as proof of disability, Tax Pin number, Certificate of Incorporation showing ownership split, Central Supplier Database Report (CSD), VAT Questionnaire, ACSA Terms and Conditions. Other Returnable Documents: documents required at specific stages. Validity of submitted information must be maintained for the duration of the contract period.
Evaluation Criteria
Source: Tender document for Services 8590 - 09 Sep.pdf (RFQ)Staged evaluation: Stage 1 – Mandatory Requirements (fully completed form of offer and all mandatory returnable documents). Stage 2 – Functionality (technical ability). Minimum threshold: 95 out of 100 points required to proceed to Stage 3. Functionality scoring (total 100 points): Tenderer's resource proposal (80 points) – Qualification and Registration (60 points), Years of experience on similar works (20 points); Tenderer's references and experience (20 points) – References with similarity in works and scope (20 points). Detailed criteria per key personnel: Tendering Organisation – completed relevant building construction projects each valued ≥ R10 million (incl. VAT): <3 projects = 0 points, ≥3 projects = 20 points. Principal Agent, Resident Engineer, Structural Engineer – each requires ≥3 completed relevant projects post-registration (R10 million+ building construction) for 5 points, plus professional registration with ECSA as Pr Eng or Pr Tech (15 points). Quantity Surveyor – ≥3 completed relevant projects post-registration (R10 million+ building construction) for 5 points, plus professional registration with SACQSP as Pr QS (15 points). Stage 3 – Price (80 points) and Stage 4 – Preference (20 points) using 80/20 preference point system. Specific Goals points (20 points max): B-BBEE Status Level 1 = 5, Level 2 = 4.5, Level 3 = 4, Level 4 = 3, Level 5 = 2, Level 6 = 0.5, Level 7 = 0.3, Level 8 = 0.1; Black youth majority-owned = 5; Black women majority-owned = 5; Company majority owned by people with disabilities = 5; Non-compliant contributor = 0. Stage 5 – Post-tender negotiations (where applicable). Price formula: Ps = 80(1 – (Pt – Pmin)/Pmin) for 80/20 system.
Technical Specifications
Source: Tender document for Services 8590 - 09 Sep.pdf (RFQ)Engineering professional services for the refurbishment of the terminal building at Bram Fischer International Airport over a 22-month period. Scope covers six stages per ECSA Guideline for Services and Processes (2016) and ACSA Project Management Manual: Stage 1 – Inception (project start-up meeting, refine brief, consultations, advise on rights/constraints/consents/approvals including National Key Point Act, understand airport operational/OHS/environmental requirements, site inspection, advise on surveys/tests/investigations, determine data/drawings availability, advise on life-cycle cost criteria, deliverables: report on project/site/functional requirements, schedule of surveys/tests/investigations, schedule of consents/approvals). Stage 2 – Concept and Viability (prepare/finalise project concept, procure/manage topographical survey/soil testing/health & safety agent per transformation objectives, review test data, design meetings, ensure regulatory compliance, refine concept design, coordinate design interfaces, advise on asset outages/durations, financial implications, space planning/materials/building services, prepare traffic accommodation drawings and contractor site establishment, apply airport standards, submit 3 sets of schematic design documents/preliminary specifications/schematic cost estimate). Stage 3 – Design Development (detailed design of agreed concept, employer review, stakeholder approvals, operational impact mitigation documentation/drawings/contingency plans, City Council approval, detailed construction cost estimates). Stage 4 – Documentation and Procurement (design meetings, chair pre-bid meetings/attend bid opening, prepare specifications/preambles, prepare tender documentation for contractor procurement, adjust designs to budget, finalise working drawings, review financial offers per CIDB Evaluation Guide, deliverables: specifications, services coordination, working drawings, budget construction cost, tender documentation, evaluation report). Stage 5 – Construction (site handover, construction administration, regular site/technical/progress meetings, quality control/works inspection/approval including post as-built survey, monitor QA procedures, proactive variation estimates, financial control/interim payment certificates, adjudicate/resolve contractor claims, practical completion/defects list, completion certificate/final completion). Level 3 Site Monitoring: Full-time Supervisor (per NEC3 PSC) on site; qualifications/experience maintained for contract duration. Stage 6 – Project Close-Out (documentation for completion/handover/operation, inspect/verify defect rectification, approve payment valuations/completion certificates, procure O&M manuals/guarantees/warranties, prepare as-built drawings/maintenance plan in hard copy and digital, post-survey of as-built, conclude final accounts). Constraints: live operational airport environment; compliance with National Key Point Act and airport safety/security requirements; security vetting may be required.
