Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Limpopo Operating Unit - Polokwane central - Polokwane - 0699
Organization Type
GOVERNMENT
Published
05 Nov 2026
OCDS Reference
ocds-9t57fa-177074
ESKOM distribution requires 100 qualifying panel contractors for the installation and commissioning of smart meters, data concentrators, ready board retrofits, access covers, insulation piercing connectors, pole top split metering kiosks, and secure pole mount dc kiosks, including decommissioning and disposal of existing meters, in the limlanga cluster, limpopo. The contract runs for 2 years on an as-and-when-required basis. The most consequential bidder consideration is the three-level evaluation process: a pass/fail mandatory returnable check, a functionality score with an 85% minimum threshold, and a physical site assessment of vehicles, tools, and equipment, after which only those passing all levels proceed to contractual evaluation.
Closing: 30 November 2026 at 08:00 SAST; late tenders are rejected and proof of posting is not proof of delivery.
Submission: deliver one original plus one complete hard copy to the address and tender box in the Tender Data, or upload via the Eskom Tender Bulletin e-tendering portal; original and copy must be separately sealed and marked "ORIGINAL" and "COPY" inside a "Confidential" outer package.
Mandatory returnables: Acknowledgement Form and all mandatory tender returnables must be submitted by closing; missing mandatory documents disqualify the bid.
Eligibility: bidders must meet the Tender Data eligibility criteria, must not be restricted from doing business with Eskom or State-Owned Companies, and may not subcontract 100% of the scope.
B-BBEE: if a B-BBEE level is a pre-qualification criterion, a valid certificate, affidavit or CSD report must be submitted at closing or the bid is disqualified; fraudulent or expired proof leads to disqualification and reporting to the B-BBEE Commission.
CIDB: if a CIDB grading is stipulated in the Tender Data, proof of registration is mandatory at closing; proof of application is accepted at closing only if full registration is provided by contract award.
SHEQ: proof of safety, health, environmental and quality systems, policies and capabilities must be provided at closing and/or contract award, with all SHEQ costs and personnel reflected in the tender.
Functionality: if functionality is a criterion, bidders must meet the minimum threshold stated in the Tender Data to proceed to price evaluation.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Check the registered grade against the tender conditions, or estimate a possible grade. Check CIDB registration · Estimate a CIDB grade.
Date & Time
Monday, 30 November 2026 - 10:00
Venue
https://teams.microsoft.com/meet/325305718013520?p=OyR0ZOXKmyS6rY54HE
Request for Bid(Open-Tender)
Limpopo Operating Unit - Polokwane central - Polokwane - 0699
Recommended Certifications
Having these can improve your winning chances: NERSA Registration, PV GreenCard (Solar Installation)
AI Document Analysis Stages
Description
05 Nov
2026
Tender Published
Tender was published
30 Nov
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Annexure N - Technical Evaluation Criteria SI LC 399 for Smart Meters and its Accessories Rev 1 Revised 11082026.pdf
Appointment of 100 qualifying panel contractors for the installation of smart meters, data concentrators, ready board retrofits, access covers, insulation piercing connectors, pole top split metering kiosks, secure pole mount DC kiosks and associated accessories, including decommissioning, scrapping and disposal of existing meters, for Eskom's Distribution Division in the LimLanga cluster, Limpopo, for a period of two years.
SDLI Strategy Setting for Bidders - Smart Meter Installation.pdf
Supply and delivery of smart meters, data concentrators, ready board retrofit, access covers, insulation piercing connector, pole top split metering kiosks, secure pole mount DC kiosk and associated accessories, including decommissioning, scrapping and disposal of existing meters, is procured through appointment of up to 100 qualifying panel contractors. The work is for the Distribution Division in the LimLanga cluster for a period of two years.
Annexure K -Occupational Health and Safety Requirements for Smart Meter Project.pdf
The department requires the appointment of 100 qualifying panel contractors to install smart meters, data concentrators, ready board retrofits, access covers, insulation‑piercing connectors, pole‑top split metering kiosks, secure pole‑mount DC kiosks and all associated accessories, and to decommission, scrap and dispose of existing meters for the Distribution Division in the LimLanga cluster, Limpopo, for a two‑year period.
240-68099512 (Rev 9) Form A- SMART Meters.pdf
Eskom requires 100 qualifying panel contractors for the installation of smart meters, data concentrators, ready board retrofits, access covers, insulation piercing connectors (IPCs), pole top split metering kiosks, secure pole mount DC kiosks and associated accessories, including decommissioning, scrapping and disposal of existing meters, for the Distribution Division in the LimLanga cluster over a 2-year period.
Invitation to Tender (ITT) - Installation of Smart Meter.pdf
Eskom requires the appointment of 100 qualifying panel contractors to install smart meters, data concentrators, ready board retrofits, access covers, insulation piercing connectors, pole-top split metering kiosks, secure pole-mount DC kiosks and associated accessories, including decommissioning, scrapping and disposal of existing meters, for the Distribution Division in the LimLanga cluster over a 2-year period.
Eskom - Standard Conditions of Tender - Rev 12.pdf
Installation of smart meters, data concentrators, ready board retrofits, access covers, insulation piercing connectors, pole top split metering kiosks, secure pole mount DC kiosks and associated accessories, including decommissioning, scrapping and disposal of existing meters, for Eskom's Distribution Division in the LimLanga cluster, Limpopo, over a two-year period. The appointment covers 100 qualifying panel contractors.
NEC ECC3 _Smart Meter Installation 13.10.2026 .docx
Eskom requires the appointment of 100 qualifying panel contractors to install smart meters, data concentrators, ready board retrofits, access covers, insulation piercing connectors, pole top split metering kiosks and secure pole mount DC kiosks, with all associated accessories, including decommissioning, scrapping and disposal of existing meters, for the Distribution Division in the LimLanga cluster over a 2-year period.
Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024 (1).docx
The appointment of 100 qualifying panel contractors for the installation of smart meters, data concentrators, ready board retrofits, access covers, insulation piercing connectors (IPC), pole top split metering kiosks, secure pole mount DC kiosks, and associated accessories, including the decommissioning, scrapping, and disposal of existing meters in the LimLanga cluster for a period of two years. Bidders must enter into a Confidentiality Agreement with Eskom Holdings SOC Ltd to receive disclosures of confidential project information and participate in the tender process, which closes on 30 November 2026 at 10:00 AM.
240-77471499 Annexure B Eskom Acknowledgement Form for OHS Legal and Other Requirements - Rev 4.docx
The appointment of 100 qualifying panel contractors is requested for the installation of smart meters, data concentrators, ready board retrofits, access covers, insulation piercing connectors, pole top split metering kiosks, secure pole mount DC kiosks, and associated accessories. The scope also includes the decommissioning, scrapping, and disposal of existing meters for the Distribution Division in the LimLanga cluster over a two-year period.
BOQ for Smart Meters labour contract LimLanga cluster 13.10.2026.xlsx
Installation of smart meters, data concentrators, ready board retrofits, access covers, insulation piercing connectors, pole top split metering kiosks, secure pole mount DC kiosks and associated accessories, including decommissioning, scrapping and disposal of existing meters, for Eskom's Distribution Division in the LimLanga cluster, Limpopo, over a two-year period. The appointment covers 100 qualifying panel contractors.
