Tender Type
Request for Bid(Open-Tender)
Delivery Location
Kusile Power Station - eMalahleni - Witbank - 1035
Organization Type
GOVERNMENT
Published
01 Sept 2026
OCDS Reference
ocds-9t57fa-167746
ESKOM invites tenders for alterations and additions to existing building structures at kusile power station over a nine-month period under an nec engineering & construction contract. The single most consequential requirement is a valid CIDB grading of 7gb or higher for the main contractor, joint venture partners, and any sub-contractors, without which a bidder cannot be considered.
Closing date and time: 23 September 2026 at 10h00 SAST; electronic submission only via Eskom E-tendering portal (https://etendering.eskom.co.za), PDF and Excel formats, 500 MB per file, 4 GB total.
Non-compulsory clarification meeting: 10 September 2026, 10h00–11h00 SAST via Microsoft Teams (Meeting ID: 370 844 332 514 756, Passcode: wW9U2iu2).
CIDB grading: 7GB or higher required for main contractor, JV and/or sub-contractor; proof at closing or within 21 working days.
Functionality evaluation: Technical criteria scored out of 100%, minimum threshold 70%; below threshold = disqualification (criteria in separate Technical Evaluation document).
Price and Specific Goals: Preferential point system 90/10 or 80/20 (PPPFA 2022); price scored 80/90, specific goals 20/10; combined score ranks tenderers.
Mandatory returnables at closing (disqualifiable if missing/incomplete): Annexures A–J (Authorisation Form, Acknowledgement Form, Tenderer's Particulars, Integrity Pact Declaration, CPA Local/Imported, SBD 6.2 Local Content G1–G4, SBD 1, SBD 6.1, SBD 4) plus E-tendering Help Manual acknowledgement; JV documents if applicable.
Contractual requirements for award (assessed post-ranking): Valid CSD registration; tax compliance (SARS PIN or clearance certificate); Employment Equity Act proof (SA designated employers); ISO 9001:2015 QMS (valid certification or documented evidence per Sections B–E); Kusile OHS Specification compliance (safety file within 2 weeks before site start); Environmental Specification compliance; audited financial statements (previous 18 months/last year; each JV/SPV participant; start-ups <12 months exempt initially); Contract Skills Development Goals: Artisan Plumber (6 months, target 6) and Artisan C&I Electrician (6 months, target 6).
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Wednesday, 23 September 2026 - 10:00
Venue
https://teams.microsoft.com/meet/370844332514756?p=aY0uCyk3NzLKgmC8Fw
Categories
Request for Bid(Open-Tender)
Kusile Power Station - eMalahleni - Witbank - 1035
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx. You don’t need to refresh — this page will pick up the updated review automatically.
01 Sept
2026
Tender Published
Tender was published
30 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
C4 ECC3 Site Information.doc
Eskom requires a contractor to carry out alterations and additions to existing building structures at Kusile Power Station over a nine-month period. The works are located on the Horingkraans Farm site in Mpumalanga, accessed via the R686 road between the N4 and N12 highways.
C2 ECC3 Pricing Data Option B.doc
Eskom requires a contractor for alterations and additions to existing building structures at Kusile Power Station in Mpumalanga over a nine-month period. The work involves demolition, structural alterations, drywall partitioning, ceiling works, and associated mechanical, electrical, and fire protection installations across four buildings: Auxiliary Building 1, FGD Control Room, Admin Building, and BOP Building.
C0 ECC3 Contract cover page.doc
Eskom Holdings SOC Ltd is procuring a contractor for alterations and additions to existing building structures at Kusile Power Station in Mpumalanga over a nine-month period under an NEC3 Engineering and Construction Contract.
240-105658000 Supplier QM Spec Rev 3-QM 58.pdf
Eskom requires alterations and additions to existing building structures at Kusile Power Station in Mpumalanga over a nine-month period. The tender is governed by Eskom's Supplier Quality Management Specification (240-105658000), which mandates ISO 9001-aligned quality management systems, contract quality plans, inspection and test plans, and supplier capability assessments. Bidders must comply with one of four quality requirement categories, each specifying distinct documentation returnables.
C3 1 ECC3 Employers Works Information.doc
Eskom is procuring a contractor for alterations and additions to existing building structures at Kusile Power Station in Mpumalanga over a nine-month period. The multidisciplinary works include demolition, structural modifications, new construction, building services installation, testing, commissioning, and handover across the Auxiliary Bay Buildings (Units 2–6), Administration Building, Substation South Building, and Station Services Building.
240-109253698 CQP Template- Rev 3.docx
C1 2b ECC3 Data by Contractor.doc
C1 2a ECC3 Data by Employer.doc
Unpriced BOQ for Alterations and Additions to Existing Building Structures at Kusile Power Station 31.08.26.pdf
Eskom requires a contractor for alterations and additions to existing building structures at Kusile Power Station in Mpumalanga over an eight-month period. The scope includes demolition, new concrete and masonry work, drywall partitioning, suspended ceilings, access flooring, HVAC, fire detection, water detection, signage, electrical installations, plumbing, tiling, carpentry, joinery, ironmongery, metalwork, plastering, waterproofing, and associated site establishment and professional design and supervision resources.
240-68099512 Form A_Cat 1_ Rev 9.docx
Kusile Power Station Environmental Specification for Alterations and Additions to Existing Building Structures.pdf
Eskom Kusile Power Station requires a contractor for alterations and additions to existing building structures over a nine-month period. The contract is governed by a detailed environmental specification (KUS-20250797 Rev 1) that mandates compliance with ISO 14001, the National Environmental Management Act, and site-specific waste, spill, and hazardous substance management procedures.
Unpriced BOQ for Alterations and Additions to Existing Building Structures at Kusile Power Station 31.08.26.xls
Eskom is procuring a contractor for alterations and additions to existing building structures at Kusile Power Station in Mpumalanga for a nine-month period.
E-tendering Help Manual for supplier - 27 January 2025.docx
Eskom is procuring alterations and additions to existing building structures at Kusile Power Station in Mpumalanga for a nine-month period. Tender submissions must be made electronically via the eTendering portal by 23 September 2026 at 10:00 UTC.
240-12248652_List of Tender Returnables_Cat 1_ Rev 7.pdf
Eskom is procuring a contractor for alterations and additions to existing building structures at Kusile Power Station in Mpumalanga for a nine-month period. The tender places significant emphasis on quality management system compliance, requiring documented evidence of ISO 9001 certification and operational quality processes.
E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.docx
Eskom is procuring a contractor for alterations and additions to existing building structures at Kusile Power Station in Mpumalanga for a nine-month period. The tender is conducted via Eskom's e-Tendering platform.
TES_Building Alterations Scope -FINAL _.pdf
Eskom invites tenders for alterations and additions to existing building structures at Kusile Power Station in Mpumalanga, including construction and commissioning supervision, for a nine-month period. The contract requires a multi-disciplinary team and proven experience in similar industrial building alterations.
OHS specification for Alterations and additions to existing building structures.pdf
Eskom Kusile Power Station is procuring a contractor for alterations and additions to existing building structures over a nine-month period. The work includes construction, demolition, electrical and mechanical installations, and commissioning at the power station in Mpumalanga. The tender is governed by a detailed OHS specification (KUS-20251238) that sets mandatory health, safety, and compliance requirements for the main contractor and any subcontractors.
Invitation to Tender (ITT) - Alteration and additions to existing building structures.pdf
Eskom Holdings SOC Ltd invites tenders for alterations and additions to existing building structures at Kusile Power Station in Mpumalanga for a nine-month period. The contract requires a CIDB grading of 7GB or higher and includes mandatory Contract Skills Development Goals for artisan training.
Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template for Bidders.pdf
Eskom is procuring a contractor for alterations and additions to existing building structures at Kusile Power Station in Mpumalanga, including construction and commissioning supervision, for a nine-month duration.
240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx
Eskom requires a contractor to perform alterations and additions to existing building structures at Kusile Power Station in Mpumalanga over a nine-month period.
Building Alterations Scope at Kusile Power Station - FINAL_.pdf
Eskom requires a contractor to execute alterations and additions to existing building structures at Kusile Power Station in Mpumalanga over a nine-month period. The multidisciplinary works include architectural, civil, structural, mechanical, electrical, and control & instrumentation components such as demolition, structural modifications, new construction, building services installation, testing, commissioning, and handover. The contractor must also provide construction and commissioning monitoring, training, and full documentation including as-built drawings and O&M manuals.
C1 1 ECC3 Offer Acceptance.doc
Eskom invites offers for alterations and additions to existing building structures at Kusile Power Station in Mpumalanga for a contract period of nine months. The contract will be based on the NEC3 Engineering and Construction Contract framework, with the final price determined in accordance with the conditions of contract.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 1 803 379
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Description
Source: Kusile Power Station Environmental Specification for Alterations and Additions to Existing Building Structures.pdfProject: Alterations and Additions to Existing Building Structures at Kusile Power Station.
Duration: Nine (9) months.
Document: Environmental Specification (Unique Identifier KUS-20250797, Revision 1).
Effective date: August 2025. Review date: August 2028.
Applicable to all contractors, partners, and suppliers in areas under direct control of Eskom Kusile Power Station.
Purpose: Outline project specifications for intended works.
Scope of work detailed in separate document KUS-20250644.
Normative references: ISO 14001, NEMA, Kusile OEMP (240-96626258), Environmental Requirements for Contractors and Suppliers (240-106963417), Waste Management Work Instruction (240-105776552), Oil/Chemical Clean-up Work Instruction (240-110383662), SHEQ Policy (32-727).
Informative references: Mandatory SHE Requirements (32-726), NEMA 1998, Waste Act 2008, Hazardous Substances Act 1973.
Contact Information
Source: Kusile Power Station Environmental Specification for Alterations and Additions to Existing Building Structures.pdf (unknown){"name":null,"email":null,"phone":null,"department":"Supply Chain Management","address":null}
Submission Guidelines
Source: Kusile Power Station Environmental Specification for Alterations and Additions to Existing Building Structures.pdf (unknown)Tender submission documentation required with all bids:
Compliance with this specification is monitored during tender evaluation, ad-hoc inspections, and internal audits.
Returnable Documents
Source: Kusile Power Station Environmental Specification for Alterations and Additions to Existing Building Structures.pdf (unknown)The following documentation shall be submitted with all tender submissions: a) Environmental Policy in line with iso 14001:2015 signed by company CEO or COO b) An Aspect/Impact register or an environmental management plan (relevant to the scope of work) c) Waste management plan
Evaluation Criteria
Source: Kusile Power Station Environmental Specification for Alterations and Additions to Existing Building Structures.pdf (unknown)Bids are evaluated for compliance with the environmental specification. The evaluation checks that the three mandatory submission documents are provided and that the bidder demonstrates ability to comply with applicable environmental legislation, the Kusile Operational Environmental Management Plan (OEMP), and site-specific work instructions for waste management and spill clean-up. No CIDB grading, B-BBEE level, or financial turnover thresholds are stated in this document.
Technical Specifications
Source: Kusile Power Station Environmental Specification for Alterations and Additions to Existing Building Structures.pdf (unknown)Scope: Alterations and additions to existing building structures at Kusile Power Station for a nine-month period. Detailed scope of work is in document KUS-20250644.
Applicability: All contractors, partners, and suppliers working in areas under direct control of Eskom Kusile Power Station.
Environmental management system: Contractor must have a documented and implemented EMS (environmental policy, operational procedures, aspects/impacts register) aligned with ISO 14001.
Key environmental rules:
Records to be kept onsite: site-specific EMP; aspects/impacts register and communication proof; incident registers and investigation reports; non-conformance register; public complaints register; waste disposal register; hazardous substances registers and SDS; audit reports and close-out records; inspection records; environmental training matrix; proof of environmental awareness; proof of SHEQ Policy communication; emergency drill reports.
Quality Management
Source: Kusile Power Station Environmental Specification for Alterations and Additions to Existing Building Structures.pdfQuality management requirements:
Compliance Requirements
Source: Kusile Power Station Environmental Specification for Alterations and Additions to Existing Building Structures.pdf (unknown)Mandatory tender submission documents:
Legislative compliance required: National Environmental Management Act (NEMA) 1998, National Environmental Management Waste Act 2008, Hazardous Substances Act 1973, and applicable Eskom standards (ISO 14001, Kusile OEMP 240-96626258, Environmental Requirements for Contractors and Suppliers 240-106963417, Waste Management Work Instruction 240-105776552, Oil/Chemical Clean-up Work Instruction 240-110383662, Mandatory SHE Requirements 32-726, SHEQ Policy 32-727).
Contractor must comply with all applicable environmental legislation and site-specific requirements throughout the contract period.
Health & Safety
Source: Kusile Power Station Environmental Specification for Alterations and Additions to Existing Building Structures.pdfHealth, safety and environmental (SHE) requirements:
Environmental
Source: Kusile Power Station Environmental Specification for Alterations and Additions to Existing Building Structures.pdfEnvironmental protection scope: noise pollution, gaseous emissions, noxious/offensive odours, liquid and solid waste separation and collection, spillage clean-up, rehabilitation of contaminated areas.
Core principles:
Waste management:
Spill management:
Oil storage:
Hazardous substances:
Compliance monitoring: tender evaluation, ad-hoc inspections, internal audits.
Conflict resolution: perceived conflicts between environmental laws and contract documents referred to Project Management Team before work commences.
Section
Source: Kusile Power Station Environmental Specification for Alterations and Additions to Existing Building Structures.pdfEvaluation includes verification of mandatory tender submission documents: Environmental Policy (ISO 14001:2015) signed by CEO/COO, Aspect/Impact Register or EMP relevant to scope, and Waste Management Plan. Compliance with the environmental specification is monitored during tender evaluation, ad-hoc inspections, and internal audits. No specific functionality scoring, price/preference split, or minimum qualifying scores are detailed in this document.
Technical Specifications
Source: C1 2b ECC3 Data by Contractor.doc (unknown)[Instructions to the contract compiler: (delete this notes before issue to
Compliance Requirements
Source: C1 2b ECC3 Data by Contractor.doc (unknown)No specific requirements found
Evaluation Criteria
Source: C4 ECC3 Site Information.doc (unknown)No eligibility criteria specified
Technical Specifications
Source: C4 ECC3 Site Information.doc (unknown)Site: Kusile Power Station, Emalahleni Local Municipality, Mpumalanga Province.
Coordinates: 25° 55' 07.34'' S, 28° 54' 43.30'' E.
Access: Approximately 37 km northwest of eMalahleni via the R686 road between the N4 and N12 highways. Primary access from the N4 highway (3 km away) via a tarred road; secondary tarred road connects to the R545 and D686.
Nearest towns: Emalahleni (42 km north-east), Bronkhorstspruit (41 km south), Delmas (45 km north).
Landowner: Portions of Horingkraans Farm.
River catchment: Wilge River.
Climate: Highveld escarpment at ~1 551 m above sea level. Winters dry and cold with regular frost; temperatures -7 °C to 23 °C. Summers mild with most rainfall; temperatures 12 °C to 32 °C.
Wind: Predominant wind direction from the power station towards the north-west for ~291 days per year (Emalahleni weather station data).
Rainfall: Average annual rainfall ~691 mm (Emalahleni weather station).
Informal settlements: Present within a 10 km radius of the power station.
Technical Specifications
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx (unknown)Quality Control Plan (QCP) / Inspection Test Plan (ITP) template for alterations and additions to existing building structures at Kusile Power Station. The template defines intervention points: Hold Point (Witness Point), Approval Point (AP), Information Only (IN), Surveillance (S), Verification (V). Testing categories: T1 (100% Testing), T2 (Sample Testing), A1 (100% Inspection), A2 (Sample Inspection), W1 (100% Witness), W2 (Sample Witness), R1 (100% Document Review), R2 (Sample Document Review). Inspection and test methods include Visual, Microscopy, NDT, Liquid/Dye Penetrant, Magnetic Particle, EDDY. Acceptance criteria cover functionality requirements, performance measures, regulatory compliance, chemical tests. Requires approvals from Contractor/Supplier, Subcontractor (where applicable), Eskom, and Approved Inspection Authority (AIA) where applicable. Abbreviations: NOBO (Notification Body), TPI (Third Party Inspection).
