Tender Type
Request for Bid(Open-Tender)
Delivery Location
Kendal Power Station, Main Stores - Near Ogies, on Jhb/Witbank Road - Witbank - 1035
Organization Type
GOVERNMENT
Published
06 Nov 2026
OCDS Reference
ocds-9t57fa-177298
The department requires the supply and delivery of fire detection spares for kendal power station over a five-year period. The tender is open to all bidders, with preference points awarded under the 90/10 system for price and specific goals. The maximum total points are 100, split between price (calculated using the 90/10 formula) and specific goals as listed in the tender. Bidders must complete and submit sbd 4 (declaration of interest) and sbd 9 (certificate of independent bid determination) with their bid.
Closing date and time: 27 November 2026 at 08:00; submission method and address not specified in the extracted text.
Mandatory briefing or site visit: not mentioned in the extracted text.
Returnable forms: SBD 4 (Declaration of Interest) — disclose whether any director or shareholder is employed by the state; SBD 9 (Certificate of Independent Bid Determination) — certify that the price was set independently. Both must be completed, signed and submitted with the bid.
Eligibility and pre-qualification thresholds: CSD registration, tax clearance (SARS TCS / tax pin), B-BBEE level, CIDB grading, CIPC registration, professional-body registrations, local content percentages — not specified in the extracted text.
Pricing format and bond / guarantee / insurance requirements: not specified in the extracted text.
Evaluation split and minimum qualifying scores: 90/10 preference point system; maximum 100 points allocated between price and specific goals; price points calculated using the 90/10 formula; specific goals points awarded per goals listed in the tender.
Financial capacity / turnover requirements: not specified in the extracted text.
Named contacts (SCM and technical) and enquiry channels: not specified in the extracted text.
Special disqualifying conditions: not specified in the extracted text.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Check the registered grade against the tender conditions, or estimate a possible grade. Check CIDB registration · Estimate a CIDB grade.
Date & Time
Friday, 27 November 2026 - 10:00
Venue
null
Categories
Request for Bid(Open-Tender)
Kendal Power Station, Main Stores - Near Ogies, on Jhb/Witbank Road - Witbank - 1035
Recommended Certifications
Having these can improve your winning chances: SABS Product Certification, NRCS Certification
AI Document Analysis Stages
Description
06 Nov
2026
Tender Published
Tender was published
27 Nov
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Annexure H - SBD 1 - Part A Invitation to Bid.pdf
Supply and delivery of fire detection spares for Kendal Power Station over a five-year period. Bidders submit a priced offer against Eskom's standard bid documentation, with the successful bidder signing a written contract.
Integrity Declaration Form - 31 May 2024.pdf
Supply and delivery of fire detection spares for Kendal Power Station for a period of five years. The procuring entity, Eskom, requires bidders to submit their completed offers by 27 November 2026 at 10:00.
Annexure G1-G4 - SBD 6.2 - Declaration Certificate for Local Production and Content for Designated Sectors - 14 March 2025.pdf
ESKOM is procuring the supply and delivery of fire detection spares for Kendal Power Station in Mpumalanga province for a 5-year period, with compliance to local content requirements under SATS 1286:2011.
C1 2b SC3 Data by Supplier.pdf
Eskom requires the supply and delivery of fire detection spares to Kendal Power Station in Mpumalanga for a five-year period under an NEC3 Supply Contract (SC3).
SHE specification for Fire Detection and Gas Suppression System (003).pdf
Supply and delivery of fire detection spares for Kendal Power Station for a period of five years.
Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf
The supply and delivery of fire detection spares for Kendal Power Station for a period of 5 years, procured by Eskom in Mpumalanga province.
Form A_Cat 3 The Provision of Fire Detection Spares .pdf
The department requires the supply and delivery of fire detection spares for Kendal Power Station for a five‑year period. Bidders must meet Eskom’s Supplier Quality Requirements (240‑105658000) and ISO 9001 standards, including rights of access, audits, nonconformity management and quality performance monitoring.
Baseline Risk Assessment for maintenance and refurbishment of FDS.pdf
The supply and delivery of Fire detection spares for Kendal Power Station for a period of 5 years is required by ESKOM in Mpumalanga. The tender closes on 27 November 2026 at 10:00.
Eskom - Standard Conditions of Tender - 30 January 2025.pdf
Supply and delivery of fire detection spares for Kendal Power Station for a period of 5 years.
Annexure C - Tenderer's Particulars.pdf
ESKOM is seeking the supply and delivery of fire detection spares for Kendal Power Station in Mpumalanga province for a 5-year period, with a closing date of 27 November 2026 at 10:00 GMT+0200.
C3 1 SC3 Purchasers Goods Information (9).pdf
Eskom is seeking proposals for the supply and delivery of fire detection spares for Kendal Power Station over a five‑year term. The successful bidder must maintain a stock of the listed spares, transport them to the station using their own vehicles, comply with fire‑detection standards (SANS 10139, NFPA 72, etc.) and Eskom’s safety, health, environmental and quality requirements, and meet local‑procurement, job‑creation and B‑BEE obligations.
240-77471499 (2) Annexure B.pdf
Supply and delivery of Fire detection spares for Kendal Power Station over a 5-year period.
Contract Quality Plan Template (CQP).pdf
Eskom requires the supply and delivery of fire detection spares for Kendal Power Station in Mpumalanga over a five-year period. The contract includes a mandatory Contract Quality Plan aligned with SANS 466:2005 and ISO 10005:2005 that the successful bidder must complete and implement.
Annexure A.1 Acknowledgement Form - Reverse E-auctioning Training - February 2024.pdf
Supply and delivery of fire detection spares for Kendal Power Station for a 5-year period. The document provided is an annexure requiring bidders to acknowledge reverse e-auction training.
Standard Bidding Document (SBD) 4 Bidders Disclosure.pdf
Supply and delivery of fire detection spares for Kendal Power Station for a period of five years is required by ESKOM in Mpumalanga. The procurement is for fire detection spares for the power station.
C1 2a SC3 Data by Purchaser.pdf
Supply and delivery of fire detection spares for Kendal Power Station for a period of five years for Eskom Holdings SOC Ltd.
240-77471651 C1 High Risk Category.pdf
Eskom requires the supply and delivery of fire detection spares for Kendal Power Station in Mpumalanga over a five-year period. The procurement is classified as high-risk for occupational health and safety, requiring extensive OHS documentation and competent personnel.
List of Tender Returnables The Provision of Fire Detection Spares at .pdf
The department requires supply and delivery of fire detection spares for Kendal Power Station for a period of 5 years.
Annexure I - SBD 6.1 Preference Points Claim Form in terms of The PPR 2022.pdf
Supply and delivery of fire detection spares for Kendal Power Station for a period of 5 years. Eskom invites tenders in Mpumalanga, closing on 27 November 2026 at 10:00 South African Standard Time.
Eskom General Conditions of Purchase - 31 May 2024 (1).pdf
Supply and delivery of fire detection spares for Kendal Power Station over a 5-year period, governed by Eskom's General Conditions of Purchase (Rev 3, effective 31 May 2024).
Annexure F - CPA (IG) Requirements for Foreign Goods and Services (1).pdf
The supply and delivery of fire detection spares for Kendal Power Station is required over a period of 5 years. The procurement is issued by Eskom for the Kendal Power Station site in Mpumalanga. The tender covers fire detection spares and includes contract duration, pricing, contract price adjustment and foreign currency payment requirements.
Eskom Supplier Integrity Pact - 02 June 2023 (1).pdf
Eskom requires the supply and delivery of fire detection spares for Kendal Power Station over a five‑year period.
Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdf
Supply and delivery of fire detection spares for Kendal Power Station for a period of 5 years, requiring prospective bidders to complete the Eskom PAYE Questionnaire for Service Contracts (Evaluation Pack A for companies/trusts or Pack B for individuals) to determine their tax status and the tax withholding obligations applicable to the contract.
C2 SC3 Pricing Data .pdf
The department requires the supply and delivery of fire detection spares for Kendal Power Station for a period of five years under an NEC3 Supply Contract (SC3).
Annexure J - SBD 4 - Tenderer's Disclosure.pdf
The department requires the supply and delivery of fire detection spares for Kendal Power Station for a period of five years.
Annexure G - Tax Compliance Questionnaire for Foreign Suppliers (Manadatory for foreign suppliers to complete) - April 2024.pdf
Supply and delivery of fire detection spares for Kendal Power Station is procured for a period of five years.
Consolidated COVID-19 - Direction on Health and Safety in the Workplace ....pdf
C0 SC3 Contract cover pages.pdf
The supply and delivery of fire detection spares for Kendal Power Station is required for a period of 5 years.
OHS Specification for Spares supply and Fire detection project.pdf
ESKOM in Mpumalanga is seeking bids for a five‑year contract covering the supply and delivery of fire detection spares for Kendal Power Station, including maintenance of fire detection systems and actuating extinguishants, with full adherence to Eskom’s Occupational Health and Safety (OHS) specification and all applicable legislative and regulatory requirements.
Authorisation Form - 08 November 2024.pdf
Supply and delivery of fire detection spares for Kendal Power Station over a five-year period. The contract covers the provision of spare components for the station's fire detection systems, with pricing submitted against a schedule of rates for the duration of the term.
E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf
The supply and delivery of fire detection spares for Kendal Power Station for a 5-year period, tendered by ESKOM in Mpumalanga province.
Annexure E - Contract Price Adjustment (CPA) Requirements for Local Goods and Services.pdf
The supply and delivery of fire detection spares for Kendal Power Station for 5 years.
Integrity Declaration Form - 08 November 2024.pdf
Supply and delivery of fire detection spares for Kendal Power Station over a five-year period. The contract is issued by Eskom in Mpumalanga and closes on 27 November 2026 at 10:00.
