Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Kusile Power Station - eMalahleni - Witbank - 1035
Organization Type
GOVERNMENT
Published
01 Sept 2026
OCDS Reference
ocds-9t57fa-167746
This specification defines the minimum quality management system requirements for all existing and potential ESKOM suppliers and sub-suppliers. IT classifies suppliers into four quality categories (1–4), each with distinct returnable documentation requirements that must be submitted with the tender response. The single most consequential requirement is that bidders must complete and sign form a and submit the category-specific quality returnables listed in the list of tender returnables (240-12248652); omission or incomplete submission may lead to disqualification.
Bidders must complete and sign Form A (Tender and Contract Quality Requirements for Supplier Quality Management Specification 240-105658000/QM 58 and ISO 9001) and submit it with the returnable documents listed in the List of Tender Returnables (240-12248652).
The applicable quality category (1, 2, 3, or 4) will be indicated in Form A for the specific procurement; only one category applies per tender.
Category 1 requires a valid ISO 9001 certificate from an accredited certification body, latest internal and external audit reports with corrective actions, a draft Contract Quality Plan (CQP) specific to the scope of work, an example Inspection and Test Plan (ITP) or Quality Control Plan (QCP) from similar work, documented control of externally provided processes, roles/responsibilities/authorities, and management review records.
Category 2 requires objective evidence of an implemented QMS (manual, policy, objectives, document control, internal audit, nonconforming output control, corrective action procedures), latest internal audit reports, draft CQP, example ITP/QCP, control of externally provided processes, roles/responsibilities, and management review records.
Category 3 requires documented QMS information (manual, policy, objectives, document control, internal audit, nonconforming output control, corrective action), draft CQP, example ITP/QCP, control of externally provided processes, and roles/responsibilities.
Category 4 requires a quality method statement based on ISO 9001, signed quality policy, quality objectives, control of externally provided processes, and project-specific roles/responsibilities/authorities.
All categories require compliance with the List of Tender Returnables (240-12248652); specific returnables per tender are selected using that document.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Wednesday, 23 September 2026 - 10:00
Venue
https://teams.microsoft.com/meet/370844332514756?p=aY0uCyk3NzLKgmC8Fw
Categories
Request for Bid(Open-Tender)
Kusile Power Station - eMalahleni - Witbank - 1035
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Important Dates
Source: OHS specification for Alterations and additions to existing building structures.pdf (unknown)01 Sept
2026
Tender Published
Tender was published
23 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
240-105658000 Supplier QM Spec Rev 3-QM 58.pdf
Eskom requires alterations and additions to existing building structures at Kusile Power Station in Mpumalanga over a nine-month period. The tender is governed by Eskom's Supplier Quality Management Specification (240-105658000), which mandates ISO 9001-aligned quality management systems, contract quality plans, inspection and test plans, and supplier capability assessments. Bidders must comply with one of four quality requirement categories, each specifying distinct documentation returnables.
240-109253698 CQP Template- Rev 3.docx
C1 2b ECC3 Data by Contractor.doc
OHS specification for Alterations and additions to existing building structures.pdf
Eskom Kusile Power Station is procuring a contractor for alterations and additions to existing building structures over a nine-month period. The work includes construction, demolition, electrical and mechanical installations, and commissioning at the power station in Mpumalanga. The tender is governed by a detailed OHS specification (KUS-20251238) that sets mandatory health, safety, and compliance requirements for the main contractor and any subcontractors.
C1 2a ECC3 Data by Employer.doc
240-68099512 Form A_Cat 1_ Rev 9.docx
Kusile Power Station Environmental Specification for Alterations and Additions to Existing Building Structures.pdf
Eskom Kusile Power Station requires a contractor for alterations and additions to existing building structures over a nine-month period. The contract is governed by a detailed environmental specification (KUS-20250797 Rev 1) that mandates compliance with ISO 14001, the National Environmental Management Act, and site-specific waste, spill, and hazardous substance management procedures.
C2 ECC3 Pricing Data Option B.doc
Eskom requires a contractor for alterations and additions to existing building structures at Kusile Power Station in Mpumalanga over a nine-month period. The work involves demolition, structural alterations, drywall partitioning, ceiling works, and associated mechanical, electrical, and fire protection installations across four buildings: Auxiliary Building 1, FGD Control Room, Admin Building, and BOP Building.
C3 1 ECC3 Employers Works Information.doc
Eskom is procuring a contractor for alterations and additions to existing building structures at Kusile Power Station in Mpumalanga over a nine-month period. The multidisciplinary works include demolition, structural modifications, new construction, building services installation, testing, commissioning, and handover across the Auxiliary Bay Buildings (Units 2–6), Administration Building, Substation South Building, and Station Services Building.
Unpriced BOQ for Alterations and Additions to Existing Building Structures at Kusile Power Station 31.08.26.xls
Eskom is procuring a contractor for alterations and additions to existing building structures at Kusile Power Station in Mpumalanga for a nine-month period.
240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx
Eskom requires a contractor to perform alterations and additions to existing building structures at Kusile Power Station in Mpumalanga over a nine-month period.
TES_Building Alterations Scope -FINAL _.pdf
Eskom invites tenders for alterations and additions to existing building structures at Kusile Power Station in Mpumalanga, including construction and commissioning supervision, for a nine-month period. The contract requires a multi-disciplinary team and proven experience in similar industrial building alterations.
C4 ECC3 Site Information.doc
Eskom requires a contractor to carry out alterations and additions to existing building structures at Kusile Power Station over a nine-month period. The works are located on the Horingkraans Farm site in Mpumalanga, accessed via the R686 road between the N4 and N12 highways.
E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.docx
Eskom is procuring a contractor for alterations and additions to existing building structures at Kusile Power Station in Mpumalanga for a nine-month period. The tender is conducted via Eskom's e-Tendering platform.
Unpriced BOQ for Alterations and Additions to Existing Building Structures at Kusile Power Station 31.08.26.pdf
Eskom requires a contractor for alterations and additions to existing building structures at Kusile Power Station in Mpumalanga over an eight-month period. The scope includes demolition, new concrete and masonry work, drywall partitioning, suspended ceilings, access flooring, HVAC, fire detection, water detection, signage, electrical installations, plumbing, tiling, carpentry, joinery, ironmongery, metalwork, plastering, waterproofing, and associated site establishment and professional design and supervision resources.
E-tendering Help Manual for supplier - 27 January 2025.docx
Eskom is procuring alterations and additions to existing building structures at Kusile Power Station in Mpumalanga for a nine-month period. Tender submissions must be made electronically via the eTendering portal by 23 September 2026 at 10:00 UTC.
C1 1 ECC3 Offer Acceptance.doc
Eskom invites offers for alterations and additions to existing building structures at Kusile Power Station in Mpumalanga for a contract period of nine months. The contract will be based on the NEC3 Engineering and Construction Contract framework, with the final price determined in accordance with the conditions of contract.
240-12248652_List of Tender Returnables_Cat 1_ Rev 7.pdf
Eskom is procuring a contractor for alterations and additions to existing building structures at Kusile Power Station in Mpumalanga for a nine-month period. The tender places significant emphasis on quality management system compliance, requiring documented evidence of ISO 9001 certification and operational quality processes.
Building Alterations Scope at Kusile Power Station - FINAL_.pdf
Eskom requires a contractor to execute alterations and additions to existing building structures at Kusile Power Station in Mpumalanga over a nine-month period. The multidisciplinary works include architectural, civil, structural, mechanical, electrical, and control & instrumentation components such as demolition, structural modifications, new construction, building services installation, testing, commissioning, and handover. The contractor must also provide construction and commissioning monitoring, training, and full documentation including as-built drawings and O&M manuals.
Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template for Bidders.pdf
Eskom is procuring a contractor for alterations and additions to existing building structures at Kusile Power Station in Mpumalanga, including construction and commissioning supervision, for a nine-month duration.
C0 ECC3 Contract cover page.doc
Eskom Holdings SOC Ltd is procuring a contractor for alterations and additions to existing building structures at Kusile Power Station in Mpumalanga over a nine-month period under an NEC3 Engineering and Construction Contract.
Invitation to Tender (ITT) - Alteration and additions to existing building structures.pdf
Eskom Holdings SOC Ltd invites tenders for alterations and additions to existing building structures at Kusile Power Station in Mpumalanga for a nine-month period. The contract requires a CIDB grading of 7GB or higher and includes mandatory Contract Skills Development Goals for artisan training.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 1 442 703
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
{"closingDate":"18 December 2025","briefingSession":"{"date":null,"time":null,"venue":"ion reports to the relevant management.","is_compulsory":false}"}
Contact Information
Source: OHS specification for Alterations and additions to existing building structures.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"Name: Scope of Work - Alterations and Additions to Existing Building Structures at Kusile"}
Evaluation Criteria
Source: OHS specification for Alterations and additions to existing building structures.pdf (unknown)Main contractor must be registered with the Compensation Commissioner and hold a valid Letter of Good Standing (COID) for the contract duration. Must comply with OHS Act, Construction Regulations, and all listed normative references (including SANS 1186, SANS 10234, ISO 45001:2018). Must appoint competent persons for all statutory and Eskom-required roles with verified qualifications and experience. Must submit safety file two weeks prior to site establishment for OHS department approval. Must sign Section 37(2) agreement with Eskom and ensure subcontractors do the same. No child labour permitted. Must have up-to-date OHS Act and regulations available on site. Must meet competency requirements for supervisors, safety officers, and H&S representatives as specified. Must provide itemised OHS costing (training, PPE, hygiene surveys, medical surveillance).
Technical Specifications
Source: OHS specification for Alterations and additions to existing building structures.pdf (unknown)Eskom Kusile Power Station’s responsibility and commitment is to ensure a safe working environment
is in line with its Safety, Health, Environmental, and Quality (SHEQ) Policy and applicable legislative
obligations. This OHS specification is Eskom Kusile Power Station minimum requirements which are
required to be met for the duration of the contract period by contractors/suppliers and, where required,
the delivery organisation. The contractor is expected to develop an OHS plan that meets these
requirements as well as all the relevant applicable legislation that they conform to. Eskom Kusile Power
Station in no way assumes the contractor’s legal responsibilities and liabilities. The contractor is and
remains accountable for the quality and execution of their health and safety programme for their
employees and appointed contractor employees. This OHS specification reflects minimum
requirements and should not be construed as all-encompassing.
Note 1: All the requirements listed hereunder are in relation to the contract and do not
supersede or replace any organizational OHS requirements.
Where requirements listed are already in place, then the organizational requirements must be taken
cognisance of and listed in the respective OHS plans. If there are any additional Eskom Kusile Power
Station and/or legislative requirements listed in the OHS specification, then these must be addressed.
2.1 Scope
This OHS specification lists the legislative and Eskom Kusile Power Station requirements and, where
applicable, any requirements pertaining to local authorities, municipal by-laws, or environmental
legislation that must be met by the contractor.
2.1.1 Purpose
This document will provide requirements to ensure compliance to legal and other requirements
pertaining to Alterations and Additions to Existing Building Structures at Kusile Power Station.
2.1.2 Applicability
This OHS specification is applicable to any contracting organisation that intends to respond to
Alterations and Additions to Existing Building Structures at Kusile Power Station scope of work
tender/enquiry with the intention of entering into a contract.
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the following
paragraphs.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 53
Template
32-726-03T Rev 1
Kusile Power Station OHS Identifier
Specification for Alterations Document KUS-20251238 Rev
and Additions to Existing Identifier
Building Structure Effective Date December 2025
Review Date December 2028
2.2.1 Normative
[1] Basic Conditions of Employment Act No .
[2] Chapter 3 (sampling of maximum risk employee)
[3] and 4 of the Occupational Exposure Sampling Strategy Manual (OESSM),
[4] Occupational Health and Safety Act and Regulations No .
[5] OHS Act Noise-Induced Hearing Loss Regulations, 2003,
[6] OHS Act Hazardous Chemical Agents Regulations 2021,
[7] OHS Act “Regulations on Hazardous Work by Children in South Africa”
[8] National Environmental Management Act .
[9] National Road Traffic Act .
[10] 32-37 Eskom Kusile Power Station Substance Abuse Procedure.
[11] 32-136 Contractor Health and Safety Requirements
[12] 240-62196227 Life- saving Rules
[13] 32-95 Occupational Health and Safety Incident Management Procedure
[14] 240-131838225: Occupational Health and Safety Incident Management Definitions and
Classification Parameters
[15] 32-727 SHEQ Policy
[16] 32- 418 Working at Heights Procedure
[17] 240-62946386 Vehicle and Driver Safety Management Procedure
[18] 32-520 Risk Assessment procedure
[19] Eskom procedure 240-114036246, Occupational Hygiene Hazard Identification and Risk
Quality Management
Source: OHS specification for Alterations and additions to existing building structures.pdfDEL Department of Employment and Labour ( Inspection and
Enforcement services – Provincial office)
supply, storage, delivery to site, construction, installation, erection, quality assurance, site testing and
commissioning of all Works as detailed herein. The Employer has prepared the detail designs for the
project scope. The Contractor shall inspect the Employer’s drawings to satisfy themselves as to the
nature and the requirement of the Contract works. The Contractor executes the building alterations in
accordance with the Employer’s design, Standards and Codes of Practice and the relevant division of
work between trades. The works are performed in strict accordance to the Occupational Health and
limited to:
a) The construction, alteration, commissioning, renovation (including cleaning), de-commissioning,
demolition or dismantling of building structures and elements
b) Surveying and setting out works
c) Dismantling of fittings or fixtures as well as demolition works including the removal of a structure,
or of any product or waste resulting from demolition or dismantling of a structure, or from
disassembly of prefabricated partition elements of building structures
d) Stripping of existing installation as detailed in the bill of quantities
e) Rewiring, retubing and reinstallation of new installations as detailed in the Employer’s designs
f) Site clearance and preparation of building sites
g) The assembly on site of prefabricated elements i.e. partitioning, to form a structure or the
disassembly on site of the prefabricated elements
h) The provision of mechanical infrastructure i.e. fire protection systems
i) The provision of electronic systems related to control and instrumentation installations, electronic
circuitry and equipment i.e. fire detection systems
j) The provision of electrical installations i.e. small power and lighting, electrical reticulation works
k) Testing and commissioning of installations forming part of the project scope
l) As-built handover documentation
Refer to Unique Identifier: KUS-20250644 scope of work - Alterations and additions to existing building
structures at Kusile Power Station
workplace accidents and car driving. As a result, Eskom Kusile Power Station has the right to
take reasonable procedures to identify and prohibit drunk people from entering the company.
General Safety Regulation 2A specifies the legal position on intoxication.
The allowable alcohol and drug level is 0%.
All contractors must follow Eskom Kusile Power Station 's procedure 32-37 ("Substance Abuse
Procedure"), considering that this is an Eskom Kusile Power Station Life-saving Rule number 4:
(BE SOBER"), and anyone entering the Kusile site will be subjected to ad hoc alcohol testing
instance and thereafter the Eskom Kusile Power Station project manager in the second instance
relating to procedure requirements, non-conformances identified, corrective actions, audits and
inspection schedules.
a) Incident investigation reports
b) Non-Conformances
c) Announcements (near miss/injury/damage)
d) Follow up on recommendations made by the employer in incident investigation reports
Pricing Schedule
Source: OHS specification for Alterations and additions to existing building structures.pdfEmployee (OHS Act) means, subject to the provisions of subsection (2), any
person who is employed by or works for an employer and who
receives or is entitled to receive any remuneration or who works
under the direction or supervision of an employer or any other
person.
Employer (OHS Act) means, subject to the provisions of subsection (2), any
person who employs or provides work for any person and
remunerates that person or expressly or tacitly undertakes to
remunerate him/her, but excludes a TES (ex labour broker) as
defined in section 1(1) of the Labour Relations Act 1956 (Act No.
)
Environment (32-94) means:
a) the land, water, and atmosphere of the earth;
b) micro-organisms and plant and animal life; and
c) any part or combination of (a) and (b) and the
interrelationships among and between them, and the
physical, chemical, aesthetic, and cultural properties and
conditions of the foregoing that influence human health and
well-being
The appointed Contractor reviews the Employer’s designs, pertaining to the works, for completeness
and constructability and proposes design changes, where required. The Contractor makes the
necessary allowance in their tender pricing for the aforementioned service. The Contractor prepares
and submits record drawings upon completion of the works.
Compliance Requirements
Source: OHS specification for Alterations and additions to existing building structures.pdf (unknown)No specific requirements found
B-BBEE Minimum Level: 1
Health & Safety
Source: OHS specification for Alterations and additions to existing building structures.pdfProject Address: Kusile power station, R45 Kendal /Balmoral Road, Haartebeesfontein farm
Eskom Contract’s Manager Eskom’s Health and Safety Manager
Name: Name:
Signature: Signature: _________
18 December 2025 23.12.2025 Date: Date:
Eskom’s Procurement Manager Eskom’s Safety Officer
Name: Name:
Signature: Signature:
18 December 2025 22 December 2025 Date: Date:
Introduction ............................................................................................................................................ 4
Supporting clauses.............................................................................................................................. 4
2.1 Scope ...................................................................................................................................................... 4
2.1.1 Purpose ..................................................................................................................................... 4
2.1.2 Applicability ................................................................................................................................ 4
2.2 Normative/informative references .......................................................................................... 4
2.2.1 Normative ................................................................................................................................... 5
2.2.2 Informative ................................................................................................................................. 5
2.3 Definitions ............................................................................................................................................ 6
2.4 Abbreviations ..................................................................................................................................... 9
2.5 Related/supporting documents ............................................................................................... 10
3.1 Scope of work .................................................................................................................................. 10
3.2 Legal compliance ............................................................................................................................ 11
3.3 ESKOM kusile power station requirements ......................................................................... 13
3.4 OHS policy .......................................................................................................................................... 15
3.5 Covid - 19 policy ................................................................................................................................ 15
3.6 Coid ....................................................................................................................................................... 16
3.7 Costing for OHS within the project ....................................................................................... 16
3.8 Statutory appointments ............................................................................................................. 16
3.9 ESKOM kusile power station life-saving rules .................................................................. 17
3.10 Substance abuse ................................................................................................................... 18
3.11 Contractor organisational structure ..................................................................... 18
3.12 Roles and responsibilities ............................................................................................... 19
3.13 Risk assessment (refer to 32-520) .................................................................................. 22
3.14 Safe work procedures / method statements .......................................................... 24
3.15 Roof work (refer to 32- 418) ............................................................................................. 24
3.16 Fire equipment and maintenance .................................................................................... 24
3.17 Flammable, combustible liquids and hazardous chemical agents .................. 25
3.18 First aid and equipment ...................................................................................................... 27
3.19 OHS communication systems ............................................................................................ 28
3.20 Toolbox talks / daily team talks / pre job meetings ............................................. 31
3.21 OHS training ............................................................................................................................ 31
3.22 General training ................................................................................................................... 32
3.23 Contractor site establishment ..................................................................................... 32
3.24 Vehicle management ............................................................................................................ 34
3.25 Housekeeping and order ................................................................................................... 35
3.26 Stacking and storage ........................................................................................................ 36
3.27 Workplace signage and colour coding ..................................................................... 36
3.28 Tools and equipment ........................................................................................................... 36
3.29 Ladders ..................................................................................................................................... 37
3.30 Scaffolding ............................................................................................................................ 38
3.31 Auditing ..................................................................................................................................... 40
3.32 Smoking ..................................................................................................................................... 41
3.33 Cellular phones ................................................................................................................... 41
3.34 Occupational health, hygiene and rehabilitation ................................................. 41
3.35 Roles and responsibilities ............................................................................................... 44
3.36 Working at heights .............................................................................................................. 44
Specification for Alterations Document KUS-20251238 Rev
and Additions to Existing Identifier
Building Structure Effective Date December 2025
Review Date December 2028
3.37 Confined spaces .................................................................................................................... 45
3.38 Personal protective equipment requirements ...................................................... 46
3.39 Incident investigation ........................................................................................................ 46
3.40 Emergency management .................................................................................................... 46
3.41 Non-conformance and compliance ............................................................................... 47
3.42 OHS files ................................................................................................................................... 47
3.43 Work stoppage ...................................................................................................................... 48
3.44 Hours of work ....................................................................................................................... 48
3.45 Omissions from safety and health requirements specification ..................... 49
3.46 Contract sign off ................................................................................................................ 49
3.47 ESKOM kusile power station 's right to terminate the contract ................... 49
3.48 Barricading ............................................................................................................................. 50
3.49 Contractor/supplier management key performance indicators (kpi’s) ....... 52
Authorization ........................................................................................................................................ 53
Revisions .................................................................................................................................................. 53
Development team ............................................................................................................................... 53
Acknowledgements ............................................................................................................................ 53
Specification for Alterations Document KUS-20251238 Rev
and Additions to Existing Identifier
Building Structure Effective Date December 2025
Review Date December 2028
Eskom Kusile Power Station’s responsibility and commitment is to ensure a safe working environment
is in line with its Safety, Health, Environmental, and Quality (SHEQ) Policy and applicable legislative
obligations. This OHS specification is Eskom Kusile Power Station minimum requirements which are
required to be met for the duration of the contract period by contractors/suppliers and, where required,
the delivery organisation. The contractor is expected to develop an OHS plan that meets these
requirements as well as all the relevant applicable legislation that they conform to. Eskom Kusile Power
Station in no way assumes the contractor’s legal responsibilities and liabilities. The contractor is and
remains accountable for the quality and execution of their health and safety programme for their
employees and appointed contractor employees. This OHS specification reflects minimum
requirements and should not be construed as all-encompassing.
Note 1: All the requirements listed hereunder are in relation to the contract and do not
supersede or replace any organizational OHS requirements.
Specification for Alterations Document KUS-20251238 Rev
and Additions to Existing Identifier
Building Structure Effective Date December 2025
Review Date December 2028
2.2.1 Normative
[1] Basic Conditions of Employment Act No .
[2] Chapter 3 (sampling of maximum risk employee)
[3] and 4 of the Occupational Exposure Sampling Strategy Manual (OESSM),
[4] Occupational Health and Safety Act and Regulations No .
[5] OHS Act Noise-Induced Hearing Loss Regulations, 2003,
[6] OHS Act Hazardous Chemical Agents Regulations 2021,
[7] OHS Act “Regulations on Hazardous Work by Children in South Africa”
[8] National Environmental Management Act .
[9] National Road Traffic Act .
[10] 32-37 Eskom Kusile Power Station Substance Abuse Procedure.
[11] 32-136 Contractor Health and Safety Requirements
[12] 240-62196227 Life- saving Rules
[13] 32-95 Occupational Health and Safety Incident Management Procedure
[14] 240-131838225: Occupational Health and Safety Incident Management Definitions and
[15] 32-727 SHEQ Policy
[16] 32- 418 Working at Heights Procedure
[17] 240-62946386 Vehicle and Driver Safety Management Procedure
[18] 32-520 Risk Assessment procedure
[19] Eskom procedure 240-114036246, Occupational Hygiene Hazard Identification and Risk
Assessment
[20] Plant Safety Regulations
[21] BS ISO 45001 :2018 Occupational Health and Safety Management Systems
[22] Eskom Kusile Power Station Covid-19 policy
[23] National Disaster Management Act
[24] KUS-20250644 scope of work - Alterations and additions to existing building structures at Kusile
2.2.2 Informative
[25] Tobacco Products Control Act (Updated 2011.05.19)
[26] SANS 1186 Symbolic Safety Signs
[27] Constitution of the Republic of South Africa No
[28] SANS 10234:2019 Global Harmonized System of classification and labelling of chemicals.
Baseline risk assessment (32-520) baseline operational risks refer to the health and safety
risks associated with all standard processes and routine activities in
the business
Business unit (BU) (32-296) means any defined unit within the Eskom Kusile Power
cost-centre number. In the context of this document and in terms
of health and safety, any reference to a BU includes a defined unit
within any Eskom Kusile Power Station division and its subsidiaries
Client (OHS Act) Eskom Kusile Power Station representative (Internal –
Asset Owner), also referred to as the contract
administrator/custodian or agent or project manager (as defined in
the contract). He/she is the person responsible for ensuring that
the works or services are executed in terms of the contract, as well
as adherence to legislation pertaining to the contract.
Competent person (OHS Act) means any person having the knowledge, training,
experience, and qualifications, specific to the work or task being
performed, provided that, where appropriate, qualifications and
training are registered in terms of the South African Qualifications
Authority Act, 1995 (Act No. )
Contractor (OHS Act) means an employer as defined in section 1 of the Act
who performs contracted work and includes Main contractors
Contract’s Manager/End Contract’s Manager/End User
Controlled disclosure controlled disclosure to external parties (either enforced by law or
discretionary)
Duty of care to the (32-136) anybody who causes or has caused or may cause
environment significant pollution or degradation of the environment must take
reasonable measures to prevent such pollution or degradation from
occurring, continuing, or recurring. If such harm to the environment
is authorised by law or cannot reasonably be avoided or stopped,
such person must minimise and rectify such pollution or
degradation of the environment
guidelines, or manuals
Fall protection plan (OHS Act) means a documented plan of all risks relating to working
from an elevated position, considering the nature of work
undertaken, and setting out the procedures and methods to be
applied in order to eliminate the risk
Hazard (OHS Act) means a source of, or exposure to, danger
Hazard identification (OHS Act) means the identification and documenting of existing or
expected hazards to the health and safety of persons, which are
normally associated with the type of construction work being
executed or to be executed
Occupational Health and (OHS Act) means a file or other record in permanent form,
safety file containing the information required in relation to the contract.
Health and safety plan (OHS Act) means a document plan that addresses hazards
identified and includes safe work procedures to mitigate, reduce, or
control hazards identified
Risk Assessment (HIRA)
Occupational Health and (OHS Act) means a document specification of all health and safety
safety specification requirements pertaining to associated to a contract, so as to ensure
the health and safety of persons.
safety requirements contract, project, site, and scope of work. This specification is
intended to ensure the health and safety of persons, both workers
and the public, and the duty of care to the environment. The health
and safety requirements must be specific to each contract, project,
site, and scope of work
Lifesaving Rules (240-62196227) a rule that, if not adhered to, has the potential to
cause serious harm to people
Medical Certificate of (OHS Act) means a certificate valid for one year, issued by an
fitness occupational health practitioner, issued in terms of the regulations,
whom shall be registered with the Health Professions Council of
Medical surveillance (OHS Act) means a planned programme or periodic examination
(which may include clinical examinations, biological monitoring, or
medical tests) of employees by an occupational health practitioner
or, in prescribed cases, by an occupational medicine practitioner
Method statement (OHS Act) means a written document detailing the key activities to
be performed in order to reduce, as reasonably as practicable, the
hazards identified in any risk assessment
Organisation may be defined as a group of individuals (large of small) that is
cooperating under the direction of executive leadership in
accomplishment of certain common objects
Pre-job meetings (34-227) means a meeting that is held prior to the commencement
of the day’s work and that is attended by all the relevant employees
associated with the work task
Main contractor (In the text of this document) Means an employer, as defined in
section 1 of the OHS Act, who intends to tender for or has signed a
contract with Eskom Kusile Power Station for services rendered.
Risk assessment (OHS Act) means a programme to determine any risk associated
with any hazard at a construction site in order to identify the steps
needed to be taken to remove, reduce, or control such hazard.
Site (34-228) means an Eskom Kusile Power Station department, unit,
complex, building, specific project, work site, or the site where
agents, clients, Main contractors, contractors, suppliers, vendors,
and service providers provide a service to Eskom Kusile Power
Task (34-227) a segment of work that requires a set of specific and
distinct actions for its completion
Toolbox talks (34-227) where the team leader, after conducting pre-task planning,
shares all the tasks at hand and discusses task allocation, the
identified risks, and the control measures with all his/her team
members on site before commencing a specific task and
documenting the agreed strategy. (This shall be done to ensure
common understanding of the tasks, risks, and control measures
required.)
The Act (OHS Act) means the Occupational Health and Safety Act No. , as amended, and the Regulations thereto
to ensure the safety of persons, property, etc. and to remove on completion.
Note: The contractor who will be awarded this contract will be known as the “Main contractor” and
any contractor appointed by the Main contractor will be known as the “sub-contractor".
3.2 Legal Compliance
3.2.1 Section 37(2) (Legal) Agreement
A section 37(2) agreement must be signed between Eskom Kusile Power Station and the main
contractor at the time of submitting the safety file. The main contractor must ensure that a section 37(2)
agreement is compiled between the main contractor and all their appointed contractors for the
contract. The original copy of the section 37(2) agreement must be retained by the contractor, and a
Specification for Alterations Document KUS-20251238 Rev
and Additions to Existing Identifier
Building Structure Effective Date December 2025
Review Date December 2028
copy must be retained by the responsible project manager/end user. A copy of all the agreements must
form part of the respective contractor’s OHS file.
3.2.2 Hazardous Work by Children (Child Labour)
The constitution of the Republic of South Africa, in the "Bill of Rights", is clear on the rights of children,
especially when it comes to:
being protected from exploitative labour practices.
not be required or permitted to perform work or provide services that
are inappropriate for a person of that child’s age; or
This places at risk the child’s well-being, education, physical or mental health, or spiritual, moral,
or social development and the Basic Conditions of Employment Act, Chapter six, Section 43,
"Prohibition of employment of children."
rights. Where work is being performed which is not prohibited in terms of the constitution, then such
work must be conducted in terms of the OHS Act "Regulations on Hazardous Work by Children in
South Africa" with emphasis on paragraph 2: Purpose and Interpretation. Eskom Kusile Power Station
does not condone the use of child labour and, therefore, all effort must be exercised, and child labour
should not be used.
3.2.3 OHS Act
project being:
The Constitution of the Republic of South Africa (particularly Section 24 of the Bill of Rights).
Occupational Health and Safety Act 1993 (Act ) and its Regulations.