Description
Source: Unpriced BOQ for Alterations and Additions to Existing Building Structures at Kusile Power Station 31.08.26.xlsAlterations and additions to existing building structures at Kusile Power Station for a period of nine (9) months. The document provided is an unpriced Bill of Quantities (BOQ) for the works.
Important Dates
Source: Unpriced BOQ for Alterations and Additions to Existing Building Structures at Kusile Power Station 31.08.26.xls (unknown)Closing date: 23 September 2026 at 10:00 (South Africa Standard Time). Submission method and address not stated in the extracted document.
Technical Specifications
Source: Unpriced BOQ for Alterations and Additions to Existing Building Structures at Kusile Power Station 31.08.26.xls (unknown)Alterations and additions to existing building structures at Kusile Power Station for a period of nine (9) months. Detailed scope, quantities, and specifications are contained in the unpriced Bill of Quantities (BOQ) which is the source document.
Description
Source: 240-109253698 CQP Template- Rev 3.docxContract Quality Plan template aligned to SANS 466:2005 / ISO 10005:2005 for the alterations and additions to existing building structures at Kusile Power Station (9-month contract). The template defines the structure and content the supplier must populate to demonstrate how quality requirements will be planned, controlled and assured across design, manufacturing, construction/installation/maintenance, commissioning and professional services. It requires documented processes for supplier/sub-supplier management, inspection and test plans, non-conformance handling, record control, databook delivery, tool/equipment calibration, customer property, preservation, traceability and post-delivery support.
Technical Specifications
Source: 240-109253698 CQP Template- Rev 3.docx (unknown)Contract Quality Plan (CQP) required per SANS 466:2005 / ISO 10005:2005. CQP must cover: definitions; scope of work; communication channels between supplier and Eskom; organogram with roles, responsibilities and QA/QC functions; index of interfacing documents (processes, standards, codes, specifications); list of suppliers and sub-suppliers with selection and monitoring criteria; monitoring of suppliers and sub-contractors; interface of sub-supplier QMS with supplier QMS; index of items to be manufactured, refurbished or purchased; items/activities requiring QCP/ITP offsite and onsite; scope areas requiring special controls (e.g. welding, NDT/NDE) with QC activities; index of documented information to be submitted to Eskom during project (technical records, method statements, inspection reports, signed QCPs, certificates, test reports); record control and retention; concession and non-conformance management (concession, defect/repair/rework, inspection processes); databook management (review, acceptance, purchase orders for quality-critical items); management of tools and equipment (list, calibration/maintenance/test status); customer property handling per ISO 9001; product preservation (identification, handling, contamination control, packaging, storage, transportation, protection); identification and traceability per statutory/regulatory requirements; commissioning and post-delivery activities (warranty, customer satisfaction, technical support, defect correction/retention). CQP to be compiled by tenderer (Rev 0 during evaluation, Rev 1 after contract signing) and approved by supplier organisation; Eskom review and acceptance after award.
Description
Source: 240-68099512 Form A_Cat 1_ Rev 9.docxThe tenderer must complete and sign Form A (Category 1) to acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 Standard. This form covers pre-contract award quality requirements (Category 1 per clause 3.5.2), post-contract award requirements (Contract Execution per clause 3.7.1 and Supplier Quality Performance Monitoring per clause 3.7.2), standard conditions (Eskom Rights of Access, Rights to Information, Preservation, Quality Audits, Management of Nonconformities, Special Processes per clauses 3.8.1-3.8.6), and full applicability of ISO 9001 clauses 4-10 and all seven Quality Management Principles. Both Eskom's and the Tenderer's Quality Representatives must be identified with name, designation, date, and signature.
Technical Specifications
Source: 240-68099512 Form A_Cat 1_ Rev 9.docx (unknown)The tenderer must complete and sign Form A (Category 1) to acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 Standard.
Pre-contract award quality requirements apply under Clause 3 of 240-105658000, specifically Category 1 (refer to clause 3.5.2).
Post-contract award requirements include Contract Execution (clause 3.7.1) and Supplier Quality Performance Monitoring Phase (clause 3.7.2).
Standard conditions apply: Eskom Rights of Access (clause 3.8.1), Eskom Rights to Information (clause 3.8.2), Preservation (clause 3.8.3), Quality Audits Related Conditions (clause 3.8.4), Management of Nonconformities and Nonconforming Outputs Identified by Eskom (clause 3.8.5), and Special Processes (clause 3.8.6).
ISO 9001 clauses 4 to 10 (Context of the Organisation, Leadership, Planning, Support, Operation, Performance Evaluations, Improvement) are applicable, along with all seven Quality Management Principles (Customer focus, Leadership, Engagement of people, Process approach, Improvement, Evidence based decision making, Relationship Management).
Both Eskom's Quality Representative and the Tenderer's Quality Representative must be named with designation, date, and signature.
Compliance Requirements
Source: 240-68099512 Form A_Cat 1_ Rev 9.docx (unknown)Compliance with Eskom Supplier Quality Requirements specification 240-105658000 and ISO 9001 Standard is mandatory. The tenderer must demonstrate capability under Category 1 requirements (clause 3.5.2 of 240-105658000).
Important Dates
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template for Bidders.pdf (TENDER)Closing date: 23 September 2026 at 10:00 (from tender record). No compulsory briefing, site visit, or clarification deadline is stated in this document.
Contact Information
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template for Bidders.pdf (TENDER)No SCM or technical contact names, emails, phones, or submission address are provided in this document.
Submission Guidelines
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template for Bidders.pdf (TENDER)Submission method and address are not stated in this document. The tender closing date is 23 September 2026 at 10:00 (per the tender record). Returnable documents required with the bid or after award:
Disqualification risks: omission of any mandatory returnable form; late submission; failure to meet CIDB Construction Skills Development Goal (if applicable) renders the tender non-responsive.
Returnable Documents
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template for Bidders.pdf (TENDER)Returnable documents: SBD 6.2 Declaration Form and Annex C (Local Content Declaration-Summary Schedule) if applicable. B-BBEE Improvement Plan within 30 days of contract signing. SDL&I Implementation Schedule within 28 days of contract award. Quarterly SDL&I reports per Data Collection Template.
Evaluation Criteria
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template for Bidders.pdf (TENDER)Two-stage evaluation:
Required documents to claim points: valid B-BBEE certificate (SANAS) / sworn affidavit / CIPS affidavit; proof of ownership/shareholding (CIPC) with breakdown; certified ID copies of shareholders; proof of disability (if applicable); consolidated B-BBEE certificate for JV/consortium/trust.
Technical Specifications
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template for Bidders.pdf (TENDER)Scope: Alterations and additions to existing building structures, including construction and commissioning supervision, at Kusile Power Station, Mpumalanga.
Duration: Nine (9) months.
SDL&I contractual obligations (not scored but binding):
Reporting: Quarterly SDL&I compliance reports per Data Collection Template. Eskom reviews within 30 days; non-compliance notified in writing; corrective measures required before next report or retention clauses invoked. SDL&I Implementation Schedule due 28 days after contract award.
Methodology
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template for Bidders.pdfSkills Development execution: Tenderers develop skills directly and through their supply network; SETA-accredited training providers may be engaged. Targets exclude Eskom employees and registered learners. Tenderer bears full cost of skills development; no Eskom financial contribution. Tenderers advised to access SETA grants, subsidies, incentives and SARS tax rebates for skills development.
Quality Management
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template for Bidders.pdf (TENDER)Reporting and Monitoring: Quarterly SDL&I compliance reports per Data Collection Template. Eskom reviews within 30 days of receipt and notifies non-compliance in writing. Suppliers must implement corrective measures before the next reporting period; failure invokes retention clauses. SDL&I Implementation Schedule to be completed and returned to SDL&I representative within 28 days of contract award for monitoring and reporting reference.
Financial Requirements
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template for Bidders.pdf (TENDER)Pricing: Tender response must be separated into components as per the Price Schedule included with the tender documents. Local procurement content = total spending minus imported component.
Penalties and security:
Compliance Requirements
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template for Bidders.pdf (TENDER)Mandatory compliance:
B-BBEE Requirements
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template for Bidders.pdf (TENDER)Required documents for preference points: Valid B-BBEE certificate (SANAS accredited) / sworn affidavit / CIPS affidavit; Proof of ownership/shareholding (CIPC documentation) with shareholding breakdown; Certified ID copies of shareholders; Proof of Disability (where applicable); Consolidated B-BBEE certificate for trust/consortium/joint venture. B-BBEE Improvement/Retention Plan required within 30 days of contract signing. Level 1: maintain; Levels 2–3: improve/maintain; Level 4: achieve Level 3 by end of Year 1 then improve; Levels 5–8/Non-compliant: achieve Level 4 by end of Year 1 then improve one level per year from Year 2. Valid B-BBEE certificate or sworn affidavit is a condition for contract award. EME (≤R10M revenue): sworn affidavit; QSE (≤R50M): comply with QSE scorecard or sworn affidavit if ≥51% Black owned; >R50M: valid B-BBEE certificate.
Contractual Terms
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template for Bidders.pdf (TENDER)Contract duration: 9 months. SDL&I Penalty: 3% of Contract Value for failure to meet SDL&I obligations. Performance Security: 3% of every invoice (excluding VAT) retained for the contract duration as security for SDL&I fulfilment; released only upon fulfilment of all SDL&I obligations. B-BBEE Improvement/Retention Plan due within 30 days of contract signing. SDL&I Implementation Schedule due within 28 days of contract award. Quarterly SDL&I compliance reports per Data Collection Template; Eskom reviews within 30 days; non-compliance triggers written notification and corrective action before next report, else retention clauses invoked.
Requirements
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template for Bidders.pdf (TENDER)Objective Criteria (condition for contract award): 2.1 Designated Sectors — Not applicable (no designated sector). 2.2 CIDB Skills Development — No compulsory training (CSDG not applicable). Failure to meet CIDB CSDG mandatory % renders tender non-responsive.
Section
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template for Bidders.pdfSpecific Goals (Preference Points): Maximum 10 points (90/10 system) or 20 points (80/20 system) for B-BBEE status level. Points per level: Level 1: 10/20; Level 2: 9/18; Level 3: 6/14; Level 4: 5/12; Level 5: 4/8; Level 6: 3/6; Level 7: 2/4; Level 8: 1/2; Non-compliant: 0/0. Total points (price + specific goals) rounded to two decimal places; highest total wins. Failure to provide B-BBEE documentation results in 0 points for specific goals and competition on price only (90 or 80 points). Objective Criteria (condition for contract award): Designated sectors — not applicable; CIDB Skills Development — no compulsory training (CSDG not applicable), but failure to meet any mandatory CSDG renders tender non-responsive.
Description
Source: E-tendering Help Manual for supplier - 27 January 2025.docxThe Eskom eTendering system is a web-based platform that replaces physical tender submissions at Eskom offices. Suppliers register using a CSD number, email, and +27-prefixed cellphone number, verify via OTP, then upload tender documents categorised as Technical, Commercial, Finance, etc. Files are limited to 50 MB each and 900 MB total. Submission is finalised electronically, generating a timestamped receipt and confirmation email with a submission ID for record-keeping.
Important Dates
Source: E-tendering Help Manual for supplier - 27 January 2025.docx (unknown)Closing date and time: 23 September 2026 at 10:00 (South African Standard Time).
No compulsory briefing session, site visit, or clarification deadline is mentioned in the source material.
Contact Information
Source: E-tendering Help Manual for supplier - 27 January 2025.docx (unknown)For eTendering system technical difficulties, contact the buyer responsible for the published tender (details not provided in the manual).
General portal access: Tender Bulletin public site — https://tenderbulletin.eskom.co.za; eTendering portal — https://eTendering.eskom.co.za.
No named SCM or technical contacts, emails, or phone numbers are given in the source material.
Submission Guidelines
Source: E-tendering Help Manual for supplier - 27 January 2025.docx (unknown)Submission is electronic via the Eskom eTendering portal (https://eTendering.eskom.co.za).
Bidders must register on the portal before submitting; registration requires a CSD number, a valid email address, a South African cellphone number starting with +27, and CAPTCHA verification. An OTP is sent to both email and cellphone for each login.
After login, select the relevant tender reference number, click "Create New Submission", then upload required documents using the "Add file" button. Each file must be named and categorised (Technical, Commercial, Finance, etc.).
Individual file size may not exceed 50 MB; total upload size may not exceed 900 MB.
Click "Finalize Submission" to complete; a confirmation pop-up appears. Click "Finalise and Close Submission" to lock the bid. A timestamped receipt and confirmation email with submission ID are generated — retain the email for future enquiries.
No physical submissions are accepted.
Evaluation Criteria
Source: E-tendering Help Manual for supplier - 27 January 2025.docx (unknown)The document provided is a supplier help manual for the eTendering system and does not contain evaluation criteria, scoring methodology, preference point system (80/20 or 90/10), minimum functionality thresholds, or stage-gate rules for this specific tender. Evaluation details will be in the tender's own bid specification document.
Technical Specifications
Source: E-tendering Help Manual for supplier - 27 January 2025.docx (unknown)The source material is a user manual for the Eskom eTendering submission platform, not the tender specification. It describes the portal's function (web-based electronic tender box replacing physical submissions at Eskom tender offices), registration process, OTP authentication, file upload procedure (categorisation, size limits), and submission finalisation. No scope of work, deliverables, quantities, standards, service levels, or capacity requirements for the building alterations at Kusile Power Station are contained in this document.
Compliance Requirements
Source: E-tendering Help Manual for supplier - 27 January 2025.docx (unknown)Central Supplier Database (CSD) registration is mandatory to access the eTendering portal.
Valid tax compliance status (SARS tax PIN) is implied by CSD registration but not explicitly stated in the manual.
No CIDB grading, B-BBEE level, CIPC registration, professional body registration, or local content requirements are mentioned in the source material. Tender-specific compliance requirements will be in the bid specification document.
Description
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdfEskom Supplier Quality Management Specification (240-105658000, QM 58, Rev 3) sets out minimum quality requirements for all existing and potential suppliers and sub-suppliers. It defines quality criteria for selection, evaluation, vendor registration, management, monitoring, assessment, and auditing. The specification applies across Eskom Holdings SOC Ltd, its subsidiaries, and all procurement types (RFI, RFQ, RFP, contracts). Suppliers must develop, implement, maintain, and continually improve a QMS based on ISO 9001. The document includes normative references (ISO 9001, ISO 10005), informative references (ISO 9000, ISO 10006, ISO 9004, Eskom SHEQ Policy 32-727, Eskom Procurement Policy 32-1033, Eskom Procurement Procedure 32-1034, PPPFA, CIDB 1004, IAEA GS-R-3.1, SANS 10845-1, List of Tender Returnables 240-12248652), definitions (Component, Contract Quality Plan, Hold Point, Intervention Points, Inspection Agency, Level 1–3 Plant Items, Nonconformity, Quality Plan, Quality Control Plan, Requirement, Primary/Secondary Plant, Special Process, Supplier, Sub-supplier, Witness Point), abbreviations, roles and responsibilities (Eskom quality representative selects requirements via Form A; suppliers complete and sign Form A), monitoring process (audited per management system audit schedule), and related/supporting documents (supersedes all divisional supplier quality standards; includes Form A, CQP template, QCP/ITP template, Method Statement template).
