Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
OR Tambo International Airport - - Johann -
Organization Type
GOVERNMENT
Published
07 Aug 2026
OCDS Reference
ocds-9t57fa-164995
Airports company south africa is procuring maintenance and support services for its access control and security verification and validation systems at the western precinct office, or tambo international airport (ortia), cape town international airport (ctia) and all data/wire centres, including upington (upn). The most consequential requirement is that bidders must hold valid original equipment manufacturer (oem) accreditation or authorisation as an approved partner or reseller of the access control devices, and must achieve a minimum functionality score of 70 out of 100 to proceed to price evaluation.
Bidders must hold valid Original Equipment Manufacturer (OEM) accreditation or authorisation confirming they are an approved partner or reseller of the access control devices.
Bidders must submit a completed pricing schedule in Annexure B in full.
Bidders must achieve a minimum functionality score of 70 out of 100 points to be eligible for price and preference evaluation.
Functionality requires reference letters proving experience in support and maintenance of access control systems (minimum 20 units per client) and cargo handheld scanners (minimum 5 units per client), plus previous work value references.
Bidders must submit certified technician CVs and certificates for at least one technician per site: ORTIA Cargo, Wire Centres and Western Precinct; CTIA Cargo and Wire Centres; and Upington Airport (on call-out basis).
Bidders must provide a comprehensive maintenance plan covering checklists, call-out response plans and ongoing support for access control systems at all ACSA airports.
Bids must be submitted by email to [email protected] before 12:00 PM on 27 August 2026; late bids will not be accepted.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Thursday, 27 August 2026 - 12:00
Venue
Teams link
For any queries, please email [email protected]
Categories
Request for Quotation
OR Tambo International Airport - - Johann -
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: CA(SA) - Chartered Accountant, PMI-PMP (Project Management Professional), Prince2 Practitioner, Six Sigma Certification
AI Document Analysis Stages
Description
Source: Annexure A Scope of work.pdf07 Aug
2026
Tender Published
Tender was published
27 Aug
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Annexure A Scope of work.pdf
The Airports Company of South Africa is procuring maintenance and support services for its Access Control and Security Verification and Validation System at Western Precinct Office, ORTIA & CTIA and all data/wire centres. The contract is for a period of 24 months.
Annexure B - Costing per site Maintenance version 1.xlsx
The Airports Company of South Africa is requesting bids for the provision of maintenance and support for Access Control and Security Verification and Validation Systems at various airports, including Western Precinct Office, ORTIA, CTIA, and data/wire centres. The contract requires the provision of minimum resources, including system engineers, senior technicians, and technicians, as well as vehicles, equipment, and consumables.
Request for quotations for the provision of Access Control RFQ 53912 .pdf
Maintenance and support services for the access control and security verification and validation system at Airports Company South Africa sites, including the Western Precinct Office, OR Tambo International Airport (ORTIA), Cape Town International Airport (CTIA), and all data/wire centres (CTIA, ORTIA, UPN).
To download these documents and access AI-powered analysis, visit the main tender page.
Win ACSA tenders with AI Matching Engine, airport-infrastructure intelligence, compliance analysis, and application support for aviation operations.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
R 607 200
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Purpose: Appointment of a service provider for maintenance and support of Access Control and Security Verification and Validation System at Western Precinct Office, ORTIA, CTIA, and all data/wire centres (CTIA, ORTIA, UPN) for 24 months. Includes licensing of handheld scanners (Drivers and Vehicle License Database and eNATIS subscriptions) and procurement of nine (9) replacement handheld scanners.
Background: ACSA implemented Imron/UnityIS Access Control system at Western Precinct, IT Data Centre, and Wire Centres at ORTIA, CTIA, and Upington Airport. Cargo access control uses Gate Book System for driver's license and vehicle disc scanning, and SNIRP for license plate recognition. ACSA and cargo stakeholders use ACSA permit cards and Identity Verification System (IVS) cards. Non-ACSA and non-cargo staff use ID documents, driver's licenses, and passports.
