Issuing Organization
Passenger Rail Agency of South Africa (PRASA)Location
Gauteng
Closing Date
18 Aug 2026
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
CNR LEYDS AND SIMMONDS - BRAAMFONTEIN - JOHANNESBURG - 2001
Organization Type
GOVERNMENT
Published
06 Aug 2026
OCDS Reference
ocds-9t57fa-164808
This tender is for the appointment of a service provider to supply, deliver, and offload ballast for track rehabilitation in the metrorail gauteng region, operated by PRASA. the contract will run for 12 months on an as-and-when-required basis, with the contractor responsible for providing plant, labour, and ensuring ballast meets strict technical specifications. The aim is to restore track infrastructure to safe operational standards and improve service reliability for commuters.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Tuesday, 18 August 2026 - 10:00
Venue
null
Categories
Request for Quotation
CNR LEYDS AND SIMMONDS - BRAAMFONTEIN - JOHANNESBURG - 2001
AI Document Analysis Stages
Description
Source: RFQ FOR SUPPLY DELIVER AND OFFLOADING OF BALLAST.pdf06 Aug
2026
Tender Published
Tender was published
18 Aug
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
RFQ FOR SUPPLY DELIVER AND OFFLOADING OF BALLAST.pdf
This is a re-advertised Request for Quotation (RFQ) by the Passenger Rail Agency of South Africa (PRASA) for the supply, delivery, and offloading of ballast in the Metrorail Gauteng Region. The RFQ number is 08/504/26/GAU-PER, with a closing date of 18 August 2026 at 10:00 CAT. Bids must be hand-delivered to the specified address in Braamfontein; no email or fax submissions are accepted. The evaluation follows a three-stage process: compliance (mandatory documents), technical/functionality (minimum threshold of 80%), and price/specific goals (80/20 preference point system). The scope includes supplying 5000 m3 of ballast and providing plant equipment (TLB and front-end loader) on a wet rate basis.
SCOPE OF WORK Supply and delivery of ballast in the Metrorail Gauteng Region.pdf
PRASA Metrorail Gauteng seeks a service provider for the supply, delivery, and offloading of railway ballast over a 12-month period. The contractor must supply ballast to SABS 1083 standards, load it onto rail wagons or deliver by road, and offload/spread it at designated sites. The scope includes providing plant (TLB and front-end loader) with operators, complying with strict safety and quality requirements, and working within track occupations. The contract is for 12 months with fixed pricing, and evaluation includes technical (minimum 80% threshold) and specific goals.
To download these documents and access AI-powered analysis, visit the main tender page.
Secure PRASA tenders with AI Matching & Recommendations, rail-infrastructure intelligence, compliance analysis, and bid support for rolling stock and station upgrades.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
R 2 346 000
Range
Based on Industry avg. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Supply, delivery, and offloading of ballast in the Metrorail Gauteng Region. The scope of work is attached separately.
Important Dates
Source: RFQ FOR SUPPLY DELIVER AND OFFLOADING OF BALLAST.pdf (RFQ)Contact Information
Source: RFQ FOR SUPPLY DELIVER AND OFFLOADING OF BALLAST.pdf (RFQ)Submission Guidelines
Source: RFQ FOR SUPPLY DELIVER AND OFFLOADING OF BALLAST.pdf (RFQ)Evaluation Criteria
Source: RFQ FOR SUPPLY DELIVER AND OFFLOADING OF BALLAST.pdf (RFQ)Technical Specifications
Source: RFQ FOR SUPPLY DELIVER AND OFFLOADING OF BALLAST.pdf (RFQ)Methodology
Source: RFQ FOR SUPPLY DELIVER AND OFFLOADING OF BALLAST.pdfProvide a detailed technical approach/methodology aligned to the scope of work, highlighting risks and mitigation measures for working within the rail environment. The methodology must cover the following elements: identification of risks and mitigation, work breakdown of activities, measurements & assessment, pre-handover quality inspection, quality assurance, material handling and storage process, plant and equipment, transportation and post quality inspection. Scoring: 0 points for unrelated/irrelevant; 4 points for 1-3 elements; 8 for 4; 12 for 5; 16 for 6; 20 for 7 elements.
Experience & Qualifications
Source: RFQ FOR SUPPLY DELIVER AND OFFLOADING OF BALLAST.pdfOrganizational Experience (60 points): Provide track record of similar successfully executed and completed Perway projects (supply and delivery of Perway material and equipment). For each project, provide in sequence: 1) Letter of Award/Purchase Order on client letterhead, signed and dated; 2) Copy of appointment letter on company letterhead with description, client name, contact (email and office number), project start/end dates, extension if applicable, contract value incl. VAT; 3) Certificate of Completion on client letterhead, signed and dated. Scoring: 0 projects = 0; 1 = 12; 2-3 = 24; 4 = 36; 5 = 48; 6+ = 60.
Quality Management
Source: RFQ FOR SUPPLY DELIVER AND OFFLOADING OF BALLAST.pdfQuality requirements are embedded in the technical evaluation criteria. The methodology must cover: pre-handover quality inspection, quality assurance, material handling and storage process, and post quality inspection. Bidders must provide a detailed technical approach aligned to the scope, highlighting risks and mitigation for working in the rail environment.
Pricing Schedule
Source: RFQ FOR SUPPLY DELIVER AND OFFLOADING OF BALLAST.pdfComplete the Pricing and Delivery Schedule (Section 4) and BOQ/Pricing Schedule (Section 10) as mandatory returnable documents. Prices must be in South African Rand inclusive of all taxes. Provide cost breakdown, price escalation basis, and deliver strictly in the prescribed format. Discounts only considered at final evaluation on unconditional basis. BOQ includes: Ballast supply (5000 m3/km), TLB and Front-end Loader at R/hr 180 each (provisional).
Financial Requirements
Source: RFQ FOR SUPPLY DELIVER AND OFFLOADING OF BALLAST.pdf (RFQ)Compliance Requirements
Source: RFQ FOR SUPPLY DELIVER AND OFFLOADING OF BALLAST.pdf (RFQ)Health & Safety
Source: RFQ FOR SUPPLY DELIVER AND OFFLOADING OF BALLAST.pdfNo explicit health and safety requirements are stated in the document beyond general compliance with laws and regulations. However, bidders must provide a methodology that includes identification of risks and mitigation measures associated with working within the rail environment. A COIDA Letter of Good Standing is required as a mandatory returnable document.
Contractual Terms
Source: RFQ FOR SUPPLY DELIVER AND OFFLOADING OF BALLAST.pdfSection
Source: RFQ FOR SUPPLY DELIVER AND OFFLOADING OF BALLAST.pdfEvaluation follows three stages:
Description
Source: SCOPE OF WORK Supply and delivery of ballast in the Metrorail Gauteng Region.pdfThis submission is aimed at getting the approval for the appointment of service providers
for the supply, delivery and offloading of ballast in the Metrorail Gauteng region
The Gauteng Region is a network of commuter rail services in Gauteng province in
South Africa, servicing the Johannesburg and Tshwane metro areas. It is operated by
Metrorail, a division of the Passenger Rail Agency of South Africa (PRASA).
