Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Gourikwa Power Station Mossel Bay - Mossel Bay - Mossel Bay - 6500
Organization Type
GOVERNMENT
Published
23 Sept 2026
OCDS Reference
ocds-9t57fa-171565
ESKOM requires corrosion protection services on an 'as and when required' basis across eleven peaking sites for a five-year period. The sites include gourikwa and ankerlig gas turbines, gariep, vanderkloof and ncora hydropower, ingula, drakensberg and palmiet pumped storage schemes, sere wind farm, port rex and acacia aeroderivative. Bidders must submit a comprehensive set of mandatory OHS returnables, including a signed acknowledgement of eskom's OHS requirements, an OHS plan, detailed OHS costing, a baseline risk assessment, a valid coida letter of good standing, a ceo-signed OHS policy, and evidence of OHS competency for key personnel. The most consequential consideration is meeting the strict OHS competency requirements for the contractor site supervisor and safety officer, as failure to do so will result in a 'not recommended' evaluation.
Mandatory OHS returnables: Submit Annexure B (signed acknowledgement of Eskom's OHS legal and other requirements), an OHS Plan addressing project risks, detailed OHS costing (broken down, not lump sum), a Baseline OHS Risk Assessment (BRA) with methodology, a valid Letter of Good Standing (COIDA or equivalent), an OHS policy signed by the CEO complying with OHS Act Section 7, and OHS competency evidence (CVs, qualifications, certificates).
Contractor Site Supervisor competency: Must have Hazard Identification and Risk Assessment (HIRA) training, incident investigation training, supervisor training, and legal liability training.
Contractor Safety Officer competency: Must have an OHS Diploma, HIRA training, incident investigation training, legal liability training, ISO 45001:2018 implementation training, and a minimum of 2 years' work experience.
Evaluation: The OHS evaluation template (Annexure C1) determines if the bidder is 'recommended' or 'not recommended'; all returnables must be submitted to be considered.
Scope: Corrosion protection services on an 'as and when required' basis for eleven Eskom peaking sites over a 5-year period, including gas turbine, hydropower, pumped storage, wind farm, and aeroderivative sites.
Closing date: 23 October 2026 at 10:00 (submission method and address not specified in the document).
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Date & Time
Friday, 23 October 2026 - 10:00
Venue
Gourikwa Power Station Mossel Bay
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Categories
Request for Bid(Open-Tender)
Gourikwa Power Station Mossel Bay - Mossel Bay - Mossel Bay - 6500
AI Document Analysis Stages
Description
Source: Peaking OHS Baseline risk assessment - Rev.6 2025.04.30.xlsx23 Sept
2026
Tender Published
Tender was published
20 Nov
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Attachment 9- 32-37_Management_of_Substance_Abuse_in_the_Workplace.pdf
Analysis completed but response format was invalid
Work at height standard (Doc 32-418).pdf
Work at height standard (Doc 32-418).pdf
Attachment 9- 32-95_Occupational_Health_and_Safety_Incident_Management_Procedure.pdf
Corrosion protection services on an 'as and when required' basis for eleven Eskom peaking sites in the Western Cape for a five-year period, closing 23 October 2026 at 10:00 GMT+0000.
E3599GXPOU - Invitation to Tender (ITT) - Corrosion Protection Services on an 'As and When Required' Basis for 11 Eskom Peaking Sites.pdf
Eskom Holdings SOC Ltd invites tenders for corrosion protection services on an 'as and when required' basis across eleven peaking sites — Gourikwa and Ankerlig gas turbine, Gariep, Vanderkloof and Ncora hydropower, Ingula, Drakensberg and Palmiet pumped storage, Sere wind farm, Port Rex and Acacia aeroderivative — for a five-year period under a single NEC3 Term Service Contract.
Acknowledgement Form Life-saving Rules Rev 3 Exp 2030.pdf
Eskom requires corrosion protection services on an 'as and when required' basis for eleven peaking sites across the Western Cape, including gas turbine, hydropower, pumped storage, wind farm, and aeroderivative facilities, for a contract period of five years.
Peaking OHS Baseline risk assessment - Rev.6 2025.04.30.xlsx
Eskom requires corrosion protection services on an 'as and when required' basis across eleven peaking sites in the Western Cape, including gas turbine, hydropower, pumped storage, wind, and aeroderivative facilities, for a five-year period. The scope covers activities such as surface preparation, coating application, and related maintenance work, with strict adherence to occupational health and safety risk assessments.
Annexure B_ H&S Acknowldgement Form_240-77471499.pdf
Eskom requires corrosion protection services on an 'as and when required' basis across eleven peaking sites in the Western Cape, including gas turbine, hydropower, pumped storage, wind, and aeroderivative facilities, for a five-year period. The contract will be governed by strict Eskom Occupational Health and Safety (OHS) requirements, with penalties for non-compliance and no compensation for OHS-related work stoppages.
Attachment 7 - SDLI Strategy Setting Template for Bidders - Corrosion Protection Services.pdf
Eskom requires corrosion protection services on an 'as and when required' basis across eleven peaking power sites in the Western Cape, including gas turbine, hydropower, pumped storage, wind, and aeroderivative facilities. The contract runs for 60 months and includes mandatory local content, CIDB skills development, and SDL&I commitments.
Attachment 6 - Tender Evaluation Strategy for Peaking Corrosion Protection.pdf
Eskom requires corrosion protection services on an 'as and when required' basis across eleven peaking generation sites in the Western Cape, including gas turbine, hydropower, pumped storage, wind and aeroderivative facilities. The contract runs for five years and covers corrosion assessments, coating application, surface preparation, structural steel rehabilitation, tank and piping remediation, inspection and testing, and quality control. Tenderers must pass mandatory criteria and achieve a minimum 70% weighted technical score to be considered.
OHS Tender Evaluation Template (Annexure C1)Corrosion.pdf
Eskom requires corrosion protection services on an 'as and when required' basis across eleven peaking sites in the Western Cape, including gas turbine, hydropower, pumped storage, wind farm, and aeroderivative facilities, for a five-year period. The contract is classified as high risk for occupational health and safety, and bidders must submit a comprehensive OHS tender returnable pack.
32-726-02T High Risk OHS Requirements for Corrosion Protection Services on an 'As and When Required' Basis.pdf
Eskom Generation requires corrosion protection services on an 'as and when required' basis across eleven peaking sites in the Western Cape and other provinces, including gas turbine, hydropower, pumped storage, and wind facilities. The five-year contract covers corrosion assessment, coating application, remediation, and repair of degraded components in atmospheric, industrial, coastal, freshwater, and hydro-mechanical environments.
Employees__Right_of_Refusal_to_Work_in_Unsafe_Situations_Procedure.pdf
Eskom requires corrosion protection services on an 'as and when required' basis across eleven peaking sites in the Western Cape, including gas turbine, hydropower, pumped storage, wind, and aeroderivative facilities, for a five-year period. The contract covers sites such as Gourikwa, Ankerlig, Gariep, Vanderkloof, Ncora, Ingula, Drakensberg, Palmiet, Sere, Port Rex, and Acacia.
Attachment 4 - Corrosion Protection Services Term Service contract.pdf
Eskom requires corrosion protection services on an as-and-when-required basis across eleven peaking power stations (Sere Wind Farm, Gourikwa, Ankerlig, Acacia, Ingula, Drakensberg, Palmiet, Gariep, Vanderkloof, Port Rex and Ncora) under an NEC3 Term Service Contract (TSC3) for a five-year period. The contract is a priced contract with a price list, task orders, and low service damages, with a starting date of 1 December 2026.
Acknowledgement Form Life-saving Rules Rev 3 Exp 2030.docx
Eskom requires corrosion protection services on an 'as and when required' basis across eleven peaking sites in the Western Cape, including gas turbine, hydropower, pumped storage, wind farm, and aeroderivative facilities, for a contract period of five years.
Attachment 5 - Eskom_Corrosion Protection Contract - NEC3_TSC_Per Station_Price Lists.pdf
Eskom requires corrosion protection services on an 'as and when required' basis for eleven peaking sites in the Western Cape, including gas turbine, hydropower, pumped storage, wind farm, and aeroderivative plants, under an NEC3 Term Service Contract for a period of five years. The tender uses a schedule of rates with nine priced bills covering preliminary and general items, assessment and NDT, access and containment, surface preparation, coatings and linings, structural and piping repairs, station-specific works, logistics and emergency call-outs, and quality and handover.
OHS Tender Evaluation Template (Annexure C1)Corrosion.pdf
Eskom seeks a contractor for corrosion protection services on an as-and-when-required basis across eleven peaking sites in the Western Cape, including gas turbine, hydropower, pumped storage, wind, and aeroderivative facilities, for a five-year period. The tender includes a high-risk OHS evaluation requiring detailed safety submissions.
Attachment 8 - 240-125473040 Guideline for Selection Criteria Rev1_signed.pdf
Analysis completed but response format was invalid
Attachment 9- 240-62946386_Driver_and_Vehicle_Safety_Management_Procedure.pdf
Corrosion protection services on an 'as and when required' basis for eleven Eskom peaking sites over a 5-year period in the Western Cape.
PPE NON COMPLIANCE MEMO.pdf
Corrosion protection services on an as-and-when-required basis for eleven Eskom peaking sites for a period of five years.
Attachment 8 - 240-68099512 Form A_Cat 3_ Rev 9.pdf
Eskom requires corrosion protection services on an as-and-when-required basis for eleven peaking sites over a five-year period. The sites include Gourikwa and Ankerlig gas turbines, Gariep, Vanderkloof and Ncora hydropower, Ingula, Drakensberg and Palmiet pumped storage schemes, Sere wind farm, Port Rex and Acacia aeroderivative plants.
Acknowledgement Form Life-saving Rules Rev 3 Exp 2030.docx
Corrosion protection services are required on an 'as and when required' basis for eleven Eskom peaking sites for a period of five years. The sites include Gourikwa and Ankerlig gas turbines, Gariep, Vanderkloof and Ncora hydropower, Ingula, Drakensberg and Palmiet pumped storage schemes, Sere wind farm, Port Rex and Accacia aeroderivative. Bidders must acknowledge and adhere to Eskom's Life-saving Rules.
Attachment 1 - E-Tenderers E-Tendering Training Acknowledgement Form (1).pdf
Eskom requires corrosion protection services on an 'as and when required' basis across eleven peaking sites in the Western Cape, including gas turbine, hydropower, pumped storage, wind, and aeroderivative facilities, for a contract period of five years.
Attachment 9- 32-37_Management_of_Substance_Abuse_in_the_Workplace.pdf
Eskom requires corrosion protection services on an 'as and when required' basis for eleven peaking sites across the Western Cape, including gas turbine, hydropower, pumped storage, wind, and aeroderivative facilities, for a five-year period. The tender is open until 23 October 2026.