Methodology
Source: Tender document for Services 8590 - 09 Sep.pdfMethodology structured across six project stages per ECSA Guideline (2016) and ACSA Project Management Manual: Stage 1 Inception – project start-up, brief refinement, stakeholder consultations, site inspection, survey/investigation planning, consents/approvals schedule (incl. National Key Point Act), deliverables report. Stage 2 Concept and Viability – concept development, procurement of surveys/testing/H&S agent per transformation objectives, design meetings, regulatory compliance, schematic design documents (3 sets), preliminary cost estimates. Stage 3 Design Development – detailed design, stakeholder approvals, operational impact mitigation, City Council approval, detailed construction cost estimates. Stage 4 Documentation and Procurement – specifications, pre-bid meetings, tender documentation, working drawings, budget cost, evaluation report (consultant reviews financial offers per CIDB Guide). Stage 5 Construction – site handover, construction administration, regular meetings, quality control/inspection, variation management, financial control/payment certificates, claims adjudication, practical completion. Level 3 Site Monitoring: full-time NEC3 PSC Supervisor. Stage 6 Close-Out – documentation, defect rectification, completion certificates, O&M manuals/warranties, as-built drawings/maintenance plan (digital + hard copy), final accounts. Constraints: live airport operations, National Key Point Act, security vetting.
Experience & Qualifications
Source: Tender document for Services 8590 - 09 Sep.pdfTendering organisation: ≥3 completed relevant building construction projects each valued ≥ R10 million (incl. VAT). Key personnel (each): Principal Agent, Resident Engineer, Structural Engineer – ≥3 completed relevant building construction projects (R10 million+) commenced post-registration; professional registration with ECSA as Pr Eng or Pr Tech. Quantity Surveyor – ≥3 completed relevant building construction projects (R10 million+) commenced post-registration; professional registration with SACQSP as Pr QS. Proof of registration and project lists required. All projects must be building construction; Structural Engineer projects must be structural building construction. Experience evaluated under Functionality: Tenderer's resource proposal (Qualification & Registration 60 pts, Years of experience 20 pts) and References (20 pts). Overall minimum functionality threshold: 95/100.
Quality Management
Source: Tender document for Services 8590 - 09 Sep.pdfQuality management per ACSA Project Management Manual and ECSA Guideline for Services (2016). Stage 5 Construction: quality control, works inspection and approval of work completed according to quality and specifications inclusive of post as-built survey. Monitor implementation of quality assurance procedures by other consultants and contractors. Level 3 Site Monitoring: full-time Supervisor (per NEC3 PSC) on site; Supervisor qualifications and experience maintained for contract duration. Stage 6 Close-Out: inspect and verify defect rectification; approve payment valuations and completion certificates; procure final O&M manuals, guarantees and warranties; prepare as-built drawings and maintenance plan (hard copy and digital); post-survey of as-built.
Pricing Schedule
Source: Tender document for Services 8590 - 09 Sep.pdfPricing must be submitted on SBD 3.3 (Professional Services) form. All applicable taxes included (VAT, PAYE, income tax, UIF, SDL). Price evaluation: 80/20 preference point system (80 points price, 20 points specific goals). Price formula: Ps = 80(1 – (Pt – Pmin)/Pmin). Validity: 120 business/working days; prices firm for validity period. Payment via interim payment certificates during construction; final accounts at close-out. No bill of quantities or schedule of rates detailed in document; professional services fee basis per ECSA Guideline (2016).
