Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
1 Impala - Hendrina Power Station - Hendrina Power Station - 1095
Organization Type
GOVERNMENT
Published
29 Jun 2026
OCDS Reference
ocds-9t57fa-160616
ESKOM is inviting tenders for the supply and delivery of turbine auxiliaries off-the-shelf spares to hendrina power station in mpumalanga on an 'as and when required' basis for a period of 5 years. The tender is open to suppliers who can meet the technical, financial, and compliance requirements, with evaluation based on functionality (70% threshold) and the 80/20 preference point system.
Date & Time
Monday, 20 July 2026 - 10:00
Venue
Clarification meeting for Turbine Aux Spares | Meeting-Join | Microsoft Teams
Categories
Request for Bid(Open-Tender)
1 Impala - Hendrina Power Station - Hendrina Power Station - 1095
29 Jun
2026
Tender Published
Tender was published
20 Jul
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Invitation to Tender_Turbine Auxilliary_Final.pdf
Eskom Holdings SOC Ltd invites tenders for the **Supply and Delivery of Turbine Auxiliaries Off-The-Shelf Spares** on an 'as and when required' basis at **Hendrina Power Station** for a **5-year period**. The tender is open, electronic submissions only, and closes on **20 July 2026 at 10:00 AM UTC**. The contract will be governed by **NEC3 SC conditions** with specific clauses (e.g., X1, X2, X7, X17, X19, X20, Z). Evaluation is based on **functionality (100 points, 70% threshold)** and **price (80 points) + specific goals (20 points)** under PPPFA 2022 regulations.
Continue with tenders sharing this issuer, category, or province.
Median Estimate
R 3 600 340
Range
Based on 10 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Recommended Certifications
Having these can improve your winning chances: SABS Product Certification, NRCS Certification
AI Document Analysis Stages
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Description
Source: 240-12248652_List of Tender Returnables_Cat 2_ (Quality 04).xlsxThe tender is for the supply and delivery of turbine auxiliaries off-the-shelf spares on an 'as and when required' basis at Hendrina Power Station for a period of 5 years. Bidders must select a single category from a list, which determines the specific quality management documentation required for submission.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 85 of 1993
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
240-12248652_List of Tender Returnables_Cat 2_ (Quality 04).xlsx
Eskom tender for supply and delivery of turbine auxiliaries off-the-shelf spares to Hendrina Power Station on an 'as and when required' basis for 5 years. The evaluation focuses heavily on quality management systems, with Category 2 selected as the applicable tender category requiring ISO 9001 compliance or equivalent documented QMS.
NEC3 Supply nd Delivery of Turbine auxiliaries Off-The-Shelf spares.pdf
Eskom seeks a supplier for a 5-year framework contract to supply and deliver turbine auxiliary off-the-shelf spares on an 'as and when required' basis to Hendrina Power Station. The contract uses the NEC3 Supply Contract (SC3) form and is structured as a priced contract with a detailed price schedule for specific spare parts.
240-68099512 Form A_Cat 2_ Rev 9(Quality 03).pdf
This is a tender for the supply and delivery of turbine auxiliaries off-the-shelf spares on an 'as and when required' basis for Hendrina Power Station over a 5-year period. The document focuses heavily on quality management requirements aligned with ISO 9001 standards and Eskom's specific quality specifications.
Safety.pdf
This document is Annexure C1: OHS Tender Evaluation Template (High Risk) for a tender issued by Eskom for the supply and delivery of turbine auxiliaries off-the-shelf spares on an 'as and when required' basis at Hendrina Power Station for a 5-year period. The closing date is July 20, 2026. The provided annexure specifically details the Occupational Health and Safety (OHS) evaluation criteria for high-risk tenders, outlining mandatory returnable documents and compliance checks.
SOW -Turbine auxiliary off the shelf spares.pdf
This tender, issued by Eskom, is for the supply and delivery of off-the-shelf turbine auxiliary spares for Hendrina Power Station over a 5-year period. The contract requires the supplier to provide readily available spares (e.g., bolts, nuts, bearings, seals, gaskets, etc.) on an 'as and when required' basis, including emergency deliveries within 24 hours. The supplier must maintain a stock of contingency spares, provide material certificates and guarantees, and ensure safe handling, storage, and transportation of all items. The scope includes a detailed list of components with specifications, quantities, and supplier part numbers.
