1 Impala - Hendrina Power Station - Hendrina Power Station - 1095
Organization Type
GOVERNMENT
Published
29 Jun 2026
OCDS Reference
ocds-9t57fa-160616
Summary
ESKOM is inviting tenders for the supply and delivery of turbine auxiliaries off-the-shelf spares to hendrina power station in mpumalanga on an 'as and when required' basis for a period of 5 years. The tender is open to suppliers who can meet the technical, financial, and compliance requirements, with evaluation based on functionality (70% threshold) and the 80/20 preference point system.
Key Requirements
Submit electronically via Eskom E-tendering site by 20 July 2026 at 10:00; late submissions will not be accepted.
Complete and submit all mandatory returnables (Annexures A, B, C, D, E, G1-G4, H, J, and Tax Evaluation Questionnaire) at closing to avoid disqualification.
Meet functionality threshold of 70% (Technical score out of 100), including evidence of company experience (5 task orders/contracts in past 5 years), a detailed method statement, Quality Control Plan, and lead time commitment.
Provide a Quality Controller with minimum N3 technical qualification and at least 3 years of experience (CV and certified qualification required).
Register on the Central Supplier Database (CSD) and provide proof of registration; submit B-BBEE status level certificate or affidavit.
Prices must be inclusive of VAT; pricing schedule must be submitted in PDF and Excel formats.
Tender validity period is 120 days from closing date; non-compulsory clarification meeting on 08 July 2026 via Microsoft Teams.
Supply and delivery of turbine auxiliaries off-the-shelf spares on an "as and when required" at hendrina power station (materials management department) for a period of 5 years
Briefing Session
Date & Time
Monday, 20 July 2026 - 10:00
Venue
Clarification meeting for Turbine Aux Spares | Meeting-Join | Microsoft Teams
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards — PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement — so nothing critical is missed before you start your bid response.
Document240-12248652_List of Tender Returnables_Cat 2_ (Quality 04).xlsxReview complete
Description
Important Dates
29 Jun
2026
PUBLICATION
Tender Published
Tender was published
20 Jul
2026
DEADLINE
Closing Date
Tender closing date
Procurement Rules & Compliance ContextThis tender may be governed by South African public procurement rules covering fairness, transparency, preferential procurement, anti-corruption, administrative justice and access to information.
10 rules
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Core procurement rules
These rules commonly apply to South African public-sector procurement.
7
Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
high
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Constitution of the Republic of South Africa, 1996 – Section 217
Act 108 of 1996 (s217)
high
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Eskom Holdings SOC Ltd invites tenders for the **Supply and Delivery of Turbine Auxiliaries Off-The-Shelf Spares** on an 'as and when required' basis at **Hendrina Power Station** for a **5-year period**. The tender is open, electronic submissions only, and closes on **20 July 2026 at 10:00 AM UTC**. The contract will be governed by **NEC3 SC conditions** with specific clauses (e.g., X1, X2, X7, X17, X19, X20, Z). Evaluation is based on **functionality (100 points, 70% threshold)** and **price (80 points) + specific goals (20 points)** under PPPFA 2022 regulations.
240-12248652_List of Tender Returnables_Cat 2_ (Quality 04).xlsx
Eskom tender for supply and delivery of turbine auxiliaries off-the-shelf spares to Hendrina Power Station on an 'as and when required' basis for 5 years. The evaluation focuses heavily on quality management systems, with Category 2 selected as the applicable tender category requiring ISO 9001 compliance or equivalent documented QMS.
NEC3 Supply nd Delivery of Turbine auxiliaries Off-The-Shelf spares.pdf
Eskom seeks a supplier for a 5-year framework contract to supply and deliver turbine auxiliary off-the-shelf spares on an 'as and when required' basis to Hendrina Power Station. The contract uses the NEC3 Supply Contract (SC3) form and is structured as a priced contract with a detailed price schedule for specific spare parts.
This is a tender for the supply and delivery of turbine auxiliaries off-the-shelf spares on an 'as and when required' basis for Hendrina Power Station over a 5-year period. The document focuses heavily on quality management requirements aligned with ISO 9001 standards and Eskom's specific quality specifications.
This document is Annexure C1: OHS Tender Evaluation Template (High Risk) for a tender issued by Eskom for the supply and delivery of turbine auxiliaries off-the-shelf spares on an 'as and when required' basis at Hendrina Power Station for a 5-year period. The closing date is July 20, 2026. The provided annexure specifically details the Occupational Health and Safety (OHS) evaluation criteria for high-risk tenders, outlining mandatory returnable documents and compliance checks.
