Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Proposal
Delivery Location
Eskom Research, Testing and Development, Lower Germiston Road - Cleveland - Johannesburg - 2000
Organization Type
GOVERNMENT
Published
04 Aug 2026
OCDS Reference
ocds-9t57fa-164608
ESKOM is inviting proposals for the design, supply, construction, and commissioning of a 50-100kW thermal waste-to-energy test facility at its research, testing and development site in johannesburg, gauteng. The contract period is 24 months. A compulsory briefing session will be held at the ESKOM research, testing and development facility on lower germiston road.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Wednesday, 26 August 2026 - 10:00
Venue
Eskom Research, Testing and Development, Lower Germiston Road, Johannesburg
Clarification meeting arrangement is to meet at the main reception at 09:45 venue: ESKOM research, testing and development, lower germiston road, johannesburg tender acknowledgement form to be submitted to [email protected] Containing email address/s to be able to participate in the clarification meeting.
Categories
Request for Proposal
Eskom Research, Testing and Development, Lower Germiston Road - Cleveland - Johannesburg - 2000
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Important Dates
Source: 240-105658000_ Supplier Quality Management Specification.pdf (unknown)04 Aug
2026
Tender Published
Tender was published
26 Aug
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
E3322CXMWP_Invitation to Tender_Waste to Energy Test Facility_04 August 2026.pdf
Eskom is seeking tenders for the design, supply, construction, and commissioning of a 50-100kW thermal waste-to-energy test facility at its Research, Testing, and Development (RT&D) site in Johannesburg, Gauteng. The contract period is 24 months. Tenders must be submitted electronically via the Eskom E-tendering site by 26 August 2026 at 10:00 SAST. The tender uses an 80/20 preference point system for price and B-BBEE status, with a minimum functionality threshold of 70% based on technical criteria.
Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.xls
The document is a corrupted or incomplete Excel file containing VBA macros and metadata for a tender from ESKOM for the design, supply, construction, and commissioning of a 50-100kW thermal waste-to-energy test facility at their Research Testing and Development (RT&D) site, with a 24-month contract period. The file includes sheets for cover, introduction, contractor type, AInfo, BInfo, appendices, and definitions, with macros for data entry, validation, and printing. However, the actual tender requirements are not readable due to corruption.
TECHNICAL EVALUATION CRITERIA.docx
Eskom is seeking a contractor for the design, supply, construction, and commissioning of a 50-100kW thermal waste-to-energy test facility at their Research Testing and Development (RT&D) site in Gauteng, with a contract period of 24 months. The tender includes mandatory technical gatekeepers and a qualitative scoring system with a minimum threshold of 70% for technical acceptability.
Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.doc
This is a tender by Eskom for the design, supply, construction, and commissioning of a 50-100kW thermal waste-to-energy test facility at their Research Testing and Development (RT&D) site. The contract period is 24 months. The document provided is primarily a PAYE (Pay-As-You-Earn) tax classification questionnaire for service contractors, not the full tender specification. It is used to determine the tax status of the contractor (e.g., Independent Contractor, Personal Service Provider, Labour Broker) for tax withholding purposes.
SDLI Strategy for Bidders Waste to Energy Test Facility.docx
Eskom is seeking a contractor for the design, supply, construction, and commissioning of a 50-100kW thermal waste-to-energy test facility at its Research Testing and Development (RT&D) site in Gauteng. The contract period is 24 months. The tender emphasizes transformation and local procurement, with specific goals for B-BBEE compliance, subcontracting to designated groups, job creation, and skills development. A 2.5% retention on invoices applies for non-compliance with SDL&I obligations.
E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025 (2).docx
Eskom is seeking a contractor for the design, supply, construction, and commissioning of a 50-100kW thermal waste-to-energy test facility at its Research Testing and Development (RT&D) site in Gauteng, with a contract period of 24 months. The tender includes a mandatory e-tendering training acknowledgment form that must be completed and submitted to avoid disqualification.
37-2 agreement form.docx
This tender from Eskom seeks a contractor for the design, supply, construction, and commissioning of a 50-100kW thermal waste-to-energy test facility at their Research Testing and Development (RT&D) site in Gauteng, with a contract period of 24 months. The document provided is a Section 37(2) agreement under the Occupational Health and Safety Act, requiring the contractor to acknowledge their duties as an employer and comply with SHE specifications.
Acknowledgement Form Life-saving Rules.docx
Eskom is seeking a contractor for the design, supply, construction, and commissioning of a 50-100kW thermal waste-to-energy test facility at its Research Testing and Development (RT&D) site in Gauteng, with a contract period of 24 months. The document emphasizes strict adherence to Eskom's Life-Saving Rules, which are mandatory for all personnel on site, with zero tolerance for violations.
Waste to Energy Facility-Typical Activitiy Schedule_04082026.xlsx
This tender from Eskom is for the design, supply, construction, and commissioning of a 50-100 kW thermal waste-to-energy test facility at their Research, Testing and Innovation Centre in Gauteng. The contract period is 24 months. The document includes a detailed schedule of works covering preliminaries, design and professional fees, civil works, structures, mechanical and fire systems, electrical installations, and testing/commissioning. It also contains extensive financial breakdowns, fee calculations for various consultants, and cash flow projections.
Supplier Declaration of Interest Template (5).docx
Eskom is seeking a contractor for the design, supply, construction, and commissioning of a 50-100kW thermal waste-to-energy test facility at their Research Testing and Development (RT&D) site in Gauteng, with a contract period of 24 months. The tender includes a mandatory Supplier Declaration of Interest form to disclose any conflicts of interest involving Eskom employees or directors.
OHS Evaluation Requirements.docx
Eskom is seeking a contractor for the design, supply, construction, and commissioning of a 50-100kW thermal waste-to-energy test facility at its Research Testing and Development (RT&D) site in Gauteng. The contract period is 24 months. The tender emphasizes strict compliance with Occupational Health and Safety (OHS) requirements, including submission of various OHS documents and a cost breakdown for safety measures.
Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdf
Eskom is seeking a contractor for the design, supply, construction, and commissioning of a 50-100kW thermal waste-to-energy test facility at its Research, Testing, and Development (RT&D) site in Gauteng. The contract period is 24 months. The document provided is the Eskom Supplier Integrity Pact, which outlines ethical and integrity obligations for all suppliers participating in Eskom procurement processes.
240-105658000_ Supplier Quality Management Specification.pdf
This tender from Eskom is for the design, supply, construction, and commissioning of a 50-100kW thermal waste-to-energy test facility at their Research, Testing, and Development (RT&D) site in Gauteng, with a 24-month contract period. The document provided is a Supplier Quality Management specification (240-105658000) that outlines mandatory quality requirements for all suppliers, emphasizing compliance with ISO 9001 and detailed quality planning, control, and auditing processes.
240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx
This tender from Eskom seeks a contractor for the design, supply, construction, and commissioning of a 50-100 kW thermal waste-to-energy test facility at the Research Testing and Development (RT&D) site in Gauteng, with a 24-month contract period. The document focuses on quality control plan approvals, inspection, and testing methods, emphasizing statutory and non-statutory compliance.
Acknowledgement Form for Eskom SHE Rules and other Requirements (1).docx
NEC3_ECC3_Waste_to_Energy_EPC_Contract.docx
Eskom is seeking a contractor for the design, supply, construction, and commissioning of a 50-100 kW thermal waste-to-energy test facility at its Research, Testing and Innovation Centre in Gauteng. The contract is for 24 months under an NEC3 Engineering and Construction Contract (Option A: lump sum with activity schedule). The facility will test various waste feedstocks to support South Africa's Just Energy Transition.
E-tendering Help Manual for supplier - 27 January 2025 (2).docx
This tender from Eskom is for the design, supply, construction, and commissioning of a 50-100kW thermal waste-to-energy test facility at their Research Testing and Development (RT&D) site, with a contract period of 24 months. The document primarily serves as a user manual for Eskom's eTendering system, outlining the electronic submission process for tender documents.
240-12248652_List of Tender Returnables_Cat 3_ Rev 7_Waste to Energy Test Facility.pdf
This tender from Eskom seeks a contractor for the design, supply, construction, and commissioning of a 50-100kW thermal waste-to-energy test facility at the Research Testing and Development (RT&D) site in Gauteng, with a contract period of 24 months. The document focuses on quality management and compliance requirements, including ISO 9001 standards, a contract quality plan, and quality control plans.
Tender Evaluations Environmental Requirements - Waste Energy Facility - 22 July 2026.pdf
Eskom is seeking proposals for the design, supply, construction, and commissioning of a 50-100kW thermal waste-to-energy test facility at its Research Testing and Development (RT&D) site in Gauteng, with a contract period of 24 months. The tender emphasizes environmental compliance, requiring bidders to submit an environmental policy, aspects and impacts register, environmental management plan (EMP), and evidence of necessary licenses (e.g., Atmospheric Emission Licence, Environmental Authorisation) as applicable.
240-68099512 Form A_Cat 3_ Rev 9_Waste to Energy Test Facility.pdf
This tender from Eskom seeks a contractor for the design, supply, construction, and commissioning of a 50-100kW thermal waste-to-energy test facility at the Research Testing and Development (RT&D) site in Gauteng. The contract period is 24 months. The document outlines quality requirements based on Eskom's specification 240-105658000 and ISO 9001, with pre- and post-contract award obligations.
240-109253698 CQP Template.docx
This tender by ESKOM is for the design, supply, construction, and commissioning of a 50-100kW thermal waste-to-energy test facility at their Research Testing and Development (RT&D) site in Gauteng. The contract period is 24 months. The document primarily provides a template for a Contract Quality Plan (CQP) that the supplier must develop, covering quality management, communication, documentation, sub-supplier management, and commissioning activities.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
R 1 983 750
Range
Based on 21 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
{"closingDate":"17 October 2021"}
Contact Information
Source: 240-105658000_ Supplier Quality Management Specification.pdf (unknown){"name":null,"email":null,"phone":null,"department":"Supply Chain Management","address":null}
Evaluation Criteria
Source: 240-105658000_ Supplier Quality Management Specification.pdf (unknown)Eligibility is based on the supplier's ability to meet the quality requirements outlined in the specification, which vary by category (1-4). All suppliers must complete and sign Form A. Category 1 requires a valid ISO 9001 certificate and full QMS documentation. Category 2 requires objective evidence of a developed QMS. Category 3 requires evidence of a developed QMS with fewer documents. Category 4 requires a quality method statement and basic QMS documents. Suppliers may be subject to capability and capacity assessments for high-risk or critical items. There is no explicit mention of financial or legal eligibility, but compliance with Eskom's procurement policies (e.g., PPPFA) is implied.
Technical Specifications
Source: 240-105658000_ Supplier Quality Management Specification.pdf (unknown)Title: Supplier Quality Management: Document Identifier: 240-105658000
Alternative Reference QM 58
Number:
Area of Applicability: Eskom Holdings SOC Ltd
Functional Area: Quality Management
Revision: 3
Total Pages: 28
Next Review Date: October 2024
Disclosure Controlled Disclosure
Classification:
Compiled by Supported by Functional Authorized by
Responsibility
SA Sambo P Dondashe L Meyer K Pather
Chief Advisor Middle Manager Acting Senior General Manager
Quality Quality Manager Quality Risk and
Management Management Management Sustainability
Date: 15/10/2021 Date: 15/10/2021 Date: 15/10/2021 Date: 17 October 2021
EDC TN Formatted 15.10.2021
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Content
. Introduction ............................................................................................................................... 3
2.1 Scope ............................................................................................................................... 3
2.1.1 Purpose ................................................................................................................. 3
2.1.2 Applicability ........................................................................................................... 3
2.1.3 Effective date ......................................................................................................... 3
2.2 Normative/Informative References ................................................................................... 3
2.2.1 Normative .............................................................................................................. 3
2.2.2 Informative............................................................................................................. 3
2.3 Definitions ........................................................................................................................ 4
2.4 Abbreviations ................................................................................................................... 5
2.5 Roles and Responsibilities ............................................................................................... 6
2.6 Process for Monitoring ...................................................................................................... 6
2.7 Related/Supporting Documents ........................................................................................ 6
3.1 Supplier and Sub-Supplier Quality Management System Requirements .......................... 7
3.2 Quality Plan ...................................................................................................................... 8
3.3 Contract Quality Plan........................................................................................................ 8
3.4 Quality Control Plan ....................................................................................................... 10
3.5 Pre-Contract Award: Quality Requirement ...................................................................... 13
3.6 Main Supplier and Sub-supplier Capability and Capacity Assessment ........................... 16
3.7 Post-Contract Award ...................................................................................................... 17
3.7.1 Contract Execution .............................................................................................. 17
3.7.2 Supplier Quality Performance Monitoring Phase ................................................. 18
3.7.3 Supplier Quality Audit .......................................................................................... 18
3.8 Standard Conditions ....................................................................................................... 19
3.8.1 Rights of Access .................................................................................................. 19
3.8.2 Eskom Rights to Information ................................................................................ 20
3.8.3 Preservation ........................................................................................................ 21
3.8.4 Quality Audits Related Conditions ....................................................................... 25
3.8.5 Management of Nonconformities and Nonconforming Outputs Identified by
Eskom ................................................................................................................. 25
3.8.6 Special Processes ............................................................................................... 26
Acceptance ............................................................................................................................. 27
Revisions ................................................................................................................................ 27
Development Team ................................................................................................................ 27
Acknowledgements ................................................................................................................ 28
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The intention of this specification is to specify and describe the minimum quality requirements for all
existing and potential Eskom suppliers and define the quality criteria for the selection, evaluation,
vendor registration, management, monitoring, assessment and auditing of suppliers. Eskom’s
position is to partner with suppliers who fully demonstrate commitment to the development,
implementation, and maintenance of a quality management system (QMS) that conforms to the
requirements of ISO 9001 standard. The priority is to encourage suppliers to continually improve
their QMS and enhance service delivery by implementing and conforming to the standard.
2.1 Scope
2.1.1 Purpose
The purpose of this specification is to outline the requirements according to which suppliers shall
develop,
implement,
maintain, and
continually improve
a quality management system (QMS) based on ISO 9001, which should form the basis for conformity
to Eskom quality requirements and continually adhere to them throughout the duration of a contract
2.1.2 Applicability
This specification shall apply throughout Eskom Holdings Limited divisions, its subsidiaries,
suppliers, and sub-suppliers and shall form part of all Eskom requests for information (RFI)/ requests
for quotation (RFQ)/ requests for proposal (RFP), including contracts for the procurement of products
and services.
2.1.3 Effective date
Date of authorisation of the specification
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] ISO 9001 Quality Management Systems – Requirements
[2] ISO 10005 Quality Management Systems – Guidelines for Quality Plans.
2.2.2 Informative
[3] ISO 9000 Quality Management Systems – Fundamentals and Vocabulary
[4] 32-727: Safety, Health, Environment, and Quality (SHEQ) Policy
[5] ISO 10006 Quality Management Systems – Guidelines for Quality Management in Projects
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
[6] ISO 9004 Quality Management – Quality of an Organisation – Guidance to Achieve Sustained
Success
[7] 32-1033: Eskom’s Procurement and Supply Chain Management Policy
[8] 32-1034: Eskom’s Procurement and Supply Chain Management Procedure
[9] PPPFA: Preferential Procurement Policy Framework Act, 2000 (Act No. )
[10] CIDB 1004: Best Practice Guideline A4: Evaluating Quality in Tender Submissions
[11] 240-12248652 Supplier Quality Management: List of Tender Returnables
[12] IAEA Safety Standard GS-R-3.1 Application of the Management System for Facilities and
Activities
[13] SANS 10845-1 Construction Procurement Part1: Processes, Methods and Procedures
2.3 Definitions
The vocabulary of ISO 9000 and the following definitions apply in the application of this specification.