Occupational_Health_and_Safety_Risk_Assessment_Procedure.pdf
Corrosion protection services are required on an as-and-when-required basis for eleven Eskom peaking sites for five years. The sites include Gourikwa and Ankerlig gas turbine, Gariep, Vanderkloof and Ncora hydropower, Ingula, Drakensberg and Palmiet pumped storage schemes, Sere wind farm, Port Rex and Accacia aeroderivative. Offers must be submitted by 23 October 2026 at 10:00.
Acknowledgement Form Life-saving Rules Rev 3 Exp 2030.pdf
Analysis completed but response format was invalid
Attachment 3 - 167A-20899 SOW Corrosion Protection_.pdf
The department requires corrosion protection services on an 'as and when required' basis for eleven Eskom peaking sites across the Western Cape for a five‑year period, covering gas turbine, hydro, pumped storage, wind farm and aeroderivative stations.
Life-Saving_Rules Standard.pdf
Eskom is procuring corrosion protection services on an 'as and when required' basis for eleven (11) peaking sites — Gourikwa & Ankerlig Gas Turbine, Gariep, Vanderkloof & NCora Hydroelectric, Ingula, Drakensberg & Palmiet Pumped Storage Schemes, Sere Wind Farm, Port Rex and Accacia Aeroderivative — over a 5-year period. The tender closes on 23 October 2026 at 10:00 and is listed under Western Cape.
Attachment 8 - 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.pdf
Eskom requires corrosion protection services on an as-and-when-required basis for eleven peaking sites across gas turbine, hydropower, pumped storage, wind farm and aeroderivative facilities for a five-year period.
Eskom_Personal_Protective_Equipment_(PPE).pdf
Eskom is procuring corrosion protection services on an 'as and when required' basis for eleven (11) peaking sites — including Gourikwa & Ankerlig Gas Turbine, Gariep, Vanderkloof & NCora Hydropower, Ingula, Drakensberg & Palmiet Pumped Storage Schemes, Sere Wind Farm, Port Rex and Accacia Aeroderivative — for a period of 5 years. The closing date is 23 October 2026 at 10:00 (CAT). The province listed is Western Cape.
Annexure B_ H&S Acknowldgement Form_240-77471499.pdf
Corrosion protection services on an as-and-when-required basis for eleven Eskom peaking sites across multiple provinces for a five-year period. The sites include gas turbine, hydropower, pumped storage, wind farm, and aeroderivative facilities.
32-726~1.PDF
This tender seeks Corrosion Protection Services for eleven ESKOM peaking sites (including power stations, pumped storage schemes, and wind farms) in the Western Cape province of South Africa, covering a five-year period on an 'as and when required' basis.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
EskomWin Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 1 100 000
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
The document provided is an Occupational Health and Safety Baseline Risk Assessment template for Sere Wind Farm and Small Hydros stations. It lists activities, hazards, risks, and controls for operations at these sites. No tender-specific description is available in the provided text.
Evaluation Criteria
Source: Peaking OHS Baseline risk assessment - Rev.6 2025.04.30.xlsx (unknown)Bidders must be registered on the Central Supplier Database (CSD).
Bidders must hold a valid tax clearance certificate (SARS TCS or tax pin).
Bidders must comply with the Occupational Health and Safety Act, 1993 (Act No. 85 of 1993) and Eskom's safety procedures.
Bidders must complete and submit all required National Treasury standard forms, including SBD 1 (Invitation to Bid), SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim), SBD 8 (Declaration of Bidder's Past Supply Chain Management Practices), and SBD 9 (Certificate of Independent Bid Determination).
Bidders must provide a B-BBEE certificate or sworn affidavit to claim preference points.
Bidders must demonstrate capacity and capability to perform corrosion protection services at multiple sites across the Western Cape and other provinces.
Technical Specifications
Source: Peaking OHS Baseline risk assessment - Rev.6 2025.04.30.xlsx (unknown)The document provided is an Occupational Health and Safety Baseline Risk Assessment template for Sere Wind Farm and Small Hydros stations, not the tender specification. It lists activities, hazards, risks, and controls for operations at these sites. No tender-specific technical specifications are available in the provided text.
Compliance Requirements
Source: Peaking OHS Baseline risk assessment - Rev.6 2025.04.30.xlsx (unknown)Bidders must be registered on the Central Supplier Database (CSD).
Bidders must have a valid tax clearance certificate (SARS TCS or tax pin).
Bidders must comply with the Occupational Health and Safety Act, 1993 (Act No. 85 of 1993) and Eskom's safety procedures.
Bidders must submit a B-BBEE certificate or sworn affidavit to claim preference points.
Bidders must complete and submit all required National Treasury standard forms, including SBD 1, SBD 4, SBD 6.1, SBD 8, and SBD 9.
Description
Source: Attachment 4 - Corrosion Protection Services Term Service contract.pdfCorrosion protection services at 11 Eskom peaking power stations on an 'as and when required' basis for a 5-year period. The contract is a NEC3 Term Service Contract (TSC3) with Option A (priced contract with price list).
Important Dates
Source: Attachment 4 - Corrosion Protection Services Term Service contract.pdf (unknown)Closing date: 23 October 2026 at 10:00 (from tender record).
Starting date of contract: 01 December 2026.
Service period: 5 years.
No briefing or site visit dates are stated in the provided document.
Contact Information
Source: Attachment 4 - Corrosion Protection Services Term Service contract.pdf (unknown)Employer representative:
Service Manager:
Employer registered office:
Megawatt Park, Maxwell Drive, Sandton, Johannesburg
Submission Guidelines
Source: Attachment 4 - Corrosion Protection Services Term Service contract.pdf (unknown)Returnable documents:
Submission method: not stated in the provided document.
Disqualification risks:
Evaluation Criteria
Source: Attachment 4 - Corrosion Protection Services Term Service contract.pdf (unknown)Evaluation stages and scoring split are not stated in the provided document.
Mandatory requirements:
Preference point system (80/20 or 90/10) is not stated in the provided document.
Technical Specifications
Source: Attachment 4 - Corrosion Protection Services Term Service contract.pdf (unknown)Scope of work:
Employer's objectives:
Experience & Qualifications
Source: Attachment 4 - Corrosion Protection Services Term Service contract.pdfNo specific experience or key personnel qualifications are stated in the provided document. However, the Contractor must provide competent personnel for specialised corrosion protection activities; failure to do so attracts low service damages of R10,000 per occurrence.
Quality Management
Source: Attachment 4 - Corrosion Protection Services Term Service contract.pdfQuality requirements are defined in the Scope of Work (Part C3), including quality assurance requirements and Category 3 quality requirements. The Contractor must comply with approved specifications, method statements, and coating manufacturer's requirements. Inspection and test records, including surface profile, environmental readings, and dry film thickness (DFT) results, must be submitted. Non-compliance with quality requirements attracts low service damages as per the service level table.
Pricing Schedule
Source: Attachment 4 - Corrosion Protection Services Term Service contract.pdfPricing is under NEC3 TSC3 Option A (priced contract with price list). The price list is in Part C2, with separate price lists for each of the 12 sites (C2.2A to C2.2L). Items may be priced as lump sums or as rates multiplied by expected quantities. The offered total of the Prices (exclusive of VAT) must be stated in the Form of Offer and Acceptance. Prices are fixed for the first year; from Year 2, they are adjusted using SEIFSA indices (15% CPI, 65% labour, 5% L2a, 15% non-adjustable). Payment is based on the Price for Services Provided to Date, assessed between the 25th and 27th of each month or after Task Order completion.
Financial Requirements
Source: Attachment 4 - Corrosion Protection Services Term Service contract.pdf (unknown)Pricing format:
Price adjustment:
Payment terms:
Securities and guarantees:
Insurance:
Limitation of liability:
Compliance Requirements
Source: Attachment 4 - Corrosion Protection Services Term Service contract.pdf (unknown)Mandatory registrations:
B-BBEE obligations:
Health and safety:
Asbestos:
Ethics and integrity:
Other conditions:
Health & Safety
Source: Attachment 4 - Corrosion Protection Services Term Service contract.pdfHealth and safety obligations:
Environmental
Source: Attachment 4 - Corrosion Protection Services Term Service contract.pdfEnvironmental obligations:
Section
Source: Attachment 4 - Corrosion Protection Services Term Service contract.pdfNo additional evaluation criteria are stated in the provided document.
Evaluation Criteria
Source: Acknowledgement Form Life-saving Rules Rev 3 Exp 2030.docx (unknown)Bidders must sign and submit the Acknowledgement Form for Eskom's Life-saving Rules (240-63942960 Rev 3). Compliance with these rules is a condition of employment and applies to all contractor personnel entering Eskom sites.
Description
Source: 32-726~1.PDF (unknown)Project Name: Corrosion Protection Services on an 'As and When Required' Basis.
Project Address: Gourikwa Power Station, Ankerlig Power Station, Ingula Pumped Storage Scheme, Drakensberg Pumped Storage Scheme, Palmiet Pumped Storage Scheme, Gariep Hydropower Station, Vanderkloof Hydropower Station, and Sere Wind Farm.
Scope of the project: Corrosion assessment/survey, corrosion protection system remediation, corrosion protection system rehabilitation, corrosion protection coating application, repair/replacement of degraded components, exposed to atmospheric, industrial, coastal, freshwater and hydro-mechanical environments.
Important Dates
Source: 32-726~1.PDF (unknown)Closing date: 23 October 2026 at 10:00
Briefing session: Not stated in the document.
Site visit: Not stated in the document.
Contact Information
Source: 32-726~1.PDF (unknown)Eskom Safety Representative
Contract Manager/End User
Submission address: Not stated in the document.
Service/delivery address: Gourikwa Power Station, Ankerlig Power Station, Ingula Pumped Storage Scheme, Drakensberg Pumped Storage Scheme, Palmiet Pumped Storage Scheme, Gariep Hydropower Station, Vanderkloof Hydropower Station, Sere Wind Farm.
Submission Guidelines
Source: 32-726~1.PDF (unknown)Returnable documents: all completed and signed forms must be submitted with the bid. Required forms include:
Disqualification risks:
Evaluation Criteria
Source: 32-726~1.PDF (unknown)Bidders must comply with the OHS Act and relevant South African legislation, hold a valid Section 37(2) agreement, meet CSD registration and tax clearance requirements, achieve a minimum B-BBEE level, possess CIDB grading for construction, maintain CIPC registration for professionals, comply with Eskom Life-Saving Rules (zero tolerance for intoxication, proper electrical isolation), and provide a competent workforce with appropriate training and qualifications.
Evaluation stages:
Minimum qualifying score: Not stated in the document.
