Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Matla Power Station - kriel - Kriel - 2271
Organization Type
GOVERNMENT
Published
29 Jun 2026
OCDS Reference
ocds-9t57fa-160592
ESKOM invites tenders for a five-year contract to provide vessel and piping rubber services for the water treatment plant and slurry plant at matla power station. This is an open tender for service providers specializing in industrial rubber lining and maintenance. The contract will be awarded based on the nec term service contract framework.
Date & Time
Monday, 31 August 2026 - 10:00
Venue
https://teams.microsoft.com/meet/370335257780881?p=DcBqdaXqfAKZq9LsHa
Tenders should be submitted electronically
Categories
Request for Bid(Open-Tender)
Matla Power Station - kriel - Kriel - 2271
AI Document Analysis Stages
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically β no action required from you.
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: Technical Evaluation Criteria Vessel and Piping rubber services for WTP and Slurry Plant.pdf. You donβt need to refresh β this page will pick up the updated review automatically.
Contact Information
Source: Non-Disclosure Agreement for vendors template.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"................... a company incorporated under the laws of [insert"}
Evaluation Criteria
Source: Non-Disclosure Agreement for vendors template.pdf (unknown)The document does not specify technical or commercial eligibility criteria for the tender itself. It is a prerequisite legal document. To be eligible to receive tender information, a supplier must be a legally incorporated entity capable of signing this agreement and must agree to its terms. The supplier's details (country of incorporation, registered address, registration number) must be inserted into the template.
Technical Specifications
Source: Non-Disclosure Agreement for vendors template.pdf (unknown)provisions of this Agreement for any
purpose whatsoever other than the Project
Compliance Requirements
Source: Non-Disclosure Agreement for vendors template.pdf (unknown)No specific requirements found
Contractual Terms
Source: Non-Disclosure Agreement for vendors template.pdfthird parties. For purposes of this clause, the Receiving Partyβs Representatives shall
be deemed to be acting, in the event of a breach, as the Receiving Partyβs duly
authorised agents.
3.5 Except as otherwise contemplated in this Agreement, the Parties agree in favour of
one another not to utilise, exploit or in any other manner whatsoever use the
3.6 Accordingly, the Receiving Party agrees to indemnify, defend and hold the Disclosing
Template Identifier 240-43921804 Rev 6
Non-Disclosure Agreement Document Identifier 240-63152171 Rev 5
(NDA) Suppliers-Tenderers Effective Date 02 September 2024
Review Date September 2029
Project/Transaction Title [insert Project Title in the header of each page]
8.2 is or becomes publicly known, otherwise than as a result of a breach of this Agreement
by the Receiving Party;
8.3 is developed independently of the Disclosing Party by the Receiving Party in
circumstances that do not amount to a breach of the provisions of this Agreement;
8.4 is disclosed by the Receiving Party to satisfy an order of a court of competent
jurisdiction or to comply with the provisions of any law or regulation in force from time
to time; provided that in these circumstances, the Receiving Party shall advise the
required to disclose and the Receiving Party will use its reasonable endeavours to
protect the confidentiality of such Confidential Information to the greatest extent
possible in the circumstances;
8.5 is disclosed to a third party pursuant to the prior written authorisation and Ltd to the
extent of such approval of the Disclosing Party;
8.6 is received from a third party in circumstances that do not result in a breach of the
provisions of this Agreement.
shall endure for a period of 3 (three) years after the date of termination of the
relationship between the parties or at a date specified in any subsequent agreement(s)
between the Parties in pursuance of the Project referred to herein.
Agreement and fail to remedy such breach within seven (7) business days from date
of a written notice to do so, then the Disclosing Party shall be entitled to invoke all
remedies available to it in law including, but not Ltd to, the institution of urgent
proceedings as well as any other way of relief appropriate under the circumstances, in
any court of competent jurisdiction, in the event of breach or threatened breach of the
14.2.1 will not result in a breach of any other Agreement to which it is a party; and
14.2.2 will not, to the best of its knowledge and belief, infringe the rights of any third party;
and the Disclosing Party hereby indemnifies and holds the Receiving Party harmless
against any liability for third party claims on such a basis.
Submission Guidelines
Source: Technical Evaluation Criteria Vessel and Piping rubber services for WTP and Slurry Plant.pdf (unknown)Returnable Documents: [Specific returnable documents not specified in available text]
Submission Guidelines
Source: Environmental Requirements.pdf (unknown)Returnable Documents: Environmental Contractors Assessment Form and Signed Contractor Commitment and Indemnity Letter.
Evaluation Criteria
Source: Environmental Requirements.pdf (unknown)While explicit financial or experience thresholds are not stated in the provided excerpt, eligibility is contingent on demonstrating robust environmental management capability. This includes the ability to implement and document an EMS (aligned with standards like ISO 14001), develop and execute the required environmental and waste plans, and comply with all relevant environmental legislation. Contractors must be willing to commit to a 5-year term and assume liability via the indemnity letter.
Compliance Requirements
Source: Environmental Requirements.pdf (unknown)Environmental Compliance: Must adhere to all legal requirements and submit a signed Contractor Commitment and Indemnity Letter.
Health & Safety
Source: Environmental Requirements.pdfHealth and Safety Requirements:
Environmental
Source: Environmental Requirements.pdfEnvironmental Requirements:
Description
Source: Safety Requirements.pdfService provider must comply with Matla Power Station Safety File requirements and obtain approval from site's Contract Custodian and OHS Professional before commencing work.
Submission Guidelines
Source: Safety Requirements.pdf (unknown)Returnable Documents: All required tender returnables must be submitted during tender close-out. Bidders are permitted ONE opportunity to submit outstanding documents within 7 working days after tender close-out. Failure to submit outstanding documents within the stipulated timeframe may result in the tenderer being disqualified as non-responsive and ineligible for contract award.
Evaluation Criteria
Source: Safety Requirements.pdf (unknown)Eligibility is contingent on submitting all mandatory OHS documentation. Failure to submit outstanding documents within the stipulated 7-day period after evaluation will result in the tenderer being deemed non-responsive and ineligible for contract award. The service provider must comply with Matla Power Station's specific Safety File requirements to gain site access.
Technical Specifications
Source: Safety Requirements.pdf (unknown)No work shall commence until the Safety File is approved by the respective site's Contract Custodian together with the OHS Professional. Service providers must comply with Matla Power Station Safety File requirements to gain site access.
Compliance Requirements
Source: Safety Requirements.pdf (unknown)OHS Requirements (must be complied with prior to signing contract):
Health & Safety
Source: Safety Requirements.pdfOHS Requirements for Matla Power Station:
Section
Source: Safety Requirements.pdfEvaluation takes place after mandatory and functionality evaluations are completed. Bidders are given ONE opportunity to submit outstanding documents within 7 working days. Failure to submit within stipulated time may result in disqualification.
Description
Source: 20. Eskom life-saving rules.pdfEskom and its subsidiaries will conduct business with respect and care for people to ensure that no
operating condition or urgency of service endangers the life of anyone or causes injury or damage
to the environment. Eskom is committed to preventing all work-related injuries. In fulfilling this
commitment to protect people, the environment and property, management will provide and
maintain a safe and healthy work environment, in accordance with industry standards and in
compliance with legislative requirements.
At-risk behaviour leads to incidents. Life-saving Rules are safety rules that have been created to
enforce zero tolerance for serious at-risk behaviours. These rules have been determined in terms
of the consequences of the behaviours they describe, that is, if a particular set of behaviours or
actions has a very high probability of causing disabilities or fatalities when performed.
The Eskom Life-saving Rules complement our existing safety best practices and are safety rules to
be followed at all locations.
The Life-saving Rules apply to all Eskom employees, agents, consultants, and contractors. Visitors
to Eskom should also respect and adhere to these rules as applicable and could be instructed to
leave the Eskom premises with immediate effect should they refuse to do so.
2. Supporting Clauses
2.1 Scope
This standard shall apply at all Eskom sites with the intention to promote a safe working
environment for all Eskom employees, agents, consultants, and contractors. Visitors to Eskom
should also respect and adhere to these rules, as applicable.
2.1.1 Purpose
This standard clarifies the five most prominent causes of serious injuries and fatalities within
Eskom, and Eskomβs intention to enforce βZERO TOLERANCEβ with respect to non-adherence to
these rules, due to the potential consequences of serious injury or fatality at the workplace.
2.1.2 Applicability
This standard shall apply throughout Eskom Holdings SOC Limited, its divisions, subsidiaries, and
entities wherein Eskom has a controlling interest and/or Eskom contractors, unless specifically
exempted by Sustainability Systems, where the business transacted may be of a completely
different nature to the core business of Eskom.
2.1.3 Effective date
This document will be effective from the date of authorisation.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] ISO 9001 Quality Management Systems
[2] 32-37: Substance Abuse Procedure
[3] 32-95: Environmental, Occupational Health and Safety Incident Management Procedure
[4] 32-136 Contractor Health and Safety Requirements
[5] 32-345 Eskom Vehicle Safety Specification
[6] 32-407 Behavioural Safety Observations
[7] 32-418: Working at Heights Standard
[8] 32-477 Safety, Health and Environment Training and Development Procedure
[9] 32-520 Occupational Health and Safety Risk Assessment Procedure
[10] 32-524 Developing a SHE Specification
[11] 36-681: Plant Safety Regulations
[12] 32-726 SHE requirements for Eskom Commercial Process
[13] 32-727: Safety, Health, Environment and Quality Policy
[14] 32-848: Operating Regulations for High Voltage Systems
[15] 32-1112: Disciplinary Code
[16] 32-1113: Disciplinary Procedure
[17] 240-44175132 Eskom Personal Protective Equipment Specification
[18] 240-62946386: Vehicle and Driver Safety Management Procedure
[19] 240-43848327: Right to Refuse Employeesβ Right of Refusal to Work in an Unsafe Situation
Procedure
[20] 240-84733329: Medical Surveillance Procedure
[21] 240-100979499 Personal Protective Equipment for Working at Heights Specification
2.2.2 Informative
[22] National Road Traffic Act
[23] Occupational Health and Safety Act
[24] 34-104 Earthing Standard
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
2.3 Definitions
2.3.1 Contractor: Any person (juristic/individual) formally contracted (directly or indirectly) by
Eskom and who performs work; supplies a service, product, equipment or material for the
purposes of advancing Eskomβs business and other interests. This includes consultants,
and third party contractors i.e. vendors, suppliers, agents, joint ventures, fixed term
contractors, principal contractors and subcontractors.
2.3.2 Life-saving Rule: Rules that, if not adhered to, have the potential to cause serious harm to
people. The consequences of a person knowingly and wilfully violating this rule will result in
a disciplinary process in accordance with the Eskom Disciplinary Code and Procedure.
2.3.3 Visitors: Any person who visits an Eskom site/office during working hours to attend a
meeting or for any reason whatsoever. This could include a minor.
2.3.4 Work at height: Means any work performed above a stable work surface or where a
person puts himself/herself in a position where he/she exposes himself/herself to a fall from
or into. Work at height is, as a result, work in any place (except a staircase in a permanent
workplace ), including a place at, above or below ground level, where a person could be
injured if he/she fell from that place. Access and egress that present a risk of fall can also
be classified as work at height.
2.3.5 Zero Tolerance: The standard that provides for the imposition of severe consequences for
a proscribed offence or behaviour without making exceptions for the extenuating
circumstances.
2.4 Abbreviations
Abbreviation Explanation
OHS Occupational Health and Safety
ORHVS Operational Regulations for High Voltage Systems
PPE Personal Protective Equipment
PSR Plant Safety Regulations
PTW Permit to Work
SHEQ Safety, health, environment and quality
2.5 Roles and Responsibilities
2.5.1 Sustainability Systems Department
The sustainability Systems Department shall:
a) Compile and review the Life-saving Rules for Occupational Health and Safety;
b) Develop awareness material;
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
c) Ensure that the rules are communicated throughout the business;
d) Ensure compliance is monitored; and
e) Ensure that violations and sanctions are consolidated and communicated by Sustainability
Systems to the organisation.
2.5.2 All Groups/Divisions/Operating Units/Business Units
The management at Group/Divisional/Operating Unit/Business Unit level shall be responsible for:
a) Implementing the Eskom Life-saving Rules in their Groups/Divisions/Operating
Units/Business Units.
b) Communicating to all their employees, contractors, contractor employees and visitors the
importance of compliance with the Eskom Life-saving Rules and the consequences of non-
compliance therewith. This includes communicating Life-saving Rules to all new
employees and new contractors.
c) Ensuring that the awareness material is made available, distributed and displayed at all
units.
d) Ensuring all employees sign confirmation that the rules have been discussed with them,
that they understand the rules and the consequences of violating these rules, and retain
copies thereof.
e) Investigating any violation of a Life-saving rule and initiate the disciplinary process within
five (5) working days.
f) Ensuring consistency in the application of appropriate sanctions on employees, contractors
and contractor employees.
2.5.3 All employees (Eskom and contractors)
a) Always observe and adhere to the Life-saving Rules.
b) Avoid taking shortcuts when executing tasks. Always do the right thing even when no-one
is watching.
c) Only perform work that you are authorised to do.
d) All employees to exercise the right to refuse to perform work in an unsafe situation, or when
required to ignore a Life-saving rule.
2.6 Process for Monitoring
Groups/Divisions/Operating Units/Business units are responsible for ensuring the understanding
of, and compliance with, Life-saving Rules. Line management shall monitor compliance and report
on analysis and trending through performance reporting. The amendments to the revised standard
shall be implemented with immediate effect and may be audited after a period of six (6) months
from date of implementation.
2.7 Related/Supporting Documents
[1] 240-62196227 - Life-saving Rules β revision 5 (superseded).
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
[2] 240β63942960 - Life-saving Rule Acknowledgement Form Document Content.
3. Document Content
Life-saving Rules are safety rules that, if not adhered to, have the potential to cause serious harm
to people. The consequences of a person knowingly and wilfully violating these rules will result in a
disciplinary process in accordance with the Eskom Disciplinary Code and Procedure.
