Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
King Phalo International Airport - - East London -
Organization Type
GOVERNMENT
Published
19 Oct 2026
OCDS Reference
ocds-9t57fa-174604
Airports company south africa requires bidders for airside construction contracts to comply with detailed insurance clauses. The employer arranges principal controlled insurance covering contract works, public liability, aviation liability, and professional indemnity, while the contractor must maintain its own insurances including employer's liability, motor vehicle liability, and buy-down cover for deductibles. The contract applies to awards not exceeding r150 million, with construction periods up to 36 months and defects liability periods up to 24 months. Bidders must accept specified deductibles or obtain buy-down cover, and produce their insurance policies within 28 days of contract commencement.
Contract value: The contract applies only to awards not exceeding R150 million, with construction period not exceeding 36 months and defects liability period not exceeding 24 months.
Deductibles: The contractor is liable for deductibles: R150,000 per occurrence for contract works (R250,000 for testing and commissioning), R75,000 per claim for public liability and lateral support, R25,000 per occurrence for SASRIA theft, R300,000 per aviation liability claim, and R5,000,000 (contracts under R50 million) or R10,000,000 (contracts over R50 million) for professional indemnity.
Buy-down cover: If the contractor finds the employer's deductibles unacceptable, it must obtain buy-down cover to a deductible level it considers acceptable.
Contractor insurances: The contractor must maintain, at its own expense, insurances including employer's liability (minimum R20,000,000), motor vehicle liability (minimum R5,000,000), construction plant and equipment (replacement value), and marine cargo insurance if applicable (CIF plus 10%).
Policy submission: The contractor must produce its insurance policies to the employer within 28 days of contract commencement, with insurers and terms approved by the employer.
Claim notification: On any occurrence likely to give rise to a claim, the contractor must immediately notify the employer and complete the Claims Advice Form (Appendix A), preserving damage and allowing insurer access.
Sub-contractors: The contractor must ensure all sub-contractors are aware of and comply with these insurance clauses, and that they effect similar insurances where applicable.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Date & Time
Thursday, 05 November 2026 - 01:00
Venue
King Phalo
Categories
Request for Quotation
King Phalo International Airport - - East London -
AI Document Analysis Stages
Description
Source: NEC3-ECC_4674 - Road Furniture Replacement.doc (unknown)19 Oct
2026
Tender Published
Tender was published
05 Nov
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
NEC3-ECC_4674 - Road Furniture Replacement.doc
Airports Company South Africa requires a contractor for the replacement of road furniture at King Phalo Airport, East London, under an NEC3 Engineering and Construction Contract for a 24-month period. The contract is a priced contract with a bill of quantities, with work covering both landside and airside areas.
2024 2025 INSURANCE CLAUSES FOR AIRSIDE CONSTRUCTION CONTRACTS LESS THAN R150 MILLION.pdf
Airports Company of South Africa requires replacement of road furniture at an Eastern Cape airport, with insurance obligations for airside construction contracts valued up to R150 million and construction periods up to 36 months.
ANNEXURE A- Bill of Quantities - Rev1.xlsx
Airports Company of South Africa requires the removal and replacement of road furniture, primarily road signs and related signage, across all areas of an airport site in the Eastern Cape. The works include supplying and installing various regulatory, warning, and information signs, as well as associated items such as cones, mirrors, and floor stickers, with all rates to include complete installation.
Request for quotation for the provision of Road sign refurbishment RFQ 11950.pdf
Airports Company South Africa (ACSA) invites tenders for the refurbishment of road furniture (road signs) at King Phalo Airport in the Eastern Cape. The contract covers the design, manufacture, and installation of road signs, with a compulsory site briefing session and a minimum CIDB contractor grading of 3CE required.
To download these documents and access AI-powered analysis, visit the main tender page.
Win ACSA tenders with AI Matching Engine, airport-infrastructure intelligence, compliance analysis, and application support for aviation operations.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 421 507
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Road furniture replacement project at King Phalo Airport for a period of 24 months.
Important Dates
Source: NEC3-ECC_4674 - Road Furniture Replacement.doc (unknown)Closing date: 5 November 2026 at 01:00 (from tender record).
No briefing or site visit dates are stated.
