TRANSNET soc ltd seeks a qualified environmental assessment practitioner (eap) to act as the environmental control officer (eco) during the construction of the 3rd mpt warehouse and associated infrastructure at the port of saldanha. The contract spans 24 months and requires compliance with environmental regulations, auditing, reporting, and training.
Key Requirements
Must be a registered legal entity with valid registration and not listed on National Treasury’s Restricted Suppliers or Tender Defaulters lists. - Must comply with B-BBEE requirements; subcontracting limited to ≤25% of contract value to lower B-BBEE status entities (unless to an EME). - Must sign Transnet’s Supplier Integrity Pact and Non-Disclosure Agreement. - Must demonstrate financial stability for 24-month performance without insolvency risk. - Must submit to South African jurisdiction and AFSA arbitration rules; foreign bidders require a local agent. - Must provide monthly auditing, reporting, and compliance verification for EMPr and EA conditions. - Must deliver training, chair environmental meetings, and conduct post-construction close-out audits.
Provision of an environmental assessment practitioner (eap) for the role of the environmental control officer during the construction of the 3rd mpt warehouse and all associated infrastructure at the port of saldanha for a period of 24 months
Professional Services & Consulting Industry Profile
Regulatory Bodies
SAICA
Tenders in this industry often require registration with these bodies.
Typical Documents
5 items
Company Registration (CIPC)
Tax Clearance Certificate
B-BBEE Certificate
CSD Registration
Company Profile
Recommended Certifications
Having these can improve your winning chances: CA(SA) - Chartered Accountant, PMI-PMP (Project Management Professional), Prince2 Practitioner, Six Sigma Certification
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards — PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement — so nothing critical is missed before you start your bid response.
RFQANNEXURE B - STANDARD TERMS AND CONDITIONS.pdfReview complete
Description
Source: ANNEXURE B - STANDARD TERMS AND CONDITIONS.pdf
Important Dates
28 May
2026
PUBLICATION
Tender Published
Tender was published
12 Jun
2026
DEADLINE
Closing Date
Tender closing date
Procurement Rules & Compliance ContextThis tender may be governed by South African public procurement rules covering fairness, transparency, preferential procurement, anti-corruption, administrative justice and access to information.
7 rules
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Core procurement rules
These rules commonly apply to South African public-sector procurement.
7
Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
high
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Constitution of the Republic of South Africa, 1996 – Section 217
Act 108 of 1996 (s217)
high
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Transnet SOC Ltd is seeking the provision of an Environmental Assessment Practitioner (EAP) to serve as the Environmental Control Officer (ECO) during the construction of the 3rd Multi-Purpose Terminal (MPT) warehouse and associated infrastructure at the Port of Saldanha. The contract duration is 24 months, and the tender closes on June 12, 2026, at 12:00 UTC.
Transnet SOC Ltd is seeking an Environmental Assessment Practitioner (EAP) to serve as the Environmental Control Officer (ECO) during the construction of the 3rd MPT Warehouse and associated infrastructure at the Port of Saldanha for a 24-month period. The EAP will ensure compliance with environmental regulations, conduct audits, and manage environmental training and reporting.
Transnet Port Terminals (TPT) is soliciting quotations for the provision of an Environmental Assessment Practitioner (EAP) to serve as the Environmental Control Officer (ECO) for a 24-month period during the construction of the 3rd MPT warehouse and associated infrastructure at the Port of Saldanha. The tender process is conducted electronically via Transnet's e-Tender Submission Portal.
Transnet Port Terminals seeks an Environmental Assessment Practitioner (EAP) to serve as an Environmental Control Officer (ECO) for a 24-month construction project at the Port of Saldanha. The role involves overseeing environmental compliance during the construction of the 3rd MPT warehouse and associated infrastructure.
Transnet SOC Ltd seeks an Environmental Assessment Practitioner (EAP) to act as an independent Environmental Control Officer (ECO) for 24 months during construction of a 3rd manganese warehouse and associated infrastructure at Saldanha Port. The ECO will ensure compliance with the Environmental Authorization and Environmental Management Programme, conduct audits, prepare reports, and monitor environmental mitigation measures.
Secure Transnet tenders using AI Matching & Recommendations, logistics infrastructure intelligence, compliance analysis, and application support for rail, ports, and pipelines.
Similar Tenders
Matched by category & region
Supplier Readiness Hub
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Based on 7 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Document read
Compliance review
Bid-ready summary
The tender is for the provision of an Environmental Assessment Practitioner (EAP) to serve as the Environmental Control Officer during the construction of the 3rd MPT Warehouse and all associated infrastructure at the Port of Saldanha. The contract duration is 24 months.
Important Dates
Source: ANNEXURE B - STANDARD TERMS AND CONDITIONS.pdf (RFQ)
No specific dates are provided beyond the contract duration of 24 months. Commencement and expiry dates are marked as 'To Be Announced' (TBA). No briefing sessions, site visits, or clarification deadlines are mentioned in the document.
Contact Information
Source: ANNEXURE B - STANDARD TERMS AND CONDITIONS.pdf (RFQ)
Formal notices must be sent to:
Transnet SOC Ltd: Attention: TPT Legal Counsel, Physical Address: 202 Anton Lembede Street, Durban. Postal Address: 101..., Midrand, 1682.
Service Provider: Address to be appointed but not specified in the document.
Notices: Can be delivered by hand or email. Deemed received upon confirmation of receipt.
Transnet Contract Manager: Details (name, designation, division, address, phone, email) are to be appointed but not provided.
Service Provider’s Account Manager: Details are to be appointed but not provided.