2.3.1 Component: a constituent part of the product or sub-assembly of the product. The product
may comprise multiple individual components
2.3.2 Contract Quality Plan: a document of the supplier’s process for delivering the level of quality
required by the contract. It is a framework for the contractor’s process for delivering quality.
Purpose of a CQP is to outline how the results defined in the specifications will be achieved.
2.3.3 Hold Point: a predetermined stage in the quality control plan (QCP) beyond which work/
manufacturing shall not proceed without the attendance of, and written authorisation of, an
Eskom representative or Eskom inspection agency, whichever is applicable.
2.3.4 Intervention Points: those control points indicated by the various controlling bodies
concerned with the implementation of a specific QCP/ ITP. These can be in the form of
inspection, hold points, surveillances, witnesses, reviews and verifications.
2.3.5 Inspection Agency: an organisation or person appointed by Eskom for the purpose of
performing quality assurance/ quality control, monitoring, inspection and/ or expediting
services.
2.3.6 Level 1 Plant Items: equipment, whose failure has an effect on personnel safety and/ or
health, causes an environmental incident, cause a huge production loss or major equipment
damage. Equipment that are safety/ redundancy/ protective device or covered by statutory
regulations requirements.
2.3.7 Level 2 Plant Items: equipment, whose failure impacts plant availability and/or reliability,
causes significant costs or secondary damage.
2.3.8 Level 3 Plant Items: equipment that does not impact on personnel safety and/ or health,
environmental, cost, availability and/ or reliability of plant.
2.3.9 Nonconformity: a deficiency in material, composition, characteristic, or performance that
renders the quality of an item, component, or product unacceptable or indeterminate. The
term also covers a deficiency in, or deviation from/non-adherence to, the quality management
system requirements, prescribed production processes, and/or related documentation such
as procedures and instructions.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
2.3.10 Quality Plan: specification of the actions, responsibilities and associated resources to be
applied to a specific object.
2.3.11 Quality Control Plan: a document specifying the activities to be inspected throughout the
execution of the project, inclusive of test methods, procedures, and acceptance criteria (This
term is equivalent to QIP and ITP).
2.3.12 Requirement: the need or expectation that is stated, generally implied, or obligatory.
Requirements are generally specified in the purchase order and/or contract documentation,
but may not be limited to these.
2.3.13 Primary Plant (Power Plant): primary plant include High Voltage equipment situated inside
the control room (breakers, bus-bars, CT’s, VT’s and transformers).
2.3.14 Secondary Plant (Control Plant): secondary plant includes all equipment used to control
and protect the HV equipment on the primary plant side. (Protection, metering, AC/DC and
tele-control).
2.3.15 Special Process: is any production or service process which generates products or services
which cannot be measured, monitored, or verified prior to delivery and use.
2.3.16 Supplier: is a current or potential supplier, vendor, contractor, consultant, or service provider.
A supplier may be a natural or legal person and includes any employee acting within the
course and scope of his/her employment or any agent or manager acting for, or on behalf of,
or in the interests of, the person registered as supplier on the Eskom supplier database.
2.3.17 Sub-supplier: an organisation that provides a product/service to the supplier and/or that
enters into a subcontract and assumes some of the obligations of the supplier or prime
contractor.
2.3.18 Witness Point: a predetermined stage in the quality control plan where and inspection
activity will take place. Work may proceed, provided Eskom or its inspection agency has been
formally notified and confirmed that inspection is waived.
2.4 Abbreviations
Abbreviation Explanation
AIA Approved Inspection Authority
CA Corrective Action
CQP Contract Quality Plan
FIDIC Federation Internationale Des Ingenieurs- Conseils
FMECA Failure Mode, Effects and Criticality Analysis
HAZOP Hazard and Operability Study
ISO International Organisation for Standardisation
ITP Inspection and Test Plan
NC Nonconformity
NDT Non Destructive Testing
PMI Positive Material Identification
QCP Quality Control Plan
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Abbreviation Explanation
QMS Quality Management System
PQP Project Quality Plan
RFI Request for Information
RFQ Request for Quotation
RFP Request for Proposal
SHEQ Safety, Health, Environment, and Quality
SETA Skills Education Training Authorities
WPS Welding procedure specifications
WQR Welder’s Qualification Record
2.5 Roles and Responsibilities
Eskom Quality representative/ professional will select applicable requirements for existing and
potential Eskom suppliers using Form A (Tender and Contract Quality Requirements for Supplier
Quality Management: Specification 240-105658000/ QM 58 and Quality Requirements for ISO 9001
Standard).
The existing and/ or potential suppliers must complete, sign and return Form A with the other
returnable as listed in the List of Tender Returnable document (240-12248652). Other roles and
responsibilities for this standard are defined within the text of this specification.
2.6 Process for Monitoring
The application of this specification throughout Eskom shall be audited as per the management
system audit schedule.
2.7 Related/Supporting Documents
The documents superseded by this specification: all divisional and business unit supplier quality
requirements standards and/or specifications.
Forms and templates:
[1] 240-68099512 Tender and Contract Quality Requirements for Supplier Quality Management
Specification 240-105658000/ QM 58 and Quality Requirements for ISO 9001 Standard (Form
A)
[2] 240-109253698 Template for a Typical Contract Quality Plan
[3] 240-109253302 Quality Control Plan/Inspection and Test Plan
[4] 240-126469599 Method Statement Template.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The quality assessment criteria and Form A of this specification will be selected and completed by
an Eskom Quality representative/ professional who will identify the applicable supplier quality
requirements to be met.
Form A of this specification must also be completed and signed by the supplier responding to an
Eskom invitation to tender, in order to acknowledge and accept Eskom Supplier Quality requirements
as per this specification and ISO 9001 Standard or any additional quality requirements specific to
the scope of work.
3.1 Supplier and Sub-Supplier Quality Management System Requirements
3.1.1 The supplier and sub-supplier shall develop, implement, maintain and improve a formal QMS
that conforms to the latest ISO 9001 standard or any applicable standard of QMS (latest
applicable revision) and in accordance with the requirements of this specification.
3.1.2 Such a formal system shall consist of the appropriate documented information required by
ISO 9001 and may include a quality manual, quality plans, work procedures, work
instructions, method statements, work flow documentation, etc., as the case may be. This
requirement constitutes the most basic QMS requirements.
3.1.3 Unless specifically excluded from the quality list of tender returnable, as per the categories of
quality requirements (Category 1, 2, 3, or 4), such a QMS shall carry a valid ISO 9001
certificate from an accredited certification body, as indicated in the applicable Eskom
invitation (this requirement applies equally to both the supplier and any/ all manufacturing
third-party organisations mentioned above).
3.1.4 Unless specifically excluded in the quality list of tender returnable, as per the categories of
quality requirements (Category 1, 2, 3, or 4), the supplier shall have a fully developed,
documented, implemented, reviewed and maintained QMS that complies with the
requirements of ISO 9001 standard or any applicable standard of QMS. In the event that the
main supplier invariably requires the assistance of a sub-supplier in order to realise its own
supply obligations. The aforementioned requirement applies equally in all cases where any
such sub-supplier’s scope of responsibility includes the provision of any of the following
activities, namely, design and development, manufacturing, maintenance, testing, storage,
delivery, installation, commissioning, and project management, or in the cases the supplier
name changes, mergers, acquisitions and/ or cessions. Eskom Quality department must
ensure that the changed entity can still fulfil the requirements as set out in the contract
documentation.
3.1.5 Eskom reserves the right to request and perform necessary assessments at sub-supplier
facilities.
3.1.6 The main supplier shall be responsible for defining and managing the specific quality
assurance and control elements applicable to the respective sub-supplier’s scope of
work/supply and ensure that its sub-supplier(s) quality programmes support Eskom
requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.1.7 The supplier shall inform Eskom of any proposed changes to the QMS or staff that will affect
the quality system prior to implementation of these changes.
3.1.8 The main supplier shall develop and implement a performance management programme for
their sub-supplier. The programme shall include, but not limited to:
Verification of the QMS
Audits and surveillances
Regular assessment of the CQPs and reviews of QCPs.
NC and Defect Management
Inspection and test plans
Risk management
3.2 Quality Plan
The information in this section constitutes the minimum requirements for a quality plan.
3.2.1 Where specified in the Evaluation Criteria and/ or quality list of tender returnables , as per the
categories of quality requirements (Category 1, 2, 3, or 4); all individual products, services
and processes shall have a documented, implemented, reviewed and maintained contract
quality plan and/or quality control plan (inspection and test plan).
3.2.2 Where specified in the evaluation criteria and/ or quality list of tender returnables. All
production and/ or service provision shall be carried out in accordance with a documented
and agreed contract quality plan (CQP) and/ or quality control plan (QCP)/ inspection and test
plan (ITP).
3.2.3 The supplier shall plan for the required quality-related activities and interfaces within the
supplier’s quality system in order to demonstrate its ability towards both controlling and
meeting specified Eskom requirements.
Note 1: Contract Quality Plan should address the quality assurance elements related to the scope
of work and/ or technical specification.
Note 2: Quality Control Plan (QCP)/ Inspection and Test Plan (ITP) should address the quality
control elements related to the scope of work and/ or technical specification.
3.3 Contract Quality Plan
The main supplier shall require sub-suppliers to submit project quality plans (PQPs)/ contract quality
plans (CQPs) and associated documentation in accordance with the requirements of project QMS
processes applicable to the sub-supplier’s scope of work.
The supplier shall, where applicable, based on scope of work criticality, ensure that procurement
documents clearly and unambiguously require sub-supplier submission of a sub-supplier CQP for
supplier and Eskom review.
The main supplier shall ensure that sub-supplier CQPs are developed and implemented in
accordance with the ISO 10005 Quality Management System Guidelines for Quality Plans. In
addition to the elements specified in ISO 10005, the supplier’s and/ or sub-suppliers’ CQPs shall
include the following (as applicable):
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.3.1 The management of records, including material tests, positive material identification (PMI)
testing, material certification, etc.
3.3.2 The provision for free and uninhibited access by the supplier and/or personnel at the time of
inspection.
3.3.3 The proposals for submission of final documentation, the final manufacturing data book, prior
to shipment.
3.3.4 The special processes related to welding: management of the welder’s qualification record
(WQR), welding procedure specifications (WPS), and procedures qualification records (PQR)
that will be used in the performance of work for supplier review and acceptance prior to
commencing manufacture. Welders shall be qualified to the specified Codes of Construction
for the applicable procedures. The requirements for qualification shall be specified by the
supplier, and welder records shall be maintained by sub-suppliers performing the work.
3.3.5 The special installation procedures and other required fabrication or manufacturing
procedures (that is, those required for post-weld heat treatment, tube rolling, coatings, etc.)
that will be used in the performance of work shall require supplier review and acceptance
prior to commencing manufacture. The personnel carrying out special processes (for
example, NDE, welding, coating, heat treatment, etc.) where the results cannot be fully
verified by subsequent inspection and test shall be suitably qualified and, where applicable,
registered with statutory bodies as legally required, that is, as radiographic workers to conduct
radiography. The requirements for the qualification shall be specified, and personnel records
shall be maintained in accordance with the Project Quality Personnel Qualification
Specification and, where applicable, legal requirements.
3.3.6 The personnel required to perform special processes shall be certified competent through a
certificate of competency in accordance with the company’s internal training management
and competency control procedures or an external certification body (for example, NDT)
through an accredited service provider as per Skills Education Training Authorities (SETA)
requirements.
3.3.7 All personnel who perform activities that affect quality shall have their training needs identified
and documented. The required training shall be implemented in accordance with the
company’s training management and competency control procedures. All the training
certificates shall meet the SETA requirements in terms of having the unit standard completed
and the accreditation number of the service providers.
3.3.8 Instructions and requirements for equipment and materials storage, preservation, and
maintenance, including identification of materials required for preservation and maintenance,
are to be provided sufficiently prior to receipt (prior to shipment or earlier) to ensure that
appropriate resources are available at the time of delivery.
3.3.9 Specific quality monitoring and verification activities are to be undertaken on the supplier’s
sub-suppliers by Eskom or it agent.
3.3.10 The CQP information need to include, but not limited to:
Spells out the aspects of the QMS to be applied within a specific Eskom project, and the
methods to be utilised to ensure quality.
Outline the resources, the communication channels, applicable documents and records to be
generated.
Management Authority and Responsibility from both supplier and client need to outline in the
Cqp.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
List of documents and records that will be used and submitted during the execution of the
project.
Communications channels should include contact person and contact details
Monitoring & measurement procedures for activities need to be indicated.
3.3.11 The main supplier and sub-supplier CQPs shall comply with the Eskom Quality Requirements
Specifications and shall be submitted prior to the initial scope of work kick-off or initial pre-
fabrication meeting and prior to commencement of manufacturing, whichever is earlier.
3.3.12 The Eskom template for CQP provided shall be used as guideline, where the supplier does
not have a CQP template.
3.4 Quality Control Plan
The supplier shall develop and implement processes and procedures that efficiently and effectively
monitor, verify and document the quality of the scope of work for deliverables.
The main supplier shall ensure that sub-supplier QCPs/ ITPs are prepared at a level of detail
sufficient to address all quality-control-related activities in a chronological order, from contract review
through materials verification, manufacturing, fabrication, assembly, final testing, commissioning,
hand-over documentation, and certification. In addition, the supplier shall ensure compliance with
the following requirements:
3.4.1 All stages of manufacturing, fabrication, assembly and installation shall be controlled by a
supplier’s QCP/ ITP that clearly and unambiguously identifies the quality verifications to be
performed and special attention to controls related to critical products and services.
3.4.2 QCP/ ITP shall be reviewed and accepted by Eskom, its inspection authority or agency, and
they shall allow for the insertion of Eskom specific requirements, including hold and witness
points prior to the commencement of work.
3.4.3 Subsequent changes to the Eskom accepted QCP/ ITP shall require Eskom, its inspection
authority or agency’s agreement prior to the commencement of work involving an activity
affected by such changes.
3.4.4 The ITPs should cover materials certification, fabrication works, in-process inspections, final
acceptance tests, packaging and pre- shipment/ transportation, shipping/ transportation
inspections where contracted, preservation, site acceptance tests, construction and erection
works, and pre-commissioning and commissioning tests.
3.4.5 All sub-supplier QCP/ ITP activity shall be performed using an Eskom-accepted supplier
Qcp/ itp.
3.4.6 All applicable codes, standards, and relevant acceptance criteria documents are available at
the work location, and Eskom representatives on site shall have on-going access to this
information. Workplace documentation shall be available in English and in any workforce-
appropriate language.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.4.7 Where activities subject to inspection and test procedures are to be undertaken by a sub-
supplier, the QCP/ ITP shall make reference to this fact and shall include descriptive details
of the sub-supplier’s involvement. A separate QCP/ ITP shall be required for each sub-
supplier scope of work.
3.4.8 The supplier shall be ultimately accountable and responsible for the development and proper
implementation of all sub-supplier QCPs/ ITPs, including those reviewed or developed by
sub-suppliers.