Contact Information
Source: NEC3-ECC_4674 - Road Furniture Replacement.doc (unknown)Employer: Airports Company South Africa SOC Limited
Address: King Phalo Airport, 66 Settlers Way, Greenfields, East London, 5201
Fax: 043 706 0384
Project Manager and Supervisor: Siyanda Ntebe
Address: King Phalo Airport, 66 Settlers Way, Greenfields, East London, 5201
Telephone and email not stated.
Submission Guidelines
Source: NEC3-ECC_4674 - Road Furniture Replacement.doc (unknown)Returnable documents:
Submission method: not stated in the document.
Disqualification risks:
Evaluation Criteria
Source: NEC3-ECC_4674 - Road Furniture Replacement.doc (unknown)Evaluation criteria are not detailed in the document. The contract is a priced contract with a Bill of Quantities (Main Option B). No preference point system (80/20 or 90/10) is stated. No minimum qualifying score is specified.
Technical Specifications
Source: NEC3-ECC_4674 - Road Furniture Replacement.doc (unknown)Scope: Road furniture replacement at King Phalo Airport (landside and airside).
Contract period: 24 months.
Works Information is in Part C3 'Scope of Works'.
Site Information is in Part C4 'Site Information'.
The works include replacement of road furniture; specific quantities and standards are not stated in the extracted text.
Financial Requirements
Source: NEC3-ECC_4674 - Road Furniture Replacement.doc (unknown)Pricing: Priced contract with Bill of Quantities (Main Option B).
Retention: 10% of the contract value (Option X16).
Delay damages: 0.5% per day, up to a maximum of 10% of the contract value (Option X7).
Payment: assessments every 4 weeks; payment within 4 weeks of assessment.
Interest on late payment: prime lending rate of Nedbank.
Insurance: Contractor must provide insurance in joint names covering events at the Contractor's risk from starting date until Defects Certificate or termination certificate. Minimum limit for employee death/injury per COIDA (Act 130 of 1993).
Limitation of liability: Employer's liability for indirect/consequential loss limited to R0.00. Contractor's liability for indirect/consequential loss is nil.
Compliance Requirements
Source: NEC3-ECC_4674 - Road Furniture Replacement.doc (unknown)B-BBEE: Contractor must annually present a compliant B-BBEE certificate; failure is a material breach and may lead to contract cancellation (Z18).
Ethics: Contractor must comply with anti-bribery and corruption laws, including the Prevention and Combating of Corrupt Activities Act 12 of 2004 (Z10).
No CIDB grading, CSD registration, or tax clearance requirements are stated in the document.
Important Dates
Source: Request for quotation for the provision of Road sign refurbishment RFQ 11950.pdf (TENDER)Closing date: 05 November 2026 at 13:00 (South African Time)
Briefing session: 26 October 2026 at 11:00 at King Phalo Airport (compulsory)
Tender documents available from 19 October 2026
Contact Information
Source: Request for quotation for the provision of Road sign refurbishment RFQ 11950.pdf (TENDER)Employer's Agent / Technical Enquiries:
Submission email: [email protected]
Bid box address: [email protected] (email submission)
Site briefing venue: King Phalo Airport
Submission Guidelines
Source: Request for quotation for the provision of Road sign refurbishment RFQ 11950.pdf (TENDER)Submission method: email to [email protected]
Closing time: 05 November 2026 at 13:00 (South African Time)
Bids must be submitted on the official tender documentation issued; re-typed or altered documents are not accepted.
Late bids will not be accepted; ACSA is not liable for late submissions.
Telegraphic, telephonic, telex, facsimile or e-mailed tenders are not accepted (except the required email submission).
Returnable documents must be completed in full and signed; incomplete submissions may be regarded as non-responsive.
Returnable forms include:
Disqualification risks:
Evaluation Criteria
Source: Request for quotation for the provision of Road sign refurbishment RFQ 11950.pdf (TENDER)Evaluation stages:
Technical Specifications
Source: Request for quotation for the provision of Road sign refurbishment RFQ 11950.pdf (TENDER)Scope: Road sign refurbishment at King Phalo Airport.
The work involves signage design, manufacturing and installation (civil works).
Bidders must provide reference letters for previous experience in civil works related to signage.
Site inspection at the briefing requires: ID document or driver's license, safety boots, and reflector vest.
