ESKOM is procuring the refurbishment of gearboxes and geared motors, as well as the supply of new gearboxes and geared motors, on an as-and-when-required basis for a period of five years. The contract is open to bidders who can demonstrate a fully operational iso 9001:2015 quality management system and submit the required quality documentation. The most consequential requirement is the mandatory submission of a valid iso 9001:2015 certificate, a draft contract quality plan, and a draft or example inspection and test plan or quality control plan from similar previous work.
ISO 9001:2015 certification: Bidders must hold a valid ISO 9001:2015 certificate from an accredited body, with the certificate scope covering the relevant products or services, and the certificate must not be expired.
Quality management evidence: Bidders must submit documented information including an organisation chart and responsibility matrix covering the quality function, documented control of externally provided processes, the latest internal management system audit report, a certification audit report not older than 12 months, and records of management review meetings.
Contract Quality Plan: Bidders must submit a draft Contract Quality Plan specific to the scope of work, referencing ISO 10005.
Inspection and Test Plan: Bidders must submit a draft or example Inspection and Test Plan (ITP) or Quality Control Plan (QCP) from similar or previous work.
Form A: Bidders must complete and sign Form A as part of the quality requirements.
Compliance with QM58: The supplier must conform to QM58 – Supplier Quality Management Specification and Eskom documented procedures, including control of non-conforming output products and services.
Scope and duration: The contract covers refurbishment of gearboxes and geared motors and supply of new gearboxes and geared motors on an as-and-when-required basis for five years, with delivery according to client specification and quality returnables per Cat 1.
Date & Time
Friday, 21 August 2026 - 10:00
Venue
null
Request for Bid(Open-Tender)
TUTUKA POWER STATION - Standerton - STANDERTON - 2340
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: Good Manufacturing Practice (GMP), SABS Product Certification, NRCS Certification
AI Document Analysis Stages
Description
06 Aug
2026
Tender Published
Tender was published
21 Aug
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
240-68099512 Form A_Cat 1_ Rev 9.pdf
Refurbishment of gearboxes and geared motors, and supply of new gearboxes and geared motors on an as-and-when-required basis for a period of five years, for Eskom in Mpumalanga.
E-Tenderers E-Tendering Training Acknowledgement Form.pdf
Refurbishment of gearboxes and geared motors, and supply of new gearboxes and geared motors, on an 'as and when' required basis for a period of 5 years, for Eskom in Mpumalanga.
240-12248652_List of Tender Returnables_Cat 1_ Rev 7.pdf
ESKOM is procuring the refurbishment of gearboxes and geared motors, as well as the supply of new gearboxes and geared motors, on an 'as and when' required basis for a period of five years. The tender is issued by ESKOM in Mpumalanga and closes on 21 August 2026.
Section 37 (2) Agreement (15).pdf
Eskom is procuring the refurbishment of gearboxes and geared motors, as well as the supply of new gearboxes and geared motors, on an 'as and when' required basis for a period of five years. The contract is managed by Eskom Holdings SOC Limited and is located in Mpumalanga.
Quality Requirements.pdf
Eskom seeks a supplier for the refurbishment of gearboxes and geared motors, as well as the supply of new units, on an as-and-when required basis over a five-year period. The contract is based in Mpumalanga and requires strict adherence to quality management standards, including ISO 9001:2015 and Eskom's QM58 specification.
E-tendering Help Manual for supplier - 27 January 2025.pdf
Eskom is procuring the refurbishment of gearboxes and geared motors, along with the supply of new gearboxes and geared motors, on an 'as and when' required basis for a period of five years. The tender is managed through Eskom's eTendering system, which requires suppliers to register and submit their bids electronically.
Guideline for Gearbox Geared Motors refurbishemnt at Tutuka P_rev7 SCOPE.pdf
Eskom seeks a supplier for the refurbishment of gearboxes and geared motors, and the supply of new units, on an 'as and when' required basis for five years at Tutuka Power Station in Mpumalanga. The scope covers gearboxes across coal handling, ash disposal, dust handling, milling, air heater, and water treatment plants, with detailed technical specifications and quality requirements.
240-77471499 Annexure B.pdf
Eskom is procuring the refurbishment of gearboxes and geared motors, as well as the supply of new gearboxes and geared motors, on an 'as and when' required basis for a period of five years. The contract will be managed from Mpumalanga, with a closing date of 21 August 2026.
Gearboxes Geared Motors supply repairs Tender technical evaluation creteria Rev3 Document.pdf
Eskom is procuring the refurbishment of gearboxes and geared motors, as well as the supply of new gearboxes and geared motors, on an 'as and when' required basis for a five-year period at Tutuka Power Station in Mpumalanga. The tender uses a weighted technical evaluation with a 70% pass threshold, and bidders must demonstrate local manufacturing capability, OEM parts usage, and relevant experience.
NEC3 TSC refurbishment and supply Gearboxes .pdf
Eskom is procuring a five-year term contract for the refurbishment of gearboxes and geared motors, and the supply of new gearboxes and geared motors on an as-and-when-required basis, for Tutuka Power Station in Mpumalanga. The contract is an NEC3 Term Service Contract (TSC3) with a priced contract (Option A) and includes a detailed price list of over 40 gearbox types.
Supplier Development Localisation Industrialisation (SDLI) Strategy- Geared Motors.pdf
Eskom Tutuka Power Station seeks a contractor to refurbish gearboxes and geared motors and supply new units on an 'as and when' required basis over five years. The tender uses the 90/10 preference point system, with up to 10 points for B-BBEE status, and includes SDL&I obligations for local procurement, black-owned enterprise spend, job creation, and skills development.