Evaluation Criteria
Source: ANNEXURE B - STANDARD TERMS AND CONDITIONS.pdf (RFQ)
Evaluation is based on the following criteria:
Legal and Compliance: Must be a registered legal entity with a valid registration number. Bidder’s name (or directors/partners) must not appear on National Treasury’s Register of Tender Defaulters or List of Restricted Suppliers.
B-BBEE Compliance: Must comply with B-BBEE requirements. Subcontracting rules apply: ≤25% of contract value may be subcontracted to entities with a lower B-BBEE status level, unless subcontracting to an Exempted Micro Enterprise (EME) with execution capability.
Integrity and Confidentiality: Must sign Transnet’s Supplier Integrity Pact and Non-Disclosure Agreement.
Financial Stability: Must demonstrate financial stability with no insolvency, receivership, or liquidation proceedings. Must prove ability to perform services for 24 months without material financial risk.
Jurisdiction: Must submit to South African jurisdiction and arbitration under AFSA rules. Foreign bidders must maintain a local agent for service of process in South Africa.
Technical Specifications
Source: ANNEXURE B - STANDARD TERMS AND CONDITIONS.pdf (RFQ)
The scope requires the provision of an Environmental Assessment Practitioner (EAP) to serve as the Environmental Control Officer during construction. Key deliverables include:
Document review.
Development of an audit plan with schedule and protocol.
Preparation of environmental training material and management of inductions for employers and contractors.
Chairing monthly environmental management review meetings and minute-taking.
Monthly auditing and reporting on the implementation of the construction Environmental Management Programme (EMPr) and compliance with Environmental Authorisation (EA) conditions.
Compilation of monthly audit reports post-site visit and submission to the Employer.
Compilation of 6-monthly audit reports post-site visit for submission to the Director: Environmental Impact Evaluation in DFFE (copied to the Employer).
Monitoring and verifying compliance with EA conditions, EMPr, and BAR (Basic Assessment Report).
Updating the EMPr where applicable.
Conducting a post-construction and rehabilitation environmental close-out audit.
Contract management and performance review meetings will be held as required by Transnet’s Contract Manager.
Note: Detailed scope of work is referenced in Annexure A (not provided in this document).
Pricing Schedule
Source: ANNEXURE B - STANDARD TERMS AND CONDITIONS.pdf (RFQ)
Pricing must be submitted in the following format (rates per month in ZAR):
Document review: 1 EA.
Audit plan with schedule and protocol: 1 EA.
Training material preparation and management of inductions: 1 EA.
Chairperson role for monthly environmental management review meetings and minute-taking: 1 EA.
Monthly auditing and reporting on EMPr implementation and EA compliance: 24 EA.
Compilation of monthly audit reports post-site visit: 24 EA.
Compilation of 6-monthly audit reports for DFFE: 1 EA.
Monitoring and verifying compliance with EA, EMPr, and BAR: 1 EA.
Total Price: Must be stated exclusive of VAT. VAT at 15% must be added if applicable. Final total must include VAT where applicable.
Payment Terms: Standard payment terms are 30 days from the date Transnet receives a month-end statement. Invoices must be original, undisputed Tax Invoices with supporting documentation and a month-end statement. Prices specified in an order cannot be increased.
Compliance Requirements
Source: ANNEXURE B - STANDARD TERMS AND CONDITIONS.pdf (RFQ)
Compliance requirements include:
Legal Entity: Must be a registered legal entity with a valid registration number.
Restricted Suppliers: No bid will be awarded to bidders listed on National Treasury’s Register of Tender Defaulters or List of Restricted Suppliers. Transnet reserves the right to cancel a contract if a bidder is later found to be restricted.
B-BBEE: Must comply with B-BBEE requirements. Subcontracting is restricted: requires Transnet’s prior approval. Penalty of up to 10% of contract value applies for undisclosed subcontracting. Subcontracting cannot reduce local production content below a stipulated threshold. Not more than 25% of the contract value may be subcontracted to an enterprise with a lower B-BBEE status level, unless subcontracting to an Exempted Micro Enterprise (EME) with execution capability.
Supplier Integrity Pact: Must observe and ensure compliance with Transnet’s Supplier Integrity Pact.
Cession and Assignment: Prohibited from ceding rights to payment or assigning obligations without Transnet’s prior written approval.
POPIA Compliance: Must comply with the Protection of Personal Information Act (POPIA).
Health and Safety: Must ensure personnel and agents comply with Transnet’s health and safety, security, and system security rules and procedures while on Transnet’s premises.
Competency: Must be competent to supply services in accordance with the terms and ensure all services comply with relevant legislation, standards, and specifications.
B-BBEE Requirements
Source: ANNEXURE B - STANDARD TERMS AND CONDITIONS.pdf (RFQ)
Subcontracting is subject to B-BBEE requirements:
The supplier may not subcontract more than 25% of the contract value to any enterprise with a lower B-BBEE status level.
Exceptions apply if subcontracting to an Exempted Micro Enterprise (EME) with the capability to execute the work.
Subcontracting requires Transnet’s prior approval. Undisclosed subcontracting may incur a penalty of up to 10% of the contract value.
Subcontracting cannot reduce local production content below the stipulated minimum threshold.
Health & Safety
Source: ANNEXURE B - STANDARD TERMS AND CONDITIONS.pdf
The supplier/service provider must ensure its personnel and agents comply with Transnet’s health and safety, security, and system security rules and procedures while on Transnet’s premises. The supplier remains liable for the acts, omissions, and defaults of its personnel or agents.
