Tender Type
Request for Bid(Open-Tender)
Delivery Location
Port Rex Power Station - - East London -
Organization Type
GOVERNMENT
Published
23 Sept 2026
OCDS Reference
ocds-9t57fa-171560
ESKOM requires remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at port rex power station in the eastern cape. Bids must be submitted electronically through the ESKOM etendering system, which requires a valid csd number for access. The most consequential consideration is that bidders must register on the etendering portal and upload all documents before the closing deadline, with strict file size limits of 50mb per file and 900mb total.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Friday, 23 October 2026 - 10:00
Venue
Port Rex Power Station
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Categories
Request for Bid(Open-Tender)
Port Rex Power Station - - East London -
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Description
23 Sept
2026
Tender Published
Tender was published
23 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Attachment 4B - Port Rex Pricing Schedule.pdf
Remedial repairs to pollution control dams, fuel containment areas and associated environmental containment infrastructure at Port Rex Power Station, including joint and crack repairs to fuel-containment bund walls and floors, and construction of a hazardous-waste skip containment area.
Attachment 18 - 32-37 Management of Substance Abuse procedure_Rev5.pdf
Remedial repairs to pollution control dams, fuel containment areas and associated environmental containment infrastructure at Port Rex Power Station, issued by Eskom in the Eastern Cape. The scope covers structural and environmental containment repairs at the power station site.
Attachment 19 - Life-Saving_Rules Standard.pdf
Remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at Port Rex Power Station, on behalf of Eskom in the Eastern Cape.
Attachment 5 - Technical Evaluation Criteria - Port Rex.pdf
Eskom requires remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at Port Rex Power Station, including resealing of fuel containment area bund wall joints and construction of a hazardous waste skips containment area. The works involve concrete rehabilitation, water-retaining structures, joint sealant replacement, and bunded waste management facilities.
Attachment 25 - Non-Disclosure Agreement (NDA) Vendors Template.docx
Remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at Port Rex Power Station, procured by Eskom Holdings SOC Ltd in the Eastern Cape.
Attachment 3 - Port Rex Scope of Work.pdf
Eskom requires remedial repairs to the fuel containment area and construction of a hazardous-waste skip containment area at Port Rex Power Station in the Eastern Cape. The works include joint and crack repairs, sealant replacement, and construction of a reinforced concrete bunded area with epoxy coating, followed by testing and handover.
Attachment 10 - Control Quality Plan (CQP) Template 2021.docx
Remedial repairs to pollution control dams, fuel containment areas and associated environmental containment infrastructure at Port Rex Power Station, for Eskom in the Eastern Cape. The contract requires the successful supplier to implement a Contract Quality Plan (CQP) covering quality management, sub-supplier control, documentation, and commissioning.
Attachment 9 - Supplier Quality Management Specification (3) (8).pdf
Remedial repairs to pollution control dams, fuel containment areas and associated environmental containment infrastructure at Port Rex Power Station, procured by Eskom in the Eastern Cape. The contract requires a supplier quality management system conforming to ISO 9001, with quality plans, control plans and audits as specified in Eskom's Supplier Quality Management specification.
Attachment 20 -Driver_and_Vehicle_Safety_Management_Procedure.pdf
Eskom requires remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at Port Rex Power Station in the Eastern Cape. The work involves restoring the integrity of containment structures to prevent environmental contamination.
Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdf
Eskom requires remedial repairs to pollution control dams, fuel containment areas, and associated environmental containment infrastructure at Port Rex Power Station in the Eastern Cape. The tender is an open invitation governed by Eskom's Standard Conditions of Tender, with a closing date of 23 October 2026 at 10:00 SAST.
Attachment 15 - Occupational_Health_and_Safety_Incident_Mngt_Procedure.pdf
Eskom requires remedial repairs to pollution control dams, fuel containment areas and associated environmental containment infrastructure at Port Rex Power Station in the Eastern Cape. The work is governed by Eskom's Occupational Health and Safety Incident Management Procedure, which sets out mandatory incident reporting, investigation and corrective-action requirements for all contractors on site.
Attachment 11 - High Risk OHS Requirements - Port Rex.pdf
Eskom requires remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at Port Rex Power Station, including resealing of fuel containment area bund wall joints and construction of a hazardous waste skips containment area. The contract is subject to extensive Occupational Health and Safety (OHS) requirements, including statutory appointments, risk assessments, and compliance with Eskom's life-saving rules.
Attachment 16 - 167A-13846- OHS&Q Management Plan.pdf
Remedial repairs to pollution control dams, fuel containment areas and associated environmental containment infrastructure at Port Rex Power Station, for Eskom's Peaking Operating Unit. The contract is governed by Eskom's Contractor OHS&Q Management Plan, which sets out safety and quality KPIs, contractor management requirements, and a three-year improvement strategy.
Attachment 8 - Remedial repairs Port Rex List of Tender Returnables Cat 3 Rev 7 (14).xlsx
Eskom requires remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at Port Rex Power Station in the Eastern Cape. The tender includes a quality management evaluation covering ISO 9001 requirements, a draft Contract Quality Plan, and an Inspection and Test Plan (ITP) or Quality Control Plan (QCP) specific to the scope of works.
Attachment 6 - SDLI Strategy Setting Template for Bidders - Port Rex Power Station.pdf
Eskom requires remedial repairs to pollution control dams, fuel containment areas and associated environmental containment infrastructure at Port Rex Gas Turbine Station in the Eastern Cape. The 18-month project includes civil works and mandatory local content for steel and cement, plus skills development and socio-economic obligations.
Attachment 26 - Supplier Declaration of Interest Template.docx
Remedial repairs to pollution control dams, fuel containment areas and associated environmental containment infrastructure at Port Rex Power Station, undertaken for Eskom in the Eastern Cape.
Attachment 4A - ECSC3 - Dam Refurbishmnet - Port Rex.doc
Eskom requires remedial repairs to the fuel containment area bund wall and floor joints and cracks, and construction of an impermeable hazardous-waste skip containment area at Port Rex Power Station in East London, Eastern Cape. The contract is an NEC3 Engineering and Construction Short Contract with a fixed completion date of 30 September 2027.
E3578GXPOU - Invitation to Tender (ITT) - Port Rex Power Station.pdf
Eskom requires remedial repairs to pollution control dams, fuel containment areas and associated environmental containment infrastructure at Port Rex Power Station, with the contract also covering Ankerlig and Gourikwa Power Stations. The work is procured under an open invitation to tender using the NEC3 Engineering and Construction Short Contract, with a compulsory site clarification meeting and a 12-week tender validity period.
Attachment 1 - E-Tenderers E-Tendering Training Acknowledgement Form.docx
Remedial repairs to pollution control dams, fuel containment areas and associated environmental containment infrastructure at Port Rex Power Station, procured by Eskom in the Eastern Cape. The tender requires bidders to complete mandatory e-tendering training and submit an acknowledgement form before the closing date.
Attachment 13 - Annexure C1 - Tender Evaluation Template.pdf
Eskom requires remedial repairs to pollution control dams, fuel containment areas, and associated environmental containment infrastructure at Port Rex Power Station in the Eastern Cape. The work is classified as high risk and bidders must submit a comprehensive OHS tender returnable pack, including a health and safety plan, baseline risk assessment, and detailed OHS costing.
Attachment 17 - PPE NON COMPLIANCE MEMO.pdf
Remedial repairs to pollution control dams, fuel containment areas, and associated environmental containment infrastructure at Port Rex Power Station, procured by Eskom. The work is subject to strict PPE compliance under Eskom's PPE Standard (240-44175132), with consequence management for non-compliance.
Drawing 18.49 - 494 Section and Details Station Waste Skips Containment Area.pdf
Remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at Port Rex Power Station, for Eskom in the Eastern Cape.
Attachment 24 - Contract Deviations Committee Approval Template.docx
Remedial repairs to pollution control dams, fuel containment areas and associated environmental containment infrastructure at Port Rex Power Station, procured by Eskom in the Eastern Cape. The tender includes a deviation process requiring negotiation with legal, insurance and end-user support, and submission of Annexure A with the original tendered contract.
Attachment 23 - Tender Questions and Answers Template.docx
Provision of gardening services at Drakensberg Pumped Storage Scheme for a period of five years, issued by Eskom.
Attachment 22 - Occ_Health_and_Safety_Risk_Assessment_Procedure.pdf
Eskom requires remedial repairs to pollution control dams, fuel containment areas, and associated environmental containment infrastructure at Port Rex Power Station in the Eastern Cape. The work is governed by Eskom's mandatory Occupational Health and Safety Risk Assessment Procedure, which bidders must comply with during project execution.
Attachment 12 - Annexure B Eskom Acknowledgement Form.pdf
Remedial repairs to pollution control dams, fuel containment areas and associated environmental containment infrastructure at Port Rex Power Station, procured by Eskom in the Eastern Cape. The tender is open for bidding until 23 October 2026 at 10:00.
Attachment 2 - E-tendering Help Manual for supplier.docx
Remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at Port Rex Power Station, on behalf of Eskom in the Eastern Cape.
Attachment 7 - Form A - Remedial Repairs_ANK.docx
Eskom requires remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at Port Rex Power Station in the Eastern Cape. The work includes compliance with Eskom's Supplier Quality Requirements (specification 240-105658000) and ISO 9001 quality management standards.
Attachment 14 - Baseline Risk Assessment - Port Rex.pdf
Remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at Port Rex Power Station, for Eskom's Peaking Operating Unit.
Attachment 21 - Eskom_Personal_Protective_Equipment_(PPE).pdf
Eskom requires remedial repairs to pollution control dams, fuel containment areas, and associated environmental containment infrastructure at Port Rex Power Station in the Eastern Cape. The work involves construction and environmental remediation, with bidders expected to comply with Eskom's PPE and safety standards.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 1 190 920
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
This document is the Eskom Supplier Quality Management Specification (240-105658000, Rev 3), applicable to all Eskom suppliers and sub-suppliers. It defines minimum quality requirements for selection, evaluation, vendor registration, management, monitoring, assessment and auditing of suppliers. Suppliers must develop, implement, maintain and improve a QMS conforming to ISO 9001. The specification applies to all Eskom divisions, subsidiaries, suppliers and sub-suppliers, and forms part of all RFIs, RFQs, RFPs and contracts.
Important Dates
Source: Attachment 9 - Supplier Quality Management Specification (3) (8).pdf (unknown)Closing date: 23 October 2026 at 10:00 (from tender record).