List of gearboxes at Tutuka_Jul 26.xlsx
Refurbishment of gearboxes and geared motors, and supply of new gearboxes and geared motors, on an 'as and when' required basis for a period of five years, for Eskom's Mpumalanga operations. The scope covers a wide range of gearboxes across ash disposal, coal stock yard, dust handling, and milling plants, with estimated quantities for refurbishment and new supply over the five-year period.
Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 24 - GEARBOXES.pdf
Eskom is procuring the refurbishment of gearboxes and geared motors, as well as the supply of new gearboxes and geared motors, on an 'as and when' required basis for a period of five years. The contract will be awarded under a 90/10 preferential procurement system, with a technical threshold of 70%.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
R 1 104 000
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
This scope of work covers the supply of new gearboxes and geared motors, and the refurbishment of existing units at Tutuka Power Station. The guideline provides a recommended scope of work and inspection checks for the refurbishment process. The supplier remains responsible for providing the final scope of work (from strip and assess) to ensure the gearbox is refurbished to standard. The work applies to reduction gearboxes in the Bulk Handling Material Plants (Coal Stock Yard, Terrace Coal Plant, Dust Handling Plant, Ash Disposal Plant), Milling Plant, Mill Feeders, Air Heaters, and Water Treatment Plant.
Evaluation Criteria
Source: Guideline for Gearbox Geared Motors refurbishemnt at Tutuka P_rev7 SCOPE.pdf (unknown)Bidders must be able to provide the full scope of refurbishment and supply services as described. They must comply with ISO 9001 quality management systems. The document does not specify additional eligibility criteria such as CSD registration, B-BBEE requirements, or CIDB grading, but standard Eskom procurement conditions may apply. Bidders must be prepared to work on an 'as and when' basis for 5 years and meet all technical and quality assurance requirements.
Technical Specifications
Source: Guideline for Gearbox Geared Motors refurbishemnt at Tutuka P_rev7 SCOPE.pdf (unknown)Scope: Supply new gearboxes, strip and assess (including report) and repair reduction gearboxes at Tutuka Power Station. Applicable plant areas: Coal Stock Yard (conveyor plant, stacker reclaim, yellow plant), Ash Disposal Plant (conveyor plant, stacker, stacker boom), Dust Handling Plant (common and unitized plants), Terrace Coal Handling Plant (common and unitized plants), Air Heaters (unitized plants), Mill Feeders (unitized plants).
Services: Supply of new power transmission gear units, relevant maintenance spares, quality refurbishment, and technical support when required.
Detailed gearbox list: Includes specific makes, models, ratios, speeds, power ratings, and quantities for new gearboxes, refurbishments, and stock for each plant area. Examples: David Brown H-series B3-450 (ratio 20.9:1, 240.5kW), Flender KZA 400 (ratio 26.3:1, 323kW), Thyssenkrupp bevel helical planetary shaft mounted gearbox (ratio 218:1, 96kW).
Refurbishment process: Supplier must strip and assess each gearbox, compile a QCP for approval by Eskom Engineering and maintenance, and provide a detailed report. Recommended checks on bearings, shafts, casings, and other items are specified.
New gearbox supply includes: Replacement of all gears, rolling element bearings, nuts and bolts, re-lining journal bearings, re-boring bearing sleeves, replacement of keys, coating casing internals with zinc-based primer and epoxy, and fitting new nameplate.
Refurbished gearbox includes: Replacement of damaged gears, regrinding gears to restore profile, replacement of bearings exceeding 50% of L10 design life, replacement of damaged nuts and bolts, re-boring bearing sleeves, replacement of keys, breathers, dipsticks, fans, coating casing internals, and fitting new nameplate.
Geared motor refurbishment: Dismantling, cleaning, post-cleaning assessment, cause of failure report, repair scope recommendation and approval (repair must not commence without written approval if cost exceeds 70% of new unit), general component repairs, bearing replacement (only SKF, NSK, NTN, FAG), 24-hour no-load test, painting (primer and two finish coats), and LV motor SOW tasks.
Quality assurance: Supplier must submit detailed QCPs for remanufacture, refurbishment, or repair, including individual component QCPs, and a time-based production schedule before starting work. Required documentation includes MPI reports on bearing bores and mounting feet, dye penetrant reports on casing, material certificates for new gears, heat treatment certificates, mechanical test reports, microstructure reports, lead/pitch/profile measurements, dimensional inspections, and hardness checks.
Quality Management
Source: Guideline for Gearbox Geared Motors refurbishemnt at Tutuka P_rev7 SCOPE.pdfQuality management system: ISO 9001 compliance required.
Normative references: ANSI/AGMA standards for gear classification, materials, heat treatment, design, measurement, lubrication, and failure mechanisms; ISO 17485 for bevel gears; BS 436 for spur and helical gears; DIN 3961 for cylindrical gear tolerances; SABS ISO 9001:2008; Eskom guidelines for lubricating oil monitoring (GGL 36-53) and extreme pressure gear oils (GSP 36 818); Eskom approval of personnel for special processes (PC/STWI/GL 32-631); Eskom NDT requirements (ST 32-632).
Quality assurance tests and documentation: Required for re-manufacturing, refurbishing, or repairing gearboxes. Includes MPI reports on bearing bores and mounting feet, dye penetrant reports on casing, material certificates for new gears, heat treatment certificates, mechanical test reports, microstructure reports, lead/pitch/profile measurements, dimensional inspections, and hardness checks.
Production schedule and QCPs: Supplier must submit detailed quality control plans for the remanufacture, refurbishment, or repair, including individual component QCPs, and a time-based production schedule before starting work.
Compliance Requirements
Source: Guideline for Gearbox Geared Motors refurbishemnt at Tutuka P_rev7 SCOPE.pdf (unknown)ISO 9001 quality management systems compliance required.