Technical Specifications
Source: 32-726~1.PDF (unknown)Scope of work: Corrosion protection services on an 'as and when required' basis for eleven (11) Eskom peaking sites for a period of 5 years.
Project sites:
Work includes:
Building envelope and structural repairs:
Methodology
Source: 32-726~1.PDF (unknown)The scope of work includes planned, corrective, reactive, and emergency maintenance, corrosion protection during storage, repair/replacement of defective components, corrosion inspections/assessments, identifying coating failures, specifying suitable products, repairing degraded coatings, reinstating protection systems, sealing water ingress, repairing galvanic/crevice corrosion defects, roofing/waterproofing repairs, painting/corrosion protection, doors/windows/walkways repairs, piping/supports repairs.
Method statements and safe work procedures must be written for new or changed jobs, new equipment or substances, and tasks with identified hazards.
Experience & Qualifications
Source: 32-726~1.PDF (unknown)The main contractor and appointed contractors must have appropriate qualifications, certificates, and employees should always be under competent supervision. The contractor health and safety officer must have HIRA, incident investigation training, legal liability training, knowledge and understanding of ISO 45001, a minimum of 2 years work experience, and an OHS Diploma. The contractor health and safety officer must submit a weekly report to Eskom safety department from daily plant walks (when applicable) and conduct monthly safety internal audits of sub-contractors, submitting reports and corrective actions with root causes of all identified deviations (when applicable).
Quality Management
Source: 32-726~1.PDF (unknown)Quality control requirements include DFT verification, submission of QCP/ITP and method statements, and monitoring of climate conditions during coating applications. The contractor must use skilled and qualified supervision, inspectors, and applicators. Surface preparation must include mechanical cleaning, abrasive blast cleaning where approved, salt and oil contamination removal, and application of coating systems.
Pricing Schedule
Source: 32-726~1.PDF (unknown)Pricing format: Not stated in the document. Costing for OHS must be itemised based on the overall scope of work, including training, PPE, safety equipment, safety campaigns, and safety promotional material.
Financial Requirements
Source: 32-726~1.PDF (unknown)Costing for OHS must be itemised based on the overall scope of work, including training, provision of PPE, safety equipment purchases, safety campaigns, and safety promotional material.
Bid security, bonds, guarantees, retention, and payment terms: Not stated in the document.
Compliance Requirements
Source: 32-726~1.PDF (unknown)B-BBEE: Minimum Level 2 required.
CSD registration: Required.
Tax clearance: Valid tax compliance status PIN required.
CIDB grading: Required for construction work (grade not specified).
CIPC registration: Required for professionals.
OHS compliance:
COID: Must be registered with an appropriate employment compensation commissioner and have a valid letter of good standing (LoG) throughout the contract period.
Child labour: Prohibited.
Substance abuse: Zero tolerance; allowable alcohol and drug level is 0%.
Health & Safety
Source: 32-726~1.PDF (unknown)The contractor must comply with Eskom Generation's OHS requirements, which cover legal compliance (OHS Act, Section 37(2) agreement, child labour prohibition), statutory appointments, Eskom Life-Saving Rules, substance abuse policy, contractor organisational structure, roles and responsibilities, risk assessment, safe work procedures/method statements, roof work, fire equipment, flammable liquids, first aid, SHE communication, toolbox talks, OHS training, site establishment, site roads, vehicle management, housekeeping, stacking/storage, signage, tools/equipment, ladders, scaffolding, auditing, smoking, cellular phones, occupational health/hygiene/rehabilitation, medical assessments, working at heights, PPE, incident reporting, emergency management, non-conformance, OHS files, work stoppage, hours of work, omissions, contractor performance monitoring, security clearance, contract sign off, and Eskom's right to terminate.
Key requirements:
Environmental
Source: 32-726~1.PDF (unknown)The contractor must comply with environmental legislation, including the National Environmental Management Act, Environment Conservation Act, National Water Act, and any local authority or municipal by-laws. The contractor has a duty of care to the environment, including preventing pollution or degradation and minimising and rectifying any harm caused.
Contractual Terms
Source: 32-726~1.PDF (unknown)Eskom has the right to terminate the contract as addressed in section 3.52. A Section 37(2) agreement must be signed between Eskom and the main contractor at the time of submitting the safety file, and between the main contractor and all appointed contractors. The original copy of the agreement must be retained by the contractor, with a copy retained by the project manager/end user, and copies must form part of the respective OHS files.
Evaluation Criteria
Source: Acknowledgement Form Life-saving Rules Rev 3 Exp 2030.docx (unknown)Safety compliance: Bidders must complete and sign the Acknowledgement Form for Eskom's Life-saving Rules, pledging to abide by the safety rules.
Description
Source: Eskom_Personal_Protective_Equipment_(PPE).pdf (unknown)This document is an Eskom internal standard (240-44175132, Revision 2) prescribing minimum requirements for generic Personal Protective Equipment (PPE) used across Eskom and its subsidiaries. It covers the selection, use, care, and maintenance of PPE. It does not cover specialised work such as Live Work or Fall Arrest Systems, which are addressed in separate standards. The standard applies throughout Eskom Holdings SOC Ltd divisions and subsidiaries; operating units may add requirements provided minimums are met.
Technical Specifications
Source: Eskom_Personal_Protective_Equipment_(PPE).pdf (unknown)Scope: This document prescribes minimum requirements for generic Personal Protective Equipment (PPE) used across Eskom Holdings SOC Ltd and its subsidiaries, and provides guidance on selection, use, care, and maintenance.
General requirements:
Garment specifications:
Other PPE categories covered (minimum standards):
Head protection:
Eye/face protection:
High-visibility vests/bibs:
Quality Management
Source: Eskom_Personal_Protective_Equipment_(PPE).pdf (unknown)Garments must be free from defects affecting appearance or serviceability, and free from marks, spots, and stains. Seams and stitching must comply with SANS 10101, be free of twists, pleats, and puckers, and be sufficiently extensible to prevent cracking and undue shrinkage. All sewing ends must be back tacked, trimmed, and loose threads removed.
Compliance Requirements
Source: Eskom_Personal_Protective_Equipment_(PPE).pdf (unknown)Compliance with the Occupational Health and Safety Act (OHS Act) is mandatory.
Health & Safety
Source: Eskom_Personal_Protective_Equipment_(PPE).pdf (unknown)Employers must conduct risk assessments and implement hierarchy of controls before PPE is identified. Employees must be trained on PPE use and limitations, sign for issued PPE, maintain it in good condition, and report loss or damage. PPE must be worn as prescribed by risk assessment. PPE-free zones may be declared after risk assessment confirms no PPE required. Compliance is monitored by SHEQ and line management.
Contractual Terms
Source: Eskom_Personal_Protective_Equipment_(PPE).pdf (unknown)PPE is issued free of charge; losses due to negligence are subject to Eskom disciplinary procedures. Eskom-branded PPE remains Eskom property and must be returned on termination of employment. Replacement of PPE is based on exchange of unserviceable items or fair wear and tear; old items are destroyed or disfigured. Disposal follows the Eskom Waste Management Standard.
Requirements
Source: Eskom_Personal_Protective_Equipment_(PPE).pdf (unknown)All PPE must meet minimum requirements: be the last means of protection per OHS Act and hierarchy of controls; supplied free of charge and readily available; suitable and fit for purpose; kept in good condition and working order; misuse discouraged; when properly used, capable of controlling exposure; compliant with authorised body and technical specifications; issued at a frequency ensuring effective protection; locally manufactured PPE given preference.
Description
Source: Attachment 9- 32-37_Management_of_Substance_Abuse_in_the_Workplace.pdf (unknown)This document is Eskom's internal procedure for managing substance abuse in the workplace. It applies to all Eskom employees, contractors, consultants, and visitors while on duty, reporting for duty, or visiting any Eskom premises or work site. The procedure aims to comply with statutory requirements, provide a healthy and safe working environment, identify and prevent substance abuse, reduce losses and incidents, and support rehabilitation through employee assistance.
Quality Management
Source: Attachment 9- 32-37_Management_of_Substance_Abuse_in_the_Workplace.pdf (unknown)All substance abuse testing and screening equipment must be calibrated and maintained according to the manufacturer's specifications. Calibration must occur at least every six months, and a complete record must be kept in a dedicated register. Instruments that have not been calibrated within the specified period must not be used. The sensor should have a warranty period of at least 24 months. Equipment must be stored safely, marked with unique identification, and used only by certified testers.
Health & Safety
Source: Attachment 9- 32-37_Management_of_Substance_Abuse_in_the_Workplace.pdf (unknown)Eskom's procedure for managing substance abuse in the workplace, covering the rules for employees, contractors, consultants, and visitors; identification of persons under the influence; alcohol and drug screening and testing procedures; testing equipment requirements; refusal to undergo testing; call-out and standby procedures; disciplinary process; rehabilitation; and confidentiality.
Contractual Terms
Source: Attachment 9- 32-37_Management_of_Substance_Abuse_in_the_Workplace.pdf (unknown)Employees will not be remunerated for the period not worked as a result of being under the influence. Contractor management and consultants are encouraged to adopt a similar stance regarding their employees.
Health & Safety
Source: Attachment 9- 32-95_Occupational_Health_and_Safety_Incident_Management_Procedure.pdf (unknown)This attachment is Eskom's internal procedure 32-95 (Revision 9) for managing occupational health and safety incidents. It applies to Eskom employees, contractors, and the public affected by Eskom activities. The procedure sets out the full incident management workflow: identification, emergency response, notification and reporting, prioritisation, classification and recording, investigation, corrective actions, close-out, and communication. It defines incident categories (accident, fatality, first-aid injury, lost-time injury, medical injury, near-miss, occupational disease, serious incident) and assigns responsibilities, including reporting to the Compensation Commissioner and escalation to the Safety Data Integrity Committee. Contractors must comply with this procedure for Eskom reporting purposes, and must cooperate with Eskom investigations; failure to cooperate may lead to further contractual and legal steps.
Health & Safety
Source: Life-Saving_Rules Standard.pdf (unknown)Eskom enforces six Life-Saving Rules with zero tolerance at all its sites. The rules are: open, isolate, test, earth and create an equipotential zone before touching electrical apparatus; hook up at height; buckle up; be sober; ensure a valid permit to work; and ensure safe live working. Violations are treated as serious misconduct and trigger disciplinary action. Contractors must remove any employee who violates a rule from site and start disciplinary proceedings within five working days. Contractors must also ensure employees are trained, authorised, and medically fit for tasks, and that pre-task risk assessments are completed.