No briefing, site visit, or clarification deadlines are stated in this document.
Contact Information
Source: Attachment 9 - Supplier Quality Management Specification (3) (8).pdf (unknown)No contact names, emails, telephone numbers, or addresses are stated in this document.
Submission Guidelines
Source: Attachment 9 - Supplier Quality Management Specification (3) (8).pdf (unknown)Returnable documents (as selected per tender via List of Tender Returnables 240-12248652):
Submission method and closing time are not stated in this document.
Evaluation Criteria
Source: Attachment 9 - Supplier Quality Management Specification (3) (8).pdf (unknown)Quality assessment criteria are selected and completed by an Eskom Quality representative using Form A.
Supplier capability and capacity assessments may be performed prior to contract award for suppliers providing high-risk products/services, working on critical plant, supplying critical items, or providing special processes.
No scoring split, minimum qualifying score, or preference point system (80/20 or 90/10) is stated in this document.
Technical Specifications
Source: Attachment 9 - Supplier Quality Management Specification (3) (8).pdf (unknown)Scope: This document is the Eskom Supplier Quality Management Specification (240-105658000, Rev 3), which applies to all Eskom suppliers and sub-suppliers. It defines minimum quality requirements for selection, evaluation, vendor registration, management, monitoring, assessment and auditing of suppliers.
Suppliers must develop, implement, maintain and continually improve a Quality Management System (QMS) conforming to ISO 9001.
The specification applies to all Eskom divisions, subsidiaries, suppliers and sub-suppliers, and forms part of all RFIs, RFQs, RFPs and contracts.
Key definitions include Contract Quality Plan, Hold Point, Intervention Points, Inspection Agency, Level 1/2/3 Plant Items, Nonconformity, Quality Plan, Quality Control Plan, Special Process, Supplier, Sub-supplier, Witness Point.
Normative references: ISO 9001, ISO 10005. Informative references: ISO 9000, ISO 9004, SHEQ Policy 32-727, Eskom procurement policy and procedure, PPPFA, CIDB 1004, IAEA GS-R-3.1, SANS 10845-1.
Methodology
Source: Attachment 9 - Supplier Quality Management Specification (3) (8).pdfMethod statements:
Preservation methodology:
Experience & Qualifications
Source: Attachment 9 - Supplier Quality Management Specification (3) (8).pdfPersonnel qualifications:
Quality Management
Source: Attachment 9 - Supplier Quality Management Specification (3) (8).pdfQuality Management System (QMS) requirements:
Contract Quality Plan (CQP):
Quality Control Plan (QCP/ITP):
Meetings and inspections:
Post-contract award:
Nonconformities:
Pricing Schedule
Source: Attachment 9 - Supplier Quality Management Specification (3) (8).pdfNo pricing schedule, rates, bill of quantities, or payment schedules are stated in this document.
Financial Requirements
Source: Attachment 9 - Supplier Quality Management Specification (3) (8).pdf (unknown)No pricing format, bid security, bonds, guarantees, retention, payment terms, or financial capacity thresholds are stated in this document.
Compliance Requirements
Source: Attachment 9 - Supplier Quality Management Specification (3) (8).pdf (unknown)QMS certification: Suppliers and sub-suppliers must have a QMS conforming to ISO 9001 (latest revision). Unless excluded per the quality category, a valid ISO 9001 certificate from an accredited certification body is required.
Quality categories (only one applies per procurement, as indicated in Form A):
Sub-suppliers must meet the same quality requirements as the main supplier.
Eskom reserves the right to perform capability and capacity assessments at supplier and sub-supplier facilities.
No B-BBEE, CIDB, CSD, tax, or CIPC requirements are stated in this document.
Health & Safety
Source: Attachment 9 - Supplier Quality Management Specification (3) (8).pdfThe specification references the Safety, Health, Environment and Quality (SHEQ) Policy (32-727) as an informative reference. No specific OHS requirements are stated in this document.
Contractual Terms
Source: Attachment 9 - Supplier Quality Management Specification (3) (8).pdfPreservation management programme requirements:
Requirements
Source: Attachment 9 - Supplier Quality Management Specification (3) (8).pdf (unknown)Pre-contract award quality requirements:
Sub-suppliers must meet the same quality requirements as the main supplier.
Eskom may perform capability and capacity assessments prior to award.
Evaluation Criteria
Source: Attachment 22 - Occ_Health_and_Safety_Risk_Assessment_Procedure.pdf (unknown)Bidders must be registered on the Central Supplier Database (CSD) and hold a valid SARS Tax Clearance (or tax pin).
Bidders must comply with the OHS Act and Construction Regulations, including preparing a baseline risk assessment and site-specific health and safety specifications.
Contractors must submit a Contractor Baseline Risk Assessment (CBRA) as part of the tender evaluation.
No specific B-BBEE level, CIDB grading, or local content percentage is stated in the provided document.
Technical Specifications
Source: Attachment 22 - Occ_Health_and_Safety_Risk_Assessment_Procedure.pdf (unknown)Eskom has adopted a value of Zero Harm, requiring all business to be conducted with respect and care for people and the environment.
The OHS risk assessment process ensures that Eskom can proactively identify, predict, evaluate, and control the actual and potential impact on health, safety, environment, socio-economic conditions, and cultural heritage.
This document describes the mandatory processes, requirements, and advisory guidance for managing occupational health and safety hazards and risks.
Compliance with this procedure is mandatory in its area of applicability.
The procedure applies throughout Eskom Holdings SOC Limited, its divisions, subsidiaries, and entities in which Eskom has a controlling interest.
Methodology
Source: Attachment 22 - Occ_Health_and_Safety_Risk_Assessment_Procedure.pdfTest the identified risk against safe limits, internal requirements, and external requirements, including legislation and other requirements, limits, and conditions of authorisations issued for that activity, and any other possible requirements to ascertain whether the risk exists or not.
Depending on the risk ranking, determine the degree of control and tolerance against the defined limits.
Determine whether the risk is acceptable; if acceptable, no further assessment is required.
3.3.10 Eliminate and reduce risk
Develop a risk management strategy to treat the impact, consequence, and/or likelihood/exposure of assessed risks.
Establish the actions to be taken (controls), where the highest-order type of preventive measure will be the most effective and sustainable.
Different approaches can be taken that are aligned with the agreed risk-tolerance level.
Quality Management
Source: Attachment 22 - Occ_Health_and_Safety_Risk_Assessment_Procedure.pdfinspections and reviews to measure compliance.
2.5.2. General manager (Risk and Sustainability)
The general manager (Risk and Sustainability) is accountable for the overall direction and function of Eskom’s risk management programme and reports back directly to the holdings board, through the Board Risk Management Committee.
Compliance Requirements
Source: Attachment 22 - Occ_Health_and_Safety_Risk_Assessment_Procedure.pdf (unknown)No specific requirements found
B-BBEE Minimum Level: 1
Health & Safety
Source: Attachment 22 - Occ_Health_and_Safety_Risk_Assessment_Procedure.pdfThis document is the Eskom Occupational Health and Safety Risk Assessment Procedure (32-520, Revision 5). It mandates a comprehensive risk assessment process to identify, evaluate, and control OHS hazards and risks, aligned with the OHS Act and ISO 45001. It defines roles and responsibilities for risk owners, control owners, task owners, line managers, supervisors, employees, project managers, and OHS professionals. It details types of risk assessments (baseline, issue-based, continuous, and OH HIRA) and the risk assessment process including hazard identification, risk analysis (with consequence and likelihood ratings), risk evaluation, and risk treatment. It also covers communication, consultation, monitoring, and reporting requirements.
Contractual Terms
Source: Attachment 22 - Occ_Health_and_Safety_Risk_Assessment_Procedure.pdfmanagement has doubts about operational effectiveness and reliability of the controls.
Section
Source: Attachment 22 - Occ_Health_and_Safety_Risk_Assessment_Procedure.pdfOverall process of hazard and identification, risk analysis, and risk evaluation.
2.3.37 Risk evaluation
EDC TN Quality Control 09.05.2022 File name: 32-520 OHS Risk assessment procedure rev.
Description
Source: Attachment 10 - Control Quality Plan (CQP) Template 2021.docxThis attachment is a template for a Contract Quality Plan (CQP) that the successful supplier must complete and maintain. It is not a specification of the works; the actual scope of work is defined in the NEC or FIDIC contract documents. The template guides the supplier in planning how quality requirements will be met, including quality assurance and control activities, documentation, and records.
Description
Source: Attachment 18 - 32-37 Management of Substance Abuse procedure_Rev5.pdfThis document is Eskom's internal procedure for managing substance abuse in the workplace (Unique Identifier: 32-37, Revision 5). It is not a tender specification or scope of work. It sets out rules, testing processes, and responsibilities applicable to anyone entering Eskom premises or work sites, including contractors and their employees.
Health & Safety
Source: Attachment 18 - 32-37 Management of Substance Abuse procedure_Rev5.pdfEskom enforces a zero-tolerance policy on substance abuse across all its premises and work sites. The procedure (32-37, Rev 5) applies to every employee, contractor, consultant, and visitor while on duty, reporting for duty, or visiting any Eskom site. Key obligations for contractors and their staff include:
Description
Source: Attachment 15 - Occupational_Health_and_Safety_Incident_Mngt_Procedure.pdfEskom's SHEQ Policy underpins its approach to occupational health, safety, environment and quality. Incident management aims to reduce risk, prevent recurrence, manage incidents effectively, classify and record accurately, investigate promptly, promote near-miss reporting, improve OHS by learning from incidents, share information, report to stakeholders, analyse trends, and involve all stakeholders. It is not for assigning blame or monitoring performance, but for identifying improvements. Eskom is committed to Zero Harm.
Methodology
Source: Attachment 15 - Occupational_Health_and_Safety_Incident_Mngt_Procedure.pdf (unknown)The incident management process follows these steps: 1) Incident identification (direct and indirect observation), 2) Initiation and execution of emergency response (rescue, scene safety, first aid, evidence collection), 3) Notification and reporting to stakeholders (internal and external, including fatalities and occupational diseases), 4) Incident prioritisation using consequence and likelihood matrices to assign priority ratings, 5) Classification and recording of incidents on SAP EH&S (including work-relatedness determination and classification of occupational diseases), 6) Incident investigation (including root cause analysis, investigation committees, and reporting timelines), 7) Management of corrective actions, 8) Incident close-out, and 9) Incident communication throughout the process.