Standard Eskom procurement conditions may apply (CSD registration, B-BBEE, CIDB grading) but are not specified in this document.
Contractual Terms
Source: Guideline for Gearbox Geared Motors refurbishemnt at Tutuka P_rev7 SCOPE.pdfBearing reuse: For repaired gearboxes, bearings that have completed less than 50% of their L10 design running hours and are in good condition (verified by the original bearing manufacturer or suitably qualified person) may be reinstalled with the system engineer's approval. The recommendation must be formally communicated in a report. If bearings that have completed a significant portion of their L10 design life are reused, the manufacturer may waive any guarantees on the repairs. Generally, reuse of old bearings is not recommended.
Evaluation Criteria
Source: 240-77471499 Annexure B.pdf (unknown)Bidders must sign and submit the Acknowledgement Form for Eskom OHS legal and other requirements (Annexure B). Compliance with Eskom's OHS requirements and statutory OHS legislation is mandatory. The main supplier is accountable for managing and monitoring subcontractors' OHS compliance. Eskom may verify the bidder's past work references and testimonials.
Technical Specifications
Source: 240-77471499 Annexure B.pdf (unknown)appointment of contractors or suppliers for the commencement
of work
Compliance Requirements
Source: 240-77471499 Annexure B.pdf (unknown)Bidders must comply with the following OHS documents when working at or rendering a service to Eskom:
After contract award, the supplier must align its processes to Eskom's OHS requirements (policies, procedures, standards).
Penalties apply to the main supplier for non-conformance with Eskom or statutory OHS requirements.
All employees (contractors/suppliers) must undergo the relevant Eskom induction.
The main contractor/supplier must:
Eskom reserves the right to verify this and may request testimonials/references and contact details of clients for similar work.
Health & Safety
Source: 240-77471499 Annexure B.pdfBidders must comply with the following documents when working at or rendering a service to Eskom: Eskom contractor Health and Safety requirements standards 32-136, OHS specification/requirements provided, Occupational Health and Safety Act, and Compensation for Occupational Diseases and Illnesses Act. After contract award, the supplier must fully align the company's processes to Eskom's OHS requirements (policies, procedures, standards). Penalties shall be enforced on the main supplier for non-conformances pertaining to Eskom and/or statutory OHS requirements. All employees (contractors/suppliers) must undergo the relevant Eskom induction. The main contractor/supplier must demonstrate the process and selection criteria for appointing contractors and suppliers, provide notification to Eskom prior to appointment, ensure contractors/suppliers have adequate resources and competencies, be accountable for managing contractors/suppliers to ensure compliance with legal and Eskom requirements, monitor through audits and assessments, provide grounds for termination of work, and deal with non-conformances directly. Eskom reserves the right to verify this and may request testimonials/references and contact details of clients for similar work.
Description
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 24 - GEARBOXES.pdfEskom invites tenders for the refurbishment of gearboxes and geared motors, and supply of new gearboxes and geared motors on an 'as and when' required basis for a period of 5 years.
Important Dates
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 24 - GEARBOXES.pdf (RFP)Closing date: 21 August 2026 at 10:00 SAST.
Contact Information
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 24 - GEARBOXES.pdf (RFP)Eskom Representative: Nancy Tshwenyane
Submission Guidelines
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 24 - GEARBOXES.pdf (RFP)Submission is electronic only via the Eskom E-Tendering site; no hard copies accepted.
Returnable Documents
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 24 - GEARBOXES.pdf (RFP)Mandatory returnables: Annexure A Authorisation Form, Annexure B Acknowledgement Form, Annexure C Tenderers Particulars, Annexure D Integrity Pact Declaration form, Annexure E CPA for local goods/services, Annexure F CPA(IG) for imported goods/services, Annexure G1-G4 SBD 6.2 Declaration certificate for local production and content, Annexure H SBD 1, Annexure I SBD 6.1 Preference Points Claim Form, Annexure J SBD 4 – Bidders Disclosure, E-tendering Help Manual acknowledgement form, JV/consortium documents, Tax Clearance Certificates, Tax Evaluation Questionnaire, Employment Equity compliance proof, NEC or other Contract completed in full, Pricing schedule, CSD Registration proof, COIDA certificate, Quality documents, Health and Safety plan, OHS risk assessment, OHS policy, Audited Financial Statements, Technical Evaluation Strategy documents.
Evaluation Criteria
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 24 - GEARBOXES.pdf (RFP)Functionality requirements apply; minimum technical threshold is 70%.
Technical Specifications
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 24 - GEARBOXES.pdf (RFP)Scope: Refurbishment of gearboxes and geared motors, and supply of new gearboxes and geared motors on an 'as and when' required basis for a period of 5 years.
Methodology
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 24 - GEARBOXES.pdfSkills development: tenderers bear full cost of developing requisite skills; Eskom contributes no funding. Tenderers may approach SETAs for grants, subsidies, and incentives. Skills development targets exclude Eskom employees and registered learners.
Quality Management
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 24 - GEARBOXES.pdf (RFP)Quality requirements: Supplier Quality Management documents, Form A Tender & Contract Quality Requirements, and ISO 9001 standard requirements.
Pricing Schedule
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 24 - GEARBOXES.pdfPricing schedule must be submitted in PDF and Excel format.
Financial Requirements
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 24 - GEARBOXES.pdf (RFP)Pricing schedule must be submitted in PDF and Excel format.
Compliance Requirements
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 24 - GEARBOXES.pdf (RFP)Mandatory: valid CSD registration (CSD number/report).
B-BBEE Requirements
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 24 - GEARBOXES.pdf (RFP)B-BBEE status level points for 90/10 system: Level 1 = 10, Level 2 = 9, Level 3 = 6, Level 4 = 5, Level 5 = 4, Level 6 = 3, Level 7 = 2, Level 8 = 1, Non-compliant = 0.