Quality Management
Source: Attachment 8 - 240-68099512 Form A_Cat 3_ Rev 9.pdf (unknown)The tenderer must complete and sign Form A to acknowledge and accept Eskom's Supplier Quality Requirements as per specification 240-105658000 and the ISO 9001 standard. The form requires the tenderer to indicate, by marking with an X or -, the applicability of each quality requirement clause. Only one category may be selected; Category 3 is selected for this tender. The tenderer must also indicate whether a site assessment is applicable. The form covers pre-contract award quality requirements, post-contract award requirements (including contract execution, supplier quality performance monitoring, Eskom rights of access and information, preservation, quality audits, management of nonconformities, and special processes), and the ISO 9001 clauses and quality principles.
Evaluation Criteria
Source: Occupational_Health_and_Safety_Risk_Assessment_Procedure.pdf (unknown)OHS compliance: bidders must be able to comply with Eskom's OHS risk assessment procedure.
Contractor baseline risk assessment: a contractor baseline risk assessment must be part of the OHS plan and is an essential consideration before contract award.
OH HIRA competence: occupational hygiene hazard identification and risk assessment must be performed by a competent person meeting the stated experience and training requirements.
Technical Specifications
Source: Occupational_Health_and_Safety_Risk_Assessment_Procedure.pdf (unknown)Eskom has adopted a value of Zero Harm, requiring all business to be conducted with respect and care for people and the environment.
The OHS risk assessment process ensures that Eskom can proactively identify, predict, evaluate, and control the actual and potential impact on health, safety, environment, socio-economic conditions, and cultural heritage.
The process allows for hazards, risks, causes, and consequences to be identified and controlled, minimising negative impact and maximising benefits.
This promotes compliance with legal requirements and principles of occupational health and safety.
Methodology
Source: Occupational_Health_and_Safety_Risk_Assessment_Procedure.pdf (unknown)Risk assessment methodology: baseline risk assessments identify general hazards, while issue-based assessments evaluate task-specific risks, using a qualitative checklist method for pre-task assessments.
The process includes risk evaluation, control adequacy and effectiveness checks, and requires the development of method statements, SOPs, and emergency plans based on the assessments.
Quality Management
Source: Occupational_Health_and_Safety_Risk_Assessment_Procedure.pdf (unknown)The Risk and Sustainability Division shall ensure that this procedure is complied with through conducting inspections and reviews to measure compliance.
The general manager (Risk and Sustainability) is accountable for the overall direction and function of Eskom's risk management programme and reports back directly to the holdings board, through the Board Risk Management Committee.
Compliance Requirements
Source: Occupational_Health_and_Safety_Risk_Assessment_Procedure.pdf (unknown)B-BBEE Minimum Level: 1
No specific requirements found
Health & Safety
Source: Occupational_Health_and_Safety_Risk_Assessment_Procedure.pdf (unknown)Risk assessment consequence ratings: 6 = multiple fatalities; 5 = fatality or life-threatening health effects; 4 = lost-time injury; irreversible health effects/occupational disease with permanent consequence; 3 = medical treatment case; occupational disease with reversible/non-permanent effect; 2 = first-aid treatment case and temporary discomfort case; 1 = no injuries or health effects (near misses).
Likelihood ratings: A = highly unlikely (more than a '100 year event', <5% probability); B = unlikely (could occur in 'years to decades', 5-20% probability); C = possible (could occur within 'months to years', 20-70% probability); D = likely (could occur within 'weeks to months', 70-90% probability); E = unavoidable (could occur within 'days to weeks', >90% probability).
Risk priority levels: I = very high, immediate action required; II = high, strong mandatory action required; III = medium, action required possibly at administrative level; IV = low, minor or no action required.
Risk treatment hierarchy: elimination (physically remove the hazard), substitution (replace the hazard), engineering controls (isolate people from the hazard), administrative controls (change the way people work), personal protective equipment (protect the worker with PPE).
Risk assessments shall be reviewed every two years where a frequency is not prescribed by specific regulations or standards.
Risk assessment results shall be documented and communicated to all affected stakeholders through OHS induction, tool box talks, emergency plans, signage, formal training, procedures, guidelines, and standards.
Requirements
Source: Occupational_Health_and_Safety_Risk_Assessment_Procedure.pdf (unknown)All projects, including non-construction work, must have OHS risk assessments conducted.
Contractors must comply with Eskom's risk assessment requirements and submit risk assessments before work begins.
The document applies throughout Eskom and its subsidiaries, and compliance is mandatory.
Section
Source: Occupational_Health_and_Safety_Risk_Assessment_Procedure.pdf (unknown)Overall process of hazard and identification, risk analysis, and risk evaluation.
2.3.37 Risk evaluation
Quality Management
Source: Annexure B_ H&S Acknowldgement Form_240-77471499.pdf (unknown)Work stoppages due to OHS issues do not warrant financial compensation claims against Eskom. Financial penalties apply for non-conformance to Eskom or statutory OHS requirements, including those of subcontractors. All employees must undergo relevant Eskom induction.
Compliance Requirements
Source: Annexure B_ H&S Acknowldgement Form_240-77471499.pdf (unknown)OHS compliance is mandatory for all work at Eskom sites. The contractor must:
Health & Safety
Source: Annexure B_ H&S Acknowldgement Form_240-77471499.pdf (unknown)The contractor must comply with Eskom OHS requirements, including procedures and standards such as the OHS Risk Assessment Procedure, Life Saving Rules, Incident Management, Right of Refusal to Work, Vehicle and Driver Safety, PPE, Substance Abuse, Baseline Risk Assessment, Working at Heights, and the Peaking OU Contractor OHS&Q Management Plan. After contract award, the contractor must align its processes to Eskom's OHS requirements. Penalties will be enforced for non-conformance to Eskom or statutory OHS requirements. Work stoppages due to OHS issues do not warrant financial compensation claims against Eskom. All employees must undergo relevant Eskom induction. The main contractor must demonstrate contractor/supplier selection criteria, notify Eskom before appointing them, ensure adequate resources and competencies, manage and monitor their compliance through audits, and handle non-conformances directly. Eskom may verify this and request testimonials/references.
Contractual Terms
Source: Annexure B_ H&S Acknowldgement Form_240-77471499.pdf (unknown)The main contractor is responsible for managing subcontractors, including:
Description
Source: Attachment 8 - 240-125473040 Guideline for Selection Criteria Rev1_signed.pdf (unknown)This guideline assists Supplier Quality Management (SQM) representatives in selecting appropriate and relevant supplier quality requirements, as per QM 58 specification, during external sourcing of products, services, and processes. It applies throughout Eskom Holdings Limited divisions and subsidiaries for all procurement transactions (tenders, RFQs, and contracts).
Evaluation Criteria
Source: Attachment 8 - 240-125473040 Guideline for Selection Criteria Rev1_signed.pdf (unknown)Supplier quality requirements are selected based on two elements: value and risk. Value thresholds follow the PPPFA: low value (R30,000 to R50 million) uses the 80/20 preference point system; high value (above R50 million) uses the 90/10 system. Risk is assessed by the impact on Eskom's core business (network vs non-network). Four categories of quality requirements apply:
Technical Specifications
Source: Attachment 8 - 240-125473040 Guideline for Selection Criteria Rev1_signed.pdf (unknown)This document is a guideline for selecting supplier quality requirements for Eskom tenders. It applies to all procurement transactions across Eskom Holdings divisions and subsidiaries. The selection considers the complexity, risk, value, and duration of the contract. For complex transactions involving installation, manufacturing, testing, or commissioning, a Quality Control Plan (QCP) or Inspection and Test Plan (ITP) is required regardless of category.
Methodology
Source: Attachment 8 - 240-125473040 Guideline for Selection Criteria Rev1_signed.pdf (unknown)The selection of supplier quality requirements is based on two main elements: value and risk. Value is determined from procurement and considers the tender or enquiry value, complexity, and duration. Risk is based on the technical specification or scope of work and its impact on Eskom's core business. Requirements are categorized into four categories: Category 1 (High Risk – High Value) requires ISO 9001 certification; Category 2 (Low Risk – High Value) applies when value is high but ISO 9001 is not mandatory; Category 3 (High Risk – Low Value) requires a documented QMS; Category 4 (Low Risk – Low Value) for non-technical, off-the-shelf items. Value thresholds follow the PPPFA: low value R30k–R50M (80/20), high value above R50M (90/10).
Quality Management
Source: Attachment 8 - 240-125473040 Guideline for Selection Criteria Rev1_signed.pdf (unknown)Quality requirements are selected based on value and risk. Categories:
For complex transactions (installation, manufacturing, testing, commissioning), a Quality Control Plan (QCP) or Inspection and Test Plan (ITP) is required. Exemptions may apply for low-risk, low-value transactions using the Exemption Certificate (240-144723833).
Compliance Requirements
Source: Attachment 8 - 240-125473040 Guideline for Selection Criteria Rev1_signed.pdf (unknown)Quality requirements are selected based on the value and risk of the tender. For Category 1 (High Risk – High Value), a valid ISO 9001 certificate is mandatory. For Category 3 (High Risk – Low Value), a documented quality management system is required. Exemptions from quality requirements may apply for low-value, low-risk transactions (above LPO limit but below R1 million) using the Exemption Certificate (240-144723833), typically for off-the-shelf items requiring no modification. All LPOs approved by cost centre managers are exempt from quality requirements.
Requirements
Source: Attachment 8 - 240-125473040 Guideline for Selection Criteria Rev1_signed.pdf (unknown)For complex transactions including installation, manufacturing, testing, commissioning, a Quality Control Plan (QCP) or Inspection and Test Plan (ITP) is required. All LPOs approved by cost centre managers are exempted from quality requirements. Other procurement transactions above LPO limit but less than R1 million with low complexity and low risk may be exempted using the Exemption Certificate, typically for off-the-shelf items requiring no modification. A business unit may develop a list of frequently purchased items requiring no quality assessment, approved by both quality management and line function.
Health & Safety
Source: Attachment 9- 240-62946386_Driver_and_Vehicle_Safety_Management_Procedure.pdf (unknown)This is an internal Eskom procedure, not a tender document. It sets mandatory driver and vehicle safety rules for anyone driving on Eskom business, including contractors and consultants. Key obligations:
Description
Source: PPE NON COMPLIANCE MEMO.pdf (unknown)This memorandum from the General Manager of the Peaking Operating Unit sets out PPE compliance obligations for all contractor and Eskom Peaking employees. It requires consistent application of the Eskom PPE Standard (240-44175132) to promote safety and prevent operational disruptions. Persistent PPE non-compliance has been identified during BSO activities, housekeeping, and plant walkdowns, and features in monthly outage management reports. Business Units must issue clear PPE compliance instructions.
Important Dates
Source: PPE NON COMPLIANCE MEMO.pdf (unknown)Memorandum date: 04 February 2026
Contact Information
Source: PPE NON COMPLIANCE MEMO.pdf (unknown)Contact: Avi Singh
Role: General Manager, Peaking Operating Unit
Telephone: +27 21 941 5800
Address: Peaking Business Unit Durbanville Office
Technical Specifications
Source: PPE NON COMPLIANCE MEMO.pdf (unknown)Purpose: clarify roles, responsibilities, and consequence management for PPE compliance for all contractor employees and Eskom Peaking employees.