Important Dates
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdf (unknown)The specification revision 3 was authorised on 17 October 2021. Next review date is October 2024. No tender-specific closing date, briefing, or site visit dates are stated in this document; those will be in the specific RFP/RFQ/RFI invitation.
Contact Information
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdf (unknown)Eskom Quality Management function is the point of contact for quality requirements. The specification was compiled by SA Sambo (Chief Advisor Quality Management), supported by P Dondashe (Middle Manager Quality Management), authorised by L Meyer (Acting Senior General Manager Quality Risk and Management Sustainability) and K Pather. No direct email, phone, or submission address is provided in this specification; tender-specific contacts will be in the invitation document.
Submission Guidelines
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdf (unknown)Bidders must complete and sign Form A (Tender and Contract Quality Requirements for Supplier Quality Management Specification 240-105658000/QM 58 and ISO 9001) and submit it with the other returnable documents listed in the List of Tender Returnables (document 240-12248652). The applicable quality category (1, 2, 3, or 4) will be indicated in Form A for the specific procurement. Only one category applies per tender. All returnable documents must be submitted as part of the bid response; omission or incomplete submission may lead to disqualification.
Evaluation Criteria
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdf (unknown)Suppliers are evaluated against four quality requirement categories defined in the specification. The Eskom quality representative selects the applicable category (1–4) and completes Form A accordingly. Category 1 requires a valid ISO 9001 certificate, latest internal/external audit reports with corrective actions, draft Contract Quality Plan (CQP), example Inspection and Test Plan (ITP)/Quality Control Plan (QCP), documented control of externally provided processes, roles/responsibilities/authorities, and management review records. Category 2 requires objective evidence of an implemented QMS (manual, policy, objectives, document control, internal audit, nonconforming output control, corrective action procedures), latest internal audit reports, draft CQP, example ITP/QCP, control of externally provided processes, roles/responsibilities, and management review records. Category 3 requires documented QMS information (manual, policy, objectives, document control, internal audit, nonconforming output control, corrective action), draft CQP, example ITP/QCP, control of externally provided processes, and roles/responsibilities. Category 4 requires a quality method statement based on ISO 9001, signed quality policy, quality objectives, control of externally provided processes, and project-specific roles/responsibilities/authorities. All categories require Form A completion and compliance with the List of Tender Returnables (240-12248652). Evaluation references CIDB 1004 Best Practice Guideline A4 and PPPFA.
Technical Specifications
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdf (unknown)This specification (240-105658000, QM 58, Rev 3) defines minimum quality requirements for all existing and potential Eskom suppliers and sub-suppliers. It applies across Eskom Holdings SOC Ltd divisions, subsidiaries, and all procurement types (RFI, RFQ, RFP, contracts for products and services). Suppliers must develop, implement, maintain, and continually improve a QMS based on ISO 9001 (latest revision). Normative references: ISO 9001, ISO 10005. Informative references: ISO 9000, ISO 10006, ISO 9004, Eskom SHEQ Policy (32-727), Eskom Procurement Policy (32-1033) and Procedure (32-1034), PPPFA, CIDB 1004, IAEA GS-R-3.1, SANS 10845-1, and List of Tender Returnables (240-12248652). Key definitions include Hold Point (work cannot proceed without Eskom written authorisation), Witness Point (inspection with formal notification, work may proceed if waived), Intervention Points (inspection, hold, surveillance, witness, review, verification), Special Processes (results cannot be fully verified before delivery), and plant item criticality Levels 1–3. Suppliers must manage sub-supplier quality, including QMS verification, audits, CQP/QCP reviews, nonconformity management, inspection/test plans, and risk management. Eskom reserves right to assess sub-supplier facilities. Suppliers must notify Eskom of QMS or staff changes affecting quality prior to implementation.
Methodology
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdfSuppliers must develop method statements for special processes (welding, coating, heat treatment, NDE, tube rolling, post-weld heat treatment) and special installation/fabrication procedures. Method statements require supplier review and acceptance prior to commencing manufacture. The Eskom Method Statement Template (240-126469599) is provided as a guideline. Quality Control Plans/Inspection and Test Plans must include detailed reference to procedures, standards, instructions, specifications with specific sections and pages. Preservation management programme requires documented work plans with performance evaluation. Sub-supplier inspection and testing protocols must include inspection checklists, report formats, report processing/distribution/retention schedules, nonconformity response tracking and resolution, FMECA reports, and HAZOP reports where applicable.
Experience & Qualifications
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdfPersonnel performing special processes (NDE, welding, coating, heat treatment, etc.) must be suitably qualified and, where legally required, registered with statutory bodies (e.g., radiographic workers for radiography). Personnel must be certified competent through internal training management and competency control procedures or external certification bodies (e.g., NDT) via accredited service providers per SETA requirements. All personnel performing quality-affecting activities must have identified and documented training needs, with training implemented per company procedures; certificates must meet SETA requirements (unit standard completed, accredited provider). Quality audits must be carried out by trained, accredited, and experienced personnel per documented procedures. Inspection personnel (including agency personnel) must be competent and qualified per Project Quality Personnel Qualification Specification. Welder qualifications (WQR, WPS, PQR) must meet specified Codes of Construction.
Quality Management
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdfPre-Contract Award: Supplier and sub-supplier QMS must conform to ISO 9001 (latest revision) and this specification. QMS must include documented information (quality manual, plans, procedures, work instructions, method statements, workflow documentation). Categories 1 and 2 require valid ISO 9001 certificate from accredited body unless excluded in tender returnables. Main supplier responsible for defining and managing sub-supplier quality assurance/control elements and ensuring sub-supplier programmes support Eskom requirements. Supplier must implement sub-supplier performance management programme covering QMS verification, audits/surveillances, CQP/QCP reviews, nonconformity/defect management, inspection/test plans, and risk management. Supplier must notify Eskom of QMS or staff changes affecting quality prior to implementation. Quality Plan: Minimum requirements per ISO 10005. Where specified in evaluation criteria or tender returnables, all products/services/processes must have documented Contract Quality Plan (CQP) and/or Quality Control Plan (QCP)/Inspection and Test Plan (ITP). CQP addresses quality assurance elements; QCP/ITP addresses quality control elements. Contract Quality Plan: Must comply with ISO 10005 and include records management (material tests, PMI, certifications), free access for inspection, final documentation submission prior to shipment, special processes (welding: WQR, WPS, PQR management; welder qualification to construction codes; special installation/fabrication procedures; personnel qualification for NDE, welding, coating, heat treatment; SETA-certified competency), training needs identification and implementation (SETA requirements), storage/preservation/maintenance instructions prior to receipt, sub-supplier quality monitoring by Eskom/agent, and CQP content requirements (QMS aspects applied, resources, communication channels, documents/records, management authority/responsibility, document list, contact details, monitoring/measurement procedures). CQPs must be submitted before initial kick-off or pre-fabrication meeting or manufacturing commencement, whichever earlier. Eskom CQP template provided as guideline. Quality Control Plan: Supplier must develop processes to monitor, verify, document quality. Sub-supplier QCPs/ITPs must cover all quality-control activities chronologically from contract review through commissioning and certification. Requirements include: all stages controlled by QCP/ITP with clear quality verifications and critical product/service controls; Eskom review/acceptance of QCP/ITP with insertion of hold/witness points before work; Eskom agreement for subsequent changes; ITP coverage of material certification, fabrication, in-process inspections, final acceptance tests, packaging, preservation, site acceptance, construction/erection, pre-commissioning/commissioning; sub-supplier activities performed under Eskom-accepted QCP/ITP; codes/standards/acceptance criteria available at work location in English; separate QCP/ITP per sub-supplier scope; supplier ultimately accountable for all sub-supplier QCPs/ITPs; Eskom right to select intervention points for oversight/surveillance/audits; signed ITPs/QCPs become contract addendums; QCP/ITP content requirements (contract number, order number, work area, description, unique number, operation sequence, specification/drawing/procedure references with criticality ratings, acceptance criteria with clause references, supplier/Eskom intervention points, sign-off provisions, inspection/test records). Sub-supplier QCPs/ITPs must include equipment/location descriptions, reference documents with specific sections/pages, acceptance criteria, certifying documents with Eskom numbering, inspection activity definitions (witness, hold, document review, verification), inspector qualifications, test procedures, acceptance criteria per tolerances, signed acceptance section, intervention points (factory acceptance, package acceptance, witness, hold). Quality kick-off meeting at contract start and each phase; 14 days' notice; competent inspection personnel per Project Quality Personnel Qualification Specification. Mandatory pre-inspection meetings convened by Eskom/agency/AIA. Eskom may appoint resident inspectors at supplier premises at no cost. Eskom may appoint any AIA/inspection agency; supplier may not object. Eskom QCP/ITP template provided as guideline.
Compliance Requirements
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdf (unknown)Suppliers must have a QMS conforming to ISO 9001 (latest revision). Depending on the applicable category (1–4), a valid ISO 9001 certificate from an accredited certification body is required (Categories 1 and 2 explicitly; Categories 3 and 4 require documented evidence of QMS compliance). Compliance with Eskom Procurement and Supply Chain Management Policy (32-1033) and Procedure (32-1034) is required. PPPFA applies for preferential procurement. CIDB 1004 guideline referenced for quality evaluation in tenders. SANS 10845-1 applies for construction procurement. Suppliers must complete Form A and submit returnables per the List of Tender Returnables (240-12248652). No specific B-BBEE level, CIDB grading, CSD registration, or tax clearance requirements are stated in this specification; those will be in the specific tender invitation.
Health & Safety
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdfThe specification references Eskom SHEQ Policy (32-727) and IAEA Safety Standard GS-R-3.1 as informative references. No specific health and safety requirements, safety plans, or HSE compliance details are defined in this quality management specification; these would be addressed in separate SHEQ specifications or the specific tender documents.
Contractual Terms
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdfStandard conditions include: Rights of Access — Eskom and its agents have free and unrestricted access to supplier and sub-supplier premises, records, and personnel for inspection, audit, and expediting. Eskom Rights to Information — Eskom may request any quality-related information, documentation, or records at any time. Preservation — Supplier must establish a preservation management programme covering all materials, equipment, and components (including valves, electrical motors, rotating equipment, piping, instrumentation, flange faces, gaskets, coatings, insulation). Programme must include special precautions (periodic shaft rotation, engine turnover, lubrication), documented preservation requirements in purchase orders and work authorisations, sub-supplier input documentation, communication to project functional areas, clear responsibility designation, oversight at all project stages, and free Eskom access to preservation records. Quality Audits — Eskom may conduct audits at supplier and sub-supplier facilities; audits performed by trained, accredited, experienced personnel per documented procedures. Management of Nonconformities — Eskom-identified nonconformities must be addressed through documented corrective action processes. Special Processes — Processes where results cannot be verified before delivery (e.g., welding, NDE, coating, heat treatment) require qualified personnel, certified per SETA or statutory requirements, with records maintained. Welder qualifications (WQR, WPS, PQR) must meet specified construction codes. Eskom may appoint resident quality inspectors at supplier/sub-supplier premises at no cost to Eskom. Eskom may appoint any Approved Inspection Authority (AIA) or inspection agency; supplier may not object or hinder. Signed QCPs/ITPs become contract addendums. Quality kick-off meetings required with 14 days' notice. Mandatory pre-inspection meetings convened by Eskom or its agency.
Section
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdfQuality evaluation is structured around four supplier categories (1–4) selected by the Eskom quality representative per procurement. Only one category applies per tender. Category 1 (highest): valid ISO 9001 certificate, latest internal/external audit reports with corrective actions, draft CQP, example ITP/QCP, documented control of externally provided processes, roles/responsibilities/authorities, management review records. Category 2: objective evidence of implemented QMS (manual, policy, objectives, document control, internal audit, nonconforming output control, corrective action procedures), latest internal audit reports, draft CQP, example ITP/QCP, control of externally provided processes, roles/responsibilities, management review records. Category 3: documented QMS information (manual, policy, objectives, document control, internal audit, nonconforming output control, corrective action), draft CQP, example ITP/QCP, control of externally provided processes, roles/responsibilities. Category 4 (lowest): quality method statement based on ISO 9001, signed quality policy, quality objectives, control of externally provided processes, project-specific roles/responsibilities/authorities. All categories require Form A completion and compliance with List of Tender Returnables (240-12248652). Evaluation references CIDB 1004 Best Practice Guideline A4 for evaluating quality in tender submissions.
Description
Source: C2 ECC3 Pricing Data Option B.docAlterations and additions to existing building structures at Kusile Power Station for a period of nine (9) months. Work covers four buildings: Auxiliary Building 1, FGD Control Room, Admin Building, and BOP Building. Contract uses NEC3 ECC3 Option B (re-measurement) with bill of quantities. Scope includes site establishment and de-establishment of contractor's camp facilities, temporary site facilities and transportation rental, health and safety compliance, PPE provision, training, occupational hygiene surveys, documentation deliverables, provision of design and site supervision professionals, construction resources across normal hours and overtime, and alteration works involving demolition/removal of existing concrete, brickwork, doors, windows, ceilings, partitions, joinery, ironmongery, tiling, and sanitary fittings.
Evaluation Criteria
Source: C2 ECC3 Pricing Data Option B.doc (unknown)Key personnel must hold professional registrations and relevant experience:
Company must provide 40 personnel for entry/exit medicals and security clearance.
Technical Specifications
Source: C2 ECC3 Pricing Data Option B.doc (unknown)Scope: Alterations and additions to existing building structures at Kusile Power Station over 9 months across four buildings: Auxiliary Building 1, FGD Control Room, Admin Building, BOP Building.
Preliminaries & General:
Construction Resources (Normal Hours - 1304 hours each unless noted):
Construction Work - Alterations (Removal of Existing Work):
Work to be carried out with minimal mess, noise, and disturbance; protection of existing fixtures required.
Financial Requirements
Source: C2 ECC3 Pricing Data Option B.doc (unknown)Contract type: NEC3 Engineering and Construction Contract (ECC3) Option B - re-measurement contract with bill of quantities comprising items measured using quantities and rates or lump sums. No value-related or time-related items used.
Pricing assumptions:
Units of measurement: Metric (m, m², m³, kg, t, h, No., sum, %, kl, l, km, ha, kW, kPa, MPa, MN, MN.m, km-pass, m²-pass, m³-km)
Bill of Quantities: 15 pages covering Preliminaries & General, Resources (Design/Site Supervision, Construction Normal Hours, Saturday Overtime, Sunday/Public Holiday Overtime), and Construction Work (Alterations across 4 buildings).
Compliance Requirements
Source: C2 ECC3 Pricing Data Option B.doc (unknown)Professional registrations required for key personnel:
All key personnel require 5 years relevant experience (3 years for Land Surveyor, Document Controller, Semi-skilled support).
Company must provide 40 personnel for medical examinations (entry and exit) and security clearance certification.
Standard Eskom requirements (not detailed in this document but typically applicable): CSD registration, valid SARS tax compliance status PIN, B-BBEE certificate, CIDB grading (construction).
Description
Source: C0 ECC3 Contract cover page.docNEC3 Engineering & Construction Contract between Eskom Holdings SOC Ltd and the Contractor (to be inserted at award stage) for Alterations and Additions to Existing Building Structures at Kusile Power Station for a period of 9 months. Contract document structure: Part C1 Agreements & Contract Data (21 pages), Part C2 Pricing Data (15 pages), Part C3 Scope of Work (45 pages), Part C4 Site Information (2 pages). Part C1 contains Form of Offer and Acceptance (3 pages), Contract Data provided by the Employer (13 pages), and Contract Data provided by the Contractor (3 pages, to be inserted from returnable documents at award stage).
Important Dates
Source: C0 ECC3 Contract cover page.doc (unknown)Contract duration: nine (9) months. Closing date, compulsory briefing date, site visit date, and clarification deadline are not provided in this extract.
