Tender Type
Request for Quotation
Delivery Location
null - East London - KuGompo - 5200
Organization Type
GOVERNMENT
Published
07 Aug 2026
OCDS Reference
ocds-9t57fa-164958
Maintenance and replacement of terminal directional signage at king phalo international airport, to be delivered over a 24-month period. Bidders must hold a valid CIDB contractor grading of 3sk or higher and achieve a minimum functionality score of 60 out of 100 to be considered for the price and preference stage.
CIDB grading: Bidders must hold a valid CIDB contractor grading of 3SK or higher.
COIDA: Proof of COIDA (letter of good standing with the Workers Compensation Commissioner or proof of application) must be submitted.
Functionality threshold: A minimum of 60 out of 100 points must be achieved in the functionality evaluation to proceed to price and preference.
Company experience: Bidders must demonstrate experience in signage design, manufacturing, and installation, with points awarded for completed projects (more than 5 projects: 60 points; 3 to 5 projects: 30 points; less than 3: 0 points).
Key personnel: The supervisor must have experience with illuminated signs and signage removal and installation, with points awarded for years of experience (more than 5 years: 40 points; 3 to 5 years: 30 points; less than 3: 0 points).
Submission format: Bids must be submitted electronically to [email protected] by 28 August 2026 at 16:00, with one original, one copy, and a USB flash drive, sealed and marked accordingly.
Validity: Tender offers must remain valid for 12 weeks (84 days) after the closing date.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Friday, 28 August 2026 - 16:00
Venue
King Phalo International Airport Information Desk
Categories
Request for Quotation
null - East London - KuGompo - 5200
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: CA(SA) - Chartered Accountant, PMI-PMP (Project Management Professional), Prince2 Practitioner, Six Sigma Certification
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: CIDB Bid document Template RFQ 12236 TERMINAL DIRECTIONAL SIGNAGE REPLACEMENT PROJECT FOR A PERIOD OF 24 MONTHS.pdf. You don’t need to refresh — this page will pick up the updated review automatically.
07 Aug
2026
Tender Published
Tender was published
28 Aug
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
NEC3-ECC_5480 - Terminal Directional Signage.pdf
The Airports Company South Africa is procuring a contractor for the replacement and maintenance of terminal directional signage at King Phalo Airport, with a contract period of 24 months. The contract is based on the NEC3 Engineering and Construction Contract, using Main Option B (priced contract with bill of quantities), and includes additional conditions covering ethics, confidentiality, intellectual property, and dispute resolution.
CIDB Bid document Template RFQ 12236 TERMINAL DIRECTIONAL SIGNAGE REPLACEMENT PROJECT FOR A PERIOD OF 24 MONTHS.pdf
Airports Company South Africa is procuring a 24-month maintenance contract for the replacement of terminal directional signage at King Phalo International Airport in the Eastern Cape. The contract covers design, manufacturing, and installation of signage, with a fixed price for the full duration.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
Airports Company South Africa (ACSA)Contact Person
masana.sithole Sithole
Phone
011-723-1400
Win ACSA tenders with AI Matching Engine, airport-infrastructure intelligence, compliance analysis, and application support for aviation operations.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
R 1 678 786
Range
Based on 10 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Important Dates
Source: CIDB Bid document Template RFQ 12236 TERMINAL DIRECTIONAL SIGNAGE REPLACEMENT PROJECT FOR A PERIOD OF 24 MONTHS.pdf (TENDER)Briefing session: 13 August 2026 at 12:00pm at King Phalo International Airport Information Desk. Non-compulsory, but bidders must sign the attendance list. Closing date for queries: 13 August 2026 at 16:00pm. Employer will respond to clarification requests by 19 August 2026. Closing date: 28 August 2026 at 16:00pm (South African time).
Contact Information
Source: CIDB Bid document Template RFQ 12236 TERMINAL DIRECTIONAL SIGNAGE REPLACEMENT PROJECT FOR A PERIOD OF 24 MONTHS.pdf (TENDER)Bidding procedure enquiries: Masana Sithole, telephone 011 729 7943, email [email protected]. Electronic submissions: [email protected]. Technical enquiries: not specified. All communication during the tender period must be directed to ACSA's Supply Chain Department, not the Principal Agent.
Submission Guidelines
Source: CIDB Bid document Template RFQ 12236 TERMINAL DIRECTIONAL SIGNAGE REPLACEMENT PROJECT FOR A PERIOD OF 24 MONTHS.pdf (TENDER)Bids must be submitted electronically to [email protected] by the closing time. Late bids will not be accepted. Bids must be submitted on the official forms provided, not re-typed. The completed bid document and contract document must be returned in their entirety. One original, one copy, and a USB flash drive with the electronic version are required. The original and copy must be sealed separately and marked 'ORIGINAL' and 'COPY'. The outer package must show the employer's address and bid reference 12236. Tender offers must remain valid for 12 weeks (84 days) after closing. Returnable documents include the Form of Offer and Acceptance (C1.1), SBD 1 (Invitation to Bid), and all other required schedules. Proof of authority (e.g., company resolution) must accompany the signature.