Applicable standard: Eskom PPE Standard (240-44175132).
Contract Custodians must:
Contractor Companies must:
Safety Department must:
Compliance Requirements
Source: PPE NON COMPLIANCE MEMO.pdf (unknown)PPE compliance is mandatory for all contractor and Eskom Peaking employees.
Non-compliance consequences:
Health & Safety
Source: PPE NON COMPLIANCE MEMO.pdf (unknown)PPE compliance is mandatory. Contract Custodians must include the PPE Standard in Pricing Schedules/BoQs and enforce compliance. Contractor Companies must issue PPE based on risk assessments, ensure PPE complies with the Eskom PPE Standard, inspect PPE, provide training, apply consequence management, sign off on PPE verification, and issue PPE free of charge. The Safety Department must ensure PPE costs are included in tender Pricing Schedules/BoQs, create awareness through SHE induction, and conduct audits. Non-compliant contractor employees must stop work and leave the site; if PPE was issued, suspension and consequence management follow. If the company failed to issue PPE, work stops until PPE is issued, proof submitted, and an NCR issued. Eskom employees not complying must stop work until an inquiry; willful failure leads to consequence management.
Description
Source: Attachment 8 - 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.pdf (TENDER)The document is a list of tender returnables for quality requirements (Category 3). It specifies the quality management system documentation and evidence required from bidders.
Submission Guidelines
Source: Attachment 8 - 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.pdf (TENDER)Returnable documents (all must be completed, signed and submitted with the bid):
Evaluation Criteria
Source: Attachment 8 - 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.pdf (TENDER)Quality requirements are evaluated as a deliverable (indicator = 1). Scoring is based on the following sections:
No minimum qualifying score is stated. No other evaluation criteria (e.g., price, functionality) are mentioned in this extract.
Technical Specifications
Source: Attachment 8 - 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.pdf (TENDER)Scope: Corrosion protection services on an 'as and when required' basis for eleven (11) Eskom peaking sites, including Gouritwa & Ankerlig gas turbine, Gariep, Vanderkloof & Ncora hydropower, Ingula, Drakensberg & Palmiet pumped storage schemes, Sere wind farm, Port Rex and Acacia aeroderivative. Contract period: 5 years.
Quality management requirements:
Quality Management
Source: Attachment 8 - 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.pdf (TENDER)Bidders must complete and sign Form A. Additional quality requirements may be listed as per the scope of work and/or specification.
Compliance Requirements
Source: Attachment 8 - 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.pdf (TENDER)No specific compliance requirements (e.g., CSD, tax, B-BBEE, CIDB) are stated in this extract.
Compliance Requirements
Source: Acknowledgement Form Life-saving Rules Rev 3 Exp 2030.pdf (unknown)Eskom enforces a zero-tolerance policy on violation of its Life-saving Rules. These rules apply to all Eskom employees, contractors, agents, consultants, and any person entering Eskom sites. The six rules are: 1) Open, isolate, test, earth, and create an equipotential zone before touch; 2) Hook up at height; 3) Buckle up; 4) Be sober; 5) Ensure that you have a permit to work; 6) Ensure safe live working. Adherence to these rules is a condition of employment and contract. Bidders must ensure their personnel understand and comply with these rules at all times.
Health & Safety
Source: Acknowledgement Form Life-saving Rules Rev 3 Exp 2030.pdf (unknown)Eskom enforces a zero-tolerance policy on violation of its Life-saving Rules. These rules apply to all Eskom employees, contractors, agents, consultants, and any person entering Eskom sites. The six rules are: 1) Open, isolate, test, earth, and create an equipotential zone before touch; 2) Hook up at height; 3) Buckle up; 4) Be sober; 5) Ensure that you have a permit to work; 6) Ensure safe live working. Adherence to these rules is a condition of employment and contract. Bidders must ensure their personnel understand and comply with these rules at all times.
Submission Guidelines
Source: Acknowledgement Form Life-saving Rules Rev 3 Exp 2030.pdf (unknown)Returnable documents: the signed Acknowledgement Form for Life-saving Rules must be submitted with the bid.
Evaluation Criteria
Source: Acknowledgement Form Life-saving Rules Rev 3 Exp 2030.pdf (unknown)Bidders must sign and submit the Acknowledgement Form for Life-saving Rules. Compliance with Eskom's Life-saving Rules is a condition of contract. No other evaluation criteria are stated in the provided document.
Compliance Requirements
Source: Acknowledgement Form Life-saving Rules Rev 3 Exp 2030.pdf (unknown)Eskom's Life-saving Rules apply to all employees, contractors, and any person entering Eskom sites. The six rules are: 1) Open, isolate, test, earth, and create an equipotential zone before touch; 2) Hook up at height; 3) Buckle up; 4) Be sober; 5) Ensure that you have a permit to work; 6) Ensure safe live working. Adherence to these rules is a condition of employment/contract.
Health & Safety
Source: Acknowledgement Form Life-saving Rules Rev 3 Exp 2030.pdfEskom's Life-saving Rules are mandatory safety rules that must not be broken under any circumstances. Eskom has a zero-tolerance stance to violations. The rules apply to all employees, contractors, and anyone entering Eskom sites. The six rules are: 1) Open, isolate, test, earth, and create an equipotential zone before touch; 2) Hook up at height; 3) Buckle up; 4) Be sober; 5) Ensure that you have a permit to work; 6) Ensure safe live working. Adherence is a condition of employment/contract.
Submission Guidelines
Source: Attachment 1 - E-Tenderers E-Tendering Training Acknowledgement Form (1).pdf (unknown)Mandatory returnable document: E-Tendering Training Acknowledgement Form. It must be fully completed and submitted to Eskom within the prescribed period. Failure to do so will render the bidder non-responsive and disqualified from the procurement process.
Returnable Documents
Source: Attachment 1 - E-Tenderers E-Tendering Training Acknowledgement Form (1).pdf (unknown)The E-Tendering Training Acknowledgement Form is a mandatory returnable document. It must be fully completed and submitted to Eskom within the prescribed period; failure to do so will render the tenderer non-responsive and lead to disqualification from the procurement process.
Evaluation Criteria
Source: Attachment 1 - E-Tenderers E-Tendering Training Acknowledgement Form (1).pdf (unknown)Bidders must fully complete and submit the E-Tendering Training Acknowledgement Form within the prescribed period. Failure to do so will render the bidder non-responsive and disqualified from the procurement process.
Important Dates
Source: 32-726-02T High Risk OHS Requirements for Corrosion Protection Services on an 'As and When Required' Basis.pdf (unknown)Closing date: 23 October 2026 at 10:00 (as per tender record).
Briefing session: not stated in the document.
Site visit: not stated in the document.
Clarification deadline: not stated in the document.
Contact Information
Source: 32-726-02T High Risk OHS Requirements for Corrosion Protection Services on an 'As and When Required' Basis.pdf (unknown)Eskom Safety Representative: Bongani Langa
Role: Eskom Safety Representative
Contract Manager/End User: not stated
Submission address: not stated in the document.
Service/delivery address: Gourikwa Power Station, Ankerlig Power Station, Ingula Pumped Storage Scheme, Drakensberg Pumped Storage Scheme, Palmiet Pumped Storage Scheme, Gariep Hydropower Station, Vanderkloof Hydropower Station, Sere Wind Farm.
Submission Guidelines
Source: 32-726-02T High Risk OHS Requirements for Corrosion Protection Services on an 'As and When Required' Basis.pdf (unknown)Returnable documents: all completed and signed forms must be submitted with the bid. Required forms include:
Disqualification risks:
Evaluation Criteria
Source: 32-726-02T High Risk OHS Requirements for Corrosion Protection Services on an 'As and When Required' Basis.pdf (unknown)Evaluation will be based on the 80/20 preference point system (price and B-BBEE).
Technical Specifications
Source: 32-726-02T High Risk OHS Requirements for Corrosion Protection Services on an 'As and When Required' Basis.pdf (unknown)Scope of work: Corrosion protection services on an 'as and when required' basis for eleven (11) Eskom peaking sites for a period of 5 years.
Sites: Gourikwa & Ankerlig Gas Turbine, Gariep, Vanderkloof & Ncora Hydropower, Ingula, Drakensberg & Palmiet Pumped Storage Schemes, Sere Wind Farm, Port Rex and Accacia Aeroderivative.
General Corrosion Protection Maintenance:
Building Envelope and Structural Repairs:
Methodology
Source: 32-726-02T High Risk OHS Requirements for Corrosion Protection Services on an 'As and When Required' Basis.pdfMethod statements and safe work procedures are required for tasks. They should be written when designing a new job or task, changing a job or task, or introducing new equipment or substances. The scope of work includes general corrosion protection maintenance, building envelope and structural repairs, roofing and waterproofing, painting and corrosion protection, doors/windows/walkways, and piping and supports. Specific tasks include repair/replacement of defective components, corrosion inspections and assessments, coating failure identification, surface preparation (mechanical cleaning, abrasive blast cleaning), coating application, DFT verification, and quality control.
Experience & Qualifications
Source: 32-726-02T High Risk OHS Requirements for Corrosion Protection Services on an 'As and When Required' Basis.pdfContractors must have appropriate qualifications, certificates, and competent supervision. The contractor health and safety officer must have:
Quality Management
Source: 32-726-02T High Risk OHS Requirements for Corrosion Protection Services on an 'As and When Required' Basis.pdfQuality control requirements:
Pricing Schedule
Source: 32-726-02T High Risk OHS Requirements for Corrosion Protection Services on an 'As and When Required' Basis.pdfPricing schedule: not stated in the document. The document is an OHS requirements document and does not contain pricing details.
Financial Requirements
Source: 32-726-02T High Risk OHS Requirements for Corrosion Protection Services on an 'As and When Required' Basis.pdf (unknown)Pricing format: not stated in the document.
Bid security: not stated in the document.
Bonds/guarantees: not stated in the document.
Retention: not stated in the document.
Payment terms: not stated in the document.
Financial capacity thresholds: not stated in the document.
OHS costing: must be itemised based on the overall scope of work (e.g., training, PPE, safety equipment purchases, safety campaigns, safety promotional material).
Compliance Requirements
Source: 32-726-02T High Risk OHS Requirements for Corrosion Protection Services on an 'As and When Required' Basis.pdf (unknown)CSD registration: required (proof of CSD registration must be submitted).
Tax status: valid tax compliance status PIN required.
B-BBEE: Minimum Level 2 required (as per currentAnalysis).
CIDB grading: not stated in the document (not construction-related).