Annexure L - Environmental Tender Requirements -Installlation of Smart Meters.pdf
The department requires the appointment of 100 qualifying panel contractors to install smart meters, data concentrators, retrofits, access covers, IPCs, pole‑top split metering kiosks, secure pole‑mount DC kiosks and all associated accessories, including decommissioning, scrapping and disposal of existing meters for the LimLanga cluster distribution network in Limpopo for a two‑year period.
LIST OF PREVETTED GUARANTORS 30 Sep 24.pdf
The department requires the appointment of 100 qualifying panel contractors to install smart meters, data concentrators, ready board retrofits, access covers, insulation piercing connectors (IPC), pole top split metering kiosks, secure pole mount DC kiosks, and handle decommissioning, scrapping and disposal of existing meters for the Distribution Division in the LimLanga cluster for a period of 2 years.
Contractors training dates - Environmental.pptx
The installation of smart meters, data concentrators, ready board retrofit, access covers, insulation piercing connector (IPC), pole top split metering kiosks, secure pole mount DC kiosk and associated accessories, including decommissioning, scrapping and disposal of existing meters, is procured through appointment of 100 qualifying panel contractors. The work is for the Distribution Division in the LimLanga cluster for a period of two years.
Annexure M -SCOPE OF WORK-SMART METER REPLACEMENT - LIMLANGA CLUSTER 559-1826396412.pdf
The department requires the appointment of 100 qualifying panel contractors to install smart meters, data concentrators, ready board retrofit, access covers, IPC, pole top split metering kiosks, secure pole mount DC kiosk and associated accessories, and to decommission, scrap and dispose of existing meters for the Distribution Division in the LimLanga cluster for a period of 2 years. The contract covers a 2‑year period in the LimLanga cluster.
Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.xls
Eskom requires a panel of 100 qualifying contractors to install smart meters, data concentrators, ready board retrofits, access covers, insulation piercing connectors, pole-top split metering kiosks and secure pole-mount DC kiosks, with associated accessories, and to decommission, scrap and dispose of existing meters for the Distribution Division in the LimLanga cluster over a 2-year period.
240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf
Eskom requires the appointment of 100 qualifying panel contractors for the installation of smart meters, data concentrators, ready board retrofits, access covers, insulation piercing connectors, pole-top split metering kiosks, secure pole-mount DC kiosks and associated accessories, including decommissioning, scrapping and disposal of existing meters, for the Distribution Division in the LimLanga cluster over a 2-year period.
E-tendering Help Manual for supplier - 27 January 2025 (1).docx
Installation of smart meters, data concentrators, ready board retrofit, access covers, insulation piercing connector, pole top split metering kiosks, secure pole mount DC kiosk and associated accessories, including decommissioning, scrapping and disposal of existing meters, for the Distribution Division in the LimLanga cluster. The appointment of 100 qualifying panel contractors is required for a period of two years.
Contract Quality Plan (CQP) Template.docx
Eskom requires the appointment of 100 qualifying panel contractors to install smart meters, data concentrators, ready board retrofits, access covers, insulation piercing connectors, pole top split metering kiosks, secure pole mount DC kiosks and associated accessories in the LimLanga cluster, Limpopo, including decommissioning, scrapping and disposal of existing meters, for a period of two years.
Quality Control Plan or Inspection Test Plan (QCP or ITP) Template.docx
E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.docx
Eskom requires the appointment of 100 qualifying panel contractors for the installation of smart meters, data concentrators, ready board retrofits, access covers, insulation piercing connectors (IPCs), pole top split metering kiosks, secure pole mount DC kiosks and associated accessories, including decommissioning, scrapping and disposal of existing meters, for the Distribution Division in the LimLanga cluster over a 2-year period.
Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.doc
Eskom requires the appointment of 100 qualifying panel contractors for the installation of smart meters, data concentrators, ready board retrofits, access covers, insulation piercing connectors, pole top split metering kiosks, secure pole mount DC kiosks and associated accessories, including the decommissioning, scrapping and disposal of existing meters. The work is for the Distribution Division in the LimLanga cluster in Limpopo for a period of 2 years.
240-12248652 (Rev7) List of Tender returnables_ Installation of Smart Meters.pdf
Eskom requires the appointment of 100 qualifying panel contractors to install smart meters, data concentrators, ready board retrofits, access covers, insulation piercing connectors, pole top split metering kiosks, secure pole mount DC kiosks and associated accessories, including decommissioning, scrapping and disposal of existing meters, for the Distribution Division in the LimLanga cluster on an as-and-when-required basis.
Clarification meeting link.docx
ESKOM is procuring 100 qualifying panel contractors to install smart meters, data concentrators, ready board retrofits, access covers, insulation piercing connectors (IPC), pole top split metering kiosks, and secure pole mount DC kiosks, along with decommissioning, scrapping, and disposal of existing meters for the Distribution Division in the LimLanga cluster over a 2-year period. This work is specifically targeted at the Limpopo province's Distribution Division.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
EskomWin Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 6 347 006
Range
Based on 19 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Supplier Quality Management Specification QM 58, document identifier 240-105658000, Revision 4.
Evaluation Criteria
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)Evaluation is based on supplier quality requirements organised into four categories (Category 1 to Category 4).
Technical Specifications
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)Suppliers must develop, implement, maintain and continually improve a quality management system (QMS) conforming to ISO 9001.
Methodology
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfThe supplier must deploy a documented programme for pre-operation preservation of quality requirements covering bulk materials, consumable items, equipment systems, system components and other procured materials or equipment transferred to project control but not yet deployed for operational purposes.
Quality Management
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfSuppliers must develop, implement, maintain and continually improve a formal QMS conforming to the latest ISO 9001 standard or any applicable QMS standard.
Compliance Requirements
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)Compliance is based on four quality categories (Category 1 to Category 4), with the applicable category indicated in Form A.
Contractual Terms
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfStandard conditions include rights of access, Eskom rights to information, preservation, quality audits, management of nonconformities, and special processes.
Section
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfQuality requirements are classified into four categories (Category 1 to Category 4).
Description
Source: Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024 (1).docxEskom Holdings SOC Ltd is a South African company (registration number 2002/015527/06) with its registered office at Megawatt Park, Maxwell Drive, Sunninghill ext.3, Sandton.
Important Dates
Source: Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024 (1).docx (unknown)Closing: 30 November 2026 at 08:00
Technical Specifications
Source: Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024 (1).docx (unknown)Scope: Installation of smart meters, data concentrators, ready board retrofits, access covers, insulation piercing connectors (IPC), pole top split metering kiosks, secure pole mount DC kiosks and associated accessories including decommissioning, scrapping and disposal of existing meters for the Distribution Division in the LimLanga cluster
Description
Source: BOQ for Smart Meters labour contract LimLanga cluster 13.10.2026.xlsxThe provided document is a Bill of Quantities (BOQ) spreadsheet containing historical customer data for the Eastern Cape region (customer counts by type, meter reading statistics, estimation percentages, and field activity backlogs). It does not contain tender-specific requirements, evaluation criteria, submission instructions, or contractual terms.
Important Dates
Source: BOQ for Smart Meters labour contract LimLanga cluster 13.10.2026.xlsx (unknown)Closing date: 30 November 2026 at 08:00
Technical Specifications
Source: BOQ for Smart Meters labour contract LimLanga cluster 13.10.2026.xlsx (unknown)Scope: Appointment of 100 qualifying panel contractors for installation of smart meters, data concentrators, ready board retrofit, access covers, insulation piercing connectors (IPC), pole-top split metering kiosks, secure pole mount DC kiosks and all associated accessories including decommissioning, scrapping and disposal of existing meters for the Distribution Division in the LimLanga cluster for a period of 2 years.