The objective of this standard is to clarify Eskomβs intention to enforce βZERO TOLERANCEβ with
respect to behaviour resulting in serious risk to an individual at the workplace.
It must be noted that the content of this standard does not detract from the requirements for safe
behaviour for all other work-related activities or other safety requirements, but emphasises the
importance thereof.
3.1 Eskom Life-Saving Rules
3.1.1 Rule 1: open, isolate, test, earth, bond, and/or insulate before
Touch
With the aim to ensure a safe electrical work environment, no person may work/operate on, around
or near any electrical network, line or apparatus, electrically connected to the power system and/or
electrically charged and/or not electrically charged unless:
a) He/she is trained and authorised as competent for the task to be done;
b) There is a valid permit to work, where required;
c) A pre-task risk assessment to identify all risks and hazards has been conducted prior to any
work commencing;
d) He/she follows the requirements on OPEN, ISOLATE, TEST, EARTH, BOND and/or
INSULATE BEFORE TOUCH, correctly based on applicable/related standards, procedures
and outcome of risk assessment fit for the type of work or task to be performed;
e) The authorised person (team leader) has certified and physically shown all team members that
the apparatus is safe to work on;
f) He/she makes the specific electrical environment safe prior to performing the work; and
g) All the appropriate PPE (including face shield and insulated gloves for low voltage work) are
worn.
3.1.2 Rule 2: hook up at heights
Working at height is a significant part of work in Eskom Holdings and is regarded as a high-risk
activity, and as a result all precautions must be taken to prevent incidents while working at height.
Wherever reasonably practicable, preference must be given to the performance of work at ground
level as opposed to work in an elevated position. Where work in an elevated position is necessary,
the requirements in this document shall apply.
No person may work at height where there is a risk of falling unless:
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
a) He/she is medically fit to work at height;
b) A pre-task risk assessment to identify all risks and hazards has been conducted prior to
commencing any work of this nature;
c) He/she is appropriately trained as determined by the risk assessment;
d) He/she is appropriately secured during ascending and descending; and
e) He/she is using an Eskom approved fall arrest system where applicable.
3.1.3 Rule 3: buckle up
Where required, the proper wearing of seat belts for any driver, operator and passenger is
mandatory in all vehicles/equipment when driving and/or travelling for Eskom business purposes.
The driver is obligated to ensure that he/she as well as all passengers are properly seated and
wearing their seatbelts at all times while being transported in the vehicle, as per Eskom
specifications.
Note: This rule is applicable on any road or parking lot, irrespective of the speed, and when the
vehicle moves in a forward or backward direction.
3.1.4 Rule 4: be sober
No person who is under the influence or who appears to be under the influence of intoxicating
liquor or drugs will be permitted to enter, or remain on an Eskom site or conduct Eskom business
or drive/operate a vehicle/equipment for Eskom business purposes.
This includes any level of alcohol or the presence of any drugs, controlled substances, and/or
illegal substances in the body that impairs or could impair mental and physical functioning,
irrespective of when the substance was used.
3.1.5 Rule 5: ensure that you have a permit to work
Where an authorisation limitation exists, no person shall work without the required Permit to Work
(PTW), which is governed by for example the:
a) Plant Safety Regulations; or
b) Operating Regulations for High Voltage Systems (ORHVS); or
c) Any other activity where a permit is required.
No plant is to be returned to service without the cancellation of all permits on that plant in
accordance with procedure, unless permission is granted for a particular plant to be returned to
service with permits still open, like in the case of redundant systems.
NOTE: In the case of live work, a βlive work declaration formβ is to be completed by the authorised
person, who is the person responsible for the safe execution of work according to relevant
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
standards and procedures. Outline the key principles or rules to support the implementation of the
standard statement.
3.2 Consequences of violating a Life-Saving Rule
In terms of general health and safety in Eskom, if any of the Life-saving Rules are violated, it will
be treated as a serious misconduct, and result in a disciplinary process in accordance with the
Eskom Disciplinary Code and Procedure.
It must be highlighted that Eskom takes a ZERO TOLERANCE stance to violation of these rules.
Depending on the circumstances, Eskom reserves the right, where a contractor
manager/supervisor allows the violation of a Life-saving Rule, to suspend the contractorβs activities
while determining an appropriate sanction.
In the light of a contractor employee allegedly violating a Life-saving Rule, the contractor shall
immediately remove the employee from site and initiate the disciplinary process. The contractor
shall investigate any violation of a Life-saving Rule and initiate the disciplinary process within five
(5) working days of the violation. The contractor shall after the disciplinary process furnish Eskom
with a copy of the sanction.
4. Acceptance
This document has been seen and approved by:
Name Designation
Thava Govender Group Executive β Generation and (Acting) Risk and Sustainability
Divisions
Kerseri Pather General Manager β Sustainability Systems
Jace Naidoo Senior Manager β Sustainability Systems β OHS
Alex Stramrood Senior Manager β Sustainability Systems β OHS
Risk and Sustainability Members of the Risk and Sustainability Management Committee
Management Committee
HR Policies and Procedures Members of the HR Policies and Procedures Committee
Committee
5. Revisions
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
Date Rev. Compiler Remarks
January 2017 6 A Stramrood Substituted the words βDisciplinary
hearingβ with Disciplinary process.
Updated the Purpose and
Applicability to specify that this
Standard is applicable to
contractors. Updated Normative
and Informative References.
Updated Definition section by
removing Agent and Consultant as
these have been incorporated into
the definition of Contractor.
Updated the definition of Work at
Height and Zero Tolerance.
Reviewed and updated the Roles
and Responsibilities section and
Process for Monitoring. Added
permit requirement to Rule 1,
updated Rule 2 - Removed the
words βpsychologically fit to workβ
as this is no longer a requirement
in terms of the Construction
Regulations, 2014 and updated
Rule 3 β Removed the words β(for
example transporting people on
the back of trucks in a cabin)β
Updated Consequences of
violating a Life-saving Rule with
regard to contractors.
October 2015 5 A Stramrood Revision date needed to be
extended. Content still valid and
same.
May 2012 4 S Govender Amended Section 3.6
Consequences of Violating a Life-
saving Rule to align with EXCO
decision.
March 2013 3 S Govender Changed Cardinal Rules to Life-
saving Rules, and amended
content to ensure better
understanding of the intent and
requirements.
September 2010 2 K Terblanche Content of Rev 1 was incorporated
into the new Policy template.
Content was revised and updated.
December 2008 1 K Terblanche Annexure 1: Acknowledgement of
Eskom Life-saving Rules of this
document was removed. The
references made to Annexure 1 in
paragraphs 3.5.2 and 3.8 were
also removed.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
Date Rev. Compiler Remarks
August 2008 0 K Terblanche The document with reference
number 32-421 was developed
and approved.
6. Development Team
The following people were involved in the development of this document:
ο· Alex Stramrood
ο· Kerseri Pather
ο· Loraine Smit
ο· Marc Lebea
ο· Mike Townsend
ο· Nosipho Noveve
ο· Sheryl Isaacs
ο· Sivi Govender
7. Acknowledgements
SN Middel
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Evaluation Criteria
Source: 20. Eskom life-saving rules.pdf (unknown)While not stating explicit tender eligibility, compliance with this standard is a fundamental precondition for working on Eskom sites. Eligible contractors must demonstrate: A robust safety management system aligned with Eskom's referenced normative documents (e.g., ISO 9001, OHS Act); proven processes for training, monitoring, and enforcing these specific rules; and acceptance of Eskom's right to suspend work for violations. Financial or technical capacity for the rubber services work is not addressed in this document.
Health & Safety
Source: 20. Eskom life-saving rules.pdf (unknown)Where an authorisation limitation exists, no person shall work without the required Permit to Work (PTW), which is governed by the Plant Safety Regulations; or the Operating Regulations for High Voltage Systems (ORHVS); or any other activity where a permit is required. No plant is to be returned to service without the cancellation of all permits on that plant in accordance with procedure, unless permission is granted for a particular plant to be returned to service with permits still open, like in the case of redundant systems. In the case of live work, a live work declaration form is to be completed by the authorised person, who is the person responsible for the safe execution of work according to relevant standards and procedures.
Contact Information
Source: E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)Submission Guidelines
Source: E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)Returnable Documents
Source: E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)Evaluation Criteria
Source: E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)Businesses must be registered and capable of using Eskom's e-tendering system. No explicit technical or financial criteria are detailed in this excerpt.
Technical Specifications
Source: E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)Compliance Requirements
Source: E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)Description
Source: Supplier declaration of interest.pdfThis document is a standard Eskom Supplier Declaration of Interest form (Template 240-59385360 Rev 3). It is not the main tender specification for vessel and piping rubber services β it is a returnable declaration document that must accompany the bid. The form requires suppliers to disclose potential conflicts of interest with Eskom employees and directors, declare business courtesies, and list other Eskom work if applicable. The actual scope of work (vessel and piping rubber services for WTP and Slurry Plant at Matla Power Station for 5 years) is described in the main tender specification, not this document.
[Source: Supplier Declaration of Interest Template]
Important Dates
Source: Supplier declaration of interest.pdf (unknown)No tender-specific dates are contained in this document. The dates shown (Effective Date 01 February 2015, Review Date November 2026) are document metadata for the declaration template, not tender-related dates. The actual closing date and briefing dates are stated in the tender record, not this document.
[Source: Supplier Declaration of Interest Template]
Contact Information
Source: Supplier declaration of interest.pdf (unknown)No specific contact details are provided in this document. The declaration form does not include SCM or technical contact names, email addresses, phone numbers, or submission addresses. Consult the main tender documentation for procurement contact details.
[Source: Supplier Declaration of Interest Template]
Submission Guidelines
Source: Supplier declaration of interest.pdf (unknown)This document is a RETURNABLE β the Supplier Declaration of Interest form must be completed and submitted with your bid.
[Source: Supplier Declaration of Interest Template β Eskom Form 240-59385360 Rev 3]
Returnable Documents
Source: Supplier declaration of interest.pdf (unknown)The Supplier Declaration of Interest form (Eskom Template 240-59385360 Rev 3) is a mandatory returnable document that must be completed and submitted with the tender bid. The form includes:
Complete all sections, provide particulars for any YES answers, sign under oath, and submit as part of your returnable documents.
[Source: Supplier Declaration of Interest Template]
Evaluation Criteria
Source: Supplier declaration of interest.pdf (unknown)Suppliers must truthfully declare all potential conflicts of interest. False declarations may result in Eskom taking action against the supplier or signatory personally. Suppliers must disclose any relationships that could influence or be seen to influence the procurement process, including: direct employment at Eskom, close family relationships, associate relationships, and business courtesy exchanges.
Technical Specifications
Source: Supplier declaration of interest.pdf (unknown)No technical specifications are contained in this document. This is a standard Eskom supplier declaration form β it does not describe the vessel and piping rubber services scope, deliverables, or technical requirements. Refer to the main tender specification for service descriptions.
[Source: Supplier Declaration of Interest Template]
Financial Requirements
Source: Supplier declaration of interest.pdf (unknown)No financial requirements are contained in this document. This declaration form does not address pricing, bonds, guarantees, payment terms, or financial capacity. Consult the main tender specification for financial requirements.
[Source: Supplier Declaration of Interest Template]
Compliance Requirements
Source: Supplier declaration of interest.pdf (unknown)This document IS itself a compliance requirement β suppliers must complete and submit the Supplier Declaration of Interest as a returnable document.
[Source: Supplier Declaration of Interest Template β Eskom Form 240-59385360 Rev 3]
Special Conditions
Source: Supplier declaration of interest.pdf (unknown)Key definitions from the declaration form:
Eskom employees and directors are not permitted to financially benefit from procurement associated with this tender. Suppliers must declare any such positions to Eskom and take an oath declaring their interests.
[Source: Supplier Declaration of Interest Template β Eskom Form 240-59385360 Rev 3]
Requirements
Source: Supplier declaration of interest.pdf (unknown)Suppliers must complete the following declarations:
Provide full particulars for all YES answers including names, relationships, dates, and nature of involvement.
[Source: Supplier Declaration of Interest Template]
Section
Source: Supplier declaration of interest.pdfNo evaluation criteria are contained in this document. This is a supplier declaration form only β the main tender specification contains the evaluation criteria and scoring methodology.
[Source: Supplier Declaration of Interest Template]
Important Dates
Source: Quality Requirements SECTION A.pdf (unknown)Closing date: 24 June 2026.
Submission Guidelines
Source: Quality Requirements SECTION A.pdf (unknown)Returnable Documents: Form A must be completed and signed. Other returnables include quality management system documentation as per the listed sections.
Returnable Documents
Source: Quality Requirements SECTION A.pdf (unknown)Form A must be completed and signed. Section E score includes 2 points for this requirement.
Evaluation Criteria
Source: Quality Requirements SECTION A.pdf (unknown)Must have ISO 9001:2015 certification from an internationally accredited body with relevant scope for vessel and piping rubber services. Must select 'Category 2' for pre-contract award quality requirements. Must demonstrate capability through documented quality management systems and provide evidence of operational QMS. Site assessment may be applicable under Category 2 requirements.
Technical Specifications
Source: Quality Requirements SECTION A.pdf (unknown)Scope: Vessel and piping rubber services for WTP and Slurry Plant for a period of 5 years at Matla Power Station.
Quality requirements apply as per specification 240-105658000.
Pre-contract award quality requirements (Clause 3) apply.
Category 2 is selected (refer to clause 3.5.-105658000).
Post-contract award clauses include Contract Execution (Clause 5) and Supplier Quality Performance Monitoring Phase (Clause 3.7).
Eskom rights include Access, Information, Preservation, Quality Audits, Management of Nonconformities, and Special Processes (Clause 3.8).
ISO 9001 clauses 4-10 and principles 1-7 are applicable.
Methodology
Source: Quality Requirements SECTION A.pdfISO 9001 clauses and principles applicable:
Quality Management
Source: Quality Requirements SECTION A.pdfPre-contract award quality requirements (Clause 3) apply.
Category 2 is selected (refer to clause 3.5.-105658000). Categories 1, 3, and 4 are not applicable.
Main Supplier and Sub-supplier Capability and Capacity Assessment is not applicable.