Environmental Evaluation checklist The Provision of supply and delivery of CI Units for Fire Detectionfor Kendal PS.pdf
Supply and delivery of fire detection spares and C&I units for Kendal Power Station over a five-year period. Suppliers must submit environmental documentation before project activities commence, assessed against a scored environmental evaluation checklist.
Annexure D - Integrity Declaration Form.pdf
ESKOM is seeking the supply and delivery of fire detection spares for Kendal Power Station in Mpumalanga for a 5-year period. The tender closes on 27 November 2026 at 10:00 GMT+0200.
C1 1 SC3 Offer Acceptance .pdf
Supply and delivery of fire detection spares for Kendal Power Station for a period of 5 years.
Standard Bidding Document (SBD) 6.1 in terms of PPR 2022 (03 February 2023).pdf
The supply and delivery of fire detection spares for Kendal Power Station is procured for a period of five years. The procuring organ is ESKOM in Mpumalanga. The tender is evaluated under the 90/10 preference point system, with points allocated for price and specific goals.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
EskomWin Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 3 600 340
Range
Based on 10 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Eskom's minimum safety, health and environmental requirements apply to the fire detection and gas suppression system contract at Kendal Power Station for five years. The contractor must develop a SHE plan meeting the specification and applicable legislation and remains accountable for its own health and safety programme. The specification applies to any contracting organisation intending to tender for the contract.
Important Dates
Source: SHE specification for Fire Detection and Gas Suppression System (003).pdf (unknown)Closing: 27 November 2026 at 08:00
Contact Information
Source: SHE specification for Fire Detection and Gas Suppression System (003).pdf (unknown)Eskom Contract's Manager: Simanga Sithole
Eskom's Safety Officer: Girly Mathebula
Eskom's Procurement Manager: Andrew Motsuki
Eskom's Health and Safety Manager: Buyelwa Basholo
Delivery address: Kendal Power Station
Technical Specifications
Source: SHE specification for Fire Detection and Gas Suppression System (003).pdf (unknown)Scope: Provision of Fire Detection and Gas Suppression System at Kendal Power Station
Contract period: 5 years
Location: Kendal Power Station
The contractor must develop a SHE plan meeting the specification and all applicable legislation
The SHE specification states Eskom's minimum safety, health and environmental requirements for the contract duration
Applicable to any contracting organisation intending to tender for the contract
Maintenance personnel must be Original Equipment Manufacturer trained on all fire detection and gas suppression systems onsite
Methodology
Source: SHE specification for Fire Detection and Gas Suppression System (003).pdfA written safe work procedure or method statement is required when designing a new job or task, changing a job or task, or introducing new equipment or substances.
Quality Management
Source: SHE specification for Fire Detection and Gas Suppression System (003).pdfISO 9001 Quality Management Systems is a referenced standard.
SANS 1186 Symbolic Safety Signs applies.
Applicable SANS Codes related to the project apply.
SAQCC (Fire) certification must be valid for the duration of the contract (five years).
Maintenance personnel must be Original Equipment Manufacturer trained on all fire detection and gas suppression systems onsite.
Compliance Requirements
Source: SHE specification for Fire Detection and Gas Suppression System (003).pdf (unknown)Valid letter of good standing from the Compensation Commissioner required before work commences
Competent persons must be appointed in writing to supervise contracted work
Medical certificates of fitness must be valid for one year and issued by a registered occupational health practitioner
Section 37(2) agreement required
Alcohol level is 0%; Eskom substance abuse procedure 32-37 applies, including ad hoc alcohol testing
SAQCC (Fire) certification must be valid for the duration of the contract (five years)
Contractor remains accountable for its own health and safety programme and employees
Health & Safety
Source: SHE specification for Fire Detection and Gas Suppression System (003).pdfProject address: Kendal Power Station
Eskom Contract's Manager: Simanga Sithole
Eskom's Safety Officer: Girly Mathebula
Eskom's Procurement Manager: Andrew Motsuki
Eskom's Health and Safety Manager: Buyelwa Basholo
A Section 37(2) agreement applies.
The contractor is accountable for its own health and safety programme and must develop a SHE plan.
A valid letter of good standing from the Compensation Commissioner is required before work commences.
Competent persons must be appointed in writing to supervise work.
Medical certificates of fitness are valid for one year and issued by a registered occupational health practitioner.
Alcohol level is 0%; Eskom procedure 32-37 applies with ad hoc alcohol testing.
Risk assessments, safe work procedures, method statements and permit to work are required.
PPE must be issued and inspected.
Environmental
Source: SHE specification for Fire Detection and Gas Suppression System (003).pdfRequirements pertaining to local authorities, municipal by-laws and environmental legislation must be met.
An Environmental Management Plan should form part of Eskom's Environmental Management System.
The contractor must take reasonable measures to prevent pollution or environmental degradation and minimise and rectify any harm.
Pricing Schedule
Source: Annexure E - Contract Price Adjustment (CPA) Requirements for Local Goods and Services.pdfPricing schedule and CPA conditions
Financial Requirements
Source: Annexure E - Contract Price Adjustment (CPA) Requirements for Local Goods and Services.pdf (TENDER)Contract Price Adjustment (CPA) requirements
Compliance Requirements
Source: Annexure D - Integrity Declaration Form.pdf (RFP)Required returnable form
Mandatory declarations
Disqualification triggers
Shareholding and beneficiary information
False information
Fraud reporting
Compliance Requirements
Source: Annexure G1-G4 - SBD 6.2 - Declaration Certificate for Local Production and Content for Designated Sectors - 14 March 2025.pdf (TENDER)SBD 6.2 (Declaration Certificate for Local Production and Content for Designated Sectors): must be completed and signed by the chief financial officer or other legally responsible person nominated in writing; the obligation cannot be transferred to an external representative, auditor or third party.
Annex C (Local Content Declaration: Summary Schedule): must be submitted at the stipulated bid deadline to substantiate the local content declaration.
Annex D (Imported Content Declaration) and Annex E (Local Content Declaration supporting schedule): must be completed and retained by the bidder for verification for at least 5 years; the successful bidder must continuously update C, D and E with actual values for the duration of the contract.
Local content is calculated as LC = [1 - (imported content / bid price excluding VAT)] x 100 in accordance with SATS 1286:2011.
Imported content is converted to ZAR using the SARB exchange rate published at 12:00 on the date of advertisement; proof of the SARB rate(s) used must be submitted.
Stipulated minimum local content threshold: no percentage stated (the threshold table is blank).
The Procurement Authority may request verification of local content in terms of SATS 1286:2011.
Incorrect or unverifiable local content data may result in remedies under Regulation 9.1 of the Preferential Procurement Regulations, 2022 issued under the PPPFA, 2000.
Contractual Terms
Source: Annexure G1-G4 - SBD 6.2 - Declaration Certificate for Local Production and Content for Designated Sectors - 14 March 2025.pdfA bid may be disqualified if the Declaration Certificate and Annex C (Local Content Declaration: Summary Schedule) are not submitted at the stipulated deadlines.
The Procurement Authority has the right to request verification of local content in terms of SATS 1286:2011.
Incorrect or unverifiable local content data may result in remedies under Regulation 9.1 of the Preferential Procurement Regulations, 2022 issued under the PPPFA, 2000.
Description
Source: Annexure H - SBD 1 - Part A Invitation to Bid.pdfThis document is the Invitation to Bid (SBD 1 Part A) for the supply and delivery of fire detection spares for Kendal Power Station for 5 years.
It sets out the bidding procedure, submission requirements, tax compliance obligations, and general terms and conditions.
Bidders must complete the supplier information and foreign supplier questionnaire where applicable.
The bid is subject to the Preferential Procurement Policy Framework Act, Preferential Procurement Regulations, General Conditions of Contract, and any special conditions.
Fraud and corruption can be reported anonymously at 0800 11 2722 or [email protected].
Important Dates
Source: Annexure H - SBD 1 - Part A Invitation to Bid.pdf (TENDER)Closing date: 27 November 2026 at 08:00 (UTC) (from tender record).
No compulsory briefing or site visit mentioned in this document.
Submission Guidelines
Source: Annexure H - SBD 1 - Part A Invitation to Bid.pdf (TENDER)Submission method: physical delivery to the bid box at the address specified in the bid document (address not provided in this extract).
Closing time: as stipulated in the bid document (not provided in this extract); late bids will not be accepted.
Bids must be submitted on the official forms provided; forms must not be re-typed.
The successful bidder must complete and sign a written contract form (SBD 7).
Returnable forms: SBD 1 (Invitation to Bid) must be completed and signed as the offer cover page; proof of authority (e.g., company resolution) for the signatory must be submitted.
Failure to provide required particulars may render the bid invalid.
Technical Specifications
Source: Annexure H - SBD 1 - Part A Invitation to Bid.pdf (TENDER)Scope: Supply and delivery of fire detection spares for Kendal Power Station, Mpumalanga, for a 5-year period.
Detailed specifications, quantities, and standards are not provided in this extract; refer to the full bid document.
Compliance Requirements
Source: Annexure H - SBD 1 - Part A Invitation to Bid.pdf (TENDER)Tax compliance: bidders must submit a valid SARS Tax Compliance Status (TCS) PIN or a printed TCS certificate.
If no TCS PIN is available, a Central Supplier Database (CSD) number must be provided.
Each party in a consortium, joint venture, or subcontracting arrangement must submit a separate TCS PIN, certificate, or CSD number.
Bids will not be considered from persons in the service of the state, companies with directors in the service of the state, or close corporations with members in the service of the state.
Registration on the Central Supplier Database (CSD) is implied.
