Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Kendal Power Station, Main Stores - Near Ogies, on Jhb/Witbank Road - Witbank - 1035
Organization Type
GOVERNMENT
Published
06 Nov 2026
OCDS Reference
ocds-9t57fa-177316
Provision of fire detection and gas suppression system maintenance at kendal power station in mpumalanga for a five‑year period. Bidders must submit a completed tax classification questionnaire (evaluation pack a for companies/ccs/trusts or pack b for individuals) together with all required affidavits. The classification outcome determines whether paye will be withheld from payments, making IT the single most consequential consideration for the bidder's net revenue. The bid closes on 27 november 2026 at 08:00.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Date & Time
Friday, 27 November 2026 - 10:00
Venue
null
Categories
Request for Bid(Open-Tender)
Kendal Power Station, Main Stores - Near Ogies, on Jhb/Witbank Road - Witbank - 1035
AI Document Analysis Stages
Important Dates
Source: Invitation to Tender E3759GXMPKEN.pdf (TENDER)06 Nov
2026
Tender Published
Tender was published
27 Nov
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf
Provision of fire detection and gas suppression system maintenance at Kendal Power Station in Mpumalanga for a five-year period.
Integrity Declaration Form - 31 May 2024.pdf
Eskom is procuring the maintenance of fire detection and gas suppression systems at Kendal Power Station for a five‑year period. The services are to be delivered to Eskom at the specified site.
C1 1 TSC3 Offer Acceptance .pdf
ESKOM HOLDINGS SOC Ltd. is procuring the Provision of Fire Detection and Gas Suppression System maintenance at Kendal Power Station in Mpumalanga for a period of 5 years. The tender closes on 27 November 2026 at 10:00 GMT+0200.
Eskom Supplier Integrity Pact - 02 June 2023 (1).pdf
The department requires the provision and maintenance of fire detection and gas suppression systems at Kendal Power Station for a five‑year period. The service will be delivered at the Kendal Power Station in Mpumalanga Province.
Standard Bidding Document (SBD) 6.1 in terms of PPR 2022 (03 February 2023).pdf
Supply and maintain fire detection and gas suppression system at Kendal Power Station for a period of five years. The tender is issued by ESKOM and must be submitted by Fri Nov 27 2026 at 10:00 GMT+0200.
Annexure J - SBD 4 - Tenderer's Disclosure.pdf
The tender is for the Provision of Fire Detection and Gas Suppression System maintenance at Kendal Power Station for a 5-year period, invited by Eskom in Mpumalanga province, with a closing date of 27 November 2026 at 10:00 SAST.
Standard Bidding Document (SBD) 4 Bidders Disclosure.pdf
Eskom requires the provision of Fire Detection and Gas Suppression System maintenance at Kendal Power Station for a five‑year period.
ANA2C1~1.PDF
Fire detection and gas suppression system maintenance must be provided at Kendal Power Station for 5 years. The procurement is issued by Eskom in Mpumalanga. The closing date is 27 November 2026 at 10:00.
Annexure A.1 Acknowledgement Form - Reverse E-auctioning Training - February 2024.pdf
Maintenance of fire detection and gas suppression systems at Kendal Power Station in Mpumalanga for a five-year period. Eskom Holdings SOC Ltd is the procuring organisation. The extracted document is Annexure A.1, an acknowledgement form for Reverse E-auction training.
Eskom General Conditions of Purchase - 31 May 2024 (1).pdf
The tender is for the provision of Fire Detection and Gas Suppression System maintenance at Kendal Power Station in Mpumalanga province for a period of 5 years. Eskom Holdings SOC Ltd is the procuring organization and seeks a qualified supplier to maintain these critical safety systems at the power station.
Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdf
The tender seeks to procure the provision of Fire Detection and Gas Suppression System maintenance at Kendal Power Station in Mpumalanga province for a 5-year period. This is a service contract with Eskom Group of Companies requiring contractors to supply ongoing maintenance services for the specified infrastructure.
Integrity Declaration Form - 08 November 2024.pdf
The procurement requires the maintenance of fire detection and gas suppression systems at Kendal Power Station for a five-year period. This service is being procured by Eskom in the Mpumalanga province. The provided document outlines the mandatory integrity declaration requirements for all tenderers.
Annexure D - Integrity Declaration Form.pdf
Eskom requires maintenance of fire detection and gas suppression systems at Kendal Power Station in Mpumalanga for a five-year period. Tenderers must complete and submit the Integrity Declaration Form (Annexure D) as a returnable document.
Eskom - Standard Conditions of Tender - 30 January 2025.pdf
Maintenance of fire detection and gas suppression systems at Kendal Power Station in Mpumalanga for Eskom over a period of five years.
Integrity Declaration Form - 31 May 2024.pdf
Supply and maintenance of fire detection and gas suppression system at Kendal Power Station for a period of 5 years.
Annexure F - CPA (IG) Requirements for Foreign Goods and Services (1).pdf
Fire detection and gas suppression system maintenance at Kendal Power Station is procured for a five-year period. The issuing authority is Eskom in Mpumalanga. The proposal closing date is 27 November 2026 at 10:00 South African Standard Time.
Authorisation Form - 08 November 2024.pdf
Eskom requires the maintenance of fire detection and gas suppression systems at Kendal Power Station for a five-year period, with work split into two phases covering the Kendal Power Station and the Kendal Ash Disposal Facility.
Annexure H - SBD 1 - Part A Invitation to Bid.pdf
Eskom requires fire detection and gas suppression system maintenance at Kendal Power Station in Mpumalanga for a five-year period.
Invitation to Tender E3759GXMPKEN.pdf
Eskom requires the maintenance of fire detection and gas suppression systems at Kendal Power Station in Mpumalanga over a five-year term, under an NEC3 Term Service Contract. The scope covers maintenance, testing and functionality of the fire detection system, with spares provision.
Invitation to Tender E3759GXMPKEN.pdf
Eskom requires a five-year contract for the maintenance of fire detection and gas suppression systems at Kendal Power Station in Mpumalanga, including the supply of fire detection spares. The successful bidder must be SAQCC-registered and demonstrate prior maintenance experience in a power station or similar environment.
C1 2b TSC3 Data by Contractor (1).pdf
ESKOM requires a five-year maintenance contract for fire detection and gas suppression systems at Kendal Power Station in Mpumalanga. The contract will be based on the NEC3 Term Service Contract (April 2013) with a priced price list.
Annexure C - Tenderer's Particulars.pdf
The department requires the provision and maintenance of fire detection and gas suppression system services at Kendal Power Station for a five‑year period.
Annexure I - SBD 6.1 Preference Points Claim Form in terms of The PPR 2022.pdf
The provision of Fire Detection and Gas Suppression System maintenance at Kendal Power Station for a 5-year period, invited by ESKOM in Mpumalanga. The tender seeks maintenance services for a critical safety system at the power station.
Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf
Maintenance of fire detection and gas suppression systems at Kendal Power Station in Mpumalanga for Eskom Holdings SOC Ltd over a five-year period. The pack includes a PAYE questionnaire to determine whether the bidder is classified as an independent contractor or personal service provider for Employees' Tax purposes.
C3 1 TSC3 Employers Service Information corrected - Reviewed by TC.pdf
Eskom requires a five-year maintenance service for the fire detection and gas suppression systems at Kendal Power Station in Mpumalanga, covering the Aritech FP2000 panels, VESDA, linear heat detection, Crowcon hydrogen gas monitoring, Pyroshield, Enviro-shield and CO2 suppression systems across Units 1 to 6 and the outside plant. The contractor must keep two SAQCC-registered servicemen permanently on site, execute weekly, monthly, six-monthly and annual planned maintenance, respond to callouts within one hour, and restore faults within 24 hours.