Financial Requirements
Source: Tender document for Services 8590 - 09 Sep.pdf (RFQ)Pricing schedule: SBD 3.3 (Professional Services) must be used. All applicable taxes (VAT, PAYE, income tax, UIF, SDL) included in rates. Price evaluation uses 80/20 preference point system (80 points for price, 20 for specific goals). Price formula: Ps = 80(1 – (Pt – Pmin)/Pmin) where Pt = tender price, Pmin = lowest acceptable tender. Validity period: 120 business/working days; prices must remain firm and valid during this period. Payment terms: interim payment certificates agreed during construction; financial control and adjudication of contractor claims; final accounts at close-out. No explicit performance bond, guarantee or insurance amounts stated in the document. Financial capacity: not explicitly stated, but key personnel and organisational experience requirements imply capacity to manage projects of R10 million+ value.
Compliance Requirements
Source: Tender document for Services 8590 - 09 Sep.pdf (RFQ)Mandatory compliance: Central Supplier Database (CSD) registration; valid SARS Tax Compliance Status PIN (or CSD number if no PIN); each consortium/joint venture/sub-contractor party must submit separate TCS certificate/PIN/CSD number. B-BBEE: Certificate/Scorecard or QSE/EME Affidavit required to claim preference points; specific goals points allocated per B-BBEE level and designated group ownership (black youth, black women, people with disabilities). Professional registration: Principal Agent, Resident Engineer, Structural Engineer must be registered with ECSA as Pr Eng or Pr Tech; Quantity Surveyor must be registered with SACQSP as Pr QS. Proof of registration required. Experience: Tendering organisation and each key person must demonstrate ≥3 completed relevant building construction projects (R10 million+ incl. VAT) commenced post-registration. Mandatory returnable forms: SBD 3.3, Declaration of Interest & PEP Form, SBD 4, SBD 6.1, Confidentiality & Non-Disclosure Agreement, B-BBEE Certificate/Affidavit, Medical certificate for disability (if claiming), Tax PIN, Certificate of Incorporation (ownership split), CSD Report, VAT Questionnaire, ACSA Terms & Conditions. Security: ACSA is a National Key Point; bidders may be subjected to security vetting; non-compliant bidders will not be contracted. Confidentiality: bidders may not disclose bid information without ACSA written approval; third-party consultants must sign confidentiality agreements. No collusion: SBD 4 and SBD 9 (Certificate of Independent Bid Determination) declarations required.
Health & Safety
Source: Tender document for Services 8590 - 09 Sep.pdfOHS requirements integrated throughout scope: Stage 1 Inception – understand operational requirements, procedures, OHS and environmental requirements of the airport. Stage 2 Concept and Viability – procure/manage health and safety agent (where done by employer). Stage 5 Construction – quality control and works inspection include OHS compliance; monitor QA procedures by contractors. Project implemented in live operational airport environment subject to safety requirements and limitations. National Key Point Act compliance required. Security vetting may be required for personnel.
Environmental
Source: Tender document for Services 8590 - 09 Sep.pdfEnvironmental requirements integrated throughout scope: Stage 1 Inception – understand environmental requirements of the airport. Stage 2 Concept and Viability – ensure design compliance with ACSA regulatory authorities' requirements (including environmental). Stage 5 Construction – monitor implementation of quality assurance procedures by contractors (includes environmental compliance). Project in live airport environment; operational impact mitigation documentation and contingency plans required for asset outages. No standalone environmental impact assessment or sustainability targets specified.
Contractual Terms
Source: Tender document for Services 8590 - 09 Sep.pdfContract governed by Preferential Procurement Policy Framework Act 2000, Preferential Procurement Regulations, General Conditions of Contract (GCC), and any Special Conditions of Contract. Successful bidder must enter into a fully completed and signed written contract post-award. ACSA reserves the right to: award whole or part of the bid; split the award; negotiate with shortlisted bidders; award to a bidder other than the highest scoring where objective criteria allow; reject the lowest acceptable bid; cancel the bid. Bid document may not be altered; any alteration leads to disqualification. Confidentiality: ACSA will not disclose bidder information without written approval; bidder names not disclosed until process finalised; bidders may not disclose bid information to third parties without ACSA written approval; third-party consultants must sign confidentiality agreements. Security: ACSA is a National Key Point; bidders may be subjected to security vetting; ACSA will not contract with non-compliant bidders. Validity period: 120 business/working days from closing date. Hot-line for fraud/corruption reporting: 0800 00 80 80 or 086 726 1681, email [email protected].