Metrorail routes spread out across the province from three main hubs: Park Station in
Johannesburg, Germiston Station on the East Rand, and Pretoria Station. Routes
service central Johannesburg, the East Rand, Soweto, the Vaal Triangle, the West
Rand, central Pretoria, and suburbs to the north, east and west of Pretoria.
1.1. Status quo:
The Permanent way department has embarked on a Perway infrastructure
rehabilitation by means of on-track machine packages that is comprised of ballast
screening machines, Tamping machines, Track stabilizer machines and ballast
regulator machines. Ballast is one of the main materials that is required when
rehabilitation works are in progress and works cannot be possible if ballast is not
supplied as most of the ballast get spoiled as it has reached its lifecycle or rather it
no longer meets ballast quality requirement.
1.2. Problem statement:
PRASA is required to ensure that infrastructure is maintained and in good operational
condition that conform to the required operating and safety standards, screening has
not been executed in a very long time and this poses a safety risk on Perway
infrastructure as ballast main purpose is to bear and distribute load; facilitate water
drainage and to control vegetation which might interfere with the track structure.
06 August 2026_Rev5 of 38
Appointment of a service provider for the supply, delivery
And offloading of ballast in the metrorail gauteng region
It has also come to light that some of the areas are experiencing shortage of ballast
due to lifespan, washaways caused by flooding during the rainy seasons which
sometimes leads to service disruptions, ballast contamination caused by illegal
trenching which led to poor drainage and service disruption. The procurement of
ballast is urgently required, so that the department can be able to carry routine
maintenance which will improve safe passage of trains and mitigate potential
incidents and train delays.
1.3. Pictorials:
06 August 2026_Rev5 of 38
Appointment of a service provider for the supply, delivery
And offloading of ballast in the metrorail gauteng region
1.4. Desired outcomes for carrying out the proposed project
The project aims to restore the Perway infrastructure to enable the safe running of the
train service. This will therefore assist PRASA in achieving its primary mandate of
providing a reliable rail transport service to Gauteng commuters and enable the
business to collect fare revenue from those commuters.
1.5. Project benefits to PRASA
In line with the PRASA strategic objectives and Operational effectiveness, Perway
department aims to achieve continuous Perway service improvement and reliable track
network. This can be achieved through the proactive management and procurement
of ballast required to support the track infrastructure, in order to render a safe and
reliable train service.
By restoring the Perway system to its design specification, maintenance cost, train
disruptions that are due to the Perway system failures will be reduced thus improving
the service offering.
1.6. Current mechanisms in place to address the problem
There’s no active contract for supply and delivery of ballast which hinders the effort to
rehabilitate Perway infrastructure.
4.1. The project entails the supply, delivery and offloading of ballast in the Metrorail
Gauteng region. and includes the following in terms of work to be done at all
identified areas in order to ensure compliance:
4.1.1. Supply, delivering and offloading of ballast will include the following activities:
4.1.1.1. Ballast is to be loaded onto AY rail wagons at the supplier’s local siding by the
supplier.
06 August 2026_Rev5 of 38
Appointment of a service provider for the supply, delivery
And offloading of ballast in the metrorail gauteng region
4.1.1.2. Ballast transported by rail to be done by PRASA however the contractor’s team
must be ready on site to spread ballast where ballast is being offloaded and final
level to conform with track manual and to be approved and signed off by PRASA
Technical Officer/Track Inspector.
4.1.1.3. In some instances of derailments and emergencies, where AY rail wagons are
not available, the contractor will be responsible for delivering ballast by road to
PRASA stockpile siding. Location to be confirmed with Technical Officer/Track
Inspector.
4.1.1.4. Prices tendered shall be the ex-works, loaded onto road trucks and transport cost
will be borne by the supplier.
4.1.1.5. All work is subjected to the terms of the succeeding clauses, drawings,
specifications and conditions pertaining to this contract.
4.1.1.6. PRASA Technical Officer/Track Inspector or his delegate together with
Contractor’s Track Master/Inspector will assess the site before the project
commences.
4.1.1.7. Quality Assurance Plan.
4.1.1.8. Project Execution Plan encompassing liaison with all the role players i.e. PRASA
Rail, Transnet Freight Rail and Local Authorities.
4.1.1.9. All work will have to be done by the contractor with machinery, equipment, transport
and Labour that he shall provide, maintain and operate during the contract period.
4.1.1.10. The contractor will be responsible for Health and Safety compliance on site.
4.1.1.11. PRSA Track Inspector and the contractor Track Inspector master will be
responsible for arrangement of occupations.
06 August 2026_Rev5 of 38
Appointment of a service provider for the supply, delivery
And offloading of ballast in the metrorail gauteng region
4.1.2. Ballast stones:
4.1.2.1. Compliance
4.1.2.1.1. Ballast stone shall comply with SABS 1083 (latest revision). In addition, ballast
stone shall comply with the requirements specified hereinafter.
4.1.2.1.2. Acceptance of the stone shall also depend on a full petro graphic analysis to
identify any micro fissuring, weakness and/or the presence of undesirable
minerals that could lead to early degradation.
4.1.2.2. Loading and Off-loading
4.1.2.2.1. The Contractor must be willing to offload ballast stone on weekends and public
holidays.
4.1.2.2.2. Before the Contractor start loading the AY or DZ trucks in the siding, he must
ensure the doors are closed.
4.1.2.3. Cleaning of the Siding
4.1.2.3.1. The Contractor must ensure that at least 3 meters on both sides of the railway line
is clean and level in the siding. The ballast in the centre of the line must be level
with the sleepers.
4.1.2.4. Standard of workmanship
4.1.2.4.1. If the ballast delivered does not comply with specifications as mentioned in this
document, it will not be paid for.
4.1.2.4.2. Material: The Contractor shall ensure that all material conform to the minimum
standard as per appendix A, B and C.
4.1.2.5. Damage
06 August 2026_Rev5 of 38
Appointment of a service provider for the supply, delivery
And offloading of ballast in the metrorail gauteng region
4.1.2.5.1. Should any damages been caused to any assets of PRASA by the Contractor
during the execution of his/her duties, it will be for the Contractor’s account.
4.1.2.6. Ballast Stone
4.1.2.6.1. In the soundness test described in Appendix A, the loss in mass shall not exceed
5% after 20 cycles of the tests.
4.1.2.6.2. No doleritic stone shall be found to be broken when conducting the durability test
described in Appendix B.
4.1.2.6.3. The Los Angeles abrasion value, determined in accordance with ASTM C 131- 89
grading B, shall not exceed 22%.