3.4.9 Eskom reserves the right to select intervention points on QCPs/ ITPs for Eskom oversight of
selected functions and to perform surveillance or audits of the work.
3.4.10 Once signed, the ITPs and QCPs become addendums to the main contract. These ITPs can
be reviewed at Eskom’s discretion based on its assessment of the supplier’s performance or
other risks.
3.4.11 A QCP/ ITP shall contain the following information:
Eskom contract number and title
The supplier’s order number
Identification of the area of works/contract
Description of the work, with components, item number, and activity date
QCP/ITP unique number
A list of the sequence of operations, including inspection and tests
The identification of the specification, drawing number, or procedure for each operation,
with reference to the relevant criticality risk rating
The acceptance criteria, with reference to the technical specification, in-house, national, or
international standard, with the relevant clause number for each operation
The inspection and test activities that the supplier has nominated for its intervention points
Provision for the inclusion of intervention points nominated by Eskom and/or its authority/
agency
Provision for intervention point acceptance by date and signature for all parties having
intervention in the plan
Inspection and test records to be generated by the supplier for each operation and an
indication of records to be provided to Eskom (as applicable)
3.4.12 The main supplier shall require sub-suppliers to submit QCPs/ ITPs and associated
documentation applicable to the sub-supplier scope of work. Any changes made to the QCP
after submission must be resubmitted to Eskom for further review. The supplier shall ensure
that all sub-supplier QCPs/ ITPs are in compliance with the Eskom Quality Requirements
Specifications, including, but not limited to, the following requirements:
Clear and unambiguous description of the equipment and location(s) at which each activity
will take place, including facility location(s)
Identification of quality verification activity and stage
The details of reference documents, procedures, or method statements to be utilised in
performance of the activity, including specific reference to actual sections and pages of
procedures, standards, instructions, specifications, etc.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Definition of acceptance criteria
Listing of certifying or verifying documents generated to provide evidence of compliance
with specified requirements; documents are to be provided using the proper Eskom
document numbering requirements
Identification of main supplier and sub-supplier (where applicable) third-party/approved
inspection authority (AIA) and Eskom inspection activities defined in terms of witness, hold,
document review, and verification monitoring points and provision for sign-off of each of the
above-mentioned parties for each intervention point
Qualification requirements for quality control inspectors, including any third-party/AIA
inspectors
Listing of all proposed test procedures
Acceptance criteria for each inspection or test in alignment with specified tolerances
A section for signed acceptance of the QC/ITP by the supplier, sub-supplier (where
applicable), and Eskom prior to commencement of work
Inspection or testing intervention points, including, but not limited to, factory acceptance test
and package acceptance test, witness, and hold points
3.4.13 A quality kick-off meeting will be held at the start of the contract and, if required, at the start
of each subsequent phase.
The supplier shall arrange coordination meetings with Eskom prior to placement of orders
for items or equipment to ensure that all technical and commercial requirements are clear
and understood. Fourteen days’ advance notice of meetings shall be given to Eskom.
Supplier inspection personnel, including inspection agency personnel, shall be competent
and qualified to perform inspection and testing assignments. Mobilisation of all such
personnel shall be in compliance with the Project Quality Personnel Qualification
Specification.
3.4.14 Where QCP/ ITP is applicable, the supplier shall ensure that sub-suppliers are provided with
comprehensive, clearly written, and unambiguous inspection and testing protocols, including
processes, procedures, and methods that shall include, but not be limited to, the following:
Requirements for inspection checklists and inspection assignments, with lists of items to be
inspected
An inspection and testing report format, report content, schedule for report processing and
distribution, and report retention requirements
Inspection and test report results response tracking (log) and resolution of nonconformity in
inspection and test processes, procedures, or methods and nonconformity identified in
inspection and test results
Associated Failure Mode, Effects and Criticality Analysis (FMECA) reports relating to the
equipment and sub-systems (if applicable)
Hazard and Operability Study (HAZOP) report, as applicable
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.4.15 The supplier shall establish processes and procedures for formal assessment of sub-supplier
inspection and testing programmes. These shall include review of sub-supplier inspection
reports and other quality control documentation. Additional formal assessment of
manufacturing, fabrication, and assembly facility operations shall be conducted by the
supplier to ensure continuing suitability, adequacy, and effectiveness of the sub-supplier’s
inspection and testing programmes. Assessment frequency shall be established in
consideration of the sub-supplier scope of work, criticality of scope of work deliverables, and
performance information. The assessment scope and schedule shall be developed in
consultation with Eskom.
3.4.16 Supplier processes and procedures for verification of supplier and sub-supplier purchased
product compliance with specifications shall obtain document return/review status prior to
implementation.
3.4.17 The objective is to finalise any outstanding procedural or other issues before proceeding to
deliver the works.
3.4.18 Eskom, in consultation with the supplier, develops an agenda for the meeting, and Eskom will
keep minutes of these meetings.
3.4.19 Mandatory pre-inspection meetings will be convened by Eskom or its inspection agency or
AIA to be attended by the supplier’s and sub-supplier’s representatives, including their quality
representatives who will be involved in the works, and records are to be kept.
3.4.20 Eskom reserves the right to appoint resident quality inspectors who can be based at the
supplier’s or sub-supplier’s premises and on site where the work is being performed. The
supplier is expected to provide workspace at no cost to Eskom for the inspector, as required.
3.4.21 Eskom may appoint any organisation it prefers to perform quality assurance and quality
control activities, either in the capacity as an AIA or inspection agency, on the works
contracted to the supplier, and the supplier or its sub-suppliers may not object, prevent,
hinder, undermine, circumvent, question, discredit, or in any way make it impossible for such
organisation to carry out its work on behalf of Eskom.
3.4.22 The Eskom template for QCP/ ITP provided shall be used as guideline, where the supplier
does not have a QCP/ ITP template.
3.5 Pre-Contract Award: Quality Requirement
3.5.1 Main Supplier and Sub-supplier Categories
Eskom supplier quality requirements for all existing and potential suppliers and sub-suppliers are
classified into four categories (category 1, 2, 3 and 4). Suppliers must prepare and submit quality
documentation as per the tender selected category (indicated in Form A) using the list of tender
returnables document.
NOTE: Only one (1) category must be applicable per procurement process e.g. [Eskom requests for
information (RFI)/ requests for quotation (RFQ)/ requests for proposal (RFP), including contracts for
the procurement of products and services].
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The following are the minimum returnable documentation for Categories 1 to 4:
3.5.2 Category 1: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit a valid copy of ISO 9001 or any applicable certificate of a QMS (the
latest applicable revision). The QMS should drive the supplier’s business management
processes to ensure that all of Eskom’s requirements are fully met on a consistent basis.
The supplier shall submit the latest copy of the management system internal and external
audit reports. The audit reports must include, if applicable, nonconformity identified, and the
resulting remedial actions (correction and/ or corrective action reports).
The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
Where applicable; the supplier shall submit a draft, or an example of an inspection and test
plan (ITP) or quality control plan (QCP) on similar and/ or previous work done.
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
The supplier shall submit documented information retained (records) of management review
meetings that include agenda, meeting minutes, attendance registers, reports, presentations,
etc.
Note: specific requirements per tender will be selected using the List of Tender Returnable
documents (240-12248652).
3.5.3 Category 2: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit objective evidence of a developed, implemented and maintained QMS
that complies with ISO 9001 or any applicable standard of quality management system (the latest
applicable revision). The following documents (approved/ signed copies) shall be submitted:
Quality Management System manual or a documented information that have defines and
describes the QMS and its scope
Quality Policy, aligned with the supplier’s strategic direction (documented information)
Quality Objectives (documented information)
Control of documented information (both maintain and retain documented information )
Internal audit procedure (documented information)
Control of nonconforming outputs (documented information)
Nonconformity and Corrective action procedure (documented information)
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The QMS should drive all the supplier’s business management processes to ensure that all of
Eskom’s requirements are fully met on a consistent basis.
The supplier shall submit the latest copy of the management system internal audit reports. The
audit reports must include, if applicable, nonconformity identified, and the resulting remedial
actions (correction and/ or corrective action reports).
The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
Where applicable; the supplier shall submit an example of inspection and test plan (ITP) or
quality control plan (QCP) on similar or previous work done.
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
The supplier shall submit documented information retained (records) of management review
meetings that include agenda, meeting minutes, attendance registers, reports, presentations,
etc.
Note: specific requirements per tender will be selected using the List of Tender Returnable
document (240-12248652).
3.5.4 Category 3: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit objective evidence of a developed QMS that complies with ISO 9001
(or the latest applicable revision). The following documented information (approved/ signed
copies) shall be submitted:
o Quality management system manual or a (documented information) that have
defines and describes the QMS and its scope
o Quality Policy, aligned with the supplier’s strategic direction (documented
information)
o Quality Objectives (documented information)
o Control of documented information (both maintain and retain documented
information )
o Internal audit procedure (documented information)
o Control of nonconforming outputs (documented information)
o Nonconformity and Corrective action procedure (documented information)
The QMS should drive all the supplier’s business management processes to ensure that all of
Eskom’s requirements are fully met on a consistent basis.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
Where applicable; the supplier shall submit an example inspection and test plan (ITP) or
quality control plan (QCP).
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
NB: specific requirements per tender will be selected using the List of Tender Returnables
document (240-12248652).
3.5.5 Category 4: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit a quality method statement based on ISO 9001 and specific to the
scope of work.
The quality method statement should address all the supplier’s business management
processes to ensure that all of Eskom’s requirements are fully met on a consistent basis.
The supplier shall submit a signed/ approved quality policy (aligned with the supplier’s strategic
direction). (documented information)
The supplier shall submit a copy of quality objectives. (documented information)
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of the documented information for roles, responsibilities and
authorities, specific to the project/ scope of work/ technical requirements. Examples of relevant
documented information are; organization charts, job descriptions, work instructions, duty
statements, manuals, procedures.
Note: specific requirements per tender will be selected using the List of Tender Returnables
document (240-12248652).
3.6 Main Supplier and Sub-supplier Capability and Capacity Assessment
Supplier capability and capacity assessments shall be performed prior to contract award on potential
suppliers participating in Eskom Holdings procurement process to:
provide products and services with high risk to operational sustainability
work on critical plant and equipment
supply of critical plant items or components
provide special processes
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
All sub-suppliers used by the main supplier/ contractor, performing work on Eskom critical plant
equipment, supplying commodities and providing specialised services shall be subjected to the
capability and capacity assessment.
Critical plant includes the following:
Generation Level 1 & 2 plant
Transmission and Distribution Power Plant & Control Plant
Mega Projects
All potential quality risks identified will be included in the assessment report provided for the tender
evaluation.
Note: Form A (Enquiry/ Contract/ Quality Requirements for Supplier Quality Management:
Specification 240-105658000/ QM 58 and ISO 9001) will be used to select and indicate whether
capability and capacity assessment will be conducted.
3.7 Post-Contract Award
3.7.1 Contract Execution
The supplier shall submit the following documents within 30 days or as per stated timeline after the
contract date, prior to the commencement of work, for acceptance by Eskom:
The supplier shall complete a QCP before contract award. This shall be reviewed and
signed off by Eskom within 30 days or as per stated timeline after contract award.
The supplier shall complete a quality control plan and ITP(s) for review and acceptance by
Eskom prior to the commencement of any work, inclusive of subcontracted work, within 30
days or as per stated timeline after contract award.
The sub-supplier QCP/ ITP shall be submitted for review and comment by the supplier and
by Eskom within 30 days or as per stated timeline after the award of the tender. All supplier
and Eskom comments shall be resolved prior to commencing work.
The equipment lists and an indication of pressurised components and systems.
Note: These plans are to be compiled in line with Eskom’s requirements and will have to be
discussed with, and approved by, Eskom prior to any work commencing.
Correspondence shall be directed to the project manager, and periodic quality review
meetings shall be convened by Eskom with the supplier.
The mandatory quality review meetings are to be convened by the nominated project quality
manager or his/her representative for the contract.
Monthly quality performance and management reports are to be prepared by the supplier
during contract execution. The content of these reports shall be agreed by Eskom when
submitted to Eskom on a monthly basis.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.7.2 Supplier Quality Performance Monitoring Phase
During the contract execution phase, suppliers shall be monitored by Eskom for performance on
quality-related aspects.
The outcomes of such monitoring will enable Eskom to take any appropriate actions pertaining to
the supplier.
The monitoring shall be carried out periodically by Eskom or at predetermined intervals during the
execution of a contract using agreed key performance indicators. The monitored key performance
areas include the following:
CQP and QCP /ITP
Delivery
Design
Cost
Management system
Subsequent key performance indicators associated with these areas will include the following:
Nonconformity monitoring
Audit and assessment evaluation scoring
Management system compliance and accreditation
Achievement of delivery targets as per contractual agreements
Process improvements
Correction and corrective action response and closure
3.7.3 Supplier Quality Audit
3.7.3.1 Quality audits and related quality performance reviews are intended to provide an objective
evaluation of compliance with performance expectations defined in this specification, in the
supplier contract quality plan (CQP), and in any other project scope of work specification.
3.7.3.2 Quality audits and related quality performance reviews include, but are not limited to, any
quality or other project functional area audits, assessments, verification of compliance
reviews, surveillance, inspections, or other interim or final assessments of scope of work
deliverables provided by the supplier or sub-suppliers
3.7.3.3 Quality audits and related quality performance reviews are intended to provide an objective
evaluation of compliance with performance expectations defined in this specification, in the
supplier contract quality plan (CQP), and in any other project scope of work specification.
3.7.3.4 Quality audits and related quality performance reviews include, but are not limited to, any
quality or other project functional area audits, assessments, verification of compliance
reviews, surveillance, inspections, or other interim or final assessments of scope of work
deliverables provided by the supplier or sub-suppliers.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.7.3.5 Quality audits and related quality performance reviews shall be carried out by trained,
accredited, and experienced personnel in accordance with procedures documented in the
Cqp.
3.7.3.6 The supplier shall submit, for Eskom review, documented processes for conducting project
scope of work quality audits and related quality performance reviews. Supplier quality audits
and related quality performance review processes shall be designed to address evaluation
of progress towards completion of project functional area deliverables as well as final
deliverable quality.
3.7.3.7 The supplier shall provide a schedule of anticipated quality audits covering all functional
areas and related quality performance reviews at the time of first post-contract award CQP
submission.
3.8 Standard Conditions
3.8.1 Rights of Access
Eskom:
3.8.1.1 shall be granted electronic and hard-copy access to all quality plans, procedures,
documentation, and other quality records relating to the work, including, but not limited to,
data extracts;
3.8.1.2 reserves the right to review, inspect, and audit any or all parts of the supplier’s QMS, as well
as any documentation, materials, or equipment associated with the work, at any time or
project work location; and
3.8.1.3 reserves the right to carry out assessments and audits on all new suppliers and sub-
suppliers.