Environmental
Source: ANNEXURE B - STANDARD TERMS AND CONDITIONS.pdf
The core service is the provision of an Environmental Assessment Practitioner (EAP) as the Environmental Control Officer. Specific environmental deliverables include:
Preparing an audit plan and protocol.
Preparing environmental training material and managing inductions for employers and contractors.
Monthly auditing and reporting on the construction Environmental Management Programme (EMPr) and Environmental Authorisation (EA) compliance.
Compiling 6-monthly audit reports for submission to the Director: Environmental Impact Evaluation in DFFE.
Monitoring and verifying compliance with EA conditions and updating the EMPr where applicable.
Conducting a post-construction environmental close-out audit.
Contractual Terms
Source: ANNEXURE B - STANDARD TERMS AND CONDITIONS.pdf
Key contractual terms include:
Duration: 24 months (commencement and expiry dates TBA).
Sole Agreement: These terms and Transnet’s purchase order represent the only conditions unless otherwise agreed in writing.
Conformity: Goods/services must conform strictly to the order. No variations without prior written consent.
Delivery and Title: Time is of the essence. Delays may result in termination without liability to Transnet.
Price and Payment: Prices cannot be increased. Payment is made against original, undisputed Tax Invoices with supporting documentation, within 30 days of receipt of a month-end statement.
Termination: Transnet may terminate the contract with 30 days’ written notice or immediately for serious breach, repeated material breach, or conduct bringing the supplier into disrepute. Supplier must submit claims within 2 months of termination.
Insolvency: Transnet may terminate if the supplier enters insolvency or similar proceedings.
Jurisdiction: Governed by South African law. Disputes subject to arbitration under AFSA rules.
Confidentiality: All information must be treated as confidential and not disclosed without prior written consent.
POPIA Compliance: Must adhere to the Protection of Personal Information Act (POPIA) for processing personal information.
Requirements
Source: ANNEXURE B - STANDARD TERMS AND CONDITIONS.pdf (RFQ)
No bid will be awarded to a bidder listed on the National Treasury Register of Tender Defaulters or List of Restricted Suppliers. Transnet reserves the right to withdraw an award or cancel a contract if a bidder is later found to be restricted.
Provision of an Environmental Assessment Practitioner (EAP) to serve as the Environmental Control Officer (ECO) during the 24-month construction of the 3rd MPT warehouse and all associated infrastructure at the Port of Saldanha.
Evaluation Criteria
Source: TECHNICAL EVALUATION ANNEXURES.pdf (RFQ)
Evaluation is based on the following criteria:
Eligibility: The EAP performing the ECO role must be registered with the Environmental Assessment Practitioners Association of South Africa (EAPASA). A certified copy of a valid registration certificate is required.
ECO Experience: The ECO must provide traceable reference letters on company letterhead for at least five (5) independent ECO projects completed in the past 5 years. Reference letters must include contact details of previous clients/employers.
Company Criteria: The service provider must submit:
A company profile demonstrating capabilities in environmental impact assessments, environmental authorizations, and environmental compliance monitoring and auditing.
A portfolio (on company letterhead) detailing ECO services rendered for at least six (6) different companies (excluding Transnet), including reference contact details.
ECO Qualifications: The ECO must submit a CV and proof of competency, including:
A minimum Bachelor’s degree/B-Tech/National Diploma in Environmental Management, Science, or Environmental Studies.
At least six (6) years of work experience as an independent ECO.
Technical Specifications
Source: TECHNICAL EVALUATION ANNEXURES.pdf (RFQ)
Scope of work: Provision of an Environmental Assessment Practitioner (EAP) to act as the Environmental Control Officer (ECO) during the construction of the 3rd MPT warehouse and all associated infrastructure at the Port of Saldanha for a period of 24 months.
Key technical requirements:
The ECO must have expertise in:
Undertaking environmental impact assessments.
Managing environmental authorizations.
Conducting environmental compliance monitoring and auditing.
The ECO must hold a minimum qualification of a Bachelor’s degree/B-Tech/National Diploma in Environmental Management, Science, or Environmental Studies.
The ECO must have at least six (6) years of experience as an independent ECO.
Experience & Qualifications
Source: TECHNICAL EVALUATION ANNEXURES.pdf
Key requirements for the ECO and service provider:
The ECO must provide traceable reference letters (on company letterhead) for at least five (5) independent ECO projects completed in the past 5 years, including contact details of previous clients.
The service provider must submit a company profile demonstrating relevant environmental services (e.g., impact assessments, authorizations, compliance monitoring).
The service provider must submit a portfolio (on company letterhead) detailing ECO services rendered for at least six (6) different companies (excluding Transnet), including reference contact details.
The ECO must have a minimum Bachelor’s degree/B-Tech/National Diploma in Environmental Management, Science, or Environmental Studies and at least six (6) years of experience as an independent ECO.
Compliance Requirements
Source: TECHNICAL EVALUATION ANNEXURES.pdf (RFQ)
Mandatory compliance requirements:
The Environmental Assessment Practitioner (EAP) performing the ECO role must be registered with the Environmental Assessment Practitioners Association of South Africa (EAPASA). A certified copy of a valid registration certificate must be provided.
Environmental
Source: TECHNICAL EVALUATION ANNEXURES.pdf
The role requires expertise in:
Undertaking environmental impact assessments.
Managing environmental authorizations.
Conducting environmental compliance monitoring and auditing.
The ECO must hold a minimum Bachelor’s degree/B-Tech/National Diploma in Environmental Management, Science, or Environmental Studies and have at least six (6) years of experience as an independent ECO.