Contact Information
Source: C0 ECC3 Contract cover page.doc (unknown)Employer: Eskom Holdings SOC Ltd (Reg No. 2002/015527/30). No SCM or technical contact names, emails, phone numbers, or submission address are given in this extract.
Submission Guidelines
Source: C0 ECC3 Contract cover page.doc (unknown)Submission details (closing date, time, address, format, and mandatory returnable documents) are not present in the provided contract cover page and table of contents. These are typically contained in the separate tender invitation (Part T1) and returnable schedules, which are not included in this extract.
Evaluation Criteria
Source: C0 ECC3 Contract cover page.doc (unknown)Evaluation criteria, scoring split, preference point system (80/20 or 90/10), and minimum qualifying thresholds are not stated in the provided extract. The document is the NEC3 contract cover page and contents list only.
Technical Specifications
Source: C0 ECC3 Contract cover page.doc (unknown)Scope: Alterations and additions to existing building structures at Kusile Power Station. The detailed Scope of Work is contained in Part C3 (45 pages), which is not included in this extract.
Financial Requirements
Source: C0 ECC3 Contract cover page.doc (unknown)Pricing data is contained in Part C2 (15 pages), not provided in this extract. No information on pricing format, bonds, guarantees, retention, payment terms, or financial capacity thresholds is available here.
Compliance Requirements
Source: C0 ECC3 Contract cover page.doc (unknown)No specific eligibility requirements (CIDB grading, B-BBEE level, tax clearance, CSD registration, local content, professional registrations) are stated in this extract. Standard Eskom and National Treasury procurement requirements are expected to apply but are not detailed in the provided pages.
Description
Source: 240-12248652_List of Tender Returnables_Cat 1_ Rev 7.pdfAlterations and additions to existing building structures at Kusile Power Station for a nine-month period. Quality requirements are governed by Eskom Supplier Quality Management Specification (Rev 7) and reference documents 240-105658000 and 240-109253698.
Contact Information
Source: 240-12248652_List of Tender Returnables_Cat 1_ Rev 7.pdf (TENDER)Eskom representative (name not legible in source); document issued 06-Nov-25.
Submission Guidelines
Source: 240-12248652_List of Tender Returnables_Cat 1_ Rev 7.pdf (TENDER)Returnable documents required with the tender submission:
Returnable Documents
Source: 240-12248652_List of Tender Returnables_Cat 1_ Rev 7.pdf (TENDER)Form A (completed and signed). Valid ISO 9001:2015 certificate. Documented QMS evidence: organisation chart and responsibility matrix; control of externally provided processes procedure; latest internal audit report with nonconformities/corrective actions; latest certification audit report (≤12 months) with nonconformities/corrective actions; management review meeting records. Draft Contract Quality Plan (ISO 10005). Draft/example ITP or QCP for similar previous work (ISO 10005).
Evaluation Criteria
Source: 240-12248652_List of Tender Returnables_Cat 1_ Rev 7.pdf (TENDER)Quality evaluation is scored across five sections totalling 13 points:
Technical Specifications
Source: 240-12248652_List of Tender Returnables_Cat 1_ Rev 7.pdf (TENDER)Alterations and additions to existing building structures at Kusile Power Station for a nine-month period. Quality deliverables must align with ISO 9001:2015 and ISO 10005. Bidders must demonstrate an operational Quality Management System covering: defined roles, responsibilities and authorities (including quality function); control of externally provided processes, products and services with criteria for evaluation, selection, monitoring and re-evaluation of external providers; internal audit reports with nonconformities and corrective actions; certification audit reports not older than 12 months; and management review records. A draft Contract Quality Plan and a draft/example Inspection and Test Plan (ITP) or Quality Control Plan (QCP) for similar previous work are required.
Compliance Requirements
Source: 240-12248652_List of Tender Returnables_Cat 1_ Rev 7.pdf (TENDER)Mandatory: valid ISO 9001:2015 certificate issued by a certification body with recognised international accreditation, with scope relevant to the works. Form A must be completed and signed. Additional scope-specific requirements may apply per the tender specification.
Requirements
Source: 240-12248652_List of Tender Returnables_Cat 1_ Rev 7.pdf (TENDER)Valid ISO 9001:2015 certification from an internationally accredited body with relevant scope. Operational QMS evidenced by documented roles/responsibilities, external provider control procedure, internal and certification audit reports (≤12 months), and management review records. Draft Contract Quality Plan and draft/example ITP/QCP for similar work specific to the tender scope. Form A completed and signed. Additional requirements as per the scope of work and specification.
Description
Source: C1 1 ECC3 Offer Acceptance.docThis is the Form of Offer and Acceptance (C1.1) for the contract: Alterations and Additions to Existing Building Structures at Kusile Power Station for a period of 8 months. The form records the tenderer's offer and the Employer's acceptance, forming the agreement between the parties. It includes the Offer section (to be completed by the tenderer), the Acceptance section (to be completed by the Employer), and a Schedule of Deviations. The contract documents are listed as Part C1 (Agreements and Contract Data), Part C2 (Pricing Data), Part C3 (Scope of Work: Works Information), and Part C4 (Site Information), plus drawings and documents incorporated by reference.
Submission Guidelines
Source: C1 1 ECC3 Offer Acceptance.doc (unknown)This document is the Form of Offer and Acceptance (C1.1) to be completed and signed by the successful tenderer after award. It is not a submission document for the tender stage. The tenderer must sign the Offer section, providing the offered total of prices exclusive of VAT, VAT at 15%, and the total inclusive of VAT (in figures and words). The tenderer must also provide their CIDB registration number (if applicable), signatory name, capacity, and witness details. The Employer accepts by signing the Acceptance section. Any deviations from the tender documents must be recorded in the Schedule of Deviations attached to this form. The agreement comes into effect when the tenderer receives a fully completed original copy signed by both parties. The tenderer must, within two weeks of receiving the completed agreement, contact the Employer's agent (details in Contract Data) to arrange delivery of securities, bonds, guarantees, proof of insurance, and any other documentation required by the conditions of contract. Failure to fulfil these obligations constitutes repudiation of the agreement.
Evaluation Criteria
Source: C1 1 ECC3 Offer Acceptance.doc (unknown)CIDB registration (registration number required). Valid tax compliance status (implied by standard Eskom procurement practice). CSD registration (implied). No other specific eligibility criteria, minimum B-BBEE level, local content thresholds, or financial turnover requirements are stated in the provided document.
Technical Specifications
Source: C1 1 ECC3 Offer Acceptance.doc (unknown)The contract is for Alterations and Additions to Existing Building Structures at Kusile Power Station. The contract duration is 8 months (the tender record states 9 months; this form states 8 months). The scope of work is defined in Part C3: Scope of Work (Works Information). The contract documents comprise Part C1: Agreements and Contract Data (including this Form of Offer and Acceptance), Part C2: Pricing Data, Part C3: Scope of Work: Works Information, Part C4: Site Information, and drawings and documents incorporated by reference.
Financial Requirements
Source: C1 1 ECC3 Offer Acceptance.doc (unknown)The offered total of prices exclusive of VAT, VAT at 15%, and the total inclusive of VAT must be stated in the Offer section. The tenderer must provide securities, bonds, guarantees, and proof of insurance as required by the conditions of contract identified in the Contract Data, to be delivered within two weeks of receiving the completed agreement. The total inclusive of VAT is required by the Employer for budgeting purposes only; actual amounts due will be assessed in terms of the conditions of contract.
Compliance Requirements
Source: C1 1 ECC3 Offer Acceptance.doc (unknown)The tenderer must provide their CIDB registration number (if applicable) in the Offer section. The signatory must be duly authorised to bind the tenderer. The tenderer must comply with all terms and conditions of the contract identified in the Contract Data.
Description
Source: C3 1 ECC3 Employers Works Information.docEskom intends to appoint a suitably qualified external Contractor to execute alterations and additions to existing buildings at Kusile Power Station. Works are multidisciplinary: architectural, civil, structural, mechanical, electrical, and control & instrumentation (C&I). Scope includes demolition/removal of existing elements/services, alterations/modifications/additions to structures, new building works/installations, reinstatement/making good of finishes, installation/alteration/relocation/reconnection of building services, testing/commissioning/handover. Contractor executes works per Employer's designs and applicable codes/standards/industry best practices. Contractor responsible for all labour, supervision, plant, equipment, materials, temporary works, and resources. Works carried out within operational power station environment - must minimise disruption to operations and ensure safety of personnel, plant, equipment, infrastructure. Contractor provides Construction and Commissioning Monitoring services, all testing/commissioning, training to Employer's personnel, and construction records (as-built drawings, O&M manuals). Objective: improve functionality and efficiency of existing facilities through alterations/additions providing comfortable, productive working environment meeting operational requirements.
Important Dates
Source: C3 1 ECC3 Employers Works Information.doc (unknown)No closing date, briefing session, site visit, or clarification deadline is stated in this document. The tender record indicates a closing date of 23 September 2026 at 10:00. Any compulsory briefing or site inspection will be advertised in the tender notice.
Contact Information
Source: C3 1 ECC3 Employers Works Information.doc (unknown)No SCM or technical contact names, emails, or phone numbers are provided in this document. The invoicing email for payment certificates is [email protected]. The Project Manager will provide the Zendto file transfer URL and project document control email address upon contract award.
Submission Guidelines
Source: C3 1 ECC3 Employers Works Information.doc (unknown)Submission method and address are not stated in this document. The document is the Employer's Works Information (C3.1) forming part of the Scope of Work. Returnable forms and documents required at tender stage are not listed here; they will be specified in the tender invitation and returnable schedules (typically SBD 1, SBD 3.1/3.2/3.3, SBD 4, SBD 6.1, SBD 8, SBD 9, CSD registration proof, tax compliance status PIN, CIDB grading certificate, B-BBEE certificate/sworn affidavit, and professional registration certificates for key personnel).
Evaluation Criteria
Source: C3 1 ECC3 Employers Works Information.doc (unknown)Key personnel must hold specified professional registrations and minimum experience:
Works must comply with SANS, Eskom standards, and all normative/informative references listed. Method statements and Quality Control Plans required for all major activities before work commencement. No work may start without accepted method statement and QCP. Bi-weekly progress reporting with updated MS Project/Primavera P6 programme required.
Technical Specifications
Source: C3 1 ECC3 Employers Works Information.doc (unknown)Scope: Alterations and additions to existing buildings at Kusile Power Station (Mpumalanga) over 9 months. Multidisciplinary works: architectural, civil, structural, mechanical, electrical, control & instrumentation (C&I).
Key work areas:
Work includes:
Key drawings provided (architectural):
Structural drawings: Ground floor plan concrete details, ground floor plan reinforcement details
Applicable standards: SANS, Eskom standards (203-1239 Conceptual Architectural Design Specifications, ESK AM AAA 1 Corporate Identity Manual, ESK PB AAQ 3 Interior Specifications, 240-10781296 Constructability Assessment Guideline, 240-57127953...), ISO 9001, Eskom Plant Safety Regulations (36-681), Supplier Quality Management Specification (240-105658000), Engineering Change Management Procedure (240-53114002), Design Review Procedure (240-53113685), Engineering Quality Manual (240-53665024), Document and Records Management (474-58 Rev1, 240-53114186).
Works executed within operational power station environment - must minimise disruption to operations and ensure safety.
Geotechnical works: excavation, earthworks, foundation preparation, ground improvement per Employer's design and applicable laws/standards.
Contractor responsible for all labour, supervision, plant, equipment, materials, temporary works.
Financial Requirements
Source: C3 1 ECC3 Employers Works Information.doc (unknown)Invoicing: Within one week of receiving payment certificate from Project Manager (core clause 51.1), Contractor provides tax invoice to Eskom Holdings SOC Ltd showing amount due per payment certificate. Invoice must include: Contractor and Service Manager name/address, contract number/title, Contractor's VAT registration number, Eskom's VAT registration number (4740101508), description of service per Price List, total excluding VAT, VAT amount, total including VAT. Invoices submitted to [email protected] once confirmed with payment certificate.
Contract change management per NEC ECC compensation event process.
Bonds and guarantees: Referenced in section 2.11 but details not provided in extract.
Compliance Requirements
Source: C3 1 ECC3 Employers Works Information.doc (unknown)Mandatory professional registrations for key personnel:
Construction Regulations 2014 compliance required for all personnel.
Quality assurance: ISO 9001 compliance, method statements and QCPs for all major activities, ITP records, material/test certificates, non-conformance reports, professional certifications, statutory approvals, warranties/guarantees.
Health & safety: Compliance with OHS Act, Eskom Plant Safety Regulations (36-681).
Environmental: Environmental Officer required, compliance with environmental controls, fauna/flora, historical objects.
CSD registration and SARS tax compliance implied standard Eskom requirements but not explicitly detailed in this extract.
No explicit CIDB grading, B-BBEE level, or financial turnover thresholds stated in this scope document.
Description
Source: TES_Building Alterations Scope -FINAL _.pdfThis document is the Tender Technical Evaluation Strategy (TES) for the scope: Execution of Alterations to Existing Building Structures including Construction & Commissioning Supervision at Kusile Power Station (Unique Identifier: KUS-20250643, Revision 1). It defines the evaluation methodology, criteria, and scoring principles for assessing tender submissions. The strategy is governed by Eskom's Tender Technical Evaluation Procedure (240-48929482), Eskom Procurement Policy (32-1034), and Internal Audit Procedure (474-59). The related Scope of Work document is KUS-20250644. The TES was compiled by L. Thipa (Civil Engineer), authorised by S. Nkomo (Auxiliary Engineering Manager) and S. Hlongwa (Engineering Group Manager). The technical evaluation threshold is 70%. The evaluation uses a weighted scorecard with mandatory pass/fail criteria and qualitative weighted criteria covering key personnel experience (67%), organisational structure (15%), and project programme (10%). Six core TET members evaluate submissions. Unacceptable technical risks include exclusion of proof of completed similar projects and exclusion of professional registration certificates for key personnel.
Submission Guidelines
Source: TES_Building Alterations Scope -FINAL _.pdf (unknown)Submission method and address are not stated in this evaluation strategy document; they will be specified in the formal tender invitation. Returnable documents required with the tender:
Disqualification risks: omission of any mandatory returnable document, unsigned forms, forged/falsified documents, failure to meet minimum 70% technical threshold, exclusion of proof of completed similar projects, or exclusion of professional registration certificates for key personnel.
Evaluation Criteria
Source: TES_Building Alterations Scope -FINAL _.pdf (unknown)Two-stage technical evaluation:
Failure on any mandatory criterion disqualifies the tender.
Architectural Professional (8%): SACAP registered, formal qualification, minimum 5 years post-registration experience in architectural design for industrial/infrastructure projects.
Structural Engineer (4%): ECSA registered (Pr.Eng/Pr.Tech Eng), Civil Engineering qualification, minimum 5 years post-registration experience in structural engineering design for industrial/infrastructure facilities.
Geotechnical Engineer (2%): ECSA registered, Civil Engineering qualification, minimum 5 years post-registration experience in geotechnical design and investigations.
Mechanical Engineer HVAC (5%): ECSA registered, Mechanical Engineering qualification, minimum 5 years post-registration experience in HVAC systems for industrial/commercial/infrastructure facilities.
Mechanical Engineer Fire Protection (3%): ECSA registered, Mechanical Engineering qualification, minimum 5 years post-registration experience in fire protection systems and rational fire design.
C&I Engineer (3%): ECSA registered, Electrical/Electronics Engineering qualification, minimum 5 years post-registration experience in design, integration, commissioning of C&I systems (PLC, SCADA, HMI, DCS, vendor networks Siemens/Schneider/ABB/GE).