Health & Safety
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 24 - GEARBOXES.pdfHealth and Safety requirements: COIDA certificate of good standing, Health and Safety plan/OHS manual addressing scope risks, baseline OHS risk assessment, valid letter of good standing, and OHS policy signed by CEO compliant to OHS Act Section 7.
Contractual Terms
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 24 - GEARBOXES.pdfConditions of contract will be the NEC.
Special Conditions
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 24 - GEARBOXES.pdf (RFP)Eskom's standard payment terms: contracts below R50 million paid within 30 days; above R50 million within 60 days. Eskom reserves the right to negotiate with preferred bidders if prices not market-related. Main contractors discouraged from subcontracting with subsidiaries; must declare if doing so.
Requirements
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 24 - GEARBOXES.pdf (RFP)Eligibility criteria: tenderers must meet eligibility criteria, not be under restriction to do business with Eskom or State-Owned Companies, not have nationality of a country on international sanctions list, not submit more than one tender (except where E-Tendering limit applies), JV/consortium must state joint and several liability, no conflict of interest, tenders must be signed by authorised persons, not restricted by National Treasury, not on Tender Defaulters list, not sub-contract 100% of Scope of Work.
Section
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 24 - GEARBOXES.pdf (RFP)Eskom Representative: Nancy Tshwenyane, Tel: 017 612 6427, Email: [email protected]. Clarification for Q&A directed to this email; closing date for Q&A is 14 August 2026.
Important Dates
Source: 240-68099512 Form A_Cat 1_ Rev 9.pdf (unknown)Closing date: 19 March 2026.
Evaluation Criteria
Source: 240-68099512 Form A_Cat 1_ Rev 9.pdf (unknown)Bidders must complete and sign Form A, acknowledging and accepting Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 standard. No other eligibility criteria are stated in the document.
Technical Specifications
Source: 240-68099512 Form A_Cat 1_ Rev 9.pdf (unknown)Scope: Refurbishment of gearboxes and geared motors, and supply of new gearboxes and geared motors on an as-and-when-required basis for a period of 5 years.
Quality category: Bidders must select one of four quality categories (Category 1, 2, 3, or 4) and indicate whether a site assessment applies. Category 1 is marked as applicable in the form.
Post-award obligations: Contract execution, supplier quality performance monitoring, Eskom rights of access and information, preservation, quality audits, management of nonconformities, and special processes apply.
Quality Management
Source: 240-68099512 Form A_Cat 1_ Rev 9.pdfQuality requirements: Bidders must select a quality category (Category 1, 2, 3, or 4) and indicate whether a site assessment applies. Post-award conditions include contract execution, supplier quality performance monitoring, Eskom rights of access and information, preservation, quality audits, management of nonconformities, and special processes. Bidders must acknowledge and accept Eskom Supplier Quality Requirements per specification 240-105658000 and ISO 9001.
Compliance Requirements
Source: 240-68099512 Form A_Cat 1_ Rev 9.pdf (unknown)Bidders must complete and sign Form A to acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and the ISO 9001 standard.
Description
Source: E-tendering Help Manual for supplier - 27 January 2025.pdfThe document is the Eskom eTendering System Suppliers Help Manual, which explains how suppliers register and submit tender documents electronically. It does not contain the scope, quantities, or technical details of the gearbox refurbishment and supply tender.
Important Dates
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)Closing date: 21 August 2026 at 10:00 (from the tender record). No other dates (briefings, site visits, clarification deadlines) are stated in the document.
Contact Information
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)For system problems with Tender Bulletin, eTendering or OpenText, contact the buyer responsible for the published tender. No specific contact names, phone numbers or addresses are provided in the document.
Submission Guidelines
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)Submission is electronic only via the Eskom eTendering portal at https://eTendering.eskom.co.za. Bidders must register on the portal before access is granted; registration requires a valid CSD number and verification via OTP sent to the registered cellphone and email.
Upload documents under the correct category (technical, commercial, finance). Each file must not exceed 50MB and the total of all files must not exceed 900MB. Finalise the submission by clicking 'Finalize Submission' then 'Finalise and Close Submission'. After finalising, an email confirmation with a submission ID is sent; keep this email for future enquiries.
Bids are disqualified if submitted after the closing time. Ensure all required documents are uploaded before finalising.
Evaluation Criteria
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)No evaluation criteria are stated in the available document. The document only notes that closed tenders are sent directly to suppliers who meet selection and evaluation criteria, but no specific scoring or thresholds are provided.
Technical Specifications
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)The document is a user manual for the Eskom eTendering system, not the tender specification. It describes how to register, log in, upload and finalise tender submissions. No technical requirements for the refurbishment or supply of gearboxes and geared motors are provided.
Compliance Requirements
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)A valid CSD number is required to access the eTendering system. Registration on the portal is mandatory. No other compliance requirements are stated in the available document.
Section
Source: E-tendering Help Manual for supplier - 27 January 2025.pdfNo evaluation criteria are provided in the document. It only mentions that closed tenders are sent to suppliers who meet selection and evaluation criteria, but does not specify what those criteria are.
Description
Source: NEC3 TSC refurbishment and supply Gearboxes .pdfRefurbishment of gearboxes and geared motors and supply of new gearboxes and geared motors on an as-and-when required basis for 5 years, to be provided at Tutuka Power Station.
Contact Information
Source: NEC3 TSC refurbishment and supply Gearboxes .pdf (unknown)Engineering Contract Strategies is the source for the NEC3 TSC3 contract conditions: tel 011 803 3008, fax 086 539 1902, www.ecs.co.za. No SCM or technical contact details are stated.