This tender, issued by Eskom, is for the supply and delivery of off-the-shelf turbine auxiliary spares for Hendrina Power Station over a 5-year period. The contract requires the supplier to provide readily available spares (e.g., bolts, nuts, bearings, seals, gaskets, etc.) on an 'as and when required' basis, including emergency deliveries within 24 hours. The supplier must maintain a stock of contingency spares, provide material certificates and guarantees, and ensure safe handling, storage, and transportation of all items. The scope includes a detailed list of components with specifications, quantities, and supplier part numbers.
380-136358 R0 - Quality Control Plan TEMPLATE(Quality 01).pdf
This is a Quality Control Plan (QCP) template for a 5-year contract to supply and deliver off-the-shelf turbine auxiliary spares on an as-needed basis to Eskom's Hendrina Power Station. The document outlines the quality control and inspection framework that the service provider must follow, including defined intervention points (Hold, Witness, Review, Surveillance) requiring Eskom approvals at various stages.
This is a template for a Contract Quality Plan (CQP) that tenderers must complete and submit as part of their bid for Eskom's 5-year contract to supply and deliver off-the-shelf turbine auxiliary spares to Hendrina Power Station on an as-needed basis. The document outlines the required structure and content for the supplier's quality management plan, referencing SANS 466:2005/ISO 10005:2005.
SDLI Strategy for supply and delivery of Turbine Auxilliary Off The Shelf spares for 5 years.pdf
Eskom invites tenders for a 5-year framework contract to supply turbine auxiliary spares on an 'as and when required' basis to Hendrina Power Station. The procurement emphasizes preferential scoring based on B-BBEE status, local content thresholds, and SDL&I (Supplier Development, Localisation & Industrialisation) commitments, with strict compliance and reporting obligations.
ESKOM tender for the supply and delivery of turbine auxiliaries off-the-shelf spares at Hendrina Power Station for a 5-year period. The tender evaluation uses a technical threshold of 70%, with evaluation criteria weighted heavily on company experience (80%) including completed orders, method statement, quality control plan, and lead times, plus key personnel qualifications (20%) for a Quality Controller with N3 qualification and 3 years experience.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Similar Tenders
Matched by category & region
Supplier Readiness Hub
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Publication of Bidders - Appointment of a Contractor to Refurbish existing infrastructure in Preparation for Copper Recycling at Komati Power Station and to Supply, Transport, Install and Commission a Copper Recycling Plant
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Document read
Compliance review
Bid-ready summary
Source: 240-12248652_List of Tender Returnables_Cat 2_ (Quality 04).xlsx
The tender is for the supply and delivery of turbine auxiliaries off-the-shelf spares on an 'as and when required' basis at Hendrina Power Station for a period of 5 years. Bidders must select a single category from a list, which determines the specific quality management documentation required for submission.
DocumentNEC3 Supply nd Delivery of Turbine auxiliaries Off-The-Shelf spares.pdfReview complete
Description
Source: NEC3 Supply nd Delivery of Turbine auxiliaries Off-The-Shelf spares.pdf
Supply and deliver Turbine Auxiliaries Off-The-Shelf Spares on an 'as and when required' basis to Hendrina Power Station (Materials Management Department) for a period of 5 years. This includes a range of mechanical and electrical spares such as seals, bolts, bearings, filters, gears, and assemblies as specified in the Price Schedule.
Supplier must submit an initial programme for acceptance within 2 weeks of contract date. Revised programmes must be submitted at intervals no longer than 4 weeks. Delivery is on an 'as and when required' basis; Supplier must notify Eskom to inspect and accept goods before delivery. Supplier may not bring goods to the delivery place more than one week before the delivery date. INCOTERMS 2010 may apply; Supplier and Purchaser obligations for transport, delivery, and risks are defined accordingly. Supplier must provide: packing lists, invoices, delivery notes, test results, and maintenance manuals. For international procurement, Supplier must handle export/import requirements and provide relevant documentation (e.g., licences, Bills of Lading).
Quality Management
Source: NEC3 Supply nd Delivery of Turbine auxiliaries Off-The-Shelf spares.pdf
Supplier must implement and maintain a quality system to Eskom’s satisfaction, subject to periodic audits. Deviations must be corrected to Eskom’s satisfaction. Supplier must provide: 1) All material certificates, 2) All inspection reports (NDT, dimensional, etc.), 3) Detailed tax invoice, 4) QIP (on items requested) at the time of delivery.
Pricing Schedule
Source: NEC3 Supply nd Delivery of Turbine auxiliaries Off-The-Shelf spares.pdf
Pricing is based on a Price Schedule with items priced as lump sums or rates multiplied by quantities. Supplier must include all necessary costs (e.g., defect correction, compliance) in pricing. No adjustments for lump sum items unless due to a compensation event. Price Schedule items include: seals, bolts, bearings, filters, gears, mechanical seals, screens, packings, rings, and assemblies (e.g., Stock numbers 73224, 220063, 222746, etc.). Supplier may add necessary items to the Price Schedule. Pricing assumptions: VAT at 15% (included in total amount due). Price adjustment for inflation: 15% non-adjustable, with indices based on the month prior to enquiry closing date.