380-136358 R0 - Quality Control Plan TEMPLATE(Quality 01).pdf
This is a Quality Control Plan (QCP) template for a 5-year contract to supply and deliver off-the-shelf turbine auxiliary spares on an as-needed basis to Eskom's Hendrina Power Station. The document outlines the quality control and inspection framework that the service provider must follow, including defined intervention points (Hold, Witness, Review, Surveillance) requiring Eskom approvals at various stages.
240-109253698 CQP Template 2021(Quality 02).pdf
This is a template for a Contract Quality Plan (CQP) that tenderers must complete and submit as part of their bid for Eskom's 5-year contract to supply and deliver off-the-shelf turbine auxiliary spares to Hendrina Power Station on an as-needed basis. The document outlines the required structure and content for the supplier's quality management plan, referencing SANS 466:2005/ISO 10005:2005.
SDLI Strategy for supply and delivery of Turbine Auxilliary Off The Shelf spares for 5 years.pdf
Eskom invites tenders for a 5-year framework contract to supply turbine auxiliary spares on an 'as and when required' basis to Hendrina Power Station. The procurement emphasizes preferential scoring based on B-BBEE status, local content thresholds, and SDL&I (Supplier Development, Localisation & Industrialisation) commitments, with strict compliance and reporting obligations.
TES forTurbine Auxiliaries Off-The-Shelf Spares.pdf
ESKOM tender for the supply and delivery of turbine auxiliaries off-the-shelf spares at Hendrina Power Station for a 5-year period. The tender evaluation uses a technical threshold of 70%, with evaluation criteria weighted heavily on company experience (80%) including completed orders, method statement, quality control plan, and lead times, plus key personnel qualifications (20%) for a Quality Controller with N3 qualification and 3 years experience.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
EskomContact Person
Rorisang Refilwe Keebine
Phone
016-457-5137
[email protected]
Address
1 Impala - Hendrina Power Station - Hendrina Power Station - 1095
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
10
Last checked
01 Aug 2026
AI status
Enhanced
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Description
Source: NEC3 Supply nd Delivery of Turbine auxiliaries Off-The-Shelf spares.pdfSupply and deliver Turbine Auxiliaries Off-The-Shelf Spares on an 'as and when required' basis to Hendrina Power Station (Materials Management Department) for a period of 5 years. This includes a range of mechanical and electrical spares such as seals, bolts, bearings, filters, gears, and assemblies as specified in the Price Schedule.
Returnable Documents
Source: NEC3 Supply nd Delivery of Turbine auxiliaries Off-The-Shelf spares.pdf (unknown)Signature(s) Name(s) Capacity For the tenderer: (Insert name and address of organisation) Name & signature of Date witness
Methodology
Source: NEC3 Supply nd Delivery of Turbine auxiliaries Off-The-Shelf spares.pdf (unknown)Supplier must submit an initial programme for acceptance within 2 weeks of contract date. Revised programmes must be submitted at intervals no longer than 4 weeks. Delivery is on an 'as and when required' basis; Supplier must notify Eskom to inspect and accept goods before delivery. Supplier may not bring goods to the delivery place more than one week before the delivery date. INCOTERMS 2010 may apply; Supplier and Purchaser obligations for transport, delivery, and risks are defined accordingly. Supplier must provide: packing lists, invoices, delivery notes, test results, and maintenance manuals. For international procurement, Supplier must handle export/import requirements and provide relevant documentation (e.g., licences, Bills of Lading).
Quality Management
Source: NEC3 Supply nd Delivery of Turbine auxiliaries Off-The-Shelf spares.pdfSupplier must implement and maintain a quality system to Eskom’s satisfaction, subject to periodic audits. Deviations must be corrected to Eskom’s satisfaction. Supplier must provide: 1) All material certificates, 2) All inspection reports (NDT, dimensional, etc.), 3) Detailed tax invoice, 4) QIP (on items requested) at the time of delivery.