4.1.2.6.4. The plasticity index on the fines developed from the Los Angeles abrasion test shall
be less than 6.
4.1.2.6.5. Flakiness index measured in accordance with SABS 1083 (latest revision) shall not
exceed 30%.
4.1.2.6.6. Voids measured in accordance with SABS 1083 (latest revision) shall not be less
than 40%.
4.1.2.6.7. The relative density shall not be less than 2.5.
4.1.2.6.8. Grading shall comply with the following for heavy axle lines (S1)
06 August 2026_Rev5 of 38
Appointment of a service provider for the supply, delivery
And offloading of ballast in the metrorail gauteng region
% By mass nominal aperture size of sieve
Passing mm
100 73.0
90 – 100 63.0
40 – 70 53.0
10 – 30 37.5
0 – 5 26.5
0 - 1 19.0
The Mill Abrasion value, determined according to test procedure described in Appendix
C, shall not exceed 7%.
4.1.2.7. Specification for stone – Appendix A
4.1.2.7.1. Test for soundness of stone (Sodium Sulphate Method)
4.1.2.7.1.1. A1 – Test solution
Prepare a saturated solution of anhydrous Na SO or crystalline Na SO. 10H
O is distilled or demineralized water between 33 o C and 35o C. Use
sufficient of the salt to give excess crystals after thorough stirring. Cool to
between 22 o C and 24o C and keep this temperature for at least 16 h. Stir
thoroughly before use.
4.1.2.7.1.2. A2 - Preparation of test specimen
From a representative sample of stone take a random specimen of at least
500g passing a 19mm and retained on a 13,2mm sieve. Wash the specimen
to remove all adhering material. Dry at 105 o C in a well-ventilated oven and
determine the mass after cooling. Continue drying until the decrease in mass
after each of 2 successive drying periods of 4 h does not exceed 0,1 % of the
total mass. Let this mass be M1.
4.1.2.7.1.3. A3 – Procedure
06 August 2026_Rev5 of 38
Appointment of a service provider for the supply, delivery
And offloading of ballast in the metrorail gauteng region
A3.1 Place the specimen in a porcelain dish and cover fully with test
solution between 20 o C for 7 h. Decant the solution taking care that no stone
is lost.
A3.2 Dry the specimen for 15 h at 105 o C. Allow the specimen to cool for 2
h. This completes one cycle of the soundness test.
A3.3 Repeat the cycle described in A3.1 and A3.2 as often as specified.
After every fifth cycle, wash the specimen on a 1,70 mm sieve with hot water
until no crystalline sodium sulphate is visible and continue the test with
material retained on a 1,70 mm sieve.
A3.4 After completion of the final cycle, wash the specimen in hot water
until the washings are free of sodium sulphate. Dry the specimen to constant
mass and screen on a 1,70 mm sieve. Let the mass retained on the sieve be
M2.
4.1.2.7.1.4. A4 – Loss
Calculate the percentage loss in mass from the formula
(M1 – m2) x 100%
M1
4.1.2.8. Durability test for stone – Appendix B
4.1.2.8.1. Test for soundness of stone (Sodium Sulphate Method)
4.1.2.8.1.1. B1 – Preparation of test specimen
From a representative sample of ballast stone take at random 100 stones
passing a 53.0 mm and retained on a 26.5 mm sieve. Wash the stones to
remove all adhering material. Dry the stones at 105 o C in a well-ventilated
oven and determine the mass after cooling. Continue drying until the
decrease in mass after each of 2 successive drying periods of 4 h does not
exceed 0.1% of the total mass.
06 August 2026_Rev5 of 38
Appointment of a service provider for the supply, delivery
And offloading of ballast in the metrorail gauteng region
4.1.2.8.1.2. B2 – Procedure
Place the 100 stones in a suitable container and cover with ethylene glycol
between 18 o C and 25 o C for 20 days. Determine the number of stones that
have broken or can be broken by hand.
4.1.2.8.1.3. B3 – Testing
The supplier must send a (3) monthly sample to laboratory for testing and all
cost will be paid by the supplier, the suppler must send the results to PRASA.
PRASA will take random test and send to the laboratory for testing and cost
will be paid by the supplier.
4.1.2.9. Mill Abrasion Test – Appendix C
4.1.2.9.1. C1 – Test Method
4.1.2.9.1.1. Prepare a test sample of the ballast under test, consisting of 1.5kg each of the
following two particle sizes:
<37.5 mm > 26.5 mm and <26.5 mm > 19 mm.
The particles shall be washed and oven – dried to a constant weight before it
is weighed and tested.
(Wo = the total weight of sample)
4.1.2.9.1.2. Place the sample in the porcelain mill pot and add 3 litres of distilled water.
Ensure that the cork washer is correctly in position before tightening the lid
securely.
4.1.2.9.1.3. The mill pot is placed in a horizontal position on the two rollers of the test
apparatus with the lid on the side of the electric motor in order that the counter’s
sensor is activated with each revolution of the mill pot.
4.1.2.9.1.4. The mill pot shall be rotated at 33 r.p.m. for a total of 10 000 revolutions.
06 August 2026_Rev5 of 38
Appointment of a service provider for the supply, delivery
And offloading of ballast in the metrorail gauteng region
4.1.2.9.1.5. The sample shall then be wash – sieved through a 9.5 mm sieve placed on top
of a 0.075 mm sieve and then oven dried to a constant weight.
4.1.2.9.1.6. Record the dry mass of the material on the sieves:
W1 = mass of material on 9.5 mm sieve.
W2 = mass of material on 0.075 mm sieve.
C 2. Evaluation method
Calculate the following abrasion value:
Wo−W1−W2
MA= × 100= Mill Abrasion Value
Wo
4.1.3. Occupations
4.1.3.1. PRASA RAIL shall arrange the track occupations for work between trains or during
total occupation for the area of occupation.
4.1.3.2. PRASA RAIL will endeavour to arrange occupations, total or between trains from
09:00 to 15:00 where practically possible on weekdays (Mondays to Fridays)
4.1.3.3. Work done must be completed during these occupations in order for Metrorail to
open the track for normal rail traffic.
4.1.3.4. The contractor must conform to these occupations as laid down by the Technical
Officer.
4.1.3.5. Occupation time used by the contractor in excess of the maximum specified
occupation time will not be paid against overtime rates unless:
4.1.3.5.1. The Technical Officer agrees upon it in writing before the start of the occupation.
4.1.3.5.2. It can be proved by the contractor that delays caused by Metrorail resulted in an
overtime claim.
4.1.3.6. Work will be done between trains or under total occupation as will be agreed before
the work commence.
06 August 2026_Rev5 of 38
Appointment of a service provider for the supply, delivery
And offloading of ballast in the metrorail gauteng region
4.1.4. Provision of plant will include the following:
condition on an “as and when required basis”.