Quality Management
Source: Attachment 15 - Occupational_Health_and_Safety_Incident_Mngt_Procedure.pdfAll investigation reports are controlled disclosure documents. All health and safety incidents must be investigated, excluding non-work-related incidents outside workplace boundaries. Repeat incidents must consider ineffective corrective actions from previous incidents. Investigation reports must include incident details, consequences, risk of recurrence, direct and root causes, system failures, corrective actions, lessons learnt and recommendations. Contractor investigations may involve Eskom employees; requests for evidence from Eskom must be evaluated by the employee's manager, with Legal and Compliance guidance if needed.
Health & Safety
Source: Attachment 15 - Occupational_Health_and_Safety_Incident_Mngt_Procedure.pdfThis is the Eskom Occupational Health and Safety Incident Management Procedure (32-95, Rev 9). It defines the process for managing OHS incidents: identification, emergency response, notification, prioritisation, classification, recording, investigation, corrective actions, close-out, and communication. It applies to all Eskom entities, employees, contractors, and affected public. Key definitions include accident, fatality, first-aid injury, lost-time injury, medical injury, OHS event, near-miss, occupational disease, public incident, PRFI, and serious incident. Responsible Managers must implement, communicate, and monitor compliance. Incidents must be recorded on SAP EH&S.
Contractual Terms
Source: Attachment 15 - Occupational_Health_and_Safety_Incident_Mngt_Procedure.pdfIn joint ventures, each company is liable for its own contraventions and may be prosecuted in its own name. Legal notification requirements include reporting to the Compensation Commissioner and the Department of Employment and Labour. On receiving a summons or notification under OHS Act sections 31 or 32, or where liability is possible, the Legal Department must be contacted immediately regarding attorney appointment; if not required, a detailed motivation must be provided without delay.
Important Dates
Source: Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Closing date: 23 October 2026 at 10:00 (SAST).
Briefing Session
Source: Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Tenderers must attend a site visit and/or clarification meeting if stipulated as compulsory; failure to attend will result in disqualification.
Contact Information
Source: Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)All communication must be directed to the Eskom Representative only, in writing, in English.
Submission Guidelines
Source: Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Submission method: paper or e-tender as specified in the Tender Data.
Evaluation Criteria
Source: Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Evaluation stages:
Technical Specifications
Source: Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Scope: remedial repairs to pollution control dams, fuel containment areas and associated environmental containment infrastructure at Port Rex Power Station.
Quality Management
Source: Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdfTenderers must provide proof to Eskom's satisfaction that quality systems, policies, and capabilities are in place at the closing date and/or contract award, as part of SHEQ requirements.
Pricing Schedule
Source: Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdfTenderers must include in rates, prices, and tendered total all duties, taxes (including VAT), and levies applicable 14 days prior to closing.
Financial Requirements
Source: Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Pricing:
Security:
Insurance:
Financial analysis:
Compliance Requirements
Source: Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)CSD registration: mandatory; bidders must be registered on the Central Supplier Database.
Tax clearance: valid tax compliance status required.
B-BBEE: proof of level required if a pre-qualification criterion; otherwise scored for preference points. Fraudulent or expired certificates lead to disqualification or zero points.
CIDB: if stipulated in the Tender Data, bidders must be registered with CIDB at closing or be capable of registration within 21 working days; proof of registration is mandatory at closing.
SHEQ: proof of safety, health, environment and quality systems, policies and capabilities must be provided at closing and/or contract award; all SHEQ costs must be included in the tender.
SDL&I Undertaking: must be completed and submitted by contract award.
Designated materials and thresholds: information must be submitted by contract award.
No 100% sub-contracting; bidders must not be under restriction to do business with Eskom or State-Owned Companies.
Misrepresentation or fraud (including B-BBEE fronting) leads to disqualification, suspension up to 10 years, and possible criminal liability.
Health & Safety
Source: Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdfTenderers must provide proof to Eskom's satisfaction that safety, health, environment, and quality (SHEQ) systems, policies, and capabilities are in place at the closing date and/or contract award. All costs and personnel associated with SHEQ must be reflected in the tender.
Environmental
Source: Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Tenderers must provide proof to Eskom's satisfaction that environmental systems, policies, and capabilities are in place at the closing date and/or contract award, as part of SHEQ requirements.
Contractual Terms
Source: Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdfEskom may accept or reject any variation, deviation or alternative tender, and may cancel the tender at any time before contract conclusion.
Requirements
Source: Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)Tenderers must comply with eligibility criteria stated in the Tender Data, and must not be under any restriction to do business with Eskom or State-Owned Companies.
Section
Source: Attachment 27 - Eskom - Standard Conditions of Tender - 30 January 2025.pdfEskom will determine basic compliance before detailed evaluation.
Description
Source: Attachment 7 - Form A - Remedial Repairs_ANK.docxThe tenderer must complete and sign the Supplier Quality Requirements acknowledgement form to accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 standard.
Submission Guidelines
Source: Attachment 7 - Form A - Remedial Repairs_ANK.docx (unknown)Returnable documents:
Evaluation Criteria
Source: Attachment 7 - Form A - Remedial Repairs_ANK.docx (unknown)Bidders must complete and sign the Supplier Quality Requirements acknowledgement form (Section A). Bidders must select and confirm the applicable quality category — Category 3 (clause 3.5.4) is indicated. Bidders must provide the tenderer's quality representative details (Section E). No other eligibility criteria (e.g., CSD, tax clearance, B-BBEE, CIDB) are stated in the provided document.
Technical Specifications
Source: Attachment 7 - Form A - Remedial Repairs_ANK.docx (unknown)The tenderer must complete and sign the Supplier Quality Requirements acknowledgement form to accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 standard.
Compliance Requirements
Source: Attachment 7 - Form A - Remedial Repairs_ANK.docx (unknown)No specific requirements found
Description
Source: Attachment 4A - ECSC3 - Dam Refurbishmnet - Port Rex.docThe contract is for remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at Port Rex Power Station. The works include resealing and repairing fuel containment area bund wall and floor joints and cracks, and constructing an impermeable hazardous-waste skip containment area.
Important Dates
Source: Attachment 4A - ECSC3 - Dam Refurbishmnet - Port Rex.doc (unknown)Starting date: 1 April 2027
Completion date: 30 September 2027
Defects date: 52 weeks after Completion
Assessment day: 25th of each month
Period for reply: Two (2) weeks
Defect correction period: Two (2) weeks
Contact Information
Source: Attachment 4A - ECSC3 - Dam Refurbishmnet - Port Rex.doc (unknown)Employer's representative:
Employer:
Submission Guidelines
Source: Attachment 4A - ECSC3 - Dam Refurbishmnet - Port Rex.doc (unknown)Returnable documents:
Evaluation Criteria
Source: Attachment 4A - ECSC3 - Dam Refurbishmnet - Port Rex.doc (unknown)The tender is evaluated on the basis of the completed Form of Offer and Acceptance and Contract Data. The tenderer must comply with all conditions of contract, including the Z-clauses. A change in B-BBEE status must be notified within 7 days; a decrease may lead to renegotiation or termination. The contractor must comply with the ethics clause prohibiting coercive, collusive, corrupt, fraudulent or obstructive actions. The contractor must provide insurance certificates as required. The contractor must not take images of the works without prior written consent. The contractor must comply with asbestos regulations and stop work if asbestos is identified until the area is declared safe.
Technical Specifications
Source: Attachment 4A - ECSC3 - Dam Refurbishmnet - Port Rex.doc (unknown)Scope of works:
Site: Port Rex Power Station, East London, Eastern Cape, including the fuel containment area and hazardous-waste skip containment work area.
Financial Requirements
Source: Attachment 4A - ECSC3 - Dam Refurbishmnet - Port Rex.doc (unknown)Pricing format: The offered total of the Prices is to be stated excluding VAT, with VAT at 15% added, and the total inclusive of VAT. The Price List is in Part 2 of the contract.
Retention: 5%
Delay damages: R 1,000.00 per day
Interest rate on late payment: 0%
Insurance: The Contractor provides insurances as per Insurance Table A (loss of or damage to works, equipment, plant and materials, liability for property damage and bodily injury, etc.) from the starting date until Completion or termination. The Employer provides insurances as per Insurance Table B (Assets All Risk, Contract Works, Environmental Liability, General and Public Liability, Transportation, Motor Fleet, Terrorism, Cyber Liability, Nuclear Material Damage, etc.).
The Contractor must provide certificates from insurer or broker when requested.
Employer's liability for indirect or consequential loss is limited to R0.00.
Compliance Requirements
Source: Attachment 4A - ECSC3 - Dam Refurbishmnet - Port Rex.doc (unknown)CIDB registration: Tenderer's CIDB registration number must be stated on the Form of Offer and Acceptance.
B-BBEE: The Contractor must notify the Employer within 7 days of any change in B-BBEE status, and submit an updated verification certificate within 30 days. A decrease in B-BBEE status may lead to renegotiation or termination.
Ethics: The Contractor must not engage in coercive, collusive, corrupt, fraudulent or obstructive actions.
Asbestos: The Contractor must comply with the Employer's Asbestos Standard 32-303 and the Asbestos Regulations. If asbestos is identified, work must stop until the area is declared safe. Removal and disposal of asbestos is done by a registered asbestos contractor instructed by the Employer at the Employer's expense.
Health and safety: The Contractor must comply with the Construction Regulations 2014 and all applicable health and safety laws. The Employer may appoint the Contractor as Principal Contractor.
Environmental: The Contractor must comply with all applicable environmental laws and regulations.
Intellectual property: All Foreground Intellectual Property vests in the Employer. The Contractor must not copy, use or issue Employer's Background Intellectual Property without written consent.
Confidentiality: The Contractor must not disclose confidential information, and must obtain prior written consent before taking images of the works.
Health & Safety
Source: Attachment 14 - Baseline Risk Assessment - Port Rex.pdfThe document is a baseline risk assessment for Port Rex Power Station, identifying workplace hazards and required controls. Key points:
Submission Guidelines
Source: Attachment 1 - E-Tenderers E-Tendering Training Acknowledgement Form.docx (unknown)Mandatory returnable: fully completed E-Tendering Training Acknowledgement Form (Template ID: 240-9722574 Rev 1). Submit to Eskom within the prescribed period. Failure to fully complete and submit the form will render the tenderer non-responsive and disqualified.