Supplier must maintain B-BBEE status as submitted in the tender. Notify Eskom within 7 days of any change in legal status, ownership, or business composition affecting B-BBEE status. Submit updated verification certificate and supporting documentation within 30 days of notification. If B-BBEE status decreases, Eskom may re-negotiate or terminate the contract. Failure to notify Eskom of B-BBEE status changes may result in termination.
Health & Safety
Source: NEC3 Supply nd Delivery of Turbine auxiliaries Off-The-Shelf spares.pdf
Supplier must comply with all applicable health and safety laws, regulations, and Eskom’s procedures. Key requirements: Include sufficient budget for health and safety compliance in pricing. Ensure subcontractors, employees, and others under Supplier’s control comply with health and safety rules. Asbestos handling: Eskom ensures ambient air meets South African standards (OEL: 0.2 fibres/ml as 4-hour TWA; short-term limit: 0.6 fibres/ml as 10-minute TWA). Supplier may request certification of safe conditions. If asbestos is identified, risk assessments and control measures must be implemented. Supplier’s personnel may stop work and leave contaminated areas until declared safe. Contract dates may be extended for asbestos-related delays.
Environmental
Source: NEC3 Supply nd Delivery of Turbine auxiliaries Off-The-Shelf spares.pdf
Supplier must comply with all applicable environmental laws and Eskom’s Asbestos Standard 32-303. Asbestos and asbestos-containing materials (ACM) must be handled, stored, and disposed of in line with South African legislation. Removal and disposal of asbestos must be conducted by a registered asbestos contractor at Eskom’s expense. Supplier must ensure environmental compliance for all activities related to the contract.
Contractual Terms
Source: NEC3 Supply nd Delivery of Turbine auxiliaries Off-The-Shelf spares.pdf
Contract is governed by NEC3 Supply Contract (April 2013) with Options X1 (Price adjustment for inflation), X2 (Changes in the law), X7 (Delay damages), X17 (Low performance damages), and Z clauses (Additional conditions for Eskom). Key terms: Contract comes into effect upon receipt of signed original copy by Supplier. Supplier must deliver securities, bonds, guarantees, and proof of insurance within two weeks of contract award. Dispute resolution: Adjudicator selected from ICE-SA or appointed by AFSA; arbitration in South Africa under Association of Arbitrators rules. Termination: Eskom may terminate for reasons including business rescue, Prohibited Actions (corruption, fraud), or failure to maintain B-BBEE status. Liability: Supplier’s liability for indirect/consequential loss is limited to R0.00; total liability capped at contract value. Warranty period commences upon use/installation of goods.
Section
Source: NEC3 Supply nd Delivery of Turbine auxiliaries Off-The-Shelf spares.pdf
Primary evaluation criteria: 1) Delays on delivery, 2) Quality of deliverables. These will be tracked in the Risk Register. Suppliers must demonstrate capability to meet delivery timelines and quality standards to avoid penalties.
DocumentInvitation to Tender_Turbine Auxilliary_Final.pdfReview complete
Description
Source: Invitation to Tender_Turbine Auxilliary_Final.pdf
This is an open invitation to tender for the supply and delivery of turbine auxiliaries off-the-shelf spares to Hendrina Power Station on an 'as and when required' basis for 5 years.
Tender documents are free of charge.
Submission of tender constitutes acceptance of Eskom Standard Conditions of Tender (available at www.eskom.co.za).
All queries must be addressed in writing to the Eskom Representative only.
Important Dates
Source: Invitation to Tender_Turbine Auxilliary_Final.pdf (TENDER)
Tender closing: 20 July 2026 at 10:00.
Clarification meeting (non-compulsory): 08 July 2026 at 10:00 via Microsoft Teams.
Tender validity period: 120 days from closing date.
Deadline for clarification queries: 5 working days before tender submission deadline (13 July 2026 at 10:00).
Requests for tender closing extension must be made before the clarification query deadline.
Briefing Session
Source: Invitation to Tender_Turbine Auxilliary_Final.pdf (TENDER)
Non-compulsory clarification meeting: 08 July 2026 at 10:00 via Microsoft Teams.
Tenderers must confirm intention to attend with Eskom Representative, stating name, position, and contact details of each attendee.
If meeting is mandatory, non-attendance leads to disqualification.
Contact Information
Source: Invitation to Tender_Turbine Auxilliary_Final.pdf (TENDER)
Financial: Audited statements for previous 18 months (or last year), JV/SPV statements, startups exempt.