C1 2a TSC3 Data by Employer .pdf
The Provision of Fire Detection and Gas Suppression System maintenance at Kendal Power Station for the period of 5 years, contracted by ESKOM Holdings SOC Ltd in Mpumalanga province.
ANFF0D~1.PDF
Eskom requires maintenance of fire detection and gas suppression systems at Kendal Power Station in Mpumalanga for a five-year period. The tender includes a mandatory local content declaration (SBD 6.2) with supporting annexures.
Annexure E - Contract Price Adjustment (CPA) Requirements for Local Goods and Services.pdf
Eskom requires the provision of Fire Detection and Gas Suppression System maintenance at Kendal Power Station for a five‑year period, with tender submissions due by 27 November 2026 at 10:00 (SAST).
C2 TSC3 Pricing Data Option A .pdf
ESKOM requires the maintenance of fire detection and gas suppression systems at Kendal Power Station for a period of 5 years. Bidders must structure their pricing in accordance with the NEC3 TSC3 Option A contract format, mapping resources and health & safety items to their operational plans.
C0 TSC3 Contract cover pages .pdf
Maintenance of fire detection and gas suppression systems at Kendal Power Station for a five-year term, procured by Eskom Holdings SOC Ltd under an NEC3 Term Service Contract (TSC3). The contract covers the full term service scope set out in Part C3, with pricing submitted in Part C2 and contract data in Part C1.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
EskomWin Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 9 825 454
Range
Based on 16 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Closing date and time: 27 November 2026 at 10:00 am
Tender issue date: 06 November 2026
Tender validity period: 90 days from closing date (until 25 February 2027)
Clarification query deadline: 7 working days before closing (by 14 November 2026)
Compulsory briefing/site visit: Not applicable
B-BBEE improvement/retention plan due: within 30 days after contract signature
Contact Information
Source: Invitation to Tender E3759GXMPKEN.pdf (TENDER)Eskom Representative (for all queries and clarifications):
Procurement Manager:
Fraud/corruption reporting:
Submission portal: https://eTendering.eskom.co.za/tender/1/95309
Training/support: https://www.eskom.co.za/tenders/
Submission Guidelines
Source: Invitation to Tender E3759GXMPKEN.pdf (TENDER)Submission method: electronic only via Eskom E-tendering portal (https://eTendering.eskom.co.za/tender/1/95309).
Closing date and time: 27 November 2026 at 10:00 am.
Late submissions will not be accepted.
All documents must be uploaded in PDF format; price list also required in Excel format.
Maximum upload size: 500 MB per document, 4 GB total.
No zip/condensed files; no hard copies accepted.
Resubmission replaces previous submission entirely; ensure submission status shows "complete".
Tender validity period: 90 days from closing date.
Returnable documents required at closing (disqualifiable if missing or unsigned):
Returnable required at closing but non-disqualifiable (5 working days to remedy if missing):
Joint venture bidders must also submit:
Mandatory contractual requirement (assessed after evaluation, before award):
Additional contractual requirements (assessed before award):
Alternative tenders not allowed.
Clarification queries must be submitted in writing to Eskom Representative at least 7 working days before closing.
Evaluation Criteria
Source: Invitation to Tender E3759GXMPKEN.pdf (TENDER)Evaluation follows a two-stage process:
Failure to meet any gatekeeper disqualifies the bid.
Organogram with all key personnel for contract – 40% sub-weight
Supporting documents for each key person required
Bidders not meeting functionality threshold are disqualified.
Price evaluation (80 points):
Specific goals (20 points) – 80/20 PPPFA system (tender value ≤ R50 million):
Ranking: combined price + specific goals score, highest to lowest.
Objective criteria applicable (refer SDLI Appendix B).
Reverse e-auction not applicable.
B-BBEE improvement/retention plan must be submitted within 30 days of contract signing:
Valid B-BBEE certificate/affidavit is condition for contract award.
SDL&I penalty: 1% of contract value for failure to meet SDL&I obligations.
Local procurement content and job creation proposals required (not scored, but contractual commitments).
Technical Specifications
Source: Invitation to Tender E3759GXMPKEN.pdf (TENDER)Scope: Provision of Fire Detection Spares (maintenance of Fire Detection and Gas Suppression Systems) at Kendal Power Station for a 5-year period.
Mandatory technical requirements (gatekeepers):
Qualitative technical criteria:
Functionality threshold: 100% (must pass all criteria).
Safety (High Risk classification):
Quality (Category 3 – ISO 9001:2015):
Environmental (ISO 14001:2015 aligned):
Financial due diligence:
Cataloguing: successful tenderer may be required to provide cataloguing information per item after award; pricing schedule must include line item for cataloguing.
Contract form: NEC3 Term Service Contract.
Quality Management
Source: Invitation to Tender E3759GXMPKEN.pdfQuality Management System (Category 3) must comply with ISO 9001:2015.
Required documented evidence (approved/signed copies):
QMS must drive business processes to consistently meet Eskom requirements.
Supplier expected to comply with ISO 9001:2015 as per relevant category.
Financial Requirements
Source: Invitation to Tender E3759GXMPKEN.pdf (TENDER)Pricing format: completed pricing schedule (Bill of Quantities) as per NEC3 contract; must be submitted in PDF and Excel formats.
Price evaluation: inclusive of VAT, corrected for arithmetic errors, excluding contingencies, Net Present Value comparison.
Unconditional discounts considered for evaluation; conditional discounts applied at payment only.
Bid security / performance security: Not applicable.
Payment terms:
Financial capacity assessment: mandatory submission of latest approved annual financial statements (full set) as part of contractual requirements before award.
For non-audited entities: public interest score, ITA34C for current and previous years.
JV/SPV partners each submit own financial statements.
Local content: Annexures G1–G4 (SBD 6.2) required if designated materials included; local procurement content proposals requested.
SDL&I penalty: 1% of contract value for failure to meet SDL&I obligations.
Eskom reserves right to negotiate with preferred bidders if prices not market-related.
Subcontracting with subsidiaries discouraged; must be declared if done.
Potential sub-contractors list available via www.csd.gov.za.
Compliance Requirements
Source: Invitation to Tender E3759GXMPKEN.pdf (TENDER)Eligibility:
Mandatory registrations:
B-bbee:
Local content: SBD 6.2 (Annexures G1–G4) if designated materials included.
CIDB: Not applicable.
Contract Skills Development Goals (CSDG): Not applicable.
Contract Participation Goals (CPG): Not applicable.
Standard forms (must be completed, signed, submitted):
Safety, Quality, Environmental, Financial due diligence documents as detailed in technicalSpecifications and financialRequirements.
Disqualification risks:
Health & Safety
Source: Invitation to Tender E3759GXMPKEN.pdfScope of Work classified as High Risk.
Safety compliance evaluated per Annexure C1 (7 criteria).
Required returnable documents:
All documents must be submitted as part of tender response.
Environmental
Source: Invitation to Tender E3759GXMPKEN.pdfEnvironmental requirements aligned with ISO 14001:2015.
Required documents:
Contractual Terms
Source: Invitation to Tender E3759GXMPKEN.pdfContract form: NEC3 Term Service Contract.
Contract period: 5 years.
Payment terms: 30 days (≤R50M) or 60 days (>R50M) from receipt of undisputed invoice.
Eskom may negotiate with preferred bidders if prices not market-related.
Subcontracting with subsidiaries discouraged; must be declared.
Cataloguing may be required post-award; pricing schedule must include cataloguing line item.
B-BBEE improvement/retention plan due within 30 days of contract signature:
SDL&I penalty: 1% of contract value for non-compliance with SDL&I obligations.
Contractual requirements (assessed after evaluation, before award): CSD registration, safety, quality, environmental, financial due diligence documents.
Failure to meet contractual requirements by deadline may render tenderer non-responsive and ineligible for award.
Tender validity: 90 days from closing.
Alternative tenders not allowed.
Clarification queries to Eskom Representative only, in writing, at least 7 working days before closing.