National Environmental Management Act 1998 (Act ).
Environment Conservation Act 1989 (Act ).
National Water Act 1998 (Act ).
a) A copy of the OHS Specification document is in the possession of the responsible person of the
contracting company as well as the Kusile Power Station baseline risk assessment.
b) The responsible person of the contracting company and the Kusile power station project
manager/contract manager have signed the Kusile power station section 37 (2) agreement.
c) The appointment of the Appointed Contractor has been concluded and signed by the Contractor
and Appointed Project Manager. A task specific baseline risk assessment must be part of the
plan must form part of the baseline risk assessment
d) Where a Subcontractor(s) is appointed by the Appointed Contractor, the Contractor supplies the
applicable Kusile power station OHS specifications to the Subcontractor(s).
3.3.1 Requirements Specific to the issued Scope of Work
g) The supervisor must conduct planned task/ job observations and submit to the OHS department
weekly reports.
h) Where a confined space can be isolated and adequately ventilated, this must be done before the
space is environmentally tested and certified clear of all dangerous gases. Thereafter a gas
certificate and environmental certificate must be issued before any person is allowed to enter.
i) Employees must be medical fit to perform the task.
j) Medical certificates of fitness that are valid must be part of the safety file package including
identification documents of the employees and their competency certificates
k) The safe work procedures must indicate how the Alterations and Additions to Existing Building
of employees.
l) Submit a detailed OHS plan which must be suitable, practical, site specific, well- documented and
a workable OHS document, compiled to satisfy the requirements of the OSH Act , the
Sub-’s safety specifications and other relevant legislation. The OHS plan must be aligned in
terms of suitability and adequacy to the extent of the scope of work. The OHS plan should detail
how health and safety would be implemented while on site looking at the scope of work as well as
any legal and other requirements applicable to the project to be carried out.
m) The OHS plan must show and describe the assignment of responsibilities, procedures and
actions to be taken in the process of implementing and maintaining the OHS plan as well as
include how deviations/non-conformances shall be managed.
n) The OHS plan must be approved by the Kusile project manager/contract manager in writing
before it is submitted to OHS department.
o) The contractor must identify suitable PPE required for the activities including the identification of
appropriate tools
p) The contractor must submit job descriptions supported by proof of competencies for all
employees.
q) Applicable legal appointments must form part of the safety file with competency certificates per
appointment.
Specification for Alterations Document KUS-20251238 Rev
and Additions to Existing Identifier
Building Structure Effective Date December 2025
Review Date December 2028
Hazard Identification and Risk Assessment Training
Incident Investigation and Root Cause Analysis Technique Training
Three years applicable experience as a supervisor
Attended an accredited supervisor’s safety course
General Health and Safety course
Confined space
Incident Investigation and Root Cause Analysis Technique Training
Hazard Identification and Risk Assessment Training
FAS Rescue as outlined in Unit Standard 229995
OH&S Act and Regulations (latest version of the Act and regulations).
COID Act (latest version of the Act).
Incident Investigation and Root Cause Analysis Technique.
Hazard Identification and Risk Assessment Training.
Emergency Preparedness Coordination Training
3.4 OHS Policy
A OHS policy is a statement of intent and a commitment by the organization’s CE and senior
management in relation to the relevant OHS roles and responsibilities, the achievement of their
strategic objectives, and values of integrity, customer satisfaction, excellence, and innovation. The
main contractor and all appointed contractors, if not already in place, will be required to compile an
organisational OHS policy in line with their OHS responsibilities. The policy must be signed by the
organisation’s CEO or the appointed assistant to the CEO, OHS Act Section 16(2). The policy must be
displayed in a prominent place within the workplace. A copy of the policy must be filed in the
contractor's OHS files and attached as an annexure to the OHS Plan. OHS Policy to comply with the
requirements of OHS Act Section 7 and ISO 45001:2018, Clause 5.2.
3.5 COVID - 19 Policy
senior person. The policy must be displayed in a prominent place within the workplace. A copy of the
policy must be filed in the contractor's OHS files and attached as an annexure to the OHS Plan.
3.5.1 Covid -19 Requirements
Covid-19 costs are not for profit making purpose and Eskom Kusile Power Station reserve the right to
accept and/or decline the list of PPE which will be listed in the detailed Covid-19 costs. Due to the
current pandemic the contractors are required to provide Eskom Kusile Power Station with a Covid-19
risk assessment and a detailed plan on how to prevent the spread of the virus and what control
measures will be put in place to protect Eskom Kusile Power Station employees and members of the
public. The risk assessment must include the following but not limited to, adherence to Covid-19
employment compensation commissioner and have available a valid letter of good standing (LoG) from
such commissioner. The obligation lies with the contractors to ensure that the LoG remain valid
throughout the contract period. A copy of the LoG must be filed in the contractor OHS files.
3.7 Costing for OHS within the Project
The costing for OHS must be itemised based on the overall scope of the project (i.e.) Training,
provision of PPE, safety equipment purchases, Occupational Hygiene Surveys, Medical Surveillance,
3.8 Statutory Appointments
should be included in the statutory appointments, but not limited to:
OHS Act General Administrative Regulation 9(2) – Incident Investigator
OHS Act Section 19 (3) - Health and Safety Committee Member
OHS Act Section 19(6)(a) – Co-opted Health and Safety Committee member
OHS Act, Section 17 – Health and Safety Representative
OHS Act General Safety Regulations 3(4) – First Aider/s
OHS Act GSR 81 a stacking & storing supervisor
3.8.1 Non statutory appointments
Working at height is defined as any work performed above a stable work surface or Rule 2
where a person puts himself/herself in a position where he/she exposes
himself/herself to a fall from or into.
employees at all levels must demonstrate their commitment by being proactively involved in the day-to-
day operations, in particular the Occupational Health and Safety aspects of any project / contract.
managers their full participation and cooperation.
must be kept for each work site.
the health and safety aspects relating to such work and that the employees understand the
hazards associated with all other work being carried out on the project.
adhere to such procedures. Similarly (without removing the appointed contractors’
responsibilities), ensure that their appointed contractors and their employees are conversant
with all relevant work procedures and that they adhere to such procedures.
Co-ordinate the activities of all the appointed contractors in the interests of safety and health;
Ensure that their contractors (whom they intend appointing) have made detailed provision for
the cost of safety and health measures throughout the project.
and safety of persons or a risk of degradation to the environment.
which such supervisor has been appointed for.
information or suspecting such information has been divulged, in the interests of health and
safety requirements.
employees have transgressed any of the requirements of the health and safety specification,
safety and health plans, site rules or any other requirements.
site or emerging risks. This should be done by a competent person appointed in writing with a
view to identify hazardous and potentially hazardous work operations.
person/man job specifications must be compiled and handed to the occupational health
practitioner.
employees, inspect such equipment regularly and ensure recipients of PPE are trained in the
proper use, care and where necessary, the maintenance of PPE;
Note: should the Main contractor or his/her appointed contractors entertain visitors on site, they will be
held responsible for the provision and wearing PPE.
work instructions and safety regulations issued by Eskom Kusile Power Station:
contractors deviate from safety requirements.
3.12.3 Contractor Health and Safety Officer full/time
of ISO 4500, Minimum work experience 2yrs, OHS Diploma (applicable to 3-5 years contract)
3.13 Risk Assessment (refer to 32-520)
It is a legal requirement in terms of Section 8 (2)(d) of the OHS Act for an employer to carry out risk
assessments, to establish which risks and hazards are attached to the health and safety of persons
due to any work which is performed, any article or substance which is, handled, stored, transported. A
risk assessment is defined as an identification of the hazards present in the activity, work, site, and an
estimate of the extent of the risks involved, considering whatever precautions are already being taken.
a) identification of all hazards.
b) evaluation of the risks.
c) Measures to control the risks.
activity, or any new process or activity should be subjected to a risk assessment and that if new
hazards come to light during the work process, then these should also be subjected to risk
assessments. Risk assessments for long term processes should be periodically reviewed and updated.
of the way jobs / tasks must be performed. Daily or issue based or task specific or on the job risk
assessments must be conducted at the place where work is to be performed/ conducted to allow
managers and employees to assess any inherent risks that could have been overlooked during the
initial risk assessment or any changes that might have occurred in a period of absence. For example, if
a job / task is extended over a day or halted due to inclement weather.
Supervisor nominated as the responsible person; and the names of workmen who have
received instruction on the work content and the sequence of the activities listed in the risk
assessment shall be recorded, and their competence established. This instruction shall be done
through an interpreter if required and recorded on the Pre-Job Brief (Daily Safe Task
Instructions), with reference to applicable Risk Assessments.
with the risk assessments. Method statements / written safe work procedure are control measures used
to prevent an incident from occurring during the execution of the project. A written safe work procedure/
method statements provide guidance how to execute the task safely. A safe working procedure should
be written when: -
a) Designing a new job or task.
b) Changing jobs or task.
c) Introducing new equipment or substances; and
a) The supervisor for the task or job and the employees who will undertake the task.
b) The tasks that are to be undertaken that pose risks.
c) The equipment and substances that are used in these tasks.
d) The control measures that have been built into these tasks.
e) Any training or qualification needed to undertake the task.
f) The personal protective equipment to be worn.
g) Actions to be undertaken to address safety issues that may arise while undertaking the task.
3.17 Flammable, Combustible Liquids and Hazardous Chemical Agents
and the approval to be obtained from the local Municipality and to be complied with for the
duration the project.
shall be provided, installed, and maintained.
a) Storage should be well clear of buildings.
b) Storage areas must be kept free from all combustible materials.
c) All Safety signs must be prominently displayed i.e.
designated safe areas and appropriate warning signs installed. Suitable drip trays must be used to
prevent spillage at the filling nozzle.
3.17.2 Hazardous Chemical Agents Management
The contractor(s) shall describe how hazardous substances, as defined in the Hazardous Chemical
Agents Regulations (OHS Act), will be managed.
Specification for Alterations Document KUS-20251238 Rev
and Additions to Existing Identifier
Building Structure Effective Date December 2025
Review Date December 2028
Prior to any hazardous chemical substances (HCA) being brought onto the site or produced on the site,
the contractor shall supply the Eskom project manager with the following:
Safety Data Sheets (SDS) for materials in accordance with the requirements of the Globally
approved training providers, providing skills programmes/unit standard training will only be
accepted, which includes:
a) US 119567 – Perform basic life support and first aid procedures.
b) US 120496 – Provide risk-based primary emergency care/first aid in the workplace.
c) US 376480 – Provide first aid as an advanced first responder.
work performed, the distance teams are working apart and the terrain to be covered if an
emergency should arise.
familiar with the emergency numbers.
team of workers on site or part thereof, taking into account the type of work performed and the
distance between teams.
Specification for Alterations Document KUS-20251238 Rev
and Additions to Existing Identifier
Building Structure Effective Date December 2025
Review Date December 2028
how they intend to communicate OHS issues to their staff, the mediums they will employ and how they
will measure the effectiveness of their OHS communication. Below is a brief on how communication
should take place. Where project meetings are conducted on site, OHS shall be included as a standing
agenda point and minutes of these meetings shall be available on site at all times. Minutes of meeting
must be compiled and filed in the relevant OHS files. All employees shall have access to these
minutes. Attendance register shall be kept for all the health and safety meetings.
3.19.1 Statutory Health and Safety Committees
of the OHS Act. Similarly, appointed contractors shall establish their own statutory health and
safety committee.
training, upcoming work and OHS requirements, incidents and lessons learned specific OHS
problems, safety performance, action plans and other relevant OHS issues. Listed below is a
preferred agenda.
Representatives on that specific statutory health and safety committee. (Refer to Section
19(2)(c) of the OHS Act)
Specification for Alterations Document KUS-20251238 Rev
and Additions to Existing Identifier
Building Structure Effective Date December 2025
Review Date December 2028
medium to high-risk work is involved, more frequent if required), and all appointed members of
the committee shall attend the meeting.
the project manager and the Inspector at DEL.
incidents and other notified serious incidents.
health and safety committees carry out their duties.
contractor. The appointed chairperson must be competent to chair meetings and be able to
make informed decisions.
3.19.2 Non-statutory health and safety committees
that worksite to assist with the communication of health and safety related matters between the
statutory health and safety committee and the workplace.
same as the statutory safety committee
3.19.2.1 Agenda
3.19.2.2 Minutes and Action Items for all Health and Safety Committee Meetings
for the duration of the project or a minimum period of three years.
project or a minimum period of 12 months.
months.
Environmental
Source: OHS specification for Alterations and additions to existing building structures.pdfEmergency Preparedness
Statistics report
Closure
3.19.2.2 Minutes and Action Items for all Health and Safety Committee Meetings
Minutes and record of action items shall be kept of all health and safety committee meetings.
Action column with target dates and responsible person shall be clearly visible on the minutes
and shall be completed during the meeting.
for the duration of the project or a minimum period of three years.
project or a minimum period of 12 months.
months.
chairperson.
recommendations and return the minutes to the relevant contractors chairperson within 14
calendar days of the meeting.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 53
applicable, any requirements pertaining to local authorities, municipal by-laws, or environmental
legislation that must be met by the contractor.
2.1.1 Purpose
Description
Source: 240-109253698 CQP Template- Rev 3.docxContract Quality Plan template assist the supplier to identify and plan for meeting client's/ contract expectations/requirements for quality management
Technical Specifications
Source: 240-109253698 CQP Template- Rev 3.docx (unknown)Contract Quality Plan template assist the supplier to identify and plan for meeting client's/ contract expectations/requirements for quality management
Compliance Requirements
Source: 240-109253698 CQP Template- Rev 3.docx (unknown)No specific requirements found
Description
Source: C1 2b ECC3 Data by Contractor.doc[Instructions to the contract compiler: (delete this notes before issue to
Technical Specifications
Source: C1 2b ECC3 Data by Contractor.doc (unknown)[Instructions to the contract compiler: (delete this notes before issue to
Description
Source: 240-68099512 Form A_Cat 1_ Rev 9.docxNB: The tenderer must complete and sign this form to acknowledge and accept Eskom Supplier Quality Requirements as per 240-105658000 Specification and ISO 9001 Standard.
Technical Specifications
Source: 240-68099512 Form A_Cat 1_ Rev 9.docx (unknown)NB: The tenderer must complete and sign this form to acknowledge and accept Eskom Supplier Quality Requirements as per 240-105658000 Specification and ISO 9001 Standard.
Description
Source: C4 ECC3 Site Information.doc|Document reference |Title |No of |
Evaluation Criteria
Source: C4 ECC3 Site Information.doc (unknown)No eligibility criteria specified
Technical Specifications
Source: C4 ECC3 Site Information.doc (unknown)|Document reference |Title |No of |
Description
Source: C1 2a ECC3 Data by Employer.docCompletion of the data in full, according to the Options chosen, is
Technical Specifications
Source: C1 2a ECC3 Data by Employer.doc (unknown)Completion of the data in full, according to the Options chosen, is
Evaluation Criteria
Source: C0 ECC3 Contract cover page.doc (unknown)No explicit eligibility criteria (CIDB grading, B-BBEE level, tax clearance, CSD registration, local content, or financial thresholds) are stated in the provided document extract. Standard Eskom and National Treasury requirements for public procurement are expected to apply but are not detailed here.
Description
Source: C2 ECC3 Pricing Data Option B.doc|Document reference |Title |No of |
Evaluation Criteria
Source: C2 ECC3 Pricing Data Option B.doc (unknown)Bidders must have professional registrations for key personnel: SACPMP (Construction Project Manager, Safety Officer), ECSA (Engineers), SACAP (Architectural), SAGC (Land Surveyor). All key personnel require 5 years relevant experience (3 years for Land Surveyor, Document Controller, Semi-skilled). Company must provide 40 personnel for medicals and security clearance. No explicit CIDB grading, B-BBEE level, or local content percentage stated in the provided document. CSD registration and tax compliance (SARS pin) are standard requirements for Eskom tenders but not detailed in this extract.
Description
Source: C3 1 ECC3 Employers Works Information.doc|Document reference |Title |No of |
Evaluation Criteria
Source: C3 1 ECC3 Employers Works Information.doc (unknown)Contractor must demonstrate capability to execute multidisciplinary works in an operational power station. Key personnel must hold specified professional registrations (SACPCMP, ECSA, SACAP, SAGC, SAQCC Fire) and minimum 5 years' relevant experience (3 years for Land Surveyor, Document Controller). No explicit CIDB grading, B-BBEE level, or financial turnover thresholds stated in the provided scope document. CSD registration and tax compliance (SARS) are implied standard requirements for Eskom tenders but not explicitly detailed in this extract.
Submission Guidelines
Source: TES_Building Alterations Scope -FINAL _.pdf (unknown)Returnable Documents: Experience of Key Personnel (cont.) 1.2 Structural Engineer Resource: 4% N/A N/A 0 = 0% 5=100%
Evaluation Criteria
Source: TES_Building Alterations Scope -FINAL _.pdf (unknown)Tenderer must be registered on the Central Supplier Database (CSD) and have a valid SARS tax compliance status (implied by standard Eskom procurement policy). Must demonstrate at least two completed projects within the last 10 years of similar scope (building alterations/additions with multi-disciplinary coordination) with verifiable reference letters and completion certificates on client letterhead. All key personnel must hold current, valid professional registrations as specified (SACAP, ECSA, SACPCMP, SAQCC, DOL) and meet minimum post-registration experience requirements (5 years for most roles). Forged or falsified documents result in disqualification. No explicit CIDB grading, B-BBEE level, or local content thresholds stated in this evaluation strategy document.
Technical Specifications
Source: TES_Building Alterations Scope -FINAL _.pdf (unknown)Execution of
Alterations to Existing Alternative Reference N/A
Building Structures Number:
including Construction
& Commissioning
Supervision at Kusile Area of Applicability: Engineering
Power Station
Documentation Type: Strategy
Revision: 1
Total Pages: 22
Next Review Date: N/A
Disclosure Classification: CONTROLLED
Disclosure
Compiled by Functional Responsibility Authorized by
p.p.
L. Thipa S. Nkomo S. Hlongwa
Civil Engineer Auxiliary Engineering Engineering Group
Manager Manager
Date: Date: 15/07/2026 Date: 26/08/2026 13/07/2026
Template Identifier: 240-53716769 Tender Technical Evaluation Strategy Template (Rev 2) (Next Review Date July 2027)
Tender Technical Evaluation Strategy: Scope of Work: Unique Identifier: KUS - 20250643
Execution of Alterations to Existing Building Structures Revision: 1
including Construction & Commissioning Supervision at
Page: Kusile Power Station
Contents . Introduction ....................................................................................................................................................... 3
2.1 Scope .............................................................................................................................................................. 3
2.1.1 Purpose...................................................................................................................................................... 3
2.1.2 Applicability ................................................................................................................................................ 3
2.2 Normative/informative references ................................................................................................... 3
2.2.1 Normative ................................................................................................................................................... 3
2.2.2 Informative ................................................................................................................................................. 3
2.3 Definitions .................................................................................................................................................... 4
2.3.1 Enquiry ....................................................................................................................................................... 4
2.3.2 Tender........................................................................................................................................................ 4
2.3.3 Tenderer .................................................................................................................................................... 4
2.3.4 Classification .............................................................................................................................................. 4
2.4 Abbreviations .............................................................................................................................................. 4
2.5 Roles and responsibilities ..................................................................................................................... 4
2.6 Process for monitoring ......................................................................................................................... 5
2.7 Related/supporting documents .......................................................................................................... 5
3.1 Technical evaluation threshold ........................................................................................................ 5
3.2 Weighted scorecard ................................................................................................................................ 5
3.3 Tet members ................................................................................................................................................. 5
3.4 Mandatory technical evaluation criteria ..................................................................................... 7
3.5 Qualitative technical evaluation criteria ..................................................................................... 9
A. Tet member responsibilities ................................................................................................................. 20
B foreseen acceptable / unacceptable qualifications ............................................................... 21
Risks ................................................................................................................................................................. 21
Exceptions / Conditions..................................................................................................................................... 21
4 acceptance ...................................................................................................................................................... 22
5 revisions............................................................................................................................................................ 22
6 development team ......................................................................................................................................... 22
7 acknowledgements ...................................................................................................................................... 22
Tables
Table 1: Abbreviations Table ..................................................................................................................................... 4
Table 2: Scorecard ...................................................................................................................................................... 5
Table 3: Core TET Members ....................................................................................................................................... 5
Table 4 Mandatory Technical Evaluation Criteria..................................................................................................... 7
Table 5: TET Member Responsibilities .................................................................................................................... 20
Table 6: Acceptable Technical Risks....................................................................................................................... 21
Table 7: Unacceptable Technical Risks .................................................................................................................. 21
Table 8: Acceptable Technical Exceptions / Conditions ....................................................................................... 21
Table 9: Unacceptable Technical Exceptions / Conditions ................................................................................... 21
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Tender Technical Evaluation Strategy: Scope of Work: Unique Identifier: KUS - 20250643
Execution of Alterations to Existing Building Structures Revision: 1
including Construction & Commissioning Supervision at
Page: Kusile Power Station
An invitation to tender will be issued to the open market, inviting suitably qualified and experienced
service providers to participate in the tender process for the Scope of Work: Execution of Alterations to
Existing Building Structures including Construction & Commissioning Supervision at Kusile Power
Station. This document sets out the evaluation methodology/criteria and scoring principles that will be
applied in the assessment of the tender submissions received in response to this tender invitation.
2.1 Scope
This strategy defines the Technical Evaluation Team (TET) and their responsibilities regarding this
scope. The mandatory and qualitative evaluation criterion used to evaluate the submitted tenders is also
included in this report.
2.1.1 Purpose
The purpose of this tender technical evaluation strategy is to outline the process to followed in
evaluating the tenders.
2.1.2 Applicability
This document applies to the Tender Evaluation Team for the project scope: Execution of Alterations to
Existing Building Structures including Construction & Commissioning Supervision at Kusile Power Station.
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the following
paragraphs.
2.2.1 Normative
[1] 240-48929482 Tender Technical Evaluation Procedure
[2] 32-1034 Eskom Procurement Policy
[3] 474-59 Internal Audit Procedure
2.2.2 Informative
[4] KUS-20250644- Scope of Work: Execution of Alterations to Existing Building Structures including
Construction & Commissioning Supervision at Kusile Power Station
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Tender Technical Evaluation Strategy: Scope of Work: Unique Identifier: KUS - 20250643
Execution of Alterations to Existing Building Structures Revision: 1
including Construction & Commissioning Supervision at
Page: Kusile Power Station
2.3 Definitions
2.3.1 Enquiry
A competitive or non-competitive request for information, interest, quotations or proposals made to a
supplier, a group of suppliers or the market at large.
2.3.2 Tender
A tender refers to an open or closed competitive request for quotations / prices against a clearly defined
scope / specification.
2.3.3 Tenderer
One who tenders.
2.3.4 Classification
Controlled Disclosure: Controlled Disclosure to external parties (either enforced by law, or discretionary).
2.4 Abbreviations
Table 1: Abbreviations Table
Abbreviation Description
CCTV Closed Circuit Television
C&I Control and Instrumentation
CV Curriculum Vitae
ECSA Engineering Council of South Africa
HVAC Heating, Ventilation and Air-conditioning
ID Identification Document
PA Public Address
SACAP South African Council for the Architechural Profession
SACPCMP South African Council for Project and Construction Management Professionals
SAGC South African Geomatics Council
TES Technical Evaluation Strategy
TET Technical Evaluation Team
2.5 Roles And Responsibilities
The roles and responsibilities are as per the Tender Technical Evaluation Procedure [1].
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Tender Technical Evaluation Strategy: Scope of Work: Unique Identifier: KUS - 20250643
Execution of Alterations to Existing Building Structures Revision: 1
including Construction & Commissioning Supervision at
Page: Kusile Power Station
2.6 Process For Monitoring
This procedure shall be monitored by the Internal Audit Procedure [3].
2.7 Related/Supporting Documents
None.
3.1 Technical Evaluation Threshold
The minimum weighted final score (i.e. threshold) required for a tender to be considered from a technical
perspective is 70%.
3.2 Weighted Scorecard
A weighted score card approach will be used to evaluate the tenders against the Employer’s requirements.
The following scoring method will be used. The individual scores from the TET members on each
evaluation criteria will be added and averaged to obtain a final score.
Table 2: Scorecard
Score Percentage Description
5 100 Compliant
4 80 Compliant With Associated Qualifications
2 40 Non-Compliant
technical risk(s) AND/OR;
0 0 Totally Deficient Or Non-Responsive
3.3 Tet Members
Table 3: Core TET Members
TET number Designation
TET 1 Civil Engineer
TET 2 Civil Engineer
TET 3 Electrical Engineer
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Tender Technical Evaluation Strategy: Scope of Work: Unique Identifier: KUS - 20250643
Execution of Alterations to Existing Building Structures Revision: 1
including Construction & Commissioning Supervision at
Page: Kusile Power Station
TET number Designation
TET 4 C&I Engineer
TET 5 Mechanical Engineer – HVAC System
TET 6 Mechanical Engineer – Fire Protection System
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Tender Technical Evaluation Strategy: Scope of WorkAlterations and Additions to Existing Building Structures at Unique Identifier: KUS - 20250643
Kusile Power Station Revision: 1
Page:
3.4 Mandatory Technical Evaluation Criteria
Table 4 Mandatory Technical Evaluation Criteria
Mandatory Technical Criteria Description Source of Evidence Motivation for use of Criteria
AND completion certificates for each project submitted
demonstrated competence and capability in delivering The Tenderer must submit verifiable reference under this criterion. All submitted documentation shall
letters and completion certificates for a minimum of meet the following minimum requirements: works of a similar nature, complexity and scale to those
the client or authorised referee.
years, directly related to building alterations and Tenderers that cannot demonstrate relevant and recent
additions of comparable nature and complexity. experience present an unacceptable technical and clearly state the:
For the purposes of this tender, “similar scope” delivery risk. This criterion therefore supports the
refers to projects involving building alterations and o Project name selection of a contractor with a proven track record,
additions of a comparable nature and complexity. o Project description and scope of work reducing overall project risk.
o Contract value Such projects may include but are not limited to the
o Completion date
following activities: o Tenderer’s role and level of responsibility
facilities including reconfigurations to electrical, and mobile and/or telephonic contact number)
control and instrumentation, and/or structural o Confirmation of satisfactory performance
and/or HVAC and/or fire protection and
detection systems. 2. The Tenderer submits a declaration letter confirming
including partial demolitions, strengthening authentic. The tenderer notes that forged or falsified
documents will result in disqualification and may have works and modifications to structural elements
legal consequences.
extensions, additional floors or new building Notes:
sections integrated with existing structures
from the tender closing date will be considered
including changes to building layouts, building defined similar works and aligned with the Technical
Scope Document; systems, finishes, ceilings and partitions
Tender Technical Evaluation Strategy: Scope of WorkAlterations and Additions to Existing Building Structures at Unique Identifier: KUS - 20250643
Kusile Power Station Revision: 1
Page:
Mandatory Technical Criteria Description Source of Evidence Motivation for use of Criteria
disciplines in construction work including
architectural, civil, structural, mechanical,
electrical and control & Instrumentation
works
Tender Technical Evaluation Strategy: Scope of WorkAlterations and Additions to Existing Building Structures at Unique Identifier: KUS - 20250643
Kusile Power Station Revision: 1
Page:
3.5 Qualitative Technical Evaluation Criteria
Notes to tenderer:
An undertaking is required that resources identified would not be changed on award of the Contract.
The CV’s of Key Personnel should have experience which is comparable in nature to the Works specified in this tender.
It is a requirement that the key personnel, in particular, have good communication skills in the English language.
Where no information is offered by the Tenderer no points shall be scored.
Tender Technical Evaluation Strategy: Scope of WorkAlterations and Additions to Existing Building Structures at Unique Identifier: KUS - 20250643
Kusile Power Station Revision: 1
Page:
No Qualitative Technical Criteria Description Reference to Technical Criteria Scoring
Specification / Tender Weighting 0 2 4 5
Returnable (%)
1.1 Architectural Professional Resource: 8% 5=100%
Architectural professional who meets the
African Council for the Architectural professional last three (3) months experience or
Profession (SACAP) less than 5 registration experience
Architectural Studies or equivalent certified within the post registration and project
Methodology
Source: TES_Building Alterations Scope -FINAL _.pdf3.1 Technical Evaluation Threshold
The minimum weighted final score (i.e. threshold) required for a tender to be considered from a technical
perspective is 70%.
3.2 Weighted Scorecard
A weighted score card approach will be used to evaluate the tenders against the Employer’s requirements.