No B-BBEE or CIDB requirements mentioned in this extract.
Important Dates
Source: Annexure A.1 Acknowledgement Form - Reverse E-auctioning Training - February 2024.pdf (RFP)25 February 2022
Important Dates
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Closing date and time: 27 November 2026 at 08:00 (SAST)
Compulsory site visit/clarification meeting: Required; details stated in Tender Data
Clarification requests: Must be submitted in writing before closing date; responses published to all tenderers
Submission Guidelines
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Closing date: 27 November 2026 at 08:00 (SAST)
Submission method: E-tendering via Eskom Tender bulletin site or hand delivery to tender box
Must submit original tender in paper form plus one complete copy, properly marked as original and copy
May be required to submit additional electronic copy
Acknowledgement Form must be completed and submitted with the tender
All returnable forms must be completed, signed and submitted by closing date/time
Late submissions not accepted under any circumstances
SDL&I Undertaking must be submitted by contract award
Tenderers must sign the original tender
E-tenderers must finalize submission before closing time
Evaluation Criteria
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Basic compliance check conducted first; non-compliant tenders disqualified
Functionality evaluation if applicable, with minimum threshold from Tender Data required to proceed
Financial analysis conducted to assess risk to Eskom
Price evaluation according to Tender Data criteria, considering CPA, FOREX, commodity exposure, unconditional discounts, technical adjustment, PV and forecasted invoicing rates
Arithmetical errors checked; discrepancy between figures and words resolved in favour of amount in words
B-BBEE level scored via CSD report or certificate/affidavit provided
Specific Goals scored with supporting documentation
Final ranking based on PPPFA system: Pricing score + Specific Goals score
80/20 or 90/10 preference point allocation applies (as stipulated in Tender Data)
Objective criteria may apply but functionality and B-BBEE scorecard may not be used as objective criteria
Reverse e-auction may be utilized using 90/10 or 80/20 price and preference point systems
Technical Specifications
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Scope: Supply and delivery of fire detection spares for Kendal Power Station
Duration: 5 years
Category: Supplies: General
Specifications incorporated by reference into Invitation to Tender documents; detailed requirements not in extracted text
Pricing Schedule
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdfPrices in South African Rand, fixed for contract duration
Must include all duties, taxes (VAT) and levies applicable 14 days before closing
No contract price adjustment except as provided in Invitation to Tender
Alterations or additions to tender documents not permitted except for Eskom Representative instructions or error corrections
Alternative tenders only permitted if main tender also submitted and allowed by Tender Data
Financial Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Prices in South African Rand, fixed for duration of contract
Must include all duties, taxes (VAT) and levies applicable 14 days prior to closing date
Eskom does not compensate tenderer for tender preparation costs
Security for performance: tenderer must indicate minimum 2 financial institutions likely to provide required security
Price evaluation considers CPA, FOREX, commodity exposure, unconditional discounts, technical adjustment, PV and forecasted invoicing rates
Arithmetical errors checked; if discrepancy between figures and words, amount in words prevails
Corrections process: tenderer may confirm prices as tendered or accept corrected prices
Compliance Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Must comply with eligibility criteria (not restricted from doing business with Eskom or SOCs)
Cannot sub-contract 100% of scope of work
CSD registration required for B-BBEE level verification
Must not submit misrepresented or falsified information (disqualification and possible criminal charges)
SDL&I Undertaking must be submitted by contract award
B-BBEE level proof must be provided at closing if pre-qualification criterion
CIDB grading if stipulated: registration required at closing or within 21 working days
SHEQ systems, policies and capabilities must be in place at closing
Designated materials information must be submitted by contract award
Functionality minimum threshold must be met if functionality is a criterion
Health & Safety
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdfSHEQ systems, policies and capabilities must be in place at closing date/time
All SHEQ costs and personnel must be reflected in tender requirements
CIDB grading registration required at closing or within 21 working days if stipulated in Tender Data
If awarded contract, must achieve Contract Skills Development Goals (CSDG) per CIDB standard
Must achieve Contract Participation Goals (CPG) relating to engagement of targeted enterprises
CPG applies to construction works contracts in GB and CE classes with minimum 6 months estimated duration
Contractual Terms
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdfEskom may accept or reject variations, deviations or alternative tenders
Eskom may cancel tender at any time before contract conclusion
Late tenders returned unopened to tenderer
Tenders opened in presence of tenderers' representatives (or electronically for e-tendering)
Prices announced if stated in Tender Data
Evaluation information confidential until after tender award
Grounds for rejection include influencing tender process, collusion/bid rigging, or fraudulent/illegal activity
Clarification obtained from tenderers before closing date
Award may be made to non-highest-scoring tender per PPPFA section 2(1)(f)
Section
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdfDocuments must be submitted and accessible for evaluation without challenges
Criteria not measured twice across evaluation phases (no double-dipping)
Functionality scoring with minimum threshold from Tender Data required to proceed to further evaluation
Financial risk assessed during evaluation
Price evaluation per Tender Data criteria including CPA, FOREX, commodity exposure, unconditional discounts, technical adjustment, PV and forecasted invoicing rates
B-BBEE level scoring via CSD report or certificate/affidavit; zero points under PPPFA point allocation if not provided
Specific Goals scored with supporting documentation
Final ranking based on PPPFA: Pricing score + Specific Goals score
Objective criteria cannot include functionality or B-BBEE scorecard as per PPPFA section 2(1)(f)
Reverse e-auction may be utilized using 90/10 or 80/20 price and preference point systems
Quality Management
Source: 240-77471499 (2) Annexure B.pdfFinancial penalties for non-conformance
Induction
Financial Requirements
Source: 240-77471499 (2) Annexure B.pdf (unknown)Financial penalties
Compliance Requirements
Source: 240-77471499 (2) Annexure B.pdf (unknown)SHE legislation
Eskom SHE standards and documents
Induction
Post-award alignment
Health & Safety
Source: 240-77471499 (2) Annexure B.pdfMandatory SHE documents
Post-award alignment
Contractual Terms
Source: 240-77471499 (2) Annexure B.pdfManagement of contractors and suppliers
Description
Source: C3 1 SC3 Purchasers Goods Information (9).pdfSupply and delivery of fire detection spares for Kendal Power Station for a 5-year period. The station uses Aritech/Techno-switch fire detection technology monitoring over 3200 detection points across 11 fire panels with global and local repeaters. Systems include VESDA, Crowcon Gas Monitoring, Linear Heat Detection, Optical Beam Detectors, and Infrared Camera Systems across Units 1-6 and Outside Plant. Spares must be supplied as and when required, transported by contractor's own vehicle to Kendal stores, and comply with all applicable fire detection standards and Eskom SHEQ requirements.
Important Dates
Source: C3 1 SC3 Purchasers Goods Information (9).pdf (unknown)Closing date: 27 November 2026 at 08:00
No compulsory briefing or site visit dates mentioned in this document section.
Contact Information
Source: C3 1 SC3 Purchasers Goods Information (9).pdf (unknown)Invoice submission email: [email protected]
No named SCM or technical contacts, telephone numbers, or physical submission/delivery addresses provided in this document section.
Delivery address for goods:
Kendal Power Station stores
Mpumalanga
Delivery hours:
Monday to Thursday: 07:15 to 16:30
Friday: 07:15 to 12:15
Gate access must be arranged one day before delivery.
All personnel must pass alcohol breathalyser test at gate.
Submission Guidelines
Source: C3 1 SC3 Purchasers Goods Information (9).pdf (unknown)The document provided is Part C3 (Scope of Work) only and does not contain submission instructions, closing address, number of copies, or packaging requirements. Bidders must obtain the full tender pack for submission details.
Returnable documents referenced in this section:
Disqualification risks:
Evaluation Criteria
Source: C3 1 SC3 Purchasers Goods Information (9).pdf (unknown)Evaluation uses the 80/20 preference point system:
B-BBEE points allocation (80/20 system):
Total points = price points + specific goal points, rounded to two decimal places. Contract awarded to highest total points.
Documents required to claim preference points:
Failure to provide B-BBEE documentation:
Additional evaluation considerations (from scope):
No minimum qualifying score for functionality stated in this section.
Technical Specifications
Source: C3 1 SC3 Purchasers Goods Information (9).pdf (unknown)Scope: Supply and delivery of fire detection spares for Kendal Power Station for 5 years.
System overview: Aritech/Techno-switch fire detection system monitoring 3200+ points across 11 fire panels with global/local repeaters. Includes VESDA, Crowcon Gas Monitoring, Linear Heat Detection, Optical Beam Detectors, Infrared Camera System. Located at Units 1-6 and Outside Plant.
Mandatory standards compliance:
Delivery requirements:
Spares list (24 items with expected quantities):
Unplanned site visits for breakdowns outside normal working hours may be required.
Quality management: ISO 9001:2015 Category 3 - documented QMS with specified submissions.
Environmental: ISO 14001:2015 policy, site-specific EMP, Waste Management Plan.
Health & Safety: OHS Spec, SHE Plan (COVID-19), Baseline Risk Assessment (COVID-19), Letter of Good Standing, SHEQ Policy (COVID-19), Annexure B.
Management meetings: Kick-off at contract start (TBC), specialist meetings as needed, minutes within 5 days.
Documentation control: All documents reference Eskom PO number; delivery note with each delivery.
Quality Management
Source: C3 1 SC3 Purchasers Goods Information (9).pdfQuality requirement: ISO 9001:2015 Category 3. Supplier must submit approved/signed copies of: QMS manual or documented information defining QMS scope; quality policy aligned with strategic direction; completed and signed Form A (Enquiry/Contract/Quality Requirements for Supplier); quality objectives; internal audit procedure; control of nonconforming outputs; nonconformity and corrective action procedure; draft contract quality plan; example inspection/test plan (ITP) or quality control plan (QCP) from similar work; documented roles/responsibilities/authorities for QMS; control of externally provided processes/products/services. QMS must drive business processes to consistently meet Eskom requirements.