Important Dates
Source: Authorisation Form - 08 November 2024.pdf (unknown)Closing date: 27 November 2026 at 08:00 UTC (10:00 SAST).
Closing time: 08:00 UTC per tender record (extracted text suggests 07:34, unverified).
Compulsory briefing or site visit: not mentioned.
Submission Guidelines
Source: Authorisation Form - 08 November 2024.pdf (unknown)Returnable forms (all must be completed, signed and submitted):
Submission method and address not specified in available information.
Evaluation Criteria
Source: Authorisation Form - 08 November 2024.pdf (unknown)Preference point system: 80/20 or 90/10 not specified.
B-BBEE: Valid B-BBEE certificate or sworn affidavit required to claim preference points.
Minimum qualifying score: not stated.
Evaluation stages: not detailed in available information.
Technical Specifications
Source: Authorisation Form - 08 November 2024.pdf (unknown)Scope: Maintenance of Fire Detection and Gas Suppression Systems at Kendal Power Station, Mpumalanga.
Contract period: 5 years.
Quantities, specific locations within station, standards, service levels, capacity requirements: not detailed in available information.
Compliance Requirements
Source: Authorisation Form - 08 November 2024.pdf (unknown)B-BBEE: Valid B-BBEE certificate or sworn affidavit required for preference points.
CSD registration, tax compliance (SARS tax pin), CIPC registration: typically required but not explicitly stated in available extract.
CIDB grading: not mentioned (service maintenance, not construction).
Local content: not mentioned.
Description
Source: C1 2b TSC3 Data by Contractor (1).pdfThe contract covers the provision of fire detection and gas suppression system maintenance at Kendal Power Station for a period of 5 years under an NEC3 Term Service Contract.
Important Dates
Source: C1 2b TSC3 Data by Contractor (1).pdf (unknown)Closing date and time: 27 November 2026 at 08:00
Contact Information
Source: C1 2b TSC3 Data by Contractor (1).pdf (unknown)Contact: Engineering Contract Strategies
Telephone: 011 803 3008
Fax: 086 5391902
Website: www.ecs.co.za
Service delivery: Kendal Power Station, Mpumalanga
Technical Specifications
Source: C1 2b TSC3 Data by Contractor (1).pdf (unknown)Scope: Maintenance of fire detection and gas suppression systems at Kendal Power Station for a 5-year period.
Contract type: NEC3 Term Service Contract (April 2013), priced contract with price list.
Key personnel: At least two key people required, each with name, job title, responsibilities, qualifications, experience, and CVs.
Price list: Must be provided; tendered total of prices required (in Rand).
Fee percentages: Direct fee percentage and subcontracted fee percentage to be stated.
Risk register: Matters to be included in the risk register to be identified.
Service information: The service information for the contractor's plan is to be referenced.
Plan: The plan identified in the contract data is to be contained in a specified document.
Experience & Qualifications
Source: C1 2b TSC3 Data by Contractor (1).pdfKey personnel requirements: The contractor must provide details for at least two key people, including name, job title, responsibilities, qualifications, experience, and CVs. Additional key personnel data and CVs may be required.
Financial Requirements
Source: C1 2b TSC3 Data by Contractor (1).pdf (unknown)Pricing format: Priced contract with price list; tendered total of prices required.
Fee percentages: Direct fee percentage and subcontracted fee percentage to be provided.
No bid security, bonds, guarantees, retention, or payment terms specified in this document.
Important Dates
Source: Annexure I - SBD 6.1 Preference Points Claim Form in terms of The PPR 2022.pdf (TENDER)Closing date: 27 November 2026 at 08:00 UTC (10:00 SAST).
No compulsory briefing or site visit dates are mentioned in this annexure.
Contact Information
Source: Annexure I - SBD 6.1 Preference Points Claim Form in terms of The PPR 2022.pdf (TENDER)Fraud and corruption reporting:
No SCM or technical enquiry contacts are provided in this annexure.
Submission Guidelines
Source: Annexure I - SBD 6.1 Preference Points Claim Form in terms of The PPR 2022.pdf (TENDER)Returnable forms:
Submission method, number of copies, packaging and closing details are not in this annexure; refer to the main tender document.
Evaluation Criteria
Source: Annexure I - SBD 6.1 Preference Points Claim Form in terms of The PPR 2022.pdf (TENDER)Evaluation uses the 90/10 preference point system (90 points for price, 10 points for specific goals) because the estimated contract value exceeds R50 million.
Price points formula: Ps = 90(1 - (Pt - Pmin)/Pmin) where Pt is the tendered price and Pmin the lowest acceptable price.
Specific goals points are claimed via SBD 6.1 and require supporting documentation; the organ of state may verify claims at any time.
No minimum qualifying score is stated in this annexure.
Compliance Requirements
Source: Annexure I - SBD 6.1 Preference Points Claim Form in terms of The PPR 2022.pdf (TENDER)Bidders must complete SBD 6.1 to claim preference points for specific goals. Required information:
Supporting documentation for specific goals claimed must be submitted; otherwise points for specific goals are not awarded.
The form includes a declaration certifying the accuracy of claims. Fraudulent claims may lead to disqualification, cost recovery, contract cancellation, restriction from state business for up to 10 years, and criminal prosecution.
Contractual Terms
Source: Annexure I - SBD 6.1 Preference Points Claim Form in terms of The PPR 2022.pdfThe SBD 6.1 declaration requires the authorised signatory to certify that:
Section
Source: Annexure I - SBD 6.1 Preference Points Claim Form in terms of The PPR 2022.pdfEvaluation uses the 90/10 preference point system (90 points for price, 10 points for specific goals) as the estimated contract value exceeds R50 million. Price points are calculated using the formula Ps = 90(1 - (Pt - Pmin)/Pmin). Specific goals points are claimed via SBD 6.1 with supporting proof; failure to submit proof means no points for specific goals. The organ of state reserves the right to verify claims at any time. No minimum qualifying score is stated.
Submission Guidelines
Source: Annexure E - Contract Price Adjustment (CPA) Requirements for Local Goods and Services.pdf (TENDER)Returnable documents
Evaluation Criteria
Source: Annexure E - Contract Price Adjustment (CPA) Requirements for Local Goods and Services.pdf (TENDER)Evaluation
Pricing Schedule
Source: Annexure E - Contract Price Adjustment (CPA) Requirements for Local Goods and Services.pdfPricing schedule — contract price adjustment
Financial Requirements
Source: Annexure E - Contract Price Adjustment (CPA) Requirements for Local Goods and Services.pdf (TENDER)Contract price adjustment (CPA)
Compliance Requirements
Source: Annexure E - Contract Price Adjustment (CPA) Requirements for Local Goods and Services.pdf (TENDER)Compliance
Description
Source: Invitation to Tender E3759GXMPKEN.pdfProcurement: Provision of fire detection system maintenance and spares supply at Kendal Power Station, Mpumalanga, for a 5-year period.
Client: Eskom Holdings SOC Ltd.
Tender number: E3759GXMPKEN.
Type: Open tender.
Scope includes compliance with SANS 10139, SAQCC registration, maintenance regime, resource allocation, and full SHE/quality/environmental management systems.
Contract: NEC3 Term Service Contract.
Important Dates
Source: Invitation to Tender E3759GXMPKEN.pdf (TENDER)Closing date and time: 27 November 2026 at 10:00 am.
Clarification queries deadline: 7 working days before closing date (by 18 November 2026, subject to working days).
Compulsory briefing/site visit: not applicable.
Tender validity period: 90 days from closing date and time.
Issue date: 06 November 2026.