4.1.4.1. Basis of Provision of Plant and Hours of Duty
4.1.4.1.1. The Contractor on an “As and when required” basis shall provide the plant. The
plant shall be supplied on site as agreed upon by the parties .
4.1.4.1.2. Normal weekdays or 10 Days out of 14 will be worked and off days can be taken
through the week. Time worked in for off periods, over weekends, will be
regarded as normal working time.
4.1.4.1.3. No standing time will be paid for time worked in, only as and when requested by
PRASA plant will be paid for standing time.
4.1.4.1.4. The contractor's employees shall conform to the hours of duty required by the
Project manager. The normal weekly hours of duty are 45 hours in a 5-day week,
from 07h00 to 16h30 with a half hour break between 12h00 and 12h30. When so
ordered by the Project manager, the contractor's employees shall work overtime
and on statutory paid public holidays.
4.1.5. Occupations
4.1.5.1. PRASA RAIL shall arrange the track occupations for work between trains or
during total occupation for the area of occupation.
4.1.5.2. PRASA RAIL will endeavour to arrange occupations, total or between trains from
09:00 to 15:00 where practically possible on weekdays (Mondays to Fridays)
4.1.5.3. Work done must be completed during these occupations in order for Metrorail to
open the track for normal rail traffic.
4.1.5.4. The contractor must conform to these occupations as laid down by the Technical
Officer.
4.1.5.5. Occupation time used by the contractor in excess of the maximum specified
occupation time will not be paid against overtime rates unless:
4.1.5.5.1. The Technical Officer agrees upon it in writing before the start of the occupation.
06 August 2026_Rev5 of 38
Appointment of a service provider for the supply, delivery
And offloading of ballast in the metrorail gauteng region
4.1.5.5.2. It can be proved by the contractor that delays caused by Metrorail resulted in an
overtime claim.
4.1.5.6. Work will be done between trains or under total occupation as will be agreed
before the work commence.
4.1.6. Initial Delivery of Plant
4.1.6.1. The Contractor shall deliver the plant in a full operational condition, with operator
to the initial place of work as directed by the PRASA RAIL REPRESENTATIVE.
Initial establishment and final removal from site will be paid for separately.
4.1.7. Fuel, Servicing and Maintenance
4.1.7.1. In all cases plant shall arrive on site, as directed, in a fully operational condition.
4.1.7.2. The contractor shall provide all fuel for the operation of the plant while on site.
4.1.7.3. The contractor shall ensure that the fuel tanks are full on arrival of plant on site.
4.1.7.4. The contractor will be fully responsible for the servicing, maintenance and
carrying out of repairs at his own expense, and in his own time, during the
duration of the contract. Maintenance of the plant must be within 2 hours after a
breakdown was reported or the plant must be replaced by a similar model.
4.1.8. Provision Of TLB and Front-end Loader with operators (Provisional)
4.1.8.1. The Contractor shall provide a roadworthy TLB and Front-end loader with
operators to PRASA RAIL for the work as required by the Project Manager on
prescribed sections of railway lines as and when required.
4.1.8.2. The Contractor shall provide the TLB and Front-end loader with operators within
one (1) working day (or within such other time as the parties may agree to from
time to time). The Contractor shall not provide any additional machine
and/or operator on verbal or written request from any PRASA
representative. PRASA RAIL shall not affect payment for the unauthorised
service rendered.
06 August 2026_Rev5 of 38
Appointment of a service provider for the supply, delivery
And offloading of ballast in the metrorail gauteng region
4.1.8.3. The operators together with the plant required and requested by PRASA RAIL
shall report for duty at such times or places as may be agreed upon from time to
time between PRASA RAIL and the Contractor.
4.1.8.4. The operator together with all the plant shall perform their daily duties at such
times as agreed upon from time to time between PRASA RAIL and the
Contractor.
4.1.8.5. The plant provided by the Contractor to PRASA RAIL in terms of this Agreement
shall only be driven by operators supplied by the Contractor.
4.1.9. Responsibility of The Contractor IRO the Plant
The Contractor shall at his own cost -
4.1.9.1. supply to PRASA RAIL all the plant in a roadworthy condition, and complying fully
with the requirements of the appropriate Road Traffic legislation, and in particular
with the Road Traffic Act, 1989 (Act No. ) (as amended);
4.1.9.2. Ensure all plant machines supplied to PRASA RAIL comprehensively and in
respect of all third-party risks;
4.1.9.3. Replace within two (2) hours of notification, any plant which is no longer
acceptable to PRASA RAIL;
4.1.9.4. Keep the plant supplied in a clean, neat and working condition;
4.1.9.5. Remove from site any plant(s) requiring workshop repairs and return it (them) in a
serviceable condition or replace it (them) as soon as reasonably possible for the
Contractor to do so; and
4.1.9.6. Arrange to do daily and weekly checks on all its machines as far as is reasonably
possible to do so.
4.1.9.7. Provide a logbook for each plant, that will be used to record hours worked, as
recorded by the machine hour meter, which shall at all times be in working
condition.
4.1.10. Responsibility of PRASA Rail IRO the Plant
PRASA RAIL shall -
06 August 2026_Rev5 of 38
Appointment of a service provider for the supply, delivery
And offloading of ballast in the metrorail gauteng region
4.1.10.1. Ensure that all the plant provided by the Contractor are not intentionally damaged
or misused in any way by PRASA RAIL employees and be liable in respect of any
damage or loss suffered by the Contractor as a result of the wilful misconduct of
PRASA RAIL employees.
4.1.10.2. Ensure that all the plant are not loaded in excess of the load capacity specified by
the motor vehicle manufacturer, or which is permitted by law, and shall at all
times comply with the maximum permissible axle, axle unit, vehicle and
combination masses as prescribed by the Road Traffic Act, 1989 (Act No. ) (as amended);
4.1.10.3. Not affix any item or sign, nor modify or attach an accessory to any plant
provided by the Contractor without the prior written permission of the Contractor.
4.1.10.4. In the event of any occurrence giving rise to a claim under the Contractor's policy
of insurance, advise the Contractor within forty-eight (48) hours of the occurrence
thereof.
4.1.11. Maintenance of Plant
4.1.11.1. Maintenance, servicing and mechanical repairs (hereinafter referred to as
maintenance), of the machines, including all adjustments necessary to keep the
plant in a roadworthy and operational condition are included in the agreement
and shall be provided by the Contractor at his own cost.
4.1.11.2. Should any plant provided by the Contractor break down or be involved in an
accident while working on the prescribed sections of railway line in terms of this
agreement, the Contractor shall, if that machine cannot be repaired within two (2)
hours or is unable to proceed with its duties within two (2) hours, at his own cost,
forthwith provide another vehicle in a roadworthy and operational condition to
continue with its duty.
4.1.11.3. The Contractor shall inform PRASA Rail as soon as practically possible of any of
his machine working in terms of this agreement which has broken down or has
been involved in an accident.