Pricing Schedule
Source: NEC3 Supply nd Delivery of Turbine auxiliaries Off-The-Shelf spares.pdfPricing is based on a Price Schedule with items priced as lump sums or rates multiplied by quantities. Supplier must include all necessary costs (e.g., defect correction, compliance) in pricing. No adjustments for lump sum items unless due to a compensation event. Price Schedule items include: seals, bolts, bearings, filters, gears, mechanical seals, screens, packings, rings, and assemblies (e.g., Stock numbers 73224, 220063, 222746, etc.). Supplier may add necessary items to the Price Schedule. Pricing assumptions: VAT at 15% (included in total amount due). Price adjustment for inflation: 15% non-adjustable, with indices based on the month prior to enquiry closing date.
B-BBEE Requirements
Source: NEC3 Supply nd Delivery of Turbine auxiliaries Off-The-Shelf spares.pdf (unknown)Supplier must maintain B-BBEE status as submitted in the tender. Notify Eskom within 7 days of any change in legal status, ownership, or business composition affecting B-BBEE status. Submit updated verification certificate and supporting documentation within 30 days of notification. If B-BBEE status decreases, Eskom may re-negotiate or terminate the contract. Failure to notify Eskom of B-BBEE status changes may result in termination.
Health & Safety
Source: NEC3 Supply nd Delivery of Turbine auxiliaries Off-The-Shelf spares.pdfSupplier must comply with all applicable health and safety laws, regulations, and Eskom’s procedures. Key requirements: Include sufficient budget for health and safety compliance in pricing. Ensure subcontractors, employees, and others under Supplier’s control comply with health and safety rules. Asbestos handling: Eskom ensures ambient air meets South African standards (OEL: 0.2 fibres/ml as 4-hour TWA; short-term limit: 0.6 fibres/ml as 10-minute TWA). Supplier may request certification of safe conditions. If asbestos is identified, risk assessments and control measures must be implemented. Supplier’s personnel may stop work and leave contaminated areas until declared safe. Contract dates may be extended for asbestos-related delays.
Environmental
Source: NEC3 Supply nd Delivery of Turbine auxiliaries Off-The-Shelf spares.pdfSupplier must comply with all applicable environmental laws and Eskom’s Asbestos Standard 32-303. Asbestos and asbestos-containing materials (ACM) must be handled, stored, and disposed of in line with South African legislation. Removal and disposal of asbestos must be conducted by a registered asbestos contractor at Eskom’s expense. Supplier must ensure environmental compliance for all activities related to the contract.
Contractual Terms
Source: NEC3 Supply nd Delivery of Turbine auxiliaries Off-The-Shelf spares.pdfContract is governed by NEC3 Supply Contract (April 2013) with Options X1 (Price adjustment for inflation), X2 (Changes in the law), X7 (Delay damages), X17 (Low performance damages), and Z clauses (Additional conditions for Eskom). Key terms: Contract comes into effect upon receipt of signed original copy by Supplier. Supplier must deliver securities, bonds, guarantees, and proof of insurance within two weeks of contract award. Dispute resolution: Adjudicator selected from ICE-SA or appointed by AFSA; arbitration in South Africa under Association of Arbitrators rules. Termination: Eskom may terminate for reasons including business rescue, Prohibited Actions (corruption, fraud), or failure to maintain B-BBEE status. Liability: Supplier’s liability for indirect/consequential loss is limited to R0.00; total liability capped at contract value. Warranty period commences upon use/installation of goods.
Section
Source: NEC3 Supply nd Delivery of Turbine auxiliaries Off-The-Shelf spares.pdfPrimary evaluation criteria: 1) Delays on delivery, 2) Quality of deliverables. These will be tracked in the Risk Register. Suppliers must demonstrate capability to meet delivery timelines and quality standards to avoid penalties.