Contact Information
Source: Invitation to Tender E3759GXMPKEN.pdf (TENDER)Eskom Representative (technical/procurement enquiries):
Procurement Manager:
Fraud/corruption reporting:
Submission portal: https://eTendering.eskom.co.za/tender/1/95309
E-tendering training: https://www.eskom.co.za/tenders/
Submission Guidelines
Source: Invitation to Tender E3759GXMPKEN.pdf (TENDER)Submission method: electronic only via Eskom E-tendering portal (https://eTendering.eskom.co.za/tender/1/95309).
Closing: 27 November 2026 at 10:00 am.
Format: all documents in PDF; price list in PDF and Excel copy.
Upload limits: 500 MB per document, 4 GB total. No zip/condensed files. No hard copies accepted.
Resubmission: latest version replaces all previous; status must show "complete".
Returnable documents — disqualifiable if missing at closing:
Returnable documents — non-disqualifiable (5 working days to remedy):
Mandatory contractual requirements (before award):
Evaluation Criteria
Source: Invitation to Tender E3759GXMPKEN.pdf (TENDER)Two-stage evaluation: functionality (technical) first, then price + specific goals (80/20).
Functionality — gatekeepers (mandatory, pass/fail):
Verification: SAQCC will confirm.
Functionality — qualitative criteria (threshold: 100%):
a. Previous similar work (25%): proof of FDS maintenance in power station or similar environment within last 5 years (official order/contract).
Scoring: ≤3 years = 5/5; 3–5 years = 4/5; 5–12 years = 2/5; none = 0/5.
b. Maintenance regime proposal (35%): critical activities, frequency, duration, plan to maintain/test system functionality.
Scoring: fully addresses = 5/5; satisfactorily = 4/5; poorly = 2/5; none = 0/5.
Price evaluation (80 points):
Specific goals (20 points) — PPPFA 80/20 (tender value ≤ R50 million):
B-BBEE level points: Level 1=20, 2=18, 3=14, 4=12, 5=8, 6=6, 7=4, 8=2, non-compliant=0.
Evidence: valid B-BBEE certificate (SANAS), sworn affidavit (EME ≤R10M, QSE ≤R50M unless 51% black-owned), or CIPC affidavit. No electronic signatures on affidavits.
Failure to submit evidence = 0 points for specific goals (not disqualified).
Ranking: combined price + specific goals score, highest to lowest.
Objective criteria applicable (refer SDLI Appendix B).
Reverse e-auction: not applicable.
Alternative tenders: not allowed.
Technical Specifications
Source: Invitation to Tender E3759GXMPKEN.pdf (TENDER)Scope: Provision of fire detection system maintenance and spares supply at Kendal Power Station for 5 years.
Key technical requirements:
Experience & Qualifications
Source: Invitation to Tender E3759GXMPKEN.pdfMandatory qualifications (gatekeepers):
Experience requirement:
Resource allocation:
Maintenance regime proposal:
Quality Management
Source: Invitation to Tender E3759GXMPKEN.pdfQuality Management System: ISO 9001:2015 Category 3.
Required documented evidence (approved/signed copies):
QMS must drive business processes to consistently meet Eskom requirements.
Compliance verified during evaluation and contract execution.
Pricing Schedule
Source: Invitation to Tender E3759GXMPKEN.pdfPricing schedule: part of NEC3 contract or separate submission.
Format: PDF and Excel copy.
Upload limits: 500 MB per document, 4 GB total.
Cataloguing: if required, separate line item in pricing schedule; Eskom pays.
Price evaluation: inclusive of VAT, arithmetic correction, exclusions of contingencies, NPV comparison.
Unconditional discounts considered; conditional discounts applied at payment only.
Tender validity: 90 days.
Payment terms: ≤R50M = 30 days; >R50M = 60 days from undisputed invoice.
No bid security or performance guarantee required.
SDL&I penalty: 1% contract value.
Retention: 1% of each invoice (excl. VAT) for SDL&I security.
Financial Requirements
Source: Invitation to Tender E3759GXMPKEN.pdf (TENDER)Pricing format: schedule of rates / bill of quantities within NEC3 contract; submitted in PDF and Excel.
Price evaluation: inclusive of VAT, arithmetic error correction, exclusions of contingencies, NPV comparison.
Tender validity: 90 days from closing.
Payment terms:
Security/guarantees:
Financial capacity:
Cataloguing: if required, separate line item in pricing schedule; Eskom pays for cataloguing.
Eskom reserves right to negotiate if prices not market-related.
Subcontracting with subsidiaries discouraged; must be declared if done.
Compliance Requirements
Source: Invitation to Tender E3759GXMPKEN.pdf (TENDER)Mandatory eligibility:
B-bbee:
SAQCC (gatekeepers):
Employment Equity Act: designated employers must submit compliance proof and EE report submission proof.
Safety (High Risk):
Quality (Category 3, ISO 9001:2015):
Environmental (ISO 14001:2015 aligned):
Local content: SBD 6.2 + annexures G1–G4 if designated materials.
CIDB: not applicable.
Contract Skills Development Goals: not applicable.
Contract Participation Goals: not applicable.
Returnable forms (standard):
Health & Safety
Source: Invitation to Tender E3759GXMPKEN.pdfScope classified High Risk — full SHE compliance mandatory.
Evaluation per Annexure C1 (7 criteria).
Required submissions:
All documents must be submitted with tender response.
Compliance assessed before award; failure may render tender non-responsive.
Environmental
Source: Invitation to Tender E3759GXMPKEN.pdfEnvironmental management aligned with ISO 14001:2015.
Required submissions:
All documents must be submitted with tender response.
Contractual Terms
Source: Invitation to Tender E3759GXMPKEN.pdfContract form: NEC3 Term Service Contract (completed in full).
Contract period: 5 years.
Payment terms: ≤R50M = 30 days; >R50M = 60 days from undisputed invoice.
SDL&I penalty: 1% of contract value for non-compliance with SDL&I obligations.
Retention: 1% of each invoice (excl. VAT) held as security for SDL&I obligations.
Cataloguing: may be required post-award; pricing must include line item; Eskom pays.
Subcontracting: 100% subcontracting prohibited; subcontracting with subsidiaries discouraged and must be declared.
Eskom right to negotiate: if tendered prices not market-related.
No alternative tenders allowed.
Tender validity: 90 days from closing.
Joint and several liability for JV/consortium.
Single business entity and single bank account for JV.
Termination: per NEC3 conditions.
Liquidated damages: not explicitly stated; SDL&I penalty of 1% contract value applies.
Section
Source: Invitation to Tender E3759GXMPKEN.pdfCaptured in evaluationCriteria section above. No additional criteria.
Submission Guidelines
Source: Integrity Declaration Form - 31 May 2024.pdf (RFP)Returnable document
Compliance Requirements
Source: Integrity Declaration Form - 31 May 2024.pdf (RFP)Integrity Declaration Form
Declarations required
Disqualification grounds
Consent
Description
Source: C1 2a TSC3 Data by Employer .pdfScope: Provision of Fire Detection and Gas Suppression System maintenance at Kendal Power Station.
Contract period: Five (5) years.
Contracting entity: Eskom Holdings SOC Ltd.
Contract form: NEC3 Term Service Contract April 2013 (TSC3), Option A (priced contract with price list).
Affected Property: Kendal Power Station.
Detailed scope: set out in Part 3: Scope of Work and all documents and drawings to which it makes reference (not included in this extract).
Contact Information
Source: C1 2a TSC3 Data by Employer .pdf (unknown)Service Manager (contract administration)
Address
Kendal Power Station
Private Bag X7272
Witbank
1035
Employer (contracting entity)
Eskom Holdings SOC Ltd
Registered office: Megawatt Park, Maxwell Drive, Sandton, Johannesburg
Registration number: 2002/015527/30
Technical Specifications
Source: C1 2a TSC3 Data by Employer .pdf (unknown)Service: Fire Detection and Gas Suppression System maintenance at Kendal Power Station.
Contract period: Five (5) years.
Contract form: NEC3 Term Service Contract April 2013 (TSC3), main Option A (priced contract with price list).