Electrical Engineer (5%): ECSA registered, Electrical Engineering qualification, minimum 5 years post-registration experience in low/medium/high voltage electrical systems.
Site Agent (15%): Degree/diploma in Civil/Structural Engineering/Construction Management, minimum 5 years post-qualification experience in general building construction and site supervision, registered with ECSA or SACPCMP.
Foreman Ceiling & Partitioning (12%): National/trade certificate in ceiling and partitioning installation, minimum 5 years relevant experience.
Foreman HVAC (5%): National/trade certificate in HVAC construction, minimum 5 years experience supervising HVAC construction, testing and commissioning.
Fire Alarm Technician (3%): National/trade certificate or equivalent in Electrical/Electronics, valid SAQCC Fire Detection Systems Installation and Commissioning Certificate/Registration, minimum 5 years experience in fire detection and alarm systems installation and commissioning.
Electrical Installation Electrician (5%): National/trade certificate in Electrical Engineering/Electrical Installation, registered with Department of Labour as Master Installation Electrician, valid Wireman's License, minimum 5 years experience in electrical construction/installation/reticulation.
Commissioning/Testing Engineer (5%): Diploma in Electrical/Electronics Engineering, minimum 5 years hands-on commissioning experience in BMS and integrated systems.
Scoring scale: 5 (100% – compliant, no risks), 4 (80% – compliant with acceptable risks/exceptions/conditions), 2 (40% – non-compliant/unacceptable risks), 0 (0% – totally deficient/non-responsive). Individual TET member scores are averaged per criterion. Total qualitative weighting sums to 100%.
Technical Specifications
Source: TES_Building Alterations Scope -FINAL _.pdf (unknown)Scope: Execution of alterations to existing building structures including construction and commissioning supervision at Kusile Power Station, Mpumalanga. Contract period: nine months. Works involve building alterations and additions to existing facilities including reconfigurations to electrical, control and instrumentation, structural, HVAC, and fire protection/detection systems; structural alterations including partial demolitions, strengthening works and modifications to structural elements; additions such as extensions, additional floors or new building sections integrated with existing structures and systems; internal renovations and reconfigurations including changes to building layouts, building systems, finishes, ceilings and partitions; coordination and integration of multiple disciplines (architectural, civil, structural, mechanical, electrical, control & instrumentation). Similar scope reference projects must include these activities. Key personnel required across 13 roles covering architectural, structural, geotechnical, mechanical (HVAC and fire protection), C&I, electrical, site management, foremen (ceiling/partitioning and HVAC), fire alarm, electrical installation, and commissioning/testing. All key personnel must hold current valid professional registrations as specified and meet minimum post-registration experience requirements (generally 5 years). Organisational structure must demonstrate delivery model, design management, design-construction interface, and subcontracting/JV arrangements. Detailed project programme with resource loading, critical path, sequencing, contingency planning, and monitoring mechanisms required.
Methodology
Source: TES_Building Alterations Scope -FINAL _.pdfTechnical evaluation methodology:
Experience & Qualifications
Source: TES_Building Alterations Scope -FINAL _.pdfExperience and qualification requirements for key personnel (all require minimum 5 years post-registration/qualification experience unless noted):
All CVs must be accompanied by certified copies of qualifications, professional registration certificates, and ID documents certified within the last three months. An undertaking is required that identified resources will not be changed on contract award. Key personnel must have good communication skills in English.
Quality Management
Source: TES_Building Alterations Scope -FINAL _.pdfQuality management is addressed through the technical evaluation criteria. Key personnel must hold current valid professional registrations (SACAP, ECSA, SACPCMP, SAQCC, DOL) and meet minimum post-registration experience requirements. The evaluation assesses competency in consultancy services including design, advisory services, technical support, performance assessments, system optimisation, fault identification, and troubleshooting. Organisational structure must demonstrate design management structure with discipline leads and design coordination. Project programme must include monitoring, reporting and coordination mechanisms. No separate quality management system requirements (e.g. ISO 9001) are stated in this evaluation strategy document.
Compliance Requirements
Source: TES_Building Alterations Scope -FINAL _.pdf (unknown)Mandatory compliance requirements derived from evaluation criteria:
Architectural Professional: SACAP
Structural Engineer: ECSA (Pr.Eng or Pr.Tech Eng)
Geotechnical Engineer: ECSA (Pr.Eng or Pr.Tech Eng)
Mechanical Engineer HVAC: ECSA (Pr.Eng or Pr.Tech Eng)
Mechanical Engineer Fire Protection: ECSA (Pr.Eng or Pr.Tech Eng)
C&I Engineer: ECSA (Pr.Eng or Pr.Tech Eng)
Electrical Engineer: ECSA (Pr.Eng or Pr.Tech Eng)
Site Agent: ECSA or SACPCMP
Foreman Ceiling & Partitioning: National/trade certificate
Foreman HVAC: National/trade certificate
Fire Alarm Technician: SAQCC Fire Detection Systems Installation and Commissioning Certificate/Registration
Electrical Installation Electrician: Department of Labour Master Installation Electrician registration, valid Wireman's License
Commissioning/Testing Engineer: Diploma qualification
Environmental
Source: TES_Building Alterations Scope -FINAL _.pdfNo specific environmental requirements, impact assessments, or sustainability criteria are stated in this evaluation strategy document. The project programme criterion requires contingency planning for operational risks, which may include environmental considerations, but no explicit environmental standards or certifications are mandated.
Section
Source: TES_Building Alterations Scope -FINAL _.pdfSee main evaluationCriteria field for complete evaluation criteria. This extended section contains only the template identifier reference.
Submission Guidelines
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.docx (unknown)Mandatory returnable: E-Tendering Training Acknowledgement Form (Template ID 240-9722574 Rev 1). The form must be fully completed and submitted to Eskom within the prescribed period before the tender closes. Failure to submit a fully completed form renders the tenderer non-responsive and disqualified from the procurement process. The form requires the tenderer's business name or joint venture name, contact person, landline, cellphone, email, an acknowledgment of self-training via the e-Tendering Noddy Guide, video, or clarification meeting, and an authorised signature with designation and date.
Evaluation Criteria
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.docx (unknown)Bidders must be registered on the National Treasury Central Supplier Database (CSD). Bidders must have a valid tax compliance status (SARS tax pin/TCS). Bidders must meet the applicable CIDB grading for building construction works. Submission of the completed E-Tendering Training Acknowledgement Form is a mandatory returnable requirement.
Technical Specifications
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.docx (unknown)Business name/JV: _______________________________________________________
Compliance Requirements
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.docx (unknown)CSD registration required. Valid SARS tax compliance status (tax pin/TCS) required. Applicable CIDB grading for building construction works required. E-Tendering Training Acknowledgement Form must be completed and submitted as a mandatory returnable document.
Important Dates
Source: C1 2a ECC3 Data by Employer.doc (unknown)Starting date: 01 August 2026
Completion date for whole of works: 31 March 2027
Sectional completion dates:
Key dates post contract award (all within 2 weeks):
Access date for Kusile Power Station: Upon obtaining site access card
Defects date: 52 weeks after Completion of whole works
Defect correction period: 1 week
Assessment interval for payment: between the 25th day of each successive month
Payment period: 4 weeks
Contact Information
Source: C1 2a ECC3 Data by Employer.doc (unknown)Employer: Eskom Holdings SOC Ltd (reg no: 2002/015527/30)
Registered office: Megawatt Park, Maxwell Drive, Sandton, Johannesburg
Project Manager: [●] (to be appointed)
Supervisor: [●] (to be appointed)
Adjudicator: selected from ICE-SA Division panel (www.ice-sa.org.za); if parties cannot agree, appointed by Arbitration Foundation of Southern Africa (AFSA)
Adjudicator nominating body: Chairman of ICE-SA joint Division of SA Institution of Civil Engineering and London Institution of Civil Engineers (www.ice-sa.org.za)
Arbitration: latest edition of Rules for Conduct of Arbitrations by Association of Arbitrators (Southern Africa); place: South Africa; appointing authority: Chairman of Association of Arbitrators (Southern Africa) or nominee
Technical Specifications
Source: C1 2a ECC3 Data by Employer.doc (unknown)Works: Alterations and Additions to Existing Building Structures at Kusile Power Station
Site boundaries: Kusile Power Station
Site Information: Part 4: Site Information
Works Information: Part 3: Scope of Work and all referenced documents and drawings
Risk Register matters: Labour and Community Strike/Unrest; Weather Conditions; Working at height; Risk Identification and Assessment meeting to be held 1x week post contract award; Risk Register compiled and managed
Weather recording location: Emalahleni Weather Station
Weather measurements (monthly): cumulative rainfall (mm); days with rainfall >10 mm; days with minimum air temperature <0°C; days with snow lying at 09:00 SAST
Weather data source: South African Weather Bureau; records included in Annexure A to Contract Data
Method of measurement: Option B (Priced contract with bill of quantities) as amended in Part C2.1 Pricing Assumptions
Contract law: Republic of South Africa
Contract language: English
Period for reply: 1 week
Contractor to submit first programme within 2 weeks of Contract Date
Revised programmes at intervals no longer than 2 weeks
Employer not willing to take over works before Completion Date
Financial Requirements
Source: C1 2a ECC3 Data by Employer.doc (unknown)Contract type: Priced contract with bill of quantities (Option B)
Currency: South African Rand
Retention: 5% of each invoice value; 50% released on Completion of Works; remaining 50% released at end of defects period
Delay damages per section: R0.5% per day for work not done to-date up to maximum of 10% of contract value per section
Total delay damages payable: not exceeding 10% of contract value
Interest rate: publicly quoted prime rate of Standard Bank of South Africa Ltd (365-day year) for Rand amounts; LIBOR rate (6-month) for other currencies
Insurance Table A (Contractor provides):
Insurance Table B (Employer provides): Assets All Risk, Contract Works insurance, Environmental Liability, General and Public Liability, Transportation (Marine), Motor Fleet and Mobile Plant, Terrorism, Cyber Liability, Nuclear Material Damage and Business Interruption, Nuclear Material Damage Terrorism - all per insurance policy document
Tax invoice: Contractor must provide within 1 week of receiving payment certificate; must include Employer's VAT number 4740101508
Contractor's liability for indirect/consequential loss: R0.00
Contractor's liability for loss/damage to Employer's property per event: amount of deductibles relevant to event
Contractor's liability for design defects not on Defects Certificate: greater of total Prices at Contract Date and amounts excluded/unrecoverable from Employer's assets policy plus applicable deductible
Contractor's total liability (excluding excluded matters): total of Prices other than for additional excluded matters
Additional excluded matters (unlimited liability): design defects arising before Defects Certificate; defects from manufacture/fabrication outside Site; loss/damage to property (other than works, Plant, Materials); death/injury to person; intellectual property infringement
End of liability date: (i) 5 years after defects date for latent defects; (ii) prescription date per Prescription Act 68 of 1969 for other matters
Compliance Requirements
Source: C1 2a ECC3 Data by Employer.doc (unknown)Contractor must comply with Construction Regulations 2014 (under OHSA 85 of 1993); warrant that prices include sufficient amount for health & safety compliance; ensure subcontractors comply
Contractor must comply with all applicable environmental laws and regulations; ensure subcontractors comply
Contractor must notify Employer within 7 days of any change in B-BBEE status; submit updated verification certificate and supporting documentation within 30 days of notification
Contractor must not disclose confidential information; obtain prior written consent for images of works; ensure subcontractors abide by confidentiality
Contractor must comply with Employer's Asbestos Standard 32-303 for safe processing, handling, storing, disposal and phase-out of asbestos and ACM
Contractor must co-operate fully with investigations into Prohibited Actions (coercive, collusive, corrupt, fraudulent, obstructive actions)
If joint venture: joint and several liability; notify Project Manager of key person with authority to bind within 2 weeks of Contract Date; no alteration of JV composition without Employer's written consent
Contractor may not cede, delegate or assign rights/obligations without Employer's written consent
Employer may cede/delegate rights to subsidiaries or divisions resulting from electricity industry restructuring
Description
Source: Unpriced BOQ for Alterations and Additions to Existing Building Structures at Kusile Power Station 31.08.26.pdfAlterations and additions to existing building structures at Kusile Power Station for a period of eight (8) months. Works cover four key buildings: Auxiliary Building 1, FGD Control Room, Admin Building, and BOP Building. The scope includes demolition/alterations, new building works, HVAC, water detection, fire detection, signage, and electrical installation. The project requires full site establishment with contractor camp (offices, kitchen, ablutions, change rooms, storage, lighting, fencing, temporary water/wastewater systems), temporary facilities and transportation (vehicles, container rentals), comprehensive health and safety compliance (safety file, medicals, security clearance, PPE, training, occupational hygiene surveys), and professional design/supervision resources alongside a large construction team. All works to be executed with minimal disturbance to adjoining premises and occupants.
Contact Information
Source: Unpriced BOQ for Alterations and Additions to Existing Building Structures at Kusile Power Station 31.08.26.pdf (unknown){"name":null,"email":null,"phone":null,"department":"QUANTITY RATE AMOUNT","address":null}
Evaluation Criteria
Source: Unpriced BOQ for Alterations and Additions to Existing Building Structures at Kusile Power Station 31.08.26.pdf (unknown)Bidders must demonstrate capacity to provide professionally registered personnel: Architect (SACAP), Engineers (ECSA) in Geotechnical, Mechanical/Fire, Mechanical/HVAC, Commissioning, Electrical, Structural — all with 5 years relevant experience. Construction team must include Project Manager (SACPCMP), Safety Officer (SACPCMP), Site Agent, Foremen, Electricians (wireman's licence), Planner, Environmental Officer, Draughtspersons, Document Controller, Plumber, and trades/labour with stated years of experience. Compliance with OHS Act, Eskom site requirements, and ability to mobilise full camp and equipment within programme. No explicit CIDB grading, B-BBEE level, or financial turnover thresholds stated in the provided document.
Technical Specifications
Source: Unpriced BOQ for Alterations and Additions to Existing Building Structures at Kusile Power Station 31.08.26.pdf (unknown)Scope: Alterations and additions to existing building structures at Kusile Power Station across four buildings (Auxiliary Building 1, FGD Control Room, Admin Building, BOP Building) over an 8-month period. Works include: demolition/alterations (breaking up reinforced concrete, removing brickwork, doors, windows, ceilings, partitions, joinery, ironmongery, sanitary fittings, tiling); building up openings; preparatory work to existing surfaces; making good finishes; new openings through walls; earthworks (site clearance, bulk excavation, filling, compaction, termite protection); concrete, formwork and reinforcement (blinding, surface beds, ramps, slabs, test cubes, finishes, formwork, movement joints, reinforcement); masonry (brickwork, face brickwork, lintels); waterproofing (damp proofing, roof waterproofing, protective paint, insulation, joint sealants); carpentry and joinery (structural timber, doors, fittings, vanities, kitchen units); ceilings, partitions and access flooring (insulation, suspended ceilings, drywall partitions with various cladding, windows, doors, shopfronts, insulation); floor coverings (vinyl sheeting, strip/seal/polish); ironmongery (flush bolts, locks, handles, push/kick plates, door closers, bathroom fittings, sundries, steel lockers); metalwork (sundry steelwork, pressed steel door frames, aluminium windows, stainless steel shower doors); plastering (screeds, internal/external plaster, specialist wall coatings, corner protectors); tiling (wall and floor porcelain/ceramic tiles); plumbing and drainage (stormwater, sanitary fittings, vitreous china, stainless steel sinks, waste unions, bonding); fire detection (analogue addressable heat detectors, manual call points, loop isolators, void detectors, PH120 cabling to SANS 10139:2021); HVAC, electrical, C&I works; testing and commissioning; 12-month maintenance and warranty; construction guarantee; as-built drawings, O&M manuals, fabrication/shop drawings, spares, construction data packages.