Evaluation Criteria
Source: CIDB Bid document Template RFQ 12236 TERMINAL DIRECTIONAL SIGNAGE REPLACEMENT PROJECT FOR A PERIOD OF 24 MONTHS.pdf (TENDER)Evaluation follows a staged process. Stage 1: Responsiveness check. Stage 2: Mandatory administration criteria – fully completed and signed Form of Offer and Acceptance (C1.1), valid CIDB contractor grading of 3SK or higher, and proof of COIDA (letter of good standing or proof of application). Stage 3: Functionality evaluation – minimum threshold of 60 out of 100 points. Functionality is scored on company experience in signage design, manufacturing, and installation (more than 5 projects: 60 points; 3 to 5 projects: 30 points; less than 3: 0 points) and key personnel experience (supervisor with more than 5 years: 40 points; 3 to 5 years: 30 points; less than 3: 0 points). Stage 4: Price and preference – 80/20 preference point system. Price scores a maximum of 80 points. Preference points are awarded for B-BBEE status level and specific goals (black youth, black women, people with disabilities majority-owned entities). Bidders must provide proof to support preference claims.
Technical Specifications
Source: CIDB Bid document Template RFQ 12236 TERMINAL DIRECTIONAL SIGNAGE REPLACEMENT PROJECT FOR A PERIOD OF 24 MONTHS.pdf (TENDER)The scope is the maintenance for terminal directional signage replacement at King Phalo International Airport for a period of 24 months. Bidders must have experience in signage design, manufacturing, and installation. The supervisor must have experience with illuminated signs and expertise in signage removal and installation. Site information is provided in Part C4 of the tender document.
Financial Requirements
Source: CIDB Bid document Template RFQ 12236 TERMINAL DIRECTIONAL SIGNAGE REPLACEMENT PROJECT FOR A PERIOD OF 24 MONTHS.pdf (TENDER)Prices must be fixed for the full duration of the contract – no contract price adjustments. Rates and prices must be stated in Rand, with VAT shown separately. The contract is subject to the 80/20 preference point system, applicable to bids with a rand value equal to or below R50 million. Bidders must submit pricing schedules as per Part C2. The employer will not compensate bidders for costs of preparing the tender.
Compliance Requirements
Source: CIDB Bid document Template RFQ 12236 TERMINAL DIRECTIONAL SIGNAGE REPLACEMENT PROJECT FOR A PERIOD OF 24 MONTHS.pdf (TENDER)Mandatory: valid CIDB contractor grading of 3SK or higher. Proof of COIDA (letter of good standing or proof of application). Tax compliance: provide SARS Tax Compliance Status PIN or CSD number; each party in a JV must submit separate proof. B-BBEE: provide a valid B-BBEE certificate from a SANAS accredited agency or a sworn affidavit; JVs must provide a consolidated certificate. Foreign suppliers must complete the questionnaire on residency and tax liability. Returnable forms include SBD 1 (Invitation to Bid) and other standard forms as listed.
Description
Source: NEC3-ECC_5480 - Terminal Directional Signage.pdf (unknown)The project involves replacement and maintenance of terminal directional signage at King Phalo Airport for a period of 24 months. The contract is between Airports Company South Africa SOC Limited and the successful bidder.
Important Dates
Source: NEC3-ECC_5480 - Terminal Directional Signage.pdf (unknown)Closing date: 28 August 2026 at 16:00 (from tender record). Starting date: on signing of contract by ACSA. Completion date: 24 months after signing. Access date: one week after issuing of the BPA. Defects date: 12 months after completion of the whole of the works. Defects correction period: two weeks. Assessment interval: four weeks. Payment period: four weeks after receipt of a valid tax invoice. First programme submission: two weeks after access date. Revised programme intervals: four weeks.
Contact Information
Source: NEC3-ECC_5480 - Terminal Directional Signage.pdf (unknown)Employer: Airports Company South Africa SOC Limited, King Phalo Airport, 66 Settlers Way, Greenfields, East London, 5201. Telephone: 043 706 0384, Fax: 043 706 0318. Project Manager and Supervisor: Siyanda Ntebe, same address. Contact details for adjudicators and arbitrators are listed in the contract data.
Submission Guidelines
Source: NEC3-ECC_5480 - Terminal Directional Signage.pdf (unknown)Returnable documents include the Form of Offer and Acceptance with the offered total price inclusive of VAT, the pricing schedule per the Bill of Quantities, Contract Data Part Two (contractor details, key people, risk register), and the Occupational Health and Safety Agreement under Section 37(2) of the OHS Act. A letter confirming good standing with the Compensation Fund or Licensed Insurer is required before work starts. Bidders must submit a preliminary programme within two weeks of the access date. Failure to provide required securities, bonds, guarantees, or insurance documentation constitutes repudiation of the agreement.