Post-contract award clauses include Contract Execution (Clause 5) and Supplier Quality Performance Monitoring Phase (Clause 3.7).
Section
Source: Quality Requirements SECTION A.pdfQuality requirements deliverables are evaluated with indicator = 1.
Scoring sections:
Pre-contract award quality requirements (Clause 3) apply.
Supplier Quality Performance Monitoring Phase (Clause 3.7) applies.
Quality Audits Related Conditions (Clause 3.8) apply.
Evaluation Criteria
Source: Environmental Contractors Assessment Form.pdf (unknown)Contractors must demonstrate environmental compliance capability including: proper hazardous material handling, waste management procedures, understanding of Matla's environmental regulations (OMOP 2255), ability to provide required documentation (MSDS, transportation certificates), and compliance with Matla's permit conditions. No specific technical qualifications or certifications are detailed in this excerpt.
Technical Specifications
Source: Environmental Contractors Assessment Form.pdf (unknown)The contractor must provide details for the following environmental management tasks:
Quality Management
Source: Environmental Contractors Assessment Form.pdfThe contractor must provide details for the following environmental management tasks:
Evaluation Criteria
Source: CONTRACTORS COMMITMENT AND INDEMNITY LETTER.pdf (unknown)While general commercial eligibility is not detailed in this annexure, the key eligibility criterion derived from this document is the demonstrated capability and commitment to implement and maintain a formal, certified Environmental Management System in line with ISO 14001:2015 for the duration of the 5-year contract. The contractor must have the organizational structure, processes, and resources to meet these specific environmental obligations.
Technical Specifications
Source: CONTRACTORS COMMITMENT AND INDEMNITY LETTER.pdf (unknown)The contractor must manage environmental aspects of station activities, products, and services within the defined scope. This includes compliance with licenses, acts, regulations, development approvals, operating procedures, and legislatively defined management plans. The contractor must ensure full compliance with environmental operational controls and planning as per OMOP 4402 and OMOP 4090.
Compliance Requirements
Source: CONTRACTORS COMMITMENT AND INDEMNITY LETTER.pdf (unknown)No specific compliance requirements stated in the provided document.
Environmental
Source: CONTRACTORS COMMITMENT AND INDEMNITY LETTER.pdfThe contractor must commit to the following environmental requirements:
Description
Source: Annexure B Safety.pdfEvaluation Criteria
Source: Annexure B Safety.pdf (unknown)Company must have CEO/Director/Managing Director authorized to sign acknowledgement form. Must demonstrate ability to comply with extensive OHS requirements. Must have experience with similar work (Eskom may request testimonials/references). Must have processes for managing subcontractors and ensuring their OHS compliance.
Technical Specifications
Source: Annexure B Safety.pdf (unknown)Compliance Requirements
Source: Annexure B Safety.pdf (unknown)Health & Safety
Source: Annexure B Safety.pdfContractual Terms
Source: Annexure B Safety.pdfImportant Dates
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)Contact Information
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)Submission Guidelines
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)Returnable Documents
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)Tender closing time 2.2 Ensure that Eskom has received the complete original tender and one (1) complete hard copy of the original tender at the address and in the tender box or e-mail address specified in the Tender Data by no later than the closing date and time for tender submission. Proof of posting or of courier delivery does not equate to proof of delivery. Eskom will not accept a tender submitted by e-mail unless stated otherwise in the Tender Data. For E-tendering the tenderer must upload and finalize the tender via Eskom Tender bulletin site on the Eskom E- tendering page by no later than the closing date and time for tender submission. It remains the sole responsibility of the tenderer to ensure that the documents (PDF/Excel) are submitted and accessible for downloading/evaluation without any challenges as well as they are not corrupt or unreadable. It is the tendererβs responsibility to ensure that their tenders documents are submitted/uploaded, and the submission is finalised before the closing date and time For E-tendering tenderers are not permitted to deposit a tender into the Eskom tender box only electronic submission via the Eskom Tender bulletin site on the Eskom E- tendering page will be accepted.
Evaluation Criteria
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)The tenderer (or consortium) must comply with eligibility criteria stated in the Tender Data (not provided in this excerpt). Key universal criteria from the standard conditions: The tenderer or its principals must not be under any restriction to do business with Eskom or State-Owned Companies. Sub-contracting 100% of the scope of work is prohibited and leads to disqualification. Tenderers found to have misrepresented or falsified any information (e.g., B-BBEE certificate) face disqualification, reporting to the B-BBEE Commission, and potential suspension from state business for up to 10 years.
Technical Specifications
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)Financial Requirements
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)Compliance Requirements
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)B-BBEE Requirements
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)2.31 Eskom may disqualify a tender if it is found that the tenderer has misrepresented or falsified any information, certificate, affidavit or document. Eskom will report any fraud in relation to a tendererβs B-BBEE certificate/affidavit, or evidence of βfrontingβ as defined in the B-BBEE Act , as amended, to the B-BBEE Commission. The tenderer will be suspended from business with any State-Owned Company for up to 10 years and may even be sentenced to jail.
Contractual Terms
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdfRequirements
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)Eligibility 2.1 Submit a tender only if the tenderer (whether a single company or an incorporated or unincorporated joint venture or consortium) complies with the eligibility criteria stated in the Tender Data and the tenderer, or any of its principals, is not under any restriction to do business with Eskom or State-Owned Companies. Tenderers that Eskom finds to be ineligible will be disqualified. Tenderers are not permitted to sub-contract 100% of the scope of work (SOW). Any tender that is based on 100% sub-contracting will be deemed ineligible and will be disqualified.
Section
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)Seek clarification 2.16 While preparing their tenders and prior to submission, tenderers are entitled to seek clarification in respect of the Invitation to Tender documents. A request for clarification or query must be addressed, in writing, to the Eskom Representative identified in the Invitation to Tender document. No request or query may be addressed to any other Eskom official other than the Eskom Representative. Eskom will publish all requests for clarification and queries received (without divulging the tendererβs name), together with its responses, on the platform/s on which the tender was advertised.
Description
Source: SDL&I strategy for Vessel and piping rubber services for WTP and Slurry Plant.pdfImportant Dates
Source: SDL&I strategy for Vessel and piping rubber services for WTP and Slurry Plant.pdf (unknown)Contact Information
Source: SDL&I strategy for Vessel and piping rubber services for WTP and Slurry Plant.pdf (unknown)Submission Guidelines
Source: SDL&I strategy for Vessel and piping rubber services for WTP and Slurry Plant.pdf (unknown)Returnable Documents
Source: SDL&I strategy for Vessel and piping rubber services for WTP and Slurry Plant.pdf (unknown)Evaluation Criteria
Source: SDL&I strategy for Vessel and piping rubber services for WTP and Slurry Plant.pdf (unknown)All tenderers are eligible but must provide B-BBEE documentation to score preference points. Failure to provide B-BBEE docs results in scoring 0/20 on specific goals and evaluation on price only (80 points). B-BBEE status level determines points scored (Level 1: 20 points, Level 8: 2 points, Non-compliant: 0 points). Specific B-BBEE documentation requirements vary by company revenue: <R10m (Exempted Micro Enterprise) can submit sworn affidavit; <R50m (Qualifying Small Enterprise) must comply with QSE scorecard or submit affidavit if 51% Black-owned; >R50m requires valid B-BBEE certificate.
Technical Specifications
Source: SDL&I strategy for Vessel and piping rubber services for WTP and Slurry Plant.pdf (unknown)Methodology
Source: SDL&I strategy for Vessel and piping rubber services for WTP and Slurry Plant.pdfPricing Schedule
Source: SDL&I strategy for Vessel and piping rubber services for WTP and Slurry Plant.pdfFinancial Requirements
Source: SDL&I strategy for Vessel and piping rubber services for WTP and Slurry Plant.pdf (unknown)Compliance Requirements
Source: SDL&I strategy for Vessel and piping rubber services for WTP and Slurry Plant.pdf (unknown)B-BBEE Requirements
Source: SDL&I strategy for Vessel and piping rubber services for WTP and Slurry Plant.pdf (unknown)Special Conditions
Source: SDL&I strategy for Vessel and piping rubber services for WTP and Slurry Plant.pdf (unknown)Section
Source: SDL&I strategy for Vessel and piping rubber services for WTP and Slurry Plant.pdfDescription
Source: E-tendering Help Manual for supplier - 27 January 2025.pdfThe Eskom eTendering system is a web-based platform for electronic submission of tender documents. It replaces manual/physical submissions at Eskom tender offices. Suppliers must register, verify their email, and authenticate via OTP (sent to phone and email). Access requires a CSD number. Documents are uploaded via https://eTendering.eskom.co.za or linked from https://tenderbulletin.eskom.co.za.
Important Dates
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)Closing date: 31 August 2026 at 10:00 AM. Note: Example email in the manual references a past date (23 August 2022, 3:42 PM), but the tender record specifies 2026-08-31T10:00:00.000Z as the official closing date.
Contact Information
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)For system issues: Contact the buyer responsible for the published tender. Automated submission confirmation emails are sent from [email protected].
Submission Guidelines
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)Submit all tender documents electronically via the Eskom eTendering system. Steps: 1) Register on https://eTendering.eskom.co.za (CSD number required). 2) Verify email and complete OTP authentication. 3) Select the tender reference number. 4) Upload documents under correct categories (Technical, Commercial, Finance). 5) Individual file size limit: 50MB; total submission limit: 900MB. 6) Finalize submission and save the confirmation email with submission ID for reference. Disqualification risk: Incomplete or incorrectly categorized submissions.
Evaluation Criteria
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)Must be a registered supplier with a valid CSD number. Must successfully register on Eskom's eTendering system, providing a valid email and mobile number for OTP verification. The document does not specify technical or financial eligibility criteria for this specific tender.
Compliance Requirements
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)Mandatory: Valid CSD (Central Supplier Database) number required to access the eTendering system. No additional compliance details (e.g., B-BBEE, CIDB) are specified in the provided document.
Section
Source: E-tendering Help Manual for supplier - 27 January 2025.pdfClosed tenders are not listed publicly on TenderBulletin. Instead, Eskom sends direct bid invitations via email to pre-qualified suppliers who meet selection criteria. These suppliers bid privately through a provided link.
Description
Source: NEC Vessel and rubber Piping Services.pdfVessel and piping rubber lining services for Water Treatment Plant (WTP) and Slurry Plant at Matla Power Station for five years on an as and when required basis. The service covers maintenance of the Ash and Dust Handling Plant, including inspections, repairs, and replacements of plant components.
Contact Information
Source: NEC Vessel and rubber Piping Services.pdf (unknown)Service Manager: Eskom Holdings SOC Ltd, Matla Power Station, Private Bag X5012, Kriel, 2271. Tel: 017 612 6381. Submission address for signed agreements: Matla Power Station, Private Bag X5012, Kriel, 2271. Invoicing email: [email protected]. Employer VAT number: 4740101508.
Submission Guidelines
Source: NEC Vessel and rubber Piping Services.pdf (unknown)Returnable Documents: Tenderer must complete and submit the Form of Offer and Acceptance (C1.1) including the Schedule of Deviations if any. The tendererβs CIDB registration number must be provided. The tenderer must submit one copy of the completed Form of Offer and Acceptance including the Schedule of Deviations (if any) to the Employer. The tenderer becomes the Contractor upon acceptance by the Employer before the end of the period of validity stated in the Tender Data. Failure to provide required securities, bonds, guarantees, proof of insurance, or other documentation within two weeks of receiving the signed agreement constitutes repudiation.
Returnable Documents
Source: NEC Vessel and rubber Piping Services.pdf (unknown)Returnable Documents: - Form of Offer and Acceptance (C1.1) with Schedule of Deviations if any. - Tendererβs CIDB registration number. - Contractor details: name, address, telephone, fax. - Direct and subcontracted fee percentages. - Risk Register matters. - Service Information for the Contractorβs plan. - Key people details and CVs. - Price list and tendered total of the Prices.
Evaluation Criteria
Source: NEC Vessel and rubber Piping Services.pdf (unknown)Contractor must be a legally registered entity. Must provide CIDB registration number (indicated in Form of Offer). Joint ventures are permitted but incur joint and several liability. Contractor must maintain and notify Eskom of any change in Broad-Based Black Economic Empowerment (B-BBEE) status; a decrease can lead to contract renegotiation or termination. Financial proposals must exclude VAT, with a separate line for VAT at 15%.
Technical Specifications
Source: NEC Vessel and rubber Piping Services.pdf (unknown)Scope: Vessel and piping rubber lining services for Water Treatment Plant (WTP) and Slurry Plant at Matla Power Station (Ash and Dust Plant) for a period of five years on an as and when required basis. Deliverables include: - Full/partial/patch repair rubber lining of vessels using Pre-cured Butyl Rubber Lining (Grade B: 50-70 IRHD) in thicknesses of 6mm and 4.8mm. - Rubber lining for brackets and supports. - Grit blasting to SA 3 (ISO 8501-1) and hand grinding to Grade St 3. - Rubber-lined carbon steel pipelines (DN 50 to DN 400) with 4mm butyl rubber (40 Shore A) internally, flanged per SANS 1123/BS4504 PN10. - Pre-inspections including visual, hardness, and spark testing. - Stripping of rubber from inside vessels. The service includes daily plant inspections, repairs, replacements, and installation/removal of plant equipment for the Ash and Dust Handling Plant. Compliance with all applicable health, safety, environmental laws, and Eskomβs Asbestos Standard 32-303 is required.
Methodology
Source: NEC Vessel and rubber Piping Services.pdf (unknown)Methodology: - The Contractor must submit a first plan for acceptance within two weeks after the effective contract date. - The plan must show how Price List items relate to operations. - Task Order programmes must be submitted within 5 days of receiving a Task Order. - Management meetings include daily toolbox meetings, plant focus meetings, and monthly progress reviews. - The Contractor must provide technical reporting certificates to the Contracts Manager.
Experience & Qualifications
Source: NEC Vessel and rubber Piping Services.pdfKey Personnel Requirements: - The Contractor must provide details of key people, including names, jobs, responsibilities, qualifications, and experience. - CVs and further key person data must be submitted as specified. - The Contractorβs plan must link to the Price List and include technical reporting and scheduling. - Minimum requirements for employed people and BBBEE preferencing scheme apply.