Quality Management
Source: Unpriced BOQ for Alterations and Additions to Existing Building Structures at Kusile Power Station 31.08.26.pdfQuality requirements include: concrete strength testing (13 no. 150mm test cubes); waste pipe system testing; fire detection system procurement, installation, testing and commissioning to SANS 10139:2021 (analogue addressable heat detectors, manual call points, loop isolators, void detectors, LED accessories, PH120 fire resistant cabling 1.0mm² minimum 2-core); building allowance items for zoning confirmation; testing and commissioning of HVAC, Fire Protection & Detection, Electrical, Plumbing, C&I works; signing off of all systems; 12-month maintenance and warranty including all consumables and parts; construction guarantee; fabrication/shop drawings; spares and special tools/equipment; construction data packages; as-built drawings and O&M manuals.
Pricing Schedule
Source: Unpriced BOQ for Alterations and Additions to Existing Building Structures at Kusile Power Station 31.08.26.pdf (unknown)Unpriced Bill of Quantities with three main summary items: 1) Preliminaries & General (site establishment once-off and de-establishment, temporary facilities monthly rentals for 8 months, H&S once-off items, PPE per person, training per person, occupational hygiene surveys, documentation items); 2) Resources (Design & Site Supervision: 7 professionals at 480 hours each; Construction: 22 roles with varying quantities at normal hours 1304 hrs, Saturday overtime 256 hrs, Sunday/Public Holiday overtime 256 hrs); 3) Construction Work (Alterations, Building Works, HVAC, Water Detection, Fire Detection, Signage, Electrical Installation). Final Summary Total (Excl VAT). Rates to be inserted by bidder against each line item.
Financial Requirements
Source: Unpriced BOQ for Alterations and Additions to Existing Building Structures at Kusile Power Station 31.08.26.pdf (unknown)Pricing format: Unpriced Bill of Quantities (BOQ) with rates to be inserted by bidder. Summary structure: Item 1 Preliminaries & General (site establishment, temporary facilities, health & safety, PPE, training, occupational hygiene surveys, documentation); Item 2 Resources (Design & Site Supervision professionals at 480 hours each; Construction resources at normal hours 1304 hrs, Saturday overtime 256 hrs, Sunday/Public Holiday overtime 256 hrs); Item 3 Construction Work (Alterations, Building Works, HVAC, Water Detection, Fire Detection, Signage, Electrical Installation). Final Summary Total (Excl VAT). No bond, guarantee, insurance, or payment terms specified in the provided document.
Compliance Requirements
Source: Unpriced BOQ for Alterations and Additions to Existing Building Structures at Kusile Power Station 31.08.26.pdf (unknown)Mandatory personnel registrations: SACAP (Architect), ECSA (Engineers), SACPCMP (Project Manager, Safety Officer), SAGC (Land Surveyor), wireman's licence (Electrician). Health & Safety: Safety file, fire extinguishers (per container), entry/exit medicals (40 persons), security clearance certification (40 persons), PPE for 37 persons (overalls, safety boots, hard hats, reflector vests, full body harness, ear muffs/protection, safety gloves). Training: First Aid (2 persons, 3-year validity), Basic Fire Fighting (2 persons, 2-year), OHS Act (2 persons, 2-year), Legal Liability (2 persons), Supervisory Safety (2 persons, 2-year), Planned Job Observation (2 persons), HIRA (2 persons, 2-year), Incident Investigator (2 persons, 2-year), Working at Heights (33 persons). Occupational Hygiene Surveys: Illumination, Indoor Air Quality, Ergonomics (7 each, 2-year validity). Documentation: As-built drawings, O&M manuals, testing/commissioning sign-off (HVAC, Fire, Electrical, Plumbing, C&I), 12-month maintenance/warranty, construction guarantee, fabrication/shop drawings, spares/special tools, construction data packages. No CSD, tax, B-BBEE, CIDB, CIPC, or local content requirements stated in the provided document.
Health & Safety
Source: Unpriced BOQ for Alterations and Additions to Existing Building Structures at Kusile Power Station 31.08.26.pdfComprehensive H&S requirements: Site establishment includes flushable ablution containers (female: 4 toilets, 4 SHE bins, 4 hand wash basins; male: 3 toilets, 3 urinals, 3 hand wash basins), change rooms (female 30 lockers, male 40 lockers), site fencing (1.8m diamond mesh, 200m), temporary wastewater (6000L septic tank for 20-25 people), temporary water supply (5000L Jojo tank), lighting plant (2 units). Monthly rentals for all facilities with weekly servicing of ablutions. H&S deliverables: Safety file, fire extinguishers (7 containers), entry/exit medicals (40 persons each), security clearance (40 persons). PPE for 37 persons: overall trousers/jackets, safety boots, hard hats, reflector vests, full body harnesses, ear muffs/protection, safety gloves. Training: First Aid (2 persons, 3yr), Basic Fire Fighting (2, 2yr), OHS Act (2, 2yr), Legal Liability (2), Supervisory Safety (2, 2yr), Planned Job Observation (2), HIRA (2, 2yr), Incident Investigator (2, 2yr), Working at Heights (33). Occupational hygiene surveys: Illumination, Indoor Air Quality, Ergonomics (7 each, 2yr validity). TLB (backhoe loader) for site clearance.
Environmental
Source: Unpriced BOQ for Alterations and Additions to Existing Building Structures at Kusile Power Station 31.08.26.pdfEnvironmental aspects covered in plumbing/drainage: stormwater drainage (cast iron outlets, rainwater downpipes, PVC pipes, weepholes); sanitary fittings (stainless steel drip sink, double bowl sinks to SABS 906; vitreous china WC pans, basins, urinals, shower trays); waste unions; bonding of hot/cold/waste pipes per supply authority and engineer specifications at multiple locations (PICS Control Room, C&I Workshop levels). No explicit environmental impact assessment, sustainability, or waste management requirements stated beyond standard plumbing compliance.
Section
Source: Unpriced BOQ for Alterations and Additions to Existing Building Structures at Kusile Power Station 31.08.26.pdfIndoor Air Quality surveys required for office containers (7 no, valid for 2 years) as part of occupational hygiene/health risk assessments.
Description
Source: Building Alterations Scope at Kusile Power Station - FINAL_.pdfThe Employer requires construction services for alterations and additions to various station buildings at Kusile Power Station over a 9-month period. The Contractor provides all labour, supervision, materials, plant, equipment, temporary works, tools, testing facilities, and resources to execute and complete the works per the scope and applicable standards. Works are multidisciplinary: architectural, civil, structural, mechanical, electrical, and control & instrumentation (C&I). Activities include demolition/removal, alterations/modifications/additions, new building works, reinstatement of finishes, installation/alteration/relocation/reconnection of building services, testing, commissioning, handover, construction/commissioning monitoring, training, and record documentation (as-builts, O&M manuals). Works executed per Employer's designs and relevant codes. Operational power station environment requires planning to minimise disruption and ensure safety. Normative references: Guideline Scope of Services, ISO 9001, 36-681 Plant Safety Regulations, 474-58 Document/Records Management, 240-105658000 Supplier Quality Management. Informative references: Engineering Change Management, Design Review, Engineering Quality Manual, Document/Records Management. Standards: SANS, Eskom standards (latest editions at contract date). Software: industry-recognised, licensed, latest approved versions. Roles: Employer provides information, reviews/approves submissions, monitors compliance, facilitates coordination. Contractor executes works, ensures HSE compliance, provides resources, maintains quality control, prepares progress reports, coordinates on site.
Important Dates
Source: Building Alterations Scope at Kusile Power Station - FINAL_.pdf (unknown)Closing date from tender record: 23 September 2026 at 10:00. No compulsory briefing, site visit, or clarification deadlines are stated in the scope document.
Contact Information
Source: Building Alterations Scope at Kusile Power Station - FINAL_.pdf (unknown)No SCM or technical contact names, emails, or phone numbers are stated in the scope document. Post-award, the Project Manager provides the Zendto portal URL and project document control email address.
Submission Guidelines
Source: Building Alterations Scope at Kusile Power Station - FINAL_.pdf (unknown)Submission method and address are not stated in the scope document. The document describes post-award document control procedures: all exchanges via formal transmittals with prescribed metadata; electronic submissions by email with large files (>20 MB) via Zendto portal (URL provided after award); hard copies require transmittal notes. Minimum copies: 2 for design/construction data and drawings. Transmittal naming convention: YYYYMMDD – <Contract Number> – <Vendor> – <Short Description> – <Sender Initials>. Email subject: YYYYMMDD – <Contract File Number> – <Email Subject line>. Documents for different purposes submitted under separate transmittals.
Evaluation Criteria
Source: Building Alterations Scope at Kusile Power Station - FINAL_.pdf (unknown)No evaluation criteria, scoring split, preference point system (80/20 or 90/10), or minimum qualifying thresholds are stated in the scope document. The document references ISO 9001, Eskom Supplier Quality Management Specification (240-105658000), and Engineering Quality Manual (240-53665024) as normative/informative quality references.
Technical Specifications
Source: Building Alterations Scope at Kusile Power Station - FINAL_.pdf (unknown)Scope: Alterations and additions to existing station buildings at Kusile Power Station over 9 months. Multidisciplinary works: architectural, civil, structural, mechanical, electrical, control & instrumentation (C&I). Key activities: demolition/removal of existing elements and services; alterations/modifications/additions to structures; new building works and installations; reinstatement of finishes; installation/alteration/relocation/reconnection of building services; testing, commissioning, handover; construction and commissioning monitoring; training of Employer's personnel; as-built drawings, O&M manuals, construction records. Works executed per Employer's designs, SANS, Eskom standards, applicable codes. Contractor provides all labour, supervision, plant, equipment, temporary works, tools, testing facilities. Operational power station environment: plan to minimise disruption, ensure safety. Standards: SANS, Eskom standards (latest editions at contract date), normative references (Guideline Scope of Services, ISO 9001, 36-681 Plant Safety Regulations, 474-58 Document/Records Management, 240-105658000 Supplier Quality Management), informative references (Engineering Change Management, Design Review, Engineering Quality Manual, Document/Records Management). Software: industry-recognised, latest approved versions, licensed. Document control: formal transmittals with prescribed fields; naming conventions; separate transmittals per purpose; email/Zendto/hard copy protocols. Quality: method statements required before work (site prep, temp works, structural steel/concrete, building, MEPCI, testing/commissioning); Quality Control Plans (QCPs) for major activities with hold/witness/review points; no work without accepted QCP; records at completion (method statements, QCPs, ITP records, material/test certificates, non-conformance reports, professional certifications, warranties). Programme: detailed, resourced, updated per contract; includes submissions/reviews, access constraints, working hours, weather, procurement lead times, dependencies, resources, statutory approvals, float. Key personnel (qualifications, registration, experience): Contract Manager (SACPCMP, 5 yrs NEC); Construction Manager (SACPCMP PrCM/Candidate, 5 yrs); Land Surveyor (SAGC, 3 yrs); Site Agent/Manager (Civil/Construction Diploma/Degree, 5 yrs); HVAC Foreman (trade cert, 5 yrs HVAC); Fire Protection/Wet Services Foreman (trade cert, 5 yrs); Fire Detection Technician (SAQCC Fire D&GS, electrical cert, 5 yrs); Electrician (NQF4/trade test, wireman's licence, Dept of Labour registered, 5 yrs); Commissioning Engineer (BTech/BEng Electrical/Electronic, ECSA Pr.Tech/Pr.Eng, SAQCC Fire commissioner, 5 yrs BMS/integrated systems); H&S Officer (SACPCMP CHSO, 5 yrs); Planning Engineer (Eng/PM Diploma/Degree, 5 yrs, Primavera/MS Project); Environmental Officer (Env Management Diploma/Degree, 5 yrs); Senior Draughtspersons (Draughting Diploma/Cert, 5 yrs multi-discipline, AutoCAD/SolidWorks/Revit/Civil 3D); Document Controller (Admin/Info Management Diploma, 3 yrs). Design resources: Architectural Professional (SACAP, 5 yrs industrial/infra); Structural Engineer (ECSA Pr.Eng/Pr.Tech Eng, 5 yrs); Geotechnical Engineer (ECSA Pr.Eng/Pr.Tech Eng, 5 yrs); HVAC Engineer (ECSA Pr.Eng/Pr.Tech Eng, 5 yrs industrial/infra); Fire Engineer (ECSA Pr.Eng/Pr.Tech Eng, 5 yrs fire suppression/detection); Electrical Engineer (ECSA Pr.Eng/Pr.Tech Eng, 5 yrs LV/MV/HV); C&I Engineer (ECSA Pr.Eng/Pr.Tech Eng, 5 yrs industrial/power, PLC/SCADA/HMI/DCS, Siemens/Schneider/ABB/GE); Senior Draughtspersons (as above). Training: minimum 2 formal workshops per major system (operation, maintenance, troubleshooting); O&M manuals; measurable competency via practical assessment; records submitted. Technology transfer: access to software, licences, supplier/manufacturer support. Handover: training/tech transfer complete before project completion; failure = defect.
Methodology
Source: Building Alterations Scope at Kusile Power Station - FINAL_.pdfContractor submits detailed construction/installation method statements for all applicable activities before commencing work; no work without accepted method statement. Method statements cover: site preparation/earthworks, temporary works/support systems, structural steelwork/concrete, building construction/partitioning, MEPCI including plumbing, testing/commissioning, other activities identified by Employer/PM. Each includes: methodology, roles/responsibilities, HSE/quality measures, plant/equipment, temporary works, technical data sheets/certificates, waste management, risk assessments, protection of existing infrastructure. No deviation without revised method statement acceptance. Quality Control Plans (QCPs) for major activities with hold/witness/review points; no work without accepted QCP. Programme: detailed, resourced, includes submissions/reviews, access constraints, working hours, weather, procurement lead times, dependencies, resources, statutory approvals, float; updated per contract. Organisational structure with reporting lines, management responsibilities, execution strategy (in-house, subconsulting, JV, consortium). JV/consortium: letters of confirmation on official letterhead, signed by authorised representative, signatory details for verification. Key personnel per accepted schedule; replacements require Employer approval. Training: minimum 2 formal workshops per major system (operation, maintenance, troubleshooting); O&M manuals; measurable competency via practical assessment; records submitted. Technology transfer: access to software, licences, supplier/manufacturer support.
Experience & Qualifications
Source: Building Alterations Scope at Kusile Power Station - FINAL_.pdfKey personnel qualifications, registrations, and minimum experience:
Design resources:
All personnel comply with Construction Regulations 2014. Replacements require Employer approval with qualifications, experience, registration.
Quality Management
Source: Building Alterations Scope at Kusile Power Station - FINAL_.pdfContractor implements and maintains comprehensive quality assurance system. Compliance with ISO 9001, Eskom Supplier Quality Management Specification (240-105658000), Engineering Quality Manual (240-53665024), Eskom Plant Safety Regulations (36-681). Method statements required before work for: site preparation/earthworks, temporary works, structural steelwork/concrete, building construction/partitioning, MEPCI installations, testing/commissioning, other activities identified by Employer/PM. Each method statement includes: methodology, roles/responsibilities, HSE/quality measures, plant/equipment, temporary works, technical data sheets/certificates, waste management, risk assessments, protection of existing infrastructure. No work without accepted method statement. Quality Control Plans (QCPs) for all major activities, aligned with QA requirements, submitted for acceptance before work. QCPs include: activity description with drawing/spec/standard references, responsible personnel, inspection/testing requirements with acceptance criteria (hold points, witness points, review points), reference to approved method statement. QCPs updated for design/methodology changes. Continuous monitoring of QCP compliance; non-compliance = defect. Completion records: approved method statements/QCPs, completed ITP records, material/test certificates, non-conformance reports/close-outs, professional certifications/statutory approvals, warranties/guarantees/performance certificates.