Pricing Schedule
Source: C3 1 SC3 Purchasers Goods Information (9).pdfPricing: 80/20 evaluation (80 price, 20 B-BBEE). Prices include delivery to Kendal Power Station stores, exclude VAT. Local procurement content must be separated in price schedule (local vs imported components); local content = total spend minus imported component. Invoicing: tax invoice within one week of payment certificate, submitted to [email protected] after quality control and goods receipt. Invoice must include: supplier/Supply Manager names and addresses, contract number/title, both VAT numbers, description per price schedule, amounts excluding/including VAT. SDL&I financial terms: 1% of contract value penalty for SDL&I non-compliance; 1% of each invoice (excl VAT) retained as security until SDL&I obligations fulfilled. Job creation/retention proposals required with demographic representation and local sourcing.
Financial Requirements
Source: C3 1 SC3 Purchasers Goods Information (9).pdf (unknown)Invoicing and payment:
Local procurement content:
SDL&I financial obligations:
Job creation/retention:
B-BBEE improvement/retention plan required within 30 days of contract signing:
Quarterly SDL&I compliance reporting required; Eskom reviews within 60 days; corrective measures required before next report or retention clauses invoked.
No bid security, performance bond, or guarantee requirements mentioned in this section.
Compliance Requirements
Source: C3 1 SC3 Purchasers Goods Information (9).pdf (unknown)Mandatory compliance requirements:
No CIDB grading required (supply contract, not construction).
Health & Safety
Source: C3 1 SC3 Purchasers Goods Information (9).pdfHealth and safety requirements: Fire detection systems are Level 1 safety systems for life/property protection. Compliance with OHSA, SAQCC (Fire) registration, and Eskom SHEQ requirements mandatory. Required submissions: OHS Specification; SHE Plan (including COVID-19 readiness); Baseline Risk Assessment (including COVID-19); Letter of Good Standing (COIDA); SHEQ Policy (including COVID-19); Annexure B Acknowledgement form. Reference standards: Eskom SHEQ Policy 32-727, Contractor H&S Standards 32-136 Rev 2, Project SHE Specification Rev 2, Occupational Health and Safety Act, Compensation for Occupational Disease and Illness Act. Unplanned site visits for breakdowns outside normal hours may be required. All personnel must pass alcohol breathalyser test at gate.
Environmental
Source: C3 1 SC3 Purchasers Goods Information (9).pdfEnvironmental requirements: Supplier must provide copy of Environmental Policy per ISO 14001:2015; detailed signed Contractor's Environmental Management Plan (EMP) for site-specific activities; Waste Management Plan. Compliance with ISO 14001:2015 framework expected.
Contractual Terms
Source: C3 1 SC3 Purchasers Goods Information (9).pdfContract period: 5 years. Prices include delivery, exclude VAT. Invoicing: tax invoice within one week of payment certificate, submitted to [email protected] after quality control. Goods marked with PO number (45....), no delivery without PO. Quality check on receipt; non-conforming goods returned for replacement. Delivery hours: Mon-Thu 07:15-16:30, Fri 07:15-12:15; gate access arranged day prior; alcohol breathalyser test at gate. Management meetings: kick-off at start, specialist meetings as needed, minutes within 5 days. Documentation references PO number; delivery note with each delivery. Subcontracting: not applicable per this section. Insurance by purchaser: not applicable. Contract change management: not applicable. Records of defined cost: not applicable.
Section
Source: C3 1 SC3 Purchasers Goods Information (9).pdfEvaluation uses 80/20 preference point system: 80 points for price, 20 points for specific goals (B-BBEE). B-BBEE points allocated per status level (Level 1: 20, Level 2: 18, Level 3: 14, Level 4: 12, Level 5: 8, Level 6: 6, Level 7: 4, Level 8: 2, Non-compliant: 0). Required documents for points: valid B-BBEE certificate/affidavit, CIPC ownership proof, certified ID copies, disability proof. No electronic signatures on affidavits. Failure to provide B-BBEE docs scores 0 for specific goals but does not disqualify. Additional technical compliance evaluated: fire detection standards (SANS 10139, 10400, 246, 369-1, NFPA 72), SAQCC Fire registration, own transport, ISO 9001:2015 Category 3 QMS, ISO 14001:2015 environmental, Eskom SHEQ policies, local content and job creation proposals, acceptance of SDL&I retention/penalty terms.
Description
Source: Baseline Risk Assessment for maintenance and refurbishment of FDS.pdfMaintenance services on Fire Detection at Kendal Power Station. Authorised by Mapule Madigoane, C & I Units Manager. Refer to OHS Risk assessment procedure 32-520 dated 22 August 2023.
Health & Safety
Source: Baseline Risk Assessment for maintenance and refurbishment of FDS.pdfHazard identification and controls:
Environmental
Source: Baseline Risk Assessment for maintenance and refurbishment of FDS.pdfEnvironmental compliance required per OHS Act Section 13 and Environmental Regulations. Disaster Management Act 2002 applies. Contractor/client responsible for environmental regulations and workplace safety.
Description
Source: Annexure G - Tax Compliance Questionnaire for Foreign Suppliers (Manadatory for foreign suppliers to complete) - April 2024.pdfTax Compliance Questionnaire for Foreign Suppliers (Annexure G) from Eskom
Purpose: Pre-award tax compliance determination for foreign suppliers supplying goods or services
Questionnaire structure: Five questions assessing supplier's connection to RSA - residency, branch presence, permanent establishment, source of income, and taxation liability
Exemption: Suppliers with no local footprint (all five answers 'No') are exempt from tax clearance certificate and Central Supplier Database registration
Mandatory requirement: All foreign suppliers must complete and submit the signed questionnaire
Declaration: Suppliers confirm answers were understood and answered truthfully
Required particulars: Company name, registration number, contact telephone, email or fax address, authorized representative signature and date
Evaluation Criteria
Source: Annexure G - Tax Compliance Questionnaire for Foreign Suppliers (Manadatory for foreign suppliers to complete) - April 2024.pdf (unknown)Mandatory pre-award requirement: Foreign suppliers must complete the Tax Compliance Questionnaire
Evaluation questions: Five questions assessing RSA connection (residency, branch, permanent establishment, source of income, taxation liability)
Exemption: Suppliers with all 'No' answers are exempt from tax clearance certificate and Central Supplier Database registration
Completion requirement: Form must be fully completed with company details, authorized signature, and date
Technical Specifications
Source: Annexure G - Tax Compliance Questionnaire for Foreign Suppliers (Manadatory for foreign suppliers to complete) - April 2024.pdf (unknown)Scope: Determination of tax compliance requirements for foreign suppliers to Eskom
Questionnaire: Five questions regarding RSA connection - (1) RSA residency, (2) branch in RSA, (3) permanent establishment in RSA, (4) source of income in RSA, (5) liability for taxation in RSA
Exemption criteria: Suppliers answering 'No' to all five questions need not submit tax clearance certificate or register on National Treasury Central Supplier Database
Mandatory completion: All foreign suppliers must complete and submit the questionnaire with truthful answers
Required information: Company name, registration number, contact telephone number, email or fax address, authorized representative name, designation, signature, and date
Compliance Requirements
Source: Annexure G - Tax Compliance Questionnaire for Foreign Suppliers (Manadatory for foreign suppliers to complete) - April 2024.pdf (unknown)Mandatory form: Tax Compliance Questionnaire for Foreign Suppliers (Annexure G) issued by Eskom must be completed by foreign suppliers
Exemption threshold: Suppliers with no local footprint in RSA (answering 'No' to all five connection questions) are exempt from tax clearance certificate and SARS tax clearance pin requirement
CSD exemption: Same suppliers exempt from National Treasury Central Supplier Database registration
Declaration: All five questions must be answered truthfully; form must be signed with company details provided
Company information: Company name and registration number must be entered on the form
Submission Guidelines
Source: Standard Bidding Document (SBD) 4 Bidders Disclosure.pdf (TENDER)Returnable forms
Disqualification
Contact Information
Source: Annexure I - SBD 6.1 Preference Points Claim Form in terms of The PPR 2022.pdf (TENDER)Enquiries\n- Email: [email protected]\n- Telephone: 0800 11 2722
Evaluation Criteria
Source: Annexure I - SBD 6.1 Preference Points Claim Form in terms of The PPR 2022.pdf (TENDER)The bid evaluation is based on price and specific goals, with a maximum of 100 points available. The 90/10 preference point system applies to this tender. Price points are determined by the tender price relative to the lowest acceptable tender, and additional points can be claimed for specific goals. Bidders must complete the SBD 6.1 Preference Points Claim Form to declare their claimed preference points, supported by required documentation.
Contractual Terms
Source: Annexure I - SBD 6.1 Preference Points Claim Form in terms of The PPR 2022.pdfFalse declarations or fraudulent claims regarding preference points may result in disqualification from the tender process, cost and loss recovery, contract cancellation, recommendation for 10-year restriction from obtaining business from any organ of state, and criminal prosecution. Contractors may be required to furnish documentary proof of claims to the satisfaction of the organ of state.
Section
Source: Annexure I - SBD 6.1 Preference Points Claim Form in terms of The PPR 2022.pdfPreference point systems: 80/20 for requirements up to R50 000 000 and 90/10 for requirements above R50 000 000 (all applicable taxes included). This tender uses the 90/10 system. Maximum 100 points allocated between price and specific goals. Bidders must claim specific goals points on the SBD 6.1 form with supporting proof. Price points calculated using the applicable system formula relative to the lowest acceptable tender.