Evaluation Criteria
Source: Invitation to Tender_Turbine Auxilliary_Final.pdf (TENDER)
Functionality (Technical) is scored out of 100 points with a minimum threshold of 70%. Tenderers below threshold are disqualified.
Functionality criteria (weighted):
Company Experience (80%): Evidence of completed task orders/contracts for supply of off-the-shelf spares in past 5 years. Scoring: 30 points for 5 orders with delivery notes; 20 points for 3 orders; 10 points for 2 orders; 0 for none. Each order evidence must include company name, project description, contract period, value, and contact person.
Key Individuals (20%): Quality Controller with N3 technical qualification and experience. Scoring: 20 points for ≥3 years experience; 10 for 2 years; 5 for 1 year; 0 for none. CV and certified copy of qualification required.
Price is scored out of 80 points (80/20 preference point system). Prices evaluated inclusive of VAT, corrected for arithmetical errors, excluding contingencies, adjusted for variations, and compared on Net Present Value. Unconditional discounts considered; conditional discounts applied at payment.
Specific Goals (PPPFA) scored out of 20 points. Failure to submit evidence results in 0 points for that goal but not disqualification.
Ranking: Total score = Price points + Specific Goals points, ranked highest to lowest.
Objective criteria and reverse e-auction are not applicable.
Eligibility: Must not be on international sanctions lists, Eskom Tender Defaulters list, or restricted by National Treasury. No conflict of interest. Only one bid per tenderer. JV/consortium must have joint and several liability. No 100% subcontracting. Tenders must be signed by authorised persons.
Technical Specifications
Source: Invitation to Tender_Turbine Auxilliary_Final.pdf (TENDER)
Scope: Supply and delivery of turbine auxiliaries off-the-shelf spares to Hendrina Power Station on an 'as and when required' basis for 5 years.
Functionality criteria require:
Company experience: Evidence of completed task orders/contracts for supply of off-the-shelf spares in past 5 years.
Detailed method statement covering procurement, handling, transportation, and storage from order placement to delivery.
Quality Control Plan (QCP) for sourcing, supply, and delivery.
Lead time confirmation letter committing to delivery within agreed calendar days (scored based on promised lead time).
Key personnel: Quality Controller with minimum N3 technical qualification and years of experience (CV and certified copy of qualification required).
Additional documents may be required per scope of work (e.g., ECSA/SACPCMP registrations, permits, licenses).
Methodology
Source: Invitation to Tender_Turbine Auxilliary_Final.pdf
Method statement must detail procurement, handling, transportation, and storage from order receipt to delivery.
Scoring: 20 points if clearly defined, detailed, comprehensive, and covers full scope; 10 points if clear, minimal errors, covers majority of scope; 5 points if basic, vague, or lacks coverage; 0 if not submitted or irrelevant.
Lead time confirmation letter required, committing to delivery within agreed calendar days (scored: 10 points for <2 days, 5 for <4 days, 2 for <6 days, 0 for >7 days or no letter).
Experience & Qualifications
Source: Invitation to Tender_Turbine Auxilliary_Final.pdf
Company experience: Provide evidence of completed task orders/contracts for supply of off-the-shelf spares in past 5 years.
Scoring: 30 points for 5 orders with delivery notes; 20 points for 3 orders; 10 points for 2 orders; 0 for none.
Each order evidence must include company name, project description, contract period, value, and contact person.
Key personnel: Quality Controller with N3 qualification and experience (scored as per quality_management section).
Quality Management
Source: Invitation to Tender_Turbine Auxilliary_Final.pdf
Quality Control Plan (QCP) is required, detailing how quality is ensured through planning, procurement, testing, and delivery.
Scoring for QCP: 20 points if detailed, comprehensive, and covers full scope; 10 points if clear and covers majority of scope; 5 points if basic, vague, or lacks coverage; 0 if not submitted or irrelevant.
Quality Controller personnel must have N3 technical qualification and years of experience (scored based on years: 20 points for ≥3 years, 10 for 2 years, 5 for 1 year, 0 for none).
Pricing Schedule
Source: Invitation to Tender_Turbine Auxilliary_Final.pdf
Pricing schedule/BOQ is required as Annexure M (PDF and Excel formats).
If cataloguing is required, include a line item for cataloguing in the pricing schedule.
Pricing is evaluated out of 80 points as part of the 80/20 scoring system.
Mandatory contractual requirements include submission of Price Schedule along with CSD registration, NEC, and all annexures.
Financial Requirements
Source: Invitation to Tender_Turbine Auxilliary_Final.pdf (TENDER)
Payment terms: For contracts below R50 million (incl. VAT), Eskom pays within 30 days of undisputed invoice receipt. For contracts above R50 million (incl. VAT), payment within 60 days.
Pricing schedule (BOQ) must be completed and submitted in PDF and Excel formats.