Special Conditions
Source: Tender document for Services 8590 - 09 Sep.pdf (RFQ)ACSA reserves right to: award whole/part; split award; negotiate with shortlisted bidders; award to other than highest scoring where objective criteria allow; reject lowest acceptable bid; cancel bid. Bid document may not be altered (disqualification if altered). ACSA is a National Key Point – compliance with security cluster laws; bidders may be security vetted; non-compliant bidders not contracted. Project in live operational airport environment – safety/operational limitations apply. Validity: 120 business/working days. Bid responses must strictly follow bid document; no changes after closing. Confidentiality: ACSA protects bidder info; bidders may not disclose bid info without ACSA written approval; third-party consultants must sign confidentiality agreements. Fraud/corruption hotline: 0800 00 80 80 / 086 726 1681, [email protected].
Requirements
Source: Tender document for Services 8590 - 09 Sep.pdf (RFQ)Mandatory Stage 1: Fully completed form of offer; all mandatory returnable documents submitted. Bids on official forms only (not re-typed). Submission by stipulated time via email ([email protected]) in ≥4 attachments of 4 MB each. Each page signed/stamped. Proof of authority to sign (board resolution). Tax compliance: SARS PIN/TCS certificate (or CSD number); each JV/consortium/sub-contractor party separate. Compliance with Preferential Procurement Policy Framework Act 2000, Preferential Procurement Regulations, GCC. No interest in other competing bidders/JVs/consortia. Fully completed and signed written contract post-award. Mandatory returnables: SBD 3.3, Declaration of Interest & PEP, SBD 4, SBD 6.1, Confidentiality & NDA, B-BBEE Certificate/Affidavit, Medical certificate (disability), Tax PIN, Certificate of Incorporation (ownership split), CSD Report, VAT Questionnaire, ACSA Terms & Conditions.
Section
Source: Tender document for Services 8590 - 09 Sep.pdfStaged evaluation: Stage 1 – Mandatory Requirements (form of offer + all mandatory returnables). Stage 2 – Functionality (technical) – minimum 95/100 to proceed. Functionality breakdown: Tenderer's resource proposal (80 pts: Qualification & Registration 60 pts, Years of experience 20 pts); Tenderer's references & experience (20 pts). Per-role criteria: Organisation (≥3 projects R10m+ = 20 pts); Principal Agent, Resident Engineer, Structural Engineer (each: ≥3 projects R10m+ post-reg = 5 pts, ECSA Pr Eng/Pr Tech registration = 15 pts); Quantity Surveyor (≥3 projects R10m+ post-reg = 5 pts, SACQSP Pr QS registration = 15 pts). Stage 3 – Price (80 pts) and Stage 4 – Preference (20 pts) via 80/20 system. Specific Goals: B-BBEE Level 1=5, 2=4.5, 3=4, 4=3, 5=2, 6=0.5, 7=0.3, 8=0.1; Black youth majority-owned=5; Black women majority-owned=5; Disability majority-owned=5; Non-compliant=0. Stage 5 – Post-tender negotiations (if applicable).
Description
Source: NEC 3 PSC - Terminal Building Refurbishment.pdfEngineering professional services for the refurbishment of the terminal building at Bram Fischer International Airport over a 22-month period. The project follows six stages: Inception, Concept and Viability, Design Development, Documentation and Procurement, Construction Monitoring, and Project Close-out. Services include investigations, design, documentation, contract administration, and site supervision. The scope aligns with the Guideline for Services and Processes for Estimating Fees for Persons Registered in terms of the Engineering Profession Act, 2000, as amended by project-specific requirements.