Evaluation Criteria
Source: NEC3-ECC_5480 - Terminal Directional Signage.pdf (unknown)The contract is a priced contract with a Bill of Quantities under NEC3 Main Option B. No specific scoring split or preference point system is stated in the available text. Bidders must complete the Form of Offer and Acceptance and provide a compliant BEE certificate annually; failure is a material breach. The contract includes delay damages of 0.5% per day up to a maximum of 10% of contract value, and retention of 10% of contract value.
Technical Specifications
Source: NEC3-ECC_5480 - Terminal Directional Signage.pdf (unknown)Scope: replacement and maintenance of terminal directional signage at King Phalo Airport for 24 months. Site boundary: King Phalo Airport (landside and airside). Works Information is in Part C3 'Scope of Works'; Site Information in Part C4. Risk register matters include availability of as-built information, access to site, site constraints, long lead items, weather, existing services, project programme delay, and payment delay. Contractor must provide a programme as per tender submission and revised programmes at intervals no longer than four weeks.
Experience & Qualifications
Source: NEC3-ECC_5480 - Terminal Directional Signage.pdf (unknown)Contractor must provide details of key people including name, job, responsibility, qualifications, and experience. CVs to be appended to tender schedule. No specific minimum experience requirements stated in available text.
Pricing Schedule
Source: NEC3-ECC_5480 - Terminal Directional Signage.pdf (unknown)Pricing is per Bill of Quantities (Main Option B). All prices shown excluding VAT unless instructed otherwise. Offered total price inclusive of VAT must be stated in the Form of Offer and Acceptance. Payment assessments every four weeks; payment within four weeks of valid tax invoice.
Financial Requirements
Source: NEC3-ECC_5480 - Terminal Directional Signage.pdf (unknown)Pricing: all prices shown excluding VAT unless instructed otherwise. Contract is a priced contract with Bill of Quantities (Main Option B). Payment: assessments every four weeks; payment within four weeks of a valid tax invoice. Interest rate: prime lending rate of Nedbank. Retention: 10% of contract value. Delay damages: 0.5% per day, maximum 10% of contract value. Limitation of liability: neither party liable for consequential loss; employer's liability for indirect loss limited to R0.00. Insurance: employer provides contract works, public liability (R100 million), lateral support (R50 million), SASRIA, aviation liability (R2 billion), and professional indemnity (R25 million aggregate). Contractor must provide insurance as stated in contract data.
Compliance Requirements
Source: NEC3-ECC_5480 - Terminal Directional Signage.pdf (unknown)B-BBEE: annual compliant BEE certificate required; failure is a material breach and may lead to cancellation. OHS: sign Section 37(2) agreement, comply with OHS Act and Construction Regulations, submit safety checklist and Construction Manager appointment 7 days before work commences. Insurance: maintain COID cover and provide letter of good standing with Compensation Fund or Licensed Insurer. Ethics: comply with anti-corruption laws; breach may lead to termination. No cession, delegation or assignment without written consent. Joint ventures: jointly and severally liable; notify key person within one week of contract date.
Health & Safety
Source: NEC3-ECC_5480 - Terminal Directional Signage.pdf (unknown)Contractor must sign an Occupational Health and Safety Agreement under Section 37(2) of the OHS Act and Construction Regulation 5.1(k). Must comply with OHS Act and COID Act. Baseline risk assessment required before work commences. Appoint competent persons, provide PPE, enforce safe working practices. Report incidents to Provincial Director: Department of Labour and client. No alcohol or intoxicating substances on premises. Only duly authorised Section 16.2 appointee may sign the agreement. Safety checklist and Construction Manager appointment must be submitted 7 days before work starts. Non-compliance may lead to immediate cancellation of contract.
Contractual Terms
Source: NEC3-ECC_5480 - Terminal Directional Signage.pdf (unknown)Contract is NEC3 Engineering and Construction Contract, April 2013, Main Option B (priced contract with Bill of Quantities). Dispute resolution via Option W1 (adjudication and arbitration). Secondary options include X2 (changes in law), X7 (delay damages), X16 (retention), X18 (limitation of liability), and additional Z clauses. Starting date on signing by ACSA; completion 24 months after signing. Access date one week after issuing BPA. Defects date 12 months after completion; correction period two weeks. Payment assessments every four weeks; payment within four weeks of valid tax invoice. Delay damages 0.5% per day up to 10% of contract value. Retention 10%. Neither party liable for consequential loss. Contractor must not cede, delegate or assign without written consent. Joint ventures jointly and severally liable. Ethics clause prohibits corrupt practices; breach may terminate contract. Confidentiality obligations apply. Employer has step-in rights if contractor defaults and fails to remedy within two weeks. Intellectual property rights remain with originator; contractor grants employer irrevocable licence. Dispute resolution via panel of adjudicators and arbitrators; arbitration in Johannesburg under Association of Arbitrators rules.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
null - East London - KuGompo - 5200
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
2
Last checked
07 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.