4.1.11.4. The Contractor shall submit a monthly log sheet IRO all hours worked during the
course of each machine duty. In the absence of a certified log sheet no payment
shall be affected for any hours worked.
06 August 2026_Rev5 of 38
Appointment of a service provider for the supply, delivery
And offloading of ballast in the metrorail gauteng region
4.2. Deliverables:
4.2.1 The following deliverables are to be provided by the appointed contractor:
4.2.2 Conducting of all ballast test at the Quarry and submit the report to PRASA
Technical Officer. All ballast stone to comply with provided specifications.
4.2.3 Submission of all municipality and statutory applications and documents to
enable work activities to commence.
4.2.4 Submission of method statement, health and safety plans as well as quality
plan. These plans to be provided and approved before work commences.
4.2.5 Supply, delivery and offloading of ballast on an “as and when required basis” for a
period of 12 months.
4.3. Information to be provided with tender:
4.3.1 The Bidders shall submit a detailed priced proposal with the following information at
the time of tendering:
4.3.1.2 Detailed schedule (in Microsoft Project format) to show how work can be
performed within timelines provided by PRASA.
4.3.1.3 Project Team organisation’s and individual team members’ recent experience
on similar projects.
4.3.1.4 Project organogram showing names, function & responsibilities of
Directors/HODs including all sub-ordinates to the lowest ranked positions
involved in this project.
4.3.1.5 Clear legal relationship, namely joint venture agreement where it applies and
responsibility between Joint Venture or Consortium members or with sub-
contractors if tendered by a single entity.
4.3.1.6 Proof of professional indemnity insurance valid for the duration of the project.
4.3.1.8 Detailed health, safety and environmental plan that is site specific and
customized for working in a railway environment.
06 August 2026_Rev5 of 38
Appointment of a service provider for the supply, delivery
And offloading of ballast in the metrorail gauteng region
4.3.1.9 Detailed quality management plan clearly stating all the quality management
processes and procedures that the contractor will follow in delivering the
scope of work to PRASA.
4.4. Measurements and payment:
4.4.1. Payments will only be made against completed milestone as per the appointed
contractor’s schedule of works, payment schedule and proposal.
4.4.2. The PRASA Project Manager will certify payments to the appointed
contractor.
4.4.3. The unit of measurement for both working and standing time will be the hour.
4.4.4. Payment will only be made:
4.4.4.1. For total quantity of ballast delivered and spread where required.
4.4.4.2. For actual hours worked at the prices quoted in the Schedule of Rates, for
working time.
4.4.4.3. The unit of measurement will be as per items in the schedule of quantities.
4.4.4.4. No down time claim for inclement weather will be paid.
4.4.4.5. No escalation will be paid. Allowance for escalation cost must be provided for
in the tendered price.
4.4.4.6. The contractor shall submit his/her claim certificate which will be checked and
certified by the Project Manager before payment can be processed. The Project
Manager shall check claimed quantities against actual completed quantities
and make necessary adjustments before payment can be processed.
4.5. Protection of workplaces:
4.5.1. Protection of the workplace will be done by flagmen supplied by the PRASA and
all liaisons with Train Services shall be done by the contractor’s supervisor together
with PRASA RAIL Track Inspector/Master.
06 August 2026_Rev5 of 38
Appointment of a service provider for the supply, delivery
And offloading of ballast in the metrorail gauteng region
4.5.2. It is the responsibility of the contractor to provide security on site for equipment,
material and personnel for the duration of the contract.
4.6. Safety:
4.6.1. All work in this contract shall comply with the Occupational Safety Act No , National Environmental management Act Act and construction
regulation 2014. These items shall all be included in the tendered rates.
4.6.2. A copy of the act as well as an approved safety file shall be kept on site for the
duration of the project.
4.6.3. The Contractor shall comply with all applicable legislation and PRASA’s safety
requirements adopted from time to time and instructed by the Project Manager.
Such compliance shall be entirely at the contractor’s cost and shall be deemed to
have been allowed for in the rates or total prices in the contract.
4.6.4. The Contractor shall report all incidents in writing to the Project Manager. Any
incident resulting in the death of or injury to any person on the works shall be
reported within 1 hour of its occurrence and any other incident shall be reported
within 24 hours of its occurrence.
4.6.5. All personnel employed by the Contractor shall have undergone a Health and
Safety Induction.
4.6.6. Permits to work (in line with Covid-19 regulations) shall be issued at the cost of the
contractor to all personnel on that shall be signed and stamped by the authorized
PRASA Official responsible for Risk Management.
4.6.7. The contractor shall ensure that all COVID - 19 protocols are adhered to.
4.6.8. The Contractor shall make necessary arrangements for sanitation, water and
electricity at these relevant sites during the installation of the equipment.
4.6.9. The safety file will be approved only after all the requirements on the checklist are
met. WITS_LIB/RISK_MGT/SHE File Checklist (version 3) is attached in this
regard.
06 August 2026_Rev5 of 38
Appointment of a service provider for the supply, delivery
And offloading of ballast in the metrorail gauteng region
4.6.10. All work shall at all times comply with the E7/1 Specification attached hereto.
4.6.11. Normal protection measures in accordance with the Protection Manual shall apply.
4.6.12. An effective safety procedure to be followed by all personnel on any work site in the
case of approaching rail traffic shall be compiled by the Contractor and
implemented before any work commences. This procedure shall be updated
whenever the need arises, and any changes shall be communicated to all
employees on a works site before work proceeds.
4.6.13. The Contractor shall be responsible for the safety of personnel on site.
4.6.14. The following shall also form part of the safety plan:
4.6.14.1. Transportation of tools, equipment and personnel
4.6.14.2. Transportation, storage and handling of hazardous equipment.
4.6.14.3. The site access certificate shall only be issued (to the successful bidder) after the
evaluation and approval of the safety file.
4.6.15. It is the requirement of this contract that the contractor should provide PRASA with
a detailed safety plan prior to being issued with a site access certificate, in
accordance with the latest version of the OHS Act and the SPK7 and the PRASA
SHE specification.
4.7. General
4.7.1. The Contractor shall ensure that all staff working on or with the contract are
adequately trained, so as to comply with any relevant safety and quality
requirements.
4.7.2. Flagman must be officially trained, evaluated and certified competent, (TETA -
ASSR 463972 (Accreditation no: TETA 1186) and Transnet 407 – Item Number
37/270451 - "Certificate of Competency") by a designated competent person,
before being used on protection duties. This certificate of competency shall
remain valid for two (2) years only after, which re-testing and re-certification of
competency will be required.
4.7.3. Flagmen will be tested by PRASA representative and if found not competent will
06 August 2026_Rev5 of 38
Appointment of a service provider for the supply, delivery
And offloading of ballast in the metrorail gauteng region
not be allowed to form part of the contractor’s team.