In-scope:
Device inventory (total 253):
Hardware covered: biometric and card readers, door controllers, power supply units, magnetic locks, door contacts, emergency break glass units, door closers, exit push buttons, override locks, door wiring, spike creepers, cargo boom gates and components.
Software covered: Imron IS2000 or DVTel Longitude application, database, backups; Gatebook System application and subscription; SNIPER LPR application and subscription.
Card issuance equipment: Imron Client Software, card printers, card encoders, digital camera.
Servers and applications: verify readers/scanners registered and online, perform server health checks, ensure backups.
Cargo-specific: backup test restore, inspections and repairs, monthly preventative maintenance, quality checks, licensing of handheld scanners and GateBook, SNIP LPR integration with eNATIS, turnstile support, Wi-Fi router/access point/antenna checks, time and identity verification systems, pedestrian permit issuing station and thermal printer, server software application support.
Out of scope: facilities (power, UPS, cooling), storage and servers, infrastructure systems (cable, switches), workstations, mobile app, display screens.
Special instructions:
Important Dates
Source: Annexure A Scope of work.pdf (unknown)Closing time: 12:00 on 27 August 2026.
No other dates (briefings, site visits, clarification deadlines) are stated in the document.
Contact Information
Source: Annexure A Scope of work.pdf (unknown)No specific contact names, emails, or phone numbers are provided in the document. Submission address is not stated.
Submission Guidelines
Source: Annexure A Scope of work.pdf (unknown)Returnable documents: the tender pack includes standard National Treasury forms (SBD/MBD series) covering the invitation to bid, pricing schedules, declarations of interest, preference points, local production, contract forms, past SCM practices, independent bid determination, and authority to sign. All must be completed, signed, and submitted with the bid.
Disqualification risks:
Evaluation Criteria
Source: Annexure A Scope of work.pdf (unknown)Bidders must be registered on the Central Supplier Database (CSD) and have a valid tax clearance certificate. Bidders must comply with the B-BBEE Act and must have a CIDB grading.
Preference points: B-BBEE points claimed under the PPPFA system (80/20 or 90/10). B-BBEE minimum level required is Level 1.
Evaluation stages: The document does not specify a detailed scoring split or minimum qualifying thresholds beyond the compliance requirements above.
Technical Specifications
Source: Annexure A Scope of work.pdf (unknown)Scope: Maintenance and support of the Access Control and Security Verification and Validation System at Western Precinct Office, ORTIA, CTIA, and all data/wire centres (CTIA, ORTIA, UPN). Contract period is 24 months.
Systems in place: Imron/UnityIS Access Control System (fingerprint and identity card authentication); Gate Book System for cargo driver's license and vehicle disc scanning; SNIRP for license plate recognition; Identity Verification System (IVS) cards for cargo stakeholders.
In-scope services:
Device inventory (total 253 devices):
Hardware covered: biometric and card readers, door controllers, power supply units, magnetic locks, door contacts, emergency break glass units, door closers, exit push buttons, override locks, door wiring, spike creepers, cargo boom gates and components.
Software covered: Imron IS2000 or DVTel Longitude application, database, backups; Gatebook System application and subscription; SNIPER LPR application and subscription.
Card issuance equipment: Imron Client Software, card printers, card encoders, digital camera.
Servers and applications: verify readers/scanners registered and online, perform server health checks, ensure backups.
Cargo-specific: backup test restore, inspections and repairs on access control systems/scanners/booms, monthly preventative maintenance (boom gate mechanical arm, motor, spike grippers), quality checks, licensing of handheld scanners and GateBook, SNIP LPR integration with eNATIS, turnstile support, Wi-Fi router/access point/antenna checks, time and identity verification systems, pedestrian permit issuing station and thermal printer, server software application support.
Handheld scanner minimum specifications:
Tools of trade required: laptop, toolbox with digital multi-meter, protective gear, appropriate stepladder (max height 6m).
IMACD: ACSA may require installations, moves, additions, changes, and de-installations of components.
Out of scope: facilities (power, UPS, cooling), storage and servers, infrastructure systems (cable, switches), workstations, mobile app, display screens.