Important Dates
Source: NEC 3 PSC - Terminal Building Refurbishment.pdf (unknown)Closing date: 14 October 2026 at 12:00 (from tender record). Contract duration: 22 months from the contract signing date (starting date). First programme due within 2 weeks of the Contract Date. Quality policy statement and quality plan due within 2 weeks of the Contract Date. Revised programmes submitted at 4-week intervals. Defects date: 52 weeks after Completion of the whole of the services. End of liability date: 1 year after Completion. No compulsory briefing or site visit dates are stated in the document.
Contact Information
Source: NEC 3 PSC - Terminal Building Refurbishment.pdf (unknown)Employer's Agent (Project Manager): Siseko Tshangana, Bram Fischer International Airport, N8 Thaba Nchu Road, Bloemfontein, 9300. Employer address: Airports Company South Africa SOC, Bram Fischer International Airport, N8 Thaba Nchu Road, Bloemfontein, 9300. Tel: 051 407 2200. No SCM or technical enquiry contacts, emails, or separate submission address are provided in the document.
Submission Guidelines
Source: NEC 3 PSC - Terminal Building Refurbishment.pdf (unknown)Submission method and address are not stated in the document. The Form of Offer and Acceptance (C1.1) must be completed, signed and returned as the offer cover page. The priced activity schedule (Part C2) and completed Contract Data provided by the Consultant (C1.2b) must be submitted with the offer. All returnable schedules listed in the tender data are required. No electronic submission channel, closing time, or physical tender box location is specified in the extracted text.
Evaluation Criteria
Source: NEC 3 PSC - Terminal Building Refurbishment.pdf (unknown)The document does not specify an evaluation methodology, price/preference split (80/20 or 90/10), functionality criteria, or minimum qualifying scores. The contract is a NEC3 Professional Services Contract, Main Option A (Lump Sum with Activity Schedule). Award will be based on the tendered total of the prices in the Form of Offer and Acceptance, subject to the Conditions of Tender which are not included in the extracted text.
Technical Specifications
Source: NEC 3 PSC - Terminal Building Refurbishment.pdf (unknown)Scope: Engineering professional services for the refurbishment of the terminal building at Bram Fischer International Airport over 22 months. Six project stages: 1) Inception, 2) Concept and Viability, 3) Design Development, 4) Documentation and Procurement, 5) Construction monitoring, 6) Project close-out. Key deliverables per stage as described in the Scope of Work (Part C3). Design standards: SANS 7240, EN 54 evacuation standards. Drawings must bear accepted standards. Consultant must provide key personnel: Principal Agent, Resident Engineer, Structural Engineer, Quantity Surveyor (names, qualifications, experience to be submitted). Quality policy statement and quality plan required within 2 weeks of Contract Date. Monthly progress and cost reports from detail design stage onwards. Programme submission within 14 days of appointment, updated monthly. Compliance with all applicable laws, codes and standards; more onerous requirement prevails in case of conflict. Services must comply with ISO 9001 quality management system; consultant must be ISO 9001 accredited. Access to as-built information, existing services, and ACSA operational/maintenance personnel provided upon award.
Methodology
Source: NEC 3 PSC - Terminal Building Refurbishment.pdfProject execution per NEC Scope of Works Briefing with detailed tasks and deliverables per stage: Scoping and Brief, Preliminary Design, Detail Design and Bid, Working Drawing, Construction. ISO 9001 quality management system mandatory. Detailed programme due within 14 days of appointment, updated monthly. Monthly progress and cost reports from detail design stage through construction. Ongoing consultation with designated ACSA representative. Consultant responsible for understanding works; employer not liable for misinterpretation. Compliance with all applicable laws, codes, and standards; more onerous requirement prevails in conflicts. Work plan required.
Experience & Qualifications
Source: NEC 3 PSC - Terminal Building Refurbishment.pdfKey personnel required: Principal Agent, Resident Engineer, Structural Engineer, Quantity Surveyor. For each: name, job title, responsibilities, qualifications, and experience must be provided in Contract Data (C1.2b). Consultant must be ISO 9001 accredited. Professional registration with ECSA implied for engineering roles. No specific minimum years of experience or project references stated in the extracted text.