Cataloguing may be required post-award; include a line item for cataloguing in pricing schedule if applicable.
Performance security may be required; tenderer must select at least two Eskom-approved financial institutions.
Prices must be inclusive of VAT.
Audited financial statements for the previous 18 months (or last year) are required for due diligence; for JVs/SPVs, statements from each participant are needed. Start-ups (formed within last 12 months) are exempt but must furnish statements later.
Compliance Requirements
Source: Invitation to Tender_Turbine Auxilliary_Final.pdf (TENDER)
Central Supplier Database (CSD) registration is mandatory (provide CSD number/report).
B-BBEE: Submit proof of B-BBEE status level (certificate or sworn affidavit) as per PPPFA 2022; use SBD 6.1 Preference Points Claim Form (Annexure I).
Tax compliance: Tax clearance certificate required for foreign tenderers with SA footprint or local tenderers without CSD/SARS PIN verification; foreign suppliers with no SA footprint complete SBD1 only.
Local content: If designated materials are included, complete SBD 6.2 and Annexures G1-G4 for local production and content.
Safety: South African tenderers must provide COIDA certificate of good standing or proof of application.
Environmental: May require EMS file (ISO14001:2015), ISO 14001 certificate, Environmental Management Plan, permits, method statements, emergency plans, hazardous substance registers, Safety Data Sheets.
Employment Equity: South African tenderers that are designated employers must provide proof of compliance with Employment Equity Act.
CIDB: Not applicable.
Eligibility restrictions: Tenderers must not be under international sanctions, have conflicts of interest, be restricted by National Treasury, or be on Tender Defaulters list.
Health & Safety
Source: Invitation to Tender_Turbine Auxilliary_Final.pdf
Safety requirements include COIDA certificate of good standing (or proof of application) for South African tenderers.
Additional documents: OHS plan, Baseline OHS Risk Assessment (BRA), valid Letter of Good Standing (COIDA or equivalent), OHS policy signed by CEO.
Emergency Preparedness Plans for incidents like oil/chemical spills.
Safety Data Sheets (SDS) for hazardous substances as per scope.
Refer to Annexure Q for full details.
Environmental
Source: Invitation to Tender_Turbine Auxilliary_Final.pdf
Environmental requirements may include: EMS file (ISO14001:2015), ISO 14001 certificate, Environmental Management Plan (EMP), environmental authorisations/permits/licenses (e.g., for waste transport).
Method statements for specific activities, procedures, work instructions, emergency plans, hazardous substance registers, waste management plans.
Proof of training for personnel performing significant activities.
Refer to Annexure S for full details.
Contractual Terms
Source: Invitation to Tender_Turbine Auxilliary_Final.pdf
Contract conditions: NEC3 SC with options X1, X2, X7, X17, X19, X20, Z.
Mandatory contractual requirements: CSD registration, NEC, Price Schedule, all annexures.
Note: Additional OHS returnables may be populated if applicable to scope. Refer to Annexure A (240-77433139) for Supplier Risk Category requirements.
Experience & Qualifications
Source: Safety.pdf
OHS Competency Requirements:
Submit CVs demonstrating relevant experience
Include qualifications and certificates
Competencies must be appropriate to scope of work, identified risks, and OHS plan
Consider applicability to the specific work activities at Hendrina Power Station
Note: This section requires tenderer to list competencies required for the work.
Health & Safety
Source: Safety.pdf
Required OHS Documents:
Signed acknowledgement of Eskom's OHS legal and other requirements (Annexure B)
Health and Safety Plan: Must address project/scope of work OHS risks and align with Eskom's health and safety specifications
OHS Costing: Detailed breakdown required (not lump sum), based on overall scope of work
Baseline OHS Risk Assessment (BRA): Identification, assessment, and management of OHS risks with documented methodology
Valid Letter of Good Standing: COIDA or equivalent
OHS Policy: Signed by CEO, must comply with OHS Act Section 7
OHS Competency: CVs, qualifications, and certificates relevant to scope, risks, and OHS plan applicability
Note: This is a high-risk evaluation template. Additional returnables may be required based on scope applicability.
Section
Source: Safety.pdf
OHS Evaluation Criteria (High Risk Work):
Document Identifier: 240-77471651 Rev 3 (Effective May 2021)
Template Identifier: 240-43921898 Rev 5
Evaluation uses Y/N/N/A scoring for each returnable
7 mandatory OHS returnables evaluated
Additional returnables may be added if applicable to scope
Reference document: Annexure A (240-77433139) for Supplier Risk Category explanatory notes
Recommendation status required before contract award
Document240-68099512 Form A_Cat 2_ Rev 9(Quality 03).pdfReview complete
Description
Source: 240-68099512 Form A_Cat 2_ Rev 9(Quality 03).pdf
Pre-contract award quality requirements are applicable.