Quality Management
Source: NEC Vessel and rubber Piping Services.pdfQuality Assurance: - Failure to adhere to the Quality Control Plan (QCP) incurs low service damages of 5% of Task Order value, limited to 10%. - Rework due to poor workmanship incurs 5% of Task Order value, limited to 10%. - NCRs Accepted/Repeat Findings target: <1 annually after first year. - Percentage Rework target: 30% to ensure high workmanship standards and address root causes. - Pre-inspections include visual, hardness, and spark testing. - Daily plant inspections are required as part of maintenance scope.
Pricing Schedule
Source: NEC Vessel and rubber Piping Services.pdfPricing Structure: Option A (Priced contract with price list). The tenderer must complete the price list in Part C2.2, including items for preliminaries, safety requirements, personnel hours, equipment days, and rubber lining services per square meter or meter. Examples: - Site establishment: Item 1. - Safety Requirements (Safety file, PPE, Medicals): Item 1. - Supervisor: 800 hours. - Vessels rubber lining (6mm): 140 m2. - Vessels rubber lining (4.8mm): 120 m2. - Pipelines (DN 80 to DN 400): 125 m each. - The tenderer must enter the tendered total of the Prices exclusive and inclusive of VAT.
Financial Requirements
Source: NEC Vessel and rubber Piping Services.pdf (unknown)Payment Terms: - Payment is made within thirty (30) calendar days after signed assessment by both parties and submission of a valid tax invoice. - For contracts valued above R50 million (including VAT), Eskomβs standard payment term is 60 days. - The Contractor must submit a tax invoice within one week of receiving a payment certificate, including Eskomβs VAT number 4740101508. - Late tax invoice submission delays payment proportionally. - Interest rate is the publicly quoted prime rate from Standard Bank of South Africa. Pricing Format: Option A (Priced contract with price list). The tenderer must provide the tendered total of the Prices exclusive and inclusive of VAT. The price list must link to the Contractorβs plan. Items can be lump sums or rates multiplied by quantities. No adjustment for lump sums except via compensation events.
Compliance Requirements
Source: NEC Vessel and rubber Piping Services.pdf (unknown)B-BBEE: The Contractor must notify Eskom within seven days of any change in B-BBEE status and submit an updated verification certificate within thirty days. A decrease in B-BBEE status may lead to renegotiation or termination. Joint ventures are jointly and severally liable. Legal Compliance: The Contractor must comply with all terms of the NEC3 Term Service Contract (TSC3), including additional conditions Z1 to Z14. This includes confidentiality, health and safety regulations (Construction Regulations 2014, asbestos regulations), environmental laws, and ethics prohibitions against corrupt, fraudulent, or coercive actions. The Contractor must also comply with VAT Act requirements.
B-BBEE Requirements
Source: NEC Vessel and rubber Piping Services.pdf (unknown)B-BBEE Requirements: - The Contractor must notify Eskom within seven days of any change in legal status, ownership, or business dealings that affects B-BBEE status. - An updated verification certificate and supporting documentation must be submitted within thirty days. - A decrease in B-BBEE status may lead to contract renegotiation or termination. - Failure to notify may constitute grounds for termination.
Health & Safety
Source: NEC Vessel and rubber Piping Services.pdfHealth and Safety Requirements: - The Contractor must take all reasonable precautions for health and safety, complying with Construction Regulations 2014 and all applicable laws. - Eskom may appoint the Contractor as Principal Contractor. - Risk Register must include health and safety risks to staff, contractors, and visitors. - Asbestos exposure limits: OEL of 0.2 regulated asbestos fibres per ml (4-hour TWA) and short-term limit of 0.6 fibres per ml (10-minute TWA). - If asbestos is identified, a risk assessment and control measures must be implemented; workers may stop work until area is declared safe. - Safety rules compliance is enforced; failure resulting in injury incurs low service damages of 3% of Task Order value, limited to 10%. - Daily toolbox meetings and regular SHEQ meetings are required.
Environmental
Source: NEC Vessel and rubber Piping Services.pdfEnvironmental Compliance: - The Contractor must comply with all applicable environmental laws, regulations, and Eskomβs procedures. - Asbestos removal and disposal must be done by a registered asbestos contractor at Eskomβs expense, following South African legislation. - Control of noise, dust, water, and waste is required while working on the Affected Property.
Contractual Terms
Source: NEC Vessel and rubber Piping Services.pdfContract Duration: Five years (60 months) on an as and when required basis. Contract Type: NEC3 Term Service Contract (TSC3) Option A (Priced contract with price list) with secondary options X1, X2, X13, X17, X18, X19, and additional conditions Z1-Z14. Key Terms: - Starting date to be specified. - Service period: Five years. - Defect date: 52 weeks after completion of each task order; defect correction period: 2 weeks or as agreed. - Law of contract: Republic of South Africa. - Language: English. - Dispute resolution: Adjudicator from ICE-SA panel; arbitration per Association of Arbitrators (Southern Africa) rules in Johannesburg. - Limitation of liability: Contractorβs liability for indirect/consequential loss limited to R0; total liability limited to the total of the Prices. - Termination: As per NEC3 core clause 9; includes termination for decreased B-BBEE status or prohibited actions. - Confidentiality, health and safety, environmental compliance, and ethics clauses apply.
Section
Source: NEC Vessel and rubber Piping Services.pdfRework workmanship quality is evaluated with a target of less than 1 annually after the first year, aiming for continuous improvement and error prevention.
Description
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.docx.pdfThis document is a 'PAYE Questionnaire for Service Contracts' to Eskom. It is a tax classification tool applicable from 1 March 2026 to 28 February 2027. Its purpose is to determine whether a contractor (Individual, Company, Close Corporation, or Trust) is an Independent Contractor, Personal Service Provider, Labour Broker, or Dependent Contractor for Employees' Tax (PAYE) withholding purposes. It consists of two evaluation packs (A for companies/CCs/trusts, B for individuals) with detailed questions and affidavits. The document includes a disclaimer and definitions from the Income Tax Act.
Important Dates
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.docx.pdf (unknown)The pack is applicable from 1 March 2026 to 28 February 2027. It is based on tax legislation for the 2026/2027 tax year.
Contact Information
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.docx.pdf (unknown)For tax-related queries, the completed pack must be submitted to your Eskom representative for referral to the Eskom Group Tax Department at Megawatt Park. When returning the completed pack, copy Group Tax on email: [email protected].
Submission Guidelines
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.docx.pdf (unknown)Returnable Documents: This is a tax classification pack, not a tender submission. The document is a 'Supplier Evaluation Pack' for PAYE determination. You must complete and return the signed summary sheet and signed affidavits to Eskom. When returning the completed pack, copy Group Tax on email: [email protected].
Evaluation Criteria
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.docx.pdf (unknown)The primary eligibility is related to tax status, not technical capability for the rubber services tender. Key tax classification criteria include: Being a South African tax resident; employing three or more full-time, non-connected employees; not having connected persons render services to Eskom; not receiving >80% of income from Eskom or associated institutions; not performing services mainly at Eskom premises under Eskom's control/supervision; and passing the 'dominant impression' test to demonstrate independent contractor status.
Technical Specifications
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.docx.pdf (unknown)This is not a technical specification document. It is a tax classification tool (PAYE Questionnaire) for service contractors. Its purpose is to establish whether an Individual, Close Corporation, Company, or Trust should be classified as an Independent Contractor, Personal Service Provider, Labour Broker, or Dependent Contractor for tax purposes.
Pricing Schedule
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.docx.pdfThis is not a pricing schedule. It details tax withholding consequences for Labour Brokers: - If a valid IRP30 exemption certificate is provided to Eskom: No Employees' Tax (PAYE) is withheld. An IT3(a) certificate with code 3617 is issued. - If a valid IRP30 certificate is not provided: PAYE will be withheld from payments at individual tax rates until a valid certificate is provided. An IRP5 certificate with code 3617 is issued.
Financial Requirements
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.docx.pdf (unknown)Tax Withholding Implications: - If classified as an Independent Supplier/Contractor and you meet the 3-employee test, no PAYE is withheld (sign Appendix 8). - If classified as a Personal Service Provider or Dependent Contractor, PAYE will be withheld from payments at the prevailing tax rate (sign Appendix 7, codes 3601 or 3616). - For Labour Brokers: if you provide a valid IRP30 exemption certificate, no PAYE is withheld and an IT3(a) with code 3617 is issued. If you do not provide a valid IRP30, PAYE will be withheld until you do.
Compliance Requirements
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.docx.pdf (unknown)Tax Compliance Requirements: This pack determines your compliance with the Income Tax Act regarding Employees' Tax (PAYE) withholding. Key requirements include: - You must be a Resident of South Africa (or declare non-resident status). - For exclusion from PAYE: you must employ 3 or more full-time employees engaged in your business who are not Connected Persons. - You must declare if any Connected Person will render services to Eskom. - You must declare if more than 80% of your income is from one client. - You must declare the place of work and level of Eskom control/supervision. Various signed affidavits (Appendices 1-10) are required based on your answers.
Section
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.docx.pdfThis is not tender evaluation criteria. It is a tax status evaluation using a 'Dominant Impression Test' with 11 questions (6(i) to 6(xi)). The test assesses factors like payment terms, Eskom's control over tools/staff, right to subcontract, personal risk for quality, obligation to be present, economic dependence, integration into Eskom's structure, and provision of benefits/equipment. Answers are classified as 'Independent' or 'PSP' (Personal Service Provider)/'Employee'. The result determines if you are classified as an independent contractor or if PAYE must be withheld.
Description
Source: Code of Ethics.pdfThis document is Eskomβs Code of Ethics, titled 'The Way.' It defines ethical standards and expected behaviour for all directors, employees, and entities acting on behalf of Eskom. The Code emphasizes Eskomβs commitment to integrity, excellence, customer satisfaction, and innovation. It serves as a foundation for interactions with colleagues, customers, suppliers, shareholders, the environment, the public, and other stakeholders. Adherence to the Code is mandatory, and any contravention may result in disciplinary action. The Code must be read alongside Eskomβs Supplementary Code information, policies, and applicable legislation.
Contact Information
Source: Code of Ethics.pdf (unknown)Ethics Office advice line: +27 11 800 3187/3189. Email: [email protected]. Fax: 086 663 4120. Eskom confidential whistle-blowing hotline: 0800 11 27 22. Ethics website FAQs available on Eskom Intranet.
Evaluation Criteria
Source: Code of Ethics.pdf (unknown)General
Open to national (South African) suppliers/contractors with proven experience in rubber lining services for industrial plants (e.g., power stations, WTPs).
Ethical
Must demonstrate a commitment to ethical business practices (e.g., no prior convictions for corruption or fraud).
Technical
Must have technical capabilities and certifications for rubber lining/vessel piping in harsh environments (e.g., slurry, chemical exposure).
Financial
Financial stability and capacity to fulfill a 5-year contract (proof of financial health may be required).
Legal
Valid registration and compliance with South African business laws; B-BBEE (Broad-Based Black Economic Empowerment) compliance may be advantageous.
Safety
Must have a strong SHE (Safety, Health, Environment) record and certifications (e.g., ISO 45001, ISO 14001).
Compliance Requirements
Source: Code of Ethics.pdf (unknown)Suppliers must adhere to Eskomβs Code of Ethics, which outlines ethical standards and behaviour for all directors, employees, and entities acting on behalf of Eskom. Key compliance points include: no favouritism or nepotism, fair and transparent procurement practices, adherence to safety, health, and environmental legislation, and protection against victimisation for reporting unethical behaviour. Suppliers must also comply with Eskomβs Conflict of Interest Policy, Protected Disclosures Policy, and other referenced legislation such as the Constitution of South Africa, Basic Conditions of Employment Act, Labour Relations Act, and Employment Equity Act.
Health & Safety
Source: Code of Ethics.pdfEskom requires a safe and healthy environment for all internal and external stakeholders. Compliance with safety, health, and environmental legislation, as well as Eskomβs policies, is mandatory. Workplaces must be free of sexual harassment, discrimination, and favouritism.
Contractual Terms
Source: Code of Ethics.pdfEskomβs Code of Ethics establishes that disciplinary action will be transparent, just, and equal for all in cases of contravention. Employees reporting unethical behaviour or violations are protected against victimisation or occupational detriment. Confidentiality is maintained for those reporting breaches. The Ethics Office and Forensic Services are responsible for monitoring, investigating, and addressing violations, including through a confidential whistle-blowing hotline (0800 11 27 22).
Contact Information
Source: Scope of Work Vessel Rubberlining Services on as and when required basis for period of 5 years.pdf (unknown){"name":null,"email":null,"phone":null,"department":"Name","address":null}
Evaluation Criteria
Source: Scope of Work Vessel Rubberlining Services on as and when required basis for period of 5 years.pdf (unknown)General
Technical
HSE
Quality
Technical Specifications
Source: Scope of Work Vessel Rubberlining Services on as and when required basis for period of 5 years.pdf (unknown)Review Date October 2027
PLANT AREA: Matla Power Station WTP and Slurry Plant
TITLE: Vessel and piping rubber lining services for WTP and Surry Plant for a period of 5 years on an as and when required basis
REF: MEP-051361 Reference Rev No:1 MULTIDISCIPLINARY: Yes Plant Level: All
Name: Yatish Ramkalawan
COMPILED BY Signature: Date:
Systems Engineer/End User
Name: Isaack Maredi
COMPILED BY Signature: Date:
Systems Engineer/End User
Name: Brenda Moeng
APPROVED Signature: Date:
Line Manager
Name: Lindokuhle Ngobese
APPROVED Signature: Date:
Group Manager
Name:
REVIEWED Signature: Date:
Quality Department
Name:
REVIEWED Signature: Date:
Occupational Health and Safety
Name:
REVIEWED Signature: Date:
Environmental Department
Name:
ACCEPTED Signature: Date:
Outage Manager/Maintenance manager
Name:
ACCEPTED Signature: Date
Aia
Reference No: MEP-051361 Reference Rev No: 1 Date: 04/06/2026 of 41
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 41
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
Review Date October 2027
NB: Do not tamper with the template.