Affected Property: Kendal Power Station.
Detailed scope and drawings: Part 3: Scope of Work and all referenced documents (not included in this extract).
First plan for acceptance: within two (2) weeks of contract signing (kick-off meeting in week one, plan submission in week two).
Task Order programme: submit to the Service Manager within two (2) days of receiving a Task Order.
Reply periods: 24 hours for emergencies; one week for normal matters.
Financial Requirements
Source: C1 2a TSC3 Data by Employer .pdf (unknown)Currency: South African Rand.
Assessment interval: between the 25th and 28th day of each successive month.
Final assessment: within four weeks after completing a Task Order.
Payment period: thirty (30) days after assessment and receipt of invoice.
Interest on late payment: publicly quoted prime rate of Standard Bank of South Africa Limited, calculated on a 365-day year.
Tax invoice: provide within one week of receiving a payment certificate, showing the amount due as stated in the certificate.
Late tax invoice: payment deadline extended by the delay period; no interest for the delayed period.
VAT: include Eskom VAT number 4740101508 on each invoice if the Contractor is registered under the Companies Act.
Contractor insurance (Table A): replacement cost for loss or damage to Employer's property, Plant and Materials, and Equipment where not covered by Employer's insurance; Employer's policy deductible where covered; replacement cost for loss or damage to other property; amount required by applicable law for bodily injury or death to a non-employee; amount required by applicable law for death or bodily injury to employees.
Employer insurance (Table B): Assets All Risk, Contract Works, Environmental Liability, General and Public Liability, Transportation (Marine), Motor Fleet and Mobile Plant, Terrorism, Cyber Liability, Nuclear Material Damage and Business Interruption, Nuclear Material Damage, Terrorism - cover per the insurance policy document.
Insurance certificates: provide on request from insurer or broker.
Compliance Requirements
Source: C1 2a TSC3 Data by Employer .pdf (unknown)B-BBEE status change: notify Eskom within seven days of any change in legal status, ownership, business composition or dealings affecting B-BBEE status.
Updated B-BBEE certificate: submit the updated verification certificate and supporting documents to the Service Manager within thirty days of notification.
Consequence of decreased B-BBEE status: Eskom may re-negotiate the contract or terminate the Contractor's obligation to provide the service.
Failure to notify B-BBEE change: may constitute grounds for termination.
Health and safety: Eskom may appoint the Contractor as Principal Contractor under the Construction Regulations 2014 (Occupational Health and Safety Act); the Contractor must price for compliance with all applicable health and safety laws and contract rules, and ensure subcontractors and employees comply.
Environmental: comply with all applicable environmental laws, regulations, rules, guidelines and procedures; ensure subcontractors and employees comply.
Confidentiality: do not disclose contract information; images of the Affected Property require prior written consent of the Service Manager; rights in images vest in Eskom; subcontractors must comply.
Ethics: no coercive, collusive, corrupt, fraudulent or obstructive action during procurement or execution; Eskom may terminate without a finding of guilt; full cooperation with investigations is required.
Joint venture: members are jointly and severally liable; notify the Service Manager within two weeks of Contract Date of the person authorised to bind the joint venture; no change to composition without Eskom's written consent.
Cession: no cession, delegation or assignment of rights or obligations without Eskom's written consent.
Health & Safety
Source: C1 2a TSC3 Data by Employer .pdfHealth and safety precautions: the Contractor must take all reasonable precautions to maintain the health and safety of persons in and about execution of the service.
Principal Contractor: Eskom may appoint the Contractor as Principal Contractor under the Construction Regulations 2014 (Occupational Health and Safety Act) for the Affected Property.
Compliance cost: the Contractor must price for sufficient compliance with the Construction Regulations, all applicable health and safety laws and regulations, and contract health and safety rules, guidelines and procedures.
Ongoing compliance: the Contractor must comply with the Construction Regulations and all applicable health and safety laws, and ensure subcontractors, employees and others under its direction and control likewise comply.
Environmental
Source: C1 2a TSC3 Data by Employer .pdfEnvironmental compliance: the Contractor must comply with all applicable environmental laws, regulations, rules, guidelines and procedures provided for under the contract.
Subcontractor and employee compliance: the Contractor must ensure subcontractors, employees and others under its direction and control likewise comply.
Contractual Terms
Source: C1 2a TSC3 Data by Employer .pdfContract period: Five (5) years; starting date to be confirmed.
Governing law: Republic of South Africa.
Language: English.
Service level penalties (Option X17): Premature Failure - 5% of the task order; Re-Work - 3.5% of the task order; Non-compliance with PMs per week - 3% of the task order.
Limitation of liability (Option X18): indirect or consequential loss limited to R0.00; loss of or damage to Employer's property limited to the applicable deductible; defects due to Contractor's design limited to R0.00; total liability limited to the total of the Prices, excluding additional excluded matters (loss or damage to property other than Employer's property, death or injury to a person, infringement of intellectual property rights), which are not limited.
End of liability date: 12 months after the end of the service period.
Task Order programme: submit within two (2) days of receiving a Task Order.
Price forecasts: prepare at intervals no longer than four weeks or as stated on the Task Order.
Cession, delegation and assignment: not permitted without Eskom's written consent; Eskom may cede to subsidiaries or restructured divisions on written notice.
Joint venture: members jointly and severally liable; notify the Service Manager within two weeks of Contract Date of the person authorised to bind the joint venture; no change to composition without written consent.
B-BBEE status change: notify within seven days; submit updated certificate within thirty days; decreased status may lead to re-negotiation or termination; failure to notify may constitute grounds for termination.
Confidentiality: no disclosure of contract information; images of the Affected Property require prior written consent of the Service Manager; rights vest in Eskom; subcontractors must comply.
Waiver and estoppel: no waiver unless agreed in writing.
Compensation events: notify within eight weeks of becoming aware, otherwise no entitlement to a change in Prices.
Employer's limitation of liability: indirect or consequential loss limited to R0.00.
Termination: a business rescue order granted against the Contractor is a termination ground.
Ethics: no coercive, collusive, corrupt, fraudulent or obstructive action; Eskom may terminate without a court finding; full cooperation with investigations required.
Insurance: Contractor provides Table A insurances from the starting date until Completion or the termination certificate; certificates on request.
Nuclear liability: Eskom is operator of the Koeberg Nuclear Power Station; Eskom is solely responsible for nuclear damage and indemnifies the Contractor; waiver of recourse subject to statutory rights.
Asbestos: Eskom manages asbestos and asbestos-containing materials; Contractor personnel may stop work and leave a contaminated area; removal and disposal by a registered asbestos contractor instructed by Eskom at Eskom's expense.
Submission Guidelines
Source: Annexure C - Tenderer's Particulars.pdf (TENDER)Returnable document — Annexure C (Tenderer's Particulars): must be completed and signed, giving the tendering structure (individual, unincorporated JV, incorporated JV or other), CIPC registration or disclosure certificate, VAT number, CIDB registration number and grading, contact, postal and physical details for the tenderer and each JV member.
Subcontracting section: where subcontracting is prescribed, the form requires the intended percentage, the subcontractor's identity, CSD registration and number, B-BBEE level, designated-group category, a signed intention to subcontract and proof of the subcontractor's designated-group status.
Vendor and tax identifiers: Eskom vendor number and National Treasury CSD supplier number must be supplied if already registered; SARS e-filing PIN must be supplied for tax status verification.
Tax compliance: a foreign supplier not on CSD, or one without a SARS PIN, must attach a current valid tax compliance certificate as a returnable by contract award stage.