Evaluation Criteria
Source: Attachment 1 - E-Tenderers E-Tendering Training Acknowledgement Form.docx (unknown)Submission of the fully completed E-Tendering Training Acknowledgement Form is mandatory and a precondition for responsiveness. Failure to submit it within the prescribed period will disqualify the tenderer.
Description
Source: E3578GXPOU - Invitation to Tender (ITT) - Port Rex Power Station.pdfRemedial repairs to pollution control dams, fuel containment areas, and associated environmental containment infrastructure at Port Rex Power Station. Open invitation to tender, whole contract only.
Important Dates
Source: E3578GXPOU - Invitation to Tender (ITT) - Port Rex Power Station.pdf (TENDER)Closing date: 23 October 2026 at 10:00
Compulsory clarification meeting: 05 October 2026 at 10:00, at Port Rex Power Station. Attendance is mandatory; non-attendance leads to disqualification.
Attendance confirmation deadline: 30 September 2026 at 12:00 – confirm with the Eskom Representative, stating company name, position, and contact details of each attendee.
Clarification queries deadline: 5 working days before tender closing.
Tender validity period: 12 weeks from closing date.
Briefing Session
Source: E3578GXPOU - Invitation to Tender (ITT) - Port Rex Power Station.pdf (TENDER)Compulsory site clarification meeting on 05 October 2026 at 10:00 at Port Rex Power Station. Tenderers must confirm attendance by 30 September 2026 at 12:00 with the Eskom Representative, stating company name, position, and contact details of each attendee. Non-attendance leads to disqualification.
Contact Information
Source: E3578GXPOU - Invitation to Tender (ITT) - Port Rex Power Station.pdf (TENDER)Eskom Representative (all queries):
Fraud/corruption reporting:
Submission: via Eskom E-tendering site (no physical address provided).
Submission Guidelines
Source: E3578GXPOU - Invitation to Tender (ITT) - Port Rex Power Station.pdf (TENDER)Submission method: electronic only, via the Eskom E-tendering site (Eskom Tender Bulletin). No hard copies accepted.
Returnable forms (all must be completed, signed where required, and submitted by closing time unless noted):
Non-disqualifiable returnables (if incomplete, Eskom will request within 5 working days; failure leads to disqualification):
Disqualification risks:
Evaluation Criteria
Source: E3578GXPOU - Invitation to Tender (ITT) - Port Rex Power Station.pdf (TENDER)Evaluation stages:
Contractual requirements (CSD registration, financial statements, etc.) are assessed after evaluation and ranking, prior to award. Failure to meet them may render the bidder non-responsive.
Objective criteria and reverse e-auction are not applicable.
Technical Specifications
Source: E3578GXPOU - Invitation to Tender (ITT) - Port Rex Power Station.pdf (TENDER)Scope: Remedial repairs to pollution control dams, fuel containment areas, and associated environmental containment infrastructure at Port Rex Power Station.
Quality Management
Source: E3578GXPOU - Invitation to Tender (ITT) - Port Rex Power Station.pdfQuality requirements (Category 3):
Pricing Schedule
Source: E3578GXPOU - Invitation to Tender (ITT) - Port Rex Power Station.pdfPricing Schedule/BOQ is Attachment 4B. Price list must be submitted in PDF and Word format. Prices evaluated inclusive of VAT, corrected for arithmetical errors, excluding contingencies, adjusted for variations, and compared on Net Present Value basis. Unconditional discounts considered; conditional discounts applied at payment. No bid security required.
Financial Requirements
Source: E3578GXPOU - Invitation to Tender (ITT) - Port Rex Power Station.pdf (TENDER)Pricing format: Pricing Schedule/BOQ (Attachment 4B). Price list must be submitted in PDF and Word format.
Compliance Requirements
Source: E3578GXPOU - Invitation to Tender (ITT) - Port Rex Power Station.pdf (TENDER)Mandatory eligibility:
CIDB grading: 2CE or higher (or JV with combined grading meeting requirement). JV members must each be CIDB-registered; lead partner must have grading not lower than one level below required. Registration must be possible within 21 working days from closing.
CSD registration: proof of CSD registration (CSD number/report) is mandatory for all tenders.
Tax compliance: valid tax clearance certificate or SARS e-filing PIN (for those not on CSD). Foreign suppliers with no SA footprint complete SBD 1 but no tax proof required.
B-BBEE: Specific Goals scored out of 20 points under PPPFA 80/20 system. Proof of B-BBEE status level (certificate or sworn affidavit) required to claim points; failure to submit results in 0 points for that goal.
Employment Equity: designated employers must provide proof of compliance, including EE report submission.
COIDA: original certificate of good standing or proof of application (South African tenderers).
Local content: SBD 6.2 and Annexures G1–G4 required only if designated materials are included.
Health & Safety
Source: E3578GXPOU - Invitation to Tender (ITT) - Port Rex Power Station.pdfSafety requirements for Port Rex Power Station include:
COIDA certificate of good standing or proof of application required (South African tenderers).
Contractual Terms
Source: E3578GXPOU - Invitation to Tender (ITT) - Port Rex Power Station.pdfContract form: NEC3 Engineering and Construction Short Contract (ECSC3).
Requirements
Source: E3578GXPOU - Invitation to Tender (ITT) - Port Rex Power Station.pdf (TENDER)Eligibility: must not be under restriction to do business with Eskom or State-Owned Companies; not a national of a sanctioned country; no conflict of interest; not restricted by National Treasury or on Tender Defaulters list; not restricted by Eskom; must not subcontract 100% of scope. CIDB grading 2CE or higher (or JV with combined grading). Proof of CSD registration mandatory. Additional contractual requirements may include SHEQ and financial viability (financial statements).
Section
Source: E3578GXPOU - Invitation to Tender (ITT) - Port Rex Power Station.pdfFunctionality requirements applicable: minimum 70% score required to progress. Prices scored out of 80 points, specific goals scored out of 20 points under PPPFA. 80/20 system used for ranking. Prices evaluated inclusive of VAT, corrected for arithmetical errors, etc. Objective criteria not applicable. Reverse e-auction not applicable.
Description
Source: Attachment 17 - PPE NON COMPLIANCE MEMO.pdfThis memorandum from Avi Singh, General Manager, Peaking Operating Unit, dated 04 February 2026, clarifies roles, responsibilities, and consequence management for PPE compliance for all contractor employees and Eskom Peaking employees. It aims to ensure consistent application of the Eskom PPE Standard (240-44175132), promote safety, and prevent operational disruptions. Persistent PPE non-compliance is a concern, identified during BSO activities, housekeeping, and routine plant walkdowns, and features in monthly outage management reports. Business Units must issue clear PPE compliance instructions, reinforcing standards and outlining consequence-management measures.
Important Dates
Source: Attachment 17 - PPE NON COMPLIANCE MEMO.pdf (unknown)Memorandum date: 04 February 2026
Contact Information
Source: Attachment 17 - PPE NON COMPLIANCE MEMO.pdf (unknown)Peaking Business Unit Durbanville Office
Telephone: +27 21 941 5800
Evaluation Criteria
Source: Attachment 17 - PPE NON COMPLIANCE MEMO.pdf (unknown)Compliance with the Eskom PPE Standard (240-44175132) is mandatory. PPE must be issued free of charge. Non-compliant contractor employees must stop work immediately and leave the site; if PPE was issued, the employee is suspended and consequence management applied. If the company failed to issue PPE, work stops until PPE is provided and an NCR is issued. Eskom employees not complying must stop work until an inquiry determines facts; willful failure to use issued PPE leads to consequence management.
Technical Specifications
Source: Attachment 17 - PPE NON COMPLIANCE MEMO.pdf (unknown)Purpose: reaffirm and clarify roles, responsibilities, and consequence management for PPE compliance for all contractor employees and Eskom Peaking employees, ensuring consistent application of the Eskom PPE Standard (240-44175132).
Background: persistent PPE non-compliance identified during BSO activities, housekeeping, and routine plant walkdowns; features in monthly outage management reports.
Contract Custodians must:
Contractor Companies must:
Safety Department must:
Compliance Requirements
Source: Attachment 17 - PPE NON COMPLIANCE MEMO.pdf (unknown)Compliance with the Eskom PPE Standard (240-44175132) is mandatory. PPE must be issued free of charge. Non-compliance leads to work stoppage, suspension, and consequence management.
Health & Safety
Source: Attachment 17 - PPE NON COMPLIANCE MEMO.pdfPPE compliance is mandatory. Contract Custodians must include the PPE Standard in Pricing Schedules/BoQs and enforce compliance. Contractor Companies must issue PPE based on risk assessments, ensure PPE complies with the Eskom PPE Standard, inspect PPE regularly, provide training, apply consequence management, sign off on PPE verification, and issue PPE free of charge. Safety Department must ensure PPE costs are included in tender Pricing Schedules/BoQs, create awareness through SHE induction, and conduct contractor audits and inspections. Non-compliant contractor employees must stop work immediately and leave the site; if PPE was issued, the employee is suspended. If the company failed to issue PPE, work stops until PPE is issued and an NCR is issued. Eskom employees not complying must stop working until an inquiry determines facts; willful failure to use issued PPE leads to consequence management.
Evaluation Criteria
Source: Drawing 18.49 - 494 Section and Details Station Waste Skips Containment Area.pdf (unknown)Bidders must be registered on the Central Supplier Database (CSD).
Bidders must have a valid SARS tax clearance certificate.
Bidders must complete and submit all required National Treasury standard forms, including SBD 1 (Invitation to Bid), SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim), SBD 8 (Declaration of Bidder's Past Supply Chain Management Practices), and SBD 9 (Certificate of Independent Bid Determination).
Bidders must meet any specified CIDB grading for construction work.
Bidders must meet any specified B-BBEE level for preference points.
Bidders must comply with any local content requirements as specified.
Description
Source: Attachment 4B - Port Rex Pricing Schedule.pdfThe works comprise remedial repairs to pollution control dams, fuel containment areas and associated environmental containment infrastructure at Port Rex Power Station. This includes joint and crack repairs to fuel-containment bund walls and floors, and construction of a hazardous-waste skip containment area.
Evaluation Criteria
Source: Attachment 4B - Port Rex Pricing Schedule.pdf (unknown)No explicit evaluation criteria are stated in the provided document. Bidders must comply with the Occupational Health and Safety Act and Construction Regulations, including Health and Safety File preparation and submission. All prices must be in South African Rand and exclude VAT.