The supplier:
3.8.1.4 shall support Eskom’s effort to monitor, verify, and/or witness any activities associated with
the work at any time;
3.8.1.5 shall cooperate with Eskom requests for documentation, records, and inspection and
witnessing. Eskom participation in audits, appraisals, assessment of plans, and verification
shall be conducted at no extra cost to Eskom;
3.8.1.6 shall ensure that a sub-supplier provides access to Eskom to all work procedures, records,
and supporting documentation through provision of access to view and photocopy, as
required, to support verification of scope of work requirements. Access shall include the
ability to photograph Eskom equipment, systems, system components, materials, etc.;
3.8.1.7 shall provide access to all quality-related information pertaining to activities performed by
itself or sub-suppliers, where Eskom might not have participated in the witnessing of their
quality assurance or control (this refers to inspections, audits, etc. performed by the supplier
on its own sub-suppliers);
3.8.1.8 shall allow Eskom to assess, audit, approve, or reject any sub-suppliers employed by
Eskom’s suppliers to assist with the product and/or service delivery to Eskom; and
3.8.1.9 shall ensure that the above requirements flow down to sub-suppliers.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.2 Eskom Rights to Information
3.8.2.1 To expect that the works will be conducted in accordance with the contract between the
parties.
3.8.2.2 To have access to the supplier’s information as determined by applicable legislation.
3.8.2.3 Eskom reserves the right to oversee the supplier’s audit programmes by participating in
selected audits as an observer and by assessing the supplier during key work stages.
Eskom will coordinate with the supplier to develop an oversight schedule aligned with the
supplier’s audit schedule.
3.8.2.4 To obtain access to any audit reports of audits performed by the supplier reflected in the
audit programme.
3.8.2.5 To conduct independent quality audits during all phases of the contract, and the supplier
shall provide all resources to support these activities.
3.8.2.6 Eskom shall have the right to participate in, or request that, a technical investigation be
launched and conducted at the supplier’s and sub-suppliers’ premises or other sites when
risk to Eskom products or service deliverables is identified.
3.8.2.7 To participate in, and/or lead, investigations related to incidents involving its products.
3.8.2.8 To require from suppliers to be responsible for the cost of re-inspections.
3.8.2.9 To withhold payment from suppliers as a result of outstanding nonconformities, irrespective
of the agreed payment schedule and in accordance with the conditions of contract.
3.8.2.10 Shall be granted electronic and hard-copy access to all quality plans, procedures,
documentation, and other quality records relating to the work, including, but not limited to,
data extracts.
3.8.2.11 Reserves the right to review, inspect, and audit any or all parts of the supplier’s QMS, as
well as any documentation, materials, or equipment associated with the work, at any time or
project work location.
3.8.2.12 Shall carry out assessments and audits on all new suppliers and sub-suppliers.
3.8.2.13 Reserves the right to appoint resident quality inspectors who can be based at the supplier’s
or sub-supplier’s premises and on site where the work is being performed.
3.8.2.14 Reserves the right to select intervention points within all developed supplier QCPs/ ITPs
for Eskom oversight of selected functions and to perform surveillance or audits of the work.
3.8.2.15 Shall be given access at all reasonable times before, during, and after manufacture and
before delivery, construction, erection, and commissioning to measure, test, and inspect the
products and workmanship, as necessary, at the supplier’s premises and at Eskom sites.
3.8.2.16 Reserves the right to suspend any pending deliveries by the issuing of a cease delivery
order at any time and for any portion of the work that is not being performed in accordance
with the specified/agreed requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.3 Preservation
The supplier shall develop and implement a comprehensive preservation programme consisting of
plans, processes, procedures and actions undertaken for the purpose of planning for and
maintenance of material deliverables quality. The supplier preservation programme scope includes,
but is not limited to, the following:
3.8.3.1 Engagement of personnel suitably qualified for oversight of, and (as required) direct
implementation of, preservation programme requirements.
3.8.3.2 Development and implementation of preservation programme training appropriate to work
need.
3.8.3.3 Eskom may make use of its appointed service provider tasked to provide a full suite of
services encompassing an online monitoring system and asset tracking during, but not
limited to the following stages: inspections, testing, shipping, transportation, storage, and
commissioning. The supplier is to enable full access during all of these stages in order to
allow the installation of the devices on Eskom-identified products and equipment, which
include the sub-supplier’s testing facilities, processing plant, and any other processes
deemed important towards effective and efficient quality control.
3.8.3.4 Eskom seeks cooperation between the supplier’s designers and those of Eskom’s service
provider in ensuring seamless installation of the device and other associated installations.
Moreover, there is also a need to integrate data flows and systems between Eskom and the
supplier. Further details are included in the Eskom specifications and works information.
3.8.3.5 Review and tracking of compliance with Eskom and supplier engineering specification of
preservation requirements.
3.8.3.6 Review and tracking of compliance with sub-supplier provided preservation requirements
and recommendations.
3.8.3.7 Evaluation of prospective temporary and longer-term material storage sites for consistency
with preservation programme expectations.
3.8.3.8 Preservation work plan development and plan execution performance evaluation of all
parties engaged for provision of material transportation, handling, or storage services.
3.8.3.9 Oversight of material quality preservation plan preparation and plan execution performance
at all work locations.
3.8.3.10 Development of a preservation programme records management process, in compliance
with Eskom information management requirements, which comprehensively addresses
generation, maintenance, and ready access by Eskom to all preservation programme
records.
3.8.3.11 The supplier shall deploy a clearly defined documented programme providing for
identification of all physical asset pre-operation preservation of quality requirements. In this
reference, the term “physical assets” should be understood to include bulk materials,
including consumable items, equipment systems, system components, and any other
procured or supplied materials or equipment transferred to project control, but not deployed
for operational purposes.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.3.12 Where the project responsibility for equipment and materials management has been
formally delegated, the supplier’s preservation programme shall ensure clear and
unambiguous communication of pre-operation preservation of goods quality requirements
to sub-suppliers.
3.8.3.13 The supplier’s preservation programme shall clearly and unambiguously document
processes and procedures for efficient and effective monitoring of compliance with
programme requirements.
3.8.3.14 Compliance monitoring shall commence with ensuring comprehensive consideration of
preservation requirements in the engineering instruction and subsequent inclusion of said
instruction in procurement documentation and shall be applicable until such time as
equipment or materials have been incorporated in an operating or operational system or
structure.
3.8.3.15 Compliance evaluation frequency shall anticipate transfer of tactical-level responsibility for
management of preservation responsibilities between project functional areas, for example,
procurement to logistics, logistics to fabrication, fabrication to logistics, logistics to
construction, etc., and shall, in similar fashion, anticipate transfer of support for tactical-level
responsibility between various subcontracted service providers.
3.8.3.16 Supplier engineering shall ensure that preservation requirements for scope of work
systems, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented and that preservation requirements are efficiently and
effectively communicated to project procurement, logistics, construction management,
quality, security, and other project functional areas, as required, for efficient and effective
implementation of preservation requirements. This shall take the form of a preservation
programme applicable to all systems, system components, equipment, materials, customer-
supplied materials, and other goods procured or managed under the scope of work.
3.8.3.17 The supplier’s preservation management programme shall clearly and unambiguously
address temporary, long-term, and in-transit preservation requirements, including, but not
limited to:
requirements for protection against, or insulation from, atmospheric conditions,
sunlight, temperature, soil, dust, humidity, salt spray, corrosive atmospheres, or
other physical environment conditions;
detailed procedures for application, use, monitoring, and maintenance of coatings,
coverings, fasteners, lines, and other components for internal and external weather
proofing;
requirements for electrical grounding or isolation;
requirements for internal or external environment creation, for example, inert gas
charging, heating, cooling, etc., inclusive of gas storage, electric power supply, etc.;
detailed procedures for initial set-up, charging, activation, and maintenance of
internal atmosphere generation, regeneration, monitoring, and relieving systems, for
example, inert gas management systems;
requirements for protection against, or insulation from, vibration or long-period
cyclical motion in transit, for example, wave-generated movement during sea
transport;
internal and external structural integrity protection, for example, internal and external
bracing, padding, framing, chocking, etc.;
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
support structure requirements, for example, stools, pads, or other devices,
substrates, or support required to ensure in-storage and in-transit stability of
systems, system components, equipment, and material, or other discrete units or
items;
provision for physical separation and/or barriers to prevent airborne or direct
transmittal of contaminants between work areas or between work areas and storage
areas, for example, prevention of carbon steel grinding or cutting debris impact on
stainless steel elements, airborne drift of blast aggregate into vessels or machinery,
etc.;
provision for, and final disposition of, temporary and longer-term storage or transit
required supports and related binding devices, for example, stools, stands, sea
fasteners, platforms, chocks, spacers, cabling, etc.;
provision of requirements for temporary work platforms or other support structures
required to ensure provision of preservation services, for example, provision of a
self-elevating work platform for periodic access to elevated fittings, gauges, man-
ways, etc.;
requirements for protection against, or insulation from, contact with other objects, for
example, padding or other protection for external tubing, fittings, or other impact-
sensitive structures or components;
clear physical delineation of temporary and longer-term storage areas supplemented
by hard and soft barriers, as required, to maintain a protective perimeter;
documented agreements with storage facility and transportation provider
management regarding security management, including, but not limited to, facility
access and egress control and control of access to project goods and materials
within facility boundaries or aboard vehicles or vessels; and
detailed procedures for inspection and testing to verify performance of preservation
procedures and to provide for timely notice and corrective action to maintain
preservation status.
3.8.3.18 The supplier’s preservation management programme scope shall encompass
management of preservation requirements, from initial transfer of ownership or management
responsibility to project scope of responsibility, through any period of temporary or longer-
term storage and through any period of transit, including transit for final delivery at point of
active use or installation.
3.8.3.19 The supplier’s preservation management programme shall clearly and unambiguously
address processes and procedures to ensure that storage and control of materials are
accomplished in accordance with manufacturer recommendations, specifications, and
project-specific requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.3.20 The supplier’s preservation management programme shall incorporate special precautions
to address preservation and control of valves, electrical motors and components,
mechanical and rotating equipment, piping and fittings, instrumentation, flange faces,
gaskets, coatings, insulation, and other materials. Special precautions include, but are not
limited to, supplier-specified maintenance procedures related to engines, electric motors,
pumps, compressors, etc., such as periodic shaft rotation, engine turnover, lubrication, etc.
3.8.3.21 The supplier shall ensure that clear and unambiguous requirements for preservation of the
system, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented in purchase orders, work authorisations, and other
communications between the supplier and sub-suppliers.
3.8.3.22 Where sub-supplier expertise is utilised in determination of the preservation protocol,
supplier procurement processes shall ensure clear and unambiguous documentation of sub-
supplier input into preservation management programme requirements.
3.8.3.23 Supplier procurement shall ensure that preservation requirements for scope of work
systems, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented and that preservation requirements are efficiently and
effectively communicated to project logistics, construction management, quality, security,
and other project functional areas, as required, for efficient and effective implementation of
preservation requirements.
3.8.3.24 The supplier shall ensure comprehensive, clear, and unambiguous designation of sub-
supplier responsibility for execution of all preservation management programme elements,
including, but not limited to, all systems, processes, procedures, methods, ready access to
records, and provision of equipment, tools, or services essential to efficient and effective
execution of the preservation management programme.
3.8.3.25 The supplier shall ensure that preservation management programme responsibilities are
clearly and unambiguously defined within the project team and efficiently and effectively
implemented at all project scope of work locations. Inclusion of supplier and sub-supplier
scope of work in the development and implementation of a preservation management
programme shall be considered essential to efficient and effective preservation
management programme execution.
3.8.3.26 The supplier shall ensure clear and unambiguous designation of project team responsibility
for oversight and management of preservation management programme elements during
every stage of project development.
3.8.3.27 The supplier shall ensure that Eskom has free and unrestricted access to all preservation
records for inspection and audit.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.4 Quality Audits Related Conditions
3.8.4.1 The supplier shall maintain an accurate quality audit and related quality performance review
schedule and shall incorporate the current schedule as an attachment to the supplier CQP.
3.8.4.2 The supplier’s quality audit and related quality performance review schedule development
process shall be designed to incorporate consideration of information generated by
previously conducted audits and reviews, by input from project risk management evaluations
(risk register), or from Eskom or sub-supplier subject matter expertise.
3.8.4.3 Eskom reserves the right to oversee supplier audit programmes by participating in selected
audits as an observer and by assessing the supplier during key work stages. Eskom will
coordinate with the supplier to develop an oversight schedule aligned with the supplier’s
audit schedule.
3.8.4.4 Eskom will have the right to obtain access to any audit reports of audits performed by the
supplier reflected in the audit programme.
3.8.4.5 Eskom reserves the right to conduct independent quality audits, scheduled and
unscheduled, during all phases of the contract. The supplier shall provide all resources to
support these activities.
3.8.4.6 Eskom shall be given access at all reasonable times before, during, and after manufacture
and before delivery, construction, erection, and commissioning to measure, test, and inspect
the products and workmanship, as necessary, at the supplier’s premises and at Eskom sites.
3.8.4.7 The supplier shall obtain access for Eskom to measure, test, witness tests, and inspect
products that are being manufactured by any sub-supplier. This includes surveillances.
3.8.4.8 The assessments and audits shall be carried out on all new suppliers and their sub-
suppliers.
3.8.4.9 Eskom shall have the right to participate in, or request that, a technical investigation be
launched and conducted at the supplier’s and sub-suppliers’ premises or other sites when
risk to Eskom products or service deliverables is identified.
3.8.4.10 Qualification requirements for supplier and sub-supplier personnel engaged in conducting
quality audits and related quality performance reviews shall be defined in the supplier CQP
and shall be in compliance with the Project Quality Personnel Qualification Specification.
3.8.5 Management of Nonconformities and Nonconforming Outputs Identified by Eskom
3.8.5.1 Nonconformity reports raised by Eskom and issued against the supplier shall be investigated
by the supplier as a matter of urgency in order to determine the root cause, corrective action
measures, as required, with implementation time frames.
3.8.5.2 A formal response shall be prepared in respect of the defined criteria and submitted to
Eskom for its review, evaluation, and acceptance, within a maximum of 14 calendar days
from the date of issue of the nonconformity and should be aligned with the site
requirements/procedure.
3.8.5.3 Eskom may, at its discretion, request a response sooner and, in any case, before the
supplier proceeding with any pending/further intervention or corrective action, as may be
required by Eskom.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.5.4 Should Eskom or its inspection authority/agency identify any nonconforming products during
the conduct of its audits/surveillances/inspections, the supplier shall be deemed to be in
breach of contract and shall be held liable for any repair, rework, and/or associated
replacement costs. The supplier may, in such instances, also be held liable for the full costs
associated with the conducting of follow-up audits/surveillances/inspections.
3.8.5.5 The nature, magnitude, and/or frequency of nonconformity and inspection defect/rejection
reports raised by Eskom or its appointed inspection authority/agency shall form the basis of
any action to rescind/withdraw the supplier’s qualification status.
3.8.5.6 Nonconforming outputs identified by Eskom shall be documented via a NC Report and
issued to the suppliers via the contract communication protocol. The suppliers shall
investigate the matter and respond in writing to Eskom of disposition within the stated
contractual conditions.
Note: The dates for the disposition should align to contractual conditions.
3.8.5.7 Eskom shall identify repeat deficiencies as systematic failures of the supplier’s QMS and
shall notify the supplier of the trends. Eskom can initiate an internal audit to highlight the
system failures. The supplier with raise a Corrective Action Report and undertake Root
Cause Analysis. In such cases, QMS rectification and/ or update measures shall be taken
immediately.
3.8.5.8 Should the Supplier fail to respond and rectify nonconforming products within stipulated
contractual conditions. The Project Manager should apply contractual remedies in
accordance with Fidic/ NEC contract.