Category 2 (refer to clause 3.5.-105658000) is selected.
Only one category must be selected.
Indicate whether site assessment is applicable.
Main supplier and sub-supplier capability and capacity assessment is not applicable.
Post-contract award quality management by Eskom applies.
Methodology
Source: 240-68099512 Form A_Cat 2_ Rev 9(Quality 03).pdf
The supplier's quality management system must address ISO 9001 clauses: Context of the Organisation, Leadership, Planning, Support, Operation, Performance Evaluation, and Improvement.
Corresponding ISO 9001 principles must be applied: Customer focus, Leadership, Engagement of people, Process approach, Improvement, Evidence-based decision making, and Relationship management.
Quality Management
Source: 240-68099512 Form A_Cat 2_ Rev 9(Quality 03).pdf
Post-contract award, Eskom will execute contract quality monitoring.
Supplier quality performance monitoring phase will be applied.
Section
Source: 240-68099512 Form A_Cat 2_ Rev 9(Quality 03).pdf
The tenderer must complete and sign the form to accept Eskom Supplier Quality Requirements per specification 240-105658000.
Pre-contract award quality requirements are applicable.
Post-contract award, contract execution and supplier quality performance monitoring will be assessed.
Quality audit related conditions apply.
Evaluation references ISO 9001 standard clauses and principles.
The document states a Contract Quality Plan Effective Date of 01 April 2021 and a Next Review Date of 01 April 2026. These are template dates, not tender-specific dates. No tender closing date, briefings, or clarification deadlines are provided in this document.
The document does not provide specific contact details (names, emails, phones, addresses) for SCM or technical queries. It mentions communication channels for quality issues, including emails, minutes, and meetings, but no actual contacts are listed.
This document is a Contract Quality Plan template. It does not specify submission guidelines, returnables, or disqualification risks for the tender. The tenderer must complete the template as part of their bid, but the actual submission details are not provided in this document.
Explicit pre-qualification criteria are not stated in this template document. However, eligibility will be de facto determined by the ability to submit a comprehensive and compliant Contract Quality Plan. This implies the supplier must have an established Quality Management System, experience in managing complex supply chains, and the capability to deliver quality-critical power station spares. Financial and technical capacity criteria are likely detailed in separate tender documents.
The document does not specify compliance requirements such as CSD, tax, B-BBEE, CIDB, CIPC, or local content. It is a quality plan template focusing on quality management systems and processes.
The document is a Contract Quality Plan template. It does not contain evaluation criteria for the tender. It includes definitions and a template index for quality management purposes.
Experience and qualifications evaluated under qualitative criteria, including company experience (past orders, method statement, QCP, lead time) and key personnel (Quality Controller with N3 and experience).
Acceptable/unacceptable risks and exceptions defined, such as slight deviation from scope (acceptable) and lack of Eskom standards adherence (unacceptable).
Quality Control Plan (QCP) required for sourcing, supply, and delivery of spares, detailing quality assurance in planning, procurement, testing, and delivery.
Points awarded based on QCP detail and coverage: comprehensive (20 points), clear but missing some points (10), basic/vague (5), not submitted (0).
Quality Controller must have N3 technical qualification and experience; points awarded for ≥3 years (20), ≥2 years (10), ≥1 year (5), none (0).
Lead time confirmation letter required; points for ≤2 days (10), <4 days (5), <6 days (2), >7 days or not submitted (0).
Unacceptable technical exceptions/conditions table referenced but content not detailed.
Document380-136358 R0 - Quality Control Plan TEMPLATE(Quality 01).pdfReview complete
Description
Source: 380-136358 R0 - Quality Control Plan TEMPLATE(Quality 01).pdf
The tender references a Contract/Order Number, Work Order / QCP Number, and a Job/Task Description with a Revision Number.
Evaluation Criteria
Source: 380-136358 R0 - Quality Control Plan TEMPLATE(Quality 01).pdf (unknown)
The tender requires a Quality Control Plan template.
The template must be reviewed by September 2027.
Bidders must have a robust quality management system capable of implementing the prescribed QCP, engaging with an Approved Inspection Authority (AIA), and complying with Eskom's engineering and maintenance standards.
Technical Specifications
Source: 380-136358 R0 - Quality Control Plan TEMPLATE(Quality 01).pdf (unknown)
The tender involves a Quality Control Plan for turbine auxiliaries spares.
The plan requires a Job/Task Description and Revision Number.
It must specify the Area of Works, Effective Date, Drawing Number & Revision, and KKS/AKZ or Item/Plant/Material.
Quality Control Plan approvals require signatures and dates from Eskom Maintenance/Service Provider, Eskom System Engineer, QA/QC/QE Personnel, and an Approved Inspection Authority (AIA).