2.1 The tenderer must submit an organisational 15% No organisational Organisational Organisational
delivery model and approach, showing: chart or submission is structure fully defined. but incomplete. most key personnel
materially deficient. Roles, responsibilities
lines and management responsibilities JV/consortium not identified. required for design Design and
discipline leads and design coordination JV/subcontractor confirmation responsibilities are delivery are not responsibilities are responsibilities not defined. arrangements well
construction teams applicable) contractor lines and JV/Consortium/Sub confirmed. Minimal risk
through subcontractors or a not submitted, are unclear. Limited arrangements are
Experience & Qualifications
Source: TES_Building Alterations Scope -FINAL _.pdfDate: Date: 15/07/2026 Date: 26/08/2026 13/07/2026
Template Identifier: 240-53716769 Tender Technical Evaluation Strategy Template (Rev 2) (Next Review Date July 2027)
Tender Technical Evaluation Strategy: Scope of Work: Unique Identifier: KUS - 20250643
Execution of Alterations to Existing Building Structures Revision: 1
including Construction & Commissioning Supervision at
Page: Kusile Power Station
Contents . Introduction ....................................................................................................................................................... 3
2.1 Scope .............................................................................................................................................................. 3
2.1.1 Purpose...................................................................................................................................................... 3
2.1.2 Applicability ................................................................................................................................................ 3
2.2 Normative/informative references ................................................................................................... 3
2.2.1 Normative ................................................................................................................................................... 3
2.2.2 Informative ................................................................................................................................................. 3
2.3 Definitions .................................................................................................................................................... 4
2.3.1 Enquiry ....................................................................................................................................................... 4
2.3.2 Tender........................................................................................................................................................ 4
2.3.3 Tenderer .................................................................................................................................................... 4
2.3.4 Classification .............................................................................................................................................. 4
2.4 Abbreviations .............................................................................................................................................. 4
2.5 Roles and responsibilities ..................................................................................................................... 4
2.6 Process for monitoring ......................................................................................................................... 5
2.7 Related/supporting documents .......................................................................................................... 5
3.1 Technical evaluation threshold ........................................................................................................ 5
3.2 Weighted scorecard ................................................................................................................................ 5
3.3 Tet members ................................................................................................................................................. 5
3.4 Mandatory technical evaluation criteria ..................................................................................... 7
3.5 Qualitative technical evaluation criteria ..................................................................................... 9
A. Tet member responsibilities ................................................................................................................. 20
B foreseen acceptable / unacceptable qualifications ............................................................... 21
Risks ................................................................................................................................................................. 21
Exceptions / Conditions..................................................................................................................................... 21
4 acceptance ...................................................................................................................................................... 22
5 revisions............................................................................................................................................................ 22
6 development team ......................................................................................................................................... 22
7 acknowledgements ...................................................................................................................................... 22
5 100 Compliant
4 80 Compliant With Associated Qualifications
2 40 Non-Compliant
technical risk(s) AND/OR;
0 0 Totally Deficient Or Non-Responsive
3.3 Tet Members
Table 3: Core TET Members
demonstrated competence and capability in delivering The Tenderer must submit verifiable reference under this criterion. All submitted documentation shall
letters and completion certificates for a minimum of meet the following minimum requirements: works of a similar nature, complexity and scale to those
the client or authorised referee.
years, directly related to building alterations and Tenderers that cannot demonstrate relevant and recent
additions of comparable nature and complexity. experience present an unacceptable technical and clearly state the:
For the purposes of this tender, “similar scope” delivery risk. This criterion therefore supports the
refers to projects involving building alterations and o Project name selection of a contractor with a proven track record,
additions of a comparable nature and complexity. o Project description and scope of work reducing overall project risk.
o Contract value Such projects may include but are not limited to the
o Completion date
following activities: o Tenderer’s role and level of responsibility
facilities including reconfigurations to electrical, and mobile and/or telephonic contact number)
control and instrumentation, and/or structural o Confirmation of satisfactory performance
and/or HVAC and/or fire protection and
detection systems. 2. The Tenderer submits a declaration letter confirming
including partial demolitions, strengthening authentic. The tenderer notes that forged or falsified
documents will result in disqualification and may have works and modifications to structural elements
legal consequences.
extensions, additional floors or new building Notes:
sections integrated with existing structures
from the tender closing date will be considered
including changes to building layouts, building defined similar works and aligned with the Technical
Scope Document; systems, finishes, ceilings and partitions
Tender Technical Evaluation Strategy: Scope of WorkAlterations and Additions to Existing Building Structures at Unique Identifier: KUS - 20250643
Kusile Power Station Revision: 1
Page:
1.1 Architectural Professional Resource: 8% 5=100%
CV demonstrating 0 = 0% N/A N/A
CV not Submitted CV The tenderer must submit particulars of an relevant experience submitted or demonstrates a
Certified copy of does not minimum of five (5) following minimum requirements: qualification(s), demonstrate the
Professionally registered with the South years’ relevant post certified within the required relevant
African Council for the Architectural professional last three (3) months experience or
Profession (SACAP) less than 5 registration experience
qualification
last three (3) months experience is implementation within
registration experience in architectural
design for industrial or infrastructure infrastructure valid SACAP qualification/s
facilities including project certificate, certified not submitted environments, including implementation. Demonstrates
registration is engineering project engineering and infrastructure projects (3) months not experience. All required
submitted/invalid
supporting documents /not certified
is not submitted
Tender Technical Evaluation Strategy: Scope of WorkAlterations and Additions to Existing Building Structures at Unique Identifier: KUS - 20250643
Kusile Power Station Revision: 1
Page:
Specification / Tender (%) 0 2 4 5
Returnable
Experience of Key Personnel (cont.)
1.2 Structural Engineer Resource: 4% N/A N/A 0 = 0% 5=100%
the following minimum requirements: minimum of five (5) experience demonstrate the
Eng or Pr. Tech Eng)
Eng/BEng/BTech/MEng or equivalent)
qualification(s), less than 5 engineering design
engineering. Demonstrates competency in the last three experience is infrastructure facilities
the provision of consultancy services, i.e. (3) months demonstrated including consultancy
design, advisory services, technical
support etc.
copy, certified not submitted
documents are included. within the last
three (3) registration is
not months
submitted/invali
of valid ECSA
certificate, copy is not
submitted certified within
the last three
(3) months
Tender Technical Evaluation Strategy: Scope of WorkAlterations and Additions to Existing Building Structures at Unique Identifier: KUS - 20250643
Kusile Power Station Revision: 1
Page:
Specification / Tender (%) 0 2 4 5
Returnable
Experience of Key Personnel (cont.)
1.3 Geotechnical Engineer Resource: 2% N/A N/A 0 = 0% 5=100%
the following minimum requirements: minimum of five (5) experience demonstrate the
Eng or Pr. Tech Eng)
Eng/BEng/BTech/MEng or equivalent) qualification(s), less than 5 geotechnical design and
engineering. Demonstrates competency in the last three experience is consultancy services
the provision of consultancy services, i.e. (3) months demonstrated experience etc. All
geotechnical investigations and design
including advisory services, technical
support etc. copy, certified not submitted
within the last
three (3) registration is
not months
submitted/invali
of valid ECSA
certificate, copy is not
certified within submitted
the last three
(3) months
Tender Technical Evaluation Strategy: Scope of WorkAlterations and Additions to Existing Building Structures at Unique Identifier: KUS - 20250643
Kusile Power Station Revision: 1
Page:
Returnable (%) 0 2 4 5
Experience of Key Project Personnel (cont.)
1.4 Mechanical Engineer (HVAC Systems): 5% N/A N/A
the following minimum requirements: minimum of five (5) experience required relevant
or Pr. Tech Eng)
qualification (BSc Eng/BEng/BTech/MEng or
certified within registration experience in HVAC equivalent) experience is
registration experience in HVAC systems months
within industrial, commercial or infrastructure qualification/s not commercial or
facilities. Demonstrates competency in the
provision of consultancy services, i.e. certified within
design, advisory services, performance the last three (3) registration is not
assessments, system optimisation, fault consultancy services months submitted/invalid/
identification, troubleshooting, technical experience. All not certified
support etc.
not submitted certificate, included.
certified within
the last three
(3) months
Tender Technical Evaluation Strategy: Scope of WorkAlterations and Additions to Existing Building Structures at Unique Identifier: KUS - 20250643
Kusile Power Station Revision: 1
Page:
Specification / Tender (%) 0 2 4 5
Returnable
Experience of Key Project Personnel (cont.)
1.5 Mechanical Engineer (Fire Engineer): 3% N/A N/A 5=100%
Mechanical Engineer or Technologist who meets relevant demonstrate the minimum of five (5) the following minimum requirements: experience required relevant
or Pr. Tech Eng)
(BSc Eng/BEng/BTech/MEng or equivalent) qualification(s) registration experience in fire
Demonstrates competency in the provision of three (3) qualification/s not design including
professional consultancy services i.e. design, months submitted consultancy services
advisory services, performance assessments,
system optimisation, fault identification,
troubleshooting, technical support. etc. copy, certified submitted/invalid/ documents are
within the last not certified included
three (3)
months is not submitted
copy of
valid ECSA
certificate,
certified
within the
last three
(3) months
Tender Technical Evaluation Strategy: Scope of Work-
Alterations and Additions to Existing Building Structures at Unique Identifier: KUS - 20250643
Kusile Power Station Revision: 1
Page:
Returnable (%) 0 2 4 5
Experience of Key Project Personnel (cont.)
1.6 C&I Engineer Resource : 3% N/A N/A
Electronics Engineer or Technologist who meets the relevant (5) or more years of demonstrate the
following minimum requirements: relevant post experience required relevant
with ECSA
Electronics Engineering (BSc/BEng/BTech/MEng)
certified within registration required supporting
control and instrumentation systems i.e. PLC, months included
Returnable (%) 0 2 4 5
Experience of Key Project Personnel (cont.)
1.7 Electrical Engineer Resource: 5% N/A N/A
following minimum requirements: minimum of five (5) experience demonstrate the
or Pr. Tech Eng)
(BSc Eng/BEng/BTech/MEng or equivalent)
certified within less than 5 experience in low,
high voltage electrical systems. months experience is voltage electrical
professional consultancy services i.e. design
advisory services, performance assessments, copy, certified qualification/s experience. All
system optimisation, fault identification, within the last not submitted
troubleshooting, technical support etc. required supporting three (3) months
documents are registration is
of valid ECSA submitted/invali
d/not certified certificate,
certified
within the last copy is not
three (3) submitted
months
Tender Technical Evaluation Strategy: Scope of Work-
Alterations and Additions to Existing Building Structures at Unique Identifier: KUS - 20250643
Kusile Power Station Revision: 1
Page:
0 2 4 5 Returnable ing (%)
Experience of Key Project Personnel (cont)
1.8 Site Agent Resource: 15% 0 = 0% N/A N/A 5 = 100%
The tenderer must submit particulars
of a Site Agent who meets the does not minimum of five (5)
following minimum requirements: relevant experience demonstrate the years' relevant
required relevant
Civil Engineering, Structural qualification(s), than 5 years’ general building
last three (3) months qualification site supervision. All equivalent qualification experience is (BSc, BEng, BTech, required supporting
equivalent) certified within the
post qualification submitted
valid
site supervision ECSA/SACPCMP registration is not
standing with ECSA or within the last three not certified
SACPCMP (3) months
not submitted
Tender Technical Evaluation Strategy: Scope of Work-
Alterations and Additions to Existing Building Structures at Unique Identifier: KUS - 20250643
Kusile Power Station Revision: 1
Page:
Experience of Key Project Personnel (cont.)
1.9 Foreman / Construction Supervisor Resource 12%
relevant
The tenderer must submit particulars of a experience or does not minimum of five (5) Foreman / Construction Supervisor who: years' relevant
ceiling and partitioning installation or or trade partitioning and experience or a related trade certificate,
relevant experience in partitioning and the last three (3) relevant post required supporting
ceiling works qualification documents are months
experience is included
certified within the demonstrated
last three (3)
months
Certified National
Has a minimum of five (5) years’ or less than fire detection and Commissioning
experience in the installation and five (5) years' fire alarm systems. Certificate/Registra
commissioning of fire detection and fire tion, certified within relevant All required
alarm systems.
the last three (3) experience supporting
months demonstrated documents are
Experience of Key Project Personnel (cont.)
1.12 Electrical Installation Electrician Resource: 5% 0 = 0% N/A N/A 5 = 100%
The tenderer must submit particulars of an relevant experience
Electrical Installation Electrician who: submitted or minimum of five (5)
copy of experience in the equivalent qualification in Electrical experience not
equivalent documents are
qualification, included (Registered Person Registration) demonstrated
certified
experience in the electrical construction,
last three (3) qualification installation and/or reticulation sector.
months not submitted
valid Wireman's Wireman’s
qualification. submitted, BMS and integrated (5) years'
relevant commissioning experience in BMS and the last three (3) supporting documents
experience integrated systems are included months
demonstrated
Exclusion of proof/record of completed projects of similar scope with traceable references
Exclusion of Professional Registration Certificates of key personnel allocated to perform the specified services
Quality Management
Source: TES_Building Alterations Scope -FINAL _.pdfExperience of Key Project Personnel (cont.)
1.10 Foreman / Construction Supervisor Resource 5%
relevant
The tenderer must submit particulars of a experience or relevant minimum of five (5) Foreman / Construction Supervisor who: years' relevant
relevant experience in supervising certified within installation not supporting
teams engaged in HVAC construction the last three (3) demonstrated or documents are
activities including testing and less than five (5) included months
commissioning of related installations years' relevant i.e. ductwork, ventilation fans,
thermostats etc. certified within the experience
last three (3) demonstrated or
months
Experience of Key Project Personnel (cont.)
1.11 Fire Alarm Technician Resource: 3% 0 = 0% N/A N/A 5 = 100%
The tenderer must submit particulars of a demonstrating
or equivalent qualification in
Experience of Key Project Personnel (cont.)
1.13 Commissioning / Testing Engineer 5% 0 = 0% N/A N/A 5 = 100%
demonstrates
The tenderer must submit particulars of a relevant submitted or than five (5) years'
Commissioning / Testing Engineer who: experience. relevant hands-on
Compliance Requirements
Source: TES_Building Alterations Scope -FINAL _.pdf (unknown)last three (3) months experience is implementation within
Certified ID copy are included. is not submitted Tender Technical Evaluation Strategy: Scope of WorkAlterations and Additions to Existing Building Structures at Unique Identifier: KUS - 20250643 Kusile Power Station Revision: 1 Page: No Qualitative Technical Criteria Description Reference to Criteria Scoring Technical Weighting Specification / Tender (%) 0 2 4 5 Criteria TET 1 TET 2 TET 3 TET 4 TET 5 TET 6 Number 1 X X X X X X Qualitative Criteria TET 1 TET 2 TET 3 TET 4 TET 5 TET 6 Number 1.1 X X 1.2 X X 1.3 X X 1.4 X 1.5 X 1.6 X 1.7 X 1.8 X X 1.9 X X 1.10 X 1.11 X 1.12 X 1.13 X X X X X 2.1 X X X X X X 3.1 X X Tender Technical Evaluation Strategy: Scope of WorkAlterations and Additions to Existing Building Structures at Unique Identifier: KUS - 20250643 Kusile Power Station Revision: 1 Page: B Foreseen Acceptable / Unacceptable Qualifications Risks Table 6: Acceptable Technical Risks Risk Description
N/A Table 7: Unacceptable Technical Risks Risk Description
Exclusion of Professional Registration Certificates of key personnel allocated to perform the specified services Exceptions / Conditions Table 8: Acceptable Technical Exceptions / Conditions Risk Description
N/A Table 9: Unacceptable Technical Exceptions / Conditions Risk Description
N/A Tender Technical Evaluation Strategy: Scope of WorkAlterations and Additions to Existing Building Structures at Unique Identifier: KUS - 20250643 Kusile Power Station Revision: 1 Page: 4 Acceptance This document has been seen and accepted by: Name Designation Signature Kunaal Dharamraj Mechanical Engineer – HVAC System Dhiresh Ram Mechanical Engineer – Fire Protection System Amanda Ngwenya Electrical Engineer Boikobo Sikhosana C&I Engineer 5 Revisions Date Rev. Remarks July 2026 1 First issue 6 Development Team The following people were involved in the development of this document: Amanda Ngwenya Dhiresh Ram Kunaal Dharamraj Boikobo Sikhosana 7 Acknowledgements Aluwani Maumela CONTROLLED DISCLOSURE When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorised version on the system.
Environmental
Source: TES_Building Alterations Scope -FINAL _.pdfprogramme (Gantt chart or equivalent) submitted, or comprehensive, logical
showing phases, milestones and critical or schedule programme is submitted but lacks demonstrates an and fully integrated.
path activities. The programme details the incomplete, detail on sequencing, acceptable
Critical path, following: unrealistic, or milestones, resource understanding of
(labour, equipment) across all project adequately dependencies,
mitigation. Significant Key activities and
activities. demonstrate resource allocation,
resource or operational risks. moderate delivery
are clearly defined.
mechanisms Demonstrates a low
risk approach to project
delivery
100%
Description
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.docxBusiness name/JV: _______________________________________________________
Evaluation Criteria
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.docx (unknown)Must be registered on the National Treasury Central Supplier Database (CSD). Must have valid tax compliance status (SARS tax pin/TCS). Must meet applicable CIDB grading for building construction works. Must submit completed E-Tendering Training Acknowledgement Form as a mandatory returnable document.
Technical Specifications
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.docx (unknown)Business name/JV: _______________________________________________________
Description
Source: Unpriced BOQ for Alterations and Additions to Existing Building Structures at Kusile Power Station 31.08.26.xlsW[?db
u1D$
mb5=
J+8>2g
*}fW
L=y
K=!c
w(71
['D3
e1Bxa `
xbuYY
H
gI
[_^O
w 91
3Q{
] uC1
eU8:
m#d1
c^A
oV.J
xI[,
{RCb
x2mt
roC|
Lv
P
;$\P
GP:k
-A2\
69 m
&aw1
~hB``T
;o1Z
Ds/:
Tunr
CtE
Mci~
+G3x]
'vH
F0@
Technical Specifications
Source: Unpriced BOQ for Alterations and Additions to Existing Building Structures at Kusile Power Station 31.08.26.xls (unknown)W[?db
u1D$
mb5=
J+8>2g
*}fW
L=y
K=!c
w(71
['D3
e1Bxa `
xbuYY
H
gI
[_^O
w 91
3Q{
] uC1
eU8:
m#d1
c^A
oV.J
xI[,
{RCb
x2mt
roC|
Lv
P
;$\P
GP:k
-A2\
69 m
&aw1
~hB``T
;o1Z
Ds/:
Tunr
CtE
Mci~
+G3x]
'vH
F0@
Description
Source: C1 1 ECC3 Offer Acceptance.docThe Employer, identified in the Acceptance signature block, has solicited
Evaluation Criteria
Source: C1 1 ECC3 Offer Acceptance.doc (unknown)CIDB registration (registration number required). Valid tax compliance status (implied by standard Eskom procurement practice). CSD registration (implied). No other specific eligibility criteria, minimum B-BBEE level, local content thresholds, or financial turnover requirements are stated in the provided document.
Technical Specifications
Source: C1 1 ECC3 Offer Acceptance.doc (unknown)The Employer, identified in the Acceptance signature block, has solicited
Evaluation Criteria
Source: Building Alterations Scope at Kusile Power Station - FINAL_.pdf (unknown)Bidder must be registered on CSD. Must have valid SARS tax clearance/tax pin. Must meet B-BBEE requirements per PPPFA. Must hold appropriate CIDB grading for building construction (grade not specified in document). Key personnel must hold current professional registrations with SACPCMP, ECSA, SACAP, SAGC, SAQCC Fire as specified. Contractor must demonstrate experience in multi-disciplinary industrial/infrastructure projects. No joint venture/consortium details specified but letters of confirmation required if applicable.
Technical Specifications
Source: Building Alterations Scope at Kusile Power Station - FINAL_.pdf (unknown)The Employer requires the provision of construction services for alterations and additions to various
station buildings at Kusile Power Station. The Contractor shall provide all labour, supervision,
materials, plant, equipment, temporary works, tools, testing facilities and all other resources
necessary to execute and complete the works in accordance with this scope. The Contractor shall
also monitor all construction and commissioning activities and provide all record documentation
required to demonstrate compliance with the scope and applicable standards. The works are
executed in accordance with the Employer’s designs and relevant codes of practice.
2.1 Scope
2.1.1 Purpose
The purpose of this document is to outline the project specifications for the intended works at Kusile
Power Station.
2.1.2 Applicability
This document applies to Kusile Power Station only.
2.1.3 Effective date
This document will be effective from the date of its authorisation.
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] Guideline Scope of Services and Professional Fees [Scope of Services and Professional Fees
for Persons Registered in terms of the Engineering Profession Act, ]
[2] ISO 9001 Quality Management Systems
[3] 36-681: Eskom Plant Safety Regulations
[4] 474-58 (Rev1): Document and Records Management
[5] 240-105658000: Supplier Quality Management Specification
2.2.2 Informative
[6] 240-53114002: Engineering Change Management Procedure
[7] 240-53113685: Design Review Procedure
[8] 240-53665024: Engineering Quality Manual
[9] 240-53114186: Document and Records Management
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Scope of Work: Scope of Work: Execution of Unique Identifier: KUS - 20250644
Alterations to Existing Building Structures including
Revision: 1Construction & Commissioning Supervision at Kusile
Power Station Page:
2.2.3 Standards and Specifications
The Contractor carries out all works in accordance with applicable South African National Standards
(SANS), prescribed Eskom standards (where applicable) and all relevant codes of practice and
specifications. References to standards, codes or manuals refer to the latest editions in force at the
contract date unless otherwise stated. The Contractor complies with all normative and informative
references stated in the scope. Where there is any conflict or inconsistency between standards,
specifications or scope requirements, the Contractor notifies the Project Manager for clarification
before proceeding. The Contractor uses industry recognised software using the latest approved
versions as appropriate for the execution of the works. The Contractor ensures that all software is
appropriately licensed and suitable for the performance of the works.
2.3 Roles and Responsibilities
Employer’s Obligations:
Contractor’s Obligations:
Employer, Employer’s engineeringProject kick-off Once-off Kusile Power Station
meeting representatives, Consultant,
Contractor
Project progress As required Kusile Power Station Employer, Employer’s engineering
meeting representatives, Consultant,
Contractor
Employer, Employer’s engineeringRisk register and As required Kusile Power Station
compensation representatives, Consultant,
events meeting Contractor
Engineering As required Kusile Power Station Employer, Employer’s engineering
representatives, Consultant,design interface
Contractor
meetings
End-of-Phase As required Kusile Power Station Employer, Employer’s engineering
review meetings representatives, Consultant,
Contractor(interim and final)
4.2 Documentation control
All document exchanges shall be conducted using formal transmittals. At a minimum, each
transmittal shall include the following information:
Title of the document
Reason for issuing/submission
Transmittal Number
Transmittal Name
Transmittal Description
Contract Number:
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Scope of Work: Scope of Work: Execution of Unique Identifier: KUS - 20250644
Alterations to Existing Building Structures including
Revision: 1Construction & Commissioning Supervision at Kusile
Power Station Page:
Package Number
Sender Name
Sender E-Mail
Sender Organisation
Recipient Name
Recipient E-Mail
Recipient Organisation
Disclosure Classification
Date Received
Quantity of documentation referenced on the transmittal
Format/Medium Submitted (e.g. paper, External Hard Drives, etc.)
Sender Signature
Recipient signature, once submitted, to acknowledge receipt
Where a transmittal is issued in response to an Eskom communication, the relevant Eskom
transmittal number shall be referenced.
The Contractor shall adopt a structured and standard naming convention for transmittal descriptions
as follows:
YYYYMMDD – <Contract Number> – <Vendor> – <Short Description> – <Sender Initials>.
Email subject lines shall follow a standard format:
YYYYMMDD – < Contract File Number> – <Email Subject line>.
The Contractor shall select the appropriate transmittal purpose in accordance with Eskom’s standard
selection criteria, including but not limited to:
Issued for Approval
Issued for Commissioning
Issued for Construction
Issued for Document Review
Issued for Handover
Issued for Information
Issued for Installation
Issued for Manufacturing
Issued for Review etc.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Scope of Work: Scope of Work: Execution of Unique Identifier: KUS - 20250644
Alterations to Existing Building Structures including
Revision: 1Construction & Commissioning Supervision at Kusile
Power Station Page:
Documents issued for different purposes shall be submitted under separate transmittals and shall
not be combined. For email submissions, any single file exceeding 20 MB shall be uploaded to the
Zendto portal, a web-based file transfer service. The applicable submission URL will be provided
upon contract award by the Project Manager. Notification of such submissions shall be
communicated to the Project Manager in accordance with the contract’s correspondence
requirements. A transmittal record shall accompany all Zendto submissions and be sent to the
project document control email address, with the Employer copied. Hard copy documents shall be
submitted by the Contractor. Unless otherwise specified in the schedule of submittals, the following
minimum number of copies shall be provided:
Submittal Description Copies Required
Design and Construction Data including Test and 2
Inspection Data
Drawings 2
The Contractor shall submit documentation to the Employer using the following media:
Large files shall be delivered using secure file transfer methods. A notification email, with the
transmittal note attached, shall be sent to the project email address, with the Employer copied.
accompanied by the relevant transmittal note.
4.3 Quality assurance requirements
The Contractor shall implement and maintain a comprehensive quality assurance system during the
execution of the works. The Contractor shall comply with all applicable Occupational Health and
Safety legislation. All works shall be executed to the highest standards of workmanship.
Construction/Installation Method Statements
The Contractor submits detailed construction and installation method statements for all applicable
work activities before commencing the respective works. No work shall commence until the method
statement has been reviewed and accepted by the Employer. Method statements shall be submitted
for but not be limited to the following construction activities:
etc.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Scope of Work: Scope of Work: Execution of Unique Identifier: KUS - 20250644
Alterations to Existing Building Structures including
Revision: 1Construction & Commissioning Supervision at Kusile
Power Station Page:
Each method statement shall include but not be limited to the following:
i.e. mechanical, C&I and electrical components, where applicable etc
waste etc.
The Contractor shall not deviate from an accepted method statement without the prior submission
and acceptance of a revised method statement. Acceptance of any method statement by the
Employer or Project Manager shall not relieve the Contractor of any obligation, responsibility, or
liability under the Contract.
Quality Control Plans
The Contractor shall prepare and submit Quality Control Plans (QCPs) for all major work activities
to ensure that the works are executed in accordance with approved designs, specifications and
applicable standards. The QCPs shall form part of the Contractor’s overall Quality Management
system and shall be aligned with the Quality Assurance requirements stated in this works
information. The Contractor notes that no construction activity shall commence without an approved
QCP for that activity that has been submitted and accepted by the Employer or Project Manager.
QCPs shall be submitted to the Employer for review and acceptance prior to the commencement of
the relevant works. The Contractor shall submit QCPs sufficiently in advance of the planned
commencement of the relevant activities to allow adequate time for review, comment, revision and
resubmission, where required. Accepted QCPs shall be implemented on site and strictly adhered to
by the Contractor. QCPs shall be updated, as necessary, to reflect changes in design, methodology
etc. Each QCP shall include, as a minimum:
o Hold Points i.e. activities that shall not proceed without Employer acceptance
o Witness Points i.e. activities where the Employer may elect to observe
o Review Points i.e. activities requiring review of documentation, records or quality
submissions etc
The Contractor shall ensure continuous monitoring of compliance with approved QCPs.
Noncompliance with QCPs shall be treated as a defect under the Contract.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Scope of Work: Scope of Work: Execution of Unique Identifier: KUS - 20250644
Alterations to Existing Building Structures including
Revision: 1Construction & Commissioning Supervision at Kusile
Power Station Page:
Upon construction completion, the Contractor submits the listed items but no limited to:
4.4 Programming constraints
The Contractor shall prepare, submit and maintain a detailed project programme. The programme
shall be realistic, fully resourced and shall demonstrate the sequence and interdependence of all
activities necessary to complete the works. The programme shall include as a minimum:
Manager, authorities, or other stakeholders, where applicable
requirements, and lead times for materials, equipment, and specialist items
handover activities
The Contractor shall update the programme at intervals stated in the contract or as instructed by the
Project Manager. The Contractor shall promptly notify the Project Manager of any event or
circumstance that may adversely affect progress or completion of the works and shall propose
appropriate mitigation and recovery measures. The Contractor shall remain solely responsible for
planning, coordinating and executing the works in a manner that achieves timely completion.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Scope of Work: Scope of Work: Execution of Unique Identifier: KUS - 20250644
Alterations to Existing Building Structures including
Revision: 1 Construction & Commissioning Supervision at Kusile
Power Station Page:
4.5 Contractor’s management, supervision and key people
The Principal Contractor shall submit a personnel schedule identifying the key persons proposed to
perform the works. The personnel schedule shall include, for each key person, details of
qualifications, relevant experience, professional registration (where applicable) and the estimated
periods of engagement in the performance of the works. The Contractor confirms that all personnel
engaged on the project shall comply with the Construction Regulations, 2014, including
requirements relating to competence, skills, responsibilities and professional registration. The
works shall be performed by the key persons named in the accepted personnel schedule for the
periods stated therein. Upon contract award, the identified key persons shall constitute a
contractual obligation of the Contractor. Where the Principal Contractor proposes to replace or
utilise personnel not named in the accepted personnel schedule, the Contractor shall submit a
written request to the Employer for approval, providing the proposed person’s name, qualifications,
experience and professional registration. The Contractor shall not implement such change unless
and until the Employer has granted approval. Subject to the Employer’s approval, the Principal
Contractor may make adjustments to the personnel schedule to ensure the efficient and effective
performance of the works, provided that such adjustments do not result in contract price
exceedance.
The Contractor shall also submit a detailed organisational structure illustrating the proposed
delivery model and approach. The organisational structures shall clearly indicate reporting lines and
management responsibilities including the proposed execution strategy (in-house, subconsulting,
joint venture (JV), or consortium arrangements etc). In the case of JV or consortium agreements
the Contractor shall submit the following:
letters or agreements must be issued on the official letterhead of the JV partner or consortium
member. Letters or agreements must be signed by an authorised representative (e.g.
Company Director, CEO or Legal Officer). The Contractor shall provide the name, designation,
and contact details of the authorised signatory for verification purposes.