Financial Requirements
Source: Request for quotation for the provision of Road sign refurbishment RFQ 11950.pdf (TENDER)Pricing must be in Rand and include all duties, taxes (except VAT) and levies applicable 14 days before closing.
VAT must be shown separately.
Rates and prices are fixed for the duration of the contract; no contract price adjustments.
Prices remain fixed, final and binding for the full contract duration.
Bid security, bonds, guarantees or insurance requirements are not specified in the provided text; refer to Contract Data.
Compliance Requirements
Source: Request for quotation for the provision of Road sign refurbishment RFQ 11950.pdf (TENDER)CIDB: Contractor grading 3CE or higher (mandatory).
Tax compliance: Submit SARS TCS PIN or CSD number; each party in a consortium/JV/subcontract must submit separate TCS/CSD.
B-BBEE: Preference points claimed based on B-BBEE status level (Level 1 to 8) and ownership categories (black youth, black women, people with disabilities). Proof required: original or certified copy of sworn affidavit or B-BBEE certificate from SANAS accredited agency. Joint ventures must provide consolidated certificate.
Foreign suppliers: Complete the foreign supplier questionnaire; if not resident in RSA, no TCS PIN required.
CSD registration: Required; provide CSD number if no TCS PIN.
No specific local content percentage stated.
Contact Information
Source: 2024 2025 INSURANCE CLAUSES FOR AIRSIDE CONSTRUCTION CONTRACTS LESS THAN R150 MILLION.pdf (unknown)Claim notification contacts:
Evaluation Criteria
Source: 2024 2025 INSURANCE CLAUSES FOR AIRSIDE CONSTRUCTION CONTRACTS LESS THAN R150 MILLION.pdf (unknown)Bidders must be able to comply with the insurance clauses, including accepting the deductibles or obtaining buy-down cover. The contract is limited to projects with an awarded value not exceeding R150 million, construction period not exceeding 36 months, and defects liability period not exceeding 24 months. No other eligibility criteria are stated in the provided document.
Technical Specifications
Source: 2024 2025 INSURANCE CLAUSES FOR AIRSIDE CONSTRUCTION CONTRACTS LESS THAN R150 MILLION.pdf (unknown)The document specifies insurance requirements for airside construction contracts. The Employer (ACSA) effects Principal Controlled Insurance (PCI) covering:
The Contractor must also effect its own insurances:
Financial Requirements
Source: 2024 2025 INSURANCE CLAUSES FOR AIRSIDE CONSTRUCTION CONTRACTS LESS THAN R150 MILLION.pdf (unknown)Deductibles payable by the Contractor:
The Employer pays premiums for PCI; the Contractor bears costs of its own insurances and any buy-down cover.
Compliance Requirements
Source: 2024 2025 INSURANCE CLAUSES FOR AIRSIDE CONSTRUCTION CONTRACTS LESS THAN R150 MILLION.pdf (unknown)Contractor must comply with all terms and conditions of Employer-arranged policies, and must produce its own insurance policies to the Employer within 28 days of contract commencement. Policies must be with insurers and on terms approved by the Employer. Contractor must notify the Employer immediately of any cancellation or restrictive modification of its insurances. Sub-contractors must be made aware of and comply with these insurance clauses.
Contractual Terms
Source: 2024 2025 INSURANCE CLAUSES FOR AIRSIDE CONSTRUCTION CONTRACTS LESS THAN R150 MILLION.pdf (unknown)The contract is limited to airside construction projects with an awarded value not exceeding R150 million, a construction period not exceeding 36 months, and a defects liability period not exceeding 24 months.
The Employer (ACSA) effects Principal Controlled Insurance (PCI) in joint names of Employer, Contractor, and relevant Sub-contractors, covering Contract Works, Contractors Public Liability (R100m limit), Removal of Lateral Support Liability (R50m limit), SASRIA Contract Works (R500m aggregate), Aviation Liability (R2bn limit), and Design & Construct Professional Indemnity (R25m aggregate, shared across all ACSA contracts).
The Contractor must familiarise itself with the Employer-arranged policies, comply with all their terms, and bear the applicable deductibles. The Contractor may obtain buy-down cover for deductibles it considers unacceptable.