Technical Specifications
Source: Annexure M -SCOPE OF WORK-SMART METER REPLACEMENT - LIMLANGA CLUSTER 559-1826396412.pdf (unknown)Scope of work
Compliance Requirements
Source: Annexure M -SCOPE OF WORK-SMART METER REPLACEMENT - LIMLANGA CLUSTER 559-1826396412.pdf (unknown)Eligibility
Submission Guidelines
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.xls (unknown)Closing time: 08:00 on 30 November 2026
Technical Specifications
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.xls (unknown)Scope: Installation of smart meters, data concentrators, ready board retrofit, access covers, insulation piercing connectors (IPC), pole top split metering kiosks, secure pole mount DC kiosks and associated accessories including decommissioning, scrapping and disposal of existing meters
Quantity: 100 qualifying panel contractors
Location: LimLanga cluster, Distribution Division
Duration: 2 years
Compliance Requirements
Source: 240-77471499 Annexure B Eskom Acknowledgement Form for OHS Legal and Other Requirements - Rev 4.docx (unknown)OHS legislation
Eskom alignment after award
Induction
Contractor and supplier management
Penalties
References
Returnable form
Description
Source: 240-12248652 (Rev7) List of Tender returnables_ Installation of Smart Meters.pdfControl of externally provided processes: Document criteria for evaluation, selection, monitoring of performance, and re-evaluation of external providers as required by ISO 9001:2015 Clause 8.4.
Evaluation Criteria
Source: 240-12248652 (Rev7) List of Tender returnables_ Installation of Smart Meters.pdf (TENDER)Bidders must submit documented evidence of a quality management system compliant with ISO 9001; certification is not mandatory.
Five quality returnable sections are evaluated:
Technical Specifications
Source: 240-12248652 (Rev7) List of Tender returnables_ Installation of Smart Meters.pdf (TENDER)Scope: Installation of smart meters, data concentrators, ready board retrofit, access covers, insulation piercing connector (IPC), pole top split metering kiosks, secure pole mount DC kiosks and all associated accessories for the Distribution Division in the LimLanga cluster.
Deliverables: Decommissioning, scrapping and disposal of existing meters; installation of new metering equipment.
Contract period: 60 months on an 'as and when' basis.
Quality management: Compliance with ISO 9001 quality management system; five returnable quality sections evaluated (A through E).
Externally provided processes: Document criteria for evaluation, selection, monitoring of performance, and re-evaluation of external providers per ISO 9001:2015 Clause 8.4.
Description
Source: Clarification meeting link.docxClarification meeting
Technical Specifications
Source: Clarification meeting link.docx (unknown)Scope
Submission Guidelines
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.docx (unknown)Mandatory returnable
Disqualification
Evaluation Criteria
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.docx (unknown)Mandatory returnable
Disqualification
Compliance Requirements
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.docx (unknown)Mandatory compliance
Description
Source: Contract Quality Plan (CQP) Template.docxThis document is a Contract Quality Plan (CQP) template based on SANS 466:2005 and ISO 10005:2005. It provides a structured framework for suppliers to identify and plan for meeting Eskom's quality management expectations and contract requirements. The template covers definitions, scope of work, communication channels, organogram, interfacing documents, supplier/sub-supplier lists, monitoring, QMS interfaces, item indices, QCP/ITP requirements, special controls, documented information submission, records control, concession and non-conformance management, databook management, tools and equipment management, customer property handling, product preservation, identification and traceability, and commissioning/post-delivery activities. It includes sign-off sections for the supplier and Eskom, to be completed during tender evaluation (Rev 0) and after contract award (Rev 1).
Technical Specifications
Source: Contract Quality Plan (CQP) Template.docx (unknown)Quality Plan Requirements
Scope of work (full description per NEC/FIDIC)
Communication channels between supplier and Eskom (documentation, meetings, reporting)
Organogram with roles, responsibilities, QA/QC functions, personnel qualifications
Index of interfacing documents (processes, standards, codes, specifications, work instructions, policies, procedures, drawings)
List of suppliers and sub-suppliers for materials, components, and outsourced activities
Monitoring plan for suppliers/contractors/sub-suppliers
Interface of sub-supplier QMS with supplier QMS
Index of items to be manufactured, refurbished, or newly purchased (with descriptions, production schedule, in-house/outsourced)
Items/activities requiring Quality Control Plans (QCP) or Inspection Test Plans (ITP) offsite and onsite
Scope areas requiring special controls (e.g., welding, NDT/NDE) with quality control activities
Index of documented information to be submitted to Eskom (technical records, inspection reports, signed QCPs, warranties, certificates, test reports)
Records control and retention methodology
Concession and non-conformance management processes (concession, defect/repair/rework, inspection management)
Databook management process (if applicable) including review, acceptance, purchase orders for quality-critical items
Management of working tools and equipment (list, calibration/maintenance/test status)
Customer property handling process per ISO 9001
Product preservation process (identification, handling, contamination control, packaging, storage, transportation, protection)
Identification and traceability methods for statutory/regulatory requirements
Commissioning and post-delivery activities (warranty, customer satisfaction, technical support, defect correction, retention funds)
Evaluation Criteria
Source: LIST OF PREVETTED GUARANTORS 30 Sep 24.pdf (unknown)Evaluation criteria:\n- Pre-vetted guarantor: Bidders must be from the pre-vetted guarantor list (banks and insurance companies) with available credit limit\n- Treasury vetting: Guarantees from entities not on the pre-vetted list require Treasury vetting, which can take up to 12 weeks\n- Credit rating thresholds: Minimum credit rating required - national scale za.A- or A3.za; foreign currency rating BBB- or Baa3\n- Non-responsive: Failure to provide an acceptable guarantee results in the bid being marked non-responsive and excluded from evaluation
Contractual Terms
Source: LIST OF PREVETTED GUARANTORS 30 Sep 24.pdfContractual terms for guarantees:\n- Entities not on the pre-vetted guarantor list are subject to Treasury vetting, which can take up to 12 weeks\n- Guarantee acceptance is subject to confirmation of available credit limit for the entity\n- The pre-vetted guarantor list is revised monthly\n- Failure to provide an acceptable guarantee results in the bid being marked non-responsive
Section
Source: LIST OF PREVETTED GUARANTORS 30 Sep 24.pdfVetting process: At evaluation end, the entity may be deemed unacceptable for various reasons. If Treasury does not accept the guarantee, the bid becomes non-responsive due to lack of an acceptable guarantee.
Description
Source: Annexure L - Environmental Tender Requirements -Installlation of Smart Meters.pdfAppointment of an environmental management representative: submit a signed appointment letter for the person responsible for environmental management, relevant to the scope of work. The appointment must be signed by the employer and accepted by the appointee.
Compliance Requirements
Source: Annexure L - Environmental Tender Requirements -Installlation of Smart Meters.pdf (unknown)Environmental compliance requirements — each requirement is scored 1 (yes) or 0 (no):
Health & Safety
Source: Annexure L - Environmental Tender Requirements -Installlation of Smart Meters.pdfEmergency preparedness plan (EPP): submit a procedure or plan detailing how environmental emergencies, such as bee, wasp or snake encounters in the work environment, will be addressed. The plan must include emergency contact details.