CIPC registration: not stated in the document.
Professional registrations: not stated in the document.
Local content: not stated in the document.
Compensation Commissioner: registration and valid Letter of Good Standing required.
OHS Act compliance: Section 37(2) agreement, statutory appointments, SHEQ policy, Life-Saving Rules, substance abuse policy (0% alcohol/drug level).
Child labour: prohibited.
Organisational organogram: signed by the company's 16.1 or 16.2.
Health & Safety
Source: 32-726-02T High Risk OHS Requirements for Corrosion Protection Services on an 'As and When Required' Basis.pdfHealth and safety requirements (from the OHS document):
Environmental
Source: 32-726-02T High Risk OHS Requirements for Corrosion Protection Services on an 'As and When Required' Basis.pdfEnvironmental requirements: contractors must comply with applicable environmental legislation, including the National Environmental Management Act, and any requirements pertaining to local authorities, municipal by-laws, or environmental legislation. Duty of care to the environment is required (as per 32-136).
Contractual Terms
Source: 32-726-02T High Risk OHS Requirements for Corrosion Protection Services on an 'As and When Required' Basis.pdfContract duration: 5 years (as per tender title).
Termination: Eskom has the right to terminate the contract (as per section 3.52 of the OHS requirements).
Contract sign-off: required (section 3.51).
Performance monitoring: contractor performance will be monitored (section 3.46).
Work stoppage: provisions for work stoppage are included (section 3.43).
Hours of work: normal work, night work, and overtime provisions are specified (section 3.44).
Security clearance: required (section 3.50).
Section
Source: 32-726-02T High Risk OHS Requirements for Corrosion Protection Services on an 'As and When Required' Basis.pdfAdditional evaluation criteria: Bidders must be registered with the Compensation Commissioner and provide a valid Letter of Good Standing. They must comply with the OHS Act and sign a Section 37(2) agreement. A SHEQ policy signed by the CEO or Section 16(2) appointee is required. Contractors must have an up-to-date copy of the OHS Act and regulations available to employees. They must comply with Eskom's Life-Saving Rules and Substance Abuse Procedure (0% alcohol/drug level). Statutory appointments must be made in line with the OHS Act. Contractors must provide an organisational organogram signed by the company's 16.1 or 16.2. No child labour may be used, per the Constitution and BCEA.
Description
Source: Attachment 9- 32-37_Management_of_Substance_Abuse_in_the_Workplace.pdfThis document is Eskom's procedure for managing substance abuse in the workplace. It sets out rules for employees, contractors, consultants, and visitors, including prohibitions on being under the influence, consumption of alcohol/drugs on premises, and requirements to undergo screening/testing. It details processes for identification (breath alcohol screening, observation checklists), testing procedures (pre-placement, compulsory, post-accident, reasonable suspicion, ad hoc, return-to-work, follow-up), management of persons under the influence, refusal to test, disciplinary processes, rehabilitation, and confidentiality. It also specifies roles and responsibilities for line management, occupational health practitioners, EAP practitioners, SHEQS managers, security, employees, testers, and screeners, as well as equipment requirements for breathalysers.
Evaluation Criteria
Source: Attachment 9- 32-37_Management_of_Substance_Abuse_in_the_Workplace.pdf (unknown)Bidders must comply with Eskom's substance abuse policy as a condition of working on Eskom premises. This includes ensuring that all employees, contractors, and visitors are subject to alcohol and drug screening/testing as per Eskom procedure 32-37. No specific eligibility criteria (e.g., CSD registration, B-BBEE level, CIDB grading) are stated in the provided document.
Compliance Requirements
Source: Attachment 9- 32-37_Management_of_Substance_Abuse_in_the_Workplace.pdf (unknown)No specific requirements found
B-BBEE Minimum Level: 4
Health & Safety
Source: Attachment 9- 32-37_Management_of_Substance_Abuse_in_the_Workplace.pdfEskom's substance abuse procedure applies to all persons on Eskom premises or on Eskom business, including contractors, consultants, and visitors. Key obligations include:
Submission Guidelines
Source: Annexure B_ H&S Acknowldgement Form_240-77471499.pdf (unknown)Returnable documents:
Evaluation Criteria
Source: Annexure B_ H&S Acknowldgement Form_240-77471499.pdf (unknown)Bidders must sign and submit the Acknowledgement Form for Eskom OHS legal and other requirements (Annexure B). The form must be signed by an authorised person (CEO/Director/Managing Director) and witnessed by two witnesses. Bidders must demonstrate their process and selection criteria for appointing contractors and suppliers, and may be required to provide testimonials/references and client contact details for previous similar work. No other eligibility criteria (e.g., CSD, tax, B-BBEE, CIDB) are stated in the provided document.
Technical Specifications
Source: Annexure B_ H&S Acknowldgement Form_240-77471499.pdf (unknown)The main contractor must:
Compliance Requirements
Source: Annexure B_ H&S Acknowldgement Form_240-77471499.pdf (unknown)OHS compliance:
Health & Safety
Source: Annexure B_ H&S Acknowldgement Form_240-77471499.pdfThe supplier/contractor/tenderer must comply with Eskom OHS requirements including the listed procedures and standards (e.g., OHS Risk Assessment Procedure 32-520, Life Saving Rules, Incident Management, PPE, Substance Abuse, Baseline Risk Assessment, Working at Heights, and the Peaking OU Contractor OHS&Q Management Plan). After contract award, the contractor must align its processes to Eskom's OHS requirements. Penalties will be enforced for non-conformance to Eskom and statutory OHS requirements. Work stoppages due to OHS will not warrant financial compensation claims against Eskom. All employees (contractors/suppliers) must undergo relevant Eskom induction.
Contractual Terms
Source: Annexure B_ H&S Acknowldgement Form_240-77471499.pdfThe main contractor is accountable for managing its contractors/suppliers to ensure compliance with legal and Eskom requirements. It must demonstrate the process and selection criteria for appointing contractors/suppliers, notify Eskom prior to their appointment, ensure they have adequate resources and competencies, monitor them through audits and assessments, and provide grounds for termination of their work. Non-conformances by contractors/suppliers are dealt with directly with the main contractor through performance and penalty processes. Eskom reserves the right to verify compliance and may request testimonials/references and client contact details for previous similar work.
Description
Source: Attachment 7 - SDLI Strategy Setting Template for Bidders - Corrosion Protection Services.pdfScope: Corrosion protection services on an 'as and when required' basis for eleven (11) Eskom peaking sites. Duration: 60 months.
Submission Guidelines
Source: Attachment 7 - SDLI Strategy Setting Template for Bidders - Corrosion Protection Services.pdf (TENDER)Returnable documents:
Disqualification risks:
Evaluation Criteria
Source: Attachment 7 - SDLI Strategy Setting Template for Bidders - Corrosion Protection Services.pdf (TENDER)Evaluation is based on the 90/10 or 80/20 preference point system. A maximum of 10/20 points may be awarded for the specific goal (B-BBEE status level). Points for the specific goal are added to price points, and the total is rounded to two decimal places. The contract is awarded to the tenderer scoring the highest total points.
B-BBEE points table (90/10 system / 80/20 system):
Objective criteria are not mandatory but are a condition for contract award. If a tenderer does not meet objective criteria, the second-ranked tenderer may be recommended for award.
Technical Specifications
Source: Attachment 7 - SDLI Strategy Setting Template for Bidders - Corrosion Protection Services.pdf (TENDER)Scope of work: Corrosion protection services on an 'as and when required' basis for eleven (11) Eskom peaking sites.
Sites:
Duration: 60 months (5 years).
CIDB Skills Development:
Pricing Schedule
Source: Attachment 7 - SDLI Strategy Setting Template for Bidders - Corrosion Protection Services.pdfPricing format: Tender response must be separated into its components as per the Price Schedule included with the tender documents. Local procurement content is total spending minus the imported component.
Financial Requirements
Source: Attachment 7 - SDLI Strategy Setting Template for Bidders - Corrosion Protection Services.pdf (TENDER)Pricing format: Tender response must be separated into its components as per the Price Schedule included with the tender documents.
SDL&I Penalty and Performance Security:
Compliance Requirements
Source: Attachment 7 - SDLI Strategy Setting Template for Bidders - Corrosion Protection Services.pdf (TENDER)B-BBEE requirements:
B-BBEE improvement/retention plan:
Local content:
Sworn affidavit validity:
B-BBEE Requirements
Source: Attachment 7 - SDLI Strategy Setting Template for Bidders - Corrosion Protection Services.pdf (TENDER)Preference points: Maximum 10/20 points for specific goal (B-BBEE status level). Points table as per 90/10 and 80/20 systems.
Required documents to claim preference points: Valid B-BBEE certificate / sworn affidavit / CIPC affidavit; proof of ownership/shareholding; certified ID copies of shareholders; proof of disability (where applicable).
Failure to provide documentation: Not disqualified, but scores 0 out of 10/20 for specific goals and may only score out of 90/80 for price.
Designated sector: Steel Products and Steel Components – local content threshold 100%. SBD 6.2 and Annex C mandatory.
B-BBEE improvement/retention plan: Submit within 30 days of contract signing. Level 4 bidders must reach Level 3 by end of first year; Level 5-8 or non-compliant must reach Level 4 by end of first year, then improve one level each year.
Local procurement content: Eskom target 100%. Procurement from designated groups: Black Owned 4.0%, Black Women Owned 2.0%, Black Youth Owned 2.0%, Black Persons with Disability 2.0%.
Health & Safety
Source: Attachment 7 - SDLI Strategy Setting Template for Bidders - Corrosion Protection Services.pdfSworn affidavit validity requirements (as they relate to B-BBEE):
Contractual Terms
Source: Attachment 7 - SDLI Strategy Setting Template for Bidders - Corrosion Protection Services.pdf (TENDER)SDL&I Penalty and Performance Security:
Special Conditions
Source: Attachment 7 - SDLI Strategy Setting Template for Bidders - Corrosion Protection Services.pdf (TENDER)Reporting and Monitoring:
Requirements
Source: Attachment 7 - SDLI Strategy Setting Template for Bidders - Corrosion Protection Services.pdf (TENDER)Objective criteria: Not mandatory but a condition for contract award. If not met, the second-ranked tenderer may be recommended for award.
CIDB Skills Development: Mandatory CSDG of 0.25%. Failure to meet it renders the tender non-responsive. Expenditure of 0.375% of the Acceptable Contract Amount is a condition for contract award.
Sworn affidavit validity: Must meet all listed requirements to be valid.
Section
Source: Attachment 7 - SDLI Strategy Setting Template for Bidders - Corrosion Protection Services.pdfSpecific goals: Maximum 10/20 points for B-BBEE status level. Points added to price points, total rounded to two decimal places. Contract awarded to highest scorer.