3.8.5.9 Repeated Nonconformities; if there are any identified repeat nonconformities from the same
supplier within a period of 6 months or less. This must then be escalated to the management
review committees of the BU/ OU/ Cluster/ or Divisions for adjudication. If not resolved, then
the matter must be escalated to the supplier review committee for recommendation.
3.8.6 Special Processes
The following requirements shall be applicable as well as additional requirements as specified in the
scope of work for the provision of the following special process services:
3.8.6.1 The supplier shall ensure that all processes which require that procedures be pre-qualified
or work methods and operators tested and qualified are controlled and all steps followed
before the work can commence.
3.8.6.2 This typically covers such activities as welding, non-destructive testing, special fabrication
techniques, coating, painting, etc.
3.8.6.3 All special processes (procedures and processes) shall be submitted for review and
acceptance by Eskom, accredited or certified agency. No work shall commence until these
are accepted.
3.8.6.4 Where applicable, a relevant Management System for the special process shall be certified
or approved by an accredited body and proof of certification shall be submitted to Eskom for
review. An example for this will be the Welding Management System based on ISO 3834.
3.8.6.5 Where samples are required for acceptance, these shall be submitted to Eskom for review
and acceptance.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.6.6 The supplier shall ensure that all operators are suitably qualified for these processes in
accordance with the procedures, processes and/ or applicable standards/ codes.
3.8.6.7 The records of qualification of procedures, processes and operators shall be maintained by
the supplier in accordance with the applicable procedure or code and these made available
to Eskom at all times.
This document has been seen and accepted by:
Name Designation
Kerseri Pather General Manager: Risk and Sustainability
Lenock Meyer Acting Senior Manager: Quality Management
Pamela Dondashe Middle Manager: Quality Assurance
Mandla Mkhwanazi Middle Manager: SHEQ Procurement and Supply Chain Management
Suzette Manthe Senior Advisor: Quality Performance and Planning
Lorna Ndlela Middle Manager: Eskom Document and Records Management
Date Rev. Compiler Remarks
October 2021 3 SA Sambo Specification was due for revision and in addition, to
align the requirements with the latest Eskom business
processes and systems.
October 2018 2 SA Sambo Specification reviewed to be aligned with the
requirements of ISO 9001:2015
March 2016 1 SA Sambo Specification was due for revision and also to
repackage the requirements and tender returnable
documents into four categories.
December 2011 0 A Hunter New document
The following people were involved in the development of this document:
Andrew Else
Bongi Tshabalala
Feziwe Mogamisi
Lesego Garegae
Patrick Thwane
Xolani Zuma
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Eskom Operational Quality Forum Members
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Section
Source: 240-105658000_ Supplier Quality Management Specification.pdfSupplier Quality Management: Specification Unique Identifier: 240-105658000
The intention of this specification is to specify and describe the minimum quality requirements for all
existing and potential Eskom suppliers and define the quality criteria for the selection, evaluation,
implementation, and maintenance of a quality management system (QMS) that conforms to the
a quality management system (QMS) based on ISO 9001, which should form the basis for conformity
to Eskom quality requirements and continually adhere to them throughout the duration of a contract
[1] ISO 9001 Quality Management Systems – Requirements
[2] ISO 10005 Quality Management Systems – Guidelines for Quality Plans.
[3] ISO 9000 Quality Management Systems – Fundamentals and Vocabulary
[4] 32-727: Safety, Health, Environment, and Quality (SHEQ) Policy
[5] ISO 10006 Quality Management Systems – Guidelines for Quality Management in Projects
[6] ISO 9004 Quality Management – Quality of an Organisation – Guidance to Achieve Sustained
[9] PPPFA: Preferential Procurement Policy Framework Act, 2000 (Act No. )
[10] CIDB 1004: Best Practice Guideline A4: Evaluating Quality in Tender Submissions
[11] 240-12248652 Supplier Quality Management: List of Tender Returnables
2.3.2 Contract Quality Plan: a document of the supplier’s process for delivering the level of quality
required by the contract. It is a framework for the contractor’s process for delivering quality.
2.3.3 Hold Point: a predetermined stage in the quality control plan (QCP) beyond which work/
2.3.4 Intervention Points: those control points indicated by the various controlling bodies
inspection, hold points, surveillances, witnesses, reviews and verifications.
performing quality assurance/ quality control, monitoring, inspection and/ or expediting
Title: Supplier Quality Management: Document Identifier: 240-105658000
Functional Area: Quality Management
Quality Quality Manager Quality Risk and
Description
Source: Acknowledgement Form for Eskom SHE Rules and other Requirements (1).docxAnnexure B: Acknowledgement Form for Eskom OHS legal and other requirements
Technical Specifications
Source: Acknowledgement Form for Eskom SHE Rules and other Requirements (1).docx (unknown)Annexure B: Acknowledgement Form for Eskom OHS legal and other requirements
Compliance Requirements
Source: Acknowledgement Form for Eskom SHE Rules and other Requirements (1).docx (unknown)No specific requirements found
Description
Source: 37-2 agreement form.docx………………………………………..[insert name of subsidiary or Eskom Holdings SOC Limited]
Evaluation Criteria
Source: 37-2 agreement form.docx (unknown)The document does not specify explicit eligibility criteria such as financial or technical qualifications. However, applicants must be capable of undertaking the full scope of work (design, supply, construction, commissioning) and must be willing to enter into the Section 37(2) agreement. They should have relevant experience in waste-to-energy projects and compliance with occupational health and safety regulations.
Technical Specifications
Source: 37-2 agreement form.docx (unknown)………………………………………..[insert name of subsidiary or Eskom Holdings SOC Limited]
Description
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.docEskom Holdings SOC Ltd Registration Number 2002/015527/00
Evaluation Criteria
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.doc (unknown)The tender is open to Companies, Close Corporations, Trusts, and Individuals who can provide the required services. Contractors must be able to complete the tax classification process. Non-resident contractors must sign Appendix 9 and have their documentation referred to Eskom's Group Tax Department. Contractors who employ 3 or more full-time non-connected employees may be exempt from certain PAYE withholding requirements. Contractors who receive more than 80% of income from one client may be classified as a Personal Service Provider.
Technical Specifications
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.doc (unknown)Eskom Holdings SOC Ltd Registration Number 2002/015527/00
Description
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.xlsElse: ActiveSheet.Shapes.Range(Array("Button 4")).Visible = msoTrue
Evaluation Criteria
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.xls (unknown)Not extractable from the corrupted document. Typically, ESKOM tenders require bidders to be registered on the Central Supplier Database (CSD), have relevant experience in waste-to-energy projects, and meet B-BBEE requirements.
Technical Specifications
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.xls (unknown)Else: ActiveSheet.Shapes.Range(Array("Button 4")).Visible = msoTrue
Important Dates
Source: E3322CXMWP_Invitation to Tender_Waste to Energy Test Facility_04 August 2026.pdf (RFP){"closingDate":"04 August 2026","closingTime":"10h00","briefingSession":"{"date":"18 August 2026","time":"10h00","venue":"ion meeting A non-compulsory clarification meeting/site visit with","is_compulsory":true}"}
Contact Information
Source: E3322CXMWP_Invitation to Tender_Waste to Energy Test Facility_04 August 2026.pdf (RFP){"name":null,"email":"[email protected]","phone":"011 800 5642","department":null,"address":"lopment, Lower Germiston Road,"}
Evaluation Criteria
Source: E3322CXMWP_Invitation to Tender_Waste to Energy Test Facility_04 August 2026.pdf (RFP)Tenderers must not be under any restriction to do business with Eskom or State-Owned Companies. They must not have nationality of a country on international sanctions lists. Only one proposal per tenderer (except for e-tendering size limits). Joint ventures must have a binding agreement with joint and several liability. No conflict of interest. Tenders must be signed by authorized persons. Tenderers must not be on the Tender Defaulters list or restricted by National Treasury or Eskom.
Technical Specifications
Source: E3322CXMWP_Invitation to Tender_Waste to Energy Test Facility_04 August 2026.pdf (RFP)Annexure Attached
(Y / n / n/a)
1.1.1 *Authorisation Form Annexure A Y
1.1.2 *Acknowledgement form Annexure B Y
1.1.3 *Tenderer’s particulars Annexure C Y
1.1.4 *Integrity Declaration Form (Suppliers are required to Annexure D Y
download and read the Supplier Integrity Pact. It is
accessible on the Eskom Tender Bulletin via Eskom Supplier
Integrity Pact (eskom.co.za) link)
1.1.5 *CPA Requirements for Local Goods/Services Annexure E Y
1.1.6 *CPA(IG) for Foreign Goods/Services (if applicable) Annexure F Y
1.1.7 SBD 6.2 Declaration Certificate for Local Production and Local Annexure G1 Y
Content (only applicable if designated materials are included
and then Tenderers will be required to complete and submit
Annexures G1 to G4 as evidence of compliance with this
requirement).
Annexure C Local Content Declaration- Summary Schedule Annexure G2 Y
Annexure D Imported Content Declaration – Supporting Schedule Annexure G3 Y
to Annexure C
Annexure E Local Content Declaration- Supporting Schedule to Annexure G4 Y
Annexure C
1.1.8 *SBD 1 Invitation to Bid must be filled out by all tenderers and Annexure H Y
submitted with the tender at tender submission deadline
1.1.9 *Sbd
Quality Management
Source: E3322CXMWP_Invitation to Tender_Waste to Energy Test Facility_04 August 2026.pdfTender number E3322CXMWP
Issue date 04 August 2026
Closing date and time 26 August 2026 at 10h00 South African
Standard Time (SAST)
Tender validity period 24 weeks from the closing date and time
Clarification/Site meeting 18 August 2026
Time: 10h00 (SAST) The meeting arrangement is
to meet at the Main Reception at 09:45
Venue: Eskom Research, Testing and
011 800 5642
Request for Proposal – E3322CXMWP
Eskom Holdings SOC Ltd (hereinafter “Eskom”) invites you to submit a tender for the design, supply,
construction and commissioning of a 50-100kW thermal Waste to Energy Test Facility at Research
Testing and Development (RT&D) for a contract period of Twenty-four (24) months
Venue: Eskom Research, Testing and Development,
Safety COIDA - Original certificate of good standing or proof √
of application issued by the Compensation Fund
(COID) or a licensed compensation insurer (South
African tenderers only)
Quality As per the following Eskom’s quality requirements √
that will be attached:
Plan (QCP/ITP)
Other safety/quality As per the following Eskom’s Safety and Health √
documents as requirements that will be attached:
required per scope
of works
Pricing Schedule
Source: E3322CXMWP_Invitation to Tender_Waste to Energy Test Facility_04 August 2026.pdfDeclaration)
1.1.18 Scope of Work NEC Y
1.1.19 NEC or other Contract NEC Y
1.1.20 Pricing Schedule/BOQ (if not contained in Contract) Y
3.19 Ranking of tenders Tenderers will be ranked by applying the preferential
point scoring for the 80/20 system. Eskom will add the
score from Pricing and Specific Goals together and rank
the suppliers from the highest to the lowest.
Effective Date 07 April 2026
Review Date April 2031
Reference Returnable From Suppliers at at **
closing (Non- prior Award. required required closing. required Tender (disqualifiable)* Contract disqualifiable)
to Tender Returnable Returnable Returnable
Pricing schedule Completed pricing schedule (if not already submitted √
in the NEC or other Contract).
Financial Requirements
Source: E3322CXMWP_Invitation to Tender_Waste to Energy Test Facility_04 August 2026.pdf (RFP)Payment Terms: payment terms as stipulated hereunder when
submitting tenders and concluding contracts with Eskom:
For contracts valued below R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
Suppliers within 30 days of receipt of undisputed invoices.
For contracts valued above R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed
Compliance Requirements
Source: E3322CXMWP_Invitation to Tender_Waste to Energy Test Facility_04 August 2026.pdf (RFP)ADDITIONAL CONTRACTUAL REQUIREMENTS SUPPORTING EVIDENCE Safety COIDA - Original certificate of good standing or proof √ of application issued by the Compensation Fund (COID) or a licensed compensation insurer (South African tenderers only) Quality As per the following Eskom’s quality requirements √ that will be attached
Category 3: List of Quality Requirements
Quality Control Plan / Inspection and Test Plan (QCP/ITP)
Template for a Typical Contract Quality Plan
Form A (to be completed and signed) Other safety/quality As per the following Eskom’s Safety and Health √ documents as requirements that will be attached: required per scope of works
OHS Plan (Must address the project /scope of work OHS risk(s) and aligned with the health and safety specification or requirements)
Baseline OHS Risk Assessment (BRA)
Letter of Good standing (COIDA or Equivalent)
OHS policy signed by CEO
37(2) Eskom Agreement
Costing for Health and Safety
Competency Environmental As per the following Eskom’s Environmental √ requirements that will be attached
Signed Environmental Policy
Aspects and Impacts register as per scope of work
Environmental Management Plan
Apply for Atmospheric Emission Licence (AEL) if required/applicable
Apply for Environmental Authorisation (EA) if threshold triggered
Stormwater and Water management to comply with applicable municipal by-laws and regulatory requirements Due
A signed copy of the public interest score (only applicable to South African entities that are not audited) o Giving the actual score o Indicating whether the company is owner managed or not o Confirming whether the annual financial statements were externally prepared or not.
Copies of the ITA34C for the current & previous years of assessment (only applicable to South African entities that are not audited)
For unincorporated JV or a SPV, each partner in the JV or a SPV must submit its annual financial statements including all items listed above. DOCUMENTS REQUIRED UNDER FUNCTIONALITY/TECHINICAL CRITERIA Functionality/Technical 1 Technical Evaluation criteria √ Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 61 File name: E3322CXMWP_Invitation to Tender_Waste to Energy Test Facility_04 August 2026 Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 28 Identifier Request for Proposal Effective Date 07 April 2026 Review Date April 2031 ANNEXURE A AUTHORISATION FORM Indicate the status of the tenderer by ticking the appropriate box below. A B C D E F COMPANY CLOSE PARTNERSHIP JOINT SOLE TRUST CORPORATION VENTURE PROPRIETOR The tenderer must complete the appropriate certificate set out below for its category of organisation. If the tenderer is a company, close corporation, joint venture, or trust the tenderer must attach a certified copy the document that is proof of the contents of the certificate (resolution of the board of directors of a company, members’ resolution of a close corporation, power of attorney in the case of a joint venture, or resolution of the board of trustees of a trust). Note further that, in addition to completing the relevant certificate for category of organisation, the authorised representative of the tenderer is also required to complete and sign the table at the end of this Authorisation Form.