Description
Source: Form A_Cat 3 The Provision of Fire Detection Spares .pdfScope
Quality category
Submission Guidelines
Source: Form A_Cat 3 The Provision of Fire Detection Spares .pdf (unknown)Returnable form
Technical Specifications
Source: Form A_Cat 3 The Provision of Fire Detection Spares .pdf (unknown)Scope
Quality category
Methodology
Source: Form A_Cat 3 The Provision of Fire Detection Spares .pdfISO 9001 clauses applied
ISO 9001 quality principles applied
Quality Management
Source: Form A_Cat 3 The Provision of Fire Detection Spares .pdfIso 9001
Eskom standard conditions
Form and sign-off
Compliance Requirements
Source: Form A_Cat 3 The Provision of Fire Detection Spares .pdf (unknown)Quality standards
Eskom standard conditions
Form and sign-off
Section
Source: Form A_Cat 3 The Provision of Fire Detection Spares .pdfApplicable ISO 9001 clauses
Applicable ISO 9001 quality principles
Award-phase requirements
Eskom standard conditions
Form acceptance
Description
Source: Annexure F - CPA (IG) Requirements for Foreign Goods and Services (1).pdfCPA formula breakdown table (Eskom proposed for foreign goods/services):
Important Dates
Source: Annexure F - CPA (IG) Requirements for Foreign Goods and Services (1).pdf (TENDER)Closing date: 27 November 2026 at 08:00 (from tender record).
Advertisement date: not specified in annexure; required for exchange rate determination (SARB rate at 12H00 on advertisement date).
Base date for monthly indices: the month before the month in which the tender closes.
Base price for daily/more frequent indices: average for the month before the month in which the tender closes.
No compulsory briefing or site visit mentioned.
Contact Information
Source: Annexure F - CPA (IG) Requirements for Foreign Goods and Services (1).pdf (TENDER)Fraud and corruption reporting:
No procurement or technical contacts provided in this annexure.
Submission Guidelines
Source: Annexure F - CPA (IG) Requirements for Foreign Goods and Services (1).pdf (TENDER)Submission requirements from Annexure F:
Disqualification risks:
Technical Specifications
Source: Annexure F - CPA (IG) Requirements for Foreign Goods and Services (1).pdf (TENDER)CPA formula structure (Eskom proposed breakdown for foreign goods/services):
Methodology
Source: Annexure F - CPA (IG) Requirements for Foreign Goods and Services (1).pdfService-related payment methodologies:
Exchange rate requirement: Tenderer must use SARB exchange rate at 12H00 on date of tender advertisement (source: www.resbank.co.za). Proof of SARB rate used must be submitted.
Pricing Schedule
Source: Annexure F - CPA (IG) Requirements for Foreign Goods and Services (1).pdfCPA and pricing requirements:
Foreign currency pricing:
Payment method selection (choose one):
Service payments: Secondment (foreign invoices, docs: commercial invoice, local invoice, passport/work permit, activity schedule) or Payroll Transfer (local ZAR contract, no foreign commitment).
Financial Requirements
Source: Annexure F - CPA (IG) Requirements for Foreign Goods and Services (1).pdf (TENDER)Contract Price Adjustment (CPA):
Payment methods for foreign commitments (select one):
Service-related payments:
Exchange rate: Tenderer must use SARB rate at 12H00 on advertisement date; proof of rate must be submitted.
Compliance Requirements
Source: Annexure F - CPA (IG) Requirements for Foreign Goods and Services (1).pdf (TENDER)Mandatory compliance requirements from Annexure F:
Health & Safety
Source: Annexure F - CPA (IG) Requirements for Foreign Goods and Services (1).pdfCPA conditions and requirements:
Description
Source: 240-77471651 C1 High Risk Category.pdfSupply and delivery of fire detection spares for Kendal Power Station for a period of 5 years. The OHS requirements in this document apply to the execution of this scope.
Submission Guidelines
Source: 240-77471651 C1 High Risk Category.pdf (unknown)Returnable OHS documents (all must be completed and submitted):
Submission method and address are not stated in this document.
Evaluation Criteria
Source: 240-77471651 C1 High Risk Category.pdf (unknown)Evaluation is based on the OHS returnables listed in Annexure C1 (High risk). Each item is assessed as Yes, No or Not Applicable. The outcome is a recommendation of Recommended or Not Recommended. No scoring weights or minimum score are stated.
Technical Specifications
Source: 240-77471651 C1 High Risk Category.pdf (unknown)Scope: supply and delivery of fire detection spares for Kendal Power Station over a 5-year period. The OHS requirements apply to the execution of this scope. No further technical specifications are provided in this document.
Financial Requirements
Source: 240-77471651 C1 High Risk Category.pdf (unknown)OHS costing must be submitted as a detailed breakdown, not a lump sum. The costing must be based on the overall scope of work/service and may use the scope of work and risk assessment as a guideline. No other financial requirements are stated.
Compliance Requirements
Source: 240-77471651 C1 High Risk Category.pdf (unknown)OHS compliance (high-risk category):
General Eskom procurement requirements (CSD, tax, B-BBEE, CIDB) are not detailed in this document.
Health & Safety
Source: 240-77471651 C1 High Risk Category.pdfOHS returnables required:
Section
Source: 240-77471651 C1 High Risk Category.pdfOHS returnables are evaluated using the Annexure C1 template for high-risk categories. Each item is marked Yes, No or Not Applicable, and a recommendation of Recommended or Not Recommended is made. No scoring weights or minimum score are stated.
Compliance Requirements
Source: Annexure J - SBD 4 - Tenderer's Disclosure.pdf (RFP)SBD 4 (Tenderer's Disclosure): must be completed, signed and submitted with the bid. Declares any director/shareholder employed by the state, relationships with procuring institution officials, and certifies independent bid determination.
Description
Source: C2 SC3 Pricing Data .pdfSupply and delivery of fire detection spares for Kendal Power Station over a 5-year period.
Items and expected quantities
Submission Guidelines
Source: C2 SC3 Pricing Data .pdf (unknown)Pricing submission
Technical Specifications
Source: C2 SC3 Pricing Data .pdf (unknown)Scope
Price Schedule items and expected quantities
Pricing Schedule
Source: C2 SC3 Pricing Data .pdfPricing basis
Amount due
Preparing the Price Schedule
Format of the Price Schedule
Price Schedule items and expected quantities
Financial Requirements
Source: C2 SC3 Pricing Data .pdf (unknown)Pricing basis
Amount due
Price Schedule format
Adjustment
Important Dates
Source: Authorisation Form - 08 November 2024.pdf (unknown)Closing date: 27 November 2026 at 10:00 (South African Standard Time).
No compulsory briefing session or site visit is mentioned in the available information. Bidders should confirm whether any clarification deadline or briefing exists in the full tender document.
Submission Guidelines
Source: Authorisation Form - 08 November 2024.pdf (unknown)Returnable forms — all must be completed, signed and submitted with the bid:
Submission method and address are not stated in the available information. Bidders must verify the submission channel (email, physical delivery, or e-tender portal), the number of copies required, packaging instructions, and the exact closing time from the full tender document.
Evaluation Criteria
Source: Authorisation Form - 08 November 2024.pdf (unknown)Mandatory compliance requirements (must be met for the bid to be considered):
Evaluation methodology (price vs functionality split, preference point system 80/20 or 90/10, minimum qualifying scores, functionality criteria and weights) is not stated in the available information. Bidders must obtain the full tender document for the detailed evaluation criteria.
Technical Specifications
Source: Authorisation Form - 08 November 2024.pdf (unknown)Scope: Supply and delivery of fire detection spares for Kendal Power Station (Eskom) for a period of 5 years.
Quantities, specific part numbers, technical standards, delivery schedule, service levels, and capacity requirements are not stated in the available information. Bidders must obtain the full specification from the tender document.
Compliance Requirements
Source: Authorisation Form - 08 November 2024.pdf (unknown)Mandatory compliance:
No CIDB grading, professional registration, local content thresholds, or minimum turnover requirements are mentioned in the available information.
Submission Guidelines
Source: Standard Bidding Document (SBD) 6.1 in terms of PPR 2022 (03 February 2023).pdf (TENDER)Closing time: 27 November 2026 at 08:00. Returnable forms: SBD 4 (Declaration of Interest) discloses whether any director or shareholder is employed by the state; SBD 9 (Certificate of Independent Bid Determination) certifies the price was set independently. Both must be completed, signed and submitted with the bid.
Evaluation Criteria
Source: Standard Bidding Document (SBD) 6.1 in terms of PPR 2022 (03 February 2023).pdf (TENDER)90/10 preference point system applicable. Maximum 100 points allocated between price and specific goals. Price points calculated using 90/10 formula. Specific goals points awarded per goals listed in tender.
Description
Source: C1 1 SC3 Offer Acceptance .pdfProcurement of fire detection spares for Kendal Power Station
Submission Guidelines
Source: C1 1 SC3 Offer Acceptance .pdf (unknown)Closing date: 27 November 2026 at 08:00
Bidders must submit one completed copy of the Form of Offer and Acceptance (C1.1 SC3), including any Schedule of Deviations, before the end of the period of validity stated in the Tender Data
Pricing Schedule
Source: C1 1 SC3 Offer Acceptance .pdfAgreement and contract data including Form of Offer and Acceptance in Part C1
Pricing data in Part C2
Scope of work, goods information and supply requirements in Part C3, including incorporated drawings and documents
Financial Requirements
Source: C1 1 SC3 Offer Acceptance .pdf (unknown)Value Added Tax @ 15% applicable on quoted prices
Tenderer must provide securities, bonds, guarantees and proof of insurance as specified in the Contract Data, to be delivered at or just after the date the agreement comes into effect
Contractual Terms
Source: C1 1 SC3 Offer Acceptance .pdfWithin two weeks of receiving a completed copy of the agreement, the tenderer must contact the Purchaser's agent (details in Contract Data) to arrange delivery of securities, bonds, guarantees and proof of insurance
Documentation must be provided at or just after the agreement comes into effect
Failure to fulfil these obligations constitutes repudiation of the agreement
Description
Source: Environmental Evaluation checklist The Provision of supply and delivery of CI Units for Fire Detectionfor Kendal PS.pdfPurpose: Assess whether suppliers have submitted required environmental documentation prior to commencement of project activities for the supply and delivery of C&I Units for Fire Detection at Kendal Power Station.