Quality Management
Source: NEC 3 PSC - Terminal Building Refurbishment.pdfConsultant must be ISO 9001 accredited. Quality policy statement and quality plan to be submitted within 2 weeks of Contract Date. All projects managed under strict ISO 9001 quality system covering design, administration, reports, and site administration. Each project administered for quality and technical compliance per international quality procedures. Defects date: 52 weeks after Completion of the whole of the services. Defects liability extended if Employer cannot use works due to defects (Z7 clauses).
Pricing Schedule
Source: NEC 3 PSC - Terminal Building Refurbishment.pdfPricing basis: Priced Contract with Activity Schedule (NEC3 Option A). Main Pricing Schedule items: 1) Inception Stage 1 (SIPDM 3), 2) Concept Stage (preliminary design calculations, drawings/layouts, concept design report), 3) Detail Design Stage (detail design calculations, layouts, design report), 4) Documentation and Procurement (tender documentation, adjudication, contractor liaison), 5) Construction Monitoring, 6) Project Close-out, 7) Specialist Services, 8) Permits, 9) Safety File. Disbursement Schedule: only listed project-related costs recoverable; travel/accommodation to/from airport included in fees unless agreed in writing; no mark-up; cellular calls and construction travel via Contractor's claim; Health and Safety Agent via disbursements; excluded costs (typing, telephone, cellular, computer, telefax, email) deemed included in professional fees. All rates exclusive of VAT. Tendered total of prices in Form of Offer and Acceptance. Staff rates as stated in Pricing Data.
Financial Requirements
Source: NEC 3 PSC - Terminal Building Refurbishment.pdf (unknown)Contract type: NEC3 Professional Services Contract, Main Option A — Lump Sum with Activity Schedule. Pricing: Priced contract with activity schedule; rates per project stage as per the Main Pricing Schedule (Inception, Concept, Detail Design, Documentation & Procurement, Construction Monitoring, Project Close-out, Specialist Services, Permits, Safety File). Disbursements: only project-related costs listed are recoverable; travel to/from airport and accommodation are deemed included in fees unless agreed in writing; no mark-up on disbursements; cellular calls and travel during construction recovered through Contractor's claim; Health and Safety Agent recovered through disbursements. Payment terms: assessment interval ends 25th of each month; payment within 4 weeks of receipt of valid tax invoice; currency ZAR; interest at prime lending rate of the Employer's bank. Professional Indemnity Insurance: R5 million. Public Liability Insurance: R10 million. COID Act compliance required. Delay damages: 2% per week up to maximum 10% of total contract value. Limitation of liability: no indirect/consequential loss; direct liability capped at 100% of contract value cumulative; defects liability capped at contract price; liability ends 1 year after Completion.
Compliance Requirements
Source: NEC 3 PSC - Terminal Building Refurbishment.pdf (unknown)Mandatory insurances: Professional Indemnity Insurance (R5 million), Public Liability Insurance (R10 million), COID Act good-standing letter. Occupational Health and Safety Agreement (Section 37(2) of OHS Act and Construction Regulation 5.1(k)) must be signed by a duly authorised Section 16.2 appointee before work commences. Baseline risk assessment by a competent person required before commencement. Safety file documentation including Construction Manager appointment (Construction Regulation 8) must be submitted 7 days before work starts. Consultant must be ISO 9001 accredited. Key personnel (Principal Agent, Resident Engineer, Structural Engineer, Quantity Surveyor) must be named with qualifications and experience. B-BBEE certificate required annually; failure to present is a material breach allowing contract cancellation. Ethics compliance: Prevention and Combating of Corrupt Activities Act. Confidentiality obligations. Intellectual Property rights remain with originator; employer receives irrevocable, royalty-free licence. No cession/delegation/assignment without employer's written consent. Tax invoices must include scope details and SARS requirements. CSD registration, tax compliance status, CIDB grading, and CIPC registration are not explicitly mentioned in the extracted text.