Certificate for company I,_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ , in my capacity as _ _ _ _ _ _ _ _ _ _ _ of the board of directors of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, hereby confirm that by resolution of the board taken on _ _ _ __ _ _ _ _ (date), Mr/Ms _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , acting in his/her capacity of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, is authorised to submit this tender on behalf of the company, and to sign all documents in connection with this tender and any contract that may result from it on behalf of the company. A certified copy of the resolution of the board is annexed to this Form. Signed: Date: Name: Position: Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 61 File name: E3322CXMWP_Invitation to Tender_Waste to Energy Test Facility_04 August 2026 Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 28 Identifier Request for Proposal Effective Date 07 April 2026 Review Date April 2031
Certificate for close corporation I,_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ , in my capacity as member of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, hereby confirm that by majority vote of the members taken on _ _ _ __ _ _ _ _ (date), Mr/Ms _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , acting in his/her capacity of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, is authorised to submit this tender on behalf of the close corporation, and to sign all documents in connection with this tender and any contract that may result from it on behalf of the close corporation. A certified copy of the members’ resolution is annexed to this Form. Signed: Date: Name: Position
Certificate for partnership We, the undersigned, being the key partners in the business trading as _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ hereby authorise Mr/Ms _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, acting in his/her capacity of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, to submit this tender on behalf of the partnership, and to sign all documents in connection with the tender and any contract that may result from it on behalf of the partnership. Name Address Signature Date NOTE: This certificate is required to be completed and signed by the full number of Partners necessary to commit the Partnership. Attach additional pages if more space is required. Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 61 File name: E3322CXMWP_Invitation to Tender_Waste to Energy Test Facility_04 August 2026 Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 28 Identifier Request for Proposal Effective Date 07 April 2026 Review Date April 2031
Certificate for Joint Venture We, the undersigned, are submitting this tender offer in Joint Venture and hereby authorise Mr/Ms _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, an authorised signatory of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , being the lead member in the Joint Venture, to sign all documents in connection with the tender and any contract that may result from it on behalf of all the members in the Joint Venture. This authorisation is evidenced by the attached power of attorney signed by the legally authorised signatories of all the members in the Joint Venture. We attach to this Form a certified copy of the Joint Venture Agreement which incorporates a statement that all members in the Joint Venture are liable jointly and severally for the execution of the contract, a term that indicates which member will be the lead member, and terms that indicate the ratios according to which work and payment will be divided amongst the members. Name of JV member Address Authorised signature, name and capacity Lead member Member Member Member NOTE: This certificate is required to be completed and signed by all members of the joint venture. Attach additional pages if more space is required.
Certificate for sole proprietor I, _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, hereby confirm that I am the sole proprietor of the business trading as _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Signed: Date: Name: Position:(Sole Proprietor) Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 61 File name: E3322CXMWP_Invitation to Tender_Waste to Energy Test Facility_04 August 2026 Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 28 Identifier Request for Proposal Effective Date 07 April 2026 Review Date April 2031
Certificate for trust I,_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ , in my capacity as _ _ _ _ _ _ _ _ _ _ _ of the board of trustees of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, hereby confirm that by resolution of the board of trustees taken on _ _ _ __ _ _ _ _ (date), Mr/Ms _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , acting in his/her capacity of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, is authorised to submit this tender on behalf of the trust and to sign all documents in connection with this tender and any contract that may result from it on behalf of the trust. A certified copy of the resolution of the board of trustees is annexed to this Form. Signed: Date: Name: Position: NOTE: The table below must also be fully completed by all tenderers in addition to the certificate that was selected and completed above. Name of tenderer: Full names of authorised signatory: Designation and capacity: Signature of authorised signatory Date of signature: Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 61 File name: E3322CXMWP_Invitation to Tender_Waste to Energy Test Facility_04 August 2026 Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 28 Identifier Request for Proposal Effective Date 07 April 2026 Review Date April 2031 ANNEXURE B ACKNOWLEDGEMENT FORM We are in receipt of the Proposal from Eskom Holdings SOC Ltd and the following addenda issued by Eskom: We confirm that the documentation received by us is: (Indicate by ticking the box) Correct as stated in the RFP Content List, and that each document is complete. Or: Incorrect or incomplete for the following reasons: Cataloguing Acknowledgement: Please select the relevant statement by ticking the appropriate box below
We agree to provide the cataloguing information as described in the Invitation to Tender
We have already supplied Eskom with the cataloguing information pertaining to this Invitation to Tender in a previous contract/order [insert previous contract/order number] __________
We do not intend to provide the required cataloguing information for the reasons stated hereunder:
Points Allocation: 20 points
B-BBEE Details: Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 61
File name: E3322CXMWP_Invitation to Tender_Waste to Energy Test Facility_04 August 2026
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 28
Identifier
Request for Proposal
Effective Date 07 April 2026
Review Date April 2031
Clause Number from Standard Conditions of
Tender Data
Tender
3.18 Evaluation of Specific Goals Specific goals will be scored out of 20 points in
accordance with the PPPFA.
The following specific goals score card applies:
B-BBEE Status Level of Number of points
Contributor (80/20 system)
1 20
2 18
3 14
4 12
5 8
6 6
7 4
8 2
Non Compliant 0
To claim preference points as specific goals/preference
points, a tenderer must submit the following
documentation:
verification professional/ a sworn affidavit/CIPC
affidavit.
documentation) inclusive of shareholding
breakdown,
A tenderer failing to provide documentation for the
allocation of preference points will not be disqualified,
but-
a) may only score points out of 80 for price
b) scores 0 points out of 20 for specific goals.
If a tenderer fails to submit evidence of its points
claim for a Specific Goal, it will not be disqualified.
However, it will be awarded 0 points for that Specific
Goal.
3.19 Ranking of tenders Tenderers will be ranked by applying the preferential
point scoring for the 80/20 system. Eskom will add the
score from Pricing and Specific Goals together and rank
the suppliers from the highest to the lowest.
Controlled Disclo
Health & Safety
Source: E3322CXMWP_Invitation to Tender_Waste to Energy Test Facility_04 August 2026.pdfcontract the CSDG established in the CIDB Standard for A4 Supervisor
included if applicable:
statements) /
(financial analysis is compulsory as a contractual
requirement for CIDB-related transactions from
R30 000 excluding VAT); and/or
documentation (Form A2 Baseline Training Plan, Form
A3 Project Interim Report, Form A4 Supervisor
Agreement, Form A5 Project Completion Report) that
may be required as returnables after contract award as
stipulated by Clause 4 of the Contract Skills
Development Goals Standard published in GGN 36760
of March 2020.
Construction Works Contract (published in GN 1779,
Government Gazette No. April 2023)
2.28 CIDB Requirements (where applicable for CIDB Requirements are applicable
2.30 Contract Participation Goals is applicable Contractor shall achieve in the performance of the
contract the Contract Participation Goals (CPG)
relating to the engagement of targeted enterprises as
established in the CIDB Standard for Indirect
Construction Works Contract (published in
Government Gazette No. February 2013)
relating to the engagement of targeted enterprises as
established in the aforesaid standard applies to:
a) construction works contracts in the General
Building (GB) and to Civil Engineering (CE)
classes of construction works;
b) construction works contracts of an estimated
minimum project duration of 6 months; and
c) construction works contracts in which at least
25% of the main contract could reasonably be
expected to be sub-contracted out in one or more
of the following CIDB classes of construction
works:
Contractual Terms
Source: E3322CXMWP_Invitation to Tender_Waste to Energy Test Facility_04 August 2026.pdfinternational sanctions list. A tenderer shall be
found to have the nationality of a country if the
tenderer is a national or is constituted,
incorporated, or registered and operates in
conformity with the provisions of the laws of that
country. This criterion shall also apply to the
determination of the nationality of proposed
subcontractors or suppliers for any part of the
the clarification meeting to [email protected]
(Eskom Representative) stating the name, position and
contact details of each proposed attendee to the meeting
is received two working days prior to the meeting date.
2.16 Seeking clarification The tenderer will notify Eskom of any clarifications
required before the closing time for clarification queries,
which is 3 working days before the deadline for tender
submission.
2.22 Alternative tenders Alternative tenders are not allowed.
2.33 Cataloguing Not Applicable
2.34 Provision of Security for Performance The following forms of security are required for this
tender:
a performance bond or a demand guarantee is a
requirement, the tenderer must select a minimum of two
(2) financial institutions that it is likely to approach from
the list provided of Eskom-approved financial institutions.
submitting tenders and concluding contracts with Eskom:
For contracts valued below R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
Suppliers within 30 days of receipt of undisputed invoices.
For contracts valued above R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
suppliers within 60 days of receipt of undisputed invoices.
Section
Source: E3322CXMWP_Invitation to Tender_Waste to Energy Test Facility_04 August 2026.pdf1.1.9 *SBD 6.1 Preference Points Claim Form in terms of PPPFA 2022 Annexure I Y
1.1.11 Tax Evaluation questionnaire to determine whether a company, Y
3.13 Functionality requirements Functionality requirements are applicable
transaction under functionality criteria
Threshold 70%
Refer to Annexure K (Technical Evaluation)
functionality scoring will be disqualified
3.15 Evaluation of Price Prices will be evaluated as follows
other evaluation parameters relating to uncertainty
for evaluation purposes.
for evaluation purposes but will be implemented
Prices will be scored out of 80 points
3.18 Evaluation of Specific Goals Specific goals will be scored out of 20 points in
accordance with the PPPFA.
The following specific goals score card applies
B-BBEE Status Level of Number of points
Contributor (80/20 system)
To claim preference points as specific goals/preference
points, a tenderer must submit the following
allocation of preference points will not be disqualified,
a) may only score points out of 80 for price
b) scores 0 points out of 20 for specific goals.
If a tenderer fails to submit evidence of its points
However, it will be awarded 0 points for that Specific
point scoring for the 80/20 system. Eskom will add the
Description
Source: NEC3_ECC3_Waste_to_Energy_EPC_Contract.docxThe Employer, identified in the Acceptance signature block, has solicited offers to enter into a contract for the procurement of:
Evaluation Criteria
Source: NEC3_ECC3_Waste_to_Energy_EPC_Contract.docx (unknown)Tenderers must comply with BBBEE requirements and maintain or improve their BBBEE level for the contract duration. Mandatory subcontracting of 30% of contract value to EMEs/QSEs with at least 51% black ownership (including specific categories for youth, women, persons with disabilities, rural/township, military veterans). Tenderers must submit SDL&I undertakings, local content plans, and skills development proposals. Joint ventures are allowed but must be jointly and severally liable. The contract is governed by South African law.
Technical Specifications
Source: NEC3_ECC3_Waste_to_Energy_EPC_Contract.docx (unknown)The Employer, identified in the Acceptance signature block, has solicited offers to enter into a contract for the procurement of:
Description
Source: SDLI Strategy for Bidders Waste to Energy Test Facility.docxSection 1: Pre-qualification Criteria for set aside Procurement (Not Applicable)
Evaluation Criteria
Source: SDLI Strategy for Bidders Waste to Energy Test Facility.docx (unknown)No specific pre-qualification criteria for set-aside procurement are applicable. However, tenderers must meet CIDB CSDG mandatory percentages (if applicable) to avoid being non-responsive. B-BBEE status level is used for scoring preference points. Tenderers with annual revenue ≤ R10 million can submit a sworn affidavit; those with revenue ≤ R50 million and at least 51% black-owned can also use a sworn affidavit; others need a valid B-BBEE certificate from a SANAS-accredited agency.
Technical Specifications
Source: SDLI Strategy for Bidders Waste to Energy Test Facility.docx (unknown)Section 1: Pre-qualification Criteria for set aside Procurement (Not Applicable)
Description
Source: Waste to Energy Facility-Typical Activitiy Schedule_04082026.xlsxCell A1: Engineer, Procure, Construct and Commission a 50 to 100 kW thermal Waste-to-Energy Test Facility at Eskom Research, Testing and Innovation Centre
Evaluation Criteria
Source: Waste to Energy Facility-Typical Activitiy Schedule_04082026.xlsx (unknown)The document does not explicitly list eligibility criteria such as minimum turnover, certifications, or local content requirements. However, given the nature of the project and Eskom's requirements, typical criteria would include: registration with relevant professional bodies (e.g., ECSA for engineers), proven experience in EPCC projects, financial stability, and compliance with South African procurement laws. The presence of detailed fee calculations suggests that bidders must be able to provide professional services in multiple disciplines.
Technical Specifications
Source: Waste to Energy Facility-Typical Activitiy Schedule_04082026.xlsx (unknown)Cell A1: Engineer, Procure, Construct and Commission a 50 to 100 kW thermal Waste-to-Energy Test Facility at Eskom Research, Testing and Innovation Centre
Evaluation Criteria
Source: TECHNICAL EVALUATION CRITERIA.docx (unknown)Bidders must demonstrate ability to design and construct the specified facility (mandatory gatekeeper 1) and comply with South African environmental, safety, and engineering requirements including NEMA, SANS, and Eskom site requirements (mandatory gatekeeper 2). Failure to meet either gatekeeper results in technical non-responsiveness. Additionally, bidders must achieve a minimum weighted technical score of 70% across the qualitative criteria to be considered technically acceptable.
Technical Specifications
Source: TECHNICAL EVALUATION CRITERIA.docx (unknown)Annexure k
Technical evaluation criteria
Mandatory Technical Evaluation Criteria / Gatekeepers Mandatory Technical Evaluation Criteria / Gatekeepers Mandatory Technical Evaluation Criteria / Gatekeepers Mandatory Technical Evaluation Criteria / Gatekeepers
No Mandatory requirements Minimum evidence required Evaluation basis Outcome
instrumentation and data acquisition facility. Technical proposal, process description, preliminary PFD, preliminary GA layout and equipment list. Yes / No Failure to comply is technically
nonresponsive
engineering requirements including NEMA, relevant SANS requirements and Eskom site requirements. Compliance matrix and proposed approach to statutory approvals,
environmental compliance, occupational health and safety, and emissions
management. Yes/ No Failure to comply is technically
nonresponsive
5 100% Fully compliant: meets the requirement with no foreseen technical risk. Fully compliant: meets the requirement with no foreseen technical risk. Fully compliant: meets the requirement with no foreseen technical risk.
4 80% Compliant with minor qualifications: meets the requirement with acceptable technical risks, exceptions or conditions. Compliant with minor qualifications: meets the requirement with acceptable technical risks, exceptions or conditions. Compliant with minor qualifications: meets the requirement with acceptable technical risks, exceptions or conditions.
2 40% Partially compliant / weak response: does not fully meet the requirement or presents material technical risk. Partially compliant / weak response: does not fully meet the requirement or presents material technical risk. Partially compliant / weak response: does not fully meet the requirement or presents material technical risk.
0 0% Non-responsive or totally deficient: no adequate evidence provided. Non-responsive or totally deficient: no adequate evidence provided. Non-responsive or totally deficient: no adequate evidence provided.
Note: Scores of 1 and 3 are not used. Weighted score = criterion weighting x score percentage. Note: Scores of 1 and 3 are not used. Weighted score = criterion weighting x score percentage. Note: Scores of 1 and 3 are not used. Weighted score = criterion weighting x score percentage. Note: Scores of 1 and 3 are not used. Weighted score = criterion weighting x score percentage.
No Criteria Scoring guidance / evidence required Weighting Maximum
score
1 Company experience and
reference projects Evidence of completed projects of similar complexity involving waste-to energy, incineration, thermal treatment, combustion systems, flue gas treatment, pilot/test/commercial plants.
Returnables must include project name, client, scope, value, start and completion dates, commissioning status and traceable references.
5 = three or more directly relevant
completed projects;
4 = two relevant completed projects;
2 = one relevant project;
0 = no adequate evidence. 20% 20
2 Technical solution,
methodology and design
approach Assessment of proposed technical
solution for the 50 to 100 kW test
facility, including but not limited to waste reception, storage, drying/feed
preparation, controlled incineration, flue gas treatment, stack/emissions
monitoring, instrumentation, control and data acquisition.