Health & Safety
Source: Annexure K -Occupational Health and Safety Requirements for Smart Meter Project.pdfOHS Legal Requirements for Tender Responsiveness (must be submitted with bid):
Submission Guidelines
Source: NEC ECC3 _Smart Meter Installation 13.10.2026 .docx (unknown)Returnable documents — complete, sign and submit with the bid:
Securities and insurance:
Evaluation Criteria
Source: NEC ECC3 _Smart Meter Installation 13.10.2026 .docx (unknown)Evaluation is by a preference point system based on specific goals. B-BBEE evidence is a condition of contract award.
B-BBEE evidence required:
Mandatory B-BBEE migration milestones (non-negotiable):
Subcontracting:
Other conditions:
Technical Specifications
Source: NEC ECC3 _Smart Meter Installation 13.10.2026 .docx (unknown)Scope — appointment of 100 qualifying panel contractors for a 2-year period for the Distribution Division in the LimLanga cluster.
Works include:
Meter and kiosk work:
Data concentrators:
Small power user (SPU) work:
Testing, commissioning and close-out:
Standards and compliance:
Financial Requirements
Source: NEC ECC3 _Smart Meter Installation 13.10.2026 .docx (unknown)Pricing method:
Retention and penalties:
Payment and tax:
Bonds and guarantees:
Other:
Compliance Requirements
Source: NEC ECC3 _Smart Meter Installation 13.10.2026 .docx (unknown)Registration and certification:
Construction standards:
Description
Source: E-tendering Help Manual for supplier - 27 January 2025 (1).docxElectronic tender submission platform for document upload. Replaces previous manual submission at Eskom offices. Bidder registration required before access. One-time pin sent to registered cell phone and email for verification.
Submission Guidelines
Source: E-tendering Help Manual for supplier - 27 January 2025 (1).docx (unknown)Submission must be made electronically via Eskom eTendering system.
Bidders register on system and complete OTP verification (sent to cell phone and email).
Tender reference number selected and documents uploaded in correct categories (Technical, Commercial, Finance).
Individual file size limited to 50MB, total submission capped at 900MB.
Documents named prior to upload.
System records submission timestamp upon finalization.
Email confirmation sent on completion.
Evaluation Criteria
Source: E-tendering Help Manual for supplier - 27 January 2025 (1).docx (unknown)CSD number required for eTendering system access.
Description
Source: SDLI Strategy Setting for Bidders - Smart Meter Installation.pdfSDL&I objectives form part of contractual obligations but do not affect scoring.
2.1 Skills Development: Tenderers must submit proposals for developing skills of unemployed candidates (target: Smart Meter Installer). Candidates from all provinces representative of South African demographics, excluding Eskom employees and registered learners. Tenderers bear full cost and advised to approach relevant SETAs for grants, subsidies, and incentives including SARS tax rebates.
2.2 Jobs: Tenderers must submit proposals for type and number of jobs created and retained in South Africa. Communities local to site prioritized for employment; all unskilled labourers sourced from areas local to site.
Evaluation Criteria
Source: SDLI Strategy Setting for Bidders - Smart Meter Installation.pdf (unknown)Evaluation is based on price and specific goals.
B-BBEE Status Level of Contributor under the 90/10 system awards specific goal points: Level 1 = 10 points, Level 2 = 9 points, Level 3 = 6 points, Level 4 = 5 points, Level 5 = 4 points, Level 6 = 3 points, Level 7 = 2 points, Level 8 = 1 point, Non-compliant = 0.
Maximum 10 specific goal points added to price points; total rounded to nearest two decimal places.
Contract awarded to tenderer scoring highest total points.
Bidders failing to provide B-BBEE documentation score 0 points out of 10 for specific goals but may score out of 90 for price.
Technical Specifications
Source: SDLI Strategy Setting for Bidders - Smart Meter Installation.pdf (unknown)Installation of smart meters, data concentrators, ready board retrofit, access covers, insulation piercing connector (IPC), pole top split metering kiosks, secure pole mount DC kiosk and all associated accessories including decommissioning, scrapping and disposal of existing meters. Location: Distribution Division in LimLanga cluster. Contract duration: 2 years.
Methodology
Source: SDLI Strategy Setting for Bidders - Smart Meter Installation.pdfTenderers must submit proposals for skills development of unemployed candidates through their supply network, with SETA accredited training providers able to participate.
Targets categorically exclude Eskom employees and registered learners.
Tenderers bear full cost of skills development and advised to approach relevant SETAs for grants, subsidies, and incentives including SARS tax rebates earmarked for skills development.
Tenderers must also submit proposals for type and number of jobs to be created and retained in South Africa, with communities local to site prioritized for employment and all unskilled labourers sourced from areas local to site.
Financial Requirements
Source: SDLI Strategy Setting for Bidders - Smart Meter Installation.pdf (unknown)2.5% penalty of invoice amount for SDL&I non-compliance.
2.5% penalty of Order Value for SDL&I non-compliance.
2.5% retention of every invoice (excluding VAT) retained for SDL&I obligation fulfilment, released upon receipt of SDL&I progress reports, fulfilment of all SDL&I obligations, and submission of approved compliance report.
SDL&I Implementation Schedule due 28 days after contract award. No explicit bid security, guarantees, payment terms, or financial capacity thresholds stated.
Compliance Requirements
Source: SDLI Strategy Setting for Bidders - Smart Meter Installation.pdf (unknown)Valid B-BBEE certificate from SANAS accredited verification agency, or sworn affidavit/CIPS affidavit required to claim preference points.
Required documentation: proof of ownership/shareholding (CIPC documentation with shareholding breakdown), certified ID copies of shareholders, proof of disability (where applicable).
B-BBEE Status Level determines specific goal points (90/10 system): Level 1 = 10 points, Level 2 = 9, Level 3 = 6, Level 4 = 5, Level 5 = 4, Level 6 = 3, Level 7 = 2, Level 8 = 1, Non-compliant = 0.
SDL&I obligations: 2.5% penalty of invoice amount and Order Value for non-compliance; 2.5% retention of every invoice (excluding VAT) for SDL&I fulfilment, released upon progress reports and approved compliance report; SDL&I Implementation Schedule due 28 days after contract award. Tenderers must submit proposals for skills development of unemployed candidates (target: Smart Meter Installer) and for jobs created and retained in South Africa, with communities local to site prioritized for employment.
Health & Safety
Source: SDLI Strategy Setting for Bidders - Smart Meter Installation.pdfAffidavit validity requirements:
Name/s of deponent as they appear in identity document and identity number required.
Designation of deponent as director, owner or member must be indicated to confirm duly authorised person.
Name of enterprise as per CIPC registration documents with enterprise business address.
Percentage of black ownership, black female ownership and designated group must be reflected (no blank spaces).
Total revenue for year under review must be indicated with basis (audited financial statements or management account) specified.
Financial year end as per enterprise registration documents (day/month/year).
B-BBEE Status level must be selected (only one level allowed).
Empowering supplier status must be indicated for QSEs.
Date of deponent signature and Commissioner of Oath signature must be same day.
Commissioner of Oath must be independent of enterprise (cannot be employee or ex officio).
Sworn affidavit must be signed in presence of Commissioner of Oath, who must also sign and stamp.
Section
Source: SDLI Strategy Setting for Bidders - Smart Meter Installation.pdfMaximum 10 points for specific goal.
Points allocated based on B-BBEE Status Level under 90/10 system (Level 1=10 points, Level 2=9, Level 3=6, Level 4=5, Level 5=4, Level 6=3, Level 7=2, Level 8=1, Non-compliant=0).
Specific goal points added to price points; total rounded to nearest two decimal places.