Technical Specifications
Source: Attachment 4B - Port Rex Pricing Schedule.pdf (unknown)Scope of work includes:
Quality Management
Source: Attachment 4B - Port Rex Pricing Schedule.pdfQuality control and inspection are included in rates and prices. Specific testing requirements include compaction testing to 95% Mod AASHTO, concrete cube-strength testing to 30 MPa, dry film thickness measurement of epoxy coating, and a 24-hour water-retention test. Test records and manufacturer's compliance certificates must be submitted.
Pricing Schedule
Source: Attachment 4B - Port Rex Pricing Schedule.pdfPricing assumptions: Sum/Item items are fixed totals; measured items are remeasurable; rate-only items paid only when work is required. All prices exclude VAT and are in South African Rand. Rates include all costs for labour, plant, materials, supervision, temporary works, access, surface preparation, handling, transport, site establishment, health and safety, environmental controls, quality control, testing, protection of existing plant, waste handling, cleaning, reinstatement, and all other work necessary.
Price List items:
Financial Requirements
Source: Attachment 4B - Port Rex Pricing Schedule.pdf (unknown)Pricing format: Price List with items measured as Sum, Item, or Rate only.
Compliance Requirements
Source: Attachment 4B - Port Rex Pricing Schedule.pdf (unknown)B-BBEE Minimum Level: 3 (as stated in currentAnalysis).
Health & Safety
Source: Attachment 4B - Port Rex Pricing Schedule.pdfContractor must comply with the Occupational Health and Safety Act and Construction Regulations, including preparation, submission and maintenance of a Health and Safety File. Staff medicals, site induction and access requirements are included. The tenderer must allow in prices for maintaining the operational environment safely.
Environmental
Source: Attachment 4B - Port Rex Pricing Schedule.pdfEnvironmental controls are included in rates and prices. Off-site transport and lawful disposal of hazardous or hydrocarbon-contaminated solid waste is a rate-only item, including waste manifests, disposal records and certificates.
Description
Source: Attachment 8 - Remedial repairs Port Rex List of Tender Returnables Cat 3 Rev 7 (14).xlsxThe tender is for remedial repairs to pollution control dams, fuel containment areas, and associated environmental containment infrastructure at Port Rex Power Station. The work falls under Category 3, which requires an implemented Quality Management System and associated quality documentation.
Submission Guidelines
Source: Attachment 8 - Remedial repairs Port Rex List of Tender Returnables Cat 3 Rev 7 (14).xlsx (unknown)Returnable documents for Category 3 (selected in the tender returnables template):
The returnables template must be completed, saved as PDF, signed, and submitted to the buyer.
Evaluation Criteria
Source: Attachment 8 - Remedial repairs Port Rex List of Tender Returnables Cat 3 Rev 7 (14).xlsx (unknown)Quality evaluation is weighted across five sections:
Standard weights apply unless modified. Bidders must achieve scores on each applicable indicator; no minimum overall score is stated.
Technical Specifications
Source: Attachment 8 - Remedial repairs Port Rex List of Tender Returnables Cat 3 Rev 7 (14).xlsx (unknown)The tender covers remedial repairs to pollution control dams, fuel containment areas, and associated environmental containment infrastructure at Port Rex Power Station. The scope includes quality management deliverables as per the tender quality requirements (Ref 240-105658000 and 240-51544462).
Compliance Requirements
Source: Attachment 8 - Remedial repairs Port Rex List of Tender Returnables Cat 3 Rev 7 (14).xlsx (unknown)No specific compliance requirements (e.g., CSD registration, tax clearance, B-BBEE level, CIDB grading) are stated in the provided document.
Description
Source: Attachment 16 - 167A-13846- OHS&Q Management Plan.pdfThe Contractor OHS&Q Management Plan describes roles, responsibilities, key focus areas, and initiatives prioritized over three years. Objectives include reducing contractor-related medical incidents from two to zero, reducing struck against/stuck, contact with fumes/electricity, and wasp insect bites incidents by analyzing root causes, and creating a strong safety culture through behavior-based observations. The plan applies throughout Peaking OU and is reviewed annually. Key challenges include lack of accountability, poor processes, misalignment in human performance, emergency work compromising safety, constrained resources, contractor safety culture prioritizing financial viability, and emerging contractors lacking safety consciousness.
Important Dates
Source: Attachment 16 - 167A-13846- OHS&Q Management Plan.pdf (unknown)Safety engagements between BU leadership and contractor leadership: bi-annual, target date 30 April 2025.
Evaluation Criteria
Source: Attachment 16 - 167A-13846- OHS&Q Management Plan.pdf (unknown)Contractor must comply with Eskom's Contractor OHS&Q Management Plan.
Contractor must have a Quality Management System compliant with ISO 9001:2015.
Contractor personnel must meet competency requirements as per Peaking OHS specification (e.g., Contractor Site Manager and Supervisor: HIRA, Incident Investigation training, Supervisor training, Legal Liability; Safety Officer: SAMTRAC, HIRA, Incident Investigation training, Legal Liability training, ISO 45001 knowledge, minimum 2 years experience, OHS Diploma for contracts 3 years or more).
Contractor must attend safety engagements with Peaking leadership bi-annually.
Contractor must have OHS KPIs included in contract documents.
Contractor must be categorised according to site-specific risk profile (High, Medium, Low) and managed accordingly.
Contractor must comply with all applicable legal, statutory, regulatory and technical requirements.
Technical Specifications
Source: Attachment 16 - 167A-13846- OHS&Q Management Plan.pdf (unknown)The plan applies throughout Peaking OU and is reviewed annually.
The plan is implemented over three years.
Contractor must establish, document, implement and maintain a Quality Management System (QMS) compliant with ISO 9001:2015.
Contractor must conduct internal quality audits and forward a copy of the audit report to Eskom.
Contractor must ensure personnel have necessary competence and undergo annual assessment.
Contractor must maintain Health and Safety file and comply with health and safety plan, Eskom OHS specification and applicable legislation.
Contractor must maintain good housekeeping.
Contractor must implement and monitor near miss reporting strategy.
Contractor must develop and comply with Behavioural Safety Observation (BSO) and Planned Job Observation (PJO) programmes.
Contractor must maintain zero fatalities for the duration of the contract.
OHS performance must be within lost time injury (LTI) tolerance level.
All incidents must be reported immediately or before end of shift.
Incident investigations must be completed within 30 days.
Incident investigation recommendations must be closed within recommended time frames.
Audit findings and non-conformances must be closed as per recommended time frames.
Contractor must comply with project specifications and contract requirements.
Zero defects in workmanship.
Contractor personnel must have qualification and training for the job.
Contractor must adhere to project budget and timelines.
Contractor must have effective quality management system.
Methodology
Source: Attachment 16 - 167A-13846- OHS&Q Management Plan.pdf (unknown)The plan is implemented over three years with annual reviews. It includes strategic objectives and initiatives with specific actions, responsible persons, and target dates, such as safety engagements, contractor KPI inclusion in contracts, contractor categorization, audits, incident trend analysis, permit reviews, legal liability training, competency matrix implementation, standardized OHS files, dashboard compliance, and workgroup membership.
Experience & Qualifications
Source: Attachment 16 - 167A-13846- OHS&Q Management Plan.pdfContractor personnel must meet competency requirements as per Peaking OHS specification. Contractor Site Manager and Supervisor: HIRA, Incident Investigation training, Supervisor training, Legal Liability. Safety Officer: SAMTRAC, HIRA, Incident Investigation training, Legal Liability training, knowledge and understanding of ISO 45001, minimum work experience of 2 years, OHS Diploma (applicable to contracts which are 3 years and more).
Quality Management
Source: Attachment 16 - 167A-13846- OHS&Q Management Plan.pdfContractor quality KPIs measure success of quality management activities, including compliance with specifications, zero defects, qualified personnel, effective communication, adherence to budget and timelines, and effective quality management system. Contractors must establish a QMS compliant with ISO 9001:2015, demonstrate management commitment through policy and reviews, perform risk and opportunities analysis, allocate necessary resources, ensure competence and training, and conduct internal quality audits with reports forwarded to Eskom.
Compliance Requirements
Source: Attachment 16 - 167A-13846- OHS&Q Management Plan.pdf (unknown)Contractor must comply with ISO 9001:2015 Quality Management System.
Contractor must comply with ISO 14001 Environmental Management System.
Contractor must comply with ISO 45001 OHS Management System.
Contractor must comply with ISO 31000 Risk Management.
Contractor must comply with Eskom OHS Strategy (240-112651496).
Contractor must comply with OHS Contractor Management Model (240-5430191841T).
Contractor must comply with Eskom Contractor Health and Safety Requirements Standard (32-136).
Contractor must comply with Contract and Contractor OHS Management (32-726).
Contractor must comply with Peaking Integrated Risk Management Plan (167A/8493).
Contractual Terms
Source: Attachment 16 - 167A-13846- OHS&Q Management Plan.pdfRoles and responsibilities are defined for Peaking OHS & Quality Senior Advisors, Contract/Project/Outage Managers, BU General Manager, Eskom and contractor employees, and Risk and Assurance Manager, ensuring implementation and accountability of the plan.
Submission Guidelines
Source: Attachment 26 - Supplier Declaration of Interest Template.docx (unknown)Returnable documents:
Disqualification risks:
Evaluation Criteria
Source: Attachment 26 - Supplier Declaration of Interest Template.docx (unknown)Bidders must submit a signed (sworn) Supplier Declaration of Interest (Eskom form 240-59385360 Rev 3). Eskom employees or directors may not financially benefit from the procurement. Bidders must disclose any conflicts of interest arising from employment, close family, or associate relationships with Eskom personnel involved in the procurement.
Description
Source: Attachment 2 - E-tendering Help Manual for supplier.docxThis document is the Eskom eTendering System Suppliers Help Manual. It explains how suppliers register and submit tender documents electronically, replacing physical submission at Eskom tender offices. It does not describe the scope of the tender itself.
Contact Information
Source: Attachment 2 - E-tendering Help Manual for supplier.docx (unknown)For system problems or difficulties using Tender Bulletin, eTendering or OpenText systems, contact the buyer responsible for the published tender. No specific contact details are provided in this document.
Submission Guidelines
Source: Attachment 2 - E-tendering Help Manual for supplier.docx (unknown)Submission is electronic only via the Eskom eTendering system.
Evaluation Criteria
Source: Attachment 2 - E-tendering Help Manual for supplier.docx (unknown)No evaluation criteria are provided in this document. The document only describes the electronic submission process.