The Contractor notes that the project personnel required in the management and delivery of the
works, include the following but not limited to:
a) Contract Manager
Management Professions (SACPCMP)
projects with ddemonstrable experience in the administration and management of NEC
contracts
b) Construction Manager
d) Land Surveyor:
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Scope of Work: Scope of Work: Execution of Unique Identifier: KUS - 20250644
Alterations to Existing Building Structures including
Revision: 1Construction & Commissioning Supervision at Kusile
Power Station Page:
e) Site Agent / Site Manager
a) National Diploma or Degree in Civil Engineering or Construction Management
b) Minimum of 5 years’ site-based experience on engineering construction projects
e) Foreman / Construction Supervisor Resource (HVAC Works):
construction activities including testing and commissioning of related installations i.e.ductwork,
ventilation fans, thermostats etc
f) Foreman / Construction Supervisor Resource (Fire Protection Systems and Wet
Services):
Protection systems and Wet Services construction activities including testing and commissioning
of related installations i.e. pipe systems, valves, fire hose reels, etc
g) Fire Detection System Installation Technician
fire alarm systems
h) Electrical Installation Electrician Resource:
certificate as an electrician
sector
i) Commissioning / Testing Engineer Resource:
engineering in Electrical/Electronic/electronic Engineering
and
j) Health and Safety Officer
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Scope of Work: Scope of Work: Execution of Unique Identifier: KUS - 20250644
Alterations to Existing Building Structures including
Revision: 1Construction & Commissioning Supervision at Kusile
Power Station Page:
k) Planning / Scheduling Engineer
l) Environmental Officer
m) Senior Draughtsperson/s
engineering and architectural disciplines i.e. Architechural, Civil & Structural, Mechanical,
Electronics & Electrical disciplines
AutoCAD (Essential) - advanced skill level
SolidWorks (Mechanical)
Revit (Architectural/Structural/MEP)
Civil 3D or related softwares etc
Key responsibilities and skills include preparation of detailed drawings, technical draughting
support
n) Document Controller/Records officer
related field
construction or engineering projects
Resources required for design including construction and commissioning monitoring
a) Architectural Professional (Interior Designer)
equivalent)
implementation within industrial or infrastructure environments. Resource must demonstrate
proven experience in multi-disciplinary engineering projects i.e. coordination with various
engineering disciplines
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Scope of Work: Scope of Work: Execution of Unique Identifier: KUS - 20250644
Alterations to Existing Building Structures including
Revision: 1Construction & Commissioning Supervision at Kusile
Power Station Page:
b) Structural Engineer / Technologist
c) Geotechnical Engineer / Technologist
d) Mechanical Engineer / Technologist (HVAC Engineer)
equivalent)
troubleshooting and maintenance support of HVAC systems
e) Mechanical Engineer / Technologist (Fire Engineer)
equivalent)
rational design
troubleshooting and system optimisation of fire systems.
f) Electrical Engineer / Technologist
switchgears, generator systems, transformers, protection systems etc.
troubleshooting and optimisation
g) C&I Engineer / Technologist
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Scope of Work: Scope of Work: Execution of Unique Identifier: KUS - 20250644
Alterations to Existing Building Structures including
Revision: 1Construction & Commissioning Supervision at Kusile
Power Station Page:
or equivalent).
within industrial or power generation facilities.
control and instrumentation systems i.e. PLC, SCADA & HMI and Distributed Control Systems
(DCS), Server networks supplied by vendors such as Siemens, Schneider Electric, ABB or GE.
Resource also demonstrates experience in instrumentation, control system architecture, system
optimisation, troubleshooting and performance analysis etc.
h) Senior Draughtsperson/s
engineering and architectural disciplines i.e. Architectural, Civil & Structural, Mechanical,
Electronics & Electrical disciplines
support
4.6 Training workshops and technology transfers
The Contractor provides training and carries out technology transfer to the Employer’s personnel to
enable them to operate and maintain the works. Training is provided by suitably qualified and
experienced persons and includes both theoretical and practical instruction.
Training requirements:
The Contractor conducts training at times stated in the accepted programme or as agreed with the
Employer. The Contractor conducts a minimum of two (2) formal training workshops for each major
system. Trainings include the following but not limited to:
Training Materials
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Scope of Work: Scope of Work: Execution of Unique Identifier: KUS - 20250644
Alterations to Existing Building Structures including
Revision: 1Construction & Commissioning Supervision at Kusile
Power Station Page:
The Contractor provides training materials for all training interventions. Training materials include
but are not limited to:
Training provided by the Contractor achieves the following:
and installations
sports systems
Substation South
366 - 539641 R02 Ground Floor Plan
366 - 539642 R02 Ceiling Plan
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Scope of Work: Scope of Work: Execution of Unique Identifier: KUS - 20250644
Alterations to Existing Building Structures including
Revision: 1Construction & Commissioning Supervision at Kusile
Power Station Page:
Drawing number Revision Title
366 - 539643 R02 Sections & Details
Substation South
366 - 539644 R02 Interior Elevations
366 - 539645 R02 Drainage & Water Details
Administration Building
366 - 539789 R01 Block B – Plans & Sections
366 - 539790 R01 Block A & C - First Floor Plans
366 - 539791 R01 Block A – Ground Floor Plan & Section Details
366 - 539792 R01 Doors, Windows & Finishes Schedule
Station Services Building
366 - 539793 R02 Plan & Elevations
366 - 539794 R02 Ceiling Plan
366 - 539795 R02 Section Details
366 - 539796 R02 Internal Wall Elevations
366 - 539797 R02 Doors, Windows & Finishes Schedule
366 - 541734 R02 Drainage & Water Details
366 - 5417310 R02 Tiling Layout & Elevations
5.2.4.2 Employer’s standards relating to the works
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Scope of Work: Scope of Work: Execution of Unique Identifier: KUS - 20250644
Alterations to Existing Building Structures including
Revision: 1Construction & Commissioning Supervision at Kusile
Power Station Page:
The Employer’s standards applicable to the architectural discipline are listed. The Contractor shall
comply with these standards, together with all applicable national, statutory and regulatory
requirements, in the execution of the works.
Document number Title
203 - 1239 Conceptual Architectural Design Specifications for Structures
and Other Buildings
ESK AM AAA 1 Corporate Identity Manual
ESK PB AAQ 3 Interior Specifications for Eskom
5.2.5 Civil & Structural scope of works
5.2.5.1 Employer’s list of drawings
The Contractor shall execute the civil and structural works in accordance with the drawings and
specifications issued by the Employer. The scope of work includes, but is not limited to, all civil and
structural elements as detailed in the issued drawings. The Contractor shall refer to the complete list
of the civil and structural drawings provided by the Employer and ensure that all work is carried out
in full compliance with these documents. The Contractor shall verify all dimensions and site
conditions prior to construction and report any discrepancies to the Employer before proceeding with
the works.
Drawing number Revision Title
Structural Engineering Drawings
Ground Floor Plan Concrete Details
22841-097-114
Ground Floor Plan Reinforcement Details 22841-097-115
5.2.5.2 Employer’s standards relating to the works
The Employer’s standards applicable to the civil and structural engineering disciplines are listed. The
Contractor shall comply with these standards, together with all applicable national and regulatory
requirements, in the execution of the works.
Document number Title
240 - 10781296 Constructability Assessment Guideline
240 - 57127953 Execution of Site Preparation and Earthworks Standard
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Scope of Work: Scope of Work: Execution of Unique Identifier: KUS - 20250644
Alterations to Existing Building Structures including
Revision: 1Construction & Commissioning Supervision at Kusile
Power Station Page:
Document number Title
240 - 57127955 Geotechnical and Foundation Engineering Standard
203-770 Kusile Specification for Structural Concrete
240 - 57127955 Geotechnical and Foundation Engineering Standard
240 - 56364545 Structural Design and Engineering Standard
240-85549846 Standard for Design of Drainage and Sewerage Infrastructure
5.2.6 Electrical scope of works
5.2.6.1 Employer’s list of drawings
The Contractor shall execute the electrical works in accordance with the drawings and specifications
issued by the Employer. The scope of work includes, but is not limited to, all electrical elements as
detailed in the issued drawings. The Contractor shall refer to the complete list of electrical system
drawings provided by the Employer and ensure that all work is carried out in full compliance with
these documents. The Contractor shall verify all dimensions and site conditions prior to construction
and report any discrepancies to the Employer before proceeding with the works.
Drawing number Revision Title
Auxiliary Bay Buildings
366 - 539647 r02
Small Power Layout – Level 9m (C&I Workshop Plan)
366 - 539648 R02 Small Power Layout – Level 16m (Control Room
Plan)
366 - 539649 R02 Small Power Layout – Level 16m (Production Office
Plan)
366-539653 R02 Lighting Layout – Level 9m (C&I Workshop Plan)
366-539655 R02 Lighting Layout – Level 16m (Control Room Plan)
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Scope of Work: Scope of Work: Execution of Unique Identifier: KUS - 20250644
Alterations to Existing Building Structures including
Revision: 1Construction & Commissioning Supervision at Kusile
Power Station Page:
Drawing number Revision Title
366-539657 R02 Lighting Layout – Level 16m (Production Office
Plan)
Substation South
366 - 539650 R02 Ground Floor Small Power Layout (FGD Control
Room)
366 - 539658 R02 Ground Floor Lighting Layout (FGD Control Room)
Administration Building
366 - 541815 R01 First Floor Small Power Layout (Block A & C)
366 - 544952 R01 Ground Floor Small Power Layout (Block A)
366 - 544953 R01 Ground & First Floor Small Power Layout (Block B)
366 - 541816 R01 Ground Floor Lighting Layout (Block A)
366 - 541817 R01 First Floor Lighting Layout (Block A & C)
366 - 541818 R01 Ground & First Floor Lighting Layout (Block B)
Station Services Building
366 - 541804 R02 Ground Floor Small Power Layout (BOP Control
Room)
366 - 541810 R01 Lighting Layout (BOP Control Room)
5.2.6.2 Employer’s standards relating to the works
The Employer’s standards applicable to the electrical engineering discipline are listed. The
Contractor shall comply with these standards, together with all applicable national, statutory and
regulatory requirements, in the execution of the works.
Document number Title
240-56356396 Earthing and Lightning Protection Standard
200-11768 Station Cabling and Racking Standard
SANS 1484
Identification Marking for Electrical Conductors and Equipment
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Scope of Work: Scope of Work: Execution of Unique Identifier: KUS - 20250644
Alterations to Existing Building Structures including
Revision: 1Construction & Commissioning Supervision at Kusile
Power Station Page:
Document number Title
SANS 10142-1:2009 The wiring of premises Part 1: Low-voltage installation
SANS 10114-2 Emergency lighting of Interiors
SANS 10198 The Selection, Handling and Installation of Electric Luminaires
240-155675380 Kusile Power Station Lighting and Small Power Operating and
Control Philosophy
SANS 10114-1 Interior lighting Part 1: Artificial lighting of interiors
240-56227443
Generation Requirements for Control and Power Cables for
Power Stations Standard
240-150642762 Generation Plant Safety Regulation
5.2.6.3 General Requirements (Electrical Works)
The Contractor shall execute all electrical installations i.e. lighting, small power, emergency power,
dimming systems, distribution board modifications, cabling, containment systems, tagging, testing,
commissioning and certification, strictly in accordance with the drawings and documents listed in
Section 5.2.6.1: Employer’s List of Drawings. All work shall comply with the latest editions and
amendments of applicable South African National Standards (SANS) and other standards as listed
in section 5.2.6.2. All materials, equipment, installations and workmanship shall comply with the
manufacturer's recommendations and all applicable statutory and regulatory requirements. Only
suitably qualified, competent and registered electrical personnel shall undertake the works.
Lighting Installations
The Contractor shall supply, install, connect, test and commission all lighting installations shown on
the drawings, including LED panel luminaires, downlights, accent lighting, emergency lighting
systems. All luminaires, control equipment, sensors, emergency fittings and associated wiring shall
be installed in the locations and configurations indicated on the drawings and in accordance with the
manufacturers' requirements. The Contractor shall mount and wire sensors including emergency
backup circuits, strictly following the documentation shown in the drawings.
Small Power and Socket-Outlets
The Contractor shall provide general-purpose 13 A outlets and specialty sockets (e.g., kitchen, AV,
communications) per the locations, quantities and load ratings shown in the drawings. The
Contractor ensures RCD/earth leakage protection for each circuit as required and label each outlet
per site tagging guidelines.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Scope of Work: Scope of Work: Execution of Unique Identifier: KUS - 20250644
Alterations to Existing Building Structures including
Revision: 1Construction & Commissioning Supervision at Kusile
Power Station Page:
Cabling and Containment
The Contractor shall route conduits, trunking and cable trays exactly as depicted. No rerouting shall
be permitted without formal drawing amendment. The Contractor shall use proper cable types and
sizes, identify all conductors per SANS 1484 and firestop any penetrations as shown.
Distribution Boards
The Contractor shall modify, extend and reconfigure distribution boards as indicated on the drawings,
schedules and RCD/SPD specifications. The Contractor uses Type 1+2 surge protection devices in
areas where lightning protection is present, or Type 2 SPDs where not, ensuring compliance with
SANS 10142-1 requirements (live-earth and neutral-earth wiring, conductor sizing, <0.5 m lead
length).
Testing, Commissioning and Certification
The Contractor shall perform comprehensive testing as per SANS 10142-1: insulation resistance,
earth loop, continuity (including bonding conductors with ≤0.2 Ω), functional verification of all circuits
and lighting control/emergency systems. The Contractor submits full commissioning documentation
and compliance certificates for every area covered by the drawings.
Summary
All electrical work must align exactly with the listed drawings - this scope forms a direct instruction
to follow them without exception. Compliance with South African and Eskom electrical standards and
approved testing protocols is compulsory. Qualified personnel must also carry out, test and certify
all work. Submittals of as-built drawings and completion documentation are required.
5.2.7 Mechanical scope of works
5.2.7.1 Heating, Ventilation and Airconditioning (HVAC) scope of works
5.2.7.1.1 Employer’s list of drawings
The Contractor shall execute the HVAC system works in accordance with the drawings and
specifications issued by the Employer. The scope of work includes, but is not limited to, all HVAC
elements as detailed in the issued drawings. The Contractor shall refer to the complete list of HVAC
drawings provided by the Employer and ensure that all work is carried out in full compliance with
these documents. The Contractor shall verify all dimensions and site conditions prior to construction
and report any discrepancies to the Employer before proceeding with the works.
Drawing number Revision Title
Auxiliary Bay Buildings
366 - 539669 R02 Level 9m – HVAC Layout (C&I Workshop)
366 - 539670 R02 Level 16m – HVAC Layout (Control Room Plan)
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Scope of Work: Scope of Work: Execution of Unique Identifier: KUS - 20250644
Alterations to Existing Building Structures including
Revision: 1Construction & Commissioning Supervision at Kusile
Power Station Page:
Drawing number Revision Title
Substation South
366 - 539680 R02 Ground Floor – FGD HVAC Layout
Administration Building
366 - 541811 R01 Ground Floor – HVAC Layout (Administration
Building – Block A)
366 - 541812 R01 First Floor – HVAC Layout (Administration Building
– Block A)
366 - 541813 R01 Ground & First Floor – HVAC Layout (Administration
Building – Block B)
366 - 541814 R01 First Floor – HVAC Layout (Administration Building
– Block C)
Station Services Building
366 - 541808 R03 Ground Floor - BOP HVAC Layout
5.7.1.2.2 Employer’s standards relating to the works
The Employer’s standards applicable to the HVAC engineering discipline are listed. The Contractor
shall comply with these standards, together with all applicable national, statutory and regulatory
requirements, in the execution of the works.
Document number Title
240-56355731 Environmental conditions for process control equipment used
at Power Stations
240-102547991 General Technical Specification for HVAC Systems Standard
SANS10147 Refrigeration systems including plants associated with air-
conditioning systems
Auxiliary Bay – Level 9
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Scope of Work: Scope of Work: Execution of Unique Identifier: KUS - 20250644
Alterations to Existing Building Structures including
Revision: 1Construction & Commissioning Supervision at Kusile
Power Station Page:
The Contractor must relocate the existing supply air grille to the new kitchen area. This must be
accompanied with a balancing damper to adjust the air flow to approximately 135 L/s. Additionally a
new extraction wall fan must be installed to extract air from the kitchen at approximately 150 L/s.
Auxiliary Bay Level 16
The modification requires that the supply air terminals and it’s HVAC auxiliaries at the SPO office
and EOD office to be offset a certain distance such that its new location is central to the new office
space as per the drawing.
The male and female ablution facilities will require the disc valves for extraction air together with its
HVAC auxiliaries be offset a certain distance such that its new location is central to the new space
as per the drawing. Both ablution facilities will also require the installation of new extraction ducts
together with spigots and disc valves. The linear diffusers are to be blanked.
FGD Control Room – Ground Floor
The FGD Control Room would require extensive changes to its HVAC system. The supply air system
to the control room would require the repositioning of certain supply air terminals as per the drawing.
These may be repositioned via flexible ducting. A new supply air terminal would be required together
with a damper to balance its airflow to approximately 172 L/s. Insulated galvanized steel ducting
would be required for the supply air system. The supply air duct after heater bank 3 must be blanked
off as per the drawing.
Return air grilles are required at the newly located offices. These must be white coloured hinged
aluminium curved blade.
A new extraction air system is to be installed at the ablution facilities, change room and showers.
This central system will utilise uninsulated galvanized steel ducting with branched uninsulated
flexible ducting, extraction air disc valves as well as all its auxiliaries. The extraction air fan must be
equipped with a sound attenuator and the air must be extracted to the outside via a powder coated
aluminium weather louvre.
BOP Control Room – Ground Floor
The BOP Control Room would require the repositioning of the supply air terminals at the shift
manager office, office and PTW office. A new Return Air Grille and new thermostat must be installed
at the shift manager office space. At the office space and PTW office, the Return Air Grille and
thermostat must be relocated.
The new shower facility will have a new extraction air system which would extract air from each
shower cubicle. This central system will utilise uninsulated galvanized steel ducting with branched
uninsulated flexible ducting, extraction air disc valves as well as all its auxiliaries. The extraction air
fan must be equipped with a sound attenuator and the air must be extracted to the outside via a
powder coated aluminium weather louvre.
The common duct for the existing extraction system utilized for the toilet facilities must be extended
and located above the weather louvre of the new extraction air system.
Administration Building – First Floor Block A
Offices A201, A202, A203, A204 and Conference A201, A202, A203, A204 rooms
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Scope of Work: Scope of Work: Execution of Unique Identifier: KUS - 20250644
Alterations to Existing Building Structures including
Revision: 1Construction & Commissioning Supervision at Kusile
Power Station Page:
In these rooms it would be required that the current variable volume diffusers must be replaced with
new variable volume air diffusers and these must be extended to reach the new ceiling height. The
new variable volume air diffusers must also be relocated such that they a centralized. The existing
thermostats must be moved accordingly as per the drawings.
Focus booths 1-4
New variable volume diffusers are required with new thermostats for each focus room. A flexible
duct would be required to supply air to these focus booths via the central duct as per the referenced
drawing. Each variable volume would supply an estimated 114 L/s of air to each focus room.
Administration Building – First Floor Block C
Offices C201, C202, C203, C204 and Conference C201, C202, C203, C204 rooms
In these rooms it would be required that the current variable volume diffusers must be replaced with
new variable volume air diffusers and these must be extended to reach the new ceiling height. The
new variable volume air diffusers must also be relocated such that they a centralized. The existing
thermostats must be moved accordingly as per the drawings.
New meeting room, office C205, C206, C207, C208, C209, C210
It is required that the branched duct that originally supplies air to the south facing side of the office
space is moved approximately 480 mm along the central duct coming from the air handling unit. This
would enable all variable volume diffusers to be central to the newly sectioned office spaces. All new
office spaces will require new thermostats. Return air grilles are to be installed in the new offices.
Office C211, C212, C213, C214
It is required that the branched duct that originally supplies air to the north facing side of the office
space is moved approximately 800 mm along the central duct coming from the air handling unit. This
would enable all variable volume diffusers to be central to the newly sectioned office spaces. All new
office spaces will require new thermostats. Return air grilles are to be installed in the new offices.
Administration Building – Ground Floor Block A Focus booth 1-4
New variable volume diffusers are required with new thermostats for each focus room. A flexible
duct would be required to supply air to these focus booths via the central duct as per the referenced
drawing. Each variable volume would supply an estimated 114 L/s of air to each focus room. Focus
booth 1 and 3 would require the relocation of the existing diffusers to a location central to the focus
booth.
Administration Building – Ground Floor Block B
At the ground floor Block B it is required that existing variable volume diffuser must be relocated to
a central point. A new thermostat must also be installed on the wall.
5.7.1.2.3 General Requirements
The Contactor must manufacture, supply, install, test and commission the HVAC systems for the
areas that are relevant to the project. The modification works includes:
HVAC equipment in various building spaces in Kusile Power Station.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Quality Management
Source: Building Alterations Scope at Kusile Power Station - FINAL_.pdfstation buildings at Kusile Power Station. The Contractor shall provide all labour, supervision,
materials, plant, equipment, temporary works, tools, testing facilities and all other resources
necessary to execute and complete the works in accordance with this scope. The Contractor shall
also monitor all construction and commissioning activities and provide all record documentation
required to demonstrate compliance with the scope and applicable standards. The works are
executed in accordance with the Employer’s designs and relevant codes of practice.
following paragraphs.
2.2.1 Normative
[1] Guideline Scope of Services and Professional Fees [Scope of Services and Professional Fees
for Persons Registered in terms of the Engineering Profession Act, ]
[2] ISO 9001 Quality Management Systems
[3] 36-681: Eskom Plant Safety Regulations
[4] 474-58 (Rev1): Document and Records Management
[5] 240-105658000: Supplier Quality Management Specification
2.2.2 Informative
[6] 240-53114002: Engineering Change Management Procedure
[7] 240-53113685: Design Review Procedure
[8] 240-53665024: Engineering Quality Manual
[9] 240-53114186: Document and Records Management
(SANS), prescribed Eskom standards (where applicable) and all relevant codes of practice and
specifications. References to standards, codes or manuals refer to the latest editions in force at the
contract date unless otherwise stated. The Contractor complies with all normative and informative
references stated in the scope. Where there is any conflict or inconsistency between standards,
specifications or scope requirements, the Contractor notifies the Project Manager for clarification
before proceeding. The Contractor uses industry recognised software using the latest approved
versions as appropriate for the execution of the works. The Contractor ensures that all software is
appropriately licensed and suitable for the performance of the works.
2.3 Roles and Responsibilities
Employer’s Obligations:
Contractor’s Obligations:
requirements
2.4 Related/Supporting Documents
to existing buildings at Kusile Power Station. The works are multidisciplinary in nature and include
architectural, civil, structural, mechanical, electrical and control and instrumentation (C&I)
components. The works generally comprise but are not limited to:
The Contractor shall execute the works in accordance with the Employer’s designs and in general
conformity with applicable codes, standards and recognised industry best practices. The Contractor
is responsible for providing all labour, supervision, plant, equipment, materials, temporary works and
all other resources necessary for the successful completion of the works.
these services in accordance with this scope and the Employer's requirements. The Contractor shall
be responsible for all testing and commissioning of the completed works, to ensure compliance with
performance and operational requirements. The Contractor shall also provide training to the
Employer’s personnel in the operation and maintenance of the installed systems and equipment.
project manager during the final inspection of a project
transmittal note attached, shall be sent to the project email address, with the Employer copied.
accompanied by the relevant transmittal note.
4.3 Quality assurance requirements
work activities before commencing the respective works. No work shall commence until the method
statement has been reviewed and accepted by the Employer. Method statements shall be submitted
for but not be limited to the following construction activities:
etc.
The Contractor shall prepare and submit Quality Control Plans (QCPs) for all major work activities
to ensure that the works are executed in accordance with approved designs, specifications and
applicable standards. The QCPs shall form part of the Contractor’s overall Quality Management
system and shall be aligned with the Quality Assurance requirements stated in this works
information. The Contractor notes that no construction activity shall commence without an approved
the relevant works. The Contractor shall submit QCPs sufficiently in advance of the planned
commencement of the relevant activities to allow adequate time for review, comment, revision and
resubmission, where required. Accepted QCPs shall be implemented on site and strictly adhered to
by the Contractor. QCPs shall be updated, as necessary, to reflect changes in design, methodology
etc. Each QCP shall include, as a minimum:
o Hold Points i.e. activities that shall not proceed without Employer acceptance
o Witness Points i.e. activities where the Employer may elect to observe
o Review Points i.e. activities requiring review of documentation, records or quality
submissions etc
Reference to the approved method statement for the activity etc
Approved Method statements and QCPs
Completed ITP records
Material certificates, test certificates and results
Records of non-conformance reports and close-out actions
Professional certifications and statutory approvals where applicable
Warranties, guarantees, performance certificates etc.
4.4 Programming constraints
requirements, and lead times for materials, equipment, and specialist items
handover activities
e) Site Agent / Site Manager
a) National Diploma or Degree in Civil Engineering or Construction Management
b) Minimum of 5 years’ site-based experience on engineering construction projects
e) Foreman / Construction Supervisor Resource (HVAC Works):
construction activities including testing and commissioning of related installations i.e.ductwork,
ventilation fans, thermostats etc
f) Foreman / Construction Supervisor Resource (Fire Protection Systems and Wet
Services):
of related installations i.e. pipe systems, valves, fire hose reels, etc
g) Fire Detection System Installation Technician
fire alarm systems
h) Electrical Installation Electrician Resource:
certificate as an electrician
sector
i) Commissioning / Testing Engineer Resource:
engineering in Electrical/Electronic/electronic Engineering
and
j) Health and Safety Officer
dimming systems, distribution board modifications, cabling, containment systems, tagging, testing,
commissioning and certification, strictly in accordance with the drawings and documents listed in
Section 5.2.6.1: Employer’s List of Drawings. All work shall comply with the latest editions and
amendments of applicable South African National Standards (SANS) and other standards as listed
in section 5.2.6.2. All materials, equipment, installations and workmanship shall comply with the
manufacturer's recommendations and all applicable statutory and regulatory requirements. Only
suitably qualified, competent and registered electrical personnel shall undertake the works.
The Contractor shall perform comprehensive testing as per SANS 10142-1: insulation resistance,
earth loop, continuity (including bonding conductors with ≤0.2 Ω), functional verification of all circuits
and lighting control/emergency systems. The Contractor submits full commissioning documentation
and compliance certificates for every area covered by the drawings.
to follow them without exception. Compliance with South African and Eskom electrical standards and
approved testing protocols is compulsory. Qualified personnel must also carry out, test and certify
all work. Submittals of as-built drawings and completion documentation are required.
5.2.7 Mechanical scope of works
5.2.7.1 Heating, Ventilation and Airconditioning (HVAC) scope of works
5.2.7.1.1 Employer’s list of drawings
Compliance Requirements
Source: Building Alterations Scope at Kusile Power Station - FINAL_.pdf (unknown)Ensure compliance with applicable health, safety and environmental regulations.
Provide all labour, materials, equipment and supervision necessary to complete the works.
Maintain quality control and carry out inspections and testing as required.