Section
Source: TECHNICAL EVALUATION ANNEXURES.pdf
Evaluation criteria focus on:
The experience and qualifications of the Environmental Control Officer (ECO).
The company’s relevant service offerings, including environmental impact assessments, authorizations, and compliance monitoring.
DocumentANNEXURE A - SCOPE OF WORK.pdfReview complete
Evaluation Criteria
Source: ANNEXURE A - SCOPE OF WORK.pdf (unknown)
The document states the following evaluation criteria:
Minimum qualification: Bachelor’s degree/B-tech/National Diploma in Environmental Management/Science/Studies.
At least 6 years' work experience as an independent Environmental Control Officer (ECO).
Must be registered with the Environmental Practitioners Association of South Africa (EAPASA).
Must have provided ECO services for at least 5 previous projects.
Must provide a company profile and portfolio demonstrating ECO service capability.
The onus rests on the ECO to produce work conforming in quality and accuracy to requirements. Quality control will be managed per the EAP’s internal procedures and any additional requirements stipulated.
Technical Specifications
Source: ANNEXURE A - SCOPE OF WORK.pdf (unknown)
The Environmental Assessment Practitioner (EAP) will act as Environmental Control Officer (ECO) for 24 months during construction of the 3rd MPT Warehouse and associated infrastructure at Port of Saldanha.
Key responsibilities include:
Prepare audit checklists, plans, schedules, protocols, and report templates per GNR 326 EIA Regulations.
Develop training material for inducting Transnet and contractor employees.
Submit required reports to DFFE, Transnet Port Terminals, and the Landowner.
Conduct compliance audits against the Environmental Management Programme (EMPr) and Environmental Authorization (EA) conditions.
Implement monitoring programs to assess EMPr performance.
Investigate incidents and non-conformances, confirm corrective actions.
Assess and facilitate amendments to the EMPr.
Prepare audit reports per Appendix 7 of 2014 EIA regulations.
Update EMPr based on audit findings.
Provide support and advice to project team, contractor, and subcontractors.
Submit monthly compliance reports and 6-monthly audit reports to DFFE (Director: Environmental Compliance) copied to Transnet.
Monitor implementation of mitigation measures and EMPr compliance throughout construction.
Maintain records of all site activities and report to competent authority.
Provide detailed activity schedule and cost breakdown.
Chair monthly meetings post site inspections.
Inform Landowner of construction programme and interferences.
Monitor compliance with EA, EMPr, and BAR conditions.
Conduct monthly site inspections, report progress to contractors and Transnet project managers.
Conduct post-construction inspection and site close-out audit.
Key deliverables:
Documents review post contract award.
Attend kick-off meeting.
Deliver audit schedule, checklist, protocol, report template, and induction material.
Chair monthly environmental management review meetings and take minutes.
Monthly auditing and reporting on EMPr implementation and EA compliance.
Compile and submit monthly and 6-monthly audit reports to DFFE (Director: Environmental Impact Evaluation) copied to Employer.
Update EMPr where applicable.
Conduct post-construction and rehabilitation environmental close-out audit.
All deliverables must be submitted to Transnet Port Terminals for review prior to finalization.
Draft monthly and 6-monthly audit reports must be submitted to relevant construction contractors and Transnet by end of each audit month (preferably last Friday).
Final 6-monthly audit reports must be submitted to DFFE representative within 10 days from month end of every second month.
Intellectual property: All data submitted becomes property of Transnet Port Terminal and must be provided in original editable format; Transnet may use copyright for any purpose without consent.
Project scope includes design, supply, fabrication, construction, and commissioning of a warehouse and supporting infrastructure at Port of Saldanha to meet operational, storage, and logistical needs.
Works include:
Bulk earthworks and geotechnical works.
Clear-span warehouse.
Mess and ablutions facility.
Surrounding surface areas and stormwater management.
Internal and external wet services.
Electrical and instrumentation work.
HVAC.
Fire services.
Dust suppression system.
Background: Saldanha Multi-Purpose Terminal (MPT) handles manganese and iron ore; current warehouse capacity constraints necessitate a third warehouse to accommodate additional trains and new entrants.
Contract timeframe is 24 months.
Methodology
Source: ANNEXURE A - SCOPE OF WORK.pdf
Contractor must submit detailed Contractor Execution Plan (CEP) for approval per TRN-IMS-GRP-GDL 014.5.
ECO services must align with relevant EA and EMPr.
Deliverables include audit protocol, report template, induction material.
Monthly auditing and reporting on EMPr implementation and EA compliance.
Compilation of monthly and 6-monthly audit reports.
All deliverables finalized after Transnet review.
Draft monthly and 6-monthly audit reports submitted to contractors and Transnet by end of audit month (preferably last Friday).
Final 6-monthly audit reports submitted to DFFE representative within 10 days from month end of every second month.
Experience & Qualifications
Source: ANNEXURE A - SCOPE OF WORK.pdf
EAP must have:
Minimum Bachelor’s degree/B-tech/National Diploma in Environmental Management/Science/Studies.
At least 6 years’ work experience as an independent ECO.
EAPASA registration.
At least 5 previous ECO services rendered.
Quality control managed per EAP’s internal procedures.
Service provider must provide company profile demonstrating services required by TPT.
Quality Management
Source: ANNEXURE A - SCOPE OF WORK.pdf
Contract Manager ensures specifications are met with emphasis on technical specs, quality inspection, health and safety, environment, and quantity of work.
Key deliverables include post-construction inspection and site close-out audit report.
Close-out phase requires co-signing Final Handover and Closeout Inspection Checklist.