Compliance Requirements
Source: Annexure C - Tenderer's Particulars.pdf (TENDER)CSD registration
Tax compliance
Cipc
CIDB
VAT
Subcontracting
Compliance Requirements
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf (unknown)Mandatory returnable
Description
Source: C0 TSC3 Contract cover pages .pdfScope
Important Dates
Source: C0 TSC3 Contract cover pages .pdf (unknown)Closing: 27 November 2026 at 08:00
Submission Guidelines
Source: C0 TSC3 Contract cover pages .pdf (unknown)Returnable documents
Submission Guidelines
Source: Annexure J - SBD 4 - Tenderer's Disclosure.pdf (RFP)Returnable forms:
Compliance Requirements
Source: Annexure J - SBD 4 - Tenderer's Disclosure.pdf (RFP)Mandatory declarations (via SBD 4):
Important Dates
Source: Eskom General Conditions of Purchase - 31 May 2024 (1).pdf (unknown)Effective date of general conditions: 31 May 2024
Review date of general conditions: May 2029
Quality Management
Source: Eskom General Conditions of Purchase - 31 May 2024 (1).pdfRejection: Eskom may reject any part of goods by written notice specifying reason and whether replacement or rework required; rejected goods returned at supplier's risk and expense; costs of replacement from third party borne by supplier
Non-conformance correction: for works/services, supplier must correct non-conformances/defects as indicated by Eskom; if supplier delays, Eskom may have third party correct at supplier's cost
Acceptance: goods/works/services subject to Eskom approval; inspection and testing at any stage; deemed accepted if Eskom fails to notify acceptance
Financial Requirements
Source: Eskom General Conditions of Purchase - 31 May 2024 (1).pdf (unknown)Price adjustment: prices or rates may include an amount for price adjustment calculated per the formula stated in the agreement
Payment terms: payment within 30 days after receipt of a correct tax invoice
VAT requirement: Eskom VAT registration number 4740101508 must appear on the tax invoice before payment
CPA (IG) form: must be duly completed by the supplier
Currency: payment may be in any currency; one exchange rate used for conversion to ZAR; payment in non-ZAR currency shall not exceed agreement amounts
Delivery cost: supplier must state in tender whether delivery cost is included in the price; if not stated, deemed included
Compliance Requirements
Source: Eskom General Conditions of Purchase - 31 May 2024 (1).pdf (unknown)Statutory compliance: supplier must adhere to all statutory requirements relevant to the agreement
Governing law: agreement governed by the law of the Republic of South Africa; parties submit to jurisdiction of South African courts
Ethics: Eskom expects suppliers to adhere to the highest standard of ethical behavior
Health & Safety
Source: Eskom General Conditions of Purchase - 31 May 2024 (1).pdfCurrency and payment: one exchange rate used for conversion to ZAR; payment in non-ZAR currency shall not exceed agreement amounts; CPA (IG) form must be completed; payment within 30 days of correct tax invoice; Eskom VAT number 4740101508 must appear on invoice
Delivery: delivery means delivery of goods or completion of work at point of delivery/site per agreement on or before agreed date; late delivery may incur penalty; no payment if goods/services/works not provided as per agreement
Delivery documentation: supplier must mark packages with name and destination details, include packing note; send advice note with transport means, weight, volume, dispatch point/date; send detailed tax invoice after delivery/completion; state agreement number on all communications; state in tender whether delivery cost included (deemed included if not stated)
Containers/packing material: no payment for containers or packing materials unless otherwise stated
Acceptance: goods/works/services subject to Eskom approval; inspection and testing at any stage
Contractual Terms
Source: Eskom General Conditions of Purchase - 31 May 2024 (1).pdfIndemnity: supplier indemnifies Eskom against actions, suits, claims, costs arising from negligence, IP infringement, breach of statutory duty, defective design/materials/workmanship by supplier, subcontractors, agents
Warranty: goods/works/services warranted fit for purpose and free from defects for one year from acceptance (unless otherwise stated); supplier must rectify defects free of cost within agreed period
Assignment and subcontracting: neither party may cede or delegate rights/obligations without written consent of the other; Eskom may cede to subsidiaries or divisions on written notice
Statutory requirements: supplier must adhere to all relevant statutory requirements; agreement governed by RSA law; jurisdiction of SA courts
Breach: either party may terminate after written notice and failure to rectify default
Termination: Eskom may terminate at any time if supplier defaults in performance, becomes bankrupt, or is in financial circumstances prejudicing performance
Ethics: Eskom committed to highest ethical standards and expects same from suppliers
Entire agreement: constitutes entire agreement; variations must be in writing signed by both parties
Evaluation Criteria
Source: Standard Bidding Document (SBD) 6.1 in terms of PPR 2022 (03 February 2023).pdf (TENDER)90/10 preference point system applies for requirements above R50 000 000. Points awarded for Price and Specific Goals. Maximum 100 points total.
Compliance Requirements
Source: Standard Bidding Document (SBD) 6.1 in terms of PPR 2022 (03 February 2023).pdf (TENDER)Proof/documentation required to claim specific goals points. 90/10 preference point system applies.
Description
Source: Annexure F - CPA (IG) Requirements for Foreign Goods and Services (1).pdfAnnexure F sets out Eskom's contract price adjustment (CPA) requirements for foreign goods and services and the rules for payment of foreign commitments. CPA applies to contracts longer than 12 months and is not applied in the first year. A minimum 15% fixed portion applies and each CPA formula must total 100%. Only official public-domain indices may be used, with separate formulae for local and foreign CPA. Bidders pricing in foreign currency must be direct importers and must observe the specified payment methods and exchange rate rules.
Submission Guidelines
Source: Annexure F - CPA (IG) Requirements for Foreign Goods and Services (1).pdf (TENDER)Contract price adjustment (CPA): a CPA formula must be submitted with the tender; if no CPA is proposed, the pricing is treated as fixed.
CPA alignment: the bidder must align its CPA to Eskom's proposed breakdown in the tender, or submit an alternative CPA proposal for Eskom's consideration.
Foreign currency: before tender close, the bidder must confirm through the Procurement Practitioner that the foreign currency it intends to price in is acceptable to Eskom.
Payment Method 2: approval must be requested from Eskom before tender close, and a written indemnity confirming the bidder will not buy forward cover must accompany the submission; if approval is not obtained before tender close, the bidder must select another payment method.
Pricing disclosure: the foreign currency and foreign currency amounts must be shown in the pricing schedule; if the schedule does not allow for this, they must be shown in a covering letter.
Exchange rate proof: proof of the South African Reserve Bank exchange rate used must be submitted with the tender.
Methodology
Source: Annexure F - CPA (IG) Requirements for Foreign Goods and Services (1).pdfSpecialist skills: foreign specialists may be brought to South Africa by secondment (retaining overseas employment, invoiced in foreign currency, typically Euro or GBP, short to medium term) or payroll transfer (local ZAR contract, long term, no foreign commitment). Exchange rate: the tenderer must use the South African Reserve Bank exchange rate as at 12H00 on the date the tender is advertised and must submit proof of the SARB rate used.
Pricing Schedule
Source: Annexure F - CPA (IG) Requirements for Foreign Goods and Services (1).pdfPricing: for contracts over 12 months, a CPA formula must accompany the tender or the price is treated as fixed; the first year is fixed and CPA applies from year 2. Minimum 15% fixed portion; each formula totals 100%. Foreign currency and amounts must be shown in the pricing schedule or a covering letter. The exchange rate used in the tender is the SARB rate on the advertisement date. Payment methods 1A, 1B, 2 and the Fixed ZAR Option govern payment of foreign commitments, with proof of importation and matching commercial and tax invoices required.
Financial Requirements
Source: Annexure F - CPA (IG) Requirements for Foreign Goods and Services (1).pdf (TENDER)CPA applicability: CPA applies only where the contractual duration exceeds 12 months; for durations of 12 months or less, a fixed price must be submitted.
First year: CPA is not applied in the first year; for contracts over 12 months it applies from year 2 onwards.
Fixed portion: a minimum of 15% of the total agreement value must remain fixed and not subject to CPA.