Submission Guidelines
Source: NEC3 TSC refurbishment and supply Gearboxes .pdf (unknown)Returnable documents:
Disqualification risks:
Evaluation Criteria
Source: NEC3 TSC refurbishment and supply Gearboxes .pdf (unknown)No scoring or weighting details are provided in the document. The only evaluation-related content is a list of risks for the refurbishment scope, including quality of workmanship, unexpected additional repairs, and performance of refurbished gearboxes. No minimum qualifying thresholds or preference point system are stated.
Technical Specifications
Source: NEC3 TSC refurbishment and supply Gearboxes .pdf (unknown)Scope:
Supply price list:
Refurbishment risks to be included in the Risk Register:
Supply risks:
Experience & Qualifications
Source: NEC3 TSC refurbishment and supply Gearboxes .pdfThe Contract Data requires the bidder to provide details of key people, including name, job, responsibilities, qualifications, and experience, with CVs to be submitted. No specific minimum experience or qualification requirements are stated.
Pricing Schedule
Source: NEC3 TSC refurbishment and supply Gearboxes .pdfPricing is under NEC3 TSC3 Option A. The price list includes items for supply of gearboxes and geared motors with descriptions, units, stock numbers, and rates. Items are priced as lump sums or rates multiplied by expected quantities. Lump sum items are not adjusted if quantities change; only compensation events change the Prices.
Financial Requirements
Source: NEC3 TSC refurbishment and supply Gearboxes .pdf (unknown)Pricing format:
Payment terms:
Compliance Requirements
Source: NEC3 TSC refurbishment and supply Gearboxes .pdf (unknown)CIDB:
B-bbee:
Health and safety:
Environmental:
Asbestos:
Ethics:
Health & Safety
Source: NEC3 TSC refurbishment and supply Gearboxes .pdfThe Contractor must take all reasonable precautions to maintain health and safety, may be appointed as Principal Contractor under the Construction Regulations 2014, and must comply with all applicable health and safety laws and regulations. Asbestos management provisions require the Employer to ensure ambient air conforms to prescribed standards, and the Contractor may stop work if asbestos is identified until the area is declared safe.
Environmental
Source: NEC3 TSC refurbishment and supply Gearboxes .pdfThe Contractor must comply with all applicable environmental laws and regulations and ensure subcontractors and employees do the same.
Contractual Terms
Source: NEC3 TSC refurbishment and supply Gearboxes .pdfContract form:
Key terms:
Additional conditions:
Section
Source: NEC3 TSC refurbishment and supply Gearboxes .pdfNo scoring or weighting details are provided. Quality of workmanship is listed as a risk for the refurbishment scope.
Contact Information
Source: Gearboxes Geared Motors supply repairs Tender technical evaluation creteria Rev3 Document.pdf (unknown){"name":null,"email":null,"phone":null,"department":"C&I Control and instrumentation","address":null}
Evaluation Criteria
Source: Gearboxes Geared Motors supply repairs Tender technical evaluation creteria Rev3 Document.pdf (unknown)Technical evaluation is 100% weighted, with a minimum qualifying threshold of 70%. Bidders are scored on a weighted scorecard across five criteria: company experience (40%), quality control measures (15%), local manufacturing content (15%), manufacturing lead time for a BTA500 gearbox (15%), and expected gearbox lifetime calculation (15%). Scoring per criterion: 5 = fully compliant, 4 = compliant with acceptable qualifications, 2 = non-compliant, 0 = totally deficient or non-responsive. Repairs must use OEM original parts, with proof of OEM approval supplied to Eskom. Acceptable technical risks include having refurbished or manufactured at least 5 gearboxes in the past year, 50% local component manufacturing, and a 7-month lead time for a BTA500 gearbox. Unacceptable risks include ISO 9001:2008 non-compliance, inadequate gearbox manufacturing experience, and inadequate tender returnables.
Technical Specifications
Source: Gearboxes Geared Motors supply repairs Tender technical evaluation creteria Rev3 Document.pdf (unknown)Scope covers supply of new gearboxes and geared motors and refurbishment of existing units for Tutuka Power Station. The supplier is responsible for the final scope of work, including strip-down and access, to ensure refurbishment meets standard. A guideline document (15ENG GEN-3074) provides recommended scope and inspection checks. Bidders must demonstrate ability to manufacture new gearboxes locally, import parts, or import complete units. Repairs must use OEM original parts with proof of approval.
Methodology
Source: Gearboxes Geared Motors supply repairs Tender technical evaluation creteria Rev3 Document.pdfBidders must demonstrate their manufacturing approach: whether new gearboxes are manufactured locally, parts are imported, or complete units are imported. A weighted scorecard evaluates technical compliance. Repairs must use OEM original parts, with proof of OEM approval supplied to Eskom. The technical evaluation is 100% weighted, and bidders need a minimum 70% score to qualify.
Experience & Qualifications
Source: Gearboxes Geared Motors supply repairs Tender technical evaluation creteria Rev3 Document.pdfBidders must provide a list of gearboxes manufactured or repaired in the last year, including reference contact details, order numbers, scope executed, and delivery dates. Scoring: 10 or more gearboxes scores full marks, 5-9 scores 80%, 1-4 scores 40%, none scores zero. Acceptable risk: at least 5 gearboxes refurbished or manufactured in the past year. Inadequate gearbox manufacturing experience is an unacceptable risk.
Quality Management
Source: Gearboxes Geared Motors supply repairs Tender technical evaluation creteria Rev3 Document.pdfISO 9001 Quality Management Systems is a normative reference. Bidders must provide a previous approved and signed detailed Quality Control Plan (QCP) with intervention points for manufacturing or refurbishment of gearboxes. A sound and approved QCP scores full marks; an unsigned QCP or one without intervention points scores partial; no QCP scores zero. Non-compliance with ISO 9001:2008 or equivalent is an unacceptable technical risk.