General
(Document Control)
Scope of work procedure, specification, hold points, responsible
Description / activity eng. Requirements / documentation witness, reports party
1.1 Occupational Health and
Safety to any work commences on site
and Plant Safety Regulations. (240-150642762).
for the task they are performing.
requirements.
equipment, and tools to reduce worker noise exposure, contribute towards compliance
Reference No: MEP-051361 Reference Rev No: 1 Date: 04/06/2026 of 41
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 41
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
Review Date October 2027
to OHSA noise exposure limits and ultimately reduce the risk of noise induced hearing
loss.
1.2 Environmental Management.
. amended, must have environmental AUTHORISATION before commencement of work.
procedures to ensure the prevention of pollution (refer: OMOP 4090 and 4402).
sheet (Annexure C: OMOP 4402) of designated area.
1.3 Quality Management
documentation and this must be approved by engineering and authorised by the Quality
Department before commencing with the work.
Inspector, Contractor QC Inspector and/or AIA.
Reference No: MEP-051361 Reference Rev No: 1 Date: 04/06/2026 of 41
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 41
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
Review Date October 2027
approved by quality
scope
1.4 Inputs from other
departments
1.5 Commissioning reference
Scope of work description / activity procedure, specification, hold points, responsible
Eng. Requirements / documentation witness, party
Reports
Reference No: MEP-051361 Reference Rev No: 1 Date: 04/06/2026 of 41
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 41
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
Review Date October 2027
1 Opening and closing of vessels and removal of Eskom MMD
Outside Plant
vessel connecting pipework, internals and laterals
and support beams and brackets, and erection of
scaffolding
2 Rubber lining pre-inspection (Visual, hardness, and Hold Contractor
spark testing)
3 Strip and grind off existing rubber from the affected Contractor
area on the vessel wall using flapper disk
4 Removal of rubber from pipes currently lined pipes Method statement to be provided Contractor
5. Surface preparation of piping Contractor to provide method statement Contractor
6 Primer, adhesive and rubber lining application to DN 50, 65, 80, 100, 150, 200, 250, 400 Carbon Hold Contractor
Steel Pipeline, PN10, flanged as per SANS
piping
1123/BS4504. Pipe to be rubber lined with 4 mm
50-70 IRHD butyl Grade B Rubber Internally Pipe
lengths 3, 6 or 9 m lengths.
Rubber lining to comply with SANS 1198 and SANS
1201 and Eskom Standard 240-101712128
Standard for the Internal Corrosion Protection of
Reference No: MEP-051361 Reference Rev No: 1 Date: 04/06/2026 of 41
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 41
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
Review Date October 2027
Water Systems, Chemical Tanks and Vessels and
Associated Piping with Linings
7 Grit blasting of vessels to SA3 (or hand grinding for Abrasive blast clean to Grade Sa 3 (ISO 8501-1). Hold Contractor
3 (iso 8501-1).
In both cases the final surface profile shall be as
specified by the rubber lining and adhesive
Manufacturerβs requirements.
8 Primer, adhesive and rubber lining application to Rubber lining to comply with SANS 1198 and SANS Hold Contractor
1201 and Rubber lining specification in Appendix A vessels and including brackets supports and
and Eskom Standard 240-101712128 Standard for
internals the Internal Corrosion Protection of Water Systems,
Chemical Tanks and Vessels and Associated
Piping with Linings.
As per point 12 below and bill of material.
9 Vessel rubber lining final inspection (Visual, Hold Contractor
hardness and spark testing)
10 Piping rubber lining final inspection (Visual, Hold Contractor
hardness and spark testing)
Reference No: MEP-051361 Reference Rev No: 1 Date: 04/06/2026 of 41
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 41
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
Review Date October 2027
11 Rubber lined areas shall be thoroughly washed with Contractor
a hose pipe to remove lose dirt and debris.
12 This scope of work is applicable to the following 6mm Chloroprene rubber (refer to pics in Contractor
appendix B) systems and their operating conditions.
Slurry plant mixers (3 x 80m2) and AWRSE
Ash water pH > 12
240 m2
4mm Butyl rubber lining 50-70 IRHD
Carbon Steel Piping, PN10, flanged as per SANS
1123/BS4504, nb 50, 65, 80, 100, 150, 200, 250,
6mm pre cured Butyl rubber lining 40-70 IRHD
(refer to pics in appendix B)
Cation CPR Vessel (3 x 30m2 per vessel)
Reference No: MEP-051361 Reference Rev No: 1 Date: 04/06/2026 of 41
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 41
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
Review Date October 2027
Anion CPR Vessel (3 x 25m2 per vessel)
Demin Storage CPR Vessel (3x 25m2 per vessel)
25Β°C.
Demin Cation Vessel (3 x 80 m2 per vessel)
Reference No: MEP-051361 Reference Rev No: 1 Date: 04/06/2026 of 41
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 41
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
Review Date October 2027
Demin Strong base Anion Vessel (3 x 60m2 per
vessel)
Demin Weak base Anion Vessel (3 x 45m2 per
vessel)
Demin Mixed Bed Vessel (3 x 40m2 per vessel)
Sulphuric Acid, Concentration (8%)
Reference No: MEP-051361 Reference Rev No: 1 Date: 04/06/2026 of 41
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 41
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
Review Date October 2027
Demin Hot Water Tank (1 x 45m2 )
CPP Hot Water Tank (1 x 30m2)
4.8mm precured butyl rubber lining Grade B 50
β 70 IRHD (Refer to pics in appendix B)
Ammonium Hydroxide Dilution Tanks (2 x 70m2
per vessel)
Reference No: MEP-051361 Reference Rev No: 1 Date: 04/06/2026 of 41
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 41
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
Review Date October 2027
CPP vessels (18 x 25m2 per vessel)
13 Removal and disposal of all waste rubber lining and Contractor
sand blasting grit and provide the waste disposal
certificate/s
14 Eskom warrants to be able to rubber lining any Eskom warrants to be able to rubber lining any
quantities of the pipelines or vessels listed in the quantities of the pipelines or vessels listed in the
SOW, or any other rubber lining that may be
SOW, or any other rubber lining that may be required on site, up to the total value of the
required on site, up to the total value of the contract, contract.
utilising the bill of materials.
Reference No: MEP-051361 Reference Rev No: 1 Date: 04/06/2026 of 41
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 41
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
Review Date October 2027
Review Date October 2027
8 DN 80 Carbon Steel Rubber Lined Pipeline, 4mm butyl rubber, 40 Shore A 125m (Quote
PN10, flanged as per SANS 1123/BS4504. Pipe per metre)
to be rubber lined with 4 mm 40 Shore A butyl
Grade B Rubber Internally 3/6.9 m length.
9 DN 65 Carbon Steel Rubber Lined Pipeline, 4mm butyl rubber, 40 Shore A 125m (Quote
PN10, flanged as per SANS 1123/BS4504. Pipe per metre)
to be rubber lined with 4 mm 40 Shore A butyl
Grade B Rubber Internally 3/6.9 m length.
10 DN 50 Carbon Steel Rubber Lined Pipeline, 4mm butyl rubber, 40 Shore A 125m (Quote
PN10, flanged as per SANS 1123/BS4504. Pipe per metre)
to be rubber lined with 4 mm 40 Shore A butyl
Grade B Rubber Internally 3/6.9 m length.
11 DN 100 Carbon Steel Rubber Lined Pipeline, 4mm butyl rubber, 40 Shore A 125m (Quote
PN10, flanged as per SANS 1123/BS4504. Pipe per metre)
to be rubber lined with 4 mm 40 Shore A butyl
Grade B Rubber Internally 3/6.9 m length.
12 DN 150 Carbon Steel Rubber Lined Pipeline, 4mm butyl rubber, 40 Shore A 125m (Quote
PN10, flanged as per SANS 1123/BS4504. Pipe per metre)
to be rubber lined with 4 mm 40 Shore A butyl
Grade B Rubber Internally 3/6.9 m length.
13 DN 200 Carbon Steel Rubber Lined Pipeline, 4mm butyl rubber, 40 Shore A 125m (Quote
PN10, flanged as per SANS 1123/BS4504. Pipe per metre)
to be rubber lined with 4 mm 40 Shore A butyl
Grade B Rubber Internally 3/6.9 m length.
14 DN 250 Carbon Steel Rubber Lined Pipeline, 4mm butyl rubber, 40 Shore A 125m (Quote
per metre)
PN10, flanged as per SANS 1123/BS4504. Pipe
Reference No: MEP-051361 Reference Rev No: 1 Date: 04/06/2026 of 41
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 41
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
Review Date October 2027
to be rubber lined with 4 mm 40 Shore A butyl
Grade B Rubber Internally 3/6.9 m length.
15 DN 400 Carbon Steel Rubber Lined Pipeline, 4mm butyl rubber, 40 Shore A 125m (Quote
per metre)
PN10, flanged as per SANS 1123/BS4504. Pipe
to be rubber lined with 4 mm 40 Shore A butyl
Grade B Rubber Internally 3/6.9 m length.
16 Piping Pick up and delivery to and from site 10 ton per load flatbed 50 collection
and deliveries
17 Vessel rubber lining pre-inspections Visual, hardness and spark testing. 10 vessels
18. Stripping of rubber from inside vessels 500m2 (quote
per metre
square)
Reference No: MEP-051361 Reference Rev No: 1 Date: 04/06/2026 of 41
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 41
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
Review Date October 2027
Scope compilation references
SOURCE & Ref No. Yes No N/A Comments
Previous outage service reports
Return to service data packages
Maintenance Strategy with Rev number
SAP defects (attach list as appendix)
GHRMS (STEP) reports
(Generation Heat Rate Management System)
Online Condition Monitoring
Pre-outage performance test results
Post outage performance test results
GPSS/ Plant Performance data on UCLF incurred
OMS / IIRMS recommendations (Audits Reports)
Risk controls (IRM system)
Previous audits and reviews (e.g. ERAP)
Engineering Change Requests (Projects)
LOPP strategy reports
Urs
Reference No: MEP-051361 Reference Rev No: 1 Date: 04/06/2026 of 41
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 41
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
Review Date October 2027
Philosophy (Outage)
Condition Monitoring Report
VA/PHD Viewer trends
Corrective Actions
CARAB reports
Statutory Requirements
Grid code requirements
Waivers and Exemptions
Calibration requirements
Previous Outage SOW variations
Post Mortems Actions from previous outages
PreβOutage plant walks
Risk based inspection (RBI) report
Simulation, TOIs, OON, SI
Comments
Reference No: MEP-051361 Reference Rev No: 1 Date: 04/06/2026 of 41
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 41
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
Review Date October 2027
ATTACHMENTS: DRAWINGS, SKETCHES, DIAGRAMS, INSTRUCTIONS, etc
Reference No: MEP-051361 Reference Rev No: 1 Date: 04/06/2026 of 41
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 41
Document
MATLA POWER STATION Identifier 14593 Rev 7
SCOPE OF WORK Effective Date October 2024
Review Date October 2027
Appendix A β Vessel Rubber lining Specification
To account for various conditions, two options such as rubber lining patch repairs or complete rubber lining
replacement are considered in this document.
Rubber lining inspections shall be carried out by the Contractor and Eskom representative and thereafter
inspection findings shall be documented. Based on the inspection findings, Eskom with recommendations
from the Contractor, will decide upon the suitable rubber lining option (either rubber lining patch repairs or
complete replacement).
Option 1 - Rubber Patch Repairs
Assess the condition of the existing rubber lining through detailed visual inspection and pin-hole detection
testing (no more than 3 kilovolts per mm). Identify and mark-up the defects or the areas requiring the
repairs.
The Contractor shall compile a rubber patch repair procedure and submit to Eskom for approval. As a
minimum, the repair procedure shall include the following:
Pin-hole detection testing on the existing rubber lining.
inspections.
repaired where abrasive blast cleaning is impractical, the Rubber Liner or Contractor shall propose a
suitable cleaning method. The cleaning method shall be submitted to Eskom for review and approval
before commencement of the work.
rubber patch repairs. The Contractor shall propose substrate repair procedures and submit these to Eskom
for approval.
any damage such as mechanical damage, welding/grinding sparks, and welding spatter.
repair of the affected areas. The total surface area to be rubber lined will be determined by inspection.
Option 2 - Complete Rubber Lining Replacement
Reference No: MEP- Reference Rev No: 1 Date: of 41
051361 04/06/2026
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 41
Document
MATLA POWER STATION Identifier 14593 Rev 7
SCOPE OF WORK Effective Date October 2024
Review Date October 2027
After inspection step in option 1 is completed and inspection findings documented; if the damage covers a
large surface area, Eskom with recommendations by the Contractor will decide on complete rubber
replacement.
techniques such as cutting out, stripping and flapper disc grinding.
inspection shall be carried out to check for defects of the substrate surface. Where necessary mechanical
repairs i.e. welding and grinding shall be carried out before new rubber is installed. The Contractor shall
propose substrate repair procedures and submit these to Eskom for approval. The procedure shall be
agreed by both parties before commencement of work.
been completed and released in terms of the applicable mechanical repair Quality Control Plan (QCP).
2 Specific Project Requirements
2.1 To enable proper inspection as detailed in section 1 above the vessels need to be emptied and all
components that are removable shall be removed from the vessel. These components include but are not
limited to the laterals, nozzles and distribution pipes.
2.2 Based on the inspection findings it might be necessary to conduct repairs on the vessel before
corrosion protection application therefore provision shall be made for mechanical repairs i.e. welding and
grinding.
2.3 For these mechanical repairs, it is strongly recommended that the appropriate engineering subject
matter experts (welding engineers and NDT subject matter experts) are consulted. The engineering
experts in consultation with the Rubber Liner or Contractor and Lining Manufacturer shall compile substrate
repair procedures for the works and submit to Eskom for review and approval.