Reference Kendal documentation includes seven work instructions/policies (listed in technicalSpecifications).
Environmental evaluation checklist with nine items, each with maximum points, used to score contractor compliance.
Important Dates
Source: Environmental Evaluation checklist The Provision of supply and delivery of CI Units for Fire Detectionfor Kendal PS.pdf (unknown)Document authorisation date: April 2025
Document review date: April 2028
Evaluation Criteria
Source: Environmental Evaluation checklist The Provision of supply and delivery of CI Units for Fire Detectionfor Kendal PS.pdf (unknown)Environmental evaluation checklist scoring:
Total maximum score: 100 points
Technical Specifications
Source: Environmental Evaluation checklist The Provision of supply and delivery of CI Units for Fire Detectionfor Kendal PS.pdf (unknown)Scope of work: Provision of supply and delivery of C&I Units for Fire Detection at Kendal Power Station.
Reference Kendal documentation (work instructions and policies):
Compliance Requirements
Source: Environmental Evaluation checklist The Provision of supply and delivery of CI Units for Fire Detectionfor Kendal PS.pdf (unknown)Environmental documentation required before commencement of project activities:
Environmental
Source: Environmental Evaluation checklist The Provision of supply and delivery of CI Units for Fire Detectionfor Kendal PS.pdfEnvironmental compliance checklist (nine items) with maximum points totalling 100:
Scoring: ≥80% compliant, ≤79% non-compliant.
Reference Kendal environmental work instructions and SHEQ policy apply.
Section
Source: Environmental Evaluation checklist The Provision of supply and delivery of CI Units for Fire Detectionfor Kendal PS.pdfEnvironmental evaluation checklist scoring criteria:
Checklist items and points as detailed in evaluationCriteria section.
Submission Guidelines
Source: Integrity Declaration Form - 31 May 2024.pdf (RFP)Returnable forms — must be completed, signed and submitted with the bid:
No submission method, number of copies, packaging details or closing time are specified in this form.
Compliance Requirements
Source: Integrity Declaration Form - 31 May 2024.pdf (RFP)Mandatory declarations required by the Integrity Declaration Form:
Standard compliance requirements (CSD registration, tax clearance, B-BBEE, CIDB, etc.) are not addressed in this form.
Description
Source: Eskom Supplier Integrity Pact - 02 June 2023 (1).pdfScope and purpose:
Submission Guidelines
Source: Eskom Supplier Integrity Pact - 02 June 2023 (1).pdf (unknown)Returnable forms — each must be completed, signed and submitted with the bid:
Reporting:
Evaluation Criteria
Source: Eskom Supplier Integrity Pact - 02 June 2023 (1).pdf (unknown)Mandatory conditions for the bid:
Consequences of non-compliance:
Compliance Requirements
Source: Eskom Supplier Integrity Pact - 02 June 2023 (1).pdf (unknown)Standing compliance obligations:
Contractual Terms
Source: Eskom Supplier Integrity Pact - 02 June 2023 (1).pdfContract conduct and sanctions:
Important Dates
Source: C1 2b SC3 Data by Supplier.pdf (unknown)Closing date and time: 27 November 2026 at 08:00 UTC (10:00 SAST)
Submission method: Not specified in this document
Contact Information
Source: C1 2b SC3 Data by Supplier.pdf (unknown)Contract documentation contact:
Tender enquiry contact: Not specified in this document
Technical Specifications
Source: C1 2b SC3 Data by Supplier.pdf (unknown)Scope: Supply and delivery of fire detection spares to Kendal Power Station, Mpumalanga
Contract period: 5 years
Detailed specifications, quantities, and standards: Not provided in this document
Pricing Schedule
Source: C1 2b SC3 Data by Supplier.pdfPricing requirements per contract data:
Financial Requirements
Source: C1 2b SC3 Data by Supplier.pdf (unknown)Pricing format: Tendered total price required (in figures and words)
Price schedule to be submitted
Overheads and profit percentage to be added to Defined Cost required
Goods information for supplier's design to be provided
Risk register matters to be included
Bid security, guarantees, retention, payment terms: Not specified in this document
Description
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdfPurpose: establish whether an individual, close corporation, company or trust is an independent contractor, personal service provider, labour broker or dependent contractor, and the tax consequences of that classification
Legal basis: Fourth Schedule to the Income Tax Act; Employees' Tax withheld from remuneration paid by an employer to an employee
Applies only to contractors that supply Eskom Holdings SOC Ltd and its subsidiaries with services, or individual contractors providing Eskom with labour
The contractor or its duly authorised representative must declare that all questions are answered truthfully
Pack based on 2026/2027 tax year legislation and subject to change
Eskom accepts no liability for loss or damages arising from use of the pack
Important Dates
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)Pack validity: applies from 1 March 2026 to 28 February 2027
The pack is based on tax legislation for the 2026/2027 tax year and is subject to change
Contact Information
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)Enquiries and tax referral: Eskom Group Taxation and Corporate Tax Department
Email: [email protected]
Location: Megawatt Park
Return the completed Pack to your contractor representative in Eskom and copy Group Tax at [email protected]
Submission Guidelines
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)Submission method: return the completed and signed Pack to Eskom through your contractor representative, and copy Group Tax at [email protected]
Returnable documents: the signed summary sheet and the signed affidavits or declarations applicable to the contractor's tax classification
All fields marked with an asterisk are compulsory
The contractor or its duly authorised representative must declare that all answers are truthful
If any required affidavit or declaration is not signed, PAYE will be withheld from payments
Pack validity: applies from 1 March 2026 to 28 February 2027, subject to changes in tax legislation
Evaluation Criteria
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)Evaluation method: tax status questionnaire under the Fourth Schedule to the Income Tax Act, not a price or functionality score
Pack A: for companies, close corporations and trusts, to determine Personal Service Provider status
Pack B: for individuals, to determine Dependent Contractor status
Answer Questions 1 to 6; each answer directs the next step in the questionnaire
Classification outcomes: Independent Contractor, Personal Service Provider, Labour Broker or Dependent Contractor
Personal Service Provider or Dependent Contractor: sign Appendix 7; Employees' Tax withheld; IRP5 coded 3601 or 3616; nature of person coded H
Labour Broker: sign Appendix 6; provide a valid IRP30 exemption certificate to avoid Employees' Tax withholding; otherwise IRP5 coded 3617
Independent Supplier or Contractor: sign Appendix 8
Non-resident: sign Appendix 9 and refer the pack to the Eskom Group Tax Department in Megawatt Park
Technical Specifications
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)Scope of this pack: tax classification of contractors that supply Eskom Holdings SOC Ltd and its subsidiaries with services, and individual contractors that provide Eskom with labour
Legal basis: Fourth Schedule to the Income Tax Act; Employees' Tax is withheld from remuneration paid by an employer to an employee
Eskom entities covered: Eskom Holdings SOC Ltd and subsidiaries, including Eskom Rotek Industries, Eskom Enterprises, Escap, Eskom Finance Company, Eskom Foundation NPC and Eskom National Transmission Company SA
Contractor particulars required (fields marked with an asterisk are compulsory): contractor or trading name and vendor number; authorised representative name, surname, capacity and identity or passport number; VAT registration number; income tax registration number; CO/CC/trust registration number; email address; telephone and fax numbers; physical and postal business address; bank account number, bank name, branch name and number, account holder name, account type and account holder relationship
Financial Requirements
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)Tax withholding consequences: if required affidavits or declarations are not signed, PAYE will be withheld from payments
Personal Service Provider or Dependent Contractor: Employees' Tax withheld at the prevailing tax rate; IRP5 coded 3601 or 3616; nature of person coded H
Labour Broker with a valid IRP30 certificate: no Employees' Tax withheld from payments; IT3(a) certificate code 3617; non-deduction reason code 07
Labour Broker without a valid IRP30 certificate: Employees' Tax withheld at individual tax rates until a valid IRP30 certificate is provided; IRP5 code 3617
Eskom is entitled to withhold taxes, interest and penalties from payments if the information provided is inaccurate
The contractor must notify Eskom in writing of any change to the declared information
Compliance Requirements
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)Compulsory tax registration details: income tax registration number; VAT registration number; CO/CC/trust registration number for companies, close corporations and trusts
Truthful declaration by the duly authorised representative
Signed affidavits or appendices applicable to the contractor's classification, as directed by the questionnaire (Appendices 1 to 9)
Appendix 10: definitions under the Income Tax Act
Notify Eskom forthwith in writing if any declared statement ceases to be true
Pack based on 2026/2027 tax year legislation, subject to change
Section
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdfPack A for companies, close corporations and trusts: determines Personal Service Provider status through Questions 1 to 6
Pack B for individuals: determines Dependent Contractor status through Questions 1 to 6
Each answer directs the next step; the dominant impression test, Questions 6(i) to 6(xi), determines independent versus dependent status
Personal Service Provider or Dependent Contractor: sign Appendix 7; Employees' Tax withheld; IRP5 coded 3601 or 3616
If Appendix 7 was not already signed under Questions 4 or 5: sign Appendix 8; if unsigned, PAYE withheld
Independent classification: sign Appendix 8
Non-resident: sign Appendix 9 and refer the pack to the Eskom Group Tax Department in Megawatt Park
Contact Information
Source: Consolidated COVID-19 - Direction on Health and Safety in the Workplace ....pdf (unknown)Government Printer contact (not a tender contact):
Submission Guidelines
Source: Annexure C - Tenderer's Particulars.pdf (TENDER)Returnable documents — complete, sign and submit with the bid:
Compliance Requirements
Source: Annexure C - Tenderer's Particulars.pdf (TENDER)Central Supplier Database (CSD): provide the supplier registration number; registration is not mandatory at the time of responding but is mandatory prior to award; register online at www.treasury.gov.za.