Intervention Points (IP) are defined: Hold (cannot be waived), Witness (proceed with notice/waiver), Review, Surveillance.
Final acceptance requires signatures from Eskom Maintenance/Service Provider, System Engineer, Tech Advisor/QA/QC Personnel, and AIA.
DocumentSDLI Strategy for supply and delivery of Turbine Auxilliary Off The Shelf spares for 5 years.pdfReview complete
Description
Source: SDLI Strategy for supply and delivery of Turbine Auxilliary Off The Shelf spares for 5 years.pdf
Failure to meet the mandatory CIDB Construction Skills Development Goal (CSDG) percentage will render your tender non-responsive.
Returnable Documents
Source: SDLI Strategy for supply and delivery of Turbine Auxilliary Off The Shelf spares for 5 years.pdf (TENDER)
SBD 6.2 Declaration Form and Annex C (Local Content Declaration-Summary Schedule) are tender returnables if applicable.
Methodology
Source: SDLI Strategy for supply and delivery of Turbine Auxilliary Off The Shelf spares for 5 years.pdf
Skills development may involve SETA-accredited training providers.
You are responsible for the full cost of developing skills; Eskom provides no financial contribution.
You are advised to approach SETAs for grants and SARS for tax rebates.
Eskom applies penalties of 1-3% of contract value for SDL&I failures.
Eskom retains 1-3% of each invoice (excluding VAT) as security for SDL&I obligations, released only upon fulfilment.
Suppliers must submit quarterly SDL&I reports.
Pricing Schedule
Source: SDLI Strategy for supply and delivery of Turbine Auxilliary Off The Shelf spares for 5 years.pdf
Your tender response must separate components as per the Price Schedule included with the tender documents.
B-BBEE Requirements
Source: SDLI Strategy for supply and delivery of Turbine Auxilliary Off The Shelf spares for 5 years.pdf (TENDER)
Sworn affidavits must include specific details such as deponent information, enterprise details, ownership percentages, revenue, financial year end, B-BBEE status level, empowering supplier status, and Commissioner of Oath requirements.
Special Conditions
Source: SDLI Strategy for supply and delivery of Turbine Auxilliary Off The Shelf spares for 5 years.pdf (TENDER)
Eskom will review SDL&I reports within 30 days and notify you if obligations are not met.
You must implement corrective measures before the next report if obligations are not met, or retention clauses will be invoked.
The SDL&I Implementation Schedule must be completed and returned to the SDL&I representative within 28 days after contract award.
Requirements
Source: SDLI Strategy for supply and delivery of Turbine Auxilliary Off The Shelf spares for 5 years.pdf (TENDER)
If CIDB compulsory training applies, you must match Eskom’s Construction Skills Development Goal (CSDG) percentage.
Failure to meet the mandatory CIDB CSDG percentage will render your tender non-responsive.
Section
Source: SDLI Strategy for supply and delivery of Turbine Auxilliary Off The Shelf spares for 5 years.pdf
If you fail to provide documentation for preference points, you will not be disqualified but:
You may only score points out of 90/80 for price.
You score 0 points out of 10/20 for specific goals.
DocumentSOW -Turbine auxiliary off the shelf spares.pdfReview complete
Description
Source: SOW -Turbine auxiliary off the shelf spares.pdf
Contract for supply and delivery of off-the-shelf turbine auxiliary spares to Hendrina Power Station on an 'as and when required' basis for 5 years.
Scope includes bolts, nuts, washers, gaskets, bearings, seals, valves, filters, gearboxes, pipes, couplings, heat exchangers, and other turbine plant maintenance components.
Applicable to Eskom Hendrina Power Station; supports the tender technical evaluation process.
Submission Guidelines
Source: SOW -Turbine auxiliary off the shelf spares.pdf (unknown)
Submit a Quality Control Plan (QCP) or Quality Inspection Plan (QIP) as a returnable document for evaluation.
All spares supplied must be accompanied by quality control documentation.
Ensure all required returnables are submitted before the closing date and time.
Non-compliance with submission requirements may lead to disqualification.
Returnable Documents
Source: SOW -Turbine auxiliary off the shelf spares.pdf (unknown)
Submit Quality Control Plan (QCP) or Quality Inspection Plan (QIP) as returnable documents.
These documents must support the tender bid and demonstrate compliance with quality and technical requirements.
Evaluation Criteria
Source: SOW -Turbine auxiliary off the shelf spares.pdf (unknown)
Evaluation is based on the Tender Technical Evaluation process, referencing the Generation Tender Technical Evaluation Procedure (240-168966153) and the Tender Technical Evaluation Strategy (380-137062).
Compliance with ISO 9001 (Quality Management Systems) and the Occupational Health and Safety Act (OHSA) is mandatory.
Technical evaluation will assess the ability to supply spares that meet exact specifications, including materials, dimensions, and certifications.