Compliance Requirements
Source: Gearboxes Geared Motors supply repairs Tender technical evaluation creteria Rev3 Document.pdf (unknown)ISO 9001 Quality Management Systems compliance is a normative reference. Non-compliance with ISO 9001:2008 or equivalent is an unacceptable technical risk. Bidders must provide a signed letter specifying the origin of gearbox components to verify local manufacturing content.
Important Dates
Source: Section 37 (2) Agreement (15).pdf (unknown){"closingDate":"21 January 2025"}
Evaluation Criteria
Source: Section 37 (2) Agreement (15).pdf (unknown)Bidders must be able to enter into a Section 37(2) agreement with Eskom Holdings SOC Limited or its subsidiary. The signatory must have the requisite authority to sign on behalf of the contractor/supplier. No other eligibility criteria are stated in the provided document.
Technical Specifications
Source: Section 37 (2) Agreement (15).pdf (unknown)provisions of
the Act.
I undertake that ......................................................... [insert name of contractor/supplier]
shall strictly adhere to, and ensure that his/her employees adhere to, the provisions of the
Occupational Health and Safety Act, 1993 (Act ).
I have been provided with SHE specifications for project
Compliance Requirements
Source: Section 37 (2) Agreement (15).pdf (unknown)The contractor/supplier must acknowledge being an employer in their own right with duties under the Occupational Health and Safety Act, and agree to ensure all work is performed and machinery/plant used in accordance with the Act. The contractor/supplier must strictly adhere to the Act and ensure employees do the same. The contractor/supplier must comply with the SHE specifications provided for the project/service, which constitute arrangements and procedures between the contractor/supplier and Eskom Holdings SOC Limited to ensure compliance with the Act as contemplated in section 37(2).
Contractual Terms
Source: Section 37 (2) Agreement (15).pdf (unknown)This agreement constitutes the sole agreement between the parties. No variation, modification, waiver, or consent to departure from its provisions shall have any force or effect unless confirmed in writing and signed by both parties, and shall be effective only in the specific instance and for the specific purpose and to the extent made or given. Each signatory warrants they have the requisite authority to sign.
Description
Source: 240-12248652_List of Tender Returnables_Cat 1_ Rev 7.pdfThe tender covers the refurbishment of gearboxes and geared motors, and the supply of new gearboxes and geared motors on an as-and-when-required basis for a period of 5 years.
Evaluation Criteria
Source: 240-12248652_List of Tender Returnables_Cat 1_ Rev 7.pdf (TENDER)Quality deliverables are scored per category, with each item marked as applicable (score 1) or not. Section A (ISO 9001 certification) scores 4 points if the certificate is valid, relevant to the scope, issued by an accredited body, and unexpired. Section B (evidence of QMS in operation) scores 5 points for documented roles, external provider controls, internal audit reports, certification audit reports not older than 12 months, and management review records. Section C (Contract Quality Plan) scores 1 point for a draft plan specific to the scope. Section D (Quality Control Plan) scores 1 point for a draft Inspection and Test Plan or QCP on similar work. Section E (additional requirements) scores 2 points for a completed and signed Form A and any other specified requirements.
Technical Specifications
Source: 240-12248652_List of Tender Returnables_Cat 1_ Rev 7.pdf (TENDER)Scope: Refurbishment of gearboxes and geared motors, and supply of new gearboxes and geared motors on an as-and-when-required basis for a period of 5 years. The tender is for Category 1 quality requirements. Bidders must provide a draft Contract Quality Plan and a draft Inspection and Test Plan (ITP) or Quality Control Plan (QCP) for similar or previous work.
Quality Management
Source: 240-12248652_List of Tender Returnables_Cat 1_ Rev 7.pdf (TENDER)Bidders must complete and sign Form A. Additional requirements may be added as per the scope of work and specification.
Compliance Requirements
Source: 240-12248652_List of Tender Returnables_Cat 1_ Rev 7.pdf (TENDER)ISO 9001 certification by an accredited body is required (Option 1). The certificate must be valid, relevant to the scope, and issued by an approved authority with international accreditation. Form A must be completed and signed.
Section
Source: 240-12248652_List of Tender Returnables_Cat 1_ Rev 7.pdfQuality deliverables are evaluated per category. Section A (ISO 9001 certification) scores 4 points. Section B (evidence of QMS in operation) scores 5 points. Section C (Contract Quality Plan) scores 1 point. Section D (Quality Control Plan) scores 1 point. Section E (additional requirements) scores 2 points.
Evaluation Criteria
Source: Quality Requirements.pdf (TENDER)Bidders must hold a valid ISO 9001:2015 certificate from an accredited body, with the certificate scope covering the relevant products or services. The certification authority must be approved and have recognised international accreditation, and the certificate must not be expired.
Evaluation focuses on quality management evidence. Bidders must submit:
Technical Specifications
Source: Quality Requirements.pdf (TENDER)The scope covers refurbishment of gearboxes and geared motors, and supply of new gearboxes and geared motors on an as-and-when-required basis for five years.
The supplier must deliver according to client specification and provide quality returnables per Cat 1.
The supplier must conform to QM58 – Supplier Quality Management Specification and ISO 9001:2015, plus Eskom documented procedures including control of non-conforming output products and services.
Compliance Requirements
Source: Quality Requirements.pdf (TENDER)The supplier must conform to QM58 – Supplier Quality Management Specification and ISO 9001:2015 requirements, plus Eskom documented procedures including control of non-conforming output products and services.
Required quality evidence includes:
Section
Source: Quality Requirements.pdfEvaluation focuses on quality management evidence. Bidders must submit a valid ISO 9001:2015 certificate, documented QMS operation evidence, a draft Contract Quality Plan, and a draft or example ITP/QCP from similar work. Form A must be completed and signed.