Health & Safety
Source: NEC 3 PSC - Terminal Building Refurbishment.pdfOccupational Health and Safety Agreement (Section 37(2) OHS Act, Construction Regulation 5.1(k)) mandatory before work commences. Signed by duly authorised Section 16.2 appointee with CEO delegation letter. Consultant warrants COID Act compliance and good-standing letter from Compensation Fund or Licensed Insurer. Public Liability Insurance per subcontract agreement. Baseline risk assessment by competent person required before commencement. Safety file including Construction Manager appointment (Construction Regulation 8) due 7 days before work starts. Mandatory compliance with OHS Act, Construction Regulations, and ACSA OHS Specification (Annexure C). Work on landside of operational airport; normal operations must continue. Special requirements per Annexure B: ACSA Special Requirements at an Operational Airport. Baseline HIRA, Generic Hazards Assessment, and Environmental Terms (EMS 048) apply. No alcohol/intoxicating substances on premises. Incident reporting to Provincial Director: Department of Labour and ACSA. Permit-to-work system mandatory. PPE issued and enforced by Consultant. Competent persons appointed for OHS aspects. Discipline strictly enforced. Health and Safety Agent costs recovered through disbursements.
Contractual Terms
Source: NEC 3 PSC - Terminal Building Refurbishment.pdfContract form: NEC3 Professional Services Contract, April 2013, Main Option A (Lump Sum with Activity Schedule). Dispute resolution: Option W1 (Adjudication then Arbitration). Adjudicator nominated from panel; nominating body: Chairman of Johannesburg Advocates' Bar Council. Arbitration under shortened rules; venue to be agreed; arbitrator selected by Chairman of Association of Arbitrators (Southern Africa). Secondary options: X7 Delay Damages (2%/week, max 10% of contract value), X9 Transfer of Rights, X10 Employer's Agent (Siseko Tshangana, Project Manager), X11 Termination by Employer, X18 Limitation of Liability (no indirect/consequential loss; direct liability capped at 100% contract value; defects liability capped at contract price; liability ends 1 year after Completion). Additional conditions (Z clauses): Z1 fee estimation per guideline; Z2 tax invoice requirements; Z3 communications and notices (deemed receipt rules); Z4 adjudicator/arbitrator appointment from panels; Z5 no waiver/estoppel without written agreement; Z6 consultant warrants works fit for purpose; Z7 defects date extension rules; Z8 business rescue proceedings as termination trigger; Z9 cession/assignment restrictions; Z10 ethics and anti-corruption; Z11 confidentiality; Z12 employer step-in rights; Z13 intellectual property; Z14 dispute resolution amendments (adjudicator decides on written submissions only; termination disputes go straight to arbitration). Z15: annual B-BBEE certificate required; failure is material breach allowing cancellation.
Section
Source: NEC 3 PSC - Terminal Building Refurbishment.pdfThe document does not contain a defined evaluation criteria section with scoring weights, functionality thresholds, or preference point system. Evaluation details are likely contained in a separate Conditions of Tender document not included in the extracted text. The contract award will be based on the tendered total of prices in the Form of Offer and Acceptance under a NEC3 Professional Services Contract Option A (Lump Sum with Activity Schedule).
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
O. R. Tambo International Airport, Shop R7, First Floor, Domestic Terminal, O.R. Tambo Airport Rd, O.R. Tambo, Kempton Park, 1627, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
2
Last checked
25 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Contact
010-207-2000[email protected]www.acsa.co.zaO. R. Tambo International Airport, Shop R7, First Floor, Domestic Terminal, O.R. Tambo Airport Rd, O.R. Tambo, Kempton Park, 1627, South Africa
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
Win consulting, legal, accounting, and engineering service contracts with government. Learn registration requirements and proposal strategies.
Comprehensive guide to Institute of IT Professionals South Africa membership. Certification levels, requirements for ICT professionals, and how IITPSA membership enhances credibility for SITA and government IT tenders.
Definitive guide to Health Professions Council of South Africa registration for healthcare professionals bidding on government tenders. Covers the 12 professional boards, step-by-step registration, CPD requirements, foreign qualification evaluation, provincial health department tender opportunities, and how AI Tender Matching on Tenders-SA.org helps you find HPCSA-requiring contracts.
A strategic guide to getting listed on government consultancy, legal, and engineering panels. Learn why panels are the gateway to steady public sector work.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services: Professional. Unlock full pricing strategies, bid frequency, and historical win rates.