2.4 The Eskom standard 240-101712128 (Section 5 in particular), SANS 1201, SANS 1198 and BS 6374-5
shall apply for the manufacture, selection and installation of rubber lining. The Rubber Liner/ Contractor to
take note of the selected type of rubber required in the table above. NOTE: Special Requirements as per
SANS 1198, Table 4, Property Column (Special points (I), (III), (V) and (VI)) shall apply.
2.5 The type of rubber for lining shall be one of those given in SANS 1198, as specified by the Rubber
Liner, to meet Eskomβs requirements namely Pre-cured Butyl rubber (Grade B with 40-70 IRHD) or
possibly Grade C strictly based on the requirements in the tables at the top of this document. Only Grade B
rubber will be considered at tendering stage.
Reference No: MEP- Reference Rev No: 1 Date: of 41
051361 04/06/2026
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 41
Document
MATLA POWER STATION Identifier 14593 Rev 7
SCOPE OF WORK Effective Date October 2024
Review Date October 2027
2.6 All components in the vessel shall be rubber lined except components constructed from stainless steel
or plastic. These components include distribution pipes and nozzle plates. As part of the method statement
the Contractor shall consider and propose steps and measures to ensure a leak tight seal between the
nozzles and nozzle plate. The measures shall describe how the rubber lining will be applied to the nozzle
plate to ensure the rubber is completely flat to facilitate nozzle assembly. The rubber lining on the nozzle
plate shall serve a dual purpose of corrosion protection and as a gasket.
2.7 The rubber lining thickness of 6 mm is specified for the shell and 3mm for the beams on condition that
this thickness is suitable for the flange arrangement and eventual fitment/re-assembly in terms of existing
piping/flange length and alignment. The Rubber Liner or Contractor shall confirm the specified thickness as
satisfactory for the application.
2.8 The rubber lining Manufacturer, adhesive Manufacturer and Rubber Liner or Contractor shall select
relevant primer and or adhesive system for the type of rubber lining material, substrate and service
conditions to ensure compatibility.
2.9 All parts comprising systems i.e. Rubber Lining , in this specification sheet, shall be supplied by the
same Manufacturer. Should this not be possible the coating/rubber lining Supplier shall confirm suitability
or compatibility of the particular product with his system.
2.10 The solvents used shall be those recommended and manufactured by the Coating Manufacturer.
Where the recommended βsolventβ and βclean-up thinnersβ for a material differs, the βclean-upβ solvent must
not be added to the paint for dilution purposes.
2.11 Surface preparation by abrasive blasting shall be performed by means of blasting equipment capable
of removing remaining/residual rubber, rust and suitably preparing the substrate to the required cleanliness
of Grade Sa 3 or Sa 2.5 as specified for the internal or external surfaces.
2.12 The requirement for surface preparation of all metallic surfaces for immersion is strictly Grade Sa 3
(ISO 8501-1), in which case the surfaces shall be blast cleaned to white metal where all traces of rust, mill
scale and other foreign matter are removed.
2.13 Power and hand tool cleaning is only applicable to the external surface and for localised patch repairs.
Hand-tool cleaning for isolated/localised areas may be utilised provided the required standard of finish is
achieved. For all external applications and internal patch repair applications final mechanical cleaning shall
be by bristle blaster in order to create a surface profile.
2.14 Cleaning by means of hand or power-tools, i.e. wire brushes, chipping hammers, scrapers, grinders,
sanders, needle descalers, bristle blasters etc. may only be used where accepted by the Eskom Engineer
and where the position and condition of the substrate metal is such that efficient cleaning and surface
profile can be achieved.
Reference No: MEP- Reference Rev No: 1 Date: of 41
051361 04/06/2026
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 41
Document
MATLA POWER STATION Identifier 14593 Rev 7
SCOPE OF WORK Effective Date October 2024
Review Date October 2027
2.15 Burnishing of the surface shall not be permitted.
2.16 In all cases, after wire brushing or grinding, all traces of loose material shall be removed from the
surface by vacuum cleaning. Cleaned surfaces shall not be contaminated with oil, grease, rust or other
deposits before primer application.
2.17 After tender award the Manufacturer shall supply batch certificate for each of the lining/ products.
Specifically for rubber lining all tests, parameters, and results shall be as per the requirements of SANS
1198 Table 4. These tests shall be conducted as per SANS 1198 by an ISO 9001 certified independent
laboratory. These test results or certificates shall be submitted to Eskom after tender award and before
commencement of work to verify mechanical and chemical properties in the product data sheets.
2.18 After tender award and prior to project execution the Manufacturer shall submit test samples of the
lining system as proposed in the tender submission. Two samples shall be required for reference
purposes. The samples (substrates) shall be prepared as per the requirements of the Manufacturerβs
datasheet and in compliance with the requirements of this standard. The size of the test sample panels
shall be (200 mm X 300 mm X 3 mm), with a rubber lining thickness of 4.6/6 mm as per the vessel being
lined. The lining shall be cured as would be in practical situations without any artificial assistance. The
Manufacturer shall supply the relevant batch certificate for each of the lining products used in the submitted
test sample panels.
2.19 In addition to the panel samples above, representative (considering different batches), loose rubber
sheeting 500 mm X 500 mm, with a rubber lining thickness of 4.8/6 mm, as per the vessel being lined, shall
be submitted for tensile testing to ensure conformity to SANS 1198.
2.20 Specifically for the tensile testing, specimens shall be prepared as per SANS 10037 βType 1 Dumb-
bellβ. The Rubber Liner or Manufacturer shall provide written commitment to this requirement at the tender
stage.
2.21 During rubber lining of the vessels the Rubber Liner shall prepare (200 mm X 300 mm X 3 mm) test
panels with a rubber lining thickness of 4.8/6 mm, at the same time and under the same conditions as the
vessels. The prepared test panels shall be sent to Eskom for adhesion/peel testing as per the requirements
of SANS 1201 section 9.4.
2.22 Corrosion protection shall only proceed once all mechanical repairs or activities i.e. cutting and
welding have been completed and released in terms of the fabrication Quality Control Plan (QCP). And
under no circumstances shall this work be performed until the corrosion protection QCP and Method
Statement have been accepted by the Eskom Engineer.
3 General Requirements
Reference No: MEP- Reference Rev No: 1 Date: of 41
051361 04/06/2026
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 41
Document
MATLA POWER STATION Identifier 14593 Rev 7
SCOPE OF WORK Effective Date October 2024
Review Date October 2027
3.1 Sharp edges shall be dressed to a radius of not less than 3 mm. All burrs and weld spatter shall be
removed. Welds shall be free from imperfections (e.g. asperities, undercutting, blowholes, craters, and
spatter).
3.2 Weld beads with a surface irregularity exceeding 3 mm or with sharp crests having a radius less than 3
mm shall be ground.
3.3 All welds shall be free of slag, inclusions and pinholes. Adjacent areas shall be free of weld spatter,
which shall be removed by grinding or scraping.
3.4 All surfaces shall be completely dry and free from contaminants such as traces of oil, grease, etc.,
before surface preparation is carried out.
3.5 After initial blasting of representative patches soluble salt testing shall be performed by the Bresle
soluble salt test method. If not within acceptable limits (as per the Manufacturer requirement but not
exceeding 100 mg/m2), the surfaces shall then be washed/decontaminated by High Pressure (HP) water
washing using fresh/clean water (with a conductivity reading of maximum 100 ΞΌS/cm) at a minimum
pressure of 300 bar. A salt decontamination chemical additive with demonstrated capability of removing
salts may be used in conjunction with HP cleaning.
3.6 Soluble salt testing shall be repeated on representative test patches and if acceptable then proceed
with blasting and application steps β if not then repeat HP washing until the salt contamination has been
removed to within acceptable limits.
3.7 Prior to any surface preparation all surfaces that are or are likely to be contaminated with oil or grease
shall be solvent cleaned with a suitable water-soluble biodegradable alkaline cleaner/detergent or with
appropriate organic solvents.
3.8 Cleaning may be performed by using rags for small areas, or a spray gun for large areas. The
detergent/solvent-cleaned surfaces shall then be thoroughly washed down with fresh/clean water ensuring
that the oil-water emulsion formed is completely removed from the metal. Special attention shall be paid to
drillings, bolt holes, etc.
3.9 Degreased and water washed surfaces shall be checked for residual oil and grease using the atomized
water spray test as per ASTM F21 and further degreasing shall be carried out if residual oil or grease is
found to be present. In instances where there is no or poor natural lighting then the interpretation of the
ASTMF21 shall be assessed by means of ultraviolet light i.e. back light.
3.10 A black light test shall be used to check for oil contamination. Zero oil and grease contamination are
the acceptable limit. Washing with fresh/clean water containing a suitable degreasing agent of partially
painted components shall take place between coats, if surfaces are found to be contaminated.
Reference No: MEP- Reference Rev No: 1 Date: of 41
051361 04/06/2026
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 41
Document
MATLA POWER STATION Identifier 14593 Rev 7
SCOPE OF WORK Effective Date October 2024
Review Date October 2027
3.11 During the corrosion protection process on site care shall be taken to ensure adequate protection of
the surrounding areas and any parts of the ancillary equipment i.e. pumps, filters, valves seats, drains, inlet
and outlet piping from abrasive blasting and spent grit particles, paint.
3.12 No abrasive blasting or lining applications shall take place when conditions are likely to affect these
operations. Clauses 4.1.1.2 to 4.1.1.5 of BS 6374-5 shall apply.
3.13 Different grades and types of blasting media exist. It is important that the correct abrasive be used in
combination with a specific corrosion protection system to achieve the specified surface profile. The
required blast profile height should be carefully considered. The Contractor shall select an appropriate
abrasive type and mesh size to attain the specified surface profile.
3.14 Only inert mineral grit or steel grit abrasives shall be used. Sand or silica-based abrasives shall not be
used. Abrasive material for blast cleaning shall be used in line with local environmental regulations.
3.15 The abrasive shall be used in accordance with the Manufacturerβs specifications and shall be clean,
sound, hard particles free from foreign substances such as dirt, oil, grease, toxic substances, organic
matter and water-soluble salts. It is important that good quality abrasives are used to minimize the amount
of waste grit and dust generated and contamination of the surfaces.
3.16 The use of re-cycled blasting media for the final blast is strictly prohibited.
3.17 All abrasive media shall be stored in an area that is completely dry, covered and protected from
weather.
3.18 All compressed air for blasting and /lining activities shall be free from entrained moisture and oil. All
traps shall be in a functional condition. The compressed air shall be tested at regular intervals using clean
white clothes to assess cleanliness and dryness. This requirement shall be included in the QCP.
3.19 On completion of grit blasting the surface shall be thoroughly vacuumed until no loose dust is evident.
The process shall be repeated until the required level of dust and debris removal is achieved.
3.20 The level of cleanliness required shall be less than βdust quality ratingβ 1 when tested in accordance
with ISO 8502-3. It is imperative that all surface dirt and contaminants are completely removed before
lining or the adhesion of the lining shall be impaired.
3.21 During the corrosion protection process on site care shall be taken to ensure adequate protection of
the surrounding areas and any parts of the ancillary equipment i.e. pumps, filters, valves seats, drains, inlet
and outlet piping from abrasive blasting and spent grit particles, paint.
3.22 Cleaned surfaces shall not be contaminated with oil, grease, rust or other deposits before coating
application. Unnecessary traffic prior to painting/lining shall be avoided.
Reference No: MEP- Reference Rev No: 1 Date: of 41
051361 04/06/2026
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 41
Document
MATLA POWER STATION Identifier 14593 Rev 7
SCOPE OF WORK Effective Date October 2024
Review Date October 2027
3.23 The Contractor shall ensure that during surface preparation and corrosion protection activities the
relative humidity (RH) in open, undercover shop environments is less than 80 % RH and for the vessel
internal space is less than 60% RH. Ambient temperatures shall be between 5 Β°C and 30 Β°C or as per the
Manufacturer recommendations, whichever is the more stringent. The maximum/minimum substrate
temperature at the time of coating application shall be strictly in accordance with the product data sheet.
During stable weather conditions environmental parameters shall be measured and recorded at least 4
times per shift.
3.24 During periods of inclement or cold weather conditions the environmental parameters shall be
measured and recorded hourly. If the latest two readings of any of the parameters indicate a deteriorating
trend which would likely exceed parameter/s limit then no final surface preparation or spray application
shall be permitted. All measurements shall be recorded at the steel surface. Dew point requirements shall
be as per the Product Datasheet or Eskom standards 240-101712128 and 240-106365693.
3.25 To avoid recontamination and flash rusting of the surfaces, the primer shall be applied within 8 hours
after final surface preparation of the steel surfaces. Under no circumstances shall the blast be permitted to
stand overnight.
3.26 If the pre-cleaned substrate has been exposed for more than 8 hours or the cleanliness grade of the
substrate has deteriorated then the substrate will require rework to reinstate the required grade of
cleanliness in accordance with ISO 8501-1.
3.27 Individual rubber sheets shall be tailored to fit the surface to be lined. The lining shall be bonded to
the manhole flange faces. The mating surface of the flange face to gasket shall be suitably dressed such
that the face is acceptably flat to ensure sealing between the liner and the gasket. The application and
flange arrangement shall be as per SANS 1201 Figure 7 a) or c) and the Eskom Engineer requirements.
3.28 All joints of lined rubber shall be strapped as per BS 6374-5.
3.29 All surfaces shall be pinhole tested before strapping with the testing starting from the top of the vessel
downwards as the scaffolding is being dismantled to ensure the lining is pinhole free and if required
additional repairs shall be performed and once cured then the repair areas shall be retested. The process
to be repeated until a pinhole free lining is achieved.
3.30 The rubber lining Manufacturer and Rubber Liner or Contractor shall specify the test voltage and the
length of spark (no less than 2 kilovolts per mm). If the rubber Manufacturer cannot comply then a detailed
motivation describing the reasons why this requirement canβt be met shall be submitted for review,
acceptance or rejection
3.31 The installed lining shall present a smooth appearance and be free of voids, blisters, pinholes, cracks,
open seams, entrapped air or any other defects which will impair its use. Defective areas shall be cause for
rejection of the lining.