Contract awarded to tenderer scoring highest total points.
Documentation required: valid B-BBEE certificate from SANAS accredited verification agency, or sworn affidavit/CIPS affidavit, proof of ownership/shareholding (CIPC documentation with breakdown), certified ID copies of shareholders, proof of disability (where applicable).
Bidders failing to provide documentation score 0 points out of 10 for specific goals but may score out of 90 for price.
Evaluation Criteria
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.doc (unknown)Bidder must be a Company, Close Corporation, Trust or Individual.
Must be Resident of South Africa in terms of Income Tax Act (non-residents sign Appendix 9 and refer to Eskom Group Tax Department in Megawatt Park).
To claim employees exclusion: employ three or more full-time employees who are not connected persons (Appendix 1 affidavit required).
No more than 80% of income may be from one client or associated institution (Appendix 4 affidavit required).
Duties must not be performed mainly at Eskom premises and bidder must not be subject to Eskom's control or supervision (Appendix 3 affidavit required).
Failure to sign required affidavits or declarations results in PAYE being withheld from payments.
Technical Specifications
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.doc (unknown)Scope: Appointment of 100 qualifying panel contractors for installation of smart meters, data concentrators, ready board retrofit, access covers, insulation piercing connector (IPC), pole top split metering kiosks, secure pole mount DC kiosk and all associated accessories.
Includes decommissioning, scrapping and disposal of existing meters.
Location: Distribution Division in LimLanga cluster.
Contract period: 2 years.
Compliance Requirements
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.doc (unknown)Must complete either Evaluation Pack A (companies/CCs/trusts) or Evaluation Pack B (individuals).
Must be Resident of South Africa in terms of Income Tax Act (non-residents sign Appendix 9 and refer to Eskom Group Tax Department in Megawatt Park).
Employ three or more full-time employees who are not connected persons (Appendix 1 affidavit required).
No more than 80% of income from one client or associated institution (Appendix 4 affidavit required).
Duties must not be performed mainly at Eskom premises and not subject to Eskom's control or supervision (Appendix 3 affidavit required).
Non-residents: Appendix 9 required.
All questions must be answered truthfully.
Based on 2026/2027 tax legislation.
Important Dates
Source: Invitation to Tender (ITT) - Installation of Smart Meter.pdf (RFP)Closing date and time: 30 November 2026 at 10:00
Non-compulsory clarification meeting: 13 November 2026 at 10:00 via Microsoft Teams (Meeting ID: 325 305 718 013 520, Passcode: NS7Hc2Ff)
Clarification queries deadline: 5 working days before closing date
Tender validity period: 12 weeks from closing date and time
Contact Information
Source: Invitation to Tender (ITT) - Installation of Smart Meter.pdf (RFP)Eskom Representative: Constance Sekhuto
Telephone: 016 457 5925
Email: [email protected]
Procurement Manager: Madimetja Phalane
Fraud reporting: 0800 11 2722 / [email protected]
Submission address: Eskom E-tendering site https://etendering.eskom.co.za
Clarification meeting link: https://teams.microsoft.com/meet/325305718013520?p=OyR0ZOXKmyS6rY54HE
Submission Guidelines
Source: Invitation to Tender (ITT) - Installation of Smart Meter.pdf (RFP)Submission method: electronic via Eskom E-tendering site (https://etendering.eskom.co.za)
Format: PDF documents (max 500 MB per document, total submission 4 GB); price list in PDF and Excel
No zip/condensed files; no hard copies accepted
Resubmission: latest version only; previous submissions void
Submission status must be marked complete
Mandatory returnables at closing (disqualifiable if missing):
Non-disqualifiable returnables at closing (5 working days to remedy if requested):
Returnables required prior to contract award:
Joint venture requirements: letter of intent, JV agreement with joint and several liability, profit-sharing ratios, single designated bank account
Disqualification conditions: late submission, conflict of interest, restriction by National Treasury/Eskom, on Tender Defaulters list, unauthorized signatory, subcontracting 100% of scope, JV without joint and several liability, multiple tenders
Evaluation Criteria
Source: Invitation to Tender (ITT) - Installation of Smart Meter.pdf (RFP)Three-stage evaluation:
Tenderers below 85% disqualified
Level 1: 10, Level 2: 9, Level 3: 6, Level 4: 5, Level 5: 4, Level 6: 3, Level 7: 2, Level 8: 1, Non-compliant: 0
Failure to submit Specific Goals evidence scores zero for that goal but does not disqualify
Ranking: combined price and specific goals scores, highest to lowest
No objective criteria, no reverse e-auction
Technical Specifications
Source: Invitation to Tender (ITT) - Installation of Smart Meter.pdf (RFP)Scope: Installation of smart meters, data concentrators, ready board retrofit, access covers, insulation piercing connectors (IPC), pole top split metering kiosks, secure pole mount DC kiosks, associated accessories, decommissioning, scrapping and disposal of existing meters
Location: Distribution Division, LimLanga cluster (Limpopo)
Duration: 2 years
Panel size: 100 qualifying contractors
Mandatory technical requirement: Department of Labour Letter of Registration as Electrical Contractor with Installation Electrician (IE) or Master Installation Electrician (MIE), valid, unexpired, in company or director name
Quality requirements (refer to attached documents):
Safety requirements:
Environmental requirements:
CIDB grading: Level 3 or higher, Class Electrical Engineering Work (Buildings) – EB
JV conditions: all members CIDB registered; lead partner graded EB; combined grading meets requirement
Scope of Work: Annexure M (Document no 559-1826396412)
Technical evaluation criteria: Annexure N (Document no SI LC 399)
Contract: NEC3 Engineering Construction Contract (ECC)
Experience & Qualifications
Source: Invitation to Tender (ITT) - Installation of Smart Meter.pdfFunctionality evaluation criteria weights:
Total: 100%
Minimum threshold: 85%
Tenderers who do not meet the threshold will be disqualified
Detailed technical requirements in Scope of Work (Document no 559-1826396412) and Technical Evaluation Criteria (Document no SI LC 399)
Quality Management
Source: Invitation to Tender (ITT) - Installation of Smart Meter.pdfQuality requirements (refer to attached documents):
These documents must be referenced and complied with; quality plans required prior to contract award
Pricing Schedule
Source: Invitation to Tender (ITT) - Installation of Smart Meter.pdfPricing schedule requirements:
Price evaluation methodology:
Contract: NEC3 Engineering Construction Contract (ECC) with fully priced schedule; omission leads to disqualification
Financial Requirements
Source: Invitation to Tender (ITT) - Installation of Smart Meter.pdf (RFP)Pricing: inclusive of VAT; corrected for arithmetic errors; excluding contingencies; adjusted for variations; NPV comparison; unconditional discounts considered; conditional discounts not evaluated but implemented at payment
Price schedule: PDF and Excel format
Payment terms:
Security for performance: performance bond or demand guarantee may be required based on financial analysis; tenderer must select minimum two financial institutions from Eskom-approved pre-vetted guarantors list (as at 30 September 2024)
Financial viability: latest approved annual financial statements (not draft) of tendering company (not parent/holding) including: background, signed director's report, signed auditor/reviewer/compiler/accounting officer report, statement of financial position, comprehensive income, changes in equity, cash flows, notes, public interest score (if applicable), ITA34C copies (if applicable); for unincorporated JV/SPV each partner must submit
Cataloguing: may be required; pricing schedule must include line item for cataloguing
Compliance Requirements