Prepare progress reports and coordinate with the Employer on site activities. 2.4 Related/Supporting Documents N/A. CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 Scope of Work: Scope of Work: Execution of Unique Identifier: KUS - 20250644 Alterations to Existing Building Structures including Revision: 1Construction & Commissioning Supervision at Kusile Power Station Page: 3 Description of the works 3.1 Executive Overview Eskom intends to appoint a suitably qualified external Contractor to execute alterations and additions to existing buildings at Kusile Power Station. The works are multidisciplinary in nature and include architectural, civil, structural, mechanical, electrical and control and instrumentation (C&I) components. The works generally comprise but are not limited to
Demolition and removal of existing building elements and services
Alterations/modifications and additions to existing structures
Construction of new building works and associated installations
Reinstatement and making good of existing finishes and affected areas
Installation, alteration, relocation and reconnection of building services
Testing, commissioning, and handover of completed works etc The Contractor shall execute the works in accordance with the Employer’s designs and in general conformity with applicable codes, standards and recognised industry best practices. The Contractor is responsible for providing all labour, supervision, plant, equipment, materials, temporary works and all other resources necessary for the successful completion of the works. The Contractor shall examine and familiarize himself with the building site conditions i.e. access limitations, operational constraints, interfaces with existing services and all conditions that may influence the execution of the works. The Contractor notes that the works shall be carried out within an operational power station environment. The Contractor shall therefore plan, coordinate and execute the works in a manner that minimises disruption to the Employer's operations and ensures the safety of personnel, plant, equipment and existing infrastructure etc. The works include Construction and Commissioning Monitoring services. The Contractor provides these services in accordance with this scope and the Employer's requirements. The Contractor shall be responsible for all testing and commissioning of the completed works, to ensure compliance with performance and operational requirements. The Contractor shall also provide training to the Employer’s personnel in the operation and maintenance of the installed systems and equipment. Upon completion, the Contractor shall provide all required construction records i.e. as-built drawings, operation and maintenance manuals and any other documentation necessary to support the operation and maintenance of the facility. 3.2 Employer’s objective and purpose of the works The objective of the works is to improve the functionality and efficiency of existing facilities through alterations and additions that provide a comfortable and productive working environment while meeting the Employer's operational requirements. 3.3 Interpretation and terminology The following abbreviations are used in this Works Information: CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 Scope of Work: Scope of Work: Execution of Unique Identifier: KUS - 20250644 Alterations to Existing Building Structures including Revision: 1Construction & Commissioning Supervision at Kusile Power Station Page: Abbreviation Description ACS Access Control System AFC Approved for Construction CADD Computer Aided Drawing and Design CBMS Consolidated Building Management System CCTV Closed Circuit Television C&I Control and Instrumentation CV Curriculum Vitae DCS Distributed Control System DGN Design File DWG Drawing File ECSA Engineering Council of South Africa EPPA Emergency Exit and Public Address EW Early Warning FAT Factory Acceptance Testing HVAC Heating, Ventilation and Air-conditioning ITP Inspection and Test Plan KKS Kraftwerk-Kennzeichensystem NFPA National Fire Protection Association OHS Act Occupational Health and Safety Act O&M Operating and Maintenance PEC Professional Engineering Certificate Pr.Eng Professional Engineer Pr.Tech Professional Technologist SACAP South African Council for the Architechural Profession SACPCMP South African Council for Project and Construction Management Professionals SANS South African National Standards SAQCC South African Qualification and Certification Committee ACS Access Control System EPPA Emergency Exit and Public Address CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 Scope of Work: Scope of Work: Execution of Unique Identifier: KUS - 20250644 Alterations to Existing Building Structures including Revision: 1Construction & Commissioning Supervision at Kusile Power Station Page: Definitions Definition Explanation Systems installed in buildings to make them comfortable, functional, efficient Building services and safe. Review of plans and specifications either by a contractor or third-party reviewer Constructability Review to ensure accuracy and proper detail of the construction plans. Any person or a juristic person under contract to a client to perform the works or Contractor part of it on a project, including a subcontractor under contract to such contractor Refers to the professional Consultant team appointed to perform the engineering Consultant and project management works required for the project in terms of the NEC3 Professional Services Contract DWG (from drawing) is a binary file format used for storing two- and three- dimensional design data and metadata. It is the native format for several CAD DWG packages. In addition, DWG is supported non-natively by many other CAD applications Eskom Plant Refers to the Eskom Engineering team who will perform the design review and Engineering provide technical assistance for the work performed by the appointed Consultant. Handover constitutes change of ownership and ensures completion. It confirms Handover that the constructed facilities are safe to commission and operate.. ‘HVAC’ refers to Heating Ventilation and Air Conditioning which can be used in buildings to: Heating Ventilation and
Regulate internal temperatures
Regulate internal humidity System to indicate the degrees of protection provided by an enclosure against IP rating access to hazardous parts, ingress of solid foreign objects, ingress of water and to give additional information in connection with such protection. Project Manager The person that coordinates and facilitates the project and project sponsors’ goals in accordance with the Project Review Team’s recommendations and Punch List A list of deficiencies, incomplete, or unacceptable work items compiled by the project manager during the final inspection of a project Renovation Total or partial upgrading of a facility to higher standards of quality or efficiency. Under certain conditions a renovation may also be classified as an improvement. Redlines A red-line drawing is essentially an intermediate drawing that shows corrections or changes to a previous drawing. The term red line literally comes from the (typically) red pen used to amend the drawings by hand. These changes mark- ups show changes made to the drawing subject matter during the manufacture or construction of the product CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 Scope of Work: Scope of Work: Execution of Unique Identifier: KUS - 20250644 Alterations to Existing Building Structures including Revision: 1Construction & Commissioning Supervision at Kusile Power Station Page: 4 Management and start up 4.1 Management meetings Regular meetings of a general nature may be convened and chaired by the Project Manager as detailed. Unless otherwise agreed, meetings shall be held in person. Meetings of a specialist nature may also be convened. Where the location of any meeting is not stated, the party convening the meeting shall determine the time and place, having regard to the convenience of the parties. Records of meetings are submitted to the Employer’s agent by the person convening the meeting within five (5) days of the meeting. All meetings shall be recorded using minutes or a register prepared and circulated by the person who convened the meeting. Title and Intervals Location Attendance by
Develops the ability to identify faults, undertake basic troubleshooting and implement corrective actions
Familiarises personnel with emergency procedures and system responses under abnormal conditions
Ensures understanding of performance requirements etc. Training Competency The Contractor ensures that training outcomes are measurable and that personnel demonstrate an acceptable level of competence prior to completion. The Contractor demonstrates that the Employer’s personnel are able to operate and maintain the works. The Employer requires demonstration by practical assessment or may confirm competence by acceptance. Records of training provided, including attendance thereof, are submitted to the Employer by the Contractor. Technology Transfer The Contractor provides technology transfer to the Employer in relation to the operation and maintenance of the works i.e., control systems and software etc. The Contractor provides the Employer with access to information required to operate and maintain the works i.e. software systems, licences including supplier and manufacturer support details. Handover & completion Training and technology transfer are completed before project completion. Records of training provided, including attendance registers, are submitted to the Employer. Failure to adequately provide training and technology transfer, as stated in this scope, shall be considered a defect under the contract. CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 Scope of Work: Scope of Work: Execution of Unique Identifier: KUS - 20250644 Alterations to Existing Building Structures including Revision: 1Construction & Commissioning Supervision at Kusile Power Station Page: 5 Engineering and the Contractor’s design 5.1 Employer’s design The Employer has prepared the designs for the works relating to building alterations and additions. The Contractor shall review the Employer’s designs in accordance with the works information and shall identify any errors, omissions, ambiguities, inconsistencies or risks. The Contractor shall also assess the completeness and constructability of the designs, including the practicality of the construction methods implied by the designs. The Contractor shall notify the Project Manager as soon as practicable of any matter in the Employer’s design which may affect the cost, Completion Date, Key Dates or quality of the works. Any proposal by the Contractor for a design amendment, value engineering solution or alternative design shall be submitted to the Project Manager for acceptance. The Contractor shall not implement any change to the Employer’s design unless instructed or accepted by the Project Manager in accordance with the procedures of the contract. The Contractor’s prices are deemed to include full allowance for
Reviewing and coordinating the Employer’s design
Attendance at design, review, and coordination meetings
Liaison with the Employer’s designers and other contractors
Preparation and submission of technical information including alternative design proposals etc. 5.2 Description of the works 5.2.1 Site Description The Kusile Power Station site is located approximately 37km northwest of eMalahleni in the Mpumalanga Province. The site is accessed from the R686 road between highways, N4 and N12. The site has approximate coordinates 25° 55’ 07.34’’S and 28° 54’ 43.30’’E. Refer to Figure 1 below for the location of the site. CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 Scope of Work: Scope of Work: Execution of Unique Identifier: KUS - 20250644 Alterations to Existing Building Structures including Revision: 1Construction & Commissioning Supervision at Kusile Power Station Page: Figure 1: Location Map of Kusile Power Station 5.2.2 Boundary of Works The Contractor shall execute all works in accordance with the Employer’s designs. The scope shall include all associated multidisciplinary work and interfaces necessary to deliver the works. The area boundaries of the scope are detailed
Auxiliary Bay (Aux Bay) Buildings (Unit 2 – Unit 6)
Administration (Admin) Building
Substation South (Sub South) Building
Station Services Building (SSB) The Contractor is responsible for the coordination, integration and proper functioning of all interfaces between the above elements. Any item or activity reasonably necessary for the proper completion, operation and use of the works shall be deemed to be included in the Contractor’s scope and pricing. 5.2.3 Geotechnical Works The Contractor shall carry out all geotechnical works necessary for the execution of the works in accordance with the Employer’s design and applicable laws and standards. The works include but are not limited to, excavation works, earthworks, foundation preparation, ground improvement and any other measures required to achieve suitable founding conditions. The Contractor reviews and verifies all geotechnical information provided by the Employer. The Contractor shall notify the Project Manager as soon as practicable of any discrepancy, ambiguity or condition which differs from that which an experienced contractor would have reasonably anticipated. The Contractor ensures that all excavation and foundation works are inspected, tested and where required, accepted by the Project Manager before proceeding with subsequent construction activities. The Contractor takes all necessary measures to ensure the safety and stability of excavations and adjacent structures, to prevent damage to the works or any surrounding property. CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 Scope of Work: Scope of Work: Execution of Unique Identifier: KUS - 20250644 Alterations to Existing Building Structures including Revision: 1Construction & Commissioning Supervision at Kusile Power Station Page: 5.2.4 Architectural scope of work 5.2.4.1 Employer’s list of drawings The Contractor shall execute the architectural works in accordance with the drawings and specifications issued by the Employer. The scope of work includes but is not limited to all architectural elements as detailed in the issued drawings. The Contractor shall refer to the complete list of architectural drawings provided by the Employer and ensure that all work is carried out in full compliance with these documents. The Contractor shall verify all dimensions and site conditions prior to construction and report any discrepancies to the Employer before proceeding with the works. The Contractor shall note that the works to be executed within the C&I Workshop area located at the Auxiliary Bay Buildings will be undertaken across Units 2 to 6. Drawing number Revision Title Auxiliary Bay Buildings 366 - 539631 R02 Floor Plan & Section – 9m Level 366 - 539632 R02 Floor Plan & Section – 16m Level 366 - 539633 R02 Ceiling Plan – 16m Level 366 - 539634 R02 Sections 366 - 539636 R02 Wall Murals 366 - 539637 R02 Drainage & Water Details – 9m Level 366 - 539639 R02 Drainage & Water Details – 16m Level 366 - 539640 R02 Door Schedule & Shower Details, Finishes
B-BBEE Minimum Level: 4
Health & Safety
Source: Building Alterations Scope at Kusile Power Station - FINAL_.pdflimitations, operational constraints, interfaces with existing services and all conditions that may
influence the execution of the works. The Contractor notes that the works shall be carried out within
an operational power station environment. The Contractor shall therefore plan, coordinate and
execute the works in a manner that minimises disruption to the Employer's operations and ensures
the safety of personnel, plant, equipment and existing infrastructure etc.
execution of the works. The Contractor shall comply with all applicable Occupational Health and
i.e. mechanical, C&I and electrical components, where applicable etc
waste etc.
Risk assessments related to the proposed activity
Protection measures of existing infrastructure i.e. existing utilities etc.
Enables the Employer’s personnel to understand the design intent and functionality of all systems
and installations
sports systems
requirements
actions
conditions
required, accepted by the Project Manager before proceeding with subsequent construction
activities. The Contractor takes all necessary measures to ensure the safety and stability of
excavations and adjacent structures, to prevent damage to the works or any surrounding property.
366 - 539631 R02 Floor Plan & Section – 9m Level
366 - 539632 R02 Floor Plan & Section – 16m Level
366 - 539633 R02 Ceiling Plan – 16m Level
366 - 539634 R02 Sections
366 - 539636 R02 Wall Murals
366 - 539637 R02 Drainage & Water Details – 9m Level
366 - 539639 R02 Drainage & Water Details – 16m Level
366 - 539640 R02 Door Schedule & Shower Details, Finishes
Specification
366 - 539789 R01 Block B – Plans & Sections
366 - 539790 R01 Block A & C - First Floor Plans
366 - 539791 R01 Block A – Ground Floor Plan & Section Details
366 - 539792 R01 Doors, Windows & Finishes Schedule
366 - 539793 R02 Plan & Elevations
366 - 539794 R02 Ceiling Plan
366 - 539795 R02 Section Details
366 - 539796 R02 Internal Wall Elevations
366 - 539797 R02 Doors, Windows & Finishes Schedule
366 - 541734 R02 Drainage & Water Details
366 - 5417310 R02 Tiling Layout & Elevations
5.2.4.2 Employer’s standards relating to the works
SANS 10142-1:2009 The wiring of premises Part 1: Low-voltage installation
SANS 10114-2 Emergency lighting of Interiors
SANS 10198 The Selection, Handling and Installation of Electric Luminaires
240-155675380 Kusile Power Station Lighting and Small Power Operating and
240-150642762 Generation Plant Safety Regulation
5.2.6.3 General Requirements (Electrical Works)
the drawings, including LED panel luminaires, downlights, accent lighting, emergency lighting
systems. All luminaires, control equipment, sensors, emergency fittings and associated wiring shall
be installed in the locations and configurations indicated on the drawings and in accordance with the
manufacturers' requirements. The Contractor shall mount and wire sensors including emergency
backup circuits, strictly following the documentation shown in the drawings.
flexible ducting, extraction air disc valves as well as all its auxiliaries. The extraction air fan must be
equipped with a sound attenuator and the air must be extracted to the outside via a powder coated
aluminium weather louvre.
BOP Control Room – Ground Floor
shower cubicle. This central system will utilise uninsulated galvanized steel ducting with branched
uninsulated flexible ducting, extraction air disc valves as well as all its auxiliaries. The extraction air
fan must be equipped with a sound attenuator and the air must be extracted to the outside via a
powder coated aluminium weather louvre.
Contractual Terms
Source: Building Alterations Scope at Kusile Power Station - FINAL_.pdfliability under the Contract.
Important Dates
Source: Invitation to Tender (ITT) - Alteration and additions to existing building structures.pdf (RFP){"closingDate":"30 October 2025","closingTime":"10h00"}
Contact Information
Source: Invitation to Tender (ITT) - Alteration and additions to existing building structures.pdf (RFP){"name":null,"email":"[email protected]","phone":"+27 13 680 3426","department":null,"address":"r which"}
Evaluation Criteria
Source: Invitation to Tender (ITT) - Alteration and additions to existing building structures.pdf (RFP)Tenderers must not be restricted from doing business with Eskom or state-owned companies, must not appear on National Treasury's restricted suppliers list or the Tender Defaulters list, must not have a conflict of interest (common controlling partner/majority shareholder or information-sharing relationships), must not submit more than one tender, must not subcontract 100% of the scope, and must be signed by authorised persons. The main contractor must hold a valid CIDB grading of 7GB or higher. Tenderers must meet the 70% minimum functionality threshold. Proof of CSD registration is mandatory for contract award. South African tenderers defined as 'designated employers' under the Employment Equity Act must provide proof of compliance and submission of Employment Equity reports. Audited financial statements for the previous 18 months are required (or last year if 18 months unavailable); start-ups under 12 months are exempt initially but must provide first-year statements if awarded.
Technical Specifications
Source: Invitation to Tender (ITT) - Alteration and additions to existing building structures.pdf (RFP)Annexure Attached (Y /
N / n/a)
1.1.1 *Authorisation Form Annexure A Y
1.1.2 *Acknowledgement form Annexure B Y
1.1.3 *Tenderer’s particulars Annexure C Y
1.1.4 *Integrity Declaration Form (Suppliers are required to Annexure D Y
download and read the Supplier Integrity Pact. It is
accessible on the Eskom Tender Bulletin via Eskom
Supplier Integrity Pact (eskom.co.za) link)
1.1.5 *CPA Requirements for Local Goods/Services Annexure E Y
1.1.6 *CPA(IG) for Foreign Goods/Services (if applicable) Annexure F Y
1.1.7 SBD 6.2 Declaration Certificate for Local Production Annexure G1 Y
and Local Content (only applicable if designated
materials are included and then Tenderers will be
required to complete and submit Annexures G1 to
G4 as evidence of compliance with this
requirement).
Annexure C Local Content Declaration- Summary Annexure G2 Y
Schedule
Annexure D Imported Content Declaration – Supporting Annexure G3 Y
Schedule to Annexure C
Annexure E Local Content Declaration- Supporting Annexure G4 Y
Schedule to Annexure C
1.1.8 *SBD 1 Invitation to Bid must be filled out by all Annexure H Y
tenderers and submitted with the tender at tender
submission deadline
1.1.9 *
Pricing Schedule
Source: Invitation to Tender (ITT) - Alteration and additions to existing building structures.pdfEffective Date 30 October 2025
Review Date October 2030
Number Description Annexure Attached (Y /
N / n/a)
1.1.11 Tax Evaluation questionnaire to determine whether a
company, close corporation (CC) or Trust is a personal
service provider for purposes of PAYE
1.1.12 Reverse e-auction training acknowledgement form (if N/A
applicable)
1.1.13 Reverse e-auction process (if applicable) N/A
1.1.14 E-tendering Help Manual acknowledgement form Y
1.1.15 E-tendering Help Manual for supplier Y
1.1.16 CIDB Contract Skills Development Goals (CSDG) N/A
(if applicable)
1.1.17 Contract Participation Goals (CPG) N/A
(if applicable)
1.1.18 Scope of Work Y
1.1.19 NEC or other Contract Y
1.1.20 Pricing Schedule/BOQ (if not contained in Contract) Y
option clauses, acceptable to Eskom as the Employer, selected
from the NEC Engineering and Construction Contract.
2.33 Cataloguing The successful tenderer may be required to provide the cataloguing
information per item after contract award and will need to ensure that
all materials delivered to Eskom are labelled in line with Eskom’s
labelling specifications as may be stipulated by Eskom. Where
cataloguing is a requirement, the Pricing Schedule must also include
Goal, it will not be disqualified. However, it will be awarded 0 points
for that Specific Goal.
3.19 Ranking of tenders Tenderers will be ranked by applying the preferential point scoring for
the 90/10 or 80/20 system. Eskom will add the score from Pricing and
Pricing schedule Completed pricing schedule (if not already submitted √
in the NEC or other Contract).
Financial Requirements
Source: Invitation to Tender (ITT) - Alteration and additions to existing building structures.pdf (RFP)Payment Terms: payment terms as stipulated hereunder when
submitting tenders and concluding contracts with Eskom:
For contracts valued below R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
Suppliers within 30 days of receipt of undisputed invoices.
For contracts valued above R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed
Compliance Requirements
Source: Invitation to Tender (ITT) - Alteration and additions to existing building structures.pdf (RFP)ADDITIONAL CONTRACTUAL REQUIREMENTS SUPPORTING EVIDENCE Safety OCCUPATIONAL HYGIENE AND SAFETY √ SHEQ fall under contractual requirements which means that all service providers should submit the returnable on the tender closing date. OHS will evaluate the service providers that have passed functionality and mandatory. The service providers who have not submitted all the requirements or the compliance standards is not satisfactory, OHS will request the outstanding documents from the service providers only once through the buyer. The service providers will be given 7 working days to respond to the request. The service providers who responded within the stipulated time will be re-evaluated, failure to submit the outstanding document will be rendered non-responsive. The evaluation report will be submitted to procurement. This Safety requirements are for tender phase, upon signing the contract the service providers shall comply with the Safety OHS Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 63 File name: Invitation to Tender (ITT) - Alteration and additions to existing building structures Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 27 Identifier Invitation to Tender Effective Date 30 October 2025 Review Date October 2030 Reference Returnable From Suppliers at at ** closing (Non- prior Award. required required closing. required Tender (disqualifiable)* Contract disqualifiable) to Tender Returnable Returnable Returnable requirements. No work may commence until the Safety file is approved by the OHS personnel together with the Contract Custodian. The following are the minimum requirements for tendering
Kusile Power Station OHS Specification for Alterations and Additions to Existing Building Structure. Upon contract awarding, the successful contractor should submit a safety file within 2 weeks prior the commencement of activities on site. The safety file must be as per the issued OHS specification. Quality It is important for all Eskom contractors to meet the √ minimum requirements of ISO 9001 Quality Management System to maintain high standards of products or services rendered to Eskom. It is therefore important that the contractor demonstrate commitment to the development, implementation and maintenance of its Quality Management System that complies with the ISO 9001:2015 requirements. Category 1: Quality Requirements SECTION A: Quality Management System Requirements ISO 9001 (Option 1) Valid certification of Quality Management System by an ISO accredited body Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 63 File name: Invitation to Tender (ITT) - Alteration and additions to existing building structures Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 27 Identifier Invitation to Tender Effective Date 30 October 2025 Review Date October 2030 Reference Returnable From Suppliers at at ** closing (Non- prior Award. required required closing. required Tender (disqualifiable)* Contract disqualifiable) to Tender Returnable Returnable Returnable A.1 Product / Service Scoping on ISO 9001 certificate is defined and relevant A.2 Certificate by Approved and Authorized certification authority A.3 Certification Authority has Recognized International Accreditation A.4 Validity (expiry date) of certificate Section A Score Option 1 SECTION B: Evidence of QMS in operation (Tender Quality Requirements -Ref 240
B.1 Documented information for defined roles, responsibilities and authorities - Organization chart and Responsibility matrix (must include but not limited to quality management function/role) (Clause 5.3 of ISO 9001:2015) B.2 Documented information for Control of Externally Provided Processes, Products and Services - Must include criteria for evaluation, selection, monitoring of performance, and re-evaluation of external providers (Clause 8.4 of ISO 9001:2015) B.3 Latest copy of an internal management system audit report (with Nonconformity, Correction and/ or Corrective Action Reports) - Report must include but not limited to Objective, Scope, Criteria and outcomes of the audit. (Clause 9.2 of ISO 9001:2015) B.4 Latest copy of a certification management system audit report not older than 12 months (with Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 63 File name: Invitation to Tender (ITT) - Alteration and additions to existing building structures Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 27 Identifier Invitation to Tender Effective Date 30 October 2025 Review Date October 2030 Reference Returnable From Suppliers at at ** closing (Non- prior Award. required required closing. required Tender (disqualifiable)* Contract disqualifiable) to Tender Returnable Returnable Returnable Nonconformity, Correction and/ or Corrective Action Reports) B.5 Records of Management Review meetings (minutes, attendance registers etc.) Section B Score SECTION C: Contract Quality Plan Requirements (Ref 240-105658000 and 240-109253698). Draft Contract Quality Plan specific to the scope of work as described in the tender documents (Ref ISO 10005) NB! Draft Contract/Project Quality Plan has important QA deliverables Section C Score SECTION D: Quality Control Plan Requirements (Ref 240-105658000 or 240-109253302) QCP /Checklist/ ITP (Quality Control Plans) as per Scope of Works (Ref ISO 10005) NB! Draft/ Example of an Inspection and Test Plan (ITP) or Quality Control Plan (QCP) on similar and/ or previous work done Section D Score Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 63 File name: Invitation to Tender (ITT) - Alteration and additions to existing building structures Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 27 Identifier Invitation to Tender Effective Date 30 October 2025 Review Date October 2030 Reference Returnable From Suppliers at at ** closing (Non- prior Award. required required closing. required Tender (disqualifiable)* Contract disqualifiable) to Tender Returnable Returnable Returnable SECTION E: User defined additional Requirements & miscellaneous (Ref 240
Customer specific requirements & other standards and required can be listed and evaluated here E.1 Form A is completed and signed. E.2 Add other requirements (if applicable) as per the scope of work and/ or specification Section E Score Other safety/quality √ documents as required per scope of works Environmental Kusile Power Station Environmental Specification √ for Alterations and Additions to Existing Building Structures is attached as annexure for contractor/s to refer Due Audited Financial Statements of the tenderer for the n/a Diligence/financial previous 18 months, to the extent that such analysis statements are not available, for the last year. In the case of a joint venture or special purpose vehicle (SPV) specially formed for this tender, audited financial statements for each participant in the JV / SPV must be submitted. Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 63 File name: Invitation to Tender (ITT) - Alteration and additions to existing building structures Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 27 Identifier Invitation to Tender Effective Date 30 October 2025 Review Date October 2030 Reference Returnable From Suppliers at at ** closing (Non- prior Award. required required closing. required Tender (disqualifiable)* Contract disqualifiable) to Tender Returnable Returnable Returnable Start-up enterprises formed within the last 12 months are not required to submit audited financial statements, but if successful in this Invitation to Tender; will be required to furnish statements for the first year once available DOCUMENTS REQUIRED UNDER FUNCTIONALITY/TECHINICAL CRITERIA Functionality/Technical Refer to a separate Technical Evaluation criteria √ document Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 63 File name: Invitation to Tender (ITT) - Alteration and additions to existing building structures Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 27 Identifier Invitation to Tender Effective Date 30 October 2025 Review Date October 2030 ANNEXURE A AUTHORISATION FORM Indicate the status of the tenderer by ticking the appropriate box below. A B C D E F COMPANY CLOSE PARTNERSHIP JOINT SOLE TRUST CORPORATION VENTURE PROPRIETOR The tenderer must complete the appropriate certificate set out below for its category of organisation. If the tenderer is a company, close corporation, joint venture, or trust the tenderer must attach a certified copy the document that is proof of the contents of the certificate (resolution of the board of directors of a company, members’ resolution of a close corporation, power of attorney in the case of a joint venture, or resolution of the board of trustees of a trust). Note further that, in addition to completing the relevant certificate for category of organisation, the authorised representative of the tenderer is also required to complete and sign the table at the end of this Authorisation Form.
Certificate for company I,_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ , in my capacity as _ _ _ _ _ _ _ _ _ _ _ of the board of directors of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, hereby confirm that by resolution of the board taken on _ _ _ __ _ _ _ _ (date), Mr/Ms _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , acting in his/her capacity of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, is authorised to submit this tender on behalf of the company, and to sign all documents in connection with this tender and any contract that may result from it on behalf of the company. A certified copy of the resolution of the board is annexed to this Form. Signed: Date: Name: Position: Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 63 File name: Invitation to Tender (ITT) - Alteration and additions to existing building structures Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 27 Identifier Invitation to Tender Effective Date 30 October 2025 Review Date October 2030
Certificate for close corporation I,_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ , in my capacity as member of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, hereby confirm that by majority vote of the members taken on _ _ _ __ _ _ _ _ (date), Mr/Ms _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , acting in his/her capacity of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, is authorised to submit this tender on behalf of the close corporation, and to sign all documents in connection with this tender and any contract that may result from it on behalf of the close corporation. A certified copy of the members’ resolution is annexed to this Form. Signed: Date: Name: Position
Certificate for partnership We, the undersigned, being the key partners in the business trading as _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ hereby authorise Mr/Ms _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, acting in his/her capacity of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, to submit this tender on behalf of the partnership, and to sign all documents in connection with the tender and any contract that may result from it on behalf of the partnership. Name Address Signature Date NOTE: This certificate is required to be completed and signed by the full number of Partners necessary to commit the Partnership. Attach additional pages if more space is required. Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 63 File name: Invitation to Tender (ITT) - Alteration and additions to existing building structures Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 27 Identifier Invitation to Tender Effective Date 30 October 2025 Review Date October 2030
Certificate for Joint Venture We, the undersigned, are submitting this tender offer in Joint Venture and hereby authorise Mr/Ms _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, an authorised signatory of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , being the lead member in the Joint Venture, to sign all documents in connection with the tender and any contract that may result from it on behalf of all the members in the Joint Venture. This authorisation is evidenced by the attached power of attorney signed by the legally authorised signatories of all the members in the Joint Venture. We attach to this Form a certified copy of the Joint Venture Agreement which incorporates a statement that all members in the Joint Venture are liable jointly and severally for the execution of the contract, a term that indicates which member will be the lead member, and terms that indicate the ratios according to which work and payment will be divided amongst the members. Name of JV member Address Authorised signature, name and capacity Lead member Member Member Member NOTE: This certificate is required to be completed and signed by all members of the joint venture. Attach additional pages if more space is required.
Certificate for sole proprietor I, _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, hereby confirm that I am the sole proprietor of the business trading as _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Signed: Date: Name: Position:(Sole Proprietor) Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 63 File name: Invitation to Tender (ITT) - Alteration and additions to existing building structures Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 27 Identifier Invitation to Tender Effective Date 30 October 2025 Review Date October 2030
Certificate for trust I,_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ , in my capacity as _ _ _ _ _ _ _ _ _ _ _ of the board of trustees of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, hereby confirm that by resolution of the board of trustees taken on _ _ _ __ _ _ _ _ (date), Mr/Ms _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , acting in his/her capacity of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, is authorised to submit this tender on behalf of the trust and to sign all documents in connection with this tender and any contract that may result from it on behalf of the trust. A certified copy of the resolution of the board of trustees is annexed to this Form. Signed: Date: Name: Position: NOTE: The table below must also be fully completed by all tenderers in addition to the certificate that was selected and completed above. Name of tenderer: Full names of authorised signatory: Designation and capacity: Signature of authorised signatory Date of signature: Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 63 File name: Invitation to Tender (ITT) - Alteration and additions to existing building structures Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 27 Identifier Invitation to Tender Effective Date 30 October 2025 Review Date October 2030 ANNEXURE B ACKNOWLEDGEMENT FORM We are in receipt of the Invitation to Tender/Proposal from Eskom Holdings SOC Ltd and the following addenda issued by Eskom: We confirm that the documentation received by us is: (Indicate by ticking the box) Correct as stated in the Invitation to Tender / RFP Content List, and that each document is complete. Or: Incorrect or incomplete for the following reasons: Cataloguing Acknowledgement: Please select the relevant statement by ticking the appropriate box below
We agree to provide the cataloguing information as described in the Invitation to Tender
We have already supplied Eskom with the cataloguing information pertaining to this Invitation to Tender in a previous contract/order [insert previous contract/order number] __________
We do not intend to provide the required cataloguing information for the reasons stated hereunder:
We are a Distributor/Importer/Agent and our Principal, being the Original Equipment Manufacturer (OEM), is or is not [delete whichever is not applicable] in the position to supply cataloguing information for items. We attach the letter from the OEM confirming its position. Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 63 File name: Invitation to Tender (ITT) - Alteration and additions to existing building structures Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 27 Identifier Invitation to Tender Effective Date 30 October 2025 Review Date October 2030 Invitation to Tender/Request for Proposal No: ____________________ Name of Tenderer: ___________ _ _ Country of registration: _______________________________________ Full names of contact person: __________________________________ Contact details: Tel (landline): Cell phone: e-mail address: Name of tenderer: Full names of authorised signatory
Points Allocation: 10 points
B-BBEE Details: es the right to negotiate with preferred bidders after a competitive bidding process or price
quotations should the tendered prices not be market-related.
Main contractors/ suppliers are discouraged from subcontracting with their subsidiary companies as this
may be interpreted as subcontracting with themselves and / or using their subsidiaries for fronting.
Where a main contractor subcontracts with a subsidiary, this must be declared in its tender documents.
A report containing a list of potential sub-contractors may be drawn by accessing the following link:
“proof of B-BBEE status level of contributor” means-
(a) the B-BBEE status level certificate issued by an authorised body or person; or
(b) a sworn affidavit as prescribed by the B-BBEE Codes of Good Practice; or
(c) any other requirement prescribed in terms of the Broad-Based Black Economic Empowerment Act
1.3 Tender returnables
The tenderer must submit the returnable set out hereunder as part of its tender at the stipulated deadline.
Note the following: -
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 63
File name: Invitation to Tender (ITT) - Alteration and additions to existing building structures
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Docume
Health & Safety
Source: Invitation to Tender (ITT) - Alteration and additions to existing building structures.pdfapplicable:
Safety OCCUPATIONAL HYGIENE AND SAFETY √
Requirements
means that all service providers should submit the
returnable on the tender closing date. OHS will
evaluate the service providers that have passed
functionality and mandatory. The service providers
who have not submitted all the requirements or the
compliance standards is not satisfactory, OHS will
request the outstanding documents from the service
providers only once through the buyer. The service
providers will be given 7 working days to respond to
the request. The service providers who responded
within the stipulated time will be re-evaluated, failure
to submit the outstanding document will be rendered
non-responsive. The evaluation report will be
submitted to procurement. This Safety requirements
are for tender phase, upon signing the contract the
service providers shall comply with the Safety OHS
should submit a safety file within 2 weeks prior the
commencement of activities on site. The safety file
must be as per the issued OHS specification.