Special instructions:
Service coverage windows:
Personnel requirements:
Equipment and spares:
System documentation: Bidders must provide architectural documents, training manuals, and manuals where necessary.
Maintenance activities:
Reporting:
Methodology
Source: Annexure A Scope of work.pdfMonitoring: Provider shall implement measurement and monitoring tools and produce metrics/reports to measure performance against Service Levels. Upon request for audit, provider must provide ACSA or designees with information and access to tools and procedures used.
Reporting: Provider shall report performance against each SLR monthly, beginning on effective date, with detailed supporting information. Reports must be provided no later than 5 business days after end of measurement interval. Raw data and supporting information are confidential to ACSA.
Root cause analysis: Provider shall promptly investigate and correct Service Level Failures per procedures in the agreement.
Service credits: For each primary service level failure, provider pays/credits ACSA a service credit computed by multiplying weighting factor allocation by at-risk amount.
Personnel methodology:
Service coverage windows:
SLA measurement exclusions: prescheduled outages for preventative maintenance, third-party vendor resolution time, customer facility power/network malfunctions, customer personnel actions, acts of nature.
Quality Management
Source: Annexure A Scope of work.pdfQuality standards: Services delivered per SABS standards, OHS Act, manufacturer's specifications, and statutory regulations.
Quality checks: Perform quality checks and report any potential hazards affecting system/device performance.
Maintenance quality:
Spares and equipment:
System documentation: Bidders must provide architectural documents, training manuals, and manuals where necessary.
Reporting:
Corrective and breakdown maintenance:
Financial Requirements
Source: Annexure A Scope of work.pdf (unknown)Pricing format:
Rate of exchange:
Quotations:
Invoices:
Compliance Requirements
Source: Annexure A Scope of work.pdf (unknown)CSD registration: Bidders must be registered on the Central Supplier Database.
Tax: Valid tax clearance certificate required.
B-BBEE: Compliance with B-BBEE Act required; minimum level 1. Preference points claimed under PPPFA.
CIDB: CIDB grading required.
Safety: Completed safety file for ACSA approval at each airport; personal protective equipment required.
Permits: ACSA permits for all maintenance and project resources; security screening and compulsory airside induction training required (cost for provider).
Non-disclosure: All resources must sign ACSA Non-Disclosure Agreement.
Standards: Services delivered per SABS standards, OHS Act, manufacturer's specifications, and statutory regulations.
Spares: Provider must establish warehouse/safe within 60 days of award for spares storage.
Returnable forms: Standard National Treasury forms (SBD/MBD series) as listed in submission guidelines.
Health & Safety
Source: Annexure A Scope of work.pdfSafety requirements:
Environmental influences:
Personnel safety:
Environmental
Source: Annexure A Scope of work.pdfEnvironmental influences on equipment:
Reliability: Systems must function 24x365; special care needed to protect scanners against excessive wear and tear.
Availability: Equipment lifespan typically 7–10 years; replacement or extension should use identical products in same configuration (form, fit, functionality) for long-term availability.
Contractual Terms
Source: Annexure A Scope of work.pdfContract duration: 24 months.
Service levels: Provider must meet Service Level Requirements (SLRs) with fee reductions for failures. Monthly reporting on compliance. Penalties incurred if SLA times not met. Good performance on one SLA cannot compensate bad performance on another.
Incident priority levels:
Incident response and resolution targets (International Airports, office hours):
After hours and regional airports:
Hardware fix/replacement: in line with hardware support procured by ACSA, 0% (no specific target).
Root cause analysis: report within 48 hours of incident resolution.
Service availability: 24x7x365 requirement. Availability SLR 98% for Priority 1–4 objects. Exclusions: prescheduled outages for preventative maintenance, third-party vendor resolution time, customer facility power/network malfunctions, customer personnel actions, acts of nature.
IMACD SLRs:
Asset tracking SLR:
Configuration management: activities to identify, control, maintain, and verify installed hardware, software, and utility versions.
Service credits: For each primary service level failure, provider pays/credits ACSA a service credit computed by multiplying weighting factor allocation by at-risk amount.