Formula total: each CPA formula must add up to 100%.
Indices: only official published CPA indices in the public domain may be used; in-house indices are prohibited; local indices may not be used for imported components.
Separate formulae: separate CPA formulae are required for local and foreign CPA, and they may not be combined into one formula.
Rate of exchange: Eskom will not accept a rate of exchange adjustment within any CPA formula.
Base date: for monthly indices, the base date is the month before the month in which the tender closes; for daily or more frequent references, the average for the month before the tender closes is used as the base price.
Professional services: the country-specific CPI Headline index is the preferred index; the adjustment factor takes effect from each contractual anniversary and equals the average of the CPI Headline figures for the 12-month period ending before the anniversary.
Foreign currency pricing: bidders pricing imported goods or services in foreign currency, or linking pricing to an exchange rate, must be direct importers and must indicate the foreign currency and amounts.
Payment methods: foreign commitments are paid under Method 1A (foreign bank account in foreign currency), Method 1B (SARB-approved CFC account in South Africa in foreign currency), Method 2 (ZAR at Eskom's Treasury selling spot rate on the date forward cover is cancelled), or the Fixed ZAR Option (bidder bears exchange rate risk).
Payment Method 2: applies to goods only, not services; the contracting party must be the direct importer; exchange rate adjustments after Eskom's notification are for the supplier's account.
Fixed ZAR Option: the bidder must match or better Eskom's exchange rate; once agreed, Eskom bears no further exchange rate adjustments; the tender exchange rate is the SARB rate on the date the tender is advertised.
Proof of importation: required at the time of payment and invoicing; supporting documents include the commercial invoice, SAD 500, Bill of Entry, customs release notification, transport documents, and transport evidence such as a bill of lading, airway bill, consignment note, postal receipt, certificate of posting, or courier dispatch note.
Documents with payment: the commercial invoice from the foreign supplier and the local tax invoice must both be submitted and must match; Eskom will not pay profit in foreign currency.
SARB approval: for Method 1B and service-related foreign payments, the bidder must hold SARB approval to invoice Eskom in foreign currency into a CFC account, and documents to the Reserve Bank must specifically reference Eskom; approval is valid for 1 year or the SARB approval period.
No commercial invoice: if the supplier cannot provide a commercial invoice, the contract is concluded in rands and cannot be linked to any exchange rate.
Domestic costs: South African value-added costs, such as transport, are paid in rands only.
Compliance Requirements
Source: Annexure F - CPA (IG) Requirements for Foreign Goods and Services (1).pdf (TENDER)CPA formula: must be submitted with the tender; failure to submit results in the pricing being treated as fixed.
Direct importer: bidders pricing imported goods or services in foreign currency, or linked to an exchange rate, must be direct importers.
SARB approval: bidders using Payment Method 1B or receiving service-related foreign payments must hold SARB approval to invoice Eskom in foreign currency into a CFC account, with documents to the Reserve Bank specifically referencing Eskom.
Indices: only official published CPA indices in the public domain may be used; in-house indices are prohibited.
Separate formulae: local and foreign CPA require separate formulae and may not be combined.
Proof of importation: required for payment, including the commercial invoice, SAD 500, Bill of Entry, customs release notification, and transport documents.
Exchange rate proof: proof of the South African Reserve Bank exchange rate used must be submitted.
Health & Safety
Source: Annexure F - CPA (IG) Requirements for Foreign Goods and Services (1).pdfCPA conditions: CPA applies where the contractual duration exceeds 12 months; fixed pricing applies for durations of 12 months or less. CPA is not applied in the first year and runs from year 2 onwards. A minimum of 15% of the agreement value must be fixed; each formula must total 100%. Only official published public-domain indices may be used; in-house indices are prohibited. Local and foreign CPA require separate formulae. Eskom may negotiate CPA terms during negotiations.
Submission Guidelines
Source: Annexure H - SBD 1 - Part A Invitation to Bid.pdf (TENDER)Submission rules
Returnable forms
Compliance Requirements
Source: Annexure H - SBD 1 - Part A Invitation to Bid.pdf (TENDER)Tax compliance
State employment restriction
Foreign suppliers
Proof of authority
Consequence
Submission Guidelines
Source: ANFF0D~1.PDF (TENDER)SBD 6.2 (Declaration Certificate for Local Production and Content for Designated Sectors): must be completed, signed by the chief financial officer or nominated responsible person, and submitted with the bid; certifies compliance with minimum local content requirements measured under SATS 1286:2011.
Annex C (Local Content Declaration: Summary Schedule): must be submitted at the stipulated deadline; a bid may be disqualified if the declaration certificate and Annex C are not submitted on time.
Technical Specifications
Source: C2 TSC3 Pricing Data Option A .pdf (unknown)Scope: Fire Detection and Gas Suppression System maintenance at Kendal Power Station for 5 years.
Required resources per year:
Overtime capacity:
Transport: 50,500 km per year
Summary price list items: Health & Safety (lump sum), Labour (lump sum)
Health & Safety equipment per year:
Quality Management
Source: C2 TSC3 Pricing Data Option A .pdfQuality management requirements:
Pricing Schedule
Source: C2 TSC3 Pricing Data Option A .pdfPricing schedule (NEC3 TSC3 Option A):
Financial Requirements
Source: C2 TSC3 Pricing Data Option A .pdf (unknown)Pricing model: NEC3 Term Service Contract (TSC3) Option A – priced contract with Price List.
Price List contains lump sum items and rate-based items (rate × quantity).
Price List is not Service Information; work instructions are in Service Information.
Contractor must link plan operations to Price List items.
Prices must be inclusive of all necessary and incidental work to provide the service and correct defects not caused by Employer’s risk.
No adjustment to lump sum prices for quantity variations; only compensation events can change lump sums.
Price List format: Item description, Unit, Estimated Quantity per year, Rate, Price.
Totals calculated per year and for 5-year period.
Compliance Requirements
Source: C2 TSC3 Pricing Data Option A .pdf (unknown)Service personnel must hold valid SAQCC (South African Qualification Certification Council) certification.
Health and safety equipment as listed must be provided.
No other compliance requirements (CIDB, B-BBEE, CSD, tax) specified in this document.
Health & Safety
Source: C2 TSC3 Pricing Data Option A .pdfHealth and safety requirements (annual quantities):
Pricing Schedule
Source: C1 1 TSC3 Offer Acceptance .pdfPricing details specified in Part C2 of the contract.
Scope of work and associated drawings or documents detailed in Part C3, both referenced from Contract Data Part C1.
Contractual Terms
Source: C1 1 TSC3 Offer Acceptance .pdfWithin two weeks of agreement effective date, tenderer must contact Employer's agent to arrange delivery of securities, bonds, guarantees, proof of insurance and other contractual documentation.
Failure to provide these documents constitutes repudiation of the agreement.
Submission Guidelines
Source: Integrity Declaration Form - 31 May 2024.pdf (RFP)Returnable form - Integrity Declaration Form (559-1848080 Rev 2): must be fully completed, signed and submitted. It requires declarations of interest/relationships with Eskom, fair tendering practices and shareholding information.
A false declaration may result in rejection of the tender/proposal and action by Eskom.
Description
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdfThe PAYE Questionnaire for Service Contracts is a tax compliance tool used by Eskom to classify contractors (Individual, Close Corporation, Company, Trust) as Independent Contractor, Personal Service Provider, Labour Broker, or Dependent Contractor for the 2025/2026 tax year. It applies to all service providers to Eskom and its subsidiaries. The contractor completes Evaluation Pack A (entities) or Pack B (individuals), answering a series of yes/no questions on residence, employees, connected persons, income concentration, place/control/supervision, and dominant impression. Based on answers, specific affidavits/declarations (Appendices 1-9) must be signed. The completed pack with signed summary sheet and affidavits must be returned to Eskom, copying Group Tax at [email protected]. Eskom accepts no liability for use of the pack.