Source: Invitation to Tender (ITT) - Installation of Smart Meter.pdf (RFP)CSD registration (mandatory contractual requirement)
Tax compliance: certified tax clearance certificate or SARS e-filing PIN for verification (foreign tenderers with no SA footprint complete SBD1 only)
B-BBEE: valid certificate from SANAS-accredited agency, sworn affidavit, or CIPS affidavit; plus proof of ownership/shareholding (CIPC), certified ID copies of shareholders, proof of disability where applicable
CIDB: Level 3 EB or higher; JV members must be CIDB registered; lead partner graded EB; combined grading meets requirement
Department of Labour: Letter of Registration as Electrical Contractor with IE or MIE
Employment Equity: designated employers must provide proof of compliance and EE report submission to Dept of Labour (SA tenderers only)
COIDA: original certificate of good standing or proof of application from Compensation Fund or licensed insurer (SA tenderers only)
Integrity Pact: Annexure D declaration
Local content: SBD 6.2 and Annexures G1-G4 if designated materials included
Standard forms: SBD 1 (Annexure H), SBD 4 (Annexure J), SBD 6.1 (Annexure I), SBD 6.2 (Annexure G1)
E-tendering Help Manual acknowledgement
Non-disclosure agreement
Health & Safety
Source: Invitation to Tender (ITT) - Installation of Smart Meter.pdfSafety requirements:
Other safety/quality documents as required per scope of work
Environmental
Source: Invitation to Tender (ITT) - Installation of Smart Meter.pdfEnvironmental requirements:
Refer to attached documentation for detailed environmental compliance
Contractual Terms
Source: Invitation to Tender (ITT) - Installation of Smart Meter.pdfEligibility: tenderers must not be restricted by National Treasury/Eskom, on Tender Defaulters list, have conflict of interest, be from sanctioned country, submit multiple tenders, subcontract 100% of scope, or have unauthorized signatory
JV requirements: joint and several liability; lead partner graded EB; combined grading meets requirement
Security for performance: performance bond or demand guarantee may be required based on financial analysis; select minimum two institutions from pre-vetted guarantors list
Tender opening: electronic, no public opening
Price evaluation: prices not read out; evaluated as per 90/10 system
Payment terms: below R50M (incl. VAT) – 30 days; above R50M – 60 days from receipt of undisputed invoice
Cataloguing: may be required; pricing schedule must include line item
Basic compliance: meet eligibility, submit complete tender with mandatory returnables
Mandatory returnables at closing (disqualifiable if missing) and non-disqualifiable (5 days to remedy)
Alternative tenders not permitted
CIDB: Level 3 EB or higher; JV conditions apply
Contract Skills Development Goals: not applicable
Contract Participation Goals: not applicable
Subcontracting with subsidiaries discouraged; must be declared
Standard payment terms as above
Section
Source: Invitation to Tender (ITT) - Installation of Smart Meter.pdfFunctionality evaluation (minimum threshold 85%):
Price and Preference evaluation (90/10 system):
Level 1: 10, Level 2: 9, Level 3: 6, Level 4: 5, Level 5: 4, Level 6: 3, Level 7: 2, Level 8: 1, Non-compliant: 0
Required evidence for Specific Goals: valid B-BBEE certificate (SANAS), sworn affidavit, or CIPS affidavit; proof of ownership/shareholding (CIPC); certified ID copies of shareholders; proof of disability where applicable
Failure to submit Specific Goals evidence scores zero for that goal but does not disqualify
Ranking: combined price and specific goals scores, highest to lowest
No objective criteria, no reverse e-auction
Evaluation Criteria
Source: 240-68099512 (Rev 9) Form A- SMART Meters.pdf (unknown)Pre-contract award quality requirements
Tenderer's quality representative
ISO 9001 and Eskom conditions
Technical Specifications
Source: 240-68099512 (Rev 9) Form A- SMART Meters.pdf (unknown)Scope of work
Quality Management
Source: 240-68099512 (Rev 9) Form A- SMART Meters.pdfISO 9001 clauses
ISO 9001 quality principles
Eskom conditions
Compliance Requirements
Source: 240-68099512 (Rev 9) Form A- SMART Meters.pdf (unknown)Quality compliance
Form A
Section
Source: 240-68099512 (Rev 9) Form A- SMART Meters.pdfPre-contract award quality requirements
ISO 9001 and Eskom conditions
Description
Source: Eskom - Standard Conditions of Tender - Rev 12.pdfThe tender is for the appointment of 100 qualifying panel contractors to install smart meters, data concentrators, ready board retrofits, access covers, insulation piercing connectors (IPC), pole top split metering kiosks, secure pole mount DC kiosks and associated accessories, including decommissioning, scrapping and disposal of existing meters for Eskom's Distribution Division in the LimLanga cluster (Limpopo) over a 2‑year period.
Important Dates
Source: Eskom - Standard Conditions of Tender - Rev 12.pdf (TENDER)Closing date and time: 30 November 2026 at 08:00 (South African Standard Time).
Compulsory briefing/site visit: date, time and venue not stated in this document; details would be in the Tender Data.
Submission Guidelines
Source: Eskom - Standard Conditions of Tender - Rev 12.pdf (TENDER)Submission method: original tender plus one complete hard copy delivered to the address and tender box specified in the Tender Data, or electronic submission via the Eskom Tender Bulletin e‑tendering portal (upload to Technical, Commercial and Financial folders).
Closing: tender must be received by the closing date and time (South African Standard Time). Proof of posting or courier delivery is not proof of delivery; late tenders are rejected.
Packaging: original and copy must be in separate sealed packages marked "ORIGINAL" and "COPY", placed together in an outer package marked "Confidential" showing the Eskom address, Invitation to Tender number, tenderer name, address, email and authorised signatory contact details.
Mandatory returnables: Acknowledgement Form (completed and submitted with tender), all mandatory tender returnables by closing date/time, documents required for contract award before award. All forms must be fully completed, valid, current and original where stipulated.
Signing: original tender must be signed by the duly authorised signatory; electronic tender signed electronically.
Alterations: only permitted to comply with Eskom Representative instructions or to correct errors; all alterations initialled by all signatories; no correction fluid/tape.
Alternative tenders: only if a main tender is submitted and permitted by the Invitation to Tender.
Clarification during evaluation: Eskom may request clarification but mandatory returnables cannot be submitted after closing.
Undertakings: sign Form of Agreement; provide proof of authority if agent; indicate two financial institutions for performance security if required; submit SDL&I Undertaking by contract award; cataloguing information may be required after award.
Evaluation Criteria
Source: Eskom - Standard Conditions of Tender - Rev 12.pdf (TENDER)Evaluation stages:
Quality Management
Source: Eskom - Standard Conditions of Tender - Rev 12.pdfQuality requirements are referenced through compliance with standardised specifications incorporated by reference and Eskom's SHEQ requirements. Tenderers must demonstrate SHEQ systems, policies and capabilities at closing/award. No specific quality management standards (e.g. ISO 9001) are detailed in this document.
Pricing Schedule
Source: Eskom - Standard Conditions of Tender - Rev 12.pdfPricing schedule requirements: all-inclusive rates (duties, taxes, VAT, levies as at 14 days before closing); fixed prices for contract duration; ZAR currency unless otherwise stated; exchange rate and base date per Invitation to Tender. Arithmetical error correction rules apply (words over figures, line‑item total over rate, total over components). Performance security: two nominated financial institutions. Insurance cover may be incomplete; tenderer to seek advice. Financial analysis may be conducted. Reverse e‑auction may require submission without prices.