B-BBEE points table (90/10 and 80/20 systems) as listed.
Failure to provide preference point documentation: Scores 0 out of 10/20 for specific goals, may only score out of 90/80 for price.
Description
Source: Attachment 6 - Tender Evaluation Strategy for Peaking Corrosion Protection.pdfEskom requires corrosion protection services on an 'as and when required' basis across eleven peaking sites for a five-year period. The scope covers corrosion assessments, rehabilitation, coating application, repairs, structural steel rehabilitation, tank and piping remediation, inspection and testing, surface preparation, quality control, environmental management and reporting. The technical evaluation will assess capability, experience, technical competence, resources and proposed methodology.
Submission Guidelines
Source: Attachment 6 - Tender Evaluation Strategy for Peaking Corrosion Protection.pdf (unknown)Returnable documents and evidence:
Evaluation Criteria
Source: Attachment 6 - Tender Evaluation Strategy for Peaking Corrosion Protection.pdf (unknown)Evaluation stages:
Scoring guideline: 5 = Compliant, 4 = Compliant with qualifications, 2 = Non-compliant, 0 = Totally deficient. Scores of 1 and 3 are not used.
Minimum qualifying score: 70% overall.
Technical Specifications
Source: Attachment 6 - Tender Evaluation Strategy for Peaking Corrosion Protection.pdf (unknown)Scope of work includes corrosion assessments, corrosion protection system rehabilitation, coating application, corrosion repairs, structural steel rehabilitation, tank and piping corrosion remediation, inspection and testing activities, surface preparation, quality control, environmental management and reporting across Eskom Peaking's power generation facilities, including OCGT, Aeroderivatives, Hydro, Pumped Storage and Renewable Energy assets.
Contract period: 5 years.
Sites: Gourikwa & Ankerlig gas turbine, Gariep, Vanderkloof & Ncora hydropower, Ingula, Drakensberg & Palmiet pumped storage schemes, Sere wind farm, Port Rex and Acacia aeroderivative.
Method statements must cover: corrosion assessments, defect classification and prioritisation, surface preparation, containment, waste disposal, coating application, inspection, testing and reporting, corrosion register updates.
QCP must address 20 required activities including material receipt and storage, equipment calibration, pre-cleaning, mechanical surface preparation, abrasive blasting, surface cleanliness verification, environmental monitoring, material verification and mixing, stripe coating, coating application, WFT measurement, DFT measurement, curing/overcoating, visual inspection, adhesion testing, holiday testing, repairs, final inspection, handling and storage, records and turnover dossier.
Inspection & test strategy must include inspection methodology, personnel qualifications, frequency, environmental monitoring, surface preparation inspections, surface cleanliness inspections, surface profile measurements, WFT/DFT measurements, adhesion testing, holiday/pinhole testing, repair acceptance criteria, final acceptance inspections, reporting and turnover requirements, defect and non-conformance management.
Methodology
Source: Attachment 6 - Tender Evaluation Strategy for Peaking Corrosion Protection.pdfMethod statements (70% sub-weighting of Methodology, Quality & Technical Approach) must cover corrosion assessments, defect classification and prioritisation, surface preparation, containment, waste disposal, coating application, inspection, testing and reporting, and corrosion register updates. Quality Control Plan (20% sub-weighting) must be project-specific and address 20 required activities. Inspection & Test Strategy (10% sub-weighting) must include inspection methodology, personnel qualifications, frequency, environmental monitoring, surface preparation inspections, surface cleanliness inspections, surface profile measurements, WFT/DFT measurements, adhesion testing, holiday/pinhole testing, repair acceptance criteria, final acceptance inspections, reporting and turnover requirements, and defect and non-conformance management.
Experience & Qualifications
Source: Attachment 6 - Tender Evaluation Strategy for Peaking Corrosion Protection.pdfCorrosion Protection Experience (5% weighting): bidder must demonstrate experience in executing corrosion protection works simultaneously across a minimum of three geographically dispersed sites under a single contract or multiple concurrent contracts. Evidence may include appointment letters, purchase orders, contract award letters, completion certificates, and signed client performance reports, clearly indicating number of sites serviced, geographical spread, contract duration, and scope of works performed. Resources and Organisation (25% weighting): Key Personnel (65% sub-weighting) - bidder must provide CVs, qualifications and certifications for Project Manager (relevant Engineering/Project Management qualification, minimum 5 years' experience), Site Supervisor (relevant technical qualification, coating application supervision experience), Quality Representative/QA-QC Officer (relevant qualification, ISO 9001 experience, ISO 9001 Internal Auditor certification preferred), Coating Inspector (valid SAQCC/AMPP/NACE Coating Inspector Level 2), and Corrosion Specialist/Technical Advisor (relevant Engineering degree with corrosion management experience). Submission must include qualifications, professional registrations, SAQCC/AMPP/NACE certifications, years of experience, experience on similar projects, and roles and responsibilities. Plant & Equipment (25% sub-weighting) - bidder must provide a schedule with proof of ownership, availability or lease agreements for inspection and testing equipment (DFT gauges, WFT gauges, surface profile gauges, surface cleanliness comparators, soluble salt testing equipment, dust contamination testing kits, adhesion testing equipment, holiday/pinhole detector) and application and blasting equipment (airless spray, conventional spray, abrasive blasting, power mixing, oil and moisture traps/separators). All inspection and test equipment must have valid calibration certificates. Organogram and Resource Deployment (10% sub-weighting) - must demonstrate head office support, site support, multi-site resource deployment, escalation structure, and show Project Manager, Site Supervisor, QA/QC Representative, Coating Inspector, Corrosion Specialist, reporting lines, escalation structure, head office support, multi-site deployment, and roles and responsibilities.
Quality Management
Source: Attachment 6 - Tender Evaluation Strategy for Peaking Corrosion Protection.pdfThe bidder must submit a project-specific Quality Control Plan (QCP) aligned to the corrosion protection system, method statements, product data sheets, inspection requirements and acceptance criteria. The QCP must identify activities, responsibilities, inspection points, Hold Points (H), Witness Points (W), acceptance criteria, inspection and test methods, check sheets and records, and must address 20 required activities including material receipt and storage, equipment calibration, pre-cleaning, mechanical surface preparation, abrasive blasting, surface cleanliness verification, environmental monitoring, material verification and mixing, stripe coating, coating application, WFT measurement, DFT measurement, curing/overcoating, visual inspection, adhesion testing, holiday testing, repairs, final inspection, handling and storage, and records and turnover dossier.
Compliance Requirements
Source: Attachment 6 - Tender Evaluation Strategy for Peaking Corrosion Protection.pdf (unknown)B-BBEE Minimum Level: 2.
Key personnel requirements:
Plant & equipment requirements: DFT gauges, WFT gauges, surface profile gauges, surface cleanliness comparators, soluble salt testing equipment, dust contamination testing kits, adhesion testing equipment, holiday/pinhole detector, airless spray equipment, conventional spray equipment, abrasive blasting equipment, power mixing equipment, oil and moisture traps/separators. All inspection and test equipment must have valid calibration certificates.
Health & Safety
Source: Attachment 6 - Tender Evaluation Strategy for Peaking Corrosion Protection.pdf (unknown)The evaluation considers acceptable technical risks including use of specialist subcontractors for corrosion inspections, NDT, coating inspections, abrasive blasting, containment systems or specialised coating application, provided they possess required qualifications and competency. Unacceptable technical risks include methodology presenting unacceptable quality, safety or operational risks to Eskom facilities, and inability to demonstrate adequate containment, environmental protection, housekeeping or waste disposal arrangements.
Environmental
Source: Attachment 6 - Tender Evaluation Strategy for Peaking Corrosion Protection.pdf (unknown)The evaluation considers acceptable technical risks including use of specialist subcontractors for containment systems, and unacceptable technical risks include inability to demonstrate adequate containment, environmental protection, housekeeping or waste disposal arrangements for corrosion protection activities. Unacceptable exceptions include excluding responsibility for containment, environmental protection, waste handling or waste disposal activities associated with the works.
Contractual Terms
Source: Attachment 6 - Tender Evaluation Strategy for Peaking Corrosion Protection.pdfThe contract is for a period of five years. The technical evaluation strategy defines acceptable and unacceptable technical risks and exceptions. Acceptable risks include use of specialist subcontractors, hiring/leasing equipment, sharing resources between sites, supplementing with temporary labour, and using manufacturer technical representatives. Unacceptable risks include inability to demonstrate required experience, lack of minimum plant/equipment, subcontracting majority of core activities without in-house capability, unacceptable quality/safety/operational risks, inadequate containment/environmental/waste arrangements, and lack of qualified inspectors. Acceptable exceptions include minor deviations, alternative equipment/materials/methods if equivalence or superiority demonstrated, and additional quality control measures. Unacceptable exceptions include not covering full scope, reduced QC/inspection/testing, personnel not meeting minimum qualifications, alternative coating systems without demonstrated suitability, and excluding responsibility for containment/environmental/waste.
Special Conditions
Source: Attachment 6 - Tender Evaluation Strategy for Peaking Corrosion Protection.pdf (unknown)Acceptable technical risks: use of specialist subcontractors for corrosion inspections, NDT, coating inspections, abrasive blasting, containment systems or specialised coating application, provided they have required qualifications and competency; hiring or leasing specialised plant and equipment, provided proof of ownership, availability or lease agreements can be demonstrated; sharing resources between multiple sites, provided adequate resource planning and service delivery capability are demonstrated; supplementing permanent personnel with temporary labour during peak periods, provided supervision and quality are maintained; utilising manufacturer technical representatives or coating specialists for technical support, product selection, quality verification and warranty support. Unacceptable technical risks: contractor or subcontractor cannot demonstrate required experience; no access to minimum plant, equipment or specialist tools; subcontracting majority of core activities without sufficient in-house management and control; methodology presents unacceptable quality, safety or operational risks; inadequate containment, environmental protection, housekeeping or waste disposal; no access to suitably qualified inspectors or supervisory personnel. Acceptable exceptions: minor deviations not affecting quality, safety, functionality or scope; alternative equipment, materials, coating systems or methods if equivalence or superiority demonstrated and accepted; additional quality control measures exceeding requirements. Unacceptable exceptions: proposal does not cover full scope; reduced quality control, inspection or testing requirements; personnel not meeting minimum qualifications; alternative coating systems or materials without demonstrated suitability and compliance with Eskom and ISO standards; excluding responsibility for containment, environmental protection, waste handling or disposal.