Technical Specifications
Source: Attachment 2 - E-tendering Help Manual for supplier.docx (unknown)This document is a help manual for the Eskom eTendering system. It does not contain technical specifications for the tender (remedial repairs to pollution control dams, fuel containment areas and associated environmental containment infrastructure at Port Rex Power Station).
Compliance Requirements
Source: Attachment 2 - E-tendering Help Manual for supplier.docx (unknown)A valid CSD number is required to access the eTendering system and submit a bid.
Description
Source: Attachment 25 - Non-Disclosure Agreement (NDA) Vendors Template.docxThe document provided is a Non-Disclosure Agreement (NDA) template between Eskom Holdings SOC Ltd and suppliers/tenderers. It sets out the terms for handling confidential information disclosed during the tender process. The NDA must be signed and returned with the bid.
Submission Guidelines
Source: Attachment 25 - Non-Disclosure Agreement (NDA) Vendors Template.docx (unknown)Returnable documents: the signed Non-Disclosure Agreement (NDA) must be submitted with the bid. The NDA must be signed by a duly authorised representative of the bidder. No other returnable forms are specified in the provided document.
Evaluation Criteria
Source: Attachment 25 - Non-Disclosure Agreement (NDA) Vendors Template.docx (unknown)The bidder must be a legal entity capable of entering into a binding agreement. The NDA must be signed by a duly authorised representative. No other eligibility criteria are stated in the provided document.
Technical Specifications
Source: Attachment 25 - Non-Disclosure Agreement (NDA) Vendors Template.docx (unknown)The tender is for remedial repairs to pollution control dams, fuel containment areas and associated environmental containment infrastructure at Port Rex Power Station. The scope includes civil engineering works. No further technical details are provided in the supplied document.
Compliance Requirements
Source: Attachment 25 - Non-Disclosure Agreement (NDA) Vendors Template.docx (unknown)The bidder must be a legal entity capable of entering into a binding agreement. The NDA must be signed by a duly authorised representative. No other compliance requirements are stated in the provided document.
Description
Source: Attachment 11 - High Risk OHS Requirements - Port Rex.pdfThe project involves remedial repairs to pollution control dams, fuel containment areas, and associated environmental containment infrastructure at Port Rex Power Station. Specifically, the work includes design and construction of impermeable secondary containment areas for hazardous waste skips, and resealing of fuel containment area bund wall joints with expansion joint sealant where degradation has occurred.
Important Dates
Source: Attachment 11 - High Risk OHS Requirements - Port Rex.pdf (unknown)No briefing session or site visit is stated in this document.
Contact Information
Source: Attachment 11 - High Risk OHS Requirements - Port Rex.pdf (unknown)Eskom Safety Representative: Kamesha Achari
Contract Manager/End User: Zukile Tshisa
Project Address: Eskom Port Rex Power Station, 9 Wells Road, Gately, KuGompo City, 5201
Submission Guidelines
Source: Attachment 11 - High Risk OHS Requirements - Port Rex.pdf (unknown)Returnable documents: none specified in this attachment. The document is an OHS requirements specification, not the full tender pack. Bidders must submit the completed and signed OHS plan and all supporting OHS documentation with their bid, as required by the main tender documents.
Evaluation Criteria
Source: Attachment 11 - High Risk OHS Requirements - Port Rex.pdf (unknown)Bidders must be registered with the Compensation Commissioner and provide a valid Letter of Good Standing. They must comply with the OHS Act and all applicable legislation. They must sign a Section 37(2) agreement. They must not use child labour. They must have a SHEQ policy signed by the CEO or Section 16(2) appointee. They must provide an organogram and statutory appointments. They must comply with Eskom's Life-Saving Rules and substance abuse policy (0% alcohol/drug level). They must have a substance abuse programme. They must provide evidence of training and competence for all employees, including working at heights training (Unit Standards 229998 and 229995).
Technical Specifications
Source: Attachment 11 - High Risk OHS Requirements - Port Rex.pdf (unknown)Scope of work: Design and construction of impermeable secondary containment areas for hazardous waste skips at Port Rex Power Station, and resealing of fuel containment area bund wall joints with expansion joint sealant where degradation has occurred.
Location: Port Rex Power Station, 9 Wells Road, Gately, KuGompo City, 5201.
The contractor must develop an OHS plan that meets Eskom's minimum requirements and all applicable legislation.
The contractor remains accountable for the health and safety programme for their employees and appointed contractors.
Eskom does not assume the contractor's legal responsibilities.
Methodology
Source: Attachment 11 - High Risk OHS Requirements - Port Rex.pdfSafe work procedures and method statements must be written for new or changed jobs/tasks, and when introducing new equipment or substances. These must provide guidance on how to execute tasks safely.
Experience & Qualifications
Source: Attachment 11 - High Risk OHS Requirements - Port Rex.pdfThe main contractor and appointed contractors must have appropriate qualifications and certificates, and employees must always be under competent supervision.
Quality Management
Source: Attachment 11 - High Risk OHS Requirements - Port Rex.pdfContractors must maintain satisfactory standards of housekeeping, stacking, storage, and tool/equipment condition. Hand tools must be recorded on a register and inspected monthly by the supervisor and by users prior to use. Tools with mushroom heads are prohibited.
Financial Requirements
Source: Attachment 11 - High Risk OHS Requirements - Port Rex.pdf (unknown)Costing for OHS must be itemised based on the overall scope of work, including training, PPE, safety equipment purchases, safety campaigns, and safety promotional material.
Health & Safety
Source: Attachment 11 - High Risk OHS Requirements - Port Rex.pdfThe contractor must comply with all OHS requirements listed in the document, including: legal compliance (Section 37(2) agreement, child labour prohibition, OHS Act compliance), SHEQ policy, COID registration with letter of good standing, statutory and non-statutory appointments, Eskom Life-Saving Rules, substance abuse policy (0% alcohol/drug level), contractor organisational structure (organograms), roles and responsibilities, risk assessments, safe work procedures/method statements, roof work, fire equipment, flammable liquids, first aid, SHE communication, toolbox talks, OHS training, site establishment, site roads, vehicle management, housekeeping, stacking/storage, signage, tools/equipment, ladders, scaffolding, auditing, smoking, cellular phones, occupational health, medical assessments, working at heights, PPE, incident reporting, emergency management, non-conformance, OHS files, work stoppage, hours of work, contractor performance monitoring, security clearance, contract sign off.
Environmental
Source: Attachment 11 - High Risk OHS Requirements - Port Rex.pdfThe contractor must comply with all applicable environmental legislation, including the National Environmental Management Act, Environment Conservation Act, and National Water Act. The contractor has a duty of care to prevent pollution or degradation of the environment.
Contractual Terms
Source: Attachment 11 - High Risk OHS Requirements - Port Rex.pdfThe main contractor must sign a Section 37(2) agreement with Eskom at the time of submitting the safety file, and must also compile Section 37(2) agreements with all appointed contractors. Eskom has the right to terminate the contract for non-compliance with OHS requirements.
Important Dates
Source: Attachment 6 - SDLI Strategy Setting Template for Bidders - Port Rex Power Station.pdf (TENDER)Closing date: 23 October 2026 at 10:00 (from tender record).
Note: The document mentions an effective date of 01 April 2023 and review date April 2026, but these are template dates, not tender-specific deadlines.
Submission Guidelines
Source: Attachment 6 - SDLI Strategy Setting Template for Bidders - Port Rex Power Station.pdf (TENDER)Returnable documents:
Disqualification risks:
Evaluation Criteria
Source: Attachment 6 - SDLI Strategy Setting Template for Bidders - Port Rex Power Station.pdf (TENDER)Evaluation is based on price and specific goals (B-BBEE status level). The contract is awarded to the tenderer scoring the highest total points.
Preference point system: 90/10 or 80/20, depending on the tender. Points for B-BBEE status level:
Objective criteria (conditions for contract award):
If objective criteria are not met, the second-ranked tenderer may be recommended for award.
Technical Specifications
Source: Attachment 6 - SDLI Strategy Setting Template for Bidders - Port Rex Power Station.pdf (TENDER)Scope of work: Provision of remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at Port Rex Gas Turbine Station.
Duration of the project: 18 months.
CIDB skills development: Eskom target CSDG percentage is 0.375%, with description '2 CE'. Possible training initiative: Civil Engineer – Diploma/Equivalent, 12 months experiential training/work exposure.
Financial Requirements
Source: Attachment 6 - SDLI Strategy Setting Template for Bidders - Port Rex Power Station.pdf (TENDER)Pricing: The tender response must be separated into its components as per the Price Schedule included with the tender documents. Local procurement content is total spending minus the imported component.
SDL&I penalty and performance security:
Compliance Requirements
Source: Attachment 6 - SDLI Strategy Setting Template for Bidders - Port Rex Power Station.pdf (TENDER)B-BBEE requirements:
B-BBEE improvement or retention plan:
Local content:
CIDB skills development:
Sworn affidavit validity:
Health & Safety
Source: Attachment 6 - SDLI Strategy Setting Template for Bidders - Port Rex Power Station.pdfNo health and safety requirements are stated in this document. The content provided under this section is actually about sworn affidavit validity, which is covered under compliance requirements.
Contractual Terms
Source: Attachment 6 - SDLI Strategy Setting Template for Bidders - Port Rex Power Station.pdf (TENDER)SDL&I penalty and performance security:
Special Conditions
Source: Attachment 6 - SDLI Strategy Setting Template for Bidders - Port Rex Power Station.pdf (TENDER)Reporting and monitoring:
Requirements
Source: Attachment 6 - SDLI Strategy Setting Template for Bidders - Port Rex Power Station.pdf (TENDER)Objective criteria:
Section
Source: Attachment 6 - SDLI Strategy Setting Template for Bidders - Port Rex Power Station.pdfSection 1: Specific Goals - A maximum of 10/20 points may be awarded for the specific goal. Points table for B-BBEE status levels under 90/10 and 80/20 systems. Required documents to claim preference points: valid B-BBEE certificate (SANAS accredited) or sworn affidavit/CIPC affidavit, proof of ownership/shareholding (preferably CIPC), certified ID copies of shareholders, proof of disability where applicable. If documentation not provided, tenderer may only score out of 90/80 for price and 0 out of 10/20 for specific goals.
Submission Guidelines
Source: Attachment 13 - Annexure C1 - Tender Evaluation Template.pdf (unknown)Returnable documents (all must be submitted with the bid):
Failure to submit any required returnable may result in disqualification.