Financial Requirements
Source: Eskom - Standard Conditions of Tender - Rev 12.pdf (TENDER)Pricing: rates and prices must include all duties, taxes (including VAT) and levies applicable 14 days before closing. Prices fixed for contract duration, not subject to adjustment except as provided in the Invitation to Tender. Prices stated in South African Rand unless otherwise instructed; exchange rate and base date per Invitation to Tender.
Performance security: if required, tenderer must name at least two financial institutions for the security; Eskom may reject unsuitable institutions.
Insurance: Eskom’s insurance cover may not be full; tenderer advised to seek qualified advice.
Financial analysis: Eskom may evaluate financial statements to assess risk; tenderer may be required to meet mitigating factors or be excluded.
Arithmetical error correction: detailed rules for correcting unit rates, line‑item totals and overall price totals; tenderer must accept corrections or tender rejected.
Compliance Requirements
Source: Eskom - Standard Conditions of Tender - Rev 12.pdf (TENDER)Eligibility: must meet eligibility criteria in Tender Data; not under restriction to do business with Eskom or State‑Owned Companies; 100% subcontracting not permitted.
B‑BBEE: if B‑BBEE level is a pre‑qualification criterion, valid certificate/affidavit/CSD report must be submitted at closing; subcontractors to designated groups must provide their B‑BBEE status at closing. Fraudulent/expired documents lead to disqualification and reporting to B‑BBEE Commission (suspension up to 10 years).
CIDB: if stipulated in Tender Data, must be registered at closing or capable of registration within 21 working days; proof of registration mandatory at closing (proof of application accepted at closing, full registration by contract award).
SHEQ: proof of safety, health, environmental and quality systems, policies and capabilities at closing and/or contract award; all SHEQ costs and personnel reflected in tender.
Legislation: comply with National Treasury Instruction Notes, CIDB Regulations, designated local content/production, PPPFA Regulations, Amended B‑BBEE Codes, COIDA, OHS Act, Eskom SHEQ requirements.
SDL&I Undertaking: complete and submit by contract award.
Designated materials and thresholds: submit information by contract award.
Contract Skills Development Goals (CSDG): apply to contracts ≥12 months and ≥R5 million (professional services) or CIDB grade 7+ (engineering/construction works).
Contract Participation Goals (CPG): apply to construction works contracts in GB, CE, EB, ME classes, duration ≥6 months, where ≥25% of main contract can be subcontracted.
Misrepresentation/falsification: disqualification, suspension up to 10 years, possible criminal prosecution.
Health & Safety
Source: Eskom - Standard Conditions of Tender - Rev 12.pdfHealth and safety compliance is mandated through the OHS Act and Eskom's SHEQ requirements. Tenderers must provide proof of safety, health, environmental and quality systems at closing/award. All SHEQ costs and personnel must be reflected in the tender. CIDB registration (if applicable) and Contract Skills Development Goals (CSDG) and Contract Participation Goals (CPG) also apply to construction works contracts meeting specified thresholds.
Contractual Terms
Source: Eskom - Standard Conditions of Tender - Rev 12.pdfContract terms include: tender validity period (extendable on request, no modification allowed); confidentiality of procurement documents; compliance with standardised specifications incorporated by reference; compulsory site visit/clarification meeting if stipulated; undertaking to sign Form of Agreement; provision of performance security from two nominated financial institutions; SDL&I Undertaking by contract award; cataloguing and labelling per Eskom specifications; Contract Skills Development Goals (CSDG) for qualifying contracts; Contract Participation Goals (CPG) for qualifying construction works; liability limitations (Eskom not liable for tenderer losses); mandated negotiations rights; cancellation rights; and acceptance notification before validity expiry.
Section
Source: Eskom - Standard Conditions of Tender - Rev 12.pdfEvaluation follows a multi‑stage process: basic compliance (mandatory returnables, original and copy), pre‑qualification (if stipulated), functionality scoring (minimum threshold per Tender Data), financial risk analysis, price evaluation per Tender Data criteria, arithmetical error correction, B‑BBEE scoring (pre‑qualification proof at closing or disqualification; otherwise zero PPPFA points), Specific Goals scoring (zero points for non‑submission but not disqualification), ranking via PPPFA 90/10 or 80/20, objective criteria per PPPFA s2(1)(f) if stipulated, and possible reverse e‑auction.
Contact Information
Source: Annexure N - Technical Evaluation Criteria SI LC 399 for Smart Meters and its Accessories Rev 1 Revised 11082026.pdf (unknown)PDE SCOT website access requests: Brenda Morrison; email: [email protected]; external access: https://scot.eskom.co.za
Submission Guidelines
Source: Annexure N - Technical Evaluation Criteria SI LC 399 for Smart Meters and its Accessories Rev 1 Revised 11082026.pdf (unknown)All mandatory returnable documents must be submitted with the bid at tender closing; Eskom does not permit outstanding documents to be submitted later, and any missing mandatory document disqualifies the tenderer.
Mandatory returnable: valid Department of Labour letter of registration as an electrical contractor (Installation Electrician or Master Installation Electrician), issued in the company's name or a company director's name, valid, unexpired and authentic.
Functionality returnables: SETA or EWSETA-accredited MV and LV line construction training certificate and prepayment or split metering or smart metering training certificate (OTO 06G, OTO 06C or OTO 06A), each with a signed and stamped Annexure A affidavit confirming employment of the resource; signed completion certificates or handover documents for relevant completed projects; vehicle registration documents or bona fide rental agreements for a truck with VMC and aerial device, a 4x4 or 4x2 LDV or double-cab with ladder rack, and a worker transport vehicle with safety belts; completed and signed Annexure B tools and equipment register.
Contractual returnables: PDE SCOT website access confirmation letter and MV and LV authorisation certificates or portfolio of evidence with per-employee affidavits certified by a Commissioner of Oaths.
Sharing of vehicles, tools or equipment between contractors is strictly prohibited and results in disqualification.
Evaluation Criteria
Source: Annexure N - Technical Evaluation Criteria SI LC 399 for Smart Meters and its Accessories Rev 1 Revised 11082026.pdf (unknown)Evaluation runs through three compulsory levels and a tenderer must pass each level to continue.
Level 1 desktop evaluation: Phase 1 assesses mandatory returnables on a pass/fail basis and every mandatory requirement must be met; Phase 2 assesses functionality and a minimum threshold score of 85% is required to proceed.
Functionality weighting: training 20%, relevant company experience 35%, vehicles 25%, tools and equipment 20%.
Level 2 site assessment verifies ownership, rental capability and availability of vehicles, tools and equipment at a central location; inconsistent or inaccurate information can result in disqualification or a score adjustment.
Level 3 contractual evaluation requires full compliance with contractual requirements before award.
Mandatory requirement: valid Department of Labour letter of registration as an electrical contractor with an Installation Electrician or Master Installation Electrician, issued in the company's or a director's name.
Contractual requirements: valid access to the Eskom PDE SCOT website and MV and LV authorisation certificates or portfolio of evidence certificates covering First Aid Level 2, Basic Fire Fighting, Supervision, Risk Assessment or HIRA, Equipotential Earthing, ORHVS HV02, FAS certificate and Basic Electric or N2 in Electrical Engineering authorisation, with a per-employee affidavit certified by a Commissioner of Oaths.