Description
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy- Geared Motors.pdfScope: Refurbishment of gearboxes and geared motors, and supply of new gearboxes and geared motors, on an 'as and when' required basis for a period of 5 years. Market research indicates no current suppliers; potential suppliers are the open market.
Important Dates
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy- Geared Motors.pdf (TENDER)Closing date: 21 August 2026 at 10:00 (from tender record). The document mentions a validity period for sworn affidavits but no other dates. No briefings or site visits are stated.
Contact Information
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy- Geared Motors.pdf (TENDER)Business unit: Tutuka Power Station. Buyer: Nancy Tshwenyane. No email, phone, or submission address is provided in this document.
Submission Guidelines
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy- Geared Motors.pdf (TENDER)Returnable documents: SBD 6.2 (Declaration for Local Production and Content) and Annex C (Local Content Declaration-Summary Schedule) are required if applicable. Bidders must also submit the documents needed to claim preference points (see complianceRequirements). No other submission instructions are provided in this document.
Returnable Documents
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy- Geared Motors.pdf (TENDER)Documents required to claim preference points: Valid B-BBEE certificate issued by a SANAS accredited verification agency / sworn affidavit / CIPS affidavit; Proof of ownership / shareholding (preferably CIPC documentation) inclusive of shareholding breakdown; Certified ID copies of shareholder(s); Proof of Disability (where applicable); In a case of a trust, consortium or joint venture (including incorporated consortia and joint ventures), a consolidated B-BBEE status level verification certificate.
Evaluation Criteria
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy- Geared Motors.pdf (TENDER)Specific goals: maximum 10 points for B-BBEE status under the 90/10 system. Points are added to price points and the total rounded to two decimal places. The contract is awarded to the highest scoring tenderer. Bidders failing to provide preference point documentation score only 1 point out of 90 for price and 0 out of 10 for specific goals. Objective criteria: inclusion is not mandatory but is a condition for contract award; failure to meet objective criteria may lead to the second-ranked bidder being recommended for award. Designated sectors: this commodity is a designated sector with a 70% local content threshold for pumps, medium voltage (MV) motors and associated accessories. CIDB: no compulsory CIDB training applies. NIPP: applicable only for contracts with imported content of USD 5 million or more; winning bidders must sign a NIPP obligation agreement with the dtic before signing the Eskom contract.
Technical Specifications
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy- Geared Motors.pdf (TENDER)Scope: Refurbishment of gearboxes and geared motors, and supply of new gearboxes and geared motors, on an 'as and when' required basis for a period of 5 years. The commodity is a designated sector with a local content threshold of 70% for pumps, medium voltage (MV) motors and associated accessories. No quantities, service levels, or technical standards are specified in this document. Market research indicates no current suppliers; potential suppliers are the open market.
Methodology
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy- Geared Motors.pdfSkills development: bidders must propose how they will develop skills of unemployed candidates, targeting Eskom's core, scarce and critical skills. Proposed targets: 3 Mechanical Technician learners (National Diploma, 24 months on-the-job experiential exposure/training) and 2 Artisan learners (N3 or Trade Test Certificate equivalent), total 5 learners. Candidates must be from all provinces and representative of South Africa's population demographics. Training may involve the bidder's supply network and SETA-accredited training providers. These targets exclude Eskom employees and registered learners. Bidders bear the full cost of skills development; Eskom makes no financial contribution. Bidders may approach SETAs for grants, subsidies, and incentives, and SARS for tax rebates.
Pricing Schedule
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy- Geared Motors.pdfThe tender response must separate local and imported components as per the Price Schedule included with the tender documents. Local procurement content is total spending minus the imported component.
Financial Requirements
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy- Geared Motors.pdf (TENDER)Pricing must be separated into local and imported components as per the Price Schedule included in the tender documents. Local procurement content is total spending minus the imported component. Eskom targets 100% local procurement content. No pricing format, bonds, guarantees, or payment terms are stated in this document.
Compliance Requirements
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy- Geared Motors.pdf (TENDER)B-BBEE: A valid B-BBEE certificate from a SANAS accredited verification agency, or a sworn affidavit (for Exempted Micro Enterprises with annual revenue R10 million or less, or Qualifying Small Enterprises with revenue R50 million or less that are at least 51% black owned), or a CIPS affidavit is required to claim preference points. Proof of ownership/shareholding (preferably CIPC documentation), certified ID copies of shareholders, proof of disability (where applicable), and a consolidated B-BBEE certificate for trusts, consortia, or joint ventures are also required. A valid B-BBEE certificate or sworn affidavit is a condition for contract award. Bidders with revenue above R50 million must submit a valid B-BBEE certificate. B-BBEE improvement plans: bidders at Level 4 must reach Level 3 by end of first contract year; bidders at Levels 5-8 or non-compliant must reach Level 4 by end of first year and improve one level each subsequent year. B-BBEE improvement or retention plans must be submitted within 30 days of contract signing. Local content: SBD 6.2 and Annex C are returnable. CIDB: No compulsory CIDB training applies. NIPP: Applicable only if imported content equals or exceeds USD 5 million; then a NIPP obligation agreement with the dtic is required before contract signing.