Tax compliance: provide the SARS E-filing PIN to verify tax compliance status; if not registered on CSD, a foreign supplier, or without a PIN, attach or furnish a current valid tax compliance certificate as a tender returnable by contract award stage.
CIPC: provide the CIPC registration number or CIPC disclosure certificate for each individual company and each joint-venture member, or the trust number.
VAT: provide the VAT registration number for each individual company and each joint-venture member.
CIDB: provide the CIDB registration number and contractor grading designation for each individual company and each joint-venture member, and the combined CIDB contractor grading designation for a joint venture, where applicable.
Subcontracting, if prescribed: confirm intention to sub-contract; state the percentage to be sub-contracted; name the subcontractor; provide the subcontractor CIPC registration number, VAT registration number, CIDB registration number and grade, CSD registration number and B-BBEE level; state the subcontractor designated-group category; attach the signed intention to sub-contract document; and attach proof of the subcontractor's designated-group status.
Description
Source: C0 SC3 Contract cover pages.pdfThis document is the cover page of the NEC3 Supply Contract (SC3) for the supply and delivery of fire detection spares for Kendal Power Station for a 5-year period. The contract is between Eskom Holdings SOC Ltd (Registration No. 2002/015527/30) and the successful supplier (details to be inserted at award). The contract comprises three parts:
No further description of the goods, delivery locations, or technical requirements is provided in this extract.
Submission Guidelines
Source: C0 SC3 Contract cover pages.pdf (unknown)Returnable documents required:
Submission method, address, number of copies, and closing time are not specified in this document. Bidders must refer to the full tender advertisement for submission details. Disqualification risks: omission or incomplete completion of any returnable document. Late submissions will not be accepted. All forms must be signed by an authorised signatory.
Technical Specifications
Source: C0 SC3 Contract cover pages.pdf (unknown)Scope: Supply and delivery of fire detection spares for Kendal Power Station for a period of 5 years.
Contract type: NEC3 Supply Contract (SC3).
Contract structure:
No specific quantities, delivery schedules, or technical standards are detailed in this document.
Pricing Schedule
Source: C0 SC3 Contract cover pages.pdfPricing data is contained in Part C2 of the contract. This cover page does not provide any pricing details, rates, bill of quantities, payment schedules, or financial terms. Bidders must refer to the full tender document for the complete pricing schedule and instructions for completing the pricing data.
Compliance Requirements
Source: C0 SC3 Contract cover pages.pdf (unknown)Returnable documents:
Other compliance requirements (CSD registration, valid tax compliance status PIN, B-BBEE certificate or sworn affidavit, CIDB grading, CIPC registration, professional body registrations, local content thresholds) are not specified in this document. Bidders must verify requirements in the full tender pack.
Description
Source: C1 2a SC3 Data by Purchaser.pdfSupply and delivery of fire detection spares for Kendal Power Station for a period of 5 years.
Supply Manager: Cathrine Tsajoa, Kendal Power Station, Private Bag X7272, Witbank 1035, Tel 013 647 9189, Email [email protected].
Purchaser: Eskom Holdings SOC Ltd (reg no 2002/015527/30), registered office Megawatt Park, Maxwell Drive, Sandton, Johannesburg.
Contact Information
Source: C1 2a SC3 Data by Purchaser.pdf (TENDER)Supply Manager
Purchaser
Technical Specifications
Source: C1 2a SC3 Data by Purchaser.pdf (TENDER)Scope: Supply and delivery of fire detection spares for Kendal Power Station for a period of 5 years.
Delivery: As per accepted programme and lead times; supplier must not deliver more than one week before delivery date; arrangement for changes to be made two days prior with Supply Manager.
Programme: First programme to be submitted with tender documents; revised programmes submitted within 24 hours after every missed delivery date.
Defects: Defects date is 2 weeks after delivery; defect correction period is 4 weeks after defect notification; defects access period is 2 days after defect notification.
Risk register includes: no access due to road closures or natural disasters; damage during loading/offloading; road accidents; delivery delays due to supply chain disruptions.
Incoterms: Based on Incoterms 2010; specific term to be selected (EXW, FCA, FAS, FOB, CFR, CIF, CPT, CIP, DAT, DAP, DDP). Delivery place to be stated.
Supply requirements: Detailed in Annexure A (template).
Financial Requirements
Source: C1 2a SC3 Data by Purchaser.pdf (TENDER)Payment terms: Assessment interval 4 weeks after each successful delivery. Currency: South African Rand. Payment within 30 days, or 60 days for contracts valued at R50 million and above. Interest rate: publicly quoted prime rate of Standard Bank of South Africa (365-day year).
Tax invoice: Supplier must provide tax invoice within one week of receiving payment certificate, per purchaser's procedures. Late invoice extends payment period by delay duration.
Delay damages: 0.5% per day of purchase order value for missed delivery dates, capped at 5%.
Low performance damages: 0.5% per deviation from accepted programme, capped at 5%.
Liability limits: Supplier's liability for indirect/consequential loss limited to R0. Liability for loss/damage to purchaser's property limited to applicable insurance deductible. Total liability limited to total of prices (amount to be inserted). End of liability date: 1 year after delivery of all goods.
Insurance: Supplier must provide insurances per Insurance Table A (loss/damage to goods, liability for property damage and bodily injury, employer's liability). Purchaser provides insurances per Insurance Table B (assets all risk, contract works, environmental liability, public liability, transportation, motor fleet, terrorism, cyber, nuclear).
Compliance Requirements
Source: C1 2a SC3 Data by Purchaser.pdf (TENDER)B-BBEE: Supplier must notify purchaser within 7 days of any change in B-BBEE status due to legal status, ownership, or business composition changes. Updated verification certificate and supporting documentation must be submitted to Supply Manager within 30 days of notification. Decrease in B-BBEE status may lead to renegotiation or termination. Failure to notify may constitute grounds for termination.
Joint ventures: If supplier is a joint venture/consortium, members are jointly and severally liable. Must notify Supply Manager of key person authorised to bind the venture within 2 weeks of contract date. Composition cannot be altered without purchaser's written consent.
Confidentiality: Supplier must not disclose contract information; images of goods require prior written consent; subcontractors must comply.
Ethics: Prohibited actions (corrupt, fraudulent, coercive, collusive, obstructive) during procurement or execution are grounds for termination without need for court finding. Supplier must cooperate with investigations.
Insurance: Supplier must provide certificates of insurance when requested. Cover per Insurance Table A from starting date until last defects date or termination.
Nuclear liability: Purchaser (operator of Koeberg Nuclear Power Station) indemnifies supplier against nuclear damage liabilities, except where due to supplier's unlawful intent or unauthorised presence at KNPS.
Asbestos: Purchaser ensures ambient air meets South African asbestos standards (OEL 0.2 fibres/ml 4-hour TWA, STEL 0.6 fibres/ml 10-min TWA). Supplier may request certification; measurements by SANAS-accredited AAIA. Supplier personnel may stop work if asbestos identified above action level; area must be declared safe before resuming. Asbestos removal by registered contractor at purchaser's expense.
Health & Safety
Source: C1 2a SC3 Data by Purchaser.pdfHealth, safety and environment (Z6):
Tax invoice and interest (Z7):
Asbestos (Z15):
Environmental
Source: C1 2a SC3 Data by Purchaser.pdfEnvironmental requirements primarily covered under asbestos management (Z15) and general environmental compliance (Z6.2).
Contractual Terms
Source: C1 2a SC3 Data by Purchaser.pdfContract terms based on NEC3 Supply Contract (April 2013) with options X2, X7, X17 and additional conditions Z1-Z15.
Law: Republic of South Africa. Language: English. Period for reply: 3 working days.
Starting date: as stipulated. Delivery date: per accepted programme and lead times. Supplier may not deliver more than 1 week early; changes arranged 2 days prior with Supply Manager.
Programme: first programme submitted with tender; revised programmes within 24 hours after missed delivery.
Defects: defects date 2 weeks after delivery; correction period 4 weeks; access period 2 days.
Payment: assessment interval 4 weeks after successful delivery; currency ZAR; payment within 30 days (60 days for contracts ≥ R50M); interest at Standard Bank prime rate.
Compensation events: per NEC3 clause 6. Title: per NEC3 clause 7.
Liability: Supplier's indirect/consequential loss liability limited to R0. Property damage liability limited to insurance deductibles. Total liability limited to total of prices (amount to be inserted). End of liability 1 year after full delivery.
Dispute resolution: Adjudicator from ICE-SA panel; arbitration per Association of Arbitrators rules; place in South Africa.
Option X2: change in South African law after contract date is compensation event.
Option X7: delay damages 0.5% per day of purchase order value, capped at 5%.
Option X17: low performance damages 0.5% per deviation, capped at 5%.
Additional conditions:
Z1: No cession/delegation/assignment without purchaser consent; purchaser may cede to subsidiaries.