Quality It is important for all Eskom contractors to meet the √
minimum requirements of ISO 9001 Quality
Other safety/quality √
documents as
required per scope
of works
Environmental Kusile Power Station Environmental Specification √
for Alterations and Additions to Existing Building
Contractual Terms
Source: Invitation to Tender (ITT) - Alteration and additions to existing building structures.pdfsanctions list. A tenderer shall be found to have the nationality
of a country if the tenderer is a national or is constituted,
incorporated, or registered and operates in conformity with the
provisions of the laws of that country. This criterion shall also
apply to the determination of the nationality of proposed
subcontractors or suppliers for any part of the Contract including
related services.
individually or as a partner in a joint venture (JV) or consortium,
except on an E-Tendering system where there is a limit size
(The upload size per document is 500 megabytes and total
submission is restricted to 4 gigabytes).
submitting tenders and concluding contracts with Eskom:
For contracts valued below R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
Suppliers within 30 days of receipt of undisputed invoices.
For contracts valued above R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
suppliers within 60 days of receipt of undisputed invoices.
Section
Source: Invitation to Tender (ITT) - Alteration and additions to existing building structures.pdf1.1.11 Tax Evaluation questionnaire to determine whether a
3.13 Functionality requirements The following criteria will be applicable for this transaction under
functionality criteria
Criteria that will be used to score Score
Minimum Threshold 70%
Tenderers who do not meet the threshold of 70% for functionality
3.15 Evaluation of Price Prices will be evaluated as follows
evaluation parameters relating to uncertainty and risk, where
evaluation purposes but will be implemented when payment is
Prices will be scored out of 80 or 90 points
3.18 Evaluation of Specific Goals Specific goals will be scored out of 20 or 10 points in accordance
3.18 Evaluation of Specific Goals Specific goals will be scored out of 20 or 10 points in accordance with
the PPPFA.
If a tenderer fails to submit evidence of its points claim for a Specific
Goal, it will not be disqualified. However, it will be awarded 0 points
the 90/10 or 80/20 system. Eskom will add the score from Pricing and
Specific Goals together and rank the suppliers from the highest to the
Contractual Requirements are not evaluation criteria. They will
be assessed after the evaluation and ranking of the tenders.
Quality It is important for all Eskom contractors to meet the √
minimum requirements of ISO 9001 Quality
implementation and maintenance of its Quality
Category 1: Quality Requirements
SECTION A: Quality Management System
Evaluation Criteria
Source: 240-12248652_List of Tender Returnables_Cat 1_ Rev 7.pdf (TENDER)Bidders must hold a valid ISO 9001:2015 certificate issued by a certification body with recognised international accreditation, with product/service scope defined and relevant to the works. They must demonstrate an operational QMS through the documented evidence listed above. No CIDB grading, B-BBEE level, financial turnover, or other pre-qualification thresholds are stated in the provided document.
Section
Source: 240-12248652_List of Tender Returnables_Cat 1_ Rev 7.pdfSection A Score Option 1 4
SECTION B : Evidence of QMS in operation (Tender Quality Requirements -Ref 240-105658000)
not limited to quality management function/role) 1
B.2 Documented information for Control of Externally Provided Processes, Products and Services - Must include criteria for evaluation, selection,
monitoring of performance, and re-evaluation of external providers (Clause 8.4 of ISO 9001:2015)
Section B Score 5
SECTION C: Contract Quality Plan Requirements (Ref 240-105658000 and 240-109253698).
Draft Contract Quality Plan specific to the scope of work as described in the tender documents (Ref ISO 10005)
NB! Draft Contract/Project Quality Plan has important QA deliverables 1
Section C Score 1
SECTION D: Quality Control Plan Requirements (Ref 240-105658000 or 240-109253302)
QCP /Checklist/ ITP (Quality Control Plans) as per Scope of Works (Ref ISO 10005)
NB! Draft/ Example of an Inspection and Test Plan (ITP) or Quality Control Plan (QCP) on similar and/ or previous work done 1
Section D Score 1
Section E Score 2
Supplier Quality Management: Revision 7
Category 1 : Quality Requirements Deliverables to be evaluated indicator = 1
SECTION A : Quality Management System Requirements ISO 9001
(Option 1) Valid certification of Quality Management System by an ISO accredited body
QCP /Checklist/ ITP (Quality Control Plans) as per Scope of
Description
Source: Kusile Power Station Environmental Specification for Alterations and Additions to Existing Building Structures.pdf (unknown)Project Name: Alterations and Additions to Existing Building Structures at Kusile Power Station. Scope of the project: Alterations and Additions to Existing Building Structures at Kusile Power Station. Effective Date: August 2025. Review Date: August 2028.
Contact Information
Source: Kusile Power Station Environmental Specification for Alterations and Additions to Existing Building Structures.pdf (unknown){"name":null,"email":null,"phone":null,"department":"Supply Chain Management","address":null}
Evaluation Criteria
Source: Kusile Power Station Environmental Specification for Alterations and Additions to Existing Building Structures.pdf (unknown)Bidders must submit with their tender: (1) Environmental Policy aligned with ISO 14001:2015, signed by the company CEO or COO; (2) An Aspect/Impact Register or Environmental Management Plan relevant to the scope of work; (3) A Waste Management Plan. The contractor must demonstrate the ability to comply with all applicable environmental legislation, the Kusile OEMP, and site-specific work instructions for waste management and spill clean-up. No specific CIDB grading, B-BBEE level, or financial turnover thresholds are stated in this document.
Technical Specifications
Source: Kusile Power Station Environmental Specification for Alterations and Additions to Existing Building Structures.pdf (unknown)Eskom’s responsibility and commitment is to ensure protection of environment within which it operate
and minimisation of environmental impact in line with its Safety, Health, Environmental and Quality
Policy (SHEQ), along with legislative obligations.
This environmental specification specifies minimum requirements which are required to be met for
the specific contract and for the duration of the contract period by contractors and where required,
the delivery organisation.
2.1 Scope
This document is applicable to all contractors, partners and suppliers doing work at all areas under
direct control of Eskom Kusile Power Station.
2.1.1 Purpose
The purpose of this document is to outline the project specifications for the intended Works at Kusile
Power Station.
2.1.2 Applicability
This document shall apply throughout Kusile Power Station procurement processes and operation
stages of the works.
2.1.3 Effective date
From the date of signatures.
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] Environmental management Systems (ISO 14001) requirements
[2] National Environmental management Act No
[3] Kusile Power Station Operational Environmental Management Plan (240-96626258)
[4] 240-106963417 Kusile Power Station Environmental Requirements for Contractors and Suppliers
[5] 240-105776552 Kusile Power Station Waste Management Work Instruction
[6] 240- Kusile Power Station Oil/Chemical clean-up and Rehabilitation Work Instruction
[7] 32-727: Safety Health Environmental Quality Policy.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties
without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 11
Kusile Power Station Environmental Unique Identifier: KUS-20250797
Specification Revision: 1
Page:
2.2.2 Informative
[8] 32-726 Mandatory SHE Requirements for Eskom Procurement and Supply Chain Management
[9] 32-727: Safety Health Environmental Quality Policy.
[10] National Environmental Management Act 1998 (Act ).
[11] National Environmental Management Waste Act 2008 (Act )
[12] Hazardous Substances Act 1973 (Act )
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties
without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 11
Kusile Power Station Environmental Unique Identifier: KUS-20250797
Specification Revision: 1
Page:
2.3 Definitions
2.3.1 Contractor: Any employer formally contracted (directly or indirectly) by Eskom Kusile
Power Station and who performs work, supplies a service, product, equipment or material
for the purposes of advancing Eskom Kusile Power Station’s business or other interests.
This includes personal contractors (i.e. consultants) and third-party contractors i.e. vendors,
suppliers, agents, joint ventures, principal contractors and subcontractors.
2.3.2 Environmental Management Plan: It is a programme/plan of action for achieving
organisational objectives relating to the mitigation of environmental impacts of its activities,
products and services.
2.3.3 Environmental Management System: The part of the overall management systems that
includes organisational structure planning activities, responsibilities, practices procedures
and resources of developing, reviewing and managing the environmental policy (ISO
14001).
2.3.4 Duty of care to the environment: Anybody who causes or has caused or may cause
significant pollution or degradation of the environment must take reasonable measures to
prevent such pollution or degradation from occurring, continuing, or recurring. If such harm
to the environment is authorised by law or cannot reasonably be avoided or stopped, such
person must minimise and rectify such pollution or degradation of the environment.
2.3.5 Environment: Surrounding within which an organization operates, including air, water,
land, natural resources, flora, fauna, humans and their interactions.
2.3.6 Environmental aspect: Element of an organisation’s activities or products or services that
interacts or can interact with the environment.
2.3.7 Environmental Policy: Overall intentions and direction of an organization related to
environmental as formally expressed by top management.
2.3.8 Environmental impact: Change to the environment, whether adverse or beneficial, wholly
or partially resulting from the environmental aspects of an organisation.
2.4 Abbreviations
Abbreviation Explanation
SHEQ Policy Safety, Health, Environmental and Quality Policy
EMP Environmental Management Plan
MSDS Material Safety Data Sheets
NEMA National Environmental Management Act
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties
without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 11
Kusile Power Station Environmental Unique Identifier: KUS-20250797
Specification Revision: 1
Page:
2.5 Roles and Responsibilities
2.5.1 The Contractor and or Supplier
a) Shall be responsible for implementing the requirements of this Specification
b) Ensure that the environmental documentation as stipulated in this document are kept safe and
available
c) Ensure compliance to environmental requirements and applicable environmental legislation
2.5.2 Kusile Senior Environmental Advisor or Officer Environmental Management
a) Shall be responsible for evaluating compliance to this Specification during the various phases
of the procurement and works;
b) Conduct regular audit to ensure compliance to the environmental specification and other
applicable environmental legislation.
2.6 Process for Monitoring
Compliance to this specification will be monitored during tender evaluation, ad-hoc inspections and
by internal audits.
2.7 Related/Supporting Documents
240-106963417 Kusile Power Station Environmental Requirements for Contractors and Suppliers.
3.1 Scope of work
A copy of the scope of works must be retained by the contractor. The scope of work for this contract
is detailed in the document: KUS - 20250644
3.2 Environmental Requirements
Note 1: In the event of any perceived conflict between the “environmental laws” and the contract
documents, the Contractor shall, prior to commencing the work, refer such conflict to the Project
Management Team for clarification.
Note 2: Environmental protection shall include, but not be limited to, noise pollution, gaseous
emissions, noxious and/or offensive odours, liquid and solid waste separation and collection, spillage
clean-up and rehabilitation of contaminated area.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties
without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 11
Kusile Power Station Environmental Unique Identifier: KUS-20250797
Specification Revision: 1
Page:
3.3 Environmental Rules
Duty of care and remediation of environmental damage - Every person who causes, has caused or
may cause significant pollution or degradation of the environment must take reasonable measures
to prevent such pollution or degradation from occurring, continuing or recurring, or, in so far as such
harm to the environment is authorized by law or cannot reasonably be avoided or stopped, to
minimize and rectify such pollution or degradation of the environment.
Polluter Pay Principle - The costs of remedying pollution, environmental degradation and consequent
adverse health effects and of preventing, controlling or minimizing further pollution, environmental
damage or adverse health effects must be paid for by those responsible for harming the environment.
Zero Liquid Effluent Discharge Policy - All Contractors shall abide to Eskom Zero Liquid Effluent
Discharge through the process of reuse and recycling.
Waste - all waste shall be stored in marked and labelled containers, and as per Kusile Power Station
Waste Management Work Instruction 240-105776552 and be disposed of at a permitted disposal
site. Records of waste disposed including safe disposal certificate must be maintained.
Spillages - All spills/emergency incidents should be reported to the Supervisor and Environmental
Officer(s) immediately on occurrence. Incidents should be investigated to prevent reoccurrence and
clean-up, or rehabilitation should be done as per Kusile Power Station Oil/Chemical spillage clean-
up and rehabilitation process 240-110383662.
Oil storage - oils shall be stored in bunded areas/impermeable tanks to prevent spillages. Where oil
is disposed, disposal certificate must be submitted to the Environmental Department.
3.4 Environmental Instruction
The contractor and or supplier shall have a documented and implemented environmental
management system e.g. environmental policy, operational procedures relating to their activities,
aspects/impacts register etc.;
3.4.1 Environmental Aspect and Impact Register
a) The contractor and or supplier shall prepare an environmental aspect and impact relating to
their activities that will be carried out. The aspect and impact register must also indicate the
mitigations/ environmental management plan on how the impact will be mitigated. The
Environmental Management Plan/Mitigation Measures must be in line with Eskom Kusile
Power Station’s OEMP and any other applicable environmental legislation.
b) The environmental aspect and impact register must indicate the aspect rating matrix. Where
significant aspect, an environmental objective must be developed and maintained.
c) The environmental aspect and impact must be communicated to all employees and proof of
communication be maintained.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties
without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 11
Kusile Power Station Environmental Unique Identifier: KUS-20250797
Specification Revision: 1
Page:
3.4.2 Induction
The contractor and or supplier employees shall be inducted on the environmental requirements
before commencement with work. Proof of induction must be retained.
3.4.3 Environmental Training Matrix
a) The contractor must identify the training needs aligned to the scope of work/ activities then
develop the training matrix.
b) Proof of training and awareness must be maintained.
c) The contractor shall appoint trained and competent personnel in writing, who will have the
responsibilities of implementing all environmental requirements.
3.4.4 Environmental Incident registers and investigation reports
a) All environmental incidents must be reported within 24 hours or immediately to Kusile
Environmental Department.
b) Immediate measure must be taken to prevent/minimise environmental pollution where incident
occurs e.g. Use saw dust to contain the spillage, e.g. extinguish the fire.
c) All incidents must be investigated within 24 hours and Kusile Environmental representative
must be part of the investigation.
d) The contractor is responsible to remediate the impact associated with the incident.
3.4.5 Non-conformances
Non-conformance and incident reporting and investigations shall be done by the contractor, such
reports must include but not limited to the following information:
i. The cause of the non-conformance/incident;
ii. The proposed actions to correct and prevent recurrence.
iii. Eskom Kusile Power Station shall issue non-conformances where there are deviations from
Eskom Kusile Power Station Procedures and any other environmental requirements.
3.4.6 Hazardous Substances registers and SDS
a) All hazardous substances to be used onsite must be stored in bunded area (110% capacity).
b) The SDS for all hazardous substances must be kept onsite.
c) Oil spill kit/absorbent must be kept close to the hazardous storage area to use in case of
accident.
d) The hazardous substance register must be maintained.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties
without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 11
Kusile Power Station Environmental Unique Identifier: KUS-20250797
Specification Revision: 1
Page:
3.4.7 Waste Management
a) The contractor is responsible to ensure that waste is stored in allocated bins.
b) No mixing of waste is allowed, no burning of waste is allowed.
c) No waste should be stored on the ground, and full bins must be reported to Environmental
Department.
d) Initiative to recycle waste must be implemented.
e) Contactors are not allowed to remove waste from site unless permitted/authorised by the
Environmental Department.
f) Good housekeeping must be maintained at contractors laydown areas and working areas.
3.4.8 Audit reports
a) Environmental Department will conduct regular audits/inspection. Where non-conformance is
recorded, the contractor will submit action plan for correction/preventative measures.
b) The audit report will be maintained.
3.4.9 Environmental Objectives
The contractor must develop environmental objectives for each financial year. The environmental
objectives must be updated and communicated to employees. The environmental objectives must
include the significant aspects.
3.4.10 Environmental improvement opportunities
The contractor must identify areas of improvements, the improvements should also take into account
the significant aspects where applicable.
3.4.11 Emergency Management
The art of emergency preparedness and response is to minimise the effects of any emergency and
to restore normal activities as soon as practical. The supplier must develop their own emergency
response in their work premises. The Eskom employees attending training must be made aware of
the emergency process and the assembly points. Where any office and or site is located within any
Local Authorities area, then the plans must include their involvement. Emergency preparedness.
Periodic emergency drills must be undertaken to test the effectiveness of the plan. This must be
recorded and provided on request.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties
without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 11
Kusile Power Station Environmental Unique Identifier: KUS-20250797
Specification Revision: 1
Page:
3.4.12 SHE policy
A SHE policy is a statement of intent and a commitment by the organisation’s CE and senior
management in relation to the relevant environmental roles and responsibilities, the achievement of
their strategic objectives, values of integrity, customer satisfaction, excellence, and innovation.
The policy must be displayed in a prominent place within the workplace. A copy of the policy must
be filed and the policy must be communicated to all employees and proof of communication be
retained.
3.5 Records to be kept during execution of service/scope onsite
The following minimum records shall be kept on all sites (the documentation must be in accordance
to the scope of work:
a) Contractor site specific Environmental Management Plan;
b) Aspects/Impacts register and proof of communication
c) Incident registers and investigation reports;
d) Non-conformance register;
e) Public Complaints register;
f) Waste disposal register;
g) Hazardous Substances registers and SDS where applicable;
h) Records of audit reports and audit findings close-out, where applicable;
i) Records of inspections conducted
j) Environmental Training matrix
k) Proof of environmental awareness
l) Proof of communication of SHEQ Policy
m) Emergency drill reports
3.6 Tender Submission Documentation
The following documentation shall be submitted with all tender submissions:
a) Environmental Policy in line with iso 14001:2015 signed by company CEO or COO
b) An Aspect/Impact register or an environmental management plan (relevant to the scope of
work)
c) Waste management plan
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties
without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 11
Kusile Power Station Environmental Unique Identifier: KUS-20250797
Specification Revision: 1
Page:
This document has been seen and accepted by:
Full Name and Surname Designation
Muwanwa Sinthumule Environmental Officer
Maqhawe Nkambule Senior advisor Environmental
Date Rev. Compiler Remarks
August 2025 1 Cylia Malebana. Environmental specification
document.
The following people were involved in the development of this document:
a) Nhlonipho Nkosi.
b) Cylia Malebana.
None.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties
without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 11
Environmental
Source: Kusile Power Station Environmental Specification for Alterations and Additions to Existing Building Structures.pdfit is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties
without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 11
Kusile Power Station Environmental Unique Identifier: KUS-20250797
Specification Revision: 1
Page:
. Introduction ............................................................................................................................... 3
2.1 Scope ............................................................................................................................... 3
2.1.1 Purpose ................................................................................................................. 3
2.1.2 Applicability ............................................................................................................ 3
2.1.3 Effective date ......................................................................................................... 3
2.2 Normative/Informative References .................................................................................... 3
2.2.1 Normative .............................................................................................................. 3
2.2.2 Informative ............................................................................................................. 4
2.3 Definitions ......................................................................................................................... 5
2.4 Abbreviations .................................................................................................................... 5
2.5 Roles and Responsibilities ................................................................................................ 6
2.6 Process for Monitoring ...................................................................................................... 6
2.7 Related/Supporting Documents ........................................................................................ 6
3.1 Scope of work ................................................................................................................... 6
3.2 Environmental Requirements ............................................................................................ 6
3.3 Environmental Rules ......................................................................................................... 7
3.4 Environmental Instruction .................................................................................................. 7
3.5 Records to be kept during execution of service/scope onsite .......................................... 10
3.6 Tender Submission Documentation ................................................................................ 10
Acceptance ............................................................................................................................. 11
Revisions ................................................................................................................................ 11
Development Team ................................................................................................................. 11
Acknowledgements (if applicable ) .......................................................................................... 11
following paragraphs.
2.2.1 Normative
[1] Environmental management Systems (ISO 14001) requirements
[2] National Environmental management Act No
[3] Kusile Power Station Operational Environmental Management Plan (240-96626258)
[4] 240-106963417 Kusile Power Station Environmental Requirements for Contractors and Suppliers
[5] 240-105776552 Kusile Power Station Waste Management Work Instruction
[6] 240- Kusile Power Station Oil/Chemical clean-up and Rehabilitation Work Instruction
[7] 32-727: Safety Health Environmental Quality Policy.
it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties
without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 11
Kusile Power Station Environmental Unique Identifier: KUS-20250797
Specification Revision: 1
Page:
2.3 Definitions
2.3.1 Contractor: Any employer formally contracted (directly or indirectly) by Eskom Kusile
for the purposes of advancing Eskom Kusile Power Station’s business or other interests.
This includes personal contractors (i.e. consultants) and third-party contractors i.e. vendors,
suppliers, agents, joint ventures, principal contractors and subcontractors.
2.3.2 Environmental Management Plan: It is a programme/plan of action for achieving
organisational objectives relating to the mitigation of environmental impacts of its activities,
products and services.
2.3.3 Environmental Management System: The part of the overall management systems that
includes organisational structure planning activities, responsibilities, practices procedures
and resources of developing, reviewing and managing the environmental policy (ISO
14001).
2.3.4 Duty of care to the environment: Anybody who causes or has caused or may cause
significant pollution or degradation of the environment must take reasonable measures to
prevent such pollution or degradation from occurring, continuing, or recurring. If such harm
to the environment is authorised by law or cannot reasonably be avoided or stopped, such
person must minimise and rectify such pollution or degradation of the environment.
2.3.5 Environment: Surrounding within which an organization operates, including air, water,
land, natural resources, flora, fauna, humans and their interactions.
2.3.6 Environmental aspect: Element of an organisation’s activities or products or services that
interacts or can interact with the environment.
2.3.7 Environmental Policy: Overall intentions and direction of an organization related to
environmental as formally expressed by top management.
2.3.8 Environmental impact: Change to the environment, whether adverse or beneficial, wholly
or partially resulting from the environmental aspects of an organisation.
2.4 Abbreviations
it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties
without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 11
Kusile Power Station Environmental Unique Identifier: KUS-20250797
Specification Revision: 1
Page:
2.5 Roles and Responsibilities
2.5.1 The Contractor and or Supplier
a) Shall be responsible for implementing the requirements of this Specification
b) Ensure that the environmental documentation as stipulated in this document are kept safe and
available
c) Ensure compliance to environmental requirements and applicable environmental legislation
2.5.2 Kusile Senior Environmental Advisor or Officer Environmental Management
a) Shall be responsible for evaluating compliance to this Specification during the various phases
of the procurement and works;
b) Conduct regular audit to ensure compliance to the environmental specification and other
applicable environmental legislation.
2.6 Process for Monitoring
by internal audits.
2.7 Related/Supporting Documents
240-106963417 Kusile Power Station Environmental Requirements for Contractors and Suppliers.
3.1 Scope of work
is detailed in the document: KUS - 20250644
3.2 Environmental Requirements
Note 1: In the event of any perceived conflict between the “environmental laws” and the contract
documents, the Contractor shall, prior to commencing the work, refer such conflict to the Project
Note 2: Environmental protection shall include, but not be limited to, noise pollution, gaseous
emissions, noxious and/or offensive odours, liquid and solid waste separation and collection, spillage
clean-up and rehabilitation of contaminated area.
it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties
without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 11
Kusile Power Station Environmental Unique Identifier: KUS-20250797
Specification Revision: 1
Page:
3.3 Environmental Rules
adverse health effects and of preventing, controlling or minimizing further pollution, environmental
damage or adverse health effects must be paid for by those responsible for harming the environment.
Waste Management Work Instruction 240-105776552 and be disposed of at a permitted disposal
site. Records of waste disposed including safe disposal certificate must be maintained.
is disposed, disposal certificate must be submitted to the Environmental Department.
3.4 Environmental Instruction
management system e.g. environmental policy, operational procedures relating to their activities,
aspects/impacts register etc.;
3.4.1 Environmental Aspect and Impact Register
a) The contractor and or supplier shall prepare an environmental aspect and impact relating to
their activities that will be carried out. The aspect and impact register must also indicate the
mitigations/ environmental management plan on how the impact will be mitigated. The
Power Station’s OEMP and any other applicable environmental legislation.
b) The environmental aspect and impact register must indicate the aspect rating matrix. Where
significant aspect, an environmental objective must be developed and maintained.
c) The environmental aspect and impact must be communicated to all employees and proof of
communication be maintained.
it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties
without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 11
Kusile Power Station Environmental Unique Identifier: KUS-20250797
Specification Revision: 1
Page:
3.4.2 Induction
before commencement with work. Proof of induction must be retained.
3.4.3 Environmental Training Matrix
a) The contractor must identify the training needs aligned to the scope of work/ activities then
develop the training matrix.
b) Proof of training and awareness must be maintained.
c) The contractor shall appoint trained and competent personnel in writing, who will have the
responsibilities of implementing all environmental requirements.
3.4.4 Environmental Incident registers and investigation reports
a) All environmental incidents must be reported within 24 hours or immediately to Kusile
it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties
without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 11
Kusile Power Station Environmental Unique Identifier: KUS-20250797
Specification Revision: 1
Page:
3.4.7 Waste Management
a) The contractor is responsible to ensure that waste is stored in allocated bins.
b) No mixing of waste is allowed, no burning of waste is allowed.
c) No waste should be stored on the ground, and full bins must be reported to Environmental
d) Initiative to recycle waste must be implemented.
e) Contactors are not allowed to remove waste from site unless permitted/authorised by the
objectives must be updated and communicated to employees. The environmental objectives must
include the significant aspects.
3.4.10 Environmental improvement opportunities
a) Environmental Policy in line with iso 14001:2015 signed by company CEO or COO
b) An Aspect/Impact register or an environmental management plan (relevant to the scope of
work)
c) Waste management plan
it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties
without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 11
Kusile Power Station Environmental Unique Identifier: KUS-20250797
Specification Revision: 1
Page:
August 2025 1 Cylia Malebana. Environmental specification
document.
Section
Source: Kusile Power Station Environmental Specification for Alterations and Additions to Existing Building Structures.pdfCompliance to this specification will be monitored during tender evaluation, ad-hoc inspections and
and minimisation of environmental impact in line with its Safety, Health, Environmental and Quality
stages of the works.
[7] 32-727: Safety Health Environmental Quality Policy.
[9] 32-727: Safety Health Environmental Quality Policy.
Important Dates
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template for Bidders.pdf (TENDER){"closingDate":"01 April 2023"}
Contact Information
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template for Bidders.pdf (TENDER){"name":null,"email":null,"phone":null,"department":null,"address":"it proposals in a table below for developing the skills of unemployed"}
Evaluation Criteria
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template for Bidders.pdf (TENDER)Valid B-BBEE certificate (SANAS accredited) or sworn affidavit (for EMEs/QSEs) with supporting ownership and ID documents required to claim preference points. Failure to provide B-BBEE documentation results in zero points for specific goals but does not disqualify. No minimum CIDB grading or designated sector local content thresholds specified. CSD registration and tax compliance (SARS pin) are implied standard requirements. A valid B-BBEE certificate or sworn affidavit is a condition for contract award.
Technical Specifications
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template for Bidders.pdf (TENDER)N/a
NOTE: Failure by the Contractor/Service Provider/Supplier to meet the CIDB CSDG mandatory %
will render their tender non-responsive.
Methodology
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template for Bidders.pdfthrough their supply network. In certain cases, the SETA’s accredited training providers can be
approached to participate in developing critical and scarce skills.
Note: That these targets for skills development candidates categorically exclude Eskom
employees and registered learners. The tenderers are required to take full responsibility
for the total cost of developing the requisite skills, and Eskom shall not make any
financial contribution towards the fulfilment of this obligation. Tenderers also are
advised to approach their relevant SETAs to access grants, subsidies, and incentives
as well as South African Revenue Services for tax rebates that are earmarked for skills
development initiatives
Section 3: SDL&I Penalty and Performance Security
Eskom will apply a penalty of 3% of the Contract Value for failure to meet SDL&I obligations.
For the duration of the contract, Eskom will retain 3% of every invoice (excluding VAT) as security for
the fulfilment of all SDL&I Obligations. The retained amounts shall only be released to the Contractor
upon fulfilment of all SDL&I obligations by the contractor.
Section 4: Reporting and Monitoring
Pricing Schedule
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template for Bidders.pdftender response must be separated into its components as per the Price Schedule included with
the tender documents. Local procurement content is total spending minus the imported
component.
Compliance Requirements
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template for Bidders.pdf (TENDER)Proof of ownership / shareholding (preferably CIPC documentation) inclusive of shareholding
B-BBEE Minimum Level: 0
Points Allocation: 20 points
B-BBEE Details: tions to Existing Building Structures including
Construction and Commissioning Supervision at Kusile
Power Station
Duration of the Project Nine (9) Months
Section 1: Specific Goals
A maximum of 10/20 points may be awarded to a tenderer for the specific goal specified for the
tender. The points scored for the specific goal must be added to the points scored for price and the
total must be rounded off to the nearest two decimal places. Subject to section 2(1)(f) of the
Preferential Procurement Policy Framework Act, the contract must be awarded to the tenderer
scoring the highest points.
B-BBEE Status Level of Number of points Number of points
Contributor (90/10 system) (80/20 system)
1 10 20
2 9 18
3 6 14
4 5 12
5 4 8
6 3 6
7 2 4
8 1 2
Non-compliant contributor 0 0
NB: The following documents are required to claim preference points,
CIPS affidavit
breakdown
ventures),a consolidated B-BBEE status level verification certificate.
Tenderer failing to provide documentation for the allocation of preference points will not be
disqualified, but’
Section 2: Objective criteria
Confidential
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorised version on the system. No p
Health & Safety
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template for Bidders.pdfensure their validity:
authorised to depose of an affidavit. (Mark the applicable option).
business address.
as per Statement 004, the percentage of black beneficiaries must be reflected. (No blank spaces to be left).
management account. (Mark the applicable option).