Suppliers must demonstrate capacity to store and deliver spares to Hendrina Power Station, including emergency deliveries within 24 hours.
Ability to supply branded items (e.g., Burgmann, Viton, PTFE) as specified is required.
Compliance with Eskom Procurement Policy and South African National Standards (SANS) is expected.
Technical Specifications
Source: SOW -Turbine auxiliary off the shelf spares.pdf (unknown)
Scope: Supply and delivery of off-the-shelf turbine auxiliary spares (e.g., bolts, nuts, washers, gaskets, bearings, seals, valves, filters, gearboxes, pipes, couplings, heat exchangers) to Hendrina Power Station on an 'as and when required' basis for a maximum of 5 years.
Spares must match exact brand, part numbers, and technical specifications in purchase orders; non-compliant items will be rejected.
Maintain contingency stock of all listed spares for emergency deliveries; emergency deliveries must reach Hendrina Power Station within 24 hours.
All spares must be accompanied by material certificates (for metallic products) and applicable guarantees/warranties.
Provide confirmation of technical specifications upon delivery.
Storage: Maintain a suitably sized storage facility to keep minimum stock; ensure safekeeping and quality preservation.
Handling and transportation: Practice safe handling during loading, offloading, and transport; damaged items will not be accepted; supplier remains responsible for replacement of defective items.
Material specifications: Metallic products must comply with BS EN 10204-2004 (Material Certificate 3.1); graphite seals/packings must be pure (99.8% or higher) and reinforced where specified (e.g., Inconel wire mesh); specific brands may be required (e.g., Burgmann, Viton); dimensions, materials, and finishes must strictly adhere to provided drawings and revision numbers.
List of components includes but is not limited to: seal repair kits, pressure seals, O-rings, bolts, nuts, washers, glass tubes, gauge glass seals, filters, valve repair kits, gearboxes, bearings, mechanical seals, mesh screens, oil seals, preformed packings, pistons, scraper rings, stem/disc assemblies, Virinta seals, gaskets, coolers, steam traps, ball floats, PTFE flange seals, LP heater plugs, metallic pipes, expandable rubber plugs, dust covers, pump shafts, plate heat exchangers (VT-40), gasket sets, port rings, Turboflex couplings, pump packing (Burgmann 6230/SL), stand-by oil pumps, and flow indicators.
Quality Management
Source: SOW -Turbine auxiliary off the shelf spares.pdf
Compliance with ISO 9001 Quality Management Systems.
All spares must be accompanied by quality control documentation, material certificates (for metallic products), and applicable guarantees/warranties.
Ensure all items meet specified technical and material standards.
Compliance Requirements
Source: SOW -Turbine auxiliary off the shelf spares.pdf (unknown)
Comply with ISO 9001 (Quality Management Systems).
Comply with the Occupational Health and Safety Act (OHSA).
Adhere to Eskom Procurement Policy (32-1034).
Follow the Generation Tender Technical Evaluation Procedure (240-168966153) and Tender Technical Evaluation Strategy (380-137062).
Provide a Quality Control Plan (QCP) or Quality Inspection Plan (QIP).
All spares must be accompanied by quality control documentation; material certificates required for metallic products.
Maintain contingency stock and ensure emergency deliveries within 24 hours.
Safe handling techniques during loading, offloading, and transportation are mandatory.
Health & Safety
Source: SOW -Turbine auxiliary off the shelf spares.pdf
Comply with Occupational Health and Safety Act (OHSA).
Practice safe handling during loading, offloading, and transportation.
Damaged or non-functional items not accepted; supplier responsible for replacements including handling and transportation costs.
Contractual Terms
Source: SOW -Turbine auxiliary off the shelf spares.pdf
Contract effective from date of authorization.
Supply and deliver spares as and when required for maximum 5 years.
Maintain contingency stock; emergency deliveries within 24 hours.
All spares must match purchase order specifications; non-compliant items rejected.
Supplier responsible for safe handling, transportation, and replacement of defective items.
Requirements
Source: SOW -Turbine auxiliary off the shelf spares.pdf (unknown)
Adhere to ISO 9001, OHSA, and Eskom Procurement Policy.
Provide Quality Control Plan (QCP) or Quality Inspection Plan (QIP).
All spares accompanied by quality control documentation; material certificates for metallic products.
Maintain contingency stock; emergency deliveries within 24 hours.
Section
Source: SOW -Turbine auxiliary off the shelf spares.pdf
Evaluation based on Tender Technical Evaluation process, referencing 240-168966153 and 380-137062.
Mandatory compliance with ISO 9001 and OHSA.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
1 Impala - Hendrina Power Station - Hendrina Power Station - 1095
Document-Backed
Source Snapshot Available
AI Enhanced
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
10
Last checked
01 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.