4.7.4. PRASA Rail Regional Engineer remains ultimately responsible in terms of the
requirements of Act 85 for the safe working environment of his/her own
personnel as well as contractor's personnel within the track maintenance
environment on his/her region/depot.
4.7.5. The Regional Engineer is therefore also responsible for ensuring that any
changes in the Protection Procedures that may occur over time are effectively
communicated to any flagmen prior to them being used for Protection Duties.
4.8. Method statement
4.8.1. Contractor is requested to submit with their tender a method statement, in it the
following should be outlined in detail:
4.8.1.1. Procedure in carrying out the work (working methods)
4.8.1.2. Technical and Engineering capability (Certificates of key personnel staff)
4.8.1.3. All Resources (Labour, Plant, Equipment, Support and Outside Services) that
the contractor proposes to use in the execution of the works.
4.9. Hours and days of duty / occupation
4.9.1. Work shall proceed during weekdays from 06h00 to 18h00 and or over
weekends from 06h00 to 18h00.
4.9.2. Work outside of normal working hours shall not be paid against overtime rates
unless:
4.9.2.1. Agreed upon by the Project Manager in writing before the start of the any
project task.
4.9.2.2. The contractor can prove PRASA Rail’s accountability for delays resulting
in overtime being required.
06 August 2026_Rev5 of 38
Appointment of a service provider for the supply, delivery
And offloading of ballast in the metrorail gauteng region
4.10. Bonds and guarantees
4.10.1. Surety in the amount equal to either five percent or five percent of the
contract price, as elected by the Contractor, shall be provided by the
Contractor for the due and faithful performance by him in terms of the
Contract. Such security shall be in the form of:
4.10.1.1. Government or approved Municipal stocks in negotiable form, or
4.10.1.2. A deed of suretyship furnished by an approved bank, insurance or
guarantee corporation in such form as may be prescribed by
PRASA, provided however that the Project Manager may, upon
written application by the Contractor, return to the Contractor the
whole or part of such security held by PRASA.
4.10.2. All work done shall be guaranteed for a period of 12 month after the
successful handover.
4.10.3. All completion certificates will be given in writing after all contract obligations
are met and approved by PRASA Project Manager.
4.10.4. Formal completion certificate will be given in writing after all contract
obligations are met and approved by PRASA Project Manager.
4.10.5. Corrective action to be taken by the Contractor during the guarantee period at
his/her own cost and expense.
4.10.6. Project Manager will, where practicable be entitled to take corrective action of
its own should the Contractor not be able to give immediate attention at the
time a fault occurs and recover from the contractor any costs and expenses
reasonably incurred by it in doing so as per penalty clauses.
4.11. Payment certificate
4.11.1. On or after the assessment date, the Supervisor and the Contractor will
together assess the quantities of the progress on each item in the Bill of
Quantities and complete the Progress Assessment Detail form, where
after the Progress Assessment Certificate will be issued.
06 August 2026_Rev5 of 38
Appointment of a service provider for the supply, delivery
And offloading of ballast in the metrorail gauteng region
4.11.2. The Contractor shall then submit a VAT invoice and attach the above
Progress Certificate for payment by the Employer.
4.11.3. Claims for payment will only be made on a monthly basis, and
payments will be made within 30 days of approved invoices.
4.11.4. Contractor to provide the Employer with the necessary details regarding
banking details to enable the Employer to make electronic payments.
4.12. Pricing the works
4.12.1. The contractor is required to provide firm prices/ rates for material and
labor for the duration of the contract.
4.12.2. The Contractor is advised to study the requirements of the SPK 7/1 and
ensure that all works can be completed in accordance with these
requirements.
4.12.3. The contract offer shall be based on the rates as indicated in the bill of
quantities. The quantities shall be agreed during construction per
section.
4.13. Penalties
4.13.1. If the Contractor fails to complete the Services within the time a
stipulated in this Contract for completion of Services or a part or portion
of Services, the Contractor shall be liable to the Employer for an amount
calculated at 0.05% of the Contract Price per delayed Day per order,
which shall be paid for every day which shall elapse between the time
for due completion and completion of the relevant Services. However,
the total amount due under this sub-clause shall not exceed the
maximum of 10% of the Contract Price.
4.13.2. The imposition of such penalty shall not relieve the Contractor from its
obligation to complete Services or from any of its obligations and
liabilities under the Contract,
06 August 2026_Rev5 of 38
Appointment of a service provider for the supply, delivery
And offloading of ballast in the metrorail gauteng region
4.13.3. PRASA may set off or deduct from the fees due to the Contractor any
penalty amounts due and owed by the Contractor in terms of
clause 4.13.1
4.14. Construction related security
4.14.1. Mandatory Security Requirements
4.14.1.1. All security companies used by the Contractor shall be PSIRA registered with valid
letter of good standing.
4.14.1.2. Security personnel shall all be PSIRA registered with a clear criminal record no
criminal pending cases and preferably be sourced from the local community.
4.14.1.3. All security officials utilised in this project shall be South African Citizens.
4.14.1.4. All personnel employed by the Contractor including sub-contractors shall have
undergone a Health and Safety Induction.
4.14.1.5. Permits to work (in line with Covid-19 regulations) shall be issued at the cost of the
contractor to all personnel on that shall be signed and stamped by the authorized
PRASA Official responsible for Risk Management.
4.14.1.6. The security to be provided by the contractor shall be responsible for both the
appointed contractor’s assets and PRASA’s assets on site until the site is handed
over to PRASA. A list of all functioning equipment that do not form part of this scope
of work will be shared with the successful bidder and shall be signed off by both
the successful bidder and PRASA’s representative.
4.14.1.7. PRASA assets that shall be guarded by the contracted security includes Permanent
way assets, All Train Authorisation on track elements, all train stations (with all
assets included) along the section and all functioning equipment along the corridor.
4.14.1.8. Any lost or stolen material shall be replaced by the contractor at his own cost.
4.14.1.9. The contractor shall provide on-site security for personnel and material stock and
should ensure that patrols are in place at the section handed over to the contractor
and until the completed work is handed over to PRASA. No claims of material or
losses shall be lodged with the client for stolen goods during the construction
06 August 2026_Rev5 of 38
Appointment of a service provider for the supply, delivery
And offloading of ballast in the metrorail gauteng region
before the completed work is handed over to PRASA.
4.14.1.10. Furthermore, it is the contractor’s responsibility to ensure that valuable metal i.e.
copper is adequately protected while in transit to and from site.
4.14.1.11. The contractor shall make sure that all material removed from site is quantified,
counted, logged in the site diary and that it is co-signed by a PRASA
representative on site before it is removed from site.
4.14.1.12. Scrap metal removed from the section shall be adequately protected until it is
delivered to PRASA’s stores.
4.14.1.13. PRASA reserves the right to conduct ad-hoc inspections to ensure Compliance.
4.14.2. Risks
4.14.2.1. Tabulated below are the associated security Risks and
proposed mitigation measures. It should be noted that this are
minimum risks identified and bidders shall be responsible for
conducting their own risk assessment that will influence their
quotations.