Service provider must implement and maintain applicable Health, Safety, Quality, and Environmental regulations (e.g., SANS codes, OHS Act 1993, ISO 9001, 14001, 45001).
Ensure all employees are informed of hazards, risks, and relevant safety procedures; proof submitted in SHE File.
Compliance Requirements
Source: ANNEXURE A - SCOPE OF WORK.pdf (unknown)
The Service Provider must submit:
Company profile demonstrating services required by TPT, including environmental impact assessments, authorizations, compliance monitoring, and auditing.
Portfolio of previous ECO services rendered at 6 different companies aside from TPT, with reference contact details.
EAPASA registration certificate.
Detailed CV of the EAP with at least 5 previous ECO services rendered; experience considered is from the last 6 years of the proposed personnel, not the company.
Traceable reference letters on company letterhead with contact details for at least 5 projects where independent ECO service was rendered.
Certified copy of proof of competency: Bachelor’s degree/B-tech/National Diploma in Environmental Management/Science/Studies plus at least 6 years’ work experience as an independent ECO.
Contractor must comply with safety and compliance specifications:
Submit detailed Contractor Execution Plan (CEP) for approval per TRN-IMS-GRP-GDL 014.5.
Submit TRN-IMS-GRP-TMP 014.3 Employee Personal Profile Dossier including certified copies of medicals, IDs, competencies via email to [email protected] before induction training.
Comply with Contractor Compliance SHE File requirements including COVID-19 checklist TPT-IMS-SLDT-CL-014-001.1 & TRN-IMS-GRP-TMP-014.11, and guidelines TRN-IMS-GRP-GDL 014.2, 014.4, 014.6, 014.5.
Principal contractor must approve Mandatory Agreement per section 37(2) of OHS Act (TRN-IMS-GRP-TMP-014.1) and submit to Contractor Manager.
Principal contractor must submit written request for subcontractor permission and ensure 37(2) agreements are submitted.
Submit completed SHE File electronically for approval.
Undergo induction training per TRN-IMS-GRP-GDL 014.6 before site handover.
Site establishment requires all relevant permits and authorizations per TRN-IMS-GRP-TMP 014.7 prior to site access.
Contractor Manager will conduct pre-site handover inspection (TRN-IMS-GRP-TMP 014.8) before site access.
No work without approved Operational Safe Work Permit (TRN-IMS-GRP-TMP-014.10).
Close-out phase:
Co-sign Final Handover and Closeout Inspection Checklist (TRN-IMS-GRP-TMP-014.13).
Implement and maintain applicable Health, Safety, Quality, and Environmental regulations (e.g., SANS codes, OHS Act 1993, ISO 9001, 14001, 45001).
Ensure all employees are informed of hazards, risks, safety work procedures, environmental plans, emergency plans; proof submitted in SHE File.
Principal contractor responsible for ensuring subcontractor SHE File complies with TPT requirements and is approved.
Health & Safety
Source: ANNEXURE A - SCOPE OF WORK.pdf
Contractor must submit:
Employee Personal Profile Dossier including certified copies of medicals, IDs, competencies via email to [email protected].
Comply with Contractor Compliance SHE File requirements including COVID-19 checklist and relevant guidelines.
Principal contractor must approve Mandatory Agreement per OHS Act section 37(2) and submit to Contractor Manager.
Ensure all 37(2) agreements between principal and subcontractor are submitted.
Submit completed SHE File electronically for approval.
Site establishment requires all relevant permits and authorizations per TRN-IMS-GRP-TMP 014.7.
Environmental
Source: ANNEXURE A - SCOPE OF WORK.pdf
The EAP will serve as ECO for 24 months during construction of the 3rd MPT Warehouse at Port of Saldanha.
Develop training material for inducting Transnet and contractor employees.
Submit reports to DFFE, Transnet, and Landowner.
Conduct compliance audits against EMPr and EA.
Implement monitoring programs.
Investigate incidents and confirm corrective actions.
Assess and facilitate EMPr amendments.
Prepare audit reports per 2014 EIA regulations.
Update EMPr based on findings.
Provide support to project team and contractors.
Submit monthly compliance reports and 6-monthly audit reports to DFFE (Director: Environmental Compliance) copied to Transnet.
Monitor mitigation measures and EMPr compliance.
Maintain site records and report to authority.
Provide activity schedule and cost breakdown.
Chair monthly meetings post inspections.
Inform Landowner of construction programme.
Monitor compliance with EA, EMPr, BAR.
Conduct monthly site inspections and report progress.
Monitor post-construction rehabilitation.
Provide proof of audit report submission to DFFE.
Conduct post-construction inspection and close-out audit.
Service provider must submit portfolio of previous ECO services at 6 different companies (excluding TPT) with references.
EAP must be EAPASA registered with at least 5 previous ECO services.
Submit EAPASA certificate, detailed CV with at least 5 ECO services, traceable reference letters for 5 projects, and certified proof of competency (degree/diploma plus 6 years’ experience).
Contractual Terms
Source: ANNEXURE A - SCOPE OF WORK.pdf (unknown)
Contract is an agreement with legal effects involving transfer of consideration (financial or other benefit).
Employer’s Agent supervises/liaises with ECO to ensure contract specifications are met.
Contract Owner provides budget and approval.
ECO’s documentation: Transnet gains license to use copyright for any purpose without consent; all data submitted becomes Transnet property and must be in original editable format.
DocumentNDA, GENERAL CONDITIOS & SUPPLIER INTERGRITY.pdfReview complete
Important Dates
Source: NDA, GENERAL CONDITIOS & SUPPLIER INTERGRITY.pdf (TENDER)
Closing date: As specified in the Bid Documents.