In the event of a claim, the Contractor must immediately notify the Employer and the Employer's Insurance Brokers, complete the Claim Advice Form (Appendix A), preserve damage, take photographs, inform police for theft, advise of other insurances, assist insurers, and not proceed with making good loss without prior authorisation. The Contractor must keep separate records of costs.
The Contractor must effect and maintain its own insurances: Construction Plant and Equipment, Employer's Liability (min R20m), Motor Vehicle Liability (min R5m), buy-down cover for deductibles, Marine Cargo (if applicable), and excess Public Liability, Aviation Liability, and Professional Indemnity. Policies must be approved by the Employer and produced within 28 days of contract commencement. If the Contractor fails to maintain required insurances, the Employer may effect them and deduct premiums from amounts due to the Contractor.
The Contractor must ensure all Sub-contractors are aware of and comply with these insurance clauses.
Description
Source: ANNEXURE A- Bill of Quantities - Rev1.xlsx (unknown)The bill of quantities covers the replacement and installation of road furniture, primarily signage and related items, at an ACSA site in the Eastern Cape. The Model Preambles for Trades published by the Association of South African Quantity Surveyors are deemed incorporated; no claims for brevity of description will be entertained.
Submission Guidelines
Source: ANNEXURE A- Bill of Quantities - Rev1.xlsx (unknown)Returnable documents: none specified in the source. Submission method and address not stated in the provided document.
Evaluation Criteria
Source: ANNEXURE A- Bill of Quantities - Rev1.xlsx (unknown)No evaluation criteria are stated in the provided document. The document is a bill of quantities only.
Technical Specifications
Source: ANNEXURE A- Bill of Quantities - Rev1.xlsx (unknown)Scope: replacement and installation of road furniture, primarily signage and related items, at an ACSA (Airports Company of South Africa) site in the Eastern Cape.
Financial Requirements
Source: ANNEXURE A- Bill of Quantities - Rev1.xlsx (unknown)Pricing format: bill of quantities with rates and amounts.
Compliance Requirements
Source: ANNEXURE A- Bill of Quantities - Rev1.xlsx (unknown)No specific compliance requirements (CSD, tax, B-BBEE, CIDB, etc.) are stated in the provided document.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
King Phalo International Airport - - East London -
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
4
Last checked
20 Oct 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Get deep intelligence on Services: General. Unlock full pricing strategies, bid frequency, and historical win rates.
Learn how to submit a winning bid with these related articles
Everything South African general contractors need to know about how to write a winning tender proposal without an in-house bid team in gauteng — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Your meticulously crafted General sector tender submission can be disqualified for a single, seemingly minor compliance oversight. The reality for South African contractors is that technical competence is no longer sufficient; it is underpinned by a non-negotiable framework of documentary compliance. This regulatory guide: mastering CSD and BBBEE compliance for general sector tenders in south africa provides a comprehensive, step-by-step breakdown of the mandatory registrations and certificates you must secure and present. We detail the precise requirements for CSD, BBBEE, SARS TCS, CIPC, and COIDA, explaining their function within the procurement ecosystem governed by the PFMA and PPPFA. Learn the actionable steps to prepare your business, avoid the most common disqualifying errors, and leverage technology to streamline your compliance process for successful bidding in 2026 and beyond.
For South African General contractors, the path to government procurement is paved with non-negotiable regulatory requirements. The most common barrier to entry is not a lack of capability, but a failure to master the foundational compliance frameworks that govern every bid. This complete regulatory guide to CSD and BBBEE compliance for General sector tender suppliers in South Africa demystifies the process. It provides a meticulous, step-by-step field manual for ensuring your company is fully compliant and audit-ready, enabling you to confidently access the R billions in opportunities across infrastructure maintenance, facilities management, and service delivery within the General sector.
This definitive guide provides General sector contractors with the precise, actionable steps required to achieve and maintain CSD and BBBEE compliance for South African public tenders in 2026. Authored by Dr. Sarah Mokwena, a Legal Compliance Specialist, it meticulously walks through the regulatory framework, mandatory registrations, and the critical documentation needed to avoid disqualification. We dissect the common, costly errors made during submission and provide a clear checklist to ensure your bid is responsive and competitive. Learn how to navigate the Central Supplier Database, validate your BBBEE status, and integrate compliance into your tender preparation process.
💡 Want more tendering tips and strategies?
Explore Our Blog