Z2: Joint ventures jointly and severally liable; notify key person within 2 weeks; no composition change without consent.
Z3: B-BBEE status change notification within 7 days; updated certificate within 30 days; decrease may trigger renegotiation/termination.
Z4: Confidentiality; no disclosure; images require consent; subcontractors bound.
Z5: Waiver/estoppel requires written agreement.
Z6: Health, safety, environment compliance; prices include H&S costs; subcontractors must comply.
Z7: Tax invoice within 1 week of payment certificate; late invoice delays payment; VAT compliance and purchaser VAT number 4740101508 on invoices.
Z8: Compensation event notification amendment.
Z9: Purchaser's liability for indirect/consequential loss limited to R0.
Z10: Termination includes business rescue order.
Z11: Delay damages limit reached allows termination per termination table.
Z12: Ethics: prohibited actions (corrupt, fraudulent, coercive, collusive, obstructive) grounds for termination; cooperation with investigations.
Z13: Insurance: Supplier provides per Table A; purchaser provides per Table B; certificates on request.
Z14: Nuclear liability: purchaser indemnifies supplier for nuclear damage at Koeberg, except unlawful intent/unauthorised presence.
Z15: Asbestos: purchaser ensures ambient air meets standards; measurements by SANAS AAIA; supplier may stop work if exposure above action level; asbestos removal by registered contractor at purchaser expense.
Important Dates
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf (unknown)Closing date and time: 27 November 2026 at 08:00 (from tender record).
Form effective date: August 2023.
Form review date: August 2026.
Document date: 27 January 2025 (date of this form).
Submission Guidelines
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf (unknown)The tender uses Eskom's e-tendering system.
The E-Tendering Training Acknowledgement Form (Template ID: 240-9722574 Rev 1) is a mandatory returnable document.
Bidders must complete the form in full, including business name/JV, contact person, telephone, cellphone, email, and acknowledgement of self-training via the e-Tendering Noddy Guide, video, or clarification meeting.
The form must be signed by an authorised signatory with designation and date.
Failure to submit the fully completed form within the prescribed period will render the bidder non-responsive and lead to disqualification.
Submission method: electronic via Eskom e-tendering portal (details not provided in this document).
Technical Specifications
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf (unknown)Scope: Supply and delivery of fire detection spares for Kendal Power Station.
Contract period: 5 years.
Location: Kendal Power Station, Mpumalanga.
No further technical details, quantities, or specifications provided in this document.
Compliance Requirements
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf (unknown)Mandatory returnable: E-Tendering Training Acknowledgement Form (Template ID: 240-9722574 Rev 1) must be completed, signed, and submitted.
The form requires acknowledgement of self-training via e-Tendering Noddy Guide, video, or clarification meeting.
Standard compliance requirements (CSD registration, tax compliance, B-BBEE, etc.) are not detailed in this document.
Description
Source: List of Tender Returnables The Provision of Fire Detection Spares at .pdfSupply and delivery of fire detection spares at Kendal Power Station for a period of 5 years.
Contact Information
Source: List of Tender Returnables The Provision of Fire Detection Spares at .pdf (TENDER)Eskom representative
Name: Glenda Zulu
Role: Eskom Representative
Evaluation Criteria
Source: List of Tender Returnables The Provision of Fire Detection Spares at .pdf (TENDER)Quality evaluation — scored returnable sections
Compliance Requirements
Source: List of Tender Returnables The Provision of Fire Detection Spares at .pdf (TENDER)Quality management system compliance
Returnable form
Section
Source: List of Tender Returnables The Provision of Fire Detection Spares at .pdfQuality evaluation — scored returnable sections
Description
Source: Eskom General Conditions of Purchase - 31 May 2024 (1).pdfEskom General Conditions of Purchase (Rev 3, effective 31 May 2024, review May 2029).
These conditions form the basis of the contract between Eskom and the Supplier for the supply of goods or execution of works/services as described in the agreement.
Quality Management
Source: Eskom General Conditions of Purchase - 31 May 2024 (1).pdfQuality and rejection provisions
Pricing Schedule
Source: Eskom General Conditions of Purchase - 31 May 2024 (1).pdfPricing and payment schedule
Financial Requirements
Source: Eskom General Conditions of Purchase - 31 May 2024 (1).pdf (unknown)Price and payment terms
Compliance Requirements
Source: Eskom General Conditions of Purchase - 31 May 2024 (1).pdf (unknown)Statutory and ethical compliance
Health & Safety
Source: Eskom General Conditions of Purchase - 31 May 2024 (1).pdfDelivery and documentation requirements
Clearly mark each consignment/package with Supplier name and full destination details per order; include packing note with contents.
Send advice note specifying transport means, weight, number/volume, point and date of dispatch to Eskom delivery address.
Send detailed tax invoice after delivery or completion.
State agreement number on all communications.
State in tender whether delivery cost included in price; if not, deemed included.
Contractual Terms
Source: Eskom General Conditions of Purchase - 31 May 2024 (1).pdfKey contractual terms
Description
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdfPurpose
Contact Information
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdf (unknown)Enquiries
Submission
Submission Guidelines
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdf (unknown)Submission channel
Returnable documents
Consequence of non-compliance
Evaluation Criteria
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdf (unknown)Tax classification outcome
Independent contractor conditions (avoid PAYE withholding)
Dominant impression test (Questions 6(i) to 6(xi))
Labour brokers
Pricing Schedule
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdfIRP30 exemption certificate (labour broker)
Financial Requirements
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdf (unknown)Tax withholding and certificates
Compliance Requirements
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdf (unknown)Tax registration
Residency
Employee threshold
Income concentration
Place and control
Connected persons
Section
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.pdfDominant impression test (Questions 6(i) to 6(xi))
Outcome
Description
Source: OHS Specification for Spares supply and Fire detection project.pdfDescription:
Important Dates
Source: OHS Specification for Spares supply and Fire detection project.pdf (unknown)Important dates:
Evaluation Criteria
Source: OHS Specification for Spares supply and Fire detection project.pdf (unknown)Evaluation criteria:
Technical Specifications
Source: OHS Specification for Spares supply and Fire detection project.pdf (unknown)Technical specifications:
Experience & Qualifications
Source: OHS Specification for Spares supply and Fire detection project.pdfExperience qualifications:
Quality Management
Source: OHS Specification for Spares supply and Fire detection project.pdfQuality management:
Pricing Schedule
Source: OHS Specification for Spares supply and Fire detection project.pdfPricing schedule:
Financial Requirements
Source: OHS Specification for Spares supply and Fire detection project.pdf (unknown)Financial requirements:
Compliance Requirements
Source: OHS Specification for Spares supply and Fire detection project.pdf (unknown)Compliance requirements:
Health & Safety
Source: OHS Specification for Spares supply and Fire detection project.pdfHealth and safety requirements:
Environmental
Source: OHS Specification for Spares supply and Fire detection project.pdfEnvironmental requirements:
Contractual Terms
Source: OHS Specification for Spares supply and Fire detection project.pdfContractual terms:
Section
Source: OHS Specification for Spares supply and Fire detection project.pdfEvaluation criteria:
Submission Guidelines
Source: Integrity Declaration Form - 08 November 2024.pdf (RFP)The Integrity Declaration Form (559-1848080 Rev 3) is a mandatory returnable document that must be completed in full and signed. It must be submitted with the bid by the closing deadline.
Evaluation Criteria
Source: Integrity Declaration Form - 08 November 2024.pdf (RFP)Evaluation eligibility requirements:
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Kendal Power Station, Main Stores - Near Ogies, on Jhb/Witbank Road - Witbank - 1035
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
37
Last checked
07 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Get deep intelligence on Supplies: General. Unlock full pricing strategies, bid frequency, and historical win rates.
Learn how to submit a winning bid with these related articles
Everything South African general contractors need to know about how to write a winning tender proposal without an in-house bid team in gauteng — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Your meticulously crafted General sector tender submission can be disqualified for a single, seemingly minor compliance oversight. The reality for South African contractors is that technical competence is no longer sufficient; it is underpinned by a non-negotiable framework of documentary compliance. This regulatory guide: mastering CSD and BBBEE compliance for general sector tenders in south africa provides a comprehensive, step-by-step breakdown of the mandatory registrations and certificates you must secure and present. We detail the precise requirements for CSD, BBBEE, SARS TCS, CIPC, and COIDA, explaining their function within the procurement ecosystem governed by the PFMA and PPPFA. Learn the actionable steps to prepare your business, avoid the most common disqualifying errors, and leverage technology to streamline your compliance process for successful bidding in 2026 and beyond.
For South African General contractors, the path to government procurement is paved with non-negotiable regulatory requirements. The most common barrier to entry is not a lack of capability, but a failure to master the foundational compliance frameworks that govern every bid. This complete regulatory guide to CSD and BBBEE compliance for General sector tender suppliers in South Africa demystifies the process. It provides a meticulous, step-by-step field manual for ensuring your company is fully compliant and audit-ready, enabling you to confidently access the R billions in opportunities across infrastructure maintenance, facilities management, and service delivery within the General sector.
This definitive guide provides General sector contractors with the precise, actionable steps required to achieve and maintain CSD and BBBEE compliance for South African public tenders in 2026. Authored by Dr. Sarah Mokwena, a Legal Compliance Specialist, it meticulously walks through the regulatory framework, mandatory registrations, and the critical documentation needed to avoid disqualification. We dissect the common, costly errors made during submission and provide a clear checklist to ensure your bid is responsive and competitive. Learn how to navigate the Central Supplier Database, validate your BBBEE status, and integrate compliance into your tender preparation process.
💡 Want more tendering tips and strategies?
Explore Our Blog