Site visits or briefing sessions may be requested. If indicated as compulsory in the RFX Document, attendance is mandatory; failure to attend will result in disqualification.
Briefing Session
Source: NDA, GENERAL CONDITIOS & SUPPLIER INTERGRITY.pdf (TENDER)
You may be requested to attend a site visit or briefing session to view the site or receive further information.
If such visits or sessions are indicated as compulsory in the RFX Document, you must attend; failure will result in disqualification.
Contact Information
Source: NDA, GENERAL CONDITIOS & SUPPLIER INTERGRITY.pdf (TENDER)
For clarification before the closing date, direct queries to the contact person listed in the RFX Document.
After the closing date, communicate only with the Chairperson of the relevant Bid Preparation and Evaluation Committee.
Submission Guidelines
Source: NDA, GENERAL CONDITIOS & SUPPLIER INTERGRITY.pdf (TENDER)
Submit your bid by the closing date and time specified in the Bid Documents. Late bids will not be considered.
Complete all Bid Documents in full, legibly, in non-erasable ink.
Deliver bids in a sealed envelope with the bid number and subject marked on the front, and your return address on the reverse.
Use Transnet’s official bid forms and formats where provided. Non-compliance may result in rejection.
Submit all mandatory returnable documents listed in the RFX Documents. Failure to submit mandatory documents will result in disqualification.
If samples are required, mark them with your name, address, bid number, and item number, and ensure they reach the addressee by the closing date. Failure may lead to rejection.
After the closing date, communicate only with the Chairperson of the Bid Preparation and Evaluation Committee.
Unauthorised communication about your bid with other bidders or Transnet officials during the evaluation period may lead to disqualification.
Returnable Documents
Source: NDA, GENERAL CONDITIOS & SUPPLIER INTERGRITY.pdf (TENDER)
Submit all returnable documents listed in the RFX Documents with your bid. Failure to submit mandatory documents results in disqualification.
Use Transnet's official bid forms and formats. If insufficient space, you may submit additional information on company letterhead, cross-referenced in the RFX.
Evaluation Criteria
Source: NDA, GENERAL CONDITIOS & SUPPLIER INTERGRITY.pdf (TENDER)
Bidders must not be listed on National Treasury’s Register of Tender Defaulters or List of Restricted Suppliers.
Bidders must be legally registered entities (companies, close corporations, partnerships, or individuals).
Foreign bidders must have a South African representative authorised to sign contracts and provide a Power of Attorney.
Proven track record as an Environmental Assessment Practitioner (EAP) or Environmental Control Officer (ECO) for similar construction projects, preferably in port or industrial environments.
Demonstrated ability to manage environmental compliance for large-scale infrastructure projects.
Adherence to all South African laws, including environmental regulations, labour laws, and anti-corruption statutes.
Willingness to submit to Transnet’s audit and monitoring processes.
Technical Specifications
Source: NDA, GENERAL CONDITIOS & SUPPLIER INTERGRITY.pdf (TENDER)
Goods offered must be NEW (unused, not second-hand or reconditioned) unless otherwise stipulated.
Tender strictly in accordance with the drawings and/or specifications supplied by Transnet, unless notified otherwise by an official amendment.
If quoting against foreign specifications (other than British or American standards), submit translated copies with your bid and detail any departures in a covering letter.
Drawings required from you must be furnished before the closing time and date; non-receipt may disqualify your bid.
Uphold the ten principles of the United Nations Global Compact (UNGC), including:
Support a precautionary approach to environmental challenges.
Undertake initiatives to promote greater environmental responsibility.
Encourage development and diffusion of environmentally friendly technologies.
Pricing Schedule
Source: NDA, GENERAL CONDITIOS & SUPPLIER INTERGRITY.pdf
Furnish your bid prices in the Price Schedule of the Bid Documents.
For local supplies (manufactured/produced/assembled in RSA or imported supplies held in SA), quote on a Delivered RSA named destination basis.
For imported supplies, quote on a Delivered Duty Paid (latest ICC Incoterms) basis to end destination in South Africa, unless otherwise specified.
Delete items from your bid for which you have not tendered or where the price is included elsewhere.
Prices for local supplies must be inclusive of VAT, shown separately on the Tax Invoice.
For foreign services rendered through a South African service provider, the local commission invoice must show VAT separately.
You may offer conditional discounts for payment within a specific period; the discount period is calculated from receipt of your correct month-end statement and Tax Invoice.
Financial Requirements
Source: NDA, GENERAL CONDITIOS & SUPPLIER INTERGRITY.pdf (TENDER)
All monetary amounts must be in South African Rand (ZAR), unless specifically permitted otherwise in the RFP.
Prices quoted subject to confirmation will not be considered.
Alterations to bid prices must be made by deleting incorrect figures/words and inserting correct ones, initialled by the signatory. Failure may lead to exclusion of those items.
For Goods: Prices must be quoted on a Delivered Duty Paid (latest ICC Incoterms) basis at the specified delivery point, unless stated otherwise. Bids on any other delivery basis are liable to disqualification.
For local supplies (manufactured/produced/assembled in RSA or imported supplies held in SA), quote on a Delivered RSA named destination basis.
For imported supplies, quote on a Delivered Duty Paid basis to end destination in South Africa.
Prices for local supplies must be inclusive of VAT, shown separately on the Tax Invoice.
For foreign services rendered through a South African service provider, the local commission invoice must show VAT separately.
You may submit alternative payment or financing proposals, but you must first tender strictly according to the Terms and Conditions of Contract.
The successful bidder may be required to furnish a guarantee covering any advance payments.