5 = comprehensive, integrated and fitfor- purpose design approach;
4 = compliant with minor clarifications required;
2 = incomplete or high-risk approach;
0 = inadequate or nonresponsive. 25% 25
3 Resource capability and
key personnel Relevant qualified and experienced
personnel for civil/structural,
mechanical, electrical, control and
instrumentation, process/chemical
engineering, project management,
construction supervision, SHEQ and
commissioning. CVs, statutory
registrations where applicable and
project roles must be provided.
5 = all required disciplines adequately covered;
4 = most disciplines covered
with acceptable mitigation;
2 = significant gaps in personnel or
experience;
0 = no adequate resource
evidence. 20% 20
4 Project programme and
delivery capability Detailed programme for design,
procurement, construction, installation, commissioning, performance testing, documentation handover and training.
The programme must identify critical
path activities, interfaces, assumptions and key risks.
5 = achievable completion within 12
months from contract award;
4 = achievable completion within 16
months;
2 = completion within 18
months or programme lacks detail;
0 = no credible programme. 15% 15
5 Compliance, safety, quality and environmental management Approach to statutory compliance,
environmental management, emissions control, occupational health and safety, QA/QC, inspection and testing, risk
management and site execution
controls.
5 = comprehensive compliance, SHEQ and environmental approach; 4 = compliant with minor clarification
2 = incomplete or high-risk approach
0 = inadequate evidence. 10% 10
6 Commissioning, performance testing, documentation and training Commissioning plan, performance test procedure, acceptance criteria,
operating and maintenance
manuals/plans, training plan and post commissioning support.
5 = complete and practical
commissioning and handover approach;
4 = acceptable with minor clarifications;
2 = incomplete or weak approach;
0 = inadequate evidence. 10% 10
Total scoring Total scoring 100%
Minimum technical threshold: Tenderers must achieve a minimum weighted technical score of 70% to be considered technically acceptable and to proceed to the next stage of evaluation. Minimum technical threshold: Tenderers must achieve a minimum weighted technical score of 70% to be considered technically acceptable and to proceed to the next stage of evaluation. Minimum technical threshold: Tenderers must achieve a minimum weighted technical score of 70% to be considered technically acceptable and to proceed to the next stage of evaluation. Minimum technical threshold: Tenderers must achieve a minimum weighted technical score of 70% to be considered technically acceptable and to proceed to the next stage of evaluation.
Description
Source: Supplier Declaration of Interest Template (5).docxI, the undersigned [insert full name of signatory]…………………………………………, in my capacity as [insert capacity, i.e., member, director, partner, etc.] …………………………………………... of the supplier [insert registered full legal name of the supplying entity AND their company registration number] ………………....................................................., certify under oath that, to the best of my knowledge, the information furnished herein is true and correct. I accept that Eskom reserves its right to act against the supplier named above or me personally in terms hereof, should this declaration prove to be false.
Evaluation Criteria
Source: Supplier Declaration of Interest Template (5).docx (unknown)Eligibility is not explicitly detailed in the provided document, but applicants must be capable of designing, supplying, constructing, and commissioning a 50-100kW thermal waste-to-energy test facility. They must also comply with the Supplier Declaration of Interest requirements, including disclosing any conflicts of interest. The document implies that suppliers with undisclosed conflicts of interest may be disqualified.
Technical Specifications
Source: Supplier Declaration of Interest Template (5).docx (unknown)I, the undersigned [insert full name of signatory]…………………………………………, in my capacity as [insert capacity, i.e., member, director, partner, etc.] …………………………………………... of the supplier [insert registered full legal name of the supplying entity AND their company registration number] ………………....................................................., certify under oath that, to the best of my knowledge, the information furnished herein is true and correct. I accept that Eskom reserves its right to act against the supplier named above or me personally in terms hereof, should this declaration prove to be false.
Evaluation Criteria
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx (unknown)The document does not explicitly list eligibility criteria, but applicants must be capable of managing a 24-month contract, have expertise in thermal waste-to-energy systems, and comply with Eskom's quality control and inspection protocols. They may need to demonstrate experience with similar facilities and hold relevant certifications.
Technical Specifications
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx (unknown)Contract / Order Number Contract / Order Number Subcontractor Order Number Subcontractor Order Number QCP Number Page 1 of ___
Scope of Work Scope of Work Item/ Plant/ Material Description Item/ Plant/ Material Description Rev Number - Date
Quality Control Plan Approvals Quality Control Plan Approvals Name Name Name Signature Signature Intervention Point Legend (KEY) Intervention Point Legend (KEY) Intervention Point Legend (KEY) Intervention Point Legend (KEY) Intervention Point Legend (KEY) Intervention Point Legend (KEY)
Contractor /Supplier Contractor /Supplier Hold Point AP - Document Requires Approval AP - Document Requires Approval T1 – 100% Testing
T2- Sample Testing T1 – 100% Testing
T2- Sample Testing A1 – 100% Inspection
A2- Sample Inspection
Subcontractor (where applicable) Subcontractor (where applicable) Witness Point W1 – 100% witness W1 – 100% witness W2 - Sample witness W2 - Sample witness
Eskom Eskom Document Review IN - Document Requires for information only IN - Document Requires for information only R1- 100% Document Review R1- 100% Document Review R2- Sample Document Review
Approved Inspection Authority (AIA)
(Where applicable) Approved Inspection Authority (AIA)
(Where applicable) Surveillance (S)
Approved Inspection Authority (AIA)
(Where applicable) Approved Inspection Authority (AIA)
(Where applicable) Verification (V)
Activities Activities Activities Intervention Point Intervention Point Category Inspection and Test Method Inspection and Test Method Inspection and Test Method Supplier Inspection Supplier Inspection Eskom Inspection Eskom Inspection Records
No Description / Requirement Date Supplier Eskom S=Statutory / N= Non-statutory Method Controlling document Acceptance Criteria AIA/NOBO Internal/TPI AIA/NOBO Internal/TPI
Notes: INSPECTION AND TEST METHOD (e.g. Visual, Microscopy, NDT, Liquid/ Dye Penetrant, Magnetic Particle, EDDY, etc.); ACCEPTANCE CRITERIA ( e.g. Functionality requirement, Performance Measures, Regulatory Compliance, Chemical test , etc.)
Abbreviations: NOBO (Notification Body); TPI (Third Party Inspection)
Public
Evaluation Criteria
Source: Tender Evaluations Environmental Requirements - Waste Energy Facility - 22 July 2026.pdf (RFP)The document does not specify general eligibility criteria such as company size, financial standing, or prior experience. However, bidders must be capable of meeting all environmental evaluation criteria listed, including having a signed environmental policy, a comprehensive aspects and impacts register, a detailed EMP, and the ability to obtain necessary environmental licenses (AEL, EA) as required. Compliance with Eskom's document control and copyright policies is also mandatory.
Technical Specifications
Source: Tender Evaluations Environmental Requirements - Waste Energy Facility - 22 July 2026.pdf (RFP)supply, construction and commissioning of a 50-100kW Document Identifier 240-77471969 Rev 3
thermal Waste to Energy Test Facility)
Effective Date May 2021
Ref Environmental Tender Returnable Submission Comments
Y = Yes
N= No
1 Signed Environmental Policy:
2 Aspects and Impacts register as per scope of work
Environmental
Source: Tender Evaluations Environmental Requirements - Waste Energy Facility - 22 July 2026.pdf(Request for proposals for the design, supply, construction and commissioning of a 50-100kW Document Identifier 240-77471969 Rev 3
thermal Waste to Energy Test Facility)
Effective Date May 2021
Identification, assessment, and control of activities that have or may have an impact on the environment.
The methodology used must be provided together with the identified activities that have been identified,
based on the scope of work, that have an impact on the environment and the control measures.
Waste handling procedures.
Spill prevention and response.
Dust management.
Air emissions monitoring.
Housekeeping requirements.
(Request for proposals for the design, supply, construction and commissioning of a 50-100kW Document Identifier 240-77471969 Rev 3
thermal Waste to Energy Test Facility)
Effective Date May 2021
Emergency preparedness plan.
Training and awareness.
Incident reporting.
Complaints management, etc
4 Apply for Atmospheric Emission Licence (AEL) if required/applicable
5 Apply for Environmental Authorisation (EA) if threshold triggered
Section
Source: Tender Evaluations Environmental Requirements - Waste Energy Facility - 22 July 2026.pdfEnvironmental Evaluation Criteria
Evaluation Criteria
Source: OHS Evaluation Requirements.docx (unknown)Tenderers must be capable of designing, supplying, constructing, and commissioning a thermal waste-to-energy test facility. They must demonstrate compliance with Eskom's OHS legal and other requirements, including submission of all specified OHS documents. A valid Letter of Good Standing (COIDA or equivalent) is mandatory. The OHS policy must be signed by the CEO and comply with OHS Act Section 7. The contractor must have competent personnel with relevant training, knowledge, experience, and qualifications for the work.
Important Dates
Source: Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdf (unknown){"closingDate":"27 June 2023"}
Contact Information
Source: Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdf (unknown){"name":null,"email":null,"phone":null,"department":"ies and that","address":null}
Evaluation Criteria
Source: Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdf (unknown)The document does not specify technical or financial eligibility criteria for this tender. However, all suppliers must be registered on the Eskom Vendor Database and must adhere to the Supplier Integrity Pact. Suppliers must not have any undisclosed conflicts of interest or be involved in dishonest practices. The tender is open to natural or juristic persons capable of designing, supplying, constructing, and commissioning the specified waste-to-energy test facility.
Technical Specifications
Source: Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdf (unknown)1.1 Scope
The Eskom Supplier Integrity Pact (Integrity Pact) is applicable to Eskom Holdings SOC Ltd (including all
wholly owned subsidiaries) and all existing and potential suppliers (as per the definition hereunder).
1.2 Purpose
The integrity pact is a pact between Eskom and its suppliers that prescribes the “ethical behaviour”. Ethical
behaviour is desirable/acceptable conduct (actions and decisions) that will bring about good/appropriate
consequences/outcomes in the interaction with others. Ethical behaviour incorporates ethical values and
considers not only what is good for oneself, but also what is good for others. Eskom considers such behaviour
of paramount importance and expects every existing/potential supplier and its own employees/directors to
always act ethically and with integrity.
Eskom commits to ensuring that it implements a procurement policy/procedure that aligns to all applicable
South African laws and regulations, as well as the constitutional principles of fairness, transparency, equity,
cost effectiveness and competitiveness.
This document supplements all other relevant Commercial and Ethics related policies/codes/procedures.
1.3 Preamble
In order to achieve this purpose, all Eskom suppliers are required to read this Integrity Pact and to complete,
sign and submit the Integrity Declaration Form whenever they participate in any Eskom procurement process.
Eskom and its suppliers commit to honouring their respective obligations herein, and agree to refrain from
any form of dishonesty, fraud, and/or corruption throughout the entire procurement process, including
tendering practices that are in bad faith, unfair and anti-competitive (e.g., under-pricing/collusion/bid rigging)
Term Definition
Conflict of Interest A conflict of interest arises when one’s personal interests, personal
financial interests or any other interests, affect, or could be perceived to
affect, or has the potential to affect one’s objectivity and discretion and/or
the objectivity and discretion of another in performing Eskom duties or
making decisions on behalf of Eskom. This means that an employee or
director is in a position to make a decision (or influences a decision) that
is not fair and objective in order to benefit personally, or to benefit related
and /or inter-related persons.
Director Means a member of the board of Eskom, or a board of its subsidiary or
an alternate director of such board and includes a person occupying the
position of a director, by whatever name designated, or a prescribed
officer, or a person who is a member of a committee of the board or of
the audit committee, irrespective of whether the person is also a member
of such board.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Supplier Integrity Pact Unique Identifier: 240-113650212
Revision: 2
Page:
Employment equity The Employment Equity Act promotes equity in the workplace,
ensures that all employees receive equal opportunities and that
employees are treated fairly by their employers. The law protects a
person from unfair treatment and any form of discrimination.
Employee (s) Also referred to as staff members. These include individuals employed
by Eskom on a permanent basis, contract labour, temporary employees,
part-time employees, casual employees, occasional employees, fixed-
term contractors, learners, and others acting on behalf of Eskom or its
subsidiaries.
Eskom Registered Vendor Means a current or potential supplier who may be a natural or juristic
person and includes any employee of such supplier acting within the
course and scope of his/her employment, or any agent or manager acting
for or on behalf of, or in the interests of the supplier registered as a vendor
on the Eskom Vendor Database.
Supplier Means any natural person or juristic person that does business with
Eskom or tenders to do business with Eskom, or is registered on Eskom’s
Vendor Database, such as consultants, contractors, sub-contractors and
providers of goods and services.
Abbreviation Explanation
DOI Declaration of Interest
ETC EXCO Tender Committee
NDA Non-disclosure agreement
RFP Request for Proposal
RFQ Request for Quotation
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Supplier Integrity Pact Unique Identifier: 240-113650212
Revision: 2
Page:
4.1 Eskom’s suppliers accept that they will at all times:
4.1.1 Maintain an impeachable standard of integrity in all their business and personal dealings and take all
reasonable measures necessary to prevent all dishonest, unfair, fraudulent, corrupt, and illegal
practices during any stage of the Eskom procurement process including the execution of contracts
and contract modifications.
4.1.2 Ensure that they are familiar with all publicly available Eskom policies/ procedures/codes that impact
the supply chain processes including, but not limited to Eskom’s Standard Conditions of Tender.
4.1.3 Reject all improper business practices (as may be prohibited by Eskom).
4.1.4 Not abuse the trust placed in them by Eskom employees, or misuse opportunities arising during their
interaction with Eskom for personal gain.
4.1.5 Seek to constantly maintain and enhance their standards of professional competence.
4.1.6 Adopt, where possible, policies and practices which align with those of Eskom (labour practices,
employment equity initiatives and human relations policies) to the highest ethical standards.
4.2 Eskom’s suppliers confirm specifically that:
4.2.1 All confidential information, to which they may have access in the course of their work, must not be
disclosed without the express consent from the authorised Eskom representative. The supplier is
required to complete a Non-Disclosure Agreement (NDA) to give effect to this.
4.2.2 They will not deliberately misrepresent information, submit false certifications or forged documents to
influence the tendering process to advantage themselves or to mislead Eskom in any way and that
Eskom has the right to request an audit of such information, and take further action against the supplier
should it be found that it has acted in a dishonest or fraudulent manner.
4.2.3 Although the establishment of long term and close relations between Eskom and its suppliers is
recognised, Suppliers are nevertheless, required to avoid relationships with Eskom
employees//directors, that may be perceived to be contrary to the constitutional principles of fairness,
equitability, transparency, competitiveness, and cost effectiveness. Suppliers are therefore required
to complete the Integrity declaration form wherein they are required to disclose any interest that they
may have with an Eskom employee/director, whether financial, personal, or private, in its business,
and/or any affiliation /relationship which affects, or may affect, or may be perceived to affect, the
decision-making during tender award. Should a supplier later become aware that its
owners/members/directors/partners/shareholders are an Eskom employee/director with respect to a
tender in which it participated, the supplier is required to disclose the interest/relationship to Eskom
and submit whatever information may be required regarding the parties involved.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Supplier Integrity Pact Unique Identifier: 240-113650212
Revision: 2
Page:
4.2.4 Although the entertainment of customers and provisions of business courtesies or gifts are generally
an accepted commercial practice, they must not in any way negatively affect Eskom’s image and
reputation. They should not exceed the R1500,00 value prescribed by Eskom and should not be of
such a nature (value or circumstances) as to be construed as placing an Eskom employee/director
under obligation to the supplier or in any way improperly influence the recipient.