Pricing Schedule
Source: Building Alterations Scope at Kusile Power Station - FINAL_.pdfNo pricing schedule, bill of quantities, rates, or payment schedules are stated in the scope document. The document notes that any item or activity reasonably necessary for proper completion, operation, and use of the works shall be deemed included in the Contractor's scope and pricing.
Financial Requirements
Source: Building Alterations Scope at Kusile Power Station - FINAL_.pdf (unknown)No pricing format, bonds, guarantees, insurance, payment terms, or financial capacity thresholds are stated in the scope document. The document notes that any item reasonably necessary for proper completion, operation, and use of the works is deemed included in the Contractor's scope and pricing.
Compliance Requirements
Source: Building Alterations Scope at Kusile Power Station - FINAL_.pdf (unknown)Mandatory professional registrations for key personnel: SACPCMP (Contract Manager, Construction Manager, H&S Officer), ECSA (Engineers/Technologists), SACAP (Architectural Professional), SAGC (Land Surveyor), SAQCC Fire (Fire Detection Technician, Commissioning Engineer), Dept of Labour (Electrician wireman's licence). Compliance with Construction Regulations 2014. Occupational Health and Safety Act compliance. Environmental compliance (Environmental Officer required). Quality: ISO 9001, Eskom Supplier Quality Management Specification. Eskom Plant Safety Regulations (36-681). Document/Records Management (474-58). No CSD registration, tax clearance, B-BBEE level, CIDB grade, or local content percentages stated in the scope document.
Health & Safety
Source: Building Alterations Scope at Kusile Power Station - FINAL_.pdfContractor complies with all applicable Occupational Health and Safety legislation and Construction Regulations 2014. Works executed in operational power station environment; Contractor plans/coordinates/executes to minimise disruption and ensure safety of personnel, plant, equipment, existing infrastructure. Method statements include health, safety, quality control measures, risk assessments, protection of existing infrastructure/utilities. Key personnel requirements: H&S Officer registered with SACPCMP as CHSO, minimum 5 years construction H&S management experience. Fire Detection System Installation Technician registered with SAQCC Fire under Fire Detection & Alarm Systems (D&GS). Electrical Installation Electrician registered with Dept of Labour, holds wireman's licence. Commissioning Engineer registered with SAQCC Fire as commissioner under D&GS. Standards referenced: SANS 10142-1:2009 (wiring of premises), SANS 10114-2 (emergency lighting), SANS 10198 (electric luminaires), 240-155675380 (Kusile Lighting/Small Power O&M), 240-150642762 (Generation Plant Safety Regulation), 36-681 (Eskom Plant Safety Regulations). Excavation safety: Contractor takes measures to ensure safety/stability of excavations and adjacent structures, prevent damage.
Environmental
Source: Building Alterations Scope at Kusile Power Station - FINAL_.pdfEnvironmental Officer required: Degree/Diploma in Environmental Management or related field, minimum 5 years environmental compliance on construction projects. Environmental conditions standard referenced: 240-56355731 (Environmental conditions for process control equipment at Power Stations). Contractor includes environmental compliance in programme (statutory approvals, permits, inspections). Waste management procedures required in method statements (removal of excavated materials, disposal of construction waste). HVAC standards: 240-102547991 (General Technical Specification for HVAC Systems), SANS 10147 (Refrigeration/air-conditioning systems). Works in operational power station require minimising disruption and ensuring safety of existing infrastructure.
Contractual Terms
Source: Building Alterations Scope at Kusile Power Station - FINAL_.pdfAcceptance of method statements by Employer/Project Manager does not relieve Contractor of obligations, responsibilities, or liabilities under the Contract. Contractor shall not deviate from accepted method statements without prior submission and acceptance of revised statements. Non-compliance with QCPs treated as a defect. Failure to adequately provide training and technology transfer considered a defect. Contractor remains solely responsible for planning, coordinating, and executing works for timely completion. JV/consortium agreements require letters of confirmation on official letterhead, signed by authorised representative (Director/CEO/Legal Officer), with signatory details for verification. Key personnel named in accepted schedule constitute contractual obligation; replacements require Employer approval with qualifications, experience, registration details.
Section
Source: Building Alterations Scope at Kusile Power Station - FINAL_.pdfNo evaluation criteria, scoring methodology, preference point system, or minimum qualifying scores are stated in the scope document. The document references quality management standards (ISO 9001, Eskom Supplier Quality Management Specification, Engineering Quality Manual) as normative/informative references for the works, not as bid evaluation criteria.
Description
Source: OHS specification for Alterations and additions to existing building structures.pdfThis document is the Eskom Kusile Power Station OHS Specification (Identifier: KUS-20251238 Rev, Template 32-726-03T Rev 1) for the Alterations and Additions to Existing Building Structures project. Effective December 2025, review December 2028. It sets minimum OHS requirements for contractors/suppliers for the contract duration. Contractor must develop an OHS plan meeting these requirements and all applicable legislation. Eskom does not assume contractor's legal responsibilities. Specification covers legislative compliance, Eskom-specific requirements, statutory and non-statutory appointments, competency requirements, risk assessment, safe work procedures, life-saving rules, substance abuse, organisational structure, roles/responsibilities, training, site establishment, vehicle management, housekeeping, stacking/storage, signage, tools/equipment, ladders, scaffolding, auditing, smoking, cellular phones, occupational health/hygiene, working at heights, confined spaces, PPE, incident investigation, emergency management, non-conformance, OHS files, work stoppage, hours of work, contract sign-off, termination rights, barricading, and KPIs. Applicable to any contracting organisation responding to the tender/enquiry for this scope of work. Normative references include 24 legislative and Eskom procedural documents; informative references include 4 acts/standards. Definitions and abbreviations provided for 50+ terms.
Important Dates
Source: OHS specification for Alterations and additions to existing building structures.pdf (unknown)Document effective date: December 2025. Document review date: December 2028. Safety file submission deadline: at least two weeks before the agreed project commencement date (exact commencement date not stated in this document). Tender closing date (from tender record): 23 September 2026 at 10:00. No compulsory briefing session or site visit date is specified in this document.
Contact Information
Source: OHS specification for Alterations and additions to existing building structures.pdf (unknown)Eskom Contract's Manager (name not provided). Eskom Health and Safety Manager (name not provided). Eskom Procurement Manager (name not provided). Eskom Safety Officer (name not provided). Project address: Kusile Power Station, R45 Kendal/Balmoral Road, Haartebeesfontein Farm. Enquiry number: not stated in this document.
Submission Guidelines
Source: OHS specification for Alterations and additions to existing building structures.pdf (unknown)The safety file package must be submitted to the Eskom Kusile Power Station OHS department at least two weeks before the agreed project commencement date. The OHS department will assess the file and provide written feedback; a written approval letter authorises the contractor to commence site establishment. The safety file must include: a signed Section 37(2) agreement between Eskom and the main contractor (and between the main contractor and each subcontractor); the OHS plan aligned to the scope of work and approved by the Kusile project/contract manager in writing before submission; baseline risk assessment with monitoring and review plan; statutory and Eskom-required appointments with competency certificates; medical certificates of fitness and identification documents for all employees; proof of competencies and job descriptions; valid Letter of Good Standing (COID); OHS policy signed by the CEO or Section 16(2) appointee; COVID-19 policy and risk assessment; and itemised OHS costing. All returnable documents must be complete, signed, and submitted with the tender; any omission or unsigned form disqualifies the bid.
Evaluation Criteria
Source: OHS specification for Alterations and additions to existing building structures.pdf (unknown)The document is an OHS specification and does not define the commercial evaluation methodology (price/preference split, functionality thresholds, or scoring weights). Compliance with this specification is a mandatory pre-qualification requirement: the main contractor must be registered with the Compensation Commissioner and hold a valid Letter of Good Standing (COID) for the full contract duration; must comply with the OHS Act, Construction Regulations, and all listed normative references (including SANS 1186, SANS 10234:2019, ISO 45001:2018); must appoint competent persons for all statutory and Eskom-required roles with verified qualifications and experience (supervisor: 3 years' experience, accredited supervisor safety course, confined space, FAS Rescue per Unit Standards 229995/229998, HIRA and incident investigation training; safety officer: OHS Act, COID Act, incident investigation, HIRA, emergency preparedness; H&S representative: general H&S training, H&S representative training, HIRA training, incident investigation training); must submit the safety file two weeks prior to site establishment for OHS department approval; must sign Section 37(2) agreement with Eskom and ensure subcontractors do the same; must have an up-to-date copy of the OHS Act and regulations available on site; must provide itemised OHS costing (training, PPE, safety equipment, occupational hygiene surveys, medical surveillance); no child labour permitted; zero-tolerance substance abuse policy (0% alcohol/drug level, ad hoc testing per Eskom procedure 32-37).
Technical Specifications
Source: OHS specification for Alterations and additions to existing building structures.pdf (unknown)Scope of work: alterations and additions to existing building structures at Kusile Power Station for a nine-month period. Works include: construction, alteration, commissioning, renovation (including cleaning), de-commissioning, demolition or dismantling of building structures and elements; surveying and setting out; dismantling of fittings/fixtures and demolition with waste removal; stripping of existing installations per bill of quantities; rewiring, retubing and reinstallation of new installations per employer's designs; site clearance and preparation; assembly/disassembly of prefabricated partitioning elements; provision of mechanical infrastructure (fire protection systems); provision of electronic systems (control and instrumentation, fire detection); provision of electrical installations (small power, lighting, reticulation); testing and commissioning of installations; as-built handover documentation. Contractor must review employer's designs for completeness and constructability, propose design changes where required, and allow for this in tender pricing. Contractor responsible for all propping, barricades, screens, overhead protections for safety and stability during contract period. Works must meet highest standard; employer may reject non-compliant work/materials at contractor's expense. Reference scope of work document KUS-20250644. OHS plan must be site-specific, practical, well-documented, aligned to scope, and detail implementation, responsibilities, procedures, and non-conformance management. Safe work procedures/method statements required for all activities. Continuous gas monitoring and confined space certification required where applicable. FAS Rescue trained personnel (minimum two per team) per Unit Standards 229995/229998 and Eskom Working at Heights Standard (32-418). Supervisor must conduct planned task observations and submit weekly reports to OHS department.
Methodology
Source: OHS specification for Alterations and additions to existing building structures.pdfSafe work procedures/method statements required for all activities (section 3.14). Must detail key activities to reduce hazards identified in risk assessments as reasonably practicable. Must indicate how Alterations and Additions scope of work activities will be done safely without endangering health and safety. Must be site-specific, practical, well-documented, and workable. OHS plan must describe assignment of responsibilities, procedures, actions for implementation and maintenance, and non-conformance/deviation management. Pre-job meetings held prior to day's work with all relevant employees (section 3.20). Toolbox talks: team leader shares tasks, allocation, identified risks, control measures with team before commencing task, documenting agreed strategy. Continuous gas monitoring during confined space activities. Planned task/job observations by supervisor with weekly reports to OHS department. FAS rescue procedures per Unit Standards 229995/229998 and Eskom 32-418. Isolation and confirmation by operator before work commencement. Confined space isolation, ventilation, environmental testing, gas/environmental certification before entry.
Quality Management
Source: OHS specification for Alterations and additions to existing building structures.pdfQuality assurance, site testing and commissioning of all works required per employer's designs, standards, codes of practice, and relevant trade divisions. Contractor must inspect employer's drawings to satisfy themselves on nature and requirements. Works performed in strict accordance with OHS Act. Contractor reviews designs for completeness and constructability, proposes design changes where required. Record drawings (as-built) submitted upon completion. Employer has authority to reject any work/materials not in full accordance with best practices and approved standards/codes; rejected items replaced/repaired at contractor's expense. Auditing requirements per section 3.31. Non-conformance and compliance management per section 3.41. OHS files maintained per section 3.42. Statistics reporting per section 3.19.2.2 and section 22. Emergency preparedness per section 3.40 and section 21.
Pricing Schedule
Source: OHS specification for Alterations and additions to existing building structures.pdfOHS costing must be itemised in tender pricing covering: training, provision of PPE, safety equipment purchases, occupational hygiene surveys, medical surveillance. COVID-19 costs itemised separately (not for profit; Eskom may accept/decline listed PPE; costs cease when pandemic declared over). Contractor must make allowance in tender pricing for design review and constructability assessment services. No bill of quantities, pricing schedule, rates, or payment schedules provided in this document. Reference made to bill of quantities for stripping of existing installations (section 3.1(d)).
Financial Requirements
Source: OHS specification for Alterations and additions to existing building structures.pdf (unknown)OHS costing must be itemised in the tender based on the overall project scope, covering: training, provision of PPE, safety equipment purchases, occupational hygiene surveys, and medical surveillance. COVID-19 costs are not for profit; Eskom reserves the right to accept or decline the listed PPE items; COVID-19 costs apply only for the pandemic duration and cease once the national pandemic declaration is lifted. Contractor must make necessary allowance in tender pricing for design review and constructability assessment services. No other financial requirements (bonds, guarantees, payment terms, financial capacity thresholds) are specified in this document.
Compliance Requirements
Source: OHS specification for Alterations and additions to existing building structures.pdf (unknown)Mandatory compliance requirements: CSD registration and valid tax compliance status (implied standard requirement). B-BBEE minimum level: not specified in this document. CIDB grading: not specified in this document. COID registration with valid Letter of Good Standing maintained throughout contract. Section 37(2) agreement signed with Eskom and with each subcontractor. OHS Act and regulations compliance (including Construction Regulations, Noise-Induced Hearing Loss Regulations 2003, Hazardous Chemical Agents Regulations 2021, Regulations on Hazardous Work by Children). National Environmental Management Act, Environment Conservation Act, National Water Act, Civil and Building Work Act, National Road Traffic Act, Compensation for Occupational Injuries and Diseases Act. SANS standards applicable to project (SANS 1186 symbolic safety signs, SANS 10234:2019 GHS). ISO 45001:2018 Occupational Health and Safety Management Systems. Eskom Kusile Power Station procedures: 32-37 Substance Abuse, 32-136 Contractor H&S Requirements, 240-62196227 Life-Saving Rules, 32-95 Incident Management, 32-727 SHEQ Policy, 32-418 Working at Heights, 240-62946386 Vehicle and Driver Safety, 32-520 Risk Assessment, 240-114036246 Occupational Hygiene HIRA. COVID-19 policy and risk assessment per National Disaster Management Act with Compliance Officer appointment. Statutory appointments per OHS Act: Incident Investigator (GAR 9(2)), H&S Committee Members (S19(3), S19(6)(a)), H&S Representatives (S17), First Aiders (GSR 3(4)), Stacking & Storing Supervisor (GSR 8(1)). Eskom-required non-statutory appointments: Emergency Planning Coordinator, H&S Committee Chairperson, Site Manager, Site Supervisor, Risk Assessor, Safety Officer, Working at Heights Planner. Medical certificates of fitness valid for one year issued by HPCSA-registered occupational health practitioner. Competent person definition per OHS Act (knowledge, training, experience, qualifications registered with SAQA). Zero-tolerance substance abuse (0% alcohol/drug level).