Risk Probability Mitigation
Project Hi-jacking – Regulation 9 High Social Facilitation to ensure
30% Subcontracting. This includes community involvement and buy in.
the provision of security. PRASA recommends an approach
that involves the local community.
Failure to ensure local involvement
can result in serious work stoppages.
Theft of Installed equipment High Fit for purpose security with an
integrated plan for assets installed
and physical security at site office.
Ensure protective measures for site
with an access gate.
Hi-jacking of site personnel High Armed Escorts to and from the site
vehicles
Armed Robbery of personnel on High Armed Guarding at site and site office
site and Storage Facility at site with an armed response for
mobilisation
06 August 2026_Rev5 of 38
Appointment of a service provider for the supply, delivery
And offloading of ballast in the metrorail gauteng region
4.14.3. Proposed Interventions
4.14.3.1. Minimum of 2 vehicles with armed response officers (2-4) per vehicle
strategically deployed within the site. To supplement the vehicles, a suitable
number of day and night visible officers on foot patrol is required.
4.14.3.2. Requisite equipment:
4.14.3.2.1. Bullet proof vests.
4.14.3.2.2. Spotlights.
4.14.3.2.3. Night vision equipment.
4.14.3.2.4. Torches.
4.14.3.2.5. Tactical Radios (PTT with GPS and Panic Button). This should be
the primary communication for all personnel on site.
4.14.3.2.6. Handcuffs (disposable type) and other standard equipment.
4.14.3.2.7. Firearms with extra magazine.
5.9.1.1.1. Any other equipment identified through the risk assessment.
4.15. Form of contract:
General Condition of Contract (GCC) will be used as form of contract.
4.16. Area of focus: metrorail gauteng region
4.17. Preferred option
This is the latest available preferred option of tackling the problem as also prescribed
or recommended by the Perway Track maintenance manual, Railway Safety
Regulator and the South African National Standards.
4.18. Targeted areas by this project
The targeted area by this project is Metrorail Gauteng Region.
4.19. Extent and coverage of the proposed project
The extent and coverage area is Metrorail Gauteng Region.
4.20. Other related projects
06 August 2026_Rev5 of 38
Appointment of a service provider for the supply, delivery
And offloading of ballast in the metrorail gauteng region
On-track Screening Project
Staff
5.1 Staff requirements
The appointed Contractor will be required to provide qualified and experienced
professional staff with the following key professional expertise:
Project or Contract Manager (Civil).
Plant Operators
Professional Body Registration
Professions: Pr. CPM, CPM and/or Pr. CM, CM and/or Pr. CHSA, CHSO and
Chsm
Details of the minimum qualifications for the technical staff listed above are outlined
in the Technical matrix.
5.1.1. Project or contract manager
The desired minimum qualifications for the Project or Contract Manager are as
follows:
Management.
Professions (SACPCMP) professional registration certification or Project
Management Professional (PMP) Certification.
06 August 2026_Rev5 of 38
Appointment of a service provider for the supply, delivery
And offloading of ballast in the metrorail gauteng region
5.1.2. Plant operators
The desired minimum qualifications for the Health and Safety Officer are as
follows:
6.1.1. The documents forming the contract are to be taken as complimentary to each
other. In case of any discrepancy or inconsistency between contract documents,
the order of precedence will be:
a) SANS 3000-1 to 2, Railway Safety Management.
b) SABS 1200NB Railway Sidings (Track work).
c) EN13674-1, UIC 860-0, UIC 8610-1 or the latest equivalent standard.
d) EN13848 - Railway applications – Track geometry quality or the latest
equivalent standard.
e) Standard specifications E7/1.
f) Safety Arrangements and Procedural Compliance with the Occupational Health
and Safety Act (Act ); PRASA SHE Specification and Applicable
Regulations; including any subsequent amendments.
g) E10: General Specifications for Railway Track work.
h) E10/1: Laying of Rails.
i) E10/2: Laying of sleepers.
j) E10/4: Ballasting and alignment.
k) Manual for Track Maintenance (2000).
l) Railway Safety Regulator Act (Act )
m) Infrastructure Perway Technical Specification for Rails
06 August 2026_Rev5 of 38
Appointment of a service provider for the supply, delivery
And offloading of ballast in the metrorail gauteng region
Contact Information
Source: SCOPE OF WORK Supply and delivery of ballast in the Metrorail Gauteng Region.pdf (RFP)Submission Guidelines
Source: SCOPE OF WORK Supply and delivery of ballast in the Metrorail Gauteng Region.pdf (RFP)Returnable Documents
Source: SCOPE OF WORK Supply and delivery of ballast in the Metrorail Gauteng Region.pdf (RFP)4.2. Deliverables:
4.2.1 The following deliverables are to be provided by the appointed contractor:
4.2.2 Conducting of all ballast test at the Quarry and submit the report to PRASA
and make necessary adjustments before payment can be processed.
Evaluation Criteria
Source: SCOPE OF WORK Supply and delivery of ballast in the Metrorail Gauteng Region.pdf (RFP)Technical Specifications
Source: SCOPE OF WORK Supply and delivery of ballast in the Metrorail Gauteng Region.pdf (RFP)Methodology
Source: SCOPE OF WORK Supply and delivery of ballast in the Metrorail Gauteng Region.pdfIntroduction .............................................................................................................................. 3
Background information ....................................................................................................... 3
Objective of the proposed project ........................................................................................ 5
Scope of works and areas of focus ...................................................................................... 5
Overall staffing and key related proffesional staff .................................................... 27
Technical specifications related to this project: ........................................................... 28
Pricing schedule ...................................................................................................................... 29
CIDB requirements ............................................................................................................... 30
Evaluation methodology ................................................................................................. 30
THE NATIONAL INDUSTRIAL PARTICIPATION PROGRAMME ...... Error! Bookmark not defined.
not be allowed to form part of the contractor’s team.
4.7.4. PRASA Rail Regional Engineer remains ultimately responsible in terms of the
requirements of Act 85 for the safe working environment of his/her own
personnel as well as contractor's personnel within the track maintenance
environment on his/her region/depot.
4.7.5. The Regional Engineer is therefore also responsible for ensuring that any
changes in the Protection Procedures that may occur over time are effectively
communicated to any flagmen prior to them being used for Protection Duties.
4.8. Method statement
4.8.1. Contractor is requested to submit with their tender a method statement, in it the
following should be outlined in detail:
4.8.1.1. Procedure in carrying out the work (working methods)
4.8.1.2. Technical and Engineering capability (Certificates of key personnel staff)
4.8.1.3. All Resources (Labour, Plant, Equipment, Support and Outside Services) that
the contractor proposes to use in the execution of the works.