Furnish your bid prices in the Price Schedule of the Bid Documents.
Delete items from your bid for which you have not tendered or where the price is included elsewhere.
You may offer conditional discounts for payment within a specific period; the discount period is calculated from receipt of your correct month-end statement and Tax Invoice.
Compliance Requirements
Source: NDA, GENERAL CONDITIOS & SUPPLIER INTERGRITY.pdf (TENDER)
State the full names of directors (if a company), members (if a close corporation), or partners/individual (if a partnership or sole trader).
No bid will be awarded to a bidder whose name (or members/directors/partners/trustees) appears on the National Treasury Register of Tender Defaulters or List of Restricted Suppliers.
Transnet may cancel a contract if it is later established the bidder has been restricted by another government institution.
Foreign bidders must state the name of an authorised South African representative empowered to sign contracts and act on their behalf.
If acting as a South African representative/agent for a foreign principal, submit written proof of authorisation and, if successful, a legal Power of Attorney.
The successful bidder, when called upon, must provide security (a Deed of Suretyship from an approved South African financial institution) for contract fulfilment. The amount will be stipulated in the Bid Documents.
The contract is governed by South African law. You must specify a domicilium (address for legal service) in South Africa.
Upon acceptance of your bid, you are bound by the General Bid Conditions, Terms and Conditions of Contract, and any Special Conditions.
The contract documents comprise the General Bid Conditions, Terms and Conditions of Contract, Special Conditions, and your bid response.
If you find any contract conditions unacceptable, you may propose amendments in writing on company letterhead. Transnet's Legal Counsel will review; you may withdraw unacceptable deviations or be disqualified.
Failure to return the completed Deed of Suretyship within 30 calendar days of acceptance may lead to immediate contract cancellation.
Transnet does not guarantee purchase quantities; you undertake to supply quantities ordered before the contract expiry.
You may be required to submit periodic progress reports on delivery.
Transnet reserves the right to purchase outside the contract to meet emergency demands if you cannot meet critical delivery.
You must comply with the Integrity Pact and Non-Disclosure Agreement, which form part of the contract.
All Bid Documents and subsequent contracts are subject to Transnet's General Bid Conditions.
A non-refundable fee may be charged for Bid Documents, but they are also available free on the National Treasury eTender Publication Portal.
You must hold your bid valid for acceptance within the requested validity period after the closing date. Transnet may request an extension, during which you cannot change your bid unless due to the extension.
In case of conflict between the General Bid Conditions and the issued RFX document, the RFX document conditions prevail.
Requirements
Source: NDA, GENERAL CONDITIOS & SUPPLIER INTERGRITY.pdf (TENDER)
All Bid Documents and subsequent contracts are subject to Transnet's General Bid Conditions.
A non-refundable fee may be charged for Bid Documents, but they are also available free on the National Treasury eTender Publication Portal.
You must hold your bid valid for acceptance within the requested validity period after the closing date. Transnet may request an extension, during which you cannot change your bid unless due to the extension.
Unauthorised communication about bids with other bidders or Transnet officials during the evaluation period may lead to disqualification.
Unsuccessful bidders will be advised in writing and informed of the successful bidder's name and reason for non-acceptance.
If you are a foreign bidder, you must comply with specific requirements for representatives, Powers of Attorney, and payment instructions.
No bid will be awarded to a bidder on the National Treasury Register of Tender Defaulters or List of Restricted Suppliers.
In case of conflict between the General Bid Conditions and the issued RFX document, the RFX document conditions prevail.
Provision of an Environmental Assessment Practitioner (EAP) for the role of the Environmental Control Officer during the construction of the 3rd MPT warehouse and all associated infrastructure at the Port of Saldanha for a period of 24 months.
You must register your own company profile and use it to log intent and submit the bid. Do not submit through another company's profile.
Upload bid documents directly to the portal. You can upload 30MB per upload; multiple uploads are allowed.
All pricing must be completed electronically in the eSupplier portal. Do not submit paper pricing schedules.
Submit at least one day before the closing date to avoid last-minute technical issues. Transnet is not liable for your technical challenges.
No late submissions will be accepted.
For joint ventures, any party may use its registered profile to submit on behalf of the joint venture.
Mandatory returnable documents (Section 4 Quotation Form and Appendix 1 EAPASA certificate) must be submitted. Failure to submit these will result in disqualification.
Returnable documents used for scoring (e.g., qualifications, reference letters, company profile) must be submitted; if missing, you will score zero for that criterion.
Essential returnable documents (Sections 5, 6, 7, and SBD1) must be submitted; failure may lead to disqualification.
Ensure all returnable documents are signed, stamped, and dated.
Changes to your quotation will not be considered after the closing date and time.
Your quotation is considered a binding offer unless exceptions are clearly indicated.
Stage 1: Administrative and Substantive Responsiveness – Your bid must be on time, include all required documents, be signed, contain a priced offer, comply with the scope, and include a valid EAPASA registration certificate.
Stage 2: Technical Threshold – Minimum score of 70 out of 100 points required.
ECO Qualifications (25 points): Minimum Bachelor’s degree/B-tech/National Diploma in Environmental Management/Science/Studies plus 6+ years independent ECO experience.
ECO Experience (25 points): Provide traceable reference letters for at least 5 ECO projects completed in the past 5 years.
Company Profile (25 points): Must demonstrate environmental services as part of your offering.
Company Portfolio (25 points): Provide a portfolio of previous ECO services rendered at 6 different companies (excluding TPT).
Stage 3: Final Weighted Scoring.
Price (80 points): Evaluated using a formula where the lowest price gets maximum points.