Evaluation Criteria
Source: Attachment 13 - Annexure C1 - Tender Evaluation Template.pdf (unknown)The tender is evaluated as high risk. The OHS evaluation template (Annexure C1) assesses compliance with all listed OHS returnables. The bidder is recommended or not recommended based on compliance. No scoring split or minimum qualifying score is stated.
Technical Specifications
Source: Attachment 13 - Annexure C1 - Tender Evaluation Template.pdf (unknown)Scope of work: Remedial repairs to the pollution control dams, fuel containment areas and associated environmental containment infrastructure at Port Rex Power Station. The work is classified as high risk from an OHS perspective.
Experience & Qualifications
Source: Attachment 13 - Annexure C1 - Tender Evaluation Template.pdfOHS competency evidence required: CVs, qualifications/certificates. Specific competencies listed: Hazardous Chemical Controller and Working at Heights training.
Compliance Requirements
Source: Attachment 13 - Annexure C1 - Tender Evaluation Template.pdf (unknown)OHS compliance requirements (as per Annexure C1):
Health & Safety
Source: Attachment 13 - Annexure C1 - Tender Evaluation Template.pdfOHS returnables required:
Section
Source: Attachment 13 - Annexure C1 - Tender Evaluation Template.pdfThe OHS evaluation template (Annexure C1) is used to evaluate the bidder's compliance with OHS returnables. The bidder is recommended or not recommended based on compliance. No scoring split or minimum qualifying score is stated.
Description
Source: Attachment 19 - Life-Saving_Rules Standard.pdfThe standard applies to all Eskom sites to promote a safe working environment for all Eskom employees, agents, consultants, and contractors. It clarifies the six most prominent causes of serious injuries and fatalities within Eskom and enforces zero tolerance for non-adherence. It applies throughout Eskom Holdings SOC Limited, its divisions, subsidiaries, and entities wherein Eskom has a controlling interest and/or Eskom contractors.
Submission Guidelines
Source: Attachment 19 - Life-Saving_Rules Standard.pdf (unknown)Returnable documents: all required National Treasury standard forms (SBD 1, SBD 4, SBD 6.1, SBD 8, SBD 9) as applicable, completed and signed. Bidders must be registered on the Central Supplier Database (CSD) and have a valid tax clearance (SARS TCS or tax pin).
Evaluation Criteria
Source: Attachment 19 - Life-Saving_Rules Standard.pdf (unknown)Bidders must comply with Eskom's Life-Saving Rules; violations are treated as serious misconduct and may lead to disciplinary action or removal from site. Contractors must ensure their employees are trained and competent for the tasks. A valid permit to work is required for relevant activities.
Technical Specifications
Source: Attachment 19 - Life-Saving_Rules Standard.pdf (unknown)Scope: remedial repairs to pollution control dams, fuel containment areas and associated environmental containment infrastructure at Port Rex Power Station. Work must be performed in accordance with Eskom's Life-Saving Rules and all applicable health and safety requirements.
Methodology
Source: Attachment 19 - Life-Saving_Rules Standard.pdfFor live work, adhere to the High Voltage Live Working Standard, maintain minimum approach distance (MAD), and never mix live and dead work on the same site at the same time.
Health & Safety
Source: Attachment 19 - Life-Saving_Rules Standard.pdfEskom's Life-Saving Rules apply to all employees, agents, consultants, and contractors. The six rules are: 1) Open, isolate, test, earth and create an equipotential zone before touch. 2) Hook up at height. 3) Buckle up. 4) Be sober. 5) Ensure that you have a permit to work. 6) Ensure safe live working. Violations are treated as serious misconduct with zero tolerance, leading to disciplinary action. Contractors must remove violating employees from site and initiate disciplinary process within five working days.
Contractual Terms
Source: Attachment 19 - Life-Saving_Rules Standard.pdf (unknown)If a contractor manager or supervisor allows a violation of a Life-Saving Rule, Eskom may suspend the contractor's activities while determining an appropriate sanction. Contractor employees who violate a rule must be removed from site and the contractor must initiate disciplinary process within five working days. The contractor must provide Eskom with a copy of the sanction after the disciplinary process.
Section
Source: Attachment 19 - Life-Saving_Rules Standard.pdfCompliance with ISO 9001 Quality Management Systems and Eskom's Safety, Health, Environment and Quality Policy is required.
Important Dates
Source: Attachment 3 - Port Rex Scope of Work.pdf (unknown)Compulsory site clarification meeting: Date and venue not stated in this extract. Attendance is mandatory.
Closing date: 23 October 2026 at 10:00.
Submission Guidelines
Source: Attachment 3 - Port Rex Scope of Work.pdf (unknown)Returnable documents: The bid pack includes the standard Eskom tender forms (SBD/MBD equivalents) covering declaration of interest, independent bid determination, preference points claim, and authority to sign. All must be completed, signed and submitted with the bid.
Submission method: Not stated in this extract. Closing time: 23 October 2026 at 10:00.
Disqualification risks:
Evaluation Criteria
Source: Attachment 3 - Port Rex Scope of Work.pdf (unknown)Evaluation method: Not detailed in this extract. The document states the Contractor must comply with the B-BBEE and preferencing commitments forming part of its accepted tender. No minimum qualifying score or preference point system (80/20 or 90/10) is stated.
Compulsory site clarification meeting: Attendance is required (see importantDates).
Technical Specifications
Source: Attachment 3 - Port Rex Scope of Work.pdf (unknown)Scope of works:
Dimensions: Outside bund walls 6.30 m x 4.30 m x 0.40 m high; internal 6.02 m x 4.02 m x 0.20 m high; internal volume approx. 4.8 m3.
Foundation: Remove min 150 mm topsoil, excavate approx. 200 mm, rip and recompact 150 mm, replace unsuitable material with G7, compact to 95% Mod AASHTO, 50 mm 10 MPa blinding.
Standards: ISO 9001, OHSA, SANS 1200, SANS 10400, SANS 10400-J, SANS 110:2011, Eskom Life-Saving Rules, Generation Plant Safety Regulations, Engineering Quality Manual, Engineering Change Management Procedure 240-53114002.
Testing and verification:
Contractor provides all labour, plant, materials, equipment, temporary works, supervision, quality control and testing.
Employer provides: Site access, potable-water supply points (subject to availability), Employer forms, authorised representatives for inspections.
Employer does not provide: electrical supply, temporary lighting, Contractor's equipment, sanitary facilities, site office, storage, or potable water for personnel.
Financial Requirements
Source: Attachment 3 - Port Rex Scope of Work.pdf (unknown)Payment: Contractor assesses amount due and applies for payment (core clause 50). Tax invoice must include specified details, including Employer's VAT number 4740101508. Invoices submitted per Employer's electronic invoicing procedures; non-compliant invoices may be returned.
Records: Contractor must keep auditable records of Defined Cost for compensation events, retained for contract duration plus any further period required.
No bid security, guarantee, retention or financial capacity thresholds stated in this extract.
Compliance Requirements
Source: Attachment 3 - Port Rex Scope of Work.pdf (unknown)B-BBEE: Contractor must comply with B-BBEE and preferencing commitments in its accepted tender. Must notify Employer of any change in B-BBEE status. No specific level or threshold stated.
CSD: Not explicitly stated in this extract.
Tax: Valid tax invoice with VAT registration number required.
Security: Personnel subject to security clearance, including police clearance where required.
Site compliance: Must comply with OHSA, Generation Plant Safety Regulations, Eskom Life-Saving Rules, Site induction, alcohol and fitness-for-work requirements.
Description
Source: Attachment 5 - Technical Evaluation Criteria - Port Rex.pdfThe procurement is for remedial works to fuel tank bunds and construction of a hazardous waste skips containment area at Port Rex Power Station. The contractor must have proven experience in concrete rehabilitation, water-retaining structures, pollution control facilities, fuel containment systems, structural assessments, stormwater infrastructure rehabilitation, and bunding for waste management. The evaluation will identify a contractor with the capability to undertake these remedial civil engineering works.
Submission Guidelines
Source: Attachment 5 - Technical Evaluation Criteria - Port Rex.pdf (unknown)Mandatory returnable: attendance at the compulsory site clarification meeting at Port Rex Power Station. Bidders who fail to attend are disqualified and will not proceed to qualitative evaluation.
Returnable documents (as part of technical submission):
Disqualification risks:
Evaluation Criteria
Source: Attachment 5 - Technical Evaluation Criteria - Port Rex.pdf (unknown)Evaluation stages:
Scoring scale (0–5, no 1 or 3):
Weighted criteria (total 100%):
Acceptable technical risks:
Unacceptable technical risks:
Acceptable exceptions/conditions:
Unacceptable exceptions/conditions:
Technical Specifications
Source: Attachment 5 - Technical Evaluation Criteria - Port Rex.pdf (unknown)Scope: Remedial works to fuel tank bunds and construction of a hazardous waste skips containment area at Port Rex Power Station.
Work categories (contractor must have proven experience in):
Specific works:
Methodology
Source: Attachment 5 - Technical Evaluation Criteria - Port Rex.pdfTechnical Approach & Methodology (30% weighting):
Experience & Qualifications
Source: Attachment 5 - Technical Evaluation Criteria - Port Rex.pdfTenderer's Experience (30% weighting): Must submit five or more completed projects within the last five years covering structural concrete works & repairs, water retaining concrete structures, and joint sealant replacement works. The list must include project name, contactable reference (phone/email), detailed description of work performed, project value (only for scope performed), and project start and end dates. These must be completion letters or reference letters from previous clients. Scoring: 0 (none/unrelated), 2 (less than 3 projects), 4 (3–5 projects), 5 (more than 5 projects).
Key Personnel (20% weighting):
Quality Management
Source: Attachment 5 - Technical Evaluation Criteria - Port Rex.pdfQuality Management (10% weighting): Bidders must submit a project-specific Quality Control Plan covering concrete repairs, crack injection works, joint sealant replacement, fuel bund remedial works, earthworks and compaction testing, construction of the hazardous waste skips containment area, material approvals, hold points, witness points, inspection and test plans, check sheets, and handover records. Scoring is based on the level of detail and coverage: 0 (none or addresses none), 2 (high-level with major deviations), 4 (minor deviations, shows all work activities, procedures, risks, intervention points), 5 (detailed, all tasks, inspections, check sheets). ISO 9001 is referenced as an informative standard.
Compliance Requirements
Source: Attachment 5 - Technical Evaluation Criteria - Port Rex.pdf (unknown)Mandatory: attendance at compulsory site clarification meeting at Port Rex Power Station.