(Financial year end to be stipulated by day/month/year).
supplier status.
the presence of the Commissioner of Oath. Furthermore the Commissioner must also sign and stamp)
commission a sworn affidavit in which they have an interest.
Section
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template for Bidders.pdfSection 1: Specific Goals
A maximum of 10/20 points may be awarded to a tenderer for the specific goal specified for the
tender. The points scored for the specific goal must be added to the points scored for price and the
scoring the highest points.
B-BBEE Status Level of Number of points Number of points
Contributor (90/10 system) (80/20 system)
NB: The following documents are required to claim preference points,
Tenderer failing to provide documentation for the allocation of preference points will not be
Description
Source: E-tendering Help Manual for supplier - 27 January 2025.docxeTendering system is a web-based system that allows suppliers bidding for various tenders advertised on Tender Bulletin system to “upload” their tender documents. Currently the tenderers or suppliers submit tender documents at various Eskom tender offices. eTendering system replaces the manual or physical submission of tender documents at various Eskom tender offices. eTendering system in a nutshell is an electronic box where tender documents can be “dropped” or “uploaded”. Suppliers will be required to register their details before they can be granted access to the eTendering system. An OTP (one time pin) will be sent to both their cell phone and email address.
Evaluation Criteria
Source: E-tendering Help Manual for supplier - 27 January 2025.docx (unknown)Suppliers must be registered on the Central Supplier Database (CSD) to access the eTendering system. Registration requires a valid email address, cellphone number (with +27 prefix), and completion of CAPTCHA verification. No further eligibility criteria (e.g. CIDB grading, B-BBEE level, tax clearance) are specified in the provided document.
Technical Specifications
Source: E-tendering Help Manual for supplier - 27 January 2025.docx (unknown)eTendering system is a web-based system that allows suppliers bidding for various tenders advertised on Tender Bulletin system to “upload” their tender documents. Currently the tenderers or suppliers submit tender documents at various Eskom tender offices. eTendering system replaces the manual or physical submission of tender documents at various Eskom tender offices. eTendering system in a nutshell is an electronic box where tender documents can be “dropped” or “uploaded”. Suppliers will be required to register their details before they can be granted access to the eTendering system. An OTP (one time pin) will be sent to both their cell phone and email address.
Contact Information
Source: Unpriced BOQ for Alterations and Additions to Existing Building Structures at Kusile Power Station 31.08.26.pdf (unknown){"name":null,"email":null,"phone":null,"department":"QUANTITY RATE AMOUNT","address":null}
Evaluation Criteria
Source: Unpriced BOQ for Alterations and Additions to Existing Building Structures at Kusile Power Station 31.08.26.pdf (unknown)Bidders must demonstrate capacity to provide professionally registered personnel: Architect (SACAP), Engineers (ECSA) in Geotechnical, Mechanical/Fire, Mechanical/HVAC, Commissioning, Electrical, Structural — all with 5 years relevant experience. Construction team must include Project Manager (SACPCMP), Safety Officer (SACPCMP), Site Agent, Foremen, Electricians (wireman's licence), Planner, Environmental Officer, Draughtspersons, Document Controller, Plumber, and trades/labour with stated years of experience. Compliance with OHS Act, Eskom site requirements, and ability to mobilise full camp and equipment within programme. No explicit CIDB grading, B-BBEE level, or financial turnover thresholds stated in the provided document.
Technical Specifications
Source: Unpriced BOQ for Alterations and Additions to Existing Building Structures at Kusile Power Station 31.08.26.pdf (unknown)Unit quantity rate amount
Item 1
1 preliminaries and general
1.1 Preliminaries and General Item 1.00
Total Item 1 (Preliminaries and General) carried to Final Summary
Item 2
1.2 Resources
1.2.1 Design and Site Supervision Item 1.00
1.2.2 Normal Hours Item 1.00
1.2.3 Saturdays Overtime Item 1.00
1.2.4 Public Holidays ad Sundays Overtime Item 1.00
Total Item 2 (Resources) carried to Final Summary
Item 3
2 construction work
2.1 Alterations Item 1.00
2.2 Building Works Item 1.00
2.3 HVAC Item 1.00
2.4 Water Detection Item 1.00
2.5 Fire Detection Item 1.00
2.6 Signage Item 1.00
2.7 Electrical Installation Item 1.00
Total for Construction Work carried to Final Summary
Final summary
Item 1 preliminaries and general
Item 2 resources
Item 3 construction work
Final Summary Total (Excl VAT)
31-Aug-26
Quality Management
Source: Unpriced BOQ for Alterations and Additions to Existing Building Structures at Kusile Power Station 31.08.26.pdf6 Making and testing 150 x 150 x 150mm concrete strength test cube
No 13
40 Testing waste pipe system Item 1
41 Cutting into existing 110mm drain pipe for and forming junction with 110mm pipe No 1
42 Taking out and removing existing 110mm uPVc sewer pipe including locating, excavating, removing pipe etc and backfilling to specification M 18
(inclusive of bases) - to be used as instructed by engineer
12 All Floors Item 2
13 Void Detector LED and Accessories Item 2
Analogue Addressable Heat Detectors (New)
Allow for the procurement, installation, testing and commissioning of an analogue addressable heat detectors to specification. (inclusive of
bases)
14 All Floors Item 1
Analogue Addressable Manual Fire Alarm Points Complete with Bases, Flaps and Integral Isolator (New)
Allow for the procurement, installation, testing and commissioning of loop isolators to the satisfaction of SANS 10139:2021
18 Building Allowance – to be confirmed by contractor during zoning. To be used only after approval of zone plans with client No. 2
(inclusive of bases) - to be used as instructed by engineer
23 Ground Floor Item 2
24 Void Detector LED and Accessories Item 2
Analogue Addressable Heat Detectors (New)
Allow for the procurement, installation, testing and commissioning of an analogue addressable heat detectors to specification. (inclusive of
bases)
25 Ground Floor Item 1
Analogue Addressable Manual Fire Alarm Points Complete with Bases, Flaps and Integral Isolator (New)
Allow for the procurement, installation, testing and commissioning of loop isolators to the satisfaction of SANS 10139:2021
29 Building Allowance – to be confirmed by contractor during zoning. To be used only after approval of zone plans with client No. 1
(inclusive of bases) - to be used as instructed by engineer
35 Ground Floor Item 2
36 Void Detector LED and Accessories Item 2
Analogue Addressable Heat Detectors (New)
Allow for the procurement, installation, testing and commissioning of an analogue addressable heat detectors to specification. (inclusive of
bases)
37 Ground Floor Item 1
Analogue Addressable Manual Fire Alarm Points Complete with Bases, Flaps and Integral Isolator (New)
Allow for the procurement, installation, testing and commissioning of loop isolators to the satisfaction of SANS 10139:2021
41 Building Allowance – to be confirmed by contractor during zoning. To be used only after approval of zone plans with client No. 1
Fire Resistant Cabling - PH120
Allow for adequate PH120 cabling of appropriate diameter for the wiring of fire detection system to specification. (PH-120 only – 1.0mm2
minimum - 2 core)
42 Ground Floor M 180
(inclusive of bases) - to be used as instructed by engineer
46 All Floors Item 3
47 Void Detector LED and Accessories Item 3
Analogue Addressable Heat Detectors (New)
Allow for the procurement, installation, testing and commissioning of an analogue addressable heat detectors to specification. (inclusive of
bases)
48 All Floors Item 1
Analogue Addressable Manual Fire Alarm Points Complete with Bases, Flaps and Integral Isolator (New)
Allow for the procurement, installation, testing and commissioning of loop isolators to the satisfaction of SANS 10139:2021
52 Building Allowance – to be confirmed by contractor during zoning. To be used only after approval of zone plans with client No. 2
Health & Safety
Source: Unpriced BOQ for Alterations and Additions to Existing Building Structures at Kusile Power Station 31.08.26.pdf1.1.3 Site Establishment for: Delivery of Flushable Ablution Container - Female (3m x 6m) (1 Off) Once Off 1 1
4 Toilets, 4 SHE Bins, 4 Hand Wash and basin with soap dispensor
1.1.4 Site Establishment for: Delivery of Flushable Ablution Container - Male (3m x 6m) (1 Off) Once Off 1 1
3 Toilets, 3 Urinal, 3 Hand Wash and basin with soap dispensor
1.1.5 Site Establishment for: Delivery of Female change rooms with 30 lockers (3m x 6m) (1 Off) Once Off 1 1
1.1.6 Site Establishment for: Delivery of Male change rooms with 40 lockers (3m x 9m) (1 Off) Once Off 1 1
1.1.7 Site Establishment for: Delivery of Storage Containers (3m x 12m) (1 Off) Once Off 1 1
Site Establishment for: Delivery of Lighting Plant (Lighting up on large areas which cn be extended masts to 7m, heavy duty trailer-
1.1.8 Once Off 2 1
mounted with petrol/diesel units) (1 Off)
Delivery and connection of temporary waste water system, including, piping and plastic under-ground septic tank (6000 litres) typical
1.1.9 Once Off 2 1
for 20 to 25 people use
1.1.10 Delivery and connection of temporary water supply inlcuding, piping and storage tank (5000L Jojo) adjacent contractor camp Once Off 1 1
1.1.11 Delivery and Installation of Site Fencing (1.8m High Diamond Mesh Wire, 40 Stell Poles, 2 Way Double Swing Gate) m 1 200
1.1.12 De Establishment - Kitchen Converted Container (3m x 12m) (1 Off) Once Off 1 1
1.1.13 De Establishment - Office Converted Containers (3m x 12m) (1 Off) Once Off 1 1
1.1.14 De Establishment - Flushable Ablution Container - Female (3m x 6m) (1 Off) Once Off 1 1
1.1.15 De Establishment - Flushable Ablution Container - Male (3m x 6m) (1 Off) Once Off 1 1
1.1.16 De Establishment - Storage Containers (3m x 12m) (1 Off) Once Off 1 1
1.1.17 De Establishment - Female change rooms with 15 lockers (3m x 6m) (1 Off) Once Off 1 1
1.1.18 De Establishment - Male change rooms with 22 lockers (3m x 6m) (1 Off) Once Off 1 1
De Establishment for: Lighting Plant (Lighting up on large areas which cn be extended masts to 7m, heavy duty trailer-mounted with
1.1.19 Once Off 2 1
petrol/diesel units) (1 Off)
1.1.20 Removal and Collection of Site Fencing (1.8m High Diamond Mesh wire, 40 Steel Poles, 2 way double swing gate) m 1 200
1.1.21 Disconnection and Collection of Temporary water supply inlcuding, piping and storage tank (5000L Jojo) adjacent contractor camp Once Off 1 1
Disconnection and Collection of Temporary waste water system, including, piping and plastic under-ground spectic tank (6000 litres)
1.1.22 Once Off 2 1
typical for 20 to 25 people use
1.1.23 Site Clearance at Contractors Camp
1.1.23.1 Site Establishment for: Delivery of TLB - 4 X 4 Backhoe Loader (1 Off) Once Off 1 1
1.1.23.2 De-Site Establishment for: Delivery of TLB - 4 X 4 Backhoe Loader (1 Off) Once Off 1 1
1.1.23.3 TLB - 4 X 4 Backhoe Loader Per Day 1 1
1.2 Temporary Site Facilities and Transportation
1.2.1 Rental of 4x2 Double Cab Bakkie (1 Off) Monthly 1 8
1.2.2 Rental of 14 Seater Bus (2 Off) Monthly 2 8
1.2.3 Rental of 7 Seater (2 Off) Monthly 2 8
1.2.4 Rental of Office Converted Containers (6m x 12m) (1 Off) Monthly 1 8
1.2.5 Rental of Kitchen Converted Container (3m x 12m) (1 Off) Monthly 1 8
1.2.6 Rental of Storage Containers (3m x 12m) (1 Off) Monthly 1 8
1.2.7 Rental of Flushable Ablution Container - Female (3m x 6m) (1 Off) (To be serviced once a week) Monthly 1 8
1.2.8 Rental of Flushable Ablution Container - Male (3m x 6m) (1 Off) (To be serviced once a week) Monthly 1 8
1.2.9 Rental of Female change rooms with 15 lockers (3m x 6m) (1 Off) Monthly 1 8
1.2.10 Rental of Male change rooms with 22 lockers (3m x 9m) (1 Off) Monthly 1 8
Rental of Lighting Plant (Lighting up on large areas which cn be extended masts to 7m, heavy duty trailer-mounted with petrol/diesel
1.2.11 Monthly 2 8
units) (2 Off)
1.3 Health and Safety Requirements
1.3.1 Safety file Once Off 1 1
1.3.2 Fire Extinguishers (Per container) Once Off 1 7
1.3.3 Medicals - Entry (Per Person) Per Person 40 1
1.3.4 Medicals - Exit (Per Person) Per Person 40 1
1.3.5 Security Clearance Certification (Per Person) Per Person 40 1
1.4 Personal Protective Equipment (PPE) Consumbles
1.4.1 Overall Trouser Per Person 37 1
1.4.2 Overall Jacket Per Person 37 1
1.4.3 Safety Boots Per Person 37 1
1.4.4 Hardhat Per Person 37 1
1.4.5 Reflector Vest Per Person 37 1
1.4.6 Full Body Harness Per Person 37 1
1.4.7 Ear Muffs (Standard) Per Person 37 1
1.4.8 Ear Protection Per Person 37 1
1.4.9 Safety Gloves Per Person 37 1
1.5 Trainings
1.5.1 First Aid (Valid for 3 years) Per Person 2 1
1.5.2 Basic Fire Fighting (Valid for 2 years) Per Person 2 1
1.5.3 OHS Act (Valid for 2 years) Per Person 2 1
1.5.4 Legal Liability (Once Off) (2 Off) Per Person 2 1
1.5.5 Supervisory Safety (Valid for 2 years) (2 Off) Per Person 2 1
1.5.6 Planned Job Observation (Once Off) Per Person 2 1
1.5.7 HIRA (Valid for 2 years)) Per Person 2 1
1.5.8 Incident Investigator (Valid for 2 years) Per Person 2 1
1.5.9 Training (Working at heights) (Per Person) Per Person 33 1
1.60 Occupational hygiene surveys / (health risk assessments)
1.6.1 Illumination for Office, Kitchen, Ablution and Storage Containers (valid for 2 years) No 7 1
1.6.2 Indoor Air Quality for Office container (valid for 2 years) No 7 1
1.6.3 Ergonomics (valid for 2 years) No 7 1
1.4 Documentation
1.4.1 As built-drawings Item 1 1
1.4.2 O&M Manuals Item 1 1
1.4.3 Testing and Commissioning (HVAC, Fire Protection & Detection, Electrical, Plumbing, C&I works) Item 1 1
1.4.4 Signing Off (HVAC, Fire Protection & Detection, Electrical, Plumbing, C&I works) Item 1 1
1.4.5 12 Months maintenance & warrantee (Including all consumables & parts) Item 1 1
1.4.6 Construction guarantee Item 1 1
1.4.7 Fabrication or Shop Drawings Item 1 1
1.4.8 Spares and Special tools and Equipment Item 1 1
1.4.9 Construction data packages Item 1 1
Total Item 1 (Preliminaries and General) carried to Summary:
2.1 Design and site supervision resources:
2.1.1 Architectural (Professional withSACAP with Years Relevant experience)(1 Off) Hours 1 480
2.1.2 Geotechnical Engineer (Professional with ECSA with 5 Years Relevant experience)(1 Off) Hours 1 480
2.1.3 Mechanical Engineer/ Fire Engineer (Professional with ECSA with 5 Years Relevant experience)(1 Off) Hours 1 480
2.1.4 Mechanical Engineer/HVAC (Professional with ECSA with 5 Years Relevant experience)(1 Off) Hours 1 480
2.1.5 Commissioning Engineer (Professional with ECSA with 5 Years Relevant experience)(1 Off) Hours 1 480
2.1.6 Electrical Engineer (Professional with ECSA with 5 Years Relevant experience)(1 Off) Hours 1 480
2.1.7 Structural Engineer (Professional with ECSA with 5 Years Relevant experience)(1 Off) Hours 1 480
Total for item 2.1 (Design and Site Supervision Resources) Carried to Final Summary :
2.2 Construction resources:
2.2 Normal Hours
2.2.1 Construction Project Manager (Professional with SACPMP with 5 Years Relevant experience)(1 Off) Hours 1 1304
2.2.2 Land Surveyor (Professional with SAGC with 3 Years Relevant experience)(1 Off) Hours 1 1304
2.2.3 Safety Officer (Professional with SACPMP with 5 Years Relevant experience)(1 Off) Hours 1 1304
2.2.4 Site Agent / Site Manager (5 Years Relevant experience)(1 Off) Hours 1 1304
2.2.5 Site Foreman - Partitioning (Fire) (5 Years Relevant experience)(1 Off) Hours 1 1304
2.2.6 Site Foreman - Mechanical Works (Fire) (5 Years Relevant experience)(1 Off) Hours 1 1304
2.2.7 Site Foreman - Mechanical Works (HVAC) (5 Years Relevant experience)(1 Off) Hours 1 1304
2.2.8 Electrical Electrician with wireman licence (5 Years Relevant experience)(1 Off) Hours 1 1304
2.2.9 Fire Detection System Electrician (5 Years Relevant experience)(1 Off) Hours 1 1304
2.2.10 Planner/Scheduling Engineer ( with '5 Years Relevant experience)(1 Off) Hours 1 1304
2.2.11 Environmental Officer (5 Years Relevant experience)(1 Off) Hours 1 1304
2.2.12 Architectural Draughtsperson (Civil & Structural) (5 Years Relevant experience)(1 Off) Hours 1 1304
2.2.13 Draughtsperson - Civil & Structural (5 Years Relevant experience)(1 Off) Hours 1 1304
2.2.14 Mechanical Draughtsperson (5 Years Relevant experience)(1 Off) Hours 1 1304
2.2.15 Electrical & C&I Draughtsperson (5 Years Relevant experience)(1 Off) Hours 1 1304
2.2.16 Document Controller/Record Officer (3 Years Relevant experience)(1 Off) Hours 1 1304
2.2.17 Plumber (5 Years Relevant experience) (1 Off) Hours 1 1304
2.2.18 Semi-skilled site support (3 Years Relevant experience) (6 Off) Hours 6 1304
2.2.19 General Labour (1-3 Years Relevant experience) (10 Off) Hours 10 1304
2.2.20 Cleaner (2 Off) Hours 2 1304
2.2.21 Driver (For 14 Seater Bus ) (2 Off) Hours 2 1304
2.2.22 Driver (For 7 Seater) (1 Off) Hours 1 1304
2.3 Saturday Overtime
2.3.1 Construction Project Manager (Professional with SACPMP with 5 Years Relevant experience)(1 Off) Hours 1 256
2.3.2 Safety Officer (Professional with SACPMP with 5 Years Relevant experience)(1 Off) Hours 1 256
2.3.3 Site Agent / Site Manager (5 Years Relevant experience)(1 Off) Hours 1 256
2.3.4 Site Foreman - Partitioning (Fire) (5 Years Relevant experience)(1 Off) Hours 1 256
2.3.5 Site Foreman - Mechanical Works (Fire) (5 Years Relevant experience)(1 Off) Hours 1 256
2.3.6 Site Foreman - Mechanical Works (HVAC) (5 Years Relevant experience)(1 Off) Hours 1 256
2.3.7 Electrical Electrician with wireman licence (5 Years Relevant experience)(1 Off) Hours 1 256
2.3.8 Fire Detection System Electrician (5 Years Relevant experience)(1 Off) Hours 1 256
2.3.9 Environmental Officer (5 Years Relevant experience)(1 Off) Hours 1 256
2.3.10 Plumber (5 Years Relevant experience) (1 Off) Hours 1 256
2.3.11 Semi-skilled site support (3 Years Relevant experience) (6 Off) Hours 6 256
2.3.12 General Labour (1-3 Years Relevant experience) (10 Off) Hours 10 256
2.3.13 Cleaner (1 Off) Hours 1 256
2.3.14 Driver (For 14 Seater Bus ) (2 Off) Hours 2 256
2.3 Overtime - Sundays and Public Holidays
2.3.1 Construction Project Manager (Professional with SACPMP with 5 Years Relevant experience)(1 Off) Hours 1 256
2.3.2 Safety Officer (Professional with SACPMP with 5 Years Relevant experience)(1 Off) Hours 1 256
2.3.3 Site Agent / Site Manager (5 Years Relevant experience)(1 Off) Hours 1 256
2.3.4 Site Foreman - Partitioning (Fire) (5 Years Relevant experience)(1 Off) Hours 1 256
2.3.5 Site Foreman - Mechanical Works (Fire) (5 Years Relevant experience)(1 Off) Hours 1 256
2.3.6 Site Foreman - Mechanical Works (HVAC) (5 Years Relevant experience)(1 Off) Hours 1 256
2.3.7 Electrical Electrician with wireman licence (5 Years Relevant experience)(1 Off) Hours 1 256
2.3.8 Fire Detection System Electrician (5 Years Relevant experience)(1 Off) Hours 1 256
2.3.9 Environmental Officer (5 Years Relevant experience)(1 Off) Hours 1 256
2.3.10 Plumber (5 Years Relevant experience) (1 Off) Hours 1 256
2.3.11 Semi-skilled site support (3 Years Relevant experience) (6 Off) Hours 6 256
2.3.12 General Labour (1-3 Years Relevant experience) (10 Off) Hours 10 256
2.3.13 Cleaner (1 Off) Hours 1 256
2.3.14 Driver (For 14 Seater Bus ) (2 Off) Hours 2 256
adjoining premises and their tenants/occupants. He/She shall provide proper protection and provide,erect and maintain in position proper
temporary tarpaulins that may be necessary to protect existing fixtures, fittings and furniture during the progress of the works and remove on
completion or when directed, all to the satisfaction of the Project Manager/Principal Agent
Section 1
Bill 1
or brick surfaces for new screed, plaster or tile finishes
21 300 x 300mm Tiles to floors M2 52
finishes (making good tiling and paintwork elsewhere)
22 Vitreous china wash hand basin and built-in vanity (Credit R.................) No 12
23 Vitreous china WC pan with cistern (Credit R.................) No 11
24 Vitreous china urinal (Credit R.................) No 6
25 Wash trough (Credit R.......................) No 5
26 Floor drain and sealing pipes No 5
"Lafarge" Universal Snap-on Stringer Access floor system (SS) with type 2 panel, system pedestal with freestanding head and high
pressure laminate panel with integral trim edge (Colour: Grey Dust)
32 Access floor where drywall removed or to be installed M 182
A : 0b : 0c : 182d : 0
2,5mm Thick vinyl sheeting to match existing fixed with approved adhesive to manufacturer's specifications
33 On floors in patches M2 2
A : 2b : 0c : 0d : 0
12 Slabs exceeding 250mm and not exceeding 500mm thick propped up exceeding 1,5m but not exceeding 3,5m high M2 52
19 Mild steel reinforcement (R20 to R32) T 0
20 Mild steel reinforcement (R8 to R16) T 0
R12 Dowel,700mm long @ 500mm c/c drilled and epoxied into existing structure with 450mm exposed portion to be dipped in bitumen prior
21 No 28
to casting
One layer of 375 micron "Consol Plastics Brikgrip DPC" embossed damp proof course
1 In walls M2 75
One layer of 250 micron "Consol Plastics Gunplas USB Green" waterproof sheeting sealed at laps with "Gunplas Pressure Sensitive
Tape"
2 Under surface beds M2 133
3 Between brick walls (bond breaker) M2 23
Backing board for two coat hooks, 400mm long x 75mm high x 20mm thick plugged to drywall with 10 x 33 plug wing toggles (coat hooks
9 No 12
elsewhere) (as per architect's detail drawing)
Slatted shelving, seats, etc., 800mm long x 376mm wide formed of two 100 x 38mm and two 50 x 38mm slats spaced 25mm apart and two
10 No 12
38 x 50mm side cleats, screwed to steel framing including holes (steel framing elsewhere) (as per architect's detail drawing)
Kitchen Worktop - 32mm thick Rustenburg Black granite worktop, with 25mm diameter bull nose edge and cut-out for sink unit
Cupboard doors, sides, bottom, shelves & backplate- 16 Melamine cupboard doors etc.
Colours: doors - Vancouver Maple
Sink unit - Grade 304 18/10 polished stainless steel double end bowl drop-in sink (Code: 811024), overall size 1500 x 460mm with two 340 x
370 x 149mm deep bowls, fitted onto cupboard (elsewhere specified) including PVC traps (traps elsewhere specified) with 90mm waste
fitting.
Hot water supply - Kwikot Kwikboil 10 point of use 7.5 litre electric thermostat regulated overbasin water heater, plugged and screwed to
wall and connected to 230V electrical power supply, all in accordance to manufacturer's recommendations (see architect's drawing/s
accompanying these bills of quantities)
Sink cabinet cupboard, 2,800mm long x 600mm wide x 900mm high with top, sides, bottom, division, shelf, back, single hinged doors,
13 double hinged doors, drawer units and dividing framework (including sink cut-out, but sink elsewhere) complete to architect's details (see No 1
architect's drawings no. 24002-A-1.02)
Sink corner cabinet cupboard, 2,850mm and 1,650mm long x 600mm wide x 900mm high with top, sides, bottom, division, shelf, back,
14 single hinged doors, double hinged doors, drawer units and dividing framework (including sink cut-out, but sink elsewhere) complete to No 5
architect's details (see architect's drawings no. 24002-AB-101)
Hangers, suspension grids, "lay-in" panels, etc are to be in accordance with the manufacturers' recommendations Electrical light fittings,
diffusers, panels etc are generally "lay-in" units of the same dimensions as the suspension grid described and allowance must be made in
the rates accordingly for their support inclusive of any flexibility in setting out that ma 600 x 600 x 20mm Thick "Armstrong - Optima" acoustic
gypsum ceiling panels laid on white enamel finished T-suspension system as Prelude
XL2/TL 24mm, comprising main tees, cross tees, necessary hangers, grids, etc. all suspended with galvanised hangers at
2 Ceilings suspended exceeding 1m and not exceeding 2m below steel roof trusses M2 48
1,200 x 600 x 20mm Thick "Armstrong - Optima" acoustic gypsum ceiling panels laid on white enamel finished T-suspension
system as Prelude XL2/TL 24mm, comprising main tees, cross tees, necessary hangers, grids, etc. all suspended with galvanised
hangers at centres not exceeding 1,200mm and all in accordance with manufacturer's specifications
3 Ceilings suspended exceeding 1m and not exceeding 2m below steel roof trusses M2 106
600 x 600 x 10mm Thick "Armstrong - vinyl clad Greenboard" ceiling panels laid on white enamel finished T-suspension system as
Prelude XL2/TL 24mm, comprising main tees, cross tees, necessary hangers, grids, etc. all suspended with galvanised hangers at
centres not exceeding 1,200mm and all in accordance with manufacturer's specifications
4 Ceilings suspended exceeding 1m and not exceeding 2m below steel roof trusses M2 137
1,200 x 600 x 10mm Thick "Gyproc SoundBloc" ceiling panels laid on white enamel finished T- suspension system as Prelude
XL2/TL 24mm, comprising main tees, cross tees, necessary hangers, grids, etc. all suspended with galvanised hangers at centres
not exceeding 1,200mm and all in accordance with manufacturer's specifications
5 Ceilings suspended exceeding 1m and not exceeding 2m below steel roof trusses M2 68
"GypRoc - SoundBloc" panels to soffits
6 15mm "Gyproc SoundBloc" boarding plugged M2 494
"GypRoc Drywall" or other approved partition systems
Partitions consisting of 63,5 x 35mm "Donn - UltraSTEEL Drywall" steel studs inserted at 600mm centres into 63,5 x 25mm "Donn -
UltraSTEEL Drywall" steel track at top and bottom clad on both sides as described, including additional studs as necessary at a Unless
otherwise described rates for partitions shall be deemed to include for a 125mm High x 10mm profiled "Smooth Edge" or other approved
brushed stainless steel in sharp cornered top finish skirtings to architects detail on both sides Wall paper and/or paint and varnish finishes
are given elsewhere "GypWall Duraline 63/F30S45" steel stud partitions with both sides clad with one layer of 15mm "Taper-edge
Rhinoboard"
8 Partitioning 2,720mm high with bottom track plugged and top track fixed to suspended ceiling tees M 41
9 Extra over partition 2,720mm high for vertical abutment, corner, T-intersection, etc. No 7
10 Extra over partition 2,720mm high for corner No 4
11 Partitioning 3,060mm high with bottom track plugged and top track fixed to suspended ceiling tees M 62
12 Extra over partition 3,060mm high for vertical abutment No 16
13 Extra over partition 3,060mm high for corner No 3
14 Extra over partition 3,060mm high for T-intersection No 1
"GypWall Duraline 63/F30S45" steel stud partitions with both sides clad with one layer of 15mm "Gyproc Moisture resistant Taper-
edge Rhinoboard"
15 Partitioning 2,720mm high with bottom track plugged and top track fixed to suspended ceiling tees M 34
16 Extra over partition 2,720mm high for vertical abutment, corner, T-intersection, etc. No 15
17 Extra over partition 2,720mm high for corner No 3
18 Extra over partition 2,720mm high for T-intersection No 9
19 Partitioning 3,060mm high with bottom track plugged and top track fixed to suspended ceiling tees M 6
20 Extra over partition 3,060mm high for vertical abutment No 4
21 Extra over partition 3,060mm high for corner No 2
"Saint Gobain Sound Block Duraline 63/F30S45" steel stud partitions with both sides clad with two layers of 15mm "Gyprock Block
board"
22 Partitioning 2,700mm high with bottom track plugged and top track fixed to suspended ceiling tees M 114
23 Extra over partition 2,700mm high for vertical abutment No 19
24 Extra over partition 2,700mm high for corner No 5
25 Extra over partition 2,700mm high for T-intersection No 11
26 Partitioning 2,750mm high with bottom track plugged and top track fixed to suspended ceiling tees M 7
27 Extra over partition 2,750mm high for vertical abutment No 2
28 Extra over partition 2,750mm high for corner No 1
29 Partitioning 2,805mm high with bottom track plugged and top track fixed to suspended ceiling tees M 27
30 Extra over partition 2,805mm high for vertical abutment No 5
31 Extra over partition 2,805mm high for corner No 2
32 Extra over partition 2,805mm high for T-intersection No 3
Extra over partition for window (standard approved aluminum windows frame with 6,8mm clear laminated safety fixed glass (as per
window specification / schedule)
33 Window type "Sidelight", 900mm wide x 2,350mm high No 9
34 Window type W01, 1,500mm wide x 1,500mm high No 1
35 Window type W02, 2,000mm wide x 1,225mm high No 2
36 Window type W01, 1,495mm wide x 3,060mm high No 4
44mm semi-solid core flush door 686 x 2,032mm high with masonite veneer both sides, concealed hardwood edges, concealed coathook
37 block and hung to and including aluminium door frame (to match existing) with one pair of 100mm steel hinges, fixing of ironmongery (see No 7
ironmongery elsewhere), additional studding, trimming, etc.