Technical Specifications
Source: Annexure N - Technical Evaluation Criteria SI LC 399 for Smart Meters and its Accessories Rev 1 Revised 11082026.pdf (unknown)Scope: appointment of 100 qualifying panel contractors for the installation and commissioning of smart meters, data concentrator units (DCU or ECU), ready board retrofit, access covers, insulation piercing connectors (IPC), pole top split metering kiosks and secure pole mount DC kiosks, with all associated accessories, including decommissioning, scrapping and disposal of existing meters, for the Eskom Distribution Division in the LimLanga Cluster, Limpopo, on an as-and-when-required basis for a period of 2 years.
Normative references: ISO 9001 quality management systems, Eskom Supplier Quality Management Specification 240-105658000 (QM 58), Eskom Procurement and Supply Chain Management Procedure 32-1034, Occupational Health and Safety Act, and Eskom Guideline 240-70413681 on portfolio of evidence for authorisation.
Work must comply with Eskom Standards, Eskom Buyer's Guide Documents and South African National Standards.
Sharing of vehicles, tools and equipment between contractors is strictly prohibited; all resources must be dedicated solely to the tenderer's own operations.
Experience & Qualifications
Source: Annexure N - Technical Evaluation Criteria SI LC 399 for Smart Meters and its Accessories Rev 1 Revised 11082026.pdfRelevant company experience is weighted at 35% of functionality.
Tenderers must demonstrate experience in at least one of: installation of smart meters; electrification projects; or infill projects involving house connections or minor reticulation.
Evidence: signed completion certificates or handover documents for each completed project, confirming the completion date and including project name, high-level scope of work, client name, contractor name, start date, end date, project or task value and an authorised signature.
Smart meter or electrification experience: minimum 2 projects, 5 points each, maximum 10 points.
Infill project experience: minimum 4 projects, 2.5 points each, maximum 10 points.
A maximum of 10 points applies regardless of the number of projects submitted above the minimum.
Quality Management
Source: Annexure N - Technical Evaluation Criteria SI LC 399 for Smart Meters and its Accessories Rev 1 Revised 11082026.pdfVehicle requirements: tenderers must demonstrate ownership or bona fide hire of dedicated vehicles; sharing of vehicles, tools and equipment between contractors is strictly prohibited and leads to disqualification.
Option 1 (ownership): submit certified vehicle registration documents reflecting the company name or the owner's or director's name; a licence disc alone is not accepted.
Option 2 (hiring): submit a rental agreement or contract from a bona fide rental company indicating the vehicle types.
Required vehicles: one truck with suitable VMC and aerial device supported by a valid crane inspection certificate (maximum 20 points); one 4x4 or 4x2 LDV or double-cab bakkie fitted with a ladder rack (maximum 10 points); one worker transport vehicle, not an open bakkie, with safety belts for all (maximum 10 points).
Vehicles are weighted at 25% of functionality.
Compliance Requirements
Source: Annexure N - Technical Evaluation Criteria SI LC 399 for Smart Meters and its Accessories Rev 1 Revised 11082026.pdf (unknown)Mandatory compliance: valid Department of Labour letter of registration as an electrical contractor with an Installation Electrician (IE) or Master Installation Electrician (MIE), issued in the company's name or a company director's name, and valid, unexpired and authentic.
The Occupational Health and Safety Act applies as a normative reference.
Training certificates must be issued by a SETA or EWSETA-accredited training service provider and be in the name of the employee listed on the organogram.
Vehicle registration documents must reflect the company name or the owner's or director's name; a licence disc alone is not accepted.
Tools and equipment must be owned by the company and recorded on the completed and signed Annexure B register; any deviation can lead to disqualification.
Health & Safety
Source: Annexure N - Technical Evaluation Criteria SI LC 399 for Smart Meters and its Accessories Rev 1 Revised 11082026.pdfThe Occupational Health and Safety Act applies as a normative reference.
Required authorisation or portfolio of evidence certificates per relevant resource, valid at submission: First Aid Level 2, Basic Fire Fighting, Supervision, Risk Assessment or HIRA, Equipotential Earthing, ORHVS HV02, FAS certificate and Basic Electric or N2 in Electrical Engineering authorisation.
Certificates must be in the name of the employee working for the applicant company.
A per-employee affidavit, completed on the Annexure B template and certified by a Commissioner of Oaths, confirms employment of the resources named on the certificates during the tender period.
All listed certificates are required to score full points.
Contractual Terms
Source: Annexure N - Technical Evaluation Criteria SI LC 399 for Smart Meters and its Accessories Rev 1 Revised 11082026.pdfContractual requirements must be fully met and verified before tender award, although they are not scored during desktop evaluation.
Requirement 1: valid access to the Eskom PDE SCOT website, evidenced by a letter confirming the username and password; contractors must subscribe to the PDE website for the latest Eskom standards and drawings, and access requests must be sent to Brenda Morrison at [email protected]; the access confirmation letter must be valid at submission.
Requirement 2: MV and LV authorisation certificates or portfolio of evidence certificates in the name of the relevant resource and valid at submission, covering First Aid Level 2, Basic Fire Fighting, Supervision, Risk Assessment or HIRA, Equipotential Earthing, ORHVS HV02, FAS certificate and Basic Electric or N2 in Electrical Engineering authorisation; a per-employee affidavit, completed on the Annexure B template and certified by a Commissioner of Oaths, confirms employment of the resources.
All listed certificates are required to score full points.
Section
Source: Annexure N - Technical Evaluation Criteria SI LC 399 for Smart Meters and its Accessories Rev 1 Revised 11082026.pdfThree-level evaluation: Level 1 desktop evaluation has Phase 1 mandatory returnables assessed pass/fail, with every mandatory requirement required to proceed, and Phase 2 functionality scoring with a minimum threshold of 85%; Level 2 site assessment verifies vehicles, tools and equipment; Level 3 contractual evaluation requires full contractual compliance before award.
Functionality weighting: training 20%, relevant company experience 35%, vehicles 25%, tools and equipment 20%.
Mandatory requirement: valid Department of Labour electrical contractor registration with an Installation Electrician or Master Installation Electrician, issued in the company's or a director's name.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 4 of 2006
Relevant to electricity, generation, transmission, distribution and energy-service procurement.
Relevant because this tender appears to involve electricity, power supply, energy infrastructure, generators, or energy maintenance. Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve electricity, power supply, energy infrastructure, generators, or energy maintenance. Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve electricity, power supply, energy infrastructure, generators, or energy maintenance. Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
Act 28 of 2002
Relevant to mineral resources, mining rights, prospecting and mining-related procurement.
Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
Act 40 of 2004
Relevant to regulated electricity, piped-gas and petroleum-pipeline activities.
Relevant because this tender appears to involve electricity, power supply, energy infrastructure, generators, or energy maintenance.
Address
Limpopo Operating Unit - Polokwane central - Polokwane - 0699
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
23
Last checked
07 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
South Africa's energy revolution is gathering pace. Discover the massive opportunities for SMMEs in the renewable energy sector, from the Northern Cape's solar hubs to municipal wheeling projects.
Win renewable energy, Eskom, and municipal utilities contracts. IPP programmes, solar tenders, and power infrastructure opportunities.
Navigating the compliance landscape for solar installations in the public sector. Essential certifications, CIDB grading, and local content rules.
Searching for Eskom vacancies? Explore the Eskom careers portal and discover how the energy transition is creating new tenders and subcontracting roles.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on energy. Unlock full pricing strategies, bid frequency, and historical win rates.