Invoices: must be accompanied by purchase order copy, proof of delivery signed by both parties with serial numbers, asset list in Excel, proof of automated asset tracing activation, and ACSA PO number coded on invoice. Invoices not in dispute paid per payment terms.
Provider liability: liable for any failure to the system that should have been prevented during preventative maintenance.
Provider obligations: maintain asset register, provide system documentation, ensure resources available and reachable, replace absent resources with equally competent stand-ins, complete safety file within first month.
Section
Source: Annexure A Scope of work.pdfThe document does not provide additional evaluation criteria beyond the compliance requirements (CSD registration, valid tax clearance, B-BBEE compliance, CIDB grading) and the standard preference point system. No detailed scoring split or minimum qualifying thresholds are stated.
Description
Source: Annexure B - Costing per site Maintenance version 1.xlsxThe tender is for maintenance and support of access control and security verification and validation systems at multiple sites, including regional airports (George, Kimberly, Bloemfontein, Upington) and major hubs (CTIA, ORTIA, UPN). The costing structure specifies minimum resources and SLA requirements, with a detailed monthly cost breakdown covering personnel, vehicles, office, equipment, training, and insurance.
Evaluation Criteria
Source: Annexure B - Costing per site Maintenance version 1.xlsx (unknown)Returnable forms include SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim), SBD 6.2 (Declaration for Local Production and Content), and other relevant forms. These must be completed and submitted as part of the bid.
Technical Specifications
Source: Annexure B - Costing per site Maintenance version 1.xlsx (unknown)The tender covers maintenance and support for access control and security verification and validation systems at Western Precinct Office, ORTIA, CTIA, and all data/wire centres (CTIA, ORTIA, UPN) at Airports Company South Africa. Pricing is required per site for CTIA, ORTIA, UTN, and WPO, with monthly and annual costs for Year 1 and Year 2, plus an escalation rate. The costing structure includes minimum resource requirements such as technicians (7am to 5pm), assistant technicians, a shared administrator across all 9 sites, vehicles (rental, insurance, fuel, wear and tear), office rental and equipment, PPE, cell phone allowances, radio communications, training and permits (including airside compliance), tools of the trade (laptops, tool sets, power tools, ladders, test equipment), equipment hire (scaffold), cleaning materials, and insurances (public liability, R100,000,000 compulsory airside insurance, asset insurance). Call-out and after-hours rates are required for technicians and assistant technicians, covering normal hours, after hours/Saturday, and Sunday/public holidays. Pricing also includes licence renewals on data application and security verification and validation systems, and training/induction (R2,500 per person) and permits (R270 per person).
Financial Requirements
Source: Annexure B - Costing per site Maintenance version 1.xlsx (unknown)Pricing must be provided per site (CTIA, ORTIA, UTN, WPO) for maintenance and support fees, including monthly and annual totals for Year 1 and Year 2, with an escalation rate. The costing structure includes detailed monthly cost breakdowns for resources, vehicles, office, equipment, PPE, communications, training, tools, and insurances. Budgets are indicated for certain items: office PC and printer (R15,000), laptops and software (R30,000), technician tool sets (R10,000), power tools (R10,000), ladders (R7,000), and specialised test equipment (Link Runner at R60,000 per unit). Compulsory insurance for airside compliance is R100,000,000. Call-out and after-hours rates must be quoted separately.
Compliance Requirements
Source: Annexure B - Costing per site Maintenance version 1.xlsx (unknown)No specific compliance requirements beyond the standard returnable forms (SBD 4, SBD 6.1, SBD 6.2) were identified in the available document.
Description
Source: Request for quotations for the provision of Access Control RFQ 53912 .pdfProvision for maintenance and support for access control and security verification and validation system at Western Precinct Office, ORTIA & CTIA and all data/wire centres (CTIA, ORTIA, UPN) at Airports Company South Africa. Bid number 53912.
Important Dates
Source: Request for quotations for the provision of Access Control RFQ 53912 .pdf (TENDER)Closing date and time: 27 August 2026 at 12:00 PM. Briefing session: 14 August 2026 at 12:00 PM, non-compulsory, held via Microsoft Teams (link, meeting ID, and passcode provided in the document). Site inspection requirements will be provided as part of the specifications.