B-BBEE Requirements
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy- Geared Motors.pdf (TENDER)B-BBEE preference points (90/10 system): Level 1 = 10, Level 2 = 9, Level 3 = 6, Level 4 = 5, Level 5 = 4, Level 6 = 3, Level 7 = 2, Level 8 = 1, non-compliant = 0. Bidders failing to provide preference point documentation are not disqualified but score only 1 point out of 90 for price and 0 out of 10 for specific goals. B-BBEE improvement or retention plans must be submitted within 30 days of contract signing. Bidders at Level 4 must reach Level 3 by end of first year; bidders at Levels 5-8 or non-compliant must reach Level 4 by end of first year and improve one level each subsequent year. A valid B-BBEE certificate or sworn affidavit is a condition for contract award. Exempted Micro Enterprises (revenue R10 million or less) may submit a sworn affidavit; Qualifying Small Enterprises (revenue R50 million or less) must comply with QSE scorecard elements unless at least 51% black owned, in which case a sworn affidavit is required; entities with revenue above R50 million must submit a valid B-BBEE certificate. Local procurement content target: 100%. Procurement from entities with at least 51% black ownership target: 20%. Bidders must submit proposals for jobs created and retained in South Africa. Sworn affidavits must meet validity requirements: deponent's name and ID number as per identity document, designation (director, owner, or member), enterprise name as per CIPC registration and business address, percentage of black ownership (including black female and designated groups), total revenue for the year under review and whether based on audited financial statements or management accounts, financial year end, B-BBEE status level, empowering supplier status, and the affidavit must be signed in the presence of a Commissioner of Oath who is not an employee or ex officio of the enterprise.
Contractual Terms
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy- Geared Motors.pdf (TENDER)SDL&I penalty and performance security: Eskom will apply a penalty of 2.5% of the contract value for failure to meet SDL&I obligations. Eskom will retain 2.5% of every invoice (excluding VAT) as security for SDL&I obligations; retained amounts are released only upon full fulfilment of those obligations. Reporting and monitoring: suppliers must submit quarterly SDL&I compliance reports using Eskom's Data Collection Template. Eskom reviews reports within 30 days and notifies suppliers in writing of any shortfall. Suppliers must implement corrective measures before the next reporting period, failing which retention clauses are invoked. An SDL&I Implementation Schedule must be completed and returned to the SDL&I representative for acceptance within 28 days of contract award.
Description
Source: List of gearboxes at Tutuka_Jul 26.xlsxThe tender covers refurbishment of existing gearboxes and geared motors and supply of new units on an as-and-when-required basis for five years at Tutuka Power Station. The detailed list specifies each unit's location, type, ratio, speed, power, quantity, and estimated five-year refurbishment and new supply volumes.
Submission Guidelines
Source: List of gearboxes at Tutuka_Jul 26.xlsx (unknown)Returnable documents — complete, sign and submit with the bid:
Disqualification risks:
Evaluation Criteria
Source: List of gearboxes at Tutuka_Jul 26.xlsx (unknown)Bidders must be able to supply or refurbish gearboxes to the specified technical standards and within the required timelines. Bidders must comply with Eskom's tender conditions, including completing all required standard forms (e.g., SBD 1, SBD 4, SBD 6.1, SBD 9) as applicable. Bidders must be registered on the Central Supplier Database (CSD) and be tax compliant. Bidders must have the capacity to handle the estimated quantities over the 5-year period.
Technical Specifications
Source: List of gearboxes at Tutuka_Jul 26.xlsx (unknown)Scope: Refurbishment and supply of gearboxes and geared motors at Tutuka Power Station on an as-and-when-required basis for five years.
The attached list details each gearbox by location, component description, quantity, estimated refurbishment and new supply quantities over five years, stock number, and SAP description.
Key specifications include:
Vendors must ensure they work to the correct drawing revision number where applicable. Some gearboxes require LH and RH configurations, specific rotation directions, shaft sizes, and coupling types as detailed in the list.
Compliance Requirements
Source: List of gearboxes at Tutuka_Jul 26.xlsx (unknown)No specific requirements found
Contact Information
Source: E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown){"name":"__________________________________________________________","email":null,"phone":null,"department":null,"address":null}
Submission Guidelines
Source: E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)Bidders must submit the E-Tendering Training Acknowledgement Form (Annexure) fully completed and signed to Eskom before the prescribed deadline. The form confirms the bidder has completed self-training via the E-Tendering Noddy Guide, video, or clarification meeting and can operate the E-Tendering Solution. Failure to fully complete and submit the form within the prescribed period renders the bidder non-responsive and disqualified.
Evaluation Criteria
Source: E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)The E-Tendering Training Acknowledgement Form is a mandatory returnable. Non-submission or incomplete submission within the prescribed period results in disqualification from the procurement process.
Technical Specifications
Source: E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)E-Tenderers’ E-Tendering Document 240-9722574 Rev 1
Identifier
Training Acknowledgement
Effective Date August 2023
Form Review Date August 2026
Annexure NO.: ______
Acknowledgement form – e-tendering training
Enquiry no: [......................................................]
Business name/JV: _______________________________________________________
Contact Person: __________________________________________________________
Tel (landline): _________________________________________
Cellphone: ____________________________________________
E-mail address: ________________________________________
Acknowledgment: [Select and complete in full applicable paragraph below]
I _________________________________________ (Tenderer’s Name) acknowledge that I have undergone
self-training though the e- Tendering Noddy Guide or video or via a clarification meeting for me to understand.
I am satisfied with my self-training and confirm that I will be able to operate the E- Tendering Solution.
This document is a Mandatory returnable prior to for E-Tendering. Failure to FULLY complete the
form and submit it to Eskom within prescribe period will render the Tenderer non-responsive and will
be disqualified from the Procurement Process.
Authorized Signature: _____________________________________________________________
Designation: _____________________________________________________________________
Date: _________________________
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 1
E-Tenderers E-Tendering Training Acknowledgement Form
Template ID: 240-9722574 (Rev 1) E-Tenderers’ E-Tendering Training Acknowledgement Form
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
TUTUKA POWER STATION - Standerton - STANDERTON - 2340
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
13
Last checked
07 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Repair and installation of machinery and equipment. Unlock full pricing strategies, bid frequency, and historical win rates.