Important Dates
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdf (unknown)Pack applicability: 1 March 2025 to 28 February 2026 (2025/2026 tax year).
Tender closing date: 27 November 2026 at 08:00 (per tender record).
The questionnaire must be completed and submitted as part of the bid; no separate deadline stated in the pack.
Contact Information
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdf (unknown)Enquiries: Eskom Group Tax Department, Megawatt Park.
Email: [email protected] (for submission copies).
No named individual or telephone provided in the document.
Submission address: Not specified in the pack; likely via the Eskom procurement channel for the specific tender.
Submission Guidelines
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdf (unknown)The completed PAYE Questionnaire (Evaluation Pack A for Company/CC/Trust, or Pack B for Individuals) must be submitted to Eskom with the signed summary sheet and all required affidavits/declarations.
Copy Group Tax at [email protected] when returning the pack.
The questionnaire must be completed by the contractor or a duly authorised representative, who must declare all answers are truthful.
Based on answers, specific appendices (1-9) must be signed and submitted; failure to sign required affidavits results in PAYE being withheld from payments.
The pack is valid for the 2025/2026 tax year (1 March 2025 – 28 February 2026).
Evaluation Criteria
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdf (unknown)The questionnaire determines the contractor's tax classification through a decision tree:
Classification outcomes: Independent Contractor, Personal Service Provider (PSP), Labour Broker, or Dependent Contractor.
If classified as PSP or Dependent Contractor, PAYE must be withheld (codes 3601/3616 on IRP5).
If Labour Broker with valid IRP30 certificate, no PAYE withheld (code 3617); without certificate, PAYE withheld until certificate provided.
Decision matrix: answering "PSP" to any of questions 6(i), 6(iii), 6(v), 6(vi), 6(ix) or >50% "PSP" on questions 6(ii), 6(iv), 6(vii), 6(viii), 6(x), 6(xi) triggers PSP classification.
Technical Specifications
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdf (unknown)This document is a PAYE compliance questionnaire, not a technical specification.
It applies to all contractors supplying services to Eskom Holdings SOC Ltd and its subsidiaries (Eskom Rotek Industries, Eskom Enterprises, Escap, Eskom Finance Company, Eskom Foundation, Eskom National Transmission Company SA).
The specific tender is for Fire Detection and Gas Suppression System maintenance at Kendal Power Station for 5 years (per tender record).
The questionnaire classifies the contractor for tax purposes; it does not define technical scope, deliverables, or service levels.
Pricing Schedule
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdfThe questionnaire does not include a pricing schedule or bill of quantities. It addresses tax treatment of payments: for Labour Brokers, a valid IRP30 certificate exempts PAYE withholding (IT3(a) code 3617, reason 07); without it, PAYE is withheld at individual rates until certificate provided (IRP5 code 3617). For PSP/Dependent Contractors, PAYE is withheld at prevailing rates (codes 3601/3616). No pricing format, rates, or payment schedules are defined here.
Financial Requirements
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdf (unknown)Tax implications based on classification:
Contractor must provide bank details (account number, bank, branch, account holder, type).
No bid security, guarantees, retention, or payment terms specified in this questionnaire.
Compliance Requirements
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdf (unknown)Contractor must be a tax resident of South Africa (per Income Tax Act definition) or complete Appendix 9 for non-residents.
Must provide: VAT registration number, Income Tax registration number, Company/CC/Trust registration number, vendor number.
Must complete the relevant Evaluation Pack (A or B) truthfully and sign the summary sheet.
Depending on answers, must sign one or more affidavits/declarations:
Must notify Eskom in writing of any changes to declared information.
Definitions per Income Tax Act (Appendix 10) apply: Connected Person, Associated Institution, Labour Broker, Personal Service Provider, Remuneration, Resident.
No B-BBEE, CIDB, CIPC, or professional registration requirements mentioned in this pack.
Health & Safety
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdfThe document does not contain health and safety requirements. It is solely a tax classification questionnaire. Any OHS requirements for the fire detection maintenance tender would be in the tender's technical specifications, not in this pack.
Section
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdfThe questionnaire's evaluation criteria are the decision rules that lead to a tax classification. The process flows through six tests: (1) Residence – non-residents complete Appendix 9 and are referred to Group Tax. (2) Number of Employees Exclusion – entities with ≥3 full-time non-connected employees sign Appendices 1 and 8 and are classified as Independent. (3) Connected Person Services – if no connected person renders services, sign Appendices 2 and 8 for Independent classification. (4) 80% Income Test – if >80% income from one client/associated institution, sign Appendix 7 (PSP/Dependent Contractor). (5) Place, Control & Supervision – if duties mainly at Eskom premises and under Eskom control, sign Appendix 7. (6) Dominant Impression Test – 11 questions; answers mapped to "Independent" or "PSP"/"Employee" columns. If any "PSP" on questions 6(i), 6(iii), 6(v), 6(vi), 6(ix) or >50% "PSP" on the others, classify as PSP (Appendix 7). Otherwise, if not already signed Appendix 7, sign Appendix 8 for Independent classification. The outcome determines PAYE withholding and IRP5 codes.
Compliance Requirements
Source: ANA2C1~1.PDF (unknown)Tax Compliance Questionnaire for Foreign Suppliers (Annexure G, Template 240-119645544 Rev 1): mandatory for foreign suppliers to complete.
Description
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdfDescription
Contact Information
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)Contact information
Evaluation Criteria
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)Evaluation criteria
Technical Specifications
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)Technical specifications
Pricing Schedule
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdfPricing schedule
Financial Requirements
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)Financial requirements
Compliance Requirements
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)Compliance requirements
Section
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdfEvaluation criteria
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Kendal Power Station, Main Stores - Near Ogies, on Jhb/Witbank Road - Witbank - 1035
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
30
Last checked
07 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Get deep intelligence on Services: General. Unlock full pricing strategies, bid frequency, and historical win rates.
Learn how to submit a winning bid with these related articles
Everything South African general contractors need to know about how to write a winning tender proposal without an in-house bid team in gauteng — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Your meticulously crafted General sector tender submission can be disqualified for a single, seemingly minor compliance oversight. The reality for South African contractors is that technical competence is no longer sufficient; it is underpinned by a non-negotiable framework of documentary compliance. This regulatory guide: mastering CSD and BBBEE compliance for general sector tenders in south africa provides a comprehensive, step-by-step breakdown of the mandatory registrations and certificates you must secure and present. We detail the precise requirements for CSD, BBBEE, SARS TCS, CIPC, and COIDA, explaining their function within the procurement ecosystem governed by the PFMA and PPPFA. Learn the actionable steps to prepare your business, avoid the most common disqualifying errors, and leverage technology to streamline your compliance process for successful bidding in 2026 and beyond.
For South African General contractors, the path to government procurement is paved with non-negotiable regulatory requirements. The most common barrier to entry is not a lack of capability, but a failure to master the foundational compliance frameworks that govern every bid. This complete regulatory guide to CSD and BBBEE compliance for General sector tender suppliers in South Africa demystifies the process. It provides a meticulous, step-by-step field manual for ensuring your company is fully compliant and audit-ready, enabling you to confidently access the R billions in opportunities across infrastructure maintenance, facilities management, and service delivery within the General sector.
This definitive guide provides General sector contractors with the precise, actionable steps required to achieve and maintain CSD and BBBEE compliance for South African public tenders in 2026. Authored by Dr. Sarah Mokwena, a Legal Compliance Specialist, it meticulously walks through the regulatory framework, mandatory registrations, and the critical documentation needed to avoid disqualification. We dissect the common, costly errors made during submission and provide a clear checklist to ensure your bid is responsive and competitive. Learn how to navigate the Central Supplier Database, validate your BBBEE status, and integrate compliance into your tender preparation process.
💡 Want more tendering tips and strategies?
Explore Our Blog