Specific Goals (20 points): Preference points awarded for B-BBEE status and other specific goals.
Stage 4: Price Negotiations – Transnet may negotiate if prices are not market-related, starting with the highest-ranked bidder.
Stage 5: Award – Successful bidder will receive a Letter of Award; acceptance may constitute the final contract.
Scope: Provision of an Environmental Assessment Practitioner (EAP) to act as the Environmental Control Officer during the construction of the 3rd MPT warehouse and associated infrastructure at the Port of Saldanha for 24 months.
Monthly auditing and reporting on construction EMPr and EA compliance.
Monthly audit reports.
Six-monthly audit reports submitted to DFFE.
Monitoring compliance with EA conditions and EMPr.
Post-construction environmental close-out audit.
Pre-qualification Requirement: The EAP must be registered with the Environmental Assessment Practitioners Association of South Africa (EAPASA). Submit a certified copy of the valid certificate.
Personnel Requirements: The ECO must have a minimum of a Bachelor’s degree/B-tech/National Diploma in Environmental Management/Science/Studies and at least six years' experience as an independent ECO. If the proposed employee leaves before award, the replacement must meet the same minimum requirements.
Company Profile: Must demonstrate experience in environmental services (e.g., impact assessments, authorisations, compliance monitoring).
Company Portfolio: Must provide a portfolio of previous ECO services rendered at different companies, with reference contact details.
Experience & Qualifications
Source: RFQ - TPT-2026-05-0382-4952-RFQ .pdf
ECO Qualifications: The Environmental Control Officer must have a Bachelor’s degree/B-tech/National Diploma in Environmental Management/Science/Studies and at least six years' experience as an independent ECO.
ECO Experience: Provide traceable reference letters for at least five ECO projects completed in the past 5 years, including client contact details.
Company Experience: Submit a company profile showing environmental services (e.g., impact assessments, authorisations, compliance monitoring) and a portfolio of previous ECO services rendered at different companies (with references).
Replacement Personnel: If the proposed ECO leaves before award, the replacement must meet the same minimum qualifications and experience.
Pricing Schedule
Source: RFQ - TPT-2026-05-0382-4952-RFQ .pdf
Submit pricing strictly according to the Price Schedule in Section 4.
Items to price:
Document review (EA 1).
Audit plan with schedule and protocol (EA 1).
Training material for environmental inductions (EA 1).
Tax Compliance: Submit your SARS Tax Compliance Status (TCS) PIN or Central Supplier Database (CSD) number. Foreign suppliers with no local entity may not need to register on CSD.
B-BBEE: Submit a B-BBEE Status Level Verification Certificate or sworn affidavit for compliance. Preference points are allocated for specific goals (20 points).
Central Supplier Database (CSD): Register on the National Treasury CSD at https://secure.csd.gov.za/ unless you are a foreign supplier with no local registered entity.
Legal Compliance: The successful respondent must comply with all applicable national and local laws, including the Employment Equity Act.
EAPASA Registration: Mandatory—submit certified copy of valid EAPASA registration certificate for the EAP.
Foreign Supplier Declaration: If applicable, complete the questionnaire for foreign suppliers regarding residency, branch, permanent establishment, or income in RSA.
Disclosure Requirements: Disclose any commercial relationship with Domestic Prominent Influential Persons (DPIP) or Foreign Prominent Public Officials (FPPO).
Breach of Law: Declare if found guilty of a serious breach of law in the past 5 years (excluding minor offences).
Security Clearance: The successful respondent may need to obtain security clearance at CONFIDENTIAL/SECRET/TOP SECRET level for personnel and subcontractors.
Environmental
Source: RFQ - TPT-2026-05-0382-4952-RFQ .pdf
Environmental Compliance: The EAP/ECO must ensure compliance with environmental authorisations, the Environmental Management Programme (EMPr), and all EA conditions during construction.
Monitoring and Reporting: Conduct monthly audits and compile reports on EMPr implementation and EA compliance.
Training: Develop and manage environmental training/inductions for employers and contractors' employees.
Close-out Audit: Perform a post-construction environmental close-out audit.
ESG Disclosure: Transnet may request information on your Environmental, Social, and Governance (ESG) standing for record-keeping, though not for evaluation.
Contractual Terms
Source: RFQ - TPT-2026-05-0382-4952-RFQ .pdf
Validity Period: Bids must remain valid for 90 business days from the closing date. Transnet may request an extension.
Contract Formation: Acceptance of your quotation, along with Transnet's acceptance, forms a binding contract.
Termination: Transnet may terminate the contract if you fail to maintain validity of returnable documents (e.g., certifications) during the contract period.
Legal Review: Your proposed contractual terms are subject to review by Transnet's Legal Counsel.
Security Clearance: The successful respondent may need to obtain security clearance at CONFIDENTIAL/SECRET/TOP SECRET level for personnel and subcontractors.
Breach of Law: You must declare if found guilty of a serious breach of law in the past 5 years (e.g., Competition Act violations).
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Prevention and Combating of Corrupt Activities Act (PRECCA)
Act 12 of 2004
high
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Public Procurement Act, 2024 (PPA)
Act 28 of 2024
high
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Promotion of Access to Information Act (PAIA)
Act 2 of 2000
medium
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Promotion of Administrative Justice Act (PAJA)
Act 3 of 2000
medium
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Website
www.transnet.net/
Address
Level 200, Carlton Centre, 150 Commissioner St, Cbd, Johannesburg, 2001, South Africa
Document-Backed
Source Snapshot Available
AI Enhanced
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
5
Last checked
12 Jul 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.