44mm semi-solid core flush door 760 x 2,032mm high with masonite veneer both sides, concealed hardwood edges, concealed coathook
38 block and hung to and including aluminium door frame (to match existing) with one pair of 100mm steel hinges, fixing of ironmongery (see No 5
ironmongery elsewhere), additional studding, trimming, etc.
44mm semi-solid core flush door 813 x 2,032mm high with masonite veneer both sides, concealed hardwood edges and hung to and
39 including aluminium door frame (to match existing) with one pair of 100mm steel hinges, fixing of ironmongery (see ironmongery elsewhere), No 5
additional studding, trimming, etc.
44mm semi-solid core flush door 900 x 2,450mm high with masonite veneer both sides, concealed hardwood edges and hung to and
40 including aluminium door frame (to match existing) with one pair of 100mm steel hinges, fixing of ironmongery (see ironmongery elsewhere), No 9
additional studding, trimming, etc.
44mm solid core flush door 813 x 2,032mm high with masonite veneer both sides, concealed hardwood edges and hung to and including
41 aluminium door frame (to match existing) with one pair of 100mm steel hinges, fixing of ironmongery (see ironmongery elsewhere), No 5
additional studding, trimming, etc.
40mm semi-solid flush double door 1,210 x 2,032mm high with masonite veneer on both sides and hardwood edge strips to vertical edges
42 hung to and including aluminium door frame (to match existing) with one pair of 100mm steel hinges, fixing of ironmongery (see ironmongery No 1
elsewhere), additional studding, trimming, etc.
Natural anodised glazed aluminium swing door type D03, 900mm wide x 2,100mm high with 6,8mm clear laminated safety glass swing door.
43 aluminium frame with 1.5 pair 100 butt hinges per leaf, as well as with lockset, pull handles, etc. (see Ironmongery trade for ironmongery) all M 8
to manufacturer's specification
Natural anodised glazed aluminium swing door type D02, 900mm wide x 2,450mm high with 6,8mm clear laminated safety glass swing door.
44 aluminium frame with 1.5 pair 100 butt hinges per leaf, as well as with lockset, pull handles, etc. (see Ironmongery trade for ironmongery) all No 1
to manufacturer's specification
Shopfront type D06, 2,600mm wide x 3,060mm high with glazed sliding door. fanlight and sidelight, as well as with and including lockset, pull
45 No 1
handles and 2x 18 Euro profile cyilnder all to manufacturer's specification
Shopfront type D05, 4,200mm wide x 3,060mm high with glazed sliding door and sidelights, as well as with and including lockset, pull
46 No 2
handles and 2x 18 Euro profile cyilnder all to manufacturer's specification
3,5mm Thick "Floorworx - Industrial" (colour: tbc) vinyl sheeting fixed with recommended adhesive and sealed as recommended, all
to manufacturer's specifications
1 On floors M2 956
1,6mm "GEZE" or other approved brushed stainless steel grade 304 push and kick plates
12 800 x 150mm Kick plate No 4
7 0,6mm Galvanised sheet metal flashing 450mm girth over parapet wall M 7
Note:
Epoxy powder coated drak bronze VP6113 matt aluminium windows glazed with minimum 6,76mm HPR (high penetration
resistance) clear laminated safety glass and plugged to brickwork or concrete
14 Window type W01, 2,000mm wide x 1,500mm high No 1
Natural anodised aluminium hinged shower door frame with 6.8mm laminated obscure safety glass to manufacturer's specifications
15 900 x 1,850mm Shower door and frame No 13
13 15 x 5mm Thick flat section brass dividing strips between different floor finishes M 49
Class 1 copper pipes
43 15mm Pipes M 290
44 22mm Pipes M 205
Extra over class 1 copper pipes for capillary fittings
45 15mm Fittings No 290
46 22mm Fittings No 205
0,6mm Galvanised sheet steel
50 1,600 x 600mm Drip tray for water heater, with 100mm high upstand all round with top edge bent over and with 50mm threaded outlet union No 1
6mm Silvered float glass copper backed mirrors with 10mm bevelled and polished edges holed for and fixed with chromium plated
dome capped mirror screws with rubber buffers to plugs in brickwork or concrete
1 Mirror 600 x 900mm high with four dome-head mirror screws No 9
Three coats "Plascon" wood preservative
7 On fittings M2 1
Open slatted shelves, seats, etc. of two 100 x 38mm and two 50 x 38mm slats spaced at 25mm apart (both sides measured over the full flat
8 area) M2 9
Three coats "Timberlife Satinwood 28" wood preservative
9 On doors M2 3
One coat "Plascon UC2/UC17" oil wood primer and two coats "Plascon Velvaglo VLO colour Y3-D2-2 Ivory Ridge" paint
10 On doors M2 322
50 mm diameter medium quality (SANS 62) black steel hose reel supply pipework including breaking in, elbows, fittings, hangers, offsets
2 m 50
around structure, etc.
3 25 mm diameter (horizontal main) medium quality (SANS 62) black steel hose reel supply pipework including breaking in, elbows, fittings,
M 60
hangers, offsets around structure, etc.
4 Hose reels with 30 metres of 25mm diameter approved hose and metal nozzle (not plastic) (Complete). No 2
5 5kg CO2 fire extinguishers fully installed on Varnished meranti backing boards No 1
6 9kg DCP fire extinguishers fully installed on Varnished meranti backing boards No 1
1 Single-Sided Statutory Emergency Signage Standard Signage (Installed, Complete - Suspended or Wall Mounted)
Supply, delivery, and installation of the statutory emergency signage installation in accordance with this document and SANS 1186 Parts 1
and 5 – including all perspex, hooks, chains and other fixing materials as required
Ground Floor Admin Building (Block A) - 2 pictogram (190 x 380) – E3, F13 etc. No. 2
Ground Floor Admin Building (Block A) - 3 pictogram (190 x 570) – F4 etc. No. 2
First Floor Admin Building (Block A) - 2 pictogram (190 x 380) – E3, F15 etc. No. 1
Ground Floor Admin Building (Block B) - 2 pictogram (190 x 380) – E3, F13 etc. No. 6
Ground Floor Admin Building (Block B) - 3 pictogram (190 x 570) – F4 etc. No. 3
First Floor Admin Building (Block B) - 2 pictogram (190 x 380) – E3, F13 etc. No. 6
First Floor Admin Building (Block B) - 3 pictogram (190 x 570) – F4 etc. No. 1
Ground Floor BOP Control Room - 2 pictogram (190 x 380) – E3, F13 etc. No. 7
Ground Floor BOP Control Room - 3 pictogram (190 x 570) – F4 etc. No. 3
Ground Floor FGC Control Room - 2 pictogram (190 x 380) – E3, F13 etc. No. 4
Ground Floor FGC Control Room - 3 pictogram (190 x 570) – F4 etc. No. 2
Ninth Floor C&I Workshop - 2 pictogram (190 x 380) – E3, F13 etc. No. 2
Ninth Floor C&I Workshop - 3 pictogram (190 x 570) – F4 etc. No. 1
Sixteenth Floor Production - 2 pictogram (190 x 380) – E3, F13 etc. No. 3
Sixteenth Floor Production - 4 pictogram (190 x 760) – F1 etc. No. 1
Sixteenth Floor PICS Control Room - 2 pictogram (190 x 380) – E3, F13 etc. No. 8
Sixteenth Floor PICS Control Room - 3 pictogram (190 x 570) – F4 etc. No. 1
Sixteenth Floor PICS Control Room - 4 pictogram (190 x 760) – F1 etc. No. 5
2 Double-Sided Statutory Emergency Signage (Installed, Complete)
Supply, delivery, and installation of the statutory emergency signage installation in accordance with this document and SANS 1186 Parts 1
and 5 – including all perspex, hooks, chains and other fixing materials as required
Ground Floor Admin Building (Block A) - 2 pictogram (190 x 380) – E1/E2 etc No. 2
Ground Floor Admin Building (Block A) - 3 pictogram (190 x 570) – F5/F6 No. 3
First Floor Admin Building (Block B) - 2 pictogram (190 x 380) – E1/E2 etc No. 1
Ground Floor BOP Control Room - 2 pictogram (190 x 380) – E1/E2 etc. No. 2
Ground Floor BOP Control Room - 3 pictogram (190 x 570) – F5/F6 etc. No. 3
Ground Floor FGC Control Room - 2 pictogram (190 x 380) – E1/E2 etc. No. 1
Ground Floor BOP Control Room - 3 pictogram (190 x 570) – F5/F6etc. No. 2
Ninth Floor C&I Workshop - 2 pictogram (190 x 380) – E1/E2 etc. No. 1
Ninth Floor C&I Workshop - 3 pictogram (190 x 570) – F5/F6 etc. No. 1
Sixteenth Floor Production - 4 pictogram (190 x 760) – F2/F2=3 etc. No. 1
Sixteenth Floor PICS Control Room - 3 pictogram (190 x 570) – F5/F6 etc. No. 1
600/1000V grade PVC insulated stranded copper power conductors drawn into conduit, trunking or power skirting
14 2,5 sq mm M 1000
15 4 sq mm M 2000
600/1000V grade PVC insulated stranded copper power conductors drawn into conduit, trunking or power skirting
36 2,5 sq mm M 200
37 4 sq mm M 400
600/1000V grade PVC insulated stranded copper power conductors drawn into conduit, trunking or power skirting
60 2,5 sq mm M 200
61 4 sq mm M 400
600/1000V grade PVC insulated stranded copper power conductors drawn into conduit, trunking or power skirting
83 2,5 sq mm M 1600
84 4 sq mm M 2000
108 16A - Single switch socket (SANS 164-1) Normal/Emergency/Essential No 12
109 16A - Single switch socket (SANS 164-2) Normal/Emergency/Essential No 12
110 16A Dedicated switched socket outlet (Isolated Earth) No 6
111 RJ45 data/telephone outlet No 10
132 16A - Single switch socket (SANS 164-1) Normal/Emergency/Essential No 16
133 16A - Single switch socket (SANS 164-2) Normal/Emergency/Essential No 16
134 16A Dedicated switched socket outlet (Isolated Earth) No 8
135 RJ45 data/telephone outlet No 18
155 16A - Single switch socket (SANS 164-1) Normal/Emergency/Essential No 34
156 16A - Single switch socket (SANS 164-2) Normal/Emergency/Essential No 34
157 16A Dedicated switched socket outlet (Isolated Earth) No 14
158 RJ45 data/telephone outlet No 26
206 Telegartner CAT7 Grey, S/FTPShielded, Unterminated LSZH Sheath M 50
Environmental
Source: Unpriced BOQ for Alterations and Additions to Existing Building Structures at Kusile Power Station 31.08.26.pdf"Franke" or other approved stainless steel
14 145 x 25 x 130mm Toilet roll holder manufactured from 0,9mm 18/10 stainless steel with satin finish plugged (ZF18) No 9
328 x 203 x 1162mm Recessed paper towel dispenser and waste bin combination manufactured from 18/10 1,2/1,5mm stainless steel with
15 satin finish with surface treatment - InoxPlus (anti-fingerprint), both parts with cylinder lock with standard key, paper towel dispenser with No 9
capacity of 300 to 400 towels, waste bin approximately 22 litres and including mounting kit (ZF09)
280mm Diameter x 500mm Inset mounted waste bin manufactured from 18/10 1,2/1,5mm stainless steel with satin finish and including
16 No 1
mounting kit
600 x 500 x 258mm "Franke model LDS" stainless steel drip sink with 50mm waste outlet, supply stainless steel bucket grid and angle
8 No 1
brackets fixed to wall, grade 304(18/10) stainless steel sink to comply with SABS 906
1,500 x 510mm Stainless steel double end bowl drop-in sink, bowl to be fitted to kitchen cupboard (cupboard elsewhere measured), grade
9 No 6
304(18/10) stainless steel sink to comply with SABS 906
"Lecico Comfort Round COMBOXDFL0SCSBE" or other approved vitreous china close coupled pan with matching dual flush cistern
10 No 9
complete with lid and fitments, with quality soft close seat
500 x 410 x 175mm Wide "Lecico Atlas code ALTBASWHU0500UE" basin and semi pedestal code "MADPEDSEM0000UE" or other
11 approved vitreous china basin with two tapholes or overflow, two 15mm "Ledimo SKU: FTP2A1LE-0GTO1" CP pillar taps, waste outlet, No 1
400mm long flexible connector pipes with angle valves, basin sealed in strict accordance to manufacturer’s specification
560 x 420 x 210mm "Lecico BS code ALTDUOUND0560UE" undermount basin or other approved vitreous china round vanity basin with no
12 tapholes or overflow, two 15mm "Ledimo SKU: FTP2A1LE-0GTO1" CP pillar taps, waste outlet, 400mm long flexible connector pipes with No 8
angle valves, basin sealed in strict accordance to manufacturer’s specification
410 x 665 x 315mm "Lecico BS60 ATLBOXUII0T60UE" vitreous china wall hung urinal with top inlet, back inlet fittings, 38mm CP domical
13 No 4
grating, spreader with 20mm diameter thread and to hanger brackets (flushing valve elsewhere)
14 1,200 x 800mm "Duravit D-Code" or other approved shower tray complete with waste and trap to manufacturer's specifications No 13
15 32mm Basin waste union No 9
16 38mm Bath or sink waste union No 21
28 Allow for bonding hot, cold waste pipes etc., as required by the applicable regulations of the supply authority and Engineers Specification Sum 1
52 Allow for bonding hot, cold waste pipes etc., as required by the applicable regulations of the supply authority and Engineers Specification Sum 1
76 Allow for bonding hot, cold waste pipes etc., as required by the applicable regulations of the supply authority and Engineers Specification Sum 1
Pics controlroom/c&i workshop 9 & 16 level
101 Allow for bonding hot, cold waste pipes etc., as required by the applicable regulations of the supply authority and Engineers Specification Sum 1
125 Allow for bonding hot, cold waste pipes etc., as required by the applicable regulations of supply authority and Engineers Specification. Sum 1
148 Allow for bonding hot, cold waste pipes etc., as required by the applicable regulations of supply authority and Engineers Specification. Sum 1
171 Allow for bonding hot, cold waste pipes etc., as required by the applicable regulations of supply authority and Engineers Specification. Sum 1
Description
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdfEskom Supplier Quality Management Specification (240-105658000, QM 58, Rev 3) sets out minimum quality requirements for all existing and potential suppliers and sub-suppliers. It defines quality criteria for selection, evaluation, vendor registration, management, monitoring, assessment, and auditing. The specification applies across Eskom Holdings SOC Ltd, its subsidiaries, and all procurement types (RFI, RFQ, RFP, contracts). Suppliers must develop, implement, maintain, and continually improve a QMS based on ISO 9001. The document includes normative references (ISO 9001, ISO 10005), informative references (ISO 9000, ISO 10006, ISO 9004, Eskom SHEQ Policy 32-727, Eskom Procurement Policy 32-1033, Eskom Procurement Procedure 32-1034, PPPFA, CIDB 1004, IAEA GS-R-3.1, SANS 10845-1, List of Tender Returnables 240-12248652), definitions (Component, Contract Quality Plan, Hold Point, Intervention Points, Inspection Agency, Level 1–3 Plant Items, Nonconformity, Quality Plan, Quality Control Plan, Requirement, Primary/Secondary Plant, Special Process, Supplier, Sub-supplier, Witness Point), abbreviations, roles and responsibilities (Eskom quality representative selects requirements via Form A; suppliers complete and sign Form A), monitoring process (audited per management system audit schedule), and related/supporting documents (supersedes all divisional supplier quality standards; includes Form A, CQP template, QCP/ITP template, Method Statement template).
Important Dates
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdf (unknown)The specification revision 3 was authorised on 17 October 2021. Next review date is October 2024. No tender-specific closing date, briefing, or site visit dates are stated in this document; those will be in the specific RFP/RFQ/RFI invitation.
Contact Information
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdf (unknown)Eskom Quality Management function is the point of contact for quality requirements. The specification was compiled by SA Sambo (Chief Advisor Quality Management), supported by P Dondashe (Middle Manager Quality Management), authorised by L Meyer (Acting Senior General Manager Quality Risk and Management Sustainability) and K Pather. No direct email, phone, or submission address is provided in this specification; tender-specific contacts will be in the invitation document.
Submission Guidelines
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdf (unknown)Bidders must complete and sign Form A (Tender and Contract Quality Requirements for Supplier Quality Management Specification 240-105658000/QM 58 and ISO 9001) and submit it with the other returnable documents listed in the List of Tender Returnables (document 240-12248652). The applicable quality category (1, 2, 3, or 4) will be indicated in Form A for the specific procurement. Only one category applies per tender. All returnable documents must be submitted as part of the bid response; omission or incomplete submission may lead to disqualification.
Evaluation Criteria
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdf (unknown)Suppliers are evaluated against four quality requirement categories defined in the specification. The Eskom quality representative selects the applicable category (1–4) and completes Form A accordingly. Category 1 requires a valid ISO 9001 certificate, latest internal/external audit reports with corrective actions, draft Contract Quality Plan (CQP), example Inspection and Test Plan (ITP)/Quality Control Plan (QCP), documented control of externally provided processes, roles/responsibilities/authorities, and management review records. Category 2 requires objective evidence of an implemented QMS (manual, policy, objectives, document control, internal audit, nonconforming output control, corrective action procedures), latest internal audit reports, draft CQP, example ITP/QCP, control of externally provided processes, roles/responsibilities, and management review records. Category 3 requires documented QMS information (manual, policy, objectives, document control, internal audit, nonconforming output control, corrective action), draft CQP, example ITP/QCP, control of externally provided processes, and roles/responsibilities. Category 4 requires a quality method statement based on ISO 9001, signed quality policy, quality objectives, control of externally provided processes, and project-specific roles/responsibilities/authorities. All categories require Form A completion and compliance with the List of Tender Returnables (240-12248652). Evaluation references CIDB 1004 Best Practice Guideline A4 and PPPFA.
Technical Specifications
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdf (unknown)This specification (240-105658000, QM 58, Rev 3) defines minimum quality requirements for all existing and potential Eskom suppliers and sub-suppliers. It applies across Eskom Holdings SOC Ltd divisions, subsidiaries, and all procurement types (RFI, RFQ, RFP, contracts for products and services). Suppliers must develop, implement, maintain, and continually improve a QMS based on ISO 9001 (latest revision). Normative references: ISO 9001, ISO 10005. Informative references: ISO 9000, ISO 10006, ISO 9004, Eskom SHEQ Policy (32-727), Eskom Procurement Policy (32-1033) and Procedure (32-1034), PPPFA, CIDB 1004, IAEA GS-R-3.1, SANS 10845-1, and List of Tender Returnables (240-12248652). Key definitions include Hold Point (work cannot proceed without Eskom written authorisation), Witness Point (inspection with formal notification, work may proceed if waived), Intervention Points (inspection, hold, surveillance, witness, review, verification), Special Processes (results cannot be fully verified before delivery), and plant item criticality Levels 1–3. Suppliers must manage sub-supplier quality, including QMS verification, audits, CQP/QCP reviews, nonconformity management, inspection/test plans, and risk management. Eskom reserves right to assess sub-supplier facilities. Suppliers must notify Eskom of QMS or staff changes affecting quality prior to implementation.
Methodology
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdfSuppliers must develop method statements for special processes (welding, coating, heat treatment, NDE, tube rolling, post-weld heat treatment) and special installation/fabrication procedures. Method statements require supplier review and acceptance prior to commencing manufacture. The Eskom Method Statement Template (240-126469599) is provided as a guideline. Quality Control Plans/Inspection and Test Plans must include detailed reference to procedures, standards, instructions, specifications with specific sections and pages. Preservation management programme requires documented work plans with performance evaluation. Sub-supplier inspection and testing protocols must include inspection checklists, report formats, report processing/distribution/retention schedules, nonconformity response tracking and resolution, FMECA reports, and HAZOP reports where applicable.
Experience & Qualifications
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdfPersonnel performing special processes (NDE, welding, coating, heat treatment, etc.) must be suitably qualified and, where legally required, registered with statutory bodies (e.g., radiographic workers for radiography). Personnel must be certified competent through internal training management and competency control procedures or external certification bodies (e.g., NDT) via accredited service providers per SETA requirements. All personnel performing quality-affecting activities must have identified and documented training needs, with training implemented per company procedures; certificates must meet SETA requirements (unit standard completed, accredited provider). Quality audits must be carried out by trained, accredited, and experienced personnel per documented procedures. Inspection personnel (including agency personnel) must be competent and qualified per Project Quality Personnel Qualification Specification. Welder qualifications (WQR, WPS, PQR) must meet specified Codes of Construction.
Quality Management
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdfPre-Contract Award: Supplier and sub-supplier QMS must conform to ISO 9001 (latest revision) and this specification. QMS must include documented information (quality manual, plans, procedures, work instructions, method statements, workflow documentation). Categories 1 and 2 require valid ISO 9001 certificate from accredited body unless excluded in tender returnables. Main supplier responsible for defining and managing sub-supplier quality assurance/control elements and ensuring sub-supplier programmes support Eskom requirements. Supplier must implement sub-supplier performance management programme covering QMS verification, audits/surveillances, CQP/QCP reviews, nonconformity/defect management, inspection/test plans, and risk management. Supplier must notify Eskom of QMS or staff changes affecting quality prior to implementation. Quality Plan: Minimum requirements per ISO 10005. Where specified in evaluation criteria or tender returnables, all products/services/processes must have documented Contract Quality Plan (CQP) and/or Quality Control Plan (QCP)/Inspection and Test Plan (ITP). CQP addresses quality assurance elements; QCP/ITP addresses quality control elements. Contract Quality Plan: Must comply with ISO 10005 and include records management (material tests, PMI, certifications), free access for inspection, final documentation submission prior to shipment, special processes (welding: WQR, WPS, PQR management; welder qualification to construction codes; special installation/fabrication procedures; personnel qualification for NDE, welding, coating, heat treatment; SETA-certified competency), training needs identification and implementation (SETA requirements), storage/preservation/maintenance instructions prior to receipt, sub-supplier quality monitoring by Eskom/agent, and CQP content requirements (QMS aspects applied, resources, communication channels, documents/records, management authority/responsibility, document list, contact details, monitoring/measurement procedures). CQPs must be submitted before initial kick-off or pre-fabrication meeting or manufacturing commencement, whichever earlier. Eskom CQP template provided as guideline. Quality Control Plan: Supplier must develop processes to monitor, verify, document quality. Sub-supplier QCPs/ITPs must cover all quality-control activities chronologically from contract review through commissioning and certification. Requirements include: all stages controlled by QCP/ITP with clear quality verifications and critical product/service controls; Eskom review/acceptance of QCP/ITP with insertion of hold/witness points before work; Eskom agreement for subsequent changes; ITP coverage of material certification, fabrication, in-process inspections, final acceptance tests, packaging, preservation, site acceptance, construction/erection, pre-commissioning/commissioning; sub-supplier activities performed under Eskom-accepted QCP/ITP; codes/standards/acceptance criteria available at work location in English; separate QCP/ITP per sub-supplier scope; supplier ultimately accountable for all sub-supplier QCPs/ITPs; Eskom right to select intervention points for oversight/surveillance/audits; signed ITPs/QCPs become contract addendums; QCP/ITP content requirements (contract number, order number, work area, description, unique number, operation sequence, specification/drawing/procedure references with criticality ratings, acceptance criteria with clause references, supplier/Eskom intervention points, sign-off provisions, inspection/test records). Sub-supplier QCPs/ITPs must include equipment/location descriptions, reference documents with specific sections/pages, acceptance criteria, certifying documents with Eskom numbering, inspection activity definitions (witness, hold, document review, verification), inspector qualifications, test procedures, acceptance criteria per tolerances, signed acceptance section, intervention points (factory acceptance, package acceptance, witness, hold). Quality kick-off meeting at contract start and each phase; 14 days' notice; competent inspection personnel per Project Quality Personnel Qualification Specification. Mandatory pre-inspection meetings convened by Eskom/agency/AIA. Eskom may appoint resident inspectors at supplier premises at no cost. Eskom may appoint any AIA/inspection agency; supplier may not object. Eskom QCP/ITP template provided as guideline.
Compliance Requirements
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdf (unknown)Suppliers must have a QMS conforming to ISO 9001 (latest revision). Depending on the applicable category (1–4), a valid ISO 9001 certificate from an accredited certification body is required (Categories 1 and 2 explicitly; Categories 3 and 4 require documented evidence of QMS compliance). Compliance with Eskom Procurement and Supply Chain Management Policy (32-1033) and Procedure (32-1034) is required. PPPFA applies for preferential procurement. CIDB 1004 guideline referenced for quality evaluation in tenders. SANS 10845-1 applies for construction procurement. Suppliers must complete Form A and submit returnables per the List of Tender Returnables (240-12248652). No specific B-BBEE level, CIDB grading, CSD registration, or tax clearance requirements are stated in this specification; those will be in the specific tender invitation.
Health & Safety
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdfThe specification references Eskom SHEQ Policy (32-727) and IAEA Safety Standard GS-R-3.1 as informative references. No specific health and safety requirements, safety plans, or HSE compliance details are defined in this quality management specification; these would be addressed in separate SHEQ specifications or the specific tender documents.
Contractual Terms
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdfStandard conditions include: Rights of Access — Eskom and its agents have free and unrestricted access to supplier and sub-supplier premises, records, and personnel for inspection, audit, and expediting. Eskom Rights to Information — Eskom may request any quality-related information, documentation, or records at any time. Preservation — Supplier must establish a preservation management programme covering all materials, equipment, and components (including valves, electrical motors, rotating equipment, piping, instrumentation, flange faces, gaskets, coatings, insulation). Programme must include special precautions (periodic shaft rotation, engine turnover, lubrication), documented preservation requirements in purchase orders and work authorisations, sub-supplier input documentation, communication to project functional areas, clear responsibility designation, oversight at all project stages, and free Eskom access to preservation records. Quality Audits — Eskom may conduct audits at supplier and sub-supplier facilities; audits performed by trained, accredited, experienced personnel per documented procedures. Management of Nonconformities — Eskom-identified nonconformities must be addressed through documented corrective action processes. Special Processes — Processes where results cannot be verified before delivery (e.g., welding, NDE, coating, heat treatment) require qualified personnel, certified per SETA or statutory requirements, with records maintained. Welder qualifications (WQR, WPS, PQR) must meet specified construction codes. Eskom may appoint resident quality inspectors at supplier/sub-supplier premises at no cost to Eskom. Eskom may appoint any Approved Inspection Authority (AIA) or inspection agency; supplier may not object or hinder. Signed QCPs/ITPs become contract addendums. Quality kick-off meetings required with 14 days' notice. Mandatory pre-inspection meetings convened by Eskom or its agency.
Section
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdfQuality evaluation is structured around four supplier categories (1–4) selected by the Eskom quality representative per procurement. Only one category applies per tender. Category 1 (highest): valid ISO 9001 certificate, latest internal/external audit reports with corrective actions, draft CQP, example ITP/QCP, documented control of externally provided processes, roles/responsibilities/authorities, management review records. Category 2: objective evidence of implemented QMS (manual, policy, objectives, document control, internal audit, nonconforming output control, corrective action procedures), latest internal audit reports, draft CQP, example ITP/QCP, control of externally provided processes, roles/responsibilities, management review records. Category 3: documented QMS information (manual, policy, objectives, document control, internal audit, nonconforming output control, corrective action), draft CQP, example ITP/QCP, control of externally provided processes, roles/responsibilities. Category 4 (lowest): quality method statement based on ISO 9001, signed quality policy, quality objectives, control of externally provided processes, project-specific roles/responsibilities/authorities. All categories require Form A completion and compliance with List of Tender Returnables (240-12248652). Evaluation references CIDB 1004 Best Practice Guideline A4 for evaluating quality in tender submissions.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Address
Kusile Power Station - eMalahleni - Witbank - 1035
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
22
Last checked
01 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
A practical guide for small and medium building contractors on winning government tenders for schools, clinics, housing, and municipal buildings in South Africa.
How established construction firms use Joint Ventures with EMEs and QSEs to meet B-BBEE preferential procurement targets and access set-aside contracts.
Everything South African construction contractors need to know about how procurement officers verify cidb grades: what gauteng contractors must ensure is correct — april 2026 update — covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
How small and medium construction contractors use Joint Ventures to combine CIDB grades, win larger infrastructure projects, and grow beyond their current grading ceiling.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Construction of buildings. Unlock full pricing strategies, bid frequency, and historical win rates.