Description
Source: Invitation to Tender_Turbine Auxilliary_Final.pdfImportant Dates
Source: Invitation to Tender_Turbine Auxilliary_Final.pdf (TENDER)Briefing Session
Source: Invitation to Tender_Turbine Auxilliary_Final.pdf (TENDER)Contact Information
Source: Invitation to Tender_Turbine Auxilliary_Final.pdf (TENDER)Submission Guidelines
Source: Invitation to Tender_Turbine Auxilliary_Final.pdf (TENDER)Returnable Documents
Source: Invitation to Tender_Turbine Auxilliary_Final.pdf (TENDER)Evaluation Criteria
Source: Invitation to Tender_Turbine Auxilliary_Final.pdf (TENDER)Technical Specifications
Source: Invitation to Tender_Turbine Auxilliary_Final.pdf (TENDER)Methodology
Source: Invitation to Tender_Turbine Auxilliary_Final.pdfExperience & Qualifications
Source: Invitation to Tender_Turbine Auxilliary_Final.pdfQuality Management
Source: Invitation to Tender_Turbine Auxilliary_Final.pdfPricing Schedule
Source: Invitation to Tender_Turbine Auxilliary_Final.pdfFinancial Requirements
Source: Invitation to Tender_Turbine Auxilliary_Final.pdf (TENDER)Compliance Requirements
Source: Invitation to Tender_Turbine Auxilliary_Final.pdf (TENDER)Health & Safety
Source: Invitation to Tender_Turbine Auxilliary_Final.pdfEnvironmental
Source: Invitation to Tender_Turbine Auxilliary_Final.pdfContractual Terms
Source: Invitation to Tender_Turbine Auxilliary_Final.pdfRequirements
Source: Invitation to Tender_Turbine Auxilliary_Final.pdf (TENDER)Section
Source: Invitation to Tender_Turbine Auxilliary_Final.pdfReturnable Documents
Source: Safety.pdf (unknown)OHS Returnable Checklist:
Key returnables:
Note: Additional OHS returnables may be populated if applicable to scope. Refer to Annexure A (240-77433139) for Supplier Risk Category requirements.
Experience & Qualifications
Source: Safety.pdfOHS Competency Requirements:
Note: This section requires tenderer to list competencies required for the work.
Health & Safety
Source: Safety.pdfRequired OHS Documents:
Note: This is a high-risk evaluation template. Additional returnables may be required based on scope applicability.
Section
Source: Safety.pdfOHS Evaluation Criteria (High Risk Work):
Description
Source: 240-68099512 Form A_Cat 2_ Rev 9(Quality 03).pdfMethodology
Source: 240-68099512 Form A_Cat 2_ Rev 9(Quality 03).pdfQuality Management
Source: 240-68099512 Form A_Cat 2_ Rev 9(Quality 03).pdfSection
Source: 240-68099512 Form A_Cat 2_ Rev 9(Quality 03).pdfImportant Dates
Source: 240-109253698 CQP Template 2021(Quality 02).pdf (unknown)The document states a Contract Quality Plan Effective Date of 01 April 2021 and a Next Review Date of 01 April 2026. These are template dates, not tender-specific dates. No tender closing date, briefings, or clarification deadlines are provided in this document.
Contact Information
Source: 240-109253698 CQP Template 2021(Quality 02).pdf (unknown)The document does not provide specific contact details (names, emails, phones, addresses) for SCM or technical queries. It mentions communication channels for quality issues, including emails, minutes, and meetings, but no actual contacts are listed.
Submission Guidelines
Source: 240-109253698 CQP Template 2021(Quality 02).pdf (unknown)This document is a Contract Quality Plan template. It does not specify submission guidelines, returnables, or disqualification risks for the tender. The tenderer must complete the template as part of their bid, but the actual submission details are not provided in this document.
Evaluation Criteria
Source: 240-109253698 CQP Template 2021(Quality 02).pdf (unknown)Explicit pre-qualification criteria are not stated in this template document. However, eligibility will be de facto determined by the ability to submit a comprehensive and compliant Contract Quality Plan. This implies the supplier must have an established Quality Management System, experience in managing complex supply chains, and the capability to deliver quality-critical power station spares. Financial and technical capacity criteria are likely detailed in separate tender documents.