Key personnel registration requirements:
Quality management: ISO 9001 referenced as informative standard; project-specific Quality Control Plan required.
No B-BBEE, CIDB, CSD, or tax compliance requirements stated in this document.
Environmental
Source: Attachment 5 - Technical Evaluation Criteria - Port Rex.pdfThe scope includes pollution control facilities, fuel containment systems, and bunding for waste management. The waste skip bund construction methodology must include environmental controls. No specific environmental impact or sustainability requirements are stated beyond these.
Section
Source: Attachment 5 - Technical Evaluation Criteria - Port Rex.pdfMandatory: attendance at compulsory site clarification meeting at Port Rex Power Station. Failure disqualifies.
Qualitative: weighted scoring, minimum threshold 70%.
Scoring scale 0–5 (no 1 or 3): 5=compliant, 4=compliant with acceptable qualifications, 2=non-compliant, 0=totally deficient.
Acceptable risks: minor deviations not affecting performance/safety/durability; minor sequencing differences not impacting critical path.
Unacceptable risks: lack of experience, insufficient method statements, infeasible programme, no ECSA registered resource.
Acceptable exceptions: clearly stated assumptions not conflicting with scope; alternative methods achieving same performance.
Unacceptable exceptions: scheduling errors (e.g., no lead time for materials); alternative proposals without technical justification.
Description
Source: Attachment 24 - Contract Deviations Committee Approval Template.docxThe document is an internal Eskom template for obtaining Deviation Committee approval for changes to standard contract terms. It is not a standalone tender specification; it is an attachment to a tender for remedial repairs at Port Rex Power Station. The template requires negotiation of deviations with legal, insurance, and the end-user, and completion of Annexure A with the original tendered contract.
Submission Guidelines
Source: Attachment 24 - Contract Deviations Committee Approval Template.docx (unknown)Returnable documents: Annexure A (Deviation Request) must be correctly completed and submitted to the Secretariat, together with the original tendered contract and the contract documents that went out with the tender. The submission must include the required sign-offs (project manager, commercial manager, legal adviser, insurance adviser) and the standard condition table with proposed changes, rationale, and risk mitigation. Incomplete or incorrectly completed documents will be returned. The Deviation Committee chairman must not be copied on submissions.
Evaluation Criteria
Source: Attachment 24 - Contract Deviations Committee Approval Template.docx (unknown)No evaluation criteria are stated in the provided document. The document concerns the internal Eskom process for approving deviations from standard contract terms, not the evaluation of bids.
Technical Specifications
Source: Attachment 24 - Contract Deviations Committee Approval Template.docx (unknown)The document is a template for requesting deviations from standard contract terms for the project 'REMEDIAL REPAIRS TO THE POLLUTION CONTROL DAMS, FUEL CONTAINMENT AREAS AND ASSOCIATED ENVIRONMENTAL CONTAINMENT INFRASTRUCTURE AT PORT REX POWER STATION.' It requires negotiation of deviations with legal, insurance, and the end-user, and completion of Annexure A with details of the project, value, duration, contract type (NEC or FIDIC), supplier, buyer, project manager, legal adviser, commercial manager, and the proposed changes with rationale and risk mitigation.
Compliance Requirements
Source: Attachment 24 - Contract Deviations Committee Approval Template.docx (unknown)The document does not state specific compliance requirements such as CSD registration, tax clearance, B-BBEE, or CIDB grading. It requires adherence to the deviation submission process, including obtaining approvals from the project manager and commercial manager, and noting the 21-day turnaround time for Deviation Committee approval.
Evaluation Criteria
Source: Attachment 21 - Eskom_Personal_Protective_Equipment_(PPE).pdf (unknown)Bidders must comply with the Occupational Health and Safety Act. They must conduct risk assessments before issuing PPE and follow the hierarchy of controls. Bidders must ensure PPE meets SANS standards and is locally manufactured where possible. Employees must sign for issued PPE. Bidders must provide training on PPE use and limitations. Bidders must not permit work without required PPE. Bidders must allow employees to refuse unsafe work. Bidders must clean PPE if contamination spread is possible. Bidders must manage PPE disposal per Eskom's Waste Standard (32-245).
Technical Specifications
Source: Attachment 21 - Eskom_Personal_Protective_Equipment_(PPE).pdf (unknown)The document prescribes minimum requirements for generic Personal Protective Equipment (PPE) used in Eskom, including guidance on selection, use, care, and maintenance. It applies throughout Eskom Holdings SOC Ltd divisions and subsidiaries, with additional requirements determined by risk assessment. The document is effective from authorization, with implementation monitored after six months.
Detailed specifications for various PPE items:
Methodology
Source: Attachment 21 - Eskom_Personal_Protective_Equipment_(PPE).pdf (unknown)PPE issuance procedures include issuing free of charge based on risk assessment and PPE Matrix, individual issuance, sanitization of shared PPE, record keeping, and regular inspections. Replacement is based on exchange of unserviceable items, with destruction of old items and disposal per Eskom Waste Standard. Special circumstances allow for specially manufactured PPE with specialist documentation.
Quality Management
Source: Attachment 21 - Eskom_Personal_Protective_Equipment_(PPE).pdfPPE must meet minimum requirements including being fit for purpose, kept in good condition, and compliant with technical specifications. Garments must be free from defects, seams and stitching must comply with SANS standards, and reflective strips must be sewn on for visibility. Garments must be labelled according to SANS 434 and manufacturers must provide certificates of compliance for fabrics.
Health & Safety
Source: Attachment 21 - Eskom_Personal_Protective_Equipment_(PPE).pdfThe document is based on the Occupational Health and Safety Act, requiring employers to provide and maintain safety equipment free of charge, and to train employees in proper use, maintenance, and limitations. It includes duties of employers, employees, and OHS departments regarding PPE issuance, training, risk assessments, and compliance monitoring.
Contractual Terms
Source: Attachment 21 - Eskom_Personal_Protective_Equipment_(PPE).pdfAll PPE/clothing shall be issued free of charge. Where losses are due to negligence, the appropriate Eskom disciplinary procedures shall be followed. All Eskom-branded items of PPE shall be handed in on termination of an employee's service with Eskom. These items shall remain Eskom's property and responsibility. The responsible line manager shall monitor this process within the scope of the existing processes for the issuing and replacement of PPE.
Submission Guidelines
Source: Attachment 12 - Annexure B Eskom Acknowledgement Form.pdf (unknown)Returnable documents:
Submission method and address: not stated in the provided document.
Closing time: 23 October 2026 at 10:00 (from tender record).
Evaluation Criteria
Source: Attachment 12 - Annexure B Eskom Acknowledgement Form.pdf (unknown)The bidder must sign the Eskom Acknowledgement Form (Annexure B) as a condition of the bid.
No other evaluation criteria (e.g., price, functionality, preference points) are stated in the provided document.
Technical Specifications
Source: Attachment 12 - Annexure B Eskom Acknowledgement Form.pdf (unknown)Scope: remedial repairs to pollution control dams, fuel containment areas and associated environmental containment infrastructure at Port Rex Power Station.
The main supplier is responsible for managing and overseeing all contractors and suppliers (all tiers) engaged for the work.
Quality Management
Source: Attachment 12 - Annexure B Eskom Acknowledgement Form.pdfThe main supplier must:
Compliance Requirements
Source: Attachment 12 - Annexure B Eskom Acknowledgement Form.pdf (unknown)OHS compliance:
Health & Safety
Source: Attachment 12 - Annexure B Eskom Acknowledgement Form.pdfThe contractor must comply with all applicable OHS legislation, standards, policies and procedures, including the Occupational Health and Safety Act, Compensation for Occupational Injuries and Diseases Act, Eskom contractor Health and Safety requirements standard 32-136, OHS specification/requirements, Incident Management Procedure 32-95, and Working at Heights Procedure 32-418. After contract award, the contractor is responsible for aligning its processes to Eskom's OHS requirements. Contractual penalties may be enforced for non-compliance. All employees must undergo relevant Eskom and company inductions. The main supplier must provide evidence of a documented contractor and supplier selection process, notify Eskom before appointing contractors, ensure they have necessary resources and competencies, be accountable for their management and oversight, implement audits and assessments to verify OHS compliance, and manage non-conformances in accordance with performance and penalty mechanisms. Eskom reserves the right to verify actions taken.
Health & Safety
Source: Attachment 20 -Driver_and_Vehicle_Safety_Management_Procedure.pdfEskom enforces a zero-tolerance policy on at-risk driving behaviour. All drivers and vehicles used for Eskom business, including contractor and consultant vehicles, must comply with this procedure. Vehicles must be roadworthy, fitted with ABS and dual airbags where possible, and all occupants must wear safety belts. Transporting persons on the back of LDVs or trucks is prohibited. Motorcycles are prohibited for Eskom business; quad bikes, golf carts, and upright wheelers are only permitted under specific conditions. Drivers must hold a valid national driver's licence and an Eskom driver permit. Medical fitness certification is required. Pre-trip inspections are mandatory for Eskom-owned vehicles; visual checks are required for other vehicles. Eskom-owned self-propelled vehicles must be fitted with vehicle monitoring devices and driver cameras, monitored regularly. All work-related vehicle incidents must be investigated. Driver risk assessments are required for new employees within three months and every two years thereafter. Long-distance drivers must rest at least every two hours. Drivers must use dipped beams in poor visibility. Dangerous goods transport must comply with the National Road Traffic Act and SANS standards. Route risk assessments must be conducted and kept for planning. Non-compliance may lead to disciplinary action, including dismissal.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Port Rex Power Station - - East London -
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
30
Last checked
24 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
How consulting engineers, engineering firms, and multidisciplinary practices can win public sector infrastructure contracts in South Africa — from ECSA registration and CESA membership to fee proposals, QBS scoring, and building a winning tender response.
A comprehensive guide to civil engineering infrastructure tenders in South Africa. Covers CIDB requirements, major buyers, the tender pipeline, and how civil engineering firms win government work in roads, dams, water, and sanitation.
How mechanical and electrical engineers, contractors, and consultants can win public sector contracts in South Africa — HVAC, plumbing, fire systems, electrical infrastructure, ECSA registration, CIDB ME designation, and tender documentation essentials.
A professional guide for consulting engineers on bidding for government infrastructure projects. Understanding percentage-based fees, discounting ECSA guidelines, and managing professional indemnity risk.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Civil engineering. Unlock full pricing strategies, bid frequency, and historical win rates.