Reference No: MEP- Reference Rev No: 1 Date: of 41
051361 04/06/2026
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 41
Document
MATLA POWER STATION Identifier 14593 Rev 7
SCOPE OF WORK Effective Date October 2024
Review Date October 2027
3.32 For all inspections of all surface preparation and coating/lining activities the surfaces shall be clean
allowing unhindered visual access to the surface. The Contractor shall provide sufficient and adequate
lighting (Cool White) to enable inspections. Cell phone lighting is not acceptable
3.33 Prior to commencement of rubber lining/coating the Applicator shall submit detailed repair procedures
in accordance with BS 6374-5. Any defects such as mechanical damage, cuts, blisters, lack of adhesion
and poor joints shall be marked up and repaired according to BS 6374-5 Clause 5.2.4.
3.34 Application of subsequent coats shall be in accordance with the specified system. The required over-
coating intervals as mentioned in the latest Product Data Sheet shall be observed and adhered to.
3.35 The supply and cost of all testing, inspection and specialized testing equipment shall be the
Contractorβs responsibility. QC shall be performed by the Applicator and the Quality Assurance inspection
shall be conducted by Eskom. A series of witness and hold points shall be agreed such that Eskom may
witness any of the above tests. Eskom may elect to carry out its own tests at these times.
4 Safety Requirements and Considerations
4.1 During the application of all coatings/lining systems, care shall be taken to ensure adequate ventilation
and lighting, to avoid/minimise health and safety risks.
4.2 Special care needs to be taken when working with all organic coatings/linings. Prior to the use of any
coating material, the Material Safety Data Sheets shall be obtained from the relevant Coating
Manufacturer.
4.3 A confined spaces (CSs) may be defined as an enclosed, restricted, or limited space in which, because
of its construction, location or contents, or any work activity carried on therein, a hazardous substance may
accumulate and/or an oxygen-deficient atmosphere may occur, and/or in which a dangerous liquid or
dangerous concentration of gas, vapour, dust or fumes may be present. It includes any chamber, tunnel,
pipe, pit, sewer, container, valve, pump, sump, chute, bunker, silo, gearbox, tank, receiver, drum or any
similar construction, equipment, machinery or object.
4.4 Flammable Atmospheres: Gases, vapours and dusts can become trapped in CSs and create
flammable or explosive atmospheres, and include combustibles e.g. Hydrogen, Acetylene, Rubber and
thinning/cleaning solvents, etc.
4.5 The Contractor shall be familiar with the contents of the safety data sheets and ensure that the
necessary safety precautions are taken in order to comply with local and national safety and health
requirements such as the OHS Act.
Reference No: MEP- Reference Rev No: 1 Date: of 41
051361 04/06/2026
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 41
Document
MATLA POWER STATION Identifier 14593 Rev 7
SCOPE OF WORK Effective Date October 2024
Review Date October 2027
4.6 Any solid waste materials or liquids stripped or generated during the coating operations shall be
discarded in accordance with the requirements of the appropriate national and/or local authorities or the
requirements of Eskom.
4.7 The Contractor shall ensure compliance with all statutory regulations, municipal by-laws, etc.
concerning pollution and the health and safety of personnel and/or members of the public who may be
affected by the work. The Contractor shall provide the personnel with the appropriate required PPE.
4.8 The Contractor shall advise Eskom of all hazardous materials to be brought on site.
4.9 The Contractorβs Safety File shall address all the hazardous activities of abrasive blast cleaning and
spray painting. The Contractor shall verify that the personnel carrying out these activities are suitably
qualified.
4.10 The Contractor shall ensure that the abrasive materials used conform to all National Health and
Safety Standards.
4.11 All materials shall be stored in designated areas in storage facilities that meet the storage
requirements of the coating/rubber Manufacturer. The Contractor shall be responsible for the provision of
appropriate storage/shipping containers as required. These containers shall include the appropriate
refrigeration/conditioning systems for temperature control. This requirement shall be dependent on where
the container will be located (indoors/outdoors), typical ambient temperature for the particular season of
the year and the maximum storage temperature limits as per the Manufacturerβs recommendations.
4.12 The Contractor shall provide for all necessary safety precautions and risk assessments.
5 Reference Documents
The latest revision of the referenced standards shall apply. Where conflict exists between any of these
documents the more stringent requirement shall apply.
5.1 240-101712128: Standard for the internal corrosion protection of water systems, Chemical Tanks and
Vessels and Associated Piping with Coatings.
5.2 240-106365693: Standard for the External Corrosion Protection of Plant, Equipment and Associated
Piping with Coatings.
5.3 240-145581571: Standard for the Identification of the Contents of Pipelines.
5.4 ASTM D4414: Standard practice for measurement of wet film DFT by notch gauges.
5.5 ASTM D4541: Standard Method for Pull-off Strength of Coatings using Portable Adhesion Testers.
Reference No: MEP- Reference Rev No: 1 Date: of 41
051361 04/06/2026
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 41
Document
MATLA POWER STATION Identifier 14593 Rev 7
SCOPE OF WORK Effective Date October 2024
Review Date October 2027
5.6 ASTM D5162: Standard Practice for Discontinuity (Holiday) Testing of Nonconductive Protective
Coating on Metallic Substrates.
5.7 ASTM E376: Measuring coating DFT by magnetic field or eddy current electro-magnetic test Methods.
5.8 ASTM F21: Standard Test Method for Hydrophobic Surface Films by the Atomizer Test.
5.9 BS 6374-5: Lining of equipment with polymeric materials for the process industries.
5.10 ISO 2409: Paints and varnishes β Cross cut test
5.11 ISO 4624: Paints and varnishes β Pull-off test for adhesion.
5.12 ISO 4628 β 1: Paints and varnishes β Evaluation of degradation of coatings β Designation of quantity
and size of defects, and of intensity of uniform changes in appearance β Part 1: General introduction and
designation system.
5.13 ISO 4628 β 3: Paints and varnishes β Evaluation of degradation of coatings β Designation of quantity
and size of defects, and of intensity of uniform changes in appearance β Part 3: Assessment of degree of
rusting.
5.14 ISO 8501-1: Preparation of steel substrates before application of paints and related products β Visual
assessment of surface cleanliness β Part 1: Rust grades and preparation grades of uncoated steel
substrates and of steel substrates after overall removal of previous coatings.
5.15 ISO 8502-3: Preparation of steel substrates before application of paint and related products β Test for
the assessment of surface cleanliness β Part 3: Assessment of dust on steel surfaces prepared for painting
(pressure sensitive tape method).
5.16 ISO 8502-6: Preparation of steel substrates before application of paint and related products β Test for
the assessment of surface cleanliness β Part 6: Extraction of soluble contaminants for analysis β The
Bresle method.
5.17 ISO 8503-4: Preparation of steel substrates before application of paint and related products β Surface
roughness characteristics of blast-cleaned steel substrates - Part 4: Method for the calibration of ISO
surface profile comparators and for the determination of surface profile β Stylus instrument procedure.
(May be used as an alternative to SANS 5772).
5.18 ISO 9001: Quality Management Systems - βis defined as the international standard that specifies
requirements for a quality management system (QMS). Organizations use the standard to demonstrate the
ability to consistently provide products and services that meet customer and regulatory requirements.β
5.19 ISO 9223: Corrosion of metal and alloys β Corrosivity of atmospheres β Classification.
Reference No: MEP- Reference Rev No: 1 Date: of 41
051361 04/06/2026
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 41
Document
MATLA POWER STATION Identifier 14593 Rev 7
SCOPE OF WORK Effective Date October 2024
Review Date October 2027
5.20 ISO 12944-3: Paint and varnishes β Corrosion protection of steel structures by protective paint
systems. Part 3: Design considerations.
5.21 SANS 1198: The manufacture of rubber sheeting for rubber lining.
5.22 SANS 1201: The application of rubber linings to pipes, pipe fittings and vessels.
5.23 SANS / ISO 2808: Paints and Varnishes: Determination of film DFTs (Can be used as alternative to
Astm e376).
5.24 SANS 5770: Preparation of steel substrates before the application of paints and related products β
Test for the assessment of cleanliness of blast-cleaned steel surface β Freedom from certain soluble salts.
5.25 SANS 5772: Preparation of steel substrates before the application of paints and related products β
Surface roughness characteristics of blast-cleaned steel surfaces β Profile of blast-cleaned surfaces
determined by a micrometre profile gauge (Can be used as alternative to ISO 8503-4).
5.26 SANS 10037: Rubber, vulcanized or thermoplastic - Determination of tensile stress-strain properties
Reference No: MEP- Reference Rev No: 1 Date: of 41
051361 04/06/2026
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 41
MATLA POWER STATION Document Identifier 14593 Rev 7
SCOPE OF WORK Effective Date October 2024
Review Date October 2027
Appendix B β Drawings
Slurry plant mixers
Reference No: MEP-051361 Reference Rev No: 1 Date: 04/06/2026 of 41
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 41
MATLA POWER STATION Document Identifier 14593 Rev 7
SCOPE OF WORK Effective Date October 2024
Review Date October 2027
AWRSE Tank
Reference No: MEP-051361 Reference Rev No: 1 Date: 04/06/2026 of 41
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 41
Methodology
Source: Scope of Work Vessel Rubberlining Services on as and when required basis for period of 5 years.pdf (unknown)1 Opening and closing of vessels and removal of vessel connecting pipework, internals and laterals and support beams and brackets, and erection of scaffolding
2 Rubber lining pre-inspection (Visual, hardness, and spark testing)
3 Strip and grind off existing rubber from the affected area on the vessel wall using flapper disk
4 Removal of rubber from pipes currently lined pipes
5. Surface preparation of piping
6 Primer, adhesive and rubber lining application to DN 50, 65, 80, 100, 150, 200, 250, 400 Carbon Steel Pipeline, PN10, flanged as per SANS 1123/BS4504. Pipe to be rubber lined with 4 mm 50-70 IRHD butyl Grade B Rubber Internally Pipe lengths 3, 6 or 9 m lengths.
7 Grit blasting of vessels to SA3 (or hand grinding for smaller patch repairs)
8 Primer, adhesive and rubber lining application to vessels and including brackets supports and internals
9 Vessel rubber lining final inspection (Visual, hardness and spark testing)
10 Piping rubber lining final inspection (Visual, hardness and spark testing)
11 Rubber lined areas shall be thoroughly washed with a hose pipe to remove lose dirt and debris.
13 Removal and disposal of all waste rubber lining and sand blasting grit and provide the waste disposal certificate/s
Pricing Schedule
Source: Scope of Work Vessel Rubberlining Services on as and when required basis for period of 5 years.pdfFull description of Material/Spares/Equipment Specifications of Material/Spares/Equipment Stock No Part Number Required
Quantity
1 Vessels Full/partial/patch repair rubber lining Pre-cured Butyl Rubber Lining (Grade B): 50 - 70 IRHD, N/A N/A 140m2 (quote
including primer and adhesives 6mm per metre
square)
2 Vessels Full/partial/patch repair rubber lining Pre-cured Butyl Rubber Lining (Grade B): 50 - 70 IRHD, N/A N/A 120m2 (quote
including primer and adhesives 4.8mm per metre
square)
3 Vessels Full/partial/patch repair rubber lining Chloroprene Rubber Lining 6mm N/A N/A 240m2 (quote
including primer and adhesives (Slurry plant per metre
mixers and AWRSE tank) square)
4 Vessels rubber lining for brackets and supports Pre-cured Butyl Rubber Lining (Grade B): 50 - 70 IRHD, N/A N/A 26m2 (quote
including primer and adhesives 2-3mm per metre
square) *
5 Vessels rubber lining for brackets and supports Chloroprene Rubber Lining 2-3mm N/A N/A 24m2 (quote
including primer and adhesives (Slurry plant per metre
mixers and AWRSE) square) *
5 Vessel grit blasting SA 3 (ISO 8501-1), Dust quality rating 1, Blast profile as 500m2 (quote
per rubber system manufacturers recommendations per metre
square)
6 Vessel hand grinding for (rubber patch repairs) Grade St 3 (ISO 8501-1), 500m2 (quote
per metre
square)
7 Piping rubber removal 500m2 (quote
per m2)
Reference No: MEP-051361 Reference Rev No: 1 Date: 04/06/2026 of 41
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 41
MATLA POWER STATION Document Identifier 14593 Rev 7
Effective Date October 2024
required on site, up to the total value of the contract, contract.
utilising the bill of materials.
Reference No: MEP-051361 Reference Rev No: 1 Date: 04/06/2026 of 41
Contractual Terms
Source: Scope of Work Vessel Rubberlining Services on as and when required basis for period of 5 years.pdf (unknown)Eskom warrants to be able to rubber lining any quantities of the pipelines or vessels listed in the SOW, or any other rubber lining that may be required on site, up to the total value of the contract, utilising the bill of materials.
Section
Source: Scope of Work Vessel Rubberlining Services on as and when required basis for period of 5 years.pdf5.12 ISO 4628 β 1: Paints and varnishes β Evaluation of degradation of coatings β Designation of quantity
5.13 ISO 4628 β 3: Paints and varnishes β Evaluation of degradation of coatings β Designation of quantity
5.18 ISO 9001: Quality Management Systems - βis defined as the international standard that specifies
requirements for a quality management system (QMS). Organizations use the standard to demonstrate the
Quality Department
Scope of work procedure, specification, hold points, responsible
Description
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template 29 June 2026 Published 2.pdfImportant Dates
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template 29 June 2026 Published 2.pdf (RFP)Briefing Session
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template 29 June 2026 Published 2.pdf (RFP)Contact Information
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template 29 June 2026 Published 2.pdf (RFP)Submission Guidelines
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template 29 June 2026 Published 2.pdf (RFP)Evaluation Criteria
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template 29 June 2026 Published 2.pdf (RFP)Tenderers must: (1) Not be under restriction to do business with Eskom or State-Owned Companies; (2) Not have nationality of country on international sanctions list; (3) Not submit more than one tender individually or as JV partner; (4) JV/consortium agreements must state joint and several liability; (5) Not have conflict of interest (no common controlling partners, no relationships enabling access to competitor information); (6) Submit tenders signed by authorised persons only; (7) Not be restricted by National Treasury, on Tender Defaulters list, or restricted by Eskom; (8) Not subcontract 100% of Scope of Work. Failure to meet eligibility criteria results in disqualification.