Requirements
Source: Attachment 6 - Tender Evaluation Strategy for Peaking Corrosion Protection.pdf (unknown)Mandatory requirements on tender closing: attendance at compulsory site clarification meeting at Gourikwa PS, evidenced by attendance register. Mandatory requirements prior to contract award: minimum three projects in last 10 years, each ≥ R2 million, involving corrosion protection/industrial coating on industrial facilities, structural steel, tanks, pipelines, process plants, marine structures or similar. Evidence may include completion certificates, formal signed-off QCPs, release certificates, coating inspection reports accepted by the client, and client reference letters on company letterhead. Each reference must include client engineer contact details (cell phone numbers not acceptable), project description, value, and duration. Outstanding or unclear information requested by the Employer must be submitted within 5 calendar days or the bidder will be disqualified.
Section
Source: Attachment 6 - Tender Evaluation Strategy for Peaking Corrosion Protection.pdfTechnical evaluation uses a weighted scorecard. Mandatory criteria are pass/fail gatekeepers; failure disqualifies. Qualitative criteria are weighted and require a minimum overall score of 70%. Scoring: 5 = Compliant, 4 = Compliant with qualifications, 2 = Non-compliant, 0 = Totally deficient. Scores of 1 and 3 are not used.
Description
Source: Attachment 5 - Eskom_Corrosion Protection Contract - NEC3_TSC_Per Station_Price Lists.pdfCorrosion protection services on an as-and-when-required basis for eleven Eskom peaking sites, covering gas turbine, hydropower, pumped storage, wind farm and aeroderivative plants. The contract is for a period of 5 years.
Technical Specifications
Source: Attachment 5 - Eskom_Corrosion Protection Contract - NEC3_TSC_Per Station_Price Lists.pdf (unknown)Scope of work: corrosion protection services on an as-and-when-required basis at eleven Eskom peaking sites, including gas turbine, hydropower, pumped storage, wind farm and aeroderivative plants.
Work is instructed through NEC Task orders; quantities are estimates and do not guarantee work.
Pricing schedule is per station, with nine bills:
Rates must include labour, supervision, equipment, materials, ordinary consumables, overheads and profit unless separately measured.
Pricing Schedule
Source: Attachment 5 - Eskom_Corrosion Protection Contract - NEC3_TSC_Per Station_Price Lists.pdfPricing schedule is per station, with nine bills: Preliminary & General; Assessment, Engineering and NDT; Access, Protection and Containment; Surface Preparation; Corrosion Protection Coatings and Linings; Structural, Building and Piping Repairs; Station-Specific Plant Works; Logistics and Emergency Call-Outs; and Quality, Handover and Provisional Sums. Rates must include labour, supervision, equipment, materials, ordinary consumables, overheads and profit unless separately measured. Quantities are estimates and do not guarantee work. Work is instructed through NEC Task orders. VAT at 15% is added to the subtotal.
Financial Requirements
Source: Attachment 5 - Eskom_Corrosion Protection Contract - NEC3_TSC_Per Station_Price Lists.pdf (unknown)Pricing format: NEC3 Term Service Contract Part C2 pricing data, priced per station.
Each station has its own price list with the same nine bills; bidders must complete rates and amounts for every item.
Quantities are estimates and do not guarantee work; payment is based on work instructed through NEC Task orders.
VAT: 15% added to the subtotal to arrive at the total tender amount.
Provisional sums: include proven third-party materials and services at net cost with a 10% markup, and unscheduled specialist work.
Compliance Requirements
Source: Attachment 5 - Eskom_Corrosion Protection Contract - NEC3_TSC_Per Station_Price Lists.pdf (unknown)B-BBEE Minimum Level: 3
Health & Safety
Source: Attachment 5 - Eskom_Corrosion Protection Contract - NEC3_TSC_Per Station_Price Lists.pdfPricing includes items for initial Health and Safety plan, risk assessments and safe work procedures, and time-related health and safety compliance. Emergency call-out items include emergency condition report within 24 hours and temporary make-safe repairs.
Contractual Terms
Source: Attachment 5 - Eskom_Corrosion Protection Contract - NEC3_TSC_Per Station_Price Lists.pdfContract type: NEC3 Term Service Contract. Work is instructed through NEC Task orders. Quantities are estimates and do not guarantee work. Rates must include labour, supervision, equipment, materials, ordinary consumables, overheads and profit unless separately measured.
Submission Guidelines
Source: OHS Tender Evaluation Template (Annexure C1)Corrosion.pdf (unknown)Returnable OHS documents (all must be submitted):
Failure to submit any of these may affect evaluation.
Evaluation Criteria
Source: OHS Tender Evaluation Template (Annexure C1)Corrosion.pdf (unknown)OHS evaluation results in a recommendation of 'Recommended' or 'Not Recommended'. Submission of all returnable OHS documents is mandatory; missing items may affect the evaluation.
Technical Specifications
Source: OHS Tender Evaluation Template (Annexure C1)Corrosion.pdf (unknown)Scope of work: corrosion protection services on an 'as and when required' basis for eleven (11) Eskom peaking sites, including Gourikwa & Ankerlig gas turbine, Gariep, Vanderkloof & Ncora hydropower, Ingula, Drakensberg & Palmiet pumped storage schemes, Sere wind farm, Port Rex and Acacia aeroderivative. Contract period: 5 years.
Experience & Qualifications
Source: OHS Tender Evaluation Template (Annexure C1)Corrosion.pdfOHS competency requirements:
Compliance Requirements
Source: OHS Tender Evaluation Template (Annexure C1)Corrosion.pdf (unknown)OHS compliance requirements (mandatory returnables):
Section
Source: OHS Tender Evaluation Template (Annexure C1)Corrosion.pdfOHS evaluation uses Annexure C1 (High risk) template. The outcome is a recommendation of 'Recommended' or 'Not Recommended'.
Contact Information
Source: OHS Tender Evaluation Template (Annexure C1)Corrosion.pdf (unknown)No contact details provided in the document.
Submission Guidelines
Source: OHS Tender Evaluation Template (Annexure C1)Corrosion.pdf (unknown)Returnable documents (Annexure C1 – OHS Tender Evaluation Template, High Risk):
All returnables must be submitted; the template is used to determine if the bidder is recommended or not recommended.
Evaluation Criteria
Source: OHS Tender Evaluation Template (Annexure C1)Corrosion.pdf (unknown)Submission of all OHS tender returnables as per Annexure C1 is mandatory. The OHS evaluation template is used to determine if the bidder is recommended or not recommended. Bidders must provide a valid Letter of Good Standing (COIDA or equivalent). The OHS policy must be signed by the CEO and comply with OHS Act Section 7. The Contractor Site Supervisor must have HIRA, incident investigation, supervisor, and legal liability training. The Contractor Safety Officer must have an OHS Diploma, HIRA, incident investigation, legal liability training, ISO 45001:2018 implementation training, and a minimum of 2 years' work experience.
Technical Specifications
Source: OHS Tender Evaluation Template (Annexure C1)Corrosion.pdf (unknown)Scope of work: corrosion protection services on an 'as and when required' basis for eleven (11) Eskom peaking sites for a period of 5 years. Sites include: Gourikwa & Ankerlig Gas Turbine, Gariep, Vanderkloof & Ncora Hydropower, Ingula, Drakensberg & Palmiet Pumped Storage Schemes, Sere Wind Farm, Port Rex and Acacia Aeroderivative. The OHS evaluation template is for high-risk work; the OHS plan must address project/scope OHS risks.
Experience & Qualifications
Source: OHS Tender Evaluation Template (Annexure C1)Corrosion.pdfOHS competency evidence required (CVs, qualifications, certificates). Contractor Site Supervisor must have HIRA, incident investigation, supervisor, and legal liability training. Contractor Safety Officer must have an OHS Diploma, HIRA, incident investigation, legal liability training, ISO 45001:2018 implementation training, and a minimum of 2 years' work experience.
Compliance Requirements
Source: OHS Tender Evaluation Template (Annexure C1)Corrosion.pdf (unknown)Mandatory OHS returnables (Annexure C1):
Competency requirements:
Health & Safety
Source: OHS Tender Evaluation Template (Annexure C1)Corrosion.pdfMandatory OHS returnables as per Annexure C1: acknowledgement of Eskom's OHS legal and other requirements (Annexure B); Occupational Health and Safety Plan addressing project risks; detailed costing for OHS (broken down, not lump sum); Baseline OHS Risk Assessment (BRA) with methodology; valid Letter of Good Standing (COIDA or equivalent); OHS policy signed by CEO complying with OHS Act Section 7; OHS competency evidence (CVs, qualifications, certificates) including training for Contractor Site Supervisor (HIRA, incident investigation, supervisor, legal liability) and Contractor Safety Officer (OHS Diploma, HIRA, incident investigation, legal liability, ISO 45001:2018 knowledge, 2 years experience).
Section
Source: OHS Tender Evaluation Template (Annexure C1)Corrosion.pdfThe OHS evaluation template (Annexure C1, High Risk) is used to determine if the bidder is recommended or not recommended. All OHS returnables must be submitted.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Gourikwa Power Station Mossel Bay - Mossel Bay - Mossel Bay - 6500
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
32
Last checked
08 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
Everything South African general contractors need to know about how to write a winning tender proposal without an in-house bid team in gauteng — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Your meticulously crafted General sector tender submission can be disqualified for a single, seemingly minor compliance oversight. The reality for South African contractors is that technical competence is no longer sufficient; it is underpinned by a non-negotiable framework of documentary compliance. This regulatory guide: mastering CSD and BBBEE compliance for general sector tenders in south africa provides a comprehensive, step-by-step breakdown of the mandatory registrations and certificates you must secure and present. We detail the precise requirements for CSD, BBBEE, SARS TCS, CIPC, and COIDA, explaining their function within the procurement ecosystem governed by the PFMA and PPPFA. Learn the actionable steps to prepare your business, avoid the most common disqualifying errors, and leverage technology to streamline your compliance process for successful bidding in 2026 and beyond.
For South African General contractors, the path to government procurement is paved with non-negotiable regulatory requirements. The most common barrier to entry is not a lack of capability, but a failure to master the foundational compliance frameworks that govern every bid. This complete regulatory guide to CSD and BBBEE compliance for General sector tender suppliers in South Africa demystifies the process. It provides a meticulous, step-by-step field manual for ensuring your company is fully compliant and audit-ready, enabling you to confidently access the R billions in opportunities across infrastructure maintenance, facilities management, and service delivery within the General sector.
This definitive guide provides General sector contractors with the precise, actionable steps required to achieve and maintain CSD and BBBEE compliance for South African public tenders in 2026. Authored by Dr. Sarah Mokwena, a Legal Compliance Specialist, it meticulously walks through the regulatory framework, mandatory registrations, and the critical documentation needed to avoid disqualification. We dissect the common, costly errors made during submission and provide a clear checklist to ensure your bid is responsive and competitive. Learn how to navigate the Central Supplier Database, validate your BBBEE status, and integrate compliance into your tender preparation process.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services: General. Unlock full pricing strategies, bid frequency, and historical win rates.