4.9. Hours and days of duty / occupation
4.9.1. Work shall proceed during weekdays from 06h00 to 18h00 and or over
weekends from 06h00 to 18h00.
4.9.2. Work outside of normal working hours shall not be paid against overtime rates
unless:
4.9.2.1. Agreed upon by the Project Manager in writing before the start of the any
project task.
4.9.2.2. The contractor can prove PRASA Rail’s accountability for delays resulting
in overtime being required.
06 August 2026_Rev5 of 38
Project Hi-jacking – Regulation 9 High Social Facilitation to ensure
30% Subcontracting. This includes community involvement and buy in.
the provision of security. PRASA recommends an approach
that involves the local community.
11.1. Evaluation And Scoring Methodology
Experience & Qualifications
Source: SCOPE OF WORK Supply and delivery of ballast in the Metrorail Gauteng Region.pdffollows:
BSc, B-Tech Degree or National Diploma in Project Management
More than 5 years of post-graduate experience.
Project Management qualification over 5 years’ experience in Project
More than 5 years of leadership experience on similar or related projects;
5.1.2. Plant operators
follows:
Pricing Schedule
Source: SCOPE OF WORK Supply and delivery of ballast in the Metrorail Gauteng Region.pdfItem total (excling
Description unit qty rate
NO. VAT)
1 supply of ballast
1.1 Ballast supplied, m3 5000 R R
loaded and delivered
/km
by road trucks
2 PROVISION OF PLANT (wet rate) - Provisional
2.1 TLB 180 R R R/hr
2.2 Front-end Loader 180 R R R/hr
R r
Sub-total (VAT exclusive)
R r
VAT
R r
TOTAL (VAT Inclusive
NB: Prices remain fixed for the duration of contract.
06 August 2026_Rev5 of 38
Appointment of a service provider for the supply, delivery
And offloading of ballast in the metrorail gauteng region
If YES, what is the applicable Class of Work & Grade?
Class of Work: N/A_
Minimum Grade: N/A_
11.1. Evaluation And Scoring Methodology
The evaluation of the Bids by the evaluation committees will be conducted at various
levels.
The following levels will be applied in the evaluation:
Level description
Verify The Bid is checked for completeness
and whether all required completeness
documentation, certificates; verify
completeness warranties and other Bid
requirements and formalities have
been complied with. Incomplete Bids
will be disqualified.
Verify compliance The Bids are checked to verify that the
essential RFP requirements have been
met. Non-compliant Bids will be
disqualified.
Detailed Detailed analysis of Bids to determine
whether the Bidder is capable of Evaluation of
delivering the Project in terms of
Technical business and technical requirements.
The minimum threshold for
technical evaluation is [80%], any
bidder who fails to meet the
minimum requirement will be
disqualified and not proceed with
the evaluation of Price and Specific
Goals.
Specific Goals Evaluate Specific Goals
06 August 2026_Rev5 of 38
4.1.3.5. Occupation time used by the contractor in excess of the maximum specified
occupation time will not be paid against overtime rates unless:
4.1.3.5.1. The Technical Officer agrees upon it in writing before the start of the occupation.
4.1.3.5.2. It can be proved by the contractor that delays caused by Metrorail resulted in an
overtime claim.
4.1.3.6. Work will be done between trains or under total occupation as will be agreed before
the work commence.
06 August 2026_Rev5 of 38
4.1.5.5. Occupation time used by the contractor in excess of the maximum specified
occupation time will not be paid against overtime rates unless:
4.1.5.5.1. The Technical Officer agrees upon it in writing before the start of the occupation.
06 August 2026_Rev5 of 38
4.3.1.9 Detailed quality management plan clearly stating all the quality management
processes and procedures that the contractor will follow in delivering the
scope of work to PRASA.
4.4. Measurements and payment:
4.4.1. Payments will only be made against completed milestone as per the appointed
contractor’s schedule of works, payment schedule and proposal.
4.4.2. The PRASA Project Manager will certify payments to the appointed
contractor.
4.4.3. The unit of measurement for both working and standing time will be the hour.
4.4.4. Payment will only be made:
4.4.4.1. For total quantity of ballast delivered and spread where required.
4.4.4.2. For actual hours worked at the prices quoted in the Schedule of Rates, for
working time.
4.4.4.3. The unit of measurement will be as per items in the schedule of quantities.
4.4.4.4. No down time claim for inclement weather will be paid.
4.4.4.5. No escalation will be paid. Allowance for escalation cost must be provided for
in the tendered price.
4.4.4.6. The contractor shall submit his/her claim certificate which will be checked and
certified by the Project Manager before payment can be processed. The Project
4.11.3. Claims for payment will only be made on a monthly basis, and
payments will be made within 30 days of approved invoices.
4.11.4. Contractor to provide the Employer with the necessary details regarding
banking details to enable the Employer to make electronic payments.
4.12. Pricing the works
4.12.1. The contractor is required to provide firm prices/ rates for material and
labor for the duration of the contract.
4.12.2. The Contractor is advised to study the requirements of the SPK 7/1 and
ensure that all works can be completed in accordance with these
requirements.
4.12.3. The contract offer shall be based on the rates as indicated in the bill of
quantities. The quantities shall be agreed during construction per
section.
4.13. Penalties
4.13.1. If the Contractor fails to complete the Services within the time a
stipulated in this Contract for completion of Services or a part or portion
of Services, the Contractor shall be liable to the Employer for an amount
calculated at 0.05% of the Contract Price per delayed Day per order,
which shall be paid for every day which shall elapse between the time
for due completion and completion of the relevant Services. However,
the total amount due under this sub-clause shall not exceed the
maximum of 10% of the Contract Price.
4.13.2. The imposition of such penalty shall not relieve the Contractor from its
obligation to complete Services or from any of its obligations and
liabilities under the Contract,
06 August 2026_Rev5 of 38
Item total (excling
Financial Requirements
Source: SCOPE OF WORK Supply and delivery of ballast in the Metrorail Gauteng Region.pdf (RFP)Compliance Requirements
Source: SCOPE OF WORK Supply and delivery of ballast in the Metrorail Gauteng Region.pdf (RFP)Contractual Terms
Source: SCOPE OF WORK Supply and delivery of ballast in the Metrorail Gauteng Region.pdf (RFP)after the Progress Assessment Certificate will be issued.
06 August 2026_Rev5 of 38
4.11.2. The Contractor shall then submit a VAT invoice and attach the above
Section
Source: SCOPE OF WORK Supply and delivery of ballast in the Metrorail Gauteng Region.pdfno longer meets ballast quality requirement.
whether the Bidder is capable of Evaluation of
technical evaluation is [80%], any
the evaluation of Price and Specific
Specific Goals Evaluate Specific Goals
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
CNR LEYDS AND SIMMONDS - BRAAMFONTEIN - JOHANNESBURG - 2001
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
2
Last checked
06 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services: Civil. Unlock full pricing strategies, bid frequency, and historical win rates.