Briefing Session
Source: Request for quotations for the provision of Access Control RFQ 53912 .pdf (TENDER)Briefing session: 14 August 2026 at 12:00 PM, non-compulsory, held via Microsoft Teams. Meeting link, ID, and passcode provided in the document. Dial-in available. Site inspection requirements will be provided as part of the specifications.
Contact Information
Source: Request for quotations for the provision of Access Control RFQ 53912 .pdf (TENDER)Bidding procedure enquiries: Helen Mahlangu, Buyer, email [email protected]. Bid submission email: [email protected]. ACSA head office: +27 11 723 1400.
Submission Guidelines
Source: Request for quotations for the provision of Access Control RFQ 53912 .pdf (TENDER)Bids must be submitted by email to [email protected] before the closing time. Late bids are not accepted. Bids must be on the official forms provided, not re-typed. The bid document may not be altered; any change leads to disqualification. Bidders may not contact ACSA employees other than the named contact. Returnable forms include SBD 3.3 (priced offer, Annexure B), SBD 4 (Bidder's Disclosure), SBD 6.1 (Preference Points Claim), Declaration of Interest and Politically Exposed Persons form, Confidentiality and Non-Disclosure Agreement, and proof of authority to sign. Missing mandatory documents disqualify the bid.
Returnable Documents
Source: Request for quotations for the provision of Access Control RFQ 53912 .pdf (TENDER)Mandatory and other returnable documents include: SBD 3.3 Priced offer (Annexure B), Original Equipment Manufacturer (OEM) accreditation/authorisation, Valid letter of good standing issued by the Department of Labour, Declaration of Interest Form and Politically Exposed Persons, SBD 4 Bidder's Disclosure Form, SBD 6.1 Preference Points Claim Form, Confidentiality and Non-Disclosure Agreement, BEE Certificate and Scorecard or BBBEE QSE/EME Affidavit, Verifiable medical certificate of report for disability claims, Tax Pin number, Certificate of Incorporation showing ownership split, Central Supplier Database Report (CSD), VAT Questionnaire, ACSA Terms and Conditions. Bidders must ensure all conditions and documents remain valid for the duration of the contract period.
Evaluation Criteria
Source: Request for quotations for the provision of Access Control RFQ 53912 .pdf (TENDER)Evaluation is staged: Stage 1 mandatory requirements (valid OEM accreditation/authorisation as approved partner or reseller of access control devices; completed pricing schedule Annexure B). Stage 2 functionality: minimum threshold of 70 out of 100 points to proceed. Functionality split: Company Experience 60 points (Access Control Systems Support and Maintenance 20, Cargo Handheld Scanners Support and Maintenance 20, Previous Work Value 20) and Resources and Maintenance Plan 40 points (Technicians 20, Maintenance Plan 20). Stage 3 price and preference under the 80/20 system. Stage 4 post-tender negotiations where applicable. Price points formula: Ps = 80(1 - (Pt - Pmin)/Pmin). Preference points for specific goals: B-BBEE status levels 1 to 8 earn 5, 4.5, 4, 3, 2, 0.5, 0.3, 0.1 points respectively; black youth majority-owned, black women majority-owned, and majority-owned by people with disabilities each earn 5 points; non-compliant contributor earns 0.
Technical Specifications
Source: Request for quotations for the provision of Access Control RFQ 53912 .pdf (TENDER)Scope: maintenance and support for access control and security verification and validation systems at Western Precinct Office, ORTIA and CTIA, and all data/wire centres (CTIA, ORTIA, UPN) at Airports Company South Africa. Detailed specifications are in Annexure A (attached).
Methodology
Source: Request for quotations for the provision of Access Control RFQ 53912 .pdfBidders must provide a maintenance schedule plan covering a maintenance checklist, call-out response plan, and ongoing support details for access control systems at all ACSA airports. The plan should include routine checklists, proactive maintenance schedules, detailed call-out response plans, and escalation procedures.