Technical Specifications
Source: 240-109253698 CQP Template 2021(Quality 02).pdf (unknown)This is a Contract Quality Plan template. The tenderer must complete the following sections to describe the scope and management of the contract:
Methodology
Source: 240-109253698 CQP Template 2021(Quality 02).pdfThe tenderer must provide method statements and related documentation:
Experience & Qualifications
Source: 240-109253698 CQP Template 2021(Quality 02).pdfThe tenderer must specify qualifications and experience:
Quality Management
Source: 240-109253698 CQP Template 2021(Quality 02).pdfThis is a Contract Quality Plan template referencing SANS 466:2005/ISO 10005:2005. Key requirements:
Compliance Requirements
Source: 240-109253698 CQP Template 2021(Quality 02).pdf (unknown)The document does not specify compliance requirements such as CSD, tax, B-BBEE, CIDB, CIPC, or local content. It is a quality plan template focusing on quality management systems and processes.
Health & Safety
Source: 240-109253698 CQP Template 2021(Quality 02).pdfThe document includes definitions relevant to health and safety:
Contractual Terms
Source: 240-109253698 CQP Template 2021(Quality 02).pdfThe document mentions post-delivery activities that may form part of contractual terms:
Section
Source: 240-109253698 CQP Template 2021(Quality 02).pdfThe document is a Contract Quality Plan template. It does not contain evaluation criteria for the tender. It includes definitions and a template index for quality management purposes.
Description
Source: TES forTurbine Auxiliaries Off-The-Shelf Spares.pdfExperience & Qualifications
Source: TES forTurbine Auxiliaries Off-The-Shelf Spares.pdfQuality Management
Source: TES forTurbine Auxiliaries Off-The-Shelf Spares.pdfHealth & Safety
Source: TES forTurbine Auxiliaries Off-The-Shelf Spares.pdfRequirements
Source: TES forTurbine Auxiliaries Off-The-Shelf Spares.pdf (unknown)Section
Source: TES forTurbine Auxiliaries Off-The-Shelf Spares.pdfDescription
Source: 380-136358 R0 - Quality Control Plan TEMPLATE(Quality 01).pdfEvaluation Criteria
Source: 380-136358 R0 - Quality Control Plan TEMPLATE(Quality 01).pdf (unknown)Technical Specifications
Source: 380-136358 R0 - Quality Control Plan TEMPLATE(Quality 01).pdf (unknown)Description
Source: SDLI Strategy for supply and delivery of Turbine Auxilliary Off The Shelf spares for 5 years.pdfReturnable Documents
Source: SDLI Strategy for supply and delivery of Turbine Auxilliary Off The Shelf spares for 5 years.pdf (TENDER)Methodology
Source: SDLI Strategy for supply and delivery of Turbine Auxilliary Off The Shelf spares for 5 years.pdfPricing Schedule
Source: SDLI Strategy for supply and delivery of Turbine Auxilliary Off The Shelf spares for 5 years.pdfB-BBEE Requirements
Source: SDLI Strategy for supply and delivery of Turbine Auxilliary Off The Shelf spares for 5 years.pdf (TENDER)Special Conditions
Source: SDLI Strategy for supply and delivery of Turbine Auxilliary Off The Shelf spares for 5 years.pdf (TENDER)Requirements
Source: SDLI Strategy for supply and delivery of Turbine Auxilliary Off The Shelf spares for 5 years.pdf (TENDER)Section
Source: SDLI Strategy for supply and delivery of Turbine Auxilliary Off The Shelf spares for 5 years.pdfDescription
Source: SOW -Turbine auxiliary off the shelf spares.pdfSubmission Guidelines
Source: SOW -Turbine auxiliary off the shelf spares.pdf (unknown)Returnable Documents
Source: SOW -Turbine auxiliary off the shelf spares.pdf (unknown)Evaluation Criteria
Source: SOW -Turbine auxiliary off the shelf spares.pdf (unknown)Technical Specifications
Source: SOW -Turbine auxiliary off the shelf spares.pdf (unknown)Quality Management
Source: SOW -Turbine auxiliary off the shelf spares.pdfCompliance Requirements
Source: SOW -Turbine auxiliary off the shelf spares.pdf (unknown)Health & Safety
Source: SOW -Turbine auxiliary off the shelf spares.pdfContractual Terms
Source: SOW -Turbine auxiliary off the shelf spares.pdfRequirements
Source: SOW -Turbine auxiliary off the shelf spares.pdf (unknown)Section
Source: SOW -Turbine auxiliary off the shelf spares.pdfSets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 46 of 2000
Relevant where professional engineering services or regulated engineering work may be required.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.