Technical Specifications
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template 29 June 2026 Published 2.pdf (RFP)Experience & Qualifications
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template 29 June 2026 Published 2.pdf (RFP)Quality Management
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template 29 June 2026 Published 2.pdf (RFP)Pricing Schedule
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template 29 June 2026 Published 2.pdfFinancial Requirements
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template 29 June 2026 Published 2.pdf (RFP)Compliance Requirements
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template 29 June 2026 Published 2.pdf (RFP)B-BBEE Requirements
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template 29 June 2026 Published 2.pdf (RFP)Environmental
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template 29 June 2026 Published 2.pdf (RFP)Special Conditions
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template 29 June 2026 Published 2.pdf (RFP)Requirements
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template 29 June 2026 Published 2.pdf (RFP)Section
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template 29 June 2026 Published 2.pdf (RFP)Description
Source: Eskom Supplier Integrity Pact - 02 June 2023 (1).pdfThe Eskom Supplier Integrity Pact is a formal agreement between Eskom Holdings SOC Ltd and its suppliers that establishes ethical behaviour standards for all procurement interactions.
Key Elements:
This document applies to:
Important Dates
Source: Eskom Supplier Integrity Pact - 02 June 2023 (1).pdf (unknown)No specific dates are stated in this document. The closing date for the tender is recorded in the tender listing, not in this Integrity Pact. Check the official tender advertisement for all relevant dates including briefings, site visits, and clarification deadlines.
Contact Information
Source: Eskom Supplier Integrity Pact - 02 June 2023 (1).pdf (unknown)Ethics Reporting Channels (for reporting dishonest, fraudulent or inappropriate behaviour):
Note: This document does not contain SCM or technical contact details for the specific tender. Refer to the main tender documentation for procurement officer and technical contact information.
Submission Guidelines
Source: Eskom Supplier Integrity Pact - 02 June 2023 (1).pdf (unknown)Required Returnable Documents:
Submission Requirements:
Disqualification Risks:
Evaluation Criteria
Source: Eskom Supplier Integrity Pact - 02 June 2023 (1).pdf (unknown)Vendor Registration
Suppliers must be registered or willing to register on Eskomβs Vendor Database.
Legal Status
Applicants must be a natural or juristic person (e.g., company, contractor, consultant).
Compliance History
Suppliers must not be listed on National Treasuryβs Restricted Suppliers Database.
Ethical Standing
No prior convictions or sanctions for fraud, corruption, or unethical business practices.
Technical Capacity
Ability to provide vessel and piping rubber services for WTP and Slurry Plant (specific technical qualifications may be detailed in separate tender documents).
Technical Specifications
Source: Eskom Supplier Integrity Pact - 02 June 2023 (1).pdf (unknown)This document is the Eskom Supplier Integrity Pact β a general ethics and conduct framework applicable to all Eskom suppliers. It does not contain technical specifications for the vessel and piping rubber services tender.
The document establishes:
For technical specifications regarding the rubber lining services scope, deliverables, and standards, refer to the main tender specification document.
Financial Requirements
Source: Eskom Supplier Integrity Pact - 02 June 2023 (1).pdf (unknown)This document does not contain financial requirements such as pricing formats, bonds, guarantees, payment terms, or financial capacity thresholds. Those requirements would be specified in the main tender documentation for the vessel and piping rubber services procurement.
Gift and Business Courtesy Limits (stated in this document):
Compliance Requirements
Source: Eskom Supplier Integrity Pact - 02 June 2023 (1).pdf (unknown)Mandatory Compliance Documents:
Key Compliance Obligations:
Consequences of Non-Compliance:
Contractual Terms
Source: Eskom Supplier Integrity Pact - 02 June 2023 (1).pdfGoverning Law and Jurisdiction:
Disciplinary Process:
Employee/Director Restrictions:
Validity:
Special Conditions
Source: Eskom Supplier Integrity Pact - 02 June 2023 (1).pdf (unknown)Supplier Obligations:
Specific Confirmations Required:
Consequences:
Eskom Commitments:
Section
Source: Eskom Supplier Integrity Pact - 02 June 2023 (1).pdfNo evaluation criteria are contained in this document. The Supplier Integrity Pact is a mandatory ethics declaration form, not a tender evaluation document. Evaluation criteria for the specific vessel and piping rubber services tender (scoring method, minimum thresholds, preference points) would be found in the main tender specification document.
29 Jun
2026
Tender Published
Tender was published
31 Aug
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Technical Evaluation Criteria Vessel and Piping rubber services for WTP and Slurry Plant.pdf
Invitation to Tender (ITT) or Request for Proposal (RFP) Template 29 June 2026 Published 2.pdf
Eskom Holdings SOC Ltd invites tenders for vessel and piping rubber services at Matla Power Station's Water Treatment Plant (WTP) and Slurry Plant for a 5-year contract period. Tender number E3138GXMPMAT closes on 30 August 2026 at 10:00. The contract will be based on NEC Term Service Contract conditions with priced contract main option. Evaluation uses 90/10 or 80/20 preferential point scoring system.
Scope of Work Vessel Rubberlining Services on as and when required basis for period of 5 years.pdf
Eskom is seeking a contractor to provide vessel and piping rubber lining services for the Water Treatment Plant (WTP) and Slurry Plant at Matla Power Station over a 5-year period. The scope includes inspection, repair, replacement, and maintenance of rubber linings for vessels, pipelines, and associated components to prevent corrosion in harsh chemical and slurry environments. The contract is on an 'as and when required' basis, with strict compliance to Eskom standards, SANS, and international specifications (e.g., ISO, BS).
NEC Vessel and rubber Piping Services.pdf
Eskom seeks a contractor for vessel and piping rubber lining services at Matla Power Station's Water Treatment and Slurry Plants. This is a 5-year, as-and-when-required term service contract based on the NEC3 Term Service Contract (TSC3) framework, with a closing date of August 31, 2026.
Environmental Requirements.pdf
ESKOM seeks a contractor to provide vessel and piping rubber services for the Water Treatment Plant (WTP) and Slurry Plant at Matla Power Station for a 5-year period. The tender places a strong emphasis on environmental compliance, requiring detailed management plans, waste handling procedures, and adherence to environmental legislation.
Quality Requirements SECTION A.pdf
Eskom is seeking a contractor to provide vessel and piping rubber services for the Water Treatment Plant (WTP) and Slurry Plant at Matla Power Station for a 5-year period. The tender emphasizes strict quality management system requirements aligned with ISO 9001:2015 standards.
Environmental Contractors Assessment Form.pdf
This is an environmental management assessment form for contractors bidding on a 5-year vessel and piping rubber services contract at Matla Power Station's WTP and Slurry Plant. The document focuses on environmental compliance and contractor responsibilities rather than technical service specifications.
CONTRACTORS COMMITMENT AND INDEMNITY LETTER.pdf
This document is Annexure D (Contractors Commitment and Indemnity Letter) from a larger tender issued by Eskom for vessel and piping rubber services at Matla Power Station. It specifically outlines the mandatory environmental management requirements for the contractor, as the site is ISO 14001:2015 certified. The core obligation is the establishment and maintenance of an ISO-aligned Environmental Management System (EMS) for the 5-year contract duration.
E-Tenderers E-Tendering Training Acknowledgement Form.pdf
Tender for vessel and piping rubber services at Matla Power Station's WTP and Slurry Plant for a 5-year period, issued by Eskom. The provided document is a mandatory training acknowledgement form for e-tendering.
Annexure B Safety.pdf
This is an OHS (Occupational Health and Safety) acknowledgement form from Eskom for a 5-year tender for vessel and piping rubber services at Matla Power Station's WTP and Slurry Plant. The document outlines strict health and safety compliance requirements that the supplier/contractor must acknowledge and adhere to.
E-tendering Help Manual for supplier - 27 January 2025.pdf
This is not the actual tender specification document but a user manual for Eskom's eTendering system. The tender is for 'Vessel and piping rubber services for WTP and Slurry Plant for a period of 5 years at Matla Power Station'. The document provided details the process for suppliers to electronically submit tender documents via the online portal.
Non-Disclosure Agreement for vendors template.pdf
This is a Non-Disclosure Agreement (NDA) template document for the tender 'Vessel and piping rubber services for WTP and Slurry Plant for a period of 5 years at Matla Power Station'. The document is a standard Eskom confidentiality agreement that potential suppliers/tenderers must sign to receive confidential project information. It establishes terms for protecting Eskom's proprietary information shared during the tender process.
SDL&I strategy for Vessel and piping rubber services for WTP and Slurry Plant.pdf
Eskom seeks a contractor for a 5-year (60-month) contract to provide vessel and piping rubber services for the Water Treatment Plant (WTP) and Slurry Plant at Matla Power Station. The tender is evaluated on an 80/20 preference point system (80 for price, 20 for B-BBEE status). Key focus areas include B-BBEE compliance, supplier development commitments, and strict post-award monitoring and reporting.
Code of Ethics.pdf
The tender is for the provision of vessel and piping rubber services for the Water Treatment Plant (WTP) and Slurry Plant at Matla Power Station over a 5-year period. Issued by Eskom, the document primarily outlines Eskom's Code of Ethics ('The Way'), which governs ethical behavior, values (Integrity, Excellence, Customer Satisfaction, Innovation), and compliance requirements for all employees, contractors, and suppliers. The tender emphasizes adherence to ethical standards, legal compliance, and alignment with Eskomβs policies.
Safety Requirements.pdf
Eskom seeks a service provider for vessel and piping rubber services at Matla Power Station's WTP and Slurry Plant for a 5-year period. The tender emphasizes strict occupational health and safety (OHS) compliance as a mandatory part of the procurement process, with detailed documentation required prior to contract signing and site access.
Supplier declaration of interest.pdf
This is a Supplier Declaration of Interest document for Eskom's tender for vessel and piping rubber services at Matla Power Station's WTP and Slurry Plant (5-year contract). The document requires suppliers to declare any conflicts of interest, relationships with Eskom personnel, and business courtesies exchanged.
20. Eskom life-saving rules.pdf
This is not a tender document but Eskom's Life-Saving Rules Standard (Document 240-62196227, Rev 6). It outlines mandatory safety rules for all work at Eskom sites, including contractors. The referenced tender is for 'Vessel and piping rubber services for WTP and Slurry Plant for a period of 5 years at Matla Power Station' (closing 2026), but the provided content is solely the safety standard that would govern the work environment for that tender.
Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf
This is Eskom's Standard Conditions of Tender document (Rev 12, effective 01 Feb 2025), providing the general procedural framework for the tender process. It outlines the rules, obligations for both Eskom and tenderers, and the evaluation methodology. The specific tender is for 'Vessel and piping rubber services for WTP and Slurry Plant for a period of 5 years at Matla Power Station'. The document itself is the standard template; specific details for this tender (like Tender Data, technical specs, site visit details) are referenced but not included in this excerpt.
Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.docx.pdf
This document is not the main tender specification but a PAYE Questionnaire for service contracts with Eskom. It is used to determine the tax classification of contractors (Personal Service Provider, Labour Broker, Dependent Contractor, or Independent Contractor) for the 2026/2027 tax year, which dictates whether PAYE must be withheld from payments. The associated tender is for vessel and piping rubber services at Matla Power Station.
Eskom Supplier Integrity Pact - 02 June 2023 (1).pdf
Eskom is inviting tenders for vessel and piping rubber services for its Water Treatment Plant (WTP) and Slurry Plant at Matla Power Station, with a contract duration of 5 years. The tender is governed by Eskom's Supplier Integrity Pact, which mandates ethical behavior, transparency, and compliance with South African laws and Eskom's procurement policies.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
EskomContact Person
Boitumelo Molapo
Phone
013-680-3426
[email protected]
Address
Matla Power Station - kriel - Kriel - 2271
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
20
Last checked
29 Jun 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Eskom is South Africa's primary electricity supplier, managing generation, transmission, and distribution.
Median Estimate
RΒ 1Β 057Β 920
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Get deep intelligence on Services: General. Unlock full pricing strategies, bid frequency, and historical win rates.
Learn how to submit a winning bid with these related articles
Your meticulously crafted General sector tender submission can be disqualified for a single, seemingly minor compliance oversight. The reality for South African contractors is that technical competence is no longer sufficient; it is underpinned by a non-negotiable framework of documentary compliance. This regulatory guide: mastering CSD and BBBEE compliance for general sector tenders in south africa provides a comprehensive, step-by-step breakdown of the mandatory registrations and certificates you must secure and present. We detail the precise requirements for CSD, BBBEE, SARS TCS, CIPC, and COIDA, explaining their function within the procurement ecosystem governed by the PFMA and PPPFA. Learn the actionable steps to prepare your business, avoid the most common disqualifying errors, and leverage technology to streamline your compliance process for successful bidding in 2026 and beyond.
For South African General contractors, the path to government procurement is paved with non-negotiable regulatory requirements. The most common barrier to entry is not a lack of capability, but a failure to master the foundational compliance frameworks that govern every bid. This complete regulatory guide to CSD and BBBEE compliance for General sector tender suppliers in South Africa demystifies the process. It provides a meticulous, step-by-step field manual for ensuring your company is fully compliant and audit-ready, enabling you to confidently access the R billions in opportunities across infrastructure maintenance, facilities management, and service delivery within the General sector.
Everything South African general contractors need to know about how to write a winning tender proposal without an in-house bid team in gauteng β covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
This definitive guide provides General sector contractors with the precise, actionable steps required to achieve and maintain CSD and BBBEE compliance for South African public tenders in 2026. Authored by Dr. Sarah Mokwena, a Legal Compliance Specialist, it meticulously walks through the regulatory framework, mandatory registrations, and the critical documentation needed to avoid disqualification. We dissect the common, costly errors made during submission and provide a clear checklist to ensure your bid is responsive and competitive. Learn how to navigate the Central Supplier Database, validate your BBBEE status, and integrate compliance into your tender preparation process.
π‘ Want more tendering tips and strategies?
Explore Our Blog