Experience & Qualifications
Source: Request for quotations for the provision of Access Control RFQ 53912 .pdfCompany experience: provide contactable reference letters on company letterheads proving experience in Access Control Systems Support and Maintenance (minimum 20 units per client) and Cargo Handheld Scanners Support and Maintenance (minimum 5 units per client). References must include company/client name, services provided, duration, contact number, email, and be signed by an authorised official. Previous work value: provide references for similar works with supporting documentation (purchase orders or project list) showing scope, site, and value. Technicians: submit comprehensive CVs and copies of access control system certificates for each technician. Required technicians: 1 for ORTIA Cargo, Wire Centres and Western Precinct; 1 for CTIA Cargo and Wire Centres; 1 for Upington Airport (call-out basis). Indicate section and page number for each certificate.
Pricing Schedule
Source: Request for quotations for the provision of Access Control RFQ 53912 .pdfPricing must be submitted on the detailed pricing schedule in Annexure B, completed in full. This is mandatory and part of Stage 1 requirements.
Financial Requirements
Source: Request for quotations for the provision of Access Control RFQ 53912 .pdf (TENDER)Pricing must be submitted on the detailed pricing schedule in Annexure B, completed in full. Prices must remain firm for a validity period of 120 business days. The 80/20 preference point system applies. No other financial requirements are stated.
Compliance Requirements
Source: Request for quotations for the provision of Access Control RFQ 53912 .pdf (TENDER)Mandatory: valid OEM accreditation/authorisation as approved partner or reseller of access control devices. Valid letter of good standing from the Department of Labour. Tax compliance: SARS Tax Compliance Status PIN or CSD number; each consortium/JV/subcontractor party must submit separately. B-BBEE certificate or QSE/EME affidavit. Certificate of Incorporation showing ownership split. CSD report. VAT questionnaire. ACSA Terms and Conditions. SBD 4 (Bidder's Disclosure) and SBD 6.1 (Preference Points Claim) must be completed. Declaration of Interest and Politically Exposed Persons form. Confidentiality and Non-Disclosure Agreement. Proof of authority to sign (e.g., company resolution).
Contractual Terms
Source: Request for quotations for the provision of Access Control RFQ 53912 .pdfValidity period: 120 business days; prices firm during this period. Confidentiality: ACSA will not disclose bidder information without written approval; bidders must not disclose bid information to third parties without ACSA approval, and any third-party consultants must sign confidentiality agreements. ACSA is a National Key Point; bidders may be subject to security vetting, and ACSA may refuse to contract with non-compliant bidders. ACSA reserves rights to award whole or part, split award, negotiate with shortlisted bidders, award to a bidder other than the highest scorer, reject the lowest bid, or cancel the bid.
Special Conditions
Source: Request for quotations for the provision of Access Control RFQ 53912 .pdf (TENDER)ACSA is a National Key Point and must comply with security cluster laws. Bidders may be subjected to security vetting depending on the goods/services. Where deemed necessary, ACSA will not contract with a bidder that does not comply with the security vetting requirement.
Requirements
Source: Request for quotations for the provision of Access Control RFQ 53912 .pdf (TENDER)Mandatory Stage 1 requirements: valid OEM accreditation/authorisation confirming the bidding entity is an approved partner or reseller of access control devices; completed pricing schedule Annexure B.
Section
Source: Request for quotations for the provision of Access Control RFQ 53912 .pdfStaged evaluation: Stage 1 mandatory requirements (OEM accreditation, completed pricing schedule). Stage 2 functionality with minimum 70 points threshold. Functionality criteria: Company Experience (60 points) including Access Control Systems Support and Maintenance (20), Cargo Handheld Scanners Support and Maintenance (20), Previous Work Value (20); Resources and Maintenance Plan (40 points) including Technicians (20) and Maintenance Plan (20). Stage 3 price and preference (80/20). Stage 4 post-tender negotiations where applicable.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
OR Tambo International Airport - - Johann -
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
3
Last checked
07 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services: Professional. Unlock full pricing strategies, bid frequency, and historical win rates.