Health & Safety
Source: OHS specification for Alterations and additions to existing building structures.pdfComprehensive OHS specification covering 49 sections. Key requirements: OHS plan submitted 2 weeks before commencement, approved by project manager then OHS department. Baseline risk assessment with monitoring/review plan (ref 32-520). Safe work procedures/method statements for all activities (ref 32-520). Statutory appointments: Incident Investigator, H&S Committee Members, H&S Representatives, First Aiders, Stacking & Storing Supervisor. Eskom-required appointments: Emergency Planning Coordinator, H&S Committee Chairperson, Site Manager, Site Supervisor, Risk Assessor, Safety Officer, Working at Heights Planner. Competency requirements: Supervisor (3 years exp, accredited course, confined space, FAS Rescue Unit Standards 229995/229998, HIRA, incident investigation); Safety Officer (OHS Act, COID Act, incident investigation, HIRA, emergency preparedness); H&S Representative (general H&S, H&S rep training, HIRA, incident investigation). Life-Saving Rules (240-62196227) mandatory. Substance abuse: 0% alcohol/drug level, ad hoc testing per procedure 32-37. Contractor organisational structure and roles/responsibilities defined (section 3.11, 3.12). Risk assessment per 32-520. Roof work per 32-418. Fire equipment and maintenance. Flammable/combustible liquids and hazardous chemical agents control. First aid and equipment. OHS communication systems. Toolbox talks/daily team talks/pre-job meetings. OHS training and general training. Contractor site establishment. Vehicle management per 240-62946386. Housekeeping and order. Stacking and storage. Workplace signage and colour coding per SANS 1186. Tools and equipment. Ladders. Scaffolding. Auditing. Smoking. Cellular phones. Occupational health, hygiene and rehabilitation. Working at heights per 32-418. Confined spaces: continuous gas monitoring, isolation/ventilation, gas/environmental certificates before entry. PPE requirements. Incident investigation per 32-95. Emergency management. Non-conformance and compliance. OHS files. Work stoppage. Hours of work. Omissions from specification. Contract sign-off. Eskom right to terminate. Barricading. Contractor/supplier management KPIs.
Environmental
Source: OHS specification for Alterations and additions to existing building structures.pdfEnvironmental legislation compliance required: National Environmental Management Act 1998, Environment Conservation Act 1989, National Water Act 1998. Duty of care to environment per section 32-136: prevent pollution/degradation, minimise and rectify where authorised or unavoidable. Environmental management referenced in section 20. Hazardous chemical agents per OHS Act HCA Regulations 2021 and SANS 10234:2019 GHS. Flammable/combustible liquids control per section 3.17. Waste management implied in demolition/dismantling scope (removal of products/waste). No specific environmental impact assessment, sustainability targets, or carbon requirements stated in this document.
Section
Source: OHS specification for Alterations and additions to existing building structures.pdfThis document does not contain commercial evaluation criteria (price/preference split, functionality scoring, minimum thresholds). It specifies mandatory OHS compliance requirements that serve as pre-qualification: valid COID Letter of Good Standing; compliance with OHS Act and all listed normative references; competent appointments with verified qualifications; safety file submission 2 weeks pre-commencement with OHS department approval; Section 37(2) agreements; up-to-date OHS Act on site; itemised OHS costing; zero-tolerance substance abuse; COVID-19 compliance; no child labour. These are pass/fail gateways, not scored criteria.
Description
Source: Invitation to Tender (ITT) - Alteration and additions to existing building structures.pdfEskom Holdings SOC Ltd invites tenders for Alterations and Additions to Existing Building Structures at Kusile Power Station for a period of nine (9) months. Tender number: E3444GXMPKUS. Issue date: 01 September 2026. Closing: 23 September 2026 at 10h00 SAST. Validity: 180 days. Non-compulsory clarification meeting: 10 September 2026, 10h00–11h00 via Microsoft Teams. Electronic submission via Eskom E-tendering portal (https://etendering.eskom.co.za).
Important Dates
Source: Invitation to Tender (ITT) - Alteration and additions to existing building structures.pdf (RFP)Issue date: 01 September 2026
Non-compulsory clarification meeting: 10 September 2026, 10h00–11h00 SAST via Microsoft Teams (Meeting ID: 370 844 332 514 756, Passcode: wW9U2iu2, Link: https://teams.microsoft.com/meet/370844332514756?p=aY0uCyk3NzLKgmC8Fw)
Closing date and time: 23 September 2026 at 10h00 SAST
Tender validity period: 180 days from closing date and time (may be extended if evaluation exceeds 180 days)
Briefing Session
Source: Invitation to Tender (ITT) - Alteration and additions to existing building structures.pdf (RFP)Non-compulsory Tender Clarification Meeting: 10 September 2026, 10h00–11h00 SAST via Microsoft Teams.
Meeting ID: 370 844 332 514 756
Passcode: wW9U2iu2
Join link: https://teams.microsoft.com/meet/370844332514756?p=aY0uCyk3NzLKgmC8Fw
Contact Information
Source: Invitation to Tender (ITT) - Alteration and additions to existing building structures.pdf (RFP)Eskom Representative (technical/SCM queries): Phuti Ngwepe, Tel: +27 13 680 3426, Email: [email protected]
Procurement Manager (Acting): Nhlanhla Mthembu
Fraud/corruption reporting: 0800 11 2722 / [email protected]
All queries must be addressed in writing to the Eskom Representative only.
Submission Guidelines
Source: Invitation to Tender (ITT) - Alteration and additions to existing building structures.pdf (RFP)Submission method: Electronic only via Eskom E-tendering portal (https://etendering.eskom.co.za). No hard copies accepted. Documents must be uploaded in PDF format (price schedule also in Excel). Maximum file size 500 MB per document; total submission limited to 4 GB. Files must be labelled under folders: Commercial, Technical, SHEQ, Financial. Submission status must show as complete. Late submissions are not accepted. If a tender is resubmitted, only the latest version is considered; previous submissions become void.
Mandatory returnables at closing (disqualifiable if missing or incomplete):
Additional JV/consortium documents (if applicable): Letter of intent or JV agreement with profit-sharing ratios; confirmation of single business entity; single designated bank account in JV name.
Non-disqualifiable returnables at closing (zero points if missing): Specific Goals evidence (SBD 6.1 supporting proof).
Returnables required prior to contract award: Proof of valid CSD registration; CIDB grading 7GB or higher (at closing or within 21 working days); NEC/Contract completed in full; Pricing Schedule (PDF and Excel); Audited financial statements for previous 18 months (or last year; each JV/SPV participant; start-ups <12 months exempt initially); Employment Equity Act compliance proof (SA designated employers); SHEQ requirements per Kusile OHS Specification; Quality requirements per ISO 9001:2015; Environmental Specification compliance; Functionality/Technical criteria per separate document.
Returnable Documents
Source: Invitation to Tender (ITT) - Alteration and additions to existing building structures.pdf (RFP)Disqualifiable at closing (must be complete, signed, submitted):
JV additional (disqualifiable): Letter of intent/JV agreement (profit-sharing), single entity confirmation, single JV bank account.
Non-disqualifiable at closing (zero points if missing): Specific Goals supporting evidence.
Prior to award (mandatory): CSD registration proof; CIDB 7GB+ (at closing or within 21 working days); NEC/Contract complete; Pricing Schedule (PDF + Excel); Audited financial statements (18 months/last year; JV/SPV each); Employment Equity proof (SA designated employers); SHEQ per Kusile OHS Spec; Quality per ISO 9001:2015; Environmental Spec compliance; Functionality/Technical criteria document.
Evaluation Criteria
Source: Invitation to Tender (ITT) - Alteration and additions to existing building structures.pdf (RFP)Two-stage evaluation:
Technical Specifications
Source: Invitation to Tender (ITT) - Alteration and additions to existing building structures.pdf (RFP)Scope: Alterations and additions to existing building structures at Kusile Power Station for a period of nine (9) months.
Contract type: NEC Engineering & Construction Contract (ECC).
CIDB requirement: Main contractor, JV and/or sub-contractor must hold valid CIDB grading designation 7GB or higher.
Contract Skills Development Goals (CSDG) mandatory: Artisan Plumber (6 months on-job training, target 6); Artisan C&I Electrician (6 months on-job training, target 6). Candidates from all provinces, demographics representative of SA population.
Contract Participation Goals (CPG): Not applicable.
Cataloguing: Successful tenderer may be required to provide cataloguing information per item post-award; materials must comply with Eskom labelling specifications; pricing schedule must include line item for cataloguing (Eskom pays for cataloguing).
Alternative tenders: Not allowed.
Provision of Security for Performance: Not applicable.
Environmental: Kusile Power Station Environmental Specification for Alterations and Additions to Existing Building Structures attached as annexure for reference.
Quality: ISO 9001:2015 QMS required (see complianceRequirements for detail).
Health & Safety: Kusile Power Station OHS Specification for Alterations and Additions to Existing Building Structure (see complianceRequirements for detail).
Quality Management
Source: Invitation to Tender (ITT) - Alteration and additions to existing building structures.pdfISO 9001:2015 Quality Management System mandatory.
Option 1: Valid ISO 9001 certification by accredited body – scope defined and relevant, certification authority approved/authorised, recognised international accreditation, certificate current (expiry date valid).
Section B – Documented QMS evidence:
Section C: Draft Contract Quality Plan specific to scope (per ISO 10005).
Section D: Quality Control Plan / Inspection and Test Plan (ITP) per scope of work (per ISO 10005); draft/example from similar previous work acceptable.
Section E: User-defined additional requirements – Form A completed and signed; other scope-specific standards.
Pricing Schedule
Source: Invitation to Tender (ITT) - Alteration and additions to existing building structures.pdfPricing Schedule/BOQ (Annexure 1.1.20) required in PDF and Excel format (if not already in NEC Contract).
Upload limits: 500 MB per document, 4 GB total.
Prices inclusive of VAT.
Cataloguing line item required if cataloguing applicable (Eskom pays).
Unconditional discounts evaluated; conditional discounts not evaluated but applied at payment.
Price evaluation includes NPV comparison based on tendered programme, Price Adjustment Factors, exchange fluctuations.
Financial Requirements
Source: Invitation to Tender (ITT) - Alteration and additions to existing building structures.pdf (RFP)Pricing format: Completed pricing schedule (Bill of Quantities/Activity Schedule) in PDF and Excel. If not contained in NEC Contract, submitted as Annexure 1.1.20. Prices inclusive of VAT. Unconditional discounts considered for evaluation; conditional discounts not evaluated but applied at payment.
Payment terms: Contracts below R50 million (incl. VAT) – 30 days from receipt of undisputed invoice. Contracts above R50 million (incl. VAT) – 60 days from receipt of undisputed invoice.
Financial capacity: Audited financial statements for previous 18 months (or last available year). JV/SPV participants each must submit. Start-ups formed within last 12 months exempt initially but must provide first-year statements if awarded.
No performance bond/guarantee requirement stated (Provision of Security for Performance: Not applicable).
Eskom reserves right to negotiate with preferred bidders if prices not market-related.
Compliance Requirements
Source: Invitation to Tender (ITT) - Alteration and additions to existing building structures.pdf (RFP)Mandatory eligibility:
Mandatory registrations/certifications:
Returnable forms (compress to one line each):
B-BBEE Requirements
Source: Invitation to Tender (ITT) - Alteration and additions to existing building structures.pdf (RFP)Specific Goals scored per PPPFA 2022 via SBD 6.1 (Annexure I).
Proof of B-BBEE status level: (a) Certificate from authorised body; (b) Sworn affidavit per B-BBEE Codes of Good Practice; (c) Other prescribed requirement.
Sub-contractor B-BBEE level and designated group classification required (EME/QSE, 51% black ownership, youth, women, disabilities, rural/township, cooperative, military veterans).
Failure to submit proof = zero points for Specific Goals (not disqualifying).
Health & Safety
Source: Invitation to Tender (ITT) - Alteration and additions to existing building structures.pdfSHEQ requirements are contractual (assessed after functionality/mandatory evaluation).
Minimum tendering requirement: Kusile Power Station OHS Specification for Alterations and Additions to Existing Building Structure.
Successful contractor must submit safety file within 2 weeks prior to site commencement; safety file must comply with issued OHS specification.
No work may commence until safety file approved by OHS personnel and Contract Custodian.
OHS evaluates providers that passed functionality and mandatory stages; non-compliant providers given 7 working days (one request via buyer) to submit outstanding documents; failure to respond renders tender non-responsive.
Post-award: Full compliance with Safety OHS requirements required.
Environmental
Source: Invitation to Tender (ITT) - Alteration and additions to existing building structures.pdf (RFP)Kusile Power Station Environmental Specification for Alterations and Additions to Existing Building Structures attached as annexure. Contractor must comply with this specification.
Contractual Terms
Source: Invitation to Tender (ITT) - Alteration and additions to existing building structures.pdfContract conditions: NEC Engineering & Construction Contract (ECC).
Payment terms: Contracts ≤ R50 million (incl. VAT) – 30 days from undisputed invoice; > R50 million – 60 days.
Eskom may negotiate with preferred bidders if prices not market-related.
Main contractors discouraged from subcontracting with subsidiaries (may be viewed as fronting); any such subcontracting must be declared.
Objective criteria may justify award to other than highest-scoring tenderer.
Contract Skills Development Goals (CSDG) mandatory: Artisan Plumber (6 months, target 6), Artisan C&I Electrician (6 months, target 6).
Contract Participation Goals (CPG): Not applicable.
Provision of Security for Performance: Not applicable.
Alternative tenders: Not allowed.
Cataloguing: May be required post-award; pricing schedule must include cataloguing line item (Eskom pays).
Tender validity: 180 days from closing; extendable if evaluation exceeds period.
JV/consortium: Must operate as single incorporated entity; single designated bank account; joint and several liability.
Requirements
Source: Invitation to Tender (ITT) - Alteration and additions to existing building structures.pdf (RFP)Eligibility: No restrictions with Eskom/SOCs; not on National Treasury restricted list or Tender Defaulters list; no sanctions-list nationality; no multiple tenders; JV agreement with joint/severe liability; no conflict of interest; authorised signatory; not subcontracting 100% scope.
CIDB: 7GB or higher (main contractor, JV/sub-contractor).
CSDG: Artisan Plumber (6 months, 6 candidates), Artisan C&I Electrician (6 months, 6 candidates) – national, demographically representative.
CPG: Not applicable.
Financial statements: Audited, previous 18 months (or last year); JV/SPV each participant; start-ups <12 months exempt initially.
Employment Equity Act compliance (SA designated employers).
Tax compliance: SARS PIN via CSD or tax clearance certificate.
B-BBEE status level proof for Specific Goals.
ISO 9001:2015 QMS (certification or documented evidence).
SHEQ: Kusile OHS Specification compliance.
Environmental: Kusile Environmental Specification compliance.
Returnables per submissionGuidelines and complianceRequirements.
Section
Source: Invitation to Tender (ITT) - Alteration and additions to existing building structures.pdfFunctionality: Technical criteria 100%, minimum 70% threshold (disqualifying). Criteria in separate Technical Evaluation document.
Price: 80/90 points – inclusive VAT, arithmetic correction, exclude contingencies, adjust for variations/deviations/alternatives, NPV comparison (programme, price adjustment factors, forex), unconditional discounts included, conditional discounts excluded.
Specific Goals: 20/10 points per PPPFA 2022 (SBD 6.1). No disqualification for missing proof; zero points awarded.
Ranking: Combined Price + Specific Goals (90/10 or 80/20).
Objective criteria may override ranking.
Contractual requirements (CSD, SHEQ, Quality, Environmental, Financials) assessed post-ranking, pre-award.
Reverse e-auction: Not applicable.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Address
Kusile Power Station - eMalahleni - Witbank - 1035
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
22
Last checked
23 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
A practical guide for small and medium building contractors on winning government tenders for schools, clinics, housing, and municipal buildings in South Africa.
How established construction firms use Joint Ventures with EMEs and QSEs to meet B-BBEE preferential procurement targets and access set-aside contracts.
Everything South African construction contractors need to know about how procurement officers verify cidb grades: what gauteng contractors must ensure is correct — april 2026 update — covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
How small and medium construction contractors use Joint Ventures to combine CIDB grades, win larger infrastructure projects, and grow beyond their current grading ceiling.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Construction of buildings. Unlock full pricing strategies, bid frequency, and historical win rates.