4.2.5 They will avoid entering into unethical and/or fraudulent dealings with any Eskom employee/director
involved in the evaluation/adjudication/negotiation of a transaction in which it participates, involving
direct/indirect monetary or material benefits in order to be unfairly benefitted. In such circumstances,
no business courtesy, bribe, gift, fees commission or inducement may be offered to, or requested by
an Eskom employee/director involved in the evaluation/adjudication/negotiation of a transaction in
which the supplier is participating.
4.2.6 They will not enter any dishonest and/or illegal agreement or an understanding with other tenderers
involved in a tender/RFP process in which it participates. They will complete the integrity Declaration
Form which incorporates a Declaration of Fair Tendering Practices, when participating in any Eskom
tender/Request for Quotation (RFQ).
4.2.7 They understand that they may be subject to a supplier discipline process and that sanctions that
may be imposed on suppliers should they be found guilty of misconduct.
4.2.8 Should a supplier become aware of any dishonest, fraudulent or inappropriate behaviour of any Eskom
employee/director; the said supplier is required to report this behaviour to the Eskom Ethics office via
email at [email protected], or via the Eskom Forensic email at [email protected] or through
the Eskom toll free hotline 0800 11 27 22, wherein confidentiality is guaranteed.
5.1 Eskom undertakes to treat all tenderers during the tender process according to the constitutional
principles of fairness, transparency, equity, cost-effectiveness, and competitiveness.
5.2 All Eskom employees/directors are required to complete an annual Declaration of Interest (DOI),
wherein they are required to declare all interests, directorships, memberships, details of any of their
related or inter-related persons or other associates that conduct business with Eskom and all other
material personal interests, whether a conflict exists or not. During the financial year, all Eskom
employees/directors have an option of amending annual DOIs should there be changes in their
interests or what has been disclosed already. In addition to this annual declaration, employees are also
required to complete an additional DOI and NDA if involved in the procurement process.
5.3 Eskom employees will ensure that all gifts received in the normal course of business is declared,
recorded, and authorised by relevant managers. Employees/directors involved in the tender evaluation/
negotiation process, may not accept, demand, or accept a promise of any money, business courtesies,
gifts, rewards, gratuity, favours from any of the tenderers involved to benefit or as may be perceived to
benefit such tenderer. Further to this, employees and directors are prohibited from offering or accepting
loan(s) or other benefit(s) from suppliers, unless the supplier is in the business of granting such loans
or benefits and the terms and conditions of the loan that is offered to the employee/director is also
offered to the general members of the public or a section thereof.
5.4 Should Eskom become aware of any relationship/interest of any employee/director in a tender in which
it is involved in tender evaluation/negotiation process, then this employee/director will be excluded from
the said tender evaluation/negotiation process.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Supplier Integrity Pact Unique Identifier: 240-113650212
Revision: 2
Page:
5.5 Eskom will implement the Supplier Discipline Process if it becomes aware of any contravention of the
provisions of this integrity pact, any other misconduct by a supplier and/or any Eskom
employee/director who acts in bad faith to benefit themselves or a supplier. Eskom has the right, after
following a process of investigation and affording the supplier an opportunity to make representation,
to notify the supplier of the intention to suspend it from the Eskom Vendor Database, impose various
other sanctions and/or institute disciplinary actions against its employees/directors. Subsequently,
Eskom will forward the names of such suppliers including the directors of the company to National
Treasury, who will include the suppliers on the List of Restricted Suppliers on the National Database.
5.6 All Eskom employees/directors are prohibited from having any direct/ indirect personal or other
beneficial interest in any contract with Eskom, whether as a supplier, an advisor or by virtue of being a
director or owner of a business, or in any other capacity. This includes third-party related transactions
with an indirect link to an Eskom contract.
6.1 This Eskom Supplier Integrity Pact is governed by and interpreted in accordance with the laws,
regulations and legislation of the Republic of South Africa.
6.2 The actions stipulated in this Integrity Pact are without prejudice to any other civil or criminal
proceedings that may arise in accordance with the provisions of the law.
6.3 This Integrity Pact shall remain valid until replaced. Should one or more provisions of this Integrity
Pact be regarded as invalid, remainder of the provisions will remain valid.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Section
Source: Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdfinvolved in the evaluation/adjudication/negotiation of a transaction in which it participates, involving
an Eskom employee/director involved in the evaluation/adjudication/negotiation of a transaction in
Evaluation Criteria
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7_Waste to Energy Test Facility.pdf (TENDER)The document does not explicitly state eligibility criteria beyond the quality and technical requirements. However, bidders must demonstrate compliance with ISO 9001 requirements, provide evidence of a QMS in operation, and submit the specified quality deliverables. The tender is open to suppliers capable of designing, supplying, constructing, and commissioning a 50-100kW thermal waste-to-energy test facility within 24 months.
Technical Specifications
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7_Waste to Energy Test Facility.pdf (TENDER)supply, construction and commissioning of a 50-100kW thermal Waste to Energy Test
Project
Section
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7_Waste to Energy Test Facility.pdfSection A Score Option 2 7
SECTION B : Evidence of QMS in operation (Tender Quality Requirements -Ref 240-105658000)
not limited to quality management function/role) 1
B.2 Documented information for Control of Externally Provided Processes, Products and Services - Must include criteria for evaluation, selection,
monitoring of performance, and re-evaluation of external providers (Clause 8.4 of ISO 9001:2015)
Section B Score 2
SECTION C: Contract Quality Plan Requirements (Ref 240-105658000 and 240-109253698).
Draft Contract Quality Plan specific to the scope of work as described in the tender documents (Ref ISO 10005)
NB! Draft Contract/Project Quality Plan has important QA deliverables 1
Section C Score 1
SECTION D: Quality Control Plan Requirements (Ref 240-105658000 or 240-109253302)
QCP /Checklist/ ITP (Quality Control Plans) as per Scope of Works (Ref ISO 10005)
NB! Draft/ Example of an Inspection and Test Plan (ITP) or Quality Control Plan (QCP) on similar and/ or previous work done 1
Section D Score 1
Section E Score 2
Supplier Quality Management: Revision 7
Category 3 : Quality Requirements Deliverables to be evaluated indicator = 1
SECTION A : Quality Management System Requirements ISO 9001
A.2 Quality Policy Approved by top management. 1
A.3 Quality Objectives Approved by top management. 1
Description
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025 (2).docxBusiness name/JV: _______________________________________________________
Evaluation Criteria
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025 (2).docx (unknown)No specific eligibility criteria are provided in the document, but the mandatory returnable form indicates that only tenderers who have undergone self-training on the e-Tendering solution and submit the completed acknowledgment form will be considered responsive.
Technical Specifications
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025 (2).docx (unknown)Business name/JV: _______________________________________________________
Description
Source: 240-109253698 CQP Template.docxContract Quality Plan template assist the supplier to identify and plan for meeting client's/ contract expectations/requirements for quality management
Evaluation Criteria
Source: 240-109253698 CQP Template.docx (unknown)The document does not explicitly state eligibility criteria, but based on the content, applicants must: (1) Be capable of designing, supplying, constructing, and commissioning a thermal waste-to-energy facility. (2) Have a robust Quality Management System (QMS) in place. (3) Be able to manage sub-suppliers and subcontractors. (4) Have experience with quality plans and standards (SANS 466:2005, ISO 10005:2005). (5) Be registered or authorized to operate in South Africa (likely). (6) Have the resources and infrastructure to execute a 24-month project. (7) Provide a completed CQP as part of the tender submission.
Technical Specifications
Source: 240-109253698 CQP Template.docx (unknown)Contract Quality Plan template assist the supplier to identify and plan for meeting client's/ contract expectations/requirements for quality management
Description
Source: E-tendering Help Manual for supplier - 27 January 2025 (2).docxeTendering system is a web-based system that allows suppliers bidding for various tenders advertised on Tender Bulletin system to “upload” their tender documents. Currently the tenderers or suppliers submit tender documents at various Eskom tender offices. eTendering system replaces the manual or physical submission of tender documents at various Eskom tender offices. eTendering system in a nutshell is an electronic box where tender documents can be “dropped” or “uploaded”. Suppliers will be required to register their details before they can be granted access to the eTendering system. An OTP (one time pin) will be sent to both their cell phone and email address.
Evaluation Criteria
Source: E-tendering Help Manual for supplier - 27 January 2025 (2).docx (unknown)The document does not explicitly state eligibility criteria for this tender. However, based on the system manual, suppliers must have a CSD number to access the eTendering system. The tender is open to members of the public who can register and submit. Specific eligibility (e.g., experience, financial stability) would be detailed in the full tender documentation, which is not included here.
Technical Specifications
Source: E-tendering Help Manual for supplier - 27 January 2025 (2).docx (unknown)eTendering system is a web-based system that allows suppliers bidding for various tenders advertised on Tender Bulletin system to “upload” their tender documents. Currently the tenderers or suppliers submit tender documents at various Eskom tender offices. eTendering system replaces the manual or physical submission of tender documents at various Eskom tender offices. eTendering system in a nutshell is an electronic box where tender documents can be “dropped” or “uploaded”. Suppliers will be required to register their details before they can be granted access to the eTendering system. An OTP (one time pin) will be sent to both their cell phone and email address.
Evaluation Criteria
Source: 240-68099512 Form A_Cat 3_ Rev 9_Waste to Energy Test Facility.pdf (unknown)The document does not specify explicit eligibility criteria such as financial or technical thresholds. However, applicants must be capable of designing, supplying, constructing, and commissioning a 50-100kW thermal waste-to-energy test facility. They must also have a quality management system compliant with ISO 9001 and Eskom's specification 240-105658000, and be willing to undergo pre-contract award assessment (Category 3) and post-contract award monitoring.
Technical Specifications
Source: 240-68099512 Form A_Cat 3_ Rev 9_Waste to Energy Test Facility.pdf (unknown)Indicate with an
105658000 (x) as applicable
Specification or (-) if not
Applicable
Pre-contract award quality requirements x
(*Select Only Applicable Category). NB: Not more than one category must be selected. Also indicate
whether site assessment is applicable.
Category 1 (refer to clause 3.5.-105658000) -
Category 2 (refer to clause 3.5.-105658000) -
Category 3 (refer to clause 3.5.-105658000) X
Category 4 (refer to clause 3.5.-105658000) -
Main Supplier and Sub-supplier Capability and Capacity Assessment (refer to clause 3.-105658000) -
3 post-contract award(eskom)
Methodology
Source: 240-68099512 Form A_Cat 3_ Rev 9_Waste to Energy Test Facility.pdfCLAUSE 4 Context of the Organisation X PRINCIPLE 1 Customer focus X
CLAUSE 5 Leadership X PRINCIPLE 2 Leadership X
CLAUSE 6 Planning X PRINCIPLE 3 Engagement of people X(ESKOM)
C CLAUSE 7 Support X PRINCIPLE 4 Process approach X
CLAUSE 8 Operation X PRINCIPLE 5 Improvement X
CLAUSE 9 Evidence based decision
Performance Evaluations X PRINCIPLE 6 XSECTION making
CLAUSE 10 Improvement X PRINCIPLE 7 Relationship Management X
Quality Management
Source: 240-68099512 Form A_Cat 3_ Rev 9_Waste to Energy Test Facility.pdfAuthorisation Date January 2022
240-105658000 and
QUALITY REQUIREMENTS FOR ISO 9001 Review Date January 2027
Eskom Rights of Access (refer to clause 3.8.-105658000) X
Eskom Rights to Information (refer to clause 3.8.-105658000) X
Preservation (refer to clause 3.8.-105658000) X
Quality Audits Related Conditions (refer to clause 3.8.-105658000) X
Management of Nonconformities and Nonconforming Outputs Identified by Eskom (refer to clause 3.8.-
Special processes (refer to clause 3.8.-105658000) x
Clauses of iso iso 9001 standard indicate with an quality iso 9001 standard indicate with an
9001 standard clause description (x) as applicable principles principle description (x) as applicable
Or (-) if not or (-) if not
Representativesection (tenderer)
NB: The tenderer must complete and sign this form to acknowledge and accept Eskom Supplier Quality Requirements as per 240-
105658000 Specification and ISO 9001 Standard.
Environmental
Source: 240-68099512 Form A_Cat 3_ Rev 9_Waste to Energy Test Facility.pdfCONTRACT Design, supply, construction and commissioning of a 50-100kW thermal Waste to Energy Test Facility
Descriptionsection (tenderer)
Clauses of 240- clause description indicate with an
105658000 (x) as applicable
Specification or (-) if not
Section
Source: 240-68099512 Form A_Cat 3_ Rev 9_Waste to Energy Test Facility.pdfArd indicate with an quality iso 9001 standard indicate with an
Performance Evaluations X PRINCIPLE 6 XSECTION making
Eskom’s quality
REPRESENTATIVE Duncan Ntshangase Snr Clerk/Quality 21/07/2026
NB: The tenderer must complete and sign this form to acknowledge and accept Eskom Supplier Quality Requirements as per 240
TENDER & CONTRACT QUALITY Document Identifier 240-68099512 Rev 9
QUALITY REQUIREMENTS FOR ISO 9001 Review Date January 2027
Pre-contract award quality requirements x
B Contract Execution (refer to clause 3.7.-105658000) X CLAUSE Supplier Quality Performance Monitoring Phase (refer to clause 3.7.-105658000) X
Quality Audits Related Conditions (refer to clause 3.8.-105658000) X
Clauses of iso iso 9001 standard indicate with an quality iso 9001 standard indicate with an
Evaluation Criteria
Source: Acknowledgement Form Life-saving Rules.docx (unknown)The document does not specify detailed eligibility criteria (e.g., financial, technical, or experience requirements). However, applicants must be capable of undertaking a 24-month project and must commit to Eskom's safety standards. The tender is open to contractors, consultants, and agents entering Eskom sites.
Technical Specifications
Source: Acknowledgement Form Life-saving Rules.docx (unknown)Acknowledgement form:
Life-saving rules
Eskom’s Life-saving Rules are safety rules which shall not be broken under any circumstances. It must be highlighted that Eskom takes a ZERO TOLERANCE stance to the violation of these rules. Life-saving Rules apply to all Eskom employees, including, subsidiaries, agents, consultants, contractors and to any person entering Eskom sites.
Rule 1: Open, Isolate, test, earth, and create an equipotential zone before touch
Rule 2: Hook up at height
Rule 3: Buckle up
Rule 4: Be sober
Rule 5: Ensure that you have a permit to work
Rule 6: Ensure Safe Live Working
Safety is a priority for Eskom. You are expected to develop a clear understanding of the rules and to apply them at all times. You are required to actively subscribe to these rules. Adherence to the safety rules is a condition of employment.
Employee’s pledge to adhere to eskom’s life-saving rules
I, ………………………………………. hereby pledge to familiarise myself with and abide by the Eskom Life-saving Rules as set out above and in the Life-saving Rules Standard (240-62196227).
Employee’s Signature: ………………………….. Date: …………………………
Initial………………
File name: 240–63942960 (Rev 3) Acknowledgement Form Life-saving Rules
Template ID: 240-43921804 (Rev 9) Header and Footer Portrait Template
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Address
Eskom Research, Testing and Development, Lower Germiston Road - Cleveland - Johannesburg - 2000
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
21
Last checked
04 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Construction. Unlock full pricing